# Nuclear Energy Policy

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/crs%3ARL33558

## Record

- **Collection:** Congressional research report
- **Document type:** CRS Report
- **Published:** October 15, 2014
- **Citation:** RL33558

## Text

Nuclear Energy Policy
(name redacted)
Specialist in Energy Policy
October 15, 2014

Congressional Research Service
7-....
www.crs.gov
RL33558

Nuclear Energy Policy

Summary
Nuclear energy issues facing Congress include reactor safety and regulation, radioactive waste
management, research and development priorities, federal incentives for new commercial
reactors, nuclear weapons proliferation, and security against terrorist attacks.
The earthquake and resulting tsunami that severely damaged Japan’s Fukushima Daiichi nuclear
power plant on March 11, 2011, raised questions in Congress about the disaster’s possible
implications for nuclear safety regulation, U.S. nuclear energy expansion, and radioactive waste
policy. The tsunami knocked out electric power at the six-reactor plant, resulting in the
overheating of several reactor cores, loss of cooling in spent fuel storage pools, major hydrogen
explosions, and releases of radioactive material into the environment. The Nuclear Regulatory
Commission (NRC) issued orders to U.S. nuclear plants March 12, 2012, to begin implementing
safety improvements in response to Fukushima.
Significant incentives for new commercial reactors were included in the Energy Policy Act of
2005 (EPACT05, P.L. 109-58), such as tax credits and loan guarantees. Together with volatile
fossil fuel prices and the possibility of greenhouse gas controls, the federal incentives for nuclear
power helped spur renewed interest by utilities and other potential reactor developers. License
applications for as many as 31 new reactors were announced, and NRC issued licenses for four
reactors at two plant sites in early 2012. However, falling natural gas prices, safety concerns
raised by the Fukushima accident, and other changing circumstances have made it unlikely that
many more of the proposed nuclear projects will move toward construction in the near term.
Four U.S. reactors were permanently closed in 2013, and another shutdown has been announced
for late 2014. Three reactors were closed because of the need for major repairs, and the other two
because electricity prices fell below their generating costs.
DOE’s nuclear energy research and development program includes advanced reactors, fuel cycle
technology and facilities, and infrastructure support. The Obama Administration’s FY2015
funding request for nuclear energy research and development totaled $863.4 million. Including
advanced reactors, fuel cycle technology, infrastructure support, and safeguards and security, the
total nuclear energy request was $25.0 million (2.9%) below the FY2014 funding level. The
House approved $826.7 million (H.R. 4923), while the Senate Subcommittee on Energy and
Water Development Appropriations recommended $777.0 million.
Disposal of highly radioactive waste has been one of the most controversial aspects of nuclear
power. The Obama Administration halted work on a long-planned waste repository at Yucca
Mountain, NV, and established the Blue Ribbon Commission on America’s Nuclear Future (BRC)
to recommend new approaches to the waste problem. The BRC issued its final report to the
Secretary of Energy on January 26, 2012. In response to the BRC report, and to provide an
outline for a new nuclear waste program, DOE issued a Strategy for the Management and
Disposal of Used Nuclear Fuel and High-Level Waste in January 2013. The DOE strategy calls
for a new nuclear waste management entity to develop consent-based storage and disposal sites,
similar to recommendations by the BRC. No funding has been requested or appropriated since
FY2011 to continue NRC licensing of the Yucca Mountain repository, although the House voted
to provide DOE with $150.0 million and NRC $55.0 million for Yucca Mountain licensing
activities in FY2015.

Congressional Research Service

Nuclear Energy Policy

Contents
Most Recent Developments ............................................................................................................. 1
Nuclear Power Status and Outlook .................................................................................................. 3
Possible New Reactors .............................................................................................................. 6
Nuclear Power Plant Safety and Regulation .................................................................................. 10
Safety ....................................................................................................................................... 10
Emergency Planning ......................................................................................................... 12
Domestic Reactor Safety Experience ................................................................................ 13
Reactor Safety in the Former Soviet Bloc ......................................................................... 15
Licensing and Regulation ........................................................................................................ 15
Reactor Security ...................................................................................................................... 17
Decommissioning .................................................................................................................... 18
Nuclear Accident Liability....................................................................................................... 19
Federal Incentives for New Nuclear Plants ................................................................................... 21
Nuclear Production Tax Credit ................................................................................................ 22
Standby Support ...................................................................................................................... 23
Loan Guarantees ...................................................................................................................... 23
Subsidy Costs .................................................................................................................... 24
Nuclear Solicitations ......................................................................................................... 25
Global Climate Change ........................................................................................................... 27
Nuclear Power Research and Development................................................................................... 30
Nuclear Waste Management .......................................................................................................... 33
Nuclear Weapons Proliferation ...................................................................................................... 36
Federal Funding for Nuclear Energy Programs ............................................................................. 37
Legislation in the 113th Congress ................................................................................................... 39
H.R. 259 (Pompeo)/S. 2279 (Lee)..................................................................................... 39
H.R. 1700 (Engel) ............................................................................................................. 39
H.R. 2081 (Thornberry) .................................................................................................... 39
H.R. 2609 (Frelinghuysen)/S. 1245 (Feinstein) ................................................................ 39
H.R. 2712 (Lowey)............................................................................................................ 40
H.R. 2861 (Lowey)............................................................................................................ 40
H.R. 3354 (Engel) ............................................................................................................. 40
H.R. 3766 (Ros-Lehtinen) ................................................................................................. 40
H.R. 3895 (Duncan) .......................................................................................................... 40
H.R. 4522 (Van Hollen)/S. 2271 (Murphy) ....................................................................... 40
H.R. 4869 (Lummis) ......................................................................................................... 40
H.R. 4923 (Simpson)......................................................................................................... 41
H.R. 4956 (Walz)............................................................................................................... 41
H.R. 5322 (Blackburn) ...................................................................................................... 41
S. 1240 (Wyden)................................................................................................................ 41
S. 1519 (Vitter) .................................................................................................................. 41
S. 2324 (Boxer) ................................................................................................................. 41
S. 2325 (Markey)............................................................................................................... 42
S. 2326 (Sanders)/H.R. 4667 (Welch) ............................................................................... 42

Congressional Research Service

Nuclear Energy Policy

Tables
Table 1. Announced Nuclear Plant License Applications ................................................................ 8
Table 2. Funding for the Nuclear Regulatory Commission ........................................................... 38
Table 3. DOE Funding for Nuclear Activities (Selected Programs) .............................................. 38

Contacts
Author Contact Information........................................................................................................... 42

Congressional Research Service

Nuclear Energy Policy

Most Recent Developments
Agreements for the first loan guarantees for nuclear power plants under the Energy Policy Act of
2005 were signed February 20, 2014, by Energy Secretary Ernest Moniz. The federal loan
guarantees total $6.5 billion for two reactors being constructed at the Vogtle nuclear plant in
Waynesboro, GA.1 Southern Company, the plant’s lead owner, estimated that its $3.46 billion
share of the loan guarantee would reduce its present-value financing costs by up to $250 million.
The guaranteed loans are to be issued by the U.S. Treasury’s Federal Financing Bank.2 The plant
owners were not charged an upfront fee for the loan guarantees but are paying interest above the
applicable Treasury rate.3
The Department of Energy’s (DOE’s) FY2015 funding request for nuclear energy research and
development, submitted to Congress in early March 2014, totaled $863.4 million. Including
advanced reactors, fuel cycle technology, infrastructure support, and safeguards and security, the
total nuclear energy request is $25.0 million (2.9%) below the FY2014 funding level. The House
approved its FY2015 Energy and Water appropriations bill (H.R. 4923) on July 10, 2014, with
$826.7 million for nuclear energy. The Senate Subcommittee on Energy and Water Development
Appropriations recommended $777.0 million on July 24, 2014.4 Pending enactment of full-year
appropriations, FY2015 funding for these programs is being provided by a continuing resolution
(P.L. 113-164).
The first construction starts for new U.S. nuclear power reactors since the 1970s officially took
place in March 2013 in South Carolina and Georgia. Pouring of the first “safety related” concrete,
which marks the start of reactor construction, was completed on March 11, 2013, for V.C.
Summer Unit 2 in Cayce, SC, and three days later for Vogtle Unit 3 in Georgia. The Nuclear
Regulatory Commission (NRC) had issued combined construction permits and operating licenses
(COLs) for two new reactors at the Vogtle site on February 9, 2012, and for two identical reactors
at the Summer plant on March 30, 2012. Each of the new Westinghouse AP1000 reactors,
scheduled for completion between 2017 and 2019, is expected to cost from $5 billion to $7
billion.
NRC approved a design certification September 16, 2014, for GE-Hitachi’s Economic Simplified
Boiling Water Reactor (ESBWR), following nine years of review. Like the Westinghouse
AP1000, the ESBWR includes “passive” safety features that are designed to protect the reactor
core from overheating after an accident. NRC is currently reviewing two COLs that would use the
ESBWR design: Fermi 3 in Michigan and North Anna 3 in Virginia.5

1

Mirshak, Meg, “Energy Secretary Moniz Visits Vogtle to Finalize Loan Guarantee,” Augusta Chronicle, February 21,
2014, http://chronicle.augusta.com/news/metro/2014-02-20/energy-secretary-moniz-visits-vogtle-finalize-loanguarantee.
2
Southern Company, “Southern Company Subsidiary, DOE Finalize Vogtle Nuclear Project Loan Guarantees,” news
release, February 20, 2014, http://www.prnewswire.com/news-releases/southern-company-subsidiary-doe-finalizevogtle-nuclear-project-loan-guarantees-246395221.html.
3
See CRS Insight.
4
Senate Committee on Appropriations, “FY15 Subcommittee Reported Bill and Draft Report,” July 24, 2014,
http://www.appropriations.senate.gov/news/fy-2015-ew-subcommittee-reported-bill-and-draft-report.
5
Nuclear Regulatory Commission, “NRC Certifies GE-Hitachi New Reactor Design,” news release, September 16,
2014, http://www.nrc.gov/reading-rm/doc-collections/news/2014/.

Congressional Research Service

1

Nuclear Energy Policy

Four U.S. reactors were permanently closed during 2013, and the shutdown of a fifth unit was
announced for late 2014. Crystal River 3 in Florida was retired in February 2013 because of
cracks in its concrete containment structure. The single-unit Kewaunee plant in Wisconsin closed
in May 2013 because regional electricity prices had dropped below the reactor’s generating costs.
San Onofre 2 and 3 in California closed in June 2013 because of faulty steam generators (unit 1
had been shut previously). And the owner of the single-unit Vermont Yankee plant announced in
August 2013 that the reactor would permanently close in the fourth quarter of 2014 for economic
reasons. All of those units had substantial time remaining on their initial 40-year operating
licenses or had received or applied for 20-year license extensions from NRC. The shutdowns
prompted widespread discussion about the future of other aging U.S. reactors.
Continued operation of “at risk” nuclear generating capacity could be encouraged by regulations
proposed by the Environmental Protection Agency (EPA) on June 2, 2014, to reduce carbon
emissions at existing power plants. The EPA proposal would require states to reduce the “carbon
intensity” (carbon emissions per megawatt-hour of electrical generation) of their existing fossil
fuel-fired generating plants by 2030. The proposed standards assume that states will prevent the
premature retirement of up to 6% of their existing nuclear capacity and also complete five
reactors currently under construction. States could also respond to the standards by encouraging
construction of additional reactors or the expansion of generating capacity at existing nuclear
plants, among many other options.6
On March 12, 2012, NRC issued its first nuclear plant safety requirements based on lessons
learned from the March 2011 Fukushima disaster in Japan. NRC ordered U.S. nuclear plant
operators to begin implementing safety enhancements related to power blackouts, reactor
containment venting, and monitoring the water levels of reactor spent fuel pools. The Fukushima
nuclear plant was hit by an earthquake and tsunami that knocked out all electric power at the sixreactor plant, resulting in the overheating of the reactor cores in three of the units and a
heightened overheating risk at several spent fuel storage pools at the site. The overheating of the
reactor cores caused major hydrogen explosions and releases of radioactive material to the
environment. NRC’s response to the accident has been the subject of continuing congressional
oversight.
After halting work on a long-planned nuclear waste repository at Yucca Mountain in Nevada,
DOE issued a Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level
Waste in January 2013. The DOE strategy calls for a new nuclear waste management entity to
develop consent-based storage and disposal sites. A pilot interim spent fuel storage facility would
be opened by 2021 and a larger-scale storage facility, which could be an expansion of the pilot
facility, would begin receiving waste by 2025. A geologic disposal facility would open by 2048—
50 years after the initial planned opening date for the Yucca Mountain repository.7 Legislation to
redirect the nuclear waste program along similar lines was introduced by Senator Wyden on June
27, 2013 (S. 1240). The U.S. Court of Appeals for the District of Columbia Circuit ruled on
August 13, 2013, that NRC must continue work on the Yucca Mountain license application as
long as funding is available. The court determined that NRC has at least $11.1 million in
6

Environmental Protection Agency, “Clean Power Plan Proposed Rule,” http://www2.epa.gov/carbon-pollutionstandards/clean-power-plan-proposed-rule.
7
DOE, Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Waste, January 2013,
http://energy.gov/sites/prod/files/
Strategy%20for%20the%20Management%20and%20Disposal%20of%20Used%20Nuclear%20Fuel%20and%20High
%20Level%20Radioactive%20Waste.pdf.

Congressional Research Service

2

Nuclear Energy Policy

previously appropriated funds for that purpose.8 In its FY2015 Energy and Water Development
appropriations bill, the House voted to provide DOE $150.0 million and NRC $55.0 million for
Yucca Mountain licensing activities. No funding was included in the draft bill approved by the
Senate subcommittee.
Pursuant to a court ruling, DOE stopped collecting nuclear waste fees from nuclear power
generators on May 16, 2014, eliminating about $750 million in annual revenues for the waste
disposal program.9 The Nuclear Waste Policy Act requires the Secretary of Energy to adjust the
fees as necessary to cover the waste program’s anticipated costs, but the U.S. Court of Appeals
for the District of Columbia Circuit ruled that DOE’s current waste plans are too vague to allow a
reasonable estimate to be calculated and that DOE must therefore stop collecting the fee.10
NRC approved a final rule August 26, 2014, on continued storage of spent nuclear fuel.11 The rule
responds to a federal circuit court ruling on June 8, 2012, that struck down NRC’s Waste
Confidence Decision, which contains the agency’s formal findings that waste generated by
nuclear power plants will be disposed of safely. The court ruled that the Waste Confidence
Decision required an environmental review under the National Environmental Policy Act and that
NRC needed to consider the possibility that a permanent waste repository would never be built
and examine potential problems with waste storage pools. In approving the storage rule, NRC
ended its suspension of final licensing decisions for new reactors, spent fuel storage facilities, and
license renewals.12

Nuclear Power Status and Outlook
After nearly 30 years in which no new orders had been placed for nuclear power plants in the
United States, a series of license applications that began in 2007 prompted widespread
speculation about a U.S. “nuclear renaissance.” The renewed interest in nuclear power largely
resulted from the improved performance of existing reactors, federal incentives in the Energy
Policy Act of 2005 (P.L. 109-58), the possibility of carbon dioxide controls that could increase
costs at fossil fuel plants, and volatile prices for natural gas—the favored fuel for new power
plants for the past two decades.
Four of the proposed new U.S. reactors received licenses from the Nuclear Regulatory
Commission (NRC) in early 2012. NRC approved combined construction permit and operating
licenses (COLs) for Southern Company to build and operate two new Westinghouse AP1000
8
U.S. Court of Appeals for the District of Columbia Circuit, In re: Aiken County et al., No. 11-1271, writ of
mandamus, August 13, 2013, http://www.cadc.uscourts.gov/internet/opinions.nsf/
BAE0CF34F762EBD985257BC6004DEB18/$file/11-1271-1451347.pdf.
9
Hiruo, Elaine, “DOE Implements Court-Ordered Suspension of Nuclear Waste Fee,” NuclearFuel, May 26, 2014.
10
U.S. Court of Appeals for the District of Columbia Circuit, National Association of Regulatory Utility
Commissioners v. U.S. Department of Energy, No. 11-1066, decided November 19, 2013,
http://www.cadc.uscourts.gov/internet/opinions.nsf/2708C01ECFE3109F85257C280053406E/$file/11-10661466796.pdf.
11
NRC, “Waste Confidence—Continued Storage of Spent Nuclear Fuel,” proposed rule, 78 Federal Register 56776,
September 13, 2013.
12
NRC, “NRC Approves Final Rule on Spent Fuel Storage and Ends Suspension of Final Licensing Actions for
Nuclear Plants and Renewals,” news release, August 26, 2014, http://pbadupws.nrc.gov/docs/ML1423/
ML14238A326.pdf.

Congressional Research Service

3

Nuclear Energy Policy

reactors at the Vogtle nuclear power plant in Georgia on February 9, 2012. On March 30, 2012,
NRC approved COLs for two additional AP1000 reactors at the existing V.C. Summer nuclear
plant in South Carolina. Pouring of the first “safety related” concrete, which marks the start of
reactor construction, was completed on March 11, 2013, for Summer Unit 2 and three days later
for Vogtle Unit 3 (after several years of site preparation, component fabrication, and other
preliminary work).
However, the future of all other proposed new U.S. reactors is uncertain. High construction cost
estimates—a major reason for earlier reactor cancellations—continue to undermine nuclear power
economics. A more recent obstacle to nuclear power growth has been the development of vast
reserves of domestic natural gas from previously uneconomic shale formations, which has held
gas prices low and reduced concern about future price spikes. Moreover, it is unclear at this point
how much incentive might be provided to nuclear power by potential U.S. carbon controls.
Four U.S. reactors were permanently closed during 2013, and the shutdown of a fifth unit was
announced for late 2014. Crystal River 3 in Florida was retired in February 2013 because of
cracks in its concrete containment structure. The single-unit Kewaunee plant in Wisconsin closed
in May 2013 because regional electricity prices had dropped below the reactor’s generating costs.
San Onofre 2 and 3 closed in June 2013 because of faulty steam generators (unit 1 had been shut
previously). And the owner of the single-unit Vermont Yankee plant announced in August 2013
that the reactor would permanently close in the fourth quarter of 2014 for economic reasons. All
of those units had substantial time remaining on their initial 40-year operating licenses or had
received or applied for 20-year license extensions from NRC. The shutdowns prompted
widespread discussion about the future of other aging U.S. reactors.
The March 11, 2011, earthquake and tsunami that severely damaged Japan’s Fukushima Daiichi
nuclear power plant could also affect plans for new U.S. reactors, although U.S. nuclear power
growth was already expected to be modest in the near term. Following the Fukushima accident,
preconstruction work was suspended on two planned reactors at the South Texas Project. Tokyo
Electric Power Company (TEPCO), which owns the Fukushima plant, had planned to invest in
the South Texas Project expansion, but TEPCO’s financial condition plunged after the accident.
New U.S. safety requirements resulting from the Fukushima disaster could raise investor
concerns about higher costs. On the other hand, after the accident the Obama Administration
reiterated its support for nuclear power expansion as part of its clean energy policy.13
The recent applications for new power reactors in the United States followed a long period of
declining nuclear generation growth rates. Until the COLs were issued for the Vogtle and Summer
projects, no nuclear power plants had been ordered in the United States since 1978, and more than
100 reactors had been canceled, including all ordered after 1973. The most recent U.S. nuclear
unit to be completed was the Tennessee Valley Authority’s (TVA’s) Watts Bar 1 reactor, ordered in
1970 and licensed to operate in 1996. But largely because of better operation and capacity
expansion at existing reactors, annual U.S. nuclear generation has risen by about 20% since the
startup of Watts Bar 1.14 The U.S. nuclear power industry currently comprises 100 licensed
reactors (excluding the four permanently closed in 2013) at 62 plant sites in 31 states and
13

Oral Testimony of Energy Secretary Steven Chu at the House Energy and Commerce Committee – As Prepared for
Delivery, March 16, 2011, http://www.energy.gov/news/10178.htm.
14
Energy Information Administration, Electricity Data Browser, “Net Generation for All Sectors, Annual,” viewed
September 4, 2013, http://www.eia.gov/electricity/data/browser.

Congressional Research Service

4

Nuclear Energy Policy

generates about 19% of the nation’s electricity.15 TVA’s board of directors voted August 1, 2007,
to resume construction on Watts Bar 2, which had been suspended in 1985; the renewed
construction project was to cost about $2.5 billion and be completed in 2013. However, TVA
announced on April 5, 2012, that completing Watts Bar 2 would cost up to $2 billion more than
expected and take until 2015.16 At TVA’s request, NRC in March 2009 reinstated the construction
authorization for the two-unit Bellefonte (AL) nuclear plant, which had been deferred in 1988 and
canceled in 2006.17 The TVA board voted on August 18, 2011, to complete construction of
Bellefonte 1 after the Watts Bar 2 project is finished. Completing Bellefonte 1 was projected at
that time to cost $4.9 billion, with operation to begin by 2020.18 Citing lower electricity sales,
TVA on June 12, 2013, announced sharp cutbacks at the Bellefonte site.19
Annual electricity production from U.S. nuclear power plants is much greater than that from oil
and hydropower and other renewable energy sources. Nuclear generation has been overtaken by
natural gas in recent years, and it remains well behind coal, which accounted for about 39% of
U.S. electricity generation in 2013.20 Nuclear plants generated more than half the electricity in
four states in 2012—New Hampshire, New Jersey, South Carolina, and Vermont—and 12 states
generated 25%-50% of their electricity from nuclear power.21 The 789 billion net kilowatt-hours
of nuclear electricity generated in the United States during 201322 was about the same as the
nation’s entire electrical output in the early 1960s, when the oldest of today’s operating U.S.
commercial reactors were ordered.23
Reasons for the 30-year halt in U.S. nuclear plant orders included high capital costs, public
concern about nuclear safety and waste disposal, and regulatory compliance issues.
High construction costs may pose the most serious obstacle to nuclear power expansion.
Construction costs for reactors completed since the mid-1980s ranged from $2 billion to $6
billion, averaging more than $3,900 per kilowatt of electric generating capacity (in 2011 dollars),
far higher than commercial fossil fuel technologies. The nuclear industry predicts that new plant
designs could be built for less than that if many identical plants were built in a series, but current
estimates for new reactors show little if any reduction in cost.24

15

U.S. Nuclear Regulatory Commission, Information Digest 2023-2014, NUREG-1350, Vol. 25, August 20013, p. 32,
http://www.nrc.gov/reading-rm/doc-collections/nuregs/staff/sr1350/v25/sr1350v25.pdf.
16
Mary Powers, “Credit Agencies See Watts Bar-2 Cost Impact,” Nucleonics Week, April 12, 2012, p. 1.
17
Nuclear Regulatory Commission, “In the Matter of Tennessee Valley Authority (Bellefonte Nuclear Plant Units 1
and 2),” 74 Federal Register 10969, March 13, 2009.
18
Tennessee Valley Authority, “TVA Board Implements Vision,” press release, August 18, 2011, http://www.tva.com/
news/releases/julsep11/board_meeting/index.htm.
19
Tennessee Valley Authority, “TVA Announces Budget Reduction for Bellefonte Plant,” press release, June 12, 2013,
http://www.tva.com/news/releases/aprjun13/bellefonte_budget.html.
20
Energy Information Administration, Electric Power Monthly, Net Generation by Energy Source, February 2014,
http://www.eia.gov/electricity/monthly/epm_table_grapher.cfm?t=epmt_1_01. Net generation excludes electricity used
for power plant operation.
21
Nuclear Regulatory Commission, Information Digest, 2013–2014, op. cit.
22
EIA, Electricity Data Browser, op. cit.
23
All of today’s 100 operating U.S. commercial reactors were ordered from 1963 through 1973; see “Historical Profile
of U.S. Nuclear Power Development,” U.S. Council for Energy Awareness, 1992.
24
For a comparison of generating costs, see CRS Report RL34746, Power Plants: Characteristics and Costs, by (name
redacted).

Congressional Research Service

5

Nuclear Energy Policy

In contrast, average U.S. nuclear plant operating costs per kilowatt-hour dropped substantially
since 1990, and expensive downtime has been steadily reduced. Licensed U.S. commercial
reactors generated electricity at an average of 90% of their total capacity in 2013, according to the
Energy Information Administration (EIA).25
Seventy-three commercial reactors have received 20-year license renewals from the Nuclear
Regulatory Commission (NRC), giving them up to a total of 60 years of operation. License
renewals for 19 additional reactors are currently under review, and more are anticipated,
according to NRC.26 However, as noted above, three reactors that have received license renewals,
Vermont Yankee, Crystal River, and Kewaunee, are being permanently closed for economic
reasons.

Possible New Reactors
Electric utilities and other firms have announced plans to apply for COLs for more than 30
reactors (see Table 1).27 (For a discussion of COLs, see the “Licensing and Regulation” section
below.)
As noted above, construction is currently underway on four of the proposed new reactors, at the
Vogtle and Summer sites. COLs are being actively pursued for 14 additional reactors (shown in
Table 1), whose owners have not committed to actual construction but are keeping the option
available if conditions are more favorable in the future. The experience of the first few reactors to
be constructed is likely to be crucial in determining whether a wave of subsequent units will
move forward as the nuclear industry envisions.
The two new Vogtle reactors are scheduled to go on line in 2017 and 2018,28 the same years now
planned for startup of the new Summer units,29 although possible delays of more than a year have
been reported.30 EIA estimates that construction costs of new nuclear power plants will average
$5,335 per kilowatt of capacity, or about $6.1 billion for an AP1000 unit, not including interest
costs.31 The two Summer units are expected to cost about $11.6 billion in 2012 dollars, according
to regulatory filings,32 while the two Vogtle units are projected by their primary owner to cost a
total of $13.35 billion.33
25
Energy Information Administration, Electric Power Monthly, “Capacity Factors for Utility-Scale Generators Not
Primarily Using Fossil Fuels,” February 2014, http://www.eia.gov/electricity/monthly/epm_table_grapher.cfm?t=
epmt_6_07_b.
26
Nuclear Regulatory Commission, “Status of License Renewal Applications and Industry Activities,” May 5, 2014,
http://www.nrc.gov/reactors/operating/licensing/renewal/applications.html.
27
Nuclear Regulatory Commission, New Reactors, http://www.nrc.gov/reactors/new-reactors.html.
28
Southern Company, “Smart Power,” http://www.southerncompany.com/smart_energy/smart_power_vogtlekemper.html.
29
South Carolina Electric and Gas Company, “V.C. Summer Nuclear Station Units 2 and 3, Quarterly Report to the
South Carolina Office of Regulatory Staff,” June 30, 2013, http://www.scana.com/NR/rdonlyres/FD5FC097-395648A6-9098-2C2D115C8512/0/NNDQuarterlyReport2013Q2FINAL81413PUBLIC.pdf.
30
Carr, Housely, “SCE&G Talks with Contractors on Summer Will Be ‘Tense,’ Analyst Says,” Nucleonics Week,
August 14, 2014, p. 5.
31
Energy Information Administration, “Updated Capital Cost Estimates for Electricity Generation Plants,” November
2010, http://www.eia.gov/oiaf/beck_plantcosts/index.html.
32
South Carolina Electric & Gas Company, “Petitions for Updates and Revisions to the Capital Cost Schedule and the
(continued...)

Congressional Research Service

6

Nuclear Energy Policy

Duke Energy’s Levy County project, with two AP1000 units, is scheduled by NRC to receive a
final decision on its COL in mid-2015, although Duke has terminated its engineering,
procurement, and construction (EPC) contract for the project. Duke said it did not foresee a need
for the plant as soon as previously planned, but “continues to regard the Levy site as a viable
option for future nuclear generation.”34 COLs for six reactors at four other sites—Fermi (MI),
South Texas Project, William States Lee (SC), and North Anna (VA)—are scheduled to be issued
by 2016. The joint venture developing the proposed South Texas Plant reactors, Nuclear
Innovation North America (NINA), is focusing solely on the COL and a DOE loan guarantee.35
The proposed new reactors at the Fermi and North Anna sites reached a milestone on September
16, 2014, when NRC approved the design certification for GE-Hitachi’s Economic Simplified
Boiling Water Reactor (ESBWR), following nine years of review. The COLs that are currently
under review for both those units would use the ESBWR design. Like the Westinghouse AP1000,
the ESBWR includes “passive” safety features that are designed to protect the reactor core from
overheating after an accident.36
As shown in Table 1, the remaining three projects that have not suspended their COLs, with a
total of four proposed reactors, do not have firm licensing schedules from NRC. As a result, these
reactors appear unlikely to be completed before the early 2020s. Some of these proposed nuclear
projects may require additional partners in order to proceed to construction, according to
company announcements.37
Several other COL applications have been suspended, withdrawn, or shifted to early site permits
(ESPs) only. Entergy suspended further license review of its planned GE ESBWR reactors at
River Bend, LA, and Grand Gulf, MS, although it still has a previously issued ESP for Grand
Gulf. AmerenUE suspended review of a COL for its proposed new Callaway unit in Missouri, and
Exelon withdrew its COL application for a proposed two-unit plant in Victoria County, TX. Most
recently, Duke Energy suspended its application for two new AP1000s at its Shearon Harris plant
in North Carolina, and Luminant suspended its COL for two Mitsubishi APWRs at Comanche
Peak in Texas.
TVA decided to defer consideration of its COL application for two new Westinghouse AP1000
reactors at its Bellefonte plant in Alabama in favor of completing the first of two unfinished

(...continued)
Construction Schedule,” before the Public Service Commission of South Carolina, February 29, 2012,
http://www.scana.com/NR/rdonlyres/35AAED95-5226-416A-8DC2-0743BC93B911/0/
2012PetitiontoUpdateCostSchedules.pdf. Total cost based on SCE&G ownership of 55%.
33
Southern Company, “Smart Power,” http://www.southerncompany.com/smart_energy/smart_power_vogtlekemper.html. Total cost based on Southern Company’s 45.7% ownership.
34
Duke Energy, “Duke Energy Reaches Revised Multi-year Settlement with Florida Consumer Advocates,” news
release, August 1, 2013, http://www.duke-energy.com/news/releases/2013080101.asp.
35
NRG Energy, “NRG Energy, Inc. Provides Greater Clarity on the South Texas Nuclear Development Project,” press
release, April 19, 2011, http://phx.corporate-ir.net/External.File?item=
UGFyZW50SUQ9OTAwMzB8Q2hpbGRJRD0tMXxUeXBlPTM=&t=1.
36
Nuclear Regulatory Commission, “NRC Certifies GE-Hitachi New Reactor Design,” news release, September 16,
2014, http://www.nrc.gov/reading-rm/doc-collections/news/2014/.
37
Jeff Beattie, “Southeast Utilities Seek Partners to Hedge Nuclear Bets,” Energy Daily, October 5, 2010, p. 1.

Congressional Research Service

7

Nuclear Energy Policy

Babcock & Wilcox reactors at the site. TVA had submitted a COL application for the Bellefonte
AP1000s in October 2007 as part of the NuStart consortium.38
Constellation Energy announced October 9, 2010, that it was abandoning negotiations with DOE
for a loan guarantee for the planned Calvert Cliffs 3 reactor, which Constellation had been
developing as part of its UniStar joint venture with the French national utility EDF.39
Constellation sold its share of UniStar to EDF so that EDF could seek another U.S. partner to
continue the Calvert Cliffs project.40 (For more discussion of Constellation’s decision, see the
“Loan Guarantees” section below.)
NRC anticipates that several more COL and other license applications will be submitted in the
future. This includes a TVA plan to submit construction permit applications for small modular
reactors (SMRs) of about 160 megawatts each at its Clinch River, TN, site.41
Table 1. Announced Nuclear Plant License Applications
Announced
Applicant

Site

Reactor
Type

Units

Status

COL issued
Southern

Vogtle (GA)

Westinghouse
AP1000

2

COL application submitted 3/13/08; engineering,
procurement, and construction (EPC) contract signed
4/8/08; ESP and limited construction approved 8/26/09;
conditional DOE loan guarantee announced 2/16/10;
NRC hearing held 9/27-28/11; COL approved 2/9/12;
first “safety-related concrete” poured 3/14/13

SCE&G

Summer
(SC)

Westinghouse
AP1000

2

COL submitted 3/31/08; EPC contract signed 5/27/08;
COL approved 3/30/12; first “safety-related concrete”
poured 3/11/13

COL scheduled for completion
Duke Energy

Levy
County (FL)

Westinghouse
AP1000

2

COL submitted 7/30/08; application scheduled for
completion in 2014; termination of EPC contract
announced 8/1/13

DTE Energy

Fermi (MI)

GE ESBWR

1

COL submitted 9/18/08; application scheduled for
completion in 2015

Nuclear
Innovation
North America

South Texas
Project

Toshiba
ABWR

2

COL submitted 9/20/07; EPC contract signed with
Toshiba 2/12/09; NRG Energy halted further investment
4/19/11; application scheduled for completion in 2016

38

Tennessee Valley Authority, “Single Nuclear Unit at the Bellefonte Plant Site,” fact sheet, http://www.tva.gov/
environment/reports/blnp/index.htm.
39
Constellation Energy, “Constellation Energy Releases Statement Regarding U.S. Department of Energy Loan
Guarantee,” press release, October 9, 2010, http://ir.constellation.com/releasedetail.cfm?ReleaseID=516614.
40
Letter from Michael J. Wallace, Vice Chairman and Chief Operating Officer, Constellation Energy, to Thomas
Piquemal, Group Executive Vice President, Finance, EDF, October 15, 2010, http://files.shareholder.com/downloads/
CEG/1036755503x0x410084/e27369a0-ce85-432f-bfad-e17ddce4f8f2/101510_-_EDF_letter.pdf; Unistar, “EDF and
Constellation Energy Announce Comprehensive Agreement,” press release, October 27, 2010, http://press.edf.com/
press-releases/all-press-releases/2010/edf-and-constellation-energy-announce-comprehensive-agreement-82018.html&
return=42873.
41
NRC, “New Reactor Licensing Applications,” August 15, 2014, http://www.nrc.gov/reactors/new-reactors/newlicensing-files/new-rx-licensing-app-legend.pdf.

Congressional Research Service

8

Nuclear Energy Policy

Announced
Applicant

Site

Reactor
Type

Units

Status

Duke Energy

William
States Lee
(SC)

Westinghouse
AP1000

2

COL submitted 12/13/07; application scheduled for
completion in 2016

Dominion

North Anna

GE ESBWR

1

COL submitted 11/27/07; ESP approved 11/20/07;
application scheduled for completion in 2016

COL schedule under revision
FPL

Turkey
Point (FL)

Westinghouse
AP1000

2

COL submitted 6/30/09; preconstruction work being
conducted

PPL

Bell Bend
(PA)

Areva EPR

1

COL submitted 10/10/08, not scheduled for review

UniStar

Calvert
Cliffs (MD)

Areva EPR

1

COL submitted 7/13/07 (Part 1), 3/13/08 (Part 2);
Constellation withdrew from project 10/8/10;
application not scheduled for review

Licensing suspended
Entergy

Grand Gulf
(MS)

Not specified

1

COL submitted 2/27/08; licensing suspended 1/9/09;
ESP approved 3/27/07

Exelon

Victoria
County
(TX)

Not specified

2

COL application withdrawn and ESP application
submitted 3/25/10; ESP application withdrawn 8/28/12

AmerenUE

Calloway
(MO)

Areva EPR

1

COL submitted 7/24/08; license review suspended
6/23/09

Entergy

River Bend
(LA)

Not specified

1

COL submitted 9/25/08; licensing suspended 1/9/09

TVA

Bellefonte

Westinghouse
AP1000

2

COL submitted 10/30/07; licensing deferred 9/29/10

Unistar

Nine Mile
Point (NY)

Areva EPR

1

COL submitted 9/30/08; licensing suspended 12/1/09

Duke Energy

Harris (NC)

Westinghouse
AP1000

2

COL submitted 2/19/08; EPC contract signed 1/5/09;
licensing suspended 5/2/13

Luminant
Power

Comanche
Peak (TX)

Mitsubishi USAPWR

2

COL submitted 9/19/08; review suspended 3/31/14

Total COL applications

28

Total currently active
COLs

16

Sources: NRC, Nucleonics Week, Nuclear News, Nuclear Energy Institute, company news releases.
Note: Applications are for COLs unless otherwise specified.

Congressional Research Service

9

Nuclear Energy Policy

Nuclear Power Plant Safety and Regulation
Safety
Worldwide concern about nuclear power plant safety rose sharply after the Fukushima accident,
which is generally considered to be much worse than the March 1979 Three Mile Island accident
in Pennsylvania but not as severe as the April 1986 Chernobyl disaster in the former Soviet
Union. Total radioactive releases from the Fukushima accident have been estimated at 25 million
curies,42 compared with 140 million curies from Chernobyl43 and 43,000 curies from Three Mile
Island.44
The Fukushima disaster resulted in similar levels of radioactive contamination per square meter
to that of Chernobyl, but the Fukushima contamination was much less widespread and affected a
smaller number of people.45 Timely evacuation of areas up to 30 kilometers (km, 18.6 miles) from
the Fukushima Daiichi plant reduced radiation exposure from the accident. A health survey
conducted by the Fukushima prefecture estimated the total dose to the prefecture’s 435,788
people at less than 617 sieverts (61,700 rem), averaging no more than about 1.4 millisieverts (140
millirem) per person for the first 28 months after the accident.46 For comparison, NRC limits the
dose resulting from the use of radioactive materials to 100 millirem per year (1 millisievert) to
any individual member of the public.47 (For more background on the Fukushima accident, see
CRS Report R41694, Fukushima Nuclear Disaster, by (name redacted), (name redacted), and
48
(name redacted).)
The Fukushima disaster has raised particular policy questions for the United States because,
unlike Chernobyl, the Fukushima reactors are similar to common U.S. designs. Although the
Fukushima accident resulted from a huge tsunami that incapacitated the power plant’s emergency
diesel generators, the accident dramatically illustrated the potential consequences of any natural
catastrophe or other situation that could cause an extended “station blackout”—the loss of
alternating current (AC) power. Safety issues related to station blackout include standards for

42

World Nuclear Association, “Fukushima Accident 2011,” September 2014, http://www.world-nuclear.org/info/
Safety-and-Security/Safety-of-Plants/Fukushima-Accident-2011. Radioactivity units converted from 940
petabecquerels of Iodine-131 equivalent.
43
World Nuclear Association, “Chernobyl Accident 1986,” June 2013, http://www.world-nuclear.org/info/Safety-andSecurity/Safety-of-Plants/Chernobyl-Accident.
44
Nuclear Regulatory Commission, “Backgrounder on the Three Mile Island Accident,” April 25, 2014,
http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/3mile-isle.html.
45
French Institut de Radioprotection et de Surete Nucleaire (IRSN), Assessment on the 66th Day of Projected External
Doses for Populations Living in the North-West Fallout Zone of the Fukushima Nuclear Accident, Report DRPH/201110, p. 27, http://hps.org/documents/irsn_fukushima_report.pdf.
46
Organisation for Economic Co-operation and Development, Nuclear Energy Agency, 2013 NEA Annual Report, p. 8.
CRS calculations based on data in Table 3.
47
NRC, “Radiation Protection and the NRC,” http://www.nrc.gov/reading-rm/doc-collections/nuregs/brochures/
br0322/#intro.
48
See also Institute of Nuclear Power Operations, Special Report on the Nuclear Accident at the Fukushima Daiichi
Nuclear Power Station, INPO 11-005, November 2011, available from the Nuclear Energy Institute at
http://www.nei.org/resourcesandstats/documentlibrary/safetyandsecurity/reports/special-report-on-the-nuclearaccident-at-the-fukushima-daiichi-nuclear-power-station.

Congressional Research Service

10

Nuclear Energy Policy

backup batteries, which had been required to provide power for 4-8 hours, and additional
measures that may be required to assure backup power.
Safety concerns at U.S. reactors were also raised by hydrogen explosions at three of the
Fukushima reactors—resulting from a high-temperature reaction between steam and nuclear fuel
cladding—and the loss of cooling at the Japanese plant’s spent fuel storage pools. Other safety
issues that have been raised in the wake of Fukushima include the vulnerability of U.S. nuclear
plants to earthquakes, floods, and other natural disasters, the availability of iodine pills to prevent
absorption of radioactive iodine released during nuclear accidents, and the adequacy of nuclear
accident emergency planning.
In response to such concerns, NRC on March 23, 2011, established a task force “made up of
current senior managers and former NRC experts” to “conduct both short- and long-term analysis
of the lessons that can be learned from the situation in Japan.”49 The Near-Term Task Force issued
its report July 12, 2011, making recommendations ranging from specific safety improvements to
broad changes in NRC’s overall regulatory approach.50 NRC staff subsequently identified several
of those actions that “can and should be initiated without delay.”51 The NRC Commissioners
largely agreed with the recommendations on October 18, 2011, and instructed the agency’s staff
to “strive to complete and implement the lessons learned from the Fukushima accident within five
years—by 2016.”52 Tier 1 regulatory actions, which are now being implemented, include53
•

Seismic and flood hazard reevaluations and walkdowns. Nuclear plant operators
must evaluate the implications of updated seismic and flooding models, including
all potential flooding sources. Plant operators must identify and verify the
adequacy of flood and seismic protection features at their sites.

•

Station blackout regulatory actions. NRC issued an order on March 12, 2012,
that required U.S. reactors to implement mitigation strategies “that will allow
them to cope without their permanent electrical power sources for an indefinite
amount of time.” Under the order, installed equipment at each plant must be
sufficient to maintain or restore cooling until portable on-site equipment and
supplies could take over. The portable on-site equipment would have to provide
sufficient cooling until “sufficient offsite resources” could be brought in to
maintain cooling indefinitely. Enough equipment and personnel would be
required to protect all affected reactors at a multi-unit plant. NRC is currently
preparing permanent regulations based on the mitigation strategies order.

49

Nuclear Regulatory Commission, “Nuclear Regulatory Commission Directs Staff on Continuing Agency Response to
Japan Events; Adjust Commission Schedule,” press release, March 23, 2011, http://pbadupws.nrc.gov/docs/ML1108/
ML110821123.pdf.
50
Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, Recommendations for Enhancing
Reactor Safety in the 21st Century, Nuclear Regulatory Commission, Washington, DC, July 12, 2011,
http://pbadupws.nrc.gov/docs/ML1118/ML111861807.pdf.
51
NRC, “Recommended Actions to Be Taken Without Delay from the Near-Term Task Force Report,” SECY-110124, September 9, 2011.
52
NRC, “Staff Requirements – SECY-11-0124 – Recommended Actions to Be Taken Without Delay from the NearTerm Task Force Report,” October 18, 2011, http://pbadupws.nrc.gov/docs/ML1126/ML11269A204.pdf.
53
NRC, “What Are the Lessons Learned from Fukushima?,” September 10, 2014, http://www.nrc.gov/reactors/
operating/ops-experience/japan-dashboard/priorities.html.

Congressional Research Service

11

Nuclear Energy Policy

•

Reliable hardened vents for Mark I containments. NRC on March 12, 2012,
ordered nuclear plants to install “reliable, hardened” vents for the containments
in Mark I reactors (the type at Fukushima). The vents would be designed to
reduce containment pressure before damage occurred to the reactor core. NRC
modified the order in June 2013 to require that the vents continue to function
after core damage occurred, which could prevent hydrogen generated by
overheated fuel cladding from leaking into the reactor building, as occurred at
Fukushima. Because venting after core damage has occurred could release
radioactive core material into the environment, NRC is also considering a
requirement that vents include filters or that other strategies be implemented to
reduce such emissions.

•

Spent fuel pool instrumentation. NRC ordered nuclear plants on March 12, 2012,
to install safety instrumentation to monitor spent fuel pool conditions, such as
water level, temperature, and radiation levels, from the plant control room.

•

Strengthening and integrating accident procedures and capabilities. NRC issued
an Advanced Notice of Proposed Rulemaking on April 18, 2012, to require
integrated emergency procedures, including clear command-and-control
strategies and training qualifications for emergency decisionmakers.

•

Emergency preparedness regulatory actions. NRC has asked nuclear plants how
many workers would be needed to respond to large accidents affecting multiple
reactors at the same site. In addition, plants were asked to assess and ensure the
operability of emergency communications systems during such accidents.

The NRC staff slightly modified its proposals for top priority actions and divided the remaining
Task Force proposals into two lower tiers, which were determined to require further assessment
and potentially long-term study. Included in the lower-tier actions were requirements for
emergency water supply systems for spent fuel pools, secure power for emergency
communications and data systems, confirmation of seismic and flooding hazards, and
modifications to NRC’s regulatory process.54

Emergency Planning
Following the Three Mile Island accident, which revealed severe weaknesses in preparations for
nuclear plant emergencies, Congress mandated that emergency plans be prepared for all licensed
power reactors (P.L. 96-295, §109). NRC was required to develop standards for emergency plans
and review the adequacy of each plant-specific plan in consultation with the Federal Emergency
Management Agency (FEMA).
NRC’s emergency planning requirements focus on a “plume exposure pathway emergency
planning zone (EPZ),” encompassing an area within about 10 miles (16.1 km) of each nuclear
plant. Within the 10-mile EPZ, a range of responses must be developed to protect the public from
radioactive releases, including evacuation, sheltering, and the distribution of non-radioactive
iodine (as discussed above). The regulations also require a 50-mile “ingestion pathway EPZ,” in

54

R.W. Borchardt, NRC Executive Director for Operations, “Prioritization of Recommended Actions to Be Taken in
Response to Fukushima Lessons Learned,” SECY-11-0137, October 3, 2011.

Congressional Research Service

12

Nuclear Energy Policy

which actions are developed to protect food supplies.55 Nuclear plants are required to conduct
emergency preparedness exercises every two years. The exercises, which are evaluated by FEMA
and NRC, may include local, state, and federal responders and may involve both the plume and
ingestion EPZs.56
The size of the plume exposure EPZ has long been a subject of controversy, particularly after the
9/11 terrorist attacks on the United States, in which nuclear plants were believed to have been a
potential target. Attention to the issue was renewed by the Fukushima accident, in which some of
the highest radiation dose rates were measured beyond 10 miles from the plant.57 Controversy
over the issue intensified after NRC recommended the evacuation of U.S. citizens within 50 miles
of the Fukushima plant on March 16, 2011. The NRC recommendation was based on computer
models that, using meteorological data and estimates of plant conditions, found that potential
radiation doses 50 miles from the plant could exceed U.S. protective action guidelines.58
In response to the 9/11 terrorist attacks, NRC modified its nuclear plant emergency planning
requirements and began a comprehensive review of emergency planning regulations and
guidance. An NRC final rule based on that review took effect December 23, 2011.59 Among the
changes included in the rule are new requirements for periodic updates of EPZ evacuation time
estimates, mandatory backups for public alert systems, and protection of emergency responders
during terrorist attacks. The new emergency planning regulations were prepared before the
Fukushima accident, but the NRC staff recommended approval of the changes without waiting for
further changes that might result from the lessons of the Japanese accident. Emergency planning
changes resulting from Fukushima should be implemented later, the staff recommended.60

Domestic Reactor Safety Experience
Nuclear power safety has been a longstanding issue in the United States. Safety-related
shortcomings have been identified in the construction quality of some plants, plant operation and
maintenance, equipment reliability, emergency planning, and other areas. In one serious case, it
was discovered in March 2002 that leaking boric acid had eaten a large cavity in the top of the
reactor vessel in Ohio’s Davis-Besse nuclear plant. The corrosion left only the vessel’s quarterinch-thick stainless steel inner liner to prevent a potentially catastrophic loss of reactor cooling
water. Davis-Besse remained closed for repairs and other safety improvements until NRC allowed
the reactor to restart in March 2004.

55

10 CFR 50.47, Emergency Plans.
Nuclear Regulatory Commission, “Emergency Preparedness & Response,” website, http://www.nrc.gov/about-nrc/
emerg-preparedness.html.
57
Japanese Ministry of Education, Culture, Sports, Science, and Technology (MEXT), “Readings of Integrated Dose at
Monitoring Post out of 20 Km Zone of Fukushima Dai-ichi NPP,” data series, http://www.mext.go.jp/english/incident/
1304275.htm.
58
Nuclear Regulatory Commission, “NRC Provides Protective Action Recommendations Based on U.S. Guidelines,”
press release, March 16, 2011, http://pbadupws.nrc.gov/docs/ML1108/ML110800133.pdf.
59
Nuclear Regulatory Commission, “Enhancements to Emergency Planning Regulations,” Final rule, Federal Register,
November 23, 2011, p. 72560.
60
Nuclear Regulatory Commission, “Final Rule: Enhancements to Emergency Preparedness Regulations,” SECY-110053, April 8, 2011, http://www.nrc.gov/reading-rm/doc-collections/commission/secys/2011/2011-0053scy.pdf.
56

Congressional Research Service

13

Nuclear Energy Policy

NRC’s oversight of the nuclear industry is a subject of contention as well; nuclear utilities often
complain that they are subject to overly rigorous and inflexible regulation, but nuclear critics
charge that NRC frequently relaxes safety standards when compliance may prove difficult or
costly to the industry.
In terms of public health consequences, the safety record of the U.S. nuclear power industry in
comparison with other major commercial energy technologies has been excellent. During more
than 3,500 reactor-years of operation in the United States,61 the only incident at a commercial
nuclear power plant that might lead to any deaths or injuries to the public has been the Three Mile
Island accident, in which more than half the reactor core melted.62 A study of 32,000 people living
within five miles of the reactor when the accident occurred found no significant increase in
cancer rates through 1998, although the authors noted that some potential health effects “cannot
be definitively excluded.”63
The relatively small amounts of radioactivity released by nuclear plants during normal operation
are not generally believed to pose significant hazards, although some groups contend that routine
emissions are unacceptably risky. There is substantial scientific uncertainty about the level of risk
posed by low levels of radiation exposure; as with many carcinogens and other hazardous
substances, health effects can be clearly measured only at relatively high exposure levels. In the
case of radiation, the assumed risk of low-level exposure has been extrapolated mostly from
health effects documented among persons exposed to high levels of radiation, particularly
Japanese survivors of nuclear bombing in World War II, medical patients, and nuclear industry
workers.64
NRC announced April 7, 2010, that it had asked the National Academy of Sciences (NAS) to
“perform a state-of-the-art study on cancer risk for populations surrounding nuclear power
facilities.” Unlike in previous studies, NAS is to examine cancer diagnosis rates, rather than
cancer deaths, potentially increasing the amount of data. The new study would also use
geographic units smaller than counties to determine how far members of the study group are
located from reactors, to more clearly determine whether there is a correlation between cancer
cases and distance from reactors. After issuing a report on methodologies for the study in 2012,
NAS began planning a pilot study at seven nuclear facilities in late 2013.65
NRC’s 1986 Safety Goal Policy Statement declared that nuclear power plants should not increase
the risk of accidental or cancer deaths among the nearby population by more than 0.1%.66 Later
61

Nuclear Energy Institute, “Myths & Facts About Safety,” viewed September 16, 2014, .http://www.nei.org/
Knowledge-Center/Backgrounders/Fact-Sheets/Myths-Facts-About-Safety.
62
Nuclear Regulatory Commission, “Backgrounder on the Three Mile Island Accident,” April 25, 2014,
http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/3mile-isle.html.
63
Evelyn O. Talbott et al., “Long Term Follow-Up of the Residents of the Three Mile Island Accident Area: 19791998,” Environmental Health Perspectives, March 2003, pp. 341-348, http://www.ncbi.nlm.nih.gov/pmc/articles/
PMC1241392.
64
National Research Council, Committee to Assess the Health Risks from Exposure to Low Levels of Ionizing
Radiation, Beir VII: Health Risks from Exposure to Low Levels of Ionizing Radiation, 2006. Available at
http://www.nap.edu.
65
National Academy of Sciences, Nuclear and Radiation Studies Board, “Analysis of Cancer Risks in Populations near
Nuclear Facilities, Phase 2: Pilot Planning,” http://nas-sites.org/cancerriskstudy/.
66
NRC, “Safety Goals for the Operations of Nuclear Power Plants,” policy statement, Federal Register, August 21,
1986, p. 30028, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/51fr30028.pdf.

Congressional Research Service

14

Nuclear Energy Policy

NRC guidance established a “subsidiary benchmark” for the probability of accidental core
damage (fuel melting): Core damage frequency should average no more than one in 10,000 per
reactor per year.67 In addition, NRC set a benchmark that reactor containments should be
successful at least 90% of the time in preventing major radioactive releases during a core-damage
accident. Therefore, the benchmark probability of a major release from containment failure
during a core melt accident would average less than one in 100,000 per reactor per year.68 (For the
current U.S. fleet of about 100 reactors, that rate would yield an average of one core-damage
accident every 100 years and a major release every 1,000 years.) On the other hand, some groups
challenge the complex calculations that go into predicting such accident frequencies, contending
that accidents with serious public health consequences may be more frequent.69

Reactor Safety in the Former Soviet Bloc
The Chernobyl accident was by far the worst nuclear power plant accident to have occurred
anywhere in the world. At least 31 persons died quickly from acute radiation exposure or other
injuries, and thousands of additional cancer deaths among the tens of millions of people exposed
to radiation from the accident may occur during the next several decades.
According to a 2006 report by the Chernobyl Forum organized by the International Atomic
Energy Agency, the primary observable health consequence of the accident was a dramatic
increase in childhood thyroid cancer. The Chernobyl Forum estimated that about 4,000 cases of
thyroid cancer have occurred in children who after the accident drank milk contaminated with
high levels of radioactive iodine, which concentrates in the thyroid. Although the Chernobyl
Forum found only 15 deaths from those thyroid cancers, it estimated that about 4,000 other
cancer deaths may have occurred among the 600,000 people with the highest radiation exposures,
plus an estimated 1% increase in cancer deaths among persons with less exposure. The report
estimated that about 77,000 square miles were significantly contaminated by radioactive
cesium.70 Greenpeace issued a report in 2006 estimating that 200,000 deaths in Belarus, Russia,
and Ukraine resulted from the Chernobyl accident between 1990 and 2004.71

Licensing and Regulation
For many years, a top priority of the U.S. nuclear industry was to modify the process for licensing
new nuclear plants. No electric utility would consider ordering a nuclear power plant, according
to the industry, unless licensing became quicker and more predictable, and designs were less
subject to mid-construction safety-related changes required by NRC. The Energy Policy Act of
1992 (P.L. 102-486) largely implemented the industry’s licensing goals.
67
NRC Staff Requirements Memorandum on SECY-89-102, “Implementation of the Safety Goals,” Memorandum to
James M. Taylor from Samuel J. Chilk, June 15, 1990, http://pbadupws.nrc.gov/docs/ML0037/ML003707881.pdf.
68
U.S. NRC, Regulatory Guide 1.174, “An Approach for Using Probabilistic Risk Assessment in Risk-Informed
Decisions on Plant-Specific Changes to the Licensing Basis,” Revision 1, November 2002, http://www.nrc.gov/
reading-rm/doc-collections/reg-guides/power-reactors/rg/01-174.
69
Public Citizen Energy Program, “The Myth of Nuclear Safety,” http://www.citizen.org/cmep/energy_enviro_nuclear/
nuclear_power_plants/reactor_safety/articles.cfm?ID=4454.
70
The Chernobyl Forum: 2003-2005, Chernobyl’s Legacy: Health, Environmental and Socio-Economic Impacts,
International Atomic Energy Agency, April 2006.
71
Greenpeace. The Chernobyl Catastrophe: Consequences on Human Health, April 2006, p. 10.

Congressional Research Service

15

Nuclear Energy Policy

Nuclear plant licensing under the Atomic Energy Act of 1954 (P.L. 83-703; U.S.C. 2011-2282)
had historically been a two-stage process. NRC first issued a construction permit to build a plant
and then, after construction was finished, an operating license to run it. Each stage of the
licensing process involved adjudicatory proceedings. Environmental impact statements also are
required under the National Environmental Policy Act.
Over the vehement objections of nuclear opponents, the Energy Policy Act of 1992 provided a
clear statutory basis for one-step nuclear licenses. Under the new process, NRC can issue
combined construction permits and operating licenses (COLs) and allow completed plants to
operate without delay if they meet all construction requirements—called “inspections, tests,
analyses, and acceptance criteria,” or ITAAC. NRC would hold preoperational hearings on the
adequacy of plant construction only in specified circumstances.
DOE’s Nuclear Power 2010 program had paid up to half the cost of several COLs and early site
permits to test the revised licensing procedures. However, the COL process cannot be fully tested
until construction of new reactors is completed. At that point, it could be seen whether completed
plants would be able to operate without delays or whether adjudicable disputes over construction
adequacy may arise. Section 638 of the Energy Policy Act of 2005 (EPACT05, P.L. 109-58)
authorizes federal payments to the owner of a completed reactor whose operation is held up by
regulatory delays. The nuclear industry has asked Congress to require NRC to use informal
procedures in determining whether ITAAC have been met, eliminate mandatory hearings on
uncontested issues before granting a COL, and make other changes in the licensing process.72
A fundamental concern in the nuclear regulatory debate is the performance of NRC in issuing and
enforcing nuclear safety regulations. The nuclear industry and its supporters have regularly
complained that unnecessarily stringent and inflexibly enforced nuclear safety regulations have
burdened nuclear utilities and their customers with excessive costs. But many environmentalists,
nuclear opponents, and other groups charge NRC with being too close to the nuclear industry, a
situation that they say has resulted in lax oversight of nuclear power plants and routine
exemptions from safety requirements.
Primary responsibility for nuclear safety compliance lies with nuclear plant owners, who are
required to find any problems with their plants and report them to NRC. Compliance is also
monitored directly by NRC, which maintains at least two resident inspectors at each nuclear
power plant. The resident inspectors routinely examine plant systems, observe the performance of
reactor personnel, and prepare regular inspection reports. For serious safety violations, NRC often
dispatches special inspection teams to plant sites.
NRC’s reactor safety program is based on “risk-informed regulation,” in which safety
enforcement is guided by the relative risks identified by detailed individual plant studies. NRC’s
risk-informed reactor oversight system, inaugurated April 2, 2000, relies on a series of
performance indicators to determine the level of scrutiny that each reactor should receive.73

72
Nuclear Energy Institute, Legislative Proposal to Help Meet Climate Change Goals by Expanding U.S. Nuclear
Energy Production, Washington, DC, October 28, 2009, p. 5, http://www.nei.org/resourcesandstats/documentlibrary/
newplants/policybrief/2009-nuclear-policy-initiative.
73
For more information about the NRC reactor oversight process, see http://www.nrc.gov/NRR/OVERSIGHT/
ASSESS/index.html.

Congressional Research Service

16

Nuclear Energy Policy

Reactor Security
Nuclear power plants have long been recognized as potential targets of terrorist attacks, and
critics have long questioned the adequacy of requirements for nuclear plant operators to defend
against such attacks. All commercial nuclear power plants licensed by NRC have a series of
physical barriers against access to vital reactor areas and are required to maintain a trained
security force to protect them.
A key element in protecting nuclear plants is the requirement that simulated terrorist attacks,
monitored by NRC, be carried out to test the ability of the plant operator to defend against them.
The severity of attacks that plant security must prepare for is specified in the “design basis threat”
(DBT).
EPACT05 required NRC to revise the DBT based on an assessment of terrorist threats, the
potential for multiple coordinated attacks, possible suicide attacks, and other criteria. NRC
approved the DBT revision based on those requirements on January 29, 2007. The revised DBT
does not require nuclear power plants to defend against deliberate aircraft attacks. NRC
contended that nuclear facilities were already required to mitigate the effects of large fires and
explosions, no matter what the cause, and that active protection against airborne threats was being
addressed by U.S. military and other agencies.74 After much consideration, NRC voted February
17, 2009, to require all new nuclear power plants to incorporate design features that would ensure
that, in the event of a crash by a large commercial aircraft, the reactor core would remain cooled
or the reactor containment would remain intact, and radioactive releases would not occur from
spent fuel storage pools.75 The rule change was published in the Federal Register June 12, 2009.76
NRC rejected proposals that existing reactors also be required to protect against aircraft crashes,
such as by adding large external steel barriers. However, NRC did impose some additional
requirements related to aircraft crashes on all reactors, both new and existing, after the 9/11
terrorist attacks of 2001. In 2002, as noted above, NRC ordered all nuclear power plants to
develop strategies to mitigate the effects of large fires and explosions that could result from
aircraft crashes or other causes. An NRC regulation on fire mitigation strategies, along with
requirements that reactors establish procedures for responding to specific aircraft threats, was
approved December 17, 2008.77 The fire mitigation rules were published in the Federal Register
March 27, 2009.78
Other ongoing nuclear plant security issues include the vulnerability of spent fuel pools, which
hold highly radioactive nuclear fuel after its removal from the reactor, standards for nuclear plant
security personnel, and nuclear plant emergency planning. NRC’s March 2009 security
74
NRC Office of Public Affairs, NRC Approves Final Rule Amending Security Requirements, News Release No. 07012, January 29, 2007.
75
Nuclear Regulatory Commission, Final Rule—Consideration of Aircraft Impacts for New Nuclear Power Reactors,
Commission Voting Record, SECY-08-0152, February 17, 2009.
76
Nuclear Regulatory Commission, “Consideration of Aircraft Impacts for New Nuclear Power Reactors,” Final Rule,
74 Federal Register 28111, June 12, 2009. This provision is codified at 10 CFR 50.150.
77
Nuclear Regulatory Commission, “NRC Approves Final Rule Expanding Security Requirements for Nuclear Power
Plants,” press release, December 17, 2008, http://www.nrc.gov/reading-rm/doc-collections/news/2008/08-227.html.
78
Nuclear Regulatory Commission, “Power Reactor Security Requirements,” Final Rule, 74 Federal Register 13925,
March 27, 2009.

Congressional Research Service

17

Nuclear Energy Policy

regulations addressed some of those concerns and included a number of other security
enhancements.
EPACT05 required NRC to conduct force-on-force security exercises at nuclear power plants
every three years (which was NRC’s previous policy), authorized firearms use by nuclear security
personnel (preempting some state restrictions), established federal security coordinators, and
required fingerprinting of nuclear facility workers.
(For background on security issues, see CRS Report RL34331, Nuclear Power Plant Security and
Vulnerabilities, by (name redacted) and (name redacted).)

Decommissioning
When nuclear power plants reach the end of their useful lives, they must be safely removed from
service, a process called decommissioning. NRC requires nuclear utilities to make regular
contributions to dedicated funds to ensure that money is available to remove radioactive material
and contamination from reactor sites after they are closed.
The first full-sized U.S. commercial reactors to be decommissioned were the Trojan plant in
Oregon, whose decommissioning completion received NRC approval on May 23, 2005, and the
Maine Yankee plant, for which NRC approved most of the site cleanup on October 3, 2005. The
Trojan decommissioning cost $429 million, according to reactor owner Portland General Electric,
and the Maine Yankee decommissioning cost about $500 million.79 Decommissioning of the
Connecticut Yankee plant cost $790 million and was approved by NRC on November 26, 2007.80
NRC approved the cleanup of the decommissioned Rancho Seco reactor site in California on
October 7, 2009.81 The decommissioning of Rancho Seco was estimated to cost $500 million,
excluding future demolition of the cooling towers and other remaining plant structures.82 Total
costs for decommissioning, spent fuel storage, and site restoration at the recently closed San
Onofre units 2 and 3 are estimated at $4.1 billion.83
When a reactor is permanently shut down, the owner (licensee) has 30 days to notify NRC. The
licensee then certifies with NRC when spent fuel has been permanently removed from the reactor
vessel. By two years after shutdown, the licensee must submit a Post Shutdown
Decommissioning Activities Report (PSDAR). The PSDAR specifies which of the two primary
decommissioning options will be pursued:
•

DECON: Plant and equipment are dismantled and removed, or decontaminated to
the level required for release from NRC licensing.

79

Sharp, David, “NRC Signs Off on Maine Yankee’s Decommissioning,” Associated Press, October 3, 2005.
E-mail communication from Bob Capstick, Connecticut Yankee Atomic Power Company, August 28, 2008.
81
Nuclear Regulatory Commission, “NRC Releases Rancho Seco Nuclear Plant for Unconditional Use,” press release,
October 7, 2009, http://www.nrc.gov/reading-rm/doc-collections/news/2009/09-165.html.
82
“20 Years Later, Rancho Seco Ready for Final Shutdown,” Sacramento County Herald, June 9, 2009.
83
Edison International, “SCE Submits Nuclear Plant Decommissioning Plan to Federal Regulator,” news release,
September 23, 2014, http://newsroom.edison.com/releases/sce-submits-nuclear-plant-decommissioning-plan-to-federalregulator.
80

Congressional Research Service

18

Nuclear Energy Policy

•

SAFSTOR: The plant is placed in a safe, stable condition for future
dismantlement and decontamination.

According to NRC, nine reactors are currently in SAFSTOR: Dresden 1 (IL), Indian Point 1
(NY), La Crosse (WI), Millstone 1 (CT), Peach Bottom 1 (PA), San Onofre 1 (CA), GE
Vallecitios (CA), NS Savannah (MD), and Three Mile Island 2 (PA). Four units are in DECON:
Fermi 1 (MI), Humboldt Bay (CA), and Zion 1 and 2 (IL).84
After nuclear reactors are decommissioned, the spent nuclear fuel (SNF) accumulated during their
operating lives remains stored in pools or dry casks at the plant sites. About 5,900 metric tons of
spent fuel is currently stored at 12 closed nuclear power plants and Vermont Yankee, which is to
close in late 2014.85 “Until this SNF is removed from these [at the time] nine sites, the sites
cannot be fully decommissioned and made available for other purposes,” DOE noted in a 2008
report.86 President Obama’s decision to terminate development of an underground spent fuel
repository at Yucca Mountain, NV, has increased concerns about the ultimate disposition of spent
fuel at decommissioned sites. (For more information, see CRS Report R42513, U.S. Spent
Nuclear Fuel Storage, by (name redacted).)

Nuclear Accident Liability
Liability for damages to the general public from nuclear incidents is addressed by the PriceAnderson Act (primarily Section 170 of the Atomic Energy Act of 1954, 42 U.S.C. 2210).
EPACT05 extended the availability of Price-Anderson coverage for new reactors and new DOE
nuclear contracts through the end of 2025. (Existing reactors and contracts were already covered.)
Under Price-Anderson, the owners of commercial reactors must assume all liability for nuclear
damages awarded to the public by the court system, and they must waive most of their legal
defenses following a severe radioactive release (“extraordinary nuclear occurrence”). To pay any
such damages, each licensed reactor with at least 100 megawatts of electric generating capacity
must carry the maximum liability insurance reasonably available, which was raised from $300
million to $375 million on January 1, 2010.87 Any damages exceeding $375 million are to be
assessed equally against all 100-megawatt-and-above power reactors, up to $121.3 million per
reactor (increased for inflation from $111.9 million on September 10, 2013).88 Those
assessments—called “retrospective premiums”—would be paid at an annual rate of no more than
$19.0 million per reactor (up from $17.5 million), to limit the potential financial burden on
reactor owners following a major accident. According to NRC, 104 commercial reactors,

84
NRC, Information Digest, 2013-2014, NUREG-1350, Volume 25, Appendix C, http://www.nrc.gov/reading-rm/doccollections/nuregs/staff/sr1350.
85
Gutherman Technical Service, “2011 Used Fuel Data,” January 14, 2012.
86
DOE Office of Civilian Radioactive Waste Management, Report to Congress on the Demonstration of the Interim
Storage of Spent Nuclear Fuel from Decommissioned Nuclear Power Reactor Sites, DOE/RW-0596, Washington, DC,
December 2008, p. 1, http://www.energy.gov/media/ES_Interim_Storage_Report_120108.pdf.
87
American Nuclear Insurers, “Need for Nuclear Liability Insurance,” January 2010,
http://www.nuclearinsurance.com/library/Nuclear%20Liability%20in%20the%20US.pdf.
88
NRC, “Inflation Adjustments to the Price-Anderson Financial Protection Regulations,” 79 Federal Register 41835,
July 12, 2013.

Congressional Research Service

19

Nuclear Energy Policy

including the four closed in 2013,89 are currently covered by the Price-Anderson retrospective
premium requirement.90
For each nuclear incident, the Price-Anderson liability system currently would provide up to
$13.6 billion in public compensation. That total includes $121.3 million in retrospective
premiums from each of the 104 currently covered reactors, totaling $12.6 billion, plus the $375
million in insurance coverage carried by the reactor that suffered the incident. On top of those
payments, a 5% surcharge may also be imposed, raising the total per-reactor retrospective
premium to $127.4 million and the total available compensation to about $13.6 billion. Under
Price-Anderson, the nuclear industry’s liability for an incident is capped at that amount, which
varies over time depending on the number of covered reactors, the amount of available insurance,
and the inflation adjustment. Payment of any damages above that liability limit would require
congressional approval under special procedures in the act.
EPACT05 increased the limit on per-reactor annual payments to $15 million from the previous
$10 million, and required the annual limit to be adjusted for inflation every five years. As under
previous law, the total retrospective premium limit is adjusted every five years as well. For the
purposes of those payment limits, a nuclear plant consisting of multiple small reactors (100-300
megawatts, up to a total of 1,300 megawatts) would be considered a single reactor. Therefore, in
the event of a severe release a power plant with six 120-megawatt small modular reactors would
be liable for retrospective premiums of up to $121.3 million, rather than $727.8 million
(excluding the 5% surcharge).
The Price-Anderson Act also covers contractors who operate DOE nuclear facilities. EPACT05
set the liability limit on DOE contractors at $10 billion per accident, to be adjusted for inflation
every five years. The first adjustment under EPACT, raising the liability limit to $11.961 billion,
took effect October 14, 2009.91 The liability limit for DOE contractors previously had been the
same as for commercial reactors, excluding the 5% surcharge, except when the limit for
commercial reactors dropped because of a decline in the number of covered reactors. PriceAnderson authorizes DOE to indemnify its contractors for the entire amount of their liability, so
that damage payments for nuclear incidents at DOE facilities would ultimately come from the
Treasury. However, the law also allows DOE to fine its contractors for safety violations, and
contractor employees and directors can face criminal penalties for “knowingly and willfully”
violating nuclear safety rules. EPACT05 limited the civil penalties against a nonprofit contractor
to the amount of management fees paid under that contract.
The Price-Anderson Act’s limits on liability were crucial in establishing the commercial nuclear
power industry in the 1950s. Supporters of the Price-Anderson system contend that it has worked
well since that time in ensuring that nuclear accident victims would have a secure source of
89

As of June 2014. See NRC, “Backgrounder on Nuclear Insurance and Disaster Relief,” http://www.nrc.gov/readingrm/doc-collections/fact-sheets/nuclear-insurance.html. NRC can exempt shutdown reactors from the retrospective
premiums after their spent fuel has sufficiently cooled. See NRC, “Exemption Requests to Reduce Liability Insurance
Coverage for Decommissioning Reactors after Transfer of All Spent Fuel from a Spent Fuel Pool to Dry Cask Storage,
SECY-04-0176, September 29, 2004, http://www.nrc.gov/reading-rm/doc-collections/commission/secys/2004/.
90
Reactors smaller than 100 megawatts must purchase an amount of liability coverage determined by NRC but are not
subject to retrospective premiums. Total liability for those reactors is limited to $560 million, with the federal
government indemnifying reactor operators for the difference between that amount and their liability coverage (Atomic
Energy Act §170 b. and c.).
91
Department of Energy, “Adjusted Indemnification Amount,” 74 Federal Register 52793, October 14, 2009.

Congressional Research Service

20

Nuclear Energy Policy

compensation, at little cost to the taxpayer. Extension of the act was widely considered a
prerequisite for new nuclear reactor construction in the United States. Opponents contend that
Price-Anderson inappropriately subsidizes the nuclear power industry by reducing its insurance
costs and protecting it from some of the financial consequences of the most severe conceivable
accidents. Projections that damages to the public from the Fukushima accident will greatly exceed
the Price-Anderson liability limits prompted renewed calls for reexamination of the law.92
The U.S. government is supporting the establishment of an international liability system that,
among other purposes, would cover U.S. nuclear equipment suppliers conducting foreign
business. The Convention on Supplementary Compensation for Nuclear Damage (CSC) will not
enter into force until at least five countries with a specified level of installed nuclear capacity
have enacted implementing legislation. Such implementing language was included in the Energy
Independence and Security Act of 2007 (P.L. 110-140, Section 934), signed by President Bush
December 19, 2007. Supporters of the Convention hope that more countries will join now that the
United States has acted. Aside from the United States, four countries have submitted the
necessary instruments of ratification, but they do not have the required nuclear capacity for it to
take effect.93 Canada signed the convention on December 3, 2013, with the government
announcing that it would be submitted to Parliament for approval. Ratification by Canada, which
has a large nuclear reactor fleet, would put the convention into force 90 days later.94
Under the U.S. implementing legislation, the CSC would not change the liability and payment
levels already established by the Price-Anderson Act. Each party to the convention would be
required to establish a nuclear damage compensation system within its borders analogous to
Price-Anderson. For any damages not covered by those national compensation systems, the
convention would establish a supplemental tier of damage compensation to be paid by all parties.
P.L. 110-140 requires the U.S. contribution to the supplemental tier to be paid by suppliers of
nuclear equipment and services, under a formula to be developed by DOE. Supporters of the
convention contend that it will help U.S. exporters of nuclear technology by establishing a
predictable international liability system. For example, U.S. nuclear equipment sales to the
growing economies of China and India would be facilitated by those countries’ participation in
the CSC liability regime.

Federal Incentives for New Nuclear Plants
The nuclear power industry contends that support from the federal government would be needed
for “a major expansion of nuclear energy generation.”95 Significant incentives for building new
nuclear power plants were included in the Energy Policy Act of 2005 (EPACT05, P.L. 109-58),
signed by President Bush on August 8, 2005. These include production tax credits, loan
92

Ellen Vancko, Union of Concerned Scientists, “The Impact of Fukushima on the US Nuclear Power Industry,”
presentation to the Center for Strategic and International Studies Conference on Nuclear Safety and Fukushima, April
7, 2011, https://csis.org/files/attachments/110407_vancko_nuclear_safety_0.pdf.
93
International Atomic Energy Agency, Latest Status of Convention on Supplementary compensation for Nuclear
Damage, July 7, 2014, https://www.iaea.org/Publications/Documents/Infcircs/1998/infcirc567.shtml.
94
Ostroff, Jim, “Nuclear Compensation Convention on the Verge of Taking Effect,” Nucleonics Week, December 12,
2013, p. 1.
95
Nuclear Energy Institute, “NEI Unveils Package of Policy Initiatives Needed to Achieve Climate Change Goals,”
press release, October 26, 2009, http://www.nei.org/newsandevents/newsreleases/nei-unveils-package-of-policyinitiatives-needed-to-achieve-climate-change-goals/.

Congressional Research Service

21

Nuclear Energy Policy

guarantees, insurance against regulatory delays, and extension of the Price-Anderson Act nuclear
liability system (discussed in the previous section on “Nuclear Accident Liability”). Relatively
low prices for natural gas—nuclear power’s chief competitor—and rising estimated nuclear plant
construction costs have decreased the likelihood that new reactors would be built without federal
support. Any regulatory delays and increased safety requirements resulting from the Fukushima
accident could also pose an obstacle to nuclear construction plans.
As a result, numerous bills have been introduced in recent years to strengthen or add to the
EPACT05 incentives (see “Legislation in the 113th Congress” at the end of this report). Nuclear
power critics have denounced the federal support programs and proposals as a “bailout” of the
nuclear industry, contending that federal efforts should focus instead on renewable energy and
energy efficiency.96

Nuclear Production Tax Credit
EPACT05 provides a 1.8-cents/kilowatt-hour tax credit for up to 6,000 megawatts of new nuclear
capacity for the first eight years of operation, up to $125 million annually per 1,000 megawatts.
The credit is not adjusted for inflation.
The Treasury Department published interim guidance for the nuclear production tax credit on
May 1, 2006.97 Under the guidance, the 6,000 megawatts of eligible capacity (enough for about
four or five reactors) are to be allocated among reactors that filed license applications by the end
of 2008. If more than 6,000 megawatts of nuclear capacity ultimately qualify for the production
tax credit, then the credit is to be allocated proportionally among any of the qualifying reactors
that begin operating before 2021.
By the end of 2008, license applications had been submitted to NRC for more than 34,000
megawatts of nuclear generating capacity,98 so if all those reactors were built before 2021 they
would receive less than 20% of the maximum tax credit. However, the reactor licensing status
shown in Table 1 indicates that only four new units, totaling about 4,600 megawatts of capacity,
are currently licensed for construction and likely to be completed before 2021. Eight other units,
totaling about 10,300 megawatts, are scheduled to receive their licenses by 2016 and could
possibly go into service by 2021.
The Nuclear Energy Institute (NEI) has urged Congress to remove the 6,000 megawatt capacity
limit for the production tax credit, index it for inflation, and extend the deadline for plants to
begin operation to the start of 2025. NEI also proposed that a 30% investment tax credit be
available for new nuclear construction as an alternative to the production credit.99

96

Nuclear Information and Resource Service, “Senate Appropriators Lard President Obama’s Stimulus Package with
up to $50 Billion in Nuclear Reactor Pork,” press release, January 30, 2009, http://www.nirs.org/press/01-30-2009/1.
97
Department of the Treasury, Internal Revenue Service, Internal Revenue Bulletin, No. 2006-18, “Credit for
Production From Advanced Nuclear Facilities,” Notice 2006-40, May 1, 2006, p. 855.
98
Energy Information Administration, Status of Potential New Commercial Nuclear Reactors in the United States,
February 19, 2009.
99
Nuclear Energy Institute, Legislative Proposal to Help Meet Climate Change Goals by Expanding U.S. Nuclear
Energy Production, Washington, DC, October 28, 2009, p. 4, http://www.nei.org/resourcesandstats/documentlibrary/
newplants/policybrief/2009-nuclear-policy-initiative.

Congressional Research Service

22

Nuclear Energy Policy

Standby Support
Because the nuclear industry has often blamed licensing delays for past nuclear reactor
construction cost overruns, EPACT05 authorizes the Secretary of Energy to provide “standby
support,” or regulatory risk insurance, to help pay the cost of regulatory delays at up to six new
commercial nuclear reactors. For the first two reactors that begin construction, the DOE payments
could cover all the eligible delay-related costs, such as additional interest, up to $500 million
each. For the next four reactors, half of the eligible costs could be paid by DOE, with a payment
cap of $250 million per reactor. Delays caused by the failure of a reactor owner to comply with
laws or regulations would not be covered. Project sponsors will be required to pay the “subsidy
cost” of the program, consisting of the estimated present value of likely future government
payments. DOE published a final rule for the “standby support” program August 11, 2006.100
Under the program’s regulations, a project sponsor may enter into a conditional agreement for
standby support before NRC issues a combined operating license. The first six conditional
agreements to meet all the program requirements, including the issuance of a COL and payment
of the estimated subsidy costs, can be converted to standby support contracts. However, no
applicant has pursued the incentive.101

Loan Guarantees
Title XVII of EPACT05 authorizes federal loan guarantees for up to 80% of construction costs for
advanced energy projects that reduce greenhouse gas emissions, including new nuclear power
plants. Under such loan guarantee agreements, the federal government would repay all covered
loans if the borrower defaulted. This would reduce the risk to lenders and allow them to provide
financing at low interest rates. The Title XVII loan guarantees are widely considered crucial by
the nuclear industry to obtain financing for new reactors. However, opponents contend that
nuclear loan guarantees provide an unjustifiable subsidy to a mature industry and shift investment
away from environmentally preferable energy technologies.102 The authorized ceiling on nuclear
power plant loan guarantees is currently $18.5 billion.103
Agreements for the first loan guarantees for nuclear power plants under EPACT05 were signed
February 20, 2014, by Energy Secretary Ernest Moniz. The federal loan guarantees total $6.5
billion for the two reactors being constructed at the Vogtle nuclear plant in Georgia—$3.46
billion for Southern Company, the plant’s lead owner, and $3.06 billion for Oglethorpe Power
Corporation. A further $1.8 billion loan guarantee for the Vogtle project, for the Municipal
100
Department of Energy, “Standby Support for Certain Nuclear Plant Delays,” Federal Register, August 11, 2006,
p. 46306.
101
Freebairn, William, “Nuclear Tax Credits, Previously Low-Profile, Might Draw Scrutiny: Lobbysists,” Nucleonics
Week, May 17, 2012.
102
Thomas B. Cochran and Christopher E. Paine, Statement on Nuclear Developments Before the Committee on Energy
and Natural Resources, United States Senate, Natural Resources Defense Council, March 18, 2009,
http://energy.senate.gov/public/index.cfm?FuseAction=Hearings.Testimony&Hearing_ID=f25ddd10-c1f5-9e2e-528ec4321cca4c1b&Witness_ID=9f14a78d-58d0-43fb-bf5b-21426d1d888e.
103
The FY2009 omnibus funding act (P.L. 111-8) increased DOE’s total loan guarantee authority for specified
technology categories to $47 billion, in addition to $4 billion in general authority provided in FY2007. Of the $47
billion, $18.5 billion continued to be reserved for nuclear power as provided in earlier appropriations, and $2 billion
was for uranium enrichment. Previous time limits on the loan guarantee authority were eliminated. DOE later allocated
an additional $2 billion to enrichment projects from the $4 billion in general authority.

Congressional Research Service

23

Nuclear Energy Policy

Electric Authority of Georgia, has not been finalized. Southern Company estimated that its Vogtle
loan guarantees would reduce its present-value financing costs by up to $250 million.104

Subsidy Costs
Title XVII requires the estimated future government costs resulting from defaults on guaranteed
loans to be covered up-front by appropriations or by payments from project sponsors, such as the
utility planning to build a plant. As specified by the Federal Credit Reform Act of 1990 (FCRA,
contained in P.L. 101-508), these “subsidy costs” are calculated as the present value of the
average possible future net costs to the government for each loan guarantee. If those calculations
are accurate, the subsidy cost payments for all the guaranteed projects together should cover the
future costs of the program, including default-related losses. However, the Congressional Budget
Office has predicted that the up-front subsidy cost payments will prove too low by at least 1%
and is scoring bills accordingly.105 For example, appropriations bills that provide loan guarantee
authorizations include an adjustment equal to 1% of the loan guarantee ceiling. (For more
information on loan guarantee subsidy costs, see CRS Report R42152, Loan Guarantees for
Clean Energy Technologies: Goals, Concerns, and Policy Options, by (name redacted).)
The guaranteed loans for the new Vogtle reactors are to be issued by the U.S. Treasury’s Federal
Financing Bank. No subsidy cost was charged for the Vogtle loan guarantees, which raised
considerable comment, as the risk of the project is likely to be greater than zero. The
methodology that may have led to such a result is discussed below.
In order to estimate credit subsidy costs for a loan transaction, certain information is required: (1)
loan value, (2) loan term (years), (3) credit risk, including default rates and recovery rates, (4)
loan interest rate, and (5) Treasury interest rate(s). Details of the credit subsidy cost calculations
for each loan (i.e., default rates, recovery rates, and project credit rating) have not been made
public. However, some aspects and considerations of the Vogtle project loans may provide some
perspective regarding the zero credit subsidy fee assessment.
Defaults—net of recoveries—and interest are the two primary subsidy cost components that
likely resulted in the zero subsidy fee calculation. The default subsidy represents the present
value of expected government losses due to defaults less recoveries. Default rates and recovery
rates—based on loan credit risk and other parameters—are applied to the outstanding principal
balance for each payment period. Two aspects of the Vogtle loans may have contributed to either
low default rates and/or high recovery rates: (1) strong financial condition and obligations of the
borrowers, and (2) the possibility of costs being passed through to Georgia Power and Oglethorpe
electricity consumers, thereby resulting in low repayment risk, and therefore a low default
subsidy estimate. These characteristics raise questions about the need for federal credit support
for this project. Nevertheless, it is likely that default-related losses to the government exist.
Interest rates for the Vogtle project loans range from 3.5% to 3.9%—higher than Treasury rates—
for disbursements made in February 2014. It is possible that gains to the government from higher
interest rates—relative to Treasury securities—offset any estimated default-related losses to the
104

Southern Company, “Federal Loan Guarantees Mark Latest Milestone in Historic Vogtle Project,” news release,
February 20, 2014.
105
Congressional Budget Office, S. 1321, Energy Savings Act of 2007, CBO Cost Estimate, Washington, DC, June 11,
2007, pp. 7-9, http://www.cbo.gov/ftpdocs/82xx/doc8206/s1321.pdf.

Congressional Research Service

24

Nuclear Energy Policy

government, while also taking into account other payments from the borrower or costs to the
government. Should this be the case, the FCRA-prescribed calculation methodology could result
in a zero, or even a negative, credit subsidy cost.
The nuclear industry contends that historical experience indicates defaults are likely to be
minimal and that nuclear plant subsidy costs should therefore be low.106 However, nuclear power
critics contend that nuclear power plants are likely to experience delays and cost overruns that
could lead to much larger losses under the loan guarantee program. The Center for American
Progress concluded that nuclear subsidy costs “should be at least 10 percent and possibly much
more.”107
Constellation Energy informed DOE on October 8, 2010, that it was withdrawing from loan
guarantee negotiations on Calvert Cliffs 3, blaming “the Office of Management and Budget’s
inability to address significant problems with its methodology for determining the project’s credit
subsidy cost.” Constellation’s letter to DOE said OMB’s “shockingly high” estimate of the
subsidy cost for Calvert Cliffs 3 was 11.6%, or about $880 million. “Such a sum would clearly
destroy the project’s economics (or the economics of any nuclear project for that matter), and was
dramatically out of line with both our own and independent assessments of what the figure should
reasonably be,” the letter stated.108 Although OMB has not released its subsidy cost methodology,
it may consider the default risk for a “merchant plant” such as Calvert Cliffs to be significantly
higher than that of a rate-regulated plant such as Vogtle. A plant under traditional rate regulation
is allowed to pass all prudently incurred costs through to utility ratepayers, while a merchant plant
charges market rates for its power. A merchant plant, therefore, could potentially earn higher
profits than a rate-regulated plant, but it also runs the risk of being unable to cover its debt
payments if market rates for wholesale electric power drop too low or if its costs are higher than
anticipated.

Nuclear Solicitations
DOE issued a solicitation for up to $20.5 billion in nuclear power and uranium enrichment plant
loan guarantees on June 30, 2008.109 According to the nuclear industry, 10 nuclear power projects
applied for $93.2 billion in loan guarantees, and two uranium enrichment projects asked for $4.8
billion in guarantees, several times the amount available.110

106

Nuclear Energy Institute, “Loan Guarantees for the Vogtle Nuclear Power Project—Understanding the Credit
Subsidy Cost,” 2014, http://www.nei.org/Master-Document-Folder/Backgrounders/Fact-Sheets/Loan-Guarantees-forthe-Vogtle-Nuclear-Power-Proje?feed=factsheet.
107
Richard Caperton, Protecting Taxpayers from a Financial Meltdown, Center for American Progress, Washington,
DC, March 8, 2010, p. 2, http://www.americanprogress.org/issues/green/report/2010/03/08/7400/protecting-taxpayersfrom-a-financial-meltdown/.
108
Letter from Michael J. Wallace, Vice Chairman and Chief Operating Officer, Constellation Energy, to Dan
Poneman, Deputy Secretary of Energy, October 8, 2010, http://media.washingtonpost.com/wp-srv/hp/ssi/wpc/
constellationenergy.PDF?sid=ST2010100900005.
109
http://www.lgprogram.energy.gov/keydocs.html.
110
Marvin S. Fertel, Statement for the Record to the Committee on Energy and Natural Resources, U.S. Senate,
Nuclear Energy Institute, March 18, 2009, p. 9, http://energy.senate.gov/public/index.cfm?FuseAction=
Hearings.Testimony&Hearing_ID=f25ddd10-c1f5-9e2e-528e-c4321cca4c1b&Witness_ID=4de5e2df-53fe-49ba-906e9b69d3674e41.

Congressional Research Service

25

Nuclear Energy Policy

In the uranium enrichment solicitation, DOE in July 2009 informed USEC Inc., which proposes
to build a new plant in Ohio, that its technology needed further testing before a loan guarantee
could be issued.111 DOE notified Congress in March 2010 that it would reprogram $2 billion of its
unused FY2007 loan guarantee authority toward uranium enrichment, increasing the uranium
enrichment total to $4 billion. The move would potentially allow guarantees to be provided to
both USEC and the other applicant in the uranium enrichment solicitation, the French firm Areva,
which has proposed a plant in Idaho.112 DOE offered a $2 billion conditional loan guarantee to
Areva on May 20, 2010.113
DOE informed USEC in October 2011 that the centrifuge technology for its proposed new
enrichment plant still needed further testing and offered to provide up to $300 million to help
build a demonstration “train” of 720 centrifuges.114 The FY2013 Continuing Appropriations
Resolution (P.L. 112-175) included $100 million for the USEC demonstration program.115 The
FY2014 Consolidated Appropriations Act (P.L. 113-76, §321) provided up to $56 million for the
program through special reprogramming authority.
DOE has recently provided other assistance to USEC. DOE agreed on May 15, 2012, to provide
depleted uranium stockpiles (material left over from the enrichment process) to Energy Northwest
for reenrichment at USEC’s plant in Paducah, KY, for use as reactor fuel.116 DOE agreed on
March 13, 2012, to acquire low-enriched uranium from USEC in exchange for taking
responsibility for low-value depleted uranium tails that USEC would otherwise have to dispose
of, freeing $44 million of USEC’s funds for the centrifuge project.117 DOE announced June 13,
2012, that it would provide $88 million for the centrifuge demonstration program by taking over
responsibility for disposal of additional depleted uranium from USEC. In return, DOE will take
ownership of the equipment and technology used in the demonstration and lease it to USEC.118
Despite the DOE assistance, USEC filed for bankruptcy reorganization March 5, 2014. The U.S.
Bankruptcy Court for the District of Delaware approved USEC’s reorganization plan September
5, 2014, in which the company will be renamed Centrus Energy Corporation.119 DOE’s Oak

111

Department of Energy, “800 to 1000 New Jobs Coming to Piketon,” press release, July 28, 2009,
http://www.lgprogram.energy.gov/press/072809.pdf.
112
Maureen Conley, “DOE Finds $2 Billion More for SWU Plant Loan Guarantees,” NuclearFuel, April 5, 2010, p. 3.
113
Department of Energy, “DOE Offers Conditional Loan Guarantee for Front End Nuclear Facility in Idaho,” press
release, May 20, 2010, http://www.energy.gov/news/8996.htm.
114
Maureen Conley, “Congress ‘Frustrated’ by Inaction on USEC Loan Guarantee,” NuclearFuel, October 31, 2011,
p. 8.
115
All FY3013 figures are pre-sequester.
116
USEC Inc., “Five-Party Arrangement Extends Paducah Gaseous Diffusion Plant Enrichment Operations,” press
release, May 15, 2012, http://www.usec.com/news/five-party-arrangement-extends-paducah-gaseous-diffusion-plantenrichment-operations. The depleted uranium consists of “high assay” tails, which have relatively high levels of fissile
U-235.
117
USEC Inc., “Funding,” web page, http://www.usec.com/american-centrifuge/what-american-centrifuge/plant/
funding.
118
Department of Energy, “Obama Administration Announces Major Step Forward for the American Centrifuge
Plant,” press release, June 13, 2012, http://energy.gov/articles/obama-administration-announces-major-step-forwardamerican-centrifuge-plant.
119
USEC, “Court Confirms USEC Inc. Plan of Reorganization,” news release, September 5, 2014,
http://www.usec.com/news/court-confirms-usec-inc-plan-reorganization.

Congressional Research Service

26

Nuclear Energy Policy

Ridge National Laboratory took over management of USEC’s centrifuge demonstration project in
April 2014, making USEC a subcontractor.120
DOE issued a draft solicitation for an additional $12.6 billion in nuclear loan guarantees on
September 30, 2014, including new nuclear reactors, upgrades and uprates of existing nuclear
reactors, and nuclear fuel facilities.121

Global Climate Change
Global climate change that may be caused by carbon dioxide and other greenhouse gas emissions
is cited by nuclear power supporters as an important reason to develop a new generation of
reactors. Nuclear power plants emit relatively little carbon dioxide, mostly from nuclear fuel
production and auxiliary plant equipment. This “green” nuclear power argument has received
growing attention in think tanks and academia. As stated by the Massachusetts Institute of
Technology in its major study The Future of Nuclear Power: “Our position is that the prospect of
global climate change from greenhouse gas emissions and the adverse consequences that flow
from these emissions is the principal justification for government support of the nuclear energy
option.”122 The Obama Administration is including nuclear power as part of its clean energy
strategy.
However, some environmental groups have contended that nuclear power’s potential greenhouse
gas benefits are modest and must be weighed against the technology’s safety risks, its potential
for nuclear weapons proliferation, and the hazards of radioactive waste.123 They also contend that
energy efficiency and renewable energy would be far more productive investments for reducing
greenhouse gas emissions.124
Proposals to reduce carbon dioxide emissions—through taxation, a cap-and-trade system, or other
regulatory controls—could significantly increase the cost of generating electricity with fossil
fuels and improve the competitive position of nuclear power. A federal Clean Energy Standard
that includes nuclear power, as proposed in President Obama’s January 2011 State of the Union
Address, could provide a similar boost to nuclear energy expansion. Utilities that have applied for
nuclear power plant licenses have often cited the possibility of federal greenhouse gas controls or
other mandates as one of the reasons for pursuing new reactors.
The Environmental Protection Agency (EPA) published a proposed rule on June 18, 2014, to
address CO2 emissions from existing power plants.125 The potential effect of the proposed rule on
120
Hiruo, Elaine, “Low Volume, Non-Production Costs Driving Net Loss, USEC Says,” NuclearFuel, August 18,
2014.
121
DOE, “Department of Energy Issues Draft Loan Guarantee Solicitation for Advanced Nuclear Energy Projects,”
news release, September 30, 2014, http://www.energy.gov/articles/department-energy-issues-draft-loan-guaranteesolicitation-advanced-nuclear-energy-projects.
122
Interdisciplinary MIT Study, The Future of Nuclear Power, Massachusetts Institute of Technology, 2003, p. 79.
123
Gronlund, Lisbeth, David Lochbaum, and Edwin Lyman, Nuclear Power in a Warming World, Union of Concerned
Scientists, December 2007.
124
Travis Madsen, Tony Dutzik, and Bernadette Del Chiaro, et al., Generating Failure: How Building Nuclear Power
Plants Would Set America Back in the Race Against Global Warming, Environment America Research and Policy
Center, November 2009, http://www.environmentamerica.org/uploads/39/62/3962c378b66c4552624d09cbd8ebba02/
Generating-Failure—Environment-America—Web.pdf.
125
Environmental Protection Agency, “Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric
(continued...)

Congressional Research Service

27

Nuclear Energy Policy

nuclear power has become a significant policy question. The formula in the proposed rule for
setting state CO2 goals explicitly accounts for some existing nuclear capacity and reactors under
construction, providing a potential incentive for states to try to keep those plants operating.
However, EPA’s proposed rule allows states to develop their own plans for meeting the CO2
emission rate goals, making it difficult to predict how nuclear energy might ultimately fare.
The proposed EPA standards would set state-specific goals for the amount of CO2 that could be
emitted in 2030 for each megawatt-hour (MWh) of electricity generated. EPA projects that, under
those proposed emissions rates, U.S. power plants would produce 30% less CO2 by 2030 than
they did in 2005 (the base year in President Obama’s Climate Action Plan).126
The unadjusted baseline for the proposed standards was developed by dividing 2012 power plant
CO2 emissions in each state by the amount of electricity generated by fossil fuel-fired plants. In
the case of Ohio, which EPA provided as an example, the unadjusted CO2 emission rate for fossil
plants in 2012 was 1,897 lbs./MWh (compared with the average rate for coal-fired plants of about
2,000 lbs./MWh). To develop the 2030 standard, EPA adjusted each state’s baseline rate with four
groups of actions, or “building blocks,” that the agency determined states could reasonably
achieve:
1. Increase efficiency of existing coal-fired steam units by 6%;
2. Replace some coal-fired generation with increased output from underutilized
natural gas combined-cycle units;
3. Prevent projected losses of 6% of each state’s existing nuclear generating
capacity, complete five nuclear reactors currently under construction, and
increase generation from renewable energy; and
4. Implement energy efficiency measures to reduce projected electricity
demand.
The nuclear adjustment was made by calculating the projected annual electricity generation from
reactors under construction within each state (if any), along with the electricity generated by 6%
of each state’s existing nuclear capacity, which EPA deems to be at risk of shutdown. These
amounts are added to each state’s total fossil fuel-fired electrical generation, resulting in a
decrease in the CO2 generation rate per megawatt-hour.127
In the Ohio example, the state has no reactors under construction but has two operating nuclear
reactors, with total generating capacity of 2,150 megawatts. Six percent of that capacity is
projected to generate 993,077 MWh per year, which EPA added to total generation from fossil
fuel sources, renewable energy sources, and electricity generation avoided through efficiency
measures, as described in the “building blocks.” The increase in total electric generation spreads
CO2 emissions among more megawatt-hours, so the rate of CO2/MWh goes down. The nuclear
(...continued)
Utility Generating Units,” proposed rule, June 18, 2014, https://www.federalregister.gov/articles/2014/06/18/201413726/carbon-pollution-emission-guidelines-for-existing-stationary-sources-electric-utility-generating.
126
Executive Office of the President, The President’s Climate Action Plan, June 2013, http://www.whitehouse.gov/
sites/default/files/image/president27sclimateactionplan.pdf.
127
EPA, Office of Air and Radiation, Goal Computation Technical Support Document, June 2014,
http://www2.epa.gov/sites/production/files/2014-06/documents/20140602tsd-goal-computation.pdf.

Congressional Research Service

28

Nuclear Energy Policy

additions plus the other changes described above result in a proposed 2030 standard for Ohio of
1,338 lbs. of CO2 per MWh—a 29.5% reduction from the unadjusted baseline.
Although the state standards for CO2 emission rates would be binding, each state could meet them
using whatever mix of options it chose. A state would not have to employ the same “building
blocks” in its compliance plans that EPA used to calculate the standards. According to an EPA
explanation, each state “is free to meet that goal in the way that works best for that state. It can
rely more or less heavily on specific measures such as efficiency or renewable energy, or even
pursue others such as increases in transmission efficiency or new gas generation.”128 Additional
nuclear reactors beyond the five already under construction would also be an option.
Because of the state flexibility, the effect of the EPA proposal on nuclear power is inherently
uncertain. EPA’s emission rate methodology might encourage states to take steps to ensure that
nuclear plants currently under construction were completed, and to prevent the shutdown of
existing nuclear capacity, because if they did not, they would need to find alternative ways to
meet the CO2 emission rate standard. For example, if Ohio’s two nuclear plants closed, the state
would lose 993,077 MWh of zero-carbon electricity in its CO2 rate formula and would need to
increase other low-carbon electricity sources or take other steps beyond those already in the EPA
building blocks.
The Nuclear Energy Institute, representing the nuclear industry, issued a statement praising the
EPA proposal for recognizing “the need to maintain and expand the use of nuclear energy.”129
However, nuclear industry officials have expressed unhappiness that the nuclear “building block”
includes only the 6% of existing nuclear capacity considered to be “at risk,” rather than all
existing nuclear capacity. According to a media report, the industry is concerned that including
only 6% of existing nuclear in the state goal calculations would not provide states with enough
incentive to prevent nuclear plants from being shut down and replaced by cheaper gas plants.130
In the Ohio example, only 993,077 MWh of carbon-free generation would have to be replaced
with other options if both the state’s reactors were shut down, under the EPA proposal. But if all
the state’s nuclear electricity were included in the nuclear building block, then 16.95 million
MWh (about 9% of the state’s total 2012 generation) would have to be replaced if the Ohio
reactors shut down (2,150 megawatts operating at 90% of capacity for a year).
On the other hand, a news release by the Nuclear Information and Resource Service, a group
critical of the nuclear industry, contended that EPA’s proposed rule “would encourage states to
provide ratepayer subsidies for continued operation of nuclear reactors that cannot compete
economically in the current electricity marketplace.”131

128

McCabe, Janet, “Understanding State Goals under the Clean Power Plan,” EPA Connect, June 4, 2014,
http://blog.epa.gov/epaconnect/2014/06/understanding-state-goals-under-the-clean-power-plan/.
129
Nuclear Energy Institute, “Carbon Reduction Requires Big Role for Nuclear Energy,” news release, June 2, 2014,
http://www.nei.org/News-Media/Media-Room/News-Releases/Carbon-Reduction-Requires-Big-Role-for-Nuclear-Ene.
130
Reeves, Dawn, “EPA May Revisit ESPS’ Nuclear Provisions in Face of Industry Concerns,” Inside EPA.com, June
13, 2014, http://insideepa.com/201406132474001/EPA-Daily-News/Daily-News/epa-may-revisit-esps-nuclearprovisions-in-face-of-industry-concerns/menu-id-95.html.
131
Nuclear Information and Resource Service, “EPA Carbon Rule Offers Misguided Subsidies for Uneconomic, Aging
and Dangerous Nuclear Reactors,” news release, June 2, 2014, http://www.nirs.org/nukesandglobalwarming/
epacarbonrulepr6214.pdf.

Congressional Research Service

29

Nuclear Energy Policy

For more details, see CRS Report R43652, State CO2 Emission Rate Goals in EPA’s Proposed
Rule for Existing Power Plants.

Nuclear Power Research and Development
The Obama Administration’s FY2015 funding request for nuclear energy research and
development totaled $863.4 million. Including advanced reactors, fuel cycle technology,
infrastructure support, and safeguards and security, the total nuclear energy request was $25.0
million (2.9%) below the FY2014 funding level. DOE’s FY2015 nuclear R&D budget
justification described the following major goals for the program:
•

Improve the safety, reliability, and economics of nuclear power plants;

•

Implement a “consent based” strategy for developing nuclear waste storage and
disposal facilities;

•

Develop improved waste management and fuel cycle technologies; and

•

Understand and minimize the risks of nuclear proliferation and terrorism.

DOE’s Office of Nuclear Energy would lead a major initiative announced in the FY2015 budget
request to commercialize the Brayton cycle for commercial power plants. Called Supercritical
Transformational Electric Power Generation (STEP), the initiative was proposed to be a joint
effort by DOE’s nuclear energy, fossil energy, and renewable energy programs. The Brayton cycle
uses supercritical gas to drive electric generators rather than the steam cycle that dominates the
industry today. DOE’s budget justification predicted that Brayton-cycle power plants could reach
efficiencies of up to 50%, compared with 33% for steam-cycle plants. The STEP program is to
reach a 50-50 cost sharing agreement with the private sector in FY2015 to develop a 10 megawatt
(electric) Brayton cycle pilot plant. Funding for the STEP initiative, provided within the nuclear
energy budget, would total $27.5 million in FY2015.
The House Appropriations Committee had recommended $899.0 million for nuclear energy,
$35.6 million above the Administration request. However, an amendment on the House floor
(H.Amdt. 979) reduced the nuclear total by $73.3 million to provide more funding for the Corps
of Engineers. The amendment did not specify how the reduction would be allocated among
Nuclear Energy programs.
The Senate subcommittee draft report recommended $777.0 million for nuclear energy programs,
$86.4 million below the request. The draft rejected the Administration’s $97 million request for
small modular reactor licensing support and cut the $100.5 million request for reactor concepts
R&D by 45%.
The House Appropriations Committee report agreed with the Administration’s $27.5 million
request for the STEP initiative and authorized DOE to “modify” the 50% cost-sharing goal for
qualifying pilot plants. The draft Senate report also recommended the full STEP request but
cautioned that the program should “be limited in scope, schedule, and cost.”

Congressional Research Service

30

Nuclear Energy Policy

Reactor Concepts
The Reactor Concepts program area includes research on advanced reactors, including advanced
small modular reactors, and research to enhance the “sustainability” of existing commercial light
water reactors. The total FY2015 funding request for this program was $100.5 million, a
reduction of $12.3 million from FY2014.
DOE proposed to combine the Small Modular Reactor (SMR) R&D and Advanced Reactor
Concepts subprograms into the Advanced Reactor Technologies subprogram in FY2015. Funding
for the combined subprogram would be $70.2 million, a reduction of $12.6 million from the
combined subprograms in FY2014. Reactor concepts being developed by the Advanced Reactor
Technology subprogram are generally classified as “Generation IV” reactors, as opposed to the
existing fleet of commercial light water reac

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/crs%3ARL33558. Public record. Not legal advice.