DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC94-16-000, et al.]

Robbins Resource Recovery Company, Robbins Resource Recovery
Partners, L.P., et al.; Electric Rate and Corporate Regulation Filings

June 22, 1994.
Take notice that the following filings have been made with the
Commission:

1. Robbins Resource Recovery Company, Robbins Resource Recovery
Partners, L.P.

[Docket No. EC94-16-000]

Take notice that on June 16, 1994, Robbins Resource Recovery
Company and Robbins Resource Recovery Partners, L.P. filed additional
information to its May 20, 1994 filing in this docket.
Comment date: July 12, 1994, in accordance with Standard Paragraph
E at the end of this notice.

2. Consumers Power Company

[Docket No. EC94-18-000]

Take notice that on June 9, 1994, Consumers Power Company tendered
for filing an application to sell undivided ownership interests in
certain transmission facilities to the City of Lansing by its Board of
Water and Light (Light).
Comment date: July 11, 1994, in accordance with Standard Paragraph
E at the end of this notice.

3. Direct Electric Inc.

[Docket No. ER94-1161-000]

Take notice that Direct Electric Inc., (DIRECT) on June 1, 1994
tendered for filing an amendment to its April 15, 1994 filing in the
above-referenced docket.
Comment date: July 6, 1994, in accordance with Standard Paragraph E
at the end of this notice.

4. Georgia Power Company

[Docket No. ER94-1175-000]

Take notice that on June 10, 1994, Georgia Power Company submitted
supplemental information in this docket.
Comment date: July 7, 1994, in accordance with Standard Paragraph E
at the end of this notice.

5. Missouri Public Service, division of UtiliCorp United, Inc.

[Docket No. ER94-1345-000]

Take notice that on June 10, 1994, Missouri Public Service division
of UtiliCorp United, Inc. (``MPS'') tendered for filing an executed
``Contract for Electric Service'' with the City of Osceola, Missouri
(``Osceola''), dated May 25, 1994 (the ``Contract''). The Contract
provides for the new points of delivery between MPS and Osceola. The
rates, terms and conditions under which service will be provided are
identical to those approved by the Commission in Docket No. ER91-124.
MPS has requested that the Contract be made effective as soon as the
necessary technical work to interconnect the two systems is complete,
but in any event, no later than August 27, 1994.
A copy of the filing was served on Osceola and the Missouri Public
Service Commission.
Comment date: July 7, 1994, in accordance with Standard Paragraph E
at the end of this notice.

6. Georgia Power Company

[Docket No. ER94-1350-000]

Take notice that on June 13, 1994, Georgia Power Company (Georgia
Power) tendered for filing a Scheduling Services Agreement between
itself and the Municipal Electric Authority of Georgia (MEAG) which
sets forth the procedural details and unit commitment cost recovery
mechanisms for off-system transactions scheduled by MEAG. The parties
intend for the Scheduling Services Agreement to become effective as of
the date it is accepted for filing or approved by the Commission, and
Georgia Power requests waiver of the Commission's notice requirements.
Georgia Power states that it has served copies of the filing on MEAG.
Comment date: July 7, 1994, in accordance with Standard Paragraph E
at the end of this notice.

7. New York State Electric & Gas Corporation

[Docket No. ER94-1353-000]

Take notice that New York State Electric & Gas Corporation (NYSEG)
on June 13, 1994, tendered for filing pursuant to Section 35.12 of the
Federal Energy Regulatory Commission's Rules of Practice and Procedure,
as an initial rate schedule, an agreement with Niagara Mohawk Power
Corporation (NMPC). The agreement provides a mechanism pursuant to
which the parties can enter into separately scheduled transactions
under which NYSEG will sell to NMPC and NMPC will purchase from NYSEG
either capacity and associated energy or energy only as the parties may
mutually agree.
NYSEG requests that the agreement become effective on June 14,
1994, so that the parties may, if mutually agreeable, enter into
separately scheduled transactions under the agreement. NYSEG has
requested waiver of the notice requirements for good cause shown.
NYSEG served copies of the filing upon the New York State Public
Service Commission and NMPC.
Comment date: July 7, 1994, in accordance with Standard Paragraph E
at the end of this notice.

8. Southwestern Electric Power Company

[Docket No. ER94-1354-000]

Take notice that on June 13, 1994, Southwestern Electric Power
Company (SWEPCO) tendered for filing a transmission service agreement,
dated May 2, 1994, between SWEPCO and the City of Lafayette, Louisiana
(Lafayette). SWEPCO proposes reduced rates for continued transmission
service through its system for up to 26 megawatts of power and
associated energy from the Southwestern Power Administration (SWPA) for
delivery to SWEPCO's interconnections with Central Louisiana Electric
Company (CLECO) and Gulf States Utilities Company (GSU) for Lafayette's
benefit.
SWEPCO requests an effective date of May 1, 1994, and, accordingly,
requests waiver of the Commission's notice requirements. Copies of the
filing were served upon Lafayette, SWPA, CLECO, GSU, the Arkansas
Public Service Commission, the Louisiana Public Service Commission and
the Public Utility Commission of Texas.
Comment date: July 7, 1994, in accordance with Standard Paragraph E
at the end of this notice.

9. Southern California Edison Company

[Docket No. ER94-1355-000]

Take notice that on June 14, 1994, Southern California Edison
Company (Edison) tendered for filing changes in rates for transmission
service as embodied in Edison's agreements with the following entities:

------------------------------------------------------------------------
Entity FERC Rate Schedule No.
------------------------------------------------------------------------
1. City of Anaheim................. 130, 241, 246.04, 246.06, 246.08,
246.13, 246.23
2. City of Azusa................... 160, 242, 242.8, 247.04, 247.06,
247.08, 247.18
3. City of Banning................. 159, 243, 243.8, 248.05, 248.07,
248.09, 248.17
4. City of Colton.................. 162, 244, 244.8, 249.04, 249.06,
249.08, 249.18
5. City of Riverside............... 129, 245, 250.04, 250.06, 250.08,
250.10, 250.15, 250.21, 250.27
6. City of Vernon.................. 149, 154.07, 172, 207, 257, 263,
272, 276
7. Arizona Electric Power 131, 161
Cooperative.
8. Arizona Public Service Company.. 185
9. California Department of Water 38, 112, 113, 181
Resources.
10. City of Burbank................ 166
11. City of Glendale............... 143
12. City of Los Angeles Department 102, 118, 140, 141, 163, 188, 219
of Water and Power.
13. City of Pasadena............... 158
14. Imperial Irrigation District... 259, 268
15. M-S-R Public Power Agency...... 153
16. Northern California Power 240
Agency.
17. Pacific Gas and Electric 117, 147, 256
Company.
18. PacfiCorp...................... 275
19. San Diego Gas and Electric 151, 232, 274, 302
Company.
20. Western Area Power 120
Administration.
------------------------------------------------------------------------

Pursuant to these rate schedules, the rate changes result from a
decrease in the rate of return from 9.94% to 9.17% authorized by the
California Public Utilities Commission, effective January 1, 1994.
Copies of this filing were served upon the Public Utilities
Commission of the State of California and all interested parties.
Comment date: July 7, 1994, in accordance with Standard Paragraph E
at the end of this notice.

10. Consolidated Edison Company of New York, Inc.

[Docket No. ER94-1359-000]

Take notice that on June 14, 1994, Consolidated Edison Company of
New York, Inc. (Con Edison) tendered for filing a Supplement to Con
Edison Rate Schedule FERC No. 112 for transmission service for New York
State Electric & Gas Corporation (NYSEG). The Supplement provides for
an increase in annual revenues of $38,582.28. The supplement increases
the charges for transmission service from $.3879/kW-mo. to $.4028/kW-
mo. Con Edison has requested waiver of notice requirements so that the
Supplement can be made effective as of April 1, 1993.
Con Edison states that a copy of this filing has been served by
mail upon NYSEG.
Comment date: July 7, 1994, in accordance with Standard Paragraph E
at the end of this notice.

11. Orange and Rockland Utilities Inc.

[Docket No. ER94-1360-000]

Take notice that on June 14, 1994, Orange and Rockland Utilities,
Inc. (Orange and Rockland) tendered for filing pursuant to the Federal
Energy Regulatory Commission's order issued January 15, 1988, in Docket
ER88-112-000, an executed Service Agreement between Orange and Rockland
and Tesa Tape, Inc.
Comment date: July 7, 1994, in accordance with Standard Paragraph E
at the end of this notice.

12. Pennsylvania Power & Light Company

[Docket No. ER94-1363-000]

Take notice that on June 15, 1994, Pennsylvania Power & Light
Company (PP&L) tendered for filing an Electrical Output Sales Agreement
(Agreement) between PP&L and North American Energy Conservation, Inc.
(NAEC) dated May 13, 1994. The Agreement provides for the sale by PP&L
to NAEC's of electrical output solely for NAEC's use in wholesale bulk
power transactions.
PP&L has requested an effective date of August 14, 1994 for the
Agreement. PP&L has not requested any notice period waivers.
PP&L states that a copy of its filing was provided to NAEC and to
the Pennsylvania Public Utility Commission.
Comment date: July 7, 1994, in accordance with Standard Paragraph E
at the end of this notice.

13. Southwestern Public Service Company

[Docket No. ER94-1365-000]

Take notice that on June 15, 1994, Southwestern Public Service
Company (Southwestern) tendered for filing a Rate Schedule to be
included in its wholesale electric rate tariff. The rate schedule is a
contribution in aid of construction agreement between Southwestern and
South Plains Electric Cooperative, Inc. (South Plains). The agreement
provides for South Plains to pay Southwestern $14,134 for the
construction of a 115 kV structure and attachment of certain facilities
to a steel tower.
Comment date: July 7, 1994, in accordance with Standard Paragraph E
at the end of this notice.

14. Vermont Yankee Nuclear Power Corporation

[Docket No. ER94-1370-000]

Take notice that on June 16, 1994, Vermont Yankee Nuclear Power
Corporation (Vermont Yankee) tendered for filing, pursuant to Section
205 of the Federal Power Act and Section 35.13 of the Commission's
regulations, an amendment to the Power Contracts under which the
Company sells electricity for resale to nine New England utilities.
Vermont Yankee states that the rate change proposed would result in an
increase in Vermont Yankee's 1993 revenue requirement of approximately
$380 thousand.
Vermont Yankee states that copies of its filing have been provided
to its customers and to state regulatory authorities in Vermont, New
Hampshire, Maine, Massachusetts, Connecticut, and Rhode Island.
Comment date: July 7, 1994, in accordance with Standard Paragraph E
at the end of this notice.

15. Northeast Utilities Service Company

[Docket No. ER94-1358-000]

Take notice that on June 14, 1994, Northeast Utilities Service
Company (NUSCO) tendered for filing, on behalf of The Connecticut Light
and Power Company, Western Massachusetts Electric Company, Holyoke
Water Power Company (including Holyoke Power and Electric Company), and
Public Service Company of New Hampshire (together, the ``NU System
Companies''), a First Amendment to System Power Sales Agreement
(Amendment) with Hudson Light and Power Department (Hudson) and a
Service Agreement between NUSCO and the NU System Companies for service
under NUSCO's Short-Term Firm Transmission Service Tariff No. 5. The
transaction provides Hudson with economic replacement power during the
extended Seabrook refueling outage over the period June 12-July 6,
1994.
NUSCO requests that the rate schedule become effective on April 11,
1994. NUSCO states that copies of the rate schedule have been mailed or
delivered to the parties to the Amendment and the affected state
utility commissions.
Comment date: July 7, 1994, in accordance with Standard Paragraph E
at the end of this notice.

Standard Paragraphs:

E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-15803 Filed 6-28-94; 8:45 am]