Proposals to Amend RCRA: Analysis
of Pending Legislation Applicable to the
Management of Coal Combustion Residuals
name redacted
Analyst in Environmental Policy
June 19, 2012

Congressional Research Service
7-....
www.crs.gov
R42570

CRS Report for Congress
Prepared for Members and Committees of Congress

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Summary
On April 24, 2012, the House and Senate began the conference process to reconcile legislation
passed in both houses that would extend authorization for Department of Transportation
programs. Title V in the House-passed legislation (H.R. 4348), Highway and Infrastructure Safety
Through the Protection of Coal Combustion Residual Recycling, would amend the Resource
Conservation and Recovery Act (RCRA) to add Section 4011. Largely identical to the Coal
Residuals Reuse and Management Act passed in the House (H.R. 2273) and introduced in the
Senate (S. 1751), the proposed Section 4011 would create a state-based permit program for the
management and disposal of coal combustion residuals (CCRs, also known as coal ash).

Concern over CCR Management
CCRs are the inorganic materials that remain after pulverized coal is burned for power
production. Generally, more than 100 million tons of CCRs are generated annually in the United
States, the majority of which is accumulated in landfills or surface impoundment ponds at
individual power plants. The Environmental Protection Agency (EPA) has determined that
accumulation in unlined units, particularly surface impoundments, poses a substantial risk of
contaminant leaching (particularly selenium and arsenic) to surface and groundwater. EPA found
that use of a composite liner largely eliminated that risk. While new units are likely to be built
with liners, EPA has determined that the majority in use today are older and unlikely to have
liners.

Administration and Congressional Proposals to Manage CCRs
CCR management is regulated by individual states, which EPA has found to be inconsistent in its
requirements for protective measures (e.g., liners and groundwater monitoring systems).
Concerns regarding the risks of improper management and inconsistent state regulations led EPA
to propose national standards for CCR disposal. In June 2010, EPA released for public comment
two regulatory options—one proposed under its existing authority to regulate hazardous wastes,
under Subtitle C of RCRA, the other under its authority to promulgate standards applicable to
“sanitary landfills,” under Subtitle D of RCRA. EPA is authorized to enforce its proposed Subtitle
C standards, but could only encourage states to adopt and enforce the Subtitle D standards.
In contrast to EPA’s proposals, the proposed amendment to RCRA would create a state-based
permit program for the management and disposal of CCRs. Established entirely in statute,
Congress would create a program unique among environmental laws. That is, the permit program
would be created with no directive to EPA to promulgate regulations applicable to the program or
to CCR landfills and surface impoundments. Instead, existing regulations applicable to municipal
solid waste (MSW) landfills and elements of EPA’s June 2010 proposal would apply to the
program.
Stakeholders in favor of the legislative approach include industry groups concerned that
implementing EPA’s Subtitle C option would stigmatize CCRs by labeling the materials
“hazardous waste,” potentially reducing markets for reuse and recycling (e.g., as a component in
concrete or roadbed materials). States support this approach, as it would allow them to regulate
CCRs as they deem necessary. Stakeholders opposed to this approach argue that the flexibility
allowed to states in deciding whether or when facilities may be required to obtain a permit, as

Congressional Research Service

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

well as the proposed amendment’s lack of federally enforceable standards applicable to CCR
landfills and surface impoundments, would likely result in few changes to current state programs.

Scope and Purpose of This Report
This report provides background to understand the legislative proposals to amend Subtitle D of
RCRA and identifies potential challenges to implementing the proposed permit program.
Considering their influence on program implementation, the report discusses the regulatory
standards on which the permit program would be based. In particular, it summarizes EPA’s
existing (MSW) and proposed (CCR) standards relevant to the proposed CCR permit program.
This report also summarizes provisions in the proposed Section 4011 of RCRA; identifies
potential challenges to implementing a statutory permit program; and compares regulations
applicable to MSW landfills to comparable elements of the proposed CCR permit program.

Congressional Research Service

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Contents
Introduction...................................................................................................................................... 1
Background...................................................................................................................................... 3
The Nature of CCRs and Concern over CCR Management ...................................................... 4
EPA Action After the Kingston Release .................................................................................... 5
Existing State and Federal Authorities to Manage CCRs .......................................................... 7
EPA Requirements Relevant to the Proposed Legislation ............................................................... 8
Existing Municipal Solid Waste Management Requirements ................................................... 8
MSW Landfill Criteria ........................................................................................................ 9
State MSW Permit Program Requirements....................................................................... 10
Proposed Standards Applicable to CCR Landfills and Surface Impoundments ...................... 11
Legislative Proposal to Amend RCRA .......................................................................................... 13
Summary of Proposed Amendment to Subtitle D.................................................................... 13
A Statutory Versus a Regulatory Permit Program ................................................................... 14
“Permit Program Specifications” Compared to MSW Landfill Criteria ........................... 16
A CCR Permit Program Compared to an MSW Permit Program...................................... 19
Conclusion ..................................................................................................................................... 21

Tables
Table A-1. Comparison of Waste Disposal Unit Criteria............................................................... 23
Table B-1. Comparison of the MSW and CCR Permit Programs.................................................. 31

Appendixes
Appendix A. Comparison of Existing and Proposed Disposal Facility Criteria............................ 22
Appendix B. An “Adequate” MSW Permit Program Compared to the Proposed CCR
Permit Program........................................................................................................................... 30

Contacts
Author Contact Information........................................................................................................... 36

Congressional Research Service

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Introduction
Coal combustion residuals (CCRs) are the inorganic material that remains after pulverized coal is
burned.1 To establish consistent national standards to address potential threats to human health
and the environment associated with improper management of CCRs destined for disposal, on
June 21, 2010, the Environmental Protection Agency (EPA) proposed for public comment two
regulatory options applicable to the material.2
Under the first proposal, EPA would reverse previous regulatory determinations to exempt CCRs
from regulation as a hazardous waste and list the material as a “special waste” pursuant to its
authorities under Subtitle C of the Resource Conservation and Recovery Act (RCRA; 42 U.S.C.
§6901 et seq.).3 Under Subtitle C, EPA has broad authority to regulate wastes it identifies as
“hazardous,” from its generation to its ultimate disposal (i.e., from “cradle to grave”). Under its
Subtitle C option, EPA would require CCRs destined for disposal in a landfill or surface
impoundment to be managed in accordance with requirements or standards applicable to
hazardous waste generators; owners and operators of hazardous waste treatment, storage, and
disposal facilities (TSDF); and TSDF permit programs. The Subtitle C option would create
federal standards enforceable by EPA, but likely adopted and implemented (and ultimately
enforced) by individual states.
Under the second proposal, EPA would promulgate national standards applicable to landfills and
surface impoundments that receive CCRs, in accordance with its authority regarding the
management of non-hazardous solid waste under Subtitle D of RCRA. If this option were
selected, the standards would be similar to those applicable to municipal solid waste (MSW)
landfills, but would take into consideration issues specific to the management of CCRs,
particularly controls necessary to address the accumulation of liquid wastes in surface
impoundments. In contrast to its Subtitle C option, EPA has no authority to enforce the standards
it proposes under the Subtitle D option. EPA is authorized to promulgate federally enforceable
waste management criteria only for MSW landfills and no other facilities that may receive nonhazardous solid wastes. Instead, EPA could finalize the proposed Subtitle D standards, but they
would be enforced by states that choose to adopt and apply them to owners and operators of CCR
landfills and surface impoundments.
EPA’s proposal drew comments from industry groups, environmental and citizen groups, state
agency representatives, individual citizens, and some Members of Congress. Concerns over the
Subtitle C proposal relate to its ultimate impact in terms of implementation costs to both industry
1

The substance is also commonly referred to as coal combustion waste, byproduct, or material. How it is referred to
generally depends on the context in which it is being discussed. For example, coal combustion waste is generally
destined for disposal, while coal combustion byproducts are likely destined for some use such as a component in
gypsum wallboard or cement. Regardless of what it is called, these terms refer to the same substance—coal ash (when
referred to broadly) or fly ash, bottom ash, boiler slag, and flue gas desulfurization materials (when referred to with
specific regard to its origin in a coal-fired power plant). This report will generally refer to the substance as coal
combustion residuals (CCRs) since that term is used in the administrative and legislative proposals discussed in this
report. As used by EPA, CCRs are materials destined for disposal. Under the legislative proposals, the term refers
broadly to the residuals, but not their destination (e.g., disposal or recycling).
2
U.S. EPA, “Hazardous and Solid Waste Management System; Identification and Listing of Special Wastes; Disposal
of Coal Combustion Residuals From Electric Utilities,” 75 Federal Register 35127-35264, June 21, 2010.
3
RCRA amended the Solid Waste Disposal Act of 1965. However, RCRA’s amendments were so comprehensive that
the act is commonly referred to as RCRA rather than by its official title, the Solid Waste Disposal Act.

Congressional Research Service

1

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

and states, energy prices, and CCR recycling opportunities. With regard to the Subtitle D
proposal, the primary concerns stem from EPA’s lack of authority to enforce them. Given the
argument by many states that the material is being managed sufficiently under current state
regulatory programs, environmental and citizen groups have expressed doubts over the degree to
which all states would adopt them, resulting in the promulgation but not implementation of any
new requirements necessary to ensure protection of human health and the environment.
Commenters have proposed various legislative options in response to the varied concerns over
EPA’s proposed regulatory options. Possible legislative options that have been debated include an
explicit directive to EPA to regulate or prohibit CCR regulation under Subtitle C or Subtitle D.4
Another legislative option, the Coal Residuals Reuse and Management Act (H.R. 2273), was
passed by the House on October 14, 2011, and introduced in the Senate (S. 1751) on October 20,
2011. The proposal would amend Subtitle D of RCRA by adding Section 4011, Management and
Disposal of Coal Combustion Residuals. That amendment would create a coal combustion
residuals permit program, defined as “a permit program or other system of prior approval and
conditions that is adopted by or for a state for the management and disposal of coal combustion
residuals to the extent such activities occur in structures in such state.”
Legislative provisions largely identical to those in the Coal Residuals Reuse and Management Act
are included in legislation that would extend the authorization of federal funding for surface
transportation programs administered by the Department of Transportation (DOT). Specifically,
Title V of H.R. 4348 (passed in the House on April 18, 2012) includes language identical to H.R.
2273 and S. 1751. On April 24, 2012, the Senate agreed by unanimous consent to an amendment
that struck the House-passed language from H.R. 4348 and substituted the language of the
Senate-passed bill to reauthorize DOT programs (S. 1813, the Moving Ahead for Progress in the
21st Century Act, or MAP-21). The Senate subsequently asked for a conference and appointed
conferees. As a result, provisions of the proposed Coal Residuals Reuse and Management Act are
being debated in the conference over the transportation reauthorization legislation.
This report provides background information concerning the provisions in the proposed Section
4011 of RCRA in H.R. 2273, S. 1751, and Title V of H.R. 4348. In particular, it identifies issues
associated with potential state adoption and implementation of the proposed CCR permit
program. Unique to the proposal would be the creation of a permit program in federal statute,
absent the promulgation of related federally enforceable standards. Requirements applicable to
the program’s adoption and implementation would be those created within the amendment to
RCRA. It would not authorize the agency with jurisdiction over RCRA’s implementation (EPA)
to promulgate regulations detailing permit program requirements or regulations applicable to
facilities that may be expected to obtain a permit pursuant to the program. Instead, requirements
applicable to the proposed statutory CCR permit program would draw upon selected existing
regulations promulgated pursuant to Subtitle D applicable to the management of municipal solid
waste (MSW). It would also draw from selected elements of EPA’s June 2010 Subtitle D proposal
to regulate CCR landfills and surface impoundments.
Considering their influence on the potential adoption and implementation of a CCR permit
program, this report identifies relevant elements of proposed and existing regulatory requirements
under Subtitle D. In particular, the report distinguishes between EPA and state agency authorities
4

Such an approach can be found in H.R. 1391, the Recycling Coal Combustion Residuals Accessibility Act of 2011,
and H.R. 1405.

Congressional Research Service

2

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

in regulating nonhazardous solid wastes under Subtitle D, including EPA’s role in developing and
individual state roles in enforcing those requirements. The report also summarizes selected MSW
landfill regulations and standards proposed by EPA in June 2010 under Subtitle D. Finally, with
regard to the legislative proposals that would amend Subtitle D, the report summarizes provisions
in the proposed Section 4011 of RCRA; identifies potential issues associated with implementing a
statutory permit program; and compares details of the regulatory requirements applicable to
MSW landfills, on which the legislative proposal is based, to comparable elements of the
proposed CCR permit program.
As noted above, the focus of this report is the legislative proposal to amend Subtitle D of RCRA
and the CCR permit program that would be created pursuant to the proposed amendment.
Analysis specific to EPA’s June 2010 proposal and details regarding the options it proposed under
Subtitles C and D of RCRA are discussed separately in CRS Report R41341, EPA’s Proposal to
Regulate Coal Combustion Waste Disposal: Issues for Congress, by (name redacted).

Background
In 2010, 45% of the electricity generated in the United States used coal as its source of fuel.
Pulverized coal burned for electricity production generates a tremendous amount of residual
inorganic material. In 2010, industry estimates that as much as 130 million tons of CCRs were
generated, making it one of the largest waste streams in the United States.5
Disposal of CCRs on-site at individual power plants may involve decades-long accumulation of
waste—with hundreds of thousands, if not millions, of tons of dry ash (in a landfill) or wet ash
slurry (in a surface impoundment pond) deposited at the site. On December 22, 2008, national
attention was turned to risks associated with managing such large volumes of CCRs when a
breach in a surface impoundment pond at the Tennessee Valley Authority’s (TVA’s) Kingston, TN,
plant released 1.1 billion gallons of coal fly ash slurry, covering more than 300 acres, damaging
or destroying homes and property. TVA estimates that cleanup will continue into 2014 and will
cost $1.2 billion.6
The incident at Kingston, as well as smaller incidents that resulted from improper CCR
management, drew attention to the potential for a sudden, catastrophic release related to the
structural failure of a surface impoundment. However, EPA has determined that a more common
threat associated with CCR management is the leaching of contaminants likely present in the
waste, primarily heavy metals, resulting in surface or groundwater contamination. The Kingston
release also brought attention to the fact that the management of CCRs is essentially unregulated
at the federal level.

5

See the American Coal Ash Association’s “2010 Coal Combustion Product (CCP) Production & Use Survey Report”
at http://acaa.affiniscape.com/associations/8003/files/2010_CCP_Survey_FINAL_102011.pdf.
6
Tennessee Valley Authority, “Form 10-Q: Quarterly Report,” filed with the United States Securities and Exchange
Commission on May 4, 2012, for the period ending March 31, 2012, p. 19.

Congressional Research Service

3

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

The Nature of CCRs and Concern over CCR Management
CCRs are the inorganic residues that remain after pulverized coal is burned. The chemical
composition of CCRs generated at a given plant depends on the type and source of the coal
burned, as well as the combustion technology and air pollution control technology used at the
plant. In data maintained by EPA, the agency has identified more than 40 toxic constituents that
may be present in CCRs, including antimony, arsenic, barium, beryllium, cadmium, chromium,
lead, mercury, and selenium.7
The fact that toxic constituents are present in a waste does not in itself mean that it poses a risk to
humans or the environment. The degree to which there is actual risk depends on whether those
constituents can find a pathway of human exposure and whether the resulting level of exposure is
likely to be high enough to cause harm. Human exposure to contaminants has been demonstrated
through the direct discharge or release of liquid waste to surface water (accidentally, as in
Kingston, or on purpose, generally pursuant to the provisions of a permit, or as a result of
improper run-on/run-off control during rain/flood events) or through fugitive dust emissions
(when fine particulates associated with the dried ash become airborne). However, the most
common pathway of exposure has occurred through contaminant leaching when the waste was
deposited in an unlined landfill or surface impoundment.
In 1980, EPA was statutorily required to provide an analysis of both potential risks and actual
documented damages to human health and the environment from CCR disposal and use.8 Since
then, EPA has gathered and released data, analysis, and studies that have identified potential risks
and damages associated with CCR management. Most notably, in March 2000, EPA submitted a
draft “Regulatory Determination on Wastes from Fossil Fuel Combustion” to the White House
Office of Management and Budget (OMB). In it, EPA stated that CCRs warranted regulation as a
hazardous waste under Subtitle C of RCRA when CCRs were land disposed (e.g., disposed of in a
landfill or accumulated in a surface impoundment). Further, EPA stated that it was considering
developing national standards that would include a contingent hazardous waste listing of CCRs
under Subtitle C. That is, EPA would not classify CCRs as a hazardous waste contingent upon
CCR management in accordance with certain standards. However, when improperly managed
(such as through disposal or accumulation in an unlined landfill or surface impoundment), CCRs
would become a listed hazardous waste subject to tailored Subtitle C standards.
In its draft regulatory determination, EPA recognized that its March 2000 proposal was a
departure from its previous opinions regarding the management of CCRs. However, EPA stated
that its determination that CCRs warranted regulation as hazardous waste was based, in part, on
data from damage cases that showed the potential threat to human health and the environment
when the waste was managed in a way that lacked basic controls (e.g., disposal in units with no
liner or groundwater monitoring). Additionally, EPA cited new data that identified significant
risks for the waste to leach arsenic.
In May 2000, after review by OMB, EPA issued a revised regulatory determination stating that it
would continue to exclude CCRs from regulation as hazardous waste under Subtitle C.9 However,
similar to statements in its March 2000 draft proposal, EPA stated that it was convinced that
7

See EPA’s June 2010 proposal at 75 Federal Register 35138.
In accordance with 42 U.S.C. §6982(n)(3)-(4) and pursuant to directive under 42 U.S.C. §6921(b)(3)(A).
9
EPA Final Rule, 65 Federal Register 32230, May 22, 2000.
8

Congressional Research Service

4

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

national regulations under Subtitle D were warranted for CCR disposal in landfills and surface
impoundments because
•

the composition of the waste had the potential to present danger to human health
and the environment in certain circumstances;

•

EPA had identified proven cases of damages to human health and the
environment through improper waste management;

•

while industry management practices had improved measurably, there was
sufficient evidence the wastes were being managed in a significant number of
landfills and surface impoundments without proper controls in place, particularly
in the area of groundwater monitoring; and

•

while there had been substantive improvements in state regulatory programs,
EPA identified significant gaps either in states’ regulatory authorities or in their
exercise of existing authorities.

Further, citing its concern regarding the potential mismanagement and inconsistent state
regulation of CCRs, EPA stated that it would revise its determination if it found that a need for
regulation under Subtitle C was warranted.

EPA Action After the Kingston Release
In the wake of events at Kingston, after 10 years of additional study, debate, and controversy over
the appropriate method of regulating CCRs, EPA did propose to revise its May 2000
determination. On October 16, 2009, EPA again submitted a draft proposal to revise its regulatory
determination and list the material as hazardous waste under Subtitle C of RCRA.10 EPA sent the
draft to OMB’s Office of Information and Regulatory Affairs (OIRA). As in March 2000, EPA
proposed to draw on its existing authority to identify and list a waste as “hazardous” and regulate
it as such pursuant to Subtitle C of RCRA. In EPA’s reexamination of its 2000 regulatory
determination proposal, the following findings are among the most significant:
•

Revised risk assessment findings. EPA determined that there is a high risk of
human exposure to carcinogens, such as lead, selenium, and arsenic, when CCRs
are deposited into unlined landfills and surface impoundments. Higher risks were
observed for surface impoundments compared to landfills due to higher waste
leachate concentrations and the higher hydraulic pressure from impounded liquid
waste.11 The risk assessment showed that CCRs can be managed safely with the
use of composite liners, but called into question the reliability of clay liners,
especially in surface impoundments.12

10

EPA’s draft proposal submitted to OMB for review, as well as any notices, supporting documents, or comment on
the June 2010 proposal, is available through the “regulations.gov” website at http://www.regulations.gov under Docket
ID EPA-HQ-RCRA-2009-0640.
11
EPA, Office of Solid Waste and Emergency Response, Office of Resource Conservation and Recovery, Human and
Ecological Risk Assessment of Coal Combustion Wastes, draft updated April 2010.
12
A composite liner is a system consisting of two components—an upper component that consists of a flexible
membrane liner and a lower component that consists of at least a two-foot layer of compacted soil. It is defined more
specifically at 40 C.F.R. §258.40(b).

Congressional Research Service

5

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

•

Additional evidence of actual damages/contamination. EPA updated its list of
damages to include 27 cases of proven damages to surface and groundwater and
40 cases of potential damage associated with the improper management of
CCRs.13 In addition to impacts on human health from surface and groundwater
contamination, EPA’s damage cases document adverse effects to plants and
wildlife.

•

The threat of a catastrophic release. Recent damage cases, such as the
Kingston release and a similar, smaller incident in 2005 in Martins Creek, PA,14
were considered evidence that current management practices can pose additional
risks that EPA had not previously studied—that is, from catastrophic releases due
to the structural failure of surface impoundments.

•

Continued inconsistencies among state requirements. According to 2009
survey data, among responding states, 36% did not have minimum liner
requirements for landfills, 67% did not have liner requirements for surface
impoundments, 19% did not have minimum groundwater monitoring for
landfills, and 61% did not have minimum groundwater monitoring for surface
impoundments.15 EPA noted that the survey results are “particularly significant as
groundwater monitoring for these kinds of units is a minimum for any credible
regulatory regime.”16 Further, while the states seem to be regulating landfills to a
greater extent, given the significant risks associated with surface impoundments,
survey results suggest that there continue to be significant gaps in state regulatory
programs for the disposal of CCRs.17

•

The number of CCR units likely operating without protections EPA has
identified as necessary. While new CCR facilities are likely to be built with
liners and groundwater monitoring systems, the majority of facilities currently in
use are not new. For example, EPA determined that 75% of surface
impoundments in use today are more than 25 years old, with 10% being more
than 50 years old. Such units are unlikely to have a liner or groundwater
monitoring, and are more likely to leach contaminants. Further, in 2004, EPA
determined that 31% of the CCR landfills and 62% of the CCR surface
impoundments lacked liners, and 10% of the CCR landfills and 58% of the CCR
surface impoundments lacked groundwater monitoring.18 EPA estimated that with
an average life expectancy of approximately 31 years, those older disposal

13

Proven damage cases were those with documented maximum contaminant level (MCL, the highest level of a
contaminant that is allowed in drinking water under the Safe Drinking Water Act) exceedances “measured in
groundwater at a sufficient distance from the waste management unit to indicate that hazardous constituents had
migrated to the extent that they could cause human health concerns.” Potential damage cases were those with
documented MCL exceedances that were measured in groundwater beneath or close to the waste source. For more
information, see EPA’s June 2010 proposal at 75 Federal Register 35131 and 35153.
14
In this case, a dam failure resulted in the release of over 100 million gallons of coal ash and contaminated water into
the Oughoughton Creek and the Delaware River.
15
See findings discussed in EPA’s June 2010 proposal at 75 Federal Register 35152.
16
Ibid.
17
Summary results of the Association of State and Territorial Solid Waste Management Officials (ASTSWMO)
“Combustion by-products (CCB) Survey” are available through the “regulations.gov” website at
http://www.regulations.gov, under Docket ID EPA-HQ-RCRA-2009-0640.
18
See findings discussed in EPA’s June 2010 proposal at 75 Federal Register 35151.

Congressional Research Service

6

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

facilities would likely continue to operate without necessary protections in place
well into the future.
After OMB’s review, EPA’s draft proposal underwent substantial changes. Its final proposal was
published on June 21, 2010. In that proposal, EPA stated that the decision to revise the May 2000
regulatory determination had not yet been made, and proposed an additional regulatory option for
consideration. That second regulatory option would continue to exclude CCRs from regulation as
hazardous waste under Subtitle C, and establish national criteria applicable to landfills and
surface impoundments under RCRA’s Subtitle D nonhazardous solid waste requirements. The
primary reason EPA cited for including the option to regulate CCRs under Subtitle D’s solid
waste requirements was industry’s argument that the “hazardous waste” label would stigmatize
beneficial uses of the material and ultimately increase the amount that must be disposed.

Existing State and Federal Authorities to Manage CCRs
In the wake of EPA’s June 2010 proposal to regulate the management of CCRs, debate over the
regulatory option EPA should select has focused on existing state and federal authorities under
RCRA to implement or enforce either option. Broadly, EPA currently has the authority to
implement and directly enforce its Subtitle C option, but could only encourage states to
implement and enforce its Subtitle D option. Under both regulatory options, owners and operators
of CCR landfills and surface impoundments would be required to implement protective measures
that are largely similar (e.g., under both options facilities would be required to install composite
liners and groundwater monitoring). A significant difference between the two options would be in
EPA’s authority to enforce the standards directly or to require states to enforce them, summarized
as follows:
•

Under the Subtitle C option—individual facility compliance with the
regulations must be demonstrated in accordance with a federal or EPA-authorized
state permit program. EPA would have direct enforcement authority with regard
to waste management requirements, including those applicable to CCR
generators, transporters, and treatment, storage, and disposal facilities, and
mechanisms for corrective action and financial responsibility. Before the rules
would become effective, states authorized to implement Subtitle C programs
would need to adopt the rule, a process that could take several years.

•

Under the Subtitle D option—individual regulated facilities (e.g., power plants
that dispose of/accumulate CCRs on-site) would be required to implement the
standards within approximately six months of promulgation. EPA would have no
direct enforcement authority to ensure facility compliance or to require states to
adopt a permit program to ensure facility compliance. Instead, the standards
could be enforced by states or citizens, pursuant to RCRA citizen suit authority.
EPA could not require states to enforce the standards, but would encourage them
to do so.

EPA’s Subtitle D approach to regulating CCR disposal facilities is generally supported by state
regulatory agencies and industry groups. Included among their arguments in favor of this
approach are: there is not enough evidence that the material poses a significant threat to human
health or the environment to warrant regulation as hazardous waste; regulating it as hazardous
would be unnecessarily costly and burdensome to both industry and state regulators; and current
state regulation of CCRs is sufficiently protective of human health and the environment. Also,
industry groups argue that labeling the material as “hazardous” or regulating it under Subtitle C

Congressional Research Service

7

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

requirements would stigmatize the material, thus limiting potential options for reuse and
ultimately increasing the amount of waste sent for disposal.
Environmental and citizen groups opposed to the Subtitle D approach have argued, in part, that
EPA’s recent waste characterization studies have sufficiently demonstrated the toxicity of CCRs.
Further, given EPA’s lack of authority to enforce it, a Subtitle D approach would not address
issues identified in EPA’s risk and damage case assessments. In particular, under the Subtitle D
option, CCRs would likely continue to be managed in accordance with inconsistently applied
state requirements. Additionally, it has been argued that reliance on citizen suits to enforce EPA’s
Subtitle D standards would be burdensome on the public and an unreliable method of
implementing national disposal standards. Finally, under the Subtitle D proposal, EPA would have
no authority to require financial assurance to insure cleanup if contamination is discovered.

EPA Requirements Relevant to the
Proposed Legislation
The proposed CCR permit program would draw from certain waste management standards
promulgated or proposed by EPA pursuant to Subtitle D: specifically, existing regulatory
standards applicable to the management of municipal solid waste (MSW) and selected proposed
standards applicable to CCR landfills and surface impoundments. To understand the provisions in
the proposed amendment to RCRA, it is useful to understand the requirements from which the
legislative proposal would be drawn.

Existing Municipal Solid Waste Management Requirements
Under Subtitle D, states have the primary authority to implement and enforce standards
applicable to facilities that receive nonhazardous solid waste for disposal. However, for a narrow
category of waste, EPA has limited authority to promulgate and ensure state enforcement of
Subtitle D standards. That authority derives from directives included under Section 4005 of
RCRA that required19
1. EPA to promulgate regulatory criteria applicable to facilities that receive MSW;20
2. states to adopt and implement a permit program to ensure facility compliance
with the MSW criteria;21
3. EPA to determine the adequacy of each state MSW permit program; and22

19
The Hazardous and Solid Waste Amendments of 1984 (HSWA; P.L. 98-616) amended Subtitle D §4005,
“Upgrading of Open Dumps,” by adding EPA and state requirements for the “Control of Hazardous Disposal” (42
U.S.C. §6945(c)), and added §4010, “Adequacy of Certain Guidelines and Criteria” (42 U.S.C. §6949a).
20
42 U.S.C. §6949a(c)(1). More specifically, the criteria were to apply to “solid waste management facilities that may
receive hazardous household waste”; the term “municipal solid waste landfill” was subsequently used in implementing
regulations.
21
42 U.S.C. §6945(c)(1)(B).
22
42 U.S.C. §6945(c)(1)(C).

Congressional Research Service

8

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

4. EPA to enforce its MSW criteria in states determined to have an inadequate MSW
permit program.23
As a result of these directives, EPA promulgated two separate but related federal standards:
•

“Criteria for Municipal Solid Waste Landfills” in 40 C.F.R. Part 258, applicable
to owners and operators of MSW landfills; and

•

“Requirements for State Permit Program Determination of Adequacy” in 40
C.F.R. Part 239, applicable to states, to ensure facility compliance with the MSW
landfills criteria.

MSW Landfill Criteria
Under Section 4010 of RCRA, Congress specified a legal standard of protection that EPA was
required to meet in promulgating the MSW landfill criteria—that criteria be “those necessary to
protect human health and the environment and may take into account the practicable capability of
such facilities.” At a minimum, they were to include criteria for groundwater monitoring,
necessary to detect contamination; criteria for the acceptable location of new or existing facilities;
and corrective action provisions, as appropriate.24 EPA’s resulting criteria for MSW landfills
include detailed, national technical standards under the following Subparts of 40 C.F.R. Part 258:
•

Location Restrictions,

•

Operating Criteria,

•

Design Criteria,

•

Groundwater Monitoring and Corrective Action Requirements,

•

Closure/Post-Closure Care, and

•

Financial Assurance Criteria.

Required elements of each Subpart are listed in Table A-1 in Appendix A.
The regulations define a “municipal solid waste landfill,” in part, as a discrete area of land or an
excavation that receives household waste, and that is not a land application unit, surface
impoundment, injection well, or waste pile.25 In accordance with this definition, facilities
regulated under these criteria receive predominantly dry wastes. That is, the MSW landfill criteria
are not intended to establish standards applicable to facilities that accumulate liquid wastes (i.e.,
surface impoundments).
MSW landfill units failing to satisfy MSW landfill criteria constitute “open dumps,” prohibited
under Section 4005 of RCRA. However, in contrast to EPA’s limited authority to enforce that
prohibition (i.e., to enforce standards applicable to sanitary landfills in 40 C.F.R. Part 257 that are
enforceable largely by states), EPA was authorized to enforce its MSW landfill criteria in states
that did not have an approved permit program (described below).
23

42 U.S.C. §6945(c)(2).
42 U.S.C. §6949a(c)(1), as well as EPA authority to promulgate regulations as necessary to carry out its functions
under RCRA (42 U.S.C. §6912(c)(1).
25
40 C.F.R. §258.2.
24

Congressional Research Service

9

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

State MSW Permit Program Requirements
Within 18 months of EPA promulgating the MSW criteria, each state was required to adopt and
implement a permit program or “other system or prior approval and conditions” to assure that
each solid waste management facility within the state that may receive MSW will comply with
the MSW landfill criteria.26 As defined in EPA’s regulations, a state solid waste permit program
refers to all the authorities, activities, and procedures that comprise the state’s system of prior
approval and conditions for regulating all solid waste disposal facilities subject to the MSW
landfill criteria in 40 C.F.R. Part 258. The “permit program” itself represents the body of
requirements and procedures that a state must have in place in order to adequately demonstrate to
EPA that it will apply the MSW landfill criteria to the owners and operators of those facilities and
ensure enforcement of facility compliance. EPA requirements in 40 C.F.R. Part 239 applicable to
its MSW permit program adequacy determination include
•

Required components of a permit program application. Details the
information that must be included in a state’s permit application, including a
narrative description and legal certification of the program.

•

State requirements necessary to demonstrate the adequacy of permit programs.
Details the state laws/procedures that must be in place to assure facility
compliance with applicable MSW landfill criteria, including appropriate state
compliance monitoring and enforcement authorities and procedures applicable to
state intervention in civil enforcement proceedings.

•

EPA procedures for making its adequacy determination. Specifies procedures
and deadlines that EPA will adhere to in determining the adequacy of a state
MSW permit program, including criteria under which EPA may withdraw its
determination that a state has an adequate permit program.

Individual requirements applicable to EPA’s determination of state permit program adequacy,
particularly as they may be compared to legislative proposals to amend Subtitle D of RCRA, are
summarized in Table B-1 in Appendix B.
In states determined to have an inadequate permit program or that fail to maintain an adequate
program, EPA is allowed to exercise its authorities regarding facility inspection and federal
enforcement as necessary to enforce applicable MSW landfill criteria. That is, the MSW landfill
criteria are federally enforceable, directly by EPA, insofar as it is authorized to enforce the
standards at facilities in states that it determines do not have an adequate permit program. Once a
permit program is approved by EPA, a state is responsible for enforcing the federal MSW landfill
standards and issuing permits to individual owners and operators of MSW landfills. The permit
itself provides documentation to demonstrate the facility’s compliance with the federal and any
state (if applicable) MSW landfill criteria.
The manner in which the MSW regulations must be adopted, implemented, and enforced by states
illustrates the limitations to EPA’s authority under Subtitle D to require states to adopt,
implement, and enforce federal standards applicable to wastes other than MSW. That is, EPA was
explicitly authorized in RCRA to develop criteria applicable to facilities that receive “hazardous
household waste” (i.e., MSW), and to determine the adequacy of state permit programs intended
26

42 U.S.C. §6945(c)(1)(B).

Congressional Research Service

10

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

to ensure facility compliance with those criteria. Beyond its authority to regulate MSW, for any
other type of nonhazardous solid waste (such as CCRs), EPA may only expand upon requirements
applicable to the state-enforced prohibition of open dumping. Further, EPA has no authority to
require or approve/disapprove of state solid waste permit programs applicable to facilities
receiving any other type of solid waste regulated under Subtitle D.

Proposed Standards Applicable to CCR Landfills and
Surface Impoundments
In its June 2010 proposal, EPA would promulgate the Subtitle D standards pursuant to its existing
authority to promulgate regulations specifying criteria applicable to sanitary landfills.27 Pursuant
to Section 4004 of RCRA, the criteria would be those necessary to ensure that ‘‘no reasonable
probability of adverse effects on health or the environment’’ will result from disposal facilities or
practices.28 The proposal would amend existing Criteria for Classification of Solid Waste
Disposal Facilities and Practices in 40 C.F.R. Part 257 to add “Standards for the Receipt of Coal
Combustion Residuals in Landfills and Surface Impoundments.” The standards would apply to
owners and operators of CCR landfills and surface impoundments, defined as:
•

CCR landfill—a disposal facility or part of a facility where CCRs are placed in or
on land and which is not a land treatment facility, a surface impoundment, an
underground injection well, a salt dome formation, a salt bed formation, an
underground mine, a cave, or a corrective action management unit. Landfills also
include piles, sand and gravel pits, quarries, and/or large-scale fill operations.
Sites that are excavated so that more coal ash can be used as fill are also
considered CCR landfills.

•

CCR surface impoundment—a facility or part of a facility that is a natural
topographic depression, man-made excavation, or diked area formed primarily of
earthen materials (although it may be lined with man-made materials), which is
designed to hold an accumulation of CCRs containing free liquids, and which is
not an injection well (e.g., holding, storage, settling, and aeration pits, ponds, and
lagoons). Such units are used to receive CCRs that have been sluiced (flushed or
mixed with water to facilitate movement), or wastes from wet air pollution
control devices, often in addition to other solid wastes.

Although included under the Part 257 standards applicable to sanitary landfills, EPA’s regulatory
proposal more closely resembles its criteria applicable to MSW landfills in 40 C.F.R. Part 258.
For example, similar to the MSW landfill criteria, it would specify location restrictions, operating
and design criteria, groundwater monitoring, and corrective action requirements. However, when
compared to the MSW landfill criteria, the significant difference in the proposed CCR standards
relates to requirements EPA has identified as those necessary to ensure protection from CCR
disposal, particularly the disposal of liquids (prohibited in MSW landfills). For example,
requirements intended to address conditions or issues unique to disposal facilities that receive
CCRs include the following:
27

Under RCRA Sections 4004 (42 U.S.C. §6944), directive to EPA to promulgate sanitary landfill criteria, and 2002
(42 U.S.C. §6912), EPA authority to review and, as necessary, revise regulation promulgated pursuant to its existing
authority under RCRA.
28
42 U.S.C. §6944(a).

Congressional Research Service

11

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

•

New disposal facilities (landfills and surface impoundments) would be required
to be placed above the natural water table and could not be located in wetlands,
within 200 feet of a fault zone, or in a seismic impact zone.

•

New or existing disposal facilities could not be located in an unstable area (e.g., a
location susceptible to natural or human-induced events or forces capable of
impairing the integrity of the unit). Existing facilities in an unstable area would
be subject to closure.

•

New disposal facilities would be required to be constructed with a composite
liner. Within five years, existing surface impoundments would be required to
have solids removed and be retrofitted with a composite liner.

•

To insure structural integrity, surface impoundments would be required to operate
in accordance with regulations similar to those promulgated under the Mine
Safety and Health Administration (MSHA) at 30 C.F.R. §77.216.

•

Facilities would be subject to fugitive dust controls and liquid run-off/run-on
control specific to CCR disposal facilities.

(Differences between the existing MSW landfill criteria and EPA’s proposed Subtitle D standards
can be seen in a comparison of both sets of standards, listed in Table A-1 in Appendix A.)
If implemented, CCR facilities that fail to satisfy the Subtitle D standards would be operating in
violation of RCRA’s prohibition of open dumping. EPA would have no authority to directly
enforce the requirements at individual facilitates. Under Subtitle D’s open dumping prohibition,
EPA could promulgate the criteria, but could only encourage states to adopt and apply them to
owners and operators of CCR disposal facilities. EPA would have no authority to require states to
enforce them. Further, EPA would have no authority to develop federal approval procedures for
state adoption of the criteria similar to its authority to determine the adequacy of a state MSW
permit program. However, states could develop their own regulations and/or permitting programs
using their solid waste laws or other state authorities.29
In its proposal, EPA notes that if states do not adopt the proposed CCR management standards,
facilities would still have to comply with the proposed Subtitle D criteria, if finalized. For that
reason, EPA has proposed its requirements in a way that would be self-implementing. That is,
facilities could implement them without interaction with state regulatory officials. Still, if
facilities choose not to self-implement the proposed criteria (particularly in a state that chooses
not to adopt them), there are limited enforcement mechanisms to require facilities to do so. EPA
argues that the requirement to make facility compliance information available to the public would
allow citizens to enforce the requirements, if a state chooses not to. However, the ability of
citizens to gather necessary information to move forward with a citizen suit could be complicated
if a facility does not disclose the specified information. Again, there are limited enforcement
options to compel a facility to produce that information. For example, in its proposal, EPA
requires owners and operators of CCR landfills and surface impoundments to make certain
facility records available to the public. However, absent state enforcement of those reporting
requirements, it is uncertain whether such records would be made readily available to the public.

29

See EPA’s discussions regarding the potential impact of a Subtitle D regulation on state programs in its June 2010
proposal at 75 Federal Register 35211.

Congressional Research Service

12

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Legislative Proposal to Amend RCRA
The legislative proposal to amend Subtitle D of RCRA would add a Section 4011, Management
and Disposal of Coal Combustion Residuals.30 Under that section, a permit program for the
management and disposal of CCRs would be created.

Summary of Proposed Amendment to Subtitle D
Under the proposed amendment to RCRA, states would have the option of adopting a CCR
permit program, and EPA would be required to implement the program in states that decline to do
so (EPA has stated that, if enacted, all states with coal-fired power plants would likely choose to
adopt the CCR permit program). Following are the key subsections of the proposed Section 4011
of RCRA:
•

“State Actions.” Within six months of enactment, states would be required to
notify EPA whether they intend to implement a CCR permit program. Within 36
months of enactment, states choosing to implement the program would be
required to submit a certification to EPA regarding their permit program (required
elements of that certification are similar to the required components of state
MSW permit program applications in 40 C.F.R. Part 239). To adopt or implement
the program, a state would be required to maintain an approved MSW landfill
permit program or be authorized to implement the federal hazardous waste
management program under Subtitle C of RCRA.

•

“Permit Program Specifications.” Instead of a directive to EPA to promulgate
criteria specific to owners and operators of CCR structures, states would be
directed to apply “Minimum Requirements” to their permit programs. Included
among those requirements are selected elements of EPA’s June 2010 proposal.
Primarily, however, the specifications would apply certain “revised criteria,”
defined essentially as the regulations in 40 C.F.R. Part 258, to a state permit
program. (For a list of criteria applicable to the permit program included under
the proposed Permit Program Specifications, compared to EPA’s detailed MSW
landfill criteria and EPA’s June 2010 proposed standards, see Table A-1 in
Appendix A.) Each state could determine that one or more of the revised criteria
are not necessary to manage CCR structures in the state and decline to apply
them to its permit program.

•

“Written Notice and Opportunity to Remedy.” Under this subparagraph, at
any time, EPA would be required to identify and provide the state with written
notice of deficiencies it identifies in certain elements of its permit program. EPA
could identify deficiencies with regard to a state—complying with provisions
required under “State Actions” and in meeting the permit program specifications,
including its decision to decline to apply certain MSW landfill criteria to its
permit program. EPA would be required to collaborate with the state to identify a

30
As included in Title V of H.R. 4348, currently being debated in the House and Senate conference over legislation to
extend DOT authorizations, as well as the Coal Residuals Reuse and Management Act, passed in the House as H.R.
2273 and introduced in the Senate as S. 1751.

Congressional Research Service

13

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

reasonable deadline for the state to remedy the deficiencies. That deadline could
not be sooner than six months after the state receives the deficiency notice.
•

“Implementation by Administrator.” Specifies that EPA would be authorized
to implement a CCR permit program if a state declines to do so, notifies EPA that
it will no longer implement the program, or fails to remedy program deficiencies
by the agreed-upon deadline and after any judicial review brought by the state
pursuant to Section 7006 of RCRA.

•

“Authority.” Specifies that states may adopt or enforce any regulation or
requirement applicable to CCRs that is more stringent or broader in scope than
those in the proposed amendment. Specifies that EPA shall, with respect to the
regulation of CCRs, “defer” to the states with respect to the proposed amendment
to RCRA.

Further, as used in the proposed Section 4011, the following terms would be defined:31
•

Coal Combustion Residuals—materials defined under Section 3001 of RCRA
(i.e., fly ash waste, bottom ash waste, slag waste, and flue gas emission control
waste generated primarily from the combustion of coal or other fossil fuels as
specified under 42 U.S.C. §6921(b)(3)(A)(i)), including recoverable materials
from such wastes, as well as descriptions of CCRs used in previous EPA
regulatory determinations regarding its management (e.g., coal combustion
wastes that are co-managed with wastes produced in conjunction with the
combustion of coal, provided that such wastes are not segregated and disposed of
separately from the coal combustion wastes and comprise a relatively small
proportion of the total wastes being disposed in the structure).

•

Coal Combustion Residuals Permit Program—a permit program or other
system of prior approval and conditions that is adopted by or for a state for the
management and disposal of coal combustion residuals to the extent such
activities occur in structures in such state.

•

Structure—a landfill, surface impoundment, or other land-based unit which may
receive coal combustion residuals.

•

Revised criteria—the criteria promulgated for MSW landfill units under Section
4004(a) and Section 1008(a)(3), as revised under Section 4010(c) in accordance
with the requirement of such section that the criteria protect human health and
the environment (i.e., the MSW landfill criteria in 40 C.F.R. Part 258).

A Statutory Versus a Regulatory Permit Program
The proposed amendment to RCRA would create a state-based permit program under Subtitle D
that uses the MSW landfill requirements as its basis, but does not direct EPA to develop standards
applicable to its adoption or implementation. By creating such a program entirely within the
proposed statute, Congress would create a permit program unique among environmental laws.

31

Under proposed §4011(k).

Congressional Research Service

14

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Generally, for other environmental laws, Congress has specified a legal standard of protection,
then directed EPA to develop criteria necessary to meet that standard. More simply, Congress
would likely declare, either generally or in specific detail, why or what standards are needed, then
direct EPA to promulgate regulations detailing how those standards should be met. Generally,
regulatory standards would apply to an entity explicitly identified in statute (e.g., facilities that
receive MSW for disposal). Before it could promulgate final federal agency standards, EPA
would be required to allow the public an opportunity to comment on its regulatory proposal and
to respond to those comments. Once finalized, depending on the statutory directive, the standards
may or may not be federally enforceable. That is, Congress may give EPA express authority to
both promulgate certain standards and enforce them, or to just promulgate standards and require
states to enforce them. Generally, most federal environmental standards are enforced by states,
pursuant to some EPA authorization or approval (also, as explicitly required in statute).
Congressional directives regarding some environmental standards have been broad and subject to
a certain degree of discretion or interpretation by EPA. For example, in its directive to EPA to
develop MSW landfill criteria, Congress broadly required the criteria to be those “necessary to
protect human health and the environment,” but specified the need for minimum requirements
applicable to groundwater monitoring, location restrictions, and corrective action.32
Over the past several years, some industry groups and state regulatory agencies, as well as some
Members of Congress, have charged that EPA has overreached its authority in promulgating
certain environmental regulations. Particular focus has been directed at EPA efforts to develop
federal standards to address greenhouse gas emissions, as well as emissions of other conventional
pollutants, pursuant to the Clean Air Act. (See CRS Report R41561, EPA Regulations: Too Much,
Too Little, or On Track?, by (name redacted) and (name redacted).)
Charges of overreaching its regulatory authority have also been cited by certain opponents to
EPA’s proposal to identify and regulate CCRs as a hazardous waste under Subtitle C. Creation of
a CCR permit program in the proposed amendment to RCRA could be seen as an effort to create a
mechanism to manage CCRs that would allow states wide discretion in adopting and
implementing the program, while limiting the potential involvement of EPA. However, given the
limits to EPA’s role in program development or implementation, it is unclear whether a CCR
permit program implemented under the proposed Section 4011 would result in a state applying
regulatory standards to CCR landfills or surface impoundments that would differ appreciably
from those it currently applies.
As a statutory permit program, requirements that would serve as “regulations” applicable to the
permit program are those contained within the proposed Section 4011. How such a permit
program may ultimately be implemented, when compared to the MSW management program on
which it is based, is difficult to determine. To recognize the similarities and distinct differences
between the two, it is useful to compare provisions in the proposed CCR permit program to
existing requirements applicable to MSW landfills, as well as elements of EPA’s June 2010
proposal to regulate CCR disposal facilities under Subtitle D.
As detailed in the discussion of “Existing Municipal Solid Waste Management Requirements,”
above, the federal regulatory framework applicable to MSW management was developed as a
result of four distinct yet interrelated directives in Subtitle D that required (1) EPA to promulgate
32

42 U.S.C. §6949a(c)(1).

Congressional Research Service

15

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

national criteria applicable to MSW landfills; (2) states to adopt a permit program to assure
facility compliance with those criteria; (3) EPA to determine the adequacy of state permit
programs; and (4) EPA to enforce the MSW landfill criteria in states with an inadequate permit
program. In contrast, EPA’s June 2010 Subtitle D proposal and the proposed Section 4011 of
RCRA would each include only a single element of the four directives that resulted in a federally
enforceable program to manage MSW. That is:
•

EPA’s Subtitle D proposal would promulgate standards applicable to owners
and operators of CCR landfills and surface impoundments.

•

Proposals to amend RCRA would create a permit program applicable to states.

Absent an explicit directive or authorities comparable to those applicable to MSW management,
neither EPA’s Subtitle D proposal nor the legislative proposals to amend RCRA involve the
creation of federally enforceable standards applicable to owners and operators of CCR landfills or
surface impoundments. Under EPA’s Subtitle D proposal, federal standards applicable to owners
and operators would be promulgated, but not federally enforceable. Under the proposed Section
4011, selected elements of the MSW landfill requirements and EPA’s June 2010 proposal would
apply to a CCR permit program, but no federal standards would be applied directly to owners and
operators of CCR structures or provide for conditions under which any national standards may be
federally enforceable. There are certain key directives missing from the proposed Section 4011
that would need to be included to explicitly require states to apply standards, similar to those
applicable to MSW landfills, directly to CCR structures. This can be seen when the regulatory
criteria applicable to the management of MSW are compared to the statutory requirements that
would apply to a CCR permit program, as detailed in the proposed Section 4011.

“Permit Program Specifications” Compared to MSW Landfill Criteria
Instead of applying regulatory criteria to CCR structures (the entities that may be expected to
obtain a CCR permit under the proposed program), Permit Program Specifications33 in the
proposed Section 4011 apply certain requirements to the CCR permit program. The proposed
subsection includes three provisions specifying:
1. “Minimum Requirements” applicable to a CCR permit program—described
as the “revised criteria” included under provision 2, except as provided in
provision 3, as well as certain additional specifications for surface
impoundments.
2. “Revised Criteria” applicable to the program—lists the MSW landfill criteria,
including specific location restrictions, design criteria, groundwater monitoring
and corrective action requirements, closure, and post-closure for existing, new,
and lateral expansions of existing, or all (new and existing), structures receiving
CCRs after the date of enactment of Section 4011.
3. Program limitations—specifies that a state may determine that one or more of
the requirements of the revised criteria (listed in provision 2) are not needed for
CCR management in that state, and may decline to apply them as part of its CCR
permit program.

33

Under proposed §4011(c).

Congressional Research Service

16

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Pursuant to those provisions, the minimum program specifications, including any revised
criteria/MSW landfill regulations, would apply to the CCR permit program, generally as a state
deems necessary. As such, those requirements are not explicitly applicable to owners and
operators of CCR structures. Additionally, the program proposed under Section 4011 is not
defined as one that is intended to assure facility compliance with certain standards (i.e., the
revised criteria listed under the permit program specifications). Instead, it is described as being
for the management and disposal of CCRs to the extent that it occurs in structures in the state. By
specifying that the MSW landfill criteria would apply to a CCR permit program or that the listed
criteria are “for” structures, it may be assumed that Congress intended states to apply the listed
MSW criteria to owners and operators of CCR structures. The program specification’s “Minimum
Requirements” includes the following provision that appears intended to apply certain criteria
specifically to CCR surface impoundments:
The coal combustion residuals permit program shall apply the revised criteria promulgated
pursuant to section 4010(c) for location, design, groundwater monitoring, corrective action,
financial assurance, closure, and post-closure described [as the Revised Criteria] in
paragraph (2) and the specifications described in this paragraph to surface impoundments.34

Those surface impoundment specifications that appear to be drawn in part from EPA’s June 2010
proposal, would be:
•

Each structure shall be designed, constructed, and maintained to provide for
containment of the maximum volumes of CCRs appropriate for the structure “in
accordance with generally accepted engineering standards for the structural
integrity of such structures.”

•

If the agency implementing the CCR permit program determines that a structure
classified as “a high hazard” (pursuant to certain Federal Emergency
Management Agency guidelines) is deficient with regard to its structural
integrity, that agency is authorized (but not explicitly directed) to require action
to correct the deficiency, according to a schedule determined by the agency, and
close the structure if the deficiency is not corrected within that time frame.

•

New structures first receiving CCRs after enactment of Section 4011 shall be
constructed with a base located a minimum of 2 feet above the upper limit of the
natural water table.

Still, by describing the program specification “Minimum Requirements,” including those above,
as specifications “for a CCR permit program,” it is unclear whether states would be required to
apply them to owners and operators of CCR structures. With no directive explicitly included in
the proposed legislation, it cannot be assumed that states would choose to do so.
If a state did choose to apply the permit program specifications to CCR landfills and surface
impoundments, the provisions included under the Minimum Requirements and Revised Criteria
would be significantly different from those identified by EPA as necessary to address the risks
associated with improper CCR disposal. For example, in contrast to EPA’s June 2010 proposal,
the CCR permit program specifications do not include requirements that owners and operators of
CCR structures

34

Under proposed §4011(c)(1)(C).

Congressional Research Service

17

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

•

construct new landfills and surface impoundments using a composite liner or
retrofit existing surface impoundments with a composite liner;

•

close structures that did not meet certain location restrictions;

•

inspect surface impoundments weekly for structural weaknesses; or

•

apply groundwater monitoring requirements before CCRs could be placed in a
new unit and within a year of enactment for all existing CCR units.

Additionally, absent from the proposed Section 4011 are requirements comparable to those
applicable to MSW landfills that would specify time frames for facility compliance. For example,
compliance deadlines applicable to MSW landfill owners/operators were explicitly listed under
40 C.F.R. Part 25 (depending on various factors, but generally not later than 1994). For the CCR
permit program, a state would only be required, within three years of enactment of Section 4011,
to certify that it has a program in place. It does not specify a time frame for states to ensure
facility compliance with the standards applicable to the permit program.
Also, if a state did choose to apply the criteria similar to those applicable to MSW landfills to
CCR structures, it is uncertain to which structures states may apply those criteria. Under Section
4011, the term “structures” would be broadly defined as a “landfill, surface impoundment, or
other land-based unit which may receive coal combustion residuals.” The terms “landfill” and
“surface impoundment” have been defined by EPA in existing regulations and specifically to
CCR accumulation units in its June 2010 proposal (see “Proposed Standards Applicable to CCR
Landfills and Surface Impoundments,” above). A state may incorporate details in those
proposed/existing definitions. However, absent a more detailed definition in statute, it would
appear that states would have discretion to define “structures” more broadly or narrowly. For
example, a state may choose to define a CCR surface impoundment similarly to EPA’s proposed
definition, with the addition that it include units designed to hold an accumulation of a specific
amount of free liquids or that a CCR landfill be one that covers a certain discrete land area. The
term “other land-based unit” is not defined in RCRA or in any proposed or existing RCRA
standards. Taken with the definition of the CCR permit program as one for the “management and
disposal” of CCRs, it would appear that other land-based units that may receive CCRs could
include land applications of the material, such as sites where it is used as structural or
embankment fill or as road bed material.
Given the issues discussed above, it is unclear whether or when a state may adopt or implement a
CCR permit program that would apply compliance standards to owners and operators of CCR
structures. If states did, it is difficult to speculate whether states would apply standards that would
vary substantially from current state practices.
To allow for a comparison of potential protection that may result if the criteria listed under the
Permit Program Specifications were applied directly to owners and operators, both the Minimum
Requirements and specifically identified Revised Criteria are listed in Table A-1, a “Comparison
of Waste Disposal Unit Criteria,” in Appendix A. Since the Permit Program Specifications
broadly apply the MSW landfill criteria to a CCR permit program, but allow states to apply them
as they deem necessary, Table A-1 does not necessarily list each potentially applicable
requirement included under the MSW landfill criteria. Instead, it highlights requirements that
would differ substantially from the standards applicable to owners and operators of CCR landfills
and surface impoundments, identified by EPA as those necessary to achieve necessary protection
associated with the accumulation and disposal of CCRs.

Congressional Research Service

18

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

A CCR Permit Program Compared to an MSW Permit Program
An MSW permit program, both as its purpose is delineated in statute and as it is implemented in
accordance with EPA regulations, is substantially different from the CCR permit program in the
proposed amendment to RCRA. Pursuant to the existing Section 4005 of RCRA, not later than 18
months after the promulgation of MSW landfill criteria, each state was required to adopt and
implement “a permit program or other system or prior approval and conditions” to assure that
each MSW facility in the state that may receive hazardous household waste (i.e., MSW) will
comply with the criteria.35
In contrast, a CCR permit program would be a program adopted by a state “for the management
and disposal of coal combustion residuals to the extent such activities occur in structures in such
state.” Under that definition, it would appear that a state could use the program broadly, but not
necessarily as a mechanism to assure facility compliance with certain standards.
Also under Section 4005 of RCRA, EPA was directed to approve state MSW permit programs.
Pursuant to that directive, in 40 C.F.R. Part 239, EPA detailed (1) the required components of a
state permit program application; (2) required state authorities and processes necessary to assure
that the state would both implement and enforce facility compliance with the MSW landfill
criteria; and (3) its responsibilities in approving a state’s permit program, including conditions
under which EPA approval may be withdrawn (resulting in the potential EPA enforcement of
MSW landfill criteria at facilities in that state).
Within 36 months of enactment of the proposed Section 4011, pursuant to provisions applicable
to “State Actions,”36 the state agency responsible for implementing the CCR permit program
would be required to certify to EPA that its program meets the Permit Program Specifications.
Required elements of that certification are similar to the required components of a state MSW
permit program. Beyond those requirements, the proposed Section 4011 includes few provisions
comparable to the regulatory requirements in Part 239. Absent their inclusion, it would appear
that directives or requirements similar to those applicable to an adequate MSW permit program
would not apply to the adoption or implementation of a CCR permit program. For example, in
contrast to requirements explicitly required of an EPA-approved MSW permit program, Section
4011 includes no comparable provisions that explicitly require a state to demonstrate or ensure
that its CCR permit program

35
36

•

has authorities and procedures in place to ensure that CCR structures comply
with the relevant criteria;

•

will uniformly apply permit program conditions to all CCR structures within the
state’s jurisdiction;

•

will require owners and operators of all new CCR structures to obtain a permit
before the facility begins operation and operate that structure in accordance with
permit conditions; or

•

will require owners and operators of all existing CCR structures to obtain a
permit and operate in accordance with permit conditions by a certain deadline.

42 U.S.C. §6945(c)(1)(B).
Under proposed §4011(b).

Congressional Research Service

19

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Absent such explicit directive, a state implementing a CCR permit would not necessarily have to
require owners and operators of all CCR structures to either obtain a permit or to operate its
facility in accordance with specific criteria. In order to adopt or implement a CCR permit
program, a state would be required to maintain a permit program approved pursuant to
requirements in Part 239 or be authorized to implement hazardous waste program requirements
established under Subtitle C of RCRA.37 As a result, a state adopting a CCR permit program
would have enacted laws and implemented procedures as required under Part 239. It is unclear,
however, the degree to which a state having an approved MSW permit program intended to
ensure compliance with the MSW landfill regulations would amend state laws or adapt its
procedures as necessary to apply those requirements to the management and disposal of CCRs in
structures in that state. It is also unclear whether a state would be required to apply its permit
program to all or some CCR structures in the state.
Compared to its responsibilities regarding the MSW permit program, EPA’s role in state adoption
and implementation of a CCR permit program would also be significantly different. For MSW
landfill permit programs, EPA may approve, disapprove, or partially approve a state program
pursuant to criteria it developed under Part 239. EPA’s role in state adoption of the proposed CCR
permit program is specified largely in provisions regarding “Written Notice and Opportunity to
Remedy.”38 In that capacity, EPA would be required to provide a state with notice and an
opportunity to remedy deficiencies, if at any time the state
•

does not satisfy provisions applicable to State Actions with regard to its
notification to EPA regarding its intent to implement a program, certification to
EPA regarding its permit program, and maintenance of an approved MSW
landfill permit program or an authorized hazardous waste management program;

•

is not implementing a CCR permit program that meets the permit program
specification minimum requirements (including a state’s decision to not apply
certain revised criteria to its permit program).

The time frame for a state to address deficiencies identified by EPA would be uncertain. If a state
is notified of a deficiency, it would be required to work with EPA to establish a “reasonable
deadline,” but one not sooner than six months after receiving EPA’s notice identifying the
deficiencies. EPA would be required to implement a CCR permit program if it determines the
state program has deficiencies (within the limits specified above), but only after the state fails to
remedy the deficiencies by the agreed-upon deadline and any judicial review brought by the state
under section 7006 of RCRA is resolved.
Beyond these criteria, EPA would not be directed to determine whether other elements of a state
CCR permit program are deficient or whether state regulatory programs are adequate to minimize
risks associated with improper accumulation and disposal of CCRs. In contrast, pursuant to
requirements in Part 239, EPA must both approve a state’s MSW permit program and could have
a role in its future implementation, including the ability to withdraw its adequacy determination.
To illustrate the differences between an MSW permit program and the proposed CCR permit
program, Table B-1 in Appendix B lists the required elements in Part 239 and identifies relevant
requirements included or excluded in the proposed Section 4011 of RCRA.
37
38

Under proposed §4011(b)(3).
Under proposed §4011(d).

Congressional Research Service

20

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Conclusion
Among its reasons for proposing national standards applicable to CCR accumulation and disposal
facilities, EPA identified the need to ensure that both new and existing facilities would operate in
a way that minimized potential contaminant leaching (primarily through the use of composite
liners) and that would monitor groundwater to determine if such leaching has occurred. EPA has
determined that states do not consistently require such protective measures, particularly at
existing CCR surface impoundments. To address those concerns, when considering EPA’s
proposal under Subtitle D and legislative proposals to amend RCRA, the most relevant question
may be “Would either approach change current state practices?” The answer is not clear.
Neither proposal would apply federally enforceable standards to owners and operators of CCR
landfills or surface impoundments. EPA’s proposal would apply national standards to those
facilities, but they would not be directly enforceable by EPA. Instead, it would be up to individual
states to determine the degree to which they may adopt, implement, and enforce the standards.
For example, a state may choose to apply EPA’s standards to new CCR disposal facilities, but not
necessarily to existing facilities—those that EPA has identified as being more likely to operate
without necessary protections. The legislative proposal to amend RCRA would create a CCR
permit program that would give states broad discretion in determining how, when, and to which
facilities they may apply new regulatory standards. In comments submitted by state agencies in
the wake of EPA’s June 2010 proposal, most state agency officials argued that their own
regulatory programs sufficiently address CCR management. It would seem unlikely that, absent
an explicit federal directive to do so, a state would choose to implement a CCR permit program
that would vary significantly from its current waste management program.

Congressional Research Service

21

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Appendix A. Comparison of Existing and
Proposed Disposal Facility Criteria
The first and second columns in Table A-1 list existing regulatory criteria applicable to MSW
landfills in 40 C.F.R. 258 and comparable standards, proposed by EPA to be added under 40
C.F.R. Part 257, applicable to CCR landfills and surface impoundments. Listed under each
column are individual requirements specifying location restrictions, operating criteria, design
criteria, groundwater monitoring and corrective action, closure and post-closure care, and
financial assurance. Table cells with an asterisk indicate the lack of a corresponding requirement
between the two standards. When individual requirements are largely similar, only the regulatory
heading is included. When there is a significant difference between two requirements, additional
information is provided to clarify that difference. Broadly, the most significant differences pertain
to the potential regulation of surface impoundments. For example, requirements that would
provide protections specific to the disposal of liquids are not included in Part 258 because bulk
disposal of liquids is prohibited in MSW landfills. In comparison, EPA’s June 2010 Subtitle D
proposal includes various requirements intended to address issues unique to the management of
CCRs, particularly the accumulation of liquids in surface impoundments—with regard to both the
higher potential risk of a catastrophic release associated with a structural failure and contaminant
leaching from those units.
The third column lists CCR Permit Program Specifications included under the “Minimum
Requirements” and “Revised Criteria” that would apply to the permit program in the proposed
Section 4011 of RCRA. As discussed previously, by creating a permit program, the proposed
amendment to RCRA does not attempt to create standards applicable to owners and operators of
CCR landfills and surface impoundments. For example, the following provision is included under
the program Minimum Requirements: “The specifications described in this subsection for a coal
combustion residuals permit program are as follows: (A) The revised criteria described in
[proposed Section 4011(c)(2)] shall apply to a coal combustion residuals permit program.”39
Further, those revised criteria/MSW landfill criteria would apply to a CCR permit program except
as a state may determine that one or more are not needed for the management of CCR in that state
and decline to apply it. Information included under the third column in Table A-1 is intended to
identify Permit Program Specifications that, if a state chose to apply them to owner/operators of
CCR structures, would be similar to or distinctly different from EPA’s June 2010 proposal
applicable to CCR landfills and surface impoundments.

39

Under proposed §4011(c)(1)(A).

Congressional Research Service

22

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Table A-1. Comparison of Waste Disposal Unit Criteria
Municipal Solid Waste Landfill Criteria
(in 40 C.F.R. Part 258)

EPA’s Proposed Standards for CCR Landfills
and Surface Impoundments
(in 40 C.F.R. Part 257)

Proposed Section 4011 “Permit Program
Specifications” for
a CCR Permit Program
(Minimum Requirements and Revised Criteria)

Overview. The MSW landfill regulations provide
minimum, national technical criteria applicable to
owners and operators of all new MSW landfill units,
lateral expansions of existing units, as well as and
existing MSW landfills (in accordance with various
deadlines for compliance).

Overview. Under its Subtitle D regulatory option, EPA
would revise the existing criteria applicable to sanitary
landfills, to add standards that would apply to new landfills
and surface impoundments that receive CCRs, as well as
lateral expansions to existing facilities. The standards
would apply to existing facilities in accordance with
various deadlines for compliance.

Overview. The proposed Permit Program Specifications
include requirements that would apply to a CCR permit
program, as described in provisions listing “Minimum
Requirements” and “Revised Criteria.” The Minimum
Requirements include several explicitly for surface
impoundments. Listed under Revised Criteria is each
subpart of the MSW landfill regulations, as well as detailed
requirements within each subpart. These specifications
would apply to the permit program, not directly to the
owners and operators of CCR structures. Additionally,
states may determine that one or more of the Revised
Criteria is not needed to manage CCRs in that state and
may decline to apply them to its CCR permit program.

Relevant definitions. “MSW landfill landfills” are
defined, in part, as a discrete area of land or an
excavation that receives household waste, and that
is not a land application unit, surface impoundment,
injection well, or waste pile. In accordance with this
definition, facilities regulated under these criteria
receive predominantly dry wastes.

Relevant definitions. “CCR landfills” are defined as a
disposal facility or part of a facility where CCRs are placed
in or on land and is not a land treatment facility, a surface
impoundment, an underground injection well, a salt dome
formation, a salt bed formation, an underground mine, a
cave, or a corrective action management unit. Landfills
would also include piles, sand and gravel pits, quarries,
and/or large-scale fill operations. Sites that are excavated
so that more coal ash can be used as fill are also
considered CCR landfills.

Relevant definitions. A “structure” would be defined as
a landfill, surface impoundment, or other land-based unit
that may receive CCRs. Individual terms used in that
definition are not further defined.

“CCR surface impoundments” are defined as a facility or
part of a facility which is a natural topographic depression,
man-made excavation, or diked area formed primarily of
earthen materials (although it may be lined with man-made
materials) that is designed to hold an accumulation of
CCRs containing free liquids (e.g., a holding, storage,
settling, or aeration pit, pond, and lagoon).

CRS-23

“Revised criteria” would be defined as the criteria
promulgated for MSW landfill units under Section 4004(a)
and Section 1008(a)(3), as revised under Section 4010(c)
in accordance with the requirement of such section that
the criteria protect human health and the environment
(i.e., the MSW landfill criteria in 40 C.F.R. Part 258). Each
subpart of the MSW landfill regulations and selected
individual requirements under each subpart are also listed
under Revised Criteria provisions in the proposed Permit
Program Specifications.

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Municipal Solid Waste Landfill Criteria
(in 40 C.F.R. Part 258)

EPA’s Proposed Standards for CCR Landfills
and Surface Impoundments
(in 40 C.F.R. Part 257)

Proposed Section 4011 “Permit Program
Specifications” for
a CCR Permit Program
(Minimum Requirements and Revised Criteria)

Subpart B—Location Restrictions
Restrictions applicable to new units and lateral expansions and those requiring closure of existing units.
§258.10 Airport safety.

* No similar requirement.

§258.11 Floodplains.

* No similar requirement.

* No similar requirement.

§257.60 Placement above the natural water table—
requires new CCR landfills and surface impoundments
receiving CCRs to be constructed with a base located a
minimum of two feet above the upper limit of the natural
water table.

Under the program’s proposed Minimum Requirements,
new structures that first receive CCRs after the date of
enactment of Section 4011 shall be constructed with a
base located a minimum of two feet above the upper limit
of the natural water table.

§258.12 Wetlands.

§257.61 Wetlands.

§258.13 Fault areas.

§257.62 Fault areas.

§258.14 Seismic impact zones.

§257.63 Seismic impact zones.

For new structures and lateral expansions of existing
structures that first receive CCRs after the date of
enactment, the revised criteria for location restrictions in
§§258.11 through 258.15.

§258.15 Unstable areas.

§257.64 Unstable areas.

For existing structures that receive CCRs after the date of
enactment, the revised criteria for location restrictions in
§§258.11 and 258.15.

§258.16 Closure of existing municipal solid waste
landfill units—required closure of MSW landfills that
could not demonstrate compliance with location
requirements pertaining to airports, floodplains, or
unstable areas.

§257.65 Closure of existing CCR landfills and surface
impoundments—would require closure of existing CCR
disposal units that cannot demonstrate compliance with
location requirements pertaining to unstable areas.
Closure would be required within five years, but may be
extended under certain circumstances.

Permit Program Specifications are not supplemented to
require the closure of existing structures that do not meet
location restrictions pertaining to unstable areas.

CRS-24

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Municipal Solid Waste Landfill Criteria
(in 40 C.F.R. Part 258)

EPA’s Proposed Standards for CCR Landfills
and Surface Impoundments
(in 40 C.F.R. Part 257)

Proposed Section 4011 “Permit Program
Specifications” for
a CCR Permit Program
(Minimum Requirements and Revised Criteria)

Subpart C—Operating Criteria
Daily operating standards for running and maintaining regulated disposal units.
§258.20 Procedures for excluding the receipt of
hazardous waste.

* No similar requirement.

§258.21 Cover material requirements.

* No similar requirement.

§258.22 Disease vector control.

* No similar requirement.

§258.23 Explosive gases control.

* No similar requirement.

§258.24 Air criteria—Requires MSW landfill units to
comply with State Implementation Plans and prohibit
open burning.

§257.80 Air criteria—differs from MSW criteria in that the
criteria specify fugitive dust controls.

§258.25 Access requirements.

* No similar requirement.

§258.26 Run-on/run-off control systems.

§257.81 Run-on/run-off control systems—requires an
independent registered professional engineer to certify
that the design of the run-on/run-off control system meets
the requirements of this section; and the owner/ operator
to notify the state that the design has been placed in the
operating record and on the owner's or operator's
publicly accessible internet site. Also requires the
owner/operator to prepare a report, certified by an
independent registered professional engineer, that
documents how relevant calculations were made, and how
the control systems meet the requirements of this subpart
and notify the state that the report has been placed in the
operating record and made available to the public on the
owner/ operator's publicly accessible internet site.

For landfills and other land-based units that receive CCRs
after the date of enactment, the revised criteria for runon/run-off control systems under §258.26.

§257.82 Surface water requirements.

For all structures that receive CCRs after the date of
enactment, the revised criteria for surface water in
§258.27.

§258.27 Surface water requirements.

CRS-25

For all structures that receive CCRs after the date of
enactment, the revised criteria for air quality in §258.24.
Under the program’s proposed Minimum Requirements, a
state implementing a CCR permit program would have the
authority to address wind dispersal of dust from CCRs by
requiring dust control measures, as determined
appropriate by the head of the lead state agency
responsible for implementing the permit program.

For surface impoundments that receive CCRs after the
date of enactment, the criteria for run-off control systems
from the active portion of the landfill to collect and
control at least the water volume resulting from a 24hour, 25-year storm the revised criteria under
§258.26(a)(2).
Design certification and reporting requirements, similar to
those in EPA’s proposal, are not included in the proposed
Permit Program Specifications.

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Municipal Solid Waste Landfill Criteria
(in 40 C.F.R. Part 258)

EPA’s Proposed Standards for CCR Landfills
and Surface Impoundments
(in 40 C.F.R. Part 257)

Proposed Section 4011 “Permit Program
Specifications” for
a CCR Permit Program
(Minimum Requirements and Revised Criteria)

§258.28 Liquids restrictions—prohibits disposal of
bulk or noncontainerized liquid waste in MSW
landfills. If similarly applied to CCR units, this
restriction may essentially prohibit liquid disposal of
CCRs (i.e., surface impoundment disposal).

* No similar requirement.

* No similar requirement.

§257.83 Surface impoundment inspection requirements—
requires surface impoundments to be inspected weekly for
appearances of structural weakness. The proposal specifies
when such inspections must occur and who would be
qualified to conduct them. It also would require certain
responses in the event hazardous conditions are identified.

Surface impoundment inspection requirements, similar to
those in EPA’s proposal, are not included in the proposed
Permit Program Specifications.

§258.29 Recordkeeping requirements.

§257.84 Recordkeeping requirements—differs from MSW
criteria in that records required to be kept include those
that document/demonstrate annual surface impoundment
inspections (something that is not required under the
MSW criteria). EPA’s proposal also specifies that the
records must be publicly accessible via the internet.

For all structures that receive CCRs after the date of
enactment, the revised criteria for recordkeeping under
§258.29.
Recordkeeping requirements, similar to those in EPA’s
proposal, are not included in the proposed Permit
Program Specifications.

Subpart D—Design Criteria
Liner and leachate collection requirements sufficient for groundwater to meet
maximum contaminant levels for selected chemicals.
§258.40 Design criteria—requires new MSW
landfills or expansions of existing units to either
install a composite liner or to allow the facility
design to be based on site-specific conditions.
Design criteria did not apply to existing units (i.e.,
units were not required to be retrofitted to meet
the new liner requirements).

CRS-26

§257.70 Design criteria for new CCR landfills and lateral
expansions—would require new/expanding CCR landfills
to have composite liners and leachate collection and
removal systems similar to those required under §258.40.
EPA stated that its decision was based on its experience
that such a liner design would be expected to be effective
in mitigating the risks of leaching contaminant to
groundwater from a waste such as CCRs. EPA did not
modify the design criteria to allow for the consideration of
site-specific conditions in individual CCR landfill design.

For new structures and lateral expansions of existing
structures that receive CCRs after the date of enactment,
the design criteria in §258.40.
In contrast to EPA’s June 2010 proposal, states
implementing a CCR permit program would be allowed to
apply site-specific conditions to a structure’s design
instead of requiring only the use of composite liners.

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Municipal Solid Waste Landfill Criteria
(in 40 C.F.R. Part 258)
* No similar requirement.

EPA’s Proposed Standards for CCR Landfills
and Surface Impoundments
(in 40 C.F.R. Part 257)
§257.71 Design criteria for existing CCR surface
impoundments—existing units would require a composite
liner, similar to that required of CCR landfills. Units would
require retrofitting with a liner within five years of the
effective date of a final rule or be subject to closure. EPA
also proposed a “D Prime” option. Under this
modification, the regulations would not require surface
impoundment closure or retrofitting with a liner; rather,
these surface impoundments could continue to operate
for the remainder of their useful life. The other coproposed Subtitle D requirements would remain the same.
Specific to surface impoundment units that continue to
operate, EPA’s proposal would require design and
inspection requirements similar to those of the Mine
Safety and Health Administration (MSHA), including
requirements that an independent registered professional
engineer certify that the impoundment’s design is in
accordance with engineering practices applicable to that
unit; weekly inspections to identify potentially hazardous
conditions or structural weakness; and annual inspections
by an independent registered professional engineer to
assure design, operation, and maintenance of the unit is in
accordance with engineering practices applicable to that
unit.

* No similar requirement.

§257.72 Design criteria for new CCR surface
impoundments and lateral expansions—essentially identical
to the provisions applicable to existing CCR surface
impoundments with regard to composite liner
requirements and the additional criteria applicable to
surface impoundment design, inspection, and
recordkeeping.

§258.41 Project XL Bioreactor Landfill Projects.

* No similar requirement.

§258.42 Approval of site-specific flexibility requests
in Indian country.

* No similar requirement.

CRS-27

Proposed Section 4011 “Permit Program
Specifications” for
a CCR Permit Program
(Minimum Requirements and Revised Criteria)
Under the program’s proposed Minimum Requirements,
the design, construction, and maintenance of each
structure must be “in accordance with generally accepted
engineering standards for the structural integrity of that
structure.” If the state agency implementing the CCR
permit program determines the structure to be “deficient”
(including structures classified as posing a high hazard
pursuant to Federal Emergency Management Agency
guidelines), the agency has the authority to require action
to correct the deficiency. If a deficiency is not corrected,
the agency may require the structure to close. In contrast
to EPA’s June 2010 proposal, criteria for determining such
a deficiency, such as design or inspection requirements,
are not specified.
A requirement that existing units be retrofitted with a
liner or requirements similar to those in EPA’s D Prime
option is not included in the proposed Permit Program
Specifications.

The proposed Permit Program Specifications do not
include design criteria for new CCR surface
impoundments, similar to those in EPA’s June 2010
proposal, except with regard to identifying deficiencies in
structures, as described above.

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Municipal Solid Waste Landfill Criteria
(in 40 C.F.R. Part 258)

EPA’s Proposed Standards for CCR Landfills
and Surface Impoundments
(in 40 C.F.R. Part 257)

Proposed Section 4011 “Permit Program
Specifications” for
a CCR Permit Program
(Minimum Requirements and Revised Criteria)

Subpart E—Groundwater Monitoring and Corrective Action
Requirements necessary to detect and respond to potential groundwater contamination.
§258.50 Applicability—all MSW landfill units unless
the owner/operator can demonstrate that there is
no potential for migration of hazardous constituents
from the unit. The criteria specify a time-table of
compliance based on the proximity of the unit to a
drinking water intake source.

§257.90 Applicability—all existing CCR units would be
required to comply with the groundwater monitoring
requirements within one year of the effective date of a
final rule; new CCR units must comply with groundwater
monitoring requirements before CCRs could be disposed
of in the units.

§258.51 Groundwater monitoring systems.

§257.91 Groundwater monitoring systems.

§258.53 Groundwater sampling and analysis
requirements.

§257.93 Groundwater sampling and analysis requirements.

§258.54 Detection monitoring program—specific
constituents required to be included in the detection
monitoring and assessment monitoring programs are
listed under Appendix I to Part 258—Constituents
for Detection Monitoring and Appendix II to Part
258—List of Hazardous Inorganic and Organic
Constituents.

§257.94 Detection monitoring program—constituents for
detection monitoring are boron, chloride, conductivity,
fluoride, pH, sulphate, sulfide, total dissolved solids.

For all structures that receive CCRs after the date of
enactment, for the purposes of detection monitoring, the
constituents boron, chloride, conductivity, fluoride,
mercury, pH, sulfate, sulfide, and total dissolved solids.

§258.55 Assessment monitoring program—within 90
days of finding that any of the constituents listed in
Appendix II have been detected at a statistically
significant level exceeding the groundwater
protection standards, the owner or operator must
initiate an assessment of corrective measures that
must be completed within “a reasonable period of
time.”

§257.95 Assessment monitoring program—would be
required whenever a statistically significant increase over
background was detected for aluminum, antimony, arsenic,
barium, beryllium, boron, cadmium, chloride, chromium
(total), copper, fluoride, iron, lead, manganese, mercury,
molybdenum, pH, selenium, sulphate, sulfide, thallium,
total dissolved solids. In such cases, additional sampling
and analysis requirements would also apply.
Owners/operators would be required to complete their
assessment corrective measures within 90 days of
detecting the increase.

For all structures that receive CCRs after the date of
enactment, for the purposes of assessment monitoring,
aluminum, boron, chloride, fluoride, iron, manganese,
molybdenum, pH, sulfate, and total dissolved solids.

§258.56 Assessment of corrective measures.

§257.96 Assessment of corrective measures.

§258.57 Selection of remedy.

§257.97 Selection of remedy.

§258.58 Implementation of the corrective action
program.

§257.98 Implementation of the corrective action program.

CRS-28

For all structures that receive CCRs after the date of
enactment, revised criteria for groundwater monitoring
and corrective action described in Subpart E of 40 C.F.R.
Part 258, except as provided below.

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Municipal Solid Waste Landfill Criteria
(in 40 C.F.R. Part 258)

EPA’s Proposed Standards for CCR Landfills
and Surface Impoundments
(in 40 C.F.R. Part 257)

Proposed Section 4011 “Permit Program
Specifications” for
a CCR Permit Program
(Minimum Requirements and Revised Criteria)

Subpart F—Closure and Post-Closure Care
Requirements applicable to the closure of regulated disposal units.
§258.60 Closure criteria.

§257.100 Closure criteria—requires the removal of liquid
and stabilization of remaining waste from a surface
impoundment before closure.

§258.61 Post-closure care requirements.

§257.101 Post-closure care requirements.

§258.62 Approval of site-specific flexibility requests
in Indian country.

* No similar requirement.

Included broadly are the revised criteria for closure and
post-closure.
Under proposed Section 4011(h), “Closure” provisions
specify that, if it is determined pursuant to a CCR
program that a structure should close, the time period and
method for the closure must be set forth in a closure plan
that establishes a deadline for completion and takes into
account the nature and the site-specific characteristics of
the structure. For surface impoundments, the closure plan
shall require, at a minimum, the removal of liquid and the
stabilization of remaining waste, as necessary to support
the final cover.

Subpart G—Financial Assurance
Guarantees required to be established to assure that the owner/operator can pay for potential cleanup of
contamination.
§258.70 Applicability and effective date.
§258.71 Financial assurance for closure.
§258.72 Financial assurance for post-closure care.

* EPA did not include financial assurance requirements in
its proposal. It noted that any such requirements would be
proposed in a separate rulemaking.

For all structures that receive CCRs after the date of
enactment, the revised criteria for financial assurance
described in Subpart G of 40 C.F.R. Part 258 would apply
to the permit program.

§258.73 Financial assurance for corrective action.
§258.74 Allowable mechanisms.
§258.75 Discounting.
Source: Congressional Research Service, based on a comparison of “Criteria for Municipal Solid Waste Landfills” in 40 C.F.R. Part 258; EPA’s “Standards for the Receipt of
Coal Combustion Residuals in Landfills and Surface Impoundments,” proposed by EPA in 75 Federal Register 35239-35253; and “Permit Program Specifications” and
“Closure” provisions in proposed Section 4011, subsections (c) and (h), respectively.

CRS-29

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Appendix B. An “Adequate” MSW Permit Program
Compared to the Proposed CCR Permit Program
Given the discretion allowed to states to apply the proposed Section 4011 Permit Program
Specifications directly to CCR structures, it is unclear whether or to what degree a state’s CCR
permit program would be comparable to an approved MSW permit program (as defined under
current law). If a state did choose to apply those criteria to owners and operators of CCR
structures, implementation of a CCR permit program would still likely be significantly different
compared to an MSW permit program. State adoption and implementation of a CCR permit
program would also likely differ from an MSW permit program as a result of the significantly
different roles and responsibilities allowed for EPA.
Key differences between the existing MSW and proposed CCR permit programs can be seen by
comparing “Requirements for State Permit Program Determination of Adequacy” to provisions
applicable to a CCR permit program in the proposed Section 4011 amendment to RCRA. Table
B-1 lists selected, relevant requirements in 40 C.F.R. Part 239 and comparable elements of the
proposed CCR permit program. Broadly, few requirements included under Part 239 are included
in the proposed Section 4011. As a result, the identification of comparable provisions that are not
included among the requirements applicable to the permit program proposed in statute would
likely not apply to a state’s program or may be applied at its discretion.

Congressional Research Service

30

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Table B-1. Comparison of the MSW and CCR Permit Programs
Selected Requirements for State Permit
Program Determination of Adequacy
(40 C.F.R. Part 239)

Comparable Elements of a CCR Permit
Program in Proposed Section 4011 of RCRA

Overview. Under §4005 of RCRA, within 18 months
of EPA promulgating the MSW landfill criteria (40
C.F.R. Part 258), each state was required to adopt and
implement a permit program to assure that each MSW
landfill in the state would comply with those criteria.
EPA was required to determine the adequacy of each
state permit program, as detailed in the requirements
in 40 C.F.R. Part 239. If it determined that a state’s
permit program was inadequate, EPA was authorized to
enforce the MSW landfill criteria at regulated facilities
in that state.

Overview. Under the proposed Section 4011,
states may choose to adopt a CCR permit program
for the management and disposal of CCR. EPA would
be required to implement the program in states that
decline to do so. EPA has estimated that, if enacted,
all the states with coal-fired power plants would
implement their own CCR permit programs.

Selected Definitions. A permit or prior approval and
conditions—any authorization, license, or equivalent
control document issued under the authority of the
state regulating the location, design, operation,
groundwater monitoring, closure, post-closure care,
corrective action, and financial assurance of Subtitle D
regulated facilities.

Proposed subsection (k)—Definitions. A coal
combustion residuals permit program would be defined
as a permit program or other system of prior
approval and conditions that is adopted by or for a
state for the management and disposal of coal
combustion residuals to the extent such activities
occur in structures in such state.

An approved permit program—a state Subtitle D permit
program or other system of prior approval and
conditions required under Section 4005 of RCRA that
has been determined to be adequate by EPA under Part
239.
A state program or permit program—all the authorities,
activities, and procedures that comprise the state's
system of prior approval and conditions for regulating
the location, design, operation, groundwater
monitoring, closure, post-closure care, corrective
action, and financial assurance of Subtitle D regulated
facilities.

Congressional Research Service

31

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Selected Requirements for State Permit
Program Determination of Adequacy
(40 C.F.R. Part 239)

Comparable Elements of a CCR Permit
Program in Proposed Section 4011 of RCRA

State Program Application Requirements.
Specifies information that must be provided by states
seeking EPA approval of their Subtitle D permit
programs.
§239.3 Components of program application. The
application must demonstrate that state authorities and
procedures are adequate to ensure compliance with
the relevant criteria in 40 C.F.R. Part 258 and that the
permit program is uniformly applicable to all the
relevant MSW landfill units.
The application must contain the following parts: a
transmittal letter requesting program approval, a
narrative description of the program (as detailed at
§239.4), a legal certification, and copies of all applicable
state statutes, regulations, and guidance (as detailed at
§239.5).

Proposed subsection (b)(2)—State Actions:
Certification. In states that notify EPA of its intent
to adopt a CCR permit program, within 36 months
of enactment of Section 4011, the head of the lead
state agency responsible for implementing the
program would be required to submit to EPA a
certification that its program meets the CCR Permit
Program Specifications. Similar to the required
components of a state program application in §239.3,
the certification would be required to include a
letter identifying the lead state agency responsible
for implementing the CCR permit program, and any
other state agencies involved in the program; a
narrative description of the program (described
below) and a legal certification that the state has, at
the time of program certification, fully effective
statutes or regulations necessary to implement a
permit program that meets the specifications.
The certification requirements are included among
the permit program elements that EPA may identify
to a state as having a deficiency.
In contrast to Part 239, a state would not be
required to demonstrate that it applies the permit
program uniformly to all CCR structures in the state.

§239.4 Narrative description of state permit
program. The state must describe state agency
jurisdiction and responsibilities in implementing the
program; how it will meet the necessary permit
program requirements; how it will ensure that existing
and new facilities are permitted or otherwise approved
and in compliance with the relevant Subtitle D federal
revised criteria; and the number of facilities within the
state's jurisdiction that received waste after EPA
promulgated the MSW landfill criteria.

Proposed subsection (b)(2)(B)(iii)—
Certification: Contents. The certification
provided to EPA would be required to include a
narrative description explaining how the state would
ensure that its permit program meets the
requirements of proposed Section 4011, including a
description of its process to inspect or otherwise
determine compliance with the permit program;
process to enforce permit program requirements;
and public participation process for promulgating,
amending, or repealing its regulations for, and the
issuance of permits under, the permit program.
Detailed requirements applicable to the narrative
description, similar to those in §239.4, are not
specified in the proposed Section 4011.

§239.5 State legal certification. The state attorney
general must certify that laws, regulations, and guidance
cited in the application are enacted at the time of
certification.

Congressional Research Service

Proposed subsection (b)(2)(B)(iii)—
Certification: Contents. The certification
provided to EPA must include a legal certification
that the state has fully effective statutes and
regulations necessary to implement a CCR permit
program that meets Minimum Requirements
described in the Permit Program Specifications
(proposed Section 4011(c)(1)), including copies of
state statutes and regulations.

32

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Selected Requirements for State Permit
Program Determination of Adequacy
(40 C.F.R. Part 239)

Comparable Elements of a CCR Permit
Program in Proposed Section 4011 of RCRA

State Requirements Necessary to Demonstrate
the Adequacy of its Proposed Permit Programs.
Specifies state roles and requirements, including
necessary law or procedures, that a state seeking
program approval must have in place before it will be
deemed adequate by EPA.
§239.6(a)-(c) Permitting requirements: public
involvement requirements. State law must require
that documents for permit determinations are made
available for public review and comment; and final
determinations on permit applications are made known
to the public. The state must also have procedures that
ensure consideration of public comments on permit
determinations and fully describe its public participation
procedures for permit issuance and post-permit actions
in its narrative description.

The narrative description of a state’s proposed
permit program (under proposed §4011(b)(2)(B)(iii))
must include a description of its public participation
process for promulgating, amending, or repealing its
regulations for, and the issuance of permits under,
the permit program.

§239.6(d) Permitting requirements: authority to
collect information. States must have the authority
to collect all information necessary to issue permits
that are adequate to ensure compliance with the
relevant 40 C.F.R. Part 258 criteria.

The proposed amendment to RCRA includes no
directives or requirements similar to those in
§239.6(d).

§239.6(e) Permitting requirements: required
state law. The state shall have the authority to impose
requirements for MSW landfill units adequate to ensure
compliance with 40 C.F.R. Part 258. These
requirements shall include standards necessary to
ensure compliance with each regulatory subpart under
Part 258 (e.g., requirements necessary to achieve
compliance with location restrictions, operating
criteria, groundwater monitoring and corrective for
MSW landfill units). With regard to these standards,
state law must also require that, prior to construction
and operation, all new MSW landfill units will have a
permit incorporating those requirements. Existing
MSW landfills units were required to have a permit
incorporating the regulatory standards in accordance
with the deadlines identified in Section 258.1 (ranging
from 1991 to 1997).

The proposed amendment to RCRA includes no
directives or requirements similar to those in
§239.6(e). In order to adopt or implement a CCR
permit program, a state would be required to
maintain a program approved pursuant to Part. 239.
As a result, a state with an approved permit program
would have enacted laws or implemented
procedures pursuant to §239.6(e). However, it is
unclear whether or the degree to which state laws
and authorities required to ensure facility compliance
with the MSW landfill regulations would be
comparable to those for a permit program intended
for the management and disposal of coal combustion
residuals in CCR structures.

Congressional Research Service

Absent a directive to states to apply the Revised
Criteria to a new CCR structure, prior to operation,
or to existing structures, by a certain deadline, it
would appear that it would be left to the state to
determine when it would require existing facilities to
obtain a permit and/or operate in accordance with
its conditions.

33

Proposals to Amend RCRA: Pending Legislation Applicable to CCR Management

Selected Requirements for State Permit
Program Determination of Adequacy
(40 C.F.R. Part 239)
§239.7 Requirements for compliance monitoring
authority. The state must have authorities to
determine owner or operator compliance with the
applicable landfill requirements, including the authority
to obtain necessary information; to conduct monitoring
or testing; to enter any sites subject to the permit
program; and to provide for inspections adequate to
determine compliance with the state permit program.
A state must also demonstrate that its compliance
monitoring program provides for adequate inspections
to determine compliance with the approved state
permit program and that its compliance monitoring
program provides mechanisms to ensure the accuracy
of information provided by MSW landfill
owner/operators.

Comparable Elements of a CCR Permit
Program in Proposed Section 4011 of RCRA
The proposed Permit Program Specifications include
a provision that, for a state implementing the CCR
permit program, that state has the authority to
“inspect structures and implement and enforce such
permit program.” This provision appears to reinforce
existing state authority. Currently, states are
authorized to inspect and monitor facilities for
compliance with waste management requirements it
chooses to adopt and implement under Subtitle D. In
contrast, the requirements detailed in §239.7 are
those EPA identified as necessary for a state to
demonstrate that its compliance monitoring
authority is adequate to assure facility compliance
with the MSW landfill criteria. No requirements
similar to those included in §239.7 are included in the
proposed amendment to RCRA.

§239.8 Requirements for enforcement
authority. Any state seeking approval must have the
authority to impose the following remedies for
violation of state program requirements: to
immediately and effectively restrain any person by
administrative or court order or by suit in a court of
competent jurisdiction from engaging in any activity
which may endanger or cause damage to human health
or the environment; to sue in a court of competent
jurisdiction to enjoin any threatened or continuing
activity which violates any statute, regulation, order, or
permit which is part of or issued pursuant to the state
program; to sue in a court of competent jurisdiction to
recover civil penalties for violations of a statute or
regulation which is part of the state program or of an
order or permit which is issued pursuant to the state
program.

The required narrative description of a state’s
proposed permit program (under proposed
§4011(b)(2)(B)(iii)) must include a description of its
process to enforce permit program requirements, but
includes no requirements that a state demonstrate
that it has authority to enforce facility violations of
CCR permit program requirements similar to those
detailed in §239.8.

§239.9 Intervention in civil enforcement
proceedings. Any state seeking approval must provide
for intervention in the state civil enforcement process
by providing either: authority that allows intervention
in any civil action to obtain remedies specifie