# Lower Eldorado Ecosystem Management Project, Clearwater National Forest, Clearwater County, Idaho

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A97-20932

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** August 8, 1997
- **Citation:** 62 FR 42739

## Text

DEPARTMENT OF AGRICULTURE

Forest Service

Lower Eldorado Ecosystem Management Project, Clearwater National
Forest, Clearwater County, Idaho

AGENCY: Forest Service, USDA.

ACTION: Notice; intent to prepare environmental impact statement.

-----------------------------------------------------------------------

SUMMARY: The Forest Service will prepare an environmental impact
statement (EIS) to disclose the environmental effects of proposed
timber harvest which would remove approximately 18.7 million board feet
of timber from 2,146 acres and build 6.2 miles of new roads. To improve
watershed conditions, the proposal would also close up to 30 miles of
roads in the area which are no longer needed.
The area is located on the Pierce District of the Clearwater
National Forest, Townships 33, 34, and 35 North, Ranges 6 and 7 East,
Boise Meridian.
The purpose of the proposal and subsequent effects analysis is to
meet the intent of the Clearwater Forest Plan, using an ecosystem
management approach for the 13,995 acre analysis area. Management Areas
(MA) within the analysis area include: MA-E1, emphasizing growth and
yield of timber; MA-C4, emphasizing big game winter range and timber
production; MA-M1, emphasizing research natural areas; MA-M2,
emphasizing riparian management; and MA-A6, emphasizing historic travel
routes.

DATES: Comments concerning the scope of the analysis should be received
in writing by September 22, 1997.

ADDRESSES: Send written comments to Douglas Gober, District Ranger, Rt.
2, Box 191, Kamiah, ID 83536.

FOR FURTHER INFORMATION CONTACT:
Lois Hill, EIS Project Team Leader, (208) 935-2513.

SUPPLEMENTARY INFORMATION: In response to the public demand for
sustainable forest management, the Forest Service has developed an
ecologically based, integrated resource approach to the management of
National Forest lands. ``Ecosystem Management'' means recognizing the
complexity and interdependencies of resources within ecosystems, so the
effects of management actions can be predicted and monitored after
activities occur.
A landscape level vegetation assessment was conducted in 1996. The
results indicate that the present species and age class distributions
in this area would not have occurred under natural conditions. Large
numbers of small trees are present, due to over fifty years of wildfire
suppression. Crowded stands are susceptible to root rot pathogens, bark
beetles, defoliators, and dwarf mistletoe. The loss of western white
pine through blister rust, along with fire suppression, has led to a
percentage of grand fir in many stands which is much higher than that
which occurred historically. The 1996 assessment also indicated that
late mature stands are lacking in this area, and often occur in smaller
patches than would have occurred naturally. Natural patch sizes in this
area ranged up to 20,000 acres.
The proposed action is designed to restore terrestrial and aquatic
ecosystem health, and to provide benefits to people within the
capabilities of the ecosystem. Vegetation treatments to reintroduce
western white pine would be considered. Prescribed regeneration and
intermediate harvest would improve forest composition and function.
Commercial and precommercial thinning would improve species
composition, moving toward a mix more consistent with historical
conditions. Intermediate treatments in over-stocked, stressed sites
would target grand fir, while maintaining desirable seral species such
as western white pine, ponderosa pine, and western larch. Silvicultural
management practices would be analyzed for their potential to keep old
stands longer. Dead and dying timber in the area would be salvaged.
The proposal includes timber harvest of varying intensities, from
rehabilitation only (slashing nonmerchantable dead trees and
replanting) to clearcuts with reserve trees. Harvest practices may not
follow traditional unit configurations or prescriptions. The natural
changes in tree densities, natural history, and health of the landscape
will dictate how areas would be treated. Biological corridors and
riparian areas in the natural landscape would be considered, as well as
human imposed landscapes and restrictions such as visual quality
corridors, cultural sites, and recreation areas. Harvest prescriptions
may be scattered, span large areas, or overlap.
Because some streams in the area are not meeting desired instream
conditions for cobble embeddedness, erosion sources in the watershed
would be corrected by closing and stabilizing roads that are no longer
needed. Culvert replacements, riparian planting, instream rock and
woody debris clusters, channel constriction structures, log drop
structures. and sediment traps would be proposed to improve fish
habitat conditions or accessibility. The proposal would also include
riparian planting to improve stream shading and woody debris
availability.
Views from the Lewis and Clark trail, which runs through a portion
of the analysis area, would be protected through site specific
silvicultural prescriptions.
The decision to be made is what, if anything, should be done to
address the following issues in the Lower Eldorado Project Area: (a)
Treating vegetation to respond to concerns about overly dense stands;
(b) increasing patch sizes to more closely resemble landscape patterns
that occurred historically, while retaining as much of the late
successional component as possible; (c) preserving scenic quality near
the Lewis and Clark trail for the long term; (d) managing the road
system to improve watershed conditions while maintaining an adequate
long term transportation system in the area; and (e) increasing timber
productivity and contributing to the Forest's sustained yield of timber
products.
Preliminary alternatives to the proposed action have been developed
in response to issues raised during internal scoping. They include: (a)
An alternative which would propose no timber harvest adjacent to the
Lewis and Clark Trail; (b) an alternative which would minimize new road
construction; and (c) an alternative which would reduce overabundant
immature and mature stands in the Lolo drainage;

[[Page 42740]]

Public participation will be an important part of the analysis.
Internal scoping began with the development of the Pierce Ranger
District Five Year Plan in early January, 1997. External scoping will
begin with this notice. Public meetings to announce this proposal,
including at least one field review of the project area, will be
scheduled between July and September of 1997. Issues which emerge from
internal and external scoping will be used to develop additional
alternatives to this proposal.
The lead agency for this project is the U.S. Forest Service. The
Forest Service will cooperate with other Federal agencies, as well as
County, State, and tribal governments who display an interest in the
project, and who require assessment and concurrence.
The responsible official for decisions regarding this analysis is
James Caswell, Clearwater National Forest Supervisor. His address is
12730 Highway 12, Orofino, ID 83544.
The draft EIS is expected to be filed with the Environmental
Protection Agency (EPA) and available for public review in January,
1998. At that time, the EPA will publish a Notice of Availability of
the draft EIS in the Federal Register. The comment period on the draft
environmental impact statement will be 45 days from the date the
Environmental Protection Agency publishes the notice of availability in
the Federal Register. The final EIS is scheduled to be completed by
May, 1998.
The Forest Service believes, at this early stage, it is important
to give reviewers notice of several court rulings related to public
participation in the environmental review process. First, reviewers of
draft environmental impact statements must structure their
participation in the environmental review of the proposal so that it is
meaningful and alerts an agency to the reviewer's position and
contentions. Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519,
553 (1978). Also, environmental objections that could be raised at the
draft environmental impact statement stage but that are not raised
until after completion of the final environmental impact statement may
be waived or dismissed by the courts. City of Angoon v. Hodel, 803 F.2d
1016, 1022 (9th Cir. 1986) and Wisconsin Heritages, Inc. v. Harris, 490
F. Supp. 1334, 1338 (E.D. Wis. 1980). Because of these court rulings,
it is very important that those interested in this proposed action
participate by the close of the 45 day comment period so that
substantive comments and objections are made available to the Forest
Service at a time when it can meaningfully consider them and respond to
them in the final environmental impact statement.
To assist the Forest Service in identifying and considering issues
and concerns on the proposed action, comments on the draft
environmental impact statement should be as specific as possible. It is
also helpful if comments refer to specific pages or chapters of the
draft statement. Comments may also address the adequacy of the draft
environmental impact statement or the merits of the alternatives
formulated and discussed in the statement. Reviewers may wish to refer
to the Council on Environmental Regulations for implementing the
procedural provisions of the National Environmental Policy Act of 40
CFR 1503.3 in addressing these points.
Comments received in response to this solicitation, including names
and addresses of those who comment, will be considered part of the
public record on this proposed action and will be available for public
inspection. Comments submitted anonymously will be accepted and
considered; however, whose who submit anonymous comments will not have
standing to appeal the subsequent decision under 36 CFR part 215 or
217.

Dated: July 31, 1997.
James L. Caswell,
Forest Supervisor.
[FR Doc. 97-20932 Filed 8-7-97; 8:45 am]
BILLING CODE 3410-11-M

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A97-20932. Public record. Not legal advice.
