Order Code RL32814

CRS Report for Congress
Received through the CRS Web

Navy Force Architecture and Ship Acquisition:
Selected FY2006 Issues for Congress

March 15, 2005

Ronald O’Rourke
Specialist in National Defense
Foreign Affairs, Defense, and Trade Division

Congressional Research Service

The
· Library of Congress

Navy Force Architecture and Ship Acquisition:
Selected FY2006 Issues for Congress
Summary
This report is based on CRS testimony at a March 10, 2005, hearing on Navy
force structure and ship acquisition before the Projection Forces Subcommittee of the
House Armed Services Committee. Since February 2003, if not earlier, there has
been no current, officially approved, unambiguous plan for the future size and
structure of the Navy. Ambiguity concerning required numbers of Navy ships may
cause business-planning uncertainty for industry and may make it difficult, if not
impossible, for Congress to conduct effective oversight by reconciling desired Navy
capabilities with planned Navy force structure, and planned Navy force structure with
supporting Navy programs and budgets. The undefined aspects of the new sea basing
concept for conducting expeditionary operations may be contributing to uncertainty
in Navy ship force-structure planning for amphibious ships, maritime prepositioning
ships, and naval surface fire support requirements.
A Center for Naval Analyses (CNA) report on fleet platform architectures
parallels fairly closely current Navy thinking on the size and composition of the fleet.
An Office of Force transformation (OFT) report on the topic challenges current Navy
thinking and recommends a radically different fleet architecture involving eight new
ship designs. For the six shipyards that build the Navy’s major warships, the Navy’s
proposed FY2006-FY2011 shipbuilding plan would result in relatively low work
loads, revenues, and employment levels. Production economies of scale would be
limited or poor, and layoffs may occur at some of the yards.
Using incremental funding or advance appropriations could help reduce
instability in Navy ship-procurement plans by avoiding or mitigating budget spikes
that can occur when traditional full funding is used to procure aircraft carriers and
“big deck” amphibious ships. A more fundamental cause of instability in Navy shipprocurement programs, however, may be the absence of a current, officially
approved, unambiguous plan for the future size and structure of the Navy. By
avoiding or mitigating budget spikes, using incremental funding or advance
appropriations could marginally, but not dramatically, increase the number of ships
that could be built for a given total amount of funding.
One option for sustaining the ship-construction industrial base in general would
be to increase the amount of commercial-ship construction work. An option for
sustaining the aircraft carrier construction industrial base would be to restore
procurement of CVN-21, the next aircraft carrier, to FY2007. The part of the
submarine industrial base that might be in most need of near-term attention is the
design and engineering portion. Options for submarine procurement include nonnuclear-powered submarines equipped with air-independent propulsion (AIP)
systems and a reduced-cost nuclear-powered submarine based on new “Tango Bravo”
technologies being developed by the Navy. There are several options for supporting
the surface combatant industrial base between now and about FY2011. Options for
FY2011 and beyond include a surface combatant about the same size as today’s
9,000-ton Aegis ships, a 6,000-ton frigate, and a low-cost gunfire support ship. This
report will not be updated.

Contents
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Selected Issues for Congress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Navy Ship Force-Structure Goals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Continued Ambiguity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Capabilities-Based Planning And Ambiguity . . . . . . . . . . . . . . . . . . . . 2
Implications Of This Ambiguity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Potential Oversight Questions Arising From This Ambiguity . . . . . . . . 5
Sea Basing Concept And Navy Ship Force-Structure Goals . . . . . . . . . . . . . 6
The Sea Basing Concept . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Effect On Navy Ship Force-Structure Goals . . . . . . . . . . . . . . . . . . . . . 7
Potential Oversight Questions For Congress . . . . . . . . . . . . . . . . . . . . . 9
CNA and OFT Reports on Navy Fleet Platform Architectures . . . . . . . . . . 10
CNA Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
OFT Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Industrial-Base Implications Of Reductions and Deferrals . . . . . . . . . . . . . 20
Overall Ship-Procurement Rate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Individual Shipbuilding Programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Alternative Funding Approaches for Navy Ship Procurement . . . . . . . . . . 28
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Full Funding Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Incremental Funding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Advance Appropriations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Potential For Reducing Instability In Ship-Procurement Plans . . . . . . 38
Potential For Increasing Number Of Ships Procured . . . . . . . . . . . . . . 40
Options for Congress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Options For Sustaining Ship-Construction Industrial Base . . . . . . . . . . . . . 46
Ship-Construction Industrial Base in General . . . . . . . . . . . . . . . . . . . 46
Aircraft Carrier Construction Industrial Base . . . . . . . . . . . . . . . . . . . 48
Submarine Construction Industrial Base . . . . . . . . . . . . . . . . . . . . . . . 48
Surface Combatant Industrial Base . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
Options For Submarine Procurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
AIP Submarine . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
Lower-Cost (“Tango Bravo”) Nuclear-Powered Submarine . . . . . . . . 52
Options for Surface Combatant Procurement . . . . . . . . . . . . . . . . . . . . . . . 53
Roughly 9,000-Ton Surface Combatant (SC[X]) . . . . . . . . . . . . . . . . 55
Roughly 6,000-Ton Frigate (FFG[X]) . . . . . . . . . . . . . . . . . . . . . . . . . 55
Low-Cost Gunfire Support Ship . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Appendix A: Ambiguity in Navy Force Structure Planning . . . . . . . . . . . . . . . . 57
310-Ship Plan From 2001 QDR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Navy 375-Ship Proposal (2002-2004) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Navy 2005 Testimony On Force Posture Ranges . . . . . . . . . . . . . . . . . . . . 58

List of Tables
Table 1. CNA-Recommended Force and Navy’s 375-Ship Proposal . . . . . . . . . 11
Table 2. Alternative Fleet Structures From OFT Report . . . . . . . . . . . . . . . . . . 16
Table 3. Navy FY2006-FY2011 Ship-Procurement Plan . . . . . . . . . . . . . . . . . . 21
Table 4. Navy Ship Force Structure Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61

Navy Force Architecture and
Ship Acquisition:
Selected FY2006 Issues for Congress
Introduction
Members of Congress who track issues relating to the Navy or the shipbuilding
industry have expressed concerns regarding the Administration’s plan for the future
size and structure of the Navy and for procuring new Navy ships. This report reviews
a number of issues relating to these topics. It is based on CRS testimony at a March
10, 2005, hearing before the Projection Forces Subcommittee of the House Armed
Services Committee.1 The Subcommittee asked CRS to testify on the following
topics:
!
!
!

!
!
!
!
!

Navy ship force-structure goals;
the effect of the Navy’s sea basing concept for expeditionary
operations on Navy ship force-structure goals;
the recently submitted reports on Navy fleet platform architectures
by the Center for Naval Analyses (CNA) and the Department of
Defense (DOD) Office of Force Transformation (OFT);
the industrial-base implications of reductions and funding deferrals
in Navy ship procurement programs;
alternative funding approaches for Navy ship procurement;
options for sustaining the ship-construction industrial base;
options for submarine procurement; and
options for surface combatant procurement.

Each of these issues is addressed below.

1

Statement of Ronald O’Rourke, Specialist in National Defense, Congressional Research
Service, Before the House Armed Services Committee Subcommittee on Projection Forces
Hearing on Navy Force Architecture and Ship Construction, Mar. 10, 2005. 55 pp. The
Subcommittee granted CRS permission to convert this testimony into a CRS report.

CRS-2

Selected Issues for Congress
Navy Ship Force-Structure Goals2
Continued Ambiguity. Since February 2003, if not earlier, there has been no
current, officially approved, unambiguous plan for the future size and structure of the
Navy. (For a review of how this situation developed, see Appendix A at the end of
this statement.)
The Navy’s February 2005 testimony that in future years it may require a total
of 260 to 325 ships, or possibly 243 to 302 ships, depending on how much the Navy
uses new technologies and the Sea Swap concept for crewing and deploying ships,3
does little to alter this situation, for three reasons:
!

These potential force ranges are fairly broad — the high end in each
case is about 25% greater than the low end.

!

The Navy’s testimony does not make clear whether these planning
ranges have been endorsed by the Secretary of Defense as official
Department of Defense (DOD) force-structure planning goals.

!

The Navy’s testimony does not specify the kinds and numbers of
ships that comprise the ship totals in these ranges.

Capabilities-Based Planning And Ambiguity. When asked about
required numbers of Navy ships and aircraft, Navy and DoD officials have argued
that under capabilities-based planning, numbers of ships and aircraft per se are not
as important as the total amount of capability represented in the fleet. That may be
correct insofar as the policy objective is to have a Navy with a certain desired set of
capabilities, and not simply one that happens to include a certain number of ships and
aircraft. But that is not the same as saying that a Navy with a desired set of
capabilities cannot be translated into a planned force structure that includes certain
numbers of ships and aircraft of various types.
Although the Navy is currently working to resolve uncertainties concerning the
applicability of new technologies the Sea Swap concept, it arguably should become
possible at some point to translate a set of desired Navy capabilities into desired
numbers of ships and aircraft. Those numbers might be expressed as focused ranges
rather than specific figures (or broad ranges), and these focused ranges may change
over time as missions, technologies, and crewing concepts change. But to argue
indefinitely that desired naval capabilities cannot be translated into desired numbers
2

Material in this section was adapted from CRS Report RL32665, Potential Navy Force
Structure and Shipbuilding Plans: Background and Issues for Congress, by Ronald
O’Rourke.

3

See Statement of Admiral Vernon Clark, USN, Chief of Naval Operations, before the
House Armed Services Committee, February 17, 2005, pp. 19-20 and Statement of Admiral
Vernon Clark, USN, Chief of Naval Operations, before the Senate Armed Services
Committee, Feb. 10, 2005, pp. 18-19.

CRS-3
of ships and aircraft would be to suggest that the Navy cannot measure and
understand the capabilities of its own ships and aircraft. In this sense, the shift to
capability-based planning does not in itself constitute a rationale for permanently
setting aside the question of the planned size and structure of the fleet.
Implications Of This Ambiguity. Continued ambiguity in Navy forcestructure planning has potential implications for the Navy, Congress, and industry.
For the Navy. For the Navy, ambiguity concerning required numbers of Navy
ships provides time to resolve uncertainties concerning the applicability of new
technologies and the Sea Swap concept to various kinds of Navy ships. Navy (and
DOD) officials may also find this ambiguity convenient because it permits them to
speak broadly about individual Navy ship-acquisition programs without offering
many quantitative details about them — details which they might be held accountable
to later, or which, if revealed now, might disappoint Members of Congress or
industry officials.
This ambiguity may also, however, make it difficult at some point for Navy
officials, in conversations with the Office of the Secretary of Defense (OSD), to
defend programs for procuring Navy ships in certain total numbers or at certain
annual rates because OSD officials might view alternative total numbers or annual
rates as sufficient for maintaining a Navy that falls somewhere within the broad
ranges of total numbers of ships that Navy officials have presented in their testimony.
For Congress. Ambiguity concerning required numbers of Navy ships may
make it difficult, if not impossible, for Congress to conduct effective oversight by
reconciling desired Navy capabilities with planned Navy force structure, and planned
Navy force structure with supporting Navy programs and budgets. With the middle
element of this oversight chain expressed in only general terms, Congress may find
it difficult to understand whether proposed programs and budgets will produce a
Navy with DOD’s desired capabilities. The defense oversight committees in recent
years have criticized the Navy for presenting a confused and changing picture of
Navy ship requirements and procurement plans.4

4

For example, the conference report (H.Rept. 107-772 of Nov. 12, 2002) on the FY2003
defense authorization act (P.L. 107-314/H.R. 4546) stated
In many instances, the overall Department of Defense ship acquisition
message is confused.... The conferees also believe that the DON shares blame
for this confusion because it has been inconsistent in its description of force
structure requirements. This situation makes it appear as if the Navy has not
fully evaluated the long-term implications of its annual budget requests....
The conferees perceive that DOD lacks a commitment to buy the number and
type of ships required to carry out the full range of Navy missions without
redundancy. The DON has proposed to buy more ships than the stated
requirement in some classes, while not requesting sufficient new hulls in other
classes that fall short of the stated requirement. Additionally, the conferees
believe that the cost of ships will not be reduced by continually changing the
(continued...)

CRS-4
For Industry. Ambiguity concerning required numbers of Navy ships may
make it easier for industry officials to pour into broad remarks from the Navy or
DOD their own hopes and dreams for individual programs. This could lead to
excessive industry optimism about those programs. Ambiguity concerning required
numbers of Navy ships can also cause business-planning uncertainty in areas such as
production planning, workforce management, facilities investment, companysponsored research and development, and potential mergers and acquisitions.5

4

(...continued)
number of ships in acquisition programs or by frequently changing the
configuration and capability of those ships, all frequent attributes of recent DON
shipbuilding plans. (Pages 449 and 450)

The House Appropriations Committee, in its report (H.Rept. 108-553 of June 18, 2004)
on the FY2005 DOD appropriations bill (H.R. 4613), stated:
The Committee remains deeply troubled by the lack of stability in the Navy’s
shipbuilding program. Often both the current year and out year ship construction
profile is dramatically altered with the submission of the next budget request.
Programs justified to Congress in terms of mission requirements in one year’s
budget are removed from the next. This continued shifting of the shipbuilding
program promotes confusion and frustration throughout both the public and
private sectors. Moreover, the Committee is concerned that this continual
shifting of priorities within the Navy’s shipbuilding account indicates uncertainty
with respect to the validity of requirements and budget requests in support of
shipbuilding proposals. (Page 164)
5

In an interview published in the February 2005 issue of Seapower magazine, for example,
Michael Petters, the president of Northrop Grumman Newport News, said:
If there was a clear, stable picture of what the Navy wants, and what sort of
infrastructure needs to be in place to support that, the industry would adapt. But
what you’ve had instead are the annual perturbations. That’s a challenge for us.
We make investments in ships that take eight years to build, then the ship gets
delayed because of the way the budget process works.
In the same published interview, Michael W. Toner, the executive vice president of General
Dynamics’ Marine Systems Group, said:
Mike [Petters] is dead on. I think Secretary [of the Navy Gordon] England has
it right, but it’s up to the Navy to establish the stability. What’s the plan? Give
us a stable plan and then we can make the investments. Industry will do what
industry needs to do. But it is a very difficult environment to make investment
in, that’s for sure.
(“Shipbuilding: An Uncertain Future,” Seapower, February 2005: 28.)
Similarly, a July 2004 press article stated:
Philip Dur, chief executive officer of Northrop Grumman’s Shipbuilding
Systems, argued that the Navy’s concept of “capabilities versus numbers” not
only would hurt the service’s operations, but decimate the industry.
(continued...)

CRS-5
Potential Oversight Questions Arising From This Ambiguity.
Potential oversight questions for Congress that arise from ambiguity in Navy ship
force-structure planning include the following:

5

!

What are the kinds and numbers of ships that comprise each of the
total ship figures (290, 375, 260, 325, 243, and 302 ships) presented
in the Navy’s February 2005 testimony? What, in other words, is the
composition of each of these potential fleets? When does the Navy
plan to release these figures?

!

Is the lack of information on kinds and numbers of specific
categories of ships intended to make it more difficult for Congress
to conduct effective oversight of Navy programs and proposed
FY2006 budget?

!

For each of the three ranges shown in the Navy’s 2005 testimony —
290 to 375 ships, 260 to 325 ships, and 243 to 302 ships — what
factors explain the difference between the low and high end of the
range? Does the Navy anticipate narrowing the difference between
the low and high end of each range? If so, when? If not, why not?

!

What is the Navy’s view regarding the prospective affordability of
a Navy of 300 or more ships (i.e., as shown in the high ends of the
three ranges from the Navy’s 2005 testimony) as opposed to a Navy
of roughly 240 to 290 ships (as shown in the low ends of the three
ranges)?

(...continued)
If the Navy decides it cannot afford 300 ships, it should come up with a
smaller number and set new ship construction plans based on that number, Dur
said.
It also would be helpful, he added, if both the Navy and the Coast Guard
jointly planned their long-term shipbuilding buys. “I do not know that either
service takes the other service’s capabilities into account,” he said. If both
services set their shipbuilding goals collectively, “then the shipbuilders can lay
out an investment plan, a hiring plan [and] a training plan that was predicated on
the assumption that we would competing for an X-number of platforms per year
on a going-forward basis,” Dur said....
If the Department of Defense can frame a requirement for ships and defend
it, the industry would make the necessary adjustments to either scale down or
ramp up, Dur told reporters during a recent tour of the company’s shipyards in
Louisiana and Mississippi.
(Roxana Tiron, “Lack of Specificity in Navy Shipbuilding Plans Irks the
Industry,” National Defense, July 2004.)

CRS-6

Sea Basing Concept And Navy Ship Force-Structure Goals6
The Sea Basing Concept. The Navy and Marine Corps are developing a
new concept of operations for conducting expeditionary operations ashore called
enhanced networked sea basing, or sea basing for short. Under the current concept
of operations for conducting expeditionary operations ashore, the Navy and Marine
Corps would establish a foothold ashore, and then use that foothold as a base from
which to conduct operations against the desired ashore objective. Under sea basing,
the Navy and Marine Corps would launch, direct, and support expeditionary
operations directly from a base at sea, without necessarily establishing an
intermediate base ashore.
Many of the details of the sea basing concept have yet to be worked out; Navy
and Marine Corps officials are currently working to produce a more refined notion
of the concept.7
A key rationale for the sea basing concept is that in the future, fixed land bases
ashore will become too vulnerable to enemy attack from weapons such as cruise
missiles or short-range ballistic missiles, and that launching the operation directly
from a base at sea will enhance the survivability of the attacking Navy-Marine Corps
force by putting the base out of the range of shorter-range enemy weapons and
targeting sensors, and by permitting the sea to be used as a medium of maneuver for
evading detection and targeting by longer-range enemy weapons and sensors.
A second rationale for sea basing is that by eliminating the intermediate land
base — the logistical “middleman” — sea basing will permit the Marine Corps to
initiate and maintain a higher pace of operations against the desired objective, thus
enhancing the effectiveness of the operation. A third rationale for sea basing is that
it could permit the Marine force, once the operation is completed, to reconstitute and
redeploy — that is, get back aboard ship and be ready for conducting another
operation somewhere else — more quickly than under the current concept of
operations.
The sea base being referred to is not a single ship, but rather a collection of
ships. The exact types and numbers of ships involved is now being studied by the
Navy and Marine Corps. Although the results of these studies have not yet been
announced, general points that have emerged from the public discussion to date
include the following:

6

Material in this section has been adapted from CRS Report RL32513, Navy-Marine Corps
Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues
for Congress, by Ronald O’Rourke.

7

For a detailed discussion of the sea basing concept, see Defense Science Board Task Force
on Sea Basing, op cit, 168 pp. See also Otto Kreisher, “Sea Basing,” Air Force Magazine,
July 2004: 64; Scott C. Truver, “Sea Basing: More Than The Sum Of Its Parts?” Jane’s
Navy International, Mar. 2004: 16-18, 20-21; Art Corbett and Vince Goulding, “Sea Basing:
What’s New?” U.S. Naval Institute Proceedings, Nov. 2002: 34-39.

CRS-7
!

The sea base would likely include, among other things, some
combination of amphibious and Maritime Prepositioning Force
(Future), or MPF(F) ships.8 The Navy has studied various
combinations of amphibious and MPF-type ships.

!

Under sea basing, certain functions previously carried out from the
intermediate land base, including command and control, fire support,
and logistics, would be transferred back to the ships at sea that
collectively make up the sea base. Other things held equal, the ships
making up the sea base would consequently have to be more capable
of carrying out these functions than today’s mix of amphibious and
MPF ships.

!

Due to both the increased capability of ships making up the sea base,
as well as the increased cost of MPF(F) ships compared to today’s
MPF ships, today’s three MPF squadrons may be replaced by a set
of ships sufficient to form two sea bases.

The Defense Department has expressed some interest in sea basing as a potential
joint concept that could involve Army and Air Force forces as well as the Navy and
Marine Corps.9 The Defense Science Board (DSB) in August 2003 issued a report
on sea basing which concluded that “sea basing represents a critical future joint
military capability for the United States.”10
Effect On Navy Ship Force-Structure Goals. The undefined aspects of
the sea basing concept may be contributing to uncertainty in Navy ship forcestructure planning in one or more of the following areas:
!

8

Total number of LPD-17s to be procured. Although the Navy’s
proposed FY2006 budget and FY2006-FY2011 Future Years

A carrier strike group (CSG) would constitute another element of the sea base.

9

Jason Sherman and David Brown, “Pentagon To Create Multiservice Sea Basing
Requirements Office,” Defense News, December 8, 2003: 30; Catherine MacRae, “Aldridge
Wants Top Defense Scientists To Study Future Of Seabasing,” Inside the Pentagon, Nov.
14, 2002: 1. For articles discussing the potential joint aspects of sea basing, see Otto
Kreisher, “Sea Basing,” Air Force Magazine, July 2004: 64; Ann Roosevelt, “Army, Navy
Collaborating On Sea Basing Concept,” Defense Daily, June 30, 2004: 3; Lisa Troshinsky,
“Army Logistics Using Sat Network, Planning For Sea-Based Capability,”Aerospace Daily
& Defense Report, June 30, 2004: 3-4; Scott C. Truver, “Seabasing: More Than The Sum
Of Its Parts?” Jane’s Navy International, Mar. 2004: 16-18, 20-21; John J. Klein, “Sea
Basing Isn’t Just About The Sea,” U.S. Naval Institute Proceedings, Jan. 2004: 32-35;

10

Defense Science Board. Defense Science Board Task Force on Sea Basing. Office of the
Under Secretary of Defense For Acquisition, Technology, and Logistics. Washington, 2003.
(August 2003) p. xi. Italics as in the original. Similar statements are made in two cover
memos included at the front of the report, and on page 87. For press reports about this
study, see John T. Bennett, “Marine Corps Commandant, DSB Describe Visions Of
Seabasing Concept,” Inside the Pentagon, Oct. 30, 2004; Jason Ma, “DSB Study,
Conference Examine Seabasing Needs and Challenges,” Inside the Navy, Oct. 27, 2003;
Jason Sherman, “Pentagon Group Details Sea Base Concept,” Defense News, Oct. 27, 2003.

CRS-8
Defense Plan (FYDP) propose reducing planned procurement of San
Antonio (LPD-17) amphibious ships to a total of nine ships, it is
possible that this number might change as the sea basing concept is
refined in more detail.
!

Design and cost of LHA(R). Although Navy officials currently
appear to support a design for LHA(R) — the next “big-deck”
amphibious assault ship — that is based on the Wasp (LHD-1) class
hull, but with enhanced aviation capabilities and no well deck, it is
possible that ongoing study of the sea basing concept, combined
with more precise estimates of the cost to build LHA9R) to various
designs, could lead to further changes in the design of the ship.

!

Procurement of “big-deck” amphibious ships after LHA®.
Uncertainty over the details of sea basing may be a barrier to
forming a clearer plan for procuring “big-deck” amphibious ships
following LHA(R).

!

Total number of amphibious ships and 2.5-MEB goal. Due in
part to the emergence of the sea basing concept, Navy officials
cannot state with confidence whether the Navy in the future will
need a total of 36 amphibious ships or some greater or lesser
number. Navy officials have also made few public comments on the
issue of whether the longstanding 2.5-Marine Expeditionary Brigade
(MEB) lift goal for the amphibious fleet will be retained, modified,
or dropped. Navy officials have reportedly suggested that savings
realized from reducing the number of Expeditionary Strike Groups
(ESGs) may be used to procure new MPF(F) ships.11

!

Numbers, designs, and costs for MPF(F) ships. Until the Navy
and Marine Corps develop a more complete understanding of the
details of the sea basing concept, it will be difficult for them to
present firm plans for these ships in terms of numbers to be
procured, designs, and unit procurement costs. Navy officials have
acknowledged that their plans for MPF(F) ships need to be more
clearly defined.12

!

Naval surface fire support requirements. Until the Navy and
Marine Corps develop a more complete understanding of the details
of the sea basing concept, it may be difficult for them to arrive at a
consensus agreement on naval surface fire support (NSFS)
requirements for the fleet.
Uncertainty regarding NSFS
requirements can in turn contribute to uncertainty regarding

11

Christopher J. Castelli, “Navy May Cut Number Of Expeditionary Strike Groups To Fund
MPF(F),” Inside the Navy, July 12, 2004.
12

Christopher J. Castelli, “Navy Acquisition Chief Urges Clark To Define Plan For MPF(F)
Ships,” Inside the Navy, June 28, 2004.

CRS-9
requirements for surface combatants, particularly the DD(X)
destroyer.13
Potential Oversight Questions For Congress. Potential oversight
questions for Congress arising from the sea basing concept include the following:

13

!

When does DOD plan to present to Congress a more detailed
description of, and a more refined estimate of the potential total cost
to fully implement, the sea basing concept? Should Congress direct
DOD to present a detailed description and cost estimate by a date
certain? How does the current lack of a detailed description and cost
estimate affect Congress’ ability to conduct effective oversight of
programs that might be affected by the concept, including
amphibious and maritime prepositioning ship programs and
programs relating to naval surface fire support? How does it affect
Congress’ ability to assess the potential affordability and cost
effectiveness of sea basing compared to possible alternatives for
conducting future expeditionary operations ashore or programs for
meeting other defense priorities?

!

What are the potential costs and merits of alternatives to sea basing
for conducting future expeditionary operations ashore? How do land
bases and sea bases compare in terms of vulnerability to attack and
cost to defend against potential attacks of various kinds? What other
defense programs might need to be reduced to finance the
implementation of sea basing? What are the potential operational
risks of not implementing sea basing?

!

Should development of the sea basing concept be led by a joint DOD
office, or by the Navy and Marine Corps (while still incorporating
input from the Army and Air Force)? Does the Pentagon’s approach
to developing the sea basing concept feature too much, not enough,
or about the right amount of interservice coordination and top-level
DOD direction? To what degree, if any, does sea basing conflict
with any emerging Army or Air Force concepts of operation for
conducting future expeditionary operations? If sea basing is
developed primarily by the Navy and Marine Corps, and is then
subsequently modified by DOD to take Army and Air Force needs
into greater account, will this lead to instability in announced plans
for procuring amphibious and maritime prepositioning ships?

A November 2004 Government Accountability Office (GAO) report concluded that
The Navy and Marine Corps have only recently begun the process to establish
validated NSFS requirements that address the overall capabilities needed and the
balance between different systems that will be required to provide effective,
continuous, and sustaining support fire for forces operating ashore.
(Government Accountability Office, Information on Options for Naval Surface
Fire Support, GAO-05-39R, Nov. 2004, p. 2.)

CRS-10

CNA and OFT Reports on Navy Fleet Platform Architectures14
Section 216 of the conference report (H.Rept. 108-354 of November 7, 2003)
on the FY2004 defense authorization bill (H.R. 1588/P.L. 108-136 of November 24,
2003) required the Secretary of Defense to provide for two independently performed
studies on potential Navy fleet platform architectures.15 The two studies were
conducted by the Center for Naval Analyses (CNA) and DOD’s Office of Force
Transformation (OFT) and were recently submitted to the congressional defense
committees. Subsection (d) of Section 216 states in part that “The results of each
study under this section shall — (1) present the alternative fleet platform
architectures considered, with assumptions and possible scenarios identified for
each...”
CNA Report.16 The CNA report presents a fairly traditional approach to naval
force planning in which capability requirements for warfighting and for maintaining
day-to-day naval forward deployments are calculated and then integrated. The
report’s discussion of how crew rotation may alter force-level requirements for
maintaining day-to-day forward deployments is somewhat detailed and may have
been adapted from other work that CNA has done on the topic for the Navy.
The report recommends a Navy force structure of 256 to 380 ships. The high
end of this range is about 48% greater than the low end, making it almost twice as
broad a range, mathematically, as the ranges presented in the Navy’s February
testimony. The difference between the low and high ends of the CNA range is that
the low end assumes a greater use of crew rotation and overseas homeporting of
Navy ships.
Table 1 below compares the CNA-recommended force range to the 375-ship
fleet proposal mentioned by Navy officials from early 2002 through early 2004.

14

Material in this section was adapted from a Feb. 25, 2005, CRS memorandum to the office
of Representative Bartlett and is used here with permission from that office.
15

H.Rept 108-354, pp.28-29 and 612-613. Section 216 is an amended version of a provision
(Section 217) in the House-reported version of H.R. 1588; see pages 255-256 of the House
report on H.R. 1588 (H.Rept. 108-106 of May 16, 2003).

16

Delwyn Gilmore, with contributions by Mark Lewellyn et al, Report to Congress
Regarding Naval Force Architecture. Alexandria (VA), Center for Naval Analyses, 2005.
(CRM D0011303.A2/1Rev, Jan. 2005) 60 pp.

CRS-11

Table 1. CNA-Recommended Force and Navy’s 375-Ship
Proposal
Ship Type

CNA-recommended
force

375-ship
proposala

Ballistic missile submarines (SSBNs)

14

14

Cruise missile submarines (SSGNs)

4

4

Attack submarines (SSNs)

38 to 62

52

Aircraft carriers

10 to 12

12

Cruisers and destroyers

66 to 112

109

Littoral combat ships (LCSs)

40 to 70

56

Amphibious ships

18 to 30

36

Maritime Prepositioning Force (Future) ships

19 to 21

18

Combat logistics (resupply) ships

25 to 33

33

22

41

Otherb

Total battle force ships
256 to 380
375
Notes: a. Composition as shown in CNA report as the program of record for the year 2022.
A somewhat different composition is shown in CRS Report RL32665.
b. Includes command ships, support ships (such as salvage ships and submarine tenders),
dedicated mine warfare ships, and high-speed sealift ships.

As can be seen in the table, the 380-ship fleet at the high end of the CNA range
is similar in size and composition to the Navy’s 375-ship fleet proposal. The 256ship fleet at the low end of the CNA range is a more-or-less scaled-down version of
the 380-ship fleet. Its reduced numbers for aircraft carriers, amphibious ships, and
attack submarines are similar to figures reported in the defense trade press since early
2004 about possible reductions in planned numbers of those kinds of ships. The 256ship fleet also includes reduced numbers for ships such as larger surface combatants
and combat logistics (resupply) ships.
The CNA range of 256 to 380 ships overlaps with ranges of 290 to 375 ships,
260 to 325 ships, and 243 to 302 ships presented in the Navy’s February testimony.
An additional comparison is that the mid-point of the CNA-recommended range (318
ships) is similar in terms of total numbers of ships to the 310-ship fleet from the 2001
Quadrennial Defense Review (QDR). Unlike the 2001 QDR fleet, however, the
CNA-recommended force includes several dozen Littoral Combat Ships (LCSs) and
smaller numbers of other kinds of ships.
The CNA-recommended fleet platform architecture uses essentially the same
kinds of ships as those currently in the fleet, under construction, or planned for
procurement. It also uses essentially the same kinds of naval formations as those in
use today or planned by the Navy. If an alternative fleet platform architecture is
defined as one that uses ship types or naval formations that differ in some significant

CRS-12
way from those currently used or planned, then the CNA-recommended force
arguably would not qualify as an alternative fleet platform architecture.
In summary, the CNA-recommended force parallels fairly closely current Navy
thinking on the size and composition of the fleet. This is perhaps not surprising,
given that much of CNA’s analytical work is done at the Navy’s request.
OFT Report.17 The OFT report differs significantly (some might say
diametrically) from the CNA report. The OFT report “calls into question the viability
of the longstanding logic of naval force building”18 and presents an essentially cleansheet proposal for a future Navy that would be radically different from the currently
planned fleet.
The OFT report was prepared under the direction of retired Navy admiral Arthur
Cebrowski, who was the director of OFT from October 29, 2001 until January 31,
2005. The report is generally consistent with Cebrowski’s ideas on network-centric
warfare and distributed force architectures, which he has developed and articulated
since his tenure as President of the Naval War College (from July 24, 1998 to August
22, 2001).
The OFT-recommended fleet would include large numbers of manned ships
(about three-quarters of them small, fast surface combatants), about the same number
of carrier-based manned aircraft as in the Navy’s planned fleet, and large numbers
of unmanned systems.
The OFT architecture employs eight new ship designs that differ substantially
from the designs of most ships currently in the fleet, under construction, or planned
for procurement. Among the eight new ship designs are four types of large surface
ships that would be built from a common, relatively inexpensive, merchant-like hull
design developed in 2004 for the Navy’s Maritime Prepositioning Force (Future)
analysis of alternatives. These four types of ships, which would all displace 57,000
tons, include:
!

An aircraft carrier that would embark a notional air wing of 30
Joint Strike Fighters (JSFs), 6 MV-22 Osprey tilt-rotor aircraft, and
15 unmanned air vehicles (UAVs). The total of 36 manned aircraft
is about half as many as in today’s carrier air wings, and the OFT
architecture envisages substituting two of these new carriers for each
of today’s carriers. This new carrier would also have support spaces
for unmanned underwater vehicles (UUVs), unmanned surface
vehicles (USVs), and mission modules for the 1,000-ton surface
combatant described below. In displacement terms, this ship would
be roughly the same size as a new aircraft carrier design that the
United Kingdom plans to procure, and somewhat larger than the

17

U.S., Department of Defense, Office of the Secretary of Defense, Alternative Fleet
Architecture Design. Washington, 2005. (Report for the Congressional Defense
Committees, Office of Force Transformation). 101 pp.
18

Ibid, p. 1

CRS-13
U.S. Navy’s 40,000-ton LHA/LHD-type amphibious assault ships.
Compared to the U.S. Navy’s aircraft carriers, which displace 81,000
to 102,000 tons, this ship could be considered a medium-size carrier.
!

A missile-and-rocket ship that would be quipped with 360 vertical
launch system (VLS) missile tubes and four trainable rocket
launchers. Additional spaces on this ship could be used to support
UUVs, USVs, and mission modules for the 1,000-ton surface
combatant. Alternatively, these spaces could be used to provide
limited stowage and working space for the 100-ton surface
combatant described below, and mission modules for these 100-ton
ships. This ship could be considered similar in some respects to the
Navy/DARPA arsenal ship concept of 1996-1997, which would have
been a large, relatively simple surface ship equipped with about 500
VLS tubes.19

!

An amphibious assault ship that would embark a notional air wing
of either 30 CH-46 equivalents or 6 JSFs, 18 MV-22s, and 3
gyrocopter heavy-lift helicopters. It would also have spaces for
Marine Corps equipment, unmanned vehicles, and mission modules
for the 1,000-ton surface combatant.

!

A “mother ship” for small combatants that would contain stowage
and support spaces for the 100-ton surface combatant described
below.

The four other new-design ships in the OFT architecture are:
!

19

A 13,500-ton aircraft carrier based on a conceptual surface effect
ship (SES)/catamaran hull design developed in 2001 by a team at the
Naval Postgraduate School. This ship would embark a notional air
wing of 8 JSFs, 2 MV-22s, and 8 UAVs. The total of 10 manned
aircraft is roughly one-eighth as many as in today’s carrier air wings,
and the OFT architecture envisages substituting eight of these new
carriers for each of today’s carriers. This new ship would have a
maximum speed of 50 to 60 knots. In displacement terms, the ship
would be slightly larger than Thailand’s aircraft carrier, which was
commissioned in 1997, and somewhat smaller than Spain’s aircraft
carrier, which was based on a U.S. design and was commissioned in
1988. Due to its SES/catamaran hull design, this 13,500-ton ship
would be much faster than the Thai and Spanish carriers (or any
other aircraft carrier now in operation), and might have a larger

For more on the arsenal ship, see CRS Report 97-455 F, Navy/DARPA Arsenal Ship
Program: Issues and Options for Congress, by Ronald O’Rourke. 133 pp.; and CRS Report
97-1044 F, Navy/DARPA Maritime Fire Support Demonstrator (Arsenal Ship) Program:
Issues Arising From Its Termination, by Ronald O’Rourke. 6 pp. Both reports are out of
print and are available directly from the author.

CRS-14
flight deck. This ship could be considered a small, high-speed
aircraft carrier.
!

A 1,000-ton surface combatant with a maximum speed of 40 to 50
knots and standard interfaces for accepting various modular mission
packages. These ships would self-deploy to the theater and would
be supported in theater by one or more of the 57,000-ton ships
described above. This design could be viewed as similar to, but
smaller than, the 2,500- to 3,000-ton Littoral Combat Ship (LCS).
Compared to the LCS, it would be closer in size to the Streetfighter
concept (a precursor to the LCS) that was proposed by retired
admiral Cebrowski during his time at the Naval War College.

!

A 100-ton surface combatant with a maximum speed of 60 knots
and standard interfaces for accepting various modular mission
packages. These ships would be transported to the theater by the
57,000-ton mother ship and would be supported in theater by that
ship and possibly also the 57,000-ton missile-and-rocket ship.
Compared to the LCS, this ship, like the 1,000-ton surface
combatant, would be closer in size to the Streetfighter concept.

!

A non-nuclear-powered submarine equipped with an airindependent propulsion (AIP) system.20 These AIP submarines
would be lower-cost supplements to the Navy’s nuclear-powered
submarines (SSNs) and would be transported from home port to the
theater of operations by transport ships. The OFT architecture
envisages substituting four of these submarines for the SSN in each
carrier strike group.21

The 1,000- and 100-ton surface combatants would be built as relatively
inexpensive sea frames, like the LCS.

20

An AIP system such as a fuel-cell or closed-cycle diesel engine extends the stationary or
low-speed submerged endurance of a non-nuclear-powered submarine. A conventional
diesel-electric submarine has a stationary or low-speed submerged endurance of a few days,
while an AIP-equipped submarine may have a stationary or low-speed submerged endurance
of up to two or three weeks. An AIP system does not significantly increase the high-speed
submerged endurance of a non-nuclear-powered submarine. A non-nuclear-powered
submarine, whether equipped with a conventional diesel-electric propulsion system or an
AIP system, has a high-speed submerged endurance of perhaps 1 to 3 hours, a performance
limited by the electrical storage capacity of the boat’s batteries, which are exhausted quickly
at high speed.
21

The report states that “Alternatives to the SSNs in formations were diesel Air Independent
Propulsion (AIP) submarines and unmanned undersea vehicles (UUVs). The AIP
submarines were substituted for Virginia class SSNs on a cost basis of roughly four to one.
These submarines could be nuclear-powered if they are designed and built based upon a
competitive, cost suppressing business model.” (Page 60) The strategy of transporting the
AIP submarines to the theater using transport ships is not mentioned in the report but was
explained at a Feb. 18, 2005 meeting between CRS and analysts who contributed to the OFT
report.

CRS-15
The OFT architecture is similar in certain ways to a fleet architecture proposed
by the Naval Surface Warfare Center (NSWC) between 1989 and 1992. The NSWC
architecture, like the OFT architecture, employed a common hull design for a large
ship that could be built in several variants for various missions, including aviation,
missile launching and fire support, amphibious warfare, logistics support, and
mother-ship support of small, fast, surface combatants. The small, fast surface
combatants in the NSWC architecture were called scout fighters and were in the same
general size range as the 100- and 1,000-ton surface combatants in the OFT
architecture.22
The OFT report combines the eight above-described types of ships, plus the
Navy’s currently planned TAOE-class resupply ship, into three alternative force
structures that the report calculates would be equal in cost to the equivalent parts of
the Navy’s proposed 375-ship fleet. The report states that each of these alternative
force structures, like the equivalent parts of the Navy’s proposed 375-ship fleet,
would be organized into 12 carrier strike groups (CSGs), 12 expeditionary strike
groups (ESGs), and 9 surface strike groups (SSGs). The three alternative force
structures are shown in Table 2 on the next page.

22

For more on this proposed fleet architecture, see Norman Polmar, “Carrying Large
Objects,” U.S. Naval Institute Proceedings, Dec. 1990, pp. 121-122; Michael L. Bosworth
et al, “Multimission Ship Design for an Alternative Fleet Concept,” Naval Engineers
Journal, May 1991, pp. 91-106; Michael L. Bosworth, “Fleet Versatility by Distributed
Aviation,” U.S. Naval Institute Proceedings, Jan. 1992, pp. 99-102; and Victor A. Meyer,
“Naval Surface Warfighting Vision 2030,” Naval Engineers Journal, May 1992, pp. 74-88.
See also “USN’s ‘2030’ Plan For Future Fleet,” Sea Power, April 1992, pp. 79, 82; Edward
J. Walsh, “‘Alternative Battle Force’ Stresses Commonality, Capability,” Sea Power, Feb.
1991,pp. 33-35; Robert Holzer, “Navy Floats Revolutionary Ship Design for Future Fleet,”
Defense News, May 14, 1990, pp. 4, 52; and Anne Rumsey, “Navy Plans Ship Look-ALikes,” Defense Week, Mar. 13, 1989, p. 3.

CRS-16

Table 2. Alternative Fleet Structures From OFT Report
Ship Type

Alternative
A

B

C

57,000-ton aircraft carrier

24

24

0

57,000-ton missile-and-rocket ship

33

33

33

57,000-ton amphibious assault ship

24

24

24

57,000-ton mother ship

0

24

24

13,500-ton aircraft carrier

0

0

96

1,000-ton surface combatant

417

0

0

100-ton surface combatant

0

609

609

AIP submarine

48

48

48

TAOE-class resupply ship

12

12

12

Subtotal 1,000- and 100-ton ships

417

609

609

Subtotal other ships

141

165

237

558a
774a
846a
Total shipsa
Source: Table prepared by CRS based on figures in OFT report.
a The totals shown in earlier copies the OFT report are 36 ships lower in each case due to
an error in those copies in calculating the numbers of ships in the 12 carrier strike groups.

The totals shown in the table do not include SSNs, cruise missile submarines
(SSGNs), and ballistic missile submarines (SSBNs) operating independently of the
12 CSGs, 12 ESGs, and 9 SSGs. The totals also do not include combat logistics
ships other than the TAOEs (e.g., oilers, ammunition ships, and general stores ships)
and fleet support ships. The Navy’s 375-ship proposal, by comparison, includes all
these kinds of ships.
As can be seen from the shaded cells in the table, the difference between
Alternatives A and B is that the former uses 1,000-ton surface combatants while the
latter uses 100-ton surface combatants that are transported into the theater by mother
ships, and the difference between Alternatives B and C is that the former uses
57,000-ton aircraft carriers while the latter substitutes 13,500-ton carriers.
As can also be seen in the table, all three fleets are dominated numerically by
the small surface combatants. These ships account for about 75% of the ships in
Alternative A, about 79% of the ships in Alternative B, and about 72% of the ships
in Alternative C. In the Navy’s currently planned architecture, by contrast, the LCS
might account for roughly 15% to 20% of the total number of ships.
The OFT report contains a fairly detailed discussion of the Navy’s budget
situation that calls into question, on several grounds, the Navy’s prospective ability

CRS-17
to afford its 375-ship proposal. The report concludes that funding for Navy shipprocurement in future years may fall as much as 40% short of what would be needed
to achieve the Navy’s 375-ship fleet proposal. If the shortfall is 40%, the report
estimates, the Navy could maintain a force of 270 to 315 ships, which is comparable
in number to today’s force of 290 ships, except that the future force would include
a substantial number of relatively inexpensive LCSs. If proportionate reductions are
applied to the force structures shown in Table 2, Alternative A would include 402
to 469 ships, Alternative B would include 557 to 650 ships, and Alternative C would
include 609 to 711 ships. Again, these totals would not include certain kinds of ships
(independently operating SSNs, etc.) that are included in the total of 270 to 315 ships
associated with the Navy’s currently planned architecture.
In terms of how the OFT architecture would compare in capability with the
currently planned architecture, the report states:
Alternative fleet formations consisting of small fast and relatively
inexpensive craft combining knowledge and attaining flexibility through
networking appear superior to the programmed fleet for non-traditional warfare
in a variety of settings. This is due to increasing the complexity the enemy faces
and increasing U.S. fleet options that in turn reduce enemy options. The speed
and complexity of the alternative fleets can provide them with the capability to
complicate and possibly defeat the attempts of non-traditional adversaries to
elude surveillance. The enemy could have difficulty determining what to expect
and how to defeat them all. The superior speed and more numerous participants
than in the programmed fleet provide a stronger intelligence base and more
numerous platforms from which to conduct strikes and interceptions. This
appears to be true even if the smaller craft are individually somewhat less
capable and less able to sustain a hit than the larger ships in the programmed
fleet.
If these circumstances are not achieved, and the enemy can continue to
elude and deceive, the programmed fleet often is as good as the alternatives,
sometimes even better. It is not necessarily better in cases in which individual
ship survivability dominates, a perhaps counterintuitive result until we realize
that fleet survivability not individual ship survivability is what dominates.
An area in which programmed fleets might have an advantage would be
when the long loiter time or deep reach of CTOL [conventional takeoff and
landing] aircraft on programmed big-deck CVNs [nuclear-powered aircraft
carriers] is needed. That said, there need be no great sacrifice. With airborne
tanking, the VSTOL [very short takeoff and landing] aircraft in the alternatives
could meet the deep strike and long loiter demands. Also, as mentioned earlier,
a combination of advances in EMALS [electromagnetic aircraft launch system]
and modifications to the JSF will make it possible to launch the JSF with only
a marginal range-payload capability penalty. Moreover, trends in technology are
providing unmanned aircraft greater capability, including greater loiter time and
sensor capability.23

At other points, the OFT report argues that its recommended fleet architecture
would:
23

Alternative Fleet Architecture Design, op. cit., pp. 75-76. Italics as in the original.

CRS-18
!

“provide a quantum leap ahead in capabilities against a spectrum of
enemies ranging from large, highly developed competitors to small
but determined asymmetric adversaries”24 and be adaptable, in a
dynamic and less-predictable security environment, to changing
strategic or operational challenges;

!

be capable of both participating in joint expeditionary operations and
maintaining “the strategic advantage the Navy has developed in the
global commons,” avoiding a need to choose between optimizing the
fleet for “performance against asymmetric challenges at the expense
of its ability to confront a potential adversary capable of traditional
high intensity conflict,” such as China;25

!

pose significant challenges to adversaries seeking to counter U.S.
naval forces due to the “large numbers of combat entities that the
enemy must deal with; a great variety of platforms with which the
enemy must contend; speed; different combinations of forces;
distribution of forces across large areas; and [adversary] uncertainty
as to the mission and capabilities of a given platform;”26

!

reduce unit shipbuilding costs, and thereby permit an increase in
total ship numbers, by shifting the fleet away from complex, highly
integrated ship designs that are inherently expensive to build and
toward less-complex merchant-like hulls and small sea frames that
are inherently less expensive to build;

!

increase shipbuilding options for the Navy by shifting the fleet away
from complex, highly integrated ship designs that can be built only
by a limited number of U.S. shipyards and toward less-complex
merchant-like hulls and small sea frames that can be built by a
broader array of shipyards;

!

make it easier and less expensive to modernize ships over their long
lives, and thereby take better advantage of rapid developments in
technology, by shifting from highly integrated ship designs to
merchant-like hulls and sea frames;

!

permit more constant experimentation with new operational
concepts, and thereby achieve higher rates of learning about how to
evolve the fleet over time; and

!

recognize potential future constraints on Navy budgets and make the
Navy more smoothly scalable to various potential future resource
levels by shifting from a fleet composed of limited numbers of

24

Ibid, p. 6.

25

Ibid, p. 1 and 2.

26

Ibid, p. i.

CRS-19
relatively expensive ships to one composed of larger numbers of less
expensive ships.
The OFT report does not include a detailed plan for transitioning from today’s
fleet architecture to its proposed architecture,27 but such a plan could be developed
as a follow-on analysis.
The report poses a significant potential business challenge to the six shipyards
that have built the Navy’s major warships in recent years. The report’s discussion
on implementing its proposed architecture states in part:
The shipbuilding industrial base would also need to start to retool to build
different types of ships more rapidly. Smaller shipyards, which presently do
little or no work for the Navy could compete to build the smaller ships, thereby
broadening the capabilities base of ship design and construction available to the
Navy. The change to smaller, lower unit cost ships would also open up overseas
markets. With more shipyards able to build the ships and potential for a broader
overall market, the U.S. shipbuilding industry would have the chance to expand
its competence, innovation and relevance. Taken together this would sharpen the
industry’s ability to compete and provide alternatives to a ship procurement
system that is beset by laws and regulations that frustrate, even pervert, market
forces.28

The report’s concluding section lists five “dangers” that “risk the Navy’s ‘losing
the way.’” One of these, the report states, is “Shielding the shipbuilding industrial
base from global competition,” which the report states “guarantees high cost, limited
innovation, and long cycle times for building ships.”29

27

On the topic of transitioning to the proposed fleet architecture, the report states:
Implementation of the alternative fleet architecture should start now and
should target option generation, short construction time, and technology
insertion. The alternative further provides an opportunity to reinvigorate the
shipbuilding industrial base. The many smaller ships, manned and unmanned, in
the alternative fleet architecture could be built in more shipyards and would be
relevant to overseas markets. The potential longevity of the existing fleet will
sustain existing shipyards as they move into building smaller ships more rapidly
in this broader market and more competitive environment. The shipyards would
develop a competence, broad relevance, and operate in an environment driven by
market imperatives instead of a framework of laws that frustrates market forces.
As the new ships enter service and the fleet has the opportunity to
experiment with new operational concepts (expanded network-centric warfare
in particular) existing ships can be retired sooner to capture operations savings.
At this point, the sooner the existing fleet is retired, the sooner the benefits of the
alternative fleet architecture design will accrue. (Page 3)

Additional general discussion of implementation is found on pages 76-77 of the report.
28

Ibid, p. 76.

29

Ibid, p. 80.

CRS-20
The OFT report proposes building ships that are substantially different from
those currently in the fleet, under construction, or planned for procurement, and
combines these ships into formations which, although similar in name to currently
planned formations (i.e., CSGs, ESGs, and SSGs), might be viewed by some
observers as substantially different in composition from the currently planned
versions of these formations. If an alternative fleet platform architecture is defined
as one that uses ship types or naval formations that differ in some significant way
from those currently used or planned, then the OFT-recommended force arguably
would qualify as an alternative fleet platform architecture.
In summary, the OFT report fundamentally challenges current Navy thinking on
the size and composition of the fleet. This is perhaps not surprising, given both
OFT’s institutional role within DOD as a leading promoter of military transformation
and Cebrowski’s views on network-centric warfare and distributed force
architectures.

Industrial-Base Implications Of Reductions and Deferrals30
The Navy’s FY2006-FY2011 ship-procurement plan, shown in Table 3 below,
reduces or defers funding for a number of Navy ship-procurement programs. This
section discusses the industrial-base implications of these reductions and funding
deferrals in terms of the overall ship-procurement rate and individual shipprocurement programs.

30

Material in this section is adapted from CRS Report RL32665, op. cit.

CRS-21

Table 3. Navy FY2006-FY2011 Ship-Procurement Plan
(Ships fully funded in FY2005 shown for reference)

FY05

FY06

FY07

FY08

FY09

FY10

1

CVN-21
SSN-774

1

DDG-51

3

1

1

1

1

1
1

1

1

1

1

CG(X)
LCS

1

1

2

LPD-17

1

1

1

3

5

1

6

1

1

5

1

5

1

1

5

21
2

1

LHA®
2

Total
FY06FY11

0

DD(X)

TAKE

FY11

1

2

1

3

TAOE(X)

1

1

2

4

MPF(F)

1

1

2

4
0

MPF(A)
TOTAL

8

4

7

7

9

10

12

49

7
3
5
4
4
5
7
28
TOTAL
less LCSs
Source: Department of the Navy, Highlights of the Department of the Navy FY 2006
Budget, Chart 14 (p. 5-1).

Overall Ship-Procurement Rate. The FY2006-FY2011 plan would procure
a total of 49 ships, or an average of about 8.2 ships per year. Assuming an average
Navy ship life of 30 to 35 years, an average procurement rate of about 8.2 ships per
year would, over the long run, maintain a fleet of 245 to 286 ships.
As shown in the table, LCSs account for 21 of these 49 ships, or about 43%.
LCSs are to be built by yards other than the six yards that have built the Navy’s major
warships in recent years.31 Setting aside LCSs so as to focus on larger ships that
would likely be built by these six yards, the total number of larger ships is 28, or an
average of about 4.7 ships per year. Assuming an average Navy ship life of 30 to
31

These six yards include Bath Iron Works (BIW) of Bath, ME, the Electric Boat Division
of Groton, CT, and Quonset Point, RI, and National Steel and Shipbuilding Company
(NASSCO) of San Diego, CA, all of which are owned by General Dynamics Corporation;
and Avondale Shipyards near New Orleans, LA, Ingalls Shipbuilding of Pascagoula, MS,
and Newport News Shipbuilding of Newport News, VA, all of which are owned by
Northrop Grumman Corporation.

CRS-22
35 years, an average procurement rate of about 4.7 ships per year other than LCSs,
if maintained over the long run, would maintain a fleet that included 140 to 163 ships
other than LCSs.
An average procurement rate of 4.7 ships per year other than LCSs would be
about equal to the relatively low rates of Navy ship procurement of the mid- to late
1990s.32 For the six shipyards that have built the Navy’s major warships in recent
years, this average ship-procurement rate would result, as a general matter, in
relatively low work loads, revenues, and employment levels. Production economies
of scale would be limited or poor, putting upward pressure on unit production costs.
Layoffs may occur at some of the yards, and the two companies that own these yards
may be less inclined to commit to new investments aimed at improving the yards’
production facilities.
Individual Shipbuilding Programs.
CVN-21 Aircraft Carrier Program. CVN-21, the next aircraft carrier, is to
be built by Northrop Grumman Newport News (NGNN). Compared to the FY2005FY2009 ship-procurement plan submitted to Congress in February 2004, the
FY2006-FY2011 plan would defer the procurement of CVN-21 by a year, to
FY2008. This may have been due in part to the need to finance the procurement in
FY2007 of other ships, including the lead DD(X) destroyer and the LHA®
amphibious assault ship. The FY2006-FY2011 plan would also defer the
procurement of the carrier after CVN-21 from FY2011 to a subsequent fiscal year.33
The deferral of CVN-21 to FY2008 may increase CVN-21’s real (i.e., inflationadjusted) procurement cost by lengthening the already-considerable production gap
at NGNN between CVN-21 and the previous carrier, CVN-77, which was procured
in FY2001. Lengthening this gap could reduce the shipyard’s ability to efficiently
shift workers coming off the CVN-77 production effort onto the CVN-21 effort. As
a result, workers coming off the CVN-77 production effort could instead be
furloughed, and any new workers hired later to support the start of CVN-21

32

The table below shows the number of battle force ships funded by Congress from FY1982
through FY2005.
Battle force ships procured (FY1982-FY2005)
82

83

84

85

86

87

88

89

90

91

92

93

17

14

16

19

20

17

15

19

15

11

11

7

94

95

96

97

98

99

00

01

02

03

04

05

4

4

5

4

5

5

6

6

6

5

7

8

Source: CRS compilation based on examination of defense authorization and appropriation
committee and conference reports for each fiscal year. The table excludes non-battle force ships that
do not count toward the 310- or 375- ship goal, such as sealift and prepositioning ships operated by
the Military Sealift Command and oceanographic ships operated by agencies such as the National
Oceanic and Atmospheric Administration (NOAA).
33

For more on the CVN-21 program, see CRS Report RS20643, Navy CVN-21 Aircraft
Carrier Program: Background and Issues for Congress, by Ronald O’Rourke.

CRS-23
construction could require training and be less productive initially than experienced
workers.
Under the FY2005 budget and FY2005-FY2009 FYDP submitted to Congress
in February 2004, CVN-21’s acquisition (i.e., research and development [R&D] plus
procurement) cost was estimated at $11.7 billion — $3.1 billion for R&D and $8.6
billion for procurement. Under the new FY2006 budget and FY2006-FY2011 FYDP,
the estimate has increased to $13.7 billion — $3.2 billion for R&D and $10.5 billion
for procurement. Some portion of the $1.9-billion increase in the ship’s estimated
procurement cost may be due to the decision to defer CVN-21 to FY2008.
Inefficiencies resulting from lengthening the production gap between CVN-77
and CVN-21 may also increase costs for attack submarine construction work done
at NGNN because that work might, for a time, need to bear a somewhat higher share
of the shipyard’s fixed overhead costs.
SSN-774 Attack Submarine Program. Virginia (SSN-774) class
submarines are built jointly by General Dynamics’ Electric Boat division (GD/EB)
and NGNN. The FY2006-FY2011 plan would maintain the Virginia-class
procurement rate at one per year through FY2011. The FY2005-FY2009 plan had
called for increasing Virginia-class procurement to two per year starting in FY2009.34
Keeping Virginia-class procurement at one per year through FY2011 would result in
Virginia-class work loads, revenues, and employment levels at GD/EB and NGNN
that are about equal to current levels. As a result, production economies of scale for
submarines would continue to remain limited or poor.
DDG-51 Destroyer Program. Arleigh Burke (DDG-51) class Aegis
destroyers are built by General Dynamics’ Bath Iron Works (GD/BIW) and Northrop
Grumman’s Ship Systems division (NGSS), specifically, Northrop’s Ingalls shipyard.
The FY2006-FY2011 plan leaves unchanged the previous procurement profile for the
DDG-51 program. This profile calls for the three DDG-51s procured in FY2005 to
be the last ships in the program. Construction of these three ships is scheduled to
finish by the end of 2010.
DD(X) Destroyer Program. DD(X) destroyers are to be built by GD/BIW
and/or NG/Ingalls. The FY2005-FY2009 plan had called for procuring a total of
eight DD(X)s through FY2009 — one in FY2005, two in FY2007, another two in
FY2008, and three in FY2009. The FY2006-FY2011 plan would reduce
procurement to one ship per year for the period FY2007-FY2011.
A comparison of the FY2006-FY2011 plan to the FY2005-FY2009 plan
suggests at first that the FY2006-FY2011 plan has deferred the procurement of the
lead DD(X) destroyer by two years, to FY2007. The actual effect of the FY2006FY2011 plan on the schedule for building this ship, however, appears to be less
dramatic. The Navy’s FY2005-FY2009 plan proposed funding the construction of

34

For more on the SSN-774 program, see CRS Report RL32418, Navy Attack Submarine
Force-Level Goal and Procurement Rate: Background and Issues for Congress, by Ronald
O’Rourke.

CRS-24
the lead DD(X) in the Navy’s research and development account through a stream
of annual funding increments stretching out to FY2011 — an approach commonly
known as incremental funding. Under this proposed scheme, the Navy had some
flexibility to choose which year to record as the nominal year of procurement for the
lead DD(X). The Navy chose FY2005, the year of the first scheduled increment,
even though the amount of funding requested for the FY2005 increment equated to
only about 8% of the ship’s total cost, leaving the remaining 92% of the ship’s cost
to be provided in future years.
Congress, in acting on the Navy’s proposed FY2005 budget, approved the
Navy’s FY2005 funding request for the lead DD(X) but directed that the ship be
procured the traditional way, through the Navy’s shipbuilding account (known
formally as the Shipbuilding and Conversion, Navy, or SCN, account), and that it be
funded the traditional way, in accordance with the full funding policy, which requires
that items acquired through the procurement title of the DOD appropriation act be
fully funded in the year they are procured.35 Consistent with this direction, the
FY2005 funding increment was designated as advance procurement (AP) funding for
a lead DD(X) to be procured in some future fiscal year.
Abiding by this direction required the Navy to alter its funding profile for the
lead DD(X) to one that fully funds the ship in a particular year. The FY2006FY2011 plan suggests that the Navy, after examining its options, selected FY2007
as the year in which the ship would be fully funded. The actual schedule for building
the lead ship, however, may delayed by about a year rather than two years.
Consequently, although the nominal year of procurement for the lead DD(X) appears
to have been deferred two years, the actual amount of change in the schedule for the
lead ship may be less.
The FY2006-FY2011 Navy plan, however, defers the procurement of the second
DD(X) by a year, to FY2008, and as mentioned earlier, reduces DD(X) procurement
to one per year for the five-year period FY2007-FY2011.
The Navy has recently testified that it requires a total of eight to 12 DD(X)s.
Under previous plans, however, the Navy envisioned stopping DD(X) procurement
at about the time that it started CG(X) procurement. If the lead CG(X) is procured
in FY2011, as shown in the FY2006-FY2011 plan, and there is a gap year in FY2012
between the procurement of the lead CG(X) and follow-on CG(X)s starting in
FY2013, then a final DD(X) might be procured in FY2012. If so, then the total
procurement quantity for the DD(X) program would be six ships.36

35

For more on the full funding policy, see CRS Report RL31404, Defense Procurement:
Full Funding Policy — Background, Issues, and Options for Congress, by Ronald O’Rourke
and Stephen Daggett.
36

For more on the DD(X) program, see CRS Report RS21059, Navy DD(X) Destroyer
Program: Background and Issues for Congress, by Ronald O’Rourke; and CRS Report
RL32109, Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options
for Congress, by Ronald O’Rourke.

CRS-25
Supporters of the surface combatant industrial base expressed concern last year
about the gap between the end of DDG-51 procurement and the start of DD(X)
procurement. This gap, supporters argued, would make it difficult for the industrial
base to manage the transition from DDG-51 production to DD(X) production. The
FY2006-FY2011 plan appears to increase the length of this gap, which would likely
intensify these concerns.
The light-ship displacement of the DD(X) design (about 12,135 tons) is about
75% greater than that of the DDG-51 design (about 6,950 tons). If shipyard
construction work is roughly proportionate to light-ship displacement, then building
a DD(X) might generate about 75% more shipyard work than building a DD(X), and
building one DD(X) per year would be equivalent to building 1.75 DDG-51s per
year.
Supporters of GD/BIW and NG/Ingalls have argued in previous years that three
DDG-51s per year, in conjunction with other work being performed at the two yards
(particularly Ingalls), is the minimum rate needed to maintain the financial health of
the two yards. Navy officials in recent years have questioned whether this figure is
still valid. Building the equivalent of 1.75 DDG-51s per year equates to about 58%
of this rate. If the minimum rate of three DDG-51 equivalents per year is valid, then
the one-per-year procurement rate for the DD(X) program may raise questions about
the potential future financial health of these yards.
Until recently, the DD(X) acquisition strategy called for the first DD(X) to be
built by NG/Ingalls and the second by GD/BIW, and for the construction contracts
for the first six DD(X)s to be divided evenly between the two yards. As a result of
the reduction in the planned DD(X) procurement rate, however, the Navy is
considering holding a competition between the two yards for the right to become the
sole builder of the DD(X).
If the Navy holds such a competition, then the consequences for the yard that
loses the competition could be very serious. GD/BIW is involved as a shipbuilder
in no shipbuilding programs other than the DDG-51 and DD(X).37 Consequently, if
GD/BIW loses the DD(X) competition and does not receive other new shipconstruction work, then GD/BIW could experience a significant reduction in
workloads, revenues, and employment levels by the end of the decade. Theoretical
scenarios for the yard under such circumstances could include closure and liquidation
of the yard, the “mothballing” of the yard or some portion of it, or reorienting the
yard into one that focuses on other kinds of work, such as building commercial ships,
overhauling and modernizing Navy or commercial ships, or fabricating components
of Navy or commercial ships that are being built by other yards. Reorienting the yard
into one that focuses on other kinds of work, if feasible, would likely result in
workloads, revenues, and employment levels that are significantly reduced from
today’s.

37

GD/BIW is also the prime contractor for the GD version of the LCS, but the GD version
is to be built by the Austal USA shipyard, of Mobile, AL.

CRS-26
If NGSS loses the DD(X) competition and other work being done at NG/Ingalls
(particularly construction of amphibious ships) does not increase, then NG/Ingalls
could similarly experience a reduction in workloads, revenues, and employment
levels. The continuation of amphibious-ship construction at NG/Ingalls could make
the scenarios of closure and liquidation or mothballing less likely for NG/Ingalls than
for GD/BIW, but workloads, revenues, and employment levels could still be reduced
from current levels, and the cost of amphibious-ship construction and other work
done at NG/Ingalls could increase due to reduced spreading of shipyard fixed
overhead costs.
If surface-combatant construction work at GD/BIW or NG/Ingalls ceases, the
Navy would be left with one yard actively building larger, complex surface
combatants. If the Navy at some point wanted to reestablish a second source for
building these ships, its options would include reconstituting surface combatant
construction at the yard where the work had ceased, reconstituting it at some other
yard with past experience building larger surface combatants — such as NGNN,
which built nuclear-powered cruisers in the 1970s, NG/Avondale, which built Knox
(FF-1052) class frigates in the 1970s and Hamilton (WHEC-715) class Coast Guard
cutters in the 1960s and 1970s, or perhaps Todd Pacific Shipyards of Seattle, WA,
which built Oliver Hazard Perry (FFG-7) class frigates in the 1980s38 — or
establishing it at a yard that has not previously built larger, complex surface
combatants, but could be made capable of doing so.
CG(X) Cruiser Program. The FY2006-FY2011 plan would accelerate the
procurement of the first CG(X) cruiser to FY2011. The long-range shipbuilding plan
that the Navy submitted to Congress in 2003 showed the first CG(X) cruiser being
procured in FY2018.39 A December 2004 DOD document called Program Budget
Decision 753 (PBD 753), stated that a DD(X) procurement rate of one per year would
“maintain the bridge to the CG(X).”40
Littoral Combat Ship (LCS) Program. The FY2006-FY2011 plan would
defer procurement of the third LCS by a year, to FY2007. This is consistent with
Congress’ direction, in acting on the Navy’s FY2005 budget request, to fully fund a
lead LCS in FY2005 but require a gap year between the procurement of a lead LCS
and any follow-on LCSs built to that same design. The Navy plans to procure two
lead LCSs to different designs developed by two competing industry teams. Under
the FY2006-FY2011 plan, the single ship now planned for FY2006 would
presumably be the second lead LCS, and the two LCSs now planned for FY2007
would presumably be follow-on ships built to the same design as the lead LCS
procured in FY2005. The FY2006-FY2011 plan would also reduce the number of
38

The Navy’s FFG-7s were built at GD/BIW, Todd Pacific Shipyards, and Todd Shipyards
of San Pedro, CA. The San Pedro yard is now part of Southwest Marine, Inc., which in turn
is part of United States Marine Repair, a group of shipyards that focuses on repairing,
modernizing, converting, and overhauling non-nuclear-powered ships.
39

For more on the CG(X) program, see CRS Report RL32109, Navy DD(X) and LCS Ship
Acquisition Programs: Oversight Issues and Options for Congress, by Ronald O’Rourke.
40

U.S. Department of Defense, Program Budget Decision [PBD] 753, Washington, 2004.
p. 6.

CRS-27
LCSs procured in FY2009 from six ships to five. This can be viewed as consistent
with the Navy’s longer-range projection for the LCS program, which has envisioned
a sustaining procurement rate of five ships per year through the end of the program,
as shown by the figures for FY2010 and FY2011.41
LPD-17 Amphibious Ship Program. San Antonio (LPD-17) class
amphibious ships are built by NGSS, particularly NG/Avondale. The FY2006FY2011 plan would end procurement of LPD-17s after procuring the ninth ship in
the class in FY2007. Previous plans had generally called for building a total of 12
LPD-17s through FY2010.42 Under the FY2006-FY2011 plan, workloads, revenues,
and employment levels associated with building LPD-17s would wind down about
three years earlier than under previous plans. NG/Avondale might be able to
compensate for this by beginning to build TAOE(X) resupply ships or MPF(F) ships,
but procurement of these ships is not scheduled to start until FY2009, suggesting that
NG/Avondale might experience a dip in workloads, revenues, and employment levels
between the winding down of LPD-17 production and the scaling up of TAOE(X) or
MPF(F) production. It is not certain, moreover, whether NG/Avondale will
participate in building either of these ships.
LHA® Amphibious Ship Program. The LHA® amphibious assault ship
would be built by NGNN, primarily NG/Ingalls. Compared to the FY2005-FY2009
plan, the FY2006-FY2011 plan would accelerate the procurement of LHA® by one
year, to FY2007. The FY2004-FY2009 shipbuilding plan that the Navy submitted
to Congress in February 2003 showed LHA® in FY2007. Accelerating procurement
of LHA® to FY2007 can thus be viewed as restoring the year of procurement shown
in the plan submitted to Congress in 2003.43 The acceleration of LHA® to FY2007
would improve NG/Ingalls’ ability to shift workers from the previous amphibious
assault ship, LHD-8, to LHA®, and perhaps help NG/Ingalls somewhat in managing
the potential consequences of the Navy’s decisions regarding the DD(X) program.
TAKE Auxiliary Cargo Ship Program. Lewis and Clark (TAKE-1) class
auxiliary cargo ships are built by GD/National Steel and Shipbuilding Company
(GD/NASSCO). Under the FY2005-FY2009 plan, the final three ships in the
program were to be procured in FY2006 (two ships) and FY2007 (one ship). The
FY2006-FY2011 plan would instead procure these ships at a rate of one per year
during the three-year period FY2006-FY2008. As a consequence, employment at the
yard associated with building these ships may start to decline around FY2006 rather

41

For more on the LCS program, see CRS Report RS21305, Navy Littoral Combat Ship
(LCS): Background and Issues for Congress, by Ronald O’Rourke; and CRS Report
RL32109, Navy DD(X) and LCS Ship Acquisition Programs: Oversight Issues and Options
for Congress, by Ronald O’Rourke.
42

For more on the LPD-17 program, see CRS Report RL32513, Navy-Marine Corps
Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues
for Congress, by Ronald O’Rourke.
43

For more on the LHA(R) program, see CRS Report RL32513, Navy-Marine Corps
Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues
for Congress, by Ronald O’Rourke.

CRS-28
than FY2007, but construction work on these ships would continue for an additional
year into the future before ceasing.
TAOE(X) Replenishment Ship Program. The FY2005-FY2009 plan
called for procuring the first two TAOE(X) ships in FY2009. The FY2006-FY2011
plan reduces the FY2009 procurement to one ship. This would appear to reduce the
potential of the TAOE(X) program to serve as a new source of work in FY2009 for
yards that may be attempting to compensate for the winding down of other
shipbuilding programs.
MPF(F)/MPF(A) Maritime Prepositioning Ship Program. The FY2005FY2009 plan included three MPF-type ships in FY2009 — two MPF(F)s and one
MPF(A) (an aviation variant of the MPF(F) design). The FY2006-FY2011 plan
would reduce MPF-type procurement to one ship in FY2009.44 This would similarly
appear to reduce the potential of the MPF program to serve as a new source of work
in FY2009 for yards that may be attempting to compensate for the winding down of
other shipbuilding programs.

Alternative Funding Approaches for Navy Ship Procurement45
Introduction. Some observers, including the Chief of Naval Operations and
shipbuilding industry officials, have recently proposed procuring Navy ships using
funding approaches other than the traditional full funding approach that has been
used to procure most Navy ships since the 1950s.46 These alternative funding
approaches include incremental funding, which has been used to fund a few Navy
ships in recent years, and advance appropriations, which has not been used for Navy
ship procurement. Supporters of these alternative funding approaches believe they
could increase stability in Navy shipbuilding plans and perhaps increase the number
44

For more on the MPF(F) program, see CRS Report RL32513, op. cit.

45

Material in this section is adapted from CRS Report RL32776, Navy Ship Procurement:
Alternative Funding Approaches — Background and Options for Congress, by Ronald
O’Rourke. See also CRS Report RL31404, Defense Procurement: Full Funding Policy —
Background, Issues, and Options for Congress, by Ronald O’Rourke and Stephen Daggett.
46

For the Chief of Naval Operations, see Statement of Admiral Vernon Clark, USN, Chief
of Naval Operations, Before The House Armed Services Committee, Feb. 17, 2005, p. 20,
and Statement of Admiral Vernon Clark, USN, Chief of Naval Operations, Before The
Senate Armed Services Committee, Feb. 10, 2005, p. 20. See also Andrew Scutro, “Clark
Seeks Hearings On Shipbuilding Process,” NavyTimes.com, Feb. 18, 2005; Dave Ahearn,
“Clark Urges Ships Funding Reforms, But Defends Shipbuilding Cuts,” Defense Today,
Febr. 18, 2005; and Geoff Fein, “Federal Acquisition Regulations Should Be Examined,
CNO Says,” Defense Daily, Feb. 18, 2005.
For industry officials, see Dave Ahearn, “Northrop Chief Says Payment Due For Aircraft
Carrier Delay,” Defense Today, Feb. 16, 2005; Nathan Hodge, “Despite Setbacks, Northrop
Grumman Chief Confident On Missile Defense, Budget,” Feb. 16, 2005; William Matthews,
“Northrop Pitches Novel Ship Financing, Again,” Defense News, Dec. 6, 2004, p. 24;
Christopher P. Cavas, “Northrop Chief Urges Spreading Ship Payments,” Defense News,
Nov. 22, 2004; Christopher J. Castelli, “Shipbuilder Northrop Pitches Financing Strategy
For Ships To Navy,” Inside the Navy, Nov. 1, 2004, p. 1.

CRS-29
of Navy ships that could be built for a given total amount of ship-procurement
funding.
Congress may maintain current practices for funding Navy ship procurement or
change them by, for example, increasing the use of incremental funding or starting
to use advance appropriations. Congress’ decision on this issue could be significant
because the full funding policy relates to Congress’ power of the purse and its
responsibility for conducting oversight of Department of Defense (DOD) programs.
Consequently, the issue can be alternately expressed as how to procure Navy ships
economically while maintaining key congressional prerogatives. Congress’ decision
on ship funding approaches could also affect future Navy capabilities, annual Navy
funding requirements, and the shipbuilding industrial base.
Full Funding Policy.
General Description. Most (but not all) Navy ships procured since the late
1950s have been funded in accordance with the full funding policy. Before then,
many Navy ships were procured with incremental funding, which is discussed below.
For DOD procurement programs, the full funding policy requires the entire
procurement cost of a usable end item (such as a Navy ship) to be funded in the year
in which the item is procured. The policy applies not just to Navy ships, but to all
weapons and equipment that DOD procures through the procurement title of the
annual DOD appropriations act.
In general, the full funding policy means that DOD cannot contract for the
construction of a new weapon or piece of equipment until funding for the entire cost
of that item has been approved by Congress. Sufficient funding must be available for
a complete, usable end item before a contract can be let for the construction of that
item. Under traditional full funding, no portion of a usable end item’s procurement
cost is funded in a year after the year in which the item is procured.
Congress imposed the full funding policy on DOD in the 1950s to make the total
procurement costs of DOD weapons and equipment more visible and thereby
enhance Congress’ ability to understand and track these costs. Congress’ intent in
imposing the policy was to strengthen discipline in DOD budgeting and improve
Congress’ ability to control DOD spending and carry out its oversight of DOD
activities. Understanding total costs and how previously appropriated funds are used
are key components of Congress’ oversight capability.
The full funding policy is consistent with two basic laws regarding government
expenditures — the Antideficiency Act of 1870, as amended, and the Adequacy of
Appropriations Act of 1861. Regulations governing the full funding policy are found
in Office of Management and Budget (OMB) Circular A-11 and DOD Directive
7000.14-R, which provide guidelines on budget formulation. OMB Circular A-11
states, among other things, that
Good budgeting requires that appropriations for the full costs of asset acquisition
be enacted in advance to help ensure that all costs and benefits are fully taken
into account at the time decisions are made to provide resources. Full funding

CRS-30
with regular appropriations in the budget year also leads to tradeoffs within the
budget year with spending for other capital assets and with spending for purposes
other than capital assets. Full funding increases the opportunity to use
performance-based fixed price contracts, allows for more efficient work planning
and management of the capital project (or investment), and increases the
accountability for the achievement of the baseline goals.
When full funding is not followed and capital projects (or investments) or useful
segments are funded in increments, without certainty if or when future funding
will be available, the result is sometimes poor planning, acquisition of assets not
fully justified, higher acquisition costs, cancellation of major investments, the
loss of sunk costs, or inadequate funding to maintain and operate the assets.47

Support for the full funding policy has been periodically reaffirmed over the
years by Congress, the Government Accountability Office (GAO), and DOD.48
Advance Procurement (AP) Payments Under Full Funding. The
executive branch regulations that implement the full funding policy for DOD
procurement programs permit two circumstances under which advance procurement
(AP) “down payments” on a usable end item can be provided in one or more years
prior to the item’s year of procurement:49
!

AP funding may be used to pay for “long-lead items” — components
of a usable end item that have long manufacturing lead times — if
needed to ensure that these items will be ready for installation into
the end item at the appropriate point in the end item’s construction
process.

AP funding may also be used to pay for “economic order quantity”
(EOQ) procurement of a set of long-lead items for a set of weapons
being acquired under a multiyear procurement (MYP) arrangement.
Each of these is discussed below.
!

AP Payments For Long-Lead Items. Long-lead items are often
manufactured not at the end item’s final assembly facility (such as a shipyard) but at
separate supplier firms. In Navy shipbuilding, AP payments have most commonly
been used to pay for nuclear-propulsion components of nuclear-powered aircraft
carriers and submarines.
Congress in recent years has occasionally approved AP funding for
conventionally powered Navy ships, such as destroyers and amphibious ships, for
which the Navy did not request any AP funding for long-lead items. Congress in
47

OMB Circular A-11 (July 2003), Appendix J, Section C, Principle 1 (of four principles
for financing capital assets).

48

For a detailed discussion of the origins, rationale, and governing regulations of the full
funding policy, as well as examples of where Congress, GAO, and DOD have affirmed their
support for the policy, see Appendix A of CRS Report RL31404, op. cit.

49

Note that the funding discussed here is advance procurement funding, which is not to be
confused with the alternate funding approach called advance appropriations, discussed later.

CRS-31
recent years has also occasionally approved AP funding for “advance construction”
work on certain ships, which apparently refers to early shipyard activities for building
the basic structure of a ship, as opposed to manufacturing long-lead components to
be installed into the ship. The use of AP funding for shipyard advance construction
activities is not recognized in executive branch budget regulations on the full funding
policy, at least not in the same way as these regulations recognize the use of AP
funding for long-lead components.
Congressional decisions to approve AP funding for ships for which the Navy did
not request such funding, or for shipyard advance construction activities, could be
aimed at one or more of the following goals:
!

generating shipyard construction work (and thus shipyard revenues
and jobs) on a particular ship in a year prior to that ship’s year of
procurement;

!

creating an early financial commitment to procuring a ship that is
planned for procurement in a future year, which can enhance job
security for construction workers at the yard that would build the
ship;

!

reducing the total construction cost of a ship through improved
sequencing or year-to-year balancing of shipyard construction work;
and

!

reducing the portion of a ship’s cost to be funded in the year of
procurement.

AP Payments For EOQ Under Multiyear Procurement. Most DOD
procurement programs use annual contracting, under which DOD lets one or more
contracts for each year’s worth of procurement of a given item. Multiyear
procurement is a special contracting authority, approved by Congress on a
program-by-program basis, that permits DOD to use a single contract to procure a set
of end items that are scheduled to be procured across a series of up to five fiscal years
(i.e., the budget year in question, plus up to four future years). An MYP arrangement
approved for the Navy’s F/A-18E/F strike-fighter program, for example, permitted
the Navy to procure, under a single contract, a total of 198 to 224 F/A-18E/Fs during
the five-year period FY2000-FY2004. Congress over the years has granted MYP
authority for a relatively small number of procurement programs.
The law governing MYP arrangements is set forth in 10 USC 2306b. This
provision permits AP funding to be used to finance, at the outset of an MYP
arrangement, the procurement of long-lead components for all of the end items to be
procured under the MYP arrangement. The MYP arrangement to procure a total of
five Virginia (SSN-774) class nuclear-powered attack submarines over the five-year
period FY2004-FY2008, for example permits the Navy to procure, in the first years
of the arrangement, five sets of long-lead nuclear-propulsion components. This upfront procurement of long-lead items is called an “economic order quantity” (EOQ)

CRS-32
because it procures (i.e., places an order for) these items in the form of a group that
can be manufactured in an efficient (i.e., economic) manner.50
“One Decision For One Pot Of Money”. When Congress approves AP
funding for an item, it does so through a funding decision for that year that is separate
from the decision that Congress subsequently makes, in the item’s year of
procurement, to fund the remainder of the item’s procurement cost. Items procured
with AP funding thus involve two or more funding decisions from Congress — one
or more decisions to approve AP funding in one or more years prior to the year of
procurement, plus a final decision, in the item’s year of procurement, to fund the
remainder of the item’s procurement cost. A decision by Congress to approve AP
funding for an item does not create an obligation on the part of Congress to approve
the remainder of the item’s procurement cost in some future year, but it usually
indicates that Congress anticipates doing so.
Although some DOD weapons and equipment are procured with AP funding,
most DOD procurement items are funded through a single decision by Congress to
provide the entire cost of the item in the item’s year of procurement. For this reason,
the full funding policy for DOD procurement programs can be described in simplified
terms as “one decision for one pot of money.”
Incremental Funding.
General Description. In spite of the existence of the full funding policy, a
few Navy and DOD ships have been procured in recent years (or are currently being
procured) with incremental funding. Examples include DOD sealift ships, the attack
submarine SSN-23, the amphibious assault ships LHD-6 and LHD-8, and the aircraft
carrier CVN-21. The DOD sealift ships were procured through the National Defense
Sealift Fund (NDSF), a DOD revolving and management fund that is outside the
procurement title of the DOD appropriations act and therefore not subject to the full
funding policy in the same way as DOD procurement programs funded through the
procurement title. LHD-8 is currently being incrementally funded by explicit
legislative direction. SSN-23, LHD-6 and CVN-21 amount to cases of de facto
incremental funding. These ships constitute recent exceptions to the use of full
funding in the procurement of Navy ships. Prior to the imposition of the full funding
policy in the 1950s, however, much of DOD weapon procurement was accomplished
through incremental funding.
Under incremental funding, a weapon’s cost is divided into two or more annual
portions, or increments, that can reflect the need to make annual progress payments
to the contractor as the weapon is built. Congress then approves each year’s
increment as part of its action on that year’s budget. Under incremental funding,

50

10 USC 2306b(i)(4)(B) states: “The Secretary of Defense may obligate funds appropriated
for any fiscal year for advance procurement under a contract for the purchase of property
only for the procurement of those long-lead items necessary in order to meet a planned
delivery schedule for complete major end items that are programmed under the contract to
be acquired with funds appropriated for a subsequent fiscal year (including an economic
order quantity of such long-lead items when authorized by law).”

CRS-33
DOD can contract for the construction of a weapon after Congress approves only the
initial increment of its cost, and completion of the weapon is dependent on the
approval of the remaining increments in future years by that Congress or future
Congresses. A key feature of incremental funding is that a portion of the ship’s cost
is provided in one or more years beyond the item’s year of procurement.
One form of incremental funding, called split funding, involves dividing a
weapon’s procurement cost into two portions, one of which is funded in the item’s
year of procurement, the other the following year. Split funding, in other words, is
a two-year form of incremental funding.
Advantages and Disadvantages.
Potential Advantages. Supporters of incremental funding could argue that,
compared to full funding, using incremental funding in DOD procurement can be
advantageous because it can do one or more of the following:

51

!

permit very expensive items, such as large Navy ships, to be
procured in a given year while avoiding or mitigating budget
“spikes” (also called lumps) that could require displacing other
programs from that year’s budget, which can increase the costs of
the displaced programs due to uneconomic program-disruption startup and stop costs;

!

avoid a potential bias against the procurement of very expensive
items that might result from use of full funding due to the item’s
large up-front procurement cost (which appears in the budget)
overshadowing the item’s long-term benefits (which do not appear
in the budget) or its lower life cycle operation and support (O&S)
costs compared to alternatives with lower up-front procurement
costs;

!

permit construction to start on a larger number of items in a given
year within that year’s amount of funding, so as to achieve better
production economies of that item than would have been possible
under full funding;

!

recognize that certain DOD procurement programs, particularly
those incorporating significant amounts of advanced technology,
bear some resemblance to research and development activities
(which can be funded in increments), even though they are intended
to produce usable end items;

!

reduce the amount of unobligated balances associated with DOD
procurement programs;51

For an explanation and discussion of unobligated balances, see CRS Report RL30002, A
Defense Budget Primer, by Mary T. Tyszkiewicz and Stephen Daggett.

CRS-34
!

implicitly recognize potential limits on DOD’s ability to accurately
predict the total procurement cost of items, such as ships, that take
several years to build; and

!

preserve flexibility for future Congresses to stop “throwing good
money after bad” by halting funding for the procurement of an item
under construction that has become unnecessary or inappropriate due
to unanticipated shifts in U.S. strategy or the international security
environment.

Potential Disadvantages. In spite of its potential advantages, Congress
replaced incremental funding with the full funding policy in the 1950s, and has
periodically reaffirmed the full funding policy since then, on the grounds that
incremental funding did (or could do) one or more of the following:
!

make the total procurement costs of weapons and equipment less
visible to Congress and more difficult for Congress to understand
and track;

!

permit one Congress to “tie the hands” of one or more future
Congresses — a kind of action that Congress traditionally tries to
avoid — by providing initial procurement funding for a weapon
whose cost would have to be largely funded by one or more future
Congresses;

!

create a potential for DOD to start procurement of an item without
necessarily understanding its total cost, stating that total cost to
Congress, or providing fully for that total cost in future DOD
budgets — the so-called “camel’s-nose-under-the-tent” issue; and

!

increase weapon procurement costs by exposing weapons under
construction to potential uneconomic start-up and stop costs that can
occur when budget reductions or other unexpected developments
cause one or more of the planned increments to be reduced or
deferred.

Navy Proposal For Funding Lead Ships. As part of its proposed FY2005
budget and FY2005-FY2009 Future Years Defense Plan (FYDP), the Navy in 2004
proposed funding the procurement of the lead DD(X) destroyer and the lead Littoral
Combat Ship (LCS) program in the Navy’s research and development (R&D)
account rather than the Navy’s ship-procurement account, which is known formally
as the Shipbuilding and Conversion, Navy (SCN) account. Funding the procurement
of lead ships through the R&D account would permit them to be incrementally
funded without violating the full funding policy.
Congress, in acting on the Navy’s proposed FY2005 defense budget, rejected
the Navy’s proposal to procure the lead DD(X) through the Navy’s research and
development account, directed the Navy to fully fund the lead DD(X) in the Navy’s
ship-procurement account, and fully funded the lead LCS in the Navy’s research and
development account.

CRS-35
Although Congress in 2004 rejected the Navy’s proposal to incrementally fund
the lead DD(X) and lead LCS, Navy officials testifying in early 2005 in support of
the Navy’s proposed FY2006 defense budget and FY2006-FY2011 FYDP have again
expressed support for the concept of funding the procurement of lead ships in the
R&D account, which would permit them to be funded incrementally.
“Multiple Decisions For Multiple Pots Of Money”. Since incremental
funding divides the procurement cost of an end item into two or more annual
increments, and since Congress typically approves one of these increments each year,
incremental funding can be described in simplified terms as “multiple decisions for
multiple pots of money.”
Advance Appropriations.
General Description. Advance appropriations have not been used in Navy
ship procurement, but have been used by other executive branch agencies to fund
various programs.52
Advance appropriations is an alternate form of full funding that is permitted
under executive branch budget regulations. As a funding approach, it can be viewed
as lying somewhere between traditional full funding and incremental funding.53
Under advance appropriations, as under traditional full funding, Congress makes a
one-time decision to fund the entire procurement cost of an end item. That cost,
however, can then be divided into two or more annual increments, as under
incremental funding, that are assigned to (in budget terminology, “scored in”) two or
more fiscal years.54
In contrast to incremental funding, under which Congress must take a positive
action each year to approve each year’s funding increment, under advance
appropriations, Congress, following its initial decision to fund the item, would need
to take a positive action to cancel or modify an annual funding increment in a future52

Use of advance appropriations in the federal budget is summarized in the appendix
volume of each year’s U.S. government budget. For the FY2006 version, see U.S.
Executive Office of the President. Office of Management and Budget. Appendix [to the]
Fiscal Year 2006 Budget of the U.S. Government. (Washington: GPO, 2005), pp. 12411242.

53

As discussed in an earlier footnote, advance appropriations is not to be confused with
advance procurement (AP) funding that can occur under traditional full funding.
54

Advance appropriations can also be used to fund the entire cost of an item and have that
entire cost assigned to a single future fiscal year.
OMB Circular A-11 defines advance appropriations as appropriations that are:
— Enacted normally in the current year;
— Scored after the budget year (e.g., in each of one, two, or more later years,
depending on the language); and
— Available for obligation in the year scored and subsequent years if specified in
the language.
(OMB Circular A-11 (July 2003 version), Appendix J (Principles Of Budgeting For
Capital Asset Acquisitions), Section E (Glossary).)

CRS-36
year budget. In this sense, advance appropriations can be thought of as a legislatively
locked in form of incremental funding: the future-year funding increments will occur
unless Congress takes action to stop them.
OMB Circular A-11 allows for the use of advance appropriations to help finance
capital assets under certain circumstances:
Regular appropriations for the full funding of a capital project or a useful
segment (or investment) of a capital project in the budget year are preferred. If
this results in spikes that, in the judgment of OMB, cannot be accommodated by
the agency or the Congress, a combination of regular and advance appropriations
that together provide full funding for a capital project or a useful segment or an
investment should be proposed in the budget.
Explanation: Principle 1 (Full Funding) is met as long as a combination of
regular and advance appropriations provide budget authority sufficient to
complete the capital project or useful segment or investment. Full funding in the
budget year with regular appropriations alone is preferred because it leads to
tradeoffs within the budget year with spending for other capital assets and with
spending for purposes other than capital assets. In contrast, full funding for a
capital project (investment) over several years with regular appropriations for the
first year and advance appropriations for subsequent years may bias tradeoffs in
the budget year in favor of the proposed asset because with advance
appropriations the full cost of the asset is not included in the budget year.
Advance appropriations, because they are scored in the year they become
available for obligation, may constrain the budget authority and outlays available
for regular appropriations of that year.
If, however, the lumpiness caused by regular appropriations cannot be
accommodated within an agency or Appropriations Subcommittee, advance
appropriations can ameliorate that problem while still providing that all of the
budget authority is enacted in advance for the capital project (investment) or
useful segment. The latter helps ensure that agencies develop appropriate plans
and budgets and that all costs and benefits are identified prior to providing
resources. In addition, amounts of advance appropriations can be matched to
funding requirements for completing natural components of the useful segment.
Advance appropriations have the same benefits as regular appropriations for
improved planning, management, and accountability of the project
(investment).55

Advantages and Disadvantages. Supporters of advance appropriations
could argue that it offers many of the potential advantages of incremental funding
outlined earlier — including avoiding or mitigating budget spikes — while avoiding
some of its potential disadvantages, such as the risk of increasing weapon
procurement costs created by uneconomic start-up and stop costs that can occur when
budget reductions or other unexpected developments cause planned increments to be
reduced or deferred.

55

OMB Circular A-11 (July 2003), Appendix J, Section C, Principle 2 (of four principles
for financing capital assets). Italics as in the original.

CRS-37
Opponents of advance appropriations could argue that it retains (or even
expands) one of the key potential disadvantages of incremental finding — that of
tying the hands of future Congresses — by committing a portion of one or more
future-year budgets to the financing of an item procured in a prior year and requiring
a positive action from future Congresses to undo those commitments. Opponents
could also argue that compared to full funding, advance appropriations under certain
circumstances could increase ship-construction costs by causing work on a ship to
stop and then be restarted. Specifically, they could argue, if a given increment of
construction work on the ship is completed before the end of a fiscal year and that
year’s funding increment is entirely expended, the Navy might have to halt work on
the ship and wait until the start of the next fiscal year to access the next increment of
funding and resume work. Under full funding, in contrast, the Navy would have
access to funding for the ship’s entire construction cost and consequently would not
have to halt work until the start of the next fiscal year, avoiding the additional costs
of halting and then resuming work.
Navy Advocacy In 2001. In 2001, some Navy officials advocated the use
of advance appropriations for Navy ship procurement, noting at that time that this
funding approach is used by several federal agencies other than DOD.56
Although use of advance appropriations for Navy ship procurement was
supported by some Navy officials and some Members of Congress,57 the Navy in

56

Source: Slides for May 3, 2001 Navy briefing to CRS, Advance Appropriations for Navy
Shipbuilding, pp. 16, 19-21. The Navy also argued that current law, contrary to some
assertions, does not prohibit the use of advance appropriations. Specifically, the Navy
argued that:
! 31 USC 1341, [the] “Anti-Deficiency Act,” prohibits writing a contract
which “involves the government in a contract or obligation for the
payment of money before an appropriation is made unless authorized by
law.”
! 10 USC 2306b [the provision covering multi-year procurement contracts]
allows [DOD and certain other federal agencies] to enter into multi-year
contracts for the purchase of weapon systems, as long as [there is] “a
reasonable expectation that throughout the contemplated contract period
the head of the agency will request funding for the contract at the level
required to avoid contract cancellation.”
! 31 USC 1105 [a provision relating to the contents of the federal budget
and its submission to Congress] requires that [the executive branch]
identify in advance of need future appropriations that will have to be
approved in order to complete the contract. These advance appropriations
have to be specifically approved by Congress to allow [the executive
branch] to obligate the government in advance of receipt of funds.
57

Christian Bohmfalk, “O’Keefe: Advance Appropriations, If Used Correctly, Could Help
Navy,” Inside the Navy, Nov. 26, 2001; Christian Bohmfalk, “Stevens Promotes Advance
Appropriations To Boost Ship Production,” Inside the Navy, Sept. 10, 2001; Mike
McCarthy, “CNO Advocates Advance Funding of Ships,” Defense Week, July 16, 2001, p.
2; Christian Bohmfalk, “Senior Navy Leaders Describe Benefits of Advance
Appropriations,” Inside the Navy, Apr. 16, 2001; Christopher J. Castelli, “Congress Weighs
(continued...)

CRS-38
2001 apparently did not receive approval from the Office of Management and Budget
(OMB) to use the approach for ship procurement, and did not officially propose its
use as part of its FY2002 budget submission to Congress.58 Congress in 2001 did not
adopt advance appropriations as a mechanism for funding Navy ships.
The House Appropriations Committee, in its report (H.Rept. 107-298 of
November 19, 2001) on the FY2002 defense appropriations bill (H.R. 3338), stated
that it was
dismayed that the Navy continues to advocate the use of alternative financing
mechanisms to artificially increase shipbuilding rates, such as advanced
appropriations, or incremental funding of ships, which only serve to decrease
cost visibility and accountability on these important programs. In attempting to
establish advanced appropriations as a legitimate budgeting technique, those
Navy advocates of such practices would actually decrease the flexibility of future
Administrations and Congresses to make rational capital budgeting decisions
with regard to shipbuilding programs. Accordingly, the Committee bill includes
a new general provision (section 8150) which prohibits the Defense Department
from budgeting for shipbuilding programs on the basis of advanced
appropriations.59

The provision mentioned above (Section 8150) was not included in the final version
of the bill that was passed by Congress and signed into law (H.R. 3338/P.L. 107-117
of January 10, 2002).
“One Decision For Multiple Pots of Money”. Because advance
appropriations involves a one-time decision by Congress to approve the entire
procurement cost of the end item, which can then be divided into two or more
increments that are assigned to two or more fiscal years, advance appropriations can
be described in simplified terms as “one decision for multiple pots of money.”
Potential For Reducing Instability In Ship-Procurement Plans.
Could using incremental funding or advance appropriations reduce instability
in Navy ship-procurement plans?
Using incremental funding or advance appropriations could help reduce
instability in Navy ship-procurement plans by avoiding or mitigating budget spikes
that can occur when traditional full funding is used to procure ships that are very
expensive and are procured once every few years. The ships that best fit this

57

(...continued)
Using ‘Advance Appropriations’ For Shipbuilding,” Inside the Navy, Apr. 9, 2001; Dale
Eisman, “Plan Would Boost Navy Shipbuilding,” Norfolk Virginian-Pilot, Apr. 5, 2001.
58

Dale Eisman, “White House Rejects Proposal To Stretch Shipbuilding Funds,” Norfolk
Virginian-Pilot, Sept. 6, 2001; Christian Bohmfalk, “Advance Appropriations, Not Part of
FY-02 Request, May Resurface,” Inside the Navy, July 16, 2001.
59

H.Rept. 107-298, p. 119.

CRS-39
description are aircraft carriers and “big-deck” amphibious assault ships.60
Accommodating budget spikes for such ships within an overall ship-procurement or
Department of the Navy budget for a given fiscal year can require the Navy to move
to other fiscal years other ships that the Navy would have preferred to procure in the
spike year, or, conversely, require the Navy to move the carrier or amphibious assault
ship from a preferred year of procurement to a less-preferred year that happens to
have fewer other Navy ships in it. Such movements of planned ship procurements
can be a source of instability in Navy ship-procurement planning.
The FY2006-FY2011 Navy ship-procurement plan submitted to Congress in
February 2005 contains at least two potential examples of such ship movements:
!

The Navy, as part of its proposed FY2005 budget and FY2005FY2009 FYDP submitted to Congress in February 2004, had
proposed funding the lead DD(X) destroyer through the Navy’s
research and development account, which would have permitted the
ship to be funded through a stream of incremental payments during
the seven-year period FY2005-FY2011. Congress, in acting on the
FY2005 budget request, directed the Navy to instead procure the
lead DD(X) through the Navy’s ship-procurement account and to use
full funding. In testifying on the Navy’s proposed FY2006 budget
and FY2006-FY2011 FYDP, Navy officials have suggested that due
in part to an inability to fully fund the lead DD(X) in FY2006 while
still meeting other FY2006 spending needs, the Navy decided in its
FY2006-FY2011 budget submission to fund DD(X) in FY2007.

!

The Navy, as part of its proposed FY2005 budget and FY2005FY2009 FYDP, had planned to procure CVN-21 in FY2007. Doing
so, however, might have required the Navy to displace one or more
other ships from FY2007 to a later year. Perhaps due in part to this
consideration, the Navy decided in its FY2006-FY2011 budget
submission to defer the procurement of CVN-21 by a year, to
FY2008, which is a year that might more easily accommodate CVN21 in budgetary terms but from a production standpoint might be a
less-preferred year for procuring CVN-21 than FY2007 because it
lengthens an already-substantial gap in the aircraft carrier production
line between CVN-21 and the previous carrier, CVN-77, which was
procured in FY2001.

Although use of full funding can contribute to instability in Navy shipprocurement plans by causing budget spikes that lead to the movement of planned
ship procurements from one year to another, a more fundamental cause of instability
in Navy ship-procurement programs in recent years may be the absence of a current,

60

“Big-deck” amphibious assault ships, which carry the designations LHA or LHD, are large
amphibious ships that are designed to embark and operate a total of about two dozen Marine
Corps helicopters and VSTOL (vertical-short takeoff and landing) airplanes. They have a
flight deck that runs the entire length of the ship and consequently look like medium-sized
aircraft carriers.

CRS-40
officially approved, consensus plan for the future size and structure of the Navy.
This in turn may reflect evolution and uncertainty in Navy and DOD thinking about
desired Navy capabilities and the metrics for translating those desired capabilities
into required types and numbers of ships.61 If so, then the primary means for
improving stability in Navy ship-procurement programs would be to encourage the
Navy and DOD to better define their thinking regarding desired Navy capabilities and
the metrics for translating those desired capabilities into ship requirements.
Potential For Increasing Number Of Ships Procured.
Could using incremental funding or advance appropriations increase the
number of Navy ships that can be built for a given total amount of shipprocurement funding?
Using incremental funding or advance appropriations could, under some
circumstances, marginally increase the number of ships that could be built for a given
total amount of ship-procurement funding (or, conversely, marginally reduce the total
cost to procure a given number of ships). By avoiding or mitigating budget spikes
that could cause ships to be moved from one year to another in ship-procurement
plans, using incremental funding or advance appropriations might avoid perturbations
in ship production schedules. Such perturbations could increase construction costs,
reducing at the margin the total number of ships that could be procured for a given
total amount of ship-procurement funding.
In addition, if a situation arises in which annual funding for ship procurement
limits ship-procurement in the near term to low rates with poor production economies
of sale, but is expected to rise in future years to levels that would be more than
adequate to support higher, economic rates of ship procurement, then using
incremental funding or advance appropriations could permit construction to begin on
additional ships in the near term, improving near-term production economies of
scale, while still permitting the Navy to procure ships in future years at economic
rates of production. Improving near-term production economies of scale while
preserving acceptable production economies of scale in later years might result in
marginally higher average economies of scale for the entire period in question and
thereby reduce, at the margin, the collective cost of all the ships procured in the near
term and the later years.
This scenario, however, is dependent on realizing the expected increase in shipprocurement funding in the later years. If this increase is not realized, then using
incremental funding or advance appropriations could simply trade poor production
economies of scale in the near term for poor production economies of scale in future
years. Put another way, it would simply trade an inability to afford something now
for an inability to afford something later.

61

For more