DEPARTMENT OF DEFENSE
Department of the Navy

Record of Decision for Realignment of Carswell Air Force Base to
Naval Air Station Fort Worth, Fort Worth, TX

Pursuant to section 102(2) of the National Environmental Policy Act
(NEPA) of 1969 and the Council on Environmental Quality regulations for
implementing NEPA procedures (40 CFR 1500-1508), the Department of the
Navy announces its decision to implement realignment of Carswell Air
Force Base (AFB) to Naval Air Station (NAS) Fort Worth Joint Reserve
Base (JRB), Fort Worth, Texas. In accordance with the legislative
requirements of the Defense Base Closure and Realignment Act of 1990
[Public Law (P.L.) 101-510), the 1993 Defense Base Closure and
Realignment Commission (BRAC-93) recommended the closure of NAS Dallas,
Texas, NAS Memphis, Tennessee, and NAS Glenview, Illinois. Assets and
operations from each of these bases were directed to be relocated to
the former Carswell AFB, which closed September 30, 1993 pursuant to a
BRAC-91 decision. The former Carswell AFB is to be realigned to become
the Naval Air Station Fort Worth Joint Reserve Base (JRB).
In compliance with the Council on Environmental Quality (CEQ)
regulations, the Department of the Navy acted as a Cooperating Agency
with the Department of the Air Force and had substantial involvement in
drafting and reviewing an Environmental Impact Statement (EIS) for the
disposal and reuse of Carswell AFB. The EIS presented a full
description of the projects and environmental impacts associated with
the Navy realignment actions. In addition, the Navy planned actions
were presented at the Draft EIS Public Hearing hosted by the Department
of the Air Force. The Department of the Navy has conducted an
independent review of the EIS and adopts the EIS for purposes of its
proposed actions. This Record of Decision announces Navy's decision to
implement actions described in the FEIS for the realignment and
operation of NAS Fort Worth JRB, Fort Worth, Texas.
A Draft EIS was prepared for the proposed reuse and disposal
actions and distributed to federal, state, and local agencies and to
interested individuals and groups in February 1993. The DEIS was
revised to include the Navy as a cooperating agency when the BRAC-93
decision to realign Carswell AFB was made. The revised DEIS was
published and distributed in March 1994. A public hearing was held on
April 4, 1994 in the City of Fort Worth, Texas. Responses to all public
comments received were incorporated in an FEIS that was distributed in
July 1994. The proposed Navy realignment action would incorporate
approximately 1,869 acres from the former Carswell AFB for reuse as NAS
Fort Worth JRB. The realignment of the base would consist of renovation
of approximately 120 buildings and new construction of an additional 25
facilities, in addition to the demolition of some facilities that are
not cost effective to reuse or renovate.
The realignment also includes upgrades of base utilities to
accommodate JRB requirements. Upgrades to the airfield stormwater
drainage will also be incorporated into the realignment plans. An
estimated total of 24 acres of land will need to be distributed for new
construction activities.
The proposed operations of the NAS Fort Worth JRB will be primarily
air operations by reserve forces. Some smaller non-air units will also
be attached to the base. Reserve units from the Navy, Marine corps, Air
Force, Texas Air National Guard, and Army National Guard will be
operating at the base. The various types of aircraft that will be
normally at the base will include F-14s, F/A-18s, F-16s, KC-130s, C-
130s, C-9s, C-12s, U-21s, CH-47s, UH-60s and a UH-1. An estimated
95,000 annual air operations are associated with the various proposed
military aircraft, including transient military aircraft. All of the
existing airspace and air traffic control services associated with
previous Air Force operations will be retained for use by the JRB. The
combination of closure and realignment will reduce military air traffic
in the area and significantly reduce potential civilian-military
aircraft conflicts.
Approximately 2,100 active duty military personnel are expected to
be attached to the JRB. An additional 1,400 civilian personnel will be
employed at the base. Approximately 8,500 reservists or guardsmen will
drill at the JRB on schedules that will attempt to spread the numbers
equally over three weekends each month.
The realignment and establishment of NAS Fort Worth JRB will occur,
as mandated by P.L. 101-510, regardless of the disposal and reuse of
the remaining portions of Carswell AFB. Therefore, these military land
areas and reuse activities were incorporated as part of the No-Action
alternative and all reuse alternatives for analysis in the EIS. Maximum
consideration was given to the use of existing structures to minimize
environmental impacts and construction costs for realignment. Sites
considered at NAS Fort Worth JRB for the proposed new facilities
avoided environmentally sensitive areas and were selected based on
functional considerations, adequacy of existing structures for the
proposed uses, availability of utilities, proximity to existing
facilities, and observing all airfield safety and noise criteria. The
proposed action will cause no significant impact to ambient air quality
levels. Localized, temporary impacts would occur during construction
and demolition activities. Compliance with state and federal
regulations, including National Emission Standards for Hazardous Air
Pollutants (NESHAPS), will be achieved during any removal of asbestos-
containing materials.
NAS Fort Worth JRB is located in a non-attainment area for ozone.
An applicability analysis was performed for air pollutant emissions of
nitrogen oxides (NOX) and volatile organic compounds (VOCs) in
compliance with the Clean Air Act Amendments of 1990 and the 1993
General Conformity Rule for determining conformity of federal actions
to state or federal implementation plans (40 CFR Parts 6, 51, and 93).
The analysis included construction-related emissions, mobile-source
emissions, and stationary-source emissions associated with the proposed
action. Neither NOX nor VOC emissions estimates for any year of
the proposed action exceeded the de minimis levels of 100 tons per year
established by the General Conformity Rule. The proposed action was
determined to conform to the State Implementation Plan (SIP) and is
exempted from any further requirements of the General Conformity Rule.
The Texas Natural Resource Conservation Commission (TNRCC) has reviewed
the applicability analysis presented in the FEIS and has approved the
air permit application resulting in the issuance of a construction
permit to the Navy.
An aircraft noise study was conducted to analyze the effects of
noise patterns associated with JRB operations as compared to the
previous operations at Carswell AFB. The area exposed to sound level
DNL 65 dB or greater is expected to decrease by approximately 2,605
acres and affect 2,300 fewer residents than the previous Air Force
aircraft noise impacts.
No significant degradation of levels of service for on-base or off-
base road systems are expected as a result of the proposed action.
Current utilities to the base are of sufficient capacity to provide
anticipated services. Utility lines within the base infrastructure will
be upgraded in some locations where additional fire protection, natural
gas, sanitary sewer, or electrical services are required.
The local economy will not encounter any significant impacts from
the proposed action. NAS Forth Worth JRB will initially reuse 83 units
of family housing on-base. An estimated 3,939 housing units within the
local communities will be vacated as a result of the closure of
Carswell AFB. An estimated 1,196 housing units will be required to
accommodate the in-migration of permanent personnel associated with the
JRB. Based on this projected in-migration, 281 new students will enroll
in the area's various school districts; this number is less than the
decreases experienced in each of the last three years as a result of
the Carswell AFB closure.
Clean-up on identified installation restoration program (IRP) sites
will continue regardless of the reuse or disposal plans. The
Departments of the Navy and Air Force have entered into a Memorandum of
Agreement to identify which department will continue the management of
the clean-up program and provide the funding requirements. The two
Departments have agreed to finalize program arrangements by October 1,
1995. In the interim, the Air Force Base Conversion Agency (AFBCA) will
continue to administer the program. New construction and renovations
requiring excavations will be closely coordinated with the IRP project
manager to avoid any impacts to IRP sites or construction plans and
maintain the health and safety of contractor personnel.
The Navy will institute a hazardous material minimization program
at NAS Fort Worth JRB by issuing hazardous materials in increments for
daily consumption to the various departments and users on base. The
hazardous waste storage facility currently permitted under a Part B
permit by the State of Texas will continued to be used as a permitted
facility for the storage of generated hazardous wastes.
The AFBCA has identified all underground storage tanks that were in
place at Carswell AFB. Navy design teams are evaluating what tanks are
required for continued support to facilities planned for reuse. These
tanks will be inspected and certified for use in accordance with all
applicable underground storage tank regulations. The AFBCA is
continuing with efforts to remove all other tanks not planned for
reuse.
The proposed action would result in no significant impacts to plant
or animal species listed as threatened or endangered by either federal
or state agencies. The U.S. Fish and Wildlife Service has concurred in
this conclusion. No impacts to wetlands will be experienced as a result
of new construction. Minor impacts to floodplains will be mitigated
through the construction of improved storm water drainage and handling
systems. The estimated 24 acres of disturbance from new construction
will have minimal impacts to biological resources because of
adjacencies to current airfield/industrial operations and the already
existing built-up conditions.
Potential impacts to cultural resources at NAS Fort Worth JRB have
been evaluated in compliance with Section 106 of the National Historic
Preservation Act (NHPA). Renovations are proposed for two buildings
(Building 1430 and 4175) that have been identified as eligible for the
National Register of Historic Places. The exterior renovations to
Building 1430 will include the installation of a new roof. Interior
renovations will include movement of office walls added to the facility
during earlier Air Force interior renovations. Building 4575 will
undergo major interior renovations to adapt this alert crew facility to
a squadron operations building. Exterior renovations will include
removal and demolition of surrounding equipment, addition of some
windows, and altering some facility points of ingress/egress. All
proposed modifications to these buildings will be coordinated with the
Texas Historical Commission (THC) during project design. The Navy is
proposing to the THC, a Memorandum of Agreement (MOA) for the
acknowledgment, operation, and maintenance of eligible historic
structures on NAS Fort Worth JRB. No significant archaeological, Native
American, or paleontological resources have been identified on NAS Fort
Worth JRB that would be adversely affected by the realignment
activities. In the event that archaeological, paleontological, or
Native American resources are discovered during the course of project
activities, ground disturbing activities will cease in the immediate
area and a qualified archaeologist will be consulted.
Questions regarding the Navy proposed actions for the realignment
of Carswell AFB to NAS Forth Worth JRB addressed in the Draft and Final
Environmental Impact Statement prepared for the Reuse and Disposal of
Carswell AFB may be directed to: Commanding Officer, Southern Division,
Naval Facilities Engineering Command, P.O. Box 190010, North
Charleston, SC 29419-9010 (Attn: Mr. Darrell Molzan, Code 203DM),
telephone (803) 743-0796, fax (803) 743-0993.

Dated: November 14, 1994.
Elsie L. Munsell,
Deputy Assistant Secretary of the Navy, (Environment and Safety).
[FR Doc. 94-28701 Filed 11-21-94; 8:45 am]
BILLING CODE 3810-FF-M

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A94-28701. Public record. Not legal advice.