# Oil and Gas Leasing; Lewis and Clark National Forest, MT

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A94-4134

## Record

- **Collection:** Federal Register
- **Document type:** Uncategorized Document
- **Published:** February 24, 1994

## Text

DEPARTMENT OF AGRICULTURE

Forest Service

DEPARTMENT OF THE INTERIOR

Bureau of Land Management

Oil and Gas Leasing; Lewis and Clark National Forest, MT

AGENCIES: Forest Service, USDA, and Bureau of Land Management,
Interior.

ACTION: Notice of Intent to prepare an Environmental Impact Statement.

-----------------------------------------------------------------------

SUMMARY: The Forest Service and the Bureau of Land Management (BLM)
will prepare an Environmental Impact Statement (EIS) to disclose the
impacts of proposed oil and gas leasing on the Lewis and Clark National
Forest. The Forest Service and the BLM will be joint lead agencies for
this EIS (40 CFR 1501.5). The EIS will be designed to satisfy the
requirements of the Federal Onshore Oil and Gas Leasing Reform Act of
1987 and implementing regulations (36 CFR 228.102).

DATES: Initial comments concerning the scope of the analysis should be
received in writing no later than March 31, 1994.

ADDRESSES: Send written comments to John D. Gorman, Forest Supervisor,
Lewis and Clark National Forest, P.O. Box 869, Great Falls, MT 59403.

FOR FURTHER INFORMATION CONTACT: Robin Strathy, Environmental Analysis
Team Leader, Lewis and Clark National Forest, as above, or phone: (406)
791-7726.

SUPPLEMENTARY INFORMATION: The Forest Service proposes to make certain
lands within the Lewis and Clark National Forest administratively
available for oil and gas leasing, subject to constraints specified in
the 1986 Lewis and Clark National Forest Land and Resource Management
Plan. The Forest Service also proposes to authorize the BLM to offer
those lands for lease, subject to specified stipulations. Both the
administratively-available decision, and the leasing decision for
specific lands are being made. The BLM will decide whether to offer the
specific lands for lease subject to the Forest Service ensuring that
correct stipulations will be attached to leases issued by BLM. In cases
where the surface resources are not managed by the federal government
but the minerals are federally owned (split estate), the BLM will also
decide whether or not to offer these mineral rights for lease and what
stipulations to apply. Except where stipulations prohibit all surface
use, operations and development may be allowed on the leased lands.
Such activity is subject to the operator obtaining an approved Surface
Use Plan of Operations from the Forest Service in accordance with 36
CFR, subpart E, 228.106 and 228.107.
The EIS will examine the effects of the proposal to implement the
oil and gas leasing direction in the 1986 Lewis and Clark Forest Plan
and additional alternatives. The primary purpose of this analysis is to
determine which lands should be available for leasing, what
stipulations should be applied to any leases, and which specific lands
should be offered for lease at this time.
Lands affected are within the boundaries of the Lewis and Clark
National Forest. These lands encompass several mountain ranges south
and east of Great Falls, Montana (including the Little Belt, Highwood,
Castle, north Crazy, Big and Little Snowy Mountains), as well as the
eastern Front Range of the Rocky Mountains west of Choteau, Montana. By
regulation, several classes of National Forest System lands are
considered legally unavailable for leasing at this time, and will be
considered unavailable for lease under all alternatives in the
analysis. On the Lewis and Clark Forest, these lands include existing
wilderness, specifically the Bob Marshall-Scapegoat Wilderness complex.
Also unavailable are those lands recommended for wilderness in the
Lewis and Clark Forest Plan, which includes about 51,800 acres on the
Rocky Mountain Division adjacent to the Bob Marshall and Scapegoat
Wildernesses. These lands are described in the Lewis and Clark Forest
Plan as the Renshaw, South Fork and West Fork of the Teton, and Silver
King-Falls Creek areas. In addition, lands proposed for wilderness
study under the Montana Wilderness Study Act (Pub. L. 95-150) are not
available for oil and gas leasing. This includes 92,000 acres in the
Middle Fork of the Judith River Wilderness Study Area in the Little
Belt Mountains, and 98,000 acres in the Big Snowy Mountain Wilderness
Study Area.
This analysis is required by the Federal Onshore Oil and Gas
Leasing Reform Act of 1987 and implementing regulations promulgated in
1990 (36 CFR 228.102).
Potential issues that have been identified to date are the effects
of oil and gas activities on:

1. Threatened and endangered species.
2. Sensitive fish, wildlife, and plant species.
3. Big game wildlife species.
4. Water quality.
5. Soil resources.
6. Inventoried roadless areas.
7. Indian rights and religious practices.
8. Dispersed and developed recreation opportunities.
9. Heritage resources.
10. Social and economic impacts to local and area communities.
11. Consistency with Forest Plan goals and objectives.
12. Lands considered in wilderness legislation.
13. Scenic byways.
14. Municipal watersheds.
15. Experimental Forest.
16. Noxious weeks.

The Lewis and Clark Forest Plan provides direction for the use of
stipulations to be attached to leases in order to comply with Forest
Plan goals and objectives. As outlined in the Forest Plan, no-surface
occupancy (NSO) is recommended for lands where oil and gas development
could conflict with riparian values, wetlands and floodplains, as well
as on slopes greater than 60%. The Forest Plan calls for no-surface
occupancy to protect existing uses such as powerlines, irrigation
canals, and cemeteries, and developed recreation sites, as well as the
area above Gibson Dam on the Sun River. Areas identified in the Forest
Plan as Research Natural Areas also require the NSO stipulation. The
Ford Creek Plateau area on the Rocky Mountain Division would be
available only for no-surface occupancy leasing for the first decade of
the Forest Plan.
The Plan also identifies areas for which timing restrictions on
activity would be stipulated to protect resource values such as
threatened and endangered species habitat, sensitive species habitat,
big game seasonal ranges, and raptor nest sites. NSO is recommended in
areas where more than one key wildlife habitat is present and the
combined seasons of use leaves no opportunity for oil and gas
occupancy.
In addition, the Lewis and Clark Forest Plan identifies resource
concerns requiring special operating constraints, such as landtypes
susceptible to moderate-severe cut-bank failure potential, semi-
primitive recreation areas, Experimental Forests, and municipal
watersheds. A stipulation controlling surface use would be applied to
leases with these resource concerns.
Under the Forest Plan, stream segments eligible for ``wild'' status
under the Wild and Scenic Rivers Act of 1968 will not be offered for
lease. Most of these stream segments are within existing wilderness
areas, but on those segments outside of designated wilderness on
Forest, lands unavailable for lease include areas within \1/4\ mile
either side of segments of the South Fork of the Sun River, the
Dearborn River, and North Fork Birch Creek.
Public participation will be important to the analysis. Part of the
goal of public involvement is to identify additional issues and to
refine the preliminary issues identified above. People may visit with
Forest Service officials at any time during the analysis and prior to
the decision. However, two periods are specifically designated for
comments on the analysis: (1) During the scoping process and (2) during
the Draft EIS (DEIS) comment period.
During the scoping process, the Forest Service is seeking
information and comments from Federal, State, and local agencies and
other individuals or organizations who may be interested in or affected
by the proposed action. A scoping document will be prepared and mailed
to parties known to be interested in the proposed action by February
25, 1994. The agency invites written comments and suggestions on this
action, particularly in terms of identification of issues and
alternative development. In addition, public open houses will be held
during the scoping period: on Monday, February 28 from 5 p.m. to 8 p.m.
at the Kings Hill Ranger District Office in White Sulphur Springs, MT;
on Wednesday, March 2, from 6 p.m. until 9 p.m. at the Great Falls
Civic Center in Great Falls, MT; on Monday, March 14, from 6 p.m. to 9
p.m. at the Holiday Inn in Missoula, MT; on Tuesday, March 16, from 6
p.m. to 9 p.m. at the Little Flower Parish in Browning, MT; and on
Wednesday, March 17, from 6 p.m. to 9 p.m. at the Choteau Public
Library in Choteau, MT.
In addition to the proposed action, a range of alternatives will be
developed in response to issues identified during scoping. This
includes the no-action alternatives required by NEPA in which no
leasing would be authorized at this time. The Forest Service will
analyze and document the direct, indirect, and cumulative effects of
all alternatives. Stipulations will be developed to mitigate effects
and protect other resources, and the effectiveness of those
stipulations will be assessed.
The BLM and Forest Service are jointly preparing a Reasonably
Foreseeable Development (RFD) scenario to predict the level and type of
oil and gas activity anticipated to occur for the 10-15 year period
following leasing. The RFD is based on known geologic, economic, and
technical information for the local area. This RFD will be used to
analyze the effects of the proposed action and alternatives.
The Forest Service will continue to involve the public and inform
interested and affected parties on how to participate and contribute to
the final decision. Another formal opportunity for response will be
provided following completion of a Draft EIS.
The Draft EIS should be available for review in the fall of 1994.
The Final EIS is scheduled for completion in September 1995.
The comment period on the Draft EIS will be 45 days from the date
the Environmental Protection Agency publishes the Notice of
Availability in the Federal Register.
The Forest Supervisor for the Lewis and Clark National Forest has
been assigned the task of compiling the EIS. However, the officials
responsible for making the decision resulting from the analysis are:
David F. Jolly, Northern Region Regional Forester, Federal Building,
200 E. Broadway, P.O Box 7669, Missoula, MT 59807; and State Director,
USDI-Bureau of Land Management, Montana State Office, 222 North 32nd
Street, P.O. Box 36800, Billings, MT 59107-6800.
They will decide on an alternative to be implemented after
considering comments and responses, environmental consequences
discussed in the Final EIS, and applicable laws, regulations, and
policies. The decision and reasons for the decision will be documented
in a Record of Decision.
The comment period on the Draft Environmental Impact Statement will
have 45 days from the date the Environmental Protection Agency
publishes the Notice of Availability in the Federal Register.
The Forest Service believes, at this early stage, it is important
to give reviewers notice of several court rulings related to public
participation in the environmental review process. First, reviewers of
draft environmental impact statements must structure their
participation in the environmental review of the proposal so it is
meaningful and alerts an agency to the reviewer's position and
contentions (Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519,
553 (1978). Also, environmental objections that could be raised at the
draft environmental impact statement stage but are not raised until
after completion of the final environmental impact statement may be
waived or dismissed by the courts. City of Angoon v. Hodel, 803 F. 2d
1016, 1022 (9th Cr. 1986) and Wisconsin Heritages, Inc. v. Harris, 490
F. Supp. 1334, 1338 (E.D. Wis. 1980). Because of these court rulings,
it is very important those interested in this proposed action
participate by the close of the 45-day comment period so substantive
comments and objections can be made available to the Forest Service at
a time when it can meaningfully consider and respond to them in the
Final Environmental Impact Statement.
To assist the Forest Service in identifying and considering issues
and concerns on the proposed action, comments during the scoping period
should be as specific as possible. Initial comments concerning the
scope of the analysis should be mailed to John D. Gorman, Forest
Supervisor by March 31, 1994. When the Draft EIS is released, it is
also helpful if comments refer to specific pages or chapters in the
draft document. Comments may also address the adequacy of the Draft EIS
or the merits of the alternatives formulated and discussed in the
statement. Reviewers may wish to refer to the Council on Environmental
Quality Regulations for implementing the procedural provisions of the
National Environmental Policy Act at 40 CFR 1503.3 in addressing these
points.

Dated: February 17, 1994.
John D. Gorman,
Forest Supervisor.
[FR Doc. 94-4134 Filed 2-23-94; 8:45 am]
BILLING CODE 3410-11-M

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A94-4134. Public record. Not legal advice.
