# Revision of Fee Schedules; Fee Recovery for FY 2002

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/fr%3A02-7114

## Record

- **Collection:** Federal Register
- **Document type:** Proposed Rule
- **Published:** March 27, 2002
- **Citation:** 67 FR 14818

## Text

NUCLEAR REGULATORY COMMISSION
10 CFR Parts 170 and 171
RIN 3150-AG95
Revision of Fee Schedules; Fee Recovery for FY 2002

AGENCY:

Nuclear Regulatory Commission.

ACTION:

Proposed rule.

SUMMARY:

The Nuclear Regulatory Commission (NRC) is proposing to amend the licensing, inspection, and annual fees charged to its applicants and licensees. The proposed amendments are necessary to implement the Omnibus Budget Reconciliation Act of 1990 (OBRA-90), as amended, which requires that the NRC recover approximately 96 percent of its budget authority in fiscal year (FY) 2002, less the amounts appropriated from the Nuclear Waste Fund (NWF) and the General Fund. The amount to be recovered for FY 2002 is approximately $479.5 million.

DATES:

The comment period expires April 26, 2002. Comments received after this date will be considered if it is practical to do so, but the NRC is able to ensure only that comments received on or before this date will be considered. Because OBRA-90 requires that the NRC collect the FY 2002 fees by September 30, 2002, requests for extensions of the comment period will not be granted.

ADDRESSES:

Mail written comments to: Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attn: Rulemakings and Adjudications Staff. Hand deliver comments to: 11555 Rockville Pike, Rockville, Maryland 20852, between 7:30 a.m. and 4:15 p.m. Federal workdays. (Telephone 301-415-1678). Comments may be faxed to (301) 415-1101.

Comments may also be submitted via the NRC's interactive rulemaking Web site (
http://ruleforum.llnl.gov
). This site provides the ability to upload comments as files (any format), if your Web browser supports that function. For information about the interactive rulemaking site, contact Ms. Carol Gallagher, 301-415-5905; e-mail
CAG@nrc.gov.

With the exception of restricted information, documents created or received at the NRC after November 1, 1999, are also available electronically at the NRC's Public Electronic Reading Room on the Internet at
http://www.nrc.gov/reading-rm/adams.html.
From this site, the public can gain entry into the NRC's Agencywide Documents Access and Management System (ADAMS), which provides text and image files of NRC's public documents. For more information, contact the NRC Public Document Room (PDR) Reference staff at 1-800-397-4209, or 301-415-4737, or by e-mail to
pdr@nrc.gov.

In addition to being available in ADAMS, the agency workpapers that support these proposed changes to 10 CFR Parts 170 and 171 may also be examined during the 30-day comment period at the NRC Public Document Room, Room O-1F22, One White Flint North, 11555 Rockville Pike, Rockville, MD 20852-2738.

FOR FURTHER INFORMATION CONTACT:

Glenda Jackson; Telephone 301-415-6057 or Robert Carlson; Telephone 301-415-8165, Office of the Chief Financial Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

SUPPLEMENTARY INFORMATION:

I. Background

II. Proposed Action

III. Plain Language

IV. Voluntary Consensus Standards

V. Environmental Impact: Categorical Exclusion

VI. Paperwork Reduction Act Statement

VII. Regulatory Analysis

VIII. Regulatory Flexibility Analysis

IX. Backfit Analysis

I. Background

For FYs 1991 through 2000, OBRA-90, as amended, required that the NRC recover approximately 100 percent of its budget authority, less the amount appropriated from the U.S. Department of Energy (DOE) administered NWF, by assessing fees. To address fairness and equity concerns raised by the NRC related to charging NRC license holders for agency expenses that do not provide a direct benefit to the licensee, the FY 2001 Energy and Water Development Appropriations Act amended OBRA-90 to decrease the NRC's fee recovery amount by 2 percent per year beginning in FY 2001, until the fee recovery amount is 90 percent in FY 2005. As a result, the NRC is required to recover approximately 96 percent of its FY 2002 budget authority, less the amounts appropriated from the NWF, through fees and other offsetting receipts. In addition, $36.0 million has been appropriated from the General Fund for activities related to homeland security. The FY 2002 Defense Appropriations Act states that this $36.0 million shall be excluded from license fee revenues. The total amount to be recovered in fees and other offsetting receipts for FY 2002 is approximately $479.5 million.

The NRC assesses two types of fees to meet the requirements of OBRA-90, as amended. First, license and inspection fees, established in 10 CFR part 170 under the authority of the Independent Offices Appropriation Act of 1952 (IOAA), 31 U.S.C. 9701, recover the NRC's costs of providing special benefits to identifiable applicants and licensees. Examples of the services provided by the NRC for which these fees are assessed are the review of applications for new licenses, and for certain types of existing licenses, the review of renewal applications, the review of amendment requests, and inspections. Second, annual fees established in 10 CFR Part 171 under the authority of OBRA-90, recover generic and other regulatory costs not otherwise recovered through 10 CFR part 170 fees.

II. Proposed Action

The NRC is proposing to amend its licensing, inspection, and annual fees to recover approximately 96 percent of its FY 2002 budget authority, including the budget authority for its Office of the Inspector General, less the appropriations received from the NWF and the General Fund. The NRC's total budget authority for FY 2002 is $559.1 million, of which approximately $23.7 million has been appropriated from the NWF. In addition, $36.0 million has been appropriated from the General Fund for activities related to homeland security. Based on the 96 percent fee recovery requirement, the NRC must collect approximately $479.5 million in FY 2002 through part 170 licensing and inspection fees, part 171 annual fees, and other offsetting receipts. The total amount to be recovered through fees and other offsetting receipts for FY 2002 is $26.2 million more than the amount estimated for recovery in FY 2001.

The FY 2002 fee recovery amount is reduced by a $1.7 million carryover from additional collections in FY 2001 that were unanticipated at the time the final FY 2001 fee rule was published. This leaves approximately $477.8 million to be recovered in FY 2002 through part 170 licensing and inspection fees, part 171 annual fees, and other offsetting receipts.

The NRC estimates that approximately $120.7 million will be recovered in FY 2002 from part 170 fees and other offsetting receipts. For FY 2002, the NRC also estimates a net adjustment of approximately $8.2 million for FY 2002 invoices that the NRC estimates will not be paid during the fiscal year, and for payments received in FY 2002 for FY 2001 invoices. The remaining $348.9 million

would be recovered through the part 171 annual fees, compared to $331.6 million for FY 2001.

Table I summarizes the budget and fee recovery amounts for FY 2002. Due to rounding, adding the individual numbers in the table may result in a total that is slightly different than the one shown.

Table I.—Budget and Fee Recovery Amounts for FY 2002
[Dollars in millions]

Total Budget Authority
$559.1

Less NWF
−23.7

Less General Fund
−36.0

Balance
$499.5

Fee Recovery Rate for FY 2002
× 96.0%

Total Amount to be Recovered For FY 2002
$479.5

Less Carryover from FY 2001
−1.7

Amount to be Recovered Through Fees and Other Receipts
$477.8

Less Estimated Part 170 Fees and Other Receipts
−120.7

Part 171 Fee Collections Required
$357.1

Part 171 Billing Adjustments:

Unpaid FY 2002 Invoices (estimated)
2.9

Less Payments Received in FY 2002 for Prior Year Invoices (estimated)
−11.1

Subtotal
−8.2

Adjusted Part 171 Collections Required
$348.9

The FY 2002 final fee rule will be a “major” final action as defined by the Small Business Regulatory Enforcement Fairness Act of 1996. Therefore, the NRC's fees for FY 2002 would become effective 60 days after publication of the final rule in the
Federal Register
. The NRC will send an invoice for the amount of the annual fee to reactors and major fuel cycle facilities upon publication of the FY 2002 final rule. For these licensees, payment would be due on the effective date of the FY 2002 rule. Those materials licensees whose license anniversary date during FY 2002 falls before the effective date of the final FY 2002 rule would be billed for the annual fee during the anniversary month of the license at the FY 2001 annual fee rate. Those materials licensees whose license anniversary date falls on or after the effective date of the final FY 2002 rule would be billed for the annual fee at the FY 2002 annual fee rate during the anniversary month of the license, and payment would be due on the date of the invoice.

The NRC, in proposing FY 2002 fees for uranium recovery licensees, is cognizant that the National Mining Association (NMA) has filed a petition requesting the commencement of a rulemaking proceeding which would result in a modification of the fee schedules to waive all fees for uranium recovery licensees. Alternatively, the NMA requested the waiver of fees associated with a contemplated rulemaking that would establish requirements for licensing uranium and thorium recovery facilities. The NRC not only published the petition in the
Federal Register
for comment (66 FR 55604; November 2, 2001), but also mailed the
Federal Register
document noticing the petition and inviting public comment to each of the NRC's more than 5,000 licensees. The comment period expired on January 16, 2002. The NRC is now evaluating the comments it has received in response to this action.

The Commission anticipates issuing its decision on the rulemaking petition before the projected promulgation of the final FY 2002 fee rule in June. Should the Commission decide to grant the rulemaking petition and provide immediate fee relief to the uranium recovery industry, this could result in higher fees for other NRC licensees. The additional fees to be distributed among other licensees could be between $3.0 and $4.0 million in FY 2002. In such a case, more than 85 percent of this sum would be allocated to power reactors based on the NRC's established method for allocating costs not attributable to those licensees paying annual fees. Thus, the NRC is inviting those who have arguments to place before the Commission
that were not submitted
in response to the November 2, 2001,
Federal Register
document requesting public comment on the petition to do so now.

As a matter of courtesy, the NRC plans to continue mailing the proposed fee rules to all licensees, although, in accordance with its FY 1998 announcement, the NRC has discontinued mailing the final rule to all licensees as a cost-saving measure. Accordingly, the NRC does not plan to routinely mail the FY 2002 final rule or future final fee rules to licensees. However, the NRC will send the final rule to any licensee or other person upon specific request. To request a copy, contact the License Fee and Accounts Receivable Branch, Division of Accounting and Finance, Office of the Chief Financial Officer, at 301-415-7554, or e-mail us at fees@nrc.gov. It is our intent to publish the final rule in June 2002. In addition to publication in the
Federal Register
, the final rule will be available on the Internet at
http://ruleforum.llnl.gov
for at least 90 days after the effective date of the final rule.

The NRC is proposing to make changes to 10 CFR parts 170 and 171 as discussed in Sections A and B below.

A. Amendments to 10 CFR Part 170: Fees for Facilities, Materials, Import and Export Licenses, and Other Regulatory Services Under the Atomic Energy Act of 1954, As Amended

The NRC is proposing to revise the hourly rates used to calculate fees and to adjust the part 170 fees based on the revised hourly rates. Additionally, the NRC is proposing to revise part 170 to clarify that full cost fees will be assessed for amendments and inspections related to the storage of reactor-related Greater than Class C (GTCC) waste under part 72, and to clarify the fee waiver provisions for special projects, including topical reports.

The proposed amendments are as follows:

1. Hourly Rates

The NRC is proposing to revise the two professional hourly rates for NRC staff time established in § 170.20. These proposed rates would be based on the number of FY 2002 direct program full time equivalents (FTEs) and the FY 2002 NRC budget, excluding direct program support costs and NRC's appropriations from the NWF and the General Fund. These rates are used to determine the part 170 fees. The proposed hourly rate for the reactor program is $156 per hour ($276,345 per direct FTE). This rate would be applicable to all activities for which fees are assessed under § 170.21 of the fee regulations. The proposed hourly rate for the materials program (nuclear materials and nuclear waste programs) is $152 per hour ($269,451 per direct FTE). This rate would be applicable to all activities for which fees are assessed under § 170.31 of the fee regulations. In the FY 2001 final fee rule, the reactor and materials program rates were $150 and $144, respectively. The proposed increases are primarily due to the Government-wide pay increase in FY 2002.

The method used to determine the two professional hourly rates is as follows:

a. Direct program FTE levels are identified for the reactor program and the materials program (nuclear materials and nuclear waste programs).

b. Direct contract support, which is the use of contract or other services in support of the line organization's direct program, is excluded from the calculation of the hourly rates because the costs for direct contract support are charged directly through the various categories of fees.

c. All other program costs (i.e., Salaries and Benefits, Travel) represent “in-house” costs and are to be collected by dividing them uniformly by the total number of direct FTEs for the program. In addition, salaries and benefits plus contracts for non-program direct management and support, and for the Office of the Inspector General, are allocated to each program based on that program's direct costs. This method results in the following costs which are included in the hourly rates. Due to rounding, adding the individual numbers in the table may result in a total that is slightly different than the one shown.

Table II.—FY 2002 Budget Authority To Be Included in Hourly Rates
[Dollars in millions]

Reactor
programs

Materials
program

Direct Program Salaries & Benefits
117.0
32.2

Overhead Salaries & Benefits, Program Travel and Other Support
59.2
15.6

Allocated Agency Management and Support
106.9
29.0

Subtotal
283.1
76.8

Less offsetting receipts
−0 .1
−0.0

Total Budget Included in Hourly Rate
283.0
76.8

Program Direct FTEs
1024.0
285.1

Rate per Direct FTE
276,345
269,451

Professional Hourly Rate (Rate per direct FTE divided by 1,776 hours)
156
152

As shown in Table II, dividing the $283.0 million budgeted amount (rounded) included in the hourly rate for the reactor program by the reactor program direct FTEs (1024.0) results in a rate for the reactor program of $276,345 per FTE for FY 2002. The Direct FTE Hourly Rate for the reactor program would be $156 per hour (rounded to the nearest whole dollar). This rate is calculated by dividing the cost per direct FTE ($276,345) by the number of productive hours in one year (1,776 hours) as set forth in the revised OMB Circular A-76, “Performance of Commercial Activities.” Similarly, dividing the $76.8 million budgeted amount (rounded) included in the hourly rate for the materials program by the program direct FTEs (285.1) results in a rate of $269,451 per FTE for FY 2002. The Direct FTE Hourly Rate for the materials program would be $152 per hour (rounded to the nearest whole dollar). This rate is calculated by dividing the cost per direct FTE ($269,451) by the number of productive hours in one year (1,776 hours).

2. Fees for Storage of Greater Than Class C Waste Under Part 72

On October 11, 2001 (66 FR 51823), the NRC published a final rule revising part 72 to allow licensing for the interim storage of reactor-related Greater than Class C (GTCC) waste in a manner that is consistent with current licensing for the interim storage of spent fuel. As provided in § 72.6, reactor-related GTCC waste can only be stored under the provisions of a specific license. The NRC stated in the statement of considerations for the final rule that subsequent to issuing the final revision of part 72, part 170 would be amended to clarify that full cost fees will be assessed for amendments and inspections related to the storage of reactor-related GTCC waste under part 72. Therefore, the NRC is revising Category 1.B. of § 170.31 to specifically include storage of reactor-related GTCC waste licensed under part 72. Category 1.B. of § 170.31 currently refers only to specific licenses for receipt and storage of spent fuel at an independent storage installation.

3. Fee Adjustments

The NRC is proposing to adjust the current part 170 fees in §§ 170.21 and 170.31 to reflect the changes in the revised hourly rates. The full cost fees assessed under §§ 170.21 and 170.31 would be based on the proposed professional hourly rates and any direct program support (contractual services) costs expended by the NRC. Any professional hours expended on or after the effective date of the final rule would be assessed at the FY 2002 hourly rates.

The fees in §§ 170.21 and 170.31 that are based on the average time to review an application (“flat” fees) would be adjusted to reflect the increase in the professional hourly rates from FY 2001. The amounts of the materials licensing “flat” fees were rounded so that the amounts would be de minimis and the resulting flat fee would be convenient to the user. Fees under $1,000 are rounded to the nearest $10. Fees that are greater than $1,000 but less than $100,000 are rounded to the nearest $100. Fees that are greater than $100,000 are rounded to the nearest $1,000.

The proposed licensing “flat” fees are applicable to fee categories K.1 through K.5 of § 170.21, and fee categories 1C, 1D, 2B, 2C, 3A through 3P, 4B through 9D, 10B, 15A through 15E, and 16 of § 170.31. Applications filed on or after the effective date of the final rule would be subject to the revised fees in this proposed rule.

4. Fee Waivers

In the FY 2001 final fee rule (66 FR 32452; June 14, 2001), the NRC revised criterion (c) of Footnote 4 to § 170.21 and criterion (c) of Footnote 5 to § 170.31 to clarify that fees will not be assessed for requests or reports submitted to the NRC as a means of exchanging information between industry organizations and the NRC for the purpose of supporting the NRC's generic regulatory improvements or efforts. However, the NRC has continued to receive requests for fee exemptions that do not meet the intent of the waiver provisions. In addition, Footnote 4 to § 170.21, Footnote 5 to § 170.31, and material in the definition of
Special Projects
in § 170.3 concerning these types of requests and reports provide information that is more suitable for inclusion in § 170.11, Exemptions.

Therefore, the NRC is proposing to delete Footnote 4 to § 170.21 and Footnote 5 to § 170.31, to modify the language that is currently in those footnotes and add the revised fee waiver provisions to the Exemption section as § 170.11(a)(1). The NRC also proposes to remove the language relating to certain reports and requests submitted to the NRC for review from the definition of
Special Projects
in § 170.3. The fee waiver provisions will be revised to specifically state that the fee waiver criteria apply only when it has been demonstrated that the report or request has been submitted to the NRC for the specific purpose of supporting the generic regulatory improvements or efforts of the NRC, rather than the industry, and that the NRC, at the time of the submission, plans to use the submission for that purpose. The proposed modification would also clarify that the waiver provisions do not apply to reports or documents submitted for the NRC's review that the NRC, at the time of the submission, does not plan to use to improve its regulatory program, and that therefore will primarily provide only a special benefit to identifiable recipients, such as the industry, vendors, or specific licensees. These criteria will allow the NRC to make waiver determinations soon after the documents are submitted. As provided in § 170.5, fee exemption requests should be made to the NRC's Chief Financial Officer. To further assist applicants in determining in advance whether their submittals meet the fee waiver criteria, specific examples of the types of submissions that meet the fee waiver criteria and those that do not would be provided in § 170.11(a)(1).

In summary, the NRC is proposing to amend 10 CFR part 170 to—

1. Revise the materials and reactor program FTE hourly rates;

2. Revise the licensing fees to be assessed to reflect the revised hourly rates;

3. Revise fee category 1.B. of § 170.31 to clarify that full cost fees would be assessed for amendments and inspections related to the storage of GTCC Waste under part 72; and

4. Add to § 170.11, Exemptions, the fee waiver provisions that are currently in Footnote 4 to § 170.21 and Footnote 5 to § 170.31, and clarify the fee waiver provisions currently in criterion (c) of these Footnotes. These footnotes, as well as material in the definition of
Special Projects
in § 170.3 related to certain special requests and reports submitted to NRC for review, would be deleted.

B. Amendments to 10 CFR Part 171: Annual Fees for Reactor Licenses, and Fuel Cycle Licenses and Materials Licenses, Including Holders of Certificates of Compliance, Registrations, and Quality Assurance Program Approvals, and Government Agencies Licensed by the NRC

The NRC proposes to revise the annual fees for FY 2002, to amend part 171 to specifically cover combined licenses issued under part 52, to clarify the annual fee exemption provision for reactors, and to modify the methodology for allocating the uranium recovery annual fee amount among the types of uranium recovery licenses. The proposed amendments are as follows.

1. Annual Fees

The NRC is proposing to establish rebaselined annual fees for FY 2002. The Commission's policy commitment, made in the statement of considerations accompanying the FY 1995 fee rule (60 FR 32225; June 20, 1995), and further explained in the statement of considerations accompanying the FY 1999 fee rule (64 FR 31448; June 10, 1999), establishes that base annual fees will be re-established (rebaselined) at least every third year, and more frequently if there is a substantial change in the total NRC budget or in the magnitude of the budget allocated to a specific class of licenses. The fees were last rebaselined in FY 2001. Based on the change in the magnitude of the budget to be recovered through fees, the Commission has determined that it is appropriate to rebaseline the annual fees again this year. Rebaselining fees would result in increased annual fees for all classes of licenses, except for the non-power reactor and spent fuel storage/reactor decommissioning classes, which would have annual fee decreases.

The annual fees in §§ 171.15 and 171.16 would be revised for FY 2002 to recover approximately 96 percent of the NRC's FY 2002 budget authority, less the estimated amount to be recovered through part 170 fees and the amounts appropriated from the NWF and the General Fund. The total amount to be recovered through annual fees for FY 2002 is $348.9 million, compared to $331.6 million for FY 2001.

The proposed FY 2002 annual fees would increase for most categories of licenses and decrease for others from the previous year. The increases in annual fees range from approximately 5.1 percent for materials licenses authorizing the receipt of waste byproduct materials and packaging/repackaging of the material (Waste Receipt/Packaging), to approximately 129 percent for rare earth facilities. The decreases in annual fees range from approximately 3.6 percent for non-power reactors, to approximately 18 percent for the Title II uranium recovery specific licenses.

Factors affecting the changes to the annual fee amounts include changes in budgeted costs for the different classes of licenses, the reduction in the fee recovery rate from 98 percent for FY 2001 to 96 percent for FY 2002, the estimated part 170 collections for the various classes of licenses, a $1.7 million carryover from additional collections in FY 2001 that were unanticipated at the time the final FY 2001 fee rule was published (compared to a $3.1 million carryover from FY 2000 which reduced FY 2001 annual fees), the increased hourly rates, and decreases in the numbers of licensees for certain categories of licenses. In addition, the proposed decreases for the Title II uranium recovery specific licenses are based on a proposed change to the methodology for allocating the annual fee amount for the uranium recovery class among Title I and Title II licenses. This proposed change is described in detail in B. below.

In addition, for some classes of materials licenses, a change in policy for assigning Project Managers (PMs) has contributed to the annual fee increases. In the last few years, part 170 fees have increased for certain classes of licenses due to initiatives to recover costs for additional activities through fees for services rather than annual fees. One such initiative was the policy for full cost recovery under part 170 for PMs, which became effective with the FY 1999 final fee rule (64 FR 31448; June 10, 1999). However, in response to concerns expressed by materials licensees, the Office of Nuclear Material Safety and Safeguards (NMSS) in July 2001 changed its policy for assigning PMs. The revised NMSS policy has resulted in classifying approximately four staff members as PMs at this time, compared to approximately 97 in FY 2000. Under NMSS's revised policy, if project management duties to support a licensee/facility do not exceed 75 percent of the assigned person's time for any given two week period, then the staff member will be considered a “Point of Contact.” As a result, that person's time which is not specifically associated with a licensing action or inspection is now recovered under part 171.

Although the change in policy for assigning PMs causes a decrease in estimated part 170 collections for some classes, it also results in more of the budgeted costs for that class being

recovered through annual fees. However, the change does not result in an increase in total fees paid by these classes. Licensees in the rare earth facility class, for example, would have an annual fee increase of approximately 129 percent, although the total budgeted costs for the class actually decreased from FY 2001. The increase in annual fees is primarily the result of the change in PM policy which caused a shift in cost recovery from part 170 to part 171. The effect of this change on the part 170 fees, part 171 fees, and the total fees for the class compared to FY 2001 is illustrated in Table III below.

Table III.—Fees for the Rare Earth Class for FY 2001 and FY 2002
[Dollars in millions]

FY 2001
FY 2002
Difference

Estimated part 170 fees
$.81
$.50
−$.31

Total annual fee amount
.09
.21
.12

Total
.90
.71
−.19

Table IV below shows the proposed rebaselined annual fees for FY 2002 for representative categories of licenses.

Table IV.—Rebaselined Annual Fees for FY 2002

Class/category of licenses
Proposed FY 2002 annual fee

Operating Power Reactors (including Spent Fuel Storage/Reactor Decommissioning annual fee)
$2,869,000

Spent Fuel Storage/Reactor Decommissioning
239,000

Nonpower Reactors
71,300

High Enriched Uranium Fuel Facility
4,073,000

Low Enriched Uranium Fuel Facility
1,366,000

UF
6
Conversion Facility

585,000

Uranium Mills
7,700

Transportation:

Users/Fabricators
72,800

Users Only
7,300

Typical Materials Users:

Radiographers
13,700

Well Loggers
10,000

Gauge Users
2,700

Broad Scope Medical
26,200

The annual fees assessed to each class of licenses include a surcharge to recover those NRC budgeted costs that are not directly or solely attributable to the classes of licenses, but must be recovered from licensees to comply with the requirements of OBRA-90, as amended. Based on the FY 2001 Energy and Water Appropriations Act which amended OBRA-90 to decrease the NRC's fee recovery amount by 2 percent per year beginning in FY 2001, until the fee recovery amount is 90 percent in FY 2005, the total surcharge costs for FY 2002 will be reduced by about $20.0 million. The total FY 2002 budgeted costs for these activities and the reduction to these amounts for fee recovery purposes are shown in Table V. Due to rounding, adding the individual numbers in the table may result in a total that is slightly different than the one shown.

Table V.—Surcharge Costs
[Dollars in millions]

Category of costs
FY 2002 budgeted costs

1. Activities not attributable to an existing NRC licensee or class of licensee:

a. International activities
$8.4

b. Agreement State oversight
8.7

c. Low-level waste disposal generic activities
1.5

d. Site decommissioning management plan activities not recovered under part 170
8.3

2. Activities not assessed part 170 licensing and inspection fees or part 171 annual fees based on existing law or Commission policy:

a. Fee exemption for nonprofit educational institutions
7.9

b. Licensing and inspection activities associated with other Federal agencies
3.7

c. Costs not recovered from small entities under 10 CFR 171.16(c)
4.5

3. Activities supporting NRC operating licensees and others:

a. Regulatory support to Agreement States
13.0

b. Generic decommissioning/reclamation (except those related to power reactors)
8.3

Total surcharge costs
64.4

Less 4 percent of NRC's FY 2002 total budget (NWF and General Fund amounts)
−20.0

Total Surcharge Costs to be Recovered
44.4

As shown in Table V, $44.4 million would be the total surcharge cost allocated to the various classes of licenses for FY 2002. The NRC would continue to allocate the surcharge costs, except Low-Level Waste (LLW) surcharge costs, to each class of licenses based on the percent of the budget for that class. The NRC would continue to allocate the LLW surcharge costs based on the volume of LLW disposed of by certain classes of licenses. The proposed surcharge costs allocated to each class would be included in the annual fee assessed to each licensee. The FY 2002 proposed surcharge costs that would be allocated to each class of licenses are shown in Table VI. Due to rounding, adding the individual numbers in the table may result in a total that is slightly different than the one shown.

Table VI.—Allocation of Surcharge

LLW surcharge
Percent
$,M
Non-LLW surcharge
Percent
$,M
Total surcharge
$,M

Operating Power Reactors
74
1.1
79.7
34.1
35.3

Spent Fuel Storage/Reactor Decomm.

7.7
3.3
3.3

Nonpower Reactors

0.1
0.0
0.0

Fuel Facilities
8
0.1
5.8
2.5
2.6

Materials Users
18
0.3
4.5
1.9
2.2

Transportation

1.3
0.5
0.5

Rare Earth Facilities

0.2
0.1
0.1

Uranium Recovery

0.9
0.4
0.4

Total Surcharge
100
1.5
100.0
42.9
44.4

The budgeted costs allocated to each class of licenses and the calculations of the rebaselined fees are described in A. through H. below. The workpapers which support this proposed rule show in detail the allocation of NRC's budgeted resources for each class of licenses and how the fees are calculated. The workpapers are available electronically at the NRC's Public Electronic Reading Room on the Internet at Website address
http://www.gov/reading-rm/adams.html.
During the 30-day public comment period, the workpapers may also be examined at the NRC Public Document Room located at One White Flint North, Room O-1F22, 11555 Rockville Pike, Rockville, MD 20852-2738.

Because the FY 2002 fee rule will be a “major” final action as defined by the Small Business Regulatory Enforcement Fairness Act of 1996, the NRC's fees for FY 2002 would become effective 60 days after publication of the final rule in the
Federal Register
. The NRC will send an invoice for the amount of the annual fee upon publication of the FY 2002 final rule to reactors and major fuel cycle facilities. For these licensees, payment would be due on the effective date of the FY 2002 rule. Those materials licensees whose license anniversary date during FY 2002 falls before the effective date of the FY 2002 final rule would be billed for the annual fee during the anniversary month of the license, and continue to pay annual fees at the FY 2001 rate in FY 2002. However, those materials licensees whose license anniversary date falls on or after the effective date of the FY 2002 final rule would be billed for the annual fee at the FY 2002 rate during the anniversary month of the license, and payment would be due on the date of the invoice.

A. Fuel Facilities

The FY 2002 budgeted costs to be recovered in annual fees assessed to the fuel facility class of licenses is approximately $18.8 million. This amount includes the LLW and other surcharges allocated to the fuel facility class. The costs are allocated to the individual fuel facility licensees based on the fuel facility matrix established in the FY 1999 final fee rule (64 FR 31448; June 10, 1999). In this matrix, licensees are grouped into five categories according to their licensed activities (i.e., nuclear material enrichment, processing operations, and material form) and according to the level, scope, depth of coverage, and rigor of generic regulatory programmatic effort applicable to each category from a safety and safeguards perspective. This methodology can be applied to determine fees for new and current licensees, licensees in unique license situations, and certificate holders.

The methodology allows for changes in the number of licensees or certificate holders, licensed-certified material/activities, and total programmatic resources to be recovered through annual fees. When a license or certificate is modified, this fuel facility fee methodology may result in a change in fee category and may have an effect on the fees assessed to other licensees and certificate holders. For example, if a fuel facility licensee amended its license/certificate in such a way that it resulted in the licensee not being subject to part 171 fees applicable to fuel facilities, the budgeted costs included in the annual fee would be spread among the remaining licensees/certificate holders, and result in a higher fee for those remaining in that fee category.

Prior to the beginning of FY 2002, one low enriched uranium fuel facility

permanently ceased licensed operations and filed for an amendment to place its license in a decommissioning status. The proposed annual fees for the fuel facility class reflect this change in the number of licensees subject to annual fees.

The methodology is applied as follows. First, a fee category is assigned based on the nuclear material and activity authorized by the license or certificate. Although a licensee/certificate holder may elect not to fully utilize a license/certificate, it is still used as the basis for determining authorized nuclear material possession and use/activity. Next, the category and license/certificate information are used to determine where the licensee/certificate holder fits into the matrix. The matrix depicts the categorization of licensee/certificate holders by authorized material types and use/activities and the relative programmatic effort associated with each category. The programmatic effort (expressed as a numeric value in the matrix) reflects the safety and safeguards risk significance associated with the nuclear material and use/activity, and the commensurate generic regulatory program (i.e., scope, depth, and rigor).

The effort factors for the various subclasses of fuel facility licenses are summarized in Table VII below.

Table VII.—Effort Factors for Fuel Facilities

Facility type
Number of facilities
Effort factors
Safety
Safeguards

High Enriched Uranium Fuel
2
91 (36.0%)
76 (57.1%)

Enrichment
2
70 (27.7%)
34 (25.6%)

Low Enriched Uranium Fuel
3
66 (26.1%)
18 (13.5%)

UF
6
Conversion

1
12 (4.7%)
0 (0%)

Limited Operations Facility
1
8 (3.2%)
3 (2.3%)

Others
1
6 (2.4%)
2 (1.5%)

Applying these factors to the safety, safeguards, and surcharge components of the $18.8 million total annual fee amount for the fuel facility class results in the proposed annual fees for each licensee within the subcategories of this class summarized in the table below.

Table VIII.—Proposed Annual Fees for Fuel Facilities

Facility type

Proposed FY 2002
annual fee

High Enriched Uranium Fuel
$4,073,000

Uranium Enrichment
2,537,000

Low Enriched Uranium
1,366,000

UF
6
Conversion

585,000

Limited Operations Facility
537,000

Others
390,000

B. Uranium Recovery Facilities

The FY 2002 budgeted costs, including surcharge costs, to be recovered through annual fees assessed to the uranium recovery class is approximately $1.7 million. Based on the following proposed change in the way NRC allocates these costs, approximately $1.0 million of this amount would be assessed to DOE. The remaining $0.7 million would be recovered through annual fees assessed to conventional mills, in-situ leach solution mining facilities, and 11e.(2) mill tailings disposal facilities.

The NRC is proposing to revise its methodology for allocating uranium recovery budgeted costs to be recovered through annual fees among the two major types of programs in the uranium recovery class. The first type is the NRC's Title I program for DOE sites under the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. The second type is the NRC's UMTRCA Title II program; specifically, commercial solution mining facilities, conventional mills, and 11e.(2) mill tailings disposal facilities. Although the Title I program is part of the uranium recovery class, DOE is not currently assessed a portion of the NRC budgeted costs attributed to generic/other activities for the uranium recovery program. As a consequence, licensees under the NRC's specific licensing program (UMTRCA Title II) bear the entire cost of these activities.

In recognizing that the uranium recovery class is comprised of two types of licensees falling under either the NRC's Title I or Title II program, the Commission determined that it was appropriate to divide the generic and other costs included in the uranium recovery annual fee evenly among the two programs. Furthermore, DOE stands to gain from NRC's generic regulatory efforts because DOE eventually will also accept the Title II specifically licensed sites under a general license from the NRC for long term surveillance and care.

Therefore, the proposed methodology would allocate the total annual fee amount, less the amounts specifically budgeted for Title I activities, equally between Title I and Title II licensees. This would result in an annual fee being assessed to DOE to recover the costs specifically budgeted for NRC's Title I activities plus 50 percent of the remaining annual fee amount, including the surcharge, for the uranium recovery class. The remaining surcharge, generic, and other costs would be assessed to the NRC Title II program licensees that are subject to annual fees. Thus, the costs to be recovered through annual fees assessed to the uranium recovery class are shown below. Due to rounding, adding the individual numbers in the table may result in a total that is slightly different than the one shown.

DOE Annual Fee Amount (UMTRCA Title I and Title II general licenses):

UMTRCA Title I budgeted costs
$377,232

50% of generic/other uranium recovery budgeted costs
489,259

50% of uranium recovery surcharge
189,509

Total Annual Fee Amount for DOE
1,056,000

Annual Fee Amount for UMTRCA Title II Specific Licenses:

50% of generic/other uranium recovery budgeted costs
489,259

50% of uranium recovery surcharge
189,509

Total Annual Fee Amount for Title II Specific Licenses
678,768

The costs allocated to the various categories of Title II specific licensees are based on the uranium recovery matrix established in the FY 1999 final fee rule (64 FR 31448; June 10, 1999). The methodology for establishing part 171 annual fees for Title II uranium recovery licensees has not changed and is as follows:

(1) The methodology identifies three categories of licenses: conventional uranium mills (Class I facilities), uranium solution mining facilities (Class II facilities), and mill tailings disposal facilities (11e.(2) disposal facilities). Each of these categories benefits from the generic uranium recovery program efforts (e.g., rulemakings, staff guidance documents);

(2) The matrix relates the category and the level of benefit by program element and subelement;

(3) The two major program elements of the generic uranium recovery program are activities related to facility operations and those related to facility closure;

(4) Each of the major program elements was further divided into three subelements;

(5) The three major subelements of generic activities associated with uranium facility operations are regulatory efforts related to the operation of mills, handling and disposal of waste, and prevention of groundwater contamination. The three major subelements of generic activities associated with uranium facility closure are regulatory efforts related to decommissioning of facilities and land clean-up, reclamation and closure of tailings impoundments, and groundwater clean-up. Weighted values were assigned to each program element and subelement considering health and safety implications and the associated effort to regulate these activities. The applicability of the generic program in each subelement to each uranium recovery category was qualitatively estimated as either significant, some, minor, or none.

The relative weighted factors per facility type for the various subclasses of specifically licensed Title II uranium recovery licensees are as follows:

Table IX.—Weighted Factors for Uranium Recovery Licenses

Facility type
Level of benefit
Number of facilities
Category weight
Total weight
Value
Percent

Class I (conventional mills)
3
770
2,310
34

Class II (solution mining)
6
645
3,870
58

11e.(2) disposal
1
475
475
7

11e.(2) disposal incident to existing tailings sites
1
75
75
1

Applying these factors to the $0.7 million in budgeted costs to be recovered from Title II specific licensees results in the following proposed annual fees:

Table X.—Annual Fees for Title II Specific Licenses

Facility type
Proposed FY 2002 annual fee

Class I (conventional mills)
$77,700

Class II (solution mining)
65,100

11e.(2) disposal
47,900

11e.(2) disposal incidental to existing tailings sites
7,600

In the FY 2001 final rule (66 FR 32478), the NRC revised § 171.19 to establish a quarterly billing schedule for the Class I and Class II licensees, regardless of the annual fee amount. Therefore, as provided in § 171.19(b), if the amounts collected in the first three quarters of FY 2002 exceed the amount of the revised annual fee, the overpayment will be refunded. The remaining categories of Title II facilities are subject to billing based on the anniversary date of the license as provided in § 171.19(c).

C. Power Reactors

The approximately $273.6 million in budgeted costs to be recovered through FY 2002 annual fees assessed to the power reactor class would be divided equally among the 104 power reactors licensed to operate. This results in a proposed FY 2002 annual fee of $2,630,000 per reactor. Additionally, each power reactor licensed to operate would be assessed the proposed FY 2002 spent fuel storage/reactor decommissioning annual fee of $239,000. This would result in a total FY 2002 annual fee of $2,869,000 for each power reactor licensed to operate.

D. Spent Fuel Storage/Reactor Decommissioning

For FY 2002, budgeted costs of approximately $28.9 million for spent fuel storage/reactor decommissioning are to be recovered through annual fees assessed to part 50 power reactors, and to part 72 licensees who do not hold a part 50 license. Those reactor licensees that have ceased operations and have no fuel onsite are not subject to these annual fees. The costs would be divided equally among the 121 licensees, resulting in a proposed FY 2002 annual fee of $239,000 per licensee.

E. Non-Power Reactors

Approximately $285,200 in budgeted costs is to be recovered through annual fees assessed to the non-power reactor class of licenses for FY 2002. This amount would be divided equally among the four non-power reactors subject to annual fees. This results in a proposed FY 2002 annual fee of $71,300 for each licensee.

F. Rare Earth Facilities

The FY 2002 budgeted costs of approximately $205,300 for rare earth facilities to be recovered through annual fees would be divided equally among the three licensees who have a specific license for receipt and processing of source material. The result is a proposed FY 2002 annual fee of $68,400 for each rare earth facility.

As explained previously, the increase in annual fees for the rare earth class is not the result of increased budgeted costs for the class, but rather the result of the change in NMSS's revised PM policy, which resulted in a shift of cost recovery for certain activities from part 170 to part 171.

G. Materials Users

To equitably and fairly allocate the $25.1 million in FY 2002 budgeted costs to be recovered in annual fees assessed to the approximately 5,000 diverse materials users and registrants, the NRC has continued to use the FY 1999 methodology to establish baseline annual fees for this class. The annual fees are based on the part 170 application fees and an estimated cost for inspections. Because the application fees and inspection costs are indicative of the complexity of the license, this approach continues to provide a proxy for allocating the generic and other regulatory costs to the diverse categories of licenses based on how much it costs the NRC to regulate each category. The fee calculation also continues to consider the inspection frequency (priority), which is indicative of the safety risk and resulting regulatory costs associated with the categories of licenses. The annual fee for these categories of licenses is developed as follows:

Annual fee = Constant × [Application Fee + (Average Inspection Cost divided by Inspection Priority)]+ Inspection Multiplier × (Average Inspection Cost divided by Inspection Priority) + Unique Category Costs.

The constant is the multiple necessary to recover approximately $17.5 million in general costs and is 1.07 for FY 2002. The inspection multiplier is the multiple necessary to recover approximately $5.3 million in inspection costs for FY 2002, and is 1.1 for FY 2002. The unique category costs are any special costs that the NRC has budgeted for a specific category of licenses. For FY 2002, of the unique costs attributable to medical licensees for the medical development program, approximately $126,900 would be allocated to NRC medical licensees.

The annual fee assessed to each licensee also includes a share of the $1.9 million in surcharge costs allocated to the materials user class of licenses and, for certain categories of these licenses, a share of the approximately $300,000 in LLW surcharge costs allocated to the class. The proposed annual fee for each fee category is shown in § 171.16(d).

H. Transportation

Of the approximately $4.8 million in FY 2002 budgeted costs to be recovered through annual fees assessed to the transportation class of licenses, approximately $1.4 million would be recovered from annual fees assessed to DOE based on the number of part 71 Certificates of Compliance that it holds. Of the remaining $3.4 million, approximately 25 percent would be allocated to the 77 quality assurance plans authorizing use only and the 39 quality assurance plans authorizing use and design/fabrication. The remaining 75 percent would be allocated only to the 39 quality assurance plans authorizing use and design/fabrication. This results in a proposed annual fee of $7,300 for each of the holders of quality assurance plans that authorize use only, and a proposed annual fee of $72,800 for each of the holders of quality assurance plans that authorize use and design/fabrication.

2. Part 52 Combined Licenses

The NRC proposes revising part 171 to: authorize assessment of annual fees for holders of combined licenses issued under part 52; clarify that the annual fees would be assessed for each license, and not for each unit; and establish when assessment of annual fees would begin.

Part 171 currently covers annual fees for part 50 licenses, but does not specifically cover annual fees for combined licenses issued under part 52. Additionally, neither part 52 nor part 171 addresses when NRC would begin to assess an annual fee to a part 52 license holder. The NRC proposes to revise § 171.3 “Scope” to specify that the annual fee regulations also apply to any person holding a combined license issued under part 52.

The annual fees for a part 52 combined license would be assessed only after construction has been completed, all regulatory requirements have been met, and the Commission has authorized operation of the reactor(s). This approach is consistent with the Commission's policy of not imposing annual fees on those entities only holding a power reactor construction permit.

Currently, § 171.15(a) provides that reactor licensees shall pay an annual fee “* * * for each unit for each license held * * *”. It is the agency's present practice to charge annual fees per license, and the NRC is proposing to revise § 171.15(a) to clarify that the annual fees are assessed for each license, and not for each unit.

At this time, the NRC is not proposing a specific annual fee category or amount for part 52 combined licenses because there are no existing combined licenses issued under part 52. However, the NRC is proposing these changes so potential applicants for a part 52 combined license are aware that such a license will be subject to annual fees in the future.

3. Fee Exemption for Reactors in 10 CFR 171.11

The NRC is modifying § 171.11(c) to clarify that the annual fee exemption provision applies only to “operating” reactors. This change is consistent with the statement of considerations in the 1986 final fee rule (51 FR 33224; September 18, 1986), which added this specific fee exemption to the regulation. Therein the Commission stated it had considered calculating the annual fee for power reactors with “operating” licenses based on the thermal megawatt ratings of those reactors. However, the Commission decided against determining its fees based on the size of the reactor because the NRC found no necessary relationship between the thermal megawatt rating of a reactor and the agency's regulatory costs. Nevertheless, the NRC stated because it was not the Commission's intent to promulgate a fee schedule that would

have the effect of forcing smaller, older reactors to shut down, it was adding an annual fee exemption provision in § 171.11 which takes reactor size, age, and other relevant factors into consideration. In the section-by-section analysis for § 171.11, the NRC stated that the added exemption section “* * * provides that the holder of a license to ‘operate’ a power reactor * * * may apply to the Commission for partial relief from annual fee[s].”

In the FY 1999 final fee rule (64 FR 31448; June 10, 1999), the NRC established the Spent Fuel Storage/Reactor Decommissioning (SFSRD) class with an annual fee to be assessed to all reactor licensees having fuel onsite, regardless of their operating status. In the statement of considerations for the FY 1999 fee rule, the NRC stated that the Commission determined all reactors, including those which are shut down, should pay the SFSRD annual fee to recover the NRC's costs related to generic reactor decommissioning and spent fuel storage activities. It is clear from the statement of considerations that the Commission did not intend to relieve reactors that are not operating from the annual fee requirements unless they had permanently ceased operations and had no fuel onsite.

The Commission reemphasizes that all communications concerning annual fees, including exemption requests, should be addressed to the Chief Financial Officer, U.S. NRC, Washington DC 20555-0001 in accordance with § 171.9.

4. Administrative Amendment

The NRC is proposing to modify Category 1.B. of § 171.16(d) to specifically include licenses issued under part 72 for the reactor-related GTCC waste. This is an administrative change that would be made only to ensure consistency with the proposed description for fee category 1.B. of § 170.31 as described in A. above. The NRC is not proposing an annual fee for this category of license.

In summary, the NRC is proposing to—

1. Establish rebaselined annual fees for FY 2002;

2. Modify part 171 to specifically authorize assessment of annual fees to part 52 combined licenses;

3. Clarify that the annual fee exemption provision in § 171.11(c) applies only to “operating” reactors;

4. Make an administrative change to fee category 1.B. of § 171.16(d) to be consistent with the proposed change to category 1.B. of § 170.31.

III. Plain Language

The Presidential Memorandum dated June 1, 1998, entitled, “Plain Language in Government Writing,” directed that the Federal government's writing be in plain language (63 FR 31883; June 10, 1998). The NRC requests comments on this proposed rule specifically with respect to the clarity and effectiveness of the language used. Comments on the language used should be sent to the NRC as indicated under the
ADDRESSES
heading.

IV. Voluntary Consensus Standards

The National Technology Transfer and Advancement Act of 1995, Pub. L. 104-113, requires that Federal agencies use technical standards that are developed or adopted by voluntary consensus standards bodies unless using such a standard is inconsistent with applicable law or is otherwise impractical. In this proposed rule, the NRC is amending the licensing, inspection, and annual fees charged to its licensees and applicants as necessary to recover approximately 96 percent of its budget authority in FY 2002 as is required by the Omnibus Budget Reconciliation Act of 1990, as amended. This action does not constitute the establishment of a standard that contains generally applicable requirements.

V. Environmental Impact: Categorical Exclusion

The NRC has determined that this proposed rule is the type of action described in categorical exclusion 10 CFR 51.22(c)(1). Therefore, neither an environmental assessment nor an environmental impact statement has been prepared for the proposed regulation. By its very nature, this regulatory action does not affect the environment and, therefore, no environmental justice issues are raised.

VI. Paperwork Reduction Act Statement

This proposed rule does not contain information collection requirements and, therefore, is not subject to the requirements of the Paperwork Reduction Act of 1995 (44 U.S.C. 3501
et seq.
).

VII. Regulatory Analysis

With respect to 10 CFR Part 170, this proposed rule was developed pursuant to Title V of the Independent Offices Appropriation Act of 1952 (IOAA) (31 U.S.C. 9701) and the Commission's fee guidelines. When developing these guidelines the Commission took into account guidance provided by the U.S. Supreme Court on March 4, 1974, in
National Cable Television Association, Inc
. v.
United States,
415 U.S. 36 (1974) and
Federal Power Commission
v.
New England Power Company,
415 U.S. 345 (1974). In these decisions, the Court held that the IOAA authorizes an agency to charge fees for special benefits rendered to identifiable persons measured by the “value to the recipient” of the agency service. The meaning of the IOAA was further clarified on December 16, 1976, by four decisions of the U.S. Court of Appeals for the District of Columbia:
National Cable Television Association
v.
Federal Communications Commission,
554 F.2d 1094 (D.C. Cir. 1976);
National Association of Broadcasters
v.
Federal Communications Commission,
554 F.2d 1118 (D.C. Cir. 1976);
Electronic Industries Association
v.
Federal Communications Commission,
554 F.2d 1109 (D.C. Cir. 1976); and
Capital Cities Communication, Inc.
v.
Federal Communications Commission,
554 F.2d 1135 (D.C. Cir. 1976). The Commission's fee guidelines were developed based on these legal decisions.

The Commission's fee guidelines were upheld on August 24, 1979, by the U.S. Court of Appeals for the Fifth Circuit in
Mississippi Power and Light Co.
v.
U.S. Nuclear Regulatory Commission,
601 F.2d 223 (5th Cir. 1979),
cert. denied,
444 U.S. 1102 (1980). This court held that—

(1) The NRC had the authority to recover the full cost of providing services to identifiable beneficiaries;

(2) The NRC could properly assess a fee for the costs of providing routine inspections necessary to ensure a licensee's compliance with the Atomic Energy Act and with applicable regulations;

(3) The NRC could charge for costs incurred in conducting environmental reviews required by NEPA;

(4) The NRC properly included the costs of uncontested hearings and of administrative and technical support services in the fee schedule;

(5) The NRC could assess a fee for renewing a license to operate a low-level radioactive waste burial site; and

(6) The NRC's fees were not arbitrary or capricious.

With respect to 10 CFR Part 171, on November 5, 1990, the Congress passed Pub. L. 101-508, the Omnibus Budget Reconciliation Act of 1990 (OBRA-90), which required that, for FYs 1991 through 1995, approximately 100 percent of the NRC budget authority be recovered through the assessment of fees. OBRA-90 was subsequently amended to extend the 100 percent fee recovery requirement through FY 2000. The FY 2001 Energy and Water

Development Appropriations Act amended OBRA-90 to decrease the NRC's fee recovery amount by 2 percent per year beginning in FY 2001, until the fee recovery amount is 90 percent in FY 2005. The NRC's fee recovery amount for FY 2002 is 96 percent. To comply with this statutory requirement and in accordance with § 171.13, the NRC is publishing the proposed amount of the FY 2002 annual fees for reactor licensees, fuel cycle licensees, materials licensees, and holders of Certificates of Compliance, registrations of sealed source and devices and QA program approvals, and Government agencies. OBRA-90, consistent with the accompanying Conference Committee Report, and the amendments to OBRA-90, provides that—

(1) The annual fees be based on approximately 96 percent of the Commission's FY 2002 budget of $559.1 million less the amounts collected from part 170 fees and funds directly appropriated from the NWF to cover the NRC's high level waste program;

(2) The annual fees shall, to the maximum extent practicable, have a reasonable relationship to the cost of regulatory services provided by the Commission; and

(3) The annual fees be assessed to those licensees the Commission, in its discretion, determines can fairly, equitably, and practicably contribute to their payment.

In addition, $36.0 million has been appropriated from the General Fund for activities related to homeland security. The FY 2002 Defense Appropriations Act states that this $36.0 million shall be excluded from license fee revenues.

10 CFR part 171, which established annual fees for operating power reactors effective October 20, 1986 (51 FR 33224; September 18, 1986), was challenged and upheld in its entirety in
Florida Power and Light Company
v.
United States,
846 F.2d 765 (D.C. Cir. 1988),
cert. denied,
490 U.S. 1045 (1989). Further, the NRC's FY 1991 annual fee rule methodology was upheld by the D.C. Circuit Court of Appeals in
Allied Signal
v.
NRC,
988 F.2d 146 (D.C. Cir. 1993).

VIII. Regulatory Flexibility Analysis

The NRC is required by the Omnibus Budget Reconciliation Act of 1990, as amended, to recover approximately 96 percent of its FY 2002 budget authority through the assessment of user fees. This act further requires that the NRC establish a schedule of charges that fairly and equitably allocates the aggregate amount of these charges among licensees.

This proposed rule would establish the schedules of fees that are necessary to implement the Congressional mandate for FY 2002. The proposed rule would result in increases in the annual fees charged to certain licensees and holders of certificates, registrations, and approvals, and decreases in annual fees for others, including those that qualify as a small entity under NRC's size standards in 10 CFR 2.810. The Regulatory Flexibility Analysis, prepared in accordance with 5 U.S.C. 604, is included as Appendix A to this proposed rule.

The Small Business Regulatory Enforcement Fairness Act of 1996 (SBREFA) was signed into law on March 29, 1996. The SBREFA requires all Federal agencies to prepare a written compliance guide for each rule for which the agency is required by 5 U.S.C. 604 to prepare a regulatory flexibility analysis. Therefore, in compliance with the law, Attachment 1 to the Regulatory Flexibility Analysis is the small entity compliance guide for FY 2002.

IX. Backfit Analysis

The NRC has determined that the backfit rule, 10 CFR 50.109, does not apply to this proposed rule and that a backfit analysis is not required for this proposed rule. The backfit analysis is not required because these proposed amendments do not require the modification of or additions to systems, structures, components, or the design of a facility or the design approval or manufacturing license for a facility or the procedures or organization required to design, construct, or operate a facility.

List of Subjects

10 CFR Part 170
Byproduct material, Import and export licenses, Intergovernmental relations, Non-payment penalties, Nuclear materials, Nuclear power plants and reactors, Source material, Special nuclear material.

10 CFR Part 171
Annual charges, Byproduct material, Holders of certificates, Registrations, Approvals, Intergovernmental relations, Non-payment penalties, Nuclear materials, Nuclear power plants and reactors, Source material, Special nuclear material.

For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; and 5 U.S.C. 553, the NRC is proposing to adopt the following amendments to 10 CFR parts 170 and 171.

PART 170—FEES FOR FACILITIES, MATERIALS, IMPORT AND EXPORT LICENSES, AND OTHER REGULATORY SERVICES UNDER THE ATOMIC ENERGY ACT OF 1954, AS AMENDED

1. The authority citation for part 170 continues to read as follows:

Authority:

Sec. 9701, Pub. L. 97-258, 96 Stat. 1051 (31 U.S.C. 9701); sec. 301, Pub. L. 92-314, 86 Stat. 227 (42 U.S.C. 2201w); sec. 201, Pub. L. 93-438, 88 Stat. 1242, as amended (42 U.S.C. 5841); sec. 205a, Pub. L. 101-576, 104 Stat. 2842, as amended (31 U.S.C. 901, 902).

2. Section 170.3 is amended by revising the definition of
Special projects
and adding, in alphabetical order, the definition for
Greater than Class C Waste
or
GTCC Waste
to read as follows:

§ 170.3
Definitions.

Greater than Class C Waste
or
GTCC Waste
means low-level radioactive waste that exceeds the concentration limits of radionuclides established for Class C waste in 10 CFR 61.55.

Special projects
means those requests submitted to the Commission for review for which fees are not otherwise specified in this chapter. Examples of special projects include, but are not limited to, topical report reviews, early site reviews, waste solidification facilities, route approvals for shipment of radioactive materials, services provided to certify licensee, vendor, or other private industry personnel as instructors for part 55 reactor operators, reviews of financial assurance submittals that do not require a license amendment, reviews of responses to Confirmatory Action Letters, reviews of uranium recovery licensees' land-use survey reports, and reviews of 10 CFR 50.71 final safety analysis reports.

3. In § 170.11, paragraph (a)(1) is added to read as follows:

§ 170.11
Exemptions.
(a) * * *

(1) A special project that is a request/report submitted to the NRC—

(i) In response to a Generic Letter or NRC Bulletin that does not result in an amendment to the license, does not result in the review of an alternate method or reanalysis to meet the requirements of the Generic Letter, or does not involve an unreviewed safety issue;

(ii) In response to an NRC request (at the Associate Office Director level or above) to resolve an identified safety, safeguards, or environmental issue, or to assist NRC in developing a rule, regulatory guide, policy statement, generic letter, or bulletin; or

(iii) As a means of exchanging information between industry organizations and the NRC for the specific purpose of supporting the NRC's generic regulatory improvements or efforts.

(A) This fee exemption applies only when:

(
1
) It has been demonstrated that the report/request has been submitted to the NRC specifically for the purpose of supporting NRC's development of generic guidance and regulations (e.g., rules, regulations, guides and policy statements); and

(
2
) The NRC, at the time the document is submitted, plans to use it for one of the purposes given in paragraph (a)(1)(iii)(A)(
1
) of this section. In this case, the exemption applies even if ultimately the NRC does not use the document as planned.

(B) An example of the type of document that meets the fee exemption criteria is a topical report that is submitted to the NRC for the specific purpose of supporting the NRC's development of a Regulatory Guide, and which the NRC plans to use in the development of that Regulatory Guide.

(C) Fees will not be waived for reports/requests that are not submitted specifically for the purpose of supporting the NRC's generic regulatory improvements or efforts, because the primary beneficiary of the NRC's review and approval of such documents is the requesting organization. In this case, the waiver provision does not apply even though the NRC may realize some benefits from its review and approval of the document.

(D) An example of the type of document that does not meet the fee waiver criteria is a topical report submitted for the purpose of obtaining NRC approval so that the report can be used by the industry in the future to address licensing or safety issues.

4. Section 170.20 is revised to read as follows:

§ 170.20
Average cost per professional staff-hour.
Fees for permits, licenses, amendments, renewals, special projects, part 55 re-qualification and replacement examinations and tests, other required reviews, approvals, and inspections under §§ 170.21 and 170.31 will be calculated using the following applicable professional staff-hour rates:

(a) Reactor Program (§ 170.21 Activities)—$156 per hour

(b) Nuclear Materials and Nuclear Waste Program (§ 170.31 Activities)—$152 per hour

5. In § 170.21, the introductory text and, in the table, Category J, Category K, and footnotes 1, 2, and 3 are revised and footnote 4 is removed to read as follows:

§ 170.21
Schedule of fees for production and utilization facilities, review of standard referenced design approvals, special projects, inspections and import and export licenses.
Applicants for construction permits, manufacturing licenses, operating licenses, import and export licenses, approvals of facility standard reference designs, re-qualification and replacement examinations for reactor operators, and special projects and holders of construction permits, licenses, and other approvals shall pay fees for the following categories of services:

Schedule of Facility Fees
[See footnotes at end of table]

Facility categories and type of fees

Fees
1

2

*         *         *         *         *         *         *

J. Special projects:

Approvals and preapplication/licensing activities
Full Cost.

Inspections
3

Full Cost.

K. Import and export licenses: Licenses for the import and export only of production and utilization facilities or the export only of components for production and utilization facilities issued under 10 CFR part 110.

1. Application for import or export of reactors and other facilities and exports of components which must be reviewed by the Commissioners and the Executive Branch, for example, actions under 10 CFR 110.40(b).

Application-new license
$9,900.

Amendment
$9,900.

2. Application for export of reactor and other components requiring Executive Branch review only, for example, those actions under 10 CFR 110.41(a)(1)-(8).

Application-new license
5,800.

Amendment
5,800.

3. Application for export of components requiring foreign government assurances only.

Application-new license
1,800.

Amendment
1,800.

4. Application for export of facility components and equipment not requiring Commissioner review, Executive Branch review, or foreign government assurances.

Application-new license
1,200.

Amendment
1,200.

5. Minor amendment of any export or import license to extend the expiration date, change domestic information, or make other revisions which do not require in-depth analysis or review.

Amendment
230.

1
Fees will not be charged for orders issued by the Commission under § 2.202 of this chapter or for amendments resulting specifically from the requirements of these types of Commission orders. Fees will be charged for approvals issued under a specific exemption provision of the Commission's regulations under Title 10 of the Code of Federal Regulations (e.g., 10 CFR 50.12, 73.5) and any other sections in effect now or in the future, regardless of whether the approval is in the form of a license amendment, letter of approval, safety evaluation report, or other form. Fees for licenses in this schedule that are initially issued for less than full power are based on review through the issuance of a full power license (generally full power is considered 100 percent of the facility's full rated power). Thus, if a licensee received a low power license or a temporary license for less than full power and subsequently receives full power authority (by way of license amendment or otherwise), the total costs for the license will be determined through that period when authority is granted for full power operation. If a situation arises in which the Commission determines that full operating power for a particular facility should be less than 100 percent of full rated power, the total costs for the license will be at that determined lower operating power level and not at the 100 percent capacity.

2
Full cost fees will be determined based on the professional staff time and appropriate contractual support services expended. For applications currently on file and for which fees are determined based on the full cost expended for the review, the professional staff hours expended for the review of the application up to the effective date of the final rule will be determined at the professional rates in effect at the time the service was provided. For those applications currently on file for which review costs have reached an applicable fee ceiling established by the June 20, 1984, and July 2, 1990, rules but are still pending completion of the review, the cost incurred after any applicable ceiling was reached through January 29, 1989, will not be billed to the applicant. Any professional staff-hours expended above those ceilings on or after January 30, 1989, will be assessed at the applicable rates established by § 170.20, as appropriate, except for topical reports whose costs exceed $50,000. Costs which exceed $50,000 for any topical report, amendment, revision or supplement to a topical report completed or under review from January 30, 1989, through August 8, 1991, will not be billed to the applicant. Any professional hours expended on or after August 9, 1991, will be assessed at the applicable rate established in § 170.20.

3
Inspections covered by this schedule are both routine and non-routine safety and safeguards inspections performed by NRC for the purpose of review or follow-up of a licensed program. Inspections are performed through the full term of the license to ensure that the authorized activities are being conducted in accordance with the Atomic Energy Act of 1954, as amended, other legislation, Commission regulations or orders, and the terms and conditions of the license. Non-routine inspections that result from third-party allegations will not be subject to fees.

6. Section 170.31 is revised to read as follows:

§ 170.31
Schedule of fees for materials licenses and other regulatory services, including inspections, and import and export licenses.
Applicants for materials licenses, import and export licenses, and other regulatory services, and holders of materials licenses or import and export licenses shall pay fees for the following categories of services. The following schedule includes fees for health and safety and safeguards inspections where applicable:

Schedule of Materials Fees
[See footnotes at end of table]

Category of materials licenses and type of fees
1

Fees
2 3

1. Special nuclear material:

A. Licenses for possession and use of 200 grams or more of plutonium in unsealed form or 350 grams or more of contained U-235 in unsealed form or 200 grams or more of U-233 in unsealed form. This includes applications to terminate licenses as well as licenses authorizing possession only:

Licensing and Inspection
Full Cost.

B. Licenses for receipt and storage of spent fuel and reactor-related Greater than Class C (GTCC) waste at an independent spent fuel storage installation (ISFSI):

Licensing and inspection
Full Cost.

C. Licenses for possession and use of special nuclear material in sealed sources contained in devices used in industrial measuring systems, including x-ray fluorescence analyzers:
4

Application
$700.

D. All other special nuclear material licenses, except licenses authorizing special nuclear material in unsealed form in combination that would constitute a critical quantity, as defined in § 150.11 of this chapter, for which the licensee shall pay the same fees as those for Category 1A:
4

Application
$1,400.

E. Licenses or certificates for construction and operation of a uranium enrichment facility:

Licensing and inspection
Full Cost.

2. Source material:

A.(1) Licenses for possession and use of source material in recovery operations such as milling, in-situ leaching, heap-leaching, refining uranium mill concentrates to uranium hexafluoride, ore buying stations, and ion exchange facilities, and in processing of ores containing source material for extraction of metals other than uranium or thorium, including licenses authorizing the possession of byproduct waste material (tailings) from source material recovery operations, as well as licenses authorizing the possession and maintenance of a facility in a standby mode:

Licensing and inspection
Full Cost.

(2) Licenses that authorize the receipt of byproduct material, as defined in Section 11e(2) of the Atomic Energy Act, from other persons for possession and disposal except those licenses subject to fees in Category 2A(1):

Licensing and inspection
Full Cost.

(3) Licenses that authorize the receipt of byproduct material, as defined in Section 11e.(2) of the Atomic Energy Act, from other persons for possession and disposal incidental to the disposal of the uranium waste tailings generated by the licensee's milling operations, except those licenses subject to the fees in Category 2A(1):

Licensing and inspection
Full Cost.

B. Licenses which authorize the possession, use, and/or installation of source material for shielding:

Application
$170.

C. All other source material licenses:

Application
$6,000.

3. Byproduct material:

A. Licenses of broad scope for the possession and use of byproduct material issued under parts 30 and 33 of this chapter for processing or manufacturing of items containing byproduct material for commercial distribution:

Application
$7,100.

B. Other licenses for possession and use of byproduct material issued under part 30 of this chapter for processing or manufacturing of items containing byproduct material for commercial distribution:

Application
$2,300.

C. Licenses issued under §§ 32.72, 32.73, and/or 32.74 of this chapter that authorize the processing or manufacturing and distribution or redistribution of radiopharmaceuticals, generators, reagent kits, and/or sources and devices containing byproduct material. This category does not apply to licenses issued to nonprofit educational institutions whose processing or manufacturing is exempt under § 170.11(a)(4). These licenses are covered by fee Category 3D.

Application
$9,200.

D. Licenses and approvals issued under §§ 32.72, 32.73, and/or 32.74 of this chapter authorizing distribution or redistribution of radiopharmaceuticals, generators, reagent kits, and/or sources or devices not involving processing of byproduct material. This category includes licenses issued under §§ 32.72, 32.73, and/or 32.74 of this chapter to nonprofit educational institutions whose processing or manufacturing is exempt under § 170.11(a)(4).

Application
$2,600.

E. Licenses for possession and use of byproduct material in sealed sources for irradiation of materials in which the source is not removed from its shield (self-shielded units):

Application
$1,800.

F. Licenses for possession and use of less than 10,000 curies of byproduct material in sealed sources for irradiation of materials in which the source is exposed for irradiation purposes. This category also includes underwater irradiators for irradiation of materials where the source is not exposed for irradiation purposes.

Application
$3,600.

G. Licenses for possession and use of 10,000 curies or more of byproduct material in sealed sources for irradiation of materials in which the source is exposed for irradiation purposes. This category also includes underwater irradiators for irradiation of materials where the source is not exposed for irradiation purposes.

Application
$8,500.

H. Licenses issued under Subpart A of part 32 of this chapter to distribute items containing byproduct material that require device review to persons exempt from the licensing requirements of part 30 of this chapter. The category does not include specific licenses authorizing redistribution of items that have been authorized for distribution to persons exempt from the licensing requirements of part 30 of this chapter:

Application
$2,400.

I. Licenses issued under Subpart A of part 32 of this chapter to distribute items containing byproduct material or quantities of byproduct material that do not require device evaluation to persons exempt from the licensing requirements of part 30 of this chapter. This category does not include specific licenses authorizing redistribution of items that have been authorized for distribution to persons exempt from the licensing requirements of part 30 of this chapter:

Application
$3,600.

J. Licenses issued under Subpart B of part 32 of this chapter to distribute items containing byproduct material that require sealed source and/or device review to persons generally licensed under part 31 of this chapter. This category does not include specific licenses authorizing redistribution of items that have been authorized for distribution to persons generally licensed under part 31 of this chapter:

Application
$1,100.

K. Licenses issued under Subpart B of part 32 of this chapter to distribute items containing byproduct material or quantities of byproduct material that do not require sealed source and/or device review to persons generally licensed under part 31 of this chapter. This category does not include specific licenses authorizing redistribution of items that have been authorized for distribution to persons generally licensed under part 31 of this chapter:

Application
$620.

L. Licenses of broad scope for possession and use of byproduct material issued under parts 30 and 33 of this chapter for research and development that do not authorize commercial distribution:

Application
$6,000.

M. Other licenses for possession and use of byproduct material issued under part 30 of this chapter for research and development that do not authorize commercial distribution:

Application
$2,600.

N. Licenses that authorize services for other licensees, except:

(1) Licenses that authorize only calibration and/or leak testing services are subject to the fees specified in fee Category 3P; and

(2) Licenses that authorize waste disposal services are subject to the fees specified in fee Categories 4A, 4B, and 4C:

Application
$2,700.

O. Licenses for possession and use of byproduct material issued under part 34 of this chapter for industrial radiography operations:

Registration
$4,400.

P. All other specific byproduct material licenses, except those in Categories 4A through 9D:

Application
$1,400.

Q. Registration of a device(s) generally licensed under part 31 of this chapter:

Application
$450.

4. Waste disposal and processing:

A. Licenses specifically authorizing the receipt of waste byproduct material, source material, or special nuclear material from other persons for the purpose of contingency storage or commercial land disposal by the licensee; or licenses authorizing contingency storage of low-level radioactive waste at the site of nuclear power reactors; or licenses for receipt of waste from other persons for incineration or other treatment, packaging of resulting waste and residues, and transfer of packages to another person authorized to receive or dispose of waste material:

Licensing and inspection
Full Cost.

B. Licenses specifically authorizing the receipt of waste byproduct material, source material, or special nuclear material from other persons for the purpose of packaging or repackaging the material. The licensee will dispose of the material by transfer to another person authorized to receive or dispose of the material:

Application
$1,800.

C. Licenses specifically authorizing the receipt of prepackaged waste byproduct material, source material, or special nuclear material from other persons. The licensee will dispose of the material by transfer to another person authorized to receive or dispose of the material:

Application
$2,700.

5. Well logging:

A. Licenses for possession and use of byproduct material, source material, and/or special nuclear material for well logging, well surveys, and tracer studies other than field flooding tracer studies:

Application
$5,900.

B. Licenses for possession and use of byproduct material for field flooding tracer studies:

Licensing
Full Cost.

6. Nuclear laundries:

A. Licenses for commercial collection and laundry of items contaminated with byproduct material, source material, or special nuclear material:

Application
$12,100.

7. Medical licenses:

A. Licenses issued under parts 30, 35, 40, and 70 of this chapter for human use of byproduct material, source material, or special nuclear material in sealed sources contained in teletherapy devices:

Application
$6,600.

B. Licenses of broad scope issued to medical institutions or two or more physicians under parts 30, 33, 35, 40, and 70 of this chapter authorizing research and development, including human use of byproduct material, except licenses for byproduct material, source material, or special nuclear material in sealed sources contained in teletherapy devices:

Application
$4,700.

C. Other licenses issued under parts 30, 35, 40, and 70 of this chapter for human use of byproduct material, source material, and/or special nuclear material, except licenses for byproduct material, source material, or special nuclear material in sealed sources contained in teletherapy devices:

Application
$2,300.

8. Civil defense:

A. Licenses for possession and use of byproduct material, source material, or special nuclear material for civil defense activities:

Application
$350.

9. Device, product, or sealed source safety evaluation:

A. Safety evaluation of devices or products containing byproduct material, source material, or special nuclear material, except reactor fuel devices, for commercial distribution:

Application—each device
$5,600.

B. Safety evaluation of devices or products containing byproduct material, source material, or special nuclear material manufactured in accordance with the unique specifications of, and for use by, a single applicant, except reactor fuel devices:

Application—each device
$5,600.

C. Safety evaluation of sealed sources containing byproduct material, source material, or special nuclear material, except reactor fuel, for commercial distribution:

Application—each source
$1,700.

D. Safety evaluation of sealed sources containing byproduct material, source material, or special nuclear material, manufactured in accordance with the unique specifications of, and for use by, a single applicant, except reactor fuel:

Application—each source
$580.

10. Transportation of radioactive material:

A. Evaluation of casks, packages, and shipping containers:

Licensing and inspections
Full Cost.

B. Evaluation of 10 CFR Part 71 quality assurance programs:

Application
$680.

Inspections
Full Cost.

11. Review of standardized spent fuel facilities:

Licensing and inspection
Full Cost.

12. Special projects:

Approvals and preapplication/Licensing activities
Full Cost.

Inspections
Full Cost.

13. A. Spent fuel storage cask Certificate of Compliance:

Licensing
Full Cost.

B. Inspections related to spent fuel storage cask Certificate of Compliance
Full Cost.

C. Inspections related to storage of spent fuel under § 72.210 of this chapter
Full Cost.

14. Byproduct, source, or special nuclear material licenses and other approvals authorizing decommissioning, decontamination, reclamation, or site restoration activities under parts 30, 40, 70, 72, and 76 of this chapter:

Licensing and inspection
Full Cost.

15. Import and Export licenses:

Licenses issued under part 110 of this chapter for the import and export only of special nuclear material, source material, tritium and other byproduct material, heavy water, or nuclear grade graphite.

A. Application for export or import of high enriched uranium and other materials, including radioactive waste, which must be reviewed by the Commissioners and the Executive Branch, for example, those actions under 10 CFR 110.40(b). This category includes application for export or import of radioactive wastes in multiple forms from multiple generators or brokers in the exporting country and/or going to multiple treatment, storage or disposal facilities in one or more receiving countries.

Application—new license
$9,900.

Amendment
$9,900.

B. Application for export or import of special nuclear material, source material, tritium and other byproduct material, heavy water, or nuclear grade graphite, including radioactive waste, requiring Executive Branch review but not Commissioner review. This category includes application for the export or import of radioactive waste involving a single form of waste from a single class of generator in the exporting country to a single treatment, storage and/or disposal facility in the receiving country.

Application—new license
$5,800.

Amendment
$5,800.

C. Application for export of routine reloads of low enriched uranium reactor fuel and exports of source material requiring only foreign government assurances under the Atomic Energy Act.

Application—new license
$1,800.

Amendment
$1,800.

D. Application for export or import of other materials, including radioactive waste, not requiring Commissioner review, Executive Branch review, or foreign government assurances under the Atomic Energy Act. This category includes application for export or import of radioactive waste where the NRC has previously authorized the export or import of the same form of waste to or from the same or similar parties, requiring only confirmation from the receiving facility and licensing authorities that the shipments may proceed according to previously agreed understandings and procedures.

Application—new license
$1,200.

Amendment
$1,200.

E. Minor amendment of any export or import license to extend the expiration date, change domestic information, or make other revisions which do not require in-depth analysis, review, or consultations with other agencies or foreign governments.

Amendment
$230.

16. Reciprocity:

Agreement State licensees who conduct activities under the reciprocity provisions of 10 CFR 150.20.

Application
$1,400.

1

Types of fees
—Separate charges, as shown in the schedule, will be assessed for pre-application consultations and reviews and applications for new licenses and approvals, issuance of new licenses and approvals, certain amendments and renewals to existing licenses and approvals, safety evaluations of sealed sources and devices, and certain inspections. The following guidelines apply to these charges:

(a)
Application and registration fees.
Applications for new materials licenses and export and import licenses; applications to reinstate expired, terminated, or inactive licenses except those subject to fees assessed at full costs; applications filed by Agreement State licensees to register under the general license provisions of 10 CFR 150.20; and applications for amendments to materials licenses that would place the license in a higher fee category or add a new fee category must be accompanied by the prescribed application fee for each category.

(1) Applications for licenses covering more than one fee category of special nuclear material or source material must be accompanied by the prescribed application fee for the highest fee category.
(2) Applications for new licenses that cover both byproduct material and special nuclear material in sealed sources for use in gauging devices will pay the appropriate application fee for fee Category 1C only.

(b)
Licensing fees.
Fees for reviews of applications for new licenses and for renewals and amendments to existing licenses, for pre-application consultations and for reviews of other documents submitted to NRC for review, and for project manager time for fee categories subject to full cost fees (fee Categories 1A, 1B, 1E, 2A, 4A, 5B, 10A, 11, 12, 13A, and 14) are due upon notification by the Commission in accordance with § 170.12(b).

(c)
Amendment fees.
Applications for amendments to export and import licenses must be accompanied by the prescribed amendment fee for each license affected. An application for an amendment to a license or approval classified in more than one fee category must be accompanied by the prescribed amendment fee for the category affected by the amendment unless the amendment is applicable to two or more fee categories, in which case the amendment fee for the highest fee category would apply.

(d)
Inspection fees.
Inspections resulting from investigations conducted by the Office of Investigations and non-routine inspections that result from third-party allegations are not subject to fees. Inspection fees are due upon notification by the Commission in accordance with § 170.12(c).

(e)
Generally licensed device registrations under 10 CFR 31.5.
Submittals of registration information must be accompanied by the prescribed fee.

2
Fees will not be charged for orders issued by the Commission under 10 CFR 2.202 or for amendments resulting specifically from the requirements of these types of Commission orders. However, fees will be charged for approvals issued under a specific exemption provision of the Commission's regulations under Title 10 of the Code of Federal Regulations (e.g., 10 CFR 30.11, 40.14, 70.14, 73.5, and any other sections in effect now or in the future), regardless of whether the approval is in the form of a license amendment, letter of approval, safety evaluation report, or other form. In addition to the fee shown, an applicant may be assessed an additional fee for sealed source and device evaluations as shown in Categories 9A through 9D.

3
Full cost fees will be determined based on the professional staff time multiplied by the appropriate professional hourly rate established in § 170.20 in effect at the time the service is provided, and the appropriate contractual support services expended. For applications currently on file for which review costs have reached an applicable fee ceiling established by the June 20, 1984, and July 2, 1990, rules, but are still pending completion of the review, the cost incurred after any applicable ceiling was reached through January 29, 1989, will not be billed to the applicant. Any professional staff-hours expended above those ceilings on or after January 30, 1989, will be assessed at the applicable rates established by § 170.20, as appropriate, except for topical reports whose costs exceed $50,000. Costs which exceed $50,000 for each topical report, amendment, revision, or supplement to a topical report completed or under review from January 30, 1989, through August 8, 1991, will not be billed to the applicant. Any professional hours expended on or after August 9, 1991, will be assessed at the applicable rate established in § 170.20.

4
Licensees paying fees under Categories 1A, 1B, and 1E are not subject to fees under Categories 1C and 1D for sealed sources authorized in the same license except for an application that deals only with the sealed sources authorized by the license.

PART 171—ANNUAL FEES FOR REACTOR LICENSES AND FUEL CYCLE LICENSES AND MATERIAL LICENSES, INCLUDING HOLDERS OF CERTIFICATES OF COMPLIANCE, REGISTRATIONS, AND QUALITY ASSURANCE PROGRAM APPROVALS AND GOVERNMENT AGENCIES LICENSED BY THE NRC

7. The authority citation for part 171 continues to read as follows:

Authority:

Sec. 7601, Pub. L. 99-272, 100 Stat. 146, as amended by sec. 5601, Pub. L. 100-203, 101 Stat. 1330, as amended by sec. 3201, Pub. L. 101-239, 103 Stat. 2132, as amended by sec. 6101, Pub. L. 101-508, 104 Stat. 1388, as amended by sec. 2903a, Pub. L. 102-486, 106 Stat. 3125 (42 U.S.C. 2213, 2214); sec. 301, Pub. L. 92-314, 86 Stat. 227 (42 U.S.C. 2201w); sec. 201, Pub. L. 93-438, 88 Stat. 1242, as amended (42 U.S.C. 5841).

8. Section 171.3 is revised to read as follows:

§ 171.3.
Scope.
The regulations in this part apply to any person holding an operating license for a power reactor, test reactor or research reactor issued under part 50 of this chapter and to any person holding a combined license issued under part 52 of this chapter that authorizes operation of a power reactor. The regulations in this part also apply to any person holding a materials license as defined in this part, a Certificate of Compliance, a sealed source or device registration, a quality assurance program approval, and to a Government agency as defined in this part.

9. In § 171.5, the definition of
Greater than Class C Waste
or
GTCC waste
is added in alphabetical order to read as follows:

§ 171.5
Definitions.

Greater than Class C Waste
or
GTCC waste
means low-level radioactive waste that exceeds the concentration limits of radionuclides established for Class C waste in 10 CFR 61.55.

10. In § 171.11, paragraph (c) is revised to read as follows:

§ 171.11
Exemptions.

(c) An exemption for operating reactors under this provision may be granted by the Commission taking into consideration each of the following factors:

(1) Age of the reactor;

(2) Size of the reactor;

(3) Number of customers in rate base;

(4) Net increase in KWh cost for each customer directly related to the annual fee assessed under this part; and

(5) Any other relevant matter which the licensee believes justifies the reduction of the annual fee.

11. Section 171.15 is revised to read as follows:

§ 171.15
Annual Fees: Reactor licenses and independent spent fuel storage licenses.
(a) Each person licensed to operate a power, test, or research reactor; each person holding a part 50 power reactor license that is in decommissioning or possession only status, except those that have no spent fuel on-site; and each person holding a part 72 license who does not hold a part 50 license shall pay the annual fee for each license held at any time during the Federal FY in which the fee is due. This paragraph does not apply to test and research reactors exempted under § 171.11(a).

(b)(1) The FY 2002 annual fee for each operating power reactor which must be collected by September 30, 2002, is $2,869,000.

(2) The FY 2002 annual fee is comprised of a base operating power reactor annual fee, a base spent fuel storage/reactor decommissioning annual fee, and associated additional charges (surcharges). The activities comprising the FY 2002 spent storage/reactor decommissioning base annual fee are shown in paragraph (c)(2)(i) and (ii) of this section. The activities comprising the FY 2002 surcharge are shown in paragraph (d)(1) of this section. The activities comprising the FY 2002 base annual fee for operating power reactors are as follows:

(i) Power reactor safety and safeguards regulation except licensing and inspection activities recovered under part 170 of this chapter and generic reactor decommissioning activities.

(ii) Research activities directly related to the regulation of power reactors, except those activities specifically related to reactor decommissioning.

(iii) Generic activities required largely for NRC to regulate power reactors, e.g., updating part 50 of this chapter, or operating the Incident Response Center. The base annual fee for operating power reactors does not include generic activities specifically related to reactor decommissioning.

(c)(1) The FY 2002 annual fee for each power reactor holding a part 50 license that is in a decommissioning or possession only status and has spent fuel on-site and each independent spent fuel storage part 72 licensee who does not hold a part 50 license is $239,000.

(2) The FY 2002 annual fee is comprised of a base spent fuel storage/reactor decommissioning annual fee (which is also included in the operating power reactor annual fee shown in paragraph (b) of this section), and an additional charge (surcharge). The activities comprising the FY 2002 surcharge are shown in paragraph (d)(1) of this section. The activities comprising the FY 2002 spent fuel storage/reactor decommissioning rebaselined annual fee are:

(i) Generic and other research activities directly related to reactor decommissioning and spent fuel storage; and

(ii) Other safety, environmental, and safeguards activities related to reactor decommissioning and spent fuel storage, except costs for licensing and inspection activities that are recovered under part 170 of this chapter.

(d)(1) The activities comprising the FY 2002 surcharge are as follows:

(i) Low level waste disposal generic activities;

(ii) Activities not attributable to an existing NRC licensee or class of licenses (e.g., international cooperative safety program and international safeguards activities, support for the Agreement State program, and site decommissioning management plan (SDMP) activities); and

(iii) Activities not currently subject to 10 CFR part 170 licensing and inspection fees based on existing law or Commission policy, e.g., reviews and inspections conducted of nonprofit educational institutions, licensing actions for Federal agencies, and costs that would not be collected from small entities based on Commission policy in accordance with the Regulatory Flexibility Act, 5 U.S.C. 601
et seq.

(2) The total FY 2002 surcharge allocated to the operating power reactor class of licenses is $35.3 million, not including the amount allocated to the spent fuel storage/reactor decommissioning class. The FY 2002 operating power reactor surcharge to be assessed to each operating power reactor is approximately $339,400. This amount is calculated by dividing the total operating power reactor surcharge ($35.3 million) by the number of operating power reactors (104).

(3) The FY 2002 surcharge allocated to the spent fuel storage/reactor decommissioning class of licenses is $3.3 million. The FY 2002 spent fuel storage/reactor decommissioning surcharge to be assessed to each operating power reactor, each power reactor in decommissioning or possession only status that has spent fuel onsite, and to each independent spent fuel storage part 72 licensee who does not hold a part 50 license is approximately $27,300. This amount is

calculated by dividing the total surcharge costs allocated to this class by the total number of power reactor licenses, except those that permanently ceased operations and have no fuel on site, and part 72 licensees who do not hold a part 50 license.

(e) The FY 2002 annual fees for licensees authorized to operate a non-power (test and research) reactor licensed under part 50 of this chapter, unless the reactor is exempted from fees under § 171.11(a), are as follows:

Research reactor—$71,300

Test reactor—$71,300

12. In § 171.16, paragraphs (c), (d), and (e) are revised to read as follows:

§ 171.16
Annual Fees: Materials Licensees, Holders of Certificates of Compliance, Holders of Sealed Source and Device Registrations, Holders of Quality Assurance Program Approvals and Government Agencies Licensed by the NRC.

(c) A licensee who is required to pay an annual fee under this section may qualify as a small entity. If a licensee qualifies as a small entity and provides the Commission with the proper certification along with its annual fee payment, the licensee may pay reduced annual fees as shown in the following table. Failure to file a small entity certification in a timely manner could result in the denial of any refund that might otherwise be due. The small entity fees are as follows:

Maximum annual fee per licensed category

Small Businesses Not Engaged in Manufacturing and Small Not-For-Profit Organizations (Gross Annual Receipts):

$350,000 to $5 million
$2,300

Less than $350,000
500

Manufacturing entities that have an average of 500 employees or less:

35 to 500 employees
$2,300

Less than 35 employees
500

Small Governmental Jurisdictions (Including publicly supported educational institutions) (Population):

20,000 to 50,000
$2,300

Less than 20,000
500

Educational Institutions that are not State or Publicly Supported, and have 500 Employees or Less:

35 to 500 employees
$2,300

Less than 35 employees
500

(1) A licensee qualifies as a small entity if it meets the size standards established by the NRC (See 10 CFR 2.810).

(2) A licensee who seeks to establish status as a small entity for the purpose of paying the annual fees required under this section must file a certification statement with the NRC. The licensee must file the required certification on NRC Form 526 for each license under which it is billed. NRC Form 526 can be accessed through the NRC's external web site at
http://www.nrc.gov.
For licensees who cannot access the NRC's external web site, NRC Form 526 may be obtained through the local point of contact listed in the NRC's “Materials Annual Fee Billing Handbook,” NUREG/BR-0238, which is enclosed with each annual fee billing. The form can also be obtained by calling the fee staff at 301-415-7554, or by e-mailing the fee staff at

(3) For purposes of this section, the licensee must submit a new certification with its annual fee payment each year.

(4) The maximum annual fee a small entity is required to pay is $2,300 for each category applicable to the license(s).

(d) The FY 2002 annual fees are comprised of a base annual fee and an additional charge (surcharge). The activities comprising the FY 2002 surcharge are shown for convenience in paragraph (e) of this section. The FY 2002 annual fees for materials licensees and holders of certificates, registrations or approvals subject to fees under this section are shown in the following table:

Schedule of Materials Annual Fees and Fees for Government Agencies Licensed by NRC
[See footnotes at end of table]

Category of materials licenses

Annual fees
1, 2, 3

1. Special nuclear material:

A.(1) Licenses for possession and use of U-235 or plutonium for fuel fabrication activities.

(a) Strategic Special Nuclear Material:

Babcock & Wilcox, SNM-42
$4,073,000

Nuclear Fuel Services, SNM-124
4,073,000

(b) Low Enriched Uranium in Dispersible Form Used for Fabrication of Power Reactor Fuel:

General Electric Company, SNM-1097
1,366,000

Siemens Nuclear Power, SNM-1227
1,366,000

Westinghouse Electric Company, SNM-1107
1,366,000

(2) All other special nuclear materials licenses not included in Category 1.A.(1) which are licensed for fuel cycle activities.

(a) Facilities with limited operations:

Framatome Cogema SNM-1168
537,000

(b) All Others:

General Electric SNM-960
390,000

B. Licenses for receipt and storage of spent fuel and reactor-related Greater than Class C (GTCC) waste at an independent spent fuel storage installation (ISFSI)

11
N/A

C. Licenses for possession and use of special nuclear material in sealed sources contained in devices used in industrial measuring systems, including x-ray fluorescence analyzers
1,500

D. All other special nuclear material licenses, except licenses authorizing special nuclear material in unsealed form in combination that would constitute a critical quantity, as defined in § 150.11 of this chapter, for which the licensee shall pay the same fees as those for Category 1.A.(2)
3,600

E. Licenses or certificates for the operation of a uranium enrichment facility
2,537,000

2. Source material:

A.(1) Licenses for possession and use of source material for refining uranium mill concentrates to uranium hexafluoride
585,000

(2) Licenses for possession and use of source material in recovery operations such as milling, in-situ leaching, heap-leaching, ore buying stations, ion exchange facilities and in processing of ores containing source material for extraction of metals other than uranium or thorium, including licenses authorizing the possession of byproduct waste material (tailings) from source material recovery operations, as well as licenses authorizing the possession and maintenance of a facility in a standby mode.

Class I facilities
4

77,700

Class II facilities
4

65,100

Other facilities
4

68,400

(3) Licenses that authorize the receipt of byproduct material, as defined in Section 11e.(2) of the Atomic Energy Act, from other persons for possession and disposal, except those licenses subject to the fees in Category 2A(2) or Category 2A(4)
47,900

(4) Licenses that authorize the receipt of byproduct material, as defined in Section 11e.(2) of the Atomic Energy Act, from other persons for possession and disposal incidental to the disposal of the uranium waste tailings generated by the licensee's milling operations, except those licenses subject to the fees in Category 2A(2)
7,600

B. Licenses that authorize only the possession, use and/or installation of source material for shielding
760

C. All other source material licenses
12,300

3. Byproduct material:

A. Licenses of broad scope for possession and use of byproduct material issued under parts 30 and 33 of this chapter for processing or manufacturing of items containing byproduct material for commercial distribution
22,400

B. Other licenses for possession and use of byproduct material issued under part 30 of this chapter for processing or manufacturing of items containing byproduct material for commercial distribution
5,700

C. Licenses issued under §§ 32.72, 32.73, and/or 32.74 of this chapter authorizing the processing or manufacturing and distribution or redistribution of radiopharmaceuticals, generators, reagent kits and/or sources and devices containing byproduct material. This category also includes the possession and use of source material for shielding authorized under part 40 of this chapter when included on the same license. This category does not apply to licenses issued to nonprofit educational institutions whose processing or manufacturing is exempt under § 171.11(a)(1). These licenses are covered by fee Category 3D
14,000

D. Licenses and approvals issued under §§ 32.72, 32.73, and/or 32.74 of this chapter authorizing distribution or redistribution of radiopharmaceuticals, generators, reagent kits and/or sources or devices not involving processing of byproduct material. This category includes licenses issued under §§ 32.72, 32.73 and 32.74 of this chapter to nonprofit educational institutions whose processing or manufacturing is exempt under § 171.11(a)(1). This category also includes the possession and use of source material for shielding authorized under part 40 of this chapter when included on the same license
4,500

E. Licenses for possession and use of byproduct material in sealed sources for irradiation of materials in which the source is not removed from its shield (self-shielded units)
3,600

F. Licenses for possession and use of less than 10,000 curies of byproduct material in sealed sources for irradiation of materials in which the source is exposed for irradiation purposes. This category also includes underwater irradiators for irradiation of materials in which the source is not exposed for irradiation purposes
6,500

G. Licenses for possession and use of 10,000 curies or more of byproduct material in sealed sources for irradiation of materials in which the source is exposed for irradiation purposes. This category also includes underwater irradiators for irradiation of materials in which the source is not exposed for irradiation purposes
23,200

H. Licenses issued under Subpart A of part 32 of this chapter to distribute items containing byproduct material that require device review to persons exempt from the licensing requirements of part 30 of this chapter, except specific licenses authorizing redistribution of items that have been authorized for distribution to persons exempt from the licensing requirements of part 30 of this chapter
3,700

I. Licenses issued under Subpart A of part 32 of this chapter to distribute items containing byproduct material or quantities of byproduct material that do not require device evaluation to persons exempt from the licensing requirements of part 30 of this chapter, except for specific licenses authorizing redistribution of items that have been authorized for distribution to persons exempt from the licensing requirements of part 30 of this chapter
5,300

J. Licenses issued under Subpart B of part 32 of this chapter to distribute items containing byproduct material that require sealed source and/or device review to persons generally licensed under part 31 of this chapter, except specific licenses authorizing redistribution of items that have been authorized for distribution to persons generally licensed under part 31 of this chapter
2,400

K. Licenses issued under Subpart B of part 31 of this chapter to distribute items containing byproduct material or quantities of byproduct material that do not require sealed source and/or device review to persons generally licensed under part 31 of this chapter, except specific licenses authorizing redistribution of items that have been authorized for distribution to persons generally licensed under part 31 of this chapter
1,600

L. Licenses of broad scope for possession and use of byproduct material issued under parts 30 and 33 of this chapter for research and development that do not authorize commercial distribution
11,200

M. Other licenses for possession and use of byproduct material issued under part 30 of this chapter for research and development that do not authorize commercial distribution
4,900

N. Licenses that authorize services for other licensees, except:

(1) Licenses that authorize only calibration and/or leak testing services are subject to the fees specified in fee Category 3P; and

(2) Licenses that authorize waste disposal services are subject to the fees specified in fee Categories 4A, 4B, and 4C
5,300

O. Licenses for possession and use of byproduct material issued under part 34 of this chapter for industrial radiography operations. This category also includes the possession and use of source material for shielding authorized under part 40 of this chapter when authorized on the same license
13,700

P. All other specific byproduct material licenses, except those in Categories 4A through 9D
2,700

Q. Registration of devices generally licensed pursuant to part 31 of this chapter

13
N/A

4. Waste disposal and processing:

A. Licenses specifically authorizing the receipt of waste byproduct material, source material, or special nuclear material from other persons for the purpose of contingency storage or commercial land disposal by the licensee; or licenses authorizing contingency storage of low-level radioactive waste at the site of nuclear power reactors; or licenses for receipt of waste from other persons for incineration or other treatment, packaging of resulting waste and residues, and transfer of packages to another person authorized to receive or dispose of waste material

5
N/A

B. Licenses specifically authorizing the receipt of waste byproduct material, source material, or special nuclear material from other persons for the purpose of packaging or repackaging the material. The licensee will dispose of the material by transfer to another person authorized to receive or dispose of the material
10,300

C. Licenses specifically authorizing the receipt of prepackaged waste byproduct material, source material, or special nuclear material from other persons. The licensee will dispose of the material by transfer to another person authorized to receive or dispose of the material
8,100

5. Well logging:

A. Licenses for possession and use of byproduct material, source material, and/or special nuclear material for well logging, well surveys, and tracer studies other than field flooding tracer studies
10,000

B. Licenses for possession and use of byproduct material for field flooding tracer studies

5
N/A

6. Nuclear laundries:

A. Licenses for commercial collection and laundry of items contaminated with byproduct material, source material, or special nuclear material
19,200

7. Medical licenses:

A. Licenses issued under parts 30, 35, 40, and 70 of this chapter for human use of byproduct material, source material, or special nuclear material in sealed sources contained in teletherapy devices. This category also includes the possession and use of source material for shielding when authorized on the same license
15,500

B. Licenses of broad scope issued to medical institutions or two or more physicians under parts 30, 33, 35, 40, and 70 of this chapter authorizing research and development, including human use of byproduct material except licenses for byproduct material, source material, or special nuclear material in sealed sources contained in teletherapy devices. This category also includes the possession and use of source material for shielding when authorized on the same license.
9

26,200

C. Other licenses issued under parts 30, 35, 40, and 70 of this chapter for human use of byproduct material, source material, and/or special nuclear material except licenses for byproduct material, source material, or special nuclear material in sealed sources contained in teletherapy devices. This category also includes the possession and use of source material for shielding when authorized on the same license.
9

5,100

8. Civil defense:

A. Licenses for possession and use of byproduct material, source material, or special nuclear material for civil defense activities
1,200

9. Device, product, or sealed source safety evaluation:

A. Registrations issued for the safety evaluation of devices or products containing byproduct material, source material, or special nuclear material, except reactor fuel devices, for commercial distribution
6,700

B. Registrations issued for the safety evaluation of devices or products containing byproduct material, source material, or special nuclear material manufactured in accordance with the unique specifications of, and for use by, a single applicant, except reactor fuel devices
6,700

C. Registrations issued for the safety evaluation of sealed sources containing byproduct material, source material, or special nuclear material, except reactor fuel, for commercial distribution
2,000

D. Registrations issued for the safety evaluation of sealed sources containing byproduct material, source material, or special nuclear material, manufactured in accordance with the unique specifications of, and for use by, a single applicant, except reactor fuel
690

10. Transportation of radioactive material:

A. Certificates of Compliance or other package approvals issued for design of casks, packages, and shipping containers.

Spent Fuel, High-Level Waste, and plutonium air packages

6
N/A

Other Casks

6
N/A

B. Quality assurance program approvals issued under part 71 of this chapter.

Users and Fabricators
72,800

Users
7,300

11. Standardized spent fuel facilities

6
N/A

12. Special Projects

6
N/A

13. A. Spent fuel storage cask Certificate of Compliance

6
N/A

B. General licenses for storage of spent fuel under 10 CFR 72.210

12
N/A

14. Byproduct, source, or special nuclear material licenses and other approvals authorizing decommissioning, decontamination, reclamation, or site restoration activities under parts 30, 40, 70, 72, and 76 of this chapter

7
N/A

15. Import and Export licenses

8
N/A

16. Reciprocity

8
N/A

17. Master materials licenses of broad scope issued to Government agencies
283,000

18. Department of Energy:

A. Certificates of Compliance

10
1,368,000

B. Uranium Mill Tailing Radiation Control Act (UMTRCA) activities
1,056,000

1
Annual fees will be assessed based on whether a licensee held a valid license with the NRC authorizing possession and use of radioactive material during the current fiscal year. However, the annual fee is waived for those materials licenses and holders of certificates, registrations, and approvals who either filed for termination of their licenses or approvals or filed for possession only/storage licenses prior to October 1, 2001, and permanently ceased licensed activities entirely by September 30, 2001. Annual fees for licensees who filed for termination of a license, downgrade of a license, or for a possession only license during the fiscal year and for new licenses issued during the fiscal year will be prorated in accordance with the provisions of § 171.17. If a person holds more than one license, certificate, registration, or approval, the annual fee(s) will be assessed for each license, certificate, registration, or approval held by that person. For licenses that authorize more than one activity on a single license (e.g., human use and irradiator activities), annual fees will be assessed for each category applicable to the license. Licensees paying annual fees under Category 1A(1) are not subject to the annual fees for Category 1C and 1D for sealed sources authorized in the license.

2
Payment of the prescribed annual fee does not automatically renew the license, certificate, registration, or approval for which the fee is paid. Renewal applications must be filed in accordance with the requirements of parts 30, 40, 70, 71, 72, or 76 of this chapter.

3
Each fiscal year, fees for these materials licenses will be calculated and assessed in accordance with § 171.13 and will be published in the
Federal Register
for notice and comment.

4
A Class I license includes mill licenses issued for