# Petitions for Waivers of Compliance

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A97-21152

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** August 11, 1997
- **Citation:** 62 FR 43021

## Text

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration

Petitions for Waivers of Compliance

In accordance with Part 211 of Title 49 Code of Federal Regulations
(CFR), notice is hereby given that the Federal Railroad Administration
(FRA) received requests for waivers of compliance with certain
requirements of its safety standards. The individual petitions are
described below, including the parties seeking relief, the regulatory
provisions involved, the nature of the relief being requested, and the
petitioners' arguments in favor of relief.

CSX Transportation, Incorporated

(Waiver Petition Docket Number H-97-4)

CSX Transportation, Incorporated (CSX) seeks approval from FRA to
conduct a test program for the purpose of evaluating recent
technological advancements applied to equipment used in the inspection
of rail for internal flaws. Specifically, CSX proposes to test a rail
inspection system in which the primary rail inspection vehicle
transmits, via radio modem, chart data to a secondary (chase) vehicle
for the purposes of defect verification.
CSX is seeking relief from the requirements of 49 CFR Section
213.5(a), which requires certain actions be taken once the track owner
has notice that the track does not meet all of the requirements of this
part. With respect to the inspection of rail for internal defects, FRA
has historically interpreted this subsection to require that suspect
rail flaw indications be verified by hand test equipment, and remedial
action taken, if necessary, within the same day of the test.
Present practice within the industry, as is the case with current
CSX procedures, is to immediately stop the rail inspection vehicle when
an indication of a possible rail flaw is received by the on-board
equipment. A hand test to verify the existence of the rail flaw is then
performed. CSX maintains that this procedure has limited the rail
inspection vehicles to an average of five miles of testing for every
hour of on-track time. CSX further states that as traffic density
continues to increase, the available on-track time for activities such
as rail inspection continues to decrease.
CSX's petition requests that for certain non-critical rail flaw
indications, hand test verification by the secondary (chase) vehicle
will be accomplished within 48 hours of the time of observation by the
primary test vehicle. All critical rail flaw indications recorded by
the primary test vehicle will be immediately verified by hand test, and
remedial action taken if necessary. In the absence of any critical rail
flaw indications, the primary rail inspection vehicle would be allowed
to continue to test the rail in a non-stop mode.
CSX petitions to implement this test program with dedicated
equipment over approximately 4,000 miles of connected trackage on its
system. CSX maintains that the procedures outlined in this test program
will result in a safety benefit by increasing its on-track test mileage
as well as increasing its testing cycle frequency, therefore creating
additional opportunities to find rail flaws before they grow to service
failure size. Critical rail flaws will be protected as in the past,
while non-critical rail flaws are unlikely to grow to service failure
size in the 48 hour delay time requested for verification.
CSX anticipates that there will not be any additional cost to
either the private sector, consumer, Federal, State and local
governments.

Burlington Northern Santa Fe Railroad Company

[Waiver Petition Docket Number LI-95-14]

The Burlington Northern Santa Fe Railroad Company (BNSF) seeks a
waiver of compliance from 49 CFR 229.9, Railroad Locomotive Safety
Standards--Movement of non-

[[Page 43022]]

complying locomotives. Section 229.9(b) states: ``A locomotive that
develops a non-complying condition enroute may continue to utilize its
propelling motors, if the requirements of paragraph (a) are otherwise
fully met, until the earlier of--

(1) The next calendar day inspection, or
(2) The nearest forward point where the repairs necessary to bring it
into compliance can be made.''

BNSF is requesting an exemption to the requirement of Section
229.9(b) for locomotives that have traction motor failures enroute,
specifically, one or more traction motors cut out, between points in
Illinois and the West Coast of the United States. BNSF would like to
continue the non-complying, cut out traction motor past Argentine Yard
in Kansas City, Kansas. BNSF maintains facilities at Argentine Yard
capable of making the required repairs to bring the locomotive into
compliance. BNSF believes that the waiver, if granted, would greatly
increase the efficiency of its locomotive utilization without adversely
affecting safety.

Union Pacific Railroad Company

[Waiver Petition Docket Numbers LI-97-1 and PB-97-1]

The Union Pacific Railroad Company (UP) seeks a waiver of
compliance from certain regulatory provisions and sections of 49 CFR
Part 229, Railroad Locomotive Safety Standards, and Part 232, Railroad
Power Brakes and Drawbars. Specifically, UP is seeking a waiver of 49
CFR 229.49(a)(1) and 232.10(j)(4) which require the main reservoir
system of each locomotive to be equipped with at least one safety valve
that shall prevent an accumulation of pressure of more than 15 pounds
per square inch above the maximum working air pressure fixed by the
chief mechanical officer of the carrier operating the locomotive; and,
the main reservoir system of each unit being equipped with at least one
safety valve, the capacity of which shall be sufficient to prevent an
accumulation of pressure of more than 10 pounds per square inch above
the maximum setting of the compressor governor fixed by the chief
mechanical officer of the carrier operating the locomotive.
This waiver would apply to the entire UP system (including the
Southern Pacific Railroad (SP) which recently merged with UP). UP seeks
a waiver permitting continued operation of 150 psi main reservoir
safety valve setting with 125 psi maximum working air pressure.
Since the late 1970's, UP reduced its maximum working pressure from
the traditional 135 psi to 125 psi, changing the air compressor
governor setting accordingly to a cut in/out pressure of 120/130 psi as
appropriate under Sections 229.49(b) and 232.10(j)(5). This change was
made in the wake of the oil shortages of the 1970's in an effort to
conserve fuel. As all railroads did not make this change, it was
necessary to leave the safety valve set for 150 psi so that the valves
did not pop continuously when UP locomotives were operated in multiple
with those of foreign lines with the higher working air pressure
settings.
In addition, SP had its safety valves set for 155 psi, with 135 psi
working air pressure. It is further requested in the waiver that this
practice be continued until these locomotives can be brought into UP's
standard, which should be no later than three years after the waiver is
granted. Implementation will be immediately upon approval of this
waiver. There are no anticipated changes in operating practices. UP
claims that no adverse effects are expected on the safety of
operations. The conditions for UP's setting of the safety valve and
maximum working pressure have existed for at least 20 years with no
identified problems. UP believes a greater margin of safety is provided
between the maximum working air pressure and the safety valve setting,
going from a margin of 15 psi to 25 psi. Safety is not believed to be
sacrificed in any manner. The maximum pressure that may exist in the
main reservoir remains at the same levels that have always existed--150
psi (155 psi in SP's case). The main reservoirs were not modified; they
carry the same burst pressure limits for which they were originally
designed. The required differentials between maximum brake pipe
pressure and air compressor cut in/cut out have been maintained. The
reduction of the maximum working air pressure is not an issue of
consideration as this is set by the carrier's chief mechanical officer.
It is also asserted that fuel consumption will be favorably affected by
approval of this waiver request, due to not having the air compressor
cut in for longer periods in order to maintain higher air pressure. The
environment (emissions) is also benefited through the consumption of
less fuel.

Iowa Railroad Historical Society

[Waiver Petition Docket Number PB-96-1]

The Iowa Railroad Historical Society, Boone & Scenic Valley
Railroad (BSV), seeks a permanent waiver of compliance from 49 CFR Part
232, Section 17(b)(2), on a passenger car equipped with U type air
brakes by extending the clean, oil, test, and stencil (COT&S) period
from 15 calendar months to 15 operating months.
On December 6, 1996, BSV was granted a waiver of compliance
(Docketed PB-96-1) from the requirements to perform COT&S every 15
calendar months as required by Section 232.17(b)(2) and as specified in
Standard S-045 in the Manual of Standards and Recommended Practices of
the Association of American Railroads A-III-256, Section 2.1.2. The
waiver applies to only the eight cars BSV specified in the original
request and extends the COT&S period from 15 calendar months to 24
calendar months, with a single car test required every 12 months. BSV
inadvertently left out Lackawana car 3218 in the original request and
hereby requests that this car be included under the same requirements
as specified for the eight cars in the original waiver.
BSV is a non-profit tourist line that operates only six months a
year, with one trip per day during the week and three trips on Saturday
and Sunday over a 15-mile captive service route originating in Boone,
Iowa. BSV explains that they have been performing the COT&S every 12
calendar months at a considerable expense for six months of operation,
and that by granting this waiver they would perform the COT&S every 24
months for 12 months of operation.

Port of Pend Oreille dba Pend Oreille Valley Railroad

[Waiver Petition Docket Number RSGM-96-2]

The Port of Pend Oreille dba Pend Oreille Valley Railroad (POVA)
seeks a waiver of compliance from 49 CFR 223.11(c) which requires that
locomotives built or rebuilt prior to July 1, 1980, be equipped with
certified glazing in all locomotive cab windows. POVA requests a
permanent waiver of compliance for its locomotive POVA 103, built by
General Electric in December 1956, which is not equipped with certified
glazing. The locomotive will be utilized in work train service.

Electric Transport of America, Incorporated

[Waiver Petition Docket Number RSGM-96-12]

Electric Transport of America, Incorporated, (ETA) seeks a waiver
of compliance from 49 CFR 223.9(a) which requires that locomotives,
including yard locomotives, built or rebuilt after June 30, 1980, be
equipped with certified glazing in all locomotive cab windows. ETA
requests a waiver for one locomotive imported from the Czech

[[Page 43023]]

Republic. It is a 49 ton diesel-electric locomotive. ETA intends to
market the switcher locomotive to industrial operators in North
America. The Ohio Central Railroad has agreed to allow the locomotive
to be demonstrated within its Coshocton Yard, Coshocton, Ohio.

Austin & Texas Central Railroad

[Waiver Petition Docket Number RSGM-97-2]

The Austin & Texas Central Railroad (ATCX) seeks a permanent waiver
of compliance with the Safety Glazing Standards, 49 CFR Part 223.15(c),
which requires certified glazing in all windows of passenger cars and
at least four emergency windows, for its three passenger coach cars:
former NKP-151, known as the City of Chicago; former MP-640, known as
the Eagle Cliff; and former ATSF-1343, known as the Red Rock. These
cars have double pane glazing consisting of a sheet of laminated safety
plate as the inside sheet, and a sheet of Polycarbonate laminated
safety plate or polished plate as the outer sheet in the lounge areas
and hallways. ATCX is a museum type excursion operation which is a
project of the Austin Steam Train Association, a 501-(c)(3) non-profit
corporation. Since 1992, operation has been on weekends for 10 months
each year along with some weekday operation. During this time period,
the railroad reports that there have been no acts of vandalism
involving any glazing location associated with the operation of a
train.
ATCX proposes that any time a glazing location must be renewed, for
any reason, the glazing location will be renewed with certified
glazing, if mechanically possible, without alterations to the structure
or function of the car.

Gettysburg Railway Company

[Waiver Petition Docket Number RSGM-97-3]

The Gettysburg Railway Company (GETY) seeks a waiver of compliance
from 49 CFR Part 223.9(a) which requires that locomotives, including
yard locomotives, built or rebuilt after June 30, 1980, be equipped
with certified glazing in all locomotive cab windows. GETY requests a
waiver for two rebuilt F-7 locomotives. GETY intends to use these
locomotives in low speed (20 mph) passenger excursions in Gettysburg,
Pennsylvania.

Union Pacific Railroad Company

[Waiver Petition Docket Number RST-97-2]

Union Pacific Railroad Company (UP) seeks approval from FRA to
electronically submit and maintain track inspection records. UP is
requesting that FRA waive the requirements of 49 CFR 213.241,
Inspection records, and permit it to use an electronic reporting system
for submitting and maintaining track inspection records. Relief is
sought from the requirement that each record shall be signed by the
person making the inspection.
UP states that the electronic system for creating and maintaining
track inspection records will provide for the integrity and security of
each record. The system will provide for several levels of security to
uniquely identify the person as the author of that record with a date
and time stamp that the record was created. Once a record is created,
it cannot be modified. UP believes that the electronic system will not
only be beneficial economically, but will be more flexible for Federal
and State track inspectors who inspect the records.

Yakima Valley Rail and Steam Museum

[Waiver Petition Docket Number SA-93-1]

The Yakima Valley Rail and Steam Museum (YVRX) seeks a waiver of
compliance from 49 CFR 231.30 (c) and (f), which requires that a
locomotive used in switching service be equipped with four switching
steps and must have means for operating the uncoupling mechanism safely
from the switching step as well as from ground level, for its
locomotive #4. Locomotive #4 is a Plymouth locomotive built in 1943.
YVRX states that the rear of the locomotive is not equipped with corner
stairways or switching steps, and the uncoupling mechanism must be
operated from the ground. If the waiver is granted, the locomotive will
be utilized to haul approximately 100 cars a year from Toppenish,
Washington, to Harrah, Washington, a distance of about 10 miles, and 4
cars per year between Toppenish, Washington, and White Swan,
Washington, a distance of 21 miles.

Napa Valley Wine Train, Incorporated

[Waiver Petition Docket Number SA-94-7]

The Napa Valley Wine Train, Incorporated, (NVRR) seeks a waiver of
compliance from 49 CFR 231.30 (c) and (f), which requires that a
locomotive used in switching service be equipped with four switching
steps with a minimum width of eighteen inches (locomotives built prior
to April 1, 1977) and that the uncoupling mechanisms be safely operated
from the switching steps as well as ground level, for their locomotive
#52. Locomotive #52 is a General Electric locomotive built in 1943.
NVRR states that the switching steps at all four locations are 14
inches wide. The locomotive uncoupling mechanisms are not equipped to
allow for uncoupling from the switching steps and must be operated from
the ground. If the waiver is granted, NVRR states the locomotive will
occasionally be utilized in interchange freight service.

Union Pacific Railroad Company

[Waiver Petition Docket Number SA-97-1]

The Union Pacific Railroad Company (UP) seeks a waiver of
compliance from 49 CFR Part 231.27, Box and other house cars without
roof hatches or placed in service after October 1, 1966, which requires
in part that cars be equipped with end platforms and end platform
handholds in addition to 16 end and 16 side handholds. UP is requesting
that it be permitted to operate 273 high side gondola cars with
removable fiberglass covers. The cars, UP 97700 through 97489 and UP
97850 through 97999, were originally constructed and approved in
accordance with 49 CFR 231.2, Hopper cars and high-side gondolas with
fixed ends, which requires side and end ladders in addition to side and
end handholds, but does not require end platforms, end platform
handholds, nor the 16 end or 16 side handholds.
The cars were subsequently equipped with temporary removable
fiberglass covers to protect contaminated earth for movement solely by
UP from Chicago, Illinois, to Clive, Utah, a distance of about 1700
miles. UP states that these cars are in captive service and have
operated more than two years without incident. UP also states that upon
expiration of the three year contract to haul the contaminated earth,
the fiberglass covers will be removed and scrapped with the cars being
returned to general service. Additionally, UP states that it would be
an unjustified economic loss to modify the cars to comply with Section
231.27, then upon expiration of the contract remodify them to comply
with Section 231.2.

Belfast & Moosehead Lake Rail Road Company

[Waiver Petition Docket Number SA-97-2]

The Belfast & Moosehead Lake Rail Road Company seeks a waiver of
compliance from 49 CFR Section 231.15(b), Railroad Safety Appliance
Standards--Steam locomotives used in road service, Pilot sill-steps.
Section 231.15(b) states that each steam locomotive used in road
service shall be equipped with two pilot sill steps mounted on or near
each end of buffer-beam outside of the rail and not more

[[Page 43024]]

then sixteen inches above the top of the rail.
The Belfast & Moosehead Lake Rail Road Company is requesting an
exemption to the requirement of these steps (2) for their steam
locomotive #1149. The railroad states that due to the design and
placement of the locomotive cylinders and pilot truck, the steps cannot
be applied without substantially rebuilding the front of the
locomotive. Also, application of the pilot sill steps would block
access to the pilot truck journal boxes, make inspections more
difficult, and possibly interfere with the movement of the locomotive's
outside-frame pilot truck. Employees of the Belfast & Moosehead Lake
Rail Road Company are not permitted to ride the pilot of the
locomotive.
Interested parties are invited to participate in these proceedings
by submitting written views, data, or comments. FRA does not anticipate
scheduling a public hearing in connection with these proceedings since
the facts do not appear to warrant a hearing. If any interested party
desires an opportunity for oral comment, they should notify FRA, in
writing, before the end of the comment period and specify the basis for
their request.
All communications concerning these proceedings should identify the
appropriate docket number (e.g., Waiver Petition Docket Number H-97-4)
and must be submitted in triplicate to the Docket Clerk, Office of
Chief Counsel, FRA, Nassif Building, 400 Seventh Street, S.W., Mail
Stop 10, Washington, D.C. 20590. Communications received within 30 days
of the date of this notice will be considered by FRA before final
action is taken. Comments received after that date will be considered
as far as practicable. All written communications concerning these
proceedings are available for examination during regular business hours
(9:00 a.m.-5:00 p.m.) at FRA's temporary docket room located at 1120
Vermont Avenue, N.W., Room 7051, Washington, D.C. 20005.

Issued in Washington, D.C. on August 6, 1997.
Grady C. Cothen, Jr.,
Deputy Associate Administrator for Safety Standards and Program
Development.
[FR Doc. 97-21152 Filed 8-8-97; 8:45 am]
BILLING CODE 4910-06-P

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A97-21152. Public record. Not legal advice.
