# PSI Argentina, Inc., et al.; Electric Rate and Corporate Regulation Filings

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A96-13216

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** May 28, 1996
- **Citation:** 61 FR 26512

## Text

DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EG94-81-000, et al.]

PSI Argentina, Inc., et al.; Electric Rate and Corporate
Regulation Filings

May 20, 1996.
Take notice that the following filings have been made with the
Commission:

1. PSI Argentina, Inc.

[Docket No. EG94-81-000]

Take notice that on April 24, 1996, pursuant to Section 365.7 of
the Commission's regulations, 18 CFR 365.7, PSI Argentina, Inc. filed
notification that it surrenders its status as an exempt wholesale
generator under Section 32(a)(1) of the Public Utility Holding Company
Act of 1935, as amended.

2. Enron Power Marketing, Inc., Vitol Gas & Electric LLC, Texas-
Ohio Power Marketing, Inc., Northwest Regional Transmission
Association, Power Exchange Corporation, KN Marketing, Inc.

[Docket No. ER94-24-012, ER94-155-013, ER94-1676-007, ER95-19-005,
ER95-72-005, ER95-869-004 (not consolidated)]

Take notice that the following informational filings have been made
with the Commission and are on file and available for inspection and
copying in the Commission's Public Reference Room:
On May 1, 1996, Enron Power Marketing, Inc. filed certain
information as required by the Commission's December 2, 1993 order in
Docket No. ER94-24-000.
On May 1, 1996, Vitol Gas & Electric LLC filed certain information
as required by the Commission's January 14, 1994 order in Docket No.
ER94-155-000.
On May 16, 1996, Texas-Ohio Power Marketing, Inc., filed certain
information as required by the Commission's October 31, 1994 order in
Docket No. ER94-1676-000.
On May 13, 1996, Northwest Regional Transmission Association filed
certain information as required by the Commission's June 28, 1995 order
in Docket No. ER95-19-000.
On May 16, 1996, Power Exchange Corporation filed certain
information as

[[Page 26513]]

required by the Commission's February 1, 1995 order in Docket No. ER95-
72-000.
On May 1, 1996 and May 13, 1996 KN Marketing, Inc. filed certain
information as required by the Commission's May 26, 1995 order in
Docket No. ER95-869-000.

3. New England Power Company

[Docket No. ER96-1004-001]

Take notice that on May 10, 1996, New England Power Company
tendered for filing revised copies of its compliance filing in the
above-referenced docket.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

4. Entergy Power, Inc.

[Docket No. ER96-1300-000]

Take notice that on May 3, 1996, Entergy Power, Inc. tendered for
filing an amendment in the above-referenced docket.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

5. Family Fiber Connection

[Docket No. ER96-1631-000]

Take notice that on May 15, 1996, Family Fiber Connection tendered
for filing supplemental information to its April 24, 1996, filing in
the above-referenced docket.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

6. Energy Tek, Inc.

[Docket No. ER96-1781-000]

Take notice that on May 10, 1996, Energy Tek, Inc. (Energy Tek),
petitioned the Commission for acceptance of Energy Tek, Inc. Rate
Schedule FERC No. 1; the granting of certain blanket approvals,
including the authority to sell electricity at market-based rates, and
the waiver of certain Commission regulations. Energy Tek, Inc. is a
subsidiary of AGR International Consultants, Inc. based in California.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

7. Maine Public Service Company

[Docket No. ER96-1782-000]

Take notice that on May 10, 1996, Maine Public Service Company
(Maine Public), filed an executed Service Agreement with Federal Energy
Sales, Inc.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

8. Northern Indiana Public Service Company

[Docket No. ER96-1783-000]

Take notice that on May 10, 1996, Northern Indiana Public Service
Company, tendered for filing an executed Standard Transmission Service
Agreement between Northern Indiana Public Service Company and Citizens
Lehman Power Sales.
Under the Transmission Service Agreement, Northern Indiana Public
Service Company will provide Point-to-Point Transmission Service to
Citizens Lehman Power Sales pursuant to the Transmission Service Tariff
filed by Northern Indiana Public Service Company in Docket No. ER96-
399-000 and allowed to become effective by the Commission, Northern
Indiana Public Service Company, 71 FERC para. 61,014 (1996). Northern
Indiana Public Service Company has requested that the Service Agreement
be allowed to become effective as of June 1, 1996.
Copies of this filing have been sent to the Indiana Utility
Regulatory Commission and the Indiana Office of Utility Consumer
Counselor.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

9. Potomac Electric Power Company

[Docket No. ER96-1784-000]

Take notice that on May 10, 1996, Potomac Electric Power Company
(Pepco), tendered for filing service agreements pursuant to Pepco FERC
Electric Tariff, Original Volume No. 1, entered into between Pepco and:
Public Service Electric and Gas Company, and Federal Energy Sales, Inc.
An effective date of April 12, 1994, for these service agreements, with
waiver of notice, is requested.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

10. Wisconsin Public Service Corporation

[Docket No. ER96-1785-000]

Take notice that on May 10, 1996, Wisconsin Public Service
Corporation, tendered for filing an executed service agreement with
Manitowoc Public Utilities under its CS-1 Coordination Sales Tariff.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

11. Wisconsin Electric Power Company

[Docket No. ER96-1786-000]

Take notice that on May 10, 1996, Wisconsin Electric Power Company
(Wisconsin Electric), tendered for filing an Electric Service Agreement
and a Transmission Service Agreement between itself and WPS Energy
Services, Inc. (WPS). The Electric Service Agreement provides for
service under Wisconsin Electric's Coordination Sales Tariff. The
Transmission Service Agreement allows WPS to receive transmission
service under Wisconsin Electric's FERC Electric Tariff, Original
Volume No. 5, Rate Schedule STNF, under Docket No. ER95-1474.
Wisconsin Electric requests an effective date of sixty days from
date of filing. Copies of the filing have been served on WPS, the
Public Service Commission of Wisconsin and the Michigan Public Service
Commission.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

12. Florida Power & Light Company

[Docket No. ER96-1787-000]

Take notice that on May 10, 1996, Florida Power & Light Company
(FPL), filed the Contract for Purchases and Sales of Power and Energy
between FPL and Phibro Inc. FPL requests an effective date of May 20,
1996.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

13. Florida Power & Light Company

[Docket No. ER96-1788-000]

Take notice that on May 10, 1996, Florida Power & Light Company
(FPL), filed the Contract for Purchases and Sales of Power and Energy
between FPL and Calpine Power Service Company. FPL requests an
effective date of May 20, 1996.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

14. Florida Power & Light Company

[Docket No. ER96-1789-000]

Take notice that on May 10, 1996, Florida Power & Light Company
(FPL), filed the Contract for Purchases and Sales of Power and Energy
between FPL and Delhi Energy Services, Inc. FPL requests an effective
date of May 20, 1996.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

15. New England Power Pool

[Docket No. ER96-1790-000]

Take notice that on May 10, 1996, the New England Power Pool
Executive Committee, filed a signature page to the NEPOOL Agreement
dated September 1, 1971, as amended, signed by Morgan Stanley Capital
Group Inc. (Morgan

[[Page 26514]]

Stanley). The New England Power Pool Agreement, as amended, has been
designated NEPOOL FPC No. 2.
The Executive Committee states that acceptance of the signature
page would permit Morgan Stanley to join the over 90 Participants
already in the Pool. NEPOOL further states that the filed signature
page does not change the NEPOOL Agreement in any manner, other than to
make Morgan Stanley a Participant in the Pool. NEPOOL requests an
effective date of July 1, 1996 for commencement of participation in the
Pool by Morgan Stanley.
Comment date: June 3, 1996, in accordance with Standard Paragraph E
at the end of this notice.

Standard Paragraph

E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 96-13216 Filed 5-24-96; 8:45 am]
BILLING CODE 6717-01-P

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A96-13216. Public record. Not legal advice.
