# Passenger Equipment Safety Standards; Standards for Alternative Compliance and High-Speed Trainsets

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A2018-25020

## Record

- **Collection:** Federal Register
- **Document type:** Rule
- **Published:** November 21, 2018
- **Citation:** 83 FR 59182

## Text

DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
49 CFR Parts 229, 231, 236, and 238
[Docket No. FRA-2013-0060, Notice No. 3]
RIN 2130-AC46
Passenger Equipment Safety Standards; Standards for Alternative Compliance and High-Speed Trainsets

AGENCY:

Federal Railroad Administration (FRA), Department of Transportation (DOT).

ACTION:

Final rule.

SUMMARY:

This final rule amends FRA's passenger equipment safety standards using a performance-based approach to adopt new and modified requirements governing the construction of conventional- and high-speed passenger rail equipment. This final rule adds a new tier of passenger equipment safety standards (Tier III) to facilitate the safe implementation of nation-wide, interoperable high-speed passenger rail service at speeds up to 220 mph. While Tier III trainsets must operate in an exclusive right-of-way without grade crossings at speeds above 125 mph, these trainsets can share the right-of-way with freight trains and other tiers of passenger equipment at speeds not exceeding 125 mph. This final rule also establishes crashworthiness and occupant protection performance requirements in the alternative to those currently specified for Tier I passenger trainsets. Together, the Tier III requirements and Tier I alternative crashworthiness and occupant protection requirements remove regulatory barriers and enable use of new technological designs, allowing a more open U.S. rail market. Additionally, the final rule increases from 150 mph to 160 mph the maximum speed for passenger equipment that complies with FRA's Tier II requirements.

DATES:

Effective date.
This final rule is effective January 22, 2019.

Incorporation by reference.
The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of January 22, 2019.

ADDRESSES:

Docket:
For access to the docket to read background documents or comments received, go to
http://www.regulations.gov
at any time or visit the Docket Management Facility, U.S. Department of Transportation, 1200 New Jersey Avenue SE, Room W12-140 on the Ground level of the West Building, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT:

Devin Rouse, Staff Director, U.S. Department of Transportation, Federal Railroad Administration, Office of Railroad Safety, Passenger Rail Division, 1200 New Jersey Avenue SE, Washington, DC 20590 (telephone: 202-493-6185); or Michael Hunter, Attorney Adviser, U.S. Department of Transportation, Federal Railroad Administration, Office of Chief Counsel, 1200 New Jersey Avenue SE, Washington, DC 20590 (telephone: 202-493-0368).

SUPPLEMENTARY INFORMATION:

Common Abbreviations

AAR Association of American Railroads

APTA American Public Transportation Association

AW0 ready-to-run weight, empty

CEM crash energy management

CFR Code of Federal Regulations

CG center of gravity

EN EuroNorm

ETF Engineering Task Force

FE finite element

FEA finite element analysis

FRA Federal Railroad Administration

g gravitational acceleration (32.2 feet/second/second)

HSR high-speed rail

in inch(es)

kip kilopound(s)

kN kilo-Newton(s)

kph kilometer(s) per hour

lbf pound(s)-force

mph mile(s) per hour

ms millisecond(s)

MU multiple-unit

OVI occupied volume integrity

PTC positive train control

RIA regulatory impact analysis

ROW right-of-way

RSAC Railroad Safety Advisory Committee

ITM inspection, testing, and maintenance

PTEP Passenger Train Emergency Preparedness

PESS Passenger Equipment Safety Standards

U.S.C. United States Code

UIC International Union of Railways

Table of Contents

I. Executive Summary

II. Statutory and Regulatory Background

A. Statutory Background

B. Implementation of the 1994 Passenger Safety Rulemaking Mandate

III. Development of the Final Rule

IV. Discussion of Comments and Conclusions

A. General Comments

B. Proposed Subpart I and the Inspection, Testing, and Maintenance Requirements for Tier III Passenger Equipment

C. Proposed Subpart J and the Safe Operation Plan for Tier III Passenger Equipment

D. Comments From the NTSB

V. Section-by-Section Analysis

VI. Regulatory Impact and Notices

A. Executive Orders 12866, 13563, and 13771, and DOT Regulatory Policies and Procedures

B. Regulatory Flexibility Act and Executive Order 13272

C. Paperwork Reduction Act

D. Federalism Implications

E. International Trade Impact Assessment

F. Environmental Impact

G. Executive Order 12898 (Environmental Justice)

H. Executive Order 13175 (Tribal Consultation)

I. Unfunded Mandates Reform Act of 1995

J. Energy Impact

K. Analysis Under 1 CFR Part 51

I. Executive Summary

Having considered the public comments in response to FRA's December 6, 2016, proposed rule on standards for alternative compliance and high-speed trainsets, see 81 FR 88006, FRA issues this final rule amending the Passenger Equipment Safety Standards, 49 CFR part 238. This final rule is the product of consensus reached by FRA's Railroad Safety Advisory Committee (RSAC), which accepted the task of reviewing passenger equipment safety needs and programs and recommending specific actions that could be useful to advance the safety of passenger service, including the development of regulatory requirements for the next generation of high-speed trainsets. The RSAC established the Passenger Safety Working Group (“PSWG” or “Working Group”) to handle this task and develop recommendations for the full RSAC to consider. In September 2009, the Working Group in turn established the Engineering Task Force (“ETF” or “Task Force”) for the purpose of producing a set of technical criteria and procedures to evaluate passenger rail equipment based on alternative designs. This work led to the development of the report entitled “Technical Criteria and Procedures for Evaluating the Crashworthiness and Occupant Protection Performance of Alternatively Designed Passenger Rail Equipment for Use in Tier I Service” (“Technical Criteria and Procedures Report” or “Report”).
1

The guidance in the Technical Criteria and Procedures Report has assisted railroads and rolling stock manufacturers who have petitioned FRA for waivers from strict compliance with FRA's Tier I passenger equipment crashworthiness standards, and has been useful to FRA in

evaluating such petitions. In addition to developing the criteria in the Report, the ETF's task was expanded to develop formal recommendations to the full RSAC for adopting these alternative crashworthiness and occupant protection criteria into FRA's regulations and to establish minimum safety requirements for the next generation of high-speed trainsets, capable of operating at speeds of up to 220 mph, classified as Tier III passenger equipment. The ETF reached consensus on recommending the adoption of these alternative crashworthiness criteria in 49 CFR part 238 for Tier I passenger equipment. The ETF also reached consensus on criteria for Tier III passenger equipment, specifically trainset structure, side-window glazing, brake systems, interior fittings and surfaces, certain emergency systems and cab equipment, and cab glazing (with the exception of ballistic penetration resistance). The ETF further reached consensus on the definition of Tier III, including when Tier III equipment can operate on shared infrastructure and when the equipment must operate in an exclusive right-of-way. On June 14, 2013, the full RSAC voted to recommend the consensus items to FRA's Administrator, as the basis for a formal rulemaking. This final rule is based on these RSAC recommendations.

1
U.S. Department of Transportation Report No. DOT-FRA-ORD-11/22. Washington, DC: Federal Railroad Administration, Office of Railroad Policy Research and Development, October 2011, available at
http://www.fra.dot.gov/eLib/details/L01292#p4_z50_gD_lRT
.

This final rule establishes requirements in three main subject areas: (1) Tier III trainset safety standards; (2) alternative crashworthiness and occupant protection performance requirements for Tier I passenger equipment; and (3) the maximum authorized speed for Tier II passenger equipment. The following is a brief overview of the rule organized by subject area and a summary of its economic impact.

Tier III Trainset Safety Standards

This final rule defines Tier III passenger train operations and outlines the minimum safety standards for the use of such trainsets in the United States, focusing on core structural and critical system design criteria. FRA intends for this final rule to facilitate the safe implementation of interoperable high-speed rail service, and enable the use of common infrastructure and promote other efficiencies. The Tier III operating environment is unique by design. Tier III passenger trains are permitted to operate in a shared right-of-way (one shared with freight trains and other tiers of passenger equipment) at speeds up to 125 mph, but must operate in an exclusive right-of-way without grade crossings at speeds exceeding 125 mph, up to 220 mph. The requirements provide for the sharing of rail infrastructure among various types of rail equipment, especially in more urban areas, while providing for dedicated passenger rail service at maximum speeds up to 220 mph.

This final rule also establishes requirements for Tier III trainset structure, window glazing, brake systems, interior fittings and surfaces, certain emergency systems (including window egress and rescue access requirements), and certain cab equipment. To support operational compatibility, the Tier III trainset crashworthiness and occupant protection requirements are predominantly based on the alternative crashworthiness and occupant protection requirements for Tier I passenger equipment and are intended to safely apply to operations at speeds up to 220 mph in a dedicated environment as approved by FRA. Specialized RSAC task groups developed the requirements for braking systems and cab glazing by focusing on the development of performance-based requirements that could be implemented in a technology-neutral manner, wherever possible.

To develop their recommendations, the ETF and full RSAC considered the latest trainset designs and technology available globally, and adapted their recommendations in a manner consistent with the North American operating environment. The intent of these requirements is to ensure that safety and reliability are paramount, while incorporating elements from the most advanced, service-proven technology available throughout the world.

Alternative Crashworthiness Requirements for Tier I Passenger Trainsets

As noted above, FRA is codifying a set of technical evaluation criteria the ETF developed as guidance for those seeking to demonstrate that alternative crashworthiness and occupant protection performance requirements for Tier I passenger trainsets provide a level of safety equivalent to the existing requirements in part 238. FRA intends for the alternative technical criteria to allow the industry greater flexibility to use more contemporary design techniques and more fully apply emerging technology, including crash energy management (CEM) technology, without requiring a waiver of compliance for operating the equipment. The technical criteria are based on established international standards and significant research and testing conducted by the industry and DOT's John A. Volpe National Transportation Systems Center (Volpe Center) over the past 25 years. Codifying the technical criteria dovetails with alternative crashworthiness performance requirements FRA earlier established in part 238 for the front-end structures of cab cars and multiple-unit (MU) locomotives (75 FR 1180), thereby broadening application of such requirements to other main structures.

Tier II Maximum Authorized Speed

On March 13, 2013, FRA issued a final rule (78 FR 16052) to amend the Federal Track Safety Standards to promote the safe interaction of rail vehicles and the tracks they operate on at speeds up to 220 mph. That final rule revised the track geometry and safety limits for various track classes, extended the limits for the highest track speeds from 200 to 220 mph (Class 9 track), and affirmed that the maximum authorized speed for Class 8 track is 160 mph. This final rule establishes the maximum authorized operating speed for Tier II passenger equipment consistent with the limits for Class 8 track. However, it is important to note that existing Tier II operations FRA has approved to operate at speeds up to 150 mph are still required to provide sufficient testing and vehicle/track interaction performance data required under 49 CFR 213.329 and 238.111, and obtain FRA approval before any operations occur at the new maximum authorized speed of 160 mph.

Economic Analysis

This final rule expands and makes more flexible FRA's Passenger Equipment Safety Standards. FRA believes this final rule will have a net cost savings effect on the passenger rail industry and society as a whole, along with safety benefits.

Specifically, the final rule will generate cost savings benefits by enabling high-speed rail operators to avoid new right-of-way acquisition and infrastructure construction for dedicated rail lines in dense urban areas. This is possible because the final rule allows such trains to travel on existing, non-dedicated rail lines, although at slower speeds than permissible for travel on dedicated rail lines.

For traditional passenger rail operations, there are both operational and safety benefits resulting from this final rule. Not issuing the rule would increase costs associated with the acquisition of new passenger trains and could delay new U.S. passenger rail infrastructure projects. The final rule ensures existing and future alternative trainset designs can operate in the U.S.

railroad environment on a widespread basis, beyond the constraints that have been imposed by FRA regulations. This helps avert perpetuating a patchwork of waivers in the U.S. passenger rail market that would, in turn, perpetuate the current unattractiveness of the U.S. passenger equipment market to manufacturers. The final rule allows U.S. trainsets to use technological advances for safety compliance purposes in a way that was previously restricted under the former regulations.

There will also be safety benefits associated with improvement of the existing rail infrastructure to accommodate the operation of new high-speed rail equipment in shared rights-of-way.
2

Additionally, as the requirements herein are largely performance-based standards and not prescriptive requirements, equipment benefits will be generated by passenger rail operators being able to adopt service-proven, safety-equivalent technology and practices and apply future technological advancements.

2
For example, the shared rail infrastructure is presumed to be better maintained to accommodate the new Tier III equipment, and thus all rail traffic operating over that shared infrastructure will benefit from track maintained to tighter tolerances for higher speeds under FRA's track safety standards at 49 CFR part 213. Track that was once maintained to Class 4 or 5 tolerances, may now be maintained to Class 6 or 7 tolerances.

Over a 30-year period, FRA estimates quantifiable cost savings range from a present value of between $512.5 million to $1.1 billion (when discounted at a 7-percent rate) or between $790.1 million to $1.6 billion (when discounted at a 3-percent rate).
3

Annualized cost savings of this rule are expected to be between $41.3 million and $85.8 million when discounted at a 7-percent rate and between $40.3 million and $84.0 million when discounted at a 3-percent rate.

3
Tier III costs and cost savings are uncertain because they are based on assumptions regarding the future growth of high-speed rail operations and how those operations will be incorporated into the U.S. rail network. It is possible that all costs, cost savings, and benefits relating to Tier III systems, including equipment and infrastructure, will be zero. This could occur if no high-speed rail projects come to fruition over the forecasted horizon. Further, the estimated infrastructure cost savings depend on the assumption of not having to build dedicated HSR track for the whole system (
i.e.,
they represent savings from being able to operate HSR using shared infrastructure). Tier I cost savings from adopting performance-based standards are challenging to quantify, as estimates are based on projecting future changes. However, given that the new regulation's performance standards provide an alternative to more design-based standards, operators would voluntarily comply only if they found it beneficial to do so. The estimated figures in the Regulatory Impact Analysis (RIA) are provided for expository purposes. For both Tier III and Tier I, if the actions that trigger cost savings are not taken, the costs would not be incurred, as the costs and cost savings are two sides of the same actions.

Over the same 30-year period, FRA estimates the industry will incur costs ranging between $227.7 to $523.3 million (when discounted at a 7-percent rate) or between $351.3 to $808.8 million (when discounted at a 3-percent rate). Annualized costs of this rule are expected to be between $18.4 million and $42.2 million when discounted at a 7-percent rate and between $17.9 million and $41.3 million when discounted at a 3-percent rate. All quantified costs would be for testing and analysis to demonstrate compliance with either the Tier I alternative or Tier III standards.

Over the 30-year period of the analysis, FRA estimates discounted net regulatory cost savings will be between $438.8 million (low range) and $837.8 million (high range) discounted at 3 percent; net regulatory cost savings will be between $284.8 million (low range) and $541.9 million (high range), discounted at 7 percent. Annualized net regulatory cost savings total between $22.4 million and $42.7 million when discounted at a 3-percent rate and between $22.9 million and $43.7 million when discounted at a 7-percent rate.

Net Regulatory Cost Savings
[Quantified estimates using a 30-year period; $ in millions]

Description
Discounted 3%
Discounted 7%

High Range

Total Costs
$808.8
$523.3

Total Cost Savings
1,646.7
1,065.2

Total Net Cost Savings
837.8
541.9

Annualized Net Cost Savings
42.7
43.7

Low Range

Total Costs
351.3
227.7

Total Cost Savings
790.1
512.5

Total Net Cost Savings
438.8
284.8

Annualized Net Cost Savings
22.4
22.9

The rulemaking will provide an optional alternative, not a mandate, for railroads to use a different type or design of passenger equipment in Tier I service and will not impose any burden on existing rolling stock or new equipment qualifying under existing regulations. Similarly, the rulemaking will provide a framework for railroads to operate equipment in new Tier III service—it will not impose any burden on existing rolling stock or new equipment qualifying under existing regulations.

Alternatives Considered

One of the main purposes of the final rule is to provide a set of minimum Federal safety requirements for safe operation in the U.S. rail environment of passenger equipment platforms designed to contemporary engineering standards outside of the U.S. Traditionally, U.S. railroad safety regulations evolved as a consequence of specific accidents scenarios, which have led to the identification of specific risks in the operating environment.
4

As FRA stated in its 1999 Passenger Equipment Safety Standards (PESS) final rule, the railroad operating environment in the United States generally requires passenger equipment to operate commingled with very heavy and long freight trains, often over track with frequent grade crossings used by heavy highway equipment.
See
64 FR 25540, 25541 (May 12, 1999). European passenger operations, on the other hand,

are intermingled with freight equipment of lesser weight than in North America. In many cases, highway-rail grade crossings also pose lesser hazards to passenger trains in Europe due to lower highway vehicle weight.

4
Passenger Equipment Safety Standards, Notice of Proposed Rulemaking, 62 FR 49728, 49729-49731 (Sep. 23, 1997) (discussing differences between the European and U.S. rail operating environments, and describing a range of passenger rail accidents demonstrating the need for comprehensive, passenger equipment safety standards).

While FRA seeks to continue ensuring the safety risks are adequately addressed for the operating environment, the final rule places special emphasis on measures to avoid those risks rather than simply mitigating them. Importantly, this final rule allows the use of additional types of rolling stock design, which will enable innovation and provide railroads the flexibility to purchase equipment designed to more performance-based and modern requirements. The rule also permits carriers to move forward with a new tier of higher speed rail.

The alternatives FRA considered in establishing the safety requirements for Tier III trainsets are based on European and Japanese industry standards. These options provide a continuum of safety requirements for a range of aspects such as: Varying levels of regulation, market accessibility, benefits and costs, and operational efficiency and safety. FRA prepared a high-level cost comparison of those options based on the key attributes of the alternatives and the effect of those attributes on societal welfare and the regulatory purpose. FRA compared the technical requirements of other established high-speed rail standards to illustrate the primary differences, not make a direct comparison between comparable requirements or standards.

In Europe, passenger rail equipment crashworthiness and occupant protection design standards have been largely standardized by EuroNorms.
5

FRA concluded that there are no significant differences between trains built to the design standards contained in EuroNorms and trains built to meet the crashworthiness and occupant protection requirements in the final rule. FRA estimates that on average trainset prices will increase $310,250 (0.62 percent) per trainset to meet the Tier III requirements in this final rule.

In Japan, railroad safety regulation is governed by the Railway Bureau, Ministry of Land, Infrastructure and Transport, and is codified in the Technical Regulatory Standards on Railways.
6

These technical standards are primarily performance-based and railways have the obligation to conform their operations, equipment, and infrastructure to these standards. In the case of its high-speed rail system, the Tokaido Shinkansen, the railway transports only passengers; the rail line is entirely dedicated to high-speed rail with no conventional trains operating and has full grade separation. These are the significant differences underlying the design of Tokaido Shinkansen trainsets operating in Japan when compared to passenger trainsets currently operating in the U.S. The key to the Japanese high-speed rail network's ongoing safety performance and reliability is the principle of crash avoidance. Modifying this advanced Japanese high-speed trainset to comply with the new Tier III requirements would result in significant additional costs to be interoperable in the U.S. rail system; FRA estimates $4.7 million per trainset. European trains generally would not need carbody, truck, suspension, or brake modifications to comply with the Tier III requirements. However, either the analysis used to demonstrate compliance of the train safety features or components would require modification, or minor design modification(s) would likely be needed, or both.
7

These differences are illustrated in the following:

5
EuroNorms title derived: “Standard” is “norme” in French and “norm” in German.
https://www.cen.eu/work/ENdev/whatisEN/Pages/default.aspx
.

6

http://www.mlit.go.jp/english/2006/h_railway_bureau/Laws_concerning/14.pdf
.

7
A discussion of the rationale supporting each of the structural requirements under the “Minor modifications required” column in the “Summary of potential changes for equipment designed to European standards to comply with final rule in the U.S.” table is available under the section-by-section analysis contained in the NPRM.
See
81 FR 88006, 88027-88028, 88034-88038 (Dec. 6, 2016). As discussed in the NPRM, each requirement was determined as necessary to achieve an equivalent level of safety as provided by conventional Tier I equipment under 49 CFR part 238, subpart C.

Summary of Potential Changes for Equipment Designed to European Standards To Comply With Final Rule in the U.S.

Engineering analysis difference
Minor modifications required

• Quasi static compression
• Structural integrity of non-cab end.

• Dynamic collision scenario
• Interior fixture attachment.

• Override protection
• Seat crashworthiness.

• Fluid entry inhibition
• Luggage racks.

• Roof and side structure integrity
• Emergency window egress & rescue access windows.

• Glazing
• Emergency lighting.

• Alerters.

The RIA that accompanies this final rule contains an analysis of regulatory alternatives FRA considered. Specifically, the analysis compares at a general level the costs and benefits of the Tier III requirements to both European and Japanese standards for high-speed trains. The analysis concludes that a hypothetical $50 million European high-speed trainset could be modified to comply with the Tier III requirements with only minor structural modifications and, as indicated above, at little additional cost—about $310,000 per trainset. Modifications are expected to ensure such trainsets safely operate in a U.S. setting. Due to the lack of historical safety information for operations at Tier III speeds in the U.S., FRA was unable to estimate the incremental safety benefit that would be provided by the Tier III requirements as compared to the European technical standards. However, these new requirements are supported by the recommendation of the full RSAC and FRA is confident about the cost-beneficial nature of the final rule. Additionally, the analysis concludes that a hypothetical $50 million Tokaido Shinkansen Japanese high-speed trainset would need significant structural modifications, including those to the carbody, trucks, and suspension, to comply with the Tier III requirements, and, as indicated above, would incur significant additional costs—about $4.7 million per trainset.

FRA is unable to provide an estimate of the expected incremental benefit of the Tier III requirements over the alternatives, but FRA believes these additional costs are justified by the nature of the risks within the U.S. rail operating environment and RSAC's recommendations. Tier III trains in the U.S. will share track with other rail operations, including heavy and long

freight trains, and operate on track with highway-rail grade crossings and the accompanying risks of colliding with trucks and other highway vehicles.

FRA conducted a qualitative analysis comparing the final rule's Tier I alternative requirements to two alternatives: Not taking any regulatory action or adopting existing international design standards. As discussed in the RIA, trainsets compliant with international design standards (such as European or Japanese) would require extensive modifications to meet Tier I requirements if FRA elected to take no regulatory action. However, under the new Tier I alternative requirements, FRA believes the costs associated with compliance will be similar to those discussed for Tier III equipment.

A second alternative would be to codify EuroNorms as Federal regulations, instead of the new Tier I alternative requirements. This option opens the possibility for manufacturers to accrue savings from fewer modifications; however, such an option would require manufacturers to expend resources that favor a particular technology or approach to equipment design. Additionally, codifying EuroNorms in lieu of the final rule would potentially have required equipment designed to a different standard to incur certain costs related to modifying the equipment to bring it into compliance.

Consequently, regardless of the requirements codified, manufacturers would likely have to modify trainsets to meet the regulatory requirements specified. Importantly, trainsets meeting only a European standard (or Japanese or other international standard) would not be interoperable with existing U.S. passenger or freight equipment. Therefore, this equipment could only operate on an exclusive right-of-way, unable to take advantage of existing infrastructure.

FRA requested and received no public comment on the alternatives presented and discussed. For further discussion, please also see the RIA's “Alternatives Considered” section, in which FRA presents more detailed discussion of the impact of the alternatives considered.

FRA did consider the alternative of standalone HSR systems (not physically connected to the general railroad system) operating on an exclusive right-of-way, which would use passenger equipment that complies with European or other international standards but not necessarily with FRA's new requirements. For the reasons discussed below, FRA declined to pursue this alternative. A major tenet of this final rule is to safely facilitate the implementation of nationwide, interoperable HSR service. Standalone systems operating equipment not compliant with FRA's passenger equipment safety standards would significantly limit the interoperability of HSR service. When developing these requirements, FRA did not envision a network of standalone, non-interoperable HSR systems comprising the nationwide network.

Additionally, it would be very costly for a standalone system to attempt to connect with major metropolitan areas because those standalone systems could not take advantage of a major regulatory savings—operating over existing infrastructure. FRA determined that two-thirds to four-fifths of the regulatory cost savings are due to infrastructure cost avoidance for operations electing to use Tier I alternative or Tier III equipment. In particular, interoperability will allow HSR operators to reach into major metropolitan areas where building new, exclusive rights-of-way may not be feasible due to land density, environmental, and other considerations.

An advantage of the standalone alternative is that an individual railroad system could optimize its operations to high levels of performance without necessarily having to adhere to requirements generally applicable to railroad systems in the U.S. However, for such a project to attain that level of performance, it would have to optimize the design of the entire system, not only the passenger equipment. Basically, a standalone system would have to bring together all the other aspects of railroad safety (such as operating practices, signal and train control, and track) that must be applied to the individual system. Given that such an approach covers more than passenger equipment, and would likely necessitate particular right-of-way intrusion protection and other safety requirements not adequately addressed in FRA's regulations, FRA continues to believe that addressing proposals for standalone HSR systems on a case-by-case basis and comprehensively (such as through a rule of particular applicability or other specific regulatory action(s)) is prudent because of the small number of potential operations and the potential for significant differences in their design. Entities considering such operations voluntarily assume the higher costs of building new infrastructure, knowing they cannot take advantage of the cost savings from sharing existing infrastructure.

II. Statutory and Regulatory Background

A. Statutory Background

In September 1994, the Secretary of Transportation (Secretary) convened a meeting of representatives from all sectors of the rail industry with the goal of enhancing rail safety. As one initiative of this Rail Safety Summit, the Secretary announced that DOT would begin developing safety standards for rail passenger equipment over a five-year period. In November 1994, Congress adopted the Secretary's schedule for implementing rail passenger equipment safety regulations and included it in the Federal Railroad Safety Authorization Act of 1994 (the Act), Public Law 103-440, 108 Stat. 4619, 4623-4624 (November 2, 1994). In the Act, Congress also authorized the Secretary to consult with various organizations involved in passenger train operations for purposes of prescribing and amending these regulations and to issue orders under it.
See
section 215 of the Act (codified at 49 U.S.C. 20133).

B. Implementation of the 1994 Passenger Safety Rulemaking Mandate

On May 4, 1998, under section 215 of the Act, FRA published the Passenger Train Emergency Preparedness final rule (PTEP).
See
63 FR 24629. The PTEP contained minimum Federal safety standards for the preparation, adoption, and implementation of emergency preparedness plans by railroads connected with the operation of passenger trains, including freight railroads hosting the operations of passenger rail service. The rule also established specific requirements for passenger train emergency systems and contained specific requirements for participation in debrief and critique sessions following emergency situations and full-scale simulations.

On May 12, 1999, FRA published the PESS final rule.
See
64 FR 25540. The PESS established comprehensive safety standards for railroad passenger equipment including requirements for carbody structure and fire safety. FRA subsequently amended the PESS to address petitions seeking FRA's reconsideration of certain requirements contained in the rule. In response to the petitions, FRA grouped issues together and published three sets of amendments to the final rule.
See
65 FR 41284, Jul. 3, 2000; 67 FR 19970, Apr. 23, 2002; and 67 FR 42892, June 25, 2002.

Since then, FRA has engaged in a number of rulemakings to amend and enhance its passenger safety requirements. On October 19, 2006, FRA

published a final rule addressing various requirements on the inspection, testing, and operation of passenger equipment, and the attachment of safety appliances.
See
71 FR 61835. On February 1, 2008, FRA published the Passenger Train Emergency Systems final rule promoting passenger occupant safety by addressing emergency communication, emergency egress, and rescue access requirements.
See
73 FR 6370. FRA also established additional requirements for passenger train emergency systems on November 29, 2013, see 78 FR 71785, revised and clarified its PTEP regulations on March 31, 2014, see 79 FR 18128, and established new standards to improve the integrity of passenger train exterior side door safety systems on December 7, 2015, see 80 FR 76118.

On January 8, 2010, FRA published a final rule enhancing requirements for the structural strength of the front end of cab cars and MU locomotives.
See
75 FR 1180. FRA included energy-absorption requirements in the 2010 rulemaking to address traditional cab car and MU locomotive designs, with very strong underframes and relatively weaker superstructures, because it is vitally important to provide protection to crewmembers and passengers if the superstructure is impacted. In that rulemaking, FRA applied mature technology and design practice to extend requirements from linear-elastic to elastic-plastic and provided descriptions of allowable deformations without complete failure of the system. Although FRA believed at the time of the rulemaking that the alternative performance requirements would principally apply to shaped-nose equipment designs or CEM designs, or both, FRA also intended for them to apply to any conventional equipment design, as an alternative to the linear-elastic approach. In particular, the alternative performance requirements allow innovative designs that protect the occupied volume for its full height, even without traditional full-height collision and corner post structures, and the rule has been applied to such innovative end frame designs and traditional end frame designs.

III. Development of the Final Rule

This final rule is primarily based on consensus recommendations from the RSAC.
8

See
81 FR 88006, 88013. Those recommendations were developed over many years, and began in 2009 when FRA elected to develop, in consultation with the RSAC, alternative criteria and procedures to assess the crashworthiness and occupant protection performance of rail passenger equipment applicable to a wide range of equipment designs to be used in Tier I service. Accordingly, the ETF
9

was established in September 2009, charged with the mission of producing a set of technical criteria and procedures for evaluating petitions for waivers from (or, as appropriate under § 238.201(b), approval of alternative compliance with) one or more of the Passenger Equipment Safety Standards. This work led to the development of the Technical Criteria and Procedures Report, published in 2011. The technical evaluation criteria and procedures in the Report provided a means of establishing whether equipment of an alternative design would result in at least equivalent performance to that of equipment designed in accordance with the structural standards in 49 CFR part 238.

8
The RSAC member groups are: American Association of Private Railroad Car Owners (AAPRCO); American Association of State Highway and Transportation Officials (AASHTO); American Chemistry Council; American Petroleum Institute; American Public Transportation Association (APTA); American Short Line and Regional Railroad Association (ASLRRA); American Train Dispatchers Association (ATDA); Association of American Railroads (AAR); Association of State Rail Safety Managers (ASRSM); Association of Tourist Railroads and Railway Museums; Brotherhood of Locomotive Engineers and Trainmen (BLET); Brotherhood of Maintenance of Way Employees Division (BMWED); Brotherhood of Railroad Signalmen (BRS); Chlorine Institute; Federal Transit Administration (FTA);* Fertilizer Institute; Institute of Makers of Explosives; International Association of Machinists and Aerospace Workers; International Association of Sheet Metal, Air, Rail and Transportation Workers (SMART), including the Sheet Metal Workers' International Association (SMWIA) and United Transportation Union (UTU); International Brotherhood of Electrical Workers (IBEW); Labor Council for Latin American Advancement (LCLAA);* League of Railway Industry Women;* National Association of Railroad Passengers (NARP); National Association of Railway Business Women;* National Conference of Firemen & Oilers; National Railroad Construction and Maintenance Association (NRCMA); National Railroad Passenger Corporation (Amtrak); National Transportation Safety Board (NTSB);* Railway Supply Institute (RSI); Safe Travel America (STA); Secretaria de Comunicaciones y Transporte (Mexico);* Transport Canada;* Transport Workers Union of America (TWU); Transportation Communications International Union/BRC (TCIU/BRC); and Transportation Security Administration (TSA).* *Indicates associate, non-voting membership.

9
The ETF member groups are: AAR; AAPRCO; AASHTO, including California Department of Transportation, and Interfleet; APTA, including Alstom, Ansaldo Breda, Bombardier, Central Japan Railway Company (JRC), China South Locomotive and Rolling Stock Corporation (CSR), Denver Regional Transportation District (RTD), East Japan Railway Company, Faiveley Transport, GE Transportation, Japan International Transport Institute, Japan's Ministry of Land, Infrastructure, Transport and Tourism, Kawasaki, Keolis, KPS N.A., LIRR, LTK Engineering Services, Marsh, Metro-North, Nippon Sharyo, Parsons Brinckerhoff, PS Consulting, Safetran Systems, SEPTA, Sharma & Associates, Siemens, Southern California Regional Rail Authority (SCRRA), Stadler, STV, Talgo, Texas Central Railway, Veolia, Voith Turbo, and Wabtec; Amtrak; ASLRRA; BLET; European Railway Agency (ERA); NTSB; RSI, including Battelle Memorial Institute, and ENSCO; SMART, including SMWIA and UTU; TCIU/BRC; and Transport Canada.

After the ETF developed the Report, the task of the ETF was expanded to: (1) Develop formal recommendations to the full RSAC to adopt the alternative crashworthiness criteria into FRA's regulations; and (2) establish minimum safety requirements for the next generation of high-speed trainsets able to operate at speeds up to 220 mph,
10

classified as Tier III passenger equipment. The work of the ETF and full RSAC culminated with the publication of the NPRM on December 6, 2016. Please see the Technical Background and Overview section of the NPRM, section III, for a more comprehensive discussion on the development of these requirements at 81 FR 88006, 88013-88017.

10
FRA elected 220 mph as the maximum operating speed for Tier III equipment to remain harmonious with FRA's track safety standards (49 CFR part 213).
See
78 FR 16052, Mar. 13, 2013 (discussing the reasoning and research behind the 220-mph maximum track speed).

The comment period was initially scheduled to close on February 6, 2017. However, in a December 12, 2016 letter, APTA requested a 30-day extension of the NPRM's comment period. APTA stated it needed additional time to thoroughly review the NPRM, and review and consolidate comments on the NPRM from its members and affiliates. On February 13, 2017, FRA published a notice in the
Federal Register
reopening the comment period until March 21, 2017.
See
82 FR 10449. A description and summary of the comments received on the NPRM is discussed below under section IV, Discussion of Comments and Conclusions.

To further benefit from the input of the ETF, FRA convened a meeting of the ETF on May 16-18, 2017, in Washington, DC.
11

During this meeting, FRA discussed proposed responses to the comments received, which was helpful to FRA in crafting the fuller responses to the comments contained in this final rule. Accordingly, FRA did not believe it necessary to bring any issues back to the full RSAC for a formal recommendation. The only issues for which there was no consensus either did not have consensus agreement initially (cab glazing ballistic requirements, which were deferred to FRA to develop) or were generally non-

substantive in nature (the archival of AAR-RP-5104 for incorporation-by-reference). Please see the fuller discussion of each of these topics under the section-by-section analysis of the respective sections (§ 238.721, Glazing, and § 238.735, Seat crashworthiness (passenger and cab crew)).

11
Minutes of this meeting is part of the docket in this proceeding and is available for public inspection.

Please note that the RSAC did not expressly consider FRA's removal of the requirement for a rule of particular applicability to conduct operations at speeds above 150 mph, as specified in subpart I of part 236 of this chapter. See the discussion of changes to § 236.1007 of this chapter in the section-by-section analysis, below. The RSAC also did not consider FRA's changes to §§ 229.3, 229.5, and 231.0 of this chapter. These changes, harmonizing references to the maximum authorized operating speed for Tier II equipment, were not expressly proposed in the NPRM as they were inadvertently omitted. See the discussion of changes to §§ 229.3, 229.5, and 231.0 of this chapter in the section-by-section analysis, below. FRA nonetheless believes the removal of language from part 236 and the harmonization of parts 229 and 231 are consistent with the RSAC recommended approach in this rulemaking.

IV. Discussion of Comments and Conclusions

As noted above, on February 13, 2017, FRA reopened the comment period for the NPRM that closed on February 6, 2017, in response to a request received from APTA.
See
82 FR 10449 (Feb. 13, 2017). During the entire comment period, FRA received comments from two individuals and the following seven entities: Alstom Transportation, Inc. (Alstom); APTA; East Japan Railway Company (JR East); Italcertifier, SPA; LTK Engineering Services (LTK); Siemens; and Texas Central Railroad, LLC (TCRR). The comments were all supportive of the rulemaking, and FRA appreciates the commenters for the time and effort put into each of the comments received. FRA will first discuss the comments that are applicable to the rulemaking, generally. Responses to comments on specific sections of the rule are discussed in the section-by-section analysis, or in the Regulatory Impact and Notices portion of this final rule, with the provisions and statements to which they specifically relate. FRA makes clear that the order of the discussion is not meant to imply that FRA is prioritizing one commenter over another.

As noted above, following the submission of these written comments, FRA convened the Engineering Task Force to consider and discuss the comments and to help achieve a fuller understanding of the comments received and recommendations for this final rule. As a result, certain of these comments have been superseded by changes made in the rule text from the NPRM to this final rule, and they should not necessarily be understood to reflect the positions of the commenters with respect to the requirements of the final rule. Nevertheless, FRA is setting out all the comments received and is responding to each of them, either here, or in the pertinent section-by-section analysis or Regulatory Impact Notice provision, so that FRA's positions are clearly understood. In addressing these comments and developing this final rule, FRA has relied on information contained in comments, RSAC meeting minutes, memoranda, and other materials in the docket for this rulemaking.

A. General Comments

APTA, in its comment, stated that it is very supportive of the “Tier III approach.” APTA further stated that the Tier III crashworthiness and occupant protection requirements permit Tier III trainsets to operate in a shared right of way with conventional passenger and freight rail equipment at speeds below 125 mph (Tier I environment). This type of interoperability has the potential to have a safe and cost-effective approach to implementing high-speed rail as it permits the use of internationally service-proven high-speed rail equipment and also the use of existing infrastructure for lower speed operation. FRA appreciates APTA's support on FRA's approach to permit Tier III equipment to be interoperable at speeds not exceeding 125 mph. APTA further noted that FRA described very well an advantage of a standalone system to be the system's potential to optimize its operations to a high level of performance.

In both their comments, APTA and TCRR recommended that FRA adopt a definition for “Tier IV system.” For the reasons discussed in the section-by-section analysis for § 238.5, below, FRA is not including a definition for “Tier IV system” in this final rule. However, APTA's and TCRR's comments on this topic went beyond the definition of a Tier IV system and touched on FRA's discussion in the NPRM of Alternatives Considered under the Executive Summary. 81 FR 88006, 88009.

Additionally, APTA, as part of its comment, noted that the regulation references several APTA standards by a “date certain” for incorporation by reference. APTA further noted that many of those standards will be updated “in the near future” and recommended that the latest versions of the standards be referenced. APTA also recommended, more generally, that all existing references to APTA standards within part 238 be updated in the final rule. FRA must incorporate by reference updated technical standards according to 1 CFR part 51. To the extent possible, FRA has included for incorporation by reference the most up-to-date APTA standards that were under consideration in this rulemaking. Under the section-by-section analysis, FRA has indicated where it has revised references from the initial versions of APTA standards to refer to the most recent editions instead. With respect to updating references to APTA standards in part 238, generally, FRA will address this issue in another rulemaking effort in which FRA reviews and updates, as necessary, all references to relevant technical standards in part 238, because part 238 incorporates by reference technical standards from a number of different industry consensus organizations.

Alstom commented on § 238.15, Movement of passenger equipment with power brake defects, asking FRA if a reference for Tier III equipment will be added where there is currently a reference to Tier II. Alstom also commented more generally whether Tier II requirements will be analyzed on a case-by-case basis and extended to apply to Tier III equipment. Alstom comments on § 238.15 are outside the intended scope of this rulemaking. Due to the unique nature of Tier III equipment and operations, FRA believes that more consideration and analysis are necessary in developing appropriate regulatory requirements addressing the specific safety concerns implicated. Accordingly, FRA believes it appropriate to seek public comment on any proposal on this topic as part of a future rulemaking. In the interim, FRA will work with any proposed Tier III operation to ensure proper safeguards and procedures are in place to protect the movement of defective Tier III equipment.

Italcertifier, SPA submitted a presentation to the docket in which it outlined six comments. None of those six comments proposed any changes to regulatory text or to FRA's approach to Tier I alternative or Tier III requirements. Among its comments, Italcertifier stated that collision risk is mitigated “by the presence and efficiency of the train protection systems” and the crash-avoidance philosophy, and added that trains in Europe must be equipped with an onboard train control system that is integrated with the wayside signal

system. Italcertifier stated, though, that the proposed rule did not account for PTC or such other technology. However, FRA notes that PTC technology is not intended as a replacement for crashworthiness and occupant protection requirements. PTC is a performance-based system requirement that provides collision avoidance and overspeed protection technology for certain accident scenarios that complement, but do not replace, crashworthiness and occupant protection requirements. Additionally, not all accidents are PTC-preventable.

Italcertifier also commented that in Italy “level crossings” (highway-rail grade crossings) are not permitted at speeds exceeding 200 km/h (approximately 124 mph) but there is a movement to eliminate such crossings from track with speeds exceeding 160 km/h (approximately 100 mph). Although this has no impact on the regulatory text, FRA notes that such an approach appears consistent with FRA's treatment of grade crossings (permitted on Class 6 track, or at speeds up to 110 mph; permitted subject to FRA approval on Class 7 track, or at speeds up to 125 mph; and prohibited on Class 8 track and above, or at speeds exceeding 125 mph).
See
49 CFR 213.347. Further, Italcertifier commented that the European standards bodies (
e.g.,
CEN or CENELEC) create technology-neutral standards, which is consistent with FRA's approach under this rule. Italcertifier also expressed its support for creating an interoperable passenger rail network, stating that the decision to have an interoperable high-speed rail system, and not a standalone system except on a case-by-case basis, is completely in line with the European position. Finally, Italcertifier commented that qualifying equipment in Italy requires a series of tests to demonstrate compliance with various European technical standards. This, too, is consistent with FRA's approach.

JR East's comment focused on the economic impacts of the proposed rule. In its comment, JR East articulated that when FRA calculates the costs of modifying Japanese equipment to meet Tier III requirements, FRA should consider not only the initial cost (which FRA estimated at $4.7 million per trainset), but also “the total cost including operation cost, maintenance cost and the expenses for the suspension of transportation due to accidents.” FRA has addressed this comment in section 2.1.1 of the regulatory impact analysis, which is included in the docket, and in the economic analysis discussion contained in this final rule. For purposes of the economic analysis, FRA chose to only consider the initial cost of modifying Japanese equipment to meet Tier III requirements. FRA considers that the operation, maintenance, and other related expenses would be unique to each railroad potentially operating the equipment, and therefore the differential cost would only be the expense to modify the equipment.

LTK was very supportive of the rule and the effort put forth by all involved in the ETF. LTK also expressed that the publication of the proposed rule was timely in that industry “requires clarity” with respect to applicable safety standards for Tier I alternative and Tier III high-speed trainsets, noting both of which must be capable of operating in mixed service with conventional passenger and freight operations at speeds below 125 mph as a result of a number of ongoing trainset procurements. LTK went on to say that the crashworthiness and occupant protection requirements contained in the proposed rule will facilitate the introduction of international passenger and high-speed trainset designs with minor modifications to enable operation in the North American rail environment. LTK also commented that it agrees with the comments APTA submitted to the docket, stating that the recommended edits in the APTA comments provide additional clarity and are consistent with the basis for consensus reached within the ETF. LTK further commented that APTA is currently in the process of reviewing and renewing its Passenger Rail Equipment Safety Standards and that, as FRA finalizes the rule, FRA should update the incorporation dates of APTA standards to the most recent dates if the standards are updated and approved through APTA prior to final rule publication. FRA makes clear it supports incorporating updated APTA standards and has incorporated by reference the most up-to-date APTA standards in this final rule consistent with the requirements of 1 CFR part 51.

Siemens' comment was very supportive of the rule and of the ETF's work on it. Siemens expressed the belief that the rule's defining of the new equipment tier, Tier III, was timely and is needed to clarify to the industry what types of trainset designs “can get approved by the FRA.” Siemens noted this significantly reduces risk for the industry and has its full support. Siemens also expressed its support for the comments submitted by APTA to the docket. Siemens stated it participated in the reviews leading to the submission of the APTA comments and believed they improve the NPRM.

TCRR also voiced support of the rulemaking and of the industry-developed comments submitted by APTA, noting they provide clarification on various requirements proposed in the NPRM and are consistent with the basis for consensus reached within the RSAC ETF. TCRR also submitted substantive comments on specific sections that are addressed in the section-by-section analysis, below.

In addition, FRA received comments on the rulemaking from individuals. One individual stated that he “strongly support[s] modifying the regulations that make American trains much more expensive and slower than train across much of the rest of the world.” The commenter urged, to the extent possible, that FRA align its regulations with other major standards (especially European standards) to enable railroads to buy “off-the-shelf” trainsets at much lower cost. The commenter stated that this was an easy way to start to reduce regulatory burdens and suggested that FRA's regulations be amended to grant a categorical safe harbor for any trainset that complies with the European safety requirements. FRA has long considered whether adopting European safety requirements would be practical in advancing passenger rail safety in the U.S., given the unique nature of the risks within the U.S. rail operating environment in which passenger trains share track with other rail operations, including heavy and long freight trains, and frequently operate on track with highway-rail grade crossings and the accompanying risks of colliding with trucks and other highway vehicles. 62 FR 49728, 49729-49731 (Sep. 23, 1997). In addressing the safety concerns that are present in the U.S., FRA has instead focused on developing regulations in this rulemaking that are performance-based and technology-neutral to further open the U.S. market to international experience and contemporary design techniques and to harmonize the crashworthiness and occupant protection requirements with those that are established internationally. Further, if a car builder can show that its equipment meets or exceeds the crashworthiness and occupant protection requirements as established by this rule without structural modification through proper modeling and documentation, FRA would not exclude that equipment from operating in the U.S. Specifically, FRA noted in the NPRM that it is important to recognize that differences between the FRA requirements and international technical standards do not mean that in all cases structural modifications are

necessary. Equipment designed to international standards can meet these requirements; the equipment manufacturer must only validate and provide supporting documentation that it does.
See
81 FR 88006, 88014. Further, FRA notes that in response to its solicitation for comments on the topic of alternative approaches to regulating Tier III equipment (
i.e.,
fully adopting European standards), no international equipment manufacturer (some of whom are members of the ETF) stated that it would be better to simply adopt European crashworthiness standards or offered any other regulatory alternative to the ETF's recommended approach. Accordingly, this supports FRA's approach to addressing crashworthiness and occupant protection requirements in this rule. Further, FRA notes that the commenter's reference to a so-called “off-the-shelf” product is misleading, as all common product platforms are modified to fit the specific needs of the customer's specifications, which often reflects varying regulatory standards for the country or service intended.

FRA received a comment from another individual who expressed overall support for the proposed rule and wanted to accommodate NTSB recommendations to the extent possible without excluding the adoption of “EuroNorm-like trains.” FRA addresses NTSB's recommendations and comments, below.

B. Proposed Subpart I and the Inspection, Testing, and Maintenance Requirements for Tier III Passenger Equipment

FRA is not adopting the proposed ITM requirements under proposed subpart I in the NPRM. FRA worked with the ETF to develop a more comprehensive set of ITM requirements for Tier III equipment. Indeed, in their comments on the NPRM, both APTA and TCRR cited the likelihood that the requirements in the subpart as proposed would be subject to change based on the ETF's then-ongoing discussion of ITM requirements, and they recommended against including the requirements of proposed subpart I in this final rule.

FRA will work with any proposed Tier III operation so that ITM processes and procedures for an operation's equipment are sufficient to address all safety-critical features. FRA will be guided by the ITM program elements the ETF developed, which may be codified in a future rulemaking.

C. Proposed Subpart J and the Safe Operation Plan for Tier III Passenger Equipment

In the NPRM, FRA proposed to add and reserve a subpart J to contain the requirements for a Safe Operation Plan for Tier III Passenger Equipment (or Tier III Safe Operation Plan). As noted below, APTA commented that this subpart is unnecessary as the information requested by FRA for inclusion in a Tier III Safe Operation Plan would be available to FRA through other regulatory means. Specifically, APTA prepared a matrix recommending changes to various proposed requirements in the NPRM where it believed the desired information should be provided, including the addition of a § 238.110 (Pre-revenue qualification plan) to review specific design review elements. FRA has adopted APTA's recommendations, in whole or in part, in various sections of this final rule (see the specific section-by-section analysis, below), and has not adopted subpart J, as proposed. However, FRA intended the Tier III Safe Operation Plan to be a mechanism allowing flexibility for both the Tier III equipment manufacturer and operator to address, and FRA to review and approve, certain aspects of Tier III equipment or operations not prescriptively defined in the regulation so they can be appropriately tailored. To do so, the Tier III Safe Operation Plan would provide FRA a broad level of oversight during the equipment design period to ensure that safety issues are addressed. FRA therefore remains concerned that APTA's comments do not offer an alternative that provides FRA the same approval oversight for all Tier III equipment or operations matters initially identified for the Tier III Safe Operation Plan. For instance, FRA does not approve railroad operating rules, so referencing a railroad's operating rules to address various matters is not a suitable alternative. Without a Tier III Safe Operation Plan requirement in the rule, some other mechanism for FRA review and approval is necessary.

As noted below, APTA has suggested the addition of a new § 238.110 to handle this review and approval oversight function. However, FRA believes that further work is necessary to develop this alternate approach. The process for how FRA would provide approval is not fully addressed in APTA's proposal, including when that approval must be sought, and what, specifically, needs to be approved, including how certain Tier III operational aspects would be reviewed and approved by FRA. In the interim, FRA will work with any proposed Tier III operation on a case-by-case basis to address safety-critical matters that would otherwise have been identified for inclusion in the proposed Tier III Safe Operation Plan.

D. Comments From the NTSB

The NTSB submitted a letter to the docket asking FRA to include in the final rule provisions to address safety recommendations the NTSB has issued. Specifically, the NTSB asked FRA to add language addressing safety recommendations R-12-41, R-14-74, R-15-01, and R-15-02.

Recommendation R-12-41 arose from a grade crossing accident that occurred in Miriam, NV, in 2011, where a tractor-trailer truck struck the side of an Amtrak train that was passing through the crossing. The NTSB recommended FRA “[r]equire that passenger railcar doors be designed to prevent fire and smoke from traveling between railcars.” FRA notes that adding weight or tighter seals to the doors to prevent fire and smoke from traveling between railcars could cause unintended harm. Both sliding and swinging doors interact closely with the surrounding car body structure, at the hinge, track, jamb, pocket, and/or latch. Even minor distortion of that structure due to the forces of collision or derailment, or simply a change in the orientation of the door due to a car being significantly displaced from its upright position, could cause the door to fail to operate as intended. Thus, during an emergency, additional time and effort would be needed to operate the doors, delaying egress and access through those doors.

Recommendation R-14-74 arose from the overspeed derailment of a Metro-North commuter train in Spuyten Duyvil, NY, in 2013. The derailment occurred in a 6-degree left-hand curve where the maximum authorized speed was 30 mph. The train was traveling at 82 mph when it derailed. As a result of the derailment, four people died and at least 61 persons were injured. Metro-North estimated about 115 passengers were on the train at the time of the derailment. Contributing to the severity of the accident was the loss of the window glazing that resulted in the fatal ejection of four passengers from the train. The NTSB recommended FRA “[d]evelop a performance standard to ensure that windows (
e.g.,
glazing, gaskets, and any retention hardware) are retained in the window opening structure during an accident and incorporate the standard into [49 CFR 238.221 and 238.421] to require that passenger railcars meet this standard.” As discussed in its responses to the

NTSB,
12

FRA is taking steps to address this recommendation. However, the Metro-North accident was the result of overspeed.
13

Implementation of positive train control should eliminate such overspeed occurrences in passenger service, thereby reducing the likelihood of rollover accidents and fatalities due to ejection through window openings similar to the events involved in the Metro-North accident. At this time, though, FRA is not amending § 238.221 or § 238.421, as the NTSB's recommendations are outside the intended scope of this rulemaking.

12

https://www.ntsb.gov/safety/safety-recs/_layouts/ntsb.recsearch/Recommendation.aspx?Rec=R-14-074
.

13

http://www.ntsb.gov/investigations/AccidentReports/Pages/RAB1412.aspx
.

Recommendations R-15-01 and R-15-02 arose from a train-to-train collision between two Metro-North commuter trains in Bridgeport, CT, in 2013. An eastbound train was struck by a westbound train after the eastbound had derailed. As a result of the collision, at least 65 persons were injured. Metro-North estimated about 250 passengers were on each train at the time of the accident. In R-15-01, the NTSB recommended FRA “[r]evise [49 CFR 238.213] to require the existing forward-end corner post strength requirements for the back-end corner posts of passenger railcars.” In R-15-02, the NTSB recommended FRA “[r]evise [49 CFR part 238] to incorporate a certificate of construction, similar to the one found at [49 CFR 179.5], and require that the certificate be furnished prior to the in-service date of the railcar.” FRA recognizes the importance of structurally sound passenger cars and believes it has achieved the intent of these recommendations. After fully analyzing FRA's current safety data, evaluating FRA's existing safety regulations, and reviewing the NTSB's findings, FRA determined that its current regulations do address the NTSB's underlying safety concerns.
14

FRA continues to use RSAC to identify and analyze potential safety issues and the need for further rulemaking. At this time, RSAC (and by extension, FRA) is not considering any changes to the strength requirements for passenger car corner posts.

14

https://www.ntsb.gov/safety/safety-recs/_layouts/ntsb.recsearch/Recommendation.aspx?Rec=R-15-001 https://www.ntsb.gov/safety/safety-recs/_layouts/ntsb.recsearch/Recommendation.aspx?Rec=R-15-002
.

V. Section-by-Section Analysis

Part 229—Railroad Locomotive Safety Standards

Subpart A—General

Section 229.3 Applicability

FRA is revising § 229.3(c) to conform the reference to Tier II maximum authorized speed with this final rule's revision to the definition of “Tier II.” FRA is simply changing the reference to “150 mph” to “160 mph,” reflecting the changes to the maximum authorized speed of Tier II equipment under this rule. This was not expressly discussed in the proposed rule; however, this is merely a conforming technical revision and will not impose any additional regulatory requirements or burdens on the regulated industry.

Section 229.5 Definitions

FRA is revising the definition of “Tier II” to conform the maximum authorized operating speed of Tier II passenger equipment in this section (150 mph) with the maximum authorized operating speed of Tier II equipment as specified under § 238.5 of this chapter (160 mph). As a result, the definition of “Tier II” under part 229 is revised to mean operating at speeds exceeding 125 mph but not exceeding 160 mph. This was not expressly discussed in the proposed rule; however, this is merely a conforming technical revision and will not impose any additional regulatory requirements or burdens on the regulated industry.

Part 231—Railroad Safety Appliance Standards

Section 231.0 Applicability and Penalties

FRA is revising § 231.0(c) to conform the reference to Tier II maximum authorized speed with the revisions in this final rule. FRA is simply changing the reference to “150 mph” to “160 mph,” reflecting the changes to the maximum authorized speed of Tier II equipment under this rule. This was not expressly discussed in the proposed rule; however, this is merely a conforming technical revision and will not impose any additional regulatory requirements or burdens on the regulated industry.

Part 236—Rules, Standards, and Instructions Governing the Installation, Inspection, Maintenance, and Repair of Signal and Train Control Systems, Devices, and Appliances

Subpart I—Positive Train Control Systems

Section 236.1007 Additional Requirements for High-Speed Service

FRA is removing paragraph (d) of this section as it is no longer relevant, and redesignating paragraph (e) as paragraph (d) of this section. FRA described the reasons for removing paragraph (d) of this section in the NPRM, see 81 FR 88006, 88017, and did not receive any comments on or objections to the paragraph's removal. As this portion of the final rule is identical to the proposed version, the analysis provided in the NPRM is not being repeated here, and FRA is adopting this change as proposed.

Part 238—Passenger Equipment Safety Standards

Subpart A—General

Section 238.5 Definitions

In this section, FRA is revising the definitions of “glazing, end-facing” and “glazing, side-facing,” and making technical revisions to the definitions of “Tier II” and “train, Tier II passenger” to reflect the change in the maximum authorized speed of Tier II passenger equipment from 150 mph to 160 mph. FRA is also adding new definitions for “Associate Administrator,” “Tier III,” “trainset, Tier I alternative passenger,” “trainset, Tier III,” and “trainset unit.” For the reasons discussed below, FRA is placing the definition of “cab” in new § 238.702, and not under this section as proposed in the NPRM.

FRA did not receive any comments on or objections to FRA's proposed revisions or additions to the definitions of “glazing, end-facing,” “glazing, side-facing,” “Tier II,” “train, Tier II passenger,” “Associate Administrator,” “Tier III,” “trainset, Tier I alternative passenger,” and “trainset, Tier III” and those definitions in this final rule are identical to the proposed versions. 81 FR 88006, 88018-88019. Accordingly, the analysis provided for these definitions in the NPRM is not being repeated here, and FRA is adopting these definitions as proposed.

FRA did receive comments, however, on the proposed new definitions of “cab” and “trainset unit.” APTA submitted comments suggesting revisions to the proposed definitions of “cab” and “trainset unit,” and to FRA's existing definition of “trainset, passenger.” Additionally, APTA, along

with Alstom, suggested adding a definition for “conventional locomotive.” Further, APTA, along with TCRR, suggested adding a definition for “Tier IV system.” However, as discussed more fully under new § 238.702, below, FRA is placing the definition of “cab” under subpart H to clarify the definition's application. Accordingly, FRA's discussion of APTA's comment on the term “cab” is in the section-by-section analysis of new § 238.702, below.

In its comment, APTA suggested that FRA amend its existing definition of “trainset, passenger” to provide a more robust definition to clarify when the term is used in other sections of the rule (
e.g.,
§ 238.705, Dynamic collision scenario). APTA suggested that the term “trainset” means: “a passenger train where all units within the trainset are semi-permanently coupled to operate as a single consist. A Tier I alternative trainset may be equipped with a conventional locomotive at either end that may not be semi-permanently coupled to the adjacent unit of the trainset.” APTA reasoned that the specific requirements proposed by the ETF for a Tier III trainset are based on the assumption that all units within the trainset are semi-permanently coupled together, such that units of the trainset can only be coupled or uncoupled at a maintenance facility or other location where personnel can safely get under or between units. Additionally, APTA commented that, because revenue operations can only be conducted using a complete trainset, the collision scenario defined in § 238.705 is based on the operation of a complete trainset, and mentioned that the specific requirements pertaining to safety appliances for Tier III trainsets are also based on the assumption that all units within a trainset are semi-permanently coupled. Further, APTA proposed allowing a passenger trainset, as it would define the term, to be equipped with an automatic coupler in the middle of the trainset configuration so it could be more easily disconnected in a maintenance facility, noting that for such configurations, the requirements of § 238.705(a) would apply to the complete trainset as operated in revenue service. At this time, FRA is not inclined to amend its current definitions of “trainset, passenger” or “train, passenger,” and is declining to adopt APTA's proposed definition of “trainset.” The definition of passenger trainset in § 238.5 applies to all tiers of passenger equipment under part 238. Specifying that trainsets, generally, are all semi-permanently coupled together places too broad a restriction on the method or manner for connecting individual trainset units. However, in this final rule, new § 238.705(a)(6) does include a reference to an “integrated trainset” as defined in new § 238.702, to clarify which initial velocity applies to a given trainset. Moreover, FRA recognizes APTA's concern about allowing for an automatic coupler in the middle of a semi-permanently coupled trainset, but believes no change is needed. FRA makes clear that the rule does not preclude the use of automatic coupler arrangements within the consist of a semi-permanently coupled Tier III trainset to facilitate maintenance within a shop facility, provided the coupler arrangements are not used for switching or other operational purposes outside of the protected maintenance environment envisioned by the rule. Of course, if a coupling between Tier III vehicles is not intended to be semi-permanent in nature, then other requirements apply, such as those governing safety appliances.

APTA also recommended clarifying the definition of “trainset unit,” which FRA proposed to mean a trainset segment located between connecting arrangements (articulations). In the NPRM, FRA explained this definition would clarify that the proposed requirements may apply to individual vehicles within a trainset consist, but not necessarily to the trainset as a whole. However, in its comment, APTA suggested restating the definition to mean “any car within a trainset that is semi-permanently coupled to an adjacent car within the trainset.” FRA is adopting its proposed definition of “trainset unit” in the final rule, not APTA's. APTA's suggested definition would be too narrow because, to be considered a trainset unit, a vehicle would require semi-permanent coupling to an adjacent unit. Yet, FRA intends the definition to apply to all tiers of passenger equipment, and therefore not require all configurations of trainsets to be semi-permanently coupled. FRA believes the definition addresses the essential elements constituting a trainset unit without being too specific.

In their comments, both APTA and Alstom requested FRA add a definition of “conventional locomotive.” APTA recommended the rule define “conventional locomotive” to mean “a piece of on-track rail equipment with one or more control stands designed to transport a Tier I alternative compliant passenger trainset and which meets the crashworthiness requirements defined in § 229.205 [of this chapter] and the design requirements contained in § 229.206 [of this chapter].” APTA stated that inclusion of such a definition would provide greater clarity with respect to application of the dynamic collision scenarios under § 238.705. As discussed below under § 238.705, APTA raised concern that because a conventional locomotive will not be used in Tier III service, requiring use of a conventional locomotive for a collision scenario under Tier III requirements would introduce confusion as to which is the correct collision scenario to apply. Alstom, in its comment, indicated that such a definition of “conventional locomotive” would clarify it is Tier I equipment governed by 49 CFR part 229 and that the front vehicle of a Tier III Trainset could therefore not be a conventional locomotive. However, FRA is not adding a definition of “conventional locomotive” to this § 238.5 of the final rule. APTA's proposed definition would be too narrowly limited to a locomotive used to move Tier I alternative equipment under appendix G to this part. Instead, FRA believes it is more appropriate to more fully explain under § 238.705, below, FRA's intent on how the two dynamic collision scenarios should be applied. As noted above, FRA is adding the term “integrated trainset” to § 238.705 to address any confusion about which initial velocity applies to a given trainset.

As mentioned above in the Discussion of Comments and Conclusions, section IV, APTA and TCRR recommended that FRA include in the final rule a definition of “Tier IV system.” According to both APTA and TCRR, a “Tier IV system would mean “any passenger rail or ground transportation system that operates on an exclusive right-of-way without grade crossings and is governed by a technology-specific rule of particular applicability, or other regulatory means.” Although amenable to undertaking the development of such a definition, FRA is not accepting APTA's and TCRR's recommendations to include a definition of a Tier IV system in this final rule. Adding such a broad-ranging definition is beyond the intended scope of this rulemaking at this final rule stage.

Section 238.21 Special Approval Procedure

In commenting on this section in the NPRM, Alstom suggested that a reference to Tier III equipment be added in paragraph (a) where there is currently a reference to Tier II. Alstom noted that paragraph (a) includes a cross-reference to § 238.505, which governs approvals for Tier II ITM programs. While FRA agrees that a change to this paragraph will be warranted in the future, doing so

in this rulemaking is premature as there is no equivalent section to reference for Tier III equipment. However, in the interim, FRA will work with any proposed Tier III operation to ensure that the specific ITM program sufficiently addresses the inspection, testing, and maintenance of all safety-critical features of a Tier III trainset.

FRA is revising paragraphs (c)(2) and (d)(2) of this section, as proposed in the NPRM. FRA did not receive any comments on these technical changes. As these paragraphs are identical to those FRA proposed in the NPRM, please see the NPRM for an analysis of the changes, 81 FR 88006, 88050, as it is not being repeated here.

Subpart B—Safety Planning and General Requirements

Section 238.111 Pre-Revenue Service Acceptance Testing Plan

This section contains requirements for pre-revenue service testing of passenger equipment. As proposed in the NPRM, FRA is amending paragraphs (b)(2), (4), (5), (7), and (c) of this section to require railroads to obtain FRA approval before using Tier III passenger equipment that either has not been used in revenue service in the U.S., or has been used in revenue service in the U.S. and is scheduled for a major upgrade or introduction of new technology that affects a safety system on such equipment. The explicit inclusion of a Tier III notification and approval process is consistent with FRA's approach to the implementation of high-speed rail technology. It also provides a formal mechanism for FRA to ensure all required elements of this part are satisfactorily addressed and documented.

In commenting on the NPRM, APTA stated that FRA should separate out from this section issues related to FRA approval of the design of Tier III equipment. APTA therefore suggested that FRA add a new § 238.110, titled “Pre-revenue qualification plan,” to require a plan addressing all documents required by subpart H to be submitted for review and approval for Tier III equipment.” According to APTA, new § 238.110 would contain the requirements of Tier III equipment design that FRA would need to review and approve before Tier III equipment could operate in revenue service. As discussed above under proposed subpart J and the Safe Operation Plan for Tier III Passenger Equipment, the creation of this new section ties into APTA's comment recommending excluding from this final rule the proposed references to a Tier III Safe Operation Plan. (Please see the discussion above, under proposed subpart J, for FRA's response concerning removal of the Tier III Safe Operation Plan.)

FRA recognizes that § 238.111 will need some further revision as new Tier III equipment requirements are established. However, APTA's request to adopt a new § 238.110 exceeds the intended scope of this current rulemaking proceeding.

Subpart C—Specific Requirements for Tier I Passenger Equipment

Section 238.201 Scope/Alternative Compliance

This section sets out the scope of subpart C, which contains specific requirements for Tier I passenger equipment, and also provides compliance alternatives for the use of Tier I passenger equipment. In its comments on the NPRM, APTA agreed with FRA's proposal to amend this section to allow Tier I equipment to comply with alternative crashworthiness and occupant protection requirements in appendix G to this part, instead of certain requirements under subpart C (§§ 238.203, 238.205, 238.207, 238.209(a), 238.211, 238.213, and 238.219). APTA also urged that efforts be undertaken to complete and reach consensus on a separate guidance document for demonstrating the crashworthiness of passenger rail equipment, to assist with the implementation of this rule. FRA is working on generating such a document, as FRA recognizes the importance of providing guidance on the proper application of the alternative crashworthiness and occupant protection requirements of appendix G to this part.

FRA did not receive any additional comments on the proposed revisions to this section as described in the NPRM, 81 FR 88006, 88019-88020, and FRA is adopting this section as proposed. Accordingly, as this portion of the final rule is identical to the proposed version, the analysis provided in the NPRM is not being repeated here.

Sections 238.203, 238.205, 238.207, 238.209, 238.211, 238.213, and 238.219

These sections contain structural and equipment protection requirements for Tier I passenger equipment. FRA did not receive any comments on the proposed revisions to these sections as described in the NPRM, 81 FR 88006, 88020, to reflect the addition of alternative standards in appendix G to this part for Tier I trainsets. As these sections of the final rule are identical to the proposed versions, FRA is adopting them as proposed and the analysis provided in the NPRM for each section is not being repeated here.

Subpart E—Specific Requirements for Tier II Passenger Equipment

Section 238.401 Scope

As discussed in the NPRM, FRA is revising this section to increase the maximum allowable speed for Tier II passenger equipment from 150 mph to 160 mph. This change is consistent with FRA's March 13, 2013, final rule amending and clarifying the Track Safety Standards, which affirmed that the maximum allowable speed on Class 8 track is 160 mph.
See
78 FR 16052. Further, this change makes the speed range for Tier II passenger equipment consistent with that for Class 8 track in the Track Safety Standards. As specified in § 213.307 of this chapter, Class 8 track encompasses the speed range above 125 mph up to 160 mph—now the same speed range for Tier II passenger equipment. Nonetheless, FRA makes clear this change only increases the maximum operating speed to 160 mph. FRA approval to operate at 160 mph is still needed as this part and other FRA safety regulations require.

In commenting on the NPRM, APTA expressed its support for this change and harmonizing the Track Safety Standards and Passenger Equipment Safety Standards. Separately, APTA stated that it might be appropriate to reexamine Tier II requirements in the future because they were developed prior to the congressional mandate to implement PTC. APTA added that such a reexamination should take into consideration the incident and accident data since the introduction of Amtrak's Acela Express trainsets, along with the corresponding risks associated with future operations and anticipated Northeast Corridor upgrades.

FRA agrees with APTA that if it becomes necessary to reexamine Tier II requirements, it would be appropriate, as always, to consider all relevant safety data available. However, FRA makes clear that the mandate to implement PTC should not be viewed as a replacement for crashworthiness and occupant protection requirements but as a complementary safety measure. Indeed, around the time part 238 was originally published, FRA issued an order of particular applicability for use of the Advanced Civil Speed Enforcement System, a type of PTC system, on Amtrak's Northeast Corridor to support safe train operations at higher speeds.
See
63 FR 39343 (Jul. 22, 1998)

and subsequent amendments thereto. Moreover, as discussed in the NPRM and in this final rule under § 238.705, not all accidents are PTC-preventable, such as collisions with trespassing highway equipment at grade crossings or with other rolling stock (freight or passenger equipment) during manual operations at speeds 20 mph or below. Accordingly, FRA does not intend to amend the Tier II occupant protection and crashworthiness requirements simply because PTC is installed on the equipment.

FRA did not receive any comments objecting to the revision to this section as described in the NPRM. 81 FR 88006, 88020. As this portion of the final rule is identical to the proposed version, the complete analysis provided in the NPRM is not being repeated here.

Subpart F—Inspection, Testing, and Maintenance Requirements for Tier II Passenger Equipment

Section 238.501 Scope

FRA is revising this section to increase the maximum allowable speed for Tier II passenger equipment from 150 mph to 160 mph. FRA did not receive any comments on the proposed revision to this section as described in the NPRM, 81 FR 88006, 88021, and FRA is adopting it as proposed. Please see the discussion of § 238.401 for further information on this speed change.

Subpart H—Specific Requirements for Tier III Passenger Equipment

This subpart contains specific requirements for Tier III passenger equipment. Many of the requirements under this subpart consider Tier III passenger equipment in terms of an integrated trainset, as that term is now defined under § 238.702, particularly for purposes of crashworthiness and occupant protection requirements. This rule presumes that Tier III trainsets will consist of semi-permanently coupled, articulated, or otherwise “fixed” configurations, that are not intended to operate normally as individual vehicles, or in mixed consists (with equipment of another design or operational tier).

The requirements in this subpart are organized into subject areas based on their general applicability: Trainset structure, window glazing, brake systems, interior fittings and surfaces, emergency systems, and cab equipment. FRA intends that the requirements be applied in a manner that is performance-based and technology-neutral, where possible. FRA notes that it intends for certain sections of this subpart to be applied as an integrated set of alternative crashworthiness and occupant protection performance requirements for Tier I passenger equipment as delineated in appendix G to this part. FRA considers this set of requirements to provide an equivalent level of safety to its counterpart set of Tier I requirements in subpart C of this part. As explained in greater detail in the discussion of appendix G below, the rule clarifies which specific Tier III crashworthiness and occupant protection performance requirement should be applied as an alternative set of Tier I counterpart requirements. Specifically, FRA makes clear that if alternative Tier I compliance is sought under appendix G, then all the requirements in appendix G must be met so the integrity of the alternative requirements is maintained.

Section 238.701 Scope

This section sets out the scope of new subpart H. Subpart H contains specific requirements for railroad passenger equipment operating in a shared right-of-way at speeds not exceeding 125 mph, and in an exclusive right-of-way without grade crossings at speeds exceeding 125 mph but not exceeding 220 mph. FRA did not receive any comments on the exclusion of grade crossings or the 125-mph speed limit when grade crossings are present within the right-of-way, or on whether FRA should explicitly apply the 125-mph speed limit only to track located at or near each grade crossing within an exclusive right-of-way. As stated in the NPRM, FRA believes that in most cases new, exclusive rights-of-way designed for Tier III operations will be constructed without highway grade crossings, see 81 FR 88006, 88021. However, in the situation where exclusive rights-of-way include highway grade crossings, but may have long stretches of track without a grade crossing, FRA would expect appropriate operational safeguards to be in place to prevent trainsets from traversing highway grade crossings at speeds exceeding 125 mph. In fact, FRA would expect those operations that include grade crossings in their exclusive rights-of-way to also comply with the requirements of § 213.347 of this chapter.

Section 213.347(a) of this chapter prohibits any grade crossings on Class 8 or 9 track. Whereas Class 8 track is track with an operational speed range from above 125 mph not exceeding 160 mph, Class 9 track is track with an operational speed range from above 160 mph not exceeding 220 mph. Further, § 213.347(b) of this chapter requires a track owner of Class 7 track (track with an operational speed range from above 110 mph not exceeding 125 mph) to submit for FRA's approval a complete description of the proposed warning/barrier system to address the protection of highway traffic and high-speed trains if the track will include highway grade crossings. Section 213.347(b) of this chapter prohibits operations on Class 7 track unless such an FRA-approved warning barrier system is in place and functioning as intended.

Separately, FRA received comments on its proposal to allow passenger seating in the leading unit of a Tier III trainset provided safety issues associated with passengers occupying the leading unit are addressed and mitigated through a comprehensive Tier III Safe Operation Plan. (See the discussion of proposed subpart J and the Safe Operation Plan for Tier III Passenger Equipment, under Discussion of Comments and Conclusions, section IV, above.) APTA stated that addressing safety concerns in a Tier III Safe Operation Plan is unnecessary because those safety concerns are already addressed through other regulatory means. APTA maintained that when Tier III equipment is operating at speeds not exceeding 125 mph, the crashworthiness and occupant protection requirements provide an equivalent level of safety to that of Tier I equipment and sufficient protection is already afforded passengers occupying leading units of Tier III trainsets. Additionally, APTA suggested that when operating above 125 mph, the right-of-way barrier plan required under § 213.361 of this chapter and the HSR-125 plan required under § 236.1007 of this chapter address any additional safety concerns for passengers occupying the leading units of Tier III trainsets, as these two sections guard against unauthorized intrusions into the right-of-way. Accordingly, APTA believed that conducting an additional, comprehensive analysis for the Tier III Safe Operation Plan would be redundant.

Alstom's comment on this section mirrored APTA's comment in substance. Alstom also suggested that the safety considerations that FRA initially sought to address in the Tier III Safe Operation Plan are adequately addressed just as APTA outlined in its comment.

As explained under Discussion of Comments and Conclusions, section IV, above, this section does not refer to a Tier III Safe Operation Plan. This final rule does not require railroads to complete a comprehensive safety analysis specifically addressing and mitigating all safety conditions

associated with passengers occupying the lead unit of a Tier III trainset. Instead, FRA's regulations continue to require, before passengers can occupy the lead unit of a Tier III trainset, that railroads seeking to do so namely have an approved right-of-way plan that complies with the requirements of § 213.361 of this chapter, have an approved PTC Safety Plan that complies with § 236.1007(c) of this chapter, and, as appropriate, comply with § 213.347 of this chapter. These requirements should not place any additional regulatory burden on a Tier III operation as these are all existing regulatory requirements. However, FRA does make clear that prior to any train operation in which passengers other than assigned crew members (
i.e.,
engineers and conductors) occupy the lead unit of a Tier III trainset, the above requirements must be met, regardless of whether operating in revenue service (
i.e.,
whether or not the passengers have paid a fare to ride). Additionally, if a railroad does identify safety concerns involving passengers occupying the lead unit of a Tier III trainset, FRA expects the railroad to properly and adequately address the concerns. Similarly, FRA reserves the right to ensure that the railroad properly and adequately addresses safety concerns involving passengers occupying the lead unit of a Tier III trainset, if FRA's inspection of a Tier III railroad operation identifies such safety concerns.

Finally, as noted earlier, APTA suggested that FRA create a new section, § 238.110, to address compliance review and approval with the requirements of this subpart H. See FRA's discussion of this suggestion under Discussion of Comments and Conclusions, section IV, above.

Section 238.702 Definitions

FRA has added this new section to contain definitions applying specifically to subpart H of this part. This section defines the terms “cab,” which was proposed in the NPRM under § 238.5, and “integrated trainset,” which is a new term not expressly proposed in the NPRM. FRA determined it will be clearer and more useful to place definitions that are tailored to the application of subpart H in this section, rather than in this part's general definitions section, § 238.5.

In its comments on the proposed definition of “cab,” APTA recommended FRA remove the proposed statement that the term “cab” includes a locomotive cab for the purposes of subpart H. According to APTA, the Tier III trainsets subpart H addresses do not have locomotive cabs. APTA also commented that any analysis for a Tier I alternatively compliant trainset as governed by appendix G cannot include an analysis of the cab of a conventional locomotive because the collision model used for that analysis is insufficient. APTA suggested instead to revise the proposed definition of “cab” to mean “for the purposes of subpart H of this part, a compartment or space in a trainset designed to be occupied by the engineer and contain an operating console from which the engineer exercises control over the trainset.” When discussed at the May 2017 ETF meeting, APTA expanded on its comment saying that if the definition were to remain as proposed, there would need to be a way to differentiate between when the term “cab” applies to a Tier III trainset versus a conventional locomotive cab. APTA stated this is crucial when applying the dynamic collision scenario under § 238.705 because (as discussed more comprehensively below) a Tier III trainset cannot be led by a conventional North American locomotive in its intended service.

FRA recognizes APTA's underlying concern with the proposed definition of “cab.” FRA has therefore defined the term in this section of the final rule to better clarify how the term is applied to Tier III equipment, and by extension of appendix G to this part, Tier I alternative equipment. Accordingly, the term “cab” means a compartment or space within a trainset that is designed to be occupied by an engineer and contain an operating console for exercising control over the trainset. As the definition is contained in this new section, which applies specifically to subpart H, there is no need to add language to the definition expressly limiting its application.

In addition, as fully discussed below, FRA has included the term “integrated trainset” in § 238.705 and is defining that term in this § 238.702. FRA believes that any confusion over which initial velocity applies to a given trainset undergoing evaluation in the dynamic collision scenario in § 238.705 is reconciled with the new term “integrated trainset.” The term “integrated trainset” is defined as a passenger trainset in which all units of the trainset are designed to operate as an integrated consist to achieve its structural crashworthiness performance. FRA intends the term “integrated trainset” to mean that each individual vehicle comprising the trainset is interdependent structurally with each other, specifically with respect to the collision load path and how the collision loads are designed to be resolved.

Trainset Structure

Section 238.703 Quasi-Static Compression Load Requirements

This section contains the quasi-static compression load requirements for Tier III equipment. This section also requires compliance with § 238.705 to demonstrate sufficient occupied volume integrity (OVI). The purpose of applying both requirements is to ensure the integrity of the occupied volume during a collision or other accident. Integrity of the occupied volume is a fundamental requirement of crashworthiness—the primary goal of which is preservation of space to protect occupants during an accident. Additionally, a strong occupied volume serves as the foundation for other crashworthiness features such as CEM components. And although the language of this section references only Tier III trainsets, the requirements of this section may also be applied to Tier I trainsets through the application of appendix G, in the alternative to the requirements of 49 CFR 238.203, Static end strength. Tier I passenger equipment designed to alternative crashworthiness standards may demonstrate an appropriate level of crashworthiness by complying with the quasi-static compression load requirements proposed in § 238.703(b).

FRA received one comment on this section. The commenter, Alstom, stated that the methodology necessary to properly apply the collision load along the collision load path was not included in the proposal, and suggested FRA supply that methodology in some form of compliance manual or document. FRA does agree with Alstom that providing guidance on how to properly apply the requirements of this section would be beneficial to the regulated community. However, to remain technology neutral, FRA did not propose a specific methodology in the rule text. FRA understands there may be different methodologies that are equivalent, and thus putting one in the regulation over another could unintentionally limit the technology employed. FRA intends to address this issue in developing a guidance document, as discussed above.

FRA did not receive any other comments on the requirements in this section as described in the NPRM, 81 FR 88006, 88021-88023, and FRA is adopting this section as proposed. Because this portion of the final rule is identical to the proposed version, the complete analysis provided in the NPRM is not being repeated here.

Section 238.705 Dynamic Collision Scenario

As discussed in the NPRM, this section contains the dynamic collision scenario analysis requirements as the second part of the OVI evaluation of a Tier III passenger trainset, in conjunction with § 238.703. Because PTC technology does not protect against all possible collision scenarios, such as collisions with trespassing highway equipment at grade crossings or with other rolling stock (freight or passenger equipment) during manual operations at 20 mph or below, compliance with this requirement is necessary to preserve the occupied volume, to protect all occupants on the trainset.

As mentioned in the discussion of § 238.703, each vehicle in the trainset needs to demonstrate it meets both the OVI requirements in paragraph (b) of that section and the dynamic collision scenario requirements in paragraph (b) of this section. Further, as provided in § 238.703, and as outlined in appendix G, a Tier I passenger trainset designed to alternative crashworthiness standards may comply with this section instead of the requirements applicable to Tier I passenger trainsets in § 238.203.

In combination with the quasi-static compression load requirements in § 238.703, the purpose of this dynamic collision scenario requirement is to ensure that survivable space for the passengers and crew is preserved in up to moderately severe accident conditions (
i.e.,
conditions comparable to a head-on collision at speeds of 20 to 25 mph, depending on the type of equipment, into a stationary train). This requirement also provides a baseline level of protection for scenarios that may be more severe, but less predictable with respect to loading conditions and historical accident data. Although the dynamic collision scenario is conducted at the trainset level, the requirements described in this section are evaluated at the level of the trainset's individual vehicles so no vehicle in the trainset may exceed the parameters outlined in paragraph (b) as a result of the dynamic collision scenario.

Paragraph (a) outlines the required conditions under which a dynamic collision scenario is performed. Generally, the collision scenario requires a dynamic impact to be simulated between an initially-moving trainset and an initially-standing train. The initially-moving trainset is the trainset undergoing evaluation, either Tier III equipment or, as provided in appendix G, Tier I equipment designed to alternative crashworthiness standards. The initially-standing train is a locomotive-led consist of five conventionally-designed passenger cars. The conventionally-designed passenger cars have a prescribed weight and force-versus-displacement characteristic.
15

The pass/fail criteria for the scenario determine whether there is sufficient preservation of occupied volume for passengers and crew in the trainset undergoing evaluation.

15
Appropriate weights and force-versus-displacement characteristics for the conventionally-designed passenger cars can be found in the Technical Criteria and Procedures Report.

FRA expects the collision scenario simulation to be executed for an impact duration sufficient to capture the most severe portion of the collision event. The actual amount of impact time required to simulate the collision sufficiently will vary based upon the characteristics of the trainset undergoing evaluation. Typically, the collision scenario will be executed until all the equipment, including the initially-standing train and initially-moving trainset, is moving in the same direction at approximately the same velocity. If all the equipment is moving together at approximately the same speed, no further vehicle-to-vehicle impacts will occur, and the simulation will then have been executed for a sufficient duration to capture the most severe decelerations.

There are various types of analyses that may be used to evaluate the collision scenario requirements. These analyses include fully-detailed FE models, lumped-parameter analyses, or a hybrid approach where a combination of detailed FE modeling and lumped-parameter techniques are used within the same simulation. An FEA of the scenario is generally a highly-detailed simulation of the actual trainset geometry. The parts making up the trainset are meshed into a large number of elements, with each element having its own mass, stiffness, and connection properties to the adjacent elements. A lumped parameter analysis represents each car or section of a car within a trainset using a small number of masses and a small number of non-linear springs. At its extreme, each vehicle consists of a single mass and a single spring characteristic. A hybrid approach may utilize an FE mesh to represent some structures (
e.g.,
CEM structures that undergo large deformations) and lumped-parameter representations of other structures (
e.g.,
vehicles far from the impacting interface that experience little deformation). Any of the three types of analyses is capable of developing the information needed to verify a trainset's ability to meet the requirements of the collision scenario. Additionally, because the centerlines of the initially-moving trainset and initially-standing train are aligned with one another during this scenario, a half-symmetric model may be used to represent the colliding vehicles, as appropriate.

FRA received comments from APTA recommending revisions to several paragraphs of this section in the NPRM. In its comments on the NPRM, APTA recommended that FRA replace the references made to “train” in paragraphs (a)(1)-(3), (6), and (8), and replace them with the term “trainset,” to clarify the application of the collision scenario under paragraph (a) of this section. APTA proposed that the term trainset be defined to mean a passenger train where all units within the trainset are semi-permanently coupled to operate as a single consist. As stated under the discussion of § 238.5, FRA has not adopted APTA's proposal definition of “trainset.” However, FRA does agree that reference to a trainset is more appropriate than to a “train” in this section. Accordingly, the above-referenced paragraphs of paragraph (a) use the term “trainset,” instead of “train,” and FRA intends the term “trainset” to mean either a Tier I alternative or Tier III trainset, as those terms are defined in § 238.5. However, with reference to the initially-standing train, as FRA envisions it being reflective of a conventional Tier I passenger train, FRA is using the term “train” for clarity. Although not specifically requested by APTA, paragraphs (a)(4) and (9) use the term “trainset” in conformance with these changes.

In commenting on the NPRM, APTA recommended that paragraph (a)(3) be placed in appendix G to part 238, consistent with its other comments that requirements for conventional locomotive led equipment are not appropriate in subpart H because Tier III equipment will not utilize conventional locomotive power. APTA also suggested that the text adopt APTA's proposed definition of “trainset” instead of “train,” as proposed. Paragraph (a)(3) of this section, as proposed in the NPRM, stated that if the trainset is intended for use in push-pull service, then both the locomotive-led and cab-car-led configurations would require separate evaluation. This proposal was intended to ensure sufficient OVI for all occupied spaces in the trainset regardless of whether led by a cab car or a conventional locomotive.

FRA's discussion of the use of the term “conventional locomotive” in paragraph (a)(6) of this section applies

here, in response to APTA's concern, as discussed below. In the final rule, this paragraph (a)(3) omits specific references to “locomotive” or “cab car” and requires that if the initially-moving trainset is intended for use in push-pull service, then, as applicable, each configuration of leading vehicle shall be evaluated separately. By requiring that each lead vehicle be evaluated separately, FRA intends to capture situations where the lead vehicles of a push-pull operation could be two different styles of vehicle that could potentially have different designs and structural characteristics, and thus have different crashworthiness and occupant protection capabilities. This paragraph eliminates any reference to a specific technology and only requires separate evaluation if the lead vehicles are different. FRA recognizes that some push-pull operations do not necessarily require a locomotive-like vehicle on one end with a cab car-like vehicle on the other. But when the two vehicles are different, in design or structural make-up, then the crashworthiness and occupant protection capabilities of each vehicle must be evaluated.

In its comments on this section, Alstom also raised concern about how to implement the force-versus-crush requirements in proposed paragraph (a)(4)(ii) and Table 1 to this section. Proposed paragraph (a)(4)(ii) stated that the rigid locomotive and each passenger coach in the initially-standing train crush in response to applied force as specified in Table 1, which in turn provided the non-linear, force-versus-crush relationships for the passenger cars and locomotive comprising the initially-standing train. In particular, Alstom found it unclear whether the paragraph made it necessary to combine characteristics at “inter-trailers,” and, if so, how to do so. Alstom therefore suggested that the force-crush characteristics to be used at each interface between vehicles be included in this paragraph instead of Table 1.

FRA makes clear that the force-crush characteristics described in Table 1 are intended for use as inputs to a lumped-parameter simulation model of a train-to-train collision. The data in Table 1 describe the resulting force when the equipment moves into a rigid fixed barrier. In the initial position, when the crush is 0 inches, the passenger coach is just touching the barrier and the force is also 0 lbf. The length of the coach is reduced as the coach moves towards the barrier and crushes. When the coach has crushed by 3 inches, the force has increased linearly to 80,000 lbf. When the coach has crushed by 6 inches, the force again increases linearly to 250,000 lbf, from 80,000 lbf. For the rigid locomotive, the force is 0 lbf when the crush is 0 inches and the rigid locomotive is just touching the barrier. After 2.5 inches of crush, the force increases linearly to 100,000 lbf. When the rigid locomotive has crushed by 5 inches, the force again increases linearly to 2,500,000 lbf, from 100,000 lbf.

Depending on the details of the software used to implement the lumped-parameter model, the data in Table 1 may need to be re-formatted. Some software may allow the data to be input simply as it is presented in Table 1. Other software may require coach-to-coach force crush characteristics for input. For coach-to-coach crush, the crush distances simply double for the corresponding force. Accordingly, 6 inches of crush between coaches are required to reach 80,000 lbf, and 12 inches of crush are required to reach 2,500,000 lbf. For rigid locomotive-to-coach crush, some calculations are required. At 80,000 lbf between the rigid locomotive and coach, the rigid locomotive has crushed by 2 inches, while the coach has crushed by 3 inches. The rigid locomotive-to-coach crush is then 5 inches when there is 80,000 lbf between the rigid locomotive and coach. At 100,000 lbf between the rigid locomotive and coach, the rigid locomotive has crushed by 2.5 inches and the coach has crushed by 3.35 inches. The rigid locomotive-to-coach crush is 5.85 inches at 100,000 lbf. At 2,500,000 lbf between the rigid locomotive and coach, the rigid locomotive has crushed by 5 inches and the coach has crushed by 6 inches. The rigid locomotive-to-coach crush is 11 inches at 2,500,000 lbf.

Calculations may be necessary to determine the force-crush characteristic between the rigid locomotive described in Table 1 and the new equipment under evaluation. The details of such calculations will likely depend on the software modeling choices. One possibility, of many, is to calculate the force-crush response of the new equipment with a rigid fixed barrier, and use those results in combination with the rigid locomotive data in Table 1. The force-crush characteristic for the rigid locomotive to the new equipment may then be calculated in a manner similar to the force crush characteristic for the rigid locomotive to the coaches.

Most notably, APTA recommended revising paragraph (a)(6), which specifically describes the initial velocities to be assigned to the initially-moving trainset in the dynamic collision scenario. FRA makes clear that, although the collision scenario in paragraph (a)(6) references “initial velocities” for the scenario, FRA expects that the actual velocity at the colliding interface be the same as the initial velocity, as generally models do not account for loss of velocity. However, if a model includes loss of velocity due to friction, or other velocity-reducing forces, FRA would expect the initial velocity to be increased so that the collision velocity remains either 20 mph or 25 mph, depending on the equipment undergoing evaluation. As proposed in the NPRM, if the initially-moving trainset were led by a cab car or an MU locomotive, its initial velocity would be 20 mph; if the initially-moving trainset were led by a conventional locomotive, its initial velocity would be 25 mph. These speeds were chosen based upon estimates of the upper limit of the ability of conventionally-designed Tier I equipment to maintain its occupied volume in a similar collision scenario.

APTA commented that, although it is probable for a Tier I alternative trainset, it is not possible for a Tier III trainset to be led by a conventional North American locomotive. APTA stated that a Tier III trainset could never meet its performance capabilities with a conventional locomotive on the leading and trailing ends, because the end units must be low-profile, aerodynamic designs that are an integral part of the trainset design. APTA therefore suggested that the portion of the rule text involving an initially-moving consist led by a conventional locomotive be placed in appendix G to this part and not contained in this section.

Alstom also provided comments on paragraph (a)(6) of this section. Specifically, Alstom sought clarification of the application of the 20-mph and 25-mph initial velocities. Alstom did not believe having two initial velocities makes sense and suggested there should instead be only one initial velocity applicable to all equipment—an initial velocity for all Tier III trainsets.

FRA carefully considered both APTA's and Alstom's comments on this paragraph. FRA recognizes the importance of ensuring that the intent of the section's application is clearly understood so that equipment designed to the Tier III crashworthiness and occupant protection requirements, or the Tier I alternative requirements, properly preserves the occupied volume in the event of a collision. As discussed above, the collision scenario speeds were chosen based upon estimates of the upper limit of the ability of conventionally-designed Tier I equipment to maintain its occupied volume in a similar collision scenario. FRA did not intend inclusion of two

collision scenario speeds to create ambiguity but rather to clarify and refine the application of this paragraph depending on the type of equipment used. Nonetheless, FRA recognizes that use of the term “conventional locomotive” for purposes of applying the dynamic collision scenario requirements could cause confusion. FRA did not intend for the reference to a “conventional locomotive” to necessarily mean a conventional North American locomotive. Instead, FRA intended the reference to refer more generally to the use of a rigid locomotive, especially a surrogate model of a rigid locomotive when the leading unit is unknown. This is why FRA included in the proposed rule text a rigid locomotive model, as described and depicted in appendix H to this part, Rigid locomotive design computer model input data and geometrical depiction. Accordingly, FRA has holistically revised this section from that proposed in the NPRM to remove the term “conventional locomotive” and replace it with the term “rigid locomotive,” referencing the rigid locomotive model in appendix H.

FRA notes that it also considered drafting the regulatory text so that the 20-mph initial velocity would apply to a trainset led by a vehicle designed to be occupied by passengers, and the 25-mph initial velocity would apply to a trainset led by equipment not designed to be occupied by passengers. When this issue was discussed at the May 2017 ETF meeting, the ETF members rejected this approach. Simply referencing a locomotive not designed to be occupied by passengers instead of a conventional locomotive did not fully resolve the issue, because of concern that a Tier III trainset may not be powered by a stand-alone power unit but rather through an integrated system in which powered axles are distributed throughout the trainset. Additionally, a question arose whether a control cab in the lead unit of such an integrated and powered trainset design made that lead unit an MU, further clouding which initial velocity would apply. Moreover, to the extent passengers do not occupy the lead unit in such a trainset, there would be a large mass in front of passenger-occupied units that allows for more absorption of energy not being transferred to the passenger-occupied units, and the ETF raised concern that the lead unit in such a trainset not be subjected to more stringent requirements.

In discussing how best to clarify the application of the requirements of this paragraph, ETF industry representatives mentioned that the requirements, when developed for the Technical Criteria and Procedures Report, were intended to apply to integrated trainsets, not trainsets led by conventional North American locomotives. Consistent with the comments APTA and Alstom submitted, ETF industry representatives suggested applying the 20-mph initial velocity to Tier III trainsets in this section, and applying the 25-mph initial velocity to Tier I alternative trainsets in appendix G to this part. ETF labor representatives noted the original consensus product of the ETF and cautioned against re-drafting consensus language. After a healthy discussion and to remain technology neutral, FRA proposed to the ETF the concept of using the term “integrated trainset” for determining which initial velocity applies. If the design of the trainset was integrated from a structural and crashworthiness perspective, with all vehicles inclusive of the leading unit designed to work together in a collision scenario, then the 20-mph initial velocity would apply. For all other configurations not considered “integrated,” regardless of the equipment's tier and what type of unit leads the trainset, the 25-mph initial velocity would apply. Such an approach would take into account instances when the lead unit of a Tier III trainset and its passenger coaches would be manufactured by different companies. Further, because properly testing the crashworthiness and occupant protection capabilities of the passenger coaches must involve some known characteristics of the vehicle leading the trainset, this section would consi

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A2018-25020. Public record. Not legal advice.
