Base Closure and Realignment (BRAC):
Background and Issues for Congress
Christopher T. Mann
Analyst in Defense Policy and Trade
April 25, 2019

Congressional Research Service
7-....
www.crs.gov
R45705

Base Closure and Realignment (BRAC)

Summary
Since 1977, statutory thresholds have effectively constrained the President’s ability to close or
realign major military installations in the United States. Congress has instead periodically granted
temporary authorities—known as a Base Realignment and Closure (BRAC)—that have
established independent commissions for the review and approval of basing changes submitted by
the Secretary of Defense. These unique and transient authorities last expired on April 16, 2006.
There have been five rounds of base closures: 1988, 1991, 1993, 1995, and 2005.
Though Congress has periodically adjusted the BRAC process to account for lessons learned, the
modern framework has remained generally consistent with earlier rounds, and includes






establishment of an independent commission;
reliance on objective and uniform criteria;
Government Accountability Office (GAO) review and certification of
Department of Defense (DOD) data;
deliberations designed to be transparent that include open hearings, solicitation of
feedback, installation visits, and data available for public review; and
requirement that the final list of closure and realignment recommendations be
accepted or rejected in their entirety.

Congress has defined BRAC selection criteria in statute, thus requiring the Secretary to prioritize
military value over cost savings. Additionally, Congress has required the Secretary to align the
Department’s recommendations with a comprehensive 20-year force structure plan. The
commission may modify, reject, or add recommendations during its review before forwarding a
final list to the President.
After receiving the Commission’s list of recommendations, the President may either accept the
report in its entirety or seek to modify it by indicating disapproval and returning it to the
commission for further evaluation. If the President accepts the commission’s recommendations,
they are forwarded to Congress. BRAC implementation begins by default unless Congress rejects
the recommendations in their entirety within 45 days by enacting a joint resolution. During the
implementation phase, DOD is required to initiate closures and realignments within two years and
complete all actions within six years.
The BRAC process represents a legislative compromise between the executive and legislative
branches wherein each shares power in managing the closure and realignment of military bases.
The imposition of an independent, third-party mediator was intended to insulate base closings
from political considerations by both branches that had complicated similar actions in the past.
This report provides background on the development of BRAC, describes its major elements and
milestones, and outlines issues frequently cited in the context of new rounds, such as potential
savings.

Congressional Research Service

Base Closure and Realignment (BRAC)

Contents
Background ..................................................................................................................................... 1
Major Elements of the Modern BRAC Process............................................................................... 2
BRAC Selection Criteria ................................................................................................................. 3
Disposal of Real Property................................................................................................................ 5
BRAC Savings ................................................................................................................................ 7
Excess Infrastructure ....................................................................................................................... 9
Legacy of the 2005 BRAC Round.................................................................................................. 11
The Department of Defense Base Closure Account ...................................................................... 13
Congressional Action on BRAC .................................................................................................... 14
Prohibition on Conducting a New Round ............................................................................... 14
BRAC Legislation in the 115th Congress ................................................................................ 14
BRAC Legislation in the 116th Congress ................................................................................ 15

Figures
Figure 1. BRAC Acreage Disposed of and Not Yet Disposed ......................................................... 6
Figure 2. BRAC Major and Minor Actions ................................................................................... 12
Figure 3. Historical View of BRAC Appropriations, FY2001-FY2020 ........................................ 13

Tables
Table 1. Infrastructure Capacity Reports; Interim and Final ......................................................... 10
Table B-1. Status of BRAC Acreage Disposal, By State/Territory and BRAC Round ................. 19

Appendixes
Appendix A. Legislative References ............................................................................................. 16
Appendix B. BRAC Acreage Disposal Status, By State ............................................................... 19

Contacts
Author Contact Information .......................................................................................................... 41

Congressional Research Service

Base Closure and Realignment (BRAC)

Background
The U.S. Constitution does not clearly specify how military bases should be managed. Article II,
Section 2, appoints the President as the commander-in-chief, with the implied power to deploy,
and redeploy, the armed forces as necessary for national defense. In common practice, this has
included the authority to create and close military installations needed to accommodate and train
personnel under the President’s command. However, Article I, Section 8, charges Congress with
the responsibility to raise armies, maintain a Navy, and regulate the militia. Through annual
authorization and appropriation legislation, Congress legislates policy for managing DOD real
property assets and funds the construction, maintenance, operation, and disposal of military
infrastructure.1
Throughout most of American history, the President has exercised broad, relatively unchallenged
authority for opening, closing, or realigning military installations. Congress largely deferred to
the Executive branch primarily because the President, as commander-in-chief, is empowered with
the responsibility of deploying military forces.2
Prompted by large-scale closures of World War II era infrastructure during the 1960s and 1970s,
Congress enacted legislation in 1977 that effectively limited the Executive branch’s ability to
close or realign major military installations. The new statute, later codified as 10 U.S.C. 2687
(Section 612 of the Military Construction Authorization Act of 1978, P.L. 95-82), generally
required DOD to conduct comprehensive and lengthy assessments of major basing decisions as
part of a congressional report-and-wait process.3 These assessments could be challenged in court
on environmental grounds or on questions related to their sufficiency, further lengthening delays.4
The new legislation effectively halted DOD’s ability to close or realign domestic bases of
significant size.5
In the decade that followed the passage of 10 U.S.C. 2687, congressional pressure grew to
accommodate DOD basing priorities. By 1988, ongoing negotiations between the Secretary of
Defense and the House and Senate Armed Service Committees led to new legislation (P.L. 100526) that authorized a limited number of base closures based on the oversight of an independent
panel.6 Though later modified, the effort marked the beginning of the first Base Realignment and

1 “Real property includes lands, buildings, structures, utility systems, improvements, and appurtenances thereto.

Includes equipment attached to and made part of buildings and structures (such as heating systems) but not movable
equipment (such as plant equipment).” See Office of the Chairman of the Joint Chiefs of Staff, “DOD Dictionary of
Military and Associated Terms,” April 2018. Available at http://www.jcs.mil/Portals/36/Documents/Doctrine/pubs/
dictionary.pdf#page=199.
2

Regarding overseas installations, Congress continues to defer to the President. Domestically, it has intervened more
assertively to manage the process.
3

Other notifications include assessments by DOD of the economic and strategic consequences of basing actions.

4 For details, see Schlossberg, George, “How Congress Cleared the Bases,” Journal of Defense Communities, Volume

1. Available at https://www.defensecommunities.org/wp-content/uploads/2012/02/FINALJournal1.pdf.
5

In general terms, 10 U.S.C. 2687 establishes reporting thresholds based on the number of DOD civilians affected by
the reduction. A second statute enacted later, 10 U.S.C. 993, establishes reporting thresholds based on the number of
service members.
6 The statute authorized a panel appointed by and reporting to the Secretary of Defense to recommend a limited number
of base closures.

Congressional Research Service

1

Base Closure and Realignment (BRAC)

Closure (BRAC) process, which was intended to insulate base closings from considerations such
as favoritism or other political interference.7
Widely considered a success, the 1988 BRAC legislation was taken up again and modified in
succeeding BRAC rounds; first in 1991, 1993, and 1995; and again in 2005.8

Major Elements of the Modern BRAC Process
The modern BRAC process refers to a temporary authority that amends the Defense Base Closure
and Realignment Act of 1990 (P.L. 101-510), hereinafter referred to as the Base Closure Act, and
features a framework of elements that entrusts an independent commission with certifying closure
and realignment recommendations made by the Secretary of Defense.
BRAC Authorization and Closure
In general, the process has required the
Rounds
Secretary to submit a list of military
installations recommended for closure or
1988 Round: The Defense Authorization Amendments
and Base Closure and Realignment Act, enacted October
realignment to an independent, bipartisan
24, 1988 (P.L. 100-526)
BRAC commission. After analyzing the
Secretary’s recommendations, the
commission may accept, reject, or modify the 1991, 1993, 1995 Rounds: Base Closure and
Realignment Act of 1990 (P.L. 101-510, Title XXIX of
list.9 Upon completing its review, the
the National Defense Authorization Act for Fiscal Year
commission forwards its final findings and
1991, enacted November 5, 1990)
recommendations to the President. Upon
acceptance of commission’s
2005 Round: National Defense Authorization Act for
recommendations, the President then submits
Fiscal Year 2002, (P.L. 107-107; amended the Defense
them to Congress. If the President does not
Base Closure and Realignment Act of 1990 (P.L. 101510)
submit the recommendations to Congress
within the timeframe required under the Base
Closure Act, the BRAC process is terminated. Upon receipt of the report from the President,
Congress has the opportunity to disapprove of the recommendations in toto through the
enactment of a joint resolution.
The hallmarks of this framework include


7

establishment of an independent commission whose members are appointed by
the President, in consultation with congressional leadership (and the advice and
consent of the Senate);10

Earlier efforts at large-scale base closures were marked by accusations of such conduct.

8 Subsequent BRAC legislation required the Secretary of Defense to report to an independent commission. In the 1988

round, a commission chartered by Secretary of Defense Frank Carlucci reported to him.
9 Commissioners are required to assess whether DOD recommendations deviate substantially from the Department’s
force structure plan and final selection criteria. Modifications to the list are prohibited in cases where recommendations
do not deviate substantially. Installations added to the list require the commission to allow input from the Secretary and
require additional conditions be met.
10 The 2005 BRAC process included nine commissioners (a tie-breaking number). Members were appointed by the
President after consultation with Congress. Congressional leadership makes a total of six recommendations, with the
number divided between: House speaker (2), House Minority Leader (1); Senate Majority Leader (2), and; Senate
Minority Leader (1). The President transmits the final list of nominations to the Senate for its final consent. By statute,
the process of congressional consultation is not mandatory. See BRAC amended legislation available at the BRAC
commission (2005) official archive site at https://www.brac.gov/docs/BRAC05Legislation.pdf.

Congressional Research Service

2

Base Closure and Realignment (BRAC)







reliance on objective and uniform criteria for evaluating basing
recommendations;
GAO review and certification of DOD data;
deliberations that include open hearings, solicitation of feedback, installation
visits, and data available for public review;
requirement that the commission’s final list of closure and realignment actions be
accepted or rejected in its entirety; and
presidential and congressional off-ramps that would terminate the BRAC process
when certain conditions are not met.

The timeline to complete an entire BRAC round has varied; however, the most recent one
conducted in 2005 took approximately 10 years, from authorization to completion (end of the sixyear BRAC implementation period).
Key milestones of a typical BRAC timeline include









DOD force structure plan, infrastructure inventory, and analysis of options (up to
four years);11
nomination and confirmation of BRAC commissioners;
DOD submission of BRAC recommendations (and associated reports) to the
commission;
commission deliberations (typically four months);
final report sent to the President for approval;
45-day deadline for Congress to reject recommendations in their entirety (Joint
Resolution of Disapproval) or allow implementation to begin;
DOD implementation (two years to begin; six years to complete); and
DOD disposal of real property (indeterminate).

BRAC Selection Criteria
BRAC is often characterized as a cost efficiency measure that enables DOD to more effectively
manage its real property assets by allowing it to shed excess infrastructure, but historically,
potential costs and savings have been a consideration that have ranked below military value.12 No
BRAC round has established cost savings targets, floors, or ceilings.

11 DOD recommendations are based on certified data, a long-term force structure plan (20 years), and comprehensive

inventory of DOD real estate.
12 Prior to the 2005 BRAC round, however, cost savings and downsizing the military was an explicit goal.

Congressional Research Service

3

Base Closure and Realignment (BRAC)

Transformation Versus Cost Savings
“In previous rounds of BRAC, the explicit goal was to save money and downsize the military in order to reap a
’peace dividend.’ It was clear from the Commission’s examination of the DoD 2005 BRAC list that the historical
goal of achieving savings through eliminating excess capacity was not always the primary consideration for many
recommendations. In fact, several DoD witnesses at Commission hearings made it clear that the purpose of
many 2005 BRAC recommendations was to advance the goals of transformation, improve capabilities, and
enhance military value. In some cases, accomplishing these new goals meant proposing BRAC scenarios that
either never paid off (i.e., resulted in a net increased cost) or had very long payback periods....”
—2005 Defense Base Closure and Realignment Commission Report, Chapter 1: Commission Strategic
Overview

During BRAC rounds in 1991, 1993, and 1995, Congress required the Secretary of Defense to
develop and report a set of objective selection criteria that would be used for identifying bases for
closure and realignment. For the 2005 round, Congress amended the BRAC statute to require the
Secretary to regard military value (defined below) as the primary consideration.13 Other factors,
such as potential costs and savings, were explicitly categorized as lower priority. Because the
amended legislative language reflected longstanding DOD policy, the 2005 BRAC criteria appear
almost identical when compared with previous versions, with additional language added for
emphasis or included for explanatory examples.
The excerpt below indicates the 2005 BRAC selection criteria.14 Emphasized text (in italics)
represents new language not included as part of the 1995 criteria.15
SEC. 2913. SELECTION CRITERIA FOR 2005 ROUND.
(a) FINAL SELECTION CRITERIA.—The final criteria to be used by the Secretary in making
recommendations for the closure or realignment of military installations inside the United
States under this part in 2005 shall be the military value and other criteria specified in
subsections (b) and (c).
(b) MILITARY VALUE CRITERIA.—The military value criteria are as follows:
(1) The current and future mission capabilities and the impact on operational
readiness of the total force of the Department of Defense, including the impact on
joint warfighting, training, and readiness.
(2) The availability and condition of land, facilities, and associated airspace
(including training areas suitable for maneuver by ground, naval, or air forces
throughout a diversity of climate and terrain areas and staging areas for the use
of the Armed Forces in homeland defense missions) at both existing and potential
receiving locations.
(3) The ability to accommodate contingency, mobilization, surge, and future total
force requirements at both existing and potential receiving locations to support
operations and training.
(4) The cost of operations and the manpower implications.

13 Defense Authorization Act for Fiscal Year 2002, (P.L. 107-107).
14 Defense Base Closure and Realignment Act of 1990, as amended.
15 Comparison derived from Government Accountability Office, “Military Bases: Opportunities Exist to Improve

Future Base Realignment and Closure Rounds (GAO-13-149),” March 2013. See Figure 2. Available at
https://www.gao.gov/assets/660/652805.pdf#page=17.

Congressional Research Service

4

Base Closure and Realignment (BRAC)

(c). OTHER CRITERIA.—The other criteria that the Secretary shall use in making
recommendations for the closure or realignment of military installations inside the United
States under this part in 2005 are as follows:
(1) The extent and timing of potential costs and savings, including the number of
years, beginning with the date of completion of the closure or realignment, for the
savings to exceed the costs.
(2) The economic impact on existing communities in the vicinity of military
installations.
(3) The ability of the infrastructure of both the existing and potential receiving
communities to support forces, missions, and personnel.
(4) The environmental impact, including the impact of costs related to potential
environmental restoration, waste management, and environmental compliance
activities.

Disposal of Real Property
The transfer and disposal of DOD real property made available following the implementation of a
BRAC round is a complex process that may extend for years beyond the initial six-year
implementation window. Disposal may be delayed or otherwise affected by the participation of
local and state communities and the degree to which environmental remediation by federal
authorities is necessary.16 The graph below shows the total acreage from previous BRAC rounds
yet to be disposed.

16 As amended in 1986, the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA,

commonly referred to as Superfund) generally requires the clean-up of contaminated federal property prior to transfer
out of federal ownership. For more information on CERCLA see CRS Report R41039, Comprehensive Environmental
Response, Compensation, and Liability Act: A Summary of Superfund Cleanup Authorities and Related Provisions of
the Act, by David M. Bearden.

Congressional Research Service

5

Base Closure and Realignment (BRAC)

Figure 1. BRAC Acreage Disposed of and Not Yet Disposed
Shown by Year of BRAC Round

Source: FY2017 data provided to CRS by the DOD Office of Economic Adjustment (OEA), May 2017.

The Base Closure Act authorizes a variety of conveyance mechanisms not otherwise available for
the transfer and disposal of federal property, a process typically performed by the General
Services Administration (GSA).17 Under a BRAC, conveyance authority is delegated from GSA,
through the Secretary of Defense to the various military departments, which receive special
approval to supersede GSA regulations with BRAC specific regulations. The primary difference
between the routine disposal of federal property and real property conveyed under a BRAC is the
role of local communities.
Under normal (non-BRAC) circumstances, the General Services Administration (GSA) is directly
responsible for disposing of any surplus federal real property, which includes defense property. A
military department in possession would, for example, declare property as excess to its needs and
turn over the administration of a site to the GSA. The GSA would then follow a number of
consecutive steps for disposal of federal property laid out in statute. It would first offer the excess
property to other federal agencies. If none expressed an interest, the excess property would be
declared surplus. The GSA would then offer the surplus property to state or local governments
and non-profits that might use it for a public benefit (public benefit conveyance), such as a
homeless shelter or medical center. Finally, if the property has neither been transferred nor
conveyed in the previous steps, the surplus property would be offered for sale to the public.18
Under a BRAC, local communities can significantly affect the BRAC property transfer and
disposal decisions, which are managed by the Secretary of the responsible military department.19
17 A conveyance is the transfer of a property title.
18 The transfer or disposal of federal property is primarily performed by the General Services Administration (GSA)

pursuant to the Federal Property and Administrative Services Act of 1949 (FPASA) 40 U.S.C. 521-559.
19 The Base Closure Act directs the Administrator of the GSA to delegate specified transfer and disposal authorities to
the Secretary of Defense for use at BRAC installations, and the secretary has, in turn, delegated this authority to the

Congressional Research Service

6

Base Closure and Realignment (BRAC)

Once approved for closure, communities around an installation typically organize a Local
Redevelopment Authority (LRA) for the purpose of creating and executing a redevelopment plan
for the property. While the plan is not binding on DOD, the Department has been statutorily
directed to give the plan considerable weight. DOD makes economic development grants and
technical support available through its Office of Economic Adjustment (OEA) to assist LRAs
with the process.20
In recent BRAC rounds, Congress has authorized a special transfer authority that has permitted
DOD to transfer title to property at less than fair market value, or even at no cost, if the LRA
agrees to certain conditions designed to create employment at the former defense facility. This has
been referred to as an Economic Development Conveyance (EDC).

BRAC Savings
DOD has asserted that savings generated from BRAC are generally the result of avoiding the cost
of retaining and operating unneeded infrastructure, with upfront costs eventually offset by annual
savings. Between FY2012 and FY2018, the Department consistently argued for a new BRAC,
asserting that “absent another BRAC round, the Department will continue to operate some of its
installations sub-optimally as other efficiency measures, changing force structure, and technology
reduce the number of missions and personnel.”21
Emphasizing the potential cost savings, DOD has suggested a new “efficiency-focused BRAC”
could save the Department billions of dollars annually: “Savings from BRAC rounds are real and
substantial. The last five BRAC rounds are collectively saving the Department $12B annually. A
new efficiency-focused BRAC could save the Department an additional ~$2B annually (based on
the ’93/’95 rounds).”22
In its ongoing series of BRAC-related reports, the GAO has noted the unreliability of DOD cost
savings estimates. In 2013, GAO concluded that, though the Department had achieved annual
recurring savings as the result of the 2005 round, visibility into the outcome has been limited due
to missing and inconsistent recordkeeping.23 Similar studies have raised questions about the data
DOD has used to predict and monitor BRAC effectiveness, long-term savings, and outcomes. For
example

secretaries of the various military departments.
20 See the Defense Base Closure and Realignment Act of 1990 (as amended), Section 2905, Implementation: “Before
any action may be taken with respect to the disposal of any surplus real property or facility located at any military
installation to be closed or realigned under this part, the Secretary of Defense shall consult with the Governor of the
State and the heads of the local governments concerned for the purpose of considering any plan for the use of such
property by the local community concerned.”
21 Department of Defense, Infrastructure Capacity Report (Interim), March 2016. Provided to CRS.
22 Statement of Mr. Peter Potochney, Acting Assistant Secretary of Defense (Energy, Installations, and Environment),
Before the Senate Appropriations Committee, Subcommittee on Military Construction, Veterans Affairs, and Related
Agencies, FY2018, June 7, 2017. Available at https://www.appropriations.senate.gov/imo/media/doc/060617Potochney-Testimony.pdf.
23 Government Accountability Office, “Opportunities Exist to Improve Future Base Realignment and Closure Rounds
(GAO-13-149)”, March 2013. Available at https://www.gao.gov/assets/660/652805.pdf ; See page 33 “lack of
consistent documentation;” page 32 “did not consistently document the assumptions;” page 43 “department does not
have effective management controls in place to monitor leased space.”

Congressional Research Service

7

Base Closure and Realignment (BRAC)



“... the services did not develop baseline operating costs before implementing the
BRAC recommendations, which would have enabled it to determine whether
savings were achieved.”24



“... We found that DOD’s process for providing the BRAC commission with cost
and savings estimates was hindered by underestimating recommendation-specific
requirements and that DOD did not fully anticipate information technology
requirements for many of the recommendations.”25
“The department cannot provide documentation to show to what extent it reduced
plant replacement value or vacated leased space as it reported in May 2005 that it
was intended to do.... In addition, DOD bundled multiple closures ... thus limiting
visibility into the estimated costs and savings for individual closures and
realignments.”26





“... DOD has not reported to Congress how the cleanup of emerging
contaminants, especially certain perfluorinated compounds, at installations closed
under BRAC will significantly increase the estimated (BRAC) cleanup costs.”27



“... We found that OSD (Office of the Secretary of Defense) did not
have a fully developed method for accurately collecting information on
costs, savings, and efficiencies achieved specifically from joint basing,
and that OSD had not developed a plan to guide joint bases in
achieving cost savings and efficiencies....”28
“... DOD has not committed to take action on some of our recommendations
related to implementing any future BRAC rounds, such as improving DOD’s
ability to estimate potential liabilities, and savings to achieve desired
outcomes.”29



In its final report to the President, the 2005 BRAC commission noted DOD’s initial estimate of
savings had been “vastly overestimated,” and suggested that the Department had claimed savings
that were “not truly savings in the commonly understood sense of the term.”30 Reflecting on the
24 Government Accountability Office, “Military Base Realignments and Closures: More Guidance and Information

Needed to Take Advantage of Opportunities to Consolidate Training (GAO-16-45), February 2016. Available at
https://www.gao.gov/assets/680/675295.pdf#page=2.
25 Government Accountability Office, ”Military Bases: More Guidance and Information Needed to Take Advantage of
Opportunities to Consolidate Training (GAO-16-45)”, February 2016. Available at https://www.gao.gov/assets/680/
675295.pdf#page=6.
26 Government Accountability Office, “Opportunities Exist to Improve Future Base Realignment and Closure Rounds
(GAO-13-149)”, March 2013. Available at https://www.gao.gov/assets/660/652805.pdf#page=2.
27 Government Accountability Office, “Military Base Realignments and Closures: DOD Has Improved Environmental
Cleanup Reporting but Should Obtain and Share More Information (GAO-17-151)”, January 2017. Available at
https://www.gao.gov/assets/690/682204.pdf#page=27.
28 Government Accountability Office,” DOD Joint Bases: Implementation Challenges Demonstrate Need to Reevaluate
the Program (GAO-14-577), September 2014, page 2. Available at https://www.gao.gov/assets/670/665964.pdf#page=
7.
29 Government Accountability Office, “High-Risk Series: Progress on Many High-Risk Areas, While Substantial
Efforts Needed on Others (GAO-17-317)”, February 15, 2017. Available at https://www.gao.gov/assets/690/
682765.pdf#page=319.
30 See “2005 Defense Base Closure and Realignment Commission Report,” Volume 1, page 3. “However, as discussed
elsewhere in this Report, the Commission noted in many cases that DoD claimed savings from proposals on the basis of
eliminated military personnel. Yet, because total end strength was not being reduced proportionately, these so-called
‘savings’ will not actually reduce total DoD spending levels. Hence, they are not truly savings in the commonly

Congressional Research Service

8

Base Closure and Realignment (BRAC)

quality of cost estimates and savings associated with 2005 BRAC round, Anthony Principi,
Chairman of the 2005 Defense Base Closure and Realignment Commission, has suggested
opportunities exist for the DOD to improve its analysis by adopting more consistent accounting
practices and inclusive metrics:
To start, DoD has to do a better job estimating the true cost of any closure or realignment....
Second, the cost of base realignment actions (COBRA) accounting procedure, used by
DoD as a basis of comparison among scenarios, should include cost estimates for
environmental restoration not just “clean to current use” standards. In addition, COBRA or
some other cost evaluation process should also include transportation and infrastructure
costs and burden sharing with the federal government....31

In addition to refining DOD accounting metrics, some observers have suggested congressional
visibility into BRAC cost and long-term effectiveness could be improved by amending the
process to require the Department to disclose how closure and realignment recommendations
meet expected cost saving and reduced infrastructure targets.

Excess Infrastructure
A BRAC process is the chief means by which DOD disposes of excess infrastructure. Each year
between 2013 and 2017, the Department requested a new BRAC round as a means of realizing
greater efficiency and reducing excess infrastructure. It has also attempted to allay concerns
related to the 2005 BRAC experience - marked by unexpectedly high costs and complexity - by
emphasizing cost savings and efficiencies rather than force transformation.
In April 2016, DOD submitted to the House Armed Services Committee an Infrastructure
Capacity Report (interim version) that assessed 22% of the Department’s base infrastructure
excess to its needs.32 The methodology used in the report—required by Section 2815 of the
National Defense Authorization Act (NDAA) for FY2016 (P.L. 114-92)—remained consistent
with excess capacity reports submitted prior to the 1998 and 2005 BRAC rounds round.33 The
Department stated its purpose for obtaining “a sense of excess and whether excess remains after
various changes, such as (prior) BRAC or force structure reductions.”34 A final infrastructure
capacity report, submitted to Congress in October 2017, modified the original excess capacity
estimate to 19%.35

understood sense of the term. No new equipment or increases in operations could be purchased with these ‘reductions’
in military personnel. Because these military personnel would not be eliminated, but merely reassigned to higherpriority tasks, the commission concluded that DoD’s initial estimates of $49 billion in net savings over a 20-year period
were vastly overestimated, although “military value”—the primary selection criterion—might be increased.
31 Anthony Prinicipi, former Veterans Affairs Secretary and Chairman of the Base Realignment and Closure
Commission, “BRAC Chair Reflects on Decisions, Offers Ideas for Future,” May 9, 2011. Available at
https://federalnewsradio.com/defense/2011/05/brac-chair-reflects-on-decisions-offers-ideas-for-future/.
32 Department of Defense Infrastructure Capacity, March 2016. Available at https://defensecommunities.org/wpcontent/uploads/2015/01/2016-4-Interim-Capacity-Report-for-Printing.pdf.
33 GAO, “DOD’s Excess Capacity Estimating Methods Have Limitations (GAO-13-535),” June 2013; “DOD continues
to use the same methodology in 2017 that it has previously used to estimate excess capacity; thus these limitations
continue…” GAO, “Defense Infrastructure: DOD needs to Improve the Accuracy of Its Excess Capacity Estimates,”
May 2018. Available at https://www.gao.gov/assets/700/691990.pdf#page=14.
34 Department of Defense Infrastructure Capacity, March 2016. Available at https://defensecommunities.org/wpcontent/uploads/2015/01/2016-4-Interim-Capacity-Report-for-Printing.pdf.
35 Department of Defense Infrastructure Capacity, October 2017. Available at https://fas.org/man/eprint/
infrastructure.pdf.

Congressional Research Service

9

Base Closure and Realignment (BRAC)

Table 1. Infrastructure Capacity Reports; Interim and Final
Percentage of Infrastructure Identified as Excess
FY2016 Interim Report

FY2017 Final Report

Army

33%

29%

Navy

7%

6%

Air Force

32%

28%

Defense Logistics Agency

12%

13%

Total DOD

22%

19%

Department

Source: Recreated from Table 1, Department of Defense Infrastructure Capacity Report, October 2017.
Notes: The FY2016 report estimated excess infrastructure DOD would carry into FY2019, according to force
structure plans. The FY2017 report measured the value according to FY2012 force structure. Both analyses used
1989 as a baseline. DLA

The Department concluded its infrastructure capacity analysis by arguing it had established
sufficient justification for a new BRAC round, a process that would allow it to more effectively
dispose of excess infrastructure and manage remaining real property assets.
The Department believes we have addressed all congressional concerns.... The time to
authorize another BRAC round is now. The BRAC process requires considerable time to
analyze and develop recommendations, have those recommendations reviewed by the
independent BRAC Commission, and then implemented over a six-year period of time.
The longer authorization is delayed, the longer the Department will be forced to expend
valuable resources on unnecessary facilities instead of weapons systems, readiness, and
other national security priorities.36

Critics of the Department’s methodology for estimating excess infrastructure have asserted it
includes unreasonable research assumptions and metrics, undermining the basis for DOD’s
conclusion. For example, observers have cited the report’s reliance on Cold War baseline values
to establish excess capacity, inconsistent application of existing metrics for measuring capacity
shortfalls, and overly broad categorization schemes.37 Some observers have also cited
longstanding data management challenges that continue to affect the Department’s ability to
measure current excess facility inventory and utilization rates.38 Others have noted the dearth of
data that support DOD claims related to BRAC effectiveness and the disposal of excess
property.39

36 Department of Defense, “Infrastructure Capacity Report,” October 2017. Available at https://fas.org/man/eprint/

infrastructure.pdf#page=35.
37 GAO, “Defense Infrastructure: DOD Needs to Improve the Accuracy of its Excess Capacity Estimates (GAO-18230), May 2018. For example, “DOD’s excess capacity methodology and analysis has limitations that affect the
accuracy and analytical sufficiency of the estimate. Specifically, DOD’s use of a 1989 baseline for excess capacity
results in inaccurate estimates of excess capacity; DOD’s methodology included assumptions that were not always
reasonable; and DOD’s approach to estimating excess capacity is not always sufficient or implemented consistently
across the military departments.” Available at https://www.gao.gov/assets/700/691990.pdf#page=11.
38 GAO, “DOD Needs to Improve its Efforts to Identify Unutilized and Underutilized Facilities (GAO-14-538),”
September 2014.
39 See GAO, “DOD Should Address Challenges with Communication and Mission Changes to Improve Future Base
Realignment and Closure Rounds (GAO-18-231), March 2018. “In reviewing DOD’s data we found that the
department ultimately did not have the needed data to calculate excess infrastructure disposed of during BRAC 2005.”

Congressional Research Service

10

Base Closure and Realignment (BRAC)

During a news briefing on the FY2019 defense budget, Undersecretary of Defense (Comptroller)
David L. Norquist noted that the Department had declined to propose a BRAC round that year,
stating that it would work instead to focus on internal reforms while preparing for a financial
audit.
And so, I think we're looking at doing two things, going forward. One is, working with
Congress to find common areas where we can make reforms and changes that don't create
the same types of obstacles. The other is that we are undergoing a financial-statement audit
that includes a look at property, and assets and investments and improving the accuracy of
the data behind it. And as a view of being able to take advantage of the data coming out of
that process, to help us make better decision-making on real property. But, yes, you are
correct, there is not (a) request for another BRAC round in this budget. 40

In testimony before the Senate Appropriations Committee Subcommittee on Military
Construction, Veterans Affairs, and Related Agencies, Lucian Niemeyer, Assistant Secretary of
Defense for Energy, Installations and Environment, indicated DOD would be working in FY2019
to improve its excess infrastructure accounting processes and demolish unneeded infrastructure:
In lieu of another request for legislation in FY 2019 to authorize an additional Base
Realignment and Closure (BRAC) round, we will review our facilities, to include facility
usage optimization review to ensure we have a better accounting of excess infrastructure.
We also have proposed for FY 2019 increased efforts to demolish unneeded or obsolete
facilities over the course of this year. 41

Legacy of the 2005 BRAC Round
The 2005 BRAC round was unique among
all previous rounds due to its relative size,
scope and complexity. (See Figure 2 for
comparison of major and minor BRAC
actions between rounds.)42 Colloquially
called “the mother of all BRACs,” the
objectives of the 2005 round were primarily
about transforming military infrastructure;
however, unanticipated expenses have
played a role in shaping subsequent
congressional views of the BRAC process
and, according to many observers,
dampened support for consideration of a
new round.
Savings estimates submitted during the
2005 round were overvalued by as much as

Context of the 2005 BRAC Round
“Prior BRAC rounds occurred at the dusk of the Cold
War, when military budgets and force structure were
shrinking. The 2005 BRAC round occurred in a post-9/11
environment with our armed forces deployed in combat
in Iraq and Afghanistan with stable or increasing force
structure and defense budgets. During the 2005 BRAC
implementation period, the armed forces expect to
relocate 70,000 servicemembers from overseas to
installations within the United States. Prior BRAC rounds
took place in the context of military doctrine and force
structure shaped by the Cold War. The 2005 BRAC
round occurred during the transformation of military
doctrine and force structure to meet the needs of an
entirely new threat and security environment....”
—2005 Defense Base Closure and Realignment
Commission Report, Chapter 1: Commission Strategic
Overview

40 Department of Defense News Briefing on the President’s Fiscal Year 2019 Defense Budget, Undersecretary of

Defense (Comptroller) David L. Norquist, February 12, 2018. Available at https://www.defense.gov/News/Transcripts/
Transcript-View/Article/1439782/department-of-defense-news-briefing-on-the-presidents-fiscal-year-2019-defense/.
41 Senate Subcommittee on Military Construction, Veterans Affairs, and Related Agencies, “Statement of Honorable
Lucian Niemeyer (Assistant Secretary of Defense for Energy, Installations and Environment),” April 26, 2018.
Available at https://www.acq.osd.mil/eie/Downloads/Testimony/FY19%20EI&E%20Posture%20Statement%20%20SAC-M.pdf#page=18.
42 Quantifying BRAC complexity can be difficult. During the 2005 BRAC round, DOD defined major closures as those

Congressional Research Service

11

Base Closure and Realignment (BRAC)

67%, according to GAO analysis, with one-time implementation costs rising from $21 to $35.1
billion.43 GAO found that the $14.1 billion increase was due primarily to the rising cost of new
construction associated with subsidiary projects not included in the original BRAC
implementation plan.44
Figure 2. BRAC Major and Minor Actions
Base Closures and Realignments

Source: GAO-13-149, “Military Bases: Opportunities Exist to Improve Future Base and Realignment and
Closure Rounds,” March 2013.
Notes: For the 2005 BRAC round, major and minor actions are based on DOD defined values. Actions during
previous rounds represent GAO estimates.

Referring to the implementation of the 2005 round, Assistant Secretary Niemeyer, noted, “BRAC
legislation effectively limited the ability of Congress to oversee BRAC implementation costs and
the Department made deliberate decisions to use BRAC implementation as a recapitalization tool,
expanding facility requirements and associated costs.”45
To address congressional concerns about spiraling costs in new BRAC rounds, DOD has
periodically proposed legislative language that would constrain the Secretary’s ability to
that had a plant replacement value (PRV) of greater than $100 million. Major realignments qualified as those that had a
net loss of 400 or more military or civilian personnel. In earlier rounds, DOD did not use compatible definitions for
BRAC actions. See Figure 2 for results of GAO analysis.
43 GAO, Military Bases: Opportunities Exist to Improve Future Base Realignment and Closure Rounds (GAO-13-149),
March 2013, page 3. Available at https://www.gao.gov/assets/660/652805.pdf#page=3.
44 GAO, “Military Base Realignments and Closures: Updated Costs and Savings Estimates from BRAC 2005 (GAO12-709R),” June 29, 2012, page 34. “DOD’s own data confirmed that the majority of the $14 billion in the BRAC 2005
cost increase was related to military construction... construction of additional facilities to enhance capabilities, address
deficiencies—BRAC as a recapitalization engine—and construction industry inflation since 2005 ($11 billion)....”
Available at https://www.gao.gov/assets/660/652805.pdf#page=34.
45 Advance Policy Questions for Lucian Niemeyer, Nominee for Assistant Secretary of Defense of Energy, Installations
and Environment, July 18, 2017. Available at https://www.armed-services.senate.gov/imo/media/doc/
Niemeyer_APQs_07-18-17.pdf.

Congressional Research Service

12

Base Closure and Realignment (BRAC)

recommend BRAC actions that would not yield savings within 20 years and to emphasize
recommendations that would yield net savings within five years.46

The Department of Defense Base Closure Account
Each year, Congress appropriates funding for the Department of Defense Base Closure Account,
part of the Military Construction Defense-Wide appropriation. With no BRAC round authorized
or underway, the primary purpose of continuing BRAC appropriations is to fund the
environmental cleanup and caretaker functions at bases that were closed under prior rounds (see
Figure 3).
Figure 3. Historical View of BRAC Appropriations, FY2001-FY2020

Source: CRS Compilation of annual DOD Comptroller, C-1 Military Construction Appropriations.
Notes: Amounts reflect budget execution in “APPN” column of annual C-1 spreadsheets and include all BRAC
accounts. FY2020 represents the Administration’s current request.

In FY2020, the Trump Administration has requested $278.5 million for BRAC continuing
environmental and caretaker costs, with $158.3 million provided for the Navy (57%), $66.1
million for the Army (24%), and $54 million for the Air Force (19%).47 The total request
represents a $63 million decrease (19%) from FY2019 enacted levels ($342 million).
In FY2018, Congress urged DOD to accelerate environmental remediation at BRAC sites. In
report language, appropriators stated that additional funds were provided to speed environmental
remediation at installations closed under previous rounds.

46 See Office of Legislative Council (website), FY2018 DOD Legislative Proposals, “First Package of Legislative

Proposals Sent to Congress for Inclusion in the National Defense Authorization Act for Fiscal Year 2018—
Consolidated Section-by-Section Analysis (Sent to Congress on May 25, 2017).” Available at http://ogc.osd.mil/olc/
docs/25May2017NDAASectionalAnalysis.pdf#page=70.
47 Department of Defense, “DOD Base Realignment and Closure Executive Summary Program Year 2020: Justification
Data Submitted to Congress.” March 2019. Available at http://comptroller.defense.gov/Portals/45/Documents/
defbudget/fy2019/budget_justification/pdfs/05_BRAC/BRAC_Exec_Sum_J-Book_FINAL.pdf#page=8.

Congressional Research Service

13

Base Closure and Realignment (BRAC)

Accelerated cleanup.—The agreement includes additional funding to accelerate
environmental remediation at installations closed during previous Base Realignment and
Closure (BRAC) rounds. Priority should be given to those sites with newly identified
radiological cleanup cost. There are many factors hindering the cleanup of BRAC sites.
However, strategic investments can lead to quicker clean-ups and faster turnover of DOD
property to the local community. Therefore, the Department is directed to submit to the
congressional defense committees a spend plan for the additional BRAC funds not later
than 30 days after enactment of this Act. 48

Congressional Action on BRAC
Prohibition on Conducting a New Round
Congressional authorizers and appropriators have regularly inserted language into annual defense
legislation that would disallow the use of funds for the purpose of a new BRAC round. In
FY2019, for example, though DOD did not propose a BRAC, authorizers inserted language into
the annual NDAA that prohibited a new round:
SEC. 2703. Prohibition on Conducting Additional Base Realignment and Closure (BRAC)
Round. Nothing in this Act shall be construed to authorize an additional Base Realignment
and Closure (BRAC) round. 49

A similar provision was included in the final FY2019 defense appropriations bill:50
SEC. 8122. None of the funds made available by this Act may be used to propose, plan for,
or execute a new or additional Base Realignment and Closure (BRAC) round. 51

BRAC Legislation in the 115th Congress
In 2017, Members in both chambers proposed legislation that would have authorized a new round
of base closures.52 Though no legislation for a full BRAC was enacted, a provision included the
following year in the final FY2019 NDAA.
48

See Explanatory Statement to Accompany H.R. 1625 (P.L. 115-141), Committee Print Book 2 of 2, Division J.
Available at https://www.gpo.gov/fdsys/pkg/CPRT-115HPRT29457/pdf/CPRT-115HPRT29457.pdf#page=509; See
also Hpt 115-188, House Appropriations Committee Report to accompany H.R. 2998, “Military Construction, Veterans
Affairs, and Related Agencies Appropriations Bill, 2018.” Available at https://www.congress.gov/115/crpt/hrpt188/
CRPT-115hrpt188.pdf#page=34.
49 National Defense Authorization Act for Fiscal Year 2019, H.R. 5515, Available at https://www.congress.gov/115/
bills/hr5515/BILLS-115hr5515rh.pdf#page=841.
50 Department of Defense and Labor, Health and Human Services, and Education Appropriations Act, 2019 and
Continuing Appropriations Act, 2019 (H.R. 6157, H.R. 245).
51 Consolidated Appropriations Act, 2018, Division C, (H.R. 1625, P.L. 115-141), Available at
https://www.congress.gov/115/bills/hr1625/BILLS-115hr1625enr.pdf#page=144.
52 On January 31, 2017, Representative Adam Smith, then Ranking Member of the House Armed Services Committee,
submitted the Military Infrastructure Consolidation and Efficiency Act of 2017 (H.R. 753), which would have
reauthorized a BRAC that would have begun in FY2019 with a framework similar to previous rounds. A second
proposal, drafted by Senator John McCain, then Chairman of the Senate Armed Services Committee, and submitted as
an amendment to the annual NDAA for FY2018 (H.R. 2810), would have taken a different approach. By omitting the
appointment of a BRAC commission charged with reviewing recommendations made by the Secretary of Defense,
Senator McCain’s amendment would have altered what long-time observers had considered the basic tenets of the
modern BRAC framework (third party appraisal by an independent commission, and expansive opportunity for public
comment by affected communities and other stakeholders).

Congressional Research Service

14

Base Closure and Realignment (BRAC)

Under the new scenario described by Section 2702 of the John S. McCain National Defense
Authorization Act for Fiscal Year 2019 (H.R. 5515, P.L. 115-232), BRAC-like actions are
authorized within the confines of a state based on the recommendation of the governor and
support of local communities affected by the proposed actions. Unlike a traditional BRAC
process, the new authorities would forgo the creation of an independent review panel. The
Secretary of Defense is, instead, required to deliver a report of planned BRAC actions to
congressional defense committees and, following a 90-day waiting period, begin implementation.
For details, please refer to “In-State BRAC” in Appendix A of this report.
The BRAC related legislative proposals above illustrate the flexibility Congress has for amending
or adopting the template of past BRAC processes that DOD has called “the only fair, objective,
and comprehensive process to achieve these goals (eliminating excess infrastructure).”53 Congress
may consider whether future legislative proposals for base closures and realignments will adopt
the lessons learned from previous rounds while retaining the basic framework, or fundamentally
alter the process.

BRAC Legislation in the 116th Congress
No BRAC legislation has so far been proposed in the 116th Congress. Additionally, the
Department has asserted that it does not intend to use the new BRAC-like authorities authorized
by Section 2702 of the FY2019 NDAA.54 To date, DOD has received no state requests under this
authority.

53 “The Department must be able to eliminate excess infrastructure to avoid wasting resources maintaining unneeded

facilities - resources that that could be much better spent on readiness. BRAC provides the only fair, objective, and
comprehensive process to achieve these goals.” See Data Submitted to Congress, “DoD Base Realignment and Closure:
BRAC Rounds (BRAC 1988, 1991, 1993, 1995 & 2005),” May 2017. Available at http://comptroller.defense.gov/
Portals/45/Documents/defbudget/FY2018/budget_justification/pdfs/05_BRAC/
FINAL_FY18_BRAC_Summary_Book.pdf#page=8.
54 In official correspondence, DOD has stated, “The Department does not intend to use section 2702 because it
undermines the Department’s ability to prioritize the military value of an installation as informed by the National
Defense Strategy, instead substituting the judgment of a Governor based on economic value.” Department of Defense
Response to Congressional Research Service Request for Information, April 11, 2019.

Congressional Research Service

15

Base Closure and Realignment (BRAC)

Appendix A. Legislative References
BRAC Authorizing Legislation
1988 Round
The Defense Authorization Amendments and Base Closure and Realignment Act, enacted
October 24, 1988 (P.L.100-526)
1991, 1993, 1995 Rounds
National Defense Authorization Act for Fiscal Year 1991, enacted November 5, 1990 (P.L.
107-107, Base Closure and Realignment Act of 1990, Title XXIX)
2005 Round
National Defense Authorization Act for Fiscal Year 2002, (P.L. 101-510; amended the
Defense Base Closure and Realignment Act of 1990 (P.L. 101-510)

10 U.S.C. 2687, 10 U.S.C. 993 Summary
In 1977, Congress enacted 10 U.S.C. 2687, the first statutory restriction on the President’s ability
to close or realign military installations. Amended over the years, the statute has retained its
essential elements, establishing procedures the Secretary of Defense must follow before closing a
military installation where a threshold number (currently 300) of civilian personnel are authorized
to be employed, or realigning an installation that involves a reduction by more than 50% (or
1,000) of civilian workers. A more recent statute, 10 U.S.C. 993, introduced additional reporting
requirements that would restrict the Secretary’s ability to realign installations if the plan would
affect more than 1,000 assigned members of the Armed Forces.

In-State BRAC
Section 2702 of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (H.R.
5515, P.L. 115-232) authorizes new in-state BRAC authorities. Text of the provision is included
below in its entirety.
SEC. 2702. ADDITIONAL AUTHORITY TO REALIGN OR CLOSE CERTAIN
MILITARY
INSTALLATIONS.
(a) Authorization.—Notwithstanding sections 993 or 2687 of title 10, United States
Code, and subject to subsection (d), the Secretary of Defense may take such actions as may
be necessary to carry out the realignment or closure of a military installation in a State
during a fiscal year if—
(1) the military installation is the subject of a notice which is described in
subsection (b); and
(2) the Secretary includes the military installation in the report submitted under
paragraph (2) of subsection (c) with respect to the fiscal year.
(b) Notice From Governor of State.—A notice described in this subsection is a notice
received by the Secretary of Defense from the Governor of a State (or, in the case of the
District of Columbia, the Mayor of the District of Columbia) in which the Governor
recommends that the Secretary carry out the realignment or closure of a military installation
located in the State, and which includes each of the following elements:

Congressional Research Service

16

Base Closure and Realignment (BRAC)

(1) A specific description of the military installation, or a specific description of
the relevant real and personal property.
(2) Statements of support for the realignment or closure from units of local
government in which the installation is located.
(3) A detailed plan for the reuse or redevelopment of the real and personal
property of the installation, together with a description of the local redevelopment
authority which will be responsible for the implementation of the plan.
(c) Response to Notice.—
(1) Mandatory response to governor and congress.—Not later than 1 year after
receiving a notice from the Governor of a State (or, in the case of the District of
Columbia, from the Mayor of the District of Columbia), the Secretary of Defense shall
submit a response to the notice to the Governor and the congressional defense
committees indicating whether or not the Secretary accepts the recommendation for
the realignment or closure of a military installation which is the subject of the notice.
(2) Acceptance of recommendation.—If the Secretary of Defense determines that
it is in the interests of the United States to accept the recommendation for the
realignment or closure of a military installation which is the subject of a notice
received under subsection (b) and intends to carry out the realignment or closure of
the installation pursuant to the authority of this section during a fiscal year, at the time
the budget is submitted under section 1105(a) of title 31, United States Code, for the
fiscal year, the Secretary shall submit a report to the congressional defense committees
which includes the following:
(A) The identification of each military installation for which the Secretary intends to
carry out a realignment or closure pursuant to the authority of this section during the fiscal
year, together with the reasons the Secretary of Defense believes that it is in the interest of
the United States to accept the recommendation of the Governor of the State involved for
the realignment or closure of the installation.
(B) For each military installation identified under subparagraph (A), a master plan
describing the required scope of work, cost, and timing for all facility actions needed to
carry out the realignment or closure, including the construction of new facilities and the
repair or renovation of existing facilities.
(C) For each military installation identified under subparagraph (A), a certification that,
not later than the end of the fifth fiscal year after the completion of the realignment or
closure, the savings resulting from the realignment or closure will exceed the costs of
carrying out the realignment or closure, together with an estimate of the annual recurring
savings that would be achieved by the realignment or closure of the installation and the
timeframe required for the financial savings to exceed the costs of carrying out the
realignment or closure.
(d) Limitations.—
(1) Timing.—The Secretary may not initiate the realignment or closure of a
military installation pursuant to the authority of this section until the expiration of the
90-day period beginning on the date the Secretary submits the report under paragraph
(2) of subsection (c).
(2) Total costs.—Subject to appropriations, the aggregate cost to the government
in carrying out the realignment or closure of military installations pursuant to the
authority of this section for all fiscal years may not exceed $2,000,000,000. In
determining the cost to the government for purposes of this section, there shall be
included the costs of planning and design, military construction, operations and
maintenance, environmental restoration, information technology, termination of

Congressional Research Service

17

Base Closure and Realignment (BRAC)

public-private contracts, guarantees, and other factors contributing to the cost of
carrying out the realignment or closure, as determined by the Secretary.
(e) Process for Implementation.—The implementation of the realignment or closure of a
military installation pursuant to the authority of this section shall be carried out in
accordance with section 2905 of the Defense Base Closure and Realignment Act of 1990
(title XXIX of P.L. 101-510; 10 U.S.C. 2687 note) in the same manner as the
implementation of a realignment or closure of a military installation pursuant to the
authority of such Act.
(f) State Defined.—In this section, the term ``State’’ means each of the several States,
the District of Columbia, the Commonwealth of Puerto Rico, American Samoa, Guam, the
United States Virgin Islands, and the Commonwealth of the Northern Mariana Islands.
(g) Termination of Authority.—The authority of the Secretary to carry out a
realignment or closure pursuant to this section shall terminate at the end of fiscal year 2029.

Congressional Research Service

18

Appendix B. BRAC Acreage Disposal Status, By State
Table B-1. Status of BRAC Acreage Disposal, By State/Territory and BRAC Round
State

BRAC Year

Alabama

1988

1993

1995
2005

Closure or
Realignment

Installation Name

CRS-19

1995

Acres Remaining
to be Disposed

Sum of
Excessed

Major Closure

COOSA RIVER STORAGE
ANNEX(ANNISTON)

2,834

0

2,834

Minor Closure

ALABAMA AAP

2,235

0

2,235

Major Closure

MOBILE - NS

0

0

0

Minor Closure

GADSDEN - NRC/AFRC

0

0

0

MONTGOMERY - NRC

0

0

0

18,431

12

18,443

Major Closure

FORT MCCLELLAN

Minor Closure

HUNTSVILLE AL - NAVRESCEN

3

0

3

Minor Closure

BG WILLIAMS P. SCREWS USARC

5

0

5

CLEVELAND LEIGHT ABBOT USARC

6

0

6

FAITH WING USARC

2

0

2

Finnell AFRC & AMSA#154

5

0

5

HARRY L. GARY, JR. USARC

0

0

0

MOBILE - NMCRC

0

0

0

NRC TUSCALOOSA

0

0

0

PFC GRADY C. ANDERSON USARC

0

0

0

WRIGHT USARC

0

0

0

23,521

12

23,533

Alabama
Total
Alaska

Acres
Disposed

Major Closure

ADAK - NAF

0

0

0

Major Realignment

FORT GREELY

0

0

0

State

BRAC Year
2005

Closure or
Realignment
Minor Closure

Installation Name

Arkansas
Total

CRS-20

Sum of
Excessed

0

0

0

KULIS AGS

0

0

0

0

0

0

1988

Minor Closure

CAMP NAVAJO

0

0

0

1991

Major Closure

WILLIAMS AFB

3,878

144

4,021

2005

Minor Closure

AFRL MESA

7

0

7

ALLEN HALL USARC

4

0

4

DEER VALLEY USARC #2

0

0

0

3,888

144

4,032

3,401

0

3,401

Arizona
Total
Arkansas

Acres Remaining
to be Disposed

GALENA AIRPORT

Alaska Total
Arizona

Acres
Disposed

1991

Major Closure

EAKER

1993

Minor Closure

FAYETTEVILLE - NRC

0

0

0

FORT SMITH - NRC

0

0

0

7,050

0

7,050

1995

Major Closure

FORT CHAFFEE

2005

Minor Closure

ARKADELPHIA USARC

0

0

0

ECS-15/ERA/ARLOG

39

0

39

HOT SPRINGS USARC

1

0

1

LEROY R. POND USARC

4

0

4

MALVERN USARC OMS

0

0

0

RUFUS GARRETT JR. USARC

3

0

3

SAMUEL STONE JR USARC

0

0

0

USARC CAMDEN

2

0

2

USARC JONESBORO

3

0

3

10,503

0

10,503

State

BRAC Year

California

1988

Closure or
Realignment
Major Closure

Installation Name
GEORGE

CRS-21

Sum of
Excessed

866

5,062

659

0

659

MATHER

5,661

0

5,661

NORTON

2,221

0

2,221

PRESIDIO OF SAN FRANCISCO

1,480

0

1,480

Minor Closure

SALTON SEA TEST RANGE

5,877

0

5,877

Major Closure

CASTLE

2,777

0

2,777

FT ORD

19,301

7,778

27,080

LONG BEACH - NH

31

0

31

LONG BEACH - NS

413

56

469

LONG BEACH - NSY

351

0

351

MOFFETT FIELD - NAS

2,951

0

2,951

Tustin MCAS

1,341

233

1,574

SACRAMENTO AD

406

0

406

TREASURE ISLAND NS HUNTERS PT
ANNEX

89

846

935

ALAMEDA - NAS

2,392

256

2,649

El Toro MCAS

4,402

292

4,694

MARE ISLAND NSY

1,201

415

1,617

NOVATO DOD HOUSING FACILITY

551

0

551

OAKLAND - NH

182

0

182

PORT HUENEME CA ENGSRVCEN

33

0

33

SAN DIEGO - NTC

380

51

431

TREASURE ISLAND - NS

917

161

1,077

Minor Closure

1993

Acres Remaining
to be Disposed

4,196

HAMILTON ARMY AIR FIELD

1991

Acres
Disposed

Major Closure

State

BRAC Year

1995

Closure or
Realignment

Installation Name

Major Realignment

MARCH

Minor Closure

PACIFIC GROVE - NRC

Major Closure

MCCLELLAN

Sum of
Excessed

0

4,441

4

0

4

2,995

457

3,452

OAKLAND - FISC

697

0

697

OAKLAND ARMY BASE

377

18

395

0

0

0

SIERRA ARMY DEPOT

4,999

4,488

9,487

EAST FORT BAKER

91

0

91

2,457

0

2,457

ONTARIO

8

0

8

POMONA - NRC

0

0

0

RIO VISTA RES TRNG AREA

28

0

28

STOCKTON - NRC

0

0

0

Minor Realignment

ONIZUKA

0

0

0

Major Closure

ONIZUKA AFS

20

0

20

RIVERBANK AAP

0

172

172

Major Realignment

CONCORD NWS

59

4,972

5,031

Minor Closure

ARNG RC BELL

0

0

0

DESIDERIO HALL USARC

5

0

5

HAZARD PARK

0

0

0

MOFFETT FIELD USARC

0

0

0

PVT GEORGE L. RICHEY USARC

9

0

9

SCHROEDER HALL USARC

5

0

5

Minor Closure

FORT HUNTER LIGGETT BRAC

LOMPOC BRANCH DISCIPLINARY
BARRACKS

CRS-22

Acres Remaining
to be Disposed

4,441

Major Realignment

2005

Acres
Disposed

State

BRAC Year

Closure or
Realignment

Installation Name
USARC MOUNTAIN VIEW

California
Total
Colorado

1988

0

7

74,016

21,062

95,078

0

15,953

15,953

242

0

242

1,786

0

1,786

BENNETT ARNG TRNG SITE

1991

Major Realignment

LOWRY

1995

Major Closure

U.S. ARMY OPERATIONS
FITZSIMONS

558

0

558

2005

Major Closure

BUCKLEY ANNEX

70

0

70

2,656

15,953

18,609

NEW LONDON - NUSC/NUWC
DET

32

0

32

STRATFORD ARMY ENGINE PLANT

1

77

78

AMSA 69

3

0

3

AMSA 72 USARC

0

0

0

MIDDLETOWN USARC/OMS

24

0

24

SGT LIBBY USARC/OMS

6

0

6

65

77

142

10

0

10

10

0

10

110

0

110

8

0

8

1995

Minor Closure

Minor Closure

2005

Minor Closure

MAJ ROBERT KIRKWOOD
MEMORIAL USARC

Delaware
Total

CRS-23

7

Minor Closure

Connecticut Total

District of
Columbia

Sum of
Excessed

PUEBLO AD

2005

Delaware

Acres Remaining
to be Disposed

Major Realignment

Colorado
Total
Connecticut

Acres
Disposed

2005

Major Closure

WALTER REED ARMY MEDICAL
CENTER

Minor Closure

POTOMAC ANNEX

State

BRAC Year

Closure or
Realignment

Installation Name

District of Columbia Total
Florida

1988
1993

1995

2005
2005

118

CAPE ST. GEORGE

6

0

6

COCONUT GROVE - NRC

3

0

3

CECIL FIELD - NAS

17,061

0

17,061

ORLANDO - NTC

2,070

0

2,070

ORLANDO FL NAVAL HOSPITAL

44

0

44

Major Realignment

HOMESTEAD

976

0

976

Major Realignment

KEY WEST - NAS

176

0

176

Minor Closure

Big Coppit Key

0

0

0

ORLANDO - NRL (USR DET)

18

0

18

ST. PETERSBURG - NRC

4

0

4

20,359

0

20,359

ATLANTA - NAS

0

0

0

FORT GILLEM

772

399

1,171

FORT MCPHERSON

474

14

487

ATHENS NAVSCSCOL

56

0

56

COLUMBUS USARC #1

2

0

2

ROME - MCRC

0

0

0

1,304

412

1,717

1,819

0

1,819

0

0

0

979

0

979

1,805

0

1,805

Minor Closure
Major Closure

Minor Closure
Major Closure

Georgia
Total

CRS-24

Sum of
Excessed

0

Minor Closure

Guam

Acres Remaining
to be Disposed

118

Florida Total
Georgia

Acres
Disposed

1993

Major Closure

AGANA - NAS

1995

Major Closure

GUAM - SHIP REPAIR FACILITY

Minor Closure

GUAM - PWC

Minor Realignment

GUAM - NAVACTS

State

BRAC Year

Closure or
Realignment

Installation Name

Guam Total
Hawaii

0

4,604

21

0

21

1993

Major Closure

BARBERS POINT - NAS

2,290

217

2,507

2005

Minor Closure

HILO KUNIEDA USARC

0

0

0

2,311

217

2,528

0

0

0

0

0

0

1,799

401

2,200

FORT SHERIDAN

386

0

386

GLENVIEW - NAS

1,196

0

1,196

274

0

274

4,994

7,890

12,884

2005

Minor Closure

NRC POCATELLO

1988

Major Closure
Major Closure

CHANUTE

O'HARE
1995

Major Closure

SAVANNA DEPOT ACTIVITY

2005

Minor Closure

COPPLE USARC

4

0

4

FOREST PARK - NRC

0

0

0

PFC R. G. WILSON USARC

3

0

3

SSG R. E. WALTON USARC

5

0

5

WAUKEGAN AFRC

4

0

4

8,665

8,291

16,956

859

0

859

JEFFERSON PROVING GROUND

3,113

1,122

4,235

Major Closure

FT BEN HARRISON

2,331

60

2,391

Major Realignment

GRISSOM

1,345

0

1,345

Minor Closure

FORT WAYNE IN NMRC

4

0

4

TERRE HAUTE - NRC

0

0

0

Illinois Total
1988
1991
1993

CRS-25

4,604
KAPALAMA MIL RESERVATION

1993

Indiana

Sum of
Excessed

Minor Closure

Idaho Total
Illinois

Acres Remaining
to be Disposed

1988

Hawaii Total
Idaho

Acres
Disposed

Major Closure

INDIANA AAP

State

BRAC Year

Closure or
Realignment

Installation Name

Acres
Disposed

Major Closure

INDIANAPOLIS - NAWC-AD

163

0

163

2005

Major Closure

NEWPORT CHEMICAL DEPOT

7,241

0

7,241

Minor Closure

EVANSVILLE NRC

0

0

0

HALLIDAY USARC

0

0

0

NMCRC GRISSOM ARB

0

0

0

15,055

1,183

16,238

1988

Minor Closure

FORT DES MOINES

51

0

51

2005

Minor Closure

BURLINGTON MEMORIAL
USARC/AMSA

11

0

11

CEDAR RAPIDS AFRC

6

0

6

DUBUQUE - NRC

0

0

0

SIOUX CITY NRC

0

0

0

USARC MUSCATINE

0

0

0

68

0

68

Iowa Total
Kansas

1993

Minor Closure

HUTCHINSON - NRC/AFRC

0

0

0

1995

Minor Closure

OLATHE - NARC

0

0

0

2005

Major Closure

KANSAS AAP

13,951

0

13,951

13,951

0

13,951

Kansas Total
Kentucky

CRS-26

Sum of
Excessed

1995

Indiana Total
Iowa

Acres Remaining
to be Disposed

1988

Major Closure

LEXINGTON (BLUE GRASS) ARMY
DEPOT

777

0

777

1995

Major Closure

LOUISVILLE - NOS

142

0

142

2005

Minor Closure

LOUISVILLE - NOS

0

0

0

MG BENJAMIN J. BUTLER USARC

7

0

7

NRC LEXINGTON

0

0

0

PADUCAH MEMORIAL USARC

4

0

4

State

BRAC Year

Closure or
Realignment

Installation Name

0

3

USARC MAYSVILLE

0

0

0

USARC RICHMOND

0

0

0

933

0

933

18

0

18

2,351

0

2,351

1988

Minor Closure

MILITARY OCEAN TERMINAL,NEW
ORLEANS

1991

Major Closure

ENGLAND

1993

Minor Closure

LAKE CHARLES - NS

0

0

0

MONROE LA NAVRESCEN

3

0

3

0

0

0

149

0

149

1995

Minor Closure

NEW ORLEANS - NAVBIOLAB

2005

Major Closure

NEW ORLEANS - NSA

Minor Closure

BATON ROUGE - NMCRC

0

0

0

ROBERTS USARC

0

0

0

SHREVEPORT USARC

0

0

0

USARC BOSSIER CITY

0

0

0

2,521

0

2,521

1991

Major Closure

LORING

9,276

0

9,276

2005

Major Closure

BRUNSWICK - NAS

2,777

578

3,355

12,053

578

12,631

8,452

13

8,465

Maine Total
Maryland

1988

Major Realignment

FORT GEORGE G. MEADE

Minor Closure

ABERDEEN PROVING GROUND

0

0

0

GAITHERSBURG RES FACILITY

23

0

23

FORT HOLABIRD (88)

7

0

7

Minor Realignment

CRS-27

Sum of
Excessed

3

Louisiana
Total
Maine

Acres Remaining
to be Disposed

PADUCAH USARC #2

Kentucky
Total
Louisiana

Acres
Disposed

State

BRAC Year
1995

Closure or
Realignment
Major Closure

Minor Closure

2005

Minor Closure

Installation Name

590

0

590

WHITE OAK - NSWC DAHLGREN
DIV DET

662

0

662

ANNAPOLIS - NSWC CARDEROCK
DIV DET

68

0

68

FORT HOLABIRD

13

0

13

ADELPHI - NRC

0

0

0

NGA DALECARLIA SITE, BETHESDA,
MD

0

0

0

SUMNER SITE (NGA)

39

0

39

9,854

13

9,867

47

0

47

3,982

138

4,120

Major Closure

ARL - WATERTOWN

1991

Major Closure

FORT DEVENS

1993

Minor Closure

LAWRENCE - NMCRC/AFRC

0

0

0

NEW BEDFORD - NRC

2

0

2

PITTSFIELD - NRC

11

0

11

1,983

113

2,097

125

0

125

SUDBURY TRAINING ANNEX

2,277

0

2,277

ARTHUR MACARTHUR USARC

5

0

5

WESTOVER USARC

0

0

0

8,432

252

8,684

29

0

29

2005

Major Closure

SOUTH WEYMOUTH - NAS

Minor Closure

HINGHAM ANNEX

Minor Closure

Massachusetts Total

CRS-28

Sum of
Excessed

1988

1995

Michigan

Acres Remaining
to be Disposed

FT RITCHIE

Maryland Total
Massachusetts

Acres
Disposed

1988

Minor Closure

PONTIAC STORAGE ACTIVITY

1991

Major Closure

Wurtsmith AFB

1,696

274

1,969

1993

Major Closure

K.I. SAWYER

2,857

0

2,857

State

BRAC Year
1995

2005

Closure or
Realignment

Installation Name

Major Realignment

DETROIT ARSENAL & DETROIT
TANK PLT

Minor Closure

2005

152

CADILLAC MI NAVRESCEN

0

0

0

Major Closure

USAG SELFRIDGE

0

103

103

Minor Closure

MARQUETTE NRF

0

0

0

STANFORD C. PARISIAN USARC

0

0

0

4,735

376

5,111

CAMBRIDGE MEMORIAL USARC

4

0

4

DULUTH - NRC

2

0

2

GEN BEEBE USARC/AMSA 111

6

0

6

FORT SNELLING USARC/AMSA 22

0

0

0

11

0

11

Minor Closure

Minnesota
Total
2005

Major Closure

NS PASCAGOULA

0

0

0

Minor Closure

MISSISSIPPI AAP

0

0

0

VICKSBURG USARC

0

0

0

0

0

0

Mississippi
Total
Missouri

1988

Minor Closure

NIKE KANSAS CITY 30

24

0

24

1991

Major Closure

RICHARDS-GEBAUR

196

0

196

1993

Minor Closure

JOPLIN - NRC

0

0

0

ST JOSEPH - NRC

0

0

0

CAPE GIRARDEAU - NRC

0

0

0

GREENTOP USARC

0

0

0

2005

CRS-29

Sum of
Excessed

0

Minor Realignment

Mississippi

Acres Remaining
to be Disposed

152

Michigan
Total
Minnesota

Acres
Disposed

Minor Closure

State

BRAC Year

Closure or
Realignment

Installation Name
KANSAS CITY - MCSA

Missouri
Total
Montana

CRS-30

27

0

27

247

0

247

GREAT FALLS MT NAVRESCEN

0

0

0

2005

Minor Closure

FORT MISSOULA

21

0

21

GALT HALL USARC

0

0

0

USARC HELENA

0

0

0

VEUVE HALL USARC/AMSA #75 (G)

12

0

12

33

0

33

COLUMBUS USARC

0

0

0

HASTINGS USARC

0

0

0

LINCOLN NRC

0

0

0

MCCOOK USARC

0

0

0

USARC KEARNEY

0

0

0

USARC WYMORE

0

0

0

0

0

0

4,037

0

4,037

4,037

0

4,037

0

0

0

2005

Minor Closure

1988

Major Closure

PEASE

New Hampshire Total
New Jersey

Sum of
Excessed

Minor Closure

Nebraska
Total
New
Hampshire

Acres Remaining
to be Disposed

1993

Montana
Total
Nebraska

Acres
Disposed

1991

Major Realignment

FORT DIX

1993

Major Closure

TRENTON NAWC

529

0

529

Major Realignment

FT MONMOUTH

220

0

220

Minor Closure

ATLANTIC CITY - NRC

0

0

0

State

BRAC Year

Closure or
Realignment

Installation Name
PERTH AMBOY - NRC

1995

2005

3

0

3

679

0

679

Major Realignment

FORT DIX BRAC

235

0

235

Minor Closure

Camp Kilmer

48

0

48

Camp Pedricktown

47

0

47

Major Closure

FORT MONMOUTH

998

128

1,126

Minor Closure

INSPECTOR-INSTRUCTOR WEST
TRENTON

8

0

8

KILMER/AMSA 21

22

2

24

SFC NELSON V. BRITTIN USARC/S-S

8

0

8

2,797

130

2,927

1988

Major Closure

FT WINGATE

8,350

6,318

14,669

2005

Minor Closure

JENKINS AFRC

0

0

0

MCGREGOR RANGE USARC/ECS 87

0

0

0

8,350

6,318

14,669

34

0

34

3,463

0

3,463

246

0

246

3,314

0

3,314

1988

Minor Closure

BROOKLYN, NY - NAVSTA

1993

Major Closure

PLATTSBURGH
STATEN ISLAND - NS

CRS-31

Sum of
Excessed

MILITARY OCEAN TERMINAL,
BAYONNE

New Mexico Total
New York

Acres Remaining
to be Disposed

Major Closure

New Jersey
Total
New Mexico

Acres
Disposed

Major Realignment

GRIFFISS

Minor Closure

JAMESTOWN - NRC/AFRC

2

0

2

NIAGARA FALLS - DOD FAMILY
HOUSING

44

0

44

POUGHKEEPSIE - NRC

0

0

0

State

BRAC Year
1995

Closure or
Realignment
Major Closure

Installation Name
ROSLYN

2005

Minor Closure

CRS-32

Sum of
Excessed

0

52

10,035

652

10,687

FORT TOTTEN

95

0

95

NEW YORK NS FORT
WADSWORTH

0

0

0

STATEN ISLAND - NRC

0

0

0

USA BELLMORE MAINT. FACILITY

17

0

17

2LT GLEN CARPENTER USARC

3

0

3

AMITYVILLE USARC

16

0

16

BUFFALO - NRD

0

0

0

FORT TILDEN USARC

0

10

10

HORSEHEAD NRC

0

0

0

MCDONALD USARC

0

0

0

MULLER USARC

1

0

1

NIAGRA FALLS USARC/AMSA 76

0

22

22

NRC GLENS FALLS

0

0

0

ROOSEVELT USARC

4

0

4

STEWART NEWBURGH USARC

17

0

17

WATERTOWN NRC

0

0

0

17,344

683

18,027

4

0

4

New York
Total
North
Carolina

Acres Remaining
to be Disposed

52

SENECA AD
Minor Closure

Acres
Disposed

1995

Minor Closure

Recreation Center #2 Ft Bragg (91)

2005

Minor Closure

ADRIAN B. RHODES AFRC

4

0

4

ASHEVILLE - NRC

0

0

0

State

BRAC Year

Closure or
Realignment

Installation Name
JESSE F. NIVEN JR., USARC

North Carolina Total
North Dakota

2005

Minor Closure

JOHNSON USARC

North Dakota Total
Not Applicable

1988

Minor Closure

53 Stand Alone Family Housing Areas

1993

Major Closure

MIDWAY NAF

Not Applicable Total
Ohio

Sum of
Excessed

4

0

4

13

0

13

0

0

0

0

0

0

399

0

399

1,535

0

1,535

1,934

0

1,934

1,764

0

1,764

Major Realignment

RICKENBACKER

1993

Major Closure

NEWARK

70

0

70

Minor Closure

GENTILE

164

0

164

Minor Closure

ARNG RC OXFORD

0

0

0

FT HAYES MEMORIAL USARC

11

0

11

LT JACOB PARROTT USARC

4

0

4

NMCRC AKRON

3

0

3

NMCRC CLEVELAND

0

0

0

SFC M. L. DOWNS USARC/AMSA 58

3

0

3

SSG ROY CLIFTON SCOUTEN
USARC

4

0

4

WHITEHALL MEMORIAL USARC

5

0

5

2,027

0

2,027

ASHWORTH USARC

0

0

0

BURRIS USARC

0

0

0

DONALD A. ROUSH USARC

5

0

5

FARR USARC

0

0

0

Ohio Total

CRS-33

Acres Remaining
to be Disposed

1991

2005

Oklahoma

Acres
Disposed

2005

Minor Closure

State

BRAC Year

Closure or
Realignment

Installation Name

0

4

KEATHLEY USARC

0

0

0

KROWSE USARC

0

0

0

NMCRC TULSA

11

0

11

PARKER USARC

0

0

0

PEREZ USARC

0

0

0

ROBBINS USAR

0

0

0

TWADDLE USARC

0

0

0

USARC BROKEN ARROW

0

0

0

20

0

20

1988

Major Closure

UMATILLA AD

0

0

0

2005

Major Closure

UMATILLA CD

0

12,229

12,229

Minor Closure

2LT ALFRED SHARFF USARC

5

0

5

NRC CENTRAL POINT

0

0

0

SGT JEROME SEARS USARC

4

0

4

9

12,229

12,238

1988
1991
1993
1995

CRS-34

Sum of
Excessed

4

Oregon
Total
Pennsylvania

Acres Remaining
to be Disposed

JOE A. SMALLEY USARC

Oklahoma
Total
Oregon

Acres
Disposed

Major Closure

PHILADELPHIA - NH

49

0

49

Minor Closure

TACONY WAREHOUSE

14

0

14

Major Closure

PHILADELPHIA - NS

910

0

910

WARMINSTER - NAWC

757

0

757

Major Closure

DSC PHILADELPHIA

86

0

86

Minor Closure

ALTOONA - NRC

6

0

6

- Select One -

CHARLES KELLY SUPPORT FACILITY

31

0

31

State

BRAC Year

2005

Closure or
Realignment

Installation Name

Major Realignment

LETTERKENNY AD

Minor Closure

Sum of
Excessed

212

1,129

FORT INDIANTOWN GAP

0

0

0

ORELAND - NAWC-AD (OWTC)

14

0

14

Minor Realignment

PHILADELPHIA - NSY

270

0

270

Major Closure

WILLOW GROVE - NASJRB

32

1,067

1,099

Minor Closure

1LT RAY S. MUSSELMAN MEMORIAL
USARC

3

0

3

BLOOMSBURG USARC

2

0

2

145

0

145

CORAOPOLIS USARC

0

0

0

GERMANTOWN MEMORIAL USARC

5

0

5

HORSHAM MEMORIAL USARC

7

0

7

JAMES W. REESE USARC

5

0

5

LEWISBURG USARC

10

0

10

LYCOMING MEMORIAL USARC/OMS

7

0

7

NORTH PENN USARC

0

19

19

PHILADELPHIA MEMORIAL AFRC

10

0

10

READING - NMCRC

7

0

7

SERRENTI USARC / OMS

2

0

2

USARC WILKES-BARRE (AMSA 32G)

4

0

4

WILSON-KRAMER USARC / OMS

4

0

4

3,298

1,298

4,596

7,891

814

8,705

7

0

7

Pennsylvania Total

CRS-35

Acres Remaining
to be Disposed

917

CHARLES KELLY SUPPORT FACILITY

Puerto Rico

Acres
Disposed

1995

Major Closure

ROOSEVELT ROADS - NS

2005

Minor Closure

1LT PAUL LAVERGNE USARC

State

BRAC Year

Closure or
Realignment

Installation Name

Puerto Rico
Total
Rhode Island

CRS-36

7,898

814

8,712

DAVISVILLE - NCBC

753

163

916

1993

Minor Closure

NEWPORT NETC

0

0

0

2005

Minor Closure

PT LLOYD S. COOPER III USARC

5

0

5

USARC BRISTOL, RI

5

0

5

USARC, CPT JONATHAN
HARWOOD

3

0

3

NEWPORT NS

0

222

222

767

385

1,152

3,933

0

3,933

1991

Major Closure

MYRTLE BEACH

1993

Major Closure

CHARLESTON - NS

0

0

0

CHARLESTON - NSY

1,373

0

1,373

CHARLESTON - REDCOM 7

0

0

0

1995

Minor Closure

CHARLESTON - FISC

0

0

0

2005

Minor Closure

ROCK HILL MEMORIAL USARC

0

0

0

5,306

0

5,306

South Carolina Total

Tennessee
Total

Sum of
Excessed

Major Closure

Rhode Island Total

Tennessee

Acres Remaining
to be Disposed

1991

Minor Realignment
South Carolina

Acres
Disposed

1993

Major Realignment

MEMPHIS - NAS

1,865

0

1,865

Minor Closure

MEMPHIS - NRC

0

0

0

1995

Major Closure

DDMT MEMPHIS

608

34

642

2005

Minor Closure

CLARKSVILLE USARC

0

0

0

GUERRY USARC

0

0

0

USARC CHATTANOOGA

0

0

0

2,472

34

2,507

Closure or
Realignment

State

BRAC Year

Installation Name

Texas

1988

Minor Closure

GALVESTON - NS

1991

Major Closure

1995

2005

CRS-37

Acres Remaining
to be Disposed

Sum of
Excessed

9

0

9

BERGSTROM

333

0

333

CARSWELL

492

0

492

3,388

0

3,388

CHASE FIELD - NAS
1993

Acres
Disposed

Major Closure

DALLAS - NAS

65

0

65

Minor Closure

ABILENE - NMRC

0

0

0

Major Closure

REESE

2,987

0

2,987

Major Realignment

KELLY

1,907

0

1,907

RED RIVER ARMY DEPOT

737

60

797

BROOKS AIR FORCE BASE

0

0

0

INGLESIDE NS

155

0

155

LONE STAR AAP

14,292

1,297

15,589

Major Realignment

RED RIVER AD

3,189

646

3,835

Minor Closure

ALICE USARC

4

0

4

BENAVIDEZ USARC

0

0

0

GRIMES MEMORIAL USARC

9

0

9

HANBY-HAYDEN USARC

0

0

0

HOUSTON USARC #2

6

0

6

HOUSTON USARC #3

6

0

6

JULES E. MUCHERT USARC

5

0

5

LUBBOCK NMCRC

0

0

0

LUFKIN USARC

0

0

0

MARSHALL USARC

4

0

4

MILLER USARC

0

0

0

Major Closure

State

BRAC Year

Closure or
Realignment

Installation Name

CRS-38

Sum of
Excessed

14

0

14

RATHJEN USARC

0

0

0

Round Rock USARC

0

0

0

SAN MARCOS USARC

0

0

0

SEGURA USARC

0

0

0

THARP MEM USARC

4

0

4

USARC PASADENA TEXAS

0

0

0

USARC SAN ANTONIO (BOSWELL)

9

0

9

USARC SAN ANTONIO
(CALLAGHAN)

5

0

5

USARC TYLER

0

0

0

USARC, WILLIAM HERZOG
MEMORIAL

6

0

6

WATTS-GUILLOT USARC

7

0

7

WICHITA FALLS USARC

3

0

3

27,634

2,002

29,636

51

0

51

1,662

0

1,662

1988

Minor Closure

FORT DOUGLAS

1993

Major Realignment

TOOELE ARMY DEPOT

Minor Closure

OGDEN UT NAVRESCEN

0

0

0

1995

Major Closure

USARC OGDEN DEPOT

1,086

0

1,086

2005

Major Closure

DESERET CD

0

0

0

2,799

0

2,799

AMSA 160 RUTLAND

0

0

0

Berlin USARC

0

0

0

CHESTER USARC

3

0

3

Utah Total
Vermont

Acres Remaining
to be Disposed

NRC Orange

Texas Total
Utah

Acres
Disposed

2005

Minor Closure

State

BRAC Year

Closure or
Realignment

Installation Name
COURCELLE BROTHERS USARC

1988

Minor Closure

5

8

0

8

Cameron Station

163

0

163

DEFENSE MAPPING AGENCY HERNDON

12

0

12

1991

Minor Closure

ARL-WOODBRIDGE

579

0

579

1993

Major Closure

VINT HILL FARMS STATION

696

0

696

Minor Closure

DRIVER - NRTF

600

0

600

1

0

1

1995

Major Closure

FORT PICKETT

2,873

0

2,873

2005

Major Closure

FORT MONROE

74

183

257

Minor Realignment

ALEXANDRIA NRC

0

0

0

4,998

183

5,181

Virginia
Total

CRS-39

Sum of
Excessed

0

STAUNTON - NRC

Washington

Acres Remaining
to be Disposed

5

Vermont
Total
Virginia

Acres
Disposed

1991

Major Closure

PUGET SOUND NS

156

0

156

1995

Minor Closure

CAMP BONNEVILLE

3,013

0

3,013

2005

Minor Closure

1LT RICHARD H. WALKER USARC

10

0

10

FOUR LAKES CS

63

0

63

FT LAWTON USAR COMPLEX

8

34

42

OSWALD USARC

3

0

3

PFC DANIEL L. WAGENAAR USARC

7

0

7

PFC JOE E. MANN USARC.AMSA 80

7

0

7

TACOMA - NMCRC

9

0

9

State

BRAC Year

Closure or
Realignment

Installation Name
VANCOUVER BARRACKS
AFRC/AMSA 82

2005

Minor Closure

0

3,276

34

3,310

1LT HARRY B. COLBORN USARC

4

0

4

MOUNDSVILLE - NMCRC

0

0

0

USARC ELKINS

4

0

4

USARC RIPLEY

5

0

5

USARC, MAJ LESLIE BIAS

5

0

5

18

0

18

1

0

1

102

0

102

LA CROSSE - NRC

0

0

0

MADISON - NMCRC

0

0

0

O'CONNELL USARC

0

0

0

OLSON USARC

4

0

4

107

0

107

0

0

0

0

0

0

315,025

72,683

387,708

1995

Minor Closure

SHEBOYGAN - NRC

2005

Minor Closure

GENERAL MITCHELL AIR FORCE
BASE

Wisconsin
Total
Wyoming

2005

Minor Closure

AVIATION SPT FAC, CHEYENNE

Wyoming
Total
Grand Total
Source: FY2017 data provided to CRS by the DOD Office of Economic Adjustment (OEA), May 2017.

CRS-40

Sum of
Excessed

0

West Virginia Total
Wisconsin

Acres Remaining
to be Disposed

0

Washington
Total
West Virginia

Acres
Disposed

BRAC

Author Contact Information
Christopher T. Mann
Analyst in Defense Policy and Trade
#redacted#@crs.loc.gov
, 7-....

Acknowledgments
This report would not have been possible without the generous contributions and continuing support of Dan
Else, who retired from CRS in 2018.

Congressional Research Service

R45705 · VERSION 2 · NEW

41

EveryCRSReport.com
The Congressional Research Service (CRS) is a federal legislative branch agency, housed inside the
Library of Congress, charged with providing the United States Congress non-partisan advice on
issues that may come before Congress.
EveryCRSReport.com republishes CRS reports that are available to all Congressional staff. The
reports are not classified, and Members of Congress routinely make individual reports available to
the public.
Prior to our republication, we redacted phone numbers and email addresses of analysts who
produced the reports. We also added this page to the report. We have not intentionally made any
other changes to any report published on EveryCRSReport.com.
CRS reports, as a work of the United States government, are not subject to copyright protection in
the United States. Any CRS report may be reproduced and distributed in its entirety without
permission from CRS. However, as a CRS report may include copyrighted images or material from a
third party, you may need to obtain permission of the copyright holder if you wish to copy or
otherwise use copyrighted material.
Information in a CRS report should not be relied upon for purposes other than public
understanding of information that has been provided by CRS to members of Congress in
connection with CRS' institutional role.
EveryCRSReport.com is not a government website and is not affiliated with CRS. We do not claim
copyright on any CRS report we have republished.

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/crs%3AR45705. Public record. Not legal advice.