# Air Plan Approval; Illinois; Revised Format for Materials Incorporated by Reference

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A2017-13659

## Record

- **Collection:** Federal Register
- **Document type:** Rule
- **Published:** June 30, 2017
- **Citation:** 82 FR 30636

## Text

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 52
[EPA-R05-OAR-2016-0599; FRL-9963-76-Region 5]
Air Plan Approval; Illinois; Revised Format for Materials Incorporated by Reference

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Final rule; administrative change.

SUMMARY:

The Environmental Protection Agency (EPA) is revising the format for materials that are made part of the Illinois State Implementation Plan (SIP) through the process of incorporation by reference (IBR). The regulations and materials affected by this format change have all been previously submitted by Illinois and approved by EPA as part of the SIP.

DATES:

This action is effective June 30, 2017.

ADDRESSES:

EPA has established a docket for this action under Docket ID No. EPA-R05-OAR-2016-0599. SIP materials which are incorporated by reference into 40 CFR part 52 are available for inspection at the following locations: Environmental Protection Agency, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604 and the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to:
http://www.archives.gov/federal-register/cfr/ibr-locations.html.

FOR FURTHER INFORMATION CONTACT:

Christos Panos, Environmental Engineer, Attainment Planning and Maintenance Section, Air Programs Branch (AR 18J), Environmental Protection Agency, Region 5, 77 West Jackson Boulevard, Chicago, Illinois 60604, (312) 353-8328,
panos.christos@epa.gov.

SUPPLEMENTARY INFORMATION:

Throughout this document, wherever “we,” “us” or “our” is used, it is intended to refer to EPA. Information is organized as follows:

Table of Contents

I. Background

A. Description of a SIP

B. How EPA Enforces SIPs

C. How the State and EPA Update the SIP

D. How EPA Compiles the SIPs

E. How EPA Organizes the SIP Compilation

F. Where You Can Find a Copy of the SIP Compilation

G. The Format of the New Identification of Plan Section

H. When a SIP Revision Becomes Federally Enforceable

I. The Historical Record of SIP Revision Approvals

II. What EPA Is Doing in This Action

III. Incorporation by Reference

IV. Statutory and Executive Order Reviews

I. Background

A. Description of a SIP

Each state has a SIP containing, among other things, the control measures and strategies used to attain and maintain the national ambient air quality standards (NAAQS). The SIP is extensive, containing such elements as air pollution control regulations, emission inventories, monitoring networks, attainment demonstrations, and enforcement mechanisms.

B. How EPA Enforces SIPs

Each state must formally adopt the control measures and strategies to attain and maintain the NAAQS after the public has had an opportunity to comment on them. The states then submit them to EPA as SIP revision requests upon which EPA must formally act. EPA evaluates these submissions to determine whether they meet CAA requirements. If and when these control measures and strategies are approved by EPA, after notice and comment rulemaking, EPA uses the IBR process to make them part of the Federally approved SIP. IBR is a method of incorporating material into EPA regulations in the CFR by referencing the original document(s) without publishing the full text of the material. In this case, the SIP rules are identified in part 52 (Approval and Promulgation of Implementation Plans), title 40 of the Code of Federal Regulations (40 CFR part 52). These rules are approved by EPA with a specific effective date, but are not reproduced in their entirety in 40 CFR part 52. This format allows both EPA and the public to identify which regulations are contained in a given SIP and to help determine whether the state is enforcing those regulations. This format also assists EPA and the public in taking enforcement action, should a state not enforce its SIP-approved regulations.

C. How the State and EPA Update the SIP

The SIP is periodically revised as necessary to address the unique air pollution problems in the state. Therefore, EPA must periodically take action on state SIP submissions containing new and/or revised regulations and other materials; if approved, they become part of the SIP. On May 22, 1997 (62 FR 27968), EPA revised the formatting procedures of 40 CFR part 52 for incorporating by reference Federally approved SIP revisions. These procedures include: (1) A revised SIP document for each state that would use the IBR process under the provisions of title 1 CFR part 51; (2) a revised mechanism for announcing EPA approval of revisions to an applicable SIP and updating both the document that has gone through the IBR process and the CFR; and (3) a revised format of the “Identification of plan” sections for each applicable subpart in 40 CFR part 52 to reflect these revised IBR procedures. The description of the revised SIP document, IBR procedures, and “Identification of plan” format are discussed in further detail in the May 22, 1997
Federal Register
document.

D. How EPA Compiles the SIPs

The Federally-approved regulations, source-specific requirements, and nonregulatory provisions (entirely or portions of) submitted by each state agency have been compiled by EPA into a “SIP compilation.” The SIP compilation contains the updated regulations, source-specific requirements, and nonregulatory provisions approved by EPA through previous rulemaking actions in the
Federal Register
.

E. How EPA Organizes the SIP Compilation

Each SIP compilation contains three parts. Part one contains the regulations, part two contains the source-specific requirements, and part three contains nonregulatory provisions. Each state's SIP compilation contains a table for each of the three parts that identifies each SIP-approved regulation, source-specific requirement, and nonregulatory provision. In this action, EPA is publishing the SIP compilation tables that summarize the applicable SIP requirements for Illinois and that will be codified at 40 CFR 52.720. The effective dates in the table indicate the date of the most recent revision to an approved regulation. EPA Regional Offices have the primary responsibility for updating the state SIP compilations and ensuring their accuracy.

F. Where You Can Find a Copy of the SIP Compilation

EPA Region 5 has developed and will maintain the SIP compilation for Illinois. A copy of the full text of Illinois's regulatory and source-specific SIP compilation will also be maintained at NARA.

G. The Format of the New Identification of Plan Section

In order to better serve the public, EPA revised the organization of the section titled “Identification of plan” at 40 CFR 52.720 and included additional information to clarify the enforceable elements of the SIP. The revised format does not affect Federal enforceability of the SIP and is consistent with the requirements of Section 110(h)(1) of the CAA concerning comprehensive SIP publication.

The revised Identification of plan section contains five subsections: (a) Purpose and scope, (b) Incorporation by reference, (c) EPA approved regulations, (d) EPA approved source specific requirements, and (e) EPA approved nonregulatory and quasi-regulatory provisions.

H. When a SIP Revision Becomes Federally Enforceable

All new requirements and revisions to the applicable SIP become Federally enforceable as of the effective date of the revisions to paragraphs (c), (d), or (e) of the applicable Identification of plan section found in each subpart of 40 CFR part 52.

I. The Historical Record of SIP Revision Approvals

To facilitate enforcement of previously approved SIP provisions and provide a smooth transition to the new SIP processing system, EPA will retain the original Identification of plan section, previously appearing in the CFR as the first or second section of part 52 for each state subpart. The original Identification of plan section will be moved to Section 52.750 of part 52 for Illinois. After an initial two-year period, EPA will review its experience with the new SIP processing system and decide whether to retain the original Identification of plan section for some further period.

II. What EPA Is Doing in This Action

We are revising the format of 40 CFR part 52 “Identification of plan” section for Illinois regarding incorporation by reference, by adding Section 52.720(c)(d) and (e), to be consistent with the format described above and in 62 FR 27968 (May 22, 1997). We are adding Section 52.720(b)(1) to further clarify that all SIP revisions listed in Section 52.720(c) and (d), regardless of inclusion in the most recent “update to the SIP compilation,” are Federally enforceable under sections 110 and 113 of the Clean Air Act (CAA) as of the effective date of the final rulemaking in which EPA approved the SIP revision. We are adding Section 52.720(b)(2) to certify that the materials provided by EPA at the addresses in paragraph (b)(3) are an exact duplicate of the official state rules/regulations. We are adding Section 52.720(b)(3) to update address and contact information. Additionally, we are removing sections 52.729 “Control strategy: Carbon monoxide”, 52.745 “Section 110(a)(2) infrastructure requirements” and 52.746 “Control strategy: Lead (Pb)” because the information within those sections is being incorporated into the tables at Section 52.720 and is, therefore, no longer necessary.

This action constitutes a recordkeeping and organizational exercise to ensure that all revisions to the state programs that have occurred are accurately reflected in 40 CFR part 52. State SIP revisions are controlled by EPA regulations at 40 CFR part 51.

EPA has determined that this action falls under the “good cause” exemption in sections 553(b)(3)(B) and 553(d)(3) of the Administrative Procedures Act (APA) which, upon finding “good cause,” authorizes agencies to dispense with public participation and allows an agency to make a rule effective immediately, thereby avoiding the 30-day delayed effective date otherwise provided for in the APA. This action simply reformats and codifies provisions which are already in effect as a matter of law in Federal and approved state programs. Under section 553(b)(3)(B) of the APA, an agency may find good cause where notice and public procedure are “impractical, unnecessary, or contrary to the public interest.” Public comment is unnecessary for this action because EPA is reformatting and codifying existing law. Immediate notice in the CFR benefits the public by removing outdated citations and making the IBR format clearer and more user-friendly.

III. Incorporation by Reference

In this rule, EPA is finalizing regulatory text that includes incorporation by reference. In accordance with requirements of 1 CFR 51.5, EPA is finalizing the incorporation by reference of the Illinois Regulations described in the amendments to 40 CFR part 52 set forth below. EPA has made, and will continue to make, these documents generally available electronically through
www.regulations.gov
and/or in hard copy at the appropriate EPA office (see the
ADDRESSES
section of this preamble for more information).

IV. Statutory and Executive Order Reviews

A. General Requirements

Under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011), this action is not a “significant regulatory action” and is therefore not subject to review by the Office of Management and Budget. This rule is not subject to Executive Order 13211, “Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use” (66 FR 28355, May 22, 2001) because it is not a significant regulatory action under Executive Order 12866. Because the agency has made a “good cause” finding that this action is not subject to notice-and-comment requirements under the Administrative Procedure Act or any other statute as indicated in the
SUPPLEMENTARY INFORMATION
section above, it is not subject to the regulatory flexibility provisions of the Regulatory Flexibility Act (5 U.S.C. 601
et seq.
), or to sections 202 and 205 of the Unfunded Mandates Reform Act of 1995 (UMRA) (Pub. L. 104-4). In addition, this action does not significantly or uniquely affect small governments or impose a significant intergovernmental mandate, as described in sections 203 and 204 of UMRA. This rule also does not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal government and Indian tribes, or on the distribution of power and responsibilities between the Federal government and Indian tribes, as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), nor will it have substantial direct effects on the states, on the relationship between the national government and the states, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132 (64 FR 43255, August 10, 1999). This rule also is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997), because it is not economically significant. This rule does not involve technical standards; thus the requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) do not apply. The rule also does not involve special consideration of environmental justice related issues as required by Executive Order 12898 (59 FR 7629, February 16, 1994). In issuing this rule, EPA has taken the necessary steps to eliminate drafting errors and ambiguity, minimize potential litigation, and provide a clear legal standard for affected conduct, as required by section 3 of Executive Order 12988 (61 FR 4729, February 7, 1996).

EPA has complied with Executive Order 12630 (63 FR 8859, March 15, 1998) by examining the takings implications of the rule in accordance with the “Attorney General's Supplemental Guidelines for the Evaluation of Risk and Avoidance of Unanticipated Takings” issued under the executive order. This rule does not impose an information collection burden under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501
et seq.
). EPA's compliance with these statutes and Executive Orders for the underlying rules is discussed in previous actions taken on the State's rules.

B. Submission to Congress and the Comptroller General

The Congressional Review Act (5 U.S.C. 801
et seq.
), as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. Section 808 allows the issuing agency to make a rule effective sooner than otherwise provided by the CRA if the agency makes a good cause finding that notice and public procedure is impracticable, unnecessary or contrary to the public interest. This action simply codifies provisions which are already in effect as a matter of law in Federal and approved state programs. 5 U.S.C. 802(2). As stated previously, EPA has made such a good cause finding, including the reasons therefore, and established an effective of June 30, 2017. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the
Federal Register
. The changes in format to the “Identification of plan” section for Illinois are not a `major rule' as defined by 5 U.S.C. 804(2).

C. Petitions for Judicial Review

EPA has also determined that the provisions of section 307(b)(1) of the Clean Air Act pertaining to petitions for judicial review are not applicable to this action. Prior EPA rulemaking actions for each individual component of the Illinois SIP compilations had previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA sees no need in this action to reopen the 60-day period for filing such petitions for judicial review for these “Identification of plan” reorganization actions for Illinois.

List of Subjects in 40 CFR Part 52

Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur dioxide, Volatile organic compounds.

Dated: June 5, 2017.
Robert A. Kaplan,
Acting Regional Administrator, Region 5.

Part 52 of chapter I, title 40 of the Code of Federal Regulations, is amended as follows:

PART 52—APROVAL AND PROMULGATION OF IMPLEMENTION PLANS

1. The authority citation for part 52 continues to read as follows:

Authority:

42 U.S.C. 7401
et seq.

Subpart O—Illinois

§ 52.720
[Redesignated as § 52.750 and amended]

2. Section 52.720 is redesignated as § 52.750 and the section heading and paragraph (a) are revised to read as follows:

§ 52.750
Original identification of plan section.
(a) This section identified the original “Air Quality Implementation Plan for the State of Illinois” and all revisions submitted by Illinois that were Federally-approved prior to June 1, 2017.

3. A new § 52.720 is added to read as follows:

§ 52.720
Identification of plan.

(a)
Purpose and scope.
This section sets forth the applicable State implementation plan for the State of Illinois under section 110 of the Clean Air Act, 42 U.S.C. 7401-7671q and 40 CFR part 51 to meet national ambient air quality standards.

(b)
Incorporation by reference.

(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to December 31, 2016, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Entries in paragraphs (c) and (d) of this section with the EPA approval dates after December 31, 2016, have been approved by EPA for inclusion in the State implementation plan and for incorporation by reference into the plan as it is contained in this section, and will be considered by the Director of the Federal Register for approval in the next update to the SIP compilation.

(2) EPA Region 5 certifies that the materials provided by EPA at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated state rules/regulations which have been approved as part of the state implementation plan as of the dates referenced in paragraph (b)(1).

(3) Copies of the materials incorporated by reference into the SIP may be inspected at the Region 5 EPA Office at 77 West Jackson Boulevard, Chicago, IL 60604. To obtain the material, please contact the person identified in the
FOR FURTHER INFORMATION CONTACT
section of this preamble. You may also inspect the material with an EPA approval date prior to June 1, 2017, at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, go to:
http://www.archives.gov/federal-register/cfr/ibr-locations.html.

(c)
EPA approved regulations.

EPA-Approved Illinois Regulations and Statutes

Illinois citation
Title/subject

State
effective
date

EPA approval date
Comments

Title 35 of the Illinois Administrative Code

Subtitle A: General Provisions

Chapter I: Pollution Control Board

Part 106: Procedural Regulations

Subpart E: Alternative Opacity Procedures

106.501
Scope and Applicability
07/13/88
12/29/92, 57 FR 61834

106.502
Joint or Single Petition
07/13/88
12/29/92, 57 FR 61834

106.503
Request to Agency to Join as Co-Petitioner
07/13/88
12/29/92, 57 FR 61834

106.504
Contents of Petition
07/13/88
12/29/92, 57 FR 61834

106.505
Response and Reply
07/13/88
12/29/92, 57 FR 61834

106.506
Notice and Conduct of Hearing
06/05/90
12/29/92, 57 FR 61834

106.507
Opinions and Orders
07/13/88
12/29/92, 57 FR 61834

Subpart J: Culpability Determinations

106.930
Applicability
07/11/94
07/13/95, 60 FR 36060

106.931
Petition for Review
07/11/94
07/13/95, 60 FR 36060

106.932
Response and Reply
07/11/94
07/13/95, 60 FR 36060

106.933
Notice and Hearing
07/11/94
07/13/95, 60 FR 36060

106.934
Opinion and Order
07/11/94
07/13/95, 60 FR 36060

Subtitle B: Air Pollution

Chapter I: Pollution Control Board

Subchapter a: Permits and General Provisions

Part 201: Permits and General Provisions

Subpart A: Definitions

201.102
Definitions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 101.

Subpart B: General Provisions

201.121
Existence of Permit No Defense
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(h).

201.122
Proof of Emissions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 108.

201.123
Burden of Persuasion Regarding Exceptions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 111.

201.124
Annual Report
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 112.

201.125
Severability
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 113.

201.126
Repealer
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 114.

Subpart C: Prohibitions

201.141
Prohibition of Air Pollution
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 102.

201.142
Construction Permit Required
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(a)(1).

201.143
Operating Permits for New Sources
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(b)(1).

201.144
Operating Permits for Existing Sources
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(b)(2).

201.146
Exemptions From State Permit Requirements
12/23/13
03/13/15, 80 FR 13248

201.147
Former Permits
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(j).

201.148
Operation Without Compliance Program and Project Completion Schedule
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(a).

201.149
Operation During Malfunction, Breakdown or Startups
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 105(a).

201.150
Circumvention
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 109.

201.151
Design of Effluent Exhaust Systems
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 110.

Subpart D: Permit Applications and Review Process

201.152
Contents of Application for Construction Permit
06/23/98
01/03/00, 65 FR 14

201.156
Conditions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(a)(6).

201.157
Contents of Application for Operating Permit
06/23/98
01/03/00, 65 FR 14

201.158
Incomplete Applications
06/23/98
01/03/00, 65 FR 14

201.159
Signatures
06/23/98
01/03/00, 65 FR 14

201.160
Standards for Issuance
06/23/98
01/03/00, 65 FR 14

201.161
Conditions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(b)(7).

201.162
Duration
12/01/10
04/07/14, 79 FR 18997

201.163
Joint Construction and Operating Permits
06/23/98
01/03/00, 65 FR 14

201.164
Design Criteria
06/23/98
01/03/00, 65 FR 14

201.165
Hearings
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(e).

201.166
Revocation
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(f).

201.167
Revisions to Permits
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(g).

201.168
Appeals From Conditions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 103(k).

Subpart F: CAAPP Permits

201.207
Applicability
06/23/98
01/03/00, 65 FR 14

Subpart H: Compliance Programs and Project Completion Schedules

201.241
Contents of Compliance Program
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(b)(1).

201.242
Contents of Project Completion Schedule
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(b)(2, 3).

201.243
Standards for Approval
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(c).

201.244
Revisions
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(d).

201.245
Effects of Approval
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(e).

201.246
Records and Reports
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 104(f).

Subpart I: Malfunctions, Breakdowns or Startups

201.261
Contents of Request for Permission To Operate During a Malfunction, Breakdown or Startup
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 105(b).

201.262
Standards for Granting Permission To Operate During a Malfunction, Breakdown or Startup
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 105(c).

201.263
Records and Reports
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 105(d).

201.264
Continued Operation or Startup Prior to Granting of Operating Permit
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 105(e).

201.265
Effect of Granting of Permission To Operate During a Malfunction, Breakdown or Startup
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 105(f).

Subpart J: Monitoring and Testing

201.281
Permit Monitoring Equipment Requirements
02/03/89
04/06/93, 58 FR 17780

201.282
Testing
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 106(b).

201.283
Records and Reports
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 106(c).

Subpart K: Records and Reports

201.301
Records
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 107(a).

201.302
Reports
12/23/13
03/13/15, 80 FR 13248

Subpart L: Continuous Monitoring

201.401
Continuous Monitoring Requirements
02/03/89
04/06/93, 58 FR 17780

201.402
Alternative Monitoring
02/03/89
04/06/93, 58 FR 17780

201.403
Exempt Sources
02/03/89
04/06/93, 58 FR 17780

201.404
Monitoring System Malfunction
02/03/89
04/06/93, 58 FR 17780

201.405
Excess Emission Reporting
02/03/89
04/06/93, 58 FR 17780

201.406
Data Reduction
02/03/89
04/06/93, 58 FR 17780

201.407
Retention of Information
02/03/89
04/06/93, 58 FR 17780

201.408
Compliance Schedules
02/03/89
04/06/93, 58 FR 17780

Part 203: Major Stationary Sources Construction and Modification

Subpart A: General Provisions

203.101
Definitions
04/30/93
09/27/95, 60 FR 49778

203.103
Actual Construction
03/22/88
12/17/92, 57 FR 59928

203.104
Actual Emissions
03/22/88
12/17/92, 57 FR 59928

203.107
Allowable Emissions
04/30/93
09/27/95, 60 FR 49778

203.110
Available Growth Margin
04/30/93
09/27/95, 60 FR 49778

203.112
Building, Structure and Facility
04/30/93
09/27/95, 60 FR 49778

203.113
Commence
03/22/88
12/17/92, 57 FR 59928

203.116
Construction
03/22/88
12/17/92, 57 FR 59928

203.117
Dispersion Enhancement Techniques
03/22/88
12/17/92, 57 FR 59928

203.119
Emission Baseline
07/22/83
12/17/92, 57 FR 59928

203.121
Emission Offset
04/30/93
09/27/95, 60 FR 49778

203.122
Emissions Unit
04/30/93
09/27/95, 60 FR 49778

203.123
Federally Enforceable
04/30/93
09/27/95, 60 FR 49778

203.124
Fugitive Emissions
03/22/88
12/17/92, 57 FR 59928

203.125
Installation
03/22/88
12/17/92, 57 FR 59928

203.126
Lowest Achievable Emission Rate
04/30/93
09/27/95, 60 FR 49778

203.127
Nonattainment Area
03/22/88
12/17/92, 57 FR 59928

203.128
Potential To Emit
04/30/93
09/27/95, 60 FR 49778

203.131
Reasonable Further Progress
03/22/88
12/17/92, 57 FR 59928

203.134
Secondary Emissions
03/22/88
12/17/92, 57 FR 59928

203.136
Stationary Source
03/22/88
12/17/92, 57 FR 59928

203.150
Public Participation
04/30/93
09/27/95, 60 FR 49778

Subpart B: Major Stationary Sources in Nonattainment Areas

203.201
Prohibition
04/30/93
09/27/95, 60 FR 49778

203.202
Coordination With Permit Requirement and Application Pursuant to 35 Ill. Adm. Code 201
03/22/88
12/17/92, 57 FR 59928

203.203
Construction Permit Requirement and Application
04/30/93
09/27/95, 60 FR 49778

203.205
Effect of Permits
03/22/88
12/17/92, 57 FR 59928

203.206
Major Stationary Source
03/10/98
05/13/03, 68 FR 25504

203.207
Major Modification of a Source
03/10/98
05/13/03, 68 FR 25504

203.208
Net Emission Determination
04/30/93
09/27/95, 60 FR 49778

203.209
Significant Emissions Determination
04/30/93
09/27/95, 60 FR 49778

203.210
Relaxation of a Source-Specific Limitation
03/22/88
12/17/92, 57 FR 59928

203.211
Permit Exemption Based on Fugitive Emissions
03/22/88
12/17/92, 57 FR 59928

Subpart C: Requirements for Major Stationary Sources in Nonattainment Areas

203.301
Lowest Achievable Emission Rate
03/10/98
05/13/03, 68 FR 25504

203.302
Maintenance of Reasonable Further Progress and Emission Offsets
04/30/93
09/27/95, 60 FR 49778

203.303
Baseline and Emission Offsets Determination
04/30/93
09/27/95, 60 FR 49778

203.305
Compliance by Existing Sources
03/22/88
12/17/92, 57 FR 59928

203.306
Analysis of Alternatives
04/30/93
09/27/95, 60 FR 49778

Subpart F: Operation of a Major Stationary Source or Major Modification

203.601
Lowest Achievable Emission Rate Compliance Requirement
03/22/88
12/17/92, 57 FR 59928

203.602
Emission Offset Maintenance Requirement
03/22/88
12/17/92, 57 FR 59928

Subpart G: General Maintenance of Emission Offsets

203.701
General Maintenance of Emission Offsets
03/22/88
12/17/92, 57 FR 59928

Subpart H: Offsets for Emission Increases From Rocket Engines and Motor Firing

203.801
Offsetting by Alternative or Innovative Means
05/14/93
09/27/95, 60 FR 49778

Subchapter b: Alternative Reduction Program

Part 205: Emissions Reduction Market System

Subpart A: General Provisions

205.100
Severability
11/25/97
10/15/01, 66 FR 52343

205.110
Purpose
11/25/97
10/15/01, 66 FR 52343

205.120
Abbreviations and Acronyms
06/13/05
07/07/08, 73 FR 38328

205.130
Definitions
06/13/05
07/07/08, 73 FR 38328

205.150
Emissions Management Periods
06/13/05
07/07/08, 73 FR 38328
Except 150(e).

Subpart B: Applicability

205.200
Participating Source
06/13/05
07/07/08, 73 FR 38328

205.205
Exempt Source
06/13/05
07/07/08, 73 FR 38328

205.210
New Participating Source
06/13/05
07/07/08, 73 FR 38328

205.220
Insignificant Emission Units
06/13/05
07/07/08, 73 FR 38328

205.225
Startup, Malfunction or Breakdown
11/25/97
10/15/01, 66 FR 52343

Subpart C: Operational Implementation

205.300
Seasonal Emissions Component of the Annual Emissions Report
06/13/05
07/07/08, 73 FR 38328

205.310
ERMS Applications
06/13/05
07/07/08, 73 FR 38328

205.315
CAAPP Permits for ERMS Sources
06/13/05
07/07/08, 73 FR 38328

205.316
Federally Enforceable State Operating Permits for ERMS Sources
06/13/05
07/07/08, 73 FR 38328

205.318
Certification for Exempt CAAPP Sources
06/13/05
07/07/08, 73 FR 38328

205.320
Baseline Emissions
06/13/05
07/07/08, 73 FR 38328

205.330
Emissions Determination Methods
06/13/05
07/07/08, 73 FR 38328

205.335
Sampling, Testing, Monitoring and Recordkeeping Practices
06/13/05
07/07/08, 73 FR 38328

205.337
Changes in Emissions Determination Methods and Sampling, Testing, Monitoring and Recordkeeping Practices
06/13/05
07/07/08, 73 FR 38328

Subpart D: Seasonal Emissions Management

205.400
Seasonal Emissions Allotment
06/13/05
07/07/08, 73 FR 38328

205.405
Exclusions From Further Reductions
06/13/05
07/07/08, 73 FR 38328

205.410
Participating Source Shutdowns
06/13/05
07/07/08, 73 FR 38328

Subpart E: Alternative ATU Generation

205.500
Emissions Reduction Generator
06/13/05
07/07/08, 73 FR 38328

205.510
Inter-Sector Transaction
06/13/05
07/07/08, 73 FR 38328

Subpart F: Market Transactions

205.600
ERMS Database
11/25/97
10/15/01, 66 FR 52343

205.610
Application for Transaction Account
06/13/05
07/07/08, 73 FR 38328

205.620
Account Officer
11/25/97
10/15/01, 66 FR 52343

205.630
ATU Transaction Procedures
11/25/97
10/15/01, 66 FR 52343

Subpart G: Performance Accountability

205.700
Compliance Accounting
06/13/05
07/07/08, 73 FR 38328

205.710
Alternative Compliance Market Account (ACMA)
11/25/97
10/15/01, 66 FR 52343

205.720
Emissions Excursion Compensation
11/25/97
10/15/01, 66 FR 52343

205.730
Excursion Reporting
06/13/05
07/07/08, 73 FR 38328

205.740
Enforcement Authority
11/25/97
10/15/01, 66 FR 52343

205.750
Emergency Conditions
06/13/05
07/07/08, 73 FR 38328

205.760
Market System Review Procedures
06/13/05
07/07/08, 73 FR 38328

Subchapter c: Emission Standards and Limitations for Stationary Sources

Part 211: Definitions and General Provisions

Subpart A: General Provisions

211.101
Incorporations by Reference
01/28/13
10/06/14, 79 FR 60070

211.102
Abbreviations and Conversion Factors
09/14/10
03/23/12, 77 FR 16940

Subpart B: Definitions

211.121
Other Definitions
09/27/93
09/09/94, 59 FR 46562

211.130
Accelacota
09/27/93
09/09/94, 59 FR 46562

211.150
Accumulator
09/27/93
09/09/94, 59 FR 46562

211.170
Acid Gases
09/27/93
09/09/94, 59 FR 46562

211.200
Acrylonitrile Butadiene Styrene (ABS) Welding
09/14/10
03/23/12, 77 FR 16940

211.210
Actual Heat Input
09/27/93
09/09/94, 59 FR 46562

211.230
Adhesive
09/27/93
09/09/94, 59 FR 46562

211.233
Adhesion Primer
09/14/10
03/23/12, 77 FR 16940

211.235
Adhesive Primer
09/14/10
03/23/12, 77 FR 16940

211.240
Adhesion Promoter
05/09/95
07/25/96, 61 FR 38577

211.250
Aeration
09/27/93
09/09/94, 59 FR 46562

211.260
Aerosol Adhesive and Adhesive Primer
09/14/10
03/23/12, 77 FR 16940

211.270
Aerosol Can Filling Line
01/18/94
10/21/96, 61 FR 54556

211.290
Afterburner
09/27/93
09/09/94, 59 FR 46562

211.310
Air Contaminant
09/27/93
09/09/94, 59 FR 46562

211.330
Air Dried Coatings
09/27/93
09/09/94, 59 FR 46562

211.350
Air Oxidation Process
09/27/93
09/09/94, 59 FR 46562

211.370
Air Pollutant
09/27/93
09/09/94, 59 FR 46562

211.390
Air Pollution
09/27/93
09/09/94, 59 FR 46562

211.410
Air Pollution Control Equipment
09/27/93
09/09/94, 59 FR 46562

211.430
Air Suspension Coater/Dryer
09/27/93
09/09/94, 59 FR 46562

211.450
Airless Spray
09/27/93
09/09/94, 59 FR 46562

211.470
Air Assisted Airless Spray
09/27/93
09/09/94, 59 FR 46562

211.474
Alcohol
05/09/95
11/08/95, 60 FR 56238

211.481
Ammunition Sealant
09/14/10
03/23/12, 77 FR 16940

211.490
Annual Grain Through Put
09/27/93
09/09/94, 59 FR 46562

211.492
Antifoulant Coating
09/14/10
03/23/12, 77 FR 16940

211.493
Antifouling Sealer/Tie Coat
07/27/11
03/23/12, 77 FR 16940

211.495
Anti-Glare/Safety Coating
05/09/95
07/25/96, 61 FR 38577

211.510
Application Area
09/27/93
09/09/94, 59 FR 46562

211.530
Architectural Coating
09/27/93
09/09/94, 59 FR 46562

211.540
Architectural Structure
09/14/10
03/23/12, 77 FR 16940

211.550
As Applied
09/27/93
09/09/94, 59 FR 46562

211.560
As-Applied Fountain Solution
05/09/95
11/08/95, 60 FR 56238

211.570
Asphalt
09/27/93
09/09/94, 59 FR 46562

211.590
Asphalt Prime Coat
09/27/93
09/09/94, 59 FR 46562

211.610
Automobile
09/27/93
09/09/94, 59 FR 46562

211.630
Automobile or Light Duty Truck Assembly Source or Automobile or Light Duty Truck Manufacturing Plant
09/27/93
09/09/94, 59 FR 46562

211.650
Automobile or Light Duty Truck Refinishing
09/27/93
09/09/94, 59 FR 46562

211.660
Automotive/Transportation Plastic Parts
05/09/95
10/26/95, 60 FR 54807

211.670
Baked Coatings
05/09/95
10/26/95, 60 FR 54807

211.685
Basecoat/Clearcoat System
05/09/95
07/25/96, 61 FR 38577

211.690
Batch Loading
09/27/93
09/09/94, 59 FR 46562

211.695
Batch Operation
05/22/95
04/02/96, 61 FR 14484

211.696
Batch Process Train
05/22/95
04/02/96, 61 FR 14484

211.710
Bead Dipping
09/27/93
09/09/94, 59 FR 46562

211.715
Bedliner
09/14/10
03/23/12, 77 FR 16940

211.730
Binders
09/27/93
09/09/94, 59 FR 46562

211.735
Black Coating
09/14/10
03/23/12, 77 FR 16940

211.740
Brakehorsepower (rated-bhp)
09/25/07
06/26/09, 74 FR 30466

211.750
British Thermal Unit
09/27/93
09/09/94, 59 FR 46562

211.770
Brush or Wipe Coating
09/27/93
09/09/94, 59 FR 46562

211.790
Bulk Gasoline Plant
09/27/93
09/09/94, 59 FR 46562

211.810
Bulk Gasoline Terminal
09/27/93
09/09/94, 59 FR 46562

211.820
Business Machine Plastic Parts
09/14/10
03/23/12, 77 FR 16940

211.825
Camouflage Coating
09/14/10
03/23/12, 77 FR 16940

211.830
Can
09/27/93
09/09/94, 59 FR 46562

211.850
Can Coating
09/27/93
09/09/94, 59 FR 46562

211.870
Can Coating Line
09/27/93
09/09/94, 59 FR 46562

211.880
Cap Sealant
09/14/10
03/23/12, 77 FR 16940

211.890
Capture
09/27/93
09/09/94, 59 FR 46562

211.910
Capture Device
09/27/93
09/09/94, 59 FR 46562

211.930
Capture Efficiency
09/27/93
09/09/94, 59 FR 46562

211.950
Capture System
09/27/93
09/09/94, 59 FR 46562

211.954
Cavity Wax
09/14/10
03/23/12, 77 FR 16940

211.955
Cement
03/15/01
11/08/01, 66 FR 56449

211.960
Cement Kiln
03/15/01
11/08/01, 66 FR 56449

211.965
Ceramic Tile Installation Adhesive
09/14/10
03/23/12, 77 FR 16940

211.970
Certified Investigation
09/27/93
09/09/94, 59 FR 46562

211.980
Chemical Manufacturing Process Unit
05/09/95
03/23/98, 63 FR 13784

211.990
Choke Loading
09/27/93
09/09/94, 59 FR 46562

211.1000
Class II Finish
06/25/10
03/23/12, 77 FR 16940

211.1010
Clean Air Act
09/27/93
09/09/94, 59 FR 46562

211.1050
Cleaning and Separating Operation
09/27/93
09/09/94, 59 FR 46562

211.1070
Cleaning Materials
01/18/94
10/21/96, 61 FR 54556

211.1090
Clear Coating
09/27/93
09/09/94, 59 FR 46562

211.1110
Clear Topcoat
09/27/93
09/09/94, 59 FR 46562

211.1120
Clinker
03/15/01
11/08/01, 66 FR 56449

211.1128
Closed Molding
09/14/10
03/23/12, 77 FR 16940

211.1130
Closed Purge System
09/27/93
09/09/94, 59 FR 46562

211.1150
Closed Vent System
09/27/93
09/09/94, 59 FR 46562

211.1170
Coal Refuse
09/27/93
09/09/94, 59 FR 46562

211.1190
Coating
09/27/93
09/09/94, 59 FR 46562

211.1210
Coating Applicator
09/27/93
09/09/94, 59 FR 46562

211.1230
Coating Line
09/27/93
09/09/94, 59 FR 46562

211.1250
Coating Plant
09/27/93
09/09/94, 59 FR 46562

211.1270
Coil Coating
09/27/93
09/09/94, 59 FR 46562

211.1290
Coil Coating Line
09/27/93
09/09/94, 59 FR 46562

211.1310
Cold Cleaning
09/27/93
09/09/94, 59 FR 46562

211.1330
Complete Combustion
09/27/93
09/09/94, 59 FR 46562

211.1350
Component
09/27/93
09/09/94, 59 FR 46562

211.1370
Concrete Curing Compounds
09/27/93
09/09/94, 59 FR 46562

211.1390
Concentrated Nitric Acid Manufacturing Process
09/27/93
09/09/94, 59 FR 46562

211.1410
Condensate
09/27/93
09/09/94, 59 FR 46562

211.1430
Condensible PM 10
09/27/93
09/09/94, 59 FR 46562

211.1455
Contact Adhesive
09/14/10
03/23/12, 77 FR 16940

211.1467
Continuous Coater
02/02/98
05/19/98, 63 FR 27489

211.1470
Continuous Process
09/27/93
09/09/94, 59 FR 46562

211.1490
Control Device
09/27/93
09/09/94, 59 FR 46562

211.1510
Control Device Efficiency
09/27/93
09/09/94, 59 FR 46562

211.1520
Conventional Air Spray
02/02/98
05/19/98, 63 FR 27489

211.1530
Conventional Soybean Crushing Source
09/27/93
09/09/94, 59 FR 46562

211.1550
Conveyorized Degreasing
09/27/93
09/09/94, 59 FR 46562

211.1560
Cove Base
09/14/10
03/23/12, 77 FR 16940

211.1565
Cove Base Installation Adhesive
09/14/10
03/23/12, 77 FR 16940

211.1570
Crude Oil
09/27/93
09/09/94, 59 FR 46562

211.1590
Crude Oil Gathering
09/27/93
09/09/94, 59 FR 46562

211.1610
Crushing
09/27/93
09/09/94, 59 FR 46562

211.1630
Custody Transfer
09/27/93
09/09/94, 59 FR 46562

211.1650
Cutback Asphalt
09/27/93
09/09/94, 59 FR 46562

211.1655
Cyanoacrylate Adhesive
09/14/10
03/23/12, 77 FR 16940

211.1670
Daily Weighted Average VOM Content
09/27/93
09/09/94, 59 FR 46562

211.1690
Day
09/27/93
09/09/94, 59 FR 46562

211.1700
Deadener
09/14/10
03/23/12, 77 FR 16940

211.1710
Degreaser
09/27/93
09/09/94, 59 FR 46562

211.1730
Delivery Vessel
09/27/93
09/09/94, 59 FR 46562

211.1740
Diesel Engine
09/25/07
06/26/09, 74 FR 30466

211.1745
Digital Printing
06/25/10
03/23/12, 77 FR 16940

211.1750
Dip Coating
09/27/93
09/09/94, 59 FR 46562

211.1770
Distillate Fuel Oil
09/27/93
09/09/94, 59 FR 46562

211.1780
Distillation Unit
05/09/95
03/23/98, 63 FR 13784

211.1790
Drum
09/27/93
09/09/94, 59 FR 46562

211.1810
Dry Cleaning Operation or Dry Cleaning Facility
09/27/93
09/09/94, 59 FR 46562

211.1830
Dump Pit Area
09/27/93
09/09/94, 59 FR 46562

211.1850
Effective Grate Area
09/27/93
09/09/94, 59 FR 46562

211.1870
Effluent Water Separator
09/27/93
09/09/94, 59 FR 46562

211.1872
Ejection Cartridge Sealant
09/14/10
03/23/12, 77 FR 16940

211.1875
Elastomeric Materials
05/09/95
07/25/96, 61 FR 38577

211.1876
Electric Dissipating Coating
09/14/10
03/23/12, 77 FR 16940

211.1877
Electric-Insulating Varnish
09/14/10
03/23/12, 77 FR 16940

211.1878
Electrical Apparatus Component
06/25/10
03/23/12, 77 FR 16940

211.1880
Electrical Switchgear Compartment Coating
09/14/10
03/23/12, 77 FR 16940

211.1882
Electrodeposition Primer (EDP)
09/14/10
03/23/12, 77 FR 16940

211.1883
Electromagnetic Interference/Radio Frequency Interference (EMI/RFI) Shielding Coatings
09/14/10
03/23/12, 77 FR 16940

211.1885
Electronic Component
06/25/10
03/23/12, 77 FR 16940

211.1890
Electrostatic Bell or Disc Spray
09/27/93
09/09/94, 59 FR 46562

211.1900
Electrostatic Prep Coat
05/09/95
10/26/95, 60 FR 54807

211.1910
Electrostatic Spray
09/27/93
09/09/94, 59 FR 46562

211.1920
Emergency or Standby Unit
09/25/07
06/26/09, 74 FR 30466

211.1930
Emission Rate
09/27/93
09/09/94, 59 FR 46562

211.1950
Emission Unit
09/27/93
09/09/94, 59 FR 46562

211.1970
Enamel
09/27/93
09/09/94, 59 FR 46562

211.1990
Enclose
09/27/93
09/09/94, 59 FR 46562

211.2010
End Sealing Compound Coat
09/27/93
09/09/94, 59 FR 46562

211.2030
Enhanced Under-the-Cup Fill
01/18/94
10/21/96, 61 FR 54556

211.2040
Etching Filler
09/14/10
03/23/12, 77 FR 16940

211.2050
Ethanol Blend Gasoline
09/27/93
09/09/94, 59 FR 46562

211.2055
Ethylene Propylenediene Monomer (DPDM) Roof Membrane
09/14/10
03/23/12, 77 FR 16940

211.2070
Excess Air
09/27/93
09/09/94, 59 FR 46562

211.2090
Excessive Release
09/27/93
09/09/94, 59 FR 46562

211.2130
Existing Grain Handling Operation
09/27/93
09/09/94, 59 FR 46562

211.2150
Exterior Base Coat
09/27/93
09/09/94, 59 FR 46562

211.2170
Exterior End Coat
09/27/93
09/09/94, 59 FR 46562

211.2190
External Floating Roof
09/27/93
09/09/94, 59 FR 46562

211.2200
Extreme High-Gloss Coating
07/27/11
03/23/12, 77 FR 16940

211.2210
Extreme Performance Coating
09/14/10
03/23/12, 77 FR 16940

211.2230
Fabric Coating
09/27/93
09/09/94, 59 FR 46562

211.2250
Fabric Coating Line
09/27/93
09/09/94, 59 FR 46562

211.2270
Federally Enforceable Limitations and Conditions
09/27/93
09/09/94, 59 FR 46562

211.2285
Feed Mill
06/17/97
02/17/00, 65 FR 8064

211.2300
Fill
11/15/94
08/08/96, 61 FR 41338

211.2310
Final Repair Coat
09/14/10
03/23/12, 77 FR 16940

211.2320
Finish Primer Surfacer
09/14/10
03/23/12, 77 FR 16940

211.2330
Firebox
09/27/93
09/09/94, 59 FR 46562

211.2350
Fixed Roof Tank
09/27/93
09/09/94, 59 FR 46562

211.2358
Flat Wood Paneling
07/27/11
03/23/12, 77 FR 16940

211.2359
Flat Wood Paneling Coating Line
06/25/10
03/23/12, 77 FR 16940

211.2360
Flexible Coating
09/14/10
03/23/12, 77 FR 16940

211.2365
Flexible Operation Unit
05/09/95
03/23/98, 63 FR 13784

211.2368
Flexible Packaging
06/25/10
03/23/12, 77 FR 16940

211.2369
Flexible Vinyl
09/14/10
03/23/12, 77 FR 16940

211.2370
Flexographic Printing
09/27/93
09/09/94, 59 FR 46562

211.2390
Flexographic Printing Line
09/27/93
09/09/94, 59 FR 46562

211.2410
Floating Roof
09/27/93
09/09/94, 59 FR 46562

211.2415
Fog Coat
09/14/10
03/23/12, 77 FR 16940

211.2430
Fountain Solution
09/27/93
09/09/94, 59 FR 46562

211.2450
Freeboard Height
09/27/93
09/09/94, 59 FR 46562

211.2470
Fuel Combustion Emission Unit or Fuel Combustion Emission Source
09/27/93
09/09/94, 59 FR 46562

211.2490
Fugitive Particulate Matter
09/27/93
09/09/94, 59 FR 46562

211.2510
Full Operating Flowrate
09/27/93
09/09/94, 59 FR 46562

211.2525
Gasket/Gasket Sealing Material
09/14/10
03/23/12, 77 FR 16940

211.2530
Gas Service
09/27/93
09/09/94, 59 FR 46562

211.2550
Gas/Gas Method
09/27/93
09/09/94, 59 FR 46562

211.2570
Gasoline
09/27/93
09/09/94, 59 FR 46562

211.2590
Gasoline Dispensing Operation or Gasoline Dispensing Facility
09/27/93
09/09/94, 59 FR 46562

211.2610
Gel Coat
01/18/94
10/21/96, 61 FR 54556

211.2615
General Work Surface
06/25/10
03/23/12, 77 FR 16940

211.2622
Glass Bonding Primer
09/14/10
03/23/12, 77 FR 16940

211.2630
Gloss Reducers
05/09/95
10/26/95, 60 FR 54807

211.2650
Grain
09/27/93
09/09/94, 59 FR 46562

211.2670
Grain Drying Operation
09/27/93
09/09/94, 59 FR 46562

211.2690
Grain Handling and Conditioning Operation
09/27/93
09/09/94, 59 FR 46562

211.2710
Grain Handling Operation
09/27/93
09/09/94, 59 FR 46562

211.2730
Green Tire Spraying
09/27/93
09/09/94, 59 FR 46562

211.2750
Green Tires
09/27/93
09/09/94, 59 FR 46562

211.2770
Gross Heating Value
09/27/93
09/09/94, 59 FR 46562

211.2790
Gross Vehicle Weight Rating
09/27/93
09/09/94, 59 FR 46562

211.2800
Hardwood Plywood
07/27/11
03/23/12, 77 FR 16940

211.2810
Heated Airless Spray
09/27/93
09/09/94, 59 FR 46562

211.2825
Heat-Resistant Coating
09/14/10
03/23/12, 77 FR 16940

211.2830
Heatset
06/25/10
03/23/12, 77 FR 16940

211.2840
Heatset Web Letterpress Printing Line
06/25/10
03/23/12, 77 FR 16940

211.2850
Heatset Web Offset Lithographic Printing Line
05/09/95
11/08/95, 60 FR 56238

211.2870
Heavy Liquid
01/28/13
10/06/14, 79 FR 60070

211.2890
Heavy Metals
09/27/93
09/09/94, 59 FR 46562

211.2910
Heavy Off Highway Vehicle Products
09/27/93
09/09/94, 59 FR 46562

211.2930
Heavy Off Highway Vehicle Products Coating
09/27/93
09/09/94, 59 FR 46562

211.2950
Heavy Off Highway Vehicle Products Coating Line
09/27/93
09/09/94, 59 FR 46562

211.2955
High Bake Coating
09/14/10
03/23/12, 77 FR 16940

211.2956
High Build Primer Surfacer
09/14/10
03/23/12, 77 FR 16940

211.2958
High Gloss Coating
09/14/10
03/23/12, 77 FR 16940

211.2960
High-Performance Architectural Coating
09/14/10
03/23/12, 77 FR 16940

211.2965
High Precision Optic
06/25/10
03/23/12, 77 FR 16940

211.2970
High Temperature Aluminum Coating
09/27/93
09/09/94, 59 FR 46562

211.2980
High Temperature Coating
09/14/10
03/23/12, 77 FR 16940

211.2990
High Volume Low Pressure (HVLP) Spray
09/27/93
09/09/94, 59 FR 46562

211.3010
Hood
09/27/93
09/09/94, 59 FR 46562

211.3030
Hot Well
09/27/93
09/09/94, 59 FR 46562

211.3050
Housekeeping Practices
09/27/93
09/09/94, 59 FR 46562

211.3070
Incinerator
09/27/93
09/09/94, 59 FR 46562

211.3090
Indirect Heat Transfer
09/27/93
09/09/94, 59 FR 46562

211.3095
Indoor Floor Covering Installation Adhesive
09/14/10
03/23/12, 77 FR 16940

211.3110
Ink
09/27/93
09/09/94, 59 FR 46562

211.3120
In-Line Repair
09/14/10
03/23/12, 77 FR 16940

211.3130
In-Process Tank
09/27/93
09/09/94, 59 FR 46562

211.3150
In-Situ Sampling Systems
09/27/93
09/09/94, 59 FR 46562

211.3170
Interior Body Spray Coat
09/27/93
09/09/94, 59 FR 46562

211.3190
Internal Floating Roof
09/27/93
09/09/94, 59 FR 46562

211.3210
Internal Transferring Area
09/27/93
09/09/94, 59 FR 46562

211.3215
Janitorial Cleaning
06/25/10
03/23/12, 77 FR 16940

211.3230
Lacquers
09/27/93
09/09/94, 59 FR 46562

211.3240
Laminate
09/14/10
03/23/12, 77 FR 16940

211.3250
Large Appliance
09/27/93
09/09/94, 59 FR 46562

211.3270
Large Appliance Coating
09/27/93
09/09/94, 59 FR 46562

211.3290
Large Appliance Coating Line
09/27/93
09/09/94, 59 FR 46562

211.3300
Lean-Burn Engine
09/25/07
06/26/09, 74 FR 30466

211.3305
Letterpress Printing Line
06/25/10
03/23/12, 77 FR 16940

211.3310
Light Liquid
09/27/93
09/09/94, 59 FR 46562

211.3330
Light Duty Truck
09/27/93
09/09/94, 59 FR 46562

211.3350
Light Oil
09/27/93
09/09/94, 59 FR 46562

211.3370
Liquid/Gas Method
09/27/93
09/09/94, 59 FR 46562

211.3390
Liquid Mounted Seal
09/27/93
09/09/94, 59 FR 46562

211.3410
Liquid Service
09/27/93
09/09/94, 59 FR 46562

211.3430
Liquids Dripping
09/27/93
09/09/94, 59 FR 46562

211.3450
Lithographic Printing Line
09/27/93
09/09/94, 59 FR 46562

211.3470
Load Out Area
09/27/93
09/09/94, 59 FR 46562

211.3480
Loading Event
10/25/94
04/03/95, 60 FR 16801

211.3483
Long Dry Kiln
03/15/01
11/08/01, 66 FR 56449

211.3485
Long Wet Kiln
03/15/01
11/08/01, 66 FR 56449

211.3487

Low-NO
X
Burner

03/15/01
11/08/01, 66 FR 56449

211.3490
Low Solvent Coating
09/27/93
09/09/94, 59 FR 46562

211.3505
Lubricating Wax/Compound
09/14/10
03/23/12, 77 FR 16940

211.3510
Magnet Wire
09/27/93
09/09/94, 59 FR 46562

211.3530
Magnet Wire Coating
09/27/93
09/09/94, 59 FR 46562

211.3550
Magnet Wire Coating Line
09/27/93
09/09/94, 59 FR 46562

211.3555
Maintenance Cleaning
06/25/10
03/23/12, 77 FR 16940

211.3570
Major Dump Pit
09/27/93
09/09/94, 59 FR 46562

211.3590
Major Metropolitan Area (MMA)
09/27/93
09/09/94, 59 FR 46562

211.3610
Major Population Area (MPA)
09/27/93
09/09/94, 59 FR 46562

211.3630
Manufacturing Process
09/27/93
09/09/94, 59 FR 46562

211.3650
Marine Terminal
10/25/94
04/03/95, 60 FR 16801

211.3660
Marine Vessel
10/25/94
04/03/95, 60 FR 16801

211.3665
Mask Coating
09/14/10
03/23/12, 77 FR 16940

211.3670
Material Recovery Section
09/27/93
09/09/94, 59 FR 46562

211.3690
Maximum Theoretical Emissions
09/27/93
09/09/94, 59 FR 46562

211.3695
Maximum True Vapor Pressure
11/15/94
08/08/96, 61 FR 41338

211.3705
Medical Device
06/25/10
03/23/12, 77 FR 16940

211.3707
Medical Device and Pharmaceutical Manufacturing
06/25/10
03/23/12, 77 FR 16940

211.3710
Metal Furniture
09/27/93
09/09/94, 59 FR 46562

211.3730
Metal Furniture Coating
09/27/93
09/09/94, 59 FR 46562

211.3750
Metal Furniture Coating Line
09/27/93
09/09/94, 59 FR 46562

211.3760
Metallic Coating
09/14/10
03/23/12, 77 FR 16940

211.3770
Metallic Shoe Type Seal
09/27/93
09/09/94, 59 FR 46562

211.3775
Metal to Urethane/Rubber Molding or Casting Adhesive
09/14/10
03/23/12, 77 FR 16940

211.3780
Mid-Kiln Firing
03/15/01
11/08/01, 66 FR 56449

211.3785
Military Specification Coating
09/14/10
03/23/12, 77 FR 16940

211.3790
Miscellaneous Fabricated Product Manufacturing Process
09/27/93
09/09/94, 59 FR 46562

211.3810
Miscellaneous Formulation Manufacturing Process
09/27/93
09/09/94, 59 FR 46562

211.3820
Miscellaneous Industrial Adhesive Application Operation
09/14/10
03/23/12, 77 FR 16940

211.3830
Miscellaneous Metal Parts and Products
09/27/93
09/09/94, 59 FR 46562

211.3850
Miscellaneous Metal Parts and Products Coating
09/27/93
09/09/94, 59 FR 46562

211.3870
Miscellaneous Metal Parts or Products Coating Line
09/27/93
09/09/94, 59 FR 46562

211.3890
Miscellaneous Organic Chemical Manufacturing Process
09/27/93
09/09/94, 59 FR 46562

211.3910
Mixing Operation
09/27/93
09/09/94, 59 FR 46562

211.3915
Mobile Equipment
05/09/95
07/25/96, 61 FR 38577

211.3925
Mold Seal Coating
09/14/10
03/23/12, 77 FR 16940

211.3930
Monitor
09/27/93
09/09/94, 59 FR 46562

211.3950
Monomer
01/18/94
10/21/96, 61 FR 54556

211.3960
Motor Vehicles
05/09/95
07/25/96, 61 FR 38577

211.3961
Motor Vehicle Adhesive
09/14/10
03/23/12, 77 FR 16940

211.3965
Motor Vehicle Refinishing
05/09/95
07/25/96, 61 FR 38577

211.3966
Motor Vehicle Weatherstrip Adhesive
09/14/10
03/23/12, 77 FR 16940

211.3967
Mouth Waterproofing Sealant
09/14/10
03/23/12, 77 FR 16940

211.3968
Multi-Colored Coating
09/14/10
03/23/12, 77 FR 16940

211.3969
Multi-Component Coating
09/14/10
03/23/12, 77 FR 16940

211.3970
Multiple Package Coating
09/27/93
09/09/94, 59 FR 46562

211.3975
Multipurpose Construction Adhesive
09/14/10
03/23/12, 77 FR 16940

211.3985
Natural Finish Hardwood Plywood Panel
07/27/11
03/23/12, 77 FR 16940

211.3990
New Grain Drying Operation
09/27/93
09/09/94, 59 FR 46562

211.4010
New Grain Handling Operation
09/27/93
09/09/94, 59 FR 46562

211.4030
No Detectable Volatile Organic Material Emissions
09/27/93
09/09/94, 59 FR 46562

211.4050
Non-Contact Process Water Cooling Tower
01/18/94
10/21/96, 61 FR 54556

211.4052
Non-Convertible Coating
09/14/10
03/23/12, 77 FR 16940

211.4055
Non-Flexible Coating
05/09/95
10/26/95, 60 FR 54807

211.4065
Non-Heatset
06/25/10
03/23/12, 77 FR 16940

211.4067

NO
X
Trading Program

04/17/01
11/08/01, 66 FR 56449

211.4070
Offset
09/27/93
09/09/94, 59 FR 46562

211.4080
One-Component Coating
09/14/10
03/23/12, 77 FR 16940

211.4090
One Hundred Percent Acid
09/27/93
09/09/94, 59 FR 46562

211.4110
One Turn Storage Space
09/27/93
09/09/94, 59 FR 46562

211.4130
Opacity
09/27/93
09/09/94, 59 FR 46562

211.4150
Opaque Stains
09/27/93
09/09/94, 59 FR 46562

211.4170
Open Top Vapor Degreasing
09/27/93
09/09/94, 59 FR 46562

211.4190
Open Ended Valve
09/27/93
09/09/94, 59 FR 46562

211.4210
Operator of a Gasoline Dispensing Operation or Operator of a Gasoline Dispensing Facility
09/27/93
09/09/94, 59 FR 46562

211.4220
Optical Coating
09/14/10
03/23/12, 77 FR 16940

211.4230
Organic Compound
09/27/93
09/09/94, 59 FR 46562

211.4250
Organic Material and Organic Materials
10/19/95
03/21/96, 61 FR 11550

211.4260
Organic Solvent
10/19/95
03/21/96, 61 FR 11550

211.4270
Organic Vapor
09/27/93
09/09/94, 59 FR 46562

211.4285
Outdoor Floor Covering Installation Adhesive
09/14/10
03/23/12, 77 FR 16940

211.4290
Oven
09/27/93
09/09/94, 59 FR 46562

211.4310
Overall Control
09/27/93
09/09/94, 59 FR 46562

211.4330
Overvarnish
09/27/93
09/09/94, 59 FR 46562

211.4350
Owner of a Gasoline Dispensing Operation or Owner of a Gasoline Dispensing Facility
09/27/93
09/09/94, 59 FR 46562

211.4370
Owner or Operator
09/27/93
09/09/94, 59 FR 46562

211.4390
Packaging Rotogravure Printing
09/27/93
09/09/94, 59 FR 46562

211.4410
Packaging Rotogravure Printing Line
09/27/93
09/09/94, 59 FR 46562

211.4430
Pail
09/27/93
09/09/94, 59 FR 46562

211.4450
Paint Manufacturing Source or Paint Manufacturing Plant
09/27/93
09/09/94, 59 FR 46562

211.4455
Pan-Backing Coating
09/14/10
03/23/12, 77 FR 16940

211.4460
Panel
07/27/11
03/23/12, 77 FR 16940

211.4470
Paper Coating
09/27/93
09/09/94, 59 FR 46562

211.4490
Paper Coating Line
09/27/93
09/09/94, 59 FR 46562

211.4510
Particulate Matter
09/27/93
09/09/94, 59 FR 46562

211.4530
Parts per Million (Volume) or Ppm (VOL)
09/27/93
09/09/94, 59 FR 46562

211.4540
Perimeter Bonded Sheet Flooring
09/14/10
03/23/12, 77 FR 16940

211.4550
Person
09/27/93
09/09/94, 59 FR 46562

211.4590
Petroleum
09/27/93
09/09/94, 59 FR 46562

211.4610
Petroleum Liquid
10/19/95
03/21/96, 61 FR 11550

211.4630
Petroleum Refinery
09/27/93
09/09/94, 59 FR 46562

211.4650
Pharmaceutical
09/27/93
09/09/94, 59 FR 46562

211.4670
Pharmaceutical Coating Operation
09/27/93
09/09/94, 59 FR 46562

211.4690
Photochemically Reactive Material
09/27/93
09/09/94, 59 FR 46562

211.4710
Pigmented Coatings
09/27/93
09/09/94, 59 FR 46562

211.4730
Plant
09/27/93
09/09/94, 59 FR 46562

211.4735
Plastic
09/14/10
03/23/12, 77 FR 16940

211.4740
Plastic Part
05/09/95
10/26/95, 60 FR 54807

211.4750
Plasticizers
09/27/93
09/09/94, 59 FR 46562

211.4760
Plastic Solvent Welding Adhesive
09/14/10
03/23/12, 77 FR 16940

211.4765
Plastic Solvent Welding Adhesive Primer
09/14/10
03/23/12, 77 FR 16940

211.4768
Pleasure Craft
09/14/10
03/23/12, 77 FR 16940

211.4769
Pleasure Craft Surface Coating
09/14/10
03/23/12, 77 FR 16940

211.4770
PM 10
09/27/93
09/09/94, 59 FR 46562

211.4790
Pneumatic Rubber Tire Manufacture
09/27/93
09/09/94, 59 FR 46562

211.4810
Polybasic Organic Acid Partial Oxidation Manufacturing Process
09/27/93
09/09/94, 59 FR 46562

211.4830
Polyester Resin Material(s)
01/18/94
10/21/96, 61 FR 54556

211.4850
Polyester Resin Products Manufacturing Process
01/18/94
10/21/96, 61 FR 54556

211.4870
Polystyrene Plant
09/27/93
09/09/94, 59 FR 46562

211.4890
Polystyrene Resin
09/27/93
09/09/94, 59 FR 46562

211.4895
Polyvinyl Chloride Plastic (PVC Plastic)
09/14/10
03/23/12, 77 FR 16940

211.4900
Porous Material
09/14/10
03/23/12, 77 FR 16940

211.4910
Portable Grain Handling Equipment
09/27/93
09/09/94, 59 FR 46562

211.4930
Portland Cement Manufacturing Process Emission Source
09/27/93
09/09/94, 59 FR 46562

211.4950
Portland Cement Process or Portland Cement Manufacturing Plant
09/27/93
09/09/94, 59 FR 46562

211.4970
Potential To Emit
01/18/94
10/21/96, 61 FR 54556

211.4990
Power Driven Fastener Coating
09/27/93
09/09/94, 59 FR 46562

211.5010
Precoat
05/09/95
07/25/96, 61 FR 38577

211.5012
Prefabricated Architectural Coating
09/14/10
03/23/12, 77 FR 16940

211.5015
Preheater Kiln
03/15/01
11/08/01, 66 FR 56449

211.5020
Preheater/Precalciner Kiln
03/15/01
11/08/01, 66 FR 56449

211.5030
Pressure Release
09/27/93
09/09/94, 59 FR 46562

211.5050
Pressure Tank
09/27/93
09/09/94, 59 FR 46562

211.5060
Pressure/Vacuum Relief Valve
09/21/94
01/27/95, 60 FR 5318

211.5061
Pretreatment Coating
09/14/10
03/23/12, 77 FR 16940

211.5062
Pretreatment Wash Primer
09/14/10
03/23/12, 77 FR 16940

211.5065
Primary Product
05/09/95
03/23/98, 63 FR 13784

211.5070
Prime Coat
09/27/93
09/09/94, 59 FR 46562

211.5075
Primer Sealant
09/14/10
03/23/12, 77 FR 16940

211.5080
Primer Sealer
05/09/95
07/25/96, 61 FR 38577

211.5090
Primer Surfacer Coat
09/14/10
03/23/12, 77 FR 16940

211.5110
Primer Surfacer Operation
09/27/93
09/09/94, 59 FR 46562

211.5130
Primers
09/27/93
09/09/94, 59 FR 46562

211.5140
Printed Interior Panel
07/27/11
03/23/12, 77 FR 16940

211.5150
Printing
09/27/93
09/09/94, 59 FR 46562

211.5170
Printing Line
09/27/93
09/09/94, 59 FR 46562

211.5185
Process Emission Source
09/27/93
09/09/94, 59 FR 46562

211.5190
Process Emission Unit
09/27/93
09/09/94, 59 FR 46562

211.5210
Process Unit
09/27/93
09/09/94, 59 FR 46562

211.5230
Process Unit Shutdown
09/27/93
09/09/94, 59 FR 46562

211.5245
Process Vent
05/22/95
04/02/96, 61 FR 14484

211.5250
Process Weight Rate
09/27/93
09/09/94, 59 FR 46562

211.5270
Production Equipment Exhaust System
09/27/93
09/09/94, 59 FR 46562

211.5310
Publication Rotogravure Printing Line
09/27/93
09/09/94, 59 FR 46562

211.5330
Purged Process Fluid
09/27/93
09/09/94, 59 FR 46562

211.5335
Radiation Effect Coating
06/25/10
03/23/12, 77 FR 16940

211.5350
Reactor
09/27/93
09/09/94, 59 FR 46562

211.5370
Reasonably Available Control Technology (RACT)
09/27/93
09/09/94, 59 FR 46562

211.5390
Reclamation System
01/18/94
10/21/96, 61 FR 54556

211.5400
Red Coating
09/14/10
03/23/12, 77 FR 16940

211.5410
Refiner
09/27/93
09/09/94, 59 FR 46562

211.5430
Refinery Fuel Gas
09/27/93
09/09/94, 59 FR 46562

211.5450
Refinery Fuel Gas System
09/27/93
09/09/94, 59 FR 46562

211.5470
Refinery Unit or Refinery Process Unit
09/27/93
09/09/94, 59 FR 46562

211.5480
Reflective Argent Coating
05/09/95
10/26/95, 60 FR 54807

211.5490
Refrigerated Condenser
09/27/93
09/09/94, 59 FR 46562

211.5500
Regulated Air Pollutant
12/07/93
04/05/95, 60 FR 17229

211.5510
Reid Vapor Pressure
01/28/13
10/06/14, 79 FR 60070

211.5520
Reinforced Plastic Composite
09/14/10
03/23/12, 77 FR 16940

211.5530
Repair
01/18/94
10/21/96, 61 FR 54556

211.5535
Repair Cleaning
06/25/10
03/23/12, 77 FR 16940

211.5550
Repair Coat
09/14/10
03/23/12, 77 FR 16940

211.5570
Repaired
09/27/93
09/09/94, 59 FR 46562

211.5585
Research and Development Operation
06/25/10
03/23/12, 77 FR 16940

211.5590
Residual Fuel Oil
09/27/93
09/09/94, 59 FR 46562

211.5600
Resist Coat
05/09/95
10/26/95, 60 FR 54807

211.5610
Restricted Area
09/27/93
09/09/94, 59 FR 46562

211.5630
Retail Outlet
09/27/93
09/09/94, 59 FR 46562

211.5640
Rich-Burn Engine
09/25/07
06/26/09, 74 FR 30466

211.5650
Ringelmann Chart
09/27/93
09/09/94, 59 FR 46562

211.5670
Roadway
09/27/93
09/09/94, 59 FR 46562

211.5690
Roll Coater
09/27/93
09/09/94, 59 FR 46562

211.5710
Roll Coating
09/27/93
09/09/94, 59 FR 46562

211.5730
Roll Printer
09/27/93
09/09/94, 59 FR 46562

211.5750
Roll Printing
09/27/93
09/09/94, 59 FR 46562

211.5770
Rotogravure Printing
09/27/93
09/09/94, 59 FR 46562

211.5790
Rotogravure Printing Line
09/27/93
09/09/94, 59 FR 46562

211.5800
Rubber
09/14/10
03/23/12, 77 FR 16940

211.5810
Safety Relief Valve
09/27/93
09/09/94, 59 FR 46562

211.5830
Sandblasting
09/27/93
09/09/94, 59 FR 46562

211.5850
Sanding Sealers
09/27/93
09/09/94, 59 FR 46562

211.5860
Scientific Instrument
06/25/10
03/23/12, 77 FR 16940

211.5870
Screening
09/27/93
09/09/94, 59 FR 46562

211.5875
Screen Printing
06/25/10
03/23/12, 77 FR 16940

211.5885
Screen Reclamation
06/25/10
03/23/12, 77 FR 16940

211.5890
Sealer
09/14/10
03/23/12, 77 FR 16940

211.5910
Semi Transparent Stains
09/27/93
09/09/94, 59 FR 46562

211.5930
Sensor
09/27/93
09/09/94, 59 FR 46562

211.5950
Set of Safety Relief Valves
09/27/93
09/09/94, 59 FR 46562

211.5970
Sheet Basecoat
09/27/93
09/09/94, 59 FR 46562

211.5980
Sheet-Fed
05/09/95
11/08/95, 60 FR 56238

211.5985
Sheet Rubber Lining Installation
09/14/10
03/23/12, 77 FR 16940

211.5987
Shock-Free Coating
09/14/10
03/23/12, 77 FR 16940

211.5990
Shotblasting
09/27/93
09/09/94, 59 FR 46562

211.6010
Side Seam Spray Coat
09/27/93
09/09/94, 59 FR 46562

211.6012
Silicone-Release Coating
09/14/10
03/23/12, 77 FR 16940

211.6015
Single-Ply Roof Membrane
09/14/10
03/23/12, 77 FR 16940

211.6017
Single-Ply Roof Membrane Adhesive Primer
09/14/10
03/23/12, 77 FR 16940

211.6020
Single-Ply Roof Membrane Installation and Repair Adhesive
09/14/10
03/23/12, 77 FR 16940

211.6025
Single Unit Operation
05/22/95
04/02/96, 61 FR 14484

211.6030
Smoke
09/27/93
09/09/94, 59 FR 46562

211.6050
Smokeless Flare
09/27/93
09/09/94, 59 FR 46562

211.6060
Soft Coat
05/09/95
10/26/95, 60 FR 54807

211.6063
Solar-Absorbent Coating
09/14/10
03/23/12, 77 FR 16940

211.6065

Solids Turnover Ratio (R
T
)

09/14/10
03/23/12, 77 FR 16940

211.6070
Solvent
09/27/93
09/09/94, 59 FR 46562

211.6090
Solvent Cleaning
09/27/93
09/09/94, 59 FR 46562

211.6110
Solvent Recovery System
01/18/94
10/21/96, 61 FR 54556

211.6130
Source
04/17/01
11/08/01, 66 FR 56449

211.6140
Specialty Coatings
05/09/95
10/26/95, 60 FR 54807

211.6145
Specialty Coatings for Motor Vehicles
05/09/95
07/25/96, 61 FR 38577

211.6150
Specialty High Gloss Catalyzed Coating
09/27/93
09/09/94, 59 FR 46562

211.6170
Specialty Leather
01/18/94
10/21/96, 61 FR 54556

211.6190
Specialty Soybean Crushing Source
09/27/93
09/09/94, 59 FR 46562

211.6210
Splash Loading
09/27/93
09/09/94, 59 FR 46562

211.6230
Stack
09/27/93
09/09/94, 59 FR 46562

211.6250
Stain Coating
01/18/94
10/21/96, 61 FR 54556

211.6270
Standard Conditions
09/27/93
09/09/94, 59 FR 46562

211.6290
Standard Cubic Foot (Scf)
09/27/93
09/09/94, 59 FR 46562

211.6310
Start Up
09/27/93
09/09/94, 59 FR 46562

211.6330
Stationary Emission Source
09/27/93
09/09/94, 59 FR 46562

211.6350
Stationary Emission Unit
09/27/93
09/09/94, 59 FR 46562

211.6370
Stationary Source
09/27/93
09/09/94, 59 FR 46562

211.6390
Stationary Storage Tank
09/27/93
09/09/94, 59 FR 46562

211.6400
Stencil Coat
09/14/10
03/23/12, 77 FR 16940

211.6405
Sterilization Indicating Ink
06/25/10
03/23/12, 77 FR 16940

211.6410
Storage Tank or Storage Vessel
09/27/93
09/09/94, 59 FR 46562

211.6420
Strippable Spray Booth Coating
02/02/98
05/19/98, 63 FR 27489

211.6425
Stripping
06/25/10
03/23/12, 77 FR 16940

211.6427
Structural Glazing
09/14/10
03/23/12, 77 FR 16940

211.6430
Styrene Devolatilizer Unit
09/27/93
09/09/94, 59 FR 46562

211.6450
Styrene Recovery Unit
09/27/93
09/09/94, 59 FR 46562

211.6460
Subfloor
09/14/10
03/23/12, 77 FR 16940

211.6470
Submerged Loading Pipe
09/27/93
09/09/94, 59 FR 46562

211.6490
Substrate
09/27/93
09/09/94, 59 FR 46562

211.6510
Sulfuric Acid Mist
09/27/93
09/09/94, 59 FR 46562

211.6530
Surface Condenser
09/27/93
09/09/94, 59 FR 46562

211.6535
Surface Preparation
06/25/10
03/23/12, 77 FR 16940

211.6540
Surface Preparation Materials
05/09/95
07/25/96, 61 FR 38577

211.6550
Synthetic Organic Chemical or Polymer Manufacturing Plant
09/27/93
09/09/94, 59 FR 46562

211.6570
Tablet Coating Operation
09/27/93
09/09/94, 59 FR 46562

211.6580
Texture Coat
05/09/95
10/26/95, 60 FR 54807

211.6585
Thin Metal Laminating Adhesive
09/14/10
03/23/12, 77 FR 16940

211.6587
Thin Particleboard
07/27/11
03/23/12, 77 FR 16940

211.6590
Thirty Day Rolling Average
09/27/93
09/09/94, 59 FR 46562

211.6610
Three Piece Can
09/27/93
09/09/94, 59 FR 46562

211.6620
Three or Four Stage Coating System
05/09/95
07/25/96, 61 FR 38577

211.6630
Through-the-Valve Fill
01/18/94
10/21/96, 61 FR 54556

211.6635
Tileboard
07/27/11
03/23/12, 77 FR 16940

211.6640
Tire Repair
09/14/10
03/23/12, 77 FR 16940

211.6650
Tooling Resin
01/18/94
10/21/96, 61 FR 54556

211.6670
Topcoat
09/14/10
03/23/12, 77 FR 16940

211.6690
Topcoat Operation
09/14/10
03/23/12, 77 FR 16940

211.6695
Topcoat System
05/09/95
07/25/96, 61 FR 38577

211.6710
Touch-Up
01/18/94
10/21/96, 61 FR 54556

211.6720
Touch-Up Coating
09/14/10
03/23/12, 77 FR 16940

211.6730
Transfer Efficiency
09/27/93
09/09/94, 59 FR 46562

211.6740
Translucent Coating
09/14/10
03/23/12, 77 FR 16940

211.6750
Tread End Cementing
09/27/93
09/09/94, 59 FR 46562

211.6770
True Vapor Pressure
09/27/93
09/09/94, 59 FR 46562

211.6780
Trunk Interior Coating
09/14/10
03/23/12, 77 FR 16940

211.6790
Turnaround
09/27/93
09/09/94, 59 FR 46562

211.6810
Two Piece Can
09/27/93
09/09/94, 59 FR 46562

211.6825
Underbody Coating
09/14/10
03/23/12, 77 FR 16940

211.6830
Under-the-Cup Fill
01/18/94
10/21/96, 61 FR 54556

211.6850
Undertread Cementing
09/27/93
09/09/94, 59 FR 46562

211.6860
Uniform Finish Blender
05/09/95
07/25/96, 61 FR 38577

211.6870
Unregulated Safety Relief Valve
09/27/93
09/09/94, 59 FR 46562

211.6880
Vacuum Metallizing
05/09/95
10/26/95, 60 FR 54807

211.6885
Vacuum Metalizing Coating
09/14/10
03/23/12, 77 FR 16940

211.6890
Vacuum Producing System
09/27/93
09/09/94, 59 FR 46562

211.6910
Vacuum Service
09/27/93
09/09/94, 59 FR 46562

211.6930
Valves Not Externally Regulated
09/27/93
09/09/94, 59 FR 46562

211.6950
Vapor Balance System
09/27/93
09/09/94, 59 FR 46562

211.6970
Vapor Collection System
10/25/94
04/03/95, 60 FR 16801

211.6990
Vapor Control System
10/25/94
04/03/95, 60 FR 16801

211.7010
Vapor Mounted Primary Seal
09/27/93
09/09/94, 59 FR 46562

211.7030
Vapor Recovery System
09/27/93
09/09/94, 59 FR 46562

211.7050
Vapor-Suppressed Polyester Resin
01/18/94
10/21/96, 61 FR 54556

211.7070
Vinyl Coating
09/27/93
09/09/94, 59 FR 46562

211.7090
Vinyl Coating Line
09/27/93
09/09/94, 59 FR 46562

211.7110
Volatile Organic Liquid (VOL)
09/27/93
09/09/94, 59 FR 46562

211.7130
Volatile Organic Material Content (VOMC)
09/27/93
09/09/94, 59 FR 46562

211.7150
Volatile Organic Material (VOM) or Volatile Organic Compound (VOC)
03/24/15
12/28/16, 81 FR 95475

211.7170
Volatile Petroleum Liquid
09/27/93
09/09/94, 59 FR 46562

211.7190
Wash Coat
09/27/93
09/09/94, 59 FR 46562

211.7200
Washoff Operations
02/02/98
05/19/98, 63 FR 27489

211.7210
Wastewater (Oil/Water) Separator
09/27/93
09/09/94, 59 FR 46562

211.7220
Waterproof Resorcinol Glue
09/14/10
03/23/12, 77 FR 16940

211.7230
Weak Nitric Acid Manufacturing Process
09/27/93
09/09/94, 59 FR 46562

211.7240
Weatherstrip Adhesive
09/14/10
03/23/12, 77 FR 16940

211.7250
Web
09/27/93
09/09/94, 59 FR 46562

211.7270
Wholesale Purchase Consumer
09/27/93
09/09/94, 59 FR 46562

211.7290
Wood Furniture
06/25/10
03/23/12, 77 FR 16940

211.7310
Wood Furniture Coating
09/27/93
09/09/94, 59 FR 46562

211.7330
Wood Furniture Coating Line
09/27/93
09/09/94, 59 FR 46562

211.7350
Woodworking
09/27/93
09/09/94, 59 FR 46562

Part 212: Visible and Particulate Matter Emissions

Subpart A: General

212.107
Measurement Method for Visible Emissions
05/22/96
03/11/98, 63 FR 11842

212.108
Measurement Methods for PM-10 Emissions and Condensible PM-10 Emissions
05/22/96
03/11/98, 63 FR 11842

212.109
Measurement Methods for Opacity
05/22/96
03/11/98, 63 FR 11842

212.110
Measurement Methods for Particulate Matter
05/22/96
03/11/98, 63 FR 11842

212.111
Abbreviations and Units
10/04/91
10/21/93, 58 FR 54291

212.113
Incorporations by Reference
05/22/96
07/14/99, 64 FR 37847

Subpart B: Visible Emissions

212.121
Opacity Standards
07/13/88
12/29/92, 57 FR 61834

212.122
Visible Emissions Limitations for Certain Emission Units for Which Construction or Modification Commenced on or After April 14, 1972
07/13/88
12/29/92, 57 FR 61834

212.123
Visible Emissions Limitations for All Other Emission Units
07/13/88
12/29/92, 57 FR 61834

212.124
Exceptions
07/13/88
12/29/92, 57 FR 61834

212.125
Determination of Violations
07/13/88
12/29/92, 57 FR 61834

212.126
Adjusted Opacity Standards Procedures
07/13/88
12/29/92, 57 FR 61834

Subpart D: Particulate Matter Emissions From Incinerators

212.181
Limitations for Incinerators
06/04/80
11/27/81, 46 FR 57893

212.182
Aqueous Waste Incinerators
06/04/80
11/27/81, 46 FR 57893

212.183
Certain Wood Waste Incinerators
06/04/80
11/27/81, 46 FR 57893

212.184
Explosive Waste Incinerators
06/04/80
11/27/81, 46 FR 57893

212.185
Continuous Automatic Stoking Animal Pathological Waste Incinerators
12/30/86
09/15/93, 58 FR 48312

Subpart E: Particulate Matter Emissions From Fuel Combustion Emission Units

212.201
Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972, Using Solid Fuel Exclusively Located in the Chicago Area
07/09/86
12/29/92, 57 FR 61834

212.202
Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972, Using Solid Fuel Exclusively Located Outside the Chicago Area
07/09/86
12/29/92, 57 FR 61834

212.203
Controlled Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972, Using Solid Fuel Exclusively
07/09/86
12/29/92, 57 FR 61834

212.204
Emission Units for Which Construction or Modification Commenced on or After April 14, 1972, Using Solid Fuel Exclusively
07/09/86
12/29/92, 57 FR 61834

212.205
Coal-Fired Industrial Boilers for Which Construction or Modification Commenced Prior to April 14, 1972, Equipped With Flue Gas Desulfurization Systems
10/19/81
02/22/84, 49 FR 6490

212.206
Emission Units Using Liquid Fuel Exclusively
04/14/72
05/31/72, 37 FR 10842

212.207
Emission Units Using More Than One Type of Fuel
04/14/72
05/31/72, 37 FR 10842

212.208
Aggregation of Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972
04/14/72
05/31/72, 37 FR 10842

212.210
Emissions Limitations for Certain Fuel Combustion Emission Units Located in the Vicinity of Granite City
05/22/96
07/14/99, 64 FR 37847

Subpart K: Fugitive Particulate Matter

212.301
Fugitive Particulate Matter
10/26/79
02/21/80, 45 FR 11472

212.302
Geographical Areas of Application
05/22/96
07/14/99, 64 FR 37847

212.304
Storage Piles
10/26/79
04/26/82, 47 FR 17814

212.305
Conveyor Loading Operations
10/26/79
04/26/82, 47 FR 17814

212.306
Traffic Areas
10/26/79
02/21/80, 45 FR 11472

212.307
Materials Collected by Pollution Control Equipment
10/26/79
02/21/80, 45 FR 11472

212.308
Spraying or Choke-Feeding Required
10/26/79
02/21/80, 45 FR 11472

212.309
Operating Program
05/22/96
07/14/99, 64 FR 37847

212.310
Minimum Operating Program
10/26/79
02/21/80, 45 FR 11472

212.312
Amendment to Operating Program
10/26/79
02/21/80, 45 FR 11472

212.313
Emission Standard for Particulate Collection Equipment
10/26/79
02/21/80, 45 FR 11472

212.314
Exception for Excess Wind Speed
10/26/79
02/21/80, 45 FR 11472

212.315
Covering for Vehicles
10/26/79
02/21/80, 45 FR 11472

212.316
Emissions Limitations for Emission Units in Certain Areas
05/22/96
07/14/99, 64 FR 37847

Subpart L: Particulate Matter Emissions From Process Emission Units

212.321
Process Emission Units for Which Construction or Modification Commenced on or After April 14, 1972
09/28/79
02/21/80, 45 FR 11472

212.322
Process Emission Units for Which Construction or Modification Commenced Prior to April 14, 1972
09/28/79
02/21/80, 45 FR 11472

212.323
Stock Piles
09/28/79
02/21/80, 45 FR 11472

212.324
Process Emission Units in Certain Areas
05/22/96
03/11/98, 63 FR 11842

Subpart N: Food Manufacturing

212.361
Corn Wet Milling Processes
09/28/79
02/21/80, 45 FR 11472

212.362
Emission Units in Certain Areas
05/22/96
03/11/98, 63 FR 11842

Subpart O: Petroleum Refining, Petrochemical and Chemical Manufacturing

212.381
Catalyst Regenerators of Fluidized Catalytic Converters
09/28/79
02/21/80, 45 FR 11472

Subpart Q: Stone, Clay, Glass and Concrete Manufacturing

212.421
Portland Cement Processes for Which Construction or Modification Commenced on or After April 14, 1972
04/14/72
05/31/72, 37 FR 10842

212.422
Portland Cement Manufacturing Processes
09/28/79
02/21/80, 45 FR 11472

212.423
Emission Limits for the Portland Cement Manufacturing Plant Located in LaSalle County, South of the Illinois River
10/04/91
10/21/93, 58 FR 54291

212.424
Fugitive Particulate Matter Control for the Portland Cement Manufacturing Plant and Associated Quarry Operations Located in LaSalle County, South of the Illinois River
05/15/92
01/12/93, 58 FR 3844

212.425
Emission Units in Certain Areas
05/22/96
03/11/98, 63 FR 11842

Subpart R: Primary and Fabricated Metal Products and Machinery Manufacture

212.441
Steel Manufacturing Processes
09/28/79
02/21/80, 45 FR 11472

212.442
Beehive Coke Ovens
09/28/79
02/21/80, 45 FR 11472

212.443
Coke Plants
05/15/92
01/12/93, 58 FR 3844

212.444
Sinter Processes
09/28/79
09/03/81, 46 FR 44172

212.445
Blast Furnace Cast Houses
05/15/92
01/12/93, 58 FR 3844

212.446
Basic Oxygen Furnaces
05/22/96
03/11/98, 63 FR 11842

212.447
Hot Metal Desulfurization Not Located in the BOF
09/28/79
09/03/81, 46 FR 44172

212.448
Electric Arc Furnaces
09/28/79
09/03/81, 46 FR 44172

212.449
Argon-Oxygen Decarburization Vessels
09/28/79
09/03/81, 46 FR 44172

212.450
Liquid Steel Charging
09/28/79
09/03/81, 46 FR 44172

212.451
Hot Scarfing Machines
09/28/79
09/03/81, 46 FR 44172

212.455
Highlines on Steel Mills
10/26/79
02/21/80, 45 FR 11472

212.456
Certain Small Foundries
09/28/79
02/21/80, 45 FR 11472

212.457
Certain Small Iron-Melting Air Furnaces
09/28/79
07/12/82, 47 FR 30057

212.458
Emission Units in Certain Areas
05/22/96
03/11/98, 63 FR 11842

Subpart S: Agriculture

212.461
Grain-Handling and Drying in General
09/28/79
02/21/80, 45 FR 11472

212.462
Grain-Handling Operations
09/28/79
02/21/80, 45 FR 11472

212.463
Grain Drying Operations
09/28/79
02/21/80, 45 FR 11472

212.464
Sources in Certain Areas
05/22/96
03/11/98, 63 FR 11842

Subpart T: Construction and Wood Products

212.681
Grinding, Woodworking, Sandblasting and Shotblasting
04/14/72
05/31/72, 37 FR 10842

Subpart U: Additional Control Measures

212.700
Applicability
07/11/94
07/13/95, 60 FR 36060

212.701
Contingency Measure Plans, Submittal and Compliance Date
07/11/94
07/13/95, 60 FR 36060

212.702
Determination of Contributing Sources
07/11/94
07/13/95, 60 FR 36060

212.703
Contingency Measure Plan Elements
07/11/94
07/13/95, 60 FR 36060

212.704
Implementation
07/11/94
07/13/95, 60 FR 36060

212.705
Alternative Implementation
07/11/94
07/13/95, 60 FR 36060

212.Appendix C:
Past Compliance Dates
04/14/72
05/31/72, 37 FR 10842
Approved as Rules 202(e), 203(c), 203(d)(3)(A) & (B), 203(d)(5)(L) & (M), 203(d)(8)(J), 203(f)(3) Preamble, 203(f)(3)(F) Preamble, and 203(i).

Part 214: Sulfur Limitations

Subpart A: General Provisions

214.101
Measurement Methods
01/15/91
06/26/92, 57 FR 28617

214.102
Abbreviations and Units
12/05/88
01/28/94, 59 FR 4001

214.104
Incorporations by Reference
01/15/91
01/28/94, 59 FR 4001

Subpart B: New Fuel Combustion Emission Sources

214.121
Large Sources
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(a).

214.122
Small Sources
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(b).

Subpart C: Existing Solid Fuel Combustion Emission Sources

214.141
Sources Located in Metropolitan Areas
03/28/83
09/03/92, 57 FR 40333
thru (a).

214.141
Sources Located in Metropolitan Areas
05/20/86
09/02/92, 57 FR 40126
(b), (c), and (d).

214.142
Small Sources Located Outside Metropolitan Areas
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(c)(1)(B).

214.143
Large Sources Located Outside Metropolitan Areas
02/03/79
02/21/80, 45 FR 11472

Subpart D: Existing Liquid or Mixed Fuel Combustion Emission Sources

214.161
Liquid Fuel Burned Exclusively
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(c)(2).

214.162
Combination of Fuels
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(d).

Subpart E: Aggregation of Sources Outside Metropolitan Areas

214.181
Dispersion Enhancement Techniques
02/03/79
02/21/80, 45 FR 11472

214.182
Prohibition
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(e) (intro).

214.183
General Formula
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(e)(1).

214.184
Special Formula
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(e)(2).

214.185
Alternative Emission Rate
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(e)(3).

214.186
New Operating Permits
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(e)(4).

Subpart F: Alternative Standards for Sources Inside Metropolitan Areas

214.201
Alternative Standards for Sources in Metropolitan Areas
03/28/83
09/03/92, 57 FR 40333

214.202
Dispersion Enhancement Techniques
03/28/83
09/03/92, 57 FR 40333

Subpart K: Process Emission Sources

214.301
General Limitation
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(f)(1)(A).

214.302
Exception for Air Pollution Control Equipment
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(f)(1)(C).

214.303
Use of Sulfuric Acid
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(f)(2)(B).

Subpart O: Petroleum Refining, Petrochemical and Chemical Manufacturing

214.381
Sulfuric Acid Manufacturing
02/03/79
02/21/80, 45 FR 11472
Only (a) and (b). Approved as Rule 204(f)(1)(B) and (f)(2)(A).

214.382
Petroleum and Petrochemical Processes
12/05/88
01/28/94, 59 FR 4001

214.383
Chemical Manufacturing
02/03/79
02/21/80, 45 FR 11472
Approved as Rule 204(f)(1)(E).

Subpart X: Utilities

214.560
Scope
05/20/86
09/02/92, 57 FR 40126

214.561
E. D. Edwards Electric Generating Station
07/11/03
11/10/08, 73 FR 66555

214.Appendix C:
Compliance Dates
04/14/72
05/31/72, 37 FR 10842
Approved as Rule 204(e)(1).

Part 215: Organic Material Emission Standards and Limitations

Subpart A: General Provisions

215.101
Clean-Up and Disposal Operations
07/28/79
02/21/80, 45 FR 11472

215.102
Testing Methods
05/14/91
08/18/92, 57 FR 37100

215.104
Definitions
01/28/13
10/06/14, 79 FR 60070

215.105
Incorporation by Reference
01/28/13
10/06/14, 79 FR 60070

215.108
Measurement of Vapor Pressures
05/14/91
08/18/92, 57 FR 37100

215.109
Monitoring for Negligibly-Reactive Compounds
06/19/98
01/15/99, 64 FR 2581

Subpart B: Organic Emissions From Storage and Loading Operations

215.121
Storage Containers
07/28/79
02/21/80, 45 FR 11472

215.122
Loading Operations
07/28/79
02/21/80, 45 FR 11472

215.123
Petroleum Liquid Storage Tanks
07/28/79
02/21/80, 45 FR 11472

215.124
External Floating Roofs
01/21/83
06/29/90, 55 FR 26814

215.125
Compliance Dates and Geographical Areas
01/21/83
06/29/90, 55 FR 26814

215.126
Compliance Plan
01/21/83
06/29/90, 55 FR 26814

Subpart C: Organic Emissions From Miscellaneous Equipment

215.141
Separation Operations
07/28/79
02/21/80, 45 FR 11472

215.142
Pumps and Compressors
07/28/79
02/21/80, 45 FR 11472

215.143
Vapor Blowdown
07/28/79
02/21/80, 45 FR 11472

215.144
Safety Relief Valves
07/28/79
02/21/80, 45 FR 11472

Subpart E: Solvent Cleaning

215.181
Solvent Cleaning in General
07/28/79
02/21/80, 45 FR 11472

215.182
Cold Cleaning
07/28/79
02/21/80, 45 FR 11472

215.183
Open Top Vapor Degreasing
07/28/79
02/21/80, 45 FR 11472

215.184
Conveyorized Degreasing
07/28/79
02/21/80, 45 FR 11472

Subpart F: Coating Operations

215.202
Compliance Schedules
07/28/79
02/21/80, 45 FR 11472

215.204
Emission Limitations for Manufacturing Plants
06/19/98
01/15/99, 64 FR 2581

215.205
Alternative Emission Limitations
06/19/98
01/15/99, 64 FR 2581

215.206
Exemptions From Emission Limitations
06/19/98
01/15/99, 64 FR 2581

215.207
Compliance by Aggregation of Emission Units
06/19/98
01/15/99, 64 FR 2581

215.208
Testing Methods for Volatile Organic Material Content
07/28/79
02/21/80, 45 FR 11472

215.209
Exemption From General Rule on Use of Organic Material
07/28/79
02/21/80, 45 FR 11472

215.211
Compliance Dates and Geographical Areas
06/19/98
01/15/99, 64 FR 2581

215.212
Compliance Plan
06/19/98
01/15/99, 64 FR 2581

215.213
Special Requirements for Compliance Plan
07/28/79
02/21/80, 45 FR 11472

215.215
DMI Emissions Limitations
07/28/79
02/21/80, 45 FR 11472

Subpart H: Special Limitations for Sources in Major Urbanized Areas Which Are Nonattainment for Ozone

215.240
Applicability
06/29/87
06/29/90, 55 FR 26814

215.241
External Floating Roofs
06/29/87
06/29/90, 55 FR 26814

215.249
Compliance Dates
06/29/87
06/29/90, 55 FR 26814

Subpart K: Use of Organic Material

215.301
Use of Organic Material
07/28/79
02/21/80, 45 FR 11472

215.302
Alternative Standard
07/28/79
02/21/80, 45 FR 11472

215.303
Fuel Combustion Emission Sources
07/28/79
02/21/80, 45 FR 11472

215.304
Operations With Compliance Program
07/28/79
02/21/80, 45 FR 11472

Subpart P: Printing and Publishing

215.408
Heatset Web Offset Lithographic Printing
09/30/87
06/29/90, 55 FR 26814

Subpart Q: Leaks From Synthetic Organic Chemical and Polymer Manufacturing Equipment

215.420
Applicability
12/14/87
06/29/90, 55 FR 26814

215.421
General Requirements
12/14/87
06/29/90, 55 FR 26814

215.422
Inspection Program Plan for Leaks
08/28/85
06/29/90, 55 FR 26814

215.423
Inspection Program for Leaks
08/28/85
06/29/90, 55 FR 26814

215.424
Repairing Leaks
08/28/85
06/29/90, 55 FR 26814

215.425
Recordkeeping for Leaks
08/28/85
06/29/90, 55 FR 26814

215.426
Reporting for Leaks
08/28/85
06/29/90, 55 FR 26814

215.427
Alternative Program for Leaks
08/28/85
06/29/90, 55 FR 26814

215.428
Compliance Dates
12/14/87
06/29/90, 55 FR 26814

215.429
Compliance Plan
12/14/87
06/29/90, 55 FR 26814

215.430
General Requirements
12/14/87
06/29/90, 55 FR 26814

215.431
Inspection Program Plan for Leaks
12/14/87
06/29/90, 55 FR 26814

215.433
Repairing Leaks
12/14/87
06/29/90, 55 FR 26814

215.434
Recordkeeping for Leaks
12/14/87
06/29/90, 55 FR 26814

215.435
Report for Leaks
12/14/87
06/29/90, 55 FR 26814

215.437
Open-Ended Valves
12/14/87
06/29/90, 55 FR 26814

215.438
Compliance Plan
12/14/87
06/29/90, 55 FR 26814

Subpart R: Petroleum Refining and Related Industries; Asphalt Materials

215.441
Petroleum Refinery Waste Gas Disposal
07/28/79
02/21/80, 45 FR 11472

215.442
Vacuum Producing Systems
07/28/79
02/21/80, 45 FR 11472

215.443
Wastewater (Oil/Water) Separator
07/28/79
02/21/80, 45 FR 11472

215.444
Process Unit Turnarounds
07/28/79
02/21/80, 45 FR 11472

215.445
Leaks: General Requirements
01/21/83
11/27/87, 52 FR 45333

215.446
Monitoring Program Plan for Leaks
01/21/83
11/27/87, 52 FR 45333

215.447
Monitoring Program for Leaks
01/21/83
11/27/87, 52 FR 45333

215.448
Recordkeeping for Leaks
01/21/83
11/27/87, 52 FR 45333

215.449
Reporting for Leaks
01/21/83
11/27/87, 52 FR 45333

215.450
Alternative Program for Leaks
01/21/83
11/27/87, 52 FR 45333

215.451
Sealing Device Requirements
01/21/83
11/27/87, 52 FR 45333

215.453
Compliance Dates and Geographical Areas
01/21/83
06/29/90, 55 FR 26814

Subpart S: Rubber and Miscellaneous Plastic Products

215.461
Manufacture of Pneumatic Rubber Tires
01/21/83
11/27/87, 52 FR 45333

215.462
Green Tire Spraying Operations
01/21/83
11/27/87, 52 FR 45333

215.463
Alternative Emission Reduction Systems
01/21/83
11/27/87, 52 FR 45333

215.464
Emissions Testing
01/21/83
11/27/87, 52 FR 45333

215.465
Compliance Dates and Geographical Areas
01/21/83
06/29/90, 55 FR 26814

215.466
Compliance Plan
01/21/83
06/29/90, 55 FR 26814

Subpart T: Pharmaceutical Manufacturing

215.480
Applicability of Subpart T
05/14/91
08/18/92, 57 FR 37100

215.481
Control of Reactors, Distillation Units, Crystallizers, Centrifuges and Vacuum Dryers
05/14/91
08/18/92, 57 FR 37100

215.482
Control of Air Dryers, Production Equipment Exhaust Systems and Filters
05/14/91
08/18/92, 57 FR 37100

215.483
Material Storage and Transfer
05/14/91
08/18/92, 57 FR 37100

215.484
In-Process Tanks
05/14/91
08/18/92, 57 FR 37100

215.485
Leaks
05/14/91
08/18/92, 57 FR 37100

215.486
Other Emission Sources
05/14/91
08/18/92, 57 FR 37100

215.487
Testing
05/14/91
08/18/92, 57 FR 37100

215.488
Monitors for Air Pollution Control Equipment
05/14/91
08/18/92, 57 FR 37100

215.489
Recordkeeping (Renumbered)
05/14/91
08/18/92, 57 FR 37100

215.490
Compliance Schedule (Renumbered)
05/14/91
08/18/92, 57 FR 37100

Subpart V: Air Oxidation Processes

215.520
Applicability
12/14/87
06/29/90, 55 FR 26814

215.521
Definitions
12/14/87
06/29/90, 55 FR 26814

215.525
Emission Limitations for Air Oxidation Processes
12/14/87
06/29/90, 55 FR 26814

215.526
Testing and Monitoring
12/14/87
06/29/90, 55 FR 26814

215.527
Compliance Date
12/14/87
06/29/90, 55 FR 26814

Subpart W: Agriculture

215.541
Pesticide Exception
07/28/79
02/21/80, 45 FR 11472

Subpart X: Construction

215.561
Architectural Coatings
07/28/79
02/21/80, 45 FR 11472

215.562
Paving Operations
07/28/79
02/21/80, 45 FR 11472

215.563
Cutback Asphalt
07/28/79
02/21/80, 45 FR 11472

Subpart Y: Gasoline Distribution

215.581
Bulk Gasoline Plants
07/28/79
02/21/80, 45 FR 11472

215.582
Bulk Gasoline Terminals
06/29/87
06/29/90, 55 FR 26814

215.583
Gasoline Dispensing Facilities—Storage Tank Filling Operations
06/29/87
06/29/90, 55 FR 26814

215.584
Gasoline Delivery Vessels
06/29/87
06/29/90, 55 FR 26814

Subpart Z: Dry Cleaners

215.607
Standards for Petroleum Solvent Dry Cleaners
04/03/87
06/29/90, 55 FR 26814

215.608
Operating Practices for Petroleum Solvent Dry Cleaners
04/03/87
06/29/90, 55 FR 26814

215.609
Program for Inspection and Repair of Leaks
04/03/87
06/29/90, 55 FR 26814

215.610
Testing and Monitoring
04/03/87
06/29/90, 55 FR 26814

215.611
Exemption for Petroleum Solvent Dry Cleaners
04/03/87
06/29/90, 55 FR 26814

215.612
Compliance Dates and Geographical Areas
04/03/87
06/29/90, 55 FR 26814

215.613
Compliance Plan
04/03/87
06/29/90, 55 FR 26814

Subpart BB: Polystyrene Plants

215.875
Applicability of Subpart BB
09/30/87
06/29/90, 55 FR 26814

215.877
Emissions Limitation at Polystyrene Plants
09/30/87
06/29/90, 55 FR 26814

215.879
Compliance Date
09/30/87
06/29/90, 55 FR 26814

215.881
Compliance Plan
09/30/87
06/29/90, 55 FR 26814

215.883
Special Requirements for Compliance Plan
09/30/87
06/29/90, 55 FR 26814

215.886
Emissions Testing
09/30/87
06/29/90, 55 FR 26814

215.Appendix C:
Past Compliance Dates
07/28/79
02/21/80, 45 FR 11472
Approved as Rules 104(a), 104(g), 104(h), 205(j), and 205(m).

Part 216: Carbon Monoxide Emissions

Subpart A: General Provisions

216.101
Measurement Methods
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(f).

Subpart B: Fuel Combustion Emission Sources

216.121
Fuel Combustion Emission Sources
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(a).

Subpart C: Incinerators

216.141
Incinerators
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(b).

216.142
Exceptions
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(b)(1,2).

Subpart N: Petroleum Refining and Chemical Manufacture

216.361
Petroleum and Petrochemical Processes
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(c).

216.362
Polybasic Organic Acid Partial Oxidation Manufacturing Processes
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(h).

Subpart O: Primary and Fabricated Metal Products

216.381
Cupolas
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(e).

216.382
Exception, General Motor's Ferrous Foundry in Vermilion County
11/13/92
08/04/94, 59 FR 39686

216.Appendix C:
Compliance Dates
07/28/79
02/21/80, 45 FR 11472
Approved as Rule 206(g).

Part 217: Nitrogen Oxides Emissions

Subpart A: General Provisions

217.101
Measurement Methods
09/25/07
06/26/09, 74 FR 30466

217.102
Abbreviations and Units
09/25/07
06/26/09, 74 FR 30466

217.104
Incorporations by Reference
09/25/07
06/26/09, 74 FR 30466

Subpart B: New Fuel Combustion Emission Sources

217.121
New Emission Sources
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 207(a)(1)-(4), 207(a)(5)(A).

Subpart C: Existing Fuel Combustion Emission Sources

217.141
Existing Emission Sources in Major Metropolitan Areas
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 207(b) and (c).

Subpart K: Process Emission Sources

217.301
Industrial Processes
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 207(e).

Subpart O: Chemical Manufacture

217.381
Nitric Acid Manufacturing Processes
04/14/72
05/31/72, 37 FR 10862
Approved as Rule 207(d).

Subpart Q: Stationary Reciprocating Internal Combustion Engines and Turbines

217.386
Applicability
09/25/07
06/26/09, 74 FR 30466

217.388
Control and Maintenance Requirements
09/25/07
06/26/09, 74 FR 30466

217.390
Emissions Averaging Plans
09/25/07
06/26/09, 74 FR 30466

217.392
Compliance
09/25/07
06/26/09, 74 FR 30466

217.394
Testing and Monitoring
09/25/07
06/26/09, 74 FR 30466

217.396
Recordkeeping and Reporting
09/25/07
06/26/09, 74 FR 30466

Subpart T: Cement Kilns

217.400
Applicability
03/15/01
11/08/01, 66 FR 56449

217.402
Control Requirements
03/15/01
11/08/01, 66 FR 56449

217.404
Testing
03/15/01
11/08/01, 66 FR 56449

217.406
Monitoring
03/15/01
11/08/01, 66 FR 56449

217.408
Reporting
03/15/01
11/08/01, 66 FR 56449

217.410
Recordkeeping
03/15/01
11/08/01, 66 FR 56449

Subpart U: NO
X

Control and Trading Program for Specified NO
X

Generating Units

217.450
Purpose
04/17/01
11/08/01, 66 FR 56449

217.452
Severability
04/17/01
11/08/01, 66 FR 56449

217.454
Applicability
04/17/01
11/08/01, 66 FR 56449

217.456
Compliance Requirements
04/17/01
11/08/01, 66 FR 56449

217.458
Permitting Requirements
04/17/01
11/08/01, 66 FR 56449

217.460

Subpart U NO
X
Trading Budget

04/17/01
11/08/01, 66 FR 56449

217.462

Methodology for Obtaining NO
X
Allocations

04/17/01
11/08/01, 66 FR 56449

217.464

Methodology for Determining NO
X
Allowances From the New Source Set-Aside

04/17/01
11/08/01, 66 FR 56449

217.466

NO
X
Allocations Procedure for Subpart U Budget Units

04/17/01
11/08/01, 66 FR 56449

217.468
New Source Set-Asides for “New” Budget Units
04/17/01
11/08/01, 66 FR 56449

217.470
Early Reduction Credits (ERCS) for Budget Units
04/17/01
11/08/01, 66 FR 56449

217.472
Low-Emitter Requirements
04/17/01
11/08/01, 66 FR 56449

217.474
Opt-In Units
04/17/01
11/08/01, 66 FR 56449

217.476
Opt-In Process
04/17/01
11/08/01, 66 FR 56449

217.478

Opt-In Budget Units: Withdrawal From NO
X
Trading Program

04/17/01
11/08/01, 66 FR 56449

217.480
Opt-In Units: Change in Regulatory Status
04/17/01
11/08/01, 66 FR 56449

217.482
Allowance Allocations To Opt-In Budget Units
04/17/01
11/08/01, 66 FR 56449

Subpart V: Electric Power Generation

217.521
Lake of Egypt Power Plant
04/13/78
06/18/01, 66 FR 32769

217.700
Purpose
04/17/01
06/18/01, 66 FR 32769

217.702
Severability
04/17/01
06/18/01, 66 FR 32769

217.704
Applicability
04/17/01
06/18/01, 66 FR 32769

217.706
Emission Limitations
04/17/01
06/18/01, 66 FR 32769

217.708

NO
X
Averaging

04/17/01
06/18/01, 66 FR 32769

217.710
Monitoring
04/17/01
06/18/01, 66 FR 32769

217.712
Reporting and Recordkeeping
04/17/01
06/18/01, 66 FR 32769

Subpart W: NO
X

Trading Program for Electrical Generating Units

217.750
Purpose
12/26/00
11/08/01, 66 FR 56454

217.751
Sunset Provisions
11/02/09
03/01/10, 75 FR 9103

217.752
Severability
12/26/00
11/08/01, 66 FR 56454

217.754
Applicability
12/26/00
11/08/01, 66 FR 56454

217.756
Compliance Requirements
12/26/00
11/08/01, 66 FR 56454
Except (d)(3).

217.758
Permitting Requirements
12/26/00
11/08/01, 66 FR 56454

217.760
NOx Trading Budget
12/26/00
11/08/01, 66 FR 56454

217.762

Methodology for Calculating NO
X
Allocations for Budget Electrical Generating Units (EGUs)

12/26/00
11/08/01, 66 FR 56454

217.764

NO
X
Allocations for Budget EGUs

12/26/00
11/08/01, 66 FR 56454

217.768
New Source Set-Asides for “New” Budget EGUs
12/26/00
11/08/01, 66 FR 56454

217.770
Early Reduction Credits for Budget EGUs
12/26/00
11/08/01, 66 FR 56454

217.774
Opt-In Units
12/26/00
11/08/01, 66 FR 56454

217.776
Opt-In Process
12/26/00
11/08/01, 66 FR 56454

217.778

Budget Opt-In Units: Withdrawal From NO
X
Trading Program

12/26/00
11/08/01, 66 FR 56454

217.780
Opt-In Units: Change in Regulatory Status
12/26/00
11/08/01, 66 FR 56454

217.782
Allowance Allocations to Budget Opt-In Units
12/26/00
11/08/01, 66 FR 56454

217.Appendix C:
Compliance Dates
04/14/72
05/31/72, 37 FR 10862

217.Appendix G:

Existing Reciprocating Internal Combustion Engines Affected by the NO
X
Sip Call

09/25/07
06/26/09, 74 FR 30466

Part 218: Organic Material Emission Standards and Limitations for the Chicago Area

Subpart A: General Provisions

218.100
Introduction
09/27/93
09/09/94, 59 FR 46562

218.101
Savings Clause
10/25/94
04/03/95, 60 FR 16801

218.102
Abbreviations and Conversion Factors
09/27/93
09/09/94, 59 FR 46562

218.103
Applicability
09/27/93
09/09/94, 59 FR 46562

218.104
Definitions
09/27/93
09/09/94, 59 FR 46562

218.105
Test Methods and Procedures
07/27/11
03/23/12, 77 FR 16940

218.106
Compliance Dates
09/14/10
03/23/12, 77 FR 16940

218.107
Operation of Afterburners
09/27/93
09/09/94, 59 FR 46562

218.108
Exemptions, Variations, and Alternative Means of Control or Compliance Determinations
01/24/94
10/21/96, 61 FR 54556

218.109
Vapor Pressure of Volatile Organic Liquids
09/27/93
09/09/94, 59 FR 46562

218.110
Vapor Pressure of Organic Material or Solvent
09/27/93
09/09/94, 59 FR 46562

218.111
Vapor Pressure of Volatile Organic Material
09/27/93
09/09/94, 59 FR 46562

218.112
Incorporations by Reference
12/23/13
03/13/15, 80 FR 13248

218.114
Compliance With Permit Conditions
01/24/94
10/21/96, 61 FR 54556

Subpart B: Organic Emissions From Storage and Loading Operations

218.119
Applicability for VOL
11/15/94
08/08/96, 61 FR 41338

218.120
Control Requirements for Storage Containers of VOL
11/15/94
08/08/96, 61 FR 41338

218.121
Storage Containers
09/27/93
09/09/94, 59 FR 46562

218.122
Loading Operations
09/27/93
09/09/94, 59 FR 46562

218.123
Petroleum Liquid Storage Tanks
09/27/93
09/09/94, 59 FR 46562

218.124
External Floating Roofs
09/27/93
09/09/94, 59 FR 46562

218.125
Compliance Dates
11/15/94
08/08/96, 61 FR 41338

218.127
Testing VOL Operations
11/15/94
08/08/96, 61 FR 41338

218.128
Monitoring VOL Operations
01/28/13
10/06/14, 79 FR 60070

218.129
Recordkeeping and Reporting for VOL Operations
11/15/94
08/08/96, 61 FR 41338

Subpart C: Organic Emissions From Miscellaneous Equipment

218.141
Separation Operations
09/27/93
09/09/94, 59 FR 46562

218.142
Pumps and Compressors
08/16/91
09/09/94, 59 FR 46562

218.143
Vapor Blowdown
09/27/93
09/09/94, 59 FR 46562

218.144
Safety Relief Valves
09/27/93
09/09/94, 59 FR 46562

Subpart E: Solvent Cleaning

218.181
Solvent Cleaning Degreasing Operations
06/25/10
03/23/12, 77 FR 16940

218.182
Cold Cleaning
06/09/97
11/26/97, 62 FR 62951

218.183
Open Top Vapor Degreasing
09/27/93
09/09/94, 59 FR 46562

218.184
Conveyorized Degreasing
09/27/93
09/09/94, 59 FR 46562

218.186
Test Methods
09/27/93
09/09/94, 59 FR 46562

218.187
Other Industrial Solvent Cleaning Operations
07/27/11
03/23/12, 77 FR 16940

Subpart F: Coating Operations

218.204
Emission Limitations
07/27/11
03/23/12, 77 FR 16940

218.205
Daily-Weighted Average Limitations
09/14/10
03/23/12, 77 FR 16940

218.206
Solids Basis Calculation
09/27/93
09/09/94, 59 FR 46562

218.207
Alternative Emission Limitations
07/27/11
03/23/12, 77 FR 16940

218.208
Exemptions From Emission Limitations
10/25/11
04/19/13, 78 FR 23495

218.209
Exemption From General Rule on Use of Organic Material
09/27/93
09/09/94, 59 FR 46562

218.210
Compliance Schedule
06/25/10
03/23/12, 77 FR 16940

218.211
Recordkeeping and Reporting
07/27/11
03/23/12, 77 FR 16940

218.212
Cross-Line Averaging To Establish Compliance for Coating Lines
09/14/10
03/23/12, 77 FR 16940

218.213
Recordkeeping and Reporting for Cross-Line Averaging Participating Coating Lines
05/09/95
02/13/96, 61 FR 5511

218.214
Changing Compliance Methods
05/09/95
02/13/96, 61 FR 5511

218.215
Wood Furniture Coating Averaging Approach
02/02/98
05/19/98, 63 FR 27489

218.216
Wood Furniture Coating Add-On Control Use
02/02/98
05/19/98, 63 FR 27489

218.217
Wood Furniture Coating and Flat Wood Paneling Coating Work Practice Standards
07/27/11
03/23/12, 77 FR 16940

218.218
Work Practice Standards for Paper Coatings, Metal Furniture Coatings, and Large Appliance Coatings
03/23/10
03/23/12, 77 FR 16940

218.219
Work Practice Standards for Automobile and Light-Duty Truck Assembly Coatings and Miscellaneous Metal and Plastic Parts Coatings
09/14/10
03/23/12, 77 FR 16940

Subpart G: Use of Organic Material

218.301
Use of Organic Material
09/27/93
09/09/94, 59 FR 46562

218.302
Alternative Standard
09/27/93
09/09/94, 59 FR 46562

218.303
Fuel Combustion Emission Units
09/27/93
09/09/94, 59 FR 46562

218.304
Operations With Compliance Program
09/27/93
09/09/94, 59 FR 46562

Subpart H: Printing and Publishing

218.401
Flexographic and Rotogravure Printing
07/27/11
03/23/12, 77 FR 16940

218.402
Applicability
07/27/11
03/23/12, 77 FR 16940

218.403
Compliance Schedule
06/25/10
03/23/12, 77 FR 16940

218.404
Recordkeeping and Reporting
07/27/11
03/23/12, 77 FR 16940

218.405
Lithographic Printing: Applicability
06/25/10
03/23/12, 77 FR 16940

218.407
Emission Limitations and Control Requirements for Lithographic Printing Lines
06/25/10
03/23/12, 77 FR 16940

218.409
Testing for Lithographic Printing on and After March 15, 1996
07/27/11
03/23/12, 77 FR 16940

218.410
Monitoring Requirements for Lithographic Printing
06/25/10
03/23/12, 77 FR 16940

218.411
Recordkeeping and Reporting for Lithographic Printing
07/27/11
03/23/12, 77 FR 16940

218.412
Letterpress Printing Lines: Applicability
06/25/10
03/23/12, 77 FR 16940

218.413
Emission Limitations and Control Requirements for Letterpress Printing Lines
06/25/10
03/23/12, 77 FR 16940

218.415
Testing for Letterpress Printing Lines
07/27/11
03/23/12, 77 FR 16940

218.416
Monitoring Requirements for Letterpress Printing Lines
06/25/10
03/23/12, 77 FR 16940

218.417
Recordkeeping and Reporting for Letterpress Printing Lines
07/27/11
03/23/12, 77 FR 16940

Subpart Q: Synthetic Organic Chemical and Polymer Manufacturing Plant

218.421
General Requirements
09/27/93
09/09/94, 59 FR 46562

218.422
Inspection Program Plan for Leaks
09/27/93
09/09/94, 59 FR 46562

218.423
Inspection Program for Leaks
09/27/93
09/09/94, 59 FR 46562

218.424
Repairing Leaks
09/27/93
09/09/94, 59 FR 46562

218.425
Recordkeeping for Leaks
09/27/93
09/09/94, 59 FR 46562

218.426
Report for Leaks
09/27/93
09/09/94, 59 FR 46562

218.427
Alternative Program for Leaks
09/27/93
09/09/94, 59 FR 46562

218.428
Open-Ended Valves
09/27/93
09/09/94, 59 FR 46562

218.429
Standards for Control Devices
09/27/93
09/09/94, 59 FR 46562

218.431
Applicability
05/09/95
03/23/98, 63 FR 13784

218.432
Control Requirements
05/09/95
03/23/98, 63 FR 13784

218.433
Performance and Testing Requirements
05/09/95
03/23/98, 63 FR 13784

218.434
Monitoring Requirements
05/09/95
03/23/98, 63 FR 13784

218.435
Recordkeeping and Reporting Requirements
05/09/95
03/23/98, 63 FR 13784

218.436
Compliance Date
05/09/95
03/23/98, 63 FR 13784

Subpart R: Petroleum Refining and Related Industries; Asphalt Materials

218.441
Petroleum Refinery Waste Gas Disposal
09/27/93
09/09/94, 59 FR 46562

218.442
Vacuum Producing Systems
08/16/91
09/09/94, 59 FR 46562

218.443
Wastewater (Oil/Water) Separator
09/27/93
09/09/94, 59 FR 46562

218.444
Process Unit Turnarounds
08/16/91
09/09/94, 59 FR 46562

218.445
Leaks: General Requirements
09/27/93
09/09/94, 59 FR 46562

218.446
Monitoring Program Plan for Leaks
09/27/93
09/09/94, 59 FR 46562

218.447
Monitoring Program for Leaks
09/27/93
09/09/94, 59 FR 46562

218.448
Recordkeeping for Leaks
08/16/91
09/09/94, 59 FR 46562

218.449
Reporting for Leaks
09/27/93
09/09/94, 59 FR 46562

218.450
Alternative Program for Leaks
09/27/93
09/09/94, 59 FR 46562

218.451
Sealing Device Requirements
08/16/91
09/09/94, 59 FR 46562

218.452
Compliance Schedule for Leaks
09/27/93
09/09/94, 59 FR 46562

Subpart S: Rubber and Miscellaneous Plastic Products

218.461
Manufacture of Pneumatic Rubber Tires
09/27/93
09/09/94, 59 FR 46562

218.462
Green Tire Spraying Operations
09/27/93
09/09/94, 59 FR 46562

218.463
Alternative Emission Reduction Systems
09/27/93
09/09/94, 59 FR 46562

218.464
Emission Testing
09/27/93
09/09/94, 59 FR 46562

Subpart T: Pharmaceutical Manufacturing

218.480
Applicability
08/26/08
11/03/10, 75 FR 67623

218.481
Control of Reactors, Distillation Units, Crystallizers, Centrifuges and Vacuum Dryers
09/27/93
09/09/94, 59 FR 46562

218.482
Control of Air Dryers, Production Equipment Exhaust Systems and Filters
09/27/93
09/09/94, 59 FR 46562

218.483
Material Storage and Transfer
09/27/93
09/09/94, 59 FR 46562

218.484
In-Process Tanks
08/16/91
09/09/94, 59 FR 46562

218.485
Leaks
09/27/93
09/09/94, 59 FR 46562

218.486
Other Emission Units
09/27/93
09/09/94, 59 FR 46562

218.487
Testing
09/27/93
09/09/94, 59 FR 46562

218.488
Monitoring for Air Pollution Control Equipment
08/16/91
09/09/94, 59 FR 46562

218.489
Recordkeeping for Air Pollution Control Equipment
09/27/93
09/09/94, 59 FR 46562

Subpart V: Batch Operations and Air Oxidation Processes

218.500
Applicability for Batch Operations
05/22/95
04/02/96, 61 FR 14484

218.501
Control Requirements for Batch Operations
05/22/95
04/02/96, 61 FR 14484

218.502
Determination of Uncontrolled Total Annual Mass Emissions and Average Flow Rate Values for Batch Operations
05/22/95
04/02/96, 61 FR 14484

218.503
Performance and Testing Requirements for Batch Operations
05/22/95
04/02/96, 61 FR 14484

218.504
Monitoring Requirements for Batch Operations
05/22/95
04/02/96, 61 FR 14484

218.505
Reporting and Recordkeeping for Batch Operations
05/22/95
04/02/96, 61 FR 14484

218.506
Compliance Date
05/22/95
04/02/96, 61 FR 14484

218.520
Emission Limitations for Air Oxidation Processes
11/15/94
09/27/95, 60 FR 49770

218.522
Savings Clause
11/15/94
09/27/95, 60 FR 49770

218.523
Compliance
11/15/94
09/27/95, 60 FR 49770

218.524
Determination of Applicability
11/15/94
09/27/95, 60 FR 49770

218.525
Emission Limitations for Air Oxidation Processes
11/15/94
09/27/95, 60 FR 49770

218.526
Testing and Monitoring
08/16/91
09/09/94, 59 FR 46562

Subpart W: Agriculture

218.541
Pesticide Exception
09/27/93
09/09/94, 59 FR 46562

Subpart X: Construction

218.561
Architectural Coatings
08/16/91
09/09/94, 59 FR 46562

218.562
Paving Operations
09/27/93
09/09/94, 59 FR 46562

218.563
Cutback Asphalt
08/16/91
09/09/94, 59 FR 46562

Subpart Y: Gasoline Distribution

218.581
Bulk Gasoline Plants
09/27/93
09/09/94, 59 FR 46562

218.582
Bulk Gasoline Terminals
09/27/93
09/09/94, 59 FR 46562

218.583
Gasoline Dispensing Operations—Storage Tank Filling Operations
12/23/13
03/13/15, 80 FR 13248

218.584
Gasoline Delivery Vessels
09/27/93
09/09/94, 59 FR 46562

218.586
Gasoline Dispensing Operations—Motor Vehicle Fueling Operations
12/23/13
03/13/15, 80 FR 13248

Subpart Z: Dry Cleaners

218.607
Standards for Petroleum Solvent Dry Cleaners
08/16/91
09/09/94, 59 FR 46562

218.608
Operating Practices for Petroleum Solvent Dry Cleaners
09/27/93
09/09/94, 59 FR 46562

218.609
Program for Inspection and Repair of Leaks
09/27/93
09/09/94, 59 FR 46562

218.610
Testing and Monitoring
09/27/93
09/09/94, 59 FR 46562

218.611
Applicability for Petroleum Solvent Dry Cleaners
01/24/94
10/21/96, 61 FR 54556

Subpart AA: Paint and Ink Manufacturing

218.620
Applicability
01/24/94
10/21/96, 61 FR 54556

218.621
Exemption for Waterbase Material and Heatset Offset Ink
09/27/93
09/09/94, 59 FR 46562

218.624
Open Top Mills, Tanks, Vats or Vessels
09/27/93
09/09/94, 59 FR 46562

218.625
Grinding Mills
08/16/91
09/09/94, 59 FR 46562

218.626
Storage Tanks
08/16/91
09/09/94, 59 FR 46562

218.628
Leaks
09/27/93
09/09/94, 59 FR 46562

218.630
Clean Up
08/16/91
09/09/94, 59 FR 46562

218.636
Compliance Schedule
09/27/93
09/09/94, 59 FR 46562

218.637
Recordkeeping and Reporting
09/27/93
09/09/94, 59 FR 46562

Subpart BB: Polystyrene Plants

218.640
Applicability
09/27/93
09/09/94, 59 FR 46562

218.642
Emissions Limitation at Polystyrene Plants
09/27/93
09/09/94, 59 FR 46562

218.644
Emissions Testing
09/27/93
09/09/94, 59 FR 46562

Subpart CC: Polyester Resin Product Manufacturing Process

218.660
Applicability
01/24/94
10/21/96, 61 FR 54556

218.666
Control Requirements
01/24/94
10/21/96, 61 FR 54556

218.667
Compliance Schedule
01/24/94
10/21/96, 61 FR 54556

218.668
Testing
01/24/94
10/21/96, 61 FR 54556

218.670
Recordkeeping and Reporting for Exempt Emission Units
01/24/94
10/21/96, 61 FR 54556

218.672
Recordkeeping and Reporting for Subject Emission Units
01/24/94
10/21/96, 61 FR 54556

Subpart DD: Aerosol Can Fillings

218.680
Applicability
01/24/94
10/21/96, 61 FR 54556

218.686
Control Requirements
05/09/95
03/12/97, 62 FR 11327

218.688
Testing
01/24/94
10/21/96, 61 FR 54556

218.690
Recordkeeping and Reporting for Exempt Emission Units
01/24/94
10/21/96, 61 FR 54556

218.692
Recordkeeping and Reporting for Subject Emission Units
01/24/94
10/21/96, 61 FR 54556

Subpart GG: Marine Terminals

218.760
Applicability
10/25/94
04/03/95, 60 FR 16801

218.762
Control Requirements
10/25/94
04/03/95, 60 FR 16801

218.764
Compliance Certification
10/25/94
04/03/95, 60 FR 16801

218.766
Leaks
10/25/94
04/03/95, 60 FR 16801

218.768
Testing and Monitoring
10/25/94
04/03/95, 60 FR 16801

218.770
Recordkeeping and Reporting
10/25/94
04/03/95, 60 FR 16801

Subpart HH: Motor Vehicle Refinishing

218.780
Emission Limitations
05/09/95
07/25/96, 61 FR 38577

218.782
Alternative Control Requirements
05/09/95
07/25/96, 61 FR 38577

218.784
Equipment Specifications
01/28/13
10/06/14, 79 FR 60070

218.786
Surface Preparation Materials
05/09/95
07/25/96, 61 FR 38577

218.787
Work Practices
05/09/95
07/25/96, 61 FR 38577

218.788
Testing
05/09/95
07/25/96, 61 FR 38577

218.789
Monitoring and Recordkeeping for Control Devices
05/09/95
07/25/96, 61 FR 38577

218.790
General Recordkeeping and Reporting
05/09/95
07/25/96, 61 FR 38577

218.791
Compliance Date
05/09/95
07/25/96, 61 FR 38577

Subpart II: Fiberglass Boat Manufacturing Materials

218.890
Applicability
09/14/10
03/23/12, 77 FR 16940

218.891
Emission Limitations and Control Requirements
07/27/11
03/23/12, 77 FR 16940

218.892
Testing Requirements
07/27/11
03/23/12, 77 FR 16940

218.894
Recordkeeping and Reporting Requirements
07/27/11
03/23/12, 77 FR 16940

Subpart JJ: Miscellaneous Industrial Adhesives

218.900
Applicability
09/14/10
03/23/12, 77 FR 16940

218.901
Emission Limitations and Control Requirements
07/27/11
03/23/12, 77 FR 16940

218.902
Testing Requirements
07/27/11
03/23/12, 77 FR 16940

218.903
Monitoring Requirements
07/27/11
03/23/12, 77 FR 16940

218.904
Recordkeeping and Reporting Requirements
07/27/11
03/23/12, 77 FR 16940

Subpart PP: Miscellaneous Fabricated Product Manufacturing Processes

218.920
Applicability
01/24/94
10/21/96, 61 FR 54556

218.926
Control Requirements
01/24/94
10/21/96, 61 FR 54556

218.927
Compliance Schedule
09/27/93
10/21/96, 61 FR 54556

218.928
Testing
09/27/93
10/21/96, 61 FR 54556

218.929
Cementable and Dress or Performance Shoe Leather
04/08/03
05/24/04, 69 FR 29446

Subpart QQ: Miscellaneous Formulation Manufacturing Processes

218.940
Applicability
07/16/98
06/18/99, 64 FR 32810

218.946
Control Requirements
01/24/94
10/21/96, 61 FR 54556

218.947
Compliance Schedule
09/27/93
09/09/94, 59 FR 46562

218.948
Testing
09/27/93
09/09/94, 59 FR 46562

Subpart RR: Miscellaneous Organic Chemical Manufacturing Processes

218.960
Applicability
01/24/94
10/21/96, 61 FR 54556

218.966
Control Requirements
05/09/95
03/12/97, 62 FR 11327

218.967
Compliance Schedule
09/27/93
10/21/96, 61 FR 54556

218.968
Testing
09/27/93
10/21/96, 61 FR 54556

Subpart TT: Other Emission Units

218.980
Applicability
05/09/95
03/12/97, 62 FR 11327

218.986
Control Requirements
01/24/94
10/21/96, 61 FR 54556

218.987
Compliance Schedule
09/27/93
10/21/96, 61 FR 54556

218.988
Testing
09/27/93
10/21/96, 61 FR 54556

Subpart UU: Recordkeeping and Reporting

218.990
Exempt Emission Units
09/27/93
10/21/96, 61 FR 54556

218.991
Subject Emission Units
01/24/94
10/21/96, 61 FR 54556

218.Appendix A:
List of Chemicals Defining Synthetic Organic Chemical and Polymer Manufacturing
09/27/93
09/09/94, 59 FR 46562

218.Appendix B:
VOM Measurement Techniques for Capture Efficiency
09/27/93
09/09/94, 59 FR 46562

218.Appendix C:
Reference Test Methods for Air Oxidation Processes
09/27/93
09/09/94, 59 FR 46562

218.Appendix D:
Coefficients for the Total Resource Effectiveness Index (TRE) Equation
09/27/93
09/09/94, 59 FR 46562

218.Appendix E:
List of Affected Marine Terminals
10/25/94
04/03/95, 60 FR 16801

218.Appendix G:
TRE Index Measurements for SOCMI Reactors and Distillation Units
05/09/95
03/23/98, 63 FR 13784

218.Appendix H:
Baseline VOM Content Limitations for Subpart F, Section 218.212 Cross-Line Averaging
05/09/95
02/13/96, 61 FR 5511

Part 219: Organic Material Emission Standards and Limitations for the Metro East Area

Subpart A: General Provisions

219.100
Introduction
09/27/93
09/09/94, 59 FR 46562

219.101
Savings Clause
10/25/94
04/03/95, 60 FR 16801

219.102
Abbreviations and Conversion Factors
09/27/93
09/09/94, 59 FR 46562

219.103
Applicability
08/16/91
09/09/94, 59 FR 46562

219.104
Definitions
09/27/93
09/09/94, 59 FR 46562

219.105
Test Methods and Procedures
12/23/13
03/13/15, 80 FR 13248

219.106
Compliance Dates
09/14/10
03/23/12, 77 FR 16940

219.107
Operation of Afterburners
09/27/93
09/09/94, 59 FR 46562

219.108
Exemptions, Variations, and Alternative Means of Control or Compliance Determinations
08/16/91
09/09/94, 59 FR 46562

219.109
Vapor Pressure of Volatile Organic Liquids
09/27/93
09/09/94, 59 FR 46562

219.110
Vapor Pressure of Organic Material or Solvent
09/27/93
09/09/94, 59 FR 46562

219.111
Vapor Pressure of Volatile Organic Material
09/27/93
09/09/94, 59 FR 46562

219.112
Incorporations by Reference
12/23/13
03/13/15, 80 FR 13248

Subpart B: Organic Emissions From Storage and Loading Operations

219.119
Applicability for VOL
11/15/94
08/08/96, 61 FR 41338

219.120
Control Requirements for Storage Containers of VOL
11/15/94
08/08/96, 61 FR 41338

219.121
Storage Containers of VPL
09/27/93
09/09/94, 59 FR 46562

219.122
Loading Operations
09/27/93
09/09/94, 59 FR 46562

219.123
Petroleum Liquid Storage Tanks
09/27/93
09/09/94, 59 FR 46562

219.124
External Floating Roofs
09/27/93
09/09/94, 59 FR 46562

219.125
Compliance Dates
11/15/94
08/08/96, 61 FR 41338

219.127
Testing VOL Operations
11/15/94
08/08/96, 61 FR 41338

219.128
Monitoring VOL Operations
01/28/13
10/06/14, 79 FR 60070

219.129
Recordkeeping and Reporting for VOL Operations
11/15/94
08/08/96, 61 FR 41338

Subpart C: Organic Emissions From Miscellaneous Equipment

219.141
Separation Operations
09/27/93
09/09/94, 59 FR 46562

219.142
Pumps and Compressors
08/16/91
09/09/94, 59 FR 46562

219.143
Vapor Blowdown
09/27/93
09/09/94, 59 FR 46562

219.144
Safety Relief Valves
09/27/93
09/09/94, 59 FR 46562

Subpart E: Solvent Cleaning

219.181
Solvent Cleaning Degreasing Operations
06/25/10
03/23/12, 77 FR 16940

219.182
Cold Cleaning
06/09/97
11/26/97, 62 FR 62951

219.183
Open Top Vapor Degreasing
09/27/93
09/09/94, 59 FR 46562

219.184
Conveyorized Degreasing
09/27/93
09/09/94, 59 FR 46562

219.186
Test Methods
09/27/93
09/09/94, 59 FR 46562

219.187
Other Industrial Solvent Cleaning Operations
07/27/11
03/23/12, 77 FR 16940

Subpart F: Coating Operations

219.204
Emission Limitations
07/27/11
03/23/12, 77 FR 16940

219.205
Daily-Weighted Average Limitations
09/14/10
03/23/12, 77 FR 16940

219.206
Solids Basis Calculation
09/27/93
09/09/94, 59 FR 46562

219.207
Alternative Emission Limitations
07/27/11
03/23/12, 77 FR 16940

219.208
Exemptions From Emission Limitations
10/25/11
04/19/13, 78 FR 23495

219.209
Exemption From General Rule on Use of Organic Material
09/27/93
09/09/94, 59 FR 46562

219.210
Compliance Schedule
09/14/10
03/23/12, 77 FR 16940

219.211
Recordkeeping and Reporting
07/27/11
03/23/12, 77 FR 16940

219.212
Cross-Line Averaging To Establish Compliance for Coating Lines
09/14/10
03/23/12, 77 FR 16940

219.213
Recordkeeping and Reporting for Cross-Line Averaging Participating Coating Lines
05/09/95
02/13/96, 61 FR 5511

219.214
Changing Compliance Methods
05/09/95
02/13/96, 61 FR 5511

219.215
Wood Furniture Coating Averaging Approach
02/02/98
05/19/98, 63 FR 27489

219.216
Wood Furniture Coating Add-On Control Use
02/02/98
05/19/98, 63 FR 27489

219.217
Wood Furniture Coating and Flat Wood Paneling Coating Work Practice Standards
07/27/11
03/23/12, 77 FR 16940

219.218
Work Practice Standards for Paper Coatings, Metal Furniture Coatings, and Large Appliance Coatings
03/23/10
03/23/12, 77 FR 16940

219.219
Work Practice Standards for Automobile and Light-Duty Truck Assembly Coatings and Miscellaneous Metal and Plastic Parts Coatings
09/14/10
03/23/12, 77 FR 16940

Subpart G: Use of Organic Material

219.301
Use of Organic Material
09/27/93
09/09/94, 59 FR 46562

219.302
Alternative Standard
09/27/93
09/09/94, 59 FR 46562

219.303
Fuel Combustion Emission Units
09/27/93
09/09/94, 59 FR 46562

219.304
Operations With Compliance Program
09/27/93
09/09/94, 59 FR 46562

Subpart H: Printing and Publishing

219.401
Flexographic and Rotogravure Printing
07/27/11
03/23/12, 77 FR 16940

219.402
Applicability
06/25/10
03/23/12, 77 FR 16940

219.403
Compliance Schedule
06/25/10
03/23/12, 77 FR 16940

219.404
Recordkeeping and Reporting
07/27/11
03/23/12, 77 FR 16940

219.405
Lithographic Printing: Applicability
06/25/10
03/23/12, 77 FR 16940

219.407
Emission Limitations and Control Requirements for Lithographic Printing Lines
06/25/10
03/23/12, 77 FR 16940

219.409
Testing for Lithographic Printing
07/27/11
03/23/12, 77 FR 16940

219.410
Monitoring Requirements for Lithographic Printing
06/25/10
03/23/12, 77 FR 16940

219.411
Recordkeeping and Reporting for Lithographic Printing
07/27/11
03/23/12, 77 FR 16940

219.412
Letterpress Printing Lines: Applicability
06/25/10
03/23/12, 77 FR 16940

219.413
Emission Limitations and Control Requirements for Letterpress Printing Lines
06/25/10
03/23/12, 77 FR 16940

219.415
Testing for Letterpress Printing Lines
07/27/11
03/23/12, 77 FR 16940

219.416
Monitoring Requirements for Letterpress Printing Lines
06/25/10
03/23/12, 77 FR 16940

219.417
Recordkeeping and Reporting for Letterpress Printing Lines
07/27/11
03/23/12, 77 FR 16940

Subpart Q: Synthetic Organic Chemical and Polymer Manufacturing Plant

219.421
General Requirements
09/27/93
09/09/94, 59 FR 46562

219.422
Inspection Program Plan for Leaks
09/27/93
09/09/94, 59 FR 46562

219.423
Inspection Program for Leaks
09/27/93
09/09/94, 59 FR 46562

219.424
Repairing Leaks
09/27/93
09/09/94, 59 FR 46562

219.425
Recordkeeping for Leaks
09/27/93
09/09/94, 59 FR 46562

219.426
Report for Leaks
09/27/93
09/09/94, 59 FR 46562

219.427
Alternative Program for Leaks
09/27/93
09/09/94, 59 FR 46562

219.428
Open-Ended Valves
09/27/93
09/09/94, 59 FR 46562

219.429
Standards for Control Devices
09/27/93
09/09/94, 59 FR 46562

219.431
Applicability
05/09/95
03/23/98, 63 FR 13784

219.432
Control Requirements
05/09/95
03/23/98, 63 FR 13784

219.433
Performance and Testing Requirements
05/09/95
03/23/98, 63 FR 13784

219.434
Monitoring Requirements
05/09/95
03/23/98, 63 FR 13784

219.435
Recordkeeping and Reporting Requirements
05/09/95
03/23/98, 63 FR 13784

219.436
Compliance Date
05/09/95
03/23/98, 63 FR 13784

Subpart R: Petroleum Refining and Related Industries; Asphalt Materials

219.441
Petroleum Refinery Waste Gas Disposal
09/27/93
09/09/94, 59 FR 46562

219.442
Vacuum Producing Systems
08/16/91
09/09/94, 59 FR 46562

219.443
Wastewater (Oil/Water) Separator
09/27/93
09/09/94, 59 FR 46562

219.444
Process Unit Turnarounds
08/16/91
09/09/94, 59 FR 46562

219.445
Leaks: General Requirements
09/27/93
09/09/94, 59 FR 46562

219.446
Monitoring Program Plan for Leaks
09/27/93
09/09/94, 59 FR 46562

219.447
Monitoring Program for Leaks
09/27/93
09/09/94, 59 FR 46562

219.448
Recordkeeping for Leaks
08/16/91
09/09/94, 59 FR 46562

219.449
Reporting for Leaks
09/27/93
09/09/94, 59 FR 46562

219.450
Alternative Program for Leaks
09/27/93
09/09/94, 59 FR 46562

219.451
Sealing Device Requirements
08/16/91
09/09/94, 59 FR 46562

219.452
Compliance Schedule for Leaks
09/27/93
09/09/94, 59 FR 46562

Subpart S: Rubber and Miscellaneous Plastic Products

219.461
Manufacture of Pneumatic Rubber Tires
09/27/93
09/09/94, 59 FR 46562

219.462
Green Tire Spraying Operations
09/27/93
09/09/94, 59 FR 46562

219.463
Alternative Emission Reduction Systems
09/27/93
09/09/94, 59 FR 46562

219.464
Emission Testing
09/27/93
09/09/94, 59 FR 46562

Subpart T: Pharmaceutical Manufacturing

219.480
Applicability
05/09/95
03/12/97, 62 FR 11327

219.481
Control of Reactors, Distillation Units, Crystallizers, Centrifuges and Vacuum Dryers
09/27/93
09/09/94, 59 FR 46562

219.482
Control of Air Dryers, Production Equipment Exhaust Systems and Filters
09/27/93
09/09/94, 59 FR 46562

219.483
Material Storage and Transfer
09/27/93
09/09/94, 59 FR 46562

219.484
In-Process Tanks
08/16/91
09/09/94, 59 FR 46562

219.485
Leaks
09/27/93
09/09/94, 59 FR 46562

219.486
Other Emission Units
09/27/93
09/09/94, 59 FR 46562

219.487
Testing
09/27/93
09/09/94, 59 FR 46562

219.488
Monitoring for Air Pollution Control Equipment
08/16/91
09/09/94, 59 FR 46562

219.489
Recordkeeping for Air Pollution Control Equipment
09/27/93
09/09/94, 59 FR 46562

Subpart V: Batch Operations and Air Oxidation Processes

219.500
Applicability for Batch Operations
05/22/95
04/02/96, 61 FR 14484

219.501
Control Requirements for Batch Operations
05/22/95
04/02/96, 61 FR 14484

219.502
Determination of Uncontrolled Total Annual Mass Emissions and Actual Weighted Average Flow Rate Values for Batch Operations
05/22/95
04/02/96, 61 FR 14484

219.503
Performance and Testing Requirements for Batch Operations
05/22/95
04/02/96, 61 FR 14484

219.504
Monitoring Requirements for Batch Operations
05/22/95
04/02/96, 61 FR 14484

219.505
Reporting and Recordkeeping for Batch Operations
05/22/95
04/02/96, 61 FR 14484

219.506
Compliance Date
05/22/95
04/02/96, 61 FR 14484

219.520
Emission Limitations for Air Oxidation Processes
11/15/94
09/27/95, 60 FR 49770

219.522
Savings Clause
11/15/94
09/27/95, 60 FR 49770

219.523
Compliance
11/15/94
09/27/95, 60 FR 49770

219.524
Determination of Applicability
11/15/94
09/27/95, 60 FR 49770

219.526
Testing and Monitoring
08/16/91
09/09/94, 59 FR 46562

Subpart W: Agriculture

219.541
Pesticide Exception
09/27/93
09/09/94, 59 FR 46562

Subpart X: Construction

219.561
Architectural Coatings
08/16/91
09/09/94, 59 FR 46562

219.562
Paving Operations
09/27/93
09/09/94, 59 FR 46562

219.563
Cutback Asphalt
08/16/91
09/09/94, 59 FR 46562

Subpart Y: Gasoline Distribution

219.581
Bulk Gasoline Plants
09/27/93
09/09/94, 59 FR 46562

219.582
Bulk Gasoline Terminals
09/27/93
09/09/94, 59 FR 46562

219.583
Gasoline Dispensing Operations—Storage Tank Filling Operations
12/23/13
03/13/15, 80 FR 13248

219.584
Gasoline Delivery Vessels
09/27/93
09/09/94, 59 FR 46562

Subpart Z: Dry Cleaners

219.607
Standards for Petroleum Solvent Dry Cleaners
08/16/91
09/09/94, 59 FR 46562

219.608
Operating Practices for Petroleum Solvent Dry Cleaners
09/27/93
09/09/94, 59 FR 46562

219.609
Program for Inspection and Repair of Leaks
09/27/93
09/09/94, 59 FR 46562

219.610
Testing and Monitoring
09/27/93
09/09/94, 59 FR 46562

219.611
Exemption for Petroleum Solvent Dry Cleaners
09/27/93
09/09/94, 59 FR 46562

Subpart AA: Paint and Ink Manufacturing

219.620
Applicability
09/27/93
09/09/94, 59 FR 46562

219.621
Exemption for Waterbase Material and Heatset-Offset Ink
09/27/93
09/09/94, 59 FR 46562

219.623
Permit Conditions
09/27/93
09/09/94, 59 FR 46562

219.624
Open-Top Mills, Tanks, Vats or Vessels
09/27/93
09/09/94, 59 FR 46562

219.625
Grinding Mills
08/16/91
09/09/94, 59 FR 46562

219.626
Storage Tanks
08/16/91
09/09/94, 59 FR 46562

219.628
Leaks
09/27/93
09/09/94, 59 FR 46562

219.630
Clean Up
08/16/91
09/09/94, 59 FR 46562

219.636
Compliance Schedule
09/27/93
09/09/94, 59 FR 46562

219.637
Recordkeeping and Reporting
09/27/93
09/09/94, 59 FR 46562

Subpart BB: Polystyrene Plants

219.640
Applicability
09/27/93
09/09/94, 59 FR 46562

219.642
Emissions Limitation at Polystyrene Plants
09/27/93
09/09/94, 59 FR 46562

219.644
Emissions Testing
09/27/93
09/09/94, 59 FR 46562

Subpart GG: Marine Terminals

219.760
Applicability
10/25/94
04/03/95, 60 FR 16801

219.762
Control Requirements
10/25/94
04/03/95, 60 FR 16801

219.764
Compliance Certification
1

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A2017-13659. Public record. Not legal advice.
