# Drawbridge Operation Regulations; Merrimack River, MA

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A94-30480

## Record

- **Collection:** Federal Register
- **Document type:** Uncategorized Document
- **Published:** December 12, 1994

## Text

DEPARTMENT OF TRANSPORTATION
33 CFR Part 117

[CGD01-94-094]
RIN 2115-AE47

Drawbridge Operation Regulations; Merrimack River, MA

AGENCY: Coast Guard, DOT.

ACTION: Notice of proposed rulemaking.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is considering a change to the regulations
governing the Newburyport US1 Bridge over the Merrimack River, mile
3.4, in Newburyport, Massachusetts, by requiring a one hour advance
notice for openings during the winter months. This is being proposed
because the waterway is often frozen during the winter and there have
been few requests for bridge openings. This will relieve the bridge
owner of the burden of posting personnel at the bridge during the
winter months.

DATES: Comments must be received on or before February 10, 1995.

ADDRESSES: Comments should be mailed to Commander (obr), First Coast
Guard District, Captain John Foster Williams Federal Building, 408
Atlantic Ave., Boston, Massachusetts 02110-3350. Comments may also be
hand-delivered to this address. The comments and other materials
referenced in this notice will be available for inspection and copying
by appointment at the Captain John Foster Williams Federal Building,
Room 628, 408 Atlantic Avenue, Boston, Massachusetts. Normal office
hours are between 6:30 a.m. and 3 p.m., Monday through Friday, except
Federal holidays.

FOR FURTHER INFORMATION CONTACT:
William C. Heming, Bridge Administrator, First Coast Guard District,
(212) 668-7170.

SUPPLEMENTARY INFORMATION:

Request for Comments

Interested persons are invited to participate in this rulemaking by
submitting written views, comments, data, or arguments. Persons
submitting comments should include their names and addresses, identify
this rulemaking (CGD01-94-094), the specific section of this proposal
to which each comment applies, and gives reasons for each comment. The
Coast Guard requests that all comments and attachments be submitted in
an unbound format suitable for copying and electronic filing. If not
practical, a second copy of any bounded material is requested. Persons
desiring acknowledgment that their comments have been received should
enclose a stamped self-addressed post card or envelope.
The Coast Guard will consider all comments received during the
comment period and it may change this proposal in light of comments
received. The Coast Guard plans no public hearing. Persons may request
a public hearing by writing to Commander (obr), First Coast Guard
District at the address listed under ADDRESSES. The request should
include reasons why a hearing would be beneficial. If the Coast Guard
determines that the opportunity for oral presentations will aid this
rulemaking, the Coast Guard will hold a public hearing at a time and
place announced by a later notice in the Federal Register.

Drafting Information

The drafters of this notice are Mr. John McDonald, First Coast
Guard District Bridge Branch, Project Manager and Lieutenant Commander
S.R. Watkins, First Coast Guard District Legal Office, Project Counsel.

Background and Purpose

The Newburyport US1 Bridge over the Merrimack River in Newburyport,
Massachusetts has a vertical clearance of 35' above mean high water
(MHW) and 42' above mean low water (MLW). The Merrimack River is frozen
during most of the winter and there have been few requests for bridge
openings during this period. The existing regulations require the
bridge to open on signal from May 1 to October 31, 6 a.m. to 10 p.m.
The proposed regulations will extend the period during which the bridge
will open on signal: from May 1 to November 15, from 6 a.m. to 10 p.m.
The proposed regulation also will require at least a one hour advance
notice for openings at all other times.

Discussion of Proposed Amendments

The Massachusetts Highway Department (MHD) has requested a change
to the existing operating regulations in 33 CFR Sec. 117.605 which
allow the Newburyport US1 Bridge to open on signal from May 1 through
October 31 from 6 a.m. to 10 p.m. and from November 1 to April 30 from
8 a.m. to 5 p.m. At all other times the draw shall open if at least a
one hour advance notice is given. The proposed regulations will permit
the draw to open on signal from May 1 to November 15, from 6 a.m. to 10
p.m. At all other times the draw will open on signal if at least one
hour advance notice is given by calling the number posted at the
bridge. This change to the regulations is being proposed due to
frequent waterway freezing during the winter months coupled with
infrequent requests for openings. The proposed change to the regulation
will relieve the bridge owner of the burden of posting personnel at the
bridge during the winter months. The drawtenders will be on call to
open the draw when the advance notice is given to the highway
department by calling the number that will be posted at the bridge.

Regulatory Evaluation

This proposal is not a significant regulatory action under section
3(f) of Executive Order 12866, and does not require an assessment of
potential costs and benefits under section 6(a)(3) of that order. It
has been exempted from review by the Office of Management and Budget
under that order. It is not significant under the regulatory policies
and procedures of the Department of Transportation (DOT) (44 FR 11040;
February 26, 1979). The Coast Guard expects the economic impact to be
so minimal that a full Regulatory Evaluation, under paragraph 10e of
the regulatory policies and procedures of DOT, is unnecessary. This
conclusion is based on the fact that the regulation will not prevent
mariners from transiting the US1 Bridge. It will require only that
mariners plan their transits around the new operating hours.

Small Entities

Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the
Coast Guard must consider whether this action will have a significant
economic impact on a substantial number of small entities. ``Small
entities'' include independently owned and operated small businesses
that are not dominant in their field and that otherwise qualify as
``small business concerns'' under section 3 of the Small Business Act
(15 U.S.C. 632). Because of the reasons discussed in the Regulatory
Evaluation above, the Coast Guard certifies under 5 U.S.C. 605(b) that
this action, if adopted, will not have a significant economic impact on
a substantial number of small entities.

Collection of Information

This rule contains no collection of information requirements under
the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).

Federalism

The Coast Guard has analyzed this proposal in accordance with the
principles and criteria contained in Executive Order 12612, and it has
been determined that this proposed regulation does not have sufficient
federalism implications to warrant preparation of a Federalism
Assessment.

Environment

The Coast Guard considered the environmental impact of this
proposal and concluded that, under section 2.B.2.e.(32)(e) of
Commandant Instruction M16475.1B, this proposal is categorically
excluded from further environmental documentation. A Categorical
Exclusion Determination is available in the docket for inspection or
copying where indicated under ADDRESSES.

List of Subjects in 33 CFR Part 117

Bridges.

Regulations

In consideration of the foregoing, the Coast Guard proposes to
amend part 117 of title 33, Code of Federal Regulations, as follows:

PART 117--DRAWBRIDGE OPERATION REGULATIONS

1. The authority citation for part 117 continues to read as
follows:

Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 CFR 1.05-1(g); section
117.255 also issued under the authority of Pub. L. 102-587, 106
Stat. 5039.

2. Section 117.605, paragraph (a) is revised and paragraph (d) is
added as follows:

Sec. 117.605 Merrimack River.

(a) The draw of the Newburyport US1 Bridge, mile 3.4, shall open on
signal from May 1 through November 15, from 6 a.m. to 10 p.m. At all
other times the draw shall open on signal if at least one hour advance
notice is given by calling the number posted at the bridge.
* * * * *
(d) The owners of this bridge shall provide and keep in good
legible condition, clearance gauges for each draw with figures not less
than twelve (12) inches high designed, installed and maintained
according to the provisions of Sec. 118.160 of this chapter.

Dated: December 2, 1994.
R.R. Clark,
Captain, U.S. Coast Guard, Acting Commander, First Coast Guard
District.
[FR Doc. 94-30480 Filed 12-9-94; 8:45 am]
BILLING CODE 4910-14-M

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A94-30480. Public record. Not legal advice.
