# Pipeline Safety: Class Location Change Requirements

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A2020-19872

## Record

- **Collection:** Federal Register
- **Document type:** Proposed Rule
- **Published:** October 14, 2020
- **Citation:** 85 FR 65142

## Text

DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials Safety Administration
49 CFR Parts 191 and 192
[Docket No. PHMSA-2017-0151]
RIN 2137-AF29
Pipeline Safety: Class Location Change Requirements

AGENCY:

Pipeline and Hazardous Materials Safety Administration (PHMSA); DOT.

ACTION:

Notice of proposed rulemaking (NPRM).

SUMMARY:

In response to public input received as part of the rulemaking process, PHMSA is proposing to revise the Federal Pipeline Safety Regulations to amend the requirements for gas transmission pipeline segments that experience a change in class location. Under the existing regulations, pipeline segments located in areas where the population density has significantly increased must perform one of the following actions: Reduce the pressure of the pipeline segment, pressure test the pipeline segment to higher standards, or replace the pipeline segment. This proposed rule would add an alternative set of requirements operators could use, based on implementing integrity management principles and pipe eligibility criteria, to manage certain pipeline segments where the class location has changed from a Class 1 location to a Class 3 location. Through required periodic assessments, repair criteria, and other extra preventive and mitigative measures, PHMSA expects this alternative approach would provide long-term safety benefits consistent with the current natural gas pipeline safety rules while also providing cost savings for pipeline operators.

DATES:

Persons interested in submitting written comments on this proposed rule must do so by December 14, 2020. Late-filed comments will be considered to the extent practicable.

ADDRESSES:

You may submit comments identified by the docket number PHMSA-2017-0151 by any of the following methods:

Federal eRulemaking Portal: https://www.regulations.gov
. This site allows the public to enter comments on any
Federal Register
notice issued by any agency. Follow the online instructions for submitting comments.

Mail:
Hand Delivery: U.S. DOT Docket Management System, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue SE, Washington, DC 20590-0001 between 9:00 a.m. and 5:00 p.m., Monday through Friday, except Federal holidays.

Fax:
1-202-493-2251.

Instructions:
Identify the docket number PHMSA-2017-0151 at the beginning of your comments. If you submit your comments by mail, submit two copies. If you wish to receive confirmation that PHMSA has received your comments, include a self-addressed stamped postcard. Internet users may submit comments at
https://www.regulations.gov/
.

Note:

Comments are posted without changes or edits to
https://www.regulations.gov,
including any personal information provided. There is a privacy statement published on
https://www.regulations.gov
.

Confidential Business Information

Confidential Business Information (CBI) is commercial or financial information that is both customarily and actually treated as private by its owner. Under the Freedom of Information Act (FOIA) (5 U.S.C. 552), CBI is exempt from public disclosure. If your comments responsive to this notice contain commercial or financial information that is customarily treated as private, that you actually treat as private, and that is relevant or responsive to this notice, it is important that you clearly designate the submitted comments as CBI. Pursuant to 49 CFR 190.343, you may ask PHMSA to give confidential treatment to information you give to the agency by taking the following steps: (1) Mark each page of the original document submission containing CBI as “Confidential”; (2) send PHMSA, along with the original document, a second copy of the original document with the CBI deleted; and (3) explain why the information you are submitting is CBI. Unless you are notified otherwise, PHMSA will treat such marked submissions as confidential under the FOIA, and they will not be placed in the public docket of this notice. Submissions containing CBI should be sent to Robert Jagger, Office of Pipeline Safety (PHP-30), Pipeline and Hazardous Materials Safety Administration (PHMSA), 2nd Floor, 1200 New Jersey Avenue SE, Washington, DC 20590-0001, or by email at
robert.jagger@dot.gov
. Any commentary PHMSA receives that is not specifically designated as CBI will be placed in the public docket.

FOR FURTHER INFORMATION CONTACT:

Robert Jagger, Senior Transportation Specialist, by telephone at 202-366-4361. For technical questions: Steve Nanney, Project Manager, by telephone at 713-272-2855.

SUPPLEMENTARY INFORMATION:

I. Executive Summary

A. Purpose of Regulatory Action

B. Summary of the Major Regulatory Provisions

C. Costs and Benefits

II. Background

A. Class Location History and Purpose

B. Changes in Class Location Due to Population Growth

C. Class Location Change Special Permits

D. Class Location Studies, Public Workshop, Report, and Stakeholder Input

E. Class Location ANPRM

F. 2019 Gas Transmission Final Rule

III. Analysis of ANPRM Comments and PHMSA's Response

A. Comments Related to the 2016 Proposed Gas Transmission Rule

B. Requiring Pipe Integrity Upgrades and Allowing Other Options for Class Location Changes

C. Integrity Upgrades and Integrity Management Options for Clustered Areas

D. Using an Integrity Management Option To Manage Safety When Class Locations Change From a Class 1 to a Class 3

E. General Eligibility for Managing Class Location Changes With Integrity Management

F. Eligibility for Pipe Operated in Accordance With § 192.619(c)

G. Eligibility for Pipe With Specific Conditions and Attributes

H. Eligibility for Pipe With Significant Corrosion

I. Eligibility for Damaged Pipe, Dented Pipe, or Pipe That Has Lost Ground Cover

J. Eligibility Factors Based on Diameter, Operating Pressure, or Potential Impact Radius Size

K. Codifying Current Special Permit Conditions

L. Additional Preventive and Mitigative Measures Needed for an Integrity Management Option for Class Location Change Management

M. Traceable, Verifiable, and Complete Records for Supporting Class Location Change Integrity Management Measures

N. Data on Class Location Pipe Replacement and Route Planning

O. Other Topics—General Comments

IV. Section-by-Section Analysis

V. Regulatory Analyses and Notices

I. Executive Summary

A. Purpose of Regulatory Action

Class locations are used in the natural gas Federal Pipeline Safety Regulations (PSR) in a graded approach to provide conservative safety margins
1

and safety standards commensurate with the potential consequences of pipeline

incidents, and are based on the population density near a pipeline.
2

As class locations are defined with relation to the number of dwellings for human occupancy in the area, an onshore gas transmission pipeline's class location can change as the population living or working near a pipeline changes. An increase in population that results in a change in class location requires operators to confirm design factors and to recalculate the maximum allowable operating pressure (MAOP) of the pipeline.
3

If a class location changes and the hoop stress
4

corresponding to the established MAOP of a segment of pipeline is not commensurate with the MAOP of the newly determined class location, § 192.611 currently requires that the pipeline operator (1) lower the pipeline's MAOP to reduce stress levels in the pipe, (2) replace the existing pipe with pipe that has thicker walls or higher yield strength to yield a lower operating stress at the same MAOP, or (3) pressure test the pipeline at a higher test pressure.

1
Pipelines are designed with a safety margin between the design operating pressure and the pressure at which failure would occur. Safety margins are necessary because pipelines can be subject to emergency situations, unexpected loads, operator error, and material degradation.

2
Class locations are defined at § 192.5. A “class location unit” is defined at § 192.5 as an onshore area that extends 220 yards on either side of the centerline of any continuous 1-mile length of pipeline. This distance is more colloquially known as the “sliding mile” and is explained in more detail later in this document. A Class 1 location is an offshore area or any class location unit with 10 or fewer buildings intended for human occupancy within the class location unit. A Class 2 location is any class location unit with more than 10 but fewer than 46 buildings intended for human occupancy within the class location unit. A Class 3 location is any class location unit with 46 or more buildings intended for human occupancy or an area where the pipeline lies within 100 yards of either a building or a small, well-defined outside area that is occupied by 20 or more persons on at least 5 days a week for 10 weeks in any 12-month period within the class location unit, and a Class 4 location is any class location unit where buildings with 4 or more stories above ground are prevalent.

3
Maximum allowable operating pressure is the maximum internal pressure at which a natural gas pipeline or pipeline segment may be operated.

4
Hoop stress is stress that acts around the circumference of a pipe (
i.e.,
perpendicular to the pipe length) and is caused by the internal pressure pushing outward against the pipe wall. As pressure within the pipe increases, the stress in the pipe wall must be capable of acting against that pressure to contain it.

Some operators have applied for special permits to manage class location changes that would normally require replacing pipe, reducing the operating pressure, or pressure testing the pipe. Under the special permit process, PHMSA waives or otherwise modifies compliance with regulatory requirements if the operator requesting the special permit demonstrates a need and PHMSA determines that granting the special permit would be consistent with pipeline safety.
5

PHMSA performs extensive technical analysis on special permit applications and has granted special permits on the condition that operators will perform alternative measures to retain a consistent level of pipeline safety for the new class location throughout the life cycle of the pipeline. In 2004, PHMSA published guidance in the
Federal Register
that addressed the common conditions for granting class location change special permit requests. This guidance clarified PHMSA's process for granting a class location waiver that would allow operators to perform alternative risk-control activities based on integrity management (IM) concepts, rather than pipe replacement, pressure testing, or pressure reductions.
6

5
The special permit process is outlined in § 190.341 and is no different for waiving the class location regulations than for waiving any other requirements in the PSR.

6
Public notices were published in
Federal Register
: “Pipeline Safety: Development of Class Location Change Waiver Guidelines,” 69 FR 22115 (Apr. 23, 2004); and “Pipeline Safety: Development of Class Location Change Waiver Criteria,” 69 FR 38948 (June 29, 2004). Additional guidance is provided online at:
http://primis.phmsa.dot.gov/classloc/index.htm
.

On January 3, 2012, Congress adopted the Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011 (2011 Pipeline Safety Act).
7

Section 5 of that act required that PHMSA evaluate whether applying IM principles to areas outside of high consequence areas (HCA), with respect to gas transmission pipeline facilities, could possibly mitigate or eliminate the need for class location requirements.
8

As stated in the resulting class location report titled “Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements” that was issued in 2016 (2016 Class Location Report), the application of IM requirements to gas transmission pipelines outside of HCAs would not warrant the total elimination of class locations.
9

However, PHMSA stated that it intended to consider whether adjustments were needed in the way that operators were required to implement certain requirements when class locations did change.

7
Pipeline Safety, Regulatory Certainty, and Job Creation Act of 2011; signed January 3, 2012; Public Law 112-90.

8

Id.
at sec. 5(a).

9
See
https://www.regulations.gov/document?D=PHMSA-2011-0023-0153
.

On July 31, 2018, PHMSA published an advance notice of proposed rulemaking (ANPRM) in the
Federal Register
to seek feedback regarding the revision of the PSR applicable to the management of gas transmission pipeline segments where the class location has changed.
10

Specifically, PHMSA requested comments regarding whether operators should have the option of performing certain risk-based IM activities in lieu of the current required activities (
i.e.,
pipe replacement, pressure test, or pressure reduction) and whether those modifications could mitigate the public safety need for the existing class location requirements in this context. This ANPRM was initiated to honor the commitment made at the conclusion of the 2016 Class Location Report that PHMSA would study alternatives to the regulatory requirement for pipe replacement when class locations change and was also responsive to comments made to a 2017 DOT notice regarding regulatory review actions.
11

10
“Pipeline Safety: Class Location Change Requirements,” 83 FR 36861 (July 31, 2018).

11
“Notification of Regulatory Review,” 82 FR 45750 (Oct. 2, 2017).

Based on input in previous public meetings and workshops,
12

the comments received on the ANPRM, the 2016 Class Location report, and a review of PHMSA's active special permits for Class 1 to Class 3 location changes,
13

PHMSA proposes to amend the class location change regulations for certain in-service gas transmission segments where the class location has changed from a Class 1 to a Class 3 to add an IM-based alternative to the existing requirements. PHMSA is requesting input from the public on all aspects of this proposal, including whether the modification or elimination of the proposed pipe eligibility attributes or additional preventative and mitigative measures would provide an equivalent level of safety and maximize net benefits to society.

12
See Section II, D of this document titled, “Class Location Studies, Public Workshop, Report, and Stakeholder Input.”

13
As of May 1, 2019, PHMSA's 12 special permits for Class 1 to Class 3 location changes apply to segments of pipe in the States of Alabama, Arizona, Colorado, Georgia, Kentucky, Louisiana, Michigan, Mississippi, New Jersey, New Mexico, New York, Ohio, Pennsylvania, Tennessee, Texas, West Virginia, and Wyoming.

B. Summary of the Major Regulatory Provisions

PHMSA is proposing an IM-based alternative to the existing class-location-change requirements. The NPRM addresses two main topics pertaining to the IM alternative: (1) The criteria that pipe must meet to be eligible for the alternative, and (2) the additional, IM-based safety requirements necessary for using the alternative. Both aspects serve to protect public safety when pipeline operators apply the alternative approach.

The NPRM addresses segments that change from a Class 1 to a Class 3 location after the publication of a final rule based on this proposed rulemaking and operate at 72 percent of specified minimum yield strength (SMYS)
14

or less. PHMSA proposes that for segments that are eligible based on pipe attributes, operators choosing the IM alternative would adhere to documentation requirements, operations and maintenance (O&M) requirements, and other additional safety measures proposed in this rulemaking. Operators who do not meet the requirements of the proposed rule would need to follow the current regulatory requirements for class location changes or apply for a special permit.

14
SMYS is an indication of the minimum stress that a pipe may experience that will cause plastic, or permanent, deformation of the steel pipe.

Specifically, pipeline segments meeting the following conditions or having the following attributes would be ineligible for the IM alternative for managing class location changes:

• Bare pipe;

• Wrinkle bends;

• Missing material properties records;

• Certain historically problematic seam types;
15

15
Problematic seam types include direct current (DC), low-frequency electric resistance welded pipe (LF-ERW), electric flash-welded (EFW) pipe, lap-welded pipe, and pipe seams with a longitudinal joint factor below 1.0 as defined in § 192.113.

• Body, seam, or girth-weld cracking;
16

16
This cracking can include stress corrosion cracking and selective seam weld corrosion, which are cracking defects in the pipe body or weld seam. Cracks are undesired openings or separations in a normally rigid material, such as a pipe wall, and are detrimental to the capability of a pipeline to restrain pressure. Often, cracks are found only on the surface and do not penetrate the pipe wall. However, cracks that don't fully penetrate the pipe wall, if left unchecked, can propagate into a failure or a rupture and must be promptly repaired.

• Pipe with poor external coating or with tape wraps or shrink sleeves;

• A leak or failure history within 5 miles of the segment;
17

17
These would be leaks or failures reported to PHMSA via an incident report per part 191.

• Pipe transporting gas that is not of suitable composition and quality for sale to gas distribution customers; and

• Pipe operated in accordance with § 192.619 (c) or (d).

PHMSA also proposes that a pipeline segment would be ineligible if it did not have a documented successful
18

8-hour, part 192, subpart J, pressure test to a minimum of 1.25 times MAOP. Pipeline segments that were previously “uprated”
19

without a documented pressure test would also not be eligible unless the operator conducts a new pressure test.

18
A “successful” pressure test is one where the pipe does not rupture or leak because of the test. Part 192, subpart J, prescribes the minimum leak-test and strength-test requirements for pipelines.

19
An “uprate” is where an operator increases the MAOP of its pipeline. To increase the pressure on its pipeline, an operator must comply with the minimum requirements prescribed in subpart K of part 192. An operator would still be subject to the leak-test and strength test requirements, including recordkeeping requirements, under part 192, subpart J.

These applicability criteria would help protect public safety by assuring that pipeline segments with known elevated risks that are changing from a Class 1 to a Class 3 location are pressure-tested, de-rated to a lower MAOP, or replaced with new and stronger pipe, as required by the current regulations in § 192.611. In most cases, this eligibility criteria prevents pipe that would be more susceptible to corrosion or cracking from using this NPRM alternative, and it also helps to ensure that operators can use the proper assessment and mitigation methods on pipeline segments that could cause great harm to the public based on their risk. PHMSA is concerned that, with the additional risk for corrosion and cracking many of these segments would have, anomalies might be able to grow to a failure size before the next assessment. Therefore, PHMSA has proposed these eligibility criteria as a matter of ensuring that pipe integrity can be maintained in Class 3 locations where pipe designed to Class 1 standards remains in service. PHMSA discusses this in more detail later in this document and seeks comment on whether there is an alternative approach that would maximize net benefits to society while maintaining safety.

Pipeline segments changing to a Class 4 location would not be eligible for the IM alternative under this proposal, but would rather be accommodated through PHMSA's current class location special permit process.
20

20
PHMSA has neither included Class 4 locations in this proposed rule nor would it include such locations in any other NPRM without having first developed a unique set of conditions to maintain safety for multi-story buildings and applying them through the issuance of several special permits.

If a pipeline segment meets all eligibility criteria and the operator opts to follow the IM alternative, PHMSA proposes to require that the operator notify PHMSA of details of each segment that experienced a Class 1 to Class 3 location change 60 days prior to implementing the IM alternative.

PHMSA is also proposing to modify the definition of an HCA to include these Class 1 to Class 3 location segments, which would then make these specific segments subject to all the requirements in subpart O, in addition to the more stringent requirements discussed in more detail below. When subpart O was developed and promulgated in 2003,
21

PHMSA did not anticipate that operators would be able to demonstrate adequate pipeline integrity for pipe that was not designed for the class location in which it was located. Therefore, the regulations address any potential risk that would be involved when a class location changes by requiring that the pipeline operate at a lower pressure if an operator does not replace the pipeline segment or pressure test the segment. The proposal would allow operators to choose to follow IM requirements in subpart O and additional requirements for applicable segments, which include required in-line inspections (ILI), external pipeline coating, cathodic protection (CP),
22

pipeline repair criteria to maintain MAOP with a Class 1 location 39 percent safety factor, usage of remote-controlled or automatic shutoff valves, and other additional preventive and mitigative (P&M) measures. PHMSA expects these measures to provide for an equivalent level of safety for the life of the pipeline when compared to pipe replacement.

21
“Pipeline Safety: Pipeline Integrity Management in High Consequence Areas (Gas Transmission Pipelines),” 68 FR 69778 (Dec. 15, 2003).

22
CP is a technique used to control or limit the corrosion of a pipeline's external metal surface by making it the cathode of an electrochemical cell. This treatment can be achieved with a special coating on the external surface of the pipeline along with an electrical system and anodes buried in the ground, or with a “sacrificial” or galvanic metal acting as an anode. In those types of systems, the anode will corrode before the protected metal will.

More specifically, PHMSA is proposing that operators perform an initial integrity assessment using ILI tools within 24 months of the class location change, which would align with the current timeframe to either confirm or change the MAOP after a class location change. PHMSA would require operators to perform this ILI assessment on the entire pipeline segment that has experienced the change in class location, including from the nearest upstream ILI tool launcher to the nearest downstream ILI tool receiver.

With respect to additional P&M measures beyond what are included in subpart O, PHMSA is proposing to require operators to do the following: Perform additional coating, interference, and corrosion surveys; remediate defined anomalies; install line-of-sight markers; install remote-control or automatic shutoff mainline valves; perform depth of cover surveys and

remediation; clear shorted casings; perform additional right-of-way patrols and leakage surveys; and use a supervisory control and data acquisition (SCADA) system. These additional requirements would address aspects of pipeline integrity and public safety for which ILI assessments alone do not address, such as reducing the likelihood of third-party damage, detecting and mitigating conditions that can accelerate corrosion growth, and terminating gas flow from ruptures faster than would be required under existing regulations.

Operators would also be required to keep documentation for all assessments, surveys, and any other required actions they perform in meeting the proposed requirements. PHMSA intends for this class location management option, when performed in conjunction with the requirements of subpart O, to provide a consistent-or-higher level of safety for the life of the pipeline if the operator chooses not to replace the pipe.

C. Costs and Benefits

Consistent with Executive Order 12866, PHMSA has prepared an assessment of the benefits and costs of this proposed rule, as well as reasonable alternatives. The estimated cost savings of this proposal are due to avoided pipe replacement of segments for which operators employ the proposed IM alternative. In the Preliminary Regulatory Impact Analysis (PRIA) posted on the public docket, PHMSA presented two estimates of the number of miles that may change from a Class 1 to a Class 3 location each year from 2019 to 2039 and analyzed them as two separate scenarios. Scenario 1 is based on an estimate of 78 miles per year, which is the average result from PHMSA's annual estimates based on historical annual report data from 2010 to 2017. Scenario 2 is based on the median of PHMSA's annual estimates, which is 118 miles. PHMSA estimated the cost savings of the proposed rule by estimating the rate and unit cost for the currently available class location change compliance methods, the unit costs of complying with the special permit program, and the mix of consequence classifications among the affected segments. PHMSA assumes that this proposed rule would cause operators to replace pipe less often when a class location changes from Class 1 to Class 3, as they would choose to use the IM alternative of this method where feasible. PHMSA estimated the costs of the IM alternative compared to the costs of pipe replacement against the estimated mileage changing from a Class 1 location to a Class 3 location per year. As such, PHMSA estimates the annual cost savings of the rule to be approximately $55 million for scenario 1, and $86 million for scenario 2, both calculated at a 7 percent discount rate.

II. Background

A. Class Location History and Purpose

The concept of class locations pre-dates the Federal regulation of gas transmission pipelines and was an early method of differentiating areas along natural gas transmission pipelines based on the potential consequence of a hypothetical pipeline accident. The first class location definitions were incorporated into the PSR on August 19, 1970, and were derived from the American Society of Mechanical Engineers (ASME) B31.8 designations that were included in the American Standards Association B31.8-1968 version of the “Gas Transmission and Distribution Pipeline Systems” standard, which eventually became ASME B31.8, “Gas Transmission and Distribution Pipeline Systems.” The definitions for class locations that PHMSA codified maintained the original ASME B31.8 characterizations for Class 1 through Class 3 locations and added a new Class 4 location definition. These original class location definitions, with some slight modifications, are still applied today.

PHMSA uses class locations to provide safety margins and standards that are commensurate with the potential consequence of a pipeline failure based on the surrounding population. A pipeline's class location is based on the number of buildings or dwellings for human occupancy in the surrounding area.

Pipeline class locations for onshore gas pipelines are determined using the concept of a “sliding mile,” which is a unit of measurement that is 1 mile in length, extending 220 yards on either side of the centerline of a pipeline, and moves along the pipeline. The number of buildings within this sliding mile at any point during the mile's movement determines the class location for the entire mile of pipeline that the sliding mile moves along.
23

23
For the purposes of this rulemaking, a “building” may be interchangeably referred to as a “home,” a “house,” or a “dwelling,” all of which refer to a structure intended for human occupancy, whether it is used as a residence, for business, or for another purpose.

A Class 1 location is a class location unit along a continuous mile containing 10 or fewer buildings intended for human occupancy or is an offshore area; a Class 2 location is a class location unit along a continuous mile containing 11 to 45 buildings intended for human occupancy; and a Class 3 location is a class location unit along a continuous mile containing 46 or more buildings intended for human occupancy, or is within 100 yards of a building or place of public assembly.
24

Class 4 locations exist where buildings with four or more stories above ground are prevalent. Whenever a pipeline segment has multiple class locations, the higher-numbered class location applies to the entire segment.

24
Under § 192.5, a location is Class 3 if it has a building or a small, well-defined outside area (including playgrounds, recreation areas, and outdoor theaters) that is occupied by 20 or more persons at least 5 days a week for 10 weeks in any 12-month period. The days and weeks need not be consecutive.

Potential consequences of personal injury and property damage resulting from incidents such as a leak- or rupture-type failure, increase in a more densely populated area. In addition, an increasing population around a pipeline amplifies the probability of an incident occurring due to additional external force stresses, corrosion, interference currents, loss of pipeline soil cover, damage from third parties, and other factors.

Design factors
25

are used along with pipe attributes in engineering calculations to determine the required design pressure and MAOP of each steel pipeline segment. To decrease operational hoop stresses
26

in areas of higher consequence, these class location-based design factors (
i.e.,
MAOP derating factors)
27

provide a safety margin and help ensure the pipeline is operated below 100 percent of SMYS. As specified in § 192.105, a pipeline's design pressure is determined using Barlow's Formula:
P = (2St/D)
×
F
×
E
×
T,
where
P
is the design pressure,
S
is the pipe's yield strength,
t
is the wall thickness of the pipe,
D
is the outside diameter of the pipe,
F
is the design factor specific to the class location,
E
is the longitudinal joint factor,
28

and
T
is the temperature

derating factor.
29

To illustrate how class location design factors influence the MAOP of a pipeline, consider a 1000 psig pipeline (1.0 design factor) with the same operating parameters (diameter, wall thickness, yield strength, seam type, and temperature) but in different class locations. The pipeline MAOPs would be as follows:

25
Design factors, which are used to calculate the design pressure for steel pipe in § 192.105(a), are listed in § 192.111. Class 1 locations have a 0.72 design factor, Class 2 locations have a 0.60 factor, Class 3 locations have a 0.50 factor, and Class 4 locations have a 0.40 design factor.

26
“Hoop stress” is the stress in a pipe wall, acting circumferentially in a plane perpendicular to the longitudinal axis of the pipe, that is produced by the pressure of the product in the pipe. Hoop stress is calculated using Barlow's Formula, which is at § 192.105. Hoop stresses are the same as design pressure, unless an outside force is acting on it. If hoop stress has the same safety factor as MAOP, then they are equal.

27
MAOP determination and the required design factors for the class location can be found in §§ 192.105, 192.111, and 192.619.

28
The longitudinal joint factor, based on the weld seam type of a pipeline, per this formula, has a

limiting effect on the MAOP of the pipeline. While it is typically “1.00” and would not affect the calculation, certain types of furnace butt-welded pipe or pipe not manufactured to certain 49 CFR part 192-approved industry standards will have factors of 0.60 or 0.80, which will necessitate a reduction in design pressure. The longitudinal joint factors for steel pipe are listed at § 192.113.

29
The temperature derating factor ranges from 1.000 to 0.867 depending on the operating temperature of the pipeline. Pipelines designed to operate at 250 degrees Fahrenheit and lower have a factor of 1.000, which does not affect the design pressure calculation. Pipelines designed to operate at higher temperatures, including up to 450 degrees Fahrenheit, have derating factors less than one, which lowers the design pressure of the pipeline. Steel pipe temperature derating factors are listed at § 192.115.

• Class 1—design factor = 0.72, MAOP = 720 psig

• Class 2—design factor = 0.60, MAOP = 600 psig

• Class 3—design factor = 0.50, MAOP = 500 psig

• Class 4—design factor = 0.40, MAOP = 400 psig

As natural gas transmission pipeline standards and regulations have evolved, the class location concept was incorporated into many other regulatory areas, including test pressures, mainline block valve spacing, pipeline design and construction requirements, and on-going O&M requirements. In all, the class location concept is incorporated throughout part 192.
30

30
Specifically, §§ 192.5, 192.8, 192.9, 192.65, 192.105, 192.111, 192.150, 192.175, 192.179, 192.243, 192.327, 192.485, 192.503, 192.505, 192.609, 192.611, 192.613, 192.619, 192.620, 192.625, 192.705, 192.706, 192.707, 192.713, 192.903, 192.933, and 192.935.

Modern pipeline inspection technology includes ILI and above-ground coating surveys. ILI technology uses devices that flow with the product in the pipeline and are colloquially known as “smart pigs,” which can measure and record irregularities in the pipe body and welds, including pipe wall loss (such as corrosion metal loss, gouges, scrapes, etc.), cracking, deformations, and dents.

There are various types of ILI tools using different technologies that have distinct capabilities for detecting specific types of pipeline anomalies. However, in selecting the most suitable ILI tool, a pipeline operator must know the type of threats that are applicable to the pipeline segment. For example, a high-resolution magnetic flux leakage (HR-MFL) ILI tool can detect internal and external corrosion metal loss reliably but cannot accurately determine whether the pipeline has dents, deformations, or tight crack indications such as stress corrosion cracking
31

or seam-weld cracks. A high-resolution deformation tool would be most appropriate for dents, whereas an electro-magnetic acoustic transducer (EMAT) tool would be the most appropriate for cracking.

31
A “tight crack” is a crack that is below 0.008 inches in width. Stress corrosion cracking is a form of corrosion that produces a marked loss of pipeline strength with little metal loss. The combined influence of pipeline stress and a corrosive medium can result in the formation of interlinking crack clusters that can grow until the pipe fails.

PHMSA first issued its IM regulations for gas transmission pipelines on December 15, 2003,
32

in response to tragic gas pipeline incidents near Carlsbad, NM, in 2000,
33

where 12 people were killed; and in Edison, NJ, in 1994, where 8 buildings were destroyed and approximately 1,500 residents were evacuated.
34

The IM regulations provided a definition for HCA and required operators to assess the condition of pipelines periodically in these areas and make any necessary repairs within defined timeframes.

32
68 FR at 69778.

33
NTSB, Pipeline Accident Report: Natural Gas Pipeline Rupture and Fire Near Carlsbad, New Mexico August 19, 2000, PAR-03-01, adopted on February 11, 2003.

34
NTSB, Pipeline Accident Report: Texas Eastern Transmission Corporation Natural Gas Pipeline Explosion and Fire, Edison, New Jersey; March 23, 1994; PAR-95-01, adopted on January 18, 1995.

Prior to the recent publication of the “Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments” final rule on October 1, 2019 (2019 Gas Transmission Final Rule),
35

operators were not required to assess or perform IM functions on pipeline segments outside of HCAs. With the publication of that rule, operators of onshore steel transmission pipeline segments with an MAOP of greater than or equal to 30 percent of SMYS and that are located in a Class 3 locations, a Class 4 locations, or a “moderate consequence area” as defined in § 192.3 where the segment can accommodate inspection by means of an instrumented ILI tool, must assess their pipelines periodically, but on a less-frequent basis than those pipelines in HCAs.
36

The 2019 Gas Transmission Final Rule also requires operators to have a continuing surveillance program for all pipeline segments and take appropriate action to maintain safety concerning changes in class location, among other things.

35
84 FR 52180.

36
49 CFR 192.710.

B. Changes in Class Location Due to Population Growth

When the population around a pipeline increases and causes the class location to increase, the numeric value of the design factor decreases, which translates, as detailed in the formula in § 192.105, into a lower MAOP for the pipeline. As the dwellings within the class location unit grow such that a Class 1 location becomes a Class 3 location, the corresponding difference in design factor, from a 0.72 to 0.5, equates to an approximate 30 percent reduction in MAOP.

If a class location increases and the current MAOP is not commensurate with the MAOP for the newly determined class location, besides applying for a special permit, the existing regulations require that the operator:

(1) Reduce the pipeline's MAOP to reduce stress levels in the pipe;

(2) replace the existing pipe with pipe that has more wall thickness or higher yield strength to operate at a lower operating stress at the same MAOP; or

(3) conduct a pressure test (conforming to subpart J) at the higher test pressure needed to meet requirements for the newly determined class location if the pipeline segment has not previously been tested, for a minimum of 8 hours, at the higher pressure.
37

37
See § 192.611, as appropriate, for one-class changes (
e.g.,
Class 1 to 2 or Class 2 to 3 or Class 3 to 4). As an example, for a Class 1 to Class 2 location change, the pipeline segment would require a pressure test to 1.25 times the MAOP for at least 8 hours. Following a successful pressure test, the pipeline segment would not need to be replaced with new pipe, but the existing design factor of 0.72 for a Class 1 location would be acceptable for a Class 2 location. The pressure test must meet the documentation requirements of § 192.517.

In accordance with those options, depending on the pipeline's test pressure and whether it meets the requirements in §§ 192.609 and 192.611, the operator can base the pipeline's MAOP on a specified design factor multiplied by the test pressure for the new class location as long as the corresponding hoop stress does not exceed certain percentages of the SMYS of the pipe and as long as the pipeline has been tested for a period of 8 hours or longer per § 192.611(a)(1).
38

This

approach is practical for situations of a “one-class bump” where a pipeline segment's class location changes from Class 1 to a Class 2, a Class 2 to a Class 3, or a Class 3 to a Class 4.
39

However, when population growth occurs to a degree that results in a class location change from a Class 1 location to a Class 3 location, the existing options of pressure testing or reducing operating pressure can be technically or operationally prohibitive for meeting contractual gas flow volume obligations.
40

If an operator cannot pressure test or reduce operating pressure, the only options remaining per the existing regulations are to replace the pipe with higher-strength pipe by installing pipe with either greater wall thickness or higher steel grade or apply for a special permit.

38
Specifically, if the applicable segment has been hydrostatically tested for a period of 8 hours or longer, the MAOP is 0.8 times the test pressure in Class 2 locations, 0.667 times the test pressure in Class 3 locations, or 0.555 times the test pressure in Class 4 locations. The corresponding hoop stress may not exceed 72 percent of SMYS of the pipe in

Class 2 locations, 60 percent of SMYS in Class 3 locations, or 50 percent of SMYS in Class 4 locations.

39
Based on the original in-place design of a pipeline, an operator can only perform a single one-class bump in a pipeline's lifetime. Pipelines constructed to the standards of lower class locations (
i.e.,
Class 1) cannot meet more rigorous testing requirements when class locations continue to increase, which eventually requires operators to replace the pipe or apply to PHMSA for a special permit.

40
See the Preliminary Regulatory Impact Assessment (PRIA) for more details.

The class location regulations, when they were promulgated in 1970, required operators to replace pipeline segments when population growth resulted in a class location change to ensure that the safety margin was commensurate with the new class location. At that time, the pipeline industry did not have the technology available to determine the in-situ
41

material condition of their pipelines, and it was unlikely that existing pipe could achieve a similar safety margin as replaced pipe per the regulations.

41
In other words, the condition of their pipelines as they existed in place in the ground.

Following the implementation of the IM regulations in 2003, and throughout the development of the 2019 Gas Transmission Final Rule, pipeline operators and industry trade associations requested that PHMSA provide operators with an additional alternative to managing class location changes: One that would use modern IM principles to assess the pipelines in question and help ensure that their integrity is maintained. PHMSA is proposing and requesting comments on a defined IM alternative that operators can use to manage pipeline segments where the class location has changed from Class 1 to Class 3. PHMSA expects that the additional repair and monitoring criteria proposed in this rule would provide, for Class 1 pipe that is in a Class 3 location, safety for the life of the pipeline that would be equivalent to that provided by a pipeline designed to Class 3 standards. This NPRM would not allow operators to manage Class 1 to Class 4 or Class 2 to Class 4 location changes in the same manner. This restriction is because Class 4 locations are so densely populated that the measures that could be provided through an IM alternative on thinner-walled pipe designed for a Class 2 location would not give people a chance to evacuate from a nearby rupture. PHMSA does not believe, at this time, that there are additional, feasible measures that can be implemented, on top of the ones proposed in this NPRM for Class 1 to Class 3 location changes, that can mitigate such risk and stand in for thicker-walled or stronger, higher grade pipe designed to Class 4 standards. PHMSA seeks comment on this current understanding.

C. Class Location Change Special Permits

As discussed above, in the absence of alternative regulations such as those proposed in this notice, some operators have applied to PHMSA for special permits to manage class location changes without replacing pipe or reducing the operating pressure. A special permit is an order issued under § 190.341 that waives or modifies compliance with regulatory requirements if the pipeline operator can demonstrate a need, and PHMSA determines that granting the special permit or granting the special permit with conditions attached would be consistent with pipeline safety. Upon receipt of such a request, PHMSA publishes a notice and request for comment in the
Federal Register
for each special permit application received and tracks issued, denied, and expired special permits on its website.
42

42

https://www.phmsa.dot.gov/pipeline/special-permits-state-waivers/special-permits-and-state-waivers-overview
.

In 2004, PHMSA published the typical considerations for class location change special permit requests in a
Federal Register
notice titled “Pipeline Safety: Development of Class Location Change Waiver Criteria” (69 FR 38948; June 29, 2004; “2004
Federal Register
Notice”). These considerations were developed by adapting risk-based IM concepts. For each class location change special permit request, PHMSA reviews the information submitted by the operator, which includes a list of the proposed sites, pipeline attributes, prior assessment results and assessment schedules, incident and leak history, prior repairs, damage prevention initiatives, prior safety-related condition reports, a summary of integrity threats, and the operator's risk-control activities. PHMSA then approves class location change special permits on the condition that operators implement integrity assessments and other P&M measures, which go beyond the regulatory requirements.
43

The additional monitoring and maintenance requirements PHMSA prescribes through this process help to ensure the integrity of the pipe to maintain a level of safety consistent with lowering the MAOP, conducting a new pressure test, or installing thicker-walled or higher-grade pipe. The class location change special permits that PHMSA has granted have allowed operators to continue operating the pipeline segments identified under the special permits at their current MAOP based on the previous class locations. In order to issue such a special permit, PHMSA must determine that the present class location change special permit conditions and operator implementation of these conditions are consistent with public safety and demonstrate the current application of class location change management. As such, they can provide a basis for the consideration of this proposed alternative.

43
Special permit conditions are implemented to mitigate the causes of gas transmission incidents and are based on the type of threats pertinent to the pipeline. The conditions are generally more heavily weighted on identifying material, coating, and CP issues; pipe wall loss; pipe and weld cracking; depth of pipe cover; third party damage prevention; marking of the pipeline and pipeline right-of-way patrols; pressure tests and documentation; data integration of integrity issues; and reassessment intervals. Examples of PHMSA's class location special permit conditions can be found at:
https://primis.phmsa.dot.gov/classloc/docs/SpecialPermit_ExampleClassLocSP_Conditions_090112_draft1.pdf,
and more information about PHMSA's special permit process for class location changes can be found at:
https://primis.phmsa.dot.gov/classloc/documents.htm
.

Since 2001, PHMSA has received over 30 applications from operators for waivers from the class location requirements in § 192.611 for pipeline segments changing from a Class 1 to a Class 3 location. PHMSA has approved approximately half of these applications and issued the corresponding special permits, with over 10 currently in effect.
44

The pipeline segments for

which PHMSA has granted special permits cover a range of diameters from 16 to 36 inches. Most the class location change special permits PHMSA has issued have been implemented effectively by operators and subsequently renewed; PHMSA notes that, to date, no leaks or failures have occurred on the approximately 100 miles of current class location change special permit pipeline segments.

44
PHMSA has rejected class location change special permits due to the presence of pipe conditions, including cracking, major corrosion, or other systemic issues, that are not easy to address via the special permit process. PHMSA considers the age and manufacturing process of the pipe and the construction processes used as well. Additionally, some operators have withdrawn special permit applications before being denied.

i. Class Location Change Special Permit Eligibility Requirements

Most of the Class 1 to Class 3 class location change special permit requests that PHMSA receives are for older pipeline segments built with lower-strength pipe, based upon its design in accordance with 49 CFR 192.105 for a Class 1 location, that operators would likely not be able to pressure test to the 1.5 times MAOP test pressure without failure required for Class 3 locations.
45

Such pipe tends to be higher-risk due to the materials and construction techniques available at the time of the pipe's installation, so each pipeline segment must meet several “threshold conditions” before PHMSA grants a special permit. These conditions include a review of the pipe's seam type, field girth welds,
46

coating type, depth of cover,
47

materials documentation,
48

pressure testing duration and minimum test pressure,
49

defect and corrosion history, repair criteria used,
50

CP, and the quality of gas transported and its effect on internal corrosion.
51

45
Some gas transmission infrastructure was installed before the 1970s, using techniques that can contain latent defects. For example, pipe manufactured using low-frequency electric resistance welding or lap-welding techniques is susceptible to seam failure.

46
Girth welds are made where two pipes are joined along their circumferences. PHMSA reviews whether operators have performed non-destructive examinations of any girth welds and what percentage of the welds have been examined.

47
The requirements for the depth of cover over a buried pipeline are at § 192.327, and they specify how much soil or consolidated rock must cover a pipeline at a given class location. PHMSA reviews whether there is less than 30 inches of cover over the pipeline and whether the pipe needs to be lowered or if additional mitigation measures need to be performed.

48
PHMSA reviews whether the operator has good material physical property records of the pipeline segment and whether operators have documentation for wall thickness, seam types, etc.

49
The pressure testing requirements for pipelines are in subpart J (§§ 192.501-192.517). PHMSA reviews whether operators have a proof test to confirm they have records for a safety factor above the MAOP (an increase of 25 percent).

50
PHMSA reviews whether the repair criteria an operator uses has a required maximum defect depth and a pressure rating 39 percent above the MAOP.

51
PHMSA reviews whether the gas has a high percentage of carbon dioxide (approximately 3 percent), or hydrogen sulfide (16 parts per million) and does not have water vapor above 7 lbs. per million. In PHMSA's experience, these thresholds are consistent with typical FERC gas tariffs for individual companies.

PHMSA also considers O&M practices and pipe attributes, and requires documentation when evaluating pipeline segment for a class location change special permit. For example, PHMSA does not grant class location special permits for pipeline segments with bare pipe or pipe containing wrinkle bends, or for pipe operating above 72 percent SMYS.
52

As a part of the special permit application process, operators must have or obtain documentation detailing the pipeline segment's diameter, wall thickness, grade, seam type, yield strength, tensile strength, and coating type. Finally, PHMSA considers the history of an operator's compliance with PSR when reviewing special permit applications.

52
Pipeline segments with these attributes do not meet the current part 192 standards for construction of transmission pipelines, regardless of the class location they are in. PHMSA approves special-permit applications based on the applicant's pipe being considered sound in accordance with current standards and ensuring through additional measures that an operator can manage the pipe to a consistent level of safety.

ii. Special Permit Compliance Conditions

The conditions PHMSA imposes in class location change special permits apply to the “special permit segment,” which is the specific pipeline segment where the class location change has occurred. In class location change special permits, PHMSA has also required operators to assess for threats up to 25 miles on either side of the special permit segment in an area known as the “special permit inspection area.”
53

The purpose of considering this larger special permit inspection area is to provide a means by which threats and pipe defects in nearby pipe can be discovered and remediated. In addition, potential incident causes that could affect the special permit segment can be identified and corrected, thus helping find and fix problems in the special permit segment before pipeline integrity is compromised.

53
In the class location change special permits, PHMSA required operators assess up to 25 miles on both sides of the special permit segment as a proxy for the nearest ILI tool launcher and receiver stations. As discussed later in this document, PHMSA is proposing to make explicit the requirement for operators to assess to ILI tool launcher and receiver stations in this NPRM.

PHMSA's typical class location change special permit conditions require an operator to incorporate the identified segment(s) into its integrity management program (IMP). An IMP, as detailed in subpart O of part 192, requires operators to perform ongoing risk analyses, perform integrity assessments to identify and analyze applicable threats to the pipeline, repair any anomalies, and implement appropriate P&M measures to ensure the integrity of the pipeline in HCAs (typically where there are significant populations). PHMSA's enforcement of operator IMPs holds operators accountable if they fail to take adequate steps under IM to mitigate the risks for their applicable pipeline segments.

Another condition included in class location change special permits is that each applicable special permit segment must be operated at or below its existing MAOP; this operating pressure is higher than the pressure reduction that would be required under the current class location change requirements in § 192.611. As a part of complying with the special permit conditions, and consistent with IM principles, PHMSA also requires operators to address issues pertaining to pipe coating quality, selective seam weld corrosion, stress corrosion cracking (SCC), and the effects of any long-term pipeline system flow reversals. In addition, PHMSA often requires operators to perform additional CP and corrosion-control measures on special permit segments, including performing coating condition surveys, coating remediation, and upgrading CP systems.

While PHMSA has the authority to modify special permit conditions in the interest of public safety, PHMSA has not significantly changed the original conditions imposed in the class location change special permits, in most cases, when operators apply to renew them. In a few cases in the early 2000s, class location SPs did not have required periodic reassessment intervals, pipe remediation, coating assessment, or other integrity requirements. PHMSA has added additional safety requirements when the special permits have been renewed. These early special permits were granted prior to the development of the class location change waiver guidelines and criteria in 2004. These public notices outlined the special permit attributes that PHMSA would review and gave an overview of the safety and integrity measures that PHMSA would require in future special permit conditions. In cases when certain changes have been made, they are a result of lessons learned during the special permit process. For example, when PHMSA first established the special permit process for class location changes in 2004, the special permits had no expiration dates. In 2008, the agency chose to impose an expiration date of 5 years for all new class location change special permits. At the time, PHMSA

felt that a 5-year expiration limit would serve as an appropriate frequency of review of the conditions and their impact on public safety. Based on PHMSA's experience over the past 15 years of monitoring these special permits and through safety reviews during the periodic special permit renewal process, PHMSA has extended the expiration date of its class location change special permits to 10 years. This 10-year timeframe allows an operator to conduct every required IM assessment and re-assessment
54

prior to submitting a renewal request to PHMSA for an updated special permit.
55

54
See 49 CFR 192.939.

55
In all special permits, PHMSA reserves the right to revoke the permit (see § 190.341) before the set expiration date and order compliance with the regulations if PHMSA finds the operator is not complying with the provisions or if PHMSA discovers a safety condition on the pipeline.

D. Class Location Studies, Public Workshop, Report, and Stakeholder Input

Prior to this NPRM, PHMSA considered extensive input from various stakeholders on the class location change regulations, various other alternatives, and safety impacts. This feedback was gathered through the public comment process via a Notice of Inquiry in 2013,
56

public meetings in 2014, comments on the class location report and gas transmission NPRM in 2016, and comments to a DOT notice of regulatory review in 2017.
57

56
“Pipeline Safety: Class Location Requirements,” 78 FR 46560 (Aug. 1, 2013).

57
“Notification of Regulatory Review,” 82 FR 45750 (Oct. 2, 2017).

i. Section 5 of the Pipeline Safety Act of 2011

On January 3, 2012, Congress enacted the 2011 Pipeline Safety Act. Section 5 of that act required PHMSA to evaluate, with respect to gas transmission pipeline facilities, whether the potential application of IM program requirements, or elements thereof, to additional areas outside of HCAs would mitigate the need for class location requirements. Per the mandate, PHMSA reported the findings of this evaluation to Congress in 2016, as discussed below. The 2011 Pipeline Safety Act authorized PHMSA to issue regulations pursuant to the findings of the report. As discussed below, PHMSA issued an NPRM in 2016 and a subsequent final rule in 2019 that addressed this mandate.

ii. 2013 Notice of Inquiry: Class Location Requirements

On August 1, 2013, PHMSA issued a Notice of Inquiry soliciting comments on whether expanding IM requirements would mitigate the need for class locations per the section 5 mandate of the 2011 Pipeline Safety Act. The notice discussed several topics, including whether class locations should be eliminated entirely, whether a single design factor could be used in all situations, whether design factors should be increased for higher class locations, and whether pipelines without complete material properties records should be allowed to use a single design factor if class locations were eliminated.

There was broad consensus among PHMSA stakeholders
58

that entirely eliminating class locations would not lead to pipeline safety improvement. Further, commenters noted that establishing a single design factor to replace class location designations might be too complicated to implement. Many commenters noted that any changes in class location requirements would impact not only the classifications of many pipelines but would also possibly lead to several adverse unintended consequences
59

related to compliance with 49 CFR part 192, as the class location requirements are referenced or built upon throughout the natural gas regulations. Several industry trade groups made suggestions for changing the class location regulations—specifically for using IM to manage pipeline segments where the operator had not replaced, pressure tested, or reduced the pressure of the pipeline segment. These suggestions were developed further through subsequent discussions at PHMSA's Gas Pipeline Advisory Committee (GPAC) meetings and at public workshops as described more fully below.

58
Approximately 30 submissions were received from a wide range of stakeholders, including, but not limited to: Operators, trade organizations (Interstate Natural Gas Association of America, American Public Gas Association, American Petroleum Institute, American Gas Association), the Pipeline Safety Trust public interest group, the National Association of Pipeline Safety Representatives comprised of State pipeline safety regulators, and individual citizens. The submissions can be reviewed at
https://www.regulations.gov/docket?D=PHMSA-2013-0161
.

59
API/AEPC explained that the elimination of class locations would preclude the ability to determine the regulatory status of gathering lines.
See
API's November 1, 2013, comment at 3,
https://www.regulations.gov/document?D=PHMSA-2013-0161-0025
.

iii. 2014 Pipeline Advisory Committee Meeting, Class Location Workshop, and Subsequent Comments

On February 25, 2014, PHMSA hosted a joint meeting of the Gas and Liquid Pipeline Advisory Committees.
60

At that meeting, PHMSA updated the committees on its activities regarding section 5 of the 2011 Pipeline Safety Act, and committee members and participating members of the public provided their comments. During the meeting, the Interstate Natural Gas Association of America (INGAA) reinforced its comments in response to the 2013 Notice of Inquiry, noting that the original class location definitions in ASME B31.8 were intended to provide an increased margin of safety for higher-density population areas and stating that IM was a better risk-management tool than class locations. INGAA reported that its members intended to perform elements of IM on pipelines outside of HCAs.
61

60
The Pipeline Advisory Committees are statutorily mandated advisory committees that advise PHMSA on proposed safety standards, risk assessments, and safety policies for natural gas and hazardous liquid pipelines (49 U.S.C. 60115). These Committees were established under the Federal Advisory Committee Act (Pub. L. 92-463, 5 U.S.C. app. 2) and the Federal Pipeline Safety Statutes (49 U.S.C. 60101-60141, 60301-60302). Each committee consists of 15 members, with membership divided among Federal and State agency representatives, the regulated industry, and the public.

61
Per a 2013 presentation, INGAA states that it will strive to apply IM principles to the entire transmission systems operated by INGAA members, extending and consistently applying the program to the following: (1) 90 percent of the population in the vicinity of pipelines using IM principles, by 2012; (2) 90 percent of the population in the vicinity of pipelines using ASME B31.8S, by 2020; (3) 100 percent of the population in the vicinity of nearby pipelines using IM principles, by 2030; and (4) the remaining 20 percent of pipeline mileage with no surrounding population using IM principles, after 2030.
https://www.ingaa.org/File.aspx?id=20899&v=a0233b08
.

On April 16, 2014, PHMSA sponsored a workshop on class locations to solicit comments on whether the application of IM program requirements beyond HCAs would mitigate the need for gas pipeline class location requirements. Representatives from PHMSA, the National Energy Board of Canada, the National Association of Pipeline Safety Representatives (NAPSR), pipeline operators, industry groups, the Pipeline Safety Trust (PST), and public interest groups gave presentations.
62

62
Meeting presentations are available online at:
http://primis.phmsa.dot.gov/meetings/MtgHome.mtg?mtg=95
.

During the workshop, INGAA alleged that the current class location regulations can result in the replacement of pipeline segments that do not warrant replacement and suggested that the special permit process for class location changes be embedded into part 192. Ameren Illinois, a member of the American Gas Association (AGA), noted that applying the current class location change requirements can cost more than $1 million for each Class 1 to Class 3

location change. Therefore, AGA suggested eliminating the special permit process for class location changes and incorporating the specific requirements for special permits into 49 CFR part 192 as part of the regulations. AGA recommended two alternative approaches. The first would allow operators to continue to implement the class location approach as it exists and apply for special permits, if needed. The second would allow operators to implement a risk-based approach using additional IM actions.

Accufacts and the PST pointed out how deeply the concept of class locations is embedded in part 192 and stated that IM requirements and class locations overlap in densely populated areas to provide a redundant, but necessary, safety regime. The PST also suggested that, in time, the older class location method potentially could be replaced with an IM method for regulation. However, the PST noted that incidents and other data suggest there is room for improvement in the IM regulations, as data shows higher incident rates in HCAs than in non-HCAs and that pipe installed after 2010 has a higher incident rate than pipe installed a decade earlier. Similarly, Accufacts noted that the 2010 Pacific Gas and Electric Company (PG&E) incident at San Bruno, CA, exposed weaknesses in the operator's IM program and demonstrated that the consequences resulting from the incident spread far beyond the expected potential impact radius (PIR).
63

Therefore, Accufacts suggested that shifting the class location approach solely to an IM approach might decrease the protection of public safety.

63
The PIR for the ruptured pipeline segment involved in the PG&E incident at San Bruno, CA, was calculated at 414 feet. However, the National Transportation Safety Board (NTSB), in its accident report (NTSB/PAR-11/01) noted that the subsequent fire damage extended to a radius of about 600 feet from the blast center.

Following the workshop on class locations, INGAA submitted additional comments to the docket, stating that advancements in IM technology and processes have superseded the need for mandatory pipe replacement following a class location change. INGAA noted that in the past, it was logical to replace a pipeline when class locations changed because of the widespread belief that thicker pipe would take longer to corrode and would withstand greater external forces, such as damage from excavators, before failure. However, INGAA stated that given improvements in technology, advances in pipe quality, and ongoing regulatory processes such as IM, it believes that operators can mitigate most threats without the need for pipe replacement. Therefore, INGAA offered an approach to class location changes that would not require pipe replacement if pipeline segments met certain requirements that were in line with the current special permit conditions PHMSA established in the 2004
Federal Register
Notice and that are currently in Class 1 to Class 3 location change special permits.
64

Specifically, INGAA suggested that pipelines meeting a “fitness for service” standard in 18 categories could address potential safety concerns and preclude the need for pipe replacement.
65

64
See also
http://primis.phmsa.dot.gov/classloc/index.htm
.

65
Those 18 categories were as follows: (1) Baseline Engineering and Record Assessments—Girth Weld Assessment, (2) Casing Assessment, (3) Pipe Seam Assessment, (4) Field Coating Assessment, (5) Cathodic Protection, (6) Interference Currents Control, (7) Close Interval Survey (CIS), (8) SCC Assessments, (9) In-line Inspection Assessments, (10) Metal Loss Anomaly Management, (11) Dent Anomaly Management, (12) Hard Spots Anomaly Management and Ongoing Requirements, (13) Integrity Management Program, (14) Root Cause Analysis for Failure or Leak, Line Markers, (15) Patrols, (16) Damage Prevention Best Practices, (17) Recordkeeping, and (18) Documentation.

iv. 2016 Class Location Report and Gas Transmission NPRM

Based on the 2011 congressional mandate discussed above, PHMSA submitted a report to Congress in April 2016 titled, “Evaluation of Expanding Pipeline Integrity Management Beyond High-Consequence Areas and Whether Such Expansion Would Mitigate the Need for Gas Pipeline Class Location Requirements,” which outlined PHMSA's findings on the issue.
66

The report also summarized operator comments and concerns regarding class location changes and subsequent pipe replacement, noting that operators said they could operate pipelines constructed in Class 1 locations that later change to Class 3 locations safely by using current IM practices.

66

https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/news/55521/report-congress-evaluation-expanding-pipeline-imp-hcas-full.pdf
.

Concurrently, PHMSA published an NPRM titled, “Safety of Gas Transmission and Gathering Pipelines” (2016 Gas Transmission NPRM),
67

in which PHMSA noted that the proposed application of IM program elements, such as assessment and remediation timeframes, beyond HCAs would not warrant the elimination of class locations.

67
“Pipeline Safety: Safety of Gas Transmission and Gathering Pipelines,” 81 FR 20722 (Apr. 8, 2016).

In those documents, PHMSA noted that class locations affect all gas transmission pipelines and are integral to determining the appropriate MAOP, design pressure, pipe wall thickness, valve spacing, HCA designation,
68

O&M inspections, surveillance, and for evaluating anomalies for repair using ASME B31G
69

and AGA Pipeline Research Committee Project PR 3-805 (RSTRENG).
70

While IM measures are critical to risk mitigation and pipeline safety, the assessment and remediation of defects alone does not compensate for these other aspects of class locations adequately. Thus, as PHMSA outlined in the Class Location Report, it determined that the existing class location requirements are appropriate for maintaining pipeline safety and should be retained. Consequently, any revisions to the class location requirements would have to be forward-looking (
i.e.,
applying to pipelines constructed after a certain effective date) and would have to provide commensurate safety as the existing regulatory regime.
71

68
Per § 192.903, under Method 1, an HCA is an area defined as a Class 3 location, a Class 4 location, any area in a Class 1 or Class 2 location where the potential impact radius is greater than 660 feet and the area within the impact circle, which is defined by the potential impact radius for the pipeline, contains 20 or more buildings intended for human occupancy, or any area in a Class 1 or Class 2 location where the potential impact circle contains an “identified site.”

69
ASME B31G, “Manual for Determining the Remaining Strength of Corroded Pipelines,” provides guidance for the evaluation of metal loss in pressurized pipelines and piping systems, and it applies to all pipelines and piping systems that are a part of the ASME B31 Code for Pressure Piping.

70
For procedures to determine the remaining strength of pipelines, see §§ 192.485(c) and 192.933(d). RSTRENG is a computer program developed to perform the procedure called “A Modified Criterion for Evaluating the Remaining Strength of Corroded Pipe.” This procedure was developed by Battelle Memorial Institute for the American Gas Association as an alternative to the ASME B31G procedures.

71
In comments following the public workshop on class locations in 2014, INGAA noted that, after further analysis, it appears that applying the PIR method to existing pipelines may be unworkable, which is detailed in:
https://www.regulations.gov/document?D=PHMSA-2013-0161-0037
.

As part of the continuing discussion on class location changes and subsequent pipe replacement, PHMSA summarized at the end of the 2016 Class Location Report the concerns operators expressed regarding the cost of replacing pipe in locations that change from a Class 1 to a Class 3 location or a Class 2 to a Class 4 location. PHMSA noted in the 2016 Class Location Report that, over the past decade, it had observed problems with pipe and fitting manufacturing quality, including low-

strength material;
72

low-frequency and high-frequency electric resistance welded pipe seam quality; construction practices; welding and the non-destructive testing of welds; pipe denting; field coating practices; IM assessments and reassessment practices;
73

and record documentation practices.
74

Based on incidents resulting from these problems, PHMSA believes it is necessary to consider additional safety measures if allowing a “two-class bump” from a Class 1 location to a Class 3 location without requiring pipe replacement, especially for higher-pressure gas transmission pipelines.
75

72
PHMSA has documented low-strength pipe material issues in an advisory bulletin and the following website link:
https://www.phmsa.dot.gov/pipeline/low-strength-pipe/low-strength-pipe-overview
.

73
IM and operational procedures and practices were issues in PG&E's incident at San Bruno, CA, in September 2010 and the Enbridge hazardous liquid pipeline rupture near Marshall, MI, in July 2010. PHMSA issued Advisory Bulletins: “Pipeline Safety: Establishing Maximum Allowable Operating Pressure or Maximum Operating Pressure Using Record Evidence, and Integrity Management Risk Identification, Assessment, Prevention, and Mitigation,” ADB-11-01, 76 FR 1504 (Jan. 10, 2011) and “Pipeline Safety: Using Meaningful Metrics in Conducting Integrity Management Program Evaluations,” ADB-2012-10, 77 FR 72435 (Dec. 5, 2012) to operators regarding IM meaningful metrics and assessments, which can be reviewed at:
https://www.phmsa.dot.gov/regulations-fr/notices
.

74
PHMSA issued Advisory Bulletin “Pipeline Safety: Verification of Records,” ADB-12-06, 77 FR 26822 (May 7, 2012) concerning the documentation of MAOP, which can be reviewed at:
https://www.phmsa.dot.gov/regulations-fr/notices
. Also note PHMSA's Advisory Bulletin “Pipeline Safety: Deactivation of Threats,” ADB-2017-01, 82 FR 14106 (Mar. 16, 2017).

75
Section 192.611 allows a “one-class bump” based upon pressure test.

PHMSA stated in the conclusion of the 2016 Class Location Report that it would further evaluate the feasibility and the appropriateness of alternatives to address issues pertaining to pipe replacement requirements, continue to reach out to and consider input from all stakeholders, and consider future rulemaking if a cost-effective and safety-focused approach to adjusting specific aspects of class location requirements could be developed to address the issues raised by pipeline operators. In doing so, PHMSA noted it would evaluate class-location-change alternatives in the context of other issues it was addressing related to new construction quality and safety management systems and would also consider inspection findings, IM assessment results, and lessons learned from past incidents.

v.
The AGA/API/INGAA Submission on Regulatory Reform—Proposal To Perform Integrity Management Measures In Lieu of Pipe Replacement When Class Locations Change

On October 2, 2017, DOT issued a Notification of Regulatory Review seeking comment from the public on existing rules and other agency actions that would be good candidates for repeal, replacement, suspension, or modification. On November 9, 2017, AGA, API, and INGAA submitted joint comments to the corresponding docket.
76

The joint comments asserted that gas transmission pipeline operators incur annual costs of $200 to $300 million nationwide replacing pipe solely to satisfy the class location change regulations. The joint commenters requested that PHMSA consider revising the current class location change regulations to include an alternative beyond pressure reduction, pressure testing, or pipe replacement, and provided a suggested approach for doing so.

76
PHMSA notes that INGAA, individually, submitted nearly identical comments on the topic of class location on July 24, 2017 in response to a previous request for input by DOT. “Transportation Infrastructure: Notice of Review of Policy, Guidance, and Regulation,” 82 FR 26734 (June 8, 2017).

The joint commenters proposed an alternative approach for class location changes that focused on operators performing “recurring [IM] assessments . . . [that] leverage advanced assessment technologies to determine whether [the] actual pipe condition warrants replacement” in areas where the class location has changed. The commenters stated that such an approach would further promote IM processes and principles throughout the Nation's gas transmission pipeline network, improve economic efficiency by reducing a regulatory burden, and help fulfill the purposes of section 5 of the 2011 Pipeline Safety Act.

The joint comments from AGA/API/INGAA asserted that the current alternatives to pipe replacement following a class location change do not reflect the substantial developments in IM processes, technologies, and regulations over the past 15 years since the initial IM regulations were first codified. The commenters suggested that advanced ILI technologies, such as HR-MFL tools, can assess the presence of corrosion and other potential defects, which can allow an operator to establish whether a pipeline segment needs remediation or replacement.

The joint comments further noted that the 2016 Gas Transmission NPRM would expand IM assessments to newly defined “moderate consequence areas,”
77

and that such an expansion would provide a framework for developing an alternative means of managing class location changes. The commenters supported the publication of the proposed provisions, as endorsed by the GPAC, to help provide such a framework. They suggested that the costs saved from avoiding pipe replacement using such an alternative could mitigate, to some degree, part of the costs of the 2016 Gas Transmission NPRM. In addition, they noted that the gas transmission NPRM contained several new provisions that would require operators to manage the integrity of their pipelines better by implementing more P&M measures to manage the threat of corrosion. The joint comments from AGA/API/INGAA stated that including such corrosion control measures as a part of a program for managing the integrity of pipeline segments, including ones that have experienced class location changes, would further justify the development of an IM-focused alternative to class location changes.

77
81 FR at 20825, 20838.

Based on those statements, AGA, API, and INGAA recommended that PHMSA develop an alternative approach to § 192.611 that would leverage specific provisions in the 2016 Gas Transmission NPRM at its proposed § 192.710 for assessing areas outside of HCAs and apply the proposed IM requirements at § 192.921 to those assessed segments. Further, they suggested that operators could reconfirm a pipeline segment's MAOP in a changed class location if the pipeline segment in question did not have traceable, verifiable, and complete (TVC) records of a hydrostatic pressure test that supported the previous MAOP.

E. Class Location ANPRM

On July 31, 2018, PHMSA published an ANPRM in the
Federal Register
seeking public comment on its existing class location requirements for natural gas transmission pipelines as they pertain to the actions that operators are required to take following class location changes due to population growth near pipelines.
78

78
83 FR 36861.

In the ANPRM, PHMSA requested comments and information to determine whether revisions should be made to the PSR regarding the current requirements that operators must meet when class locations change. PHMSA also welcomed any additional information that would be beneficial to the rulemaking process.

F. 2019 Gas Transmission Final Rule

Following the publication of the 2016 Gas Transmission NPRM, PHMSA determined it could more quickly move a rulemaking that focused on the mandates from the 2011 Pipeline Safety Act by splitting out the other provisions contained in the NPRM into two other, separate rules. Accordingly, on October 1, 2019, PHMSA published a final rule titled “Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments.”
79

PHMSA discusses the effects of that final rule on this proposal and any of the pertinent comments received on the ANPRM in the appropriate sections below.

79
84 FR 52180.

III. Analysis of ANPRM Comments and PHMSA's Response

The deadline for submitting written comments on the ANPRM was October 1, 2018. PHMSA received comments from entities consisting of citizen groups; pipeline industry consulting groups; government agencies, including representatives from the State of New Jersey and an association of State pipeline regulators; pipeline operators; and pipeline industry trade associations. PHMSA also received comments from approximately 4,800 individuals. PHMSA has considered the feedback received to the ANPRM and has taken the information submitted into account in formulating this proposal.

The comments submitted by the approximately 4,800 individuals were similar to one another and urged PHMSA to keep the class change rules as they are now until PHMSA completes gas safety rules to ensure that operators have TVC records of their systems, as recommended by NTSB. Further, these commenters noted that the existing special permit application process and NEPA requirements ensure that there is a review of the characteristics of pipe being proposed to be left in the ground and that the public has notice of those times when an operator is seeking to be exempted from strength or testing regulations, and that the current rules provide operators options other than pipe replacement, while assuring that pipe that stays in the ground is of known strength and that the public is made aware of proposed exemptions.

The following subsections summarize the questions and proposals contained in the ANPRM, each of the relevant issues raised by the commenters, and PHMSA's responses to the comments. The comments, in their original form, and corresponding rulemaking materials can be viewed at
www.regulations.gov
under Docket ID: PHMSA-2017-0151.

A. Comments Related to the 2016 Proposed Gas Transmission Rule

PHMSA received several comments on the class location ANPRM regarding the gas transmission NPRM that was issued in April 2016 and how provisions within that proposed rule would relate to potential changes to the class location regulations. There was broad agreement and support across all PHMSA's stakeholders, from public interest groups to the industry trade associations, for finalizing the 2016 Gas Transmission NPRM
80

to implement important safety initiatives, provide regulatory certainty, and promote pipeline safety technology development. The PST, representatives from the State of New Jersey, and over 4,800 members of the public commented that any consideration of changes to the current class location regulations should be postponed until after the 2016 Gas Transmission NPRM went into effect to address critical safety issues that could influence this rulemaking.

80
The Final Rule based on this NPRM was published on October 1, 2019.

In a combined submission, AGA, the American Public Gas Association (APGA), API, and INGAA (collectively, the “Associations”) specified that any regulations regarding class locations should align with the 2016 Gas Transmission NPRM. This statement was supported by many pipeline operators. Members of the pipeline industry and the Associations commented that the repair requirements detailed in the 2016 Gas Transmission NPRM would be appropriate for managing the integrity of pipeline segments where the class location has changed.

1. PHMSA's Response to General Comments Related to the 2016 Proposed Gas Transmission Integrity Rule

PHMSA is managing the potential changes to the class location regulations in this NPRM independently and based on their own merits. PHMSA acknowledges that many of the technical requirements previously proposed in the 2016 Gas Transmission NPRM are pertinent and applicable to the issues surrounding class location changes. In some cases, provisions that were proposed in the 2016 Gas Transmission NPRM were finalized in the 2019 Gas Transmission Final Rule. Comments that pertain to any of the provisions of the Class Location ANPRM referencing proposed changes in the 2016 Gas Transmission NPRM are addressed in the specific topic areas below.

B. Requiring Pipe Integrity Upgrades and Allowing Other Options for Class Location Changes

1. Summary of ANPRM Questions 1, 1a, and 2

PHMSA requested comments on whether it should allow operators to upgrade the integrity of pipeline segments undergoing class location changes by using methods other than the existing methods of pressure reduction, pressure testing, pipe replacement, or special permits. For clarification, the “pipe integrity upgrades” referred to in the ANPRM are synonymous with the existing methods that operators must use (
i.e.,
pressure reduction, pressure test, or pipe replacement) to confirm or revise MAOP in accordance with § 192.611. PHMSA also asked whether it should require pipe integrity upgrades for areas where the class location has changed from a Class 1 to a Class 3 or from a Class 2 to a Class 4.

Similarly, in question 2, PHMSA asked whether it should provide operators with the option of performing certain IM measures, in lieu of the existing measures, when class locations change from Class 1 to Class 3.

2. Summary of Comments

The California Public Advocates Office commented that pipeline segments with adequate material properties records and a successful subpart J pressure test could be managed with the existing pipe integrity upgrades per § 192.611. It said that, in areas where the class location has changed and the pipeline segment is missing material properties records and does not have documentation of a successful subpart J pressure test, either those pipeline segments should be replaced or the operator should be required to apply for a special permit. Finally, it said that if a pipeline segment undergoing a class location change is missing records but does have documentation of a previous successful subpart J pressure test, that segment could be managed with a new pressure test, pipe replacement, or a special permit.

NAPSR and the PST remarked that the best way to ensure public safety is to continue to encourage pipe replacements and to allow PHMSA to issue special permits for class location changes. These commenters were skeptical that relying on operational

practices, including IM, would be sufficient to ensure public safety, given that many accidents have been linked to operators mismanaging IM. These commenters also noted that the combination of prescribed design factors and IM better ensures safety through redundancy, and that this redundancy is good for public safety.

NAPSR and the PST also noted that, if IM concepts are used in lieu of pipe replacement, operators should be required to demonstrate improved safety levels through using IM program techniques or pressure test documentation.

Comments received from TransCanada Corporation (now TC Energy), Kinder Morgan, the Associations, GPA Midstream Association (GPA Midstream), and a member of the public expressed the view that PHMSA should allow operators to have the option of managing changes in class location with integrity assessments. The Associations stated that PHMSA should encourage operators to adopt IM measures, including those in the existing IM regulations and the regulations proposed in the 2016 Gas Transmission NPRM, to address threats posed by class location changes. In doing so, the Associations suggested, operators would gain knowledge about their systems that they would not have otherwise obtained. In addition, Enbridge noted that landowner disturbance and customer impact would be greatly reduced by reducing the amount of pipe replacements or hydrostatic tests conducted when class locations change.

Further, both Enbridge and the Associations suggested that PHMSA should allow operators to use integrity assessments as an MAOP confirmation (or revision) when class locations change, both from Class 1 to Class 3 and from Class 2 to Class 4. These commenters noted that pipeline technology has advanced since PHMSA promulgated the class location regulations. Commenters from the industry further stated that these technological advancements are feasible methods of ensuring operational integrity while managing class location changes. Therefore, operators and the Associations requested that PHMSA consider updating the class location regulations by allowing operators to perform aspects of IM when class locations change. These commenters suggested that operators would be able to analyze the condition of their pipelines through site-specific assessments and make sound pipe replacement determinations rather than follow prescriptive requirements.

Kinder Morgan added that regardless of the reason a class location changes, managing a class location change with IM principles is a more holistic approach than a “one-time” pipe replacement.

GPA Midstream suggested that PHMSA “should not impose arbitrary restrictions on an operator's ability to address class location changes with appropriate operations, maintenance, and integrity measures,” as operators can conduct risk assessments to determine the potential threats to a pipeline segment where the class location has changed. GPA Midstream further suggested that PHMSA's focus should be on making sure that operators complete such risk assessments within a reasonable amount of time and that appropriate documentation is maintained to substantiate compliance.

The Pennsylvania Grade Crude Oil Coalition (PGCOC), which represents small producers and refiners, stated that its members generally have limited resources compared with large pipeline operators. While the PGCOC supports an alternative to the current ways of managing class location changes, it requested that such an alternative not follow the framework of special permits. From its perspective, special permits contain numerous conditions that go beyond IM requirements and are unrelated to the change in class location. Furthermore, it suggested that the class-location regulations should provide certain exemptions or alternatives for small pipeline operators. Specifically, it suggested that PHMSA consider establishing minimal IM requirements for small operators.

An individual citizen noted that when comparing the failures in San Bruno, CA, and Carlsbad, NM, neither was associated with the operating stress of the pipeline. Rather, both incidents were caused by defects in the pipe itself and that these incidents were preventable using IM tools and methods. Further, this individual suggested that arbitrary pipe replacement when class locations change is not necessary, and these decisions should be made based on well-understood pipe conditions.

3. PHMSA Response

PHMSA agrees with many of the commenters that IM principles can serve as a useful and effective means of addressing the increased safety risks that accompany higher population densities near gas transmission pipelines. For this reason, in developing this proposed rule, PHMSA considered the ability of operators to demonstrate effectiveness and safety enhancements using IM performance metrics and methods. PHMSA also considered operators' recordkeeping practices and the documentation of previous pressure tests, as well as their ability to perform risk assessments. PHMSA's experience with class location change special permits demonstrates that IM methods can be appropriate for managing class location changes when implemented properly. Therefore, PHMSA is proposing to add an IM alternative to the existing class location change requirements for pipeline segments changing from a Class 1 to a Class 3 location.

On the other hand, the existing IM program is not a panacea for managing such risks. Class locations provide safety throughout the Nation's pipeline network by specifying stronger minimum safety standards for MAOP and design, construction, testing, and O&M requirements in higher class locations. The IM regulations provide a separate structure by which operators can focus their resources on managing and improving pipeline integrity in areas where a failure would have the greatest impact on public safety. Over time, pipelines can degrade due to integrity threats such as corrosion and cracking. IM provides minimum safety margins for more densely populated areas by requiring operators to assess their pipelines at a minimum of every 7 years, or more frequently, based on threat assessments or the predicted growth of anomalies found in HCAs.

For these reasons, this NPRM would not change the existing requirements for class location changes for pipelines that do not meet the proposed eligibility conditions but would instead provide an additional alternative for compliance. Newly constructed pipelines would still be required to be constructed based on part 192 class location requirements. Based on PHMSA's experience with class location special permits, as well as inspection results and incident history, the agency does not believe that IM, as it exists in subpart O, is suitable as the only appropriate method for class location change management. The IM regulations were crafted for pipe that was designed to a higher safety factor, and were not crafted for Class 1 pipe. Because the IM alternative proposed in this rule would allow operators to leave Class 1 pipe in the ground in locations where the population has increased to a Class 3 level, PHMSA is not confident that IM requirements, alone, would be adequate for protecting the population in those locations.

As a result, PHMSA is not proposing to allow pipe with higher-risk attributes

to be eligible for the proposed IM alternative, including: Bare pipe; pipe with wrinkle bends; pipe with certain weld seams (
e.g.,
direct-current (DC), low-frequency electric resistance welded (LF-ERW), electric flash-welded (EFW), lap-welded seams, or seams where the longitudinal joint factor is below 1.0); and pipe with SCC, selective seam weld corrosion, or girth weld cracking (pipe body or weld cracking) corrosion. In addition, PHMSA is imposing additional mitigation requirements beyond those currently required under IM. Operators with higher-risk attribute pipe could continue to apply for special permits to manage class location changes.

PHMSA is also not proposing exceptions to the proposed IM alternative, as suggested by some commenters, because the existing options for class location change compliance and the special permit process would remain. Operators unable or unwilling to perform the IM alternative can achieve compliance through one of the existing options at § 192.611 or via a special permit.

PHMSA has not issued a special permit to manage locations changing from a Class 2 to a Class 4, because there is not an adequate basis for applying IM measures and concepts to these higher-risk pipeline segments. Though inspection technologies have advanced from earlier iterations, PHMSA does not have the operational data to confirm that the use of such technology on pipe designed to Class 2 standards would provide an adequate margin of safety in very densely populated Class 4 locations with multi-story buildings. PHMSA is concerned that there would not be adequate, feasible measures that could be prescribed to provide Class 4 locations with an equivalent level of safety in lieu of replacing pipe.

C. Integrity Upgrades and Integrity Management Options for Clustered Areas

1. Summary of ANPRM Questions 1b, 3, 3a, and 3b

In question 1b of the ANPRM, PHMSA asked whether part 192 should continue to require operators to upgrade pipeline integrity where the class location has changed from a Class 1 to a Class 3 due to the “cluster rule.”
81

In question 3, PHMSA asked whether the agency should give operators the option of performing certain IM measures in lieu of the existing measures when class locations change due to additional structures being built outside of an existing “clustered” areas within the sliding mile and operators are using the cluster adjustment to class locations per § 192.5(c)(2).
82

In sub-questions 3a and 3b, PHMSA asked whether, if alternative IM measures are permitted for pipelines, then what additional IM and maintenance measures should be applied to offset the safety impact of additional structures being built outside of clustered areas and at what intervals and in what timeframes operators should be required to assess these pipelines and perform remediation measures.

81
See § 192.5(c)(2) and section I.B. of the ANPRM background for more details on the “cluster rule.” Operators can adjust the length of a Class 2, Class 3, or Class 4 location based on the presence of a “cluster of buildings.” Clustering reduces the amount of pipe that is subject to the safety requirements of higher class locations. Clustering does not change the length of the class location units themselves (
i.e.,
the “sliding mile”).

82
Under § 192.5(c)(2), the length of Class locations 2 and 3 may be adjusted as follows: When a cluster of buildings intended for human occupancy requires a Class 2 or 3 location, the class location ends 220 yards (200 meters) from the nearest building in the cluster.

2. Summary of Comments

Multiple commenters expressed the view that options for actions taken in response to class location changes should not depend on whether clustering was used in determining the class location designation.

More specifically, the Associations strongly disagreed with PHMSA's statement in the ANPRM of a cluster being “even a single house.” They stated that in no prior class location rulemaking has the term “cluster” ever been defined. The Associations noted that in 1992, PHMSA, in response to an ANPRM question, specified that the word “cluster” was “used in the ordinary dictionary sense,” but, according to the Associations, the dictionary definition does not support the interpretation of one structure constituting a “cluster.” The Associations contended that the ordinary meaning of a cluster should continue to apply and each operator should be able to determine the scope of a cluster. Individual operator comments supported this view.

TransCanada Corporation suggested that PHMSA revise the “cluster rule” in § 192.5(c)(2) to cover only those situations where there are more than 10 buildings in close proximity, claiming that such a definition would be closer to the original intent of using class locations as a risk-mitigation tool and would be supported by a Class 1 location being defined as one with fewer than 10 buildings. Further, TransCanada noted that this proposed definition is supported by PHMSA's recent issuance of a class location special permit that distinguished between two differently sized clusters (
i.e.,
Type A and Type B), one with more and one with fewer than 10 buildings. Finally, it stated that categorizing low-population-density areas due to PHMSA's interpretation of the cluster rule as Class 3 locations artificially manipulates pipeline risk characterizations, in that small clusters of buildings (
e.g.,
3) near larger clusters of buildings (
e.g.,
50) would share the same risk profile. TransCanada stated that this approach results in outcomes that are inconsistent from the perspective of risk because a cluster with 50 buildings would have a higher activity rate, which would increase the likelihood of failure, and any failures would have higher consequences due to the denser population, whereas a cluster of 3 buildings would have less.

GPA Midstream also disagreed with assigning a single building as a defined cluster. It suggested that operators should determine the class location for the cluster specifically and determine the class location for the rest of the class location unit solely by considering the number of buildings outside of the clustered area. In this way, population density would drive class location determinations more accurately.

3. PHMSA Response

The “cluster rule” only applies when an operator has identified a class location unit that meets the criteria for a Class 2, Class 3, or Class 4 location. Once the Class 2, Class 3, or Class 4 location has been identified, the operator may adjust the endpoints of that Class 2, Class 3, or Class 4 location by using the cluster rule.
83

The purpose of this requirement is to allow operators to avoid replacing or pressure testing segments that have no buildings intended for human occupancy in the sliding mile and outside the “cluster.”

83
See § 192.5(c).

PHMSA is not proposing any revisions to the clustering methodology in this NPRM. However, this proposed rule would address areas that might be affected by clustering by requiring that operators assess pipe with ILI tools and implement P&M measures for the entire segment.

D. Using an Integrity Management Option To Manage Safety When Class Locations Change From a Class 1 to a Class 3

1. Summary of ANPRM Question 2a

In question 2a of the ANPRM, PHMSA asked whether it should allow operators to use certain IM measures in

lieu of the existing measures to ensure safety when class locations change from a Class 1 to a Class 3, and if so, what additional IM and maintenance approaches or safety measures should be applied to offset any potential impact to safety. PHMSA also asked at what intervals operators should be required to assess such pipelines and perform the necessary remediation measures.

2. Summary of Comments

NAPSR and the PST commented that specific design measures are more effective and consistently implemented than IM, as several recent failures have been attributed to IM implementation issues. Should PHMSA allow operators to use IM measures to manage class location changes, these commenters suggested that PHMSA should consider requiring more frequent integrity assessments, multiple tool type runs, more stringent repair requirements, and additional damage prevention activities.

Members of the pipeline industry recommended that PHMSA allow operators to use IM principles for managing class location changes, noting such an approach would allow operators to determine the threats associated with each pipeline segment and appropriate actions. Industry commenters also suggested that operators could implement the integrity assessment option for class location change management similarly to how it is implemented in subpart O, with at least one commenter noting that they could classify class location change segments as HCAs and manage the segments as a part of a broader IM program. Therefore, these commenters suggested that for both covered and non-covered segments that experience a class location change, operators could complete an initial assessment within 24 months of the class change, with reassessments to occur within 7 years or 10 years, depending on where the segment is located and the status of the 2016 Gas Transmission NPRM. Operators could complete the initial assessments using, at a minimum, ILI or comparable technology capable of assessing corrosion and dents. To ensure all identified threats would be addressed, operators could use additional assessment methods.

Certain industry commenters requested that PHMSA consider allowing operators to file for an extension if it is not practicable to complete an initial integrity assessment and MAOP reconfirmation, if required, within 24 months of a class change.

3. PHMSA Response

PHMSA agrees with NAPSR and the PST that if IM is used to manage class location changes, additional and enhanced requirements would be necessary to ensure pipeline safety. PHMSA also agrees that the timing of the initial integrity assessment should correspond with the current class location change requirement of 24 months. PHMSA is proposing reassessment intervals for the IM alternative of class location change management equivalent to the reassessment intervals in subpart O. As proposed in this NPRM, any segments managed through this IM alternative would need to be classified as HCAs, which are subject to subpart O; therefore, such a requirement would be consistent with the current regulations. Operators that do not identify the Class 1 to Class 3 location change in accordance with §§ 192.609 and 192.611(d) would not be able to use the class location change alternative proposed in this NPRM.

PHMSA agrees with commenters that IM is not suitable for class location change management in every situation. Under PHMSA's proposal, an operator would perform an analysis to identify those pipeline segments where the class location has changed, and identify those segments where it would be inappropriate to manage Class 1 to Class 3 location changes with IM. PHMSA notes that even if a pipeline segment meets the proposed minimum criteria discussed later in this NPRM, it does not mean that IM would be the best option for managing that pipeline segment. Based on their knowledge of their own pipeline systems, operators would ultimately determine whether an eligible pipeline segment should be managed with the IM alternative.

As a condition of using the IM alternative proposed in this rule, operators must notify PHMSA of their intent to use the alternative to allow PHMSA to review and inspect for compliance. PHMSA has learned through its inspections that many operators fail to assess and mitigate integrity problems properly, including poor construction practices
84

and operational maintenance threats, whether due to a lack of appropriate technologies, cost, or other reasons, threats that ultimately lead to pipeline failures. IM programs can fail to account for broadly recognized safety issues, such as bare pipe, wrinkle bends, lap welds, cracking, and pipe that has other potential construction or manufacturing issues. ILI technology does not effectively identify all integrity threats that may have been created through construction or manufacturing processes and that have not been tested for stability with a subpart J pressure test. Therefore, PHMSA believes such segments should not be managed using the IM alternative when class locations change.

84
On several occasions in recent years, PHMSA has met with operators to discuss safety issues related to new construction. For example, PHMSA hosted a public workshop in collaboration with its State partners, the Federal Energy Regulatory Commission (FERC), and Canada's National Energy Board in April 2009. The objective of the public workshop was to inform the public, alert the industry, review lessons learned from inspections, and improve new pipeline construction practices prior to the 2009 construction season. The following website contains information discussed at the workshop and provides a forum in which to share additional information about pipeline construction concerns:
https://primis.phmsa.dot.gov/construction/index.htm
.

Further, as the 2010 PG&E incident at San Bruno, CA, revealed, some operators may not have TVC records of certain pipe properties, such as pipe material yield strength, pipe wall thickness, pipe seam type, pipe and seam toughness, and coating type or quality. Data on these pipe properties are critical and necessary for the effective implementation of IM processes and pipeline safety measures in populated areas. PHMSA is concerned that operators may not have this pipe material property data for Class 1 pipe segments in locations that later become Class 3, especially if the pipe has been operated in accordance with § 192.619(c).
85

This data is necessary for making important pipeline safety judgments, including technical evaluations of anomalies.

85
Pipeline segments operated in accordance with § 192.619(c) were installed prior to adoption of the PSR and likely do not meet § 192.619(a)(1), (2), or (4), or they operate above 72 percent of SMYS. These pipeline segments may not have pressure test or material properties records. Section 192.619(c) allows pipelines put into service before July 1, 1970, that were found to be in satisfactory condition, to be operated in Class 1 locations at the highest actual operating pressure they achieved during the 5 years preceding July 1, 1970, regardless of the level of hoop stress on the pipe. Pipelines in Class 1 locations that are designed and operated to part 192 standards are otherwise limited to a maximum operating hoop stress of 72 percent of SMYS.

PHMSA also notes that there may be instances where a pipeline appears to be in “good condition” from a visual standpoint, but may not have the initial pipe manufacturing, pipe body and seam strength, construction quality, coating, and CP effectiveness to prevent corrosion and cracking, and therefore lack the O&M history necessary for the effective management of class location changes using IM.

Therefore, PHMSA proposes to exclude pipe with certain pipe attributes and O&M parameters from the proposed IM alternative of managing class locations. PHMSA is concerned that some operators have not adequately identified and mitigated these integrity threats at a consistent and reliable level. Excluding these segments from the proposed IM alternative would ensure a higher level of safety. Operators would still be allowed to apply for special permits to manage such pipeline segments, but PHMSA would be able to evaluate them, and the public would be able to comment on them, on a case-by-case basis. PHMSA requests comment as to whether these proposed pipe eligibility conditions could be modified or eliminated, and if so, what the impacts to safety and the environment would be as well as the net benefits of this proposed rule.

In addition, PHMSA's experience with operator IM programs indicates that some operators do not have an IMP in place that includes sufficiently robust P&M measures in HCAs to address the various risks posed by changes in class locations. Therefore, PHMSA concludes that, while applying modern IM assessments and processes can be an appropriate way to manage certain class location changes, the addition of specific prescriptive, additional P&M measures to such a method is needed to ensure a level of safety comparable to pipe replacement or derating the pipeline MAOP for pipeline segments that change from a Class 1 to Class 3 location. PHMSA requests comment as to whether modification or elimination of any of the proposed P&M measures, beyond the current IM requirements, is feasible and what the impacts to safety and the environment would be and whether such a change would maximize nets benefits to society.

Regarding the request that PHMSA allow operators to file for an extension to the 24-month assessment timeframe, PHMSA is not proposing to adopt that suggestion. PHMSA believes that 24 months is sufficient time to complete an initial IM assessment and that longer time frames would introduce undue risk to public safety by allowing Class 1 pipe to operate untested for more than 2 years in a Class 3 location. Currently, under § 192.611, if a class location change requires pipe replacement, MAOP reduction, or pressure tests to confirm a class location upgrade to be conducted, operators must complete those actions within 24 months of the class location change. PHMSA notes that the timeframe for this requirement was established at 24 months because it provides operators with enough time to order pipe, if necessary, and make changes from one season to the next. For example, if a class location change occurs in the spring, an operator would be able to order and receive pipe before replacing the pipe in the following summer season.

E. General Eligibility for Managing Class Location Changes With Integrity Management

1. Summary of ANPRM Questions 4, 4a, 4b, and 4c

In question 4 of the ANPRM, PHMSA requested comment on whether an operator should use a “fitness-for-service”
86

standard to determine which pipelines should be eligible for using IM measures to manage segments changing from a Class 1 to a Class 3 location, and what factors should make a pipeline eligible or ineligible for doing so.

86
“Fitness for service” refers to a pipeline's ability to operate and deliver product safely while protecting the people and environment around the pipeline. Fitness for service has been a part of industry consensus standards since the mid-1980s, and PHMSA has incorporated elements of these standards into the PSR.

PHMSA also asked whether it should base a proposed class location change management IM on the alternative criteria it uses when considering class location change waivers, including the pipe's age, the manufacturing and construction processes of the pipe, and the pipe's O&M history.

In addition, PHMSA asked whether it should require operators and pipelines to meet eligibility conditions outlined in the 2004
Federal Register
Notice, including no bare pipe or pipe with wrinkle bends, records of a hydrostatic test to at least 1.25 times MAOP, records of ILI runs with no significant anomalies that would indicate systemic problems, and an agreement that up to 25 miles of pipe both upstream and downstream of the waiver location must be periodically inspected using ILI technology.

2. Summary of Comments

NAPSR and the PST stated that the existing § 192.609 serves as a fitness-for-service determination and suggested that operators should complete a fitness-for-service study for all pipeline segments, not just those impacted by a class location change. NAPSR and the PST further suggested that such a study should then be updated every 3 years, noting that the study results could assist in pipe replacement determinations when a class location change occurs. Pipeline industry commenters stated that a fitness-for-service standard should be established from the integrity assessments, enhanced repair criteria, and MAOP reconfirmation requirements proposed in the 2016 Gas Transmission NPRM. They stated that the initial MAOP establishment (or an MAOP reconfirmation where a pressure test record is not available) sets a physical safety margin that is then maintained for the life of the pipeline using integrity assessment, anomaly evaluation, and repair or replacement, where required based on pipe condition.

NAPSR, the PST, and the California Public Advocates Office commented that the criteria for class location change special permits that PHMSA published in the 2004
Federal Register
Notice are all aspects of fitness-for-service, and PHMSA should use these factors as a basis for any proposed class location change requirements. Similarly, NAPSR and the PST commented that PHMSA should approve, on a case-by-case basis, an operator's request to utilize IM measures for class location changes taking into account a fitness-for-service study. The PST also said that PHMSA should not issue class location change special permits if the applicable pipeline segment cannot be assessed with ILI tools or does not have accurate and verifiable design records.

The Associations and supporting operators broadly commented that threshold conditions should not be required and that PHMSA should allow operators to use IM measures in lieu of pipeline replacement on all segments undergoing class location changes, stating that no individual pipe attribute should determine eligibility for a class location change alternative. Instead, these commenters suggested that PHMSA should encourage operators to utilize IM measures exclusively in lieu of the current requirements for managing these segments of pipelines where the class location has changed, including addressing threats as detailed in existing regulations and as proposed in the 2016 Gas Transmission NPRM. In doing so, these commenters argued, operators would gain knowledge about their systems that they would not have obtained otherwise.

Some operators, including TransCanada Corporation, proposed that operators should be allowed to conduct site-specific assessments to determine if pipeline segments should be eligible for using IM measures in lieu of pipe replacements or pressure reductions. Such an assessment would need to assess all applicable threats and their interactions to ensure that operators can manage safety at acceptable levels. An individual citizen noted that the acceptable current fitness-for-service standards are in ASME B31.8S, ASME B31G, RSTRENG, and their equivalents. This citizen further stated that

reassessment is the key to assuring continued safety, and that lower stress does not assure public safety. The commenter further suggested that pipe segments should not be changed out if its condition is well understood and judged to be acceptable.

In addition, the Associations and supporting pipeline operators claimed that PHMSA's special permit requirement for assessing a prescribed amount of mileage upstream and downstream from the pipeline segment undergoing a class location change is not technically justified. They said that depending on the design of a pipeline system, such an assessment may require multiple tool runs or the analysis of pipe completely unrelated to the segment in which the class location has changed. Because PHMSA proposed to extend integrity assessments outside of HCAs in the 2016 Gas Transmission NPRM, these commenters suggested that special permit inspection areas are no longer appropriate or necessary to ensure pipeline safety. Similarly, Kinder Morgan stated that IM measures address segment threats, and the additional requirements detailed in the 2016 Gas Transmission NPRM will cover pipeline segments up and downstream of the class-location change.

An individual citizen commented that prescribing mileage to be assessed is not appropriate, as it could potentially exempt from the requirements pipeline segments that do not have 50 miles of pipe between ILI tool launcher and receivers.

Another individual citizen recommended that, if PHMSA were to allow an IM alternative for class location changes, operators should have to inform PHMSA and affiliated State agencies of their intent to apply IM measures for managing a pipeline segment changing from a Class 1 to a Class 3 location.

3. PHMSA Response

To the PST's comment that class location change special permits should not be issued if the applicable pipeline segment cannot be assessed with ILI tools or does not have accurate and verifiable design records, PHMSA is proposing to require in this NPRM that the segment must be “piggable” to be eligible for the IM alternative to the class location change requirements. Operators must also have pipe material property records for the segment to be eligible.

PHMSA does not believe that assessments and repairs alone are adequate to demonstrate the eligibility and fitness-for-service of pipe manufactured to Class 1 location standards to be used in Class 3 locations. In addition, PHMSA has elected to finalize the provisions proposed in the 2016 Gas Transmission NPRM in three separate final rules—the 2019 Gas Transmission Final Rule was published October 1, 2019, and the other two are in development. While the 2019 Gas Transmission Final Rule did include updated assessment requirements for “moderate consequence areas,” PHMSA intends to finalize the corresponding repair criteria in a draft final rule currently titled “Pipeline Safety: Safety of Gas Transmission Pipelines, Repair Criteria, Integrity Management Improvements, Cathodic Protection, Management of Change, and Other Related Amendments.” PHMSA does not believe that managing Class 1 to Class 3 location changes using an updated assessment schedule with the existing repair criteria would provide an equivalent level of safety when compared to pipe replacement without additional P&M requirements being applied to the eligible pipe. ASME B31.8S allows anomalies to grow until only a 10 percent safety factor remains before they need to be remediated. In this NPRM, PHMSA is proposing that operators remediate anomalies that have a predicted failure pressure of less than 1.39 or a depth of less than 40 percent of the pipe wall thickness. This safety factor of 1.39 would be similar to the installation

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A2020-19872. Public record. Not legal advice.
