## Text

DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
24 CFR Part 983
[Docket No. FR-4636-F-02]
RIN 2577-AC25
Project-Based Voucher Program

AGENCY:

Office of the Assistant Secretary for Public and Indian Housing, HUD.

ACTION:

Final rule.

SUMMARY:

This rule replaces the current project-based certificate (PBC) regulations with a comprehensive new project-based voucher program. This rule is based on statutory authorities enacted in 1998 and 2000, and follows a proposed rule and public comment.

DATES:

Effective date:
November 14, 2005.

FOR FURTHER INFORMATION CONTACT:

David Vargas, Director, Office of Voucher Programs, Department of Housing and Urban Development, 451 Seventh Street, SW., Room 4210, Washington, DC 20410; telephone (202) 708-2815 (this is not a toll-free number). Persons with hearing or speech impairments may access these numbers via TTY by calling the federal Information Relay Service at (800) 877-8339.

SUPPLEMENTARY INFORMATION:

I. Background

The project-based voucher law was initially enacted in 1998, as part of the statutory merger of the certificate and voucher tenant-based assistance programs. (See section 545 of the Quality Housing and Work Responsibility Act of 1998 (Pub L. 105-276) approved October 21, 1998) (QHWRA) amending 42 U.S.C. 1437f(o).) Under QHWRA, a public housing agency (PHA), as defined under section 3(b)(6) of the U.S. Housing Act of 1937, 42 U.S.C. 1437a(b)(6), has the option to use a portion of its available tenant-based voucher funds for project-based rental assistance. The project-based voucher law replaced an authority for project-based rental assistance in the former Section 8 certificate program.

In 2000, Congress substantially revised the project-based voucher law. (Section 8(o)(13) of the United States Housing Act of 1937, 42 U.S.C. 1473f(o)(13), as amended by section 232 of the Fiscal Year 2001 Departments of Veterans Affairs and Housing and Urban Development and Independent Agencies Appropriations Act (Pub. L. 106-377, 114 S-tat. 1441, approved October 27, 2000)). The statutory basis for project-based housing is codified at 42 U.S.C. 1437f(o)(13) under the heading, “PHA project-based assistance.”

Significant changes made by QHWRA and the FY 2001 Appropriations Act include:

• A PHA may project-base up to 20 percent of the PHA's voucher funding.

• A PHA may provide project-based assistance for existing housing that does not need rehabilitation, as well as for newly constructed or rehabilitated housing.

• Project-based assistance must be consistent with the “PHA Plan.”

• Project-basing must be consistent with the statutory goals of “deconcentrating poverty and expanding housing and economic opportunities.”

• After one year of assistance, a family may move from a project-based voucher unit. When a slot is available, the family may switch to the PHA's tenant-based voucher program or another comparable program.

• Except for units designated for families that are elderly, disabled, or receiving supportive services, no more than 25 percent of units in a building may have project-based voucher assistance.

• A PHA may enter into a housing assistance payments (HAP) contract for a term of up to 10 years. However, the PHA's contractual commitment is subject to availability of appropriated funds.

• At the end of the contract term, the PHA may extend the HAP contract with an owner for a period appropriate to achieve long-term affordability or to expand housing opportunities. Extensions are subject to availability of appropriated funds.

• Generally, project-based voucher rents (rent to owner plus the allowance for tenant-paid utilities) may not exceed the lower of the reasonable rent, or 110 percent of the applicable Fair Market Rent (FMR) (or any exception payment standard approved by the Secretary), or, if applicable, the tax credit rent. This limit applies both to the initial rent and rent adjustments over the term of the HAP contract.

• There are special provisions for establishing the project-based voucher rent for a unit in a tax credit building located outside a “qualified census tract.” These provisions are found at 42 U.S.C. 1437f(o)(13)(H).

• Admission to project-based units is subject to the overall voucher “income-targeting” requirement. Under 42 U.S.C. 1437f(o)(13)(J), the income targeting provisions of section 16(b) of the U.S. Housing Act of 1937 apply. Under these provisions, at least 75 percent of the families admitted to the PHA tenant-based and project-based voucher programs each year must be families with annual incomes below 30 percent of median income for the area. HUD's regulations define such families as “extremely low-income families” at 24 CFR 5.603.

• All units must be inspected for housing quality standards (HQS) compliance before the PHA enters into a HAP contract with an owner. After the initial inspection, the PHA is not required to re-inspect each unit annually. Instead, the PHA may inspect a representative sample of units at the annual re-inspection.

• If a family moves out, the PHA may continue payments to the owner for up to 60 days. The PHA has discretion whether to provide such vacancy payments.

On January 16, 2001, (66 FR 3605), HUD published a
Federal Register
notice with guidance on the changes made to the project-based voucher (PBV) program in the FY 2001 Appropriations Act. By “project-based voucher program,” this regulation means the program statutorily codified at 42 U.S.C. 1437f(o)(13), which allows PHAs to attach to dwelling units up to 20 percent of the funding available for tenant-based assistance. The HUD guidance notice described the law, identified statutory requirements that are effective immediately, and provided guidance on how to implement the law and existing program regulations.

II. The Proposed Rule

HUD published a proposed rule for comment on March 18, 2004 (69 FR 12950). A summary overview of the proposed rule can be found at 69 FR 12950-12953. The proposed rule text begins at 69 FR 12954. The comment period for this proposed rule closed on May 17, 2004. Forty-seven commenters submitted comments during the comment period on a wide variety of issues related to this proposed rule. The commenters included a variety of entities, including PHAs, professional and trade organizations, and individuals. In response to the comments, this final rule makes certain changes to the proposed rule as described in the following section of the preamble. In addition, a summary of the issues raised by the public commenters and HUD's responses is found at section IV of this preamble.

III. This Final Rule

This final rule implements the project-based voucher program. As of its effective date, this rule supersedes the January 2001 notice. The following

changes to the proposed rule are made by this final rule. Section IV of this preamble summarizes the public comments and HUD's responses to them.

Subpart A—General

1. Section 983.1

This final rule makes a technical correction in § 983.1(c), “Specific 24 CFR part 982 provisions that do not apply to PBV assistance.” References to § 982.551-982.555 are removed. It is not necessary to mention these sections as excepted from the sections that do not apply, because the same result is obtained by simply not mentioning them.

2. Section 983.3

In the PBV definitions under § 983.3(b), the definition of “baseline units” is deleted. Instead, the rule uses the concept of “budget authority” to indicate the amount of appropriated funds available to a PHA for its housing choice voucher program.

The definition of “HUD” is removed because it is unnecessary to restate it in this part. “HUD” is defined in 24 CFR 5.100.

The definition of PHA-owned unit is revised to clarify that “PHA owned” includes any interest by the PHA in the building in which a unit is located. This change is necessary because HUD's experience to date has been that the definition has been misunderstood and applied differently in different geographical areas. Also, in the proposed rule, this definition cross-referenced a non-applicable portion of part 982.

The definition of “proposal selection date” is revised to reference the PHA's administrative plan. Section 983.51(b) of this rule requires that the PHA's procedures for selecting proposals be stated in the administrative plan.

The definition of “rent to owner” is amended. Examples of non-housing services that are not included in rent are added, and the adjective “reasonable” is removed. The rent reasonableness test is an overall limitation on the amount of rent to owner under the rule, and it is not necessary to include it in the definition.

A number of terms defined in the proposed rule are removed because those terms are defined in 24 CFR part 982 and are applicable to this rule under § 983.3(a)(2)(ii). These terms are: Fair market rent (FMR); family; gross rent; group home; HAP contract; owner; participant; reasonable rent; tenant; and tenant rent.

Definitions were removed and replaced with cross references for “utility allowance” and “utility reimbursement.” Both of these terms are defined at 24 CFR 5.603.

3. Section 983.5

The final rule makes two minor technical corrections. Section 983.5(a)(4) is amended to change “rental assistance payments” to “housing assistance payments.” Section 983.5(b)(2) is amended to change “project-basing” to “project-based vouchers” (a similar change is made in § 983.6(c)).

4. Section 983.6

In paragraphs (a) and (c) of this section dealing with the amount of project-based assistance available to a PHA, the phrase “baseline units” is removed. Instead, the amount of project-based funding is expressed as a percentage of the amount of budget authority allocated to the PHA.

5. Section 983.7

The Notice of Proposed Rulemaking (NPRM) proposed that voucher program funds could not be used to pay for relocation costs under the Uniform Relocation Act in connection with assistance under this part. This final rule allows administrative fee reserves to be used for this purpose provided that payment of relocation benefits is consistent with state and local law and HUD regulations on the use of reserves, including 24 CFR 982.155, and that all other program administrative expenses have been satisfied.

6. Section 983.10

This final rule revises § 983.10(b) to clarify that PHAs may renew PBC HAP contracts for terms of up to five years, to an aggregate total including the original term and all extensions, of 15 years, depending on the availability of appropriated funds.

Subpart B—Selection of PBV Owner Proposals

7. Section 983.51

The final rule makes several editorial changes to this section. In addition, § 983.51(b)(2) is revised to allow PHAs to select owner proposals without a separate competition for projects that were competitively selected under another program within three years of the PBV proposal selection date. The prior competitive selection cannot have considered future PBV assistance, because such a consideration could give such projects an unfair advantage by wrongly affecting the original competition and thereby tainting the process. Also, the non-competitive selection of a project for low income housing tax credits (LIHTCs) does not satisfy the requirement of a prior competition.

8. Section 983.52

This section adds additional detail to the general description of housing types to which assistance may be attached under this program. Existing housing is defined to exclude housing for which new construction or rehabilitation has been started. The rule cross-references subpart D as applicable to newly constructed and rehabilitated housing.

9. Section 983.53

This section makes an editorial change to combine § 983.53(a)(2) and (a)(4). Substantively, § 983.53(b) is revised to give PHAs the responsibility to make an initial determination (and HUD approves such determination as the statute requires) as to whether assistance may be attached to a high-rise elevator project that may be occupied by families with children because there is no practical alternative. PHAs may make this initial determination for its entire project-based program, a portion of it, or case-by-case, and HUD may approve the determination on the same basis.

10. 983.56

The NPRM proposed that the overall cap of 25 percent of the total number of dwelling units in the building include units receiving any type of federal, project-based assistance. This final rule limits the units that count against the cap to units receiving PBV assistance under this program, revising paragraph (a)(1) accordingly and removing paragraph (a)(2). Additionally, § 983.56(b)(2)(B) is revised. In the proposed rule, this exception to the 25 percent cap on project-basing units was limited to families in a housing voucher Family Self-Sufficiency (FSS) program under section 23 of the 1937 Act, 42 U.S.C. 1437u.

This final rule revises this exemption to include units that are made available to families that are receiving any type of supportive services that the PHA specifies as qualifying services in its PHA administrative plan. If a family at the time of initial tenancy is receiving, and while the resident of an excepted unit has received, FSS supportive services or any other supportive services as defined in the PHA administrative plan, and successfully completes the FSS contract of participation or the supportive services requirement, the unit continues to count as an excepted unit for as long as the family resides in the unit. If a family in an excepted unit fails to complete the FSS contract of

participation or fails to complete another program of supportive services, such failure results in termination of assistance by the PHA, and is grounds for lease termination by the owner. The PHA is responsible for monitoring and ensuring compliance with this requirement. At the time of initial lease execution between the family and the owner, the family and the PHA sign a statement of family responsibility, and HUD will include this requirement in this statement, thus ensuring that the family is aware that the PHA will terminate assistance if the family fails to meet its obligation.

If the unit at the time of such termination is an excepted unit outside the 25 percent cap, the exception continues to apply to the unit as long as the unit is made available to another family receiving qualifying services. A family is deemed to be receiving supportive services if it has at least one family member receiving at least one qualifying service.

The section also is revised to clarify that, generally, a PHA may not require participation in medical or disability-related services. The one exception is that a PHA may require current drug and alcohol abusers to receive drug and alcohol treatment. This requirement is in accordance with HUD's overall policy to ensure that drug and alcohol abusers do not interfere with other residents' health, safety, or right to reasonable enjoyment of the premises of assisted housing. See, for example, 24 CFR 5.858 and 5.860.

11. Section 983.57

The NPRM proposed at § 983.57(b)(1) that a proposed site for project-based assistance be “consistent with the goal of deconcentrating poverty and expanding housing and economic opportunities.” This final rule revises proposed § 983.57(b)(1) and adds seven factors that the PHA must consider in determining whether a proposed PBV site is consistent with these goals. Under this final rule, the housing site must be consistent with the deconcentration goals stated in the PHA plan and with civil rights laws and regulations, including HUD's rules on accessibility at 24 CFR 8.4(b)(5). These include whether the site is in an Enterprise Zone, Economic Community, or Renewal Community (EZ/EC/RC); whether the concentration of assisted units will be or has decreased as a result of public housing demolition; whether the census tract is undergoing significant revitalization; whether government funding has been invested in the area; whether new market rate units are being developed in the area, which are likely to positively impact the poverty rate in the area; if the poverty rate in the area is greater than 20 percent, whether in the past five years there has been an overall decline in the poverty rate; and whether there are meaningful opportunities for educational and economic advancement in the area. Housing under the PBV program may be selected only if consistent with the goal of deconcentrating poverty and expanding housing and economic opportunities.

12. Section 983.58

Section 983.58(c) is revised to indicate that in the case of existing housing, the responsible entity must determine whether or not PBV assistance is categorically excluded from review under the National Environmental Policy Act and whether or not the assistance is subject to review under the laws and authorities listed in 24 CFR 58.5. The responsible entity must either complete the environmental review requirements of 24 CFR part 58, or HUD must perform the review under part 50, or the project must be determined to be exempt or categorically excluded. Section 983.58(d)(ii) of this final rule clarifies that in the case of review by the responsible entity under part 58, that entity makes the determination whether the project to be assisted is exempt or categorically excluded, and that if the project is exempt or categorically excluded, no further environmental review is needed.

Subpart C—Dwelling Units

There are no substantive changes to this subpart made in this final rule. There are some minor editorial changes.

Subpart D—Requirements for Rehabilitated and Newly Constructed Units

13. Section 983.155

The NPRM proposed that the PHA and HUD could set requirements for the evidence of completion of a housing project under this program at § 983.155(b), along with additional documentation that could be required under proposed § 983.155(b)(2). In the final rule, reference to HUD is removed so that the PHA alone sets these requirements.

Subpart E—Housing Assistance Payments Contract

14. Section 983.202

This final rule removes an unnecessary sentence from § 983.202(b)(2). This is an editorial change that does not alter the overall intent of the section. The sentence stated that HUD provides funds to PHAs to make housing assistance payments to owners. This sentence is redundant as the same idea is stated in the first two sentences of the paragraph.

15. Section 983.203

This final rule conforms § 983.203(h) to the change to the exception to the 25 percent cap, making the exception generally applicable to families receiving supportive services, rather than only to families with a contract of participation under the statutory FSS program at 42 U.S.C. 1437u (
see also
§ 983.57, redesignated from proposed § 983.56).

16. Section 983.205

The NPRM proposed that extensions of the HAP contract be in one-year increments. The final rule revises § 983.205(a) to allow for extensions of up to five years.

17. Section 983.206

In § 983.206(b), on “amendments to add contract units,” this final rule removes “compliance with Davis-Bacon wage rates during construction” as an example of the legal requirements for a HAP amendment and replaces it with “rents are reasonable.”

18. Section 983.209

This final rule adds “spouse” to the list of prohibited family relationships between the owner of a PBV unit and the resident(s) of this unit at § 983.209(e).

Subpart F—Occupancy

19. Section 983.251

This section relates to protection of in-place families; that is, families that are eligible to participate in the program as of the date the proposal is selected, and which reside in a unit that will be placed under a project-based assistance contract. This final rule finalizes similar protections for in-place families that were originally proposed, with the one difference that § 983.251(b)(2) is revised to require that such families be placed on the PHA's waiting list, with an absolute preference for referral to owners and placement in units that become available.

This final rule adds a new § 983.251(d), entitled “Preference for services offered,” and redesignates proposed § 983.251(d) as § 983.251(e). This new section allows PHAs to grant a preference to families with disabilities that require the services offered at a particular project. The preference may be applied to those families, including individuals, whose disabilities

significantly interfere with their ability to obtain and maintain themselves in housing; who, without such services, will not in the future be able to maintain themselves in housing; and for whom such services cannot be provided in a non-segregated setting. Disabled residents cannot be required to accept the particular services offered. The project may be advertised as being for a particular type of disability; however, the project must be open to all otherwise eligible persons with disabilities who may benefit from the services offered.

Section 983.252, relating to information to be provided to families, is slightly revised for consistency and to make changes. Paragraph (c) is revised to include alternative formats for persons with disabilities. A new 24 CFR 983.252(d) is added regarding information for families with limited English proficiency.

Section 983.253 is revised in this final rule. Section 983.253(a)(2), stating that the owner “may apply its own admission standards,” is replaced with a statement that, like current 24 CFR 983.203(c)(4)(i), the owner is responsible for having written tenant selection procedures. These procedures must be consistent with the purpose of improving housing opportunities for very low-income families and be reasonably related both to program eligibility requirements and to the applicant family's ability to perform its obligations under the lease.

20. Section 983.255

The NPRM proposed in § 983.255(a) that a PHA has no obligation but “may opt to screen applicants for family behavior and suitability for tenancy.” This final rule specifies that a PHA may deny admission based on this screening. Proposed § 983.255(b)(2)(vi) gave the owner broad latitude to screen a family's background for a variety of factors, including “other factors determined by the owner.” This paragraph is removed from the final rule. The owner may screen for factors “such as” the factors listed in § 983.255(b)(2)(i)-(v). A variety of minor revisions are made to proposed § 983.255 on information that a PHA must provide. These include the provision to the owner of any prior address of the applicant (rather than any immediately prior address) and information relating to drug trafficking by family members. This section also provides that the PHA may give the owner certain information about an applicant family, and that the PHA must disclose to the family a description of the PHA's policy regarding such information. The requirement that this disclosure must be included specifically in the information package given to a family is removed, although the underlying requirement to give the disclosure to the family is retained.

21. Section 983.256

This final rule strengthens the PHA's ability to ensure that the lease meets the requirements of state and local law. Proposed § 983.256(b)(4) would have allowed the PHA to require revisions to the lease, if necessary. This final rule allows the PHA to decline to approve the tenancy if the lease does not meet the requirements of law.

This final rule adds an item to § 983.256(c), entitled “Required information.” New § 983.256(c)(6) requires the lease to specify “the amount of any charges for food, furniture, or supportive services.”

The final rule revises § 983.256(f). The NPRM had proposed that, under certain conditions, leases could be for a term of less than one year. This final rule eliminates that option.

22. Section 983.257

The final rule refines the section on owner termination of tenancy and eviction by specifying in a new § 983.257(b) that the owner shall not terminate a lease under the PBV program without good cause as meant in 24 CFR 982.310 (except for 24 CFR 982.310(d)(1)(iii) and (iv), and under the eviction provisions of 24 CFR 5.858-5.861). Otherwise, an owner may renew or non-renew a lease upon expiration, but if the owner does not renew without good cause, the family must be provided tenant-based assistance and the unit must be removed from the coverage of the HAP contract. A new § 983.257(c) is added to make the section consistent with § 983.56 and clarify that, if a family is living in a unit excepted from the 25 percent per-building cap on project-basing because of the family's participation in an FSS or other supportive services program, failure of the family without good cause to complete its FSS or supportive services program is grounds for lease termination by the owner.

23. Section 983.258

This section provides that the owner may collect a security deposit from the tenant, and that the deposit may be used when the tenant moves out to reimburse the owner for any unpaid rent, damages to the unit, or other money that the tenant owes to the owner. This final rule makes only minor editorial revisions.

24. Section 983.260

This final rule makes a minor technical change to this section to make the second sentence of paragraph (a) into a new stand-alone paragraph at § 983.260(d). This change is made because this sentence is actually a separate consideration from the remainder of paragraph (a). Paragraph (a) generally concerns termination of the lease at the family's option after one year of occupancy; the new § 983.260(d) concerns termination before one year of occupancy, which is treated differently.

25. Section 983.261

This section governs referrals to units that are excepted from the 25 percent cap on project basing. Under § 983.56(b), units in a multifamily building that are occupied by the elderly, families with disabilities, or families receiving supportive services are exempt from the overall 25 percent cap. This final rule revises § 983.261 in accordance with § 983.56 to expand the exemption from families with a contract of participation in the statutory FSS program under 42 U.S.C. 1437u to units made available to all families receiving supportive services as stated in § 983.57(b)(2)(ii). A family is “receiving supportive services” if it has at least one member receiving at least one such service. If a family successfully completes its supportive services program, the unit remains an excepted unit as long as the family resides in the unit. If a family fails to complete its FSS or other supportive services participation, or no longer has a member qualifying as elderly or disabled, the family must vacate the unit in a reasonable time established by the PHA and the PHA shall cease paying housing assistance on behalf of the non-qualifying family. In the case of a partially assisted building, the owner has the choice of substituting a different unit in accordance with 983.206(a) or terminating the lease. The assistance for a family that is not in compliance with its obligations, such as non-completion of its FSS program without good cause, shall be terminated by the PHA.

Subpart G—Rent to Owner

26. Section 983.301

The proposed rule would have provided for annual redeterminations of the rent to owner (at § 983.301(a)(3)), and for the amount of rent to owner (except for certain tax credit units) to be up to the lowest of the payment standard amount for the bedroom size minus any utility allowance, the reasonable rent, or the rent requested by the owner. This final rule significantly

revises these provisions in response to public comments, which are described below at section IV of this preamble. Under this final rule, the rent to owner is established at the beginning of the HAP contract term. The rent to owner, for non-LIHTC units, may not exceed the lowest of an amount determined by the PHA, not to exceed 110 percent of the applicable FMR or HUD-approved exception payment standard for the unit size less any utility allowance; the reasonable rent; or the rent requested by the owner. The tax credit rent is similar, except that the first of the three amounts is the tax credit rent minus any utility allowance. The tax-credit rent provision applies to certain tax credit projects not located in a qualified census tract. A “qualified census tract” is defined as any census tract or equivalent area defined by the Census Bureau in which: (1) At least 50 percent of households have an income of less than 60 percent of Area Median Gross Income; or (2) the poverty rate is at least 25 percent and where the census tract is designated as a qualified census tract by HUD. The rent must be redetermined at the owner's request or whenever there is a five percent or greater decrease in the published FMRs. The owner must request any rent increase at the annual anniversary of the HAP by written notice to the PHA.

Under final § 983.301(f), when determining the initial rent to the owner, the most recently published fair market rent (FMR) and utility allowance schedule applies, rather than, as proposed, the payment standard amount on the PHA's payment standard schedule.

27. Sections 983.302 and 983.303

These sections apply to redeterminations of the rent to owner. This final rule revises these sections so that, consistent with § 983.301, the time for redetermination is upon the owner's request and when there is a five percent or greater decrease in the published FMR.

28. Section 983.304

This section addresses limitations on the rent to owner for units that have subsidies under programs in addition to the PBV program. Proposed § 983.304(b)(2) would have provided that the rent to owner could not exceed the amounts allowed in these programs, enumerated under proposed § 983.304(b)(1). This final rule adds tax credit projects to this list. In addition, in order to provide paragraph designations for all sections, the proposed undesignated introductory section is redesignated § 983.304(a) in this final rule, and the following sections are redesignated (b)-(f), accordingly.

Subpart H—Payment to Owner

29. Section 983.354

This section provides that meals and supportive services, generally, may not be charged as part of the rent to the owner, and that an owner may not use non-payment of such charges as grounds for termination of tenancy. The exception to this general rule is that in an assisted living development, owners may charge families or their members for meals or supportive services. In the case of such a development, the final rule adds a proviso that non-payment of such charges may be grounds for the owner to terminate the lease. The HAP payment may not be used for the costs of meals and supportive services.

IV. Responses to Public Comments

Comments Addressed to the Rule Generally

Comment:
One commenter questioned why the provisions applicable to the project-based voucher program do not also apply to the former PBC program. Another commenter stated that HUD should combine the certificate and voucher programs and stop having multiple versions of one program in operation.

HUD Response:
The Department is required by its regulations on rulemaking at 24 CFR 10.2 to publish regulations to implement, interpret, and prescribe law and policy for future effect. Thus, these regulations cannot be made retroactive to apply to the former program.

Comment:
A commenter stated that PHAs are currently being funded from quarter to quarter based on actual utilization, and that, as a result, would likely have to hold or set aside some of their tenant-based funding in order to facilitate project-based voucher development proposals. “The proposed rule should more specifically address the allocation of funding for the PBV program as it relates to this issue.”

HUD Response:
HUD does not agree that this rule should address funding issues as it relates to the PBV program. In Calendar Year 2005, PHAs were provided with a specified amount of funding that was determined at the beginning of the calendar year and was not subject to quarterly or other utilization changes. PHAs are charged with managing their resources within program requirements to ensure that they do not incur costs beyond their annual funding allocation. If a PHA elects to project-base any of its voucher units, it must manage its resources to ensure that the agreement to enter into a HAP contract agreement and HAP contract commitments will be honored.

Comment:
One commenter stated that PHAs should be able to give preferences to “CHDOs, HOME, HOPE VI, LIHTC properties” and similar projects, and to housing providers with a history of “responsible practices and proper reporting.”

HUD Response:
CHDOs most likely refers to community housing development organizations that are eligible to participate in certain HUD Community Development Block Grant programs. The requirements for CHDOs are stated at 570.204(c). HOME probably refers to the HOME Investment Partnerships Act, 42 U.S.C. 12701 note. HOPE VI is the popular name for the program for revitalization of public housing now codified at 42 U.S.C. 1437v.

The final rule provides that in cases where a federal, state, or local housing assistance, community development, or supportive services program that requires a competitive selection of proposals has already competitively selected proposals, a second competition for PBV is not required. The original competition, however, cannot have considered the possibility of future PBV assistance, but the selection must have been based on the project's merits at the time of the competition. However, the PHA, if it is in accordance with its administrative plan, can give a preference to CHDOs, HOME, and LIHTC projects.

Comment:
A commenter stated “we remain concerned about the need for HUD's continued involvement in a given PHA's administration of the PBV program.” This commenter stated that PHAs are independent governmental agencies and can police themselves with respect to the proper and needed use of public funds. This commenter cited proposed § 983.51 (referenced by the commenter as “dealing with PHA-owned units”) and § 983.55 (subsidy layering) as particular concerns. Because many PHAs are heavily involved in real estate development and subsidy layering reviews—“perhaps even better than a HUD staff person who is not intimate with the local real estate development market”—PHAs should be allowed to make determinations in both those areas.

HUD Response:
Congress specifically set in place safeguards against possible program abuse regarding PHA-owned units by requiring HUD to ensure that Housing Quality Standards (HQS) inspections and rent determinations are conducted by outside entities. To

protect against possible PHA bias or abuse, and to ensure fairness, HUD has promulgated program regulations to carry out Congress' intent. The Office of Public and Indian Housing will be issuing a separate regulation to delegate subsidy layering reviews (see response to comments on § 983.55).

Comment:
Five commenters commented on the relationship between 24 CFR part 982 and part 983. Four commenters stated that HUD should add a general provision that in the event of a conflict between parts 982 and 983, part 983 shall prevail over any inconsistent provisions of part 982 with respect to the PBV program. Another commenter stated that in the event that HUD has missed something in part 982 that is not applicable to the PBV program, there should be leeway for HUD to determine, short of a regulatory waiver, that the provision is inapplicable to the PBV program.

HUD Response:
24 CFR 982 is the regulation for the tenant-based voucher program. The rule identifies the provisions in 24 CFR 982 that do not apply to PBV assistance under part 983. HUD believes it has accurately cross-referenced part 982 in the 983 regulation, but if HUD determines that any errors have been made, HUD will publish corrections in the
Federal Register
.

Comment:
A commenter stated that there is a disincentive to participation in the PBV program because PHAs want to designate a portion of their Section 8 allocation to leverage investment or LIHTCs. However, while these units are undergoing construction or substantial rehabilitation, they are counted adversely in the PHA's lease-up rate calculation. This commenter recommends a grace period for such PHAs during construction or substantial rehabilitation. This grace period should be provided as long as there is a well-defined construction plan in place with specific time frames that are documented and submitted to HUD.

HUD Response:
During construction or substantial rehabilitation, units that will have PBV assistance attached pursuant to an agreement do not require the setting aside of vouchers and budget authority committed for those units. Rather such set asides are required only after completion of the project. However, the PHA must ensure that budget authority is available for those units upon execution of the HAP contract. If a PHA is leased up to its budget authority, it must ensure that through the turnover of vouchers it will have the necessary units and dollars to meet its contractual commitments when the project is ready to be occupied. PHAs are responsible for monitoring their leasing and turnover to ensure that they do not over-lease units or expend more budget authority than is available.

Comment:
A commenter also stated that “Agencies should be able to lease the necessary number of vouchers through monthly turnover by the time they are needed for occupancy under the PBV program. To allow for this, HUD should not consider budget authority committed to PBV assistance for this reason to be unutilized.” This change should also be reflected in HUD's Section Eight management assessment (SEMAP). HUD should change its procedures for determining agencies' lease-up rates and corresponding budget authority. Similarly, another commenter stated that, should a PHA set aside vouchers to project-base, the vouchers set-aside should not count against SEMAP or any other indicator. PHAs should be able to set-aside vouchers based on projections of the expected availability of vouchers due to turnover, attrition, or expected allocation of additional vouchers.

HUD Response:
See response to comment above.

Comment:
One commenter stated that HUD should increase the total number of vouchers available. “This is the best and most successful housing subsidy program in the country.”

HUD Response:
The appropriations for the voucher program, as well as the percentage of voucher funding that may be project-based, are both set by Congress.

Comment:
A commenter stated that “The rule proposed is still inconsistent with the congressional intent to simplify the process for project-basing vouchers * * *. Regrettably, the proposed rule continues to make the program too cumbersome to be appealing to many housing agencies.”

HUD Response:
HUD disagrees that the proposed rule makes the program too cumbersome. The proposed rule has simplified and deregulated many aspects of the PBV program, such as competition and HQS inspections. The rule also eliminates any HUD approval actions during the development process resulting in a decrease in the necessity for HUD-approved exceptions and regulatory waivers. The final rule also simplifies the selection of proposals even further than originally proposed.

Comment:
A commenter stated generally that transitional housing is important because it assists the homeless with skills necessary to become good tenants to whom landlords would be willing to rent. Accordingly, the PBV rule should be modified so that it will work with transitional housing serving homeless persons and persons with special needs.

HUD Response:
The final rule provides that transitional housing is ineligible housing under the project-based voucher program. The statute governing the project-based voucher program specifically provides that low-income families assisted under the program may move after the family has occupied a unit for 12 months. If a transitional housing agreement requires a family to move prior to 12 months, the law governing the project-based voucher program does not give families the right to a tenant-based voucher prior to 12 months. Thus, in the situation described, a family would not be entitled to tenant-based assistance under the law governing the project-based voucher program.

Also, if a transitional housing agreement requires a family to move some time after the initial 12 months, a PHA would be required under the law to provide such a family with tenant-based assistance. If the project-based voucher contract with the owner extends beyond the transitional housing agreement, the PHA would also be required to refill the units vacated by the previous transitional housing participant. Given the scarcity of funding, such a result is undesirable. Additionally, if a family must leave after the initial 12-month lease in accordance with the transitional housing requirements, the PHA may not have a voucher or other form of assistance readily available. Since the participant would be required to move, the participant would have to do so without the benefit of subsidy since the PBV law only requires PHAs, after the initial 12 months, to issue a voucher or other form of assistance if available. The Department believes that transitional housing is inconsistent with the project-based voucher program. Thus, the final rule makes transitional housing an ineligible housing type under the project-based voucher program.

Subpart A (Proposed §§ 983.1-983.10)

Comment:
In reference to proposed 24 CFR 983.2(c)(6)(iv), one commenter stated that the proposed rule incorrectly identifies 24 CFR §§ 982.551-.555 as being under part 982, subpart K. These sections are codified under subpart L.

HUD Response:
HUD agrees and this final rule includes this technical correction.

Comment:
A number of commenters questioned the definition of “existing housing” in § 983.3, seeking specificity about dollar amounts of repair that would distinguish substantial rehabilitation from existing housing.

Five commenters suggested that there be a “safe harbor” dollar amount of repairs that constitute existing housing. One of these commenters asked, if existing housing requires less than $1,000 of rehabilitation, and “rehabilitation” is any unit that requires $3,000 or more, how are units requiring $1,000-$3,000 worth of work categorized?

HUD Response:
In this final rule, HUD has retained the language contained in the proposed rule. HUD has decided not to accept the suggestion of specifying a dollar amount since costs attributable to repairs and rehabilitation are market-driven and may vary widely depending upon individual market areas. Such decisions are properly left up to the PHAs.

Comment:
Commenters objected to the definition of “comparable rental assistance” in proposed § 983.3, stating that the definition should define comparable rental assistance as gross rent that costs the family no more that 30 percent of their adjusted income, rather than 40 percent. One of these commenters stated that setting the standard at 40 percent violates the statute, and argued that the standard should be 30 percent, subject to a limited exception if the gross rent is greater than the PHA's payment standard.

HUD Response:
The final rule defines comparable rental assistance as “a subsidy or other means to enable a family to obtain decent housing in the PHA jurisdiction renting at a gross rent that requires the tenant to pay no more than 40 percent of its adjusted monthly gross income for rent.” Section 8(o)(3) of the United States Housing Act of 1937 governing the voucher program provides that at any time a family initially receives voucher assistance, the family rent contribution is limited to 40 percent of adjusted income. The definition of comparable rental assistance contained within the final rule does not violate the statute.

Comment:
A commenter stated that the lobbying restriction in proposed § 983.4 is obsolete.

HUD Response:
HUD reviewed the lobbying restrictions in § 983.4 and determined that they are not obsolete and therefore continue to apply to the project-based voucher program.

Comment:
A commenter stated that § 983.5, which describes the project-based program, should specify when PBVs count toward the PHA's utilization rate. This commenter states that “the Agreement to enter into a Housing Assistance Payment (HAP) contract is the appropriate trigger for SEMAP purposes.”

HUD Response:
HUD has considered this comment. Currently SEMAP does not exclude units under an Agreement from total units for SEMAP scoring purposes under the leasing indicator. Since units and dollars that are committed under an agreement do not have to be set aside during the development or rehabilitation phase of a project, these units will not be excluded from the SEMAP leasing indicator. PHAs must monitor their leasing and turnover to ensure that they do not over-lease units or expend more budget authority than available. If a PHA is fully leased, it may have to withhold issuance of vouchers for a number of months based on attrition rates to ensure that units and dollars will be available at the time the HAP contract is executed.

Comment:
A commenter stated that § 983.5(b), which references Section 8 administrative fees, should be revised. This commenter stated that PHAs that own PBV developments are restricted to a significantly lower administrative fee than private owners. However, PHAs must also contract for services at increasing administrative costs. This creates a disincentive to participation. Therefore, PHAs should be entitled to the same administrative fee as private owners.

HUD Response:
HUD has considered this comment, but is not adopting it for the following reasons. The United States Housing Act of 1937 requires that a unit of state or local government or another entity approved by HUD perform certain functions for PHA-owned units. The act also authorizes HUD to decrease the administrative fees for PHA-owned units. In the case of PHA-owned units, some activities for which an owner is compensated from rental income under other HUD project-based programs result in a reduced administrative fee. For example, income-certification and re-examination are tasks for which PHAs are reimbursed as an owner through rental income under the PBV program.

Comment:
Two commenters expressed concerns about the 20 percent cap on project basing. One of these commenters stated that the cap is too high and would force consumers “to use their vouchers in projects, at least for a period of time,” and will not have the option of using them with private landlords. The commenter stated that this does nothing to increase the amount of affordable, accessible housing and that the proposed regulation promotes segregation, loss of affordable units, and subjects tenants to impossible compliance regulations like workfare. This commenter recommends full funding of the Section 8 program in its present form, as well as additional changes in regulations to allow those with very low incomes to qualify for housing under LIHTC programs, such as the 80/20 program, HPD programs, and the Mitchell-Llama programs.

Another of these commenters stated that the 20 percent cap is a “significant restriction” on a PHA's ability to project-base vouchers and that HUD should pursue statutory changes to make the same flexibility that exists in the Moving to Work (MTW) program available to all PHAs.

HUD Response:
The commenter refers to various assisted housing programs. The 80/20 program is a form of bond-financed tax credit that derives its name from the requirement that no more than 80 percent of the units in an LIHTC project financed with tax-exempt private activity bonds are to be occupied by individuals or families at market-rate rents, while the other 20 percent must be rented to low-income (no more than 50 percent of median) households. HPD is the New York City Department of Housing Preservation and Development. Mitchell-Lama is a New York State program of moderate- and middle-income rental and limited-equity cooperative developments. MTW is a HUD demonstration program codified under 42 U.S.C. 1437 note, which allows PHAs to design and test ways to promote self-sufficiency among assisted families, achieve programmatic efficiency and reduce costs, and increase housing choice for low-income households.

HUD must work under the current statutory framework that restricts project-based assistance to 20 percent of a PHA's budget authority under the voucher program.

Comment:
Four commenters stated that proposed § 983.7(a)(2), which provides that relocation costs may not be paid out of voucher program funds, should not prohibit PHAs from using funds in the Section 8 administrative fee reserve account to pay relocation costs.

HUD Response:
HUD has considered this comment and decided to adopt it. Provided payment of relocation benefits is consistent with state and local law, and provided the use of the administrative fee reserve is consistent with 24 CFR 982.155, PHAs may use their administrative fee reserves to pay for relocation assistance after all other program administrative expenses are satisfied. Program participants should also be mindful that HUD and Congress have from time to time restricted the use of administrative fee reserves.

Comment:
Proposed §§ 983.9 and 983.53(a) prohibit voucher funding to be

used with cooperative housing and shared housing. Two commenters stated that they object to this exclusion of cooperative housing. These commenters stated that this “is an arbitrary exclusion, not required by statute, and represents a change from the Initial Guidance.” These commenters also state that the exclusion is against HUD's “regulations and policies for other project-based Section 8 programs, as well as tenant-based Section 8,” and that there are numerous examples of cooperative projects that have been good housing providers. One of these commenters stated that “denying project-based Section 8 to* * * co-ops would make the projects unfeasible and be unfair to the low-income seniors who benefit from the creation of this affordable housing.” This commenter also states that cooperatives have been proven to have lower operating costs than comparable rentals, and, therefore, it is in the government and public interest to encourage Section 8 in cooperatives.

Another commenter similarly objected to the exclusion of shared housing. The commenter stated that “[shared housing] can be an extremely effective supportive transitional housing model that is being extensively used around the country.”

HUD Response:
HUD considered these comments, but did not adopt them for the following reasons. Cooperative housing is not a permitted housing type under the project-based voucher program. Cooperative housing is considered homeownership and Section 8(y) of the United States Housing Act, which governs homeownership under the voucher program, limits the form of subsidy PHAs may use to provide homeownership assistance to tenant-based assistance. The comment regarding shared housing is also rejected since there are provisions to allow the use of group homes and congregate housing that are similar to shared housing. Additionally, to permit shared housing under the PBV program would require PHAs to refer families to an owner to occupy a unit with families that are not acquainted with each other, which may not be a desirable housing situation. This would result in many families refusing to share housing and as a result have families living in oversized units in violation of program guidelines.

Subpart B (Proposed §§ 983.51-983.59)

Comment:
A number of commenters submitted comments regarding proposed § 983.51, which requires competitive selection of proposals for project-basing with an exception for proposals already selected pursuant to a competitive government housing assistance, supportive services, or community development program.

More than ten commenters supported the exception to competitive selection for units that have been previously competed. Four commenters stated that this proposal would save time and money and avoid needless duplication.

Some commenters opposed requiring any competition. One commenter stated that the competitive selection procedure, including the requirement for prior competitive selection, is too rigid. This commenter stated that these Reform Act requirements do not apply to PHAs. Since there is no statutory requirement for a competitive process, PHAs should be given discretion in how they award vouchers. Another commenter stated that selection should be allowed based on a request from a developer or owner; based on a HOPE VI site or similar endeavor having PHA participation; or public notice inviting competitive proposals. Another commenter stated that proposals subject to previous competitive selection should be exempt from additional environmental, site selection, and subsidy layering reviews; however, the rule should allow PHAs to use PBVs without any competition because “agencies that need to lay out annual budgets and support their annual program operations would be placed in a compromising position. Agencies could thus face financial disincentives and opt out of using this important program.” Another commenter stated that there should be no competition, but PHAs should develop and provide a clear set of guidelines to applicants. This commenter stated that the statute does not require competitive selection, but does require that HAP contracts be consistent with the agency's plan. This commenter stated that competitive selection is neither practical nor necessary, given the limited number of vouchers that will be available. Most affordable housing developments have funding from a variety of sources, and adding yet another competitive funding cycle complicates the process of financing affordable housing units, and adds unnecessary time and costs.

Some commenters criticized specific aspects of the competition provisions. Two commenters, while agreeing generally with the proposal on competitive selection, stated that the rule should make clear whether the PHA must include in its administrative plan its intent to make PBVs available based on a prior competition. Another commenter supported the prior competition exemption and also stated that the rule should give PHAs some discretion in establishing the competitive criteria whereby they will select units for project basing. A commenter stated that a news release and web publication should be sufficient to satisfy the advertising requirement in proposed § 983.51(c). A commenter, while agreeing with competitive selection generally, stated that the prior competition exception would appear to allow subsidy layering.

HUD Response:
No response is necessary to the supportive comments. As to other comments, HUD believes that many commenters misunderstand the nature of the competitive selection of proposals. The purpose of the notice is to provide interested parties a fair opportunity to participate in the program. The final rule clarifies that PHAs must publish a general notice in accordance with 983.51(c) to inform the public that the PHA is soliciting proposals for the PBV program. The notice must indicate that the PHA's selection policy is available for viewing at the PHA's office. In addition, the PHA's selection criteria must be stated in the PHA's administrative plan. HUD will clarify that PHAs may target particular units in desirable neighborhoods or key “turning point” buildings in established revitalizing areas. One commenter suggested allowing PHAs to substitute environmental, site selection, and subsidy layering reviews conducted under previous competitions for the project-based voucher program. In response to the suggestion, HUD believes it would be impractical and infeasible for HUD to monitor requirements under individual state and local programs to assure consistency with federal statutory and regulatory requirements. HUD, therefore, is not adopting that comment. Site and neighborhood, site selection standards, environmental reviews, and subsidy layering requirements continue to apply.

Comment:
Proposed § 983.51(e) prohibits PHAs from using PBV assistance with public housing units. A number of commenters suggested that this language was overbroad and should be clarified. Two commenters stated that the language “could be read too broadly to include non-public housing units in a HOPE VI or public housing mixed finance project that contains both public housing units and non-public housing units.” Three commenters stated that the definition of “public housing” in the U.S. Housing Act includes units receiving both capital and operating assistance. Therefore, under this rule, PHAs could not use

PBVs in HOPE VI developments. The commenters object to this result. One commenter stated that using PBV assistance in conjunction with HOPE VI and replacement housing factor (RHF) funds is especially important in areas where there has been a significant amount of public housing demolition. Therefore, more replacement housing could be produced. In many markets, PBVs alone do not provide enough of an incentive to develop affordable housing. This commenter and another commenter stated that pairing PBV with capital funds would provide enough operating and capital subsidy to develop long-term affordable housing, and suggests that the first sentence of proposed § 983.51(e) be revised to read: “Under no circumstances may PBV assistance be used with a unit receiving public housing operating funds.” Another commenter agreed and stated that “Congress made substantial changes to the PBV program in Section 232 of the 2001 HUD Appropriations Act, with the intent of making the program more flexible and workable. One of the important changes Congress made was to repeal a former statutory prohibition of project-based assistance for units to be constructed or rehabilitated with funds under the United States Housing Act of 1937.” Proposed § 983.51(e) could be read to reinstate the bar on providing PBV assistance for units to be constructed or rehabilitated with U.S. Housing Act funds notwithstanding Congress' repeal of that bar.

HUD Response:
The Department believes that Congress' adoption of disparate or parallel statutory provisions for the public housing and voucher programs affirms that public housing and voucher programs are intended to operate as separate, and mutually exclusive, subsidy systems under the U.S. Housing Act of 1937. It is not permissible by law to combine voucher funds with public housing funds. For HOPE VI funds that predate FY 2000, it is generally permissible to combine these funds in accordance with the terms of the relevant HOPE VI appropriations act if the HOPE VI funds were not used to develop or operate public housing units. It is not permissible in any case to combine HOPE VI funds appropriated on and after FY 2000 (Section 24 funds), because Section 24 funds are public housing funds. If Capital Funds or Section 24 funds are used in the development of affordable housing, pro-ration must occur. For example, if a project receives $2,000 in non-public housing HOPE VI funds and $1,000 in Capital Funds and there are 60 units in the development, 20 of the units (one-third) are being funded with capital funds and, therefore, cannot be combined with project-based vouchers. Provided that the remaining 40 units (two-thirds) are not receiving any Public Housing funds, the units may be assisted under the PBV program.

Comment:
Proposed § 983.53 provides that certain types of housing are ineligible for PBV assistance. A number of commenters commented on this section. One commenter stated that there may be situations where location of a facility, especially supportive housing, on the grounds of a medical or mental institution is appropriate (see proposed § 983.53(a)(2)). If the intent of the rule is to prevent subsidizing of hospital rooms, that can be accomplished another way.

HUD Response:
HUD has considered this comment and is not adopting it for the following reasons. To allow project-based assistance units on the grounds of medical or mental institutions would be inappropriate since the residency requirements for such housing facilities are usually limited to patients of the medical or mental institution. Housing for medical and mental institutions is generally funded privately or by local or state governments. The PBV program is not intended to be used to substitute for financing of housing that already exists for individuals who are residents of mental or medical facilities with federal funds appropriated to assist low-income families.

Comment:
Five commenters stated that the PHA, not HUD, should determine when there is no practical alternative for a high-rise elevator project that may be occupied by families with children (see proposed § 983.53(b)). This could be particularly important where a PHA has a better understanding of the preservation needs of the community. Another commenter stated that the term “high-rise” should be defined because even two, three, or four story buildings that provide excellent family housing may have elevators. Another commenter stated that some existing high-rise developments provide good housing and should be preserved. The limitation on high-rise buildings with elevators should apply only to new construction. Another commenter stated that in Baltimore, high-rise buildings with elevators may be a significant source of housing. “We believe that that high-rise elevator buildings with one and two bedroom apartments * * * should be eligible.”

HUD Response:
While the statute gives the authority to make the determination about high-rise elevator projects to the Secretary, HUD is also mindful of the commenters' concerns. Therefore, this final rule revises the rule so that PHAs may make an initial determination, but HUD must approve a PHA's finding that there is no practical alternative.

Comment:
Proposed § 983.58(c)(2) makes the release of PBV funds contingent on an environmental review being performed. A number of commenters stated that it is unclear what “release of funds” means because the funds will have already been allocated to the PHA.

HUD Response:
Under part 58, HUD may allocate funds to the PHA, but the PHA may not commit or expend these funds until an environmental finding is completed by the responsible entity (RE). If the finding is that of an exempt activity (§ 58.34) or a finding of activity that is categorically excluded and not subject to § 58.5, then the PHA does not have to submit a request for release of funds (RROF) and certification, and no further approval from HUD is needed by the PHA for the draw down of funds to carry out exempt activities and projects. However, the RE must document in writing its determination that each activity or project is exempt and meets the conditions specified for such exemption.

In those cases where the RE determines that an environmental review is required, the RE will perform such review and execute the certification portion of the RROF by completing only Parts 1 and 2 of HUD form 7015.15 and by forwarding the form to the PHA, which must complete Part 3 before providing the form to HUD for approval. The PHA must await HUD approval from the Field Office Public Housing Director as the HUD Authorizing Officer; the approval is obtained either on HUD form 7015.16—Authority to Use Grant Funds or by a letter dispatched to the PHA. Once received, the PHA may then draw down funds under the voucher annual contributions contract for the project-based voucher project.

Comment:
One commenter commented on proposed § 983.53(d), which prohibits PHAs from attaching PBV assistance to units occupied by ineligible families. This commenter stated that the PHA should be given the flexibility, between the time the Agreement and HAP contract are executed, to move the family to another unit and free the unit for an eligible family.

HUD Response:
It is HUD's policy to minimize displacement and what the commenter proposes is unnecessary.

Section 983.206 allows PHAs to add units to the HAP contract when an ineligible family moves out.

Comment:
Proposed § 983.54 prohibits PBV assistance from being attached to units that have other forms of Section 8 and other types of federal assistance. Two commenters stated that the rule should make clear that in mixed-finance projects, this prohibition applies only to the same units that are receiving subsidies.

HUD Response:
This final rule clarifies that the use of PBV assistance in mixed-finance projects that are not classified as ineligible housing is authorized. Section 983.54 discusses prohibited types of housing under the project-based voucher program. Since the type of units the commenter mentions is not listed, the unit type is not an ineligible housing type.

Comment:
Two commenters stated that § 983.54(a), for clarification, should add the word “unit” after “public housing.”

HUD Response:
The comment is accepted. The final rule is revised to include this clarification and also to specify that the unit is a “dwelling unit.”

Comment:
A commenter stated that an exception to the general rule should be made for holders of enhanced vouchers who received those vouchers when a mortgage on an older, assisted 236 project, which may have had a high tenant rent contribution, was prepaid. PHAs should have the flexibility to replace these enhanced vouchers with PBVs to reduce these tenants' rent contribution to 30 percent of adjusted income.

HUD Response:
The comment relates to an issue that is beyond the scope of this rule. Section 8(t) of the United States Housing Act of 1937 explicitly limits enhanced voucher assistance to tenant-based assistance under section 8(o) of the Act.

Comment:
One commenter stated that proposed § 983.54(a), barring a PHA from attaching project-based assistance to “public housing units,” is a carry-over of current § 983.7(c)(1) that predates the QHWRA. In QHWRA, Congress authorized PHAs to provide capital funds only and changed the definition of public housing to include units in a mixed-finance project that receive capital or operating assistance. Section 983.7(c)(1) was intended to bar project-based assistance from being attached to units that were receiving operating assistance. It was not intended to bar using project-based assistance with units that were constructed or rehabilitated with capital funds under the 1937 Act. HUD should clarify that § 983.54(a) and the last sentence of § 983.54(e) apply only to public housing units receiving operating subsidies under section 9(e) of the 1937 Act, 42 U.S.C. 1437(g)(e). Two other commenters agreed, stating that the rule should clarify that project-based assistance can be used with HOPE VI or capital funds.

HUD Response:
HUD has considered these comments with the result that this final rule retains the proposed rule language, but clarifies when project-based voucher assistance may be combined with HOPE VI funds. The Department believes that Congress' adoption of disparate or parallel statutory provisions for the public housing and voucher programs affirms that the public housing and voucher programs are intended to operate as separate, and mutually exclusive, subsidy systems under the U.S. Housing Act of 1937. It is impermissible to combine voucher funds with public housing funds. For HOPE VI funds that predate FY 2000, it is generally permissible to combine these funds in accordance with the terms of the relevant HOPE VI appropriations act if the HOPE VI funds were not used to develop or operate public housing units. It is not permissible in any case to combine PBV and HOPE VI funds appropriated on and after FY 2000 (Section 24 funds), because Section 24 funds are public housing funds. If Capital Funds or Section 24 funds are used in the development of affordable housing, pro-ration must occur. For example, if a project receives $2,000 in HOPE VI funds and $1,000 in Capital Funds and there are 60 units in the development, 20 of the units (one-third) are being funded with capital funds and, therefore, cannot be combined with project-based vouchers. Provided that the remaining 40 units (two-thirds) are not receiving any public housing funds, the units may be assisted under the PBV program.

Comment:
One commenter asked that HUD not make projects that receive “operating support” ineligible for PBV. “Sometimes projects need additional operating cash flows due to unexpected increases in operating costs and expenses.” Another commenter stated that, as part of a plan to end long-term homelessness, “we urge that the rule be amended to permit replacement of temporary subsidy with PBVs, or to clarify that such replacement is permissible.” This commenter also stated that there may be situations, especially in supportive housing, where operating cost subsidy is required, despite rent subsidy, to ensure affordable rents and achieve project rent payment standards. This commenter suggested that HUD delete § 983.54(d) or revise it to permit operating subsidy where other governmental operating cost subsidy is required and demonstrated through the subsidy layering review to be necessary to the project. This commenter recommended that a new § 983.54(m) be added to read:

“For purposes of paragraphs (c), (d), and (l), rental or operating costs subsidies intended to terminate upon implementation of a HAP contract shall not be considered “governmental rent subsidy,” “governmental subsidy,” or “housing subsidy.”

HUD Response:
HUD considered these comments, but did not adopt them. With respect to the public housing program, it is statutorily impermissible to combine Public Housing Operating funds with PBV funds. Supportive housing programs that receive operating funds are also ineligible under the PBV program since rent is generally included as an operating expense.

Comment:
A number of commenters objected to § 983.55, which requires a subsidy layering review to be conducted by HUD or an approved entity before a PHA may enter into a HAP contract. Commenters objected both to the overall requirement of a subsidy layering review and to the conduct of the review by HUD.

One commenter stated that subsidy layering should not be required as rent caps and other guidance should suffice. If subsidy layering is to be required, the rule should be amended to allow the PHA to conduct the review and receive just compensation. One commenter stated that there should be an exception for projects that provide extensive support services, such as projects that serve the homeless. Another commenter stated that if the PHA determines that there is no other government subsidy involved, no subsidy layering review should be required. Another commenter stated that the rule should permit additional governmental subsidy when necessary for the success of the project. One commenter questioned whether subsidy layering analysis applies to every application that shows public capital investments in the form of loans or grants, and stated that such an analysis should not be required where the bulk of public financing is through loans and there is no tax-credit financing.

HUD Response:
Because prevention of excessive subsidy is statutorily required, this final rule retains the requirement for subsidy layering reviews.

Comment:
One commenter stated that HUD should not be involved in subsidy

layering reviews. Other commenters stated that section 911 of the Housing and Community Development Act of 1992 (42 U.S.C. 3545 note) requires that, where low-income housing tax credits are involved, the state tax credit allocating agency must do the review. Still another commenter stated that while use of PBV must be consistent with subsidy layering, the rule “could be misconstrued to create additional bureaucratic barriers” and that the rule should clarify that it does not supersede authority of Housing Credit Agencies (HCAs) and Housing Finance Agencies (HFAs) to conduct the review when they are involved because of tax credits. When there is such an agency already involved, HUD should not have to determine individually whether it is an appropriate independent agency to do the review. Two commenters stated that a subsidy layering review for this program should not be required when another office or agency is authorized to perform a subsidy layering review or has recently performed such a review in connection with other assistance. One commenter stated that the rule should clarify what are approved entities and what entities may conduct a layering review. This should include entities already approved or required to perform such reviews in HUD programs.

HUD Response:
The issue of entities that can perform subsidy layering reviews is addressed in statute and guidance published as
Federal Register
notices, and, hence, is not appropriate for treatment in this rule. Pursuant to Section 911 of the Housing and Community Development Act of 1992, as amended, 42 U.S.C. 3545 note, HUD has issued guidelines in the form of
Federal Register
notices on February 25, 1994 (59 FR 9332), and December 15, 1994 (59 FR 64748). Under these notices, the Office of Public and Indian Housing performs subsidy layering reviews for programs under its jurisdiction with input from field offices. HUD may invite HCAs to perform subsidy layering reviews in connection with projects receiving low-income housing tax credits, by publishing a
Federal Register
notice along with the guidelines that HCAs must follow in conducting subsidy layering reviews. PIH may publish revised guidelines as a
Federal Register
notice in the near future.

Comment:
A number of commenters commented on the Family Self-Sufficiency (FSS) program exemption to the 25 percent cap on project-basing, with most commenters stating that the exemption is too narrowly limited to statutory FSS programs under section 23 of the 1937 Act, 42 U.S.C. 1437u. Many commenters expressed the view that there should be a broader definition of services that qualify for the exemption to the cap. Commenters stated that “other tools are available than FSS, such as local self-sufficiency programs * * *,” and that a broader definition of qualifying services is a better alternative than the FSS program alone. Some of these commenters cited specific local programs as ones that should qualify for the exception to the cap. Along these lines, three commenters suggested that the term “families receiving supportive services” be defined as “families receiving services essential for maintaining or achieving independent living, such as, but not limited to, counseling, education, job training, health care, mental health services, alcohol or other substance abuse services, child care services, or service coordination and case management services.” One commenter stated, in addition, that HUD should remove § 983.56(b)(2)(ii) and replace it with the phrase “Families receiving supportive services.” Another commenter stated that the limitation of supportive services to the FSS program is arbitrary and impractical. First, families in self-sufficiency programs other than FSS in many cases receive services that are as comprehensive or more comprehensive than FSS. Second, funding for FSS coordinators has been shrinking in real terms in recent years. One commenter stated that “* * * service programs run by many of the faith-based organizations we are partnering with would not qualify for this exception.” Two commenters stated that it is inconsistent with statute to limit “families receiving supportive services” to “FSS families,” because the statute refers to the broader concept of “supportive services.”

HUD Response:
HUD has considered these comments and adopted the suggestion to allow for services other than those services associated with the statutory FSS program under 42 U.S.C. 1437u. Under the Final Rule, PHAs are authorized to establish the type of services and the extent to which services will be provided to allow exceptions to the 25 percent limit. PHAs must state in their administrative plans what these services are. The final rule also clarifies that PHAs are responsible for determining that units are made available to families that are receiving the services in order for the unit to be and to remain excepted from the cap (see § 983.56(b)(2)(ii)(C)) and ensuring that assistance is terminated if families living in exempted units fail without good cause to complete their FSS or supportive services obligation.

Comment:
One commenter stated that the narrow definition of social services that qualify for the exception to the cap “will exclude many chronically homeless individuals and families—who may neither participate in the FSS program nor qualify as ‘disabled’ under the Section 8 statute due to a primary diagnosis of alcoholism or substance abuse. Such a result would be clearly contrary to the Administration's commitment to prioritize this vulnerable population within all HUD programs.”

HUD Response:
See response above.

Comment:
Two commenters stated that HUD should provide more flexibility with respect to the FSS exception to the 25 percent cap on project basing and make clear that the PHA can make its own determination what constitutes adequate supportive services.

HUD Response:
See response above.

Comment:
Two commenters stated that the proposed rule improperly imposes a work requirement by allowing PHAs to terminate assistance to a family not in compliance with its FSS contract of participation. “The statute is silent about any such condition of continued occupancy.”

HUD Response:
Since the family is receiving PBV assistance for a unit outside the statutory 25 percent cap because of its participation in supportive services, the family necessarily loses that right if it fails with respect to its FSS contract or its supportive services program. Therefore, this final rule provides that assistance to such a family can be terminated. However, as long as the unit continues to be made available to qualifying families, the unit can continue to receive assistance and benefit another family participating in supportive services.

Comment:
A number of commenters stated that other forms of project-based subsidy should not count toward the 25 percent limit, because the statute applies only the 25 percent limit to project-based vouchers. Other commenters stated that this limitation would impede the preservation of affordable housing and constrain the development of supportive housing units. Two commenters stated that if HUD continues to include “other federal project-based assistance” as counting against the 25 percent cap on assisted units, the rule should make it clear that the term does not include units receiving only mortgage or production subsidies (such as § 236, § 221(d)(3), LIHTCs, or HOME funds).

HUD Response:
HUD has considered these comments and adopts them in this

final rule. This final rule limits the number of project-based units in a building to 25 percent of the total units in the building and not to 25 percent of the unassisted units.

Comment:
One commenter stated that limiting the size of a multifamily building to no more than a specified number of units is another alternative to the 25 percent cap.

HUD Response:
The 25 percent cap is provided for by a clear and unambiguous statute, 42 U.S.C. 1437f(o)(13)(D)(i), and cannot be changed by this rule.

Comment:
Two commenters stated that they support the exception to the 25 percent per building cap on project-based units for elderly and disabled families. One commenter stated that “we would encourage HUD to also provide an exception to developments for units that provide families with service-enhanced housing which includes families who were previously homeless.” Another commenter similarly stated that “We suggest including in the list of examples of “excepted units” housing developments created through HUD's initiatives to provide permanent supportive housing to address the needs of chronically homeless individuals.”

HUD Response:
HUD has considered these comments, but has not adopted them. The statute explicitly provides for certain exceptions to the limitation on the number of dwelling units that may be assisted in any one building. The commenters' suggestion is not included in the statutorily permissible exceptions because inclusion of the type of developments suggested would expand the exceptions allowed under the law. Nonetheless, the final rule expands the definition of supportive services to include services other than those under the FSS program.

Comment:
Two commenters stated that if HUD follows the recommendation to expand the definition of “supportive services” that qualify for the exception to the 25 percent cap on project-based units in a building, the rule should make it clear that when an owner has entered into a contract with a public agency other than a PHA to provide supportive services, it is that public agency which has the primary responsibility for monitoring the delivery of those services. As with the competition for project-based vouchers in § 983.51(b)(2), the rule should permit PHAs to rely on the established selection procedures and monitoring expertise of other agencies.

HUD Response:
HUD has considered this comment, but is not adopting it. Under the Project-Based Voucher program, HUD's contractual relationship is with public housing agencies. The Department can neither impose nor enforce requirements on entities with which the Department has no legally enforceable agreement.

Comment:
One commenter suggested that the rule add additional language to three sections. The additions are as follows:

A new § 983.56(b)(4): “(4) Monitoring of supportive services. (i) The PHA may determine that the monitoring and reporting requirements specified in § 983.203(d)(ii) and certified by the owner in § 983.209(b)(i) suffice to establish the units as “excepted units” for purposes of this section.

“(ii) Where the owner has not entered into contracts with public agencies to deliver supportive services or where the PHA has reasonably determined that the monitoring and reporting requirements specified in § 983.203(d)(ii) and certified by the owner in § 983.209(b)(i) do not suffice to establish units as ‘excepted units’ for purposes of § 983.56(b)(2)(B), the PHA may require the owner to submit such documentation as is reasonably required to establish the units as excepted units for purposes of this section.”

New §§ 983.283(d)(i) and (ii), to be added at the end (before the semicolon) of § 983.203(d): “including (i) the public agencies other than the PHA, if any, with whom the owner and/or its affiliates and/or its subcontractors intends to contract to provide funding for or direct supportive services for any units receiving PBV assistance; and (ii) a description of the monitoring and reporting requirements regarding the delivery and efficacy of the supportive services under any contracts identified under (i).”

The following, to be added at the end (before the period) of § 983.209(b): “* * * and the owner and/or its affiliates and/or its subcontractors are in compliance with any existing contracts with public agencies to provide funding for or direct supportive services for any units receiving PBV assistance.”

HUD Response:
HUD has considered these comments and has determined that, because of the variety of local circumstances and supportive services that may be provided, it is preferable for PHAs, which know the local area and the needs of residents, to administer the details of this aspect of the statute and regulations.

Comment:
The site selection standards in proposed § 983.57 would require that project-based assistance “be consistent with the goal of expanding housing opportunities” and that projects using PBV be sited to “promote greater choice of housing opportunities and avoid undue concentration of assisted persons in areas containing a high proportion of low-income persons.” One commenter stated that this standard would prevent affordable housing from being developed in areas previously dominated by urban blight, thus attracting residents. Properties outside areas with a high concentration of low-income persons are mostly unaffordable or unwilling to accept government subsidy. Conversely, another commenter stated an objection to the proposed rule's elimination of any standard for deconcentration and expansion of housing and economic opportunity, and suggested that HUD adopt an alternative standard, based on waiver requests, that allows PBV units in mixed-income projects and neighborhoods undergoing “gentrification” while ensuring that the PHA also creates PBV units in non-poor neighborhoods. Another commenter stated that the rule should allow projects to be sited in areas of poverty concentration where it would allow access to supportive services. “It is the supportive services that will ultimately help lift a family out of poverty rather than the location of the housing outside an area of concentrated poverty.”

HUD Response:
The requirement that project-based voucher contracts be consistent with the goal of deconcentrating poverty and expanding housing and economic opportunities is a clear statutory mandate and, therefore, cannot be changed as suggested by these commenters. In addition, these are factors under SEMAP scoring. This final rule provides guidelines that PHAs must consider in selecting project-based voucher proposals to ensure that, in selecting projects under the program, the statutory goal of deconcentrating poverty and expanding housing and economic opportunities is satisfied.

Comment:
Two commenters questioned whether the site and neighborhood standards in proposed § 983.57(d) should apply to the PBV program. Four commenters stated that some of the site and neighborhood standards do not seem meant to apply to existing buildings. One commenter stated that the PHA should determine whether in the context of its affordable housing goals it makes sense to provide PBVs to the project. Also, the rule should be clearer on whether the PHA or HUD makes the determination that site and neighborhood standards are met. Two commenters stated that the PHA should make the determination. One commenter stated that the proposed rule is unclear about the process for satisfying site and neighborhood

standards, and that units may be lost because landlords in low poverty areas will not wait to rent their units on the private market while a review process is underway.

HUD Response:
HUD has considered the comments, but does not adopt them. The standard for existing housing is reasonable and not as stringent as the standard for New Construction. The requirements of proposed § 983.57(d) (§ 983.58(d) of this final rule) are applicable to existing housing under the PBV program. The rule details the requirements that must be considered in determining whether site and neighborhood standards are satisfied.

Comment:
Several commenters questioned proposed § 983.58 on environmental reviews. Commenters stated that environmental review requirements should not apply to existing units because actions such as demolition, rehabilitation, and construction are not taking place. A commenter stated that properties for which an environmental review was previously done under another program should be exempt from environmental reviews in the PBV program. Another commenter stated that the section is overbroad as drafted, because it appears to prohibit PBV contracts being executed with owners who have purchased properties prior to HUD completing its environmental review. A commenter stated that where a PBV contract is for existing units and will have an initial HAP term of 5 years or less, parts 50 and 58 should not apply. A commenter stated that “to apply these requirements to existing public accommodations will make it even more difficult for landlords in strong markets to participate in the Special Mobility Program * * *.” Moreover, the delays in waiting for approvals will result in lost units.

HUD Response:
Existing housing as used in the PBV regulation is normally categorically excluded from the requirements for an environmental assessment and finding of no significant impact under the National Environmental Policy Act (NEPA). However, existing housing is subject to the applicable federal environmental laws and authorities listed at 24 CFR 58.5.

The responsible entity will conduct the environmental review in accordance with 24 CFR part 58 (or HUD will complete an environmental review under 24 CFR part 50 where HUD has determined to do the environmental review). In the case of existing housing that is reviewed under part 58, the responsible entity must determine whether or not PBV assistance is categorically excluded from review under NEPA and whether or not the assistance is subject to review under the laws and authorities listed in 24 CFR 58.5.

Assistance to a project previously approved under another HUD program for which an environmental review was completed under 24 CFR part 58 is considered supplemental assistance and is categorically excluded and not subject to further review under the related laws in 24 CFR 58.5, if the approval is made by the same responsible entity that conducted the environmental review on the original project and re-evaluation of the environmental findings is not required under 24 CFR 58.47. This exemption is limited to contracts for the same units that previously had an environmental review completed under part 58.

In accordance with the NEPA and the Council on Environmental Quality's implementing regulations, the Department does place limitations on actions before completion of the environmental review. The final rule is clear at § 983.58(d) that the PHA may not enter an Agreement or a HAP contract with an owner, and its contractors may not acquire, rehabilitate, convert, lease, repair, dispose of, demolish, or construct real property or commit or expend program or local funds for PBV activities under part 983, until an environmental review is complete. However, there is no intent to prohibit an owner from acquiring a property before the owner enters the PHA's property selection process under the PBV program.

Comment:
A commenter stated that in proposed § 983.59 and elsewhere, there are provisions regarding the selection of PHA-owned units that are problematic, because the rule establishes up-front procedural hurdles that could be addressed in a less burdensome way by monitoring PHA performance. For example, initial rents must be based on an appraisal by a licensed and certified appraiser. Also, HUD has to approve in advance an independent entity that will perform rent reasonableness and housing quality standards (HQS) determinations. Another commenter stated that the PHA should be allowed to attach PBVs to PHA-owned units without a request for proposals or review by another entity. Similarly, a commenter stated it supported removing the requirement for independent appraisal of PHA-owned units, and stated that PHAs should have the option of allowing an owner to submit an independent appraisal of the requested rents as part of the project selection process.

Similarly, a commenter stated that “in a variety of ways, the proposed rule makes it extremely difficult for PHAs to expand the supply of publicly-owned affordable housing through use of project-based vouchers.” This commenter cites language primarily from the proposed § 983.59, as well as from proposed language concerning the competitive selection of units. A commenter stated that “* * * the best way to protect tenants and the public is not through front-end procedural barriers * * * but rather through subsequent monitoring of the outcomes. PHAs * * * should be trusted to comply with the law unless they are shown to have violated the trust.” This commenter suggested changes to §§ 983.51(e) and 983.59. The change to 983.51(e) would exempt units owned by the PHA from the review of the selection process, and would provide that the “selection of PHA-owned units will be deemed approved by the HUD field office if the field office fails to act within 30 days of receipt of the required information concerning the selection process.” The changes to § 983.59 would be to permit agencies of local government (in cases where the PHA is not part of the local government) to determine rent reasonableness and HQS compliance without HUD approval, and to permit PHAs to select an independent entity other than a unit of local government to perform the same function, also without HUD approval.

HUD Response:
HUD has considered these comments, but does not adopt them. The proposed regulation governing PHA-owned units is not intended to reject the use of performance standards nor to impose a more administratively burdensome process than necessary, but rather to protect, to the extent possible, taxpayer dollars by ensuring that such dollars are appropriated fairly and without undue influence and favoritism. It should also be noted that the law requires that an independent agency inspect units and determine the reasonableness of rents in the case of PHA-owned housing under the tenant-based program. The law establishes these same requirements for the project-based component of the voucher program.

Subpart C (§§ 983.101-983.103)

Comment:
Proposed § 983.101 requires units to comply with HQS and lead-based paint regulations at 24 CFR part 35. A commenter stated, as to proposed § 983.101(c), that lead paint requirements at 24 CFR part 35, particularly at 24 CFR 35.720(c) and 35.730, which involve reporting by local health officials, could be problematic in

the PBV program. This commenter stated that the rule should be revised to require PHAs to give the local health department the addresses of all PBV units, and to require the PHA to notify each unit owner of their obligations. Also, unit owners need to be informed of their obligation to verify with the health department when they learn the information (about elevated lead levels) from a source other than local health officials.

HUD Response:
These comments relate to matters beyond the scope of this rulemaking. Since the proposed rule did not involve the lead paint regulations, those regulations were not made available for public comment. A separate public rulemaking procedure would be required to address lead paint issues.

Comment:
One commenter stated that HUD needs to define what qualifies as a unit generally complying with HQS. Two commenters stated that instead of requiring PHAs to inspect all units for HQS compliance prior to unit selection and again prior to HAP execution, the rule should give PHAs discretion to do only one inspection. One commenter also stated that if a project has a Real Estate Assessment Center (REAC) score higher than 60, it should not be necessary to do an inspection after each turnover. One commenter stated that it is unclear what steps a PHA must take to ensure that existing units comply with § 504 of the Rehabilitation Act of 1973 and the Fair Housing Act. One commenter stated that the requirement for inspection of a sample of units at least annually seems to conflict with the SEMAP requirement of inspecting each unit under contract at least annually.

HUD Response:
HUD disagrees with the comments relating to a definition of general compliance with HQS, and with the comment relating to Public Housing Assessment System (PHAS) scores. Only in the case of selecting existing units, and for the purpose of defining them as existing units, must the PHA ensure that all of the units substantially comply with HQS. HUD has elected not to define what qualifies as a unit substantially complying with HQS since the units must comply fully with HQS prior to HAP execution. The law also requires that units be inspected for compliance with HQS, regardless of PHAS score. Furthermore, compliance of existing units under Section 504 of the Rehabilitation Act of 1973 and the Fair Housing Act is defined in 24 CFR Section 8 subpart C. HUD agrees with the comment regarding SEMAP. SEMAP scoring for inspections will be adjusted to remove all PBV units as reflected in the Public Housing Information Center (PIC) from the annual inspection indicator.

Comment:
Proposed § 983.103(d) requires an annual inspection of a random sample of 20 percent of all PBV units in each building of a project. Some commenters stated that inspections should be of a random sample of units in a project, rather than units in a building. One commenter stated that the section should be revised to require inspection of at least two units or 20 percent of the units, whichever is more. Alternatively, this section should restrict the random sample method to multifamily buildings. An inspection of only one unit in a small building does not provide enough of a sample. One commenter supported this section as proposed.

HUD Response:
HUD considered the comments regarding random inspections of a project rather than a building, but is not adopting them. The statute requires annual compliance with inspection requirements except that the agency shall not be required to make annual inspections of each assisted unit in the development. HUD believes that the sample should be drawn on a building basis in order to get a good cross-section of the condition of the units in a project. HUD has interpreted the law by requiring at least 20 percent of the units in a building be inspected annually. A development or project could consist of several buildings and a random sample of the project or development would not necessarily ensure an inspection in each building. In response to the issue of sample size, HUD believes that the inspection of at least one unit in buildings where five or fewer PBV units are located is, due to the small number of units involved, an adequate sample.

Subpart D—Requirements for Rehabilitated and Newly Constructed Units (§§ 983.151-983.156)

Comment:
Proposed § 983.152(c)(1)(ii) requires that the location of contract units be described in the agreement to enter into a HAP contract. One commenter stated that because units can float, it seeks confirmation that this provision requires identification of the building, not the exact unit.

HUD Response:
The “location of the contract units on site” does refer to the location of the contract units in a building in which PBV units will be located and must be described in the HAP contract. Floating units are addressed in § 983.206.

Comment:
Proposed §§ 983.153(a) and 983.55 require a subsidy layering review prior to execution of the Agreement by the owner and the PHA. Commenters stated that subsidy layering analysis should be done prior to the Agreement only when some kind of governmental assistance is being provided to the project. “For instance, we do not think subsidy layering would apply where a PHA chose to use PBVs in a project that already has an FHA insured mortgage” and no new assistance. A commenter stated that subsidy layering requirements should be clarified and explained with a “clear road map” so as not to “chill” PHAs and developers.

HUD Response:
The Final Rule retains the requirement for subsidy layering reviews because it is statutory. Section 102(d) of the Department of Housing and Urban Development Reform Act of 1989 (codified at 42 U.S.C. 3545) requires that the Secretary certify that “assistance within the jurisdiction of the Department” to any housing project shall not be more than is necessary to provide affordable housing after taking into account “other government assistance.”

Comment:
Proposed § 983.154(b)(3) requires the owner and the owner's contractors and subcontractors to comply with applicable federal labor standards, and requires the PHA to monitor that compliance. One commenter stated that the rule should allow PHAs to work with other agencies that have an interest in the project to monitor compliance with the Davis-Bacon Act.

HUD Response:
HUD considered this comment but did not adopt it because, although a PHA can subcontract any of its functions, the PHA is still ultimately responsible for monitoring to ensure that the owner and owner's contractors and subcontractors comply with applicable federal labor standards (see HUD handbook 1344.1, Federal Labor Standards Compliance in Housing and Community Development Programs).

Comment:
Two commenters stated that the conflict-of-interest provision in § 983.154(e) is too vague and needs additional definition.

HUD Response:
The provisions of 24 CFR Section 982 subpart D apply to the project-based voucher program in accordance with Section 983.2(a). Specifically, Section 982.161 details conflict of interest provisions.

Comment:
Proposed § 983.155(a) states that the Agreement must state the completion deadline and that the owner must provide evidence of completion. Three commenters stated that the completion deadline should be between the owner and PHA, not HUD. If the project is not completed, the owner will not get the PBVs. HUD should leave the completion determinations to the PHA.

HUD Response:
HUD agrees with commenters that the completion deadline should be arranged between the owner and the PHA. Although HUD may specify additional documentation that must be submitted by the owner to evidence completion of the housing, the additional documentation must be submitted to the PHA, not to HUD.

Subpart E—Housing Assistance Payments Contract (§§ 983.201-983.209)

Comment:
One commenter stated that in the Special Mobility Program, landlords commit to a number of Section 8 units, but they may not know which specific units will be available. The requirement in proposed § 983.203(c) to identify the location of each contract unit may be difficult to meet. This commenter stated that the rule should be modified to allow HQS inspection and HAP amendment to occur as units become available, with adjustments to lease terms as needed.

HUD Response:
The regulation as proposed resolves this issue, since it allows floating units. In § 983.206(a), at the discretion of the PHA, the HAP contract may be amended to substitute a different unit with the same number of bedrooms in the same building for a previously covered contract unit. HQS and rent reasonableness must be determined for the new units. Section 983.206(b), allows for amendment of the contract within 3 years of initial execution to add additional units in a building. Leases and HAP contracts do not run concurrently as in the tenant-based program.

Comment:
A number of commenters disagreed with the provision for one-year extensions of HAP contracts in proposed § 983.205(b). These commenters stated that the length of extensions should be up to the PHA, and should be for up to the length of the initial term. Commenters stated that the statute allows longer extensions, and that the one-year limitation violates the statute. One commenter suggested that § 983.205(b) should be revised as follows:

In the initial contract, the PHA and owner may agree that, subject to appropriations, they will extend the term of the HAP contract prior to its expiration for a duration agreed upon by the parties if the PHA determines an extension is appropriate to continue providing affordable housing for low-income families and the owner has complied with the contract during the initial term. Subsequent extensions are subject to the same limitations.

Two commenters stated that annual extensions are too administratively burdensome. One commenter also stated that contractors need an assurance of a longer term. Some commenters stated that one-year extensions could impede the ability of owners to obtain financing, and that the minimum extension should be five years. One commenter stated that the limitation increases the risk to investors who are risk-averse. Three commenters stated that the limitation may also interfere with using LIHTCs. One commenter also suggested that § 983.305(b) be revised to be extendable “for up to an additional 10 years.”

One commenter stated that (as of the time of the comment) annual contributions contracts (ACCs) are only being extended for 3 months. This places the PHA in an awkward position to enter even into a one-year HAP with an owner.

HUD Response:
HUD has considered all of the comments and agrees that renewal terms should be more than one year. Accordingly, PHAs will be allowed to approve extensions after the initial term on a five-year or shorter basis as determined by the PHA.

Comment:
Proposed § 983.205(d) allows the owner to terminate a contract if the rent falls below the initial rent. In this case, families are given tenant-based assistance. A number of commenters disagreed with this provision.

Five commenters stated that instead of allowing the owner to terminate the contract if rent falls below initial rent, as provided in proposed § 983.205(d), the rule should not allow PHAs to reduce rents below initial rents. Two of these commenters stated also that the proposed rule is contrary to the statutory provision on rent adjustment and will discourage participation in the program. The statute delegates the determination of rent to PHA and owner, outside of HUD's rulemaking power. Two commenters stated that the initial guidance provided by HUD requires rent adjustments only at the request of owner, and that an arbitrary reduction in rent based on a change in payment standard can create financial stress for the property. One commenter stated that the rule should clarify whether, if the HAP contract is terminated under § 983.205(d), the tenants are eligible to receive enhanced or regular vouchers. Two commenters stated that although the rule protects tenants if rents are reduced and the owner opts out, it may endanger the project because converting the assistance to tenant-based removes a unit and would limit the units available for the intended population and threaten the viability of the project. The rule should remove disincentives for the owner to participate and protect funders by modifying § 983.301(a)(3) to provide that rents are redetermined at the request of the owner, and deleting §§ 983.205(d) and 983.302(c).

HUD Response:
HUD has considered all of the comments and has addressed changes to rent adjustments in § 983.302. However, HUD believes that the law is very specific for setting rents and that HUD lacks the ability to limit rent reductions. Should the owner terminate the HAP contract in accordance with § 983.205(d), families are eligible to receive the same regular (not enhanced) tenant-based vouchers for which they are eligible, at their request, after living in a project-based unit for 12 months.

Comment:
One commenter stated that the proposed rule provides that units do not float. PBV units should be permitted to float within a building or development so long as the PHA meets HUD requirements. This commenter suggests new language for 983.206(a):

At the discretion of the PHA and subject to all PBV requirements, the HAP contract may permit PBV units to float within a building or development. The owner must maintain the same number of units and the same number of bedrooms. Prior to attaching PBV subsidy to a unit within a building or development, all PBV requirements must be met, including an inspection confirming that the unit meets HQS standards and a rent reasonableness determination.

One commenter supported a provision to amend the HAP contract by allowing units to “float.” It should be made clear that this should only be done at turnover or where families lose assistance due to being over income to prevent displacement, and there should be safeguards against replacement of accessible units with non-accessible ones. One commenter stated that the rule should not require HAP contract amendments when, because of administrative burden, units are added or substituted. Another commenter stated that allowing units to be substituted “is a great enhancement.” However, the commenter stated that the restriction of substitutions to 3 years after HAP execution (§ 983.206(b)) should be removed, to allow the PHA to help an additional family in cases where the assistance drops to zero but the family prefers to stay in the unit and pay market rent.

HUD Response:
HUD believes the flexibility sought by the commenters already exists and therefore is not adopting the proposed change to § 983.206(a). In § 983.206(a), at the discretion of the PHA, the HAP contract may be amended to substitute a different unit with the same number of bedrooms in the same building for a

previously covered contract unit. Further restrictions regarding “floating” units is not necessary since substituting units must be in compliance with all PBV requirements. HUD believes that units cannot be assisted without a contractual agreement obligating the assistance necessitating a revision to the HAP contract. Section 983.206(a) does not restrict the substitution of units to three years. The three-year limit applies only to adding new units to the original PBV contract.

Comment:
Proposed § 983.206(c) states that even if contract units are placed under the HAP contract in stages commencing on different dates, there is a single annual anniversary for all contract units under the HAP contract. Five commenters stated that in order to protect against displacement and transition to lower-income families over time, HUD should change its position that there is a single anniversary date for all units under HAP contract within the full term of the contract. One of these commenters stated that some proposals may require a complex transition of units into the program over time. The PHA and owner should be able to structure the admission requirements in the PHA's administrative plan in a manner to best serve both current residents and those on the PHA waiting list.

HUD Response:
HUD does not accept that in order to protect against displacement and transition to lower-income families over time, HUD must change its position on a single anniversary date for all units under one HAP contract. The commenter did not elaborate on how the same anniversary date for all units under the same contract would displace and transition lower-income families. Once units are accepted into the program, they are placed under a HAP contract. Eligible current residents are given priority for admission in accordance with 983.251(b).

Comment:
Proposed § 983.209 requires the owner to certify to certain matters. Three commenters stated that the owner may not be able to certify that each unit receiving assistance is occupied by a family referred by the PHA because some families receiving assistance due to displacement provisions will not have been referred by the PHA.

HUD Response:
In response to these comments, HUD will clarify that only families referred by the PHA may be assisted. Section 983.251(b) protects in-place families by providing a priority for admission to the PBV program. However, these families must also be determined eligible by the PHA and referred to the owner by the PHA.

Comment:
One commenter stated that the prohibition on renting to the owner's relatives in proposed § 983.209(e) should be subject to an exception when necessary to make a reasonable accommodation, as in current 24 CFR 982.306(d).

HUD Response:
The comment was not adopted. HUD intentionally differentiates in this case between the tenant-based voucher and project-based voucher programs. To allow an owner of a project-based voucher development to rent to close family relatives (whether disabled or not) creates a systematic incentive to owners to misuse the program. Persons requesting a reasonable accommodation in policies in order to effectively participate in the housing choice voucher program are not harmed by restricting the exception to renting to relatives to the tenant-based program.

Subpart F—Occupancy (§§ 983.251-983.261)

Comment:
Proposed § 983.251 regulates how families are selected for the PBV program. Commenters stated that the PHA and the owner should be able to structure the admission requirements to best serve both current residents and those on the waiting list. While generally supporting the anti-displacement provision (§ 983.251(b)(2)), the commenters stated that this provision should be revised in the final rule to allow discretion in providing current families with PBV assistance. A commenter also stated that owners and PHAs should be given the flexibility to lease units on a rolling basis in compliance with the PHA's waiting list policy. Owners should be able to contract for the maximum number of units needed to accommodate the greatest number of eligible households in a way that can be financially supported over time.

HUD Response:
HUD does not agree with these comments. Eligible in-place families should not be penalized if units in the building are selected to receive project-based assistance. However, project-based assistance is limited to 25 percent of the units in a building which means that not all of the eligible families in the building can receive project-based voucher assistance. However, eligible in-place families must be given an absolute preference on the waiting list for units that become available.

Comment:
Regarding proposed 983.251(a)(1), one commenter stated that public housing families should have the choice to move to PBV units without having to put themselves on a separate Section 8 waiting list.

HUD Response:
The comment was not accepted because the statute governing the project-based voucher program requires that PHAs select families to receive project-based assistance from its waiting list.

Comment:
A number of commenters stated that they support protection for in-place families provided in § 983.251(b). One of these commenters stated that this provision would help prevent families from becoming homeless. Another commenter stated that an eligible family should have a choice between a voucher or relocation benefits. Another commenter stated that eligibility should be determined at the HAP execution stage, so that a family could become eligible during construction, and that HUD should consider making the residency determination at the proposal acceptance stage. Since the units can float, any ineligible units can be switched at the time of execution of the HAP contract. This commenter also stated that HUD should disregard in-place families when assessing a PHA's compliance with income-targeting requirements since these tenants are already in occupancy and constitute a continuing tenancy. Another commenter stated that it supports the minimizing displacement provision; however, because existing units will now be eligible for PBV, the “inclusion of minimizing displacement should be available to the families of existing units selected for PBV.” Another commenter, while expressing general support, also stated that some in-place families might not be appropriate for the project. For example, the in-place family may be a single individual and the project may be for chronically mentally ill homeless individuals. Another commenter stated that it supports approving existing housing with tenants in place. Otherwise, the supply of housing would be limited, and issues of preference usually get resolved on turnover. “The benefits outweigh the slowing down of assistance to those on the waiting list.”

HUD Response:
The suggestion regarding a choice between a voucher and relocation benefits was not adopted. This is because relocating an in-place family in these circumstances would be inconsistent with HUD's policy to minimize displacement. An in-place family cannot otherwise be placed ahead of others on a PHA's waiting list unless a PHA develops such a preference. The comment regarding establishing eligibility at the time of HAP execution would not be consistent with HUD policy to minimize

displacement and protect in-place tenants. Providing such protection is appropriate only when a decision is made to provide PBV assistance. It is for this reason that HUD determined that an in-place family must be eligible on the proposal selection date. The suggestion involving choosing appropriate in-place families cannot be considered because it would be inconsistent with civil rights laws. Specifically, the PHA's administrative plan cannot provide for a selection preference for the program based on a specific disability.

Comment:
Two commenters stated that priority for in-place families for assistance needs to be balanced against the needs of the families on the waiting list, and suggests limiting the number of prioritized in-place families to 20 to 30 percent of the total. One commenter advocated “allowing owners some discretion in determining which families are eligible for PBV assistance, consistent with administrative plan and waiting list policies.” Another commenter stated that the section clarifying that PHAs must offer assistance to eligible in-place tenants who occupy proposed contract units will facilitate the use of PBVs to preserve existing housing. However, the rule should give PHAs the flexibility, between the time the Agreement and HAP are executed, to substitute new tenants as the in-place tenants. Also, PHAs should be allowed to select units with ineligible tenants and move the tenants to appropriate units. A commenter stated that the PHA should have flexibility to offer tenant-based vouchers to in-place families. Also, the rule should clarify whether in-place families have priority for the program or the particular project they occupy. A commenter stated that from a practical perspective, it will not ordinarily be necessary to use occupied units in partially assisted developments because of turnover. While there may be meritorious cases for using an occupied unit, a PHA could use this provision to steer assistance toward favored sites and tenants.

HUD Response:
The suggestion to provide priority for only 20 to 30 percent of in-place families is contrary to HUD policy to minimize displacement. The law requires that PHAs determine eligibility of families under the project-based voucher program and PHA selection of families from the waiting list. The PHA must give in-place families that are eligible for assistance a selection preference to minimize displacement. When such families move out of the PBV unit, the unit will then become available for a waiting list family.

Comment:
Proposed § 983.251(c) governs the selection of families from the PBV waiting list. One commenter stated that the rule should allow for preferences for persons with disabilities for units in which disabled individuals will be receiving specialized services if the persons are recognized by Congress as a protected class because of their disabilities. Placing preferences for these recognized classes would minimize the need for waivers. Another commenter stated that HUD, in supportive housing with “wraparound services,” should allow PHAs and owners to select the applicants who need the services and allow preferences based on eligibility for services offered at specific complexes. Another commenter stated that “in some circumstances, supportive housing projects that serve people with disabilities that grant preference to applicants who are eligible for the supportive services offered may be entirely appropriate * * *”

HUD Response:
HUD agrees with the commenters. HUD is revising this final rule to allow a selection preference for disabled persons in need of the services offered at a particular PBV project.

Comment:
Proposed § 983.251(c)(3) provides for project or building-specific waiting lists. Three commenters sta