GENERAL SERVICES ADMINISTRATION

Public Buildings Service; Proposed Port of Entry, Located North
of Oroville, WA; Intent To Prepare an Environmental Assessment or
Environmental Impact Statement

ACTION: The General Services Administration (GSA) hereby gives notice
it intends to prepare either an Environmental Assessment (EA) or an
Environmental Impact Statement (EIS) in accordance with the National
Environmental Policy Act of 1969 (NEPA) for the proposed port of entry
located north of Oroville, Washington. The decision on whether to
prepare an EIS would be made following the completion of scoping and
the Environmental Assessment. The EA would evaluate the proposed
project, expansion of the existing port of entry, the no-action
alternative, and other reasonable alternatives that might be identified
during the scoping process.

-----------------------------------------------------------------------

ADDRESSES: Scoping will be accomplished by correspondence and through a
public meeting with interested persons, organizations, and Federal,
state, and local agencies. Written comments on the scope of
alternatives and potential impacts should be addressed to the GSA's EIS
subconsultant, ABAM Consulting Engineers, at the following address:
33301 Ninth Avenue South, Federal Way, Washington 98003-6395,
Attention: Carol Beck.

DATES: Written comments should be sent by July 15, 1994. Comments and
suggestions will also be accepted at a public scoping meeting from 5:30
p.m. to 7:00 p.m. on Monday June 27, 1994 at the Oroville Railroad
Depot, 1210 Ironwood, Oroville, WA 98844. All comments received during
the meeting will be made part of the administrative record for the EA
and will be evaluated as part of the scoping process.

FOR FURTHER INFORMATION: Contact Carol Beck at ABAM Consulting
Engineers, 33301 Ninth Avenue South, Federal Way, Washington 98003-
6395, (206) 241-2040 or Donna M. Meyer at General Services
Administration, (206) 931-7675.

SUPPLEMENTARY INFORMATION: The GSA, assisted by our contractor will
prepare an Environmental Assessment on a proposal to design and
construct a new border station to be located approximately 5 miles
north of the town of Oroville, Washington. The scoping process will
determine the issues to be addressed in the EA, identify the potential
adverse environmental issues related to the proposed expansion, and
assist to determine whether an EIS should be prepared. Scoping will be
conducted in a manner consistent with NEPA guidelines. If an EIS is
required, GSA will serve as the lead agency pursuant to Section
1501.5(a) of the Council on Environmental Quality's Regulations for
Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508).

SCOPING: GSA invites interested individuals, organizations, affected
tribes and Federal, state and local agencies and officials to
participate in defining the reasonable alternatives to be evaluated in
the EA and in identifying any adverse social, economical, or
environmental issues related to the alternatives. Scoping comments can
be made verbally or in writing (see DATES and ADDRESS sections above
for location and time of meeting). During scoping, comments should
focus on identifying specific impacts to be evaluated and suggesting
alternatives or mitigation that minimize adverse impacts while
achieving similar objectives. Comments may also identify issues which
are not significant or which have been covered by prior environmental
review. Scoping should be limited to commenting on alternatives and not
indicating preferences. If an EIS is undertaken, there will be an
opportunity to comment on impacts of the selected alternatives upon
release of the draft document.

ADDITIONAL INFORMATION: A project information packet will be available
at the public meeting or can be obtained by contacting the above
referenced personnel. The packet will describe in more detail the
proposed project, alternatives and the EA/EIS process.

MAILING LIST: If you wish to be placed on the mailing list to receive
further information for this proposal as the EA process develops,
contact the above referenced personnel.

PROJECT PURPOSE, HISTORICAL BACKGROUND, AND PROJECT DESCRIPTION: The
project purpose is the design and construction of a new Port of Entry
at the U.S. and Canadian border near the town of Oroville, Washington.
The new station would replace the existing station, which is
overcrowded and functionally obsolete. The new facility would be
constructed on 9.1 acres of land by utilizing the existing site of 3.7
acres and acquiring an additional 5.4 acres to the south. This
additional acreage is necessary for maneuverability, reconfiguration
and expansion.
This facility is the only 24-hour multi-vehicle port in Eastern
Washington located on a major arterial roadway, U.S. Route 97. It is
also the only port in Eastern Washington designated as a commercial
cargo center. The present configuration is unable to satisfactorily
accommodate the volume of southbound traffic generated by Canadian
tourists, day-trippers, shoppers, and commercial truck and bus traffic
entering into the United States.
At completion, the new port facility would provide 68,757 gross
square feet of space, including canopy areas. The new facility would
include a new main administration and inspection facility, a new multi-
purpose building, and an animal inspection building. The primary
inspection lanes would increase from two to four; secondary lanes from
three to ten; primary commercial truck inspection lanes from zero to
two; secondary commercial truck lanes from one to three; and the bus
port bays from zero to two. A total of 124 outside parking spaces,
seven truck and 117 visitor/staff would be provided for travelers,
employees, seized vehicles, commercial vehicles, and government
vehicles.

ALTERNATIVES: The EA would consider an action alternative (Federal
construction) and a no-action alternative. Due to the unique
requirements for port of entry's, GSA has found it is impractical to
consider leasing an existing office building to meet these needs. GSA
is proposing to construct the facility at the site of the existing port
of entry and to acquire a parcel of land lying directly to the south.
The no-action alternative would continue the use of the overcrowded and
obsolete station.

PROBABLE EFFECTS: GSA will evaluate significant environmental, social,
and economical impacts of the alternatives in the EA. Potential impacts
include, but are not limited to, changes in geological characteristics,
changes in drainage and absorption patterns, water quality, new sources
of light or glare, loss of agricultural acreage, impacts to local
residences and businesses, loss of open space, and changes in traffic
and circulation patterns. The impacts will be evaluated both for the
construction period and for the life of the project. Measures to
mitigate any identifiable adverse impacts will be addressed.

PROCEDURES: The EA will be prepared based on the scoping report. After
its publication, GSA will make a decision whether an EIS will be
required. If an EIS is to be prepared, a Draft EIS would be made
available for public and agency review and comment, and a public
hearing would be held. A Final EIS would be prepared following the
closing of the comment period of the Draft.

Dated: June 8, 1994.
L. Jay Pearson,
Regional Administration (10A).
[FR Doc. 94-15220 Filed 6-22-94; 8:45 am]