# Environmental Impact Statements and Regulations; Availability of EPA Comments

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A94-2606

## Record

- **Collection:** Federal Register
- **Document type:** Uncategorized Document
- **Published:** February 4, 1994

## Text

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-4708-2]

Environmental Impact Statements and Regulations; Availability of
EPA Comments

Availability of EPA comments prepared January 17, 1994 through
January 21, 1994 pursuant to the Environmental Review Process (ERP),
under Section 309 of the Clean Air Act and Section 102(2)(c) of the
National Environmental Policy Act as amended. Requests for copies of
EPA comments can be directed to the Office of Federal Activities at
(202) 260-5076.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 10, 1993 (58
FR 18392).

Draft EISs

ERP No. D-AFS-K67021-NV Rating EC2, Jerritt Canyon Gold Mine
Expansion Project, Implementation, Plan of Operation and COE Section
404 Permit, Humboldt National Forest, Mountain City Ranger District,
Elko County, NV.
Summary: EPA expressed environmental concerns regarding the
proposed alternative due to potential impacts to water quality, water
quantity, air quality and vegetation. EPA recommended that the final
EIS provide additional information on these issues as well as
cumulative impacts and wetlands mitigation.
ERP No. D-FRA-B53010-00 Rating LO1, Northeast Corridor Improvement
Project, Implementation, Electrification of the Rail Main Line from New
Haven to Boston, Funding, COE Section 10 and 404 Permits, New Haven, CT
and Boston, MA.
Summary: EPA stated that the proposed project had the potential to
improve region air quality and that other environmental resources
within EPA's jurisdiction and expertise would not be significantly
adversely affected by the proposed project.
ERP No. DC-FHW-B40050-MA Rating EC2, Central Artery/I-93 Third
Harbor Tunnel/I-90 Extension, Updated and Additional Information,
Design Alternatives for the Charles River Crossing, Funding, US COE
Section 10 and 404 Permits, US CGD Permits and EPA NPDES Permit,
Suffolk County, MA.
Summary: EPA expressed environmental concerns for Clean Air Act
conformity requirements to be addressed, and the analysis of shading
impacts and compensatory mitigation for adverse environmental impacts
to waters of the United States. EPA commented that all three new design
alternatives presented in the draft supplemental EIS would have less
adverse environmental impact, and less adverse impact on parks and open
space, than the alternative (Scheme Z) presented in the 1991 final
supplemental EIS as the proposed action.
ERP No. DS-AFS-K65136-CA Rating LO, Casa-Guard Timber Sale, Timber
Harvesting, Updated Information concerning Impacts on the California
Spotted Owl and Fish Creek Watershed and Reforestation, Sequoia
National Forest, Cannell Meadow Ranger District, Tulare County, CA.
Summary: EPA expressed lack of objections with the proposed action.
ERP No. DS-AFS-K65137-CA Rating LO, Cottonwood and Gulf Timber
Sales, Timber Harvesting in the Breckenridge Compartment, Updated
Information Concerning Withdrawal of the Golf Timber Sale and Impacts
on the California Spotted Owl and Reforestation for the Cottonwood
Timber Sale, Sequoia National Forest, Greenhorn Ranger District, Kern
County, CA.
Summary: EPA expressed lack of objections with the proposed action.

Final EISs

No. F-COE-B40062-NH, Nashua-Hudson Circumferential Highway
Improvements, Approval and COE Section 10 and 404 Permits, Towns of
Hudson, Nashua and Litchfield, Hillsborough County, NH.
Summary: EPA had environmental objections to the proposed action
due to (1) significant degradation of waters of the United States,
including wetlands; (2) potential adverse impacts to water supply
resources; and (3) the lack of specific mitigation to offset the
impacts to waters of the U.S. and drinking water supplies. EPA stated
that the proposed action is a likely candidate for action under EPA's
Section 404 (c) authority and recommended that the Corps of Engineers
deny the Section 404 permit application.

Dated: February 1, 1994.
Richard E. Sanderson,
Director, Office of Federal Activities.
[FR Doc. 94-2606 Filed 2-3-94; 8:45 am]
BILLING CODE 6560-50-P

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A94-2606. Public record. Not legal advice.
