DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission
[Docket No. EL94-30-000, et al.]

Metropolitan Edison Company, et al; Electric Rate and Corporate
Regulation Filings

February 28, 1994.
Take notice that the following filings have been made with the
Commission.

1. Metropolitan Edison Co.

[Docket No. EL94-30-000]

Take notice that on December 22, 1994, Metropolitan Edison Company
(Met-Ed) tendered for filing a request for waiver from Sections 35.14
and 35.19a of the Commission's regulations to allow Met-Ed to pass back
to its wholesale customers certain refunds, including interest, in
accordance with the proposed refund described in its filing. Met-Ed
states that the refunds relate to prior overpayments of fees to the
Department of Energy for the eventual disposal of spent nuclear fuel.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

2. Northeast Utilities Service Co.

[Docket No. ER93-94-001]

Take notice that on February 16, 1994, Northeast Utilities Service
Company tendered for filing its compliance filing in the above-
referenced docket.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

3. Public Service Electric and Gas Co.

[Docket No. ER93-862-000]

Take notice that on August 12, 1993, Public Service Electric and
Gas Company (PSE&G) of Newark, New Jersey tendered for filing an
initial Rate Schedule for the sale of Capacity and Energy to the
Borough of Park Ridge, New Jersey (Park Ridge). Thereafter, in response
to discussions with Commission Staff, PSE&G on December 22, 1993,
mailed for filing a First Supplement to said Rate Schedule.
In response to further discussions with Commission Staff, PSE&G on
February 17, 1994, tendered for filing the Second Supplemental
Agreement by and between PSE&G and Part Ridge which addresses FERC
inquiries, defines terminology, and explains methodology.
Copies of the filing were served upon Park Ridge, the New Jersey
Board of Regulatory Commissioners, and the New Jersey Department of the
Public Advocate.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

4. Northeast Utilities Service Co.

[Docket Nos. ER94-48-000 ER94-912-000]

Take notice that on February 23, 1994, Northeast Utilities Service
Company (NUSCO) tendered for filing a Service Agreement under NUSCO's
Transmission Tariff No. 2. This Service Agreement provides for non-firm
transmission to the NU System Companies for their power sales to
others. In particular, in these dockets, the Service Agreement will
provide for transmission service for the NU System Companies' sales to
the New York Power Authority (NYPA). NUSCO states that its filing is in
accordance with the Commission's filing requirements and that a copy of
the filing has been mailed to NYPA.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

5. Niagara Mohawk Power Corporation

[Docket No. ER94-328-000]

Take notice that on February 23, 1994, Niagara Mohawk Power
Corporation (Niagara Mohawk), tendered for filing an agreement between
Niagara Mohawk and the New York Power Authority (NYPA) dated February
16, 1994, providing for the terms and conditions of loss compensation
for control area transactions.
The effective date of April 1, 1994 is requested by Niagara Mohawk.
Copies of this filing were served upon NYPA and the New York State
Public Service Commission.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

6. Pennsylvania Power & Light Co.

[Docket No. ER94-623-000]

Take notice that on February 17, 1994, Pennsylvania Power & Light
Company (PP&L) supplemented its original filing in the above docket by
tendering for filing as initial rate schedules one borderline service
agreement with New York State Electric & Gas Corporation (NYSEG). In
accordance with the Commission's recently announced policy on the
filing of jurisdictional service agreements effective as of May 19,
1964. PP&L states that the borderline sales are based on state
commission approved retail rates.
PP&L states that copies of the filing were served on NYSEG.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

7. Indianapolis Power & Light Co.

[Docket No. ER94-974-000]

Take notice that on February 15, 1994, Indianapolis Power & Light
Company (IPL), tendered for filing proposed changes in its FERC Rate
Schedule No. 21. The proposed changes would increase revenues from
jurisdictional sales and service by approximately $57,500 based on the
twelve-month period ending December 31, 1992.
The rate schedule supplement consists of Amendment No. 4 to the
Agreement dated as of October 9, 1986, which sets forth the rates,
charges, terms and conditions for wholesale electric service to Boone
County Rural Electric Membership Corporation (Boone REMC). Amendment
No. 4 increases the rate, revises appropriate contract language
reflecting said assignment, and extends the existing Agreement for a
successive term of 15 years. The Agreement would otherwise terminate
December 10, 1993.
The only customer affected by this filing is Wabash Valley, which
has executed said Amendment No. 4 and has concurred in this filing.
Copies of this filing were sent to Wabash Valley and the Indiana
Utility Regulatory Commission.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

8. Public Service Company of Colorado

[Docket No. ER94-977-000]

Take notice that on February 18, 1994, Public Service Company of
Colorado (Public Service) filed with the Commission amendments to its
Power Supply Agreement (PSA) with Holy Cross Electric Association, Inc.
(Holy Cross), which is on file as Public Service Rate Schedule FERC No.
52. The changes are to lower the demand charge for Full Requirements
Service under the PSA from $13.08 per Kw of billing demand to $11.53
per Kw of billing demand and to specify the loss factor used for
transactions under Article 5.4 of the PSA, which provides for Economy
Energy purchases, as 4.6% (Public Service previously used 6%). Both
amendments are proposed to be effective as of April 15, 1992,
(requesting waiver for good cause shown), although Public Service
requests that the decrease in the demand charge be conditioned on final
FERC action (other than rejection) of the Transmission Integration and
Equalization Agreement (TIE Agreement) between Public Service and Holy
Cross, which was filed by Public Service in another docket, and the TIE
Agreement being given an effective date of April 15, 1992. Due to the
relationship between the TIE Agreement and the proposed decrease in the
demand charge under the PSA, Public Service also requests that the two
proceedings be consolidated.
Public Service states that copies of the filing have been served on
Holy Cross, the Colorado Office of Consumer Counsel, and the Colorado
Public Utilities Commission.
Comment date: March 11, 1994, in accordance with Standard Paragraph
E at the end of this notice.

9. Public Service Company of Colorado

[Docket No. ER94-978-000]

Take notice that on February 18, 1994, Public Service Company of
Colorado (Public Service) filed with the Commission the Transmission
Integration and Equalization Agreement (TIE Agreement) between Public
Service and Holy Cross Electric Association, Inc. (TIE Agreement). The
TIE Agreement provides for the integration of the Public Service and
Holy Cross Electric Association, Inc. (Holy Cross) transmission
facilities, the creation of an integrated Public Service/Holy Cross
transmission system, and a mechanism whereby the two parties share the
costs of the integrated system in accordance with the loads each places
on the integrated system. Public Service requests that the TIE
Agreement be effective as of April 15, 1992, and requests waiver of the
Commission's notice requirements for good cause shown. Public Service
also requests that this proceeding be consolidated with another Public
Service filing, which proposes two amendments to the Power Supply
Agreement between Public Service and Holy Cross, on file as Public
Service Rate Schedule FERC No. 52. Public Service states that
consolidation is appropriate due to the relationship between the TIE
Agreement and one of the proposed amendments to Rate Schedule No. 52.
Public Service states that copies of the filing have been served on
Holy Cross, the Colorado Office of Consumer Counsel, and the Colorado
Public Utilities Commission.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

10. Portland General Electric Co.

[Docket No. ER94-979-000]

Take notice that on February 22, 1994, Portland General Electric
Company (PGE) tendered for filing an amendment to the Grizzly
Construction Trust Agreement Between the Bonneville Power
Administration (BPA) and Portland General Electric Company (PGE).
PGE has served copies of this filing on the Bonneville Power
Administration and the Oregon Public Utility Commission.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

11. Portland General Electric Co.

[Docket No. ER94-980-000]

Take notice that on February 22, 1994, Portland General Electric
Company (PGE) tendered for filing an alternate point of delivery for
service under Contracts with the cities of Burbank (PGE Rate Schedule
FERC No. 77) and Glendale (PGE Rate Schedule FERC No. 78), California.
PGE requests waiver of the notice provisions of 18 CFR Part 35.3 to
allow service at the new point of delivery effective February 16, 1994,
because of extraordinary circumstances created by the California
earthquake of January 17, 1994.
PGE has served copies of this filing on the cities of Burbank and
Glendale, and on the Oregon Public Utility Commission.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

12. Central Illinois Public Service Co.

[Docket No. ER94-982-000]

Take notice that on February 22, 1994, Central Illinois Public
Service Company (CIPS) submitted for filing the First Amendment, dated
January 5, 1994 (First Amendment), to the Power Supply and Transmission
Service Agreement, dated January 9, 1992 (Agreement), between CIPS and
Wabash Valley Power Association, Inc. (Wabash Valley). At Wabash
Valley's request, the First Amendment provides that Wabash Valley will
take service under levelized demand charges for an additional two years
beyond the period for levelized rates contemplated in the presently
effective Agreement.
CIPS seeks an effective date of January 1, 1994 and, accordingly,
seeks waiver of the Commission's notice requirements. Copies of the
filing were served on Wabash Valley, the Illinois Commerce Commission
and the Indiana Utility Regulatory Commission.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

13. Northeast Utilities Service Co.

[Docket No. ER94-983-000]

Take notice that on February 22, 1994, Northeast Utilities Service
Company (NUSCO) tendered for filing a Service Agreement to provide non-
firm transmission service to Great Bay Power Corporation (Great Bay)
under the NU system Companies' Transmission Service Tariff No. 2.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

14. Montaup Electric Co.

[Docket No. ER94-984-000]

Take notice that on February 23, 1994, Montaup Electric Company
(Montaup) filed a credit of $2,283,256.23 under its Purchased Capacity
Adjustment Clause (PCAC) to true up the amounts billed in 1993 under a
forecast billing rate to conform with actual purchased capacity costs.
The credit will appear in bills for January 1994 service rendered for
all requirements service to Montaup's affiliates Eastern Edison Company
in Massachusetts and Blackstone Valley Electric Company in Rhode
Island, contract demand service to its affiliate Newport Electric
Corporation in Rhode Island, and contract demand service to non-
affiliates: Pascoag Fire District in Rhode Island and the Town of
Middleborough in Massachusetts.
Comment date: March 14, 1994, in accordance with Standard Paragraph
E at the end of this notice.

16. Northern Electric Power Co., L.P.

[Docket No. ER94-995-000]

Take notice that on February 28, 1994, Northern Electric Power Co.,
L.P. (``Northern Electric'') tendered for filing a Third Amendment to
the Power Purchase Agreement dated June 24, 1992, on file with the
Commission as Rate Schedule, FERC No. 1. According to Northern
Electric, the Third Amendment makes several minor changes to the Rate
Schedule which are being made at the request of the lenders providing
construction financing for the Hudson Falls hydroelectric project.
Northern Electric further states that the changes correct typographical
errors; replace the site description with a corrected site description;
incorporate force majeure provisions of the Interconnection Agreement
for the Hudson Falls project into the Power Purchase Agreement; and
provide a waiver by the purchasing utility of any rights it may have,
outside the Power Purchase Agreement, to limit its power purchase
obligations under the Power Purchase Agreement. Northern Electric
further states that the Interconnection Agreement is being submitted
due to the incorporation of its force majeure provisions into the Power
Purchase Agreement, and is not itself jurisdictional.
Comment date: March 10, 1994, in accordance with Standard Paragraph
E at the end of this notice.

Standard Paragraphs

E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 94-5207 Filed 3-7-94; 8:45 am]