Klamath Basin Settlement Agreements
name redacted
Specialist in Natural Resources Policy
name redacted
Analyst in Natural Resources Policy
name redacted
Specialist in Natural Resources Policy
name redacted
Legislative Attorney
October 1, 2015

Congressional Research Service
7-....
www.crs.gov
R42158

Klamath Basin Settlement Agreements

Summary
The Klamath River Basin on the California-Oregon border is a focal point for local and national
discussions on water allocation and species protection. Previously, water and species management
issues have exacerbated competition and generated conflict among several interests—farmers;
Indian tribes; commercial and sport fishermen; federal water project and wildlife refuge
managers; environmental groups; hydropower facility operators; and state, local, and tribal
governments. Drought conditions and a call for water by senior water rights holders in 2013 have
again brought these issues to the forefront.
In 2010, the Secretary of the Interior and the governors of Oregon and California, along with
multiple interest groups, announced the results of a multiyear negotiation process to resolve longstanding issues in the basin: two interrelated agreements, supported by the federal government
and signed by the two states and numerous other parties. These agreements, known as the
Klamath Basin Restoration Agreement (KBRA) and the Klamath Hydroelectric Settlement
Agreement (KHSA), together aim to provide for water deliveries to irrigators and wildlife
refuges, fish habitat restoration, and numerous other related actions. Generally, the KBRA
provides for actions intended to restore Klamath fisheries and for assurances for water deliveries
to wildlife refuges and federal project irrigators under certain circumstances, among other things.
The KHSA lays out a process that could lead to the removal of four privately owned dams on the
Klamath River. This dam removal would be one of the largest and most complex projects of its
kind ever undertaken.
Some parts of the Klamath agreements are being carried out under existing authorities. Studies to
inform a determination on dam removal under the KHSA by the Secretary of the Interior are
complete, and some restoration actions have been initiated. However, congressional authorization
is required for the most significant components of the agreements to be implemented.
The KBRA and KHSA did not address all outstanding issues in the basin. A water rights
adjudication by the state of Oregon (in progress since the 1970s) is ongoing. In 2013, the
adjudication reaffirmed “time immemorial” tribal water rights in the upper part of the Klamath
Basin, confirming that tribal water rights are senior to those of other water rights holders. This
resulted in a “call” on water rights (i.e., notice by senior water rights holders that their demands
exceed available flows), and led to reductions to water supplies for some junior users during the
low water year of 2013. To resolve these issues and prevent such a scenario from occurring again,
a separate settlement agreement (the Upper Klamath Basin Settlement Agreement) was negotiated
by stakeholders and finalized in April 2014. To be implemented, the agreement would need to be
authorized along with the KBRA and KHSA.
The KBRA and KHSA were originally set to expire in 2012 if no authorizing legislation was
enacted, but they have since been extended (most recently through 2015). Parties may also
withdraw individually from the agreements, and several parties initiated this process of
withdrawal.
In the 114th Congress, S. 133 would authorize the Klamath agreements, including a suite of new
federal actions that have received support from disparate parties and are required for the
agreements to be implemented. Previous legislation in the 113th Congress (S. 2379) was ordered
to be reported out of the Senate Committee on Energy and Natural Resources on November 13,
2014.

Congressional Research Service

Klamath Basin Settlement Agreements

Contents
Introduction ..................................................................................................................................... 1
Background ..................................................................................................................................... 2
Previous Events ............................................................................................................................... 3
Klamath Settlement Agreements ..................................................................................................... 5
Klamath Basin Restoration Agreement ..................................................................................... 5
Klamath Hydroelectric Settlement Agreement ......................................................................... 7
Upper Klamath Basin Settlement Agreement ........................................................................... 7
Congressional Action ...................................................................................................................... 8
Issues for Congress .......................................................................................................................... 9
Role of the Federal Government ............................................................................................... 9
Cost of Implementation ........................................................................................................... 10
Dam Removal.......................................................................................................................... 13
Implementation of ESA........................................................................................................... 14
Stakeholder Views ......................................................................................................................... 14
Support for Agreements .......................................................................................................... 15
Opposition to Agreements ....................................................................................................... 16

Figures
Figure 1. Klamath River Basin ........................................................................................................ 2

Tables
Table 1. Water Allocations in the Klamath Basin Restoration Agreement (KBRA) ....................... 6
Table 2. Comparison of Estimated Costs to Implement the KBRA ............................................... 11

Contacts
Author Contact Information .......................................................................................................... 18

Congressional Research Service

Klamath Basin Settlement Agreements

Introduction
The Klamath River Basin, a region along the California-Oregon border, has been a focal point for
local and national discussions on water resources and species management. Water management
issues were brought to the forefront when severe drought conditions in 2001 exacerbated
competition for scarce water resources and generated conflict among several interests—farmers;
fishermen (commercial and sport); other recreationists; federal wildlife refuge managers;
environmental organizations; and state, local, and tribal governments. Subsequent problems with
Klamath Basin fisheries, in particular events in 2002 and 2006 (see “Previous Events,” below),
and conflict over the relicensing of the Klamath Hydropower Project, exacerbated these conflicts.
Low water conditions and a call for water by senior water rights holders in 2013 have again
brought these issues to the forefront.
Congress has oversight authority over federal activities in the Klamath Basin related to operation
of the Bureau of Reclamation’s (Reclamation’s) Klamath Project; management of federal lands
(including six national wildlife refuges, managed by the Fish and Wildlife Service); and
implementation of Endangered Species Act (ESA; P.L. 93-205) and other federal laws.1
Previously, Congress has held hearings and appropriated funding to address issues in the Klamath
Basin. Past congressional debate has generally focused on the ESA’s role in water management,
the operation of the Klamath Project, and other topics, such as supplemental support for parties
impacted by federal policies.
The Klamath Basin Restoration Agreement (KBRA) and the Klamath Hydroelectric Settlement
(KHSA), collectively referred to as the Klamath agreements in this report, were signed in 2010 by
a wide array of basin interests (although not all basin interests support the agreements). They aim
to address many of the ongoing conflicts in the Klamath Basin. The KBRA would, among other
things, set limits for water allocations for irrigators and wildlife refuges under a range of
conditions related to the amount of water forecast in a given year; attempt to make available
supplemental water and power supplies in the basin; and provide for restoration and monitoring
of certain fish species. It also includes other assurances to settle ongoing water conflicts between
basin tribes and other entities, although it would not settle all ongoing conflicts in the basin. The
KHSA lays out a process that could lead to removal of four nonfederal hydroelectric dams
currently owned and operated by a private entity, PacifiCorp. If carried out as envisioned, the
project would be one of the largest, most complex dam removals in history. Under the KHSA, the
Secretary of the Interior led a study process to determine whether removal of these dams is in the
public interest. Most of this study process has been completed, but the final step—a determination
by the Secretary—would require congressional authorization.
Although the Klamath agreements require congressional authorization to move forward on key
components, some activities under existing authorities have already been undertaken.
Consideration of the agreements could result in Congress revisiting previous issues in the
Klamath Basin, as well as considering new ones. This report focuses on congressional
consideration of the Klamath agreements. It assumes some familiarity with the basin on the part
of the reader.2

1

Two freshwater species (Lost River and shortnose suckers) and one anadromous species (Coho salmon) are listed as
endangered under the federal Endangered Species Act (ESA; P.L. 93-205).
2
For detailed background about the basin, see CRS Report R42157, Klamath River Basin: Background and Issues,
coordinated by (name redacted) .

Congressional Research Service

1

Klamath Basin Settlement Agreements

Figure 1. Klamath River Basin

Source: Bureau of Reclamation, adapted by the Congressional Research Service (CRS).

Background
The Klamath River Basin is a largely sparsely populated area on the Oregon and California
border with limited water resources (see Figure 1). Irrigated agriculture in the upper basin relies
in large part on water provided by the Bureau of Reclamation’s Klamath Project. Other farmers
and ranchers (known as off-project irrigators) also rely on basin water supplies for irrigation. The
area is home to six national wildlife refuges that rely on the same water supplies to sustain
migratory bird populations and several Native American tribes that were historically dependent
on lower and upper basin fish species. Two species of upper basin fish are currently listed as
endangered under the ESA (the Lost River and shortnose sucker), and one species of lower basin
fish is listed as threatened under the ESA (coho salmon, an anadromous fish).

Congressional Research Service

2

Klamath Basin Settlement Agreements

The basin also includes seven dams on the Klamath River and its tributaries, built between 1918
and 1962. Six of these dams are owned by PacifiCorp, a private company, and are known
collectively as the Klamath Hydroelectric Project (KHP). Historically, all but one of the dams
produced hydroelectric power for the basin, including low-cost power for Klamath Project
irrigators.3 The original Federal Energy Regulatory Commission (FERC) license to operate the
KHP expired in 2006, and PacifiCorp applied for relicensing of the project in 2004. To date, a
new long-term license has not been granted because of the lack of state certification under
Section 401 of the Clean Water Act (P.L. 92-500), as well as ongoing uncertainty related to fish
passage upgrades and the status of the Klamath agreements, discussed below. In the absence of a
new FERC license, the project continues to operate under a temporary annual license with the
same conditions of the expired FERC license.

Previous Events
While water and species management issues have been prevalent throughout the history of the
Klamath Project, recent congressional consideration related to Klamath Basin usually centers on
one or more of three seminal events that occurred in 2001, 2002, and 2006. These events resulted
in press coverage, legal conflicts, and studies that framed the negotiations and agreements
currently at issue. More recently, in the summer of 2013, a call on water rights under the newly
released Oregon water rights adjudication resulted in limitations on water deliveries for junior
water rights holders in the upper part of the basin.
Several events have put the Klamath region in the national spotlight. In 2001, as a result of
previous biological opinions by the federal Fish and Wildlife Service (FWS) and the National
Marine Fisheries Service (NMFS), the Bureau of Reclamation severely curtailed water deliveries
to the Klamath Project to provide more water for endangered fish in the basin and to prevent their
extinction.4 These allocations were met with protests by area irrigators, who threatened to open
irrigation head gates by force.5 Later, in 2002, irrigators received more water than had been
allocated in 2001, but thousands of fish (mainly Chinook salmon) died on the lower part of the
Klamath River, largely due to poor water conditions and fish health in that part of the basin. In
2006, the National Oceanic and Atmospheric Administration severely restricted ocean fishing for
salmon in the region due to low numbers of naturally spawning adults (due in part to residual
effects of the aforementioned 2002 event). This restriction resulted in a large decrease in that
year’s commercial and recreational salmon catch compared to previous years.
The federal government provided emergency funding in response to these and other events in the
Klamath Basin. The funding included at least $170 million in addition to regular programmatic
expenditures over the last decade. For instance, for the 2001 and 2006 events, the federal
government provided approximately $35 million and $60 million in emergency aid, respectively.6
3

Power costs for pumping are significant for area irrigators, who rely on the KHP for power. (Unlike other
Reclamation projects, there is no power component to the Klamath Project.) The low-cost rates for Klamath irrigators
expired with the original 50-year term of the project’s FERC license in 2006 and have thus increased.
4
Although Klamath Project irrigators have continued to face uncertainty since the 2001 curtailment, there has not been
another curtailment of water deliveries.
5
Due to changed water conditions and other supplemental measures, irrigators received partial water deliveries later
that year, however, near the end of the growing season.
6
Figures for 2001 are based on 2002 estimates by Oregon State University. See William S. Braunworth, Jr., Teresa
Welch, and Ron Hathaway, et al., Water Allocation in the Klamath Reclamation Project, 2001, Oregon State University
Agricultural Extension Service, Special Report 1037, 2002, p. 267, at http://extension.oregonstate.edu/catalog/html/sr/
sr1037-e/. This includes approximately $20 million in aid that was provided from USDA under the Supplemental
(continued...)

Congressional Research Service

3

Klamath Basin Settlement Agreements

Aid in addition to regular agency programs and appropriations was also provided in other years.
Between 2002 and 2007, Reclamation spent $14 million on a pilot water bank to alleviate water
shortages.7 Due to drought events in 2010, an additional $10 million in supplemental
appropriations was provided to the Klamath Basin in that year and $2 million was provided for a
Klamath Drought Initiative by the U.S. Department of Agriculture (USDA).8 The 2002 farm bill
provided $50 million to the Klamath Basin, and USDA funding was also provided under other
general authorities and programs authorized in the 2002 and 2008 farm bills.9
Klamath Water Rights Adjudication
Questions related to the quantification of tribal water rights are interconnected with the determination of water
rights in the Klamath Basin. The Klamath Basin is over-allocated, meaning claims to water exceed the amount available
in most years. This situation often leads to legal conflicts over the proper allocation of limited resources. Allocation of
water resources is largely determined by state law but may be affected by federal laws and activities. Western states
generally follow a system of prior appropriation under which certain quantities of water are allocated to water users
depending on the users’ relative seniority in acquiring water rights. State appropriative rights can be complicated by
federal water rights, such as those of tribes claiming water rights reserved by the creation of a tribal reservation. In
addition to tribal reserved water rights, other federal rights, such as those associated with federal land reservations
such as national forests and national wildlife refuges, also may not be quantified. The uncertainties resulting from the
lack of quantification of these rights have led to ongoing legal disputes within the Klamath Basin.
Oregon undertook a general adjudication of water rights in the Oregon portion of the Klamath Basin (known as the
Klamath Basin Adjudication, or KBA) to address these disputes. The KBA began in the mid-1970s to determine water
rights among various users in the basin. The general process of the adjudication is as follows: parties with claims or
contests must file with the Oregon Water Resources Department (OWRD); an administrative panel then hears the
contests and issues proposed orders based on the hearing; and the OWRD reviews the proposed orders and issues
its final findings and order, which is filed with a state court. The OWRD’s final findings and order were filed with the
state court in March 2013. The order generally upheld previous claims and determined that the most senior claims in
the basin are held by the United States in trust for the Klamath Tribes and carry a priority date of “time immemorial.”
Even with the conclusion of the administrative adjudication, parties that are dissatisfied with the outcome may pursue
judicial appeals. For example, following the OWRD’s final determinations, parties may file “exceptions to the
Determination” with the state court. Following the state trial court’s decision, litigants may appeal through the state’s
court of appeals, state supreme court, and possibly the U.S. Supreme Court. Thus, although the KBA has been
completed and announced, appeals could prolong the disputes over the allocation of the Klamath Basin’s water
resources. In the meantime, some parties are able to make “calls” on water rights that were determined under the
adjudication. During the summer of 2013, the Klamath Tribes and Reclamation made a call on basin water rights for
the first time under the adjudication.
Sources: Or. Rev. Stat. 539.010 et seq., United States v. Braren, 338 F.3d at 973-74. All documents related to the
adjudication are available at http://www.oregon.gov/owrd/Pages/adj/index.aspx.

In addition to these events, an Oregon state water rights adjudication in the basin that was first
initiated in the 1970s received added attention in 2013 (See box above, “Klamath Water Rights
(...continued)
Appropriations Act, 2001 (P.L. 107-20), $2.2 million provided from the Bureau of Reclamation for payments to
farmers for groundwater, and an additional $13 million in USDA funding provided under other emergency authorities,
including crop insurance. For the 2006 fishery disaster declaration, the full funding amount was provided through the
Commerce Department under the U.S. Troop Readiness, Veterans’ Care, Katrina Recovery, and Iraq Accountability
Appropriations Act, 2007 (P.L. 110-28).
7
Personal correspondence, Bureau of Reclamation, June 6, 2012.
8
The 2010 funding was provided to Reclamation under the Supplemental Appropriations Act, 2010 (P.L. 111-212). For
more information on the USDA funding, see http://www.or.nrcs.usda.gov/programs/klamath/index.html.
9
$50 million to aid water conservation efforts in the Klamath Basin was provided in the 2002 farm bill (P.L. 107-171).
Additionally, funding under general authorities was provided under both the 2002 farm bill and the 2008 farm bill (P.L.
110-246), although exact amounts are not available.

Congressional Research Service

4

Klamath Basin Settlement Agreements

Adjudication”). At the conclusion of the adjudication’s administrative phase, the state of Oregon
upheld a number of previous water rights claims including, among other things, that the Klamath
Tribes have water rights with a date of “time immemorial.” These water rights are now protected
under Oregon law and were exercised over junior water rights holders in the basin for the first
time in the summer of 2013. The 2013 “call” on water rights (in which senior water rights holders
gave notice that their demands exceeded available flows) limited or shut off water deliveries to
some junior water rights holders (for the most part, off-project irrigators) in the upper basin.10

Klamath Settlement Agreements
In response to conflicts and other issues in the Klamath Basin, the federal government facilitated
talks among multiple groups between 2002 and 2010, including formal negotiations to reach two
major settlement agreements between 2006 and 2010.11 Participants in negotiations included state
governments, tribes, counties, irrigators, fishermen, conservation groups, and hydropower facility
owners and users. The goal of the negotiations was a long-term solution to the multiple water and
endangered species issues in the Klamath Basin, including the aforementioned issues associated
with irrigation deliveries and flows for fish, as well as potential issues associated with pending
water rights adjudications and relicensing of the basin’s hydroelectric dams. The two agreements
that resulted from the negotiations, the KBRA and the KHSA, are officially linked in that
signatories see them as complementary and do not support authorization of one agreement
without the other.12 Originally, both agreements were set to expire without congressional
authorization by 2012, but this deadline has been extended to 2014. In response to concerns and
outstanding issues in the upper basin, in 2013 a task force was convened to incorporate additional
issues not addressed by the KBRA and KHSA. Among other things, it resulted in an additional
settlement agreement in late 2013, the “Upper Klamath Basin Settlement Agreement,” discussed
below.

Klamath Basin Restoration Agreement
The KBRA was negotiated by stakeholders and other groups in the Klamath Basin. It was agreed
to by more than 40 signatories, or parties, although not all interests in the basin support it.
Broadly speaking, under certain conditions, parties to the KBRA promise to support diversions
for Klamath Project irrigators and federal wildlife refuges that correlate to a given year’s forecast
inflows into Upper Klamath Lake. Water that is surplus to these inflows and not subject to other
valid water rights (e.g., off-project diversions) would be allocated to other uses, including
instream flows (see Table 1 for an abbreviated summary of this arrangement). In exchange for
this support, environmental interests would gain additional federal and state funding for fisheries
restoration, some of the aforementioned surplus water supplies, and related assurances for dam
removal under the KHSA (which is expected to restore fisheries). Parties have also agreed that the
ESA will not be amended under the agreement. For their part, three of the four largest tribes in the
basin agreed to support the project and refuge diversions and not make a call on certain water
10

In contrast to the events of 2001, Klamath Project irrigators faced minimal curtailments to their irrigation supplies
resulting from the water rights call.
11
Although negotiations occurred throughout the early 2000s, many trace the current agreements to a series of
administrative hearings in 2006 related to the relicensing of the Klamath Hydroelectric Project under the Federal Power
Act (16 U.S.C. §797(e)).
12
The agreements, as well as other documents related to the Klamath restoration process, are available at
http://klamathrestoration.gov/.

Congressional Research Service

5

Klamath Basin Settlement Agreements

rights in exchange for the aforementioned restoration actions, federal actions to restore fisheries,
and economic aid.
Table 1. Water Allocations in the Klamath Basin Restoration Agreement (KBRA)
Water Forecasta

(in acre-feet of water)
Dry Yearb

Average Yearc

Wet Yeard

Klamath Reclamation
Project

March-Oct.: 340,000
Nov.-Feb.: 45,000

March-Oct. (formulabased): 340,000-385,000
Nov.-Feb.: 45,000

March-Oct.: 385,000
Nov.-Feb.: 45,000

Wildlife Refugee

March-Oct.: 48,000
Nov.-Feb.: 35,000

March-Oct. (formulabased): 48,000-60,000
Nov.-Feb.: 35,000

March-Oct.: 60,000
Nov.-Feb.: 35,000

Environmental/Otherf

NA

NA

NA

Source: Klamath Basin Restoration Agreement, Appendix E-1, p. E-26.
Notes: Units in acre-feet (a/f). Columns indicate the water allocation under a given forecast scenario. Rows
indicate the diversion reserved for a specific location.
a. Forecast references the March 1 Natural Resources Conservation Service Forecast for Net Inflow into
Upper Klamath Lake for the period April 1-September 30.
b. Dry indicates inflows less than 287,000 a/f. Section 19.2.2.B.v of the KBRA provides that if an extreme
drought is declared by the Oregon Water Resources Department and voluntary water conservation
measures triggered under the KBRA are insufficient, diversions may be reduced below the levels specified in
the KBRA.
c.
Medium indicates forecast inflows ranging from 287,000 a/f to 569,000 a/f.
d.
High indicates forecast inflows of more than 569,000 a/f.
e. The wildlife refuge allocation is expected to provide for unmet refuge demand in Lower Klamath National
Wildlife Refuge. Other diversions to wildlife refuges that are provided pursuant to existing laws and
contracts would continue to be provided for out of the Reclamation Project allocation.
f.
Additional allocations (including environmental flows for fish) are assumed in the KBRA but not provided
with a specific diversion limit or guarantee; thus, they are not displayed here.

The exact projections of the effects of the KBRA allocations on various water users are subject to
debate. However, compared to recent water years, the allocations are generally expected to result
in less water for Klamath Project irrigators in wet years but more certainty—and potentially
greater allocations than may have been the case otherwise—in dry years. Under the agreement,
area irrigators are also promised funding to develop low-cost power to replace hydropower
previously provided by the PacifiCorp dams, as well as funding to potentially make available
more water supplies through means yet to be determined.13 Irrigators who did not initially agree
to the KBRA, including some off-project irrigators in the upper basin, were not subject to the
KBRA’s assurances as they relate to tribal water rights. However, these irrigators have
subsequently come to an agreement with the Klamath tribes that may prevent future curtailment
of deliveries in exchange for promised retirement of some water rights and support for the KBRA
and KHSA.14

13
14

This may include, but not be limited to, lease or purchase of water.
See below section, “Upper Klamath Basin Settlement Agreement.”

Congressional Research Service

6

Klamath Basin Settlement Agreements

The federal government is not party to the KBRA until Congress enacts authorizing legislation.
Some of the actions envisioned by the KBRA have been interpreted as not being authorized and
would require significant federal appropriations to go forward. Initial estimates stated that total
federal costs to implement the Klamath agreements would be $798.5 million or $536 million over
15 years (depending on the assumptions used). A 2013 revision to these figures clarified that the
“new” appropriations needing to be authorized to implement the agreements would total
approximately $250 million over 15 years.15

Klamath Hydroelectric Settlement Agreement
The KHSA initiates a process that could lead to removal of four nonfederal hydroelectric dams
(J.C. Boyle, Iron Gate, Copco 1, and Copco 2) currently owned and operated by a private entity,
PacifiCorp. The agreement also provides related assurances. Most significantly, the KHSA lays
out a process for additional studies and environmental review by the Secretary of the Interior to
consider removal of the dams (known as the Secretarial Determination). Under the agreement,
the facilities’ removal would be paid for by ratepayers in California and Oregon ($200 million)
and an assumed California Water Bond ($250 million). The entity responsible for removal
(known as the Dam Removal Entity, or DRE) has yet to be defined.16 The KHSA also addresses
the interim operation of the dams as well as proceedings that could lead to transfer,
decommissioning and removal of the dams. The KHSA would transfer one dam (Keno Dam) to
the Bureau of Reclamation, and it would initiate a process to decommission other resources
associated with the project.
In contrast to the KBRA, the federal government was party to the KHSA. Reclamation has
interpreted some actions within the KHSA as not requiring an explicit authorization by Congress
(i.e., as being authorized under existing, more general, authorities), and these actions have been
completed. The central component of the KHSA, the dam removal study, was conducted under
Reclamation’s general authorities and finalized in October 2012.17 The Department of the Interior
(DOI) and most parties agree that congressional authorization is necessary to make a final
Secretarial Determination on dam removal and to move forward with that project.18 The
Secretarial Determination was originally expected by March 2012. However, since no authorizing
legislation has been enacted, the deadline (which was not binding) has passed.

Upper Klamath Basin Settlement Agreement
In July 2013, members of the Oregon congressional delegation requested that a separate task
force, the Klamath Basin Task Force, be convened to discuss several outstanding issues not
addressed in the Klamath agreements. These issues included (1) water rights conflicts in the
15

See below section, “Cost of Implementation.”
Recommendation of a Dam Removal Entity, or DRE, would be a part of the final Secretarial Determination, which
requires congressional authorization.
17
The dam removal study process included 50 different science, engineering, technical, and economic studies. See U.S.
Department of the Interior (DOI), U.S. Department of Commerce, National Marine Fisheries Service, Klamath Dam
Removal Overview: Report for the Secretary of the Interior, October 2012, at http://klamathrestoration.gov/sites/
klamathrestoration.gov/files/2013%20Updates/Final%20SDOR%20/
0.Final%20Accessible%20SDOR%2011.8.2012.pdf.
18
The settlement states that a final Secretarial Determination on dam removal may not be made until federal legislation
has been enacted. See, Klamath Hydroelectric Settlement Agreement, p. 20, at http://klamathrestoration.gov/sites/
klamathrestoration.gov/files/Klamath-Agreements/Klamath-Hydroelectric-Settlement-Agreement-2-18-10signed.pdf.
Accessed May 10, 2011.
16

Congressional Research Service

7

Klamath Basin Settlement Agreements

upper basin that were not addressed in the KBRA and that led to decreased irrigation deliveries in
summer 2013 (see above section, “Previous Events”);19 (2) power issues among both Klamath
Project and off-project irrigators; and (3) the perceived need to reduce the overall cost of the
Klamath agreements.
The task force released its report on December 3, 2013.20 It recommended support for authorizing
legislation with specific components in addition to the KBRA and KHSA, such as a new
settlement agreement among water rights holders in the Upper Klamath Basin (which was not
provided for in the original KBRA). It also recommended the inclusion of authority to serve offproject irrigators with the same low-cost power envisioned for Klamath Project irrigators under
the KBRA. Finally, it addressed cost concerns by recommending that any authorizing legislation
for the Klamath agreements include only new authorities and authorizations of appropriations
needed to execute the agreements at a total cost of $250 million over 15 years.21
The new settlement agreement recommended by the task force, the Upper Klamath Basin
Comprehensive Agreement (the Upper Basin Settlement) was circulated for public comments and
finalized in April 2014. It ostensibly would prevent a scenario such as the 2013 call on water
rights from occurring again in exchange for, among other things, an additional 30,000 acre-feet
per year in inflows into Upper Klamath Lake (resulting from reduced off-project agricultural uses
in the upper basin); it also would provide for certain riparian restoration actions and certain
regulatory assurances related to the ESA. In exchange, senior water rights holders have agreed to
not make a call on junior water rights similar to the one made in 2013. To be implemented, the
Upper Klamath Basin agreement would need to be ratified along with the KBRA in any future
authorizing legislation.

Congressional Action
The Klamath agreements require congressional authorization to be implemented. In the 114th
Congress, S. 133 would authorize the Klamath agreements, with certain changes. In the 113th
Congress, two bills were proposed to authorize the agreements: S. 2379 and S. 2727.22
S. 133 would provide congressional authorization of the actions described under the KBRA, the
KHSA, and the Upper Klamath Basin agreement. It would authorize approximately $250 million
in new federal activities envisioned under the KBRA and the Upper Basin Settlement for various
actions in the on-project plan.23 Some of the prominent activities from the agreements that would
be authorized (either directly or by reference) in the bill include a drought response plan, potential
water rights retirement for certain junior water rights holders, economic development payments
19

As stated above, the KBRA anticipated an off-project water agreement that was not included in the KBRA.
Klamath Basin Task Force, Report and Recommendations from the Klamath Basin Task Force to Senators Wyden
and Merkley, Congressman Walden, and Governor Kitzhaber, Final Review Draft, December 3, 2013, at
http://www.oregon.gov/gov/docs/KlamathBasinFinalDraftTaskForceReport2013-12-3.pdf.
21
This is less than previous estimates to implement the Klamath agreements and may be contingent on a number of
assumptions (see below section, “Cost of Implementation”).
22
The Senate Energy and Natural Resources Committee held a hearing on S. 2379 on June 3, 2014. The committee had
previously held a roundtable discussion on the Klamath agreements on June 20, 2013.
23
Previously, DOI determined in 2013 that 11 of the 113 line items in the KBRA require new federal authority.
Memorandum from John Bezdek, DOI, to Klamath Basin Task Force, November 20, 2013, at http://www.oregon.gov/
gov/GNRO/docs/
Exhibits%20to%20the%20Proposed%20Upper%20Klamath%20Basin%20Comprehensive%20Agreement/2013-1120%20Federal%20Authorities%20Memorandum.pdf. (Hereinafter “2013 Bezdek Memo.”)
20

Congressional Research Service

8

Klamath Basin Settlement Agreements

and activities for tribes, ecosystem restoration activities, and provision of low-cost power for
project and off-project irrigators. S. 133 would also provide congressional authorization for
certain steps under the KHSA that are important to the dam removal process moving forward. In
addition to authorization of new activities in the Klamath agreements, the bill also includes
assurances that certain preexisting rights and authorities (e.g., specific tribal claims/rights) would
not be affected.
Other significant changes to Klamath authorizing legislation have been made over time and are
included in S. 133. Among other things, the current legislation alters the proposed structure of the
dam removal arrangement so that the dam removal determination under the KHSA would be
made jointly by DOI and the states of Oregon and California (rather than being made solely by
DOI with concurrence by the states). Similar to legislation in the 113th Congress, S. 133 would
add new reporting requirements for dam removal (including a report on planned facilities removal
to be published one to two years prior to the removal of the dams) and ecosystem restoration, plus
several smaller alterations to individual provisions of the agreements. Among other things, it
would direct that dam removal costs include “reasonable compensation” for property owners
affected by dam removal and would alter the disposition of certain revenues from FWS lands in
the basin.

Issues for Congress
In considering legislation related to Klamath restoration, Congress may focus on a number of
issues, including the cost of implementing the legislation, its position on specific strategies and
actions in the two agreements versus the status quo, and the potential for future disruptions in
water supply deliveries in the basin. A brief discussion of some of these issues is provided below.

Role of the Federal Government
The role of the federal government in the Klamath Basin centers largely on operation of the
Bureau of Reclamation’s Klamath Project, management of several national wildlife refuges and
other fish and wildlife resources under the ESA, and tribal trust responsibilities.24 The federal role
has been contentious in the past and is a central question related to congressional consideration of
the Klamath agreements. Both agreements assume numerous actions by the federal government,
and, as noted earlier, a subset of these actions cannot go forward absent new congressional
authorization. In particular, the agreements envision an expanded federal role in the Klamath
Basin in regard to the dam removal process (i.e., a determination on dam removal), provision of
payments for water rights retirement, and pursuit of low-cost power for irrigators, among other
things. These actions are not currently authorized in the basin and have been proposed to alleviate
ongoing conflicts. Without authorization of these provisions, some supporters of the KBRA and
KHSA may withdraw their support for the agreements.
Supporters of the Klamath agreements argue that because of the federal government’s prominent
role in the basin, including its role in the area’s resource allocation conflicts, it has a
responsibility to help solve these issues. These groups note that federal involvement, including
operation of the Klamath Project, implementation of ESA, and management of fisheries and
federal lands, is central to conflicts in the basin. They argue that the agreements represent a
24

For example, in addition to its responsibilities under the federal ESA and Clean Water Act, as well as other federal
laws, DOI plays an important role in any potential call for administration of water rights under state law for project
irrigators, refuges, and the Klamath Tribes.

Congressional Research Service

9

Klamath Basin Settlement Agreements

consensus achieved by a majority of basin interests that are traditionally opposed to one another
and are the best opportunity to solve the region’s problems going forward. They also argue that
many of the expenses for these agreements are likely to be offset in the form of reduced future
federal expenditures for litigation and emergency financial support. Supporters also note that the
agreements will be a valuable source of jobs within the basin.25
Opponents of one or both of the agreements cite a number of reasons for their opposition. Some
note that the federal government has no clear obligation to authorize and implement the
agreements, and they contend that federal involvement in this case amounts to overreach that will
harm the local economy. These opponents have argued that the activities represented in both
agreements, such as dam removal and water quality improvements, could potentially occur
through preexisting processes and authorities.26 Some also generally oppose the removal of
operational dams and associated hydropower facilities, including those in the Klamath Basin, on
principle because of the dams’ status as an energy source. Finally, some argue against federal
authorization of the Klamath agreements because they believe that specific components of the
agreements will undermine existing federal laws (e.g., the ESA) or federal responsibilities (e.g.,
tribal trust responsibilities) or that they will fail to achieve their stated goals (e.g., fisheries
restoration).

Cost of Implementation
Some Members of Congress have expressed concerns about the cost to the federal government to
implement the agreements.27 Most have assumed that the majority of actions in the KBRA would
be federally funded, including the costs for the on-project plan, fisheries restoration, and tribal
components of the agreement. A detailed discussion of the estimated costs for the agreements (in
particular those for the KBRA) and how they have changed over time is provided below.
There have been multiple estimates of the cost to implement the Klamath agreements, and in
some cases these have contradicted one another or employed differing assumptions. The original
2010 KBRA estimated $970 million (in 2007 dollars) for the total cost to implement the KBRA
over a 10-year window. Most of these costs were assumed to be incurred by the federal
government, although the exact split was not specified.28 In 2011, this figure was revised to
estimate the federal government’s portion of expenses over a newly extended 15-year window.
This estimate indicated that the federal cost to implement the agreement over 15 years would be
$795 million (2007 dollars). Thus, there was a reduction in the estimated costs using constant
2007 dollars. The 2011 revision reflected increased state commitments for some activities and
altered assumptions in other areas.29 The 2011 estimate also included an estimate of “base”
25

DOI has estimated that dam removal itself will create approximately 1,400 jobs in the one-year timeframe for this
project, while other actions under the KBRA will create 4,600 jobs over 15 years, with additional gains to farming and
fisheries industries; See Klamath Regional Economics Fact Sheet, available at http://klamathrestoration.gov/sites/
klamathrestoration.gov/files/Econ.Fact.Sheet.Sept.21.pdf.
26
Thomas P. Schlosser, “Dewatering Trust Responsibility: the New Klamath River Hydroelectric and Restoration
Agreements,” Washington Journal of Environmental Law and Policy, vol. 1, no. 1 (July 2011), p. 60. Available at
http://digital.law.washington.edu/dspace-law/bitstream/handle/1773.1/1043/1WJELP042.pdf?sequence=1.
27
U.S. Congress, Senate Committee on Energy and Natural Resources, Water Resource Issues in the Klamath River
Basin, 113th Cong., 1st sess., June 20, 2013. Statement of Chairman Ron Wyden, http://www.energy.senate.gov/public/
index.cfm/files/serve?File_id=bf0f660b-1905-4515-9278-c26ddda53a21.
28
Cost estimates for the agreement were originally provided in the KBRA, Appendix C-2, p. C.6. Costs for the
agreement were estimated in 2007 dollars.
29
For a complete discussion of these changes, see Ed Sheets Consulting, “Klamath Basin Restoration Agreement
Revised Cost Estimates,” June 17, 2011, at http://216.119.96.156/Klamath/2011/06/RevisedCostEstimates.pdf.

Congressional Research Service

10

Klamath Basin Settlement Agreements

funding already being spent in the basin that could potentially reduce the “new” costs of the
agreements to the federal government, but it did not estimate the amount of budget authority
required for previously unauthorized activities.30 The first two estimates were most recently
revised in a December 2013 report by the Klamath Basin Task Force, which estimated that $923
million (in 2014 dollars) in federal funds would be required to implement the agreements and that
$250 million of this funding would come from newly authorized appropriations.31 The 2013
report also provided a retroactive estimate for the new authorizations of appropriations under the
2011 document. Table 2, below, provides a comparison of these costs, including estimates in
constant dollars.
Table 2. Comparison of Estimated Costs to Implement the KBRA
(dollars in millions)
2010 Initial KBRA
Estimate
(all costs)

2011 Revised
Estimate
(federal costs only)

2013 KTF Estimate
(federal costs only)

Estimated Costa
(nominal)

$970

$795

$923

Estimated Costa
(constant 2014 dollars)

$1,124

$926

$923

“New” Federal Budget
Authorityb
(nominal)

NA

$215

$250

“New” Federal Budget
Authorityb
(constant 2014 dollars)

NA

$247

$250

Sources: KBRA (2010), 2011 Revised Cost Estimates, and 2013 Klamath Task Force Report. Adjustments to
constant 2014 dollars are CRS estimates based on the FY2015 President’s budget request.
Notes: NA indicates the source did not include these estimates. KTF indicates Klamath Task Force. The KBRA
originally estimated that the agreements would be implemented over a 10-year window, but subsequent
revisions have provided estimated total costs over a 15-year window.
a. The 2010 KBRA was an estimate of all costs required to implement the KBRA (i.e., federal and nonfederal
costs) in 2007 dollars. The 2011 Revised Estimates estimated federal costs in 2007 dollars. The 2013
Klamath Task Force Estimate revised the 2011 federal cost estimates and used 2014 dollars.
b. The 2010 KBRA did not include an estimate for required “new” authorizations of appropriations. The
original 2011 Revised Cost Estimates provided an estimate of available “base” agency funding (i.e., ongoing
funding) that could further reduce the total estimated costs for the agreements, but it did not estimate new
budget authority required. The 2013 Klamath Task Force Report provided an estimate for new
authorizations of appropriations both for 2013 and for the 2011 document (retroactively), which are the
basis for the amounts shown here.

In contrast to the KBRA, cost estimates to implement the KHSA have not changed substantially
since the original agreement. They also have not garnered as much attention from Congress
because states are the primary entities responsible for funding dam removal under the KHSA.32
30

The 2011 revised estimates assumed that approximately $262 million in base or redirected federal funding would be
available in future years toward purposes outlined in the Klamath agreements.
31
See 2013 Bezdek Memo. The 2013 document also appeared to retroactively revise the 2011 assumption of $799
million for total federal funding down to $795 million.
32
The KHSA provides that the states of California and Oregon are responsible for up to $450 million of the costs for
dam removal, but it makes no provision for costs beyond this cap. If estimates conclude that costs are likely to exceed
$450 million, then the Secretary must put off a determination until a plan to address these costs is developed.

Congressional Research Service

11

Klamath Basin Settlement Agreements

Previous studies by DOI to inform the Secretarial Determination estimated potential costs of
approximately $290 million for dam removal, which is less than the combined amount anticipated
to be available from ratepayers ($200 million) and the state of California ($250 million).33 One
potential issue related to these costs is whether the dam removal determination will recommend
the federal government as the dam removal entity. If so, a major question may be how additional
costs for dam removal, such as cost overruns and costs resulting from potential lawsuits, would
be handled.
There is no formal estimate of potential future savings to state and federal governments
associated with the agreements. Supporters point to previous costs to federal and state
governments that would be unlikely to occur if the agreements are implemented, including at
least $170 million in supplemental aid for irrigators and fisheries that has been provided since
2001.34 Advocates also point to decreased costs for litigation as a result of agreements. Although
the agreements would not prevent future litigation, supporters argue that, if authorized, they
would obligate parties to pursue other dispute resolution mechanisms that are expected to be less
costly and would thus render future litigation costs less likely.35 Opponents note that none of
these savings are guaranteed under the agreements and that supplemental appropriations and
expenditures for litigation may still be necessary.
In addition to savings, supporters also argue that the KBRA and KHSA could create economic
benefits, both in terms of traditional and “non-use” benefits. Studies commissioned to advise
DOI’s secretarial determination on dam removal estimated that the total potential value of
restoration, including non-use values, could total $16 billion-$84 billion, depending on the
assumptions and methodology used.36 Some dispute these estimates and argue that they are
unrealistically large or derived from questionable methodologies.
Obtaining authorization and appropriations for these activities from Congress may be difficult. In
the 113th and 114th Congresses, authorization of new programs and projects by both chambers has
been limited. Beyond authorization of new funds, some observers also note that it is unlikely that
federal agencies will obtain the new appropriations envisioned for the KBRA in a constrained
budgetary environment. Hypothetically, a lack of discretionary appropriations or overall progress
associated with future actions assumed in the KBRA or KHSA could affect the status of support
for either agreement among the parties and thus cause additional conflicts among the agreement’s
supporters. Supporters have for the most part acknowledged these difficulties, but they argue that
initial authorization of the agreements is an important first step and that the basin’s issues are
important enough to warrant congressional authorization and funding.

33

DOI, “Final Secretarial Determination Overview Report,” October 2012. p. 28, at http://klamathrestoration.gov/keepme-informed/secretarial-determination/role-of-science/secretarial-determination-studies.
34
See “Previous Events” section for a breakdown of this funding.
35
This includes potential forgone costs for litigation that would have been pursued absent the Upper Klamath Basin
Agreement in Principle, whose execution is connected to the Klamath agreements.
36
DOI, Secretarial Overview Report for the Secretary of the Interior: An Assessment of Science and Technical
Information, January 23, 2012, p.364, at http://klamathrestoration.gov/sites/klamathrestoration.gov/files/
2013%20Updates/Final%20SDOR%20/0.Final%20Accessible%20SDOR%2011.8.2012.pdf. Non-use values were
calculated based on regional and national surveys that asked respondents to estimate their willingness to pay for
different restoration scenarios.

Congressional Research Service

12

Klamath Basin Settlement Agreements

Dam Removal
Some believe that congressional authorization of the agreements (in particular the KHSA) would
be an implicit endorsement of dam removal. Since authority for the Secretary of the Interior to
make a final determination on dam removal is a key step in the KHSA, some argue that
authorization of the agreements is the primary opportunity for Congress to weigh in for or against
this decision. Although it did not formally recommend dam removal, the study findings intended
to inform the Secretary’s dam removal determination did not find major drawbacks associated
with this course of action. Thus, some have concluded that if Congress authorizes the dam
removal determination to go forward, a finding that dam removal would be in the public interest
is likely. While many in Congress support dam removal as a means to restore rivers, others see it
as an unnecessary and expensive step that decreases the availability of renewable energy.
Additionally, while the KHSA anticipates that ratepayers and the state of California will be the
primary entities funding dam removal, the extent to which the federal government will be
involved in this process remains unclear.
Science and the Klamath Agreements
The science underpinning water allocation and other decisions in the Klamath Basin has been contentious. Most
prominently, the biological opinions by the Fish and Wildlife Service (FWS) and the National Marine Fisheries Service
(NMFS) that led to the 2001 decision to not make deliveries available to the Klamath Project were extremely
controversial. Reclamation’s 2002 decision to reject the NMFS and FWS opinions was similarly controversial. This
decision was the subject of a 2004 National Research Council review, which concluded that scientific data were
insufficient to support the FWS and NMFS management regimes that had been proposed for Upper Klamath Lake for
the 2001 growing season. However, the review found support for other measures in the biological opinions.37
The science underpinning the KBRA and the KHSA has also been criticized. The KHSA underwent lengthy peer
review and public comment processes but was the subject of a scientific integrity complaint by a Reclamation science
advisor who alleged that DOI violated a 2009 executive order by misrepresenting the effect of dam removal on
salmon in study summaries, among other things.38 On January 7, 2013, seven Reclamation biologists filed a separate
scientific integrity complaint, alleging that Reclamation officials violated DOI scientific integrity policies by threatening
to reassign or eliminate scientists within the Fisheries Resources Branch of the Klamath Basin Area Office.39 These
officials argue that they were targeted for retribution because their science contradicted that of other agencies, such
as FWS and NMFS. Finally, a complaint related to the scientific analysis underpinning dam removal was also filed with
DOI by the Siskiyou County Board of Supervisors in April 2013.40

Stakeholders disagree on whether dam removal would happen without the KHSA and the related
determination by the Secretary of the Interior. Opponents have noted that PacifiCorp-funded dam
removal would be likely under FERC relicensing conditions; however, PacifiCorp and other
supporters of the KHSA note that a different outcome (such as fish passage upgrades) could occur
under the FERC process for a number of reasons (for more information, see below section,
“Stakeholder Views”).

37

National Academy of Sciences, National Research Council, Endangered and Threatened Fishes in the Klamath River
Basin: Causes of Decline and Strategies for Recovery, (Washington, DC: National Academies Press, 2004), p. 81.
38
The complaint is available at http://prhouser.com/allegation.pdf.
39
This complaint is available at http://www.peer.org/assets/docs/noaa/
1_7_13_PEER_Scientific_Misconduct_Complaint.pdf.
40
The complaint is available at http://media.redding.com/media/static/Scientific_Integrity_Complaint_20130319.pdf.

Congressional Research Service

13

Klamath Basin Settlement Agreements

Implementation of ESA
The extent to which the Klamath agreements will alter implementation of the ESA and other
federal laws is a matter of disagreement. Previous biological opinions established minimum flows
on the Klamath River for coho salmon, as well as actions intended to aid the recovery of Lost
River and shortnose suckers. According to supporters, the Klamath agreements will be considered
to the maximum extent practicable under the ESA.41 At the same time, both agreements state that
implementation of the agreements shall not affect implementation of the ESA by DOI or the
NMFS.42 A perceived conflict between these two objectives, and a lack of clarity on how exactly
they will be interpreted and implemented, has resulted in ongoing disagreements among some
stakeholders.
While the agreements do not waive application of the ESA, some groups that were not signatories
argue that certain provisions—in particular the defined water allocations for irrigators—would
undermine the ESA. These groups note that the allocations for irrigators would provide more
water than irrigators received under ESA stipulations during recent low water years and would
thus decrease flows from amounts provided under recent biological opinions and provide less
water for fisheries. They note that while other processes under the ESA would technically go
forward, the assurances in the agreements, if adopted in legislation, could result in additional
pressure on regulatory agencies to adopt biological opinions that allow the flows set forth in the
proposed Water Resources Program.43
Supporters note that the Klamath agreements would provide for more resources and actions to
improve habitat for fish species, which they argue are just as important as the difference in flows
that could occur under some scenarios. Improvements under the KBRA, including new fish
habitat and improved water quality, are assumed to result in greater fish abundance, which would
in turn allow managers to forgo the previous restrictive flows that were provided under the ESA.
Furthermore, some believe that the KBRA could in the long term encourage more cooperative
actions, which could improve the likelihood of listed species’ recovery and are preferable to
previous “top-down” regulatory actions.

Stakeholder Views
While stakeholder views on the Klamath agreements can broadly be divided into those supporting
the agreements and those opposed to one or both of the agreements, such a simple
characterization may not do justice to the various motives, preferences, and specific interests of
many of these groups. Although a majority of interest groups involved in initial settlement
negotiations endorsed both agreements, reasons for support among these groups are varied and in
some cases are likely to be contingent on specific parts of the agreements (e.g., guarantees related
to water supplies, whether or not dam removal is provided for, etc.) going forward. Among those
opposed to the agreements, reasons for opposition also vary widely. They include reasons ranging
41

Klamath Basin Coordinating Council, “Summary of the Klamath Basin Settlement Agreements,” May 2010, at
http://216.119.96.156/Klamath/Summary%20of%20Klamath%20Settlement%20Agreements%204-5-10.pdf.
42
For example, see KBRA §§2.1, 19.1, 20.3.1, and 22.5.
43
The 2013 joint biological opinion for the operation of the Klamath Project concluded that the ongoing operation of
the project as proposed by Reclamation is not likely to jeopardize the existence of federally listed species. National
Marine Fisheries Service, U.S. Fish and Wildlife Service, Biological Opinions on the Effects of Proposed Klamath
Project Operations from May 31, 2013, through March 31, 2023, on Five Federally Listed Threatened and Endangered
Species, SWR-2012-9372, Klamath Falls, Oregon, May 2013, at http://www.usbr.gov/mp/kbao/docs/
Klamath_Project_Biological_Opinion.pdf.

Congressional Research Service

14

Klamath Basin Settlement Agreements

from perceived economic damages resulting from the agreements to the agreements’ overall lack
of environmental protections or effect on implementation of existing laws.

Support for Agreements
Among those supporting the Klamath agreements are all the parties listed as nonfederal parties
within both the KBRA and the KHSA. For the KBRA, this includes 5 state agencies in Oregon
and California, 3 tribes, 1 county (Humbolt County, in California), 25 parties related to the
Reclamation Project, some off-project interests, and several other groups (including
environmental interests). These same groups are also party to the KHSA.44
Other groups and individuals were not party to the agreements but have stated their support for
them. These include, most recently, off-project irrigators in the upper basin who have agreed to
support the Klamath agreements under the Upper Klamath Basin Agreement in Principle, signed
in April 2014. Notably, supporters have agreed to support authorizing legislation for both
agreements (e.g., KBRA signatories have backed enactment of the KHSA) and have generally
argued that the agreements themselves must be linked.
The states of California and Oregon, as well as the Obama Administration, support the
agreements because they represent a potential solution to the protracted resource conflicts in the
upper and lower basins. Government representatives also have pointed to the costs that resulted
from previous conflicts in the basin, including supplemental aid, crop insurance, mitigation
actions, and litigation costs.
Other groups have chosen to support the agreements not only for their potential to end conflicts in
the basin but also because they include specific provisions that are important to certain groups.45
For instance, environmental groups have pledged to support the allocations for irrigation absent a
similar allocation for fish in exchange for assurances of dam removal under the KHSA and other
promised fisheries restoration actions under the KBRA. Among irrigators, those on the Klamath
Project have pledged to support restoration provisions and less water in wet years in exchange for
benefits from water supplies in dry years that presumably would be higher than under the status
quo. Approximately half of the off-project irrigators in the upper basin support the agreements, in
some cases because the agreements offer potential alternatives that are preferable to losing water
deliveries outright due to their junior water rights status.46
For its part, PacifiCorp notes that it supports removal of its four dams under the KHSA because
retirement of the dams under the terms of the KHSA reportedly represents a more cost-effective
option for its ratepayers than FERC relicensing.47 Previously there have been disagreements over
which option the company would pursue in absence of the KHSA: FERC relicensing for ongoing
operations on all four dams (which would entail costly improvements for fish passage, and altered
44

See KHSA, pp 1-2.
General obligations for nonfederal parties to support the agreement are laid out in Part I of the KBRA.
46
While off-project irrigators are not provided with similar assurances to those of project users for water supplies, they
may stand to benefit from other programs in the agreement that would not otherwise be available to them, such as the
water rights retirement program.
47
As part of the approval process for the ratepayer surcharge for dam removal under the KHSA in Oregon and
California, PacifiCorp presented information and received concurrence from state regulatory agencies that its proposed
ratepayer increases under the KHSA were fair and reasonable for customers compared to likely costs under relicensing.
PacifiCorp estimated that relicensing actions such as construction of fish passage and water quality facilities, as well as
reduced flow conditions, would cost in excess of $460 million and would entail more costs to ratepayers than the
approximately $200 million ($172 million in 2010 dollars) pledged under the KHSA.
45

Congressional Research Service

15

Klamath Basin Settlement Agreements

operations for water quality) or a surrender of its license and related decommissioning of some or
all of the Klamath hydropower projects.48 Both options would likely be costly for PacifiCorp and
its ratepayers, and could potentially cost the company more than the arrangement under the
KHSA.49 The KHSA also has the added benefit of allowing the company to operate the dams
under the current management regime through 2019, through annual extensions to the project’s
FERC license.

Opposition to Agreements
Some groups and individuals oppose the Klamath agreements and their authorization. Some of
these parties were initially involved in settlement negotiations but dropped out for various
reasons, while others were not invited to participate in negotiations because they were not seen as
representing significant interests. Still others, including county officials in the areas of the
Reclamation project and dams, oppose the agreements in their elected capacities. Notable
opponents of the Klamath agreements include local officials in Klamath County in Oregon and
Siskiyou County in California, the Hoopa Valley and Resighini Rancheria and Quartz Valley
tribes, the Northcoast Environmental Center, Waterwatch of Oregon, Oregon Wild, and others. As
noted above, some groups that initially opposed the agreements, including approximately half of
the off-project irrigators in the upper basin, recently reached an agreement, the Upper Basin
Agreement, the effectiveness of which is tied to the authorization of the KBRA and KHSA. Other
opponents, including Klamath and Siskiyou County, have since stated their opposition to that
agreement for its ties to the KBRA and KHSA (which they also oppose).50
Some groups oppose the agreements because they believe the agreements will further damage the
region’s economy. Some off-project users continue to oppose the agreements (including the
Upper Basin Settlement) because of economic damages to farmers resulting from water rights
retirement and restoration requirements. Siskiyou County has opposed the agreements for a
number of reasons, including the assertion that the PacifiCorp dams provide flood protection and
economic benefits for downstream areas.51 Some residents and officials in these areas also oppose
dam removal because of an expected loss of property taxes associated with certain lands that will
lose lake frontage when the dams are removed.52
Others argue that the agreements do too little to benefit fisheries and give up too much to farmers
and other interests. For instance, the Hoopa Valley Tribe has been critical of the agreements
48

A previous study by the California Energy Commission and the Bureau of Reclamation found that removal of all
dams would be the most cost-effective action for PacifiCorp (i.e., less expensive than modification and ongoing
operation of the dams), and some have argued that without the KHSA, the dams would be removed. The final
environmental impact statement for FERC relicensing of the project (i.e., before the KHSA was signed) recommended
a new license with fish passage and other modifications (see http://www.ferc.gov/industries/hydropower/enviro/eis/
2007/11-16-07.asp for relicensing documents), which PacifiCorp has argued would be prohibitive (see above note).
While some have argued that these costs would eventually force PacifiCorp to surrender its license and fund dam
removal itself, PacifiCorp argues that it would pursue relicensing over license surrender and customer-funded dam
removal, which have no cap on expenses or liability protections such as those included in the KHSA.
49
As proposed, dam removal under the KHSA would be funded partially by ratepayers, with the other portion assumed
to be funded by the State of California. (The status of the latter funding is contingent on a water bond scheduled for a
statewide election in November 2014.)
50
Letter from Siskiyou County Board of Supervisors and Klamath County Board of Commissioners to the Honorable
Mary Landrieu, Chair, Committee on Energy and Natural Resources, May 30, 2014.
51
DOI has argued that these concerns are unfounded.
52
This is particularly the case in Siskiyou County, where a large majority of voters have previously expressed
opposition to removal of the three PacifiCorp dams in California.

Congressional Research Service

16

Klamath Basin Settlement Agreements

because it feels that the provisions of the KBRA have the potential to terminate the duty of the
United States to assert and protect tribal fishery rights when they conflict with operation of the
Klamath Reclamation Project. The tribe argues that the KBRA would subordinate its senior
priority water rights to the junior water rights of the irrigation project.
Some opponents have also focused on the uncertain nature of fisheries restoration in the Klamath
under the KBRA. Some contend that these uncertainties were highlighted in expert panels as a
part of the larger DOI dam removal study process but were not adequately acknowledged by DOI
in its final studies.53 Some of these groups favor dam removal but argue that removal could be
achieved through the existing FERC relicensing processes and does not need to be tied to the
KBRA. They note that by providing annual renewals of the FERC license for the Klamath
Hydroelectric Project, the KHSA allows the company to avoid project upgrades (or removal) that
would otherwise be paid for by the company and benefit fisheries in the short term.54 Combined
with a lack of performance metrics for fisheries restoration provisions and promises to not make a
call on project water rights holders under the KBRA, these opponents assert that the agreements
disproportionately benefit PacifiCorp and irrigators at the expense of fisheries.
Some environmental groups oppose other provisions of the Klamath agreements and dropped out
of negotiations as a result. Waterwatch of Oregon and Oregon Wild find fault with a number of
the provisions in the agreements, including the lack of water supplies for fish and the inclusion of
lease-land farming on wildlife refuges.55 Along with the Hoopa Valley Tribe, these groups have
called for voiding the KHSA and resuming water quality certification processes under the Clean
Water Act to force dam upgrades or removal through a separate process, which they argue will be
more expedient and less costly for state and federal taxpayers (i.e., a process to be funded by
PacifiCorp and potentially its ratepayers).56
The Yurok Tribe, which initially supported the Klamath agreements, issued a notice of withdrawal
from the agreements in September 2015. Among other things, the tribe cited inaction by Congress
and disagreements with the provisions of the Upper Klamath Settlement Agreement, in which it
was not invited to participate.

53

In particular, the expert panels associated with Chinook and Coho salmon pointed out uncertainties associated with
ongoing water quality issues that some believe were not properly reflected in summary documents. See, for example,
http://prhouser.com/allegation.pdf.
54
Thomas P. Schlosser, “Dewatering Trust Responsibility: The New Klamath River Hydroelectric and Restoration
Agreements,” Washington Journal of Environmental Law and Policy, vol. 1, no. 1 (July 2011), p. 42, at
http://digital.law.washington.edu/dspace-law/bitstream/handle/1773.1/1043/1WJELP042.pdf?sequence=1.
55
See KBRA, Section 15.4.3.
56
Ani Kame'enui and Alexander Borack, “Op-ed: Water Quality Suffers as Congress Dithers,” Redding Record
Searchlight, June 13, 2011.

Congressional Research Service

17

Klamath Basin Settlement Agreements

Author Contact Information
(name redacted)
Specialist in Natural Resources Policy
[redacted]@crs.loc.gov
, 7-....

(name redacted)
Specialist in Natural Resources Policy
[redacted]@crs.loc.gov
, 7-....

(name redacted)
Analyst in Natural Resources Policy
r[ edacted]@crs.loc.gov
, 7-....

(name redacted)
Legislative Attorney
[redacted]@crs.loc.gov , 7-....

Congressional Research Service

18

EveryCRSReport.com
The Congressional Research Service (CRS) is a federal legislative branch agency, housed inside the
Library of Congress, charged with providing the United States Congress non-partisan advice on
issues that may come before Congress.
EveryCRSReport.com republishes CRS reports that are available to all Congressional staff. The
reports are not classified, and Members of Congress routinely make individual reports available to
the public.
Prior to our republication, we redacted names, phone numbers and email addresses of analysts
who produced the reports. We also added this page to the report. We have not intentionally made
any other changes to any report published on EveryCRSReport.com.
CRS reports, as a work of the United States government, are not subject to copyright protection in
the United States. Any CRS report may be reproduced and distributed in its entirety without
permission from CRS. However, as a CRS report may include copyrighted images or material from a
third party, you may need to obtain permission of the copyright holder if you wish to copy or
otherwise use copyrighted material.
Information in a CRS report should not be relied upon for purposes other than public
understanding of information that has been provided by CRS to members of Congress in
connection with CRS' institutional role.
EveryCRSReport.com is not a government website and is not affiliated with CRS. We do not claim
copyright on any CRS report we have republished.

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/crs%3AR42158. Public record. Not legal advice.