# Prevention of Significant Deterioration (PSD) and Non-Attainment New Source Review (NSR): Equipment Replacement Provision of the Routine Maintenance, Repair and Replacement Exclusion

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A03-26320

## Record

- **Collection:** Federal Register
- **Document type:** Rule
- **Published:** October 27, 2003
- **Citation:** 68 FR 61248

## Text

ENVIRONMENTAL PROTECTION AGENCY
40 CFR Parts 51 and 52
[FRL-7575-9; RIN 2060-AK28; Electronic Docket OAR-2002-0068; Legacy Docket A-2002-04]
Prevention of Significant Deterioration (PSD) and Non-Attainment New Source Review (NSR): Equipment Replacement Provision of the Routine Maintenance, Repair and Replacement Exclusion

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Final rule.

SUMMARY:

The EPA is finalizing revisions to the regulations governing the NSR programs mandated by parts C and D of title I of the Clean Air Act (CAA). Today's changes reflect EPA's incorporation of comments from the proposed rule for “Prevention of Significant Deterioration (PSD) and Non-attainment New Source Review (NSR): Routine Maintenance, Repair and Replacement.” These changes provide a category of equipment replacement activities that are not subject to Major NSR requirements under the routine maintenance, repair and replacement (RMRR) exclusion. The changes are intended to provide greater regulatory certainty without sacrificing the current level of environmental protection and benefit derived from the NSR program. We believe that these changes will facilitate the safe, efficient, and reliable operation of affected facilities.

EFFECTIVE DATE:

This final rule is effective on December 26, 2003.

ADDRESSES:

Docket.
Docket No. A-2002-04 (Electronic docket OAR-2002-0068), containing supporting information used to develop the proposed rule and today's final rule, is available for public inspection and copying between 8:00 a.m. and 4:30 p.m., Monday through Friday (except government holidays) at the Air and Radiation Docket and Information Center (6102T), Room B-108, EPA West Building, 1301 Constitution Avenue, NW, Washington, D.C. 20460; telephone (202) 566-1742, fax (202) 566-1741. A reasonable fee may be charged for copying docket materials.

Worldwide Web (WWW).
In addition to being available in the docket, an electronic copy of this final rule will also be available on the WWW through the Technology Transfer Network (TTN). Following signature, a copy of the rule will be posted on the TTN's policy and guidance page for newly proposed or promulgated rules:
http://www.epa.gov/ttn/oarpg.

FOR FURTHER INFORMATION CONTACT:

Mr. Dave Svendsgaard, Information Transfer and Program Integration Division (C339-03), U.S. EPA Office of Air Quality Planning and Standards, Research Triangle Park, North Carolina 27711, telephone 919-541-2380, or electronic mail at
svendsgaard.dave@epa.gov
, for questions on this rule.

SUPPLEMENTARY INFORMATION:

Regulated Entities

Entities potentially affected by this final action include sources in all industry groups. The majority of sources potentially affected are expected to be in the following groups:

Industry group

SIC
a

NAICS
b

Electric Services
491
221111, 221112, 221113, 221119, 221121, 221122

Petroleum Refining
291
324110

Industrial Inorganic Chemicals
281
325181, 325120, 325131, 325182, 211112, 325998, 331311, 325188

Industrial Organic Chemicals
286
325110, 325132, 325192, 325188, 325193, 325120, 325199

Miscellaneous Chemical Products
289
325520, 325920, 325910, 325182, 325510

Natural Gas Liquids
132
211112

Natural Gas Transport
492
486210, 221210

Pulp and Paper Mills
261
322110, 322121, 322122, 322130

Paper Mills
262
322121, 322122

Automobile Manufacturing
371
336111, 336112, 336211, 336992, 336322, 336312, 336330, 336340, 336350, 336399, 336212, 336213

Pharmaceuticals
283
325411, 325412, 325413, 325414

a
Standard Industrial Classification.

b
North American Industry Classification System.

Entities potentially affected by this final action also include State, local, and tribal governments that are delegated authority to implement these regulations.

Outline

The information presented in this preamble is organized as follows:

I. General Information

A. How can I get copies of this document and other related information?

1. Docket

2. Electronic Access

B. Where can I obtain additional information?

II. Background

A. What is the RMRR exclusion?

B. Issues surrounding the RMRR exclusion

C. Process used to develop this rule

D. What we proposed

III. Equipment Replacement Provision

A. Overview and justification for today's final action

B. What is an identical or functionally equivalent replacement and why should such an activity be considered RMRR?

C. What cost limit has been placed on the equipment replacement approach?

D. What will be the basis of applying the 20-percent threshold?

E. What basic design parameters are being established to qualify for the equipment replacement provision?

F. What collection of equipment should be considered in applying the equipment replacement provision and how should it be defined?

G. Consideration of non-emitting units as part of the process unit

H. What is the accounting basis for the process unit?

I. Enforcement

1. Compliance assurance

2. General issues

J. Quantitative Analysis

K. Consideration of other options

1. Annual Maintenance, repair and replacement allowance

2. Capacity-based option

3. Age-based option

L. Specific list of excluded activities

M. Stand-alone exclusion for energy efficiency projects

N. Legal Basis

1. How does the NSR program address existing sources and why is today's rule consistent with this approach?

2. Why today's rule appropriately implements the Clean Air Act's definition of modification

IV. Administrative Requirements for This Rule

A. Executive Order 12866—Regulatory Planning and Review

B. Executive Order 13132—Federalism

C. Executive Order 13175—Consultation and Coordination with Indian Tribal Governments

D. Executive Order 13045—Protection of Children from Environmental Health Risks and Safety Risks

E. Paperwork Reduction Act

F. Regulatory Flexibility Analysis

G. Unfunded Mandates Reform Act of 1995

H. National Technology Transfer and Advancement Act of 1995

I. Executive Order 13211—Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use

J. Executive Order 12988—Civil Justice Reform

V. Effective Date for Today's Requirements

VI. Statutory Authority

I. General Information

A. How Can I Get Copies of This Document and Other Related Information?

1.
Docket.
The EPA has established an official public docket for this action under Docket ID No. A-2002-04. The official public docket consists of the documents specifically referenced in this action, any public comments received, and other information related to this action. Although a part of the official docket, the public docket does not include Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. The official public docket is the collection of materials that is available for public viewing at the EPA Docket Center, (Air Docket), U.S. Environmental Protection Agency, 1301 Constitution Ave., NW., Room: B108, Mail Code: 6102T, Washington, DC, 20004. The EPA Docket Center Public Reading Room is open from 8:30 a.m. to 4:30 p.m., Monday through Friday, excluding legal holidays. The telephone number for the Reading Room is (202) 566-1742. A reasonable fee may be charged for copying.

2.
Electronic Access.
You may access this
Federal Register
document electronically through the EPA Internet under the “
Federal Register
” listings at
http://www.epa.gov/fedrgstr/.

An electronic version of the public docket is available through EPA's electronic public docket and comment system, EPA Dockets. You may use EPA Dockets at
http://www.epa.gov/edocket/
to submit or view public comments, access the index listing of the contents of the official public docket, and to access those documents in the public docket that are available electronically. Once in the system, select “search,” then key in the appropriate docket identification number.

Certain types of information will not be placed in the EPA Dockets. Information claimed as CBI and other information whose disclosure is restricted by statute, which is not included in the official public docket, will not be available for public viewing in EPA's electronic public docket. EPA's policy is that copyrighted material will not be placed in EPA's electronic public docket but will be available only in printed, paper form in the official public docket. To the extent feasible, publicly available docket materials will be made available in EPA's electronic public docket. When a document is selected from the index list in EPA Dockets, the system will identify whether the document is available for viewing in EPA's electronic public docket. Although not all docket materials may be available electronically, you may still access any of the publicly available docket materials through the docket facility identified in section I.A.1. of this preamble. The EPA intends to work towards providing electronic access to all of the publicly available docket materials through EPA's electronic public docket.

For additional information about EPA's electronic public docket visit EPA Dockets online or see 67 FR 38102, May 31, 2002.

B. Where Can I Obtain Additional Information?

In addition to being available in the docket, an electronic copy of today's final rule is also available on the WWW through the Technology Transfer Network (TTN). Following signature by the EPA Administrator, a copy of this rule will be posted on the TTN's policy and guidance page for newly proposed or promulgated rules at
http://www.epa.gov/ttn/oarpg.
The TTN provides information and technology exchange in various areas of air pollution control. If more information regarding the TTN is needed, call the TTN HELP line at (919) 541-5384.

II. Background

A. What Is the RMRR Exclusion?

Title I of the Clean Air Act (CAA) established the New Source Review program
1

to help control airborne emissions from major new stationary sources of pollution. Under the program, anyone who seeks to construct a new stationary source that will be a major source of regulated pollutants must obtain a permit from State authorities (or, where a State has not established its own program, from EPA directly) before beginning construction of the source. In order to obtain the permit, the owner or operator must, among other things, demonstrate that the new source will have state-of-the-art pollution control devices.

1
We broadly use the term “New Source Review,” or NSR, to encompass both the PSD and the Non-attainment New Source Review program.

The NSR program does not generally affect existing sources, but it does apply if they undergo a “modification.” The NSR provisions of the CAA do not create their own definition of “modification,” instead borrowing the definition of the term established by section 111 of the CAA, which defined the term for purposes of the New Source Performance Standards (NSPS) program. That definition states that “[t]he term “modification” means any physical change in, or change in the method of operation of, a stationary source which increases the amount of any air pollutant emitted by such source or which results in the emission of any air pollutant not previously emitted.” Under 40 CFR parts 51 and 52, the rules we have promulgated to carry out the NSR program, “major modification” is similarly defined as any physical change in or change in the method of operation of a major stationary source that would result in: (1) A significant emissions increase of a regulated NSR pollutant; and (2) a significant net emissions increase of that pollutant from the major stationary source.
2

The regulations further provide that certain activities do not constitute a “physical change or change in the method of operation” under the definition of “major modification.” One category of such activities is routine maintenance, repair and replacement (RMRR). The regulatory provisions excluding RMRR from the definition of change constitute the RMRR exclusion.

2
Once a modification is determined to be major, NSR requirements apply only to those specific pollutants for which there would be a significant net emissions increase.

B. Issues Surrounding the RMRR Exclusion

Until today, the NSR regulations have not further specified what types of activities are encompassed by the term RMRR. Heretofore, we have applied the RMRR exclusion exclusively on a case-by-case basis using a multi-factor test for determining whether a particular activity falls within or outside the exclusion. We have made these case-by-case determinations both in the context of applicability determinations, where a source or permitting authority has requested EPA's guidance concerning whether a particular activity falls within the exclusion or requires a permit, and

in the context of enforcement actions, where we have challenged an activity undertaken by a source after the fact and the source has asserted that the activity was permissible under the exclusion.

This case-by-case approach has been praised for its flexibility, but criticized for hampering activities important to assuring the safe, reliable and efficient operation of existing plants. Specifically, some of the case-by-case determinations we have made, particularly over the past decade, and particularly in a series of enforcement actions, have been criticized for giving the exclusion a narrow scope that disallows replacement of significant plant components with identical or functionally equivalent components. Critics argue that the effect is to discourage plant owners or operators from engaging in replacements that are important to restoring, maintaining and improving plant safety, reliability, and efficiency. They further argue that this effect is exacerbated by what they assert are the uncertainties inherent in the case-by-case approach.

To elaborate on the uncertainty issues: Unless an owner or operator seeks an applicability determination from his or her reviewing authority, it can be difficult for the owner or operator to know with reasonable certainty whether a particular activity constitutes RMRR. This gives the owner or operator five choices, two of which the owner or operator is not likely to select, and the other three of which have significant drawbacks for the productivity of the plant.

First, the owner or operator may simply seek an NSR permit. That course, however, is likely to be time-consuming and expensive, since it will likely result in a requirement to retrofit an existing plant with state-of-the-art pollution controls which often is very costly and can present significant technical challenges. Therefore, an owner or operator is not likely to select this option if it can be avoided.

Second, the owner or operator may proceed at risk without a reviewing authority determination. That option, however, is also not likely to be attractive where a significant replacement activity is involved, because if the owner or operator proceeds without a reviewing authority determination and if we later find that he or she made an incorrect determination on its own, the owner or operator faces potentially serious enforcement consequences. Those consequences could well include substantial fines (along with the further consequences of having been determined to be in violation of the CAA) and penalties and a requirement to install the state-of-the-art pollution controls, even though those controls present technical issues or represent a significant enough expenditure that they likely would have deterred the owner or operator from seeking a permit in the first place. The owner or operator is not likely to take this risk if he or she believes there is a high probability of these kinds of consequences and if he or she has other options.

Third, the owner or operator may seek an applicability determination. That process, too, is time-consuming and expensive, albeit typically less so than seeking a permit. This path presents a potentially significant barrier to today's global, quick-to-market industries, such as computer chips, pharmaceuticals, and autos. This approach also is likely to result in substantial foregone activities that would enhance the safety, reliability and efficiency of the plant while awaiting the applicability determination.

Fourth, the owner or operator may forego or curtail replacements that would enhance the safe, reliable, or efficient operation of its plant, instead opting to repair existing components even though they are inferior to current day replacements because they likely have deteriorated with use and probably are less advanced and less efficient than current technology. Foregoing the replacement activities altogether will reduce plant safety, reliability and efficiency; curtailing or postponing them does as well, differing only in the degree of these effects.

Finally, the owner or operator may curtail the plant's productive capacity by replacing components with less than the best technology in order to be more certain that the replacement is within the RMRR regulatory bounds, or he or she may agree to limit the source's hours of operation or capacity or install less than state-of-the-art air pollution controls to ensure no increase in emissions. Either of those courses, however, will also result in loss of plant productivity.

The uncertainties are also problematic for State and local reviewing authorities. They require those authorities to devote scarce resources to make complex determinations, including applicability determinations, and consult with other agencies to ensure that any determinations are consistent with determinations made for similar circumstances in other jurisdictions and/or that other reviewing authorities would concur with the conclusion.

Industry commenters strongly echoed these concerns, asserting that the expense and delay associated with NSR scrutiny, whether or not the activity is ultimately judged to be subject to major NSR, have caused a number of facilities to forego needed and beneficial maintenance, repair, and replacement activities, including ones that would likely have reduced emissions. In our June 2002 report to the President, we similarly concluded that the NSR program has impeded or resulted in the cancellation of projects that would have maintained and improved the reliability, efficiency, or safety of existing energy capacity.

We are persuaded that we should change the approach to the RMRR exclusion that we have been following for equipment replacements. The approach we have been taking often has not encompassed the replacement of existing components with identical or similar new components that serve the same function, that represent a small fraction of the value of the process unit of which they are a part, that do not change the process unit's basic design parameters, and that do not cause the process unit to exceed any emission limitations. For the reasons noted above, this approach tends to have the effect of leading sources to refrain from replacing components, to replace them with inferior components, or to artificially constrain production in other ways. We are persuaded that none of these outcomes advanced the central policy of the major NSR program as applied to existing sources, which is not to cut back on emissions from existing major stationary sources through limitations on their productive capacity, but rather to ensure that they will install state-of-the-art pollution controls at a juncture where it otherwise makes sense to do so. We also do not believe the outcomes produced by the approach we have been taking have significant environmental benefits compared with the approach we are adopting today and, indeed, we believe our new approach may well produce environmental improvements as compared to the old one.

We are also persuaded that uncertainties surrounding the scope of the exclusion that are associated with the case-by-case approach tend to exacerbate the problem outlined above. These uncertainties can discourage replacements that would promote safety, reliability and efficiency even in instances where, if the matter were brought to EPA, we would determine that the replacement in question was RMRR. Such discouragement results in lost capacity and lost opportunities to improve energy efficiency and reduce air pollution.

We believe that these problems will be significantly reduced by the rule we

are adopting today. This rule specifies that the replacement of components of a process unit with identical components or their functional equivalents will come within the scope of the exclusion, provided the cost of replacing the component falls below 20 percent of the replacement value of the process unit of which the component is a part, the replacement does not change the unit's basic design parameters, and the unit continues to meet enforceable emission and operational limitations.

Our new equipment replacement approach will allow owners or operators to replace components under a wider variety of circumstances than they have been able to do under our prior RMRR approach. It also provides more certainty both to source owners or operators who will be able better to plan activities at their facilities, and to reviewing authorities who will be able better to focus resources on other areas of their environmental programs rather than on time-consuming RMRR determinations. The effect should be to remove disincentives to undertaking RMRR activities falling within the rule, thereby enhancing key operational elements such as efficiency, safety, reliability, and environmental performance. For example, we anticipate that improved safety and reliability will result in more stable process operations and reduce periods of startup, shutdown, and malfunction and the increased emissions usually associated with them. Accordingly, we believe the rule will promote the central purpose of Title I of the CAA, “to protect and enhance the quality of the Nation's air resources so as to promote the public health and welfare and the productive capacity of its population.” CAA section 101.

We note that we continue to believe that our prior narrower and entirely case-by-case approach to the RMRR exclusion was consistent with the relevant language of the CAA and a reasonable effort to effectuate its policies. At the same time, we also believe that the final rule's categorical exclusion of certain replacement activities and the broader definition of RMRR on which that exclusion is premised are likewise consistent with the statute's language and represent a better accommodation of the statute's twofold ends. We therefore have decided to adopt the final rule.

C. Process Used To Develop This Rule

In the 1992 “WEPCO Rule” preamble, we declared our intent to issue guidance on the subject of RMRR. In 1994, as an outgrowth of meetings with the Clean Air Act Advisory Committee, we developed, for discussion purposes only, a preliminary draft that presented possible ways of how RMRR could be defined. We received a substantial volume of comments on this document. We subsequently decided not to include this preliminary draft approach in our 1996 NSR proposed rulemaking.

In 2001, the President's National Energy Policy directed EPA in consultation with the Department of Energy (DOE) and other Federal agencies to review the impact of NSR on investment in new utility and refinery generation capacity, energy efficiency and environmental protection. Our Report to the President illustrated the problems associated with our prior case-by-case approach to identifying RMRR activities and underscored the advantages of establishing an objective bright-line approach for administering the RMRR provision.

We held conference calls with various stakeholders during October 2001 (including representatives from industry, State and local governments, and environmental groups) to discuss new ideas that were raised as to how the RMRR provision might be improved. The proposed RMRR rule reflected many of the ideas discussed in those meetings. Today's final rule on the equipment replacement provision is based on careful consideration of comments received on the proposed RMRR rule (67 FR 80920, December 31, 2002), where we sought comment on all aspects of our proposed approaches. Today's rule represents final action on only one part of what we proposed in December 2002—the equipment replacement provision. We have decided, for now, not to take final action on the proposed annual maintenance, repair and replacement allowance approach.

D. What We Proposed

The RMRR proposal offered for comment two cost-based approaches for determining what constitutes routine maintenance, repair, and replacement. Under the proposal, facilities could have relied on a facility-wide annual maintenance, repair and replacement allowance and/or an equipment replacement cost threshold to determine whether major NSR requirements were triggered by performing plant maintenance, repair and replacement activities. The proposal additionally outlined two options based on the capacity and age of a facility. We solicited comment on all aspects of the proposed approaches as well as any other viable option for clarifying the term “routine maintenance, repair, and replacement.” We took public comment on the proposed rule until May 2, 2003—120 days following publication in the
Federal Register
.

Under the “annual maintenance, repair and replacement allowance,” an annual maintenance cost allowance would be established for each industrial facility based on an industry-specific percentage. For the percentage, we considered using the Internal Revenue Service “Annual Asset Guideline Repair Allowance Percentages” (AAGRAP), which for years has been used as an integral part of an exclusion under the New Source Performance Standard (NSPS) program. A multi-year allowance approach, in addition to the annual approach, was also offered for consideration in the proposal.

Safeguards were proposed to ensure that the types of activities undertaken under the annual allowance are not activities that should be subject to greater scrutiny. These safeguards include: (1) No new unit may be installed; (2) no unit may be replaced in its entirety; and (3) changes may not cause an increase in the short-term emission rate of any regulated NSR pollutant.

Under the “equipment replacement provision,” or ERP, we proposed to streamline the process for determining if major NSR permitting requirements apply to replacement of existing equipment with identical new equipment or with functionally equivalent equipment. Per-replacement-of-component(s) thresholds, potentially up to 50 percent of the cost of replacing the process unit, were suggested by the proposal. As long as the threshold was not exceeded and the basic design parameters remained unchanged, the activity would be considered RMRR under this approach.

Under the proposal, all activities that fell within the annual maintenance, repair and replacement allowance or the equipment replacement threshold and that met all the other criteria for these provisions would be considered RMRR without further review. Activities that were unable to be accommodated under the annual maintenance, repair and replacement allowance or the equipment replacement threshold could still qualify for the RMRR exclusion after a case-by-case review in accordance with current rules.

We solicited comments on all aspects of our RMRR proposal.

III. Equipment Replacement Provision

A. Overview and Justification for Today's Final Action

Today, we are revising certain provisions of the major NSR program by

finalizing the equipment replacement provision (ERP) to specify activities that will automatically qualify for the RMRR exclusion. This rule is effective on December 26, 2003. At this time, we are not taking action on our proposed annual maintenance, repair and replacement allowance approach.

Although many commenters requested that we further clarify the case-by-case approach for determining whether an activity is RMRR, we are not taking action on this suggestion at this time. We are still considering what, if any, changes should be made to that policy. In the meantime, the case-by-case approach will remain available for the owner or operator of a source to use as an alternative and/or supplement to today's ERP.

Under today's rule, an activity (or aggregations of activities) can qualify for the ERP if: (1) It involves replacement of any existing component(s)
3

of a process unit with component(s) that are identical or that serve the same purpose as the replaced component(s); (2) the fixed capital cost of the replaced component(s), plus costs of any activities that are part of the replacement activity (
e.g.
, labor, contract services, major equipment rental, and associated repair and maintenance activities),
4

does not exceed 20 percent of the current replacement value of the process unit; and (3) the replacement(s) does not alter the basic design parameters of the process unit or cause the process unit to exceed any emission limitation or operational limitation (that has the effect of constraining emissions) that applies to any component of the process unit and that is legally enforceable.

3
For the sake of clarity, we want to be clear that the term “component” is meant to be applied broadly and read broadly to include replacements of both large components, such as economizers, reheaters, etc. at a boiler, as well as small items, such as screws, washers, gaskets,
etc.

4
We note that certain ancillary costs incurred during a given replacement activity should not be part of the replacement activity, such as replacement power that must be purchased during the maintenance shutdown of an electric utility.

Today's final rule specifies the procedures by which the owner or operator of a source selects the basic design parameters for steam electric generating facilities and for other types of process units. Specifically, for steam electric generating facilities, we have clarified our proposed approach by specifying maximum hourly heat input and fuel consumption rate
5

as basic design parameters. We are also allowing owners or operators of steam electric generating facilities the option to select a pair of parameters based on the process unit's output—more specifically, maximum hourly electric output rate or maximum steam flow rate—as an alternative to the previously proposed input-based parameters. Likewise, we are retaining our proposed approach of specifying maximum rate of fuel or material input for other types of process units, but we also allow you to use maximum rate of heat input, or maximum rate of product output if you prefer an output-based basic design parameter. In addition, we allow you to propose an alternative basic design parameter(s), if the above options are inappropriate for your process unit.

5
Actually proposed as “fuel consumption specifications.”

We are not specifically defining the basis for determining the replacement value of a new process unit. Instead, the final rule provides you with the flexibility of using any of the following: (1) Replacement cost;
6

(2) invested cost, adjusted for inflation; (3) the insurance value, where the insurance value covers complete replacement of the process unit (rather than, for example, lost revenue replacement); or (4) another accounting procedure to establish a replacement value of the process unit if such accounting procedure is based on Generally Accepted Accounting Principles (GAAP). The GAAP are the conventions, rules and procedures that define accepted accounting practice for recording and reporting financial information, including broad guidelines as well as detailed procedures. The basic doctrine was set forth by the Accounting Principles Board of the American Institute of Certified Public Accountants, which was superseded in 1973 by the Financial Accounting Standards Board.

6
Replacement cost can be either an estimate of the fixed capital cost of constructing a new process unit or the current appraised value of the process unit.

If you choose to use options 3 or 4 to determine the replacement value for a particular process unit, you must send a notice reflecting your decision to your reviewing authority. The first time that an owner or operator submits such a notice for a particular process unit, the notice may be submitted at any time, but any subsequent notice for that process unit may be submitted only at the beginning of the process unit's fiscal year. You must continue to use the same basis to evaluate any additional activities that you undertake on that process unit within that same fiscal year. If you have provided notice of using either option 3 or 4, then the reviewing authority will assume that the same method will be used for subsequent fiscal years unless you send a notice to them declaring your intent to use another method. In the absence of providing any notification to your reviewing authority, you must use option 1 or 2.

The final rules also set forth a definition of process unit, specifically delineate the boundary of the process unit for certain specified industries, and define a functionally equivalent replacement. A more detailed discussion of these requirements and our rationale for this action is contained in other parts of this preamble section.

Today's final rules are designed to allow you to engage in activities that facilitate the safe, reliable and efficient operation of your source. We believe that today's final action broadens the major NSR program exclusion for equipment replacements and provides you with additional certainty as to what equipment replacement activities qualify for the RMRR exclusion. By adding certainty to the process, we are removing the disincentives to undertaking routine equipment replacements and promoting proper operational planning to facilitate safe, reliable and efficient operations. When an activity qualifies for the ERP, it will be considered RMRR and excluded from major NSR without regard to other considerations. In many cases, we believe that maintaining safe, reliable and efficient operations will have the corresponding environmental benefit of reducing the amount of pollution generated per product produced. The final rules also will reduce the resource burden on reviewing authorities resulting from implementation of the existing, case-by-case process for determining RMRR. In these respects, the final rules are consistent with the central purpose of the CAA, “to protect and enhance the quality of the Nation's air resources so as to promote the public health and welfare and the productive capacity of its population.” CAA section 101.

B. What Is an Identical or Functionally Equivalent Replacement and Why Should Such an Activity Be Considered RMRR?

We proposed to exclude the replacement of existing equipment with identical or functionally equivalent components. As we observed at the time of our RMRR proposal, we believe that most identical and functionally equivalent replacements are necessary for the safe, efficient and reliable operations of virtually all industrial operations; are not of regulatory concern; will improve air quality (
e.g.
, by decreasing startup, shutdown, and malfunctions); and thus should qualify

for the ERP under the RMRR exclusion. We believe industrial facilities are constructed with the understanding that certain equipment failures are common and ongoing maintenance programs that include replacing components in order to maintain, restore, or enhance the reliability, safety, and efficiency of a plant are routine. Conversely, delaying or foregoing maintenance could lead to failure of the production unit and may create or add to safety concerns.

When such equipment replacement occurs, the replaced component is inherent to both the design and purpose of the process unit, and there is no reason to believe that such activity will cause the unit to emit above its original design capacity. Moreover, most of these replacements are conducted at industrial facilities to maintain proper operations and to implement good engineering practices. For example, if a pump associated with a distillation column fails and is replaced with an identical new pump, we believe that such a common activity is and should be considered an excluded replacement. It is not a “change” to the plant, since it merely maintains the plant as designed. Instead, it is the type of activity expected to occur to maintain the plant. Therefore, we think replacements like this properly fall within the exclusion for “routine maintenance, repair and replacement.” We also believe treating them in this fashion is consistent with the basic policies of the CAA: that existing plants are subject to major NSR permitting requirements only when they engage in an activity that constitutes an opportune time to install state-of-the-art pollution control equipment.

We also believe that this principle extends beyond the replacement of equipment with identical equipment. When equipment is wearing out or breaks down, it often is replaced with equipment that serves the same purpose or function but is different in some respects or improved in some ways in comparison with the equipment that is removed. To continue with the example used above, if, instead of replacing the worn out distillation column pump with an identical one, the owner or operator replaced it with a new and improved model, it does not seem to us that this changes the fundamental reasons for treating that replacement as likewise within the scope of “routine maintenance, repair and replacement.”

This is particularly true since technology is constantly changing and evolving. When equipment of this sort needs to be replaced, it often is simply not possible to find the old-style technology. Owners or operators may have no choice but to purchase and install equipment reflecting current design innovations. Even if it is possible to find old-style equipment, it seems unnecessary and undesirable to generally construe NSR permitting requirements in a manner that is bound to deter owners or operators from using the best equipment that suits the given need when replacements must be installed.

The limiting principle here is that the replacement equipment must be identical or functionally equivalent and must not change the basic design parameters of the affected process unit (
e.g.
, for electric utility steam generating units, this might mean heat input and fuel consumption specifications). We also believe, however, that we need not and should not treat efficiency as a basic design parameter as we do not believe NSR was intended to impede industry in making energy and process efficiency improvements. We believe such improvements, on balance, will be beneficial both economically and environmentally. This treatment of efficiency should address the concern and perception that the NSR program serves as a barrier to activities undertaken to facilitate, restore, or improve efficiency, reliability, availability, or safety of a facility.

Today's rule does not distinguish between the replacement of components that are expected to be replaced frequently or periodically and the replacement of components that may occur on a less frequent or one-time basis. It likewise does not distinguish between the replacement of larger and smaller components, instead requiring greater scrutiny if the replacement in question is part of an activity that exceeds 20 percent of the replacement value of the process unit.

Our decisions on these points are derived from reflection on the function of the exclusion in the context of the CAA. As explained above, and as described more fully in our legal analysis set forth below, we do not believe that application of the major NSR program to “modified” plants is designed to require existing plants that are continuing to operate in a manner consistent with their original design to curtail their rate of production or hours of operation beyond limitations set forth in their existing permits. We likewise do not believe that the program is designed to discourage plants from replacing parts or components so as to preserve their ability to produce at that rate. Rather, we believe Title I of the Clean Air largely leaves to State and local permitting authorities whether to require adjustments in the operations of those plants in order to reduce emissions to the degree needed to attain or maintain national air quality standards, and how to weigh the trade-offs such adjustments may produce in terms of potential economic impacts and loss of productivity. Instead, we believe the central function of the application of major NSR permitting requirements to “modifications” is to assure that plants install state-of-the-art pollution controls.

We recognize that on these points, the approach taken by our final rule thereby differs in some respects from the multi-factor, case-by-case approach we have been using in identifying RMRR, and particularly from some of our applications of that test to certain equipment replacements. We believe, however, that this adjustment in our approach is fully warranted for the reasons outlined above, and described more fully in our legal analysis below.

The following examples of functionally equivalent replacements under today's rule include:
7

7
As discussed in more detail below, although such activities would be functionally equivalent, they would still need to meet other criteria to qualify for the ERP. For example, a functionally equivalent replacement does not qualify for the ERP if it results in a change to a basic design parameter of the affected unit. If an activity does not qualify for RMRR under the ERP, the case-by-case RMRR approach would still be available to the owner or operator under those circumstances. And, of course, even if the activity does not qualify for the RMRR exclusion, the activity will not be a modification and, hence, will not trigger NSR unless it results in a significant emissions increase.

• Replacing worn out pipes in a chemical process plant with pipes that are constructed of different metallurgy (
e.g.
, to help reduce corrosion, erosion, or chemical compatibility problems).

• Replacing an analog controller with a digital controller, even though a similar analog controller can still be purchased and even though the new controller would allow for more precise control. A good example was presented to us by the forest products industry during our review of the NSR program's impacts on the energy sector. A company in that sector needed to replace outdated analog controllers at a series of six batch digesters. In this case, the original controllers were no longer manufactured. The new digital controllers, costing approximately $50,000, are capable of receiving inputs from the digester vessel temperature, pressure, and chemical/steam flow. The new controllers would have more precisely filled and pressurized digesters with chips, chemicals, and steam, thus bringing a batch digester on line faster.

• Replacing an existing mill or pulverizer (
e.g.
, grinding clinker in a

cement factory or coal for a boiler) with a new one of a different type because both new and old equipment serve the same purpose (even if the characteristics of the ground material would be different before and after the replacement).

• Replacing existing spray paint nozzles with new ones that might atomize the spray better or have a higher transfer efficiency because the “before” and “after” nozzles serve the same function.

At the same time, there are numerous activities that occur at facilities that may fall within the bounds of the cost threshold percentage, basic design parameters, and other backstop features of today's rule, but nevertheless cannot qualify for the RMRR exclusion on the grounds that the equipment is neither identical nor functionally equivalent. An example of this would be a chemical processing facility where the owner or operator makes a physical change that allows the production of a new end product that physically could not have been manufactured with the previous equipment using the same raw materials as used before in the same amounts as before. This would not be a functionally equivalent replacement activity because the facility is able to produce an end product after making the change that the facility was not capable of making before the change. Consequently, this activity would not qualify as RMRR under today's ERP.

Several commenters said the equipment replacement provision will streamline the major NSR applicability analysis. A number of commenters believed the ERP would be easier to implement than the proposed annual maintenance, repair and replacement allowance approach. One commenter said that allowing identical replacements to be excluded from major NSR will codify existing industrial practices, where replacement has no impact on emissions and would clearly represent RMRR.

Many commenters expressed support for the ERP, but recommended certain changes that they felt needed to be made to improve the proposal. One commenter supported the ERP in combination with a capacity-based option, on the assumption that repair and maintenance is to be excluded as well as equipment replacement.

One commenter attempted to collect data from turbine customers and found that achieving a level of data collection necessary for the ERP was far from simple, because the cost of maintenance activities is affected by such things as variability in engine model, package technology, and type of maintenance contract. Another commenter gave an example of the benefit that the ERP may provide. Without the ERP, the commenter said the source is limited to some fraction of boiler tubes allowed to be replaced at a given time, whereas with the ERP, replacement of all boiler tubes would, in the commenter's opinion, rightfully be considered routine. Another commenter said the ERP will remove regulatory burdens for types of equipment replacements that are in their view “routine,” such as replacement of tubes in industrial boilers. They added that, without a clearer understanding of which activities are RMRR, they may be inclined to delay conducting such replacements.

Many other commenters generally opposed any change to the RMRR exclusion, including one based on equipment replacement. Some of these commenters believed the ERP was problematic because it would allow a source to replace an entire process unit over time. Two of the commenters opposed the ERP because they felt it would create disincentives for the implementation of Plantwide Applicability Limits (PAL) and Clean Unit provisions from the recently finalized rule.

One commenter said that from an engineering standpoint, for a power plant, the difference between routine maintenance and a major plant refurbishing project is clear. To further clarify, the commenter made the following points. According to the commenter, routine maintenance is frequent and follows a predictable pattern. The commenter characterized routine maintenance at power plants as: repair of leaking pipes, pumps, valves, and fans; cleaning and lubrication of components; and inspections. The commenter added that permanent staff do this work either while the plant is operating or during only brief periods of downtime. The commenter further expressed that activities that are not routine require long plant or process unit shutdowns, are done infrequently, and are major capital projects for which special funding is set aside as a result of years of planning and design work.

One commenter said the proposal will allow emissions increases that will be difficult to offset through other regulations. One commenter objected to the ERP for a number of reasons: (1) The provision does not prevent replacement with different equipment; (2) it does not promote efficiency improvements or application of good air pollution controls; and (3) it would allow replacements that would significantly increase emissions. This commenter said replacement of air pollution controls should trigger best available control technology (BACT) or lowest achievable emission rate (LAER) requirements. Two local air pollution control agencies in California noted that they currently already exclude all replacements with identical equipment from major NSR when certain conditions are met.

Commenters generally had similar viewpoints on allowing both identical and functionally equivalent equipment replacements to qualify as RMRR. However, some commenters expressed greater concern related to excluding the replacement of equipment with functionally equivalent equipment. Primarily their concerns were rooted in the fact that a functionally equivalent replacement component could lead to increases in operational efficiency or productivity, and these commenters asserted that these sorts of process enhancements should not be excluded as RMRR.

We agree with the commenters who felt identical and functionally equivalent replacement activities generally should be excluded as RMRR. We also agree with the commenters who believe that this provision will streamline the major NSR applicability process and will bring clarity. The provision we are finalizing will allow a source to make a simple determination as to whether a replacement piece of equipment qualifies as identical or functionally equivalent. This type of determination will be straightforward and easier for the source to implement than the current case-by-case analysis required to determine a replacement falls within the RMRR exclusion. We support the air pollution agencies that have already excluded these types of changes from NSR.

We disagree with those commenters who believe that this provision will create disincentives for sources to accept a PAL or have emission units designated as Clean Units. A PAL offers a source to bring on entirely new emissions units with no Federal preconstruction permit, as long as emissions caps are not exceeded. A PAL or a Clean Unit designation allows a source to make modifications without performing a major NSR applicability test. These advantages will still be the driving force for sources to elect to use the PAL or Clean Unit provisions, and we do not believe this final rule will significantly detract from their appeal.

We also believe that there is substantial value in facilitating equipment replacements to a greater degree than our current approach permits and draws a cleaner and more

easily administered line between equipment replacements that categorically do not require a permit and major plant refurbishing which will result in increased emissions. For pieces of equipment used at industrial facilities, most manufacturers have well-established procedures for the inspection and replacement that are part of the regular maintenance necessary to provide for the equipment's safe, efficient and reliable operation. Some of these replacements are large in terms of cost and infrequent, but all are necessary to maintain the safe, efficient and reliable use of the process unit. We believe it is important to allow for these replacements provided that certain safeguards are in place, as discussed below.

We disagree with suggestions from commenters that the time period between activities, standing alone, provides an appropriate or clear distinction between activities that should be permissible under the RMRR exclusion and those that should not. In fact, some components wear out every year, while others wear out every 20 years. Nevertheless, both types of changes should fall within the ERP of the RMRR exclusion because both allow the facility to operate as designed. By not imposing a time limitation, the ERP allows replacement activities to be driven by consideration of economic efficiency rather than artificial regulatory constraints.

We disagree with commenters who expressed particular concern about functionally equivalent replacements. We continue to believe such activities should be encouraged and should qualify as RMRR. Even though a functionally equivalent component varies in some respects from the replaced component, we feel the most important factor to consider is whether the replacement will serve the same purpose as the replaced component. We acknowledge that a functionally equivalent replacement can result in an increase in efficiency and, consequently, productivity. In fact, one of our goals is to promote such outcomes. However, we believe that the basic design parameter safeguard is appropriate to assure that the ERP only automatically excludes from major NSR functionally equivalent replacements that do not result in a significant change to the fundamental characteristics of the process unit.

We note that the two local programs in California that exclude the replacement of equipment with identical equipment also allow the replacement of equipment with functionally equivalent equipment without considering such action to be a modification. Due to local air quality considerations, the local programs establish minimum pollution control requirements that are imposed in some circumstances when functionally equivalent equipment replacements occur. Nothing in today's rule would prevent a State or local program from imposing additional requirements necessary to meet Federal, State or local air quality goals.

After reviewing the comments on our proposal, we have decided to promulgate what we proposed in December 2002 for the RMRR equipment replacement provision with relatively minor changes. We decided to include another safeguard in addition to those we proposed in order to appropriately constrain the meaning of the term “functionally equivalent.” The additional safeguard is that an excluded replacement activity cannot cause the process unit to exceed any emission limitation or operational limitation (that has the effect of constraining emissions) that applies to the process unit and that is legally enforceable.

Thus, today's final rule allows you to categorize identical and functionally equivalent equipment replacements as RMRR if the fixed capital cost of such replacement plus the cost of repair and maintenance activities that are part of the replacement activity does not exceed 20 percent of the replacement value of the process unit, and if the replacement does not alter a basic design parameter of the process unit or cause the process unit to exceed any emission limitation or operational limitation (that has the effect of constraining emissions) that applies to the process unit.

C. What Cost Limit Has Been Placed on the Equipment Replacement Approach?

The next concept presented in the proposal is the cost-based limitation on the scope of the ERP. The purpose of this threshold is to distinguish between those equipment replacement activities that should automatically qualify as RMRR without further consideration and those activities that should undergo case-specific consideration. This concept is akin to the long-established reconstruction provision under the NSPS program. For the reasons explained below, we have decided to establish a 20-percent cost threshold under the ERP.

We believe a similar bright-line rule that would obviate the need for case-by-case review under our multi-factor test of appropriate categories of equipment replacements would be extremely useful in addressing many of the problems that we have identified with the current operation of the NSR program. Such a rule would be particularly useful in avoiding the uncertainty and delay, and consequent postponed or foregone equipment replacements, that our multi-factor case-by-case review induces. For example, our RIA indicates that it takes a year, on average, to obtain a determination whether a proposed replacement is routine. That kind of delay obviously creates perverse disincentives to refrain from equipment replacements and instead repair existing equipment or find some other solution.

This is the kind of problem that classically leads agencies to fashion bright-line tests to provide greater regulatory certainty and efficiency. Moreover, because the kind of disincentives that give rise to this concern operate largely by economic means, prompting sources to take one course of action (cut back on productive equipment replacement) rather than another (replace the equipment and incur the costs of delay, as well as potentially the costs of installing state-of-the-art controls), we think a cost-based threshold is a reasonable basis on which to create such a bright-line rule.

In the proposal, we observed that it may sometimes be difficult to determine where to draw the line between an activity that should be treated as an excluded replacement activity and one that should be viewed as a physical change that might constitute a major modification, when the replacement of equipment with identical or functionally equivalent equipment involves a large portion of an existing process unit. We solicited comment on a range of equipment replacement cost thresholds such as one based on the NSPS program. Under the NSPS program, when the cost of a project at an existing affected facility exceeds 50 percent of the fixed capital cost that would be required to construct a comparable entirely new unit (that is, the current capital replacement value of the existing affected source), then the source must notify and provide information to the permitting authority. After considering a range of factors, including the cost of the activity, the estimated life of the facility after the replacements, the extent to which the replaced equipment causes or contributes to the emissions from the source, and any economic or technical limitations on compliance with the NSPS, the reviewing authority

determines whether the proposed project is a reconstruction.
8

8
In the proposal, it was incorrectly stated that applicability of the NSPS was triggered if a project exceeded 50 percent of the cost of replacing the affected facility. As stated in this notice, if an activity exceeds this cost threshold, that only triggers further evaluation, not the automatic application of the NSPS to the source.

We observed that, in some respects, an equipment replacement cost threshold set at the NSPS reconstruction test could be an appropriate approach for distinguishing between routine and nonroutine identical and functionally equivalent replacements under the major NSR program. As under the NSPS program, we do not believe it is reasonable to exclude from major NSR those activities that involve the total replacement of an existing entire process unit.

We also noted, however, that there are other considerations pointing in favor of a threshold lower than the 50-percent reconstruction threshold that might be appropriate to bound the ERP. Under NSPS, when a source undertakes a replacement activity at an existing affected facility that constitutes half or more of the facility's capital replacement value, our rules require a case-by-case determination as to whether such replacements constitute construction. We noted that a percentage threshold lower than 50 percent might be more appropriate for determining where we would require case-by-case consideration of the question whether equipment replacements constitute a modification of an existing process unit under major NSR. We solicited comments on the appropriate level of any percentage.

Many commenters supported the threshold of 50 percent of replacement value as the upper limit on equipment replacement. They felt this number is consistent with existing regulatory requirements and would accord the flexibility originally intended under the CAA for RMRR activities, while at the same time assuring that major, nonroutine projects remain subject to major NSR applicability review, and they felt this number is consistent with a common-sense interpretation of the regulations.

They also believed a 50-percent cutoff to be consistent with reconstruction definitions used in many NSPS and National Emission Standards for Hazardous Air Pollutants regulations. Some commenters stated that a 50-percent cutoff for the ERP would be valid for the same reason as for the NSPS reconstruction test; significant changes to a process unit are necessary before retrofit controls should be considered, provided there is no increase in emissions.

Many other commenters opposed the 50-percent replacement value threshold. They believed the capital replacement percentage should be much less than 50 percent. One commenter suggested as an appropriate threshold that the sum of equipment replacement costs for a single process unit over any period of 5 consecutive years should not exceed 50 percent of the replacement value of the process unit. Another commenter said the replacement percentage should not be higher than 25 percent. Another commenter suggested a replacement percentage of 5 to 10 percent to reduce the risk of replacement of an entire process unit over time without installation of BACT. One commenter said a more appropriate percentage for electricity producers is 0.1 to 1.0 percent. Another commenter said the threshold should be 5 percent, 1 percent, or even less, as shown by an NSR enforcement case against the Tennessee Valley Authority (TVA).

Another commenter believed the 50-percent number has no practical effect in protecting public health and the environment, and the commenter was not aware of any projects that have exceeded 50 percent in cost.

While opposed to the ERP in general, one commenter said the cost threshold should be as high a percentage as possible, so as not to promote premature replacement of equipment that is repairable. Another commenter said the 50-percent number from the NSPS is archaic and not environmentally protective. This commenter suggested that the threshold instead be 24 percent. The commenter believed this lower percentage is appropriate because the lifetime of high-cost materials will considerably exceed 5 years.

We agree with those commenters who see a relationship between establishing a threshold for equipment replacements that we will treat as RMRR under the major NSR program and the threshold the NSPS program established for reconstruction. However, we disagree that these two thresholds should be the same. The NSPS threshold was intended to identify those activities that, even though they did not qualify as a modification under NSPS, nevertheless are of such magnitude that further consideration should be given as to whether they are projects tantamount to new construction. The 50-percent NSPS threshold is not a bright line in the sense that all projects that exceed 50 percent are automatically considered as reconstruction. Rather, as discussed above, it is a threshold intended to alert permitting authorities to significant projects and allow case-by-case decisions based on a series of regulatory factors.

The ERP replicates the NSPS concept in some ways. It identifies a threshold below which there is no need for further inquiry into whether an activity qualifies for the ERP and above which there is a need for a case-by-case determination. The major difference between the ERP and the NSPS reconstruction test is that the ERP deals with modifications, not reconstructions. This difference weighs in favor of establishing the equipment replacement threshold at something less than the reconstruction threshold. It is logical and practical to conclude, as some of the commenters do, that by using the word “modification” the CAA intended to capture activities on a smaller scale than reconstructions. As noted above, we have set the ERP cost threshold at 20 percent. This value is less than one-half of the 50-percent reconstruction threshold and, therefore, fits well within this conceptual framework.

A 20-percent cost threshold would be consistent with the decision of the U.S. Court of Appeals for the Seventh Circuit in the
Wisconsin Electric Power Company
v.
Reilly
(“WEPCO”) case, to the extent that it would not automatically allow the activities performed there to constitute RMRR. See 893 F.2d 901 (7th Cir. 1990). This court decision directly addressed the question of what level of “like kind” replacement activities qualify as changes under the major NSR program.

In the
WEPCO
case, the Court considered an activity involving 5 coal-fired units at WEPCO's Port Washington plant. Each unit was rated at 80 megawatts of electrical output capacity. The activity involved the replacement of numerous major components. The information submitted by WEPCO showed that the company intended to replace several components that are essential to the operation of the Port Washington plant. In particular, WEPCO sought to replace the rear steam drums on the boilers at units 2, 3, 4, and 5. According to WEPCO, these steam drums were a type of “header” for the collection and distribution of steam and/or water within the boilers. WEPCO viewed their replacement as necessary to continue operation of the units in a safe condition. In addition, at each of the emissions units, WEPCO planned to repair or replace several other integral components, including replacement of the air heaters at units 1, 2, 3, and 4. WEPCO also planned to renovate major mechanical and electrical auxiliary systems and common plant support facilities. WEPCO intended to perform

the work over a 4-year period, utilizing successive 9-month outages at each unit. The cost of the activity was estimated in 1988 to be $87.5 million. The Court noted that EPA concluded at the time this activity was unprecedented in that EPA did not find a single instance of renovation work at any electric utility generating station that approached this activity in nature, scope and extent. The Court determined, at our urging, that the changes did constitute a “physical change” under the NSR rules.

In the case of a steam electric generating facility, the process unit definition provided in today's rule is nearly identical to the make-up of the “comparable new facility” that was used in the NSPS evaluation of the WEPCO renovation project. However, under our rule we would not include the cost of pollution control equipment in determining the replacement cost of the WEPCO process units. WEPCO had electrostatic precipitators on each of its 5 process units, which our rule would subtract from the replacement cost. In addition, the WEPCO evaluation dealt with 5 boilers, each with its own turbine-generator set; to be consistent with today's definition of steam electric generating facility, we would likely treat each boiler unit as belonging to a different process unit. However, since all of the boilers underwent similar renovations, for simplicity we can assume that all of the process unit-specific activity costs are equivalent.

Using 1991 dollars, consistent with the timeframe of the Seventh Circuit Court's decision, it appears that the value of the 5 process units at the 400-megawatt WEPCO Port Washington facility would be approximately $321 million based on 1991 model plant values provided by the International Energy Agency. The 1988 project cost of $87.5 million scaled up to 1991 dollars would have had an adjusted project cost of $92.3 million.
9

Thus, the capital cost percentage for the replacement activities at WEPCO, averaged over its 5 process units, amounted to 29 percent. Alternatively, using the project cost of “at least $70.5 million” cited in the 1991 decision by the Seventh Circuit, and using the same value for process unit cost, we compute at least 22 percent. The 20-percent threshold is, therefore, beneath the scope of the activities at issue in the
WEPCO
case and hence not inconsistent with that decision.

9
Using the Chemical Engineering magazine's Annual Plant Cost Index (composite), $87.5 million in 1988 dollars is equal in real terms to (361.3/342.5) multiplied by 87.5 million, or $92.3 million in 1991 dollars.

The 20-percent threshold also is supported by available data for the electric utility sector. We have a robust and detailed set of information available on maintenance, repair and replacement activities for the electric utility sector. Information about the electric utility sector persuades us that we have established the right ERP threshold for this sector.

Information on other industrial sectors beyond electric utilities (as well as general economic theory) further supports our 20 percent bright line test. Case studies performed by an EPA contractor and included in Appendix C of our final regulatory impacts analysis (RIA) estimate the overall impact of the rule on six different industrial sectors (pulp and paper mills, automobile manufacturing, natural gas transmission, carbon black manufacturing, pharmaceutical manufacturing, and petroleum refining). The case studies find that routine equipment replacement activities generally do not cause emissions increases. The case studies also find that equipment replacement activities vary widely within these industries. Likewise, the cost of these activities as a percent of the process unit replacement value varies widely. We recognize that the study addresses specific case examples from only a part of regulated industry and that the project cost information is derived from a limited inquiry of industry representatives. We believe, however, that the study provides a useful scoping assessment that tends to support the proposition that the 20 percent threshold derived for the utility industry (which is based on robust industry data) should be applied to industry as a whole. In short, the study supports our view that it is reasonable to assume that equipment replacement activities in the utility industry are similar enough to replacement practices in other industry that the 20 percent value determined for utilities, is appropriate for industry as a whole. This data indicates that most typical replacement activities will fall within the 20-percent threshold. At the same time, the data indicates that some major replacement activities likely will cross the 20-percent threshold and will require a case-by-case evaluation under the multi-factor RMRR test.

Two comment letters (from the Utility Air Regulatory Group (UARG) and from the American Lung Association (ALA),
et al.
) were particularly helpful in understanding the issues associated with the electric utility sector. The UARG provided as an attachment to its comment letter a document describing major repair and replacement activities that its members believe must be undertaken at utility generating stations in order to keep those facilities operational. The UARG noted that capital costs incurred for repair and replacement activities at an individual process unit additionally include activities more minor than those addressed in the document. The UARG grouped repair and replacement activities into project families; within each project family were per-component costs ($/kW) for numerous equipment replacement activities. We have reviewed the list of projects supplied by UARG and have concluded that these types of replacement activities are important to maintaining, facilitating, restoring or improving the safety, reliability, availability, or efficiency of process units. Therefore, generally speaking, these types of individual activities and groups of activities should qualify for the ERP and be excluded from major NSR without case-specific review. We also believe that it is reasonably expected in the electric utility industry for groups of these activities to be implemented at the same time. Such groupings should also be excluded without case-specific review. When we compare the 20-percent ERP cost percentage to the UARG data, we find that individual replacement activities would, in fact, qualify for the ERP and that limited groupings of these activities would qualify. However, larger groupings of these activities—groupings that are not usually seen in the industry—would not qualify for the ERP. This shows that the 20-percent threshold will be effective in distinguishing between activities (and aggregations of activities) that should not require case-specific review to be excluded from major NSR and those that do.

The ALA commenters provided with their comments the results of their analysis of projects at issue in an NSR enforcement case against Tennessee Valley Authority (TVA). As shown in the ALA comment letter, the Clean Air Task Force and the Natural Resources Defense Council looked at costs for 14 projects on a process unit basis, in year 2001 dollars, from the publicly available record for the case. For all but one of the challenged projects, the ALA commenters calculated a cost of less than 4 percent of process unit replacement cost. The ALA commenters submitted results of this analysis with their opposition to a source-wide, 5-percent maintenance allowance. As noted above, we concluded in our 2002 report to the President that the NSR

program—and the RMRR provision in particular—has in fact resulted in delay or cancellation of activities that would have maintained and improved the reliability, efficiency, and safety of existing energy capacity. The primary purpose of today's rule is to rectify this problem. Thus, to the extent the activities addressed by ALA qualify for the ERP, we now believe that such activities, if conducted in the future, should be excluded from major NSR.

A final factor that we believe supports our selection of a 20 percent threshold is the cost of installing state-of-the-art controls on existing units. There is obviously no single answer to the question of at what point that cost becomes the deciding factor in an owner's decision whether to replace a piece of equipment and incur that cost, since much will depend on the rate of return on the investment. Nevertheless, we think it is reasonable to assume that if the cost of the controls is greater than the cost of the replaced equipment, it is likely to operate as a substantial deterrent to replacing the equipment at issue. That is likely to be the case with respect to electric utilities if we set the threshold below 20 percent, which represents the approximate cost of retrofitting existing plants with state-of-the-art controls. The equation is similar for industrial boilers. Notably, those sectors represent a substantial fraction of the emissions potentially subject to the NSR program. While the relative costs of air pollution controls in other industries vary more widely than the costs for utility and industrial boilers, we nevertheless believe that the costs and technical issues associated with retrofitting air pollution controls factor significantly into equipment replacement decisions.

D. What Will Be the Basis of Applying the 20-Percent Threshold?

In the proposal, we solicited comment on whether implementing the ERP on a per-activity basis or on some other reasoned basis, such as applying the percentage to components that are replaced collectively over a fixed period of time, may be more workable.

Many commenters stated that the ERP should be implemented on a per-activity (or aggregation of activities) basis. Two of the commenters cited longstanding NSR precedent as the basis of their comments, while two other commenters relied on NSPS precedent. Another commenter thought the per-activity approach would be less confusing than summing activities over a fixed period of time. Other commenters believed the equipment replacement threshold should in fact be applied on a 5-year rolling average.

We have decided to apply the percentage threshold on a per-activity (or aggregation of activities) basis. This is consistent with how major NSR has been applied in the past and will continue to apply in the future, with the exception of those sources which establish a PAL. The major NSR program is a preconstruction program that requires applicability to be determined for a given activity at a facility and, as necessary, permitting to occur prior to the time activities are commenced. The major NSR program also requires applicability to be determined, in the first instance, based on an assessment only of the parts of a facility involved in the activity. A per-activity basis works well with this approach. We are not going final with a “component-by-component” approach that we solicited comment on through our RMRR proposal.

There would be obvious problems if we chose any of the other approaches suggested in the proposal or suggested by commenters (for example, annual basis or 5-year rolling average). One of the primary concerns with applying the percentage to activities performed over a span of time is that we would be restructuring the major NSR program to operate based on after-the-fact determinations. This raises the difficult question of what happens under this type of approach if you learn after commencement of an activity that it does not qualify under the ERP. This situation is largely avoided by the per-activity approach that we are establishing in today's rule.

It should be noted that activities that are related must be aggregated under the ERP, in the same way as they would have to be aggregated for other NSR applicability purposes. Under our current policy of aggregation, two or more replacement activities that occur at the same time are not automatically considered a single activity solely because they happen at the same time. For example, a steam turbine rotor replacement project and a boiler tube replacement project would not be aggregated simply because they occur during the same maintenance outage and on the same process unit. Further inquiry into the nature of the activities and their relationship to each other is needed before deciding whether the activities must be aggregated under NSR. Also, non-replacement activities that are part of a larger replacement activity should be included when calculating costs for a replacement activity against the capital cost threshold.

E. What Basic Design Parameters Are Being Established To Qualify for the Equipment Replacement Provision?

In the proposal, equipment replacements were only eligible for the ERP if they did not change the basic design parameters of the process unit. We proposed that maximum heat input and fuel consumption specifications for EUSGUs and maximum material/fuel input specifications for other types of process units are basic design parameters. We solicited comments on limiting the eligibility of the ERP this way and on the basic design parameters we proposed.

Several commenters expressed concerns with either the use of these specific parameters, or the restriction of the regulated community to only this set of design parameters. Other comments centered around an inconsistency in how EPA has accounted for efficiency in the basic design parameter safeguard. The commenters stated that, while EPA stated in the proposed preamble that efficiency is not a basic design parameter, the basic design parameter safeguard, as proposed, has the potential to bar equipment replacements that achieve significant gains in efficiency.

Commenters from all sides supported EPA's approach to handling activities intended to improve an affected process unit's performance beyond its basic design parameters. Commenters asserted that these actions would not fall within the RMRR exclusion. Commenters from the gas transmission industry concurred and amplified this concept, stating that an engine that is “uprated” at the time of overhaul should not be excluded from major NSR under the RMRR exclusion.

We recognize that the proposed basic design parameters are inconsistent with some industry conventions, and that we should allow for industry-specific flexibility or specify additional source category-specific parameters. For example, for natural gas transmission compressor stations, commenters explained that brake horsepower is the conventional design capacity parameter. We received similar comments from other industries, including cement and surface coaters, who objected to limiting their facilities to the proposed basic design parameters. Accordingly, we have decided to provide flexibility by providing a menu of choices from which the owners or operators may select and also by allowing for owners or operators to propose alternative basic design parameters to their reviewing authority which would then be made legally enforceable.

In addition to this flexibility, there may be a need for additional flexibility in using the basic design parameters that are spelled out in today's rule. For instance with boilers, maximum steam production rate is often used by the industry, and it may make sense in some cases to set the design parameters based on those values rather than on maximum heat input. Likewise, a crude oil distillation tower may have several capacities that are a function of the type of crude that is to be processed, and so a refiner may need to have a set of basic design parameters for its crude towers. These situations can be addressed by the source proposing alternative parameters or sets of parameters to their reviewing authority.

Also, there should be flexibility in how the basic design parameters are demonstrated when the owner or operator chooses not to rely on the design information for its process unit. For example, in order to establish the heat input value that the process unit has demonstrated it is capable of achieving, an electric generating unit should have the flexibility to reference available credible information, such as results of historic maximum capability tests or engineering calculations. Results from tests performed by electric utilities in the context of providing assurances to generation dispatch systems and regional or national power pools may be used to establish the process unit's maximum heat input. A review of such data or other available operational data or design information can reveal the heat input that the process unit is capable of achieving in its “pre-activity” configuration, and this can be compared to a “post-activity” heat input value. Plant operators, where the specified basic design parameters are inappropriate for the process, can propose what the measure of performance will be for these process units, including the use of permit limits on amount of production, to their reviewing authority. For process units having multiple end products and raw materials, the owner or operator should consider the primary product or primary raw material when selecting a basic design parameter.

Many pieces of equipment are purchased based on their capacity or output. Consequently, for both utilities and non-utilities, we have modified the proposed basic design parameters to include output-based alternatives in today's final rule. For utilities, the owner or operator can select maximum hourly electric output rate and maximum steam flow rate as its basic design parameters, as an alternative to using input-based measures of maximum hourly fuel consumption rate and maximum hourly heat input. (We are clarifying from the proposal that the correct parameter is maximum hourly heat input, not maximum heat input.) Owners or operators may set different design parameters for different fuel types (such as coal or oil) or a combustion device that can accommodate multiple fuel types: for coal-fired units, owners or operators should consider that the fuel consumption rate will vary depending on the quality of the coal for a given heat input. When establishing fuel consumption specifications in terms of weight or volume, the minimum fuel quality based on BTU content should be used for coal-fired units.

Regardless of whether the source selects a basic design parameter(s) specified for non-utilities in today's rule or gets approval from their reviewing authority to use an alternative parameter(s) for any type of source, we have not specified a fixed averaging time period for the circumstance because we want the owner or operator to have the flexibility to select an averaging time that best accommodates their operation. In most cases, we believe that long term averaging periods (
e.g.,
a 12-month fixed period) will not be appropriate.

Thus, an equipment replacement that improves a process unit's efficiency and thereby enables the unit to return to its design parameters can qualify as RMRR even if current actual emissions increase as a result. For example, if boiler tubes or refractories are replaced on a boiler process unit, and these activities are beneath the capital cost threshold and are within the unit's basic design parameters, then they would qualify as RMRR under the ERP even if this improves the unit's efficiency.

The manufacturer's design parameters of a process unit are always acceptable if an owner or operator chooses to rely on them. In the rare cases where a facility does not have established design parameters, we believe that a reasonable look back period should be used for establishing the pre-activity values for basic design parameters, rather than taking the condition of the process unit immediately before the activity. We have therefore established a 5-year look back period, consistent with that for the NSPS hourly emissions increase test, for these situations.

We were urged by some commenters to incorporate a
de minimis
increase level in the basic design parameters that would allow activities to qualify for the ERP even though the activities would result in a minor change to the relevant basic design parameters. They argued that some effects resulting from the replacement may not be apparent before the equipment has been replaced. They argued that allowing for small changes in basic design parameters would add greater certainty to the ERP because unforeseen small changes would not cause an activity to lose the exclusion after the fact. While we sympathize with the commenter's concern, we do not see a ready solution to this problem under the RMRR exclusion. In fact, we are not persuaded that those types of changes can be readily justified under the ERP because it is hard to see how an activity that causes basic design parameters to change is not “a change” under NSR.

In sum, we continue to believe that an identical or functionally equivalent replacement should not qualify for the ERP if the activity causes the process unit to exceed its specified basic design parameters. Without such a requirement, significant alteration of a process unit's fundamental design could be accomplished under the guise of the ERP. Such an outcome obviously does not square with the idea that identical or functionally equivalent replacements are not “changes” under the major NSR program. Our final rule is different from the proposal, however, in that it provides greater flexibility in defining basic design parameters for process units. We were persuaded by commenters who expressed concerns that the proposed approaches did not adequately encompass all affected operations and industry sectors.

F. What Collection of Equipment Should Be Considered in Applying the Equipment Replacement Provision and How Should It Be Defined?

In the proposal, we raised the issue of what collection of equipment should be considered in applying the threshold under the ERP. We proposed the term “process unit” as the appropriate collection to accommodate the intended coverage of activities under the ERP. The purpose of this term is, to the extent possible, to align implementation of the ERP with generally accepted and practical understandings of what constitutes a discrete production process. The general definition that we proposed was based closely on the definition of process unit contained in 40 CFR 63.41 and read as follows:

Process unit means any collection of structures and/or equipment that processes, assembles, applies, blends, or otherwise uses material inputs to produce or store a completed product. A single facility may contain more than one process unit.

To help illustrate these concepts, we further proposed five industry-specific

examples of how this definition of process unit might be applied.

Some commenters compared the proposal's definition of “process unit” (“* * * producing or storing a completed product * * *”) to the definition that is used by section 112(g) and that appears in 40 CFR 63.41 (“ * * * producing or storing an intermediate or final product * * *”). One of the commenters supported the proposed definition. Two commenters said the rule's definition should be consistent with that used by section 112(g), which they believe is broad enough to encompass interrelated operations. While supporting the RMRR proposal's definition, two commenters recommended that EPA provide regulatory flexibility by allowing a facility the option to choose which definition it will use.

One commenter generally supported the proposed definition of “process unit,” but this commenter believed that “the delineation of a process unit should be made by regulated entity rather than explicitly defined in a rule.”

Three commenters asserted that pollution control equipment should be included in the process unit definition. One industry commenter said pollution control equipment is often integral to the process and may produce an intermediate product. One environmental commenter believed the proposed rule was unclear as to whether pollution control equipment is part of the process unit.

Several commenters said the proposed definition is too vague or broad. Another commenter urged EPA to change the definition of process unit to limit the scope of what is allowed in the ERP, so that the source of emissions (for example, an entire coal boiler) would not be allowed to be replaced without major NSR. The commenter asserted that the replacement unit's scope should be limited to an emission unit.

Most commenters agreed that the general process unit definition is sufficient. However, a number of commenters suggested that we revise or eliminate some of the process unit examples (that is, the industry category-specific definitions), and others were concerned that the proposed definitions do not support the detailed process unit definition for a specific industry because the definitions will never capture all possible elements and configurations.

We received comments from several industry representatives suggesting changes to our proposed industry-specific definitions, and also to request that we delineate other process unit types explicitly in the rule. Definitions were submitted for sugar mills, chemical manufacturing plants, surface coating operations, flat glass manufacturing, fiberglass manufacturing, and gas compressor stations.

One industry commenter agreed with our proposed approach to proportionately allocate, based on capacity, the cost of those components shared by two or more process units. Another commenter suggested that, for electric utilities, we allocate the cost of shared equipment based on a
pro rata
share of megawatts produced.

We agree with the commenters who favor using a process unit as the basis for administering the ERP and including a definition of process unit in the final rule. We also agree with the commenters who suggested that the definition of process unit should be consistent with the definition in 40 CFR 63.41, and we have altered the final rule definition to include those processes that produce “intermediates.” We acknowledge that, without further explanation, the term “intermediates” is susceptible to misinterpretation, which can cause confusion and lead to less regulatory certainty. Thus, we provide the following explanation as to how we intend to interpret today's rule.

By “intermediates,” we mean the intended product of an integrated facility operation. For example, for an automotive manufacturing plant, while the completed product would be the driveable vehicle ready for shipping to the showroom, an intermediate product could be the engine or the painted body shell. In this case, we would not consider smaller production operations, such as the e-coat, primer surface, or top coat operation, to be intermediates in the context of our final rule definition for process unit. Our primary goal in defining this term “process unit” is to encompass integrated manufacturing operations that produce a completed product, and those operations that produce an intermediate as the product of the process unit. In the case of the automotive paint shop, series of coating steps together comprise the carefully designed and interrelated set of operations, all of which are needed to provide a coating system that meets design specifications. The individual operations almost never are implemented individually and, as a practical matter, simply would serve no meaningful purpose in the absence of the others.

We disagree with the commenters who wish to include all pollution control equipment in the definition of process unit. We feel that periodic replacement of components of emissions control equipment should be encouraged and would rarely lead to actual emissions increases. In instances where identical or functionally equivalent replacement of pollution control equipment occurs, it is likely you will qualify for a Pollution Control Project exclusion. We do agree, however, that where the control equipment is an integral component of the process it should be included. Therefore, we are excluding associated pollution control equipment from the definition of the “process unit,” except for control equipment that serves a dual purpose in the process. We know there are industries where pollution control equipment performs a dual purpose; for example, condensers often serve to control emissions of organic air pollutants while serving as an integral component of the operation of a fractionation column. A low-NO
X
burner is another example of a dual-purpose component. In such cases, to provide clarity and simplify administration of the ERP, our rule provides that dual purpose equipment should be considered part of the process. We are also clarifying in today's rule that administrative buildings (including warehousing) are not to be included in the process unit, but other types of non-emitting units that are integral to the processing equipment should be included.

We also have included in our final rule industry-specific examples of how this definition might be applied. The examples are drawn from three selected industrial processing categories—electric utilities, refineries, and incinerators. We proposed each of these detailed definitions and received mostly support from commenters on their accuracy. While we also proposed detailed definitions for two other industries—pulp and paper and cement producers—we have decided not to finalize those definitions after receiving comments from the relevant industry trade association asserting that the definitions did not, and could not, capture all of their industry's configurations and they believed the generic process unit definition was sufficient for their industry. Because of the centrality of the “process unit” concept to the usefulness of the ERP, it is our desire to include specific definitions for steam electric generating facilities, petroleum refineries, and incinerators in the final rule to provide as much certainty as possible for facilities in these industries. As noted above, these definitions also should be useful for those in other industries who

will apply our general definition because the industry specific definitions provide clear examples of how we intend the general definition to be interpreted and applied. During the public comment period on the proposal, several commenters submitted additional industry specific definitions and asked us to put them in the final rule. We are not finalizing these suggested definitions at this time, because we did not include them in the proposed rule. However, provided below are the process unit definitions that commenters submitted to us and that we think comport well with the general definition of process unit promulgated today.

• For a
natural gas compressor station,
each compressor system, together with its proportionate share of common support equipment is a separate process unit. This would generally consist of the air inlet system, accessory drive system, gas producer, fuel delivery system, cooling system, lube system, power turbine, power shaft, control system, starting system, exhaust system, and support facilities (
e.g.
, auxiliary power generating equipment, heating/cooling equipment, station and yard pipe, valves, etc.).

• For a
flat glass manufacturing plant,
each production line within a facility should be a separate process unit. Flat glass production is completed on a continuous line where raw materials are added at one end, a continuous ribbon of glass is formed, and finished glass is packaged at the other end. The flat glass production line consists of: the batch house, where raw materials are stored and weighed; the furnace and refiner, where the raw materials are melted; the bath, where the glass ribbon is formed; the lehr, where the ribbon is annealed; and the cutting and packaging equipment, where the glass is removed from the line for sale to customers or for additional processing later.

• For a
fiberglass production facility,
each production line is a separate process unit. Fiberglass is manufactured on a continuous line where raw materials are melted at one end to form a continuous strand of fiberglass that is packaged at the other end. The fiberglass production line begins with the batch house, where raw materials are stored and weighed. In the melter, forehearth, and refiner, the raw materials are melted and refined. From the refiner, glass fibers are formed through controlled bushings. From the bushings, the continuous strand fibers are either directly cut or packaged or wound onto spools for packaging for sale to customers or for additional later processing.

• For the production of
precipitated amorphous silica,
the process unit includes, but is not limited to: raw material storage and handling equipment used for mixing sand and other raw materials prior to addition to the furnace; the furnace itself; the raw material storage and handling equipment for the cullet dissolving and silica precipitation process; all dissolving, precipitation, and filtration tanks and equipment; and drying equipment. Further, the process unit includes all the product packaging, storage, handling, and transfer equipment.

• For a
chemical manufacturing plant,
the process unit would include all the equipment assembled and connected by pipes or ducts to process raw materials and to manufacture an intended primary product and associated byproducts or intermediates. The process unit can consist of more than one unit operation. Chemical manufacturing process units may include, but are not limited to: raw material storage, and air oxidation reactors and their associated product separators and recovery devices; reactors and their associated product separators and recovery devices; distillation units and their associated distillate receivers and recovery devices; associated unit operations; associated recovery devices; and any feed, intermediate and product storage vessels, product transfer racks, and connected ducts and piping. A chemical manufacturing process unit includes pumps, compressors, agitators, pressure relief devices, sampling connection systems, open-ended valves or lines, valves, connectors, instrumentation systems, and process control or dual purpose air pollution control devices or systems. For a chemical manufacturing facility, there are several types of process units: those that separate and distill raw material feedstocks; those that change molecular structures through reactions or polymerization; those that “finish” the reacted or polymerized product, through compounding, blending, or similar operations; auxiliary facilities, such as boilers and by-product fuel production; and those that load, unload, blend, or store products. Process equipment that acts to control emissions, such as condensers, recovery devices, and oxidizers, is considered part of the process unit.

We note that we were unable to include some other process unit definitions submitted by commenters. While we do not believe that these other proposed definitions were necessarily inconsistent with our general definition of process unit, we had concerns and questions with some of these proposed definitions. We believe that now that this rule is issued, we can more fully evaluate those other definitions, including communicating with the leading industry officials, and determine whether we would approve of their use.

Finally, we have made some slight corrections to the process unit definitions that we proposed based on comments we received on the proposed definitions.

There are numerous industries that have industrial boilers at their facility to provide electricity and steam to their operations. As a general rule, we would expect these boilers to be treated as a separate process unit from the other unit operations occurring at the facility. We would expect the boundaries of the process units for such boilers to be consistent with the boundaries established under the definition for a steam electric generating facility in today's rule, which encompasses all equipment from coal handling to the emission stacks.

We also decided to continue to require that owners or operators who have components shared by two or more process units to proportionately allocate, based on capacity, the cost of those components. And we agree with the commenter that an equitable approach for electric utilities having components shared by two or more process units is to allocate the cost of shared equipment based on the
pro rata
share of megawatts produced by each process unit.

G. Consideration of Non-Emitting Units as Part of the Process Unit

Many commenters supported excluding non-emitting equipment from the ERP. One commenter stated that triggering the major NSR review process for maintenance activities is an impediment to continuous improvement projects for certain products and processes, even if actual emissions decrease or only non-emitting units on the process line are affected. Delays or postponements of project maintenance work adversely affect the reliability, safety and productivity of operations and cost control efforts. Another commenter recommended that work at clearly non-emitting units, specifically including foundation regrouting and repair and frametop replacement, should be excluded from this rule. Three commenters believed that non-emitting units cannot result in an

increase of emissions and thus do not need to be evaluated under major NSR.

A blanket exclusion for non-emitting units could create problems of interpretation because the term “non-emitting components” is ambiguous when considering certain components. Commenters asserted that identifying and separating out non-emitting components can be a complex undertaking, and may be contrary to the goal of a clear and straightforward option. One commenter provided the following examples: (1) Piping systems (although pipe connectors are a source of fugitive emissions, the pipe normally is not); and (2) structural supports for a process unit (separating out the cost of supports from an investment basis throughout a facility will be difficult).

Another commenter believed it would be difficult to separate the costs of emitting and non-emitting equipment when determining the cost of the process unit. The commenter also believed it would be difficult to determine allocation of shared equipment in the cost analysis.

We are concerned that, if owners or operators were allowed to strip away all of the non-emitting components from a process unit definition, it would create significant ambiguity in the rule and could result in significant variation in how the rule is applied to similar sources in different jurisdictions. In addition, we simply do not think it is practical or logical to separate “non-emitting” components of a process unit from “emitting” components. We believe that integrated manufacturing operations (that is, process units) typically include both types of equipment. Separating emitting from non-emitting equipment would create an artificial divide that contrasts sharply with physical and operational reality.

As noted above, however, we do believe that a distinction should be made between non-emitting equipment that is part of a process unit and non-emitting equipment that is functionally distinct from the process unit. For example, most production facilities have buildings or space to house administrative offices, such as offices for the plant accounting staff. Such non-emitting facilities should not be considered part of any process unit under today's rule.

H. What Is the Accounting Basis for the Process Unit?

In the proposal, the accounting basis for the ERP discussed was the same as for the NSPS reconstruction provision, which is the fixed capital cost that would be required to construct an entirely new unit. We also discussed for the annual maintenance, repair and replacement allowance using the invested cost of a unit as the accounting basis. We proposed that it would be appropriate to require that costs be calculated using an approach along the lines set out in the EPA Air Pollution Control Cost Manual (
http://www.epa.gov/ttn/catc/dir1/c_allchs.pdf
). Finally, we solicited comment on whether the costs associated with the unanticipated shutdown of equipment, due to component failure or catastrophic failures such as explosions or fires, should be included in evaluating costs under the ERP.

In reviewing comments, we recognized that some commenters appeared to direct their comments on the accounting methods at the annual maintenance, repair and replacement allowance, and not necessarily the ERP. Often, we came to this conclusion simply by the way the commenters organized their comments, and not by any specific statements in the comment letter. However, since we asked for comment on the accounting approaches as they would be applied to both the annual maintenance, repair and replacement allowance and the ERP, we believe that comments that appeared to be dedicated to the annual maintenance, repair and replacement allowance should also apply to our evaluation of the accounting for the ERP, except in the case where the commenter specified that their comments on the proposed accounting methods applied only to the annual maintenance, repair and replacement allowance or the ERP. Likewise, for considering whether costs associated with unanticipated shutdown of equipment, we considered the comments to apply to both the ERP and the annual maintenance, repair and replacement allowance unless the commenter specifically noted that the comment should not be applied to both of the proposed rule provisions.

Most commenters asked for flexibility on whether a facility should use replacement value, invested cost or insurance valuation as the basis for the calculations. They felt that all were of equal merit and different ones would be available at different facilities so EPA should not prescribe only one type.

Most commenters did not support the sole use of the EPA Air Pollution Control Cost Manual (APCCM) to standardize calculations for replacement and repair costs for RMRR in general. Most commenters felt that the APCCM is a worthy reference for costing but also that sources should not be limited to only one manual, because a single manual is likely to have shortcomings and not be able to represent every situation.

Many commenters supported an exclusion of costs for unanticipated shutdowns and failures. They noted that strong incentives exist to avoid fires, explosions and other unanticipated equipment failures because of the risk of human injury and production interruptions and because of the expense involved in restoring lost capacity. As a result, they contend that a catastrophic event already penalizes the facility dramatically, but then to impose the case-by-case analysis would only exacerbate their troubles. They explained that failures take place occasionally and can result in a sudden, unplanned partial or total loss of equipment. When such a failure occurs at a natural gas compressor station, the turbine or engine concerned must be replaced immediately to avoid a disruption in gas supply. Other facilities may have similar pressures to maintain their product around the clock. Such replacement fits easily within most elements of the equipment replacement test. Commenters asserted that replacing a catastrophically failed turbine or engine is clearly “routine,” since companies will always replace such failures.

Other commenters, however, opposed an exclusion for unanticipated shutdowns and failures on the grounds that maintenance activities performed during forced outages are simply maintenance and should be considered as such, particularly given that the proposed RMRR rule approaches and the December 2002 final rules already have given the industry a number of exclusion options.

We are allowing sources to determine the applicability of today's rule on the basis of replacement value, with an option for sources to notify their reviewing authority in writing if they desire to use another option (for example, invested cost or insurance value where the insurance value covers only the complete replacement of the process unit). The equipment replacement cost should be based on the current replacement value of the entire process unit at the time of conducting the activity.

Typically, replacement value is more easily obtained than invested cost. Most manufacturers will have information concerning the replacement value of a process unit, because such costs are commonly used when evaluating various business scenarios relating to manufacturing costs. Also, use of replacement value is consistent with the NSPS provisions.

In addition to determining the replacement value of a process unit, in our final rule we allow for the use of several other accepted methods in different industries for estimating such values. Replacement values are the estimated value of replacing a unit and can be based on a current appraisal. In lieu of replacement cost, you can also use inflation-adjusted original investment, insurance limits if insured for full replacement of the unit, or other cost estimation techniques currently employed by the company, as long as the company follows GAAP and if approved by the reviewing authority.

A dollar-per-kilowatt rate for calculating costs may be appropriate for utilities. This model is specific to source and fuel type and is updated periodically. We allow sources to use insurance valuation methods such as the Handy-Whitman Index to determine replacement costs for electric utilities. Other sources to compute costs include the Nelson Refinery Construction Index Factors, Solomon Refinery Study, and licensors of the respective process unit (
e.g.
, Kellogg, UOP).

In order for a cost-based approach to be equitable, all owners or operators must include the same categories of expenses in both the process unit replacement value and the replacement activities sought to be excluded. Therefore, although the final rule does not mandate any particular approach, we believe it is generally appropriate to calculate costs using an approach similar to the elements of Total Capital Investment as defined in the APCCM. While the manual contains basic concepts that could be used to estimate total capital investment at a process unit, it is geared toward cost calculations for add-on control equipment. On the other hand, the underlying concepts are taken from work done by the American Association of Cost Engineers to define the components of cost calculations for all types of processes, not just emission control equipment. In certain cases, other manuals might make more sense depending on their circumstances.

Under the APCCM, total capital investment includes the costs required to purchase equipment, the costs of labor and materials for installing the equipment (direct installation costs), costs for site preparation and buildings, and certain other indirect installation costs. However, any costs that are part of the installation and maintenance of pollution control equipment should be excluded from the cost calculation, per our discussion in the previous section of this preamble. We believe equipment that serves a dual purpose of process equipment and control equipment (combustion equipment used to produce steam and to control hazardous air pollutant emissions, exhaust conditioning in the semiconductor industry,
etc.
should be considered process equipment.

Direct installation costs include costs for foundations and supports, erecting and handling the equipment, electrical work, piping, insulation, and painting. Indirect installation costs include such costs as: engineering costs; construction and field expenses (costs for construction supervisory personnel, office personnel, rental of temporary offices,
etc.
); contractor fees (for construction and engineering firms involved in the activity); startup and performance test costs; and contingencies.

We believe there may be merit to the comments we received advocating a categorical exclusion for unanticipated shutdowns and failures of some kind. When such an outage occurs, there may be a real urgency to restore the plant to operation without forcing it to await the results of a permitting action or applicability determination. In the past, we have handled these situations with case-by-case consent orders; however, even that approach may lead to unnecessary delays. It may specifically be sensible to relaxing the 20 percent cost threshold limitation for such events because it is unlikely that sources would incur an outage to avoid controls. We did not propose such a stand-alone exclusion and hence we believe we should not act upon it at this time.

I. Enforcement

1. Compliance Assurance

We believe that the records developed and maintained in the ordinary course of business will provide the primary means of assuring compliance with today's rule. We know that, as a general rule, companies necessarily generate and keep records related to the types of projects covered by today's rule. For example, companies generally have comprehensive procedures by which funds are allocated to both capital and maintenance expense projects. Many of the records generated by these procedures are needed for tax accounting purposes and, by law, must be maintained for at least 6 years. Moreover, additional records must be maintained in industries regulated for other purposes, such as the energy sector (over 90 percent of which, by capacity, is subject to FERC regulation). Public utilities, licensees and natural gas companies that are subject to FERC jurisdiction must, unless they receive a waiver from the Commission, comply with extensive accounting and record retention requirements. They must keep financial information according to uniform systems of accounts that are set out in 18 CFR part 101 for public utilities and licensees, and 18 CFR part 201 for natural gas companies. These uniform systems of accounts include hundreds of specific accounts, including individual accounts for boiler plant equipment, engines and engine-driven generators, turbogenerator units, and hundreds of other asset, liability, cost and property items.

These companies also must retain records according to the schedules set forth in 18 CFR part 125 (for public utilities and licensees) and 18 CFR part 225 (for natural gas companies). The types of records that companies must keep include, for public utilities and licensees, for example, generation and output logs (records must be kept for 3 years), load records (3 years), gauge-reading reports (2 years), maintenance work orders and job orders showing entries for labor, materials and other charges in connection with maintenance and other work pertaining to utility operations (5 years), work order sheets for construction work in progress (5 years), appraisals and valuations made of utility property or investments (3 years), engineering records, drawings, and other supporting data for proposed or as-constructed utility facilities, including detail drawings and records of engineering studies (must be kept until facilities are retired), contracts or other agreements relating to services performed in connection with construction of utility plant (6 years after the plant is retired or sold), general and subsidiary ledgers (10 years), paid and canceled vouchers, and original bills and invoices for materials, services,
etc.
(5 years).

Altogether, these various sources of information provide more than reasonable assurance of compliance with today's rule. This is particularly true given EPA's broad authority to inspect affected facilities and require submission of compliance related data. Accordingly, we are not imposing any recordkeeping requirements in today's rule.

2. General Issues

Today's rule provides revisions to the major NSR program to specify categories of equipment replacement activities that we will consider RMRR in the future. As recognized by the U.S. Supreme Court, an agency may not promulgate retroactive rules absent express congressional authority.
See Bowen
v.
Georgetown Univ. Hosp.
, 488 U.S. 204,

208, 102 L. Ed. 2d 493, 109 S. Ct. 468 (1988). The CAA contains no such expressed grant of authority, and we do not intend by our actions today to create retroactive applicability for today's rule. 42 U.S.C. 7401
et seq.
Today's rule applies only to conduct that occurs after the rule's effective date.

None of today's rule revisions apply to any changes that are the subject of existing enforcement actions that the Agency has brought and none constitute a defense thereto. Furthermore, prior applicability determinations on major modifications that result in control requirements in an NSR permit that currently applies to a source remain valid and enforceable as to that source.

As noted above, today we are changing the scope of the RMRR exclusion from the major NSR program by taking final action on the ERP. If you subsequently undertake an activity that does not meet the applicable provisions of these new alternatives and do not obtain a preconstruction permit if you are required to do so, you will be subject to any applicable enforcement provisions (including the possibility of citizens' suits) under the applicable sections of the CAA. Sanctions for violations of these provisions may include monetary penalties of up to $27,500 per day of violation, as well as the possibility of injunctive relief, which may include the requirement to install air pollution controls.

J. Quantitative Analysis

At proposal, we presented a quantitative analysis of the possible emissions consequences of the range of different approaches to the RMRR exclusion to evaluate if our policy conclusions are correct. Our analysis was conducted using the Integrated Planning Model (IPM). This analysis was done for electric utilities because we have a powerful model to perform such an analysis that we do not have for other industries. We stated that the results for electric utilities accurately reflect the trends we would see in other industries.

The IPM analyses of different scenarios showed that the breadth of the RMRR exclusion would have no practical impact on, let alone be the controlling factor in determining, the emissions reductions that will be achieved in the future under the major NSR program. The analyses showed that emissions of SO
2
are essentially the same under all scenarios, but that under today's rule these emission levels will be met in

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---