# Service Rules for Advanced Wireless Services in the 2000-2020 MHz and 2180-2200 MHz Bands, etc.

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A2012-8405

## Record

- **Collection:** Federal Register
- **Document type:** Proposed Rule
- **Published:** April 17, 2012
- **Citation:** 77 FR 22720

## Text

FEDERAL COMMUNICATIONS COMMISSION
47 CFR Parts 1, 2, 25, 27, and 101
[WT Docket No. 12-70; ET Docket No. 10-142; WT Docket No. 04-356; FCC 12-32]
Service Rules for Advanced Wireless Services in the 2000-2020 MHz and 2180-2200 MHz Bands, etc.

AGENCY:

Federal Communications Commission.

ACTION:

Proposed rule; notice of inquiry.

SUMMARY:

In this document, the Commission proposes and/or seeks comments on service, technical, assignment, and licensing rules for flexible terrestrial use of spectrum currently assigned to the Mobile Satellite Service (MSS) in the 2 GHz band. These proposed rules are designed to increase the Nation's supply of spectrum for mobile broadband, provide for flexible use of this spectrum, encourage innovation and investment in mobile broadband, and provide a stable regulatory environment in which broadband deployment could develop. This proposal would carry out a recommendation in the
National Broadband Plan
that the Commission enable the provision of stand-alone terrestrial services in this spectrum. With this proceeding we intend to fulfill the Commission's previously stated plan to create a solid and lasting foundation for the provision of terrestrial services in the 2 GHz band. The Commission also seeks comment on an alternative band plan involving additional spectrum at 1695-1710 MHz that the National Telecommunications and Information Administration (NTIA) has proposed to reallocate from Federal to commercial use.

DATES:

Submit comments on or before May 17, 2012. Submit reply comments on or before June 1, 2012. Written comments on the proposed information collection requirements, subject to the Paperwork Reduction Act (PRA) of 1995, Public Law 104-13, should be submitted on or before June 18, 2012.

ADDRESSES:

Federal Communications Commission, 445 12th Street SW., Washington, DC 20554. A copy of any comments on the Paperwork Reduction Act information collection requirements contained herein should be submitted to the Federal Communications Commission via email to
PRA@fcc.gov
and to Nicholas A. Fraser, Office of Management and Budget, via email to
Nicholas_A._Fraser@omb.eop.gov
or via fax at 202-395-5167. You may submit comments, identified by FCC 12-32, or by WT Docket No. 12-70, ET Docket No. 10-142, WT Docket No. 04-356, by any of the following methods:

•
Federal eRulemaking Portal: http://www.regulations.gov.
Follow the instructions for submitting comments.

•
Federal Communications Commission's Web Site: http://www.fcc.gov/cgb/ecfs/.
Follow the instructions for submitting comments.

•
People with Disabilities:
Contact the FCC to request reasonable accommodations (accessible format documents, sign language interpreters, CART, etc.) by email:
FCC504@fcc.gov
or phone: (202) 418-0530 or TTY: (202) 418-0432.

•
Availability of Documents:
Comments, reply comments, and
ex parte
submissions will be available for public inspection during regular business hours in the FCC Reference Center, Federal Communications Commission, 445 12th Street, SW., CY-A257, Washington, DC 20554. These documents will also be available via ECFS. Documents will be available electronically in ASCII, Microsoft Word, and/or Adobe Acrobat.

For detailed instructions for submitting comments and additional information on the rulemaking process, see the
SUPPLEMENTARY INFORMATION
section of this document.

FOR FURTHER INFORMATION CONTACT:

Kevin Holmes of the Broadband Division, Wireless Telecommunications Bureau, at (202) 418-BITS. For additional information concerning the Paperwork Reduction Act information collection requirements contained in this document, contact Judith B. Herman at (202) 418-0214, or via the Internet at
PRA@fcc.gov
.

SUPPLEMENTARY INFORMATION:

This is a summary of the Commission's
Notice of Proposed Rulemaking and Notice of Inquiry,
FCC 12-32, adopted and released on March 21, 2012. The full text of this document is available for inspection and copying during normal business hours in the FCC Reference Information Center, Room CY-A257, 445 12th Street SW., Washington, DC 20554. The complete text may be purchased from the Commission's duplicating contractor, Best Copy and Printing, Inc. (BCPI), Portals II, 445 12th Street SW., Room CY-B402, Washington, DC 20554, (202) 488-5300, facsimile (202) 488-5563, or via email at
fcc@bcpiweb.com
. The complete text is also available on the Commission's Web site at
http://hraunfoss.fcc.gov/edocs_public/attachment/FCC-12-32A1doc.
Alternative formats (computer diskette, large print, audio cassette, and Braille) are available by contacting Brian Millin at (202) 418-7426, TTY (202) 418-7365, or via email to
bmillin@fcc.gov.

Pursuant to §§ 1.415 and 1.419 of the Commission's rules, 47 CFR 1.415, 1.419, interested parties may file comments and reply comments on or before the dates indicated on the first page of this document. Comments may be filed using the Commission's Electronic Comment Filing System (ECFS).
See Electronic Filing of Documents in Rulemaking Proceedings,
63 FR 24121 (1998). All filings should reference the docket numbers in this proceeding, WT Docket No. 12-70, ET Docket No. 10-142, WT Docket No. 04-356.

Electronic Filers:
Comments may be filed electronically using the Internet by accessing the ECFS:
http://fjallfoss.fcc.gov/ecfs2/.

Paper Filers:
Parties who choose to file by paper must file an original and one copy of each filing. If more than one docket or rulemaking number appears in the caption of this proceeding, filers must submit two additional copies for each additional docket or rulemaking number. Filings can be sent by hand or messenger delivery, by commercial overnight courier, or by first-class or overnight U.S. Postal Service mail. All filings must be addressed to the Commission's Secretary, Office of the Secretary, Federal Communications Commission.

All hand-delivered or messenger-delivered paper filings for the Commission's Secretary must be delivered to FCC Headquarters at 445 12th St. SW., Room TW-A325, Washington, DC 20554. The filing hours are 8 a.m. to 7 p.m. All hand deliveries must be held together with rubber bands or fasteners. Any envelopes and boxes must be disposed of
before
entering the building.

Commercial overnight mail (other than U.S. Postal Service Express Mail and Priority Mail) must be sent to 9300 East Hampton Drive, Capitol Heights, MD 20743.

U.S. Postal Service first-class, Express, and Priority mail must be addressed to 445 12th Street SW., Washington, DC 20554.

People With Disabilities:
To request materials in accessible formats for people with disabilities (braille, large print, electronic files, audio format), send an email to
fcc504@fcc.gov
or call the Consumer & Governmental Affairs Bureau at 202-418-0530 (voice), 202-418-0432 (tty).

Document FCC 12-32 contains proposed information collection requirements subject to the PRA. It will be submitted to the Office of Management and Budget (OMB) for review under section 3507 of the PRA. OMB, the general public, and other Federal agencies are invited to comment on the proposed information collection requirements contained in this document. PRA comments should be submitted to Judith B. Herman at (202) 418-0214, or via the Internet at
PRA@fcc.gov
and to Nicholas A. Fraser, Office of Management and Budget, via email to
Nicholas_A._Fraser@omb.eop.gov
or via fax at 202-395-5167.

To view a copy of this information collection request (ICR) submitted to OMB: (1) Go to the Web page
http://www.reginfo.gov/public/do/PRAMain,
(2) look for the section of the Web page called “Currently Under Review,” (3) click on the downward-pointing arrow in the “Select Agency” box below the “Currently Under Review” heading, (4) select “Federal Communications Commission” from the list of agencies presented in the “Select Agency” box, (5) click the “Submit” button to the right of the “Select Agency” box, (6) when the list of FCC ICRs currently under review appears, look for the Title of this ICR and then click on the ICR Reference Number. A copy of the FCC submission to OMB will be displayed.

Initial Paperwork Reduction Act Analysis:

This document contains proposed new or modified information collection requirements. The Commission, as part of its continuing effort to reduce paperwork burdens, invites the general public and the Office of Management and Budget (OMB) to comment on the information collection requirements contained in this document, as required by the Paperwork Reduction Act of 1995, Public Law 104-13. In addition, pursuant to the Small Business Paperwork Relief Act of 2002, Public Law 107-198, see 44 U.S.C. 3506(c)(4), we seek specific comment on how we might further reduce the information collection burden for small business concerns with fewer than 25 employees.

OMB Control Number:
3060-1030.

Title:
Service Rules for Advanced Wireless Services (AWS) in the 1.7 GHz and 2.1 GHz Bands.

Form Number:
N/A.

Type of Review:
Revision of a currently approved collection.

Respondents:
Business or other for-profit entities, and state, local, or tribal government.

Number of Respondents:
979 respondents; 1,630 responses.

Estimated Time per Response:
2 hours.

Frequency of Response:
Annual, semi-annual, one time, and on occasion reporting requirements; record keeping requirements; and 3rd party disclosure requirements.

Obligation to Respond:
Required to obtain or retain benefits.

Total Annual Burden:
32,384 hours.

Total Annual Cost:
$581,800.

Privacy Impact Assessment:
N/A.

Nature and Extent of Confidentiality:
There is no need for confidentiality.

Needs and Uses:
The Commission will be submitting this proposed new or modified information collection to the Office of Management and Budget as a revision of a currently approved information collection under OMB Control Number 3060-1030. The Commission has not changed its recordkeeping and/or third party disclosure requirements; however, the Commission expects to revise its reporting requirements in this collection by increasing the total annual burden hours from 32,379 to 32,384 hours to accommodate 2000-2020 MHz and 2180-2200 MHz spectrum band (AWS-4) operators. There is no change in the total annual cost burden.

The proposed new or modified information collection will be used by the Commission staff to review and determine whether an AWS-4 licensee satisfies the renewal criteria showing at the time of license renewal for AWS-4 operators, meets its performance requirements obligations, meets its discontinuance of service oblications, and satisfies its obligation to protect Mobile Satellite Services from harmful interference, pursuant to §§ 1.949, 27.14, 27.17, and 27.1136, respectfully, of the Commission's rules. Section 1.949 sets forth the renewal criteria showing at the time of license renewal; § 27.14 sets forth the construction requirements a licensee must meet in order to satisfy its performance requirements in their licensed area; § 27.17 sets forth the terms in which a licensee's authorization will terminate if it permanently discontinues its services; and § 27.1136 requires AWS-4 licensees to protect Mobile Satellite Service operations from harmful interference. Without this information, the Commission would not be able to carry out its statutory responsibilities.

Summary

I. Introduction

1. In this
Notice of Proposed Rulemaking,
we propose to increase the Nation's supply of spectrum for mobile broadband by removing unnecessary barriers to flexible use of spectrum currently assigned to the Mobile Satellite Service (MSS) in the 2 GHz band. This proposal would carry out a recommendation in the
National Broadband Plan
that the Commission enable the provision of stand-alone terrestrial services in this spectrum. (Connecting America: The National Broadband Plan (2010) (
National Broadband Plan
), available at
http://hraunfoss.fcc.gov/edocs_public/attachmatch/DOC-296935A1.pdf
(last visited Mar. 19, 2012)). We do so by proposing service, technical, assignment, and licensing rules for this spectrum. These proposed rules are designed to provide for flexible use of this spectrum, to encourage innovation and investment in mobile broadband, and to provide a stable regulatory environment in which broadband deployment could develop. Additionally, in our Notice of Inquiry, we seek comment on potential ways to free up additional valuable spectrum to address the Nation's growing demand for mobile broadband spectrum.

2. With this proceeding we intend to fulfill the Commission's previously stated plan to create a solid and lasting foundation for the provision of terrestrial services in 40 megahertz of spectrum in the 2 GHz band. As indicated in the
National Broadband Plan,
each MSS band is differently situated and therefore merits a band-specific approach to the expansion of terrestrial use. For example, the 2 GHz MSS band, unlike other MSS bands, has terrestrial Fixed and Mobile allocations and is comprised of large, contiguous blocks of spectrum. This
Notice of Proposed Rulemaking
directly follows on the
2 GHz Band Co-Allocation Order,
in which the Commission laid the predicate for full terrestrial use of the 2 GHz MSS band.
See Fixed and Mobile Services in the Mobile Satellite Service Bands at 1525-1559 MHz and 1626.5-1660.5 MHz, 1610-1626.5 MHz and 2483.5-2500 MHz, and 2000-2020 MHz and 2180-2200 MHz,
76 FR 31252 (2011).

II. Notice of Proposed Rulemaking: AWS-4

3. In this
Notice of Proposed Rulemaking
(
AWS-4 Notice
), we build on the Commission's recent actions to enable the provision of terrestrial mobile broadband service in up to 40 megahertz of spectrum in the 2000-2020 MHz and 2180-2200 MHz spectrum bands. We propose terrestrial service rules for these spectrum bands that would generally follow the Commission's part 27 rules, modified as necessary to account for issues unique to the 2000-2020 MHz and 2180-2200 MHz spectrum bands. Given the proximity of these spectrum bands to spectrum bands previously identified as Advanced Wireless Services or AWS, in our proposal we refer to these spectrum bands as “AWS-4” or “AWS-4 spectrum.” We are mindful that this spectrum is now allocated on a co-primary basis for Mobile Satellite and for terrestrial Fixed and Mobile services and that MSS licensees already have authorizations to provide service in the band. Accordingly, as explained below, we seek comment on a proposal that AWS-4 terrestrial service rules will need to provide for the protection of 2 GHz MSS systems from harmful interference caused by AWS-4 systems. Finally, for each of the issues identified below, we seek comment on the most efficient manner to address the issue. If a party believes any of these issues would be more properly resolved in another Commission proceeding, we request that the party identify those issues and the relevant Commission proceeding.

4. In the sections that follow, we seek comment on a number of parameters governing the licensing, use, and assignment of the spectrum, including their costs and benefits. We ask that commenters take into account only those costs and benefits that directly result from the implementation of the particular rules that could be adopted, including any proposed requirement or potential alternative requirement. Commenters should identify the various costs and benefits associated with a particular proposal. Further, to the extent possible, commenters should provide specific data and information, such as actual or estimated dollar figures for each specific cost or benefit addressed, including a description of how the data or information was calculated or obtained, and any supporting documentation or other evidentiary support.

A. AWS-4 Band Plan

5. In this section, we make two overarching proposals to establish the AWS-4 band plan. First, we propose to pair the two AWS-4 spectrum bands. Second, we propose block sizes and a geographic area licensing scheme to define license boundaries.

1. Paired Spectrum (Uplink/Downlink)

6. The spectrum in the 2000-2020 MHz and 2180-2200 MHz bands is presently licensed as paired spectrum for mobile satellite use. The 2000-2020 MHz band serves as an uplink band and 2180-2200 MHz band serves as a downlink band. We propose to pair the AWS-4 blocks, consistent with the existing 2 GHz MSS licenses and the Commission's treatment of other bands used for mobile wireless and broadband service, AWS and PCS. We seek comment on this proposal. We also seek comment on whether we should take any action to ensure that equipment for the AWS-4 band is interoperable across both paired blocks.

7. Specifically, we propose to adopt the same uplink and downlink pairing designations for provision of terrestrial service as presently exists for satellite service in this spectrum: 2000-2020 MHz would serve as an uplink band; 2180-2200 MHz would serve as a downlink band. Adopting the same uplink/downlink pairing approach for AWS-4 as for 2 GHz MSS may facilitate the continued use of the existing satellites for MSS. We seek comment on the above proposals and proposed AWS-4 band plan. We also seek comment on two alternative possibilities, in which the uplink band would be shifted up 5 megahertz to 2005-2025 MHz or up 10 megahertz and compressed to 2010-2025 MHz, as discussed below.

2. Spectrum Block Size

8. We also propose to license the spectrum in paired 10-megahertz blocks for each license area. Currently, the 2 GHz MSS spectrum is assigned as two paired blocks: Block A pairs 2000-2010 MHz with 2190-2200 MHz and Block B pairs 2010-2020 MHz with 2180-2190 MHz. We observe, however, that the 3rd Generation Partnership Project (3GPP) standards organization is in the process of examining whether to change the duplex spacing for Band 23, which includes this spectrum, from a spacing that corresponds to the existing duplex spacing to one that would remove the variable duplex spacing. We seek comment on which pairing approach to apply. We ask commenters to discuss the affect the ongoing 3GPP process should have on our decision. In addition, commenters seeking alternative spectrum block sizes should support their recommendations with evidence that these alternative schemes will promote greater efficiency and more flexible use of the bands than the proposed approach. Commenters also should discuss and quantify any associated costs or benefits of implementing the proposals discussed above or any alternative schemes.

9. Our proposal to license AWS-4 spectrum in paired 10-megahertz blocks reflects several considerations. First, the MSS band is currently licensed as paired 10-megahertz blocks. Issuing AWS-4 licenses with equivalent bandwidth would facilitate coordination between the two services. Second, establishing paired 10-megahertz blocks strikes a balance between potentially enabling multiple licensees in any given geographical area (
i.e.,
different licensees in each 10 + 10 block pair) and allowing the use of newer high-bandwidth technologies. We seek comment on these approaches.

10. We also seek comment on adopting a flexible paired single block option that, in the event a single licensee holds both the A and B Blocks, would allow that entity to combine them into one paired 20-megahertz block and use these contiguous spectrum blocks seamlessly with flexibility to design its network and respond effectively to any business and technical needs. Alternatively, if we were to adopt a licensing mechanism that allows AWS-4 spectrum licensees to be held by entities other than the existing 2 GHz MSS licensees, we seek comment on whether this spectrum should be licensed in smaller block sizes.

3. Geographic Area Licensing

11. We propose to license the AWS-4 band using a geographic area licensing approach, and we seek comment on this proposal. A geographic licensing area approach is well suited for the types of fixed and mobile services that would likely be deployed in this band. Additionally, geographic licensing is consistent with the Commission's licensing approach adopted for the AWS-1 bands, and proposed for both the AWS-2 and the AWS-3 bands. In the event that interested parties do not support geographic licensing for the AWS-4 spectrum, those commenters should explain their position and identify the costs and benefits associated with an alternative licensing proposal and what type of licensing scheme it supports.

12. Assuming that we utilize a geographic area approach for licensing these bands, we must determine the appropriate size(s) of service areas on which licenses should be based. In previous AWS service rule proceedings the Commission has sought to balance policy goals of fostering service to rural areas and tribal lands, and promoting investment in and rapid deployment of new technologies and services consistent with its obligations under section 309(j) of the Communications Act. To do that, the Commission, among other things, established spectrum blocks in three geographic area sizes. In regard to the AWS-4 spectrum, however, we propose to apply a single size geographic area. We propose that any new AWS-4 licenses should be assigned on an Economic Area (EA) basis.
See
47 CFR 27.6. Assigning AWS-4 in EA geographic areas would allow AWS-4 licensees to make adjustments to suit their individual needs. EA license areas are small enough to provide spectrum access opportunities for smaller carriers. EA license areas also nest within and may be aggregated up to larger license areas that have been used by the Commission for other services, such as Major Economic Areas (MEAs) and Regional Economic Area Groupings (REAGs) for those seeking to create larger service areas. Depending on the licensing mechanism we adopt, licensees may aggregate or otherwise adjust their geographic coverage through auction or through secondary markets. We seek comment on this approach. We ask commenters to discuss and quantify the economic, technical, and other public interest considerations of any particular geographic scheme for this particular band, as well as the impact that any such scheme would have on rural service and competition.

13. We also seek comment on including the Gulf of Mexico in our licensing scheme for these bands. We question whether to include it as part of larger service areas, as we did for the Upper 700 MHz band, or whether we should separately license a service area or service areas to cover the Gulf of Mexico. Commenters who advocate a separate service area or areas to cover the Gulf of Mexico should discuss what boundaries should be used, and whether special interference protection criteria or performance requirements are necessary due to the unique radio propagation characteristics and antenna siting challenges that exist for Gulf licensees.

B. Technical Issues

14. When the Commission adopted the MSS/ATC regime in 2003, it addressed intra-service and adjacent-band interference concerns, and enacted unique MSS/ATC technical rules in part 25 of the Commission's rules, which did not fully align with the technical rules for similar terrestrial operations in other bands. The ATC interference rules for the 2 GHz MSS band are contained in rule 25.252.
See
47 CFR 25.252. Subsequently, in addressing requests for ATC authority by the two 2 GHz MSS authorization holders, ICO and TerreStar, the Commission granted them waivers of several of the part 25 ATC interference rules.
See
New ICO Satellite Services G.P. Application for Blanket Authority to operate Ancillary Terrestrial Component base stations and dual-mode MSS-ATC mobile terminals in the 2 GHz MSS Bands, DA 09-38,
Order and Authorization,
24 FCC Rcd 171 (2009) (
ICO Waiver Order
). In general, these waivers resulted in aligning the terrestrial requirements for the 2 GHz MSS band operators more closely with the part 27 technical rules that apply to AWS-1 license holders. Based on review of current interference possibilities, we propose an approach that would permit deployment under the current rules and waivers by proposing that the technical rules and license conditions applicable today to the provision of terrestrial services in the 2 GHz MSS bands should generally apply to the AWS-4 bands.

15. In general, our aim in establishing technical rules is to maximize the flexible use of spectrum while appropriately protecting incumbent operations in neighboring bands. The technical rules we propose below are based on the rules for AWS-1 spectrum, with specific additions or modifications designed to protect broadband PCS services operating in the 1930-1995 MHz band, as well as future services operating in the 1995-2000 MHz band, from harmful interference from AWS-4 mobile devices operating in the 2000-2020 MHz band. Any rules would also address protection of Federal operations in the 2200-2290 MHz band from harmful interference from AWS-4 base stations operating in the 2180-2200 MHz band. We also seek comment on whether modifications to these rules might be warranted in order to provide for more flexible use of AWS-4 spectrum, while at the same time protecting other spectrum uses from interference.

1. OOBE Limits

16. In the proposed band plan, AWS-4 spectrum would be issued in paired 10-megahertz blocks, using Economic Area licenses. Therefore, interference must be considered between AWS-4 blocks and adjacent bands, between different blocks within the AWS-4 band, and between different geographic area licenses within the AWS-4 band.

a. Interference Between Adjacent Block AWS-4 Licensees

17.
Emissions limit.
To minimize harmful interference, the Commission's rules often limit the amount of RF power that may be emitted outside of the assigned block of an RF transmitter. The Commission has previously concluded that attenuating base station out-of-band emissions (OOBE) by 43+10*log
10
(P) dB at the edge of an assigned block, where P is the transmit power in watts, is appropriate to minimize harmful electromagnetic interference between terrestrial operations in the 2180-2190 MHz and 2190-2200 MHz blocks. Similarly, the Commission has previously found that attenuating terrestrial mobile emissions by 43+10*log
10
(P) dB outside the assigned block will minimize interference within the 2000-2020 MHz band. Furthermore, when the Commission created the service rules for AWS-1, it concluded that this level of attenuation is appropriate for protecting wireless systems that will operate in the AWS bands.
See Service Rules for Advanced Wireless Services in the 1.7 GHz and 2.1 GHz Bands,
69 FR 5711 (2003) (
AWS-1 Report and Order
). At the time, the Commission noted that this limit is commonly employed in other wireless services, and it has generally been found to be adequate in preventing adjacent channel interference. This level of attenuation is now established in the Commission's rules for the AWS band, both for both mobile station and base station emissions. This OOBE limit also applies in the broadband PCS band.

18.
Measurement procedure.
To fully define an emissions limit, the Commission's rules generally specify details of how to measure the power of the emissions, such as the measurement bandwidth. The part 25 ATC rules determine mobile station compliance with the OOBE limit based on a measurement bandwidth of 1 MHz or greater. For AWS-1, the measurement bandwidth used to determine compliance with this limit for both mobile stations and base stations is generally 1 MHz, with some modification within the first 1 MHz. Previously, the Commission concluded the AWS-1 measurement procedure was also appropriate for mobile stations operating in 2000-2020 MHz. At that time the Commission did not address the measurement procedure for base stations operating in 2180-2200 MHz.

However, as mentioned above, in the AWS-1 band this procedure applies to mobile and base transmissions. We believe that it is similarly reasonable to apply this procedure to both mobile and base transmissions in the AWS-4 band.

19.
Proposal.
To address potential harmful electromagnetic interference within the AWS-4 band, we propose that § 27.53(h) of the Commission's rules, which includes OOBE attenuation of 43+10*log
10
(P) dB and the associated measurement procedure, should be expanded to apply to AWS-4 operations in the 2000-2020 MHz and 2180-2200 MHz bands. We seek comment on this proposal. Commenters should discuss and quantify the costs and benefits of this proposal and any proposed alternative approaches.

b. Interference With Services in Adjacent and Other Bands

20. After considering interference between adjacent blocks within the AWS-4 band in the previous section, we next examine the adjacent and nearly adjacent bands outside the AWS-4 band. In so doing, we seek to establish rules that permit flexible use of the AWS-4 band, while effectively protecting operations in adjacent bands from harmful interference. We begin our examination of adjacent band interference by considering whether attenuation greater than 43+10*log
10
(P) dB—a level the Commission frequently applies to adjacent band operations—is needed to prevent harmful electromagnetic interference from the AWS-4 band to other bands. Although the previous section only discussed 43+10*log
10
(P) for interference within the band, that attenuation applies to all transmissions outside the assigned block, including emissions in other bands.

21.
Interference with operations below 1995 MHz.
The AWS-4 uplink band at 2000-2020 MHz is 5 megahertz from the broadband PCS downlink band at 1930-1995 MHz. To protect PCS mobile receivers from harmful electromagnetic interference from mobile stations transmitting in the 2000-2020 MHz band, the ATC rules specify an attenuation of 70+10*log
10
(P) dB below 1995 MHz. We propose that this emission limit should continue to apply to terrestrial operations in the 2000-2020 MHz band, and that a rule should be added to part 27 that fixed and mobile transmitters operating in 2000-2020 MHz must attenuate emissions below 1995 MHz by 70+10*log
10
(P) dB. We further propose that this attenuation should be measured using the existing measurement procedure of § 27.53(h) discussed above. We seek comment on these proposals. Commenters should discuss and quantify the costs and benefits of this proposal and any proposed alternative approaches.

22.
Interference with operations in 1995-2000 MHz.
The part 25 ATC technical rules also include a linear interpolation of OOBE attenuation between 70+10*log
10
(P) dB at 1995 MHz and 43+10*log
10
(P) dB at 2000 MHz. However, recently enacted legislation directs the Commission to allocate the 1995-2000 MHz band (AWS-2 Upper H block) for commercial use, and to auction and grant new initial licenses for the use of this spectrum under flexible-use service rules. Middle Class Tax Relief and Job Creation Act of 2012, Pub. L. 112-96, section 6401(b). Given this statutory directive and considering that the 1995-2000 MHz block is adjacent to existing broadband PCS downlink operations, it is likely that this block will be used for terrestrial downlink operations. This will exacerbate the existing potential for harmful interference between downlink operations below 2000 MHz and uplink operations above 2000 MHz. For example, commenters to the
2 GHz Public Notice
have suggested that a guard band of 5 MHz or more would be necessary to prevent interference between downlink operations in 1930-1995 MHz and uplink operations in 2000-2020 MHz. To address this apparent tension, we seek comment on three alternative proposals for OOBE limits in 1995-2000 MHz.

23. First, we could maintain the existing linear interpolation. However, this would offer the 1995-2000 MHz block less protection than the existing PCS blocks, which as discussed above is 70+10*log
10
(P) dB below the transmit power. In addition, meeting this limit may have a negative impact on mobile transmitters in 2000-2020 MHz, as the mobile station components, such as power amplifiers and filters, may not have sharp enough roll off characteristics to meet this limit when operating in the lower parts of the band, particularly when operating at the maximum power level supported. In this regard, we observe that, in standardizing the 2000-2020 MHz and 2180-2200 MHz bands as Band 23, 3GPP has allowed for up to 12 dB of additional power reduction below the maximum transmit power for mobile stations in 2000-2010 MHz to meet the Commission's current rules. As the mobile transmit power affects the ability of the mobile station to reach the base station, this reduction of power would appear to have a significant impact on cell coverage, uplink throughput, and ultimately the usability of this spectrum.

24. Second, we could require that fixed and mobile transmitters operating in 2000-2020 MHz attenuate emissions below 2000 MHz by 70+10*log
10
(P) dB, consistent with the emissions limit below 1995 MHz. We note, however, that this level may be difficult to meet for mobile transmitters in 2000-2020 MHz, as it requires even sharper roll off from mobile stations than the previous alternative.

25. Third, we could require that fixed and mobile transmitters operating in 2000-2020 MHz attenuate emissions below 2000 MHz by 43+10*log
10
(P) dB, symmetric with existing limits for PCS emissions in 2000-2020 MHz and broadly consistent with Commission rules as discussed above. In this case, if future service rules for 1995-2000 MHz have the same requirement, then the licensees above and below 2000 MHz would be placed on a more equal footing, and could determine among themselves if there is a need for any stricter limits.

26. We seek comment on each of these alternatives. For each alternative, we ask commenters to address whether the proposal is adequate to protect expected uses of the 1995-2000 MHz band. Commenters should address and quantify the magnitude and effect of any possible harmful interference, such as the impact on link budgets or coverage areas. Commenters should also address the amount of spectrum that may be unusable or partially usable in either band. For each alternative, we also seek comment on the impact on operations in the 2000-2020 MHz band, including whether mobile stations will be able to utilize the entire 2000-2020 MHz band while meeting the proposed limit, and if not, the amount of spectrum that may be unusable or usable only at a reduced power, as well as the extent of any such power reductions.

27. For all three alternatives, we propose that the attenuation should be measured using the existing measurement procedure of § 27.53(h) discussed above. We seek comment on this proposal.

28. Finally, in the event that the record shows none of these three proposals sufficiently addresses issues of interference with 1995-2000 MHz, we seek comment on two additional proposals. First, we seek comment on an alternative proposal to shift the uplink band up 5 megahertz from 2000-2020 MHz to 2005-2025 MHz, including the lower portion of the AWS-2 “J” Block at 2020-2025 MHz. This concept was part of Ericcson's proposal in its comments in response to the

2 GHz

Public Notice.

Would this shift proposal better mitigate interference with the AWS-2 H Upper block and PCS downlink bands, increasing the value of the spectrum for mobile broadband and other uses? Further, would this alternative approach allow for more productive use of the “stranded” lower portion of the AWS-2 J Block (2020-2025 MHz) should the Commission eventually decide to auction the upper portion of the J Block as part of an extended AWS-3 band? Second, we seek comment on an alternative proposal to shift the uplink band up 10 megahertz, while compressing the band from 20 to 15 megahertz, resulting in an uplink band of 2010-2025 MHz. For this alternative, in light of the interference issues that may impact the terrestrial use of 2000-2005 MHz, we seek comment on whether shifting the spectrum to a 15 megahertz band at 2010-2025 MHz would result in the actual loss of spectrum usable for terrestrial broadband service.

29. For both spectrum shift alternatives, we propose that the shift apply to the lower end of the band for both terrestrial and satellite service. Shifting the satellite service out of the 2000-2005 MHz or the 2000-2010 MHz blocks (in a manner consistent with the terrestrial service) would mitigate against the possibility of mobile satellite devices causing harmful interference into the 1995-2000 MHz block. The 2020-2025 MHz block is not presently allocated for satellite service. 47 CFR 2.106. We do not intend to shift the satellite service into this block. We seek comment on this proposal including its costs and benefits. Lastly, in considering the spectrum shift alternatives, we seek comment on how each might affect all of the applicable proposals contained in this
AWS-4 Notice,
including without limitation the technical protections discussed in this section, the assignment proposals, and relocation and cost sharing proposals discussed below.

30.
Interference with operations in 2020-2025 MHz.
The AWS-4 uplink band will be adjacent to the AWS-2 Lower J block, 2020-2025 MHz. Although the part 25 ATC rules adopted in 2003 originally attenuated the mobile station emissions in this range by a linear interpolation from 43+10*log
10
(P) dB at 2020 MHz to 70+10*log
10
(P) dB at 2025 MHz, the Commission separately proposed in 2004 to apply a standard of 43+10*log
10
(P) to the AWS-2 J block. Service Rules for Advanced Wireless Services in the 1915-1920 MHz, 1995-2000 MHz, 2175-2180 MHz and 1.7 GHz and 2.1 GHz Bands, 63 FR 63489 (2004). In 2009, in the
ICO Waiver Order,
the Commission waived the part 25 ATC rules and instead applied the 43+10*log
10
(P) to OOBE in 2020-2025 MHz from transmitters operating in 2000-2020 MHz.
See ICO Waiver Order.
We propose that no additional attenuation beyond 43+10*log
10
(P) dB is needed to protect services in the 2020-2025 MHz band. We seek comment on this approach. Commenters should discuss and quantify the costs and benefits of this proposal and any proposed alternative approaches.

31.
Inference with operations above 2025 MHz.
The AWS-4 uplink band is 5 megahertz from the 2025-2110 MHz band, which includes broadcast auxiliary service (BAS) and cable television service (CARS) operations, as well as certain Federal government operations. Although the ATC rules originally limited the mobile emissions to 70+10*log
10
(P) above 2025 MHz, in 2009, the Commission waived the part 25 ATC rule and instead applied the 43+10*log
10
(P) standard.
See ICO Waiver Order.
As the interference potential between these bands has not changed significantly since then, we propose that no additional attenuation beyond 43+10*log
10
(P) dB is needed to protect operations above 2025 MHz. We seek comment on this approach. Commenters should discuss and quantify the costs and benefits of this proposal and any proposed alternative approaches.

32.
Interference with operations below 2180 MHz.
The AWS-4 downlink band, 2180-2200 MHz, is adjacent to the AWS-2 Upper J block, 2175-2180 MHz, which is itself adjacent to the AWS-3 band, 2155-2175 MHz. The Commission has previously proposed that an attenuation of 43+10*log
10
(P) dB is an appropriate base station emission limit to prevent harmful electromagnetic interference in the AWS-2 and AWS-3 bands.
See, e.g.,
Service Rules for Advanced Wireless Services in the 1915-1920 MHz, 1995-2000 MHz, 2155-2175 MHz, and 2175-2180 MHz Bands, 73 FR 35995 (2008). As the circumstances have not changed significantly since that attenuation level was proposed, we propose that no additional attenuation beyond 43+10*log
10
(P) dB is needed below 2180 MHz. We seek comment on this approach. Commenters should discuss and quantify the costs and benefits of this proposal and any proposed alternative approaches.

33.
Interference with opertions above 2200 MHz.
The proposed AWS-4 downlink band, 2180-2200 MHz, is adjacent to Federal operations in 2200-2290 MHz. Federal operations in the band 2200-2290 MHz consist mainly of space, airborne telemetry, and fixed point-to-point microwave radio relay communications. The space communications in the band consist of the tracking, telemetry, scientific data communications, and control of U.S. spacecraft. The band is used by these agencies to operate space research, space operations, and Earth exploration-satellites for space-to-Earth communications, and in the case of NASA for space-to-space communications through their Tracking and Data Relay Satellite System (TDRSS). Federal agencies use this band for research; law enforcement video surveillance; control of robotic systems for explosive neutralization and disposal; and the testing of robotic ground vehicles.

34. The Commission's part 25 ATC rules require strict emissions limitations (−100.6 dBW/4 kHz) in the 2180-2200 MHz band, and prohibit the location of base stations within 820 meters of a Federal earth station operating in the 2200-2290 MHz band. See 47 CFR 25.252(a)(1), (a)(6). In 2009, the Commission waived the part 25 emissions limit rule for MSS/ATC operator ICO, replacing it with the standard emission limit of 43+10*log
10
(P) dB.
See ICO Waiver Order.
Specific to emissions limits and restrictions on base station locations with respect to the 2200-2290 MHz band, the waiver order required that ICO follow an operator-to-operator agreement that ICO had reached with several Federal agencies. Letter from Karl B. Nebbia, Associate Administrator, Office of Spectrum Management, National Telecommunications and Information Administration, to Julius Knapp, Chief, Office of Engineering and Technology, Federal Communications Commission, File No. SES-LIC-20071203-01646, SES-AMD-20080118-00075, SES-AMD-20080219-00172, Call Sign: E070272, Attachment at 2 (Jan. 6, 2009) (
ICO-Federal Agreement).
Finally, TerreStar also requested a waiver of the part 25 emission limit rules to the extent granted ICO, and is discussing an operator-to-operator agreement with Federal agencies. In summary, as it stands, ATC base stations in the 2190-2200 MHz block must meet −100.6 dBW/4 kHz in 2200-2290 MHz throughout the licensed areas, while ATC base stations in 2180-2190 MHz must meet the limits set forth in the
ICO-Federal Agreement.
If the Commission adopts the proposals contained in this
AWS-4 Notice,
we expect that licensees will construct extensive cellular systems in this band.

We seek comment on whether such deployments would represent a material change in the expected density of deployment in the band. If so, we seek comment on the advantages and disadvantages of such a change.

35. We seek comment on the appropriate emissions limits to protect Federal operations in the 2200-2290 MHz band in light of the current state of affairs. We observe that the emissions limit of −100.6 dBW/4 kHz EIRP is considerably more stringent than the standard OOBE limit of 43+10*log
10
(P) dB and may limit flexible use of the AWS-4 band. We seek comment on whether licensees would be able to use their entire spectrum block for commercial terrestrial broadband base stations while meeting this limit, or, if not, how much spectrum would be unusable or usable only at a reduced power level (that is, would effectively become a guard band), as well as the extent of any such power reductions. We also seek comment on whether current, state-of-the-art base station filter design would feasibly be able to meet the OOBE limit of -100.6 dBW/4 kHz in any portion of the 2200-2290 MHz band, and the practicality, including the costs, of commercially deploying such filters. We seek comment on whether any internal guard band would affect the band plan proposal made in the previous section that guard bands would have on the band plan proposal. Finally, we seek comment on whether to carry forward the existing waivers of the part 25 emissions limits into the part 27 regime (
e.g.,
pursuant to the Commission's license modification authority under section 316 of the Communications Act). Commenters should discuss the costs and benefits of their proposals.

36. We seek comment on whether to prohibit the location of AWS-4 base stations within 820 meters of existing Federal earth stations, consistent with both the current part 25 rule and the
ICO-Federal Agreement.
Commenters should discuss and quantify the costs and benefits of their proposals.

37. We also seek comment on whether there are any other part 25 MSS/ATC technical rules that we should incorporate into the AWS-4 technical rules.

38.
Other alternative approaches.
We also seek comment on any other alternative approaches to protecting Federal stations above 2200 MHz while maximizing the usability of AWS-4 spectrum. Commenters should discuss and quantify the costs and benefits of any proposed alternative approaches.

39.
PFD limits for protection of operations above 2200 MHz.
We seek comment on an alternative approach of specifying an aggregate power flux density (PFD) that must be met at the protected site, which would enable the AWS-4 licensee to operate as long as this limit is met. We seek comment on what PFD limit will prevent harmful interference, what methods can be used to determine that such a limit is met (
e.g.,
engineering studies), and the degree to which this approach would increase flexibility in the AWS-4 band while protecting Federal operations in the 2200 MHz band.

40.
Sliding scale for protection of operations above 2200 MHz.
The emissions limit in the
ICO-Federal Agreement
changes from an emissions limit of 43+10*log
10
(P) dB of attenuation of the transmit power beyond a specified distance from the protected site to an EIRP limit of −100.6 dBW/4 kHz within the specified distance. However, the attenuation needed and therefore the necessary emissions limit is a function of the isolation provided by the geographic separation of the protected site and the terrestrial base station, and therefore follows a curve as a function of the distance from the protected site. Therefore, we seek comment on an alternative approach where the OOBE limit is an interpolation between 43+10*log
10
(P) dB and −100.6 dBW/4 kHz as a function of distance. In this case it may be necessary for the interpolation to be linear in the logarithm of the distance.

41.
Global Positioning System (GPS).
We note that the MSS/ATC rules contain provisions regarding interference with GPS systems operating at 1559-1610 MHz.
See
47 CFR 252(a)(7), (b)(3). We further note that different MSS/ATC bands are differently situated in terms of frequency separation from the GPS band. We request comment on whether any special interference rules protecting GPS are warranted for the 2 GHz band if we implement the AWS-4 proposals. We ask that commenters provide technical analysis supporting their views. We also seek comment on the costs and benefits associated with their proposals.

2. Receiver Performance

42. We invite comment on any potential for receiver overload interference between AWS-4 operations and operations above 2200 MHz, below 2180 MHz, above 2020 MHz, and below 2000 MHz. If such a risk exists, we request that parties provide whatever information may be available about the characteristics of the receivers operating in these frequencies, potential solutions to overload interference, and an assessment of the impact this might have on deployment of AWS-4 service. We also invite comment on any other receiver issues that should be considered in this proceeding that could affect the potential for harmful interference and usability of the AWS-4 spectrum.

3. Power Limits

43. We seek comment on appropriate power limits for terrestrial operations in the AWS-4 band. Specifically, as described below, we propose to apply existing AWS power limits to the AWS-4 band. We seek comment on this proposal, including the costs and benefits of the proposal.

44.
Base stations.
The MSS/ATC rules limit ATC base station transmit power to 27 dBW EIRP in 1.23 MHz. The current AWS-1 rules limit base station power in non-rural areas to 1640 watts EIRP for emission bandwidths less than 1 MHz and to 1640 watts per MHz EIRP for emission bandwidths greater than 1 MHz, and double these limits (3280 watts EIRP) in rural areas. The Commission has previously concluded that a power limitation of 32 dBW/MHz EIRP is appropriate for base stations in the 2180-2190 MHz band, and that a power limitation of 32 dBW EIRP is appropriate for base stations in the 2190-2200 MHz band. Although neither of these limits aligns exactly with the AWS-1 rules, the 32 dBW EIRP level was specifically chosen because it approximates the 1640 watt EIRP limit of AWS-1 specified in § 27.50(d). The Commission did not consider whether the higher power level of 3280 watts EIRP allowed for rural AWS-1 base stations is appropriate for 2180-2200 MHz. Although not fully aligned with AWS-1, the current power limits are very similar. The 32 dBW EIRP limit is the same as the AWS-1 limit of 1640 watts EIRP for emissions under 1 MHz, but is more burdensome for larger bandwidths. Similarly, the 32 dBW/MHz EIRP limit is the same as the AWS-1 limit of 1640 watts/MHz EIRP for emission over 1 MHz, but is more burdensome for emissions under 1 MHz. Changing both limits to the existing AWS-1 rule of 1640 watts EIRP for emissions less than 1 MHz and 1640 watts/MHz EIRP for emissions over 1 MHz would best allow flexibility for the use of various bandwidths in the AWS-4 spectrum.

45. Furthermore, allowing the increase of these power levels to the current AWS-1 rules of 3280 watts EIRP for emissions less than 1 MHz and 3280 watts/MHz EIRP for emissions over 1 MHz in rural areas may promote the

Commission's goals of furthering rural deployment of broadband services. Therefore, we propose that § 27.50(d)(1-2), which sets the AWS-1 power limits for base stations, should also apply to AWS-4. We seek comment on this proposal, including the costs and benefits of the proposal.

46. The current AWS-1 rules also require that base stations with transmit power above 1640 watts EIRP and 1640 watts/MHz EIRP must coordinate with licensees in adjacent AWS blocks located within 120 kilometers, BRS licensees in the 2155-2160 MHz band located within 120 kilometers, and satellite entities in the 2025-2110 MHz band. As AWS-4 is not adjacent to the 2155-2160 MHz and 2025-2110 MHz bands, we do not see a need to carry these requirements over to AWS-4. Therefore, we propose only that AWS-4 base stations with transmit power above 1640 watts EIRP and 1640 watts/MHz EIRP be required to coordinate with users in adjacent AWS blocks located within 120 kilometers. We seek comment on this proposal, including the costs and benefits of the proposal.

47.
Mobile stations.
The part 25 ATC rules set a power limit of 1 dBW (1.25 watts) EIRP in a bandwidth of 1.23 MHz for mobiles operating in 2000-2020 MHz. The existing AWS-1 rules set a power limit of 1 watt EIRP for mobiles operating in AWS-1, which is somewhat more restrictive. In the interest of harmonizing the AWS rules, and given the similarity of these two limits, we propose that the more restrictive limit of § 27.50(d)(4), which is 1 watt EIRP, should apply to AWS-4. We seek comment on this proposal, including the costs and benefits of the proposal.

4. Antenna Height Restrictions

48. We propose that the flexible antenna height rules that apply to AWS-1 should also apply to AWS-4. We seek comment on this proposal, including the costs and benefits of the proposal.

49.
Base stations.
Specific antenna height restrictions for AWS-1 base stations are not set forth in part 27 of our rules. However, all part 27 services are subject to § 27.56, which prevents antenna heights that would be a hazard to air navigation.
See
47 CFR 27.56. Furthermore, the limitations of field strength at the geographical boundary of the license discussed below also effectively limit antenna heights. We propose that no unique antenna height limits are needed for AWS-4 facilities; rather, we believe that the general height restrictions are sufficient. We seek comment on this proposal, including the costs and benefits of the proposal.

50.
Fixed stations.
Section 27.50(d)(4) specifies a height restriction of 10 meters for fixed stations operating in AWS-1 spectrum. 47 CFR 27.50(d). Given the similarity of the proposed AWS-4 use to AWS-1 use, we propose that this rule should be expanded to apply to AWS-4, as well. We seek comment on this proposal, including the costs and benefits of the proposal.

5. Co-Channel Interference Among AWS-4 Systems

51. If we ultimately decide to license the AWS-4 bands on the basis of geographic service areas that are less than nationwide, we will have to ensure that such licensees do not cause interference to co-channel systems operating along common geographic borders. The current rules for AWS-1 address the possibility of harmful co-channel interference between geographically adjacent licenses by setting a field strength limit of 47 dBμV/m at the edge of the license area.
See
47 CFR 27.55(a)(1). Due to the similarities between AWS-1 and AWS-4 spectrum use, we propose that this same signal strength limit is appropriate for AWS-4, and therefore that § 27.55(a)(1) should be expanded to include the 2180-2200 MHz band. We seek comment on this proposal, including the costs and benefits of the proposal.

6. Canadian and Mexican Coordination

52. Section 27.57(c) of our rules indicates that AWS-1 operations are subject to international agreements with Mexico and Canada.
See
47 CFR 27.57(c). Until such time as any adjusted agreements between the United States, Mexico and/or Canada can be agreed to, operations must not cause harmful interference across the border, consistent with the terms of the agreements currently in force. We note that further modification (of the proposed rules) might be necessary in order to comply with any future agreements with Canada and Mexico regarding the use of these bands. We seek comment on this issue, including the costs and benefits of alternative approaches to this issue.

7. Other Technical Issues

53. There are several additional technical rules applicable to all part 27 services. Specifically, these are: § 27.51 Equipment authorization, § 27.52 RF safety, § 27.54 Frequency stability, § 27.56 Antennas structures; air navigation safety, and § 27.63 Disturbance of AM broadcast station antenna patterns. 47 CFR 27.51, 27.52, 27.54, 27.56, 27.63. As AWS-4 will be a part 27 service, we propose that all of these rules should apply to all AWS-4 licensees, including licensees who acquire their licenses through partitioning or disaggregation. We seek comment on this approach, including the costs and benefits of this approach.

C. Protection of MSS Operations

54. We propose to adopt a rule requiring an AWS-4 licensee to protect the incumbent 2 GHz MSS licensee from harmful interference. The 2000-2020 MHz band was allocated to MSS in 1997; fourteen years later the Commission added the current co-primary terrestrial Fixed and Mobile allocations. In adding the co-primary Fixed and Mobile allocations in 2011, the Commission explained that “MSS remains co-primary in the 2 GHz MSS band.” Fixed and Mobile Services in the Mobile Satellite Service Bands at 1525-1559 MHz and 1626.5-1660.5 MHz, 1610-1626.5 MHz and 2483.5-2500 MHz, and 2000-2020 MHz and 2180-2200 MHz, 76 FR 31252 (2011) (
2 GHz Band Co-Allocation Order
). The Commission further explained that the addition of the new allocation “will not result in harmful interference, and would not inevitably lead to uses that would result in harmful interference,” impliedly because (other than the pre-existing MSS/ATC rules) no terrestrial service rules yet existed for the band.
2 GHz Band Co-Allocation Order.
As we are now proposing service rules for the AWS-4 band, we propose to codify the determination that “adding co-primary Fixed and Mobile allocations in this band will not result in harmful interference” by requiring that AWS-4 licensees protect the 2 GHz MSS licensee from harmful interference.
Id.
We seek comment on this proposal, including the costs and benefits of the proposal.

D. Assignment of AWS-4 License(s)

55. The Commission concluded in 2003 that it would grant additional ATC authority to the MSS incumbents.
See Flexibility for Delivery of Communications by Mobile Satellite Service Providers in the 2 GHz Band, the L-Band, and the 1.6/2.4 GHz Bands,
68 FR 33640 (2003) (
ATC Report and Order
). The Commission reasoned that separately controlled MSS and terrestrial mobile operations (
i.e.,
two ubiquitous mobile services) in the same band would be “impractical and ill-advised” because the parties would not be able to overcome the technical hurdles to reach a workable sharing arrangement. In particular, the Commission stated:

While * * * it may be theoretically possible for two different firms to own and operate the satellite and terrestrial portions of a single system, we believe that, in reality, no two operators are likely to succeed in organizing themselves to manage the highly complex coordination process required between both the MSS and the terrestrial component at the same time in the same band in the same region. To optimally balance the frequency usage of the terrestrial and satellite portions of the system, the ATC portion must be operated in a manner that controls the ATC terminal-to-MSS uplink interface while still providing ATC service.
ATC Report and Order.

Based on its technical analyses, the Commission also concluded that “we cannot grant to a third party the right to use licensed MSS spectrum for terrestrial use without impacting the rights of the existing satellite licensees.”
ATC Report and Order.

56. In the ATC proceeding, the Commission adopted a blanket authorization process to implement geographic area licensing of ATC base station facilities operating in the U.S. coverage of the MSS space segment,
i.e.,
all 50 states and the U.S. territories and possessions. DBSD and TerreStar received ATC authority in 2009 and 2010, respectively, allowing for the deployment of terrestrial base stations and collectively up to three million dual-mode MSS/ATC user terminals in the United States. Thus, in considering the impact that AWS-4 operations would have on the existing 2 GHz MSS licensee, we also consider the impact on the MSS licensee's significant, albeit ancillary, authority to operate terrestrial stations in the 2 GHz band throughout the nation.

57. Taken together, the above concerns appear to present strong reasons that lead us to propose that AWS-4 licenses in this band should be assigned to the incumbent MSS licensee. First, the complexities of coordination between MSS and terrestrial uses that the Commission identified in 2003 in the
ATC Report and Order
suggest that assignment of terrestrial licenses to an entity other than the incumbent MSS licensee remains impractical. Second, we expect that the interference problems associated with two or more distinct terrestrial licensees in the same band (
i.e.,
distinct co-channel ATC and part 27 licensees) point to assigning the AWS-4 licenses to the incumbent MSS licensee. Third, we observe that this result would not diminish the MSS licensee's existing ability to provide terrestrial service in the band.

58. We seek comment on these issues. In particular, commenters should address whether there have been technological advances or other developments since 2003 that would either reinforce or alter these points and provide detailed technical analysis supporting any information provided. Should the record show, contrary to our expectations, that same-band, separate-operator sharing is possible—between AWS-4 licensees and an MSS licensee's satellite and ATC operations—then we seek comment on alternative approaches to licensing the new service under the Communications Act that would achieve our goal of making additional spectrum available for terrestrial mobile broadband use. In addition, we seek comment on what effect the spectrum shift alternatives proposed above would have on assigning AWS-4 licenses. We further seek comment on the impact, including the quantification of the costs and benefits that any method for assigning licenses would have on innovation, investment, and competition.

1. Section 316 License Modification

59. Based on our expectation that the Commission's earlier technical findings are still sound, and mindful of the 2 GHz MSS license holder's existing rights to operate MSS in the AWS-4 band and our proposal, above, to require protection of MSS uses, we propose to grant terrestrial authority to operate in the AWS-4 band to the current 2 GHz MSS licensee. We believe this would serve the public interest, convenience and necessity by making more spectrum available for broadband use and avoiding harmful electromagnetic interference.

60.
Legal Authority.
Under section 316 of the Communications Act, the Commission has the authority to modify a station license if “in the judgment of the Commission such action will promote the public interest, convenience, and necessity.”
See
47 U.S.C. 316(a)(1). As the D.C. Circuit explained in
California Metro Mobile Communications
v.
FCC,
“section 316 grants the Commission broad power to modify licenses; the Commission need only find that the proposed modification serves the public interest, convenience and necessity.”
California Metro Mobile Communications
v.
FCC,
365 F.3d 38, 45 (D.C. Cir. 2004) For example, in that case, the court found that the Commission's modification served the public interest, even though it was based on an analysis of potential rather than actual interference, and the modification could cause a minor disruption in the licensee's operations. Here, we propose that, once the AWS-4 service rules are effective, we would issue an Order of Proposed Modification, under section 316 of the Communications Act, to modify the existing 2 GHz MSS licensee's authority to operate in the 2000-2020 MHz and 2180-2200 MHz bands by adding part 27 terrestrial authority and obligations, which would apply to all the AWS-4 service areas in these bands. We seek comment on this proposed approach, including the costs and benefits of the proposal.

61.
Public Interest Considerations.
The incumbent MSS licensee holds exclusive authority to operate terrestrial base stations in the AWS-4 band nationwide. And existing Commission rules permit the MSS licensee to enter into spectrum manager leasing arrangements with spectrum lessees. We believe that modifying the 2 GHz MSS licensee's authority as described herein, to have 2 GHz terrestrial operations governed under part 27, would remove outdated regulatory barriers that have frustrated the Commission's goal of having the 2 GHz band used for terrestrial mobile broadband. Additionally, if the record developed in this proceeding confirms that current technology will not permit separate MSS and terrestrial mobile licensees, the envisioned section 316 license modification would serve the public interest, convenience and necessity, by: (1) Making more spectrum available for broadband use, and (2) avoiding harmful electromagnetic interference. We seek comment on this proposal, including the costs and benefits of the proposal.

62. The availability and quality of wireless broadband services will likely become constrained if additional spectrum does not become available to enable network expansion and technology upgrades. This could result in higher prices, poor service quality, an inability for the U.S. to compete effectively on an international basis, depressed demand and, ultimately, a drag on innovation. To address the need for broadband spectrum, the Commission has endeavored to promote the use of the 2 GHz MSS band, but there is virtually no current commercial use of this spectrum.

63. We believe that modifying the 2 GHz MSS licensee's authority as described herein would enhance the licensee's ability to offer high-quality, affordable terrestrial wireless broadband services, while retaining the right to offer MSS using the same spectrum; spectrum that is already licensed nationwide on an exclusive, primary basis for MSS. Thus, we propose that authorizing terrestrial operations will provide the 2 GHz MSS licensee with the possibility of achieving greater usage

of the 2000-2020 MHz and 2180-2200 MHz bands than are possible under the current regulations. We seek comment on this proposal. We also seek comment on the extent that this proposal would increase innovation and investment in mobile broadband use of this spectrum. Commenters should discuss and quantify the costs and benefits of the proposal.

64. The Commission may also modify licenses to achieve the public interest purpose of avoiding harmful interference. In 2003, the Commission concluded that separately controlled MSS and terrestrial operations (
i.e.,
two ubiquitous mobile services) in the same band would be “impractical and ill-advised” because the parties would not be able to overcome the technical hurdles to reach a workable sharing arrangement. If the record developed in this proceeding confirms that allowing terrestrial operations in the 2000-2020 MHz and 2180-2200 MHz bands independent from the MSS licensee would likely substantially compromise the effectiveness of both the mobile satellite and terrestrial services, we propose that the public interest would be best served by modifying the license to operate in the 2 GHz MSS band, as contemplated herein, rather than making the band available for initial terrestrial licenses under a sharing regime with MSS. We seek comment on this proposal and its effect on interference. Commenters should discuss and quantify the costs and benefits of this proposal on eliminating harmful interference.

65.
Other Assignment Approaches.
If, contrary to our expectations, the record developed in this proceeding reflects that it is now possible for separately authorized, independent AWS-4 licensees to protect MSS including ATC operations, then we seek comment on other approaches to authorizing terrestrial use, upon creation of the new AWS-4 service. These other approaches may include the assignment of new initial licenses via competitive bidding, if mutually exclusive applications are received, under section 309(j) of the Communications Act.
See
47 U.S.C. 309(j). Commenters should be mindful that existing MSS licensees would still retain MSS licenses and, therefore, any new terrestrial licensees would have to protect the incumbent 2 GHz MSS licensee from harmful interference. Commenters should discuss and quantify and costs and benefits associated with any alternative approaches.

66.
Applications for Any AWS-4 Licenses Returned to the Commission.
There is a potential, under proposals discussed herein or otherwise, for AWS-4 licenses to be terminated automatically or otherwise to become a part of the Commission's spectrum inventory. Under such a scenario, we would resolve any mutually exclusive applications for such AWS-4 licenses using competitive bidding. We seek comment on the appropriate competitive bidding procedures below.

67.
Procedures for Any AWS-4 Licenses Subject to Assignment by Competitive Bidding.
Some of the scenarios on which we seek comment in this notice could result in the acceptance of mutually exclusive applications for licenses that would be resolved by competitive bidding. Accordingly, we seek comment on a number of proposals relating to competitive bidding for licenses for spectrum in the AWS-4 band.

68. We propose that the Commission would conduct any auction for AWS-4 licenses in conformity with the general competitive bidding rules set forth in part 1, subpart Q, of the Commission's rules, and substantially consistent with the competitive bidding procedures that have been employed in previous auctions.
See
47 CFR 1.2101-1.2114. Specifically, we propose to employ the part 1 rules governing competitive bidding design, designated entity preferences, unjust enrichment, application and payment procedures, reporting requirements, and the prohibition on certain communications between auction applicants. Under this proposal, such rules would be subject to any modifications that the Commission may adopt for its part 1 general competitive bidding rules in the future. In addition, consistent with our long-standing approach, auction-specific matters such as the competitive bidding design and mechanisms, as well as minimum opening bids and/or reserve prices, would be determined by the Wireless Telecommunications Bureau pursuant to its delegated authority. We seek comment on this approach, including the costs and benefits of this approach. We also seek comment on whether any of our part 1 rules would be inappropriate or should be modified for an auction of licenses in the AWS-4 bands.

69. In authorizing the Commission to use competitive bidding, Congress mandated that the Commission “ensure that small businesses, rural telephone companies, and businesses owned by members of minority groups and women are given the opportunity to participate in the provision of spectrum-based services.” 47 U.S.C. 309(j)(4)(D). In addition, section 309(j)(3)(B) of the Communications Act provides that, in establishing eligibility criteria and bidding methodologies, the Commission shall promote “economic opportunity and competition * * * by avoiding excessive concentration of licenses and by disseminating licenses among a wide variety of applicants, including small businesses, rural telephone companies, and businesses owned by members of minority groups and women.” 47 U.S.C. 309(j)(3)(B). One of the principal means by which the Commission fulfills this mandate is through the award of bidding credits to small businesses.

70. In the
Competitive Bidding Second Memorandum Opinion and Order,
the Commission stated that it would define eligibility requirements for small businesses on a service-specific basis, taking into account the capital requirements and other characteristics of each particular service in establishing the appropriate threshold.
See Implementation of Section 309(j) of the Communications Act—Competitive Bidding,
59 FR 44272 (1994) (
Competitive Bidding Second Memorandum Opinion and Order).
Further, in the
Part 1 Third Report and Order,
the Commission, while standardizing many auction rules, determined that it would continue a service-by-service approach to defining small businesses.
See Amendment of Part 1 of Commission's Rules—Competitive Bidding Procedures,
63 FR 770 (1997) (
Part 1 Third Report and Order).

71. In the event that the Commission assigns exclusive geographic area licenses for terrestrial use of the AWS-4 band, we believe that this spectrum would be employed for purposes similar to those for which the AWS-1 band is used. We therefore propose to establish the same small business size standards and associated bidding credits for the AWS-4 bands as the Commission adopted for the AWS-1 band. Thus, we propose to define a small business as an entity with average annual gross revenues for the preceding three years not exceeding $40 million, and a very small business as an entity with average annual gross revenues for the preceding three years not exceeding $15 million. We seek comment on this proposal, including the costs and benefits of the proposal.

72. We propose to provide small businesses with a bidding credit of 15 percent and very small businesses with a bidding credit of 25 percent, as set forth in the standardized schedule in part 1 of our rules. We seek comment on the use of these standards and associated bidding credits, with particular focus on the appropriate definitions of small businesses and very

small businesses as they may relate to the size of the geographic area to be served and the spectrum allocated to each license. Commenters should discuss and quantify any costs or benefits associated with these standards and associated bidding credits as they relate to the proposed geographic areas. In discussing these issues, commenters are requested to address and quantify the expected capital requirements for services in these bands and other characteristics of the service. Commenters are also invited to use comparisons with other services for which the Commission has already established auction procedures as a basis for their comments and any quantification of costs and benefits regarding the appropriate small business size standards.

73. In establishing the criteria for small business bidding credits, we acknowledge the difficulty in accurately predicting the market forces that will exist at the time these frequencies are licensed. Thus, our forecasts of types of services that will be offered over these bands may require adjustment depending upon ongoing technological developments and changes in market conditions.

74. Finally, we seek comment on whether to use a different approach to bidding credits. To the extent commenters support a different approach to bidding credits than those discussed here, they should support their proposals with relevant information, including costs and benefits of their alternative proposals on the types of system architecture that are likely to be deployed in these bands, the availability of equipment, market conditions, and other factors that may affect the capital requirements of the types of services that may be provided.

E. Performance Requirements

75. The Commission establishes performance requirements to promote access to spectrum and the provision of service, including to rural areas. Over the years the Commission has applied different performance and construction requirements to different spectrum bands. For example, for licensees operating in the 2.3 GHz Wireless Communications Services (WCS) band, the Commission adopted performance requirements, which include population-based construction requirements (40 percent of the license area's population within three-and-a-half (3.5) years and 75 percent within six (6) years) and reporting requirements.
See
47 CFR 27.14(p).

76. We propose to establish performance requirements for AWS-4 licensees. Our proposal is informed by proposals made in the proceeding on DISH's request for waiver of certain ATC rules for the 2000-2020 MHz and 2180-2200 MHz bands. Specifically, DISH proposed a buildout schedule based on “the buildout principles established in the Sprint/Nextel and Sprint/Clearwire transaction decisions” and “keyed to commercial availability of the LTE Advanced standard.” DISH, DBSD, TerreStar Consolidated Opposition to Petitions to Deny and Response to Comments, IB Docket Nos. 11-149, 11-150, at 31 (Oct. 27, 2011) (internal citations omitted). The Sprint/Nextel build-out requirements were to offer service to a population of 15 million within four years and 30 million within 6 years; Applications of Nextel Communications, Inc., and Sprint Corporation For Consent to Transfer Control of Licenses and Authorizations, WT Docket No. 05-63,
Memorandum Opinion and Order,
20 FCC Rcd 13967, 14028 paragraphs 164-65 (2005) the Sprint/Clearwire build-out requirement is to “cover 140 million people by the end of 2010,” slightly more than two years after the adoption of the order. Sprint Nextel Corporation and Clearwire Corporation Applications for Consent to Transfer Control of Licenses, Leases, and Authorizations, WT Docket No. 08-94,
Memorandum Opinion and Order,
23 FCC Rcd 17570, 17617 paragraph 119 (2008). Alternatively, AT&T proposes that the Commission impose the build out conditions consistent with the March 2010 Harbinger/SkyTerra transfer of control. Letter from Joan Marsh, Vice President—Federal Regulatory, AT&T Services, Inc., to Marlene H. Dortch, Sec'y, Federal Communications Commission, Docket No. 11-149, at 2 (Jan. 26, 2012). In approving that transfer, the Commission required Harbinger (now operating as LightSquared) to build out its 4G terrestrial network according to Harbinger's proposed build-out schedule of providing coverage to at least 100 million people in the United States by the end of 2012 (21 months after the transfer order), to at least 145 million people by the end of 2013 (33 months), and to at least 260 million people in the United States by the end of 2015 (57 months). SkyTerra Communications, Inc., Transferor, and Harbinger Capital Partners Funds, Transferee, Applications for Consent to Transfer of Control of SkyTerra Subsidiary, LLC, IB Docket No. 08-184,
Memorandum Opinion and Order and Declaratory Ruling,
25 FCC Rcd 3059, 3085, 3088-89, 3098 at paragraphs 56, 72, App. B at Att. 2, p.1 (2010). On February 15, 2012, the Commission proposed to modify LightSquared's satellite license “to suspend indefinitely LightSquared's underlying ATC authorization, first granted in 2004, to an extent consistent with the NTIA Letter.” International Bureau Invites Comment on NTIA Letter Regarding LightSquared Conditional Waiver, IB Docket No. 11-109,
Public Notice,
DA 12-214 at 4 (Feb. 15, 2012).

77.
Build-out requirements.
Building off of these approaches and in light of the unique circumstances of the AWS-4 band, including its interplay with the 2 GHz MSS band located in the same frequencies, we propose to adopt a middle ground between these two proposals. We seek comment on the following build-out requirements for AWS-4 spectrum:

• AWS-4 Interim Build-out Requirement: Within three (3) years, an AWS-4 licensee shall provide signal coverage and offer service to at least thirty (30) percent of their total AWS-4 population. A licensee's total AWS-4 population shall be calculated by summing the population of each of its license authorizations in the AWS-4 band.

• AWS-4 Final Build-out Requirement: Within seven (7) years, an AWS-4 licensee shall provide signal coverage and offer service to at least seventy (70) percent of the population in each of its license authorization areas.

78. We propose these performance requirements in an effort to foster timely deployment in the AWS-4 band for the provision of wireless, terrestrial broadband service, and to enable the Commission to take appropriate corrective action should such deployment fail to occur. Specifically, the interim benchmark at three years would ensure that a licensee will begin deploying facilities quickly and thereby evidencing meaningful utilization of the spectrum. At the same time, by proposing a relatively low population threshold in the interim benchmark, we acknowledge that large-scale network deployment may ramp up over time as equipment becomes available and a customer base is established. In addition, by proposing a final build-out requirement timeline of seven years, we believe we allow a reasonable amount of time for any AWS-4 licensee to attain nationwide scale. Further, we propose geographic area based (
i.e.
EA based) requirements for the final milestone in order to encourage deployment in all areas of the country. We seek comment on the proposed build-out requirements. We encourage comment on whether our proposals represent the appropriate

balance between requirements that are too low as to not result in meaningful build-out and those that would be too high as to be unattainable. Would the DISH or AT&T proposals represent more appropriate requirements? Commenters should discuss and quantify how any supported buildout requirements will affect investment and innovation as well as discuss and quantify other costs and benefits associated with the proposal.

79.
Penalties for failure to meet construction requirements.
Again, building on what we have learned from other bands and on the unique characteristics of the AWS-4 bands, we propose and seek comment, including the costs and benefits, on the following penalties in the event an AWS-4 licensee fails to satisfy its build-out requirements:

• In the event an AWS-4 licensee fails to meet the AWS-4 Interim Build-out Requirement,
all
of the licensee's AWS-4 license authorizations shall terminate automatically without Commission action.

• In the event an AWS-4 licensee fails to meet the AWS-4 Final Build-out Requirement in any of its license authorizations, its AWS-4 license for each license authorization areas in which it fails to meet the build-out requirement shall terminate automatically without Commission action.

80. If the Commission assigns AWS-4 rights to the 2 GHz MSS licensee pursuant to a section 316 license modification, the license would include both part 27 terrestrial and part 25 mobile satellite authorizations. In such a situation, we propose that the failure to satisfy a build-out requirement would trigger the automatic termination of the mobile satellite authorization in any area in which the terrestrial authorizations are terminated. Specifically, failure to meet the AWS-4 Interim Build-out Requirement would result in the AWS-4 and 2 GHz MSS licenses automatically terminating in all license areas (
i.e.,
nationwide). Failure to meet the AWS-4 Final Build-out Requirement would result in the AWS-4 and 2 GHz MSS licenses automatically terminating in those areas where the licensee fails to meet the requirement. This proposal appears consistent with the 2 GHz MSS licensee's assertion that the ability to offer stand-alone terrestrial service is critical to support the provision of MSS in this spectrum. We similarly expect that failure to satisfy terrestrial build-out requirements would be accompanied by failure to provide meaningful MSS. We seek comment on whether the protection that is afforded to MSS operations under our proposed rules should be modified if the MSS licensee fails to meet the AWS-4 Final Build-out Requirement and the costs and benefits to any modification. If so, to what extent should the interference protection be modified?

81. We further propose that, in the event that a licensee's authority to operate terminates, terrestrial spectrum rights would become available for reassignment pursuant to the competitive bidding provisions of section 309(j). Further, consistent with the Commission's rules for other spectrum bands, including AWS-1, 700 MHz, and Broadband Radio Service, we propose that any AWS-4 licensee who forfeits its license for failure to meet it performance requirements would be precluded from regaining it.
See, e.g.,
27 CFR 27.14(a), (j), (o). We observe that for AWS-4 spectrum assigned under section 316, termination of individual AWS-4 area licenses for failure to satisfy the AWS-4 Final Build-out Requirement could result in an inability for the Commission to meaningfully reassign the spectrum rights should the Commission continue to require coordination of reassigned spectrum with the MSS operator. We request comment on the appropriate remedy in such circumstances, and commenters should discuss and quantify the costs and benefits or any proposed remedy. For example, should any subsequent Commission reassignment of the AWS-4 spectrum occur without a requirement to coordinate with, or protect MSS operations or should the MSS operations continue to receive interference protection?

82.
Compliance procedures.
Consistent with § 1.946(d) of the Commission's rules, we propose to require AWS-4 licensees to demonstrate compliance with the new performance requirements by filing a construction notification within 15 days of the relevant milestone certifying that they have met the applicable performance benchmark.
See
47 CFR 1.946(d) (“notification[s] must be filed with Commission within 15 days of the expiration of the applicable construction or coverage period”). Further, we propose that each construction notification include electronic coverage maps and supporting documentation, which must be truthful and accurate and must not omit material information that is necessary for the Commission to determine compliance with its performance requirements.

83. Electronic coverage maps must accurately depict the boundaries of each license area in the licensee's service territory. If a licensee does not provide reliable signal coverage to an entire license area, we propose that its map must accurately depict the boundaries of the area or areas within each license area not being served. Further, we propose that each licensee also must file supporting documentation certifying the type of service it is providing for each licensed area within its service territory and the type of technology used to provide such service. Supporting documentation must include the assumptions used to create the coverage maps, including the propagation model and the signal strength necessary to provide reliable service with the licensee's technology.

F. Regulatory Issues; Licensing and Operating Rules

84. We propose to provide AWS-4 licensees with the flexibility to provide any fixed or mobile service that is consistent with the allocations for this spectrum, as we have generally done with other spectrum allocated or designated for licensed fixed and mobile services,
e.g.,
AWS-1 spectrum. We also propose to license this spectrum under our market-oriented part 27 rules. We seek comment on these proposals. In addition, we seek comment on the appropriate regulatory framework for AWS-4 licenses, the license term, criteria for renewal, and other licensing and operating rules pertaining to these bands. We also seek comment on the potential impact of all of our proposals on competition. Commenters should also comment on how any proposal that they support enhances competition and results in rapid provisioning of competitive mobile broadband services to consumers. Commenters also should discuss the costs and benefits of these proposals and any alternative proposals.

1. Flexible Use, Regulatory Framework, and Regulatory Status

85.
Flexible Use.
We propose service rules for the AWS-4 band that would permit a licensee to employ the spectrum for any terrestrial use permitted by the United States Table of Frequency Allocations contained in part 2 of our rules (
i.e.,
fixed or mobile services). 47 CFR 2.106. Part 27 licensees must also comply with other Commission rules of general applicability.
See
47 CFR 27.3. These service rule proposals cover only the terrestrial use of the spectrum in this band. MSS use in this spectrum will continue to be governed by part 25. Congress recognized the potential benefits of flexibility in allocations of the electromagnetic spectrum and amended the Communications Act in 1999 to add section 303(y). This section

provides the Commission with authority to provide for flexibility of use if:

(1) such use is consistent with international agreements to which the United States is a party; and (2) the Commission finds, after notice and an opportunity for public comment, that (A) such an allocation would be in the public interest; (B) such use would not deter investment in communications services and systems, or technology development; and (C) such use would not result in harmful interference among users.

47 U.S.C. 303(y).

86. We believe that our proposal for flexibility meets these section 303(y) criteria. The public interest benefits of flexibility are manifold. The Commission has identified the establishment of maximum feasible flexibility in both allocations and service rules as a critical means of ensuring that spectrum is put to its most beneficial use. For example, in a 1999
Policy Statement
on spectrum management, the Commission observed that “[i]n the majority of cases, efficient spectrum markets will lead to use of spectrum for the highest value end use,” and that “[f]lexible allocations may result in more efficient spectrum markets.”
See
Principles for Reallocation of Spectrum to Encourage the Development of Telecommunications Technologies for the New Millenium, FCC 99-354,
Policy Statement,
14 FCC Rcd 19868, 19870 paragraph 9 (1999). We would expect these economic efficiencies to foster—not deter—technology development and investment in communications services and systems. And the technical rules we are proposing here should prevent harmful interference among users. In addition, as discussed above, flexible use would be subject to bilateral discussions commonly undertaken whenever spectrum is put to use in border areas, but is consistent with applicable international agreements. Finally, in the
2 GHz Band Co-Allocation Order,
the Commission added co-primary Fixed and Mobile allocations, along with the pre-existing MSS allocation, in the 2 GHz band, expressly “lay[ing] the foundation for more flexible use of the band [and] * * * promoting investment in the development of new services and additional innovative technologies.”
2 GHz Band Co-Allocation Order.

87. We seek comment on our proposal to provide for flexible use of the AWS-4 band, especially in light of the section 303(y) criteria noted above. If any restrictions are warranted, what should they be and why are they needed? Commenters should quantify the costs and benefits or any such restrictions. Are there trade-offs between flexibility and investment in technology and new services that we should consider? To the extent commenters believe flexibility will deter investment in these bands, they should also suggest specific restrictions on how spectrum should be used by a licensee, and provide detailed analysis and quantification of the economic tradeoffs between flexibility and investment that justify any particular recommended restriction on use. We also specifically seek comment on the types of uses that pose the greatest risk of interference to terrestrial or satellite use of this spectrum, and the quantification of these risks.

88.
Regulatory Framework.
Because we propose to permit flexible use of these bands, we also propose licensing the spectrum under the flexible regulatory framework of part 27 of our rules. Unlike other rule parts applicable to specific services, part 27 does not prescribe a comprehensive set of licensing and operating rules for the spectrum to which it applies. Rather, for each frequency band under its umbrella, part 27 defines permissible uses and any limitations thereon, and specifies basic licensing requirements. The licensing requirements for a number of spectrum bands, including the AWS spectrum at 1710-1755 MHz and 2110-2155 MHz and the Upper and Lower 700 MHz bands, are contained in part 27. In order to promote flexibility and permit market forces to determine what services are ultimately offered in these bands, we therefore seek comment on our proposal to license the AWS-4 band under part 27 service and licensing rules, and any associated costs or benefits or doing so.

89.
Regulatory Status.
We propose to apply the regulatory status provisions of § 27.10 of the Commission's rules to licensees in the AWS-4 band. The Commission's current mobile service license application requires an applicant for mobile services to identify the regulatory status of the service(s) it intends to provide because service offerings may bear on eligibility and other statutory and regulatory requirements. Under part 27, the Commission permits applicants who may wish to provide both common carrier and non-common carrier services (or to switch between them) under a single license to request status as both a common carrier and a non-common carrier. Thus, a part 27 applicant is not required to choose between providing common carrier and non-common carrier services. We propose to adopt this same approach here. Licensees in the AWS-4 band would be able to provide all allowable services anywhere within their licensed area at any time, consistent with their regulatory status. We believe that this approach is likely to achieve efficiencies in the licensing and administrative process, and provide flexibility to the marketplace. We seek comment on this approach and the costs and benefits of this approach.

90. We further propose that applicants and licensees in the AWS-4 band be required to indicate a regulatory status for any services they choose to provide. Apart from this designation of regulatory status, we would not require applicants to describe the services they seek to provide. We caution potential applicants that an election to provide service on a common carrier basis typically requires that the elements of common carriage be present; otherwise the applicant must choose non-common carrier status. If potential applicants are unsure of the nature of their services and their classification as common carrier services, they may submit a petition with their applications, or at any time, requesting clarification and including service descriptions for that purpose. We propose to apply this framework to AWS-4 licensees and seek comment on this proposal, including the costs and benefits of this proposal.

91. We also propose that if a licensee were to change the service or services it offers such that its regulatory status would change, the licensee must notify the Commission. A change in a licensee's regulatory status would not require prior Commission authorization, provided the licensee was in compliance with the foreign ownership requirements of section 310(b) of the Communications Act that would apply as a result of the change, consistent with the Commission's rules for AWS-1 spectrum. Consistent with our part 27 rules, we propose to require the notification within 30 days of a change made without the need for prior Commission approval, except that a different time period may apply where the change results in the discontinuance, reduction, or impairment of the existing service. We seek comment on this proposal, including the costs and benefits of this proposal.

2. Ownership Restrictions

92.
Foreign Ownership.
We propose that the provisions of § 27.12 of the Commission's rules should apply to applicants applying for licenses in the AWS-4 band. 47 CFR 27.12. Section 27.12 implements section 310 of the Communications Act, as modified by the Telecommunications Act of 1996, imposing foreign ownership and citizenship requirements that restrict the issuance of licenses to certain

applicants. An applicant requesting authorization for services other than broadcast, common carrier, aeronautical en route, or aeronautical fixed services would be subject to section 310(a), but not to the additional prohibitions of section 310(b). An applicant requesting authorization for these particular services would be subject to both sections 310(a) and 310(b). As applicable to these bands, we do not believe that common carriers and non-common carriers filing an application should be subject to varied reporting obligations. By establishing parity in reporting obligations, however, we do not propose a single, substantive standard for compliance. For example, we would be unlikely to deny a license to an applicant requesting authorization exclusively to provide services not enumerated in section 310(b), solely because its foreign ownership would disqualify it from receiving a license if the applicant had applied for a license to provide the services enumerated in section 310(b). We request comment on this proposal, including any costs or benefits of this proposal.

93.
Eligibility.
In recent years the Commission determined in a number of services that eligibility restrictions on licenses may be imposed only when open eligibility would pose a significant likelihood of substantial harm to competition in specific markets and when an eligibility restriction would be effective in eliminating that harm. This approach relies on market forces absent a compelling showing that regulatory intervention to exclude potential participants is necessary.

94. We propose not to apply any eligibility restrictions to AWS-4 licenses. We believe that open eligibility in the AWS-4 band would not pose a significant likelihood of substantial harm to competition in any specific markets, and thus an eligibility restriction in these bands is not warranted. We also believe that open eligibility in these bands is consistent with our statutory mandate to promote the development and rapid deployment of new technologies, products, and services; economic opportunity and competition; and the efficient and intensive use of the electromagnetic spectrum. We seek comment on this approach. Commenters should discuss the costs and benefits of the open eligibility proposal on competition, innovation, and investment.

95.
Spectrum Aggregation.
Spectrum is an essential input for the provision of mobile telephony/broadband services, and a service provider, in order to compete effectively, must have access to adequate spectrum. The Commission therefore closely examines the impact of spectrum aggregation on competition, innovation, and the efficient use of spectrum, generally on a case-by-case basis, upon establishing the relevant product and geographic markets. For example, in analyzing transactions, the Commission identifies markets where the spectrum amounts held provide reason for further competitive analysis. Thus, in this context, when evaluating the competitive effect of spectrum aggregation in bands that it has found available and suitable for the provision of mobile telephony/broadband services, the Commission conducts a market-by-market analysis of those markets identified by the initial screen to determine whether competitive harms would be likely to result. In addition, in 2008 the Commission determined that it would apply this standard competitive analysis to mobile spectrum acquired via competition bidding.

96. We seek comment on whether the acquisition of AWS-4 spectrum should be subject to the same general spectrum aggregation policies currently applicable to frequency bands that the Commission has determined to be available and suitable for mobile telephony/broadband services. Specifically, should the current spectrum screen for mobile telephony/broadband services be revised to include AWS-4 spectrum? Alternatively, depending on the specific rules and requirements that apply to AWS-4 spectrum, would there continue to be reasons to distinguish AWS-4 spectrum from other bands evaluated pursuant to the spectrum aggregation policies applicable to mobile telephony/broadband services? We seek comment generally on whether and how to address any spectrum aggregation concerns involving AWS-4 spectrum. Commenters should discuss and quantify any costs and benefits associated with alternative proposals on spectrum aggregation policies for AWS-4 spectrum on competition, innovation and investment.

3. Secondary Markets

97.
Partitioning and Disaggregation.
The Commission's part 27 rules generally allow for geographic partitioning and spectrum disaggregation.
See
47 CFR 27.15. Geographic partitioning refers to the assignment of geographic portions of a license to another licensee along geopolitical or other boundaries. Spectrum disaggregation refers to the assignment of discrete amount of spectrum under the license to another entity. Disaggregation allows for multiple transmitters in the same geographic area operated by different companies on adjacent frequencies in the same band. As the Commission noted when first establishing partitioning and disaggregation rules, allowing such flexibility could facilitate the efficient use of spectrum by providing licensees with the flexibility to make offerings directly responsive to market demands for particular types of services, increase competition by allowing market entry by new entrants, and expedite provision of services that might not otherwise receive service in the near term.

98. We seek comment on allowing licensees in the AWS-4 band to partition their service areas or to disaggregate their spectrum into new licenses. Part 27 rules for terrestrial wireless service provide that licensees may apply to partition their licensed geographic service areas or disaggregate their licensed spectrum at any time following the grant of their licenses. The Commission's rules also set forth the general requirements that apply with regard to approving applications for partitioning or disaggregation, as well as other specific requirements (
e.g.,
performance requirements) that would apply to licensees that hold licenses created through partitioning or disaggregation. We seek comment on applying these general procedures and requirements to any permissible partitioning or disaggregation of AWS-4 licenses. In particular, we seek comment on the performance requirements that would apply to any license created through partitioning or disaggregation. To ensure that the public interest would be served if partitioning or disaggregation is allowed, we propose requiring each AWS-4 licensee who is a party to a partitioning, disaggregation or combination of both to independently meet the applicable performance and renewal requirements. We believe this approach would facilitate efficient spectrum use, while enabling service providers to configure geographic area licenses and spectrum blocks to meet their operational needs. We seek comment on these proposals. Commenters should discuss and quantify the costs and benefits of these proposals on competition, innovation, and investment.

99. We acknowledge, however, that there may be technical impediments to partitioning or disaggregating satellite spectrum and service. As noted above, we seek comment on the Commission's earlier conclusion that the complexities of coordination between MSS and terrestrial operations render impractical assignment of terrestrial licenses to an

entrant other than the incumbent MSS licensee(s). Further, we seek comment on whether the actual capabilities of existing or future satellites make partitioning or disaggregation of spectrum difficult or problematic. We also acknowledge that part 25 of the Commission's rules do not contain provisions governing the partition or disaggregation of MSS. We seek comment on the affect the answers to these questions should have on whether we should permit disaggregation or partition of AWS-4 spectrum or licenses. Would an affirmation of the Commission's prior finding require us to not permit disaggregation or partition here? Conversely, if we find same-band, separate operator sharing possible and in the public interest, should that lead us apply the part 27 rules governing disaggregation and partition to AWS-4 spectrum and licensees. In the event that we apply rule § 27.15 to AWS-4 licensees (or otherwise permit partitioning or disaggregation for AWS-4 licensees), we seek comment on whether the part 25 rules should be amended to address partition and disaggregation of 2 GHz MSS spectrum by its licensees. Similarly, if we permit partitioning or disaggregation, should we require that any such arrangement apply to both the terrestrial and mobile satellite authorizations, but not to only one set of such authorizations? Should such a requirement only apply in the case where the AWS-4 authorizations are assigned to the same entity that holds the 2 GHz MSS rights? Commenters should discuss and quantify the costs and benefits of allowing partitioning and disaggregating AWS-4 spectrum.

100. We also seek comment on whether the Commission should adopt additional or different mechanisms to encourage partitioning and/or disaggregation of AWS-4 band spectrum and the extent to which such policies ultimately may promote more service, especially in rural areas. Commenters should discuss and quantify the costs and benefits of promoting more service using mechanisms to encourage partitioning and disaggregation AWS-4 spectrum, including the effects of the proposal on competition, innovation, and investment.

101.
Spectrum Leasing.
In 2003, in order to promote more efficient use of terrestrial wireless spectrum through secondary market transactions, while also eliminating regulatory uncertainty, the Commission adopted a comprehensive set of policies and rules to govern spectrum leasing arrangements between terrestrial licensees and spectrum lessees. These policies and rules enabled terrestrially-based Wireless Radio Service licensees holding “exclusive use” spectrum rights to lease some or all of the spectrum usage rights associated with their licenses to third party spectrum lessees, which then would be permitted to provide wireless services consistent with the underlying license authorization. Through these actions, the Commission sought to promote more efficient, innovative, and dynamic use of the terrestrial spectrum, expand the scope of available wireless services and devices, enhance economic opportunities for accessing spectrum, and promote competition among terrestrial wireless service providers. In 2004, the Commission built upon this spectrum leasing framework by establishing immediate approval procedures for certain categories of terrestrial spectrum leasing arrangements and extending the spectrum leasing policies to additional Wireless Radio Services. Since then, the Commission has added more terrestrial services to this spectrum leasing framework, including the Advanced Wireless Services in 2003 (when the service rules were adopted for this new service) and the Broadband Radio Services and Educational Broadband Services in 2004 (when the rebanding plan for these services in the 2.5 GHz band was adopted). Most recently, in 2011 in the
2 GHz Band Co-Allocation Order,
the Commission extended the Commission's secondary market spectrum leasing policies, procedures, and rules to MSS/ATC spectrum and licenses for spectrum manager lease arrangements; the Commission did not extend the secondary market regime to MSS/ATC
de facto
transfer lease arrangements because that would have been inconsistent with the need to have the same entity control both the terrestrial and satellite operations.

102. We now seek comment on the extent to which we should extend the Commission's secondary markets spectrum leasing policies and rules to AWS-4 spectrum. For the reasons articulated in the
2 GHz Band Co-Allocation Order,
we propose to extend spectrum manager lease arrangements to AWS-4 spectrum. With regard to
de facto
transfer lease arrangements, we propose to permit them only to the extent that we permit the disaggregation and partitioning of AWS-4 spectrum and licenses. To the extent that we find that the Commission's earlier conclusion that the complexities of coordination between MSS and terrestrial operations renders impractical assignment of terrestrial licenses to an entrant other than the incumbent MSS licensee(s), we propose to not allow
de facto
transfer lease arrangements for AWS-4 spectrum or licenses. Alternatively, if the record we develop reflects that same-band, separate terrestrial and mobile operator sharing is possible and would benefit the public interest, we propose to permit
de facto
transfer lease arrangements for AWS-4 spectrum and licenses. We seek comment on these proposals. Commenters should discuss the costs and benefits of extending the Commission's secondary spectrum leasing policies and rules to AWS-4 spectrum on competition, innovation, and investment.

4. License Term, Renewal Criteria, and Permanent Discontinuance of Operations

103.
License Term.
We propose to establish a 10-year term for licenses in the AWS-4 band. The Communications Act does not specify a term limit for AWS band licenses. The Commission has adopted 10-year license term for most wireless radio services licenses. We propose that in the AWS-4 band the license term similarly be 10 years. We seek comment on this proposal, including any costs and benefits of the proposal.

104. We also seek comment on whether a license term longer than 10 years would better serve the public interest. We note that in the
AWS-1 Report and Order,
we established an initial license term in the 1710-1755 MHz and 2110-2155 MHz bands of 15 years and subsequent renewal terms of 10 years because of the relocation and band clearance issues that were associated with those bands. Commenters who favor a different license term for the AWS-4 band should specify a reasonable license term and the bases for the period proposed.
AWS-1 Report and Order.
Commenters should also address whether it would be possible to have different license terms, depending on the type of service offered by the licensee, including the costs and benefits of an alternative proposal. We seek comment on how we would administer such an approach, particularly if licensees provide more than one service in their service area, or decide to change the type of service they plan to offer. We also seek comment on whether we should match the license term to the 15-year term of the satellite licenses. How would this be accomplished given that the term of the two 2 GHz MSS licenses have different expiration dates, and what are the costs and benefits of this proposal?

105. Under our license term proposal, if a license in these bands is partitioned or disaggregated, any partitionee or disaggregatee would be authorized to hold its license for the remainder of the partitioner's or disaggregator's original license term. This approach is similar to the partitioning provisions the Commission adopted for BRS, for broadband PCS licensees, for the 700 MHz band licensees, and for AWS-1 licenses at 1710-1755 MHz and 2110-2155 MHz. We emphasize that nothing in our proposal is intended to enable a licensee, by partitioning or disaggregation, to be able to confer greater rights than it was awarded under the terms of its license grant; nor would any partitionee or disaggregatee obtain rights in excess of those previously possessed by the underlying Commission licensee. We seek comment on these proposals, including the cost and benefits of these proposals.

106.
Renewal Criteria.
Pursuant to section 308(b) of the Communications Act, the Commission may require renewal applicants to “set forth such facts as the Commission by regulation may prescribe as to the citizenship, character, and financial, technical, and other qualifications of the applicant to operate the station” as well as “such other information as it may require.” 47 U.S.C. 308(b). We propose to adopt AWS-4 license renewal requirements consistent with those adopted in the
700 MHz First Report and Order
and which form the basis of the renewal paradigm proposed in our recent
Wireless Radio Services Renewal NPRM. See Service Rules for the 698-746, 747-762 and 777-792 MHz Bands,
72 FR 24238 (2007) (
700 MHz First Report and Order); Amendment of parts 1, 22, 24, 27, 74, 80, 90, 95, and 101 To Establish Uniform License Renewal, Discontinuance of Operation, and Geographic Partitioning and Spectrum Disaggregation Rules and Policies for Certain Wireless Radio Services,
75 FR 38959 (2010) (
Wireless Radio Services Renewal NPRM
). We emphasize that, as the Commission made clear in both of these items, a licensee's performance showing and its renewal showing are two distinct showings. Broadly speaking, a performance showing provides a snapshot in time of the level of a licensee's service. By contrast, a renewal showing provides information regarding the level and types of the licensee's service offered over its entire license term.

107. We propose that applicants for renewal of AWS-4 licenses file a “renewal showing,” in which they demonstrate that they have and are continuing to provide service to the public, and are compliant with the Commission's rules and policies and [with] the Communications Act. In the
700 MHz First Report and Order,
the Commission explained that in the renewal context, the Commission considers “a variety of factors including the level and quality of service, whether service was ever interrupted or discontinued, whether service has been provided to rural areas, and any other factors associated with a licensee's level of service to the public.”
700 MHz First Report and Order.
The
WRS Renewals NPRM and Order
also proposed to consider the extent to which service is provided to qualifying tribal lands.
WRS Renewals NPRM and Order.
We propose that these same factors should be considered when evaluating renewal showings for the AWS-4 band and seek comment on this approach. Commenters should discuss and quantify the costs and benefits of this approach on competition, innovation, and investment.

108. As explained above, today we are proposing that AWS-4 licensees meet three and seven-year performance obligations. We therefore seek comment on whether the public interest would be served by awarding AWS-4 licensees renewal expectancies where they maintain the level of service demonstrated at the seven year performance benchmark through the end of their license term, provided that they have otherwise complied with the Commission's rules and policies and the Communications Act during their license term. We also seek comment on whether AWS-4 licensees should obtain a renewal expectancy for subsequent license terms, if they continue to provide at least the level of service demonstrated at the seven year performance benchmark through the end of any subsequent license terms. Commenters should discuss and quantify the costs and benefits of this approach on competition, innovation, and investment.

109. Finally, consistent with the
700 MHz First Report and Order
and the
WRS Renewals NPRM and Order,
we propose to prohibit the filing of mutually exclusive renewal applications, and that if a license is not renewed, the associated spectrum would be returned to the Commission for reassignment. We seek comment on these proposals, including the costs and benefits of these proposals.

110.
Permanent Discontinuance of Operations.
We also request comment on the Commission's rules governing the permanent discontinuance of operations, which are intended to afford licensees operational flexibility to use their spectrum efficiently while ensuring that spectrum does not lay idle for extended periods. Under § 1.955(a)(3), an authorization will automatically terminate, without specific Commission action, if service is “permanently discontinued.” 47 CFR 1.955(a)(3). For the AWS-4 band, we propose to define “permanently discontinued” as a period of 180 consecutive days during which a licensee does not operate and does not serve at least one subscriber that is not affiliated with, controlled by, or related to the provider. We believe this definition strikes an appropriate balance between our twin goals of providing licensees operational flexibility while ensuring that spectrum does not lie fallow. Licensees would not be subject to this requirement until the date of the first performance requirement benchmark, which is proposed as 3 years from the license grant, so they will have adequate time to construct their terrestrial network. In addition, consistent with § 1.955(a)(3) of the Commission's rules, we propose that, if an AWS-4 licensee permanently discontinues service, the licensee must notify the Commission of the discontinuance within 10 days by filing FCC Form 601 or 605 and requesting license cancellation. An authorization will automatically terminate without specific Commission action if service is permanently discontinued even if a licensee fails to file the required form.

5. Other Operating Requirements

111. Even though licenses in the AWS-4 band may be issued pursuant to one rule part, licensees in this band may be required to comply with rules contained in other parts of the Commission's rules by virtue of the particular services they provide. For example:

• Applicants and licensees would be subject to the application filing procedures for the Universal Licensing System, set forth in part 1 of our rules.

• Licensees would be required to comply with the practices and procedures listed in part 1 of our rules for license applications, adjudicatory proceedings, etc.

• Licensees would be required to comply with the Commission's environmental provisions, including § 1.1307.

• Licensees would be required to comply with the antenna structure provisions of part 17 of our rules.

• To the extent a licensee provides a Commercial Mobile Radio Service, such service would be subject to the provisions of part 20 of the Commission's rules, including 911/E911

and hearing aid-compatibility (HAC) requirements, along with the provisions in the rule part under which the license was issued. Part 20 applies to all CMRS providers, even though the stations may be licensed under other parts of our rules.

• The application of general provisions of parts 22, 24, 27, or 101 of our rules would include rules related to equal employment opportunity,
etc.

112. We seek comment generally on any provisions in existing service-specific rules that may require specific recognition or adjustment to comport with the supervening application of another rule part, as well as any provisions that may be necessary in this other rule part to fully describe the scope of covered services and technologies. We seek comment on applying these rules to the spectrum that is the subject of this
AWS-4 Notice,
and specifically on any rules that would be affected by our proposal to apply elements of the framework of these parts, whether separately or in conjunction with other requirements.

113. We also seek comment generally on whether any conditions should govern the operation of a provider's network if it is granted a license to operate in these bands. What are the potential problems that may be associated with the Commission's adoption of any of these potential requirements, and how do they compare to the potential benefits?

6. Facilitating Access to Spectrum and the Provision of Service to Tribal Lands

114. The Commission currently has under consideration various provisions and policies intended to promote greater use of spectrum over Tribal lands. Improving Communications Services for Native Nations by Promoting Greater Utilization of Spectrum Over Tribal Lands, 76 FR 18476 (2011). We propose to extend any rules and policies adopted in that proceeding to any licenses that may be issued through competitive bidding in this proceeding. We seek comment on this proposal, including any costs and benefits of this proposal.

G. Relocation and Cost Sharing

1. Emerging Technologies Policies

115. Our Emerging Technologies (ET) procedures represent a broad set of tools that the Commission has used to aid the process of making spectrum available for new uses. Generally speaking, ET procedures are used when the Commission has made the decision that it is necessary to relocate incumbent licensees to introduce new services into a frequency band. The Commission sets a “sunset date”—a date by which incumbent licensees may not cause interference to new band entrants. Prior to the sunset date, the new entrants may negotiate with incumbents to gain early entry into the band and, if necessary, may relocate the incumbents to comparable facilities. Because new entrants may have to relocate incumbents from a larger frequency range or greater geographic area than where the new entrants will operate, the Commission also typically establishes a companion set of cost sharing procedures. These procedures allow new entrants to be reimbursed a portion of their relocation expenses from other new entrants that benefit from the spectrum clearance. The specific relocation process we establish under the ET framework has varied for each frequency band, and has been based on the types of incumbent licensees and particular band characteristics. We discuss, below, the particular relocation and cost sharing procedures for the 2000-2020 MHz and 2180-2200 MHz bands.

2. Relocation and Cost-Sharing for 2000-2020 MHz

116. The lower portion of AWS-4 (2000-2020 MHz) is part of the 1990-2025 MHz band that the Commission reallocated from the Broadcast Auxiliary Service (BAS) to emerging technologies such as PCS, AWS, and MSS. Consistent with the relocation principles first established in the Commission's
Emerging Technologies
proceeding, each new entrant had an independent responsibility to relocate incumbent BAS license

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/fr%3A2012-8405. Public record. Not legal advice.
