# Scenery Fire Recovery; Kootenai National Forest, Lincoln County, MT

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A95-4222

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** February 22, 1995
- **Citation:** 60 FR 9818

## Text

SUMMARY: The Scenery Face Fire burned approximately 4700 acres of
Kootenai National Forest system lands in the late summer of 1994. The
Libby Ranger District on the Kootenai National Forest intends to
prepare an Environmental Impact Statement (EIS) to assess and disclose
the environmental effects of opportunities designed to recover economic
value of burned timber, reduce fuel accumulations, rehabilitate
existing sediment sources and protect long-term soil productivity.
These objectives would be accomplished through salvage harvest of fire-
killed trees; reforestation of some harvested and severely burned
areas; fuels reduction in harvested areas and restoration of non-
essential roads. The Scenery decision area is located approximately 1
air mile west of Libby, Montana.
The proposal's actions to salvage fire-killed trees and reforest
burned areas, reduce fuels, and restore roads are being considered
together because they represent either connected or cumulative actions
as defined by the Council on Environmental Quality (40 CFR 1508.25).
The EIS will tier to the Kootenai National Forest Land and Resource
Management Plan and Final EIS of September 1987, which provides overall
guidance for achieving the desired forest condition of the area.

DATES: Written comments and suggestions should be received by no later
than March 24, 1995.

ADDRESSES: The Responsible Official is Lawrence A. Froberg, District
Ranger, Libby Ranger District, Kootenai National Forest. Written
comments and suggestions concerning the scope of the analysis should be
sent to Lawrence A. Froberg, District Ranger, Libby Ranger District,
12557 US Hwy 37 N, Libby, Montana, 59923.

FOR FURTHER INFORMATION CONTACT:
Leanne Marten, NEPA Coordinator, Libby Ranger District. Phone: (406)
293-7773.

SUPPLEMENTARY INFORMATION: During the night of August 14-15, 1994, a
lightning storm started 207 fires on the Kootenai National Forest in
northwest Montana. Several of these fires occurred on the Libby Ranger
District. The Scenery Fire Recovery EIS is being prepared in response
to conditions resulting from one of the largest of these fires, the
4700 acre Scenery Face Fire. An interdisciplinary landscape analysis
team is using an ecosystem based approach to assess the fires affects
and identify management opportunities that could be implemented to move
the postfire landscapes toward a desired ecological condition.
Burn intensities in the Scenery wildfire varied considerably.
Within the fire perimeters approximately 2200 acres burned at moderate
intensity (average 55% tree mortality) and approximately 2500 acres
burned at low intensity (average 25% mortality). The fire burned within
the Cabinet Face East Roadless Area #671.
The Scenery decision area contains approximately 3,300 acres within
the Kootenai National Forest in Lincoln County, Montana. The legal
location of the decision area is as follows: Sections or portions of
Sections 14, 15, 16, 17, 18, 19, 20, 21, 22, 24, 26, 27, 28, 29, and 30
and Township 31 North, Range 32 West; Sections or portions of Sections
24 and 25 of Township 31 North, Range 33 West; Principle Meridian. The
land in and adjacent to the decision area is primarily federal
ownership under the jurisdiction of the Forest Service with some
intermixed private ownership.

Proposed Action

The primary purpose of the project is to recover valuable timber
products from trees burned by the Scenery Face wildfire that occurred
in 1994 (while maintaining ecological processes), with the secondary
benefit of reducing fuel loads. Actions are also proposed to enhance
watershed recovery and improve grizzly bear habitat security. The
Forest Service proposes to harvest approximately 2.1 million board feet
of timber by salvaging fire-killed trees and dying trees on
approximately 350 acres of forest land outside riparian protection
areas. Only trees that were killed, or are expected to die as a result
of the fires, would be harvested. The proposal includes prescribed
burning of about 67 acres to reduce fuel loads in harvested areas. An
estimated 263 acres of proposed salvage units would be planted with
conifer seedlings to help meet desired conditions for species
diversity. The Forest Service also proposes to scarify and revegetate
an estimated 4 miles of existing non-essential roads to reduce sediment
and water yields, and improve grizzly bear habitat security. Non-
essential roads are those that are no longer considered a necessary
part of the permanent transportation system. Additional road access
restrictions may be needed to provide adequate security areas for
grizzly bears, however identification of specific road closure
proposals is pending further analysis.
The decision area includes a portion of the Cabinet Face East
Roadless Area #671. Approximately 330 acres of timber salvage and
approximately 250 acres of reforestation would occur within the
roadless area. No road construction is proposed within the roadless
area. No proposed activities are located in areas considered for
inclusion to the National Wilderness System as recommended by the
Kootenai National Forest Plan.
Due to the high level of tree mortality in proposed harvest units,
most harvested areas would resemble clearcut or seed-tree silvicultural
methods. Only those live trees which must be cut to facilitate logging
fire-killed trees would be harvested. Timber harvest would be done by
skyline and helicopter yarding, designed to result in minimal ground
disturbance, risk of erosion, and compaction.
The Kootenai National Forest Land and Resource Management Plan
provides overall management objectives in individual delineated
management areas (MA's). The decision area contains four MA's: 11, 12,
14 and 19. Briefly described, MA 11 is managed to maintain or enhance
the winter-range habitat effectiveness for big-game species and produce
a programmed yield of timber. MA 12 is managed to maintain or enhance
the summer-range [[Page 9819]] habitat effectiveness for big-game
species and produce a programmed yield of timber. MA 14 focuses on
maintaining or enhancing grizzly bear habitat, reducing grizzly/human
conflicts, assisting in the recovery of the grizzly bear, realizing a
programmed yield of timber production, and providing for the
maintenance or enhancement of other wildlife species, especially big
game. MA 19 is managed to protect soil stability and water quality by
maintaining the vegetation in a healthy condition and minimizing
surface disturbance. Timber salvage and fuels reduction is proposed in
MA 12.

Preliminary Issues

Several preliminary issues of concern have been identified by the
Forest Service. These issues are briefly described below:
Water Quality--Streams in the decision area have been
impacted by the Scenery Face wildfire. How would the proposed action
affect water yield, sediment production, stream stability, and recovery
from the wildfire?
Timber Supply--Much of the fire-killed timber will quickly
lose its commercial value due to rapid deterioration. To what extent
does the proposed action recover the commercial value of fire-killed
timber to help meet local and national needs?
Activity in Roadless Areas--What effect would the proposal
have on the roadless character of the Cabinet Face East Roadless Area
#671?
Grizzly Bear--The decision area lies within the recovery
area for the Cabinet/Taak grizzly bear ecosystem. How would the
proposal maintain and enhance grizzly bear habitat, and contribute to
recovery efforts?
Visual Quality--The units proposed can be viewed from
Highway 2, the Kootenai River Road or the Bighorn Trail. To what extent
will the viewshed be altered?

Forest Plan Amendment

The Kootenai National Forest Land and Resource Management Plan has
specific management direction for the Scenery decision area. The
Scenery proposed action is designed to maintain or improve resource
conditions and move towards achieving desired ecological conditions,
and is consistent with the goals and objectives of the Forest Plan.
Prior to making a NEPA decision, a thorough examination of all
standards and guidelines of the Forest Plan would be completed and, if
necessary, plan exceptions or amendments would be addressed in the EIS.

Decisions To Be Made

The Libby District Ranger will decide the following:
Should dead and imminent dead trees within fire areas be harvested
and if so how and where,
What amount, type, and distribution of watershed restoration
projects, including road restoration, would be implemented,
What burned areas need to be replanted, and
If Forest Plan exception or amendments are necessary to proceed
with the Proposed Action within the decision area.

Public Involvement and Scoping

An open house will be scheduled in March, to provide an opportunity
for the public to review the proposed action. Consultation with
appropriate State and Federal agencies will be initiated. Preliminary
effects analysis indicated that the wildfires may significantly affect
the quality of the human environment, and fire recovery activities have
the potential to both intensify and reduce effects. These potential
effects prompted the decision to prepare an EIS for the Scenery Fire
Salvage.
This environmental analysis and decision making process will enable
additional interested and affected people to participate and contribute
to the final decision. Public participation will be requested at
several points during the analysis. The Forest Service will be seeking
information, comments, and assistance from Federal, State, local
agencies, and other individuals or organizations who may be interested
in or affected by the proposed projects. This input will be used in
preparation of the draft and final EIS. The scoping process will
include:
Identifying potential issues.
Identifying major issues to be analyzed in depth.
Exploring additional alternatives which will be derived
from issues recognized during scoping activities.
Identifying potential environmental effects of this
project and alternatives (i.e. direct, indirect, and cumulative effects
and connected actions).
The analysis will consider a range of alternatives, including the
proposed action, no action, and other reasonable action alternatives.

Estimated Dates for Filing

The draft Scenery Fire Recovery EIS is expected to be filed with
the Environmental Protection Agency (EPA) and to be available for
public review by June, 1995. At that time EPA will publish a Notice of
Availability of the draft EIS in the Federal Register. The comment
period on the draft EIS will be 45 days from the date the EPA publishes
the Notice of Availability in the Federal Register.
The final EIS is scheduled to be completed by September, 1995. In
the final EIS, the Forest Service is required to respond to comments
and responses received during the comment period that pertain to the
environmental consequences discussed in the draft EIS and applicable
laws, regulations, and policies considered in making a decision
regarding the proposal.

Reviewer's Obligations

The Forest Service believes, at this early stage, it is important
to give reviewers notice of several court rulings related to public
participation in the environmental review process. First, reviewers of
draft environmental review of the proposal so that it is meaningful and
alerts an agency to the reviewer's position and contentions. Vermont
Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519, 553 (1978). Also,
environmental objections that could be raised at the draft
environmental impact statement stage may be waived or dismissed by the
courts. City of Angoon v. Hodel, 803 F.2d 1016, 1022 (9th Cir. 1986)
and Wisconsin Heritages, Inc. v. Harris, 490 F. Supp. 1334, 1338 (E.D.
Wis. 1980). Because of these court rulings, it is very important that
those interested in this proposed action participate by the close of
the 45 day comment period so that substantive comments and objections
are made available to the Forest Service at a time when it can
meaningfully consider and respond to them in the final EIS.
To be most helpful, comments on the draft EIS should be as specific
as possible and may address the adequacy of the statement or the merit
of the alternatives discussed. Reviewers may wish to refer to the
council on Environmental Quality regulations for implementing the
procedural provisions of the National Environmental Policy Act at 40
CFR 1503.3 in addressing these points.

Responsible Official

Lawrence A. Froberg, District Ranger, Libby Ranger District,
Kootenai National Forest, 12557 US Highway 37 North, Libby, MT 59923 is
the Responsible Official. As the Responsible Official he will decide
which, if any, of the proposed projects will be implemented. He will
document the decision and reasons for the decision in the Record of
Decision. That decision will be subject to Forest Service Appeal
Regulations.

[[Page 9820]] Dated: February 10, 1995.
Lawrence A. Forberg,
District Ranger.
[FR Doc. 95-4222 Filed 2-21-95; 8:45 am]
BILLING CODE 3410-11-M

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A95-4222. Public record. Not legal advice.
