# Seminole Electric Cooperative, Inc.; Draft Supplemental Environmental Impact Statement

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A95-12884

## Record

- **Collection:** Federal Register
- **Document type:** Notice
- **Published:** May 25, 1995
- **Citation:** 60 FR 27718

## Text

DEPARTMENT OF AGRICULTURE
Rural Utilities Service

Seminole Electric Cooperative, Inc.; Draft Supplemental
Environmental Impact Statement

AGENCY: Rural Utilities Service, USDA.

ACTION: Notice of availability of draft supplemental environmental
impact statement.

-----------------------------------------------------------------------

SUMMARY: Notice is hereby given that the Rural Utilities Service (RUS)
and the U.S. Environmental Protection Agency (EPA) are issuing a Draft
Supplemental Environmental Impact Statement (DSEIS) related to Seminole
Electric Cooperative, Inc.'s, (Seminole) proposed Hardee Unit 3. The
DSEIS is a supplement to the Final Environmental Impact Statement
issued in January 1991 by the Rural Electrification Administration
(predecessor of RUS), with EPA, and the Federal Energy Regulatory
Commission as cooperating agencies, for their actions related to the
Hardee Power Station. Hardee Unit 3 would increase the originally
proposed ultimate output of the Hardee Power Station from 660 megawatts
(MW) to 880 MW.
RUS's federal action related to Hardee Unit 3 would be providing a
loan guarantee to Seminole to cover the cost of project construction.
EPA's federal action related to Hardee Unit 3 has, to date, been the
preparation of the draft National Pollutant Discharge Elimination
System (NPDES) permit needed to operate the new unit. However, on May
1, 1995, EPA authorized the State of Florida to administer the NPDES
Permit Program (with EPA program oversight retained). As such, EPA's
role as an NPDES permitting agency has changed and EPA no longer has a
direct federal action related to the proposed Hardee Unit 3. With
program authorization, the NPDES permitting decision now is a state
action as opposed to an EPA federal action. The notice for the Draft
NPDES permit will be issued by the State of Florida. Despite program
authorization, EPA nevertheless remains a cooperating agency to RUS for
the DSEIS and will also have a role in the RUS National Environmental
Policy Act process for Hardee Unit 3 by providing review and comment on
the DSEIS and Final Supplemental Environmental Impact Statement for
Hardee Unit 3 via its responsibilities pursuant to Section 309 of the
Clean Air Act. The draft NPDES permit is Appendix A to the DSEIS.

FOR FURTHER INFORMATION CONTACT:
Mr. Lawrence R. Wolfe, Chief, Environmental Compliance Branch, Electric
Staff Division, Rural Utilities Service, Ag. Box 1569, Washington, DC
20250, Telephone (202) 720-1784, Fax (202) 720-7491.

SUPPLEMENTARY INFORMATION: The DSEIS for Hardee Unit 3 covers the
construction and operation of 440 MW of additional generating capacity
to be installed at the existing 1,300-acre Hardee Power Station site.
The Hardee Power Station site is located in Hardee and Polk counties
approximately 9 miles northwest of Wauchula, 16 miles south-southwest
of Bartow, and 40 miles east of Tampa Bay. The site is bordered on the
east by Hardee County Road 663, a CSX Railroad right-of-way, and CF
Industries' Hardee Complex. IMC-Agrico properties surround the
remaining portions of the site. Payne Creek flows along the southern
and western boundary of the Hardee Power Station site. The proposed
Hardee Unit 3 would occupy approximately 50 acres of this site.
As proposed in the Final Environmental Impact Statement for the
Hardee Power Station, Hardee Power Partners has constructed and
operates 295 MW of generation capacity at the Hardee Power Station and
proposes an additional 145 MW of generation capacity there by the year
2003 for use by Seminole. Seminole originally proposed to construct and
operate an additional 220 MW at the Hardee Power Station at a future
date to be determined. That addition, along with Hardee Power Partners'
145 MW addition, would have increased the existing 295 MW Hardee Power
Station capacity to 660 MW. Seminole now proposes in the DSEIS to
construct 440 MW of additional capacity at the Hardee Power Station at
a specified date, 1999, instead of the originally proposed 220 MW
addition at an unspecified date. As now proposed, the Hardee Power
Station Site would be made up of a total of 880 MW of capacity when
completed.
The proposed Hardee Unit 3 would consist of natural gas fired
combustion turbines utilizing heat recovery steam generators that will
operate efficiently by recovering heat from the combustion turbines.
Fuel oil would be used as a backup source of fuel. These are the same
type of generators already installed at the Hardee Power Station (295
MW) and the same type proposed for future installation (145 MW) at the
site by Hardee Power Partners. The natural gas would be transported via
an existing 18 inch diameter, underground gas pipeline connected to the
Florida Gas Transmission System to the Hardee Power Station. Three
existing 230 kilovolt transmission lines would be utilized to connect
Hardee Unit 3 into the Florida transmission grid.
Alternatives to the project as proposed included no action, design
alternatives, alternative fuels, and conservation.
Seminole has provided RUS with a Site Certification Application/
Environmental Analysis for Hardee Unit 3 which is the primary support
document used by RUS to develop its DSEIS. RUS has concluded that the
Site Certification Application/Environmental Analysis for Hardee Unit 3
represents an accurate assessment of the potential environmental
impacts related to the proposed project. The Hardee Unit 3 Site
Certification Application/Environmental Analysis has been incorporated
by reference into the DSEIS and is available for inspection by
interested parties at RUS or Seminole at the addresses provided in this
notice. That document, along with the DSEIS, will also be available for
review at the following libraries:

Bartow Public Library, 315 E. Parker Street, Bartow, Florida 33830
Hardee County Library, 315 N. 6th Avenue, Suite 114, Wauchula, Florida
33837.

Anyone wishing to comment on the DSEIS should do so in writing
within the 45-day comment period to RUS at the appropriate address
provided in this notice. All comments received during the comment
period will be given consideration in the formulation of the Final
Supplemental Environmental Impact Statement for Hardee Unit 3. (Oral
responses submitted by telephone will be considered, but it is
recommended that comments be submitted in writing.) A copy of each
written comment and a summary of each oral comment received will be
included in the Final Supplemental Environmental Impact Statement.
Notice of availability of the DSEIS and the 45-day comment period
is being published in the Federal Register by RUS and EPA. Seminole
will have a notice similar to this one published in newspapers of
general circulation in the proposed project area. As it is possible
that RUS, EPA, and Seminole's notices will not appear on the same date,
the 45-day comment period will begin on the date the latest notice
(RUS, EPA or Seminole's) is published. Questions concerning the closing
date of the 45-day comment period should be referred [[Page 27719]] to
Mr. Lawrence Wolfe at (202) 720-1784.

Dated: May 22, 1995.
Adam M. Golodner,
Deputy Administrator, Program Operations.
[FR Doc. 95-12884 Filed 5-24-95; 8:45 am]
BILLING CODE 3410-15-M

---