# CNG Transmission Corporation, Texas Eastern Transmission Corporation; Notice of Intent To Prepare an Environmental Assessment for the Proposed Seasonal Service Expansion Project and Request for Comments on Environmental Issues

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A96-31520

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** December 12, 1996
- **Citation:** 61 FR 65383

## Text

DEPARTMENT OF ENERGY
[Docket Nos. CP96-492-000, CP96-492-002, and CP96-606-000]

CNG Transmission Corporation, Texas Eastern Transmission
Corporation; Notice of Intent To Prepare an Environmental Assessment
for the Proposed Seasonal Service Expansion Project and Request for
Comments on Environmental Issues

December 6, 1996.
The staff of the Federal Energy Regulatory Commission (FERC or
Commission) will prepare an environmental assessment (EA) that will
discuss the environmental impacts of the construction and operation of
the facilities proposed in the Seasonal Service Expansion Project.\1\
The total project involves the construction of about 43.6 miles of
pipeline, five salt caverns, four brine injection wells, one new
compressor station, and additional facilities at an existing compressor
station; use of five existing caverns at a storage facility; and
hydrostatic testing of existing pipeline for operation at higher
pressure. The facilities would be in West Virginia, Pennsylvania, New
York, Maryland, and Virginia. (See appendix 1 for location maps of the
proposed facilities.)\2\ This EA will be used by the Commission in its
decision-making process to determine whether an environmental impact
statement is necessary and whether to approve the project.
---------------------------------------------------------------------------

\1\ CNG Transmission Corporation's and Texas Eastern
Transmission Corporation's applications were filed with the
Commission under Section 7 of the Natural Gas Act and Part 157 of
the Commission's regulations.
\2\ The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available from the
Commission's Public Reference and Files Maintenance Branch, 888
First Street, N.E., Washington, D.C. 20426, or call (202) 208-1371.
Copies of the appendices were sent to all those receiving this
notice in the mail.
---------------------------------------------------------------------------

Summary of the Proposed Projects

CNG Transmission Corporation (CNG) in Docket No. CP96-492-000
(``SSE Project'') and Texas Eastern Transmission Corporation (Texas
Eastern) in Docket No. CP96-606-000 (``Winternet Project'') (together
these projects are referred to as the ``Seasonal Service Expansion
Project'') want to expand the capacity of their facilities.\3\
---------------------------------------------------------------------------

\3\ CNG filed a related application in Docket No. CP96-493-000.
The staff will prepare a separate environmental assessment for that
project.
---------------------------------------------------------------------------

For the SSE Project, CNG proposes facilities to provide 103,000
dekatherms per day (Dth/d) of transmission service and 9.3 billion
cubic feet (Bcf) of storage capacity for various customers. CNG seeks
authority to:

[[Page 65384]]

construct about 15.1 miles of 24-inch-diameter pipeline in
Wetzel County, West Virginia (Line TL-492 Extensions 1 and 2);
construct a 4,000 horsepower (hp) addition to the existing
Chambersburg Compressor Station in Franklin County, Pennsylvania;
conduct hydrostatic testing of five segments of the
existing 30-inch-diameter Line PL-1 in Loudoun County, Virginia;
Frederick and Washington Counties, Maryland; and Franklin County,
Pennsylvania, and to increase the maximum allowable operating pressure
of those pipeline segments to 1,250 pounds per square inch gauge
(psig);
construct a new compressor station (Bath Compressor
Station) with three 3,200 hp compressors in Steuben County, New York;
construct metering and regulating facilities at the Bath
Compressor Station;
construct about 20.4 miles of 16-inch-diameter pipeline in
Steuben County, New York, connecting CNG's Woodhull Compressor Station
to the Bath Compressor Station (Line TL-504);
lease from Texas Eastern 64,000 Dth/d of transmission
capacity on the CRP Line in Pennsylvania from November 1, 1997, through
October 31, 1999; and
lease, operate, convert, and develop (over a period of
four years) salt cavern storage facilities near the Town of Bath, New
York, at the Bath Petroleum Storage Inc. (Bath Petroleum) storage
facility including:

--conversion of five existing liquid hydrocarbon storage caverns to gas
storage caverns (well numbers 1, 3, 5, 6, and 7);
--development of five gas storage caverns (well numbers 9, 10, 11, 12,
and 14);
--drilling or four brine disposal wells (wells 1BD, 2BD, 3BD, and 4BD)
and use of an existing brine disposal well (well 8BD); and
--construction of various lengths of 16-, 12-, and 8-inch-diameter
pipeline to connect the 10 storage wells to the Bath Compressor
Station.

Bath Petroleum, acting as a contractor for CNG, would convert the
caverns to gas storage and construct the additional salt caverns and
pipelines within its existing storage facility.
For the Winternet Project, Texas Eastern proposes to lease to CNG
64,000 Dth/d of transmission capacity on the CRP Line (jointly-owned by
Texas Eastern and CNG) in Pennsylvania from November 1, 1997, through
October 31, 1999. After October 31, 1999, this capacity would be
committed to Columbia Gas Transmission Corporation pursuant to a
pending application in Docket No. CP96-559-000. In order to provide CNG
with continued transmission capacity after October 31, 1999, Texas
Eastern proposes to construct additional capacity in 1999 on the CRP
Line including:
4.96 miles of 36-inch-diameter pipeline on the discharge
of the Uniontown Compressor Station from mileposts (MPs) 1071.64 to
1076.60 in Somerset County, Pennsylvania, replacing 24-inch-diameter
idled pipeline;
3.13 miles of 36-inch-diameter pipeline on the discharge
of the Bedford Compressor Station from MPs 1123.73 to 1126.86 in Fulton
County, Pennsylvania, replacing 24-inch-diameter idled pipeline; and
the following aboveground facilities:

--mainline, crossover, and blowoff piping and valving;
--pressure regulating devices;
--pig launchers and receivers; and
--associated pipeline and valves for operating and maintenance
purposes.

Land Requirements for Construction

The following table summarizes the acres of land required for the
projects by docket.

------------------------------------------------------------------------
Disturbed areas CP96-492-000 CP96-606-000
------------------------------------------------------------------------
Temporary Work Space.................... 246 79
Permanent Right-of-way.................. 194 60
New Aboveground Facilities.............. 44 0
-------------------------------
Total (by project).................. 484 139
------------------------------------------------------------------------

Construction of all facilities proposed by CNG and Texas Eastern
would require about 623 acres of land. Following construction, about
254 acres would be maintained as new permanent right-of-way and about
44 acres as new aboveground facility sites. The remaining 325 acres of
land would be restored and allowed to revert to its former use.
Additional temporary work spaces may be required at road, stream,
and wetland crossings. Access to most of the project would be along
existing roads that may require widening and/or grading. A few new
access roads may be constructed.

The EA Process

The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
We call this ``scoping''. The main goal of the scoping process is to
focus the analysis in the EA on the important environmental issues. By
this Notice of Intent, the Commission requests public comments on the
scope of the issues it will address in the EA. All comments received
are considered during the preparation of the EA. State and local
government representatives are encouraged to notify their constituents
of this proposed action and encourage them to comment on their areas of
concern.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
geology and soils
water resources, fisheries, and wetlands
vegetation and wildlife
endangered and threatened species
public safety
land use
cultural resources
air quality and noise
hazardous waste
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to Federal, state, and local agencies, public
interest

[[Page 65385]]

groups, interested individuals, affected landowners, newspapers,
libraries, and the Commission's official service list for this
proceeding. A comment period will be allotted for review if the EA is
published. We will consider all comments on the EA before we recommend
that the Commission approve or not approve the project.

Currently Identified Environmental Issues

We have already identified several issues that we think deserve
attention based on a preliminary review of the proposed facilities and
the environmental information provided by CNG and Texas Eastern.
This preliminary list of issues may be changed based on your
comments and our analysis.
About 8 acres of prime farmland would be taken permanently
out of agricultural production by the expansion at the Chambersburg
Compressor Station.
Hydrostatic testing of the Myersville segment, Frederick
County, Maryland, is within the South Mountain State Park.
Federally listed endangered or threatened species may
occur in the proposed project area.
The crossing of the Canisteo River requires a Section 401
permit and a site specific crossing plan.
Increase in noise and emissions would occur due to the
construction of the Bath Compressor Station and the expansion of the
Chambersburg Compressor Station.
A total of 39 wetlands would be crossed.
A total of 41 streams (18 perennial and 23 intermittent)
would be crossed. Four of the perennial streams in West Virginia are
classified as high quality streams. Six perennial streams in
Pennsylvania and six in New York are classified as cold water
fisheries.
The use of the Bath Petroleum storage facility would
involve:

--conversion of existing liquid petroleum products storage caverns to
natural gas storage;
--development by solution mining (leaching) of new storage caverns;
--drilling and use of brine disposal wells;
--withdrawal of groundwater to use in the leaching process;
--disposal of brine and solid wastes created by the leaching process;
and
--long-term operation issues involved in using salt caverns.

Public Participation

Your can make a difference by sending a letter addressing your
specific comments or concerns about the project. You should focus on
the potential environmental effects of the proposal, alternatives to
the proposal (including alternative locations/routes), and measures to
avoid or lessen environmental impact. The more specific your comments,
the more useful they will be. Please follow the instructions below to
ensure that your comments are received and properly recorded:
Address your letter to: Lois Cashell, Secretary, Federal
Energy Regulatory Commission, 888 First St., N.E., Washington, DC
20426;
Reference Docket Nos. CP96-492-000, CP96-492-002, and
CP96-606-000;
Also, send a copy of your letter to: Ms. Jennifer Goggin,
EA Project Manager, Federal Energy Regulatory Commission, 888 First
St., N.E., PR-11.2, Washington, DC 20426; and
Mail your comments so that they will be received in
Washington, DC on or before January 6, 1997.
If you wish to receive a copy of the EA, you should request one
from Ms. Goggin at the above address by using the form attached as
Appendix 3.

Becoming an Intervenor

In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding or become an
``intervenor''. Among other things, intervenors have the right to
receive copies of case-related Commission documents and filings by
other intervenors. Likewise, each intervenor must provide copies of its
filings to all other parties. If you want to become an intervenor you
must file a motion to intervene according to Rule 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.214) (see
appendix 2).
Your do not need intervenor status to have your scoping comments
considered.
Additional procedural information about the proposed project is
available from Ms. Jennifer Goggin, EA Project Manager, at (202) 208-
2226.
Lois D. Cashell,
Secretary.
[FR Doc. 96-31520 Filed 12-11-96; 8:45 am]
BILLING CODE 6717-01-M

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A96-31520. Public record. Not legal advice.