DEPARTMENT OF AGRICULTURE
Forest Service

Poorman Project; Including Timber Harvest, Prescribed Fire, Fish
and Wildlife Habitat Improvement, and Road and Trail Construction,
Helena National Forest, Lewis & Clark County, MT

AGENCY: Forest Service, USDA.

ACTION: Notice; intent to prepare Environmental Impact Statement.

-----------------------------------------------------------------------

SUMMARY: The USDA, Forest Service is gathering information and
preparing an Environmental Impact Statement (EIS) for the Poorman
Project located approximately 26 air miles northwest of Helena,
Montana.
The Forest Service proposes to treat approximately 1450 acres with
regeneration harvest treatments, 750 acres with stand replacement fire,
650 acres with commercial thinning, 4950 acres with grass/shrub/
underburning, close three miles of existing road, relocate \1/4\ miles
of existing road, construct one mile of new trail, hydromulch erosive
sites along existing roads, and install other erosion control
structures within the project area. Approximately 16 miles of new
system road construction, and two miles of temporary road construction
is needed to access treatment areas. All temporary roads will be
obliterated after harvest. All new system road will be closed.
The proposal is designed to help achieve the goals and objectives
of the 1986 Helena National Forest Plan and move selected areas towards
the desired conditions identified from the Forest Plan. These needs are
supported by the findings of the Blackfoot Landscape Analysis. The
purpose is to maintain healthy, sustainable ecosystems that (1) reduce
fire risk, (2) provide wildlife habitat similar to the habitat that
existed when fire was a natural component of the ecosystem, (3) protect
soil and water, (4) provide recreation opportunities, and (5) provide
wood for people's use.
A Forest Plan amendment is proposed to change management direction
for the M-1 management area. Further analysis of the proposed action
and alternatives to that proposal may result in a decision(s) that
include amendments to the Forest Plan.

DATES: Comments concerning the scope of the analysis should be received
in writing on or before April 8, 1996.

ADDRESSES: The responsible official is Thomas J. Clifford, Forest
Supervisor, Helena National Forest, Supervisor's Office, 2880 Skyway
Drive, Helena, MT 59601. Phone: (406) 449-5201.

FOR FURTHER INFORMATION CONTACT:
Gilbert Zepeda, District Ranger, Lincoln Ranger District, P.O. Box 219,
Lincoln, MT 59639. Phone: (406) 362-4265; or Tom Andersen,
Interdisciplinary Team Leader, Helena National Forest, 2880 Skyway
Drive, Helena, MT 59601. Phone: (406) 449-5201.

SUPPLEMENTARY INFORMATION: The prescribed burning, and timber sale(s)
with associated road construction, would occur on National Forest lands
in portions of the Poorman Creek, South Fork of Humbug Creek, and Bear
Creek of the Lincoln Ranger District. Included in the area being
analyzed is all or portions of T.14N., R.8W., Section 26 and 32;
T.14N., R.7W., Sections 30-32; T.13N., R.9W., Sections 12-14, 23 and
24; T.13N., R.8W., Sections 1-36; T.13N., R.7W., Sections 4-9, 16-23,
26-34, Montana Principle Meridian.
Portions of the prescribed fire treatment units, road construction
and tree harvest are within the Crater Mountain roadless area (1604)
and Nevada Mountain roadless area (1606). Approximately 3050 acres of
prescribed burning, 1150 acres of tree harvest and 13 miles of
specified road construction and one mile of temporary road construction
are proposed in the roadless areas.
The areas of proposed tree harvest are within the following
management areas:
T-1 Management areas are available and suitable for timber
harvest.
T-2 Should be maintained or enhanced for big game winter range for
which programmed timber harvest and prescribed fire may be used.
T-3 Should be managed in such a way to maintain and/or enhance
habitat characteristics favoring elk and other big game species
allowing the use of programmed timber harvest and prescribed fire.
T-5 Timber management ground that increased forage production is
favored in which timber harvest and prescribed fire can be used.
W-1 Wildlife (summer and winter range) and old growth potential is
optimized in the long run. Timber harvest and prescribed fire can be
used only if they can be used as tools to maintain or enhance wildlife
habitat values. These areas are generally classified as unsuitable for
timber management.
W-2 Important spring, summer and fall habitat for big game, such
as elk and deer. Forage for both big game and livestock must be
provided. Timber harvest and prescribed fire can be used only to
maintain or enhance habitat values.
M-1 Timber management and range or wildlife habitat improvements
are currently uneconomical or environmentally infeasible.
The decisions to be made, based on this environmental analysis,
are:
1. Whether or not to treat the vegetation at this time, and if so,
how would the treatments be accomplished.
2. What type of transportation system will be necessary to
accomplish the vegetation management objectives, while considering
other resource transportation needs and objectives.
If it is decided to treat the vegetation at this time, activities
may begin as early as 1997 and take up to 10 years to implement.
This EIS will tier to the Helena Forest Plan Final EIS of April
1986, that

[[Page 10723]]
provides program goals, objectives and standards and guidelines for
conducting management activities in this area. All activities
associated with the proposal will be designed to maintain or enhance
the resource objectives identified in the Forest Plan and further
refined in the Blackfoot Landscape Analysis.
The Forest Service is seeking information and comments from
Federal, State, local agencies and other organizations or individuals
who may be interested in or affected by the proposed action. The Forest
Service invites written comments and suggestions on the issues for the
proposal and the area being analyzed. Information received will be used
in preparation of the Draft EIS. Preparation of the EIS will include
the following steps:
1. Identification of potential issues.
2. Identification of issues to be analyzed in depth.
3. Elimination of insignificant issues or those that have been
covered by a relevant previous environmental analysis.
4. Identification of additional reasonable alternatives.
5. Identification of potential environmental effects of the
alternatives.
Prescribed harvest treatments in this proposal include evenaged
management techniques of clearcutting, with reserves, seed tree with
reserves and shelterwood with reserves. Intermediate treatments such as
commercial thinning will also be considered. Prescribed burning will be
used to treat nonforested and forested vegetation. Alternatives to this
proposal will include the ``no action'' alternative, in which none of
the proposed treatments would be implemented. Other alternatives will
examine variations in the location, amount and method of vegetative
management.
The preliminary issues identified are:
1. The effects on forest health and sustaining ecosystems.
2. The effects on recreation and visual resources.
3. The effects on wildlife.
4. The effects on the roadless and wilderness character of the
Crater Mountain and Nevada Mountain Roadless Areas.
5. The effects on fish, water quality, and riparian areas.
6. The effects on project area economics.
The Forest Service will analyze and disclose in the DEIS and FEIS
the environmental effects of the proposed action and a reasonable range
of alternatives. The DEIS and FEIS will disclose the direct, indirect
and cumulative environmental effects of each alternative and its
associated site specific mitigation measures.
Public participation is especially important at several points of
the analysis. Interested parties may visit with the Forest Service
officials at any time during the analysis. However, two periods of time
are specifically identified for the receipt of comments. The first
comment period is during the scoping process when the public is invited
to give written comments to the Forest Service. The Forest Service will
also conduct public open houses in Helena on March 27, 1996 at the
Helena National Forest Supervisors Office, 2880 Skyway Drive, and in
Lincoln on March 28, 1996 at the Lincoln Community Center. Open houses
will be between 6 and 8 p.m. The scoping period ends on April 8, 1996.
The second review period is during the 45 day review of the DEIS when
the public is invited to comment on the DEIS.
The DEIS is expected to be filed with the Environmental Protection
Agency (EPA) and available for public review in September 1996. At that
time, the EPA will publish a notice of availability of the DEIS in the
Federal Register.
The comment period on the DEIS will be 45 days from the date the
notice of availability is published in the Federal Register.
At this early stage in the scoping process, the Forest Service
believes it is important to give reviewers notice of several court
rulings related to public participation in the environmental review
process. First, reviews of DEIS must structure their participation in
the environmental review of the proposal so that it is meaningful and
alerts an agency to the reviewer's position and contentions. Vermont
Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519, 553 (1978). Secondly,
environmental objections that could be raised at the draft
environmental impact statement stage, but that are not raised until
after completion of the FEIS may be waived or dismissed by the courts.
City of Angoon v. Hodel, 803 F. 2d 1016, 1022 (9th cir. 1986) and
Wisconsin Heritages, Inc. v. Harris, 490 F. Supp. 1338 (E.D. Wis.
1980). Because of these court rulings, it is very important that those
interested in this proposed action participate by the close of the 45-
day comment period so that substantive comments and objections are made
available to the Forest Service at a time when it can meaningfully
consider them and respond to them in the FEIS.
To assist the Forest Service in identifying and considering issues
and concerns on the proposed action, comments on the DEIS should be as
specific as possible. It is also helpful if comments refer to specific
pages or chapters of the draft statement. Comments may also address the
adequacy of the DEIS or the merits of the alternatives formulated and
discussed in the statement. (Reviewers may wish to refer to the Council
on Environmental Quality Regulations for implementing the procedural
provisions of the National Environmental Policy Act at 40 CFR 1503.3 in
addressing these points.)
After the comment period ends on the DEIS, the comments will be
analyzed and considered by the Forest Service in preparing the FEIS.
The FEIS is expected to be filed in February 1997.

Dated: March 6, 1996.
Thomas J. Clifford,
Forest Supervisor, Helena National Forest.