# Southern Natural Gas Company; Notice of Intent to Prepare an Environmental Assessment for the Proposed East Tennessee Expansion Project and Request for Comments on Environmental Issues

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A97-17691

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** July 8, 1997
- **Citation:** 62 FR 36507

## Text

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket No. CP97-526-000]

Southern Natural Gas Company; Notice of Intent to Prepare an
Environmental Assessment for the Proposed East Tennessee Expansion
Project and Request for Comments on Environmental Issues

July 1, 1997.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the construction and operation of
the facilities proposed by the Southern Natural Gas Company (Southern)
for its East Tennessee Expansion Project.\1\ This EA will be used by
the Commission in its decision-making process to determine whether the
project is in the public convenience and necessity.
---------------------------------------------------------------------------

\1\ Southern's application was filed with the Commission on May
15, 1997 under Section 7 of the Natural Gas Act and Part 157 of the
Commission's regulations.
---------------------------------------------------------------------------

Summary of the Proposed Project

Southern proposes to expand the capacity of certain of its
facilities in

[[Page 36508]]

Tennessee, Georgia, and Alabama to meet requests from 15 shippers for
firm transportation service totaling about 65,000 thousand cubic feet
per day of natural gas. Southern seeks authority to construct and
operate the following facilities:
East Tennessee Lateral--2.9 miles of 8-inch-diameter
pipeline, in Catoosa County, Georgia and Hamilton County, Tennessee.
Ocmulgee-Atlanta Loop \2\--8.0 miles of 30-inch-diameter
pipeline, in Spalding and Henry Counties, Georgia.
---------------------------------------------------------------------------

\2\ A loop is a segment of pipeline installed adjacent to an
existing pipeline and connected to the existing line on both ends.
The loop allows more gas to be moved through the pipeline system.
---------------------------------------------------------------------------

2nd North Main Loop--2.8 miles of 24-inch-diameter
pipeline, in Pickens County, Alabama.
South Main 3rd Loop--4.6 miles of 30-inch-diameter
pipeline, in Perry County, Alabama.
Macon Branch Loop Line--replace 10.0 miles of existing 12-
inch-diameter pipeline with 16-inch-diameter pipeline, in Fulton and
Clayton Counties, Georgia.
Cartersville Gate Regulator Station--new regulator station
at milepost (MP) 41.6 on Southerns Chattanooga Line in Floyd County,
Georgia.
East Tennessee Meter Station--new meter station at the
terminus of Southerns proposed East Tennessee Lateral, in Hamilton
County, Tennessee.
Cleveland Branch Meter Station--expand an existing mater
station at MP 21.1 on Southerns Cleveland Branch Line, in Bradley
County, Tennessee.
Rome Compressor Station--new 4,700 horsepower (hp)
compressor station at MP 51.2 on Southerns Chattanooga Line in Floyd
County, Georgia.
York Compressor Station--uprate two existing compressor
units from 6,500 hp each to 9,160 hp, in Sumter County, Alabama.
Auburn Compressor Station--uprate two existing compressor
units from 6,500 hp each to 9,160 hp, in Lee County, Alabama.
Bell Mills Compressor Station--add a new 1,600 hp
compressor unit to an existing compressor station, in Cleburne County,
Alabama.
Chattanooga Line--increase the maximum allowable operating
pressure from the existing 1,114 pounds per square inch gage (psig) to
1,200 psig in two segments, from about MP 0.8 to MP 41.6 and MP 51.2 to
MP 114.9.
The general location of the proposed project facilities are shown
in appendix 1.\3\ Southern indicated the project would cost
$52,179,005, and seeks an in-service date of November 1998.
---------------------------------------------------------------------------

\3\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available from the
Commission's Public Reference and Files Maintenance Branch, 888
First Street, NE., Washington, DC 20426, or call (202) 208-1371.
Copies of the appendices were sent to all those receiving this
notice in the mail.
---------------------------------------------------------------------------

Land Requirements for Construction

Construction of the proposed facilities would disturb a total of
about 353 acres. Of this, about 181 acres is currently existing
permanent right-of-way, and about 27 acres would be added as new
permanent right-of-way. The other 145 acres of temporary construction
right-of-way would be restored and allowed to revert to its former use.

The EA Process

The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
We call this ``scoping.'' The main goal of the scoping process is to
focus the analysis in the EA on the important environmental issues. By
this Notice of Intent, the Commission requests public comments on the
scope of the issues it will address in the EA. All comments received
are considered during the preparation of the EA. State and local
government representatives are encouraged to notify their constituents
of this proposed action and encourage them to comment on their areas of
concern.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:

Geology and soils
Water resources, fisheries, and wetlands
Vegetation and wildlife
Air quality and noise
Endangered and threatened species
Cultural resources
Land use
Public safety

We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to Federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we make
recommendations to the Commission.

Currently Identified Environmental Issues

We have already identified several issues that we think deserve
attention, based on a preliminary review of the proposed facilities and
environmental information provided by Southern. These issues include:
Karst features, sinkholes, caves, and limestone deposits
in the vicinity of the East Tennessee Lateral and South Main 3rd Loop.
Potential for landslides or ground failure in the vicinity
of the East Tennessee Lateral and Rome Compressor Station.
Potential for paleontological resources in the vicinity of
the South Main 3rd Loop.
Prime farmland in the vicinity of the East Tennessee
Lateral, Ocmulgee-Atlanta Loop, 2nd North Main Loop, South Main 3rd
Loop, Rome Compressor Station, and East Tennessee Meter Station.
Crossing 32 perennial waterbodies, all classified as
warmwater fisheries, of which two streams (Cahaba River and a tributary
to the Cahaba) are over 100 feet wide.
Crossing 36 wetlands totaling 9.5 acres.
Crossing three streams with the potential for sensitive
mussel species.
Eleven archaeological sites identified along proposed
project components.
Eighteen residences within 50 feet of the construction
right-of-way.
This preliminary list of issues may be changed based on your
comments and our analysis.

Public Participation

You can make a difference by sending a letter addressing your
specific comments or concerns about the project. You should focus on
the potential environmental effects of the proposal, alternatives to
the proposal (including alternative locations and routes), and measures
to avoid or lessen environmental impact. The more specific your
comments, the more useful they will be. Please follow the instructions
below to ensure that your

[[Page 36509]]

comments are received and properly recorded:
Send two copies of your comments to:

Lois Cashell, Secretary, Federal Energy Regulatory Commission, 888
First St., N.E., Room 1A, Washington, D.C. 20426;
Reference Docket No. CP97-526-000; and
Mail your comments so that they will be received in
Washington, D.C. on or before August 4, 1997.

Becoming an Intervenor

In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding, known as an
``intervenor.'' Among other things, intervenors have the right to
receive copies of case-related Commission documents and filings by
other intervenors. Likewise, each intervenor must provide copies of its
filings to all other parties on the Commission's service list for this
proceeding. If you want to become an intervenor you must file a motion
to intervene according to Rule 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.214) (see appendix 2).
The date for filing timely motions to intervene in this proceeding
has passed, having ended June 23, 1997. Therefore, parties now seeking
to file late interventions must show good cause, as required by Section
385.214(b)(3), why this time limitation should be waived. Environmental
issues have been viewed as good cause for late intervention. You do not
need intervenor status to have your scoping comments considered.
Lois D. Cashell,
Secretary.
[FR Doc. 97-17691 Filed 7-7-97; 8:45 am]
BILLING CODE 6717-01-M

---