# Military Readiness, Operations Tempo (OPTEMPO) and Personnel Tempo (PERSTEMPO): Are U.S. Forces Doing Too Much?

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/crs%3A98-41

## Record

- **Collection:** Congressional research report
- **Document type:** CRS Report
- **Published:** January 14, 1998
- **Citation:** 98-41

## Text

98-41 F

CRS Report for Congress
Received through the CRS Web

Military Readiness, Operations Tempo
(OPTEMPO) and Personnel Tempo
(PERSTEMPO): Are U.S. Forces Doing Too
Much?
January 14, 1998

(name redacted)
National Defense Fellow
Foreign Affairs and National Defense Division

Congressional Research Service ˜ The Library of Congress

Military Readiness, Operations Tempo and Personnel
Tempo: Are U.S. Forces Doing Too Much?
Summary
Are U.S. forces doing too much? Arguably. Although the armed forces of the
United States are meeting mission requirements while maintaining an acceptable level
of readiness, indications are that under the current strategy, with existing forces
postured and organized for high intensity conflict, the sustainment of both high levels
of activity and high readiness will be difficult. Whether or not U.S. forces can
continue to sustain the current level of effort is an open question. With either the
addition of new global commitments, a reduction in available forces, or a decrease in
funding, readiness may be in jeopardy. Under different strategies, readiness could be
more sustainable but the level of risk to U.S. interests may increase. Reductions in
force structure or funding without commensurate reductions in assigned missions
may, regardless of the overall strategy, jeopardize readiness and operations.
This issue is in a new context for U.S. forces: peacetime operations are larger,
longer, more intense, and more complex than ever; the stockpiled capacity of the
global-war-based force is diminished; high levels of activity may no longer equate to
high readiness; and the force structure has decreased more than the infrastructure.
With the size of current commitments larger than anticipated in the Bottom Up
Review, workloads on the smaller force are demonstrably higher. U.S. military power
designed to react to threats is now more often a proactive tool of foreign policy.
Competition for resources between new missions and standing requirements is
heightened by open-ended operations and the needs of regional commanders. It is
difficult to assess the stress in this new context as measurements of both activity and
readiness need improvement; there is no “Opportunity Cost” evaluation; and no
clear picture of what constitutes a sustainable level of effort.
Understanding the new demands is the first step toward resolution. Measures
are OPTEMPO for the rate of unit activity, and PERSTEMPO for the sum of all
individual absences and activity. Tempos are too high/low if they are causing forces
to lose their capacity to sustain operations and meet crises. Tempos affect the
dynamic relationship of budget, readiness, and force structure decisions and bear
attention in these areas: readiness, quality of life, modernization, personnel, and
retention. The most significant negative impact of tempos that are too high is the
reduction in time and resources for relevant, necessary training, the basis of readiness
and long-term effectiveness. Over time, the continual wear on personnel and their
families may result in difficulties retaining and recruiting high quality volunteers.
Areas of congressional action bearing on readiness concern the National Guard
and Reserve, military infrastructure, military end-strength, specialized units and
equipment, incentives, increased reporting to Congress by DoD, and the option of
ending operations that are not moving toward a predefined “Exit.” Oversight areas
include validating employment concepts, considering resources for training while
deployed, reviewing and setting minimum training time guidelines, prioritization of,
and early determination of, exercise requirements, determining the number and
duration of required inspections, and ascertaining and allowing appropriate “down
time” for units following deployments.

Contents
Introduction and Major Findings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Major Findings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
The nature of operations other than war has changed . . . . . . . . . . . . . 2
Forces decreased while requirements increased . . . . . . . . . . . . . . . . . . 2
High activity doesn’t always equal high readiness . . . . . . . . . . . . . . . . 2
Reductions not commensurate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Current operations are larger and more extensive than expected . . . . . 2
Smaller forces and increased commitments equal higher workloads . . 3
Causes of high levels of military activity . . . . . . . . . . . . . . . . . . . . . . . 3
Useful assessments of readiness and stress needed . . . . . . . . . . . . . . . 4
Impacts and implications are significant . . . . . . . . . . . . . . . . . . . . . . . 4
Modernization Issues are Dynamic . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Force Structure: Dangers and dynamics . . . . . . . . . . . . . . . . . . . . . . . 6
The Quadrennial Defense Review debate may help . . . . . . . . . . . . . . . 7
Background and Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
One Force, Two Strategies: The QDR and Greater Demand . . . . . . . . . . . 9
A peacetime Major Regional Contingency equivalent . . . . . . . . . . . . 10
Capacity vs Commitments: A dynamic relationship . . . . . . . . . . . . . . . . . . 14
Measuring Commitments and Capacity . . . . . . . . . . . . . . . . . . . . . . . 16
Measuring OPTEMPO/PERSTEMPO . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Why measure OPTEMPO? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Why measure PERSTEMPO? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
No single standard for PERSTEMPO exists within DoD . . . . . . . . . 18
Comparing Navy and Air Force approaches . . . . . . . . . . . . . . . . . . . 19
Navy PERSTEMPO Rules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Air Force PERSTEMPO Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Measuring Readiness in OPTEMPO Terms . . . . . . . . . . . . . . . . . . . . . . . 24
NO “Opportunity Cost” evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . 24
PERSTEMPO measures cannot drive unit deployment decisions . . . 24
Readiness and OPTEMPO/PERSTEMPO . . . . . . . . . . . . . . . . . . . . 24
Unit Indicators of High Stress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
A New Readiness Paradigm Emerging . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Counting Capability: The Best Way to Assess Capacity . . . . . . . . . . . . . . 28
What can we do with the forces we have available? . . . . . . . . . . . . . 28
What part of our capability is not currently available? . . . . . . . . . . . . 28
Battalions, squadrons, and ships . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Estimating time and effort to extricate and redeploy as C-1 . . . . . . . 29
Why OPTEMPO Is High . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Overseas presence down = fewer forces for more tasks . . . . . . . . . . 29
The changing nature of military operations . . . . . . . . . . . . . . . . . . . . 32
Why High Optempo Is a Problem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
Congressional understanding key to successful innovation . . . . . . . . 36
Maintaining a Viable Force . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Continuity in Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
Bottom Line: Sustaining a high operational tempo difficult . . . . . . . 42

Value of Monitoring OPTEMPO/PERSTEMPO . . . . . . . . . . . . . . . . . . . 42
OPTEMPO/PERSTEMPO and the QDR . . . . . . . . . . . . . . . . . . . . . 42
Current Trends . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
A Conceptual Framework: Decreasing Size vs Increasing Workload . . . . 44
Smaller forces, increased commitments equal higher workloads . . . . 44
What is the percentage of troops involved in current operations? . . . 47
Korea: Compounding the PERSTEMPO problem for individuals . . . 48
An example: What it takes to keep within tolerable limits . . . . . . . . . 48
“It’s NOT war” — Home Station Hurt . . . . . . . . . . . . . . . . . . . . . . . 51
Trends in retention and reenlistments . . . . . . . . . . . . . . . . . . . . . . . . 51
Pentagon Efforts: Protecting long-term military effectiveness . . . . . . . . . . 51
An example: Air Force Global Sourcing . . . . . . . . . . . . . . . . . . . . . 52
What Do the Facts Mean? Understanding the Implications . . . . . . . . . . . 54
At the individual level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
At the unit level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
At the service level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
At the DoD level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Future Trends in OPTEMPO/PERSTEMPO . . . . . . . . . . . . . . . . . . . . . . 55
Key Issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Overview: Areas of Congressional Concern . . . . . . . . . . . . . . . . . . . . . . . 57
Understanding the new dynamics . . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Budget Implications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Direct and Indirect Affects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Direct Effects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Indirect Effects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Summary: Budget, Readiness, Force Structure affect OPTEMPO . . 61
Readiness Implications: “Ready for what?” . . . . . . . . . . . . . . . . . . . . . . . 62
Prepare, Deploy, Recover — Paying for the cycle with readiness . . . 63
Intangibles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Tangibles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Summary: Readiness is pervasive . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Force Structure Implications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
The dangers and options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Summary: Maintaining sustainable OPTEMPO/PERSTEMPO . . . . . 66
Options for Congress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
Options for Congressional Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
National Guard and Reserve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
Infrastructure and End-Strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
Incentives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
Expand and Increase Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
Reporting “capacity” in a high OPTEMPO environment . . . . . . . . . . 69
Supplemental Appropriations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70
Congressional Action to End Ongoing Operations . . . . . . . . . . . . . . 70
Some key questions regarding ongoing operations . . . . . . . . . . . . . . 70
Oversight Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
Validating employment concepts . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
“Cop on the Beat” force employment option . . . . . . . . . . . . . . . . . . 72
Increasing resources for training while deployed . . . . . . . . . . . . . . . . 72

Reviewing and setting minimum training time guidelines . . . . . . . . . . 73
Congressional action to protect the training base of U.S. forces . . . . 73
Prioritization of exercise requirements . . . . . . . . . . . . . . . . . . . . . . . 74
Reducing the number and duration of required inspections . . . . . . . . 74
Providing “down time” to units following deployments . . . . . . . . . . . 74
For Additional Reading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76

List of Figures
Figure 1.“Conflict Dynamics” as published in the Bottom Up Review . . . . . . . 12
Figure 2. “Conflict Dynamics” adjusted for operations 1992-1997 . . . . . . . . . 13
Figure 3. Strategy, force structure, readiness dynamic. . . . . . . . . . . . . . . . . . . 15
Figure 4. Comparison of Navy carrier versus an Air Force fighter wing . . . . . . 21
Figure 5. Additional requirements on Naval aviation units . . . . . . . . . . . . . . . . 22
Figure 6. Cyclical readiness levels of a Navy carrier deployment rotation . . . . 23
Figure 7. The number and type of exercises contribute to OPTEMPO . . . . . . . 31
Figure 8: Intensity of USAF operations is increasing . . . . . . . . . . . . . . . . . . . . 33
Figure 9. Operations involving USAF assets are becoming longer . . . . . . . . . . 34
Figure 10. As operations increase, participation in exercises decreases . . . . . . 35
Figure 11. Decreasing end-strength and increasing deployments . . . . . . . . . . . 37
Figure 12. Increasing commitment to overseas operations . . . . . . . . . . . . . . . . 38
Figure 13. Theoretical annual schedule of an Air Force squadron . . . . . . . . . . 40
Figure 14. Unplanned days reduce the number of actual training days . . . . . . . 41
Figure 15. Ship steaming days per quarter 1971-1999. . . . . . . . . . . . . . . . . . . 46
Figure 16. Number of crews required to meet requirements . . . . . . . . . . . . . . 49
Figure 17. Increase in crew requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
Figure 18. Share of the burden of current operations “Global Sourcing” . . . . . 53

List of Tables
Table 1. Service-specific Deployment Definitions and Policies . . . . . . . . . . . . 18
Table 2. Indicators of Personnel Stress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Table 3. Indicators of Equipment Stress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
Table 4. Force Structure Drawdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Table 5. Estimated PERSTEMPO Days Annuallya . . . . . . . . . . . . . . . . . . . . . 45
Table 6. Costs of U.S. Peacekeeping Commitments FY1992-1996 . . . . . . . . . 58

Military Readiness, Operations Tempo
(OPTEMPO), and Personnel Tempo
(PERSTEMPO): Are U.S. Forces Doing Too
Much?
Introduction and Major Findings
Introduction
In order to meet the challenges confronting the United States, the nation’s
leaders seek to strike a balance between (a) the military’s capability, as an instrument
of national power, to prepare to meet both large and small-scale challenges to vital
interests and (b) its ability to deal with important but lesser interests. With finite
resources, peacetime militaries can only sustain a finite level of activity beyond that
required to maintain military readiness and effectiveness through training, exercises,
and maintenance. In a force that is too busy, the cumulative effects of lost training
time, missed exercises, unprogrammed expenditures, and extended deployments can
degrade the overall capability of the force. In a force that is not busy enough,
however, a lack of training and experience in exercises and actual operations may also
be detrimental.
In testimony before the Congress, the Joint Chiefs assess that the armed forces
of the United States, as currently postured, are meeting mission requirements while
maintaining an acceptable level of readiness. This level of effort is not without cost.
How long U.S. forces can continue to sustain this level of effort is a question worth
asking. Reductions in force structure or funding without commensurate reductions
in assigned missions may upset the balance between readiness and current operations.
This paper will define the scope and implications of the armed service’s challenge
of sustaining the current level of operations, identify the dynamic relationship between
congressional action and military activity levels as it relates to budget, readiness, and
force structure decisions, and discuss options for Congress. Using information from
the Congressional Research Service (CRS), the Department of Defense (DoD), the
General Accounting Office (GAO), testimony before the Congress, and other sources,
this paper will examine the level of military activity, its likely repercussions, and the
relationship of this level to options for congressional action. Many CRS and GAO
reports provide detailed background information on issues related to the high

CRS-2
OPTEMPO/PERSTEMPO phenomenon. These reports will be referenced and, where
possible, summarized.1

Major Findings
The nature of operations other than war has changed. Operations other than
war (OOTW) are now larger, longer, more intense, and more complex than their
Cold-War predecessors; some are open-ended with no clear exit strategy; varied
operations run concurrently and require a broad range of capabilities. The forwarddeployed force dispositions used to support these operations are now smaller, albeit,
in most cases, better equipped.
Forces decreased while requirements increased. The cumulative effects of
the drawdown coupled with a more proactive use of the military in a greater range of
international crises has led to a sustained high level of operations. With a much
reduced force, the resultant high activity may be hampering DoD’s ability to execute
some short and long-range plans, programs, and obligations.
High activity doesn’t always equal high readiness. During the Cold War
high unit activity generally equated to high readiness. Today’s reality comprises a
smaller force structure supporting a wider variety of missions at a time when
resources are constrained. With today’s missions, high unit activity may, but does not
necessarily, equate to high readiness and may in some cases, be detrimental to
readiness for combat.
Reductions not commensurate. Operational missions increased 300 percent
during the 1989-1997 period that Army and Air Force force structure was reduced
by 45 percent each, Navy by 38 percent, and the Marines by 12 percent. During this
period, DoD infrastructure, bases for example, was reduced by 21 percent. To
increase operationally available manpower and improve efficiencies, many believe
further infrastructure cuts are necessary. The extra burdens are not evenly distributed
within and across the services. Some units may be more heavily tasked while others
remain relatively untasked. Service actions to level the load are underway.
Current operations are larger and more extensive than expected.
One Major Regional Contingency? The level of effort to support currently
ongoing operations is estimated by some senior DoD officials to be equivalent to
executing one Major Regional Contingency (MRC).2 This estimate includes forces
that have been extensively engaged in ongoing operations for four to five years,
including the National Guard and Reserve, whose support is approaching Desert
Storm levels. The percentage of deployable combat and combat support forces

1

The House National Security Committee issued a report on April 9, 1997 titled “Military
Readiness 1997: Rhetoric and Reality” which addresses issues similar to those in this report.
The House report is available on the World Wide Web at http://www.house.gov/nsc/pubs.htm
2

Deputy Under Secretary of Defense Louis Finch among others, interview with the author.

CRS-3
committed to operations is higher than the percentage of troops deployed publicized
by DoD. In its estimates, DoD quotes a percentage of the total force to indicate the
current level of effort, which, for example, equals roughly 8 percent for the Air Force.
Calculating the Army level of effort from only those eligible to participate shows that
up to 45 percent of the “deployable active Army” may be committed to current
operations as either deployed, preparing to deploy, or recovering from deployment;
excluding soldiers assigned to Korea, the percentage is 36 percent. In contrast, as a
percentage of the Army total force of 1.1 million, the percentage of “deployed
soldiers” (excluding Korea) is 3 percent and of the active Army, the percentage is 6
percent. The Air Force requires 13 of its 20 Fighter Wing Equivalents to support
current operations or 65 percent of the combat fighter force. On an average day, 50
percent of Navy ships are out of homeport of which roughly 30 percent are deployed.
Smaller forces and increased commitments equal higher workloads.
According to the Chief of Staff of the Army, General Dennis Reimer, the Army
reduced manpower by 36 percent while increasing the number of deployed operations
by 300 percent. In testimony before the House National Security Committee in March
1997, the Army estimated that its officers and senior non-commissioned officers from
deployable units now spend 180-190 days away from home annually, while junior
soldiers spend 140-155 days away. Understanding how the Army and the other
services absorbed the increased load during the drawdown to reach today’s level of
effort is essential to planning for the future. This raises question: What has DoD
stopped doing, what is DoD doing less of, is this an increase in efficiency, and do
these reductions compromise readiness?
Causes of high levels of military activity.
Competing strategies. The current National Military Strategy was developed
prior to the current National Security Strategy of Engagement. The latter strategy
envisioned a more proactive U.S. foreign policy while the former strategy, developed
soon after the Persian Gulf War, embraced a more reactive approach with a military
force designed to defeat, in conventional combat, the greatest potential threats to U.S.
vital interests. The reality of the last five years is that the military is heavily engaged
in advancing U.S. interests without conflict while trying to fully prepare to defend
them in conflicts. The dual requirements of two strategies are taxing the force.
Operations, exercises, and military culture. Regional Commanders-in-Chief
(CINCs), tasked with the day-to-day security of U.S. interests, wield great influence
in requesting forces to support their exercises and operations. They do not, however,
have the fiscal responsibility of supplying these forces or the service responsibility of
training them. This disconnect may result in “overspending” the force. “We never
met a deployment we didn’t like” is indicative of the can-do attitude that is usually at
odds with demanding relief from excessive work. Careerism may inhibit officers from
turning down work no matter how valid the complaint. Competition for resources
within and between the services can contribute to military “volunteerism”.
Useful assessments of readiness and stress needed.
Measurements need improvement. Tempos are difficult to assess because
current systems were not designed to indicate peacetime activity; reliable indicators

CRS-4
of unit and individual activity and stress are only now being developed. Some
analysis may be misleading because averages of large groups do not adequately reflect
burdens on discrete elements. The current DoD Status of Resources and Training
System (SORTS), does not measure levels of effort required of units to attain high
readiness or the extent to which units are committed to operations; it produces only
snapshots of: personnel, training, and supply/equipment. SORTs is not predictive nor
does it reflect a unit’s capacity to “turn-up” the level of effort. Measuring both the
level of effort and the extent of a unit’s commitments would improve the assessment.
No “Opportunity Cost” evaluation. Assuming adequate funding, acceptable
readiness levels can be maintained indefinitely at a certain OPTEMPO/PERSTEMPO
levels. These levels have not yet been identified. There is no “Opportunity Cost”
system for evaluating the relative worth of DoD actions. In other words, there is no
way to know the price, in non-monetary terms, such as readiness, for current
operations. “What didn’t we do because we did Operation X?” is a question that can
now be answered only in specific instances, anecdotally and non-quantitatively.
Importance of understanding OPTEMPO/PERSTEMPO measurements.
Measuring OPTEMPO, the rate of unit activity, and PERSTEMPO, an individual’s
absences and activity level, and comparing them with other factors like readiness
levels, personnel retention statistics, and unit evaluations should indicate what level
of activity U.S. forces can sustain. Understanding OPTEMPO or PERSTEMPO does
not provide insight into the validity of either the current two-MRC strategy or the
policy of pursuing broader military engagement in the world at-large. Understanding
OPTEMPO/PERSTEMPO should, however, suggest the degree to which U.S. forces
are capable of meeting current and proposed obligations and in what areas change
and/or innovation may be required. High OPTEMPO/PERSTEMPO can be an
indicator that U.S. forces may be exceeding designed capabilities in some areas and
failing to meet planned objectives in others.
On the other hand, low
OPTEMPO/PERSTEMPO may be an indicator that a unit’s readiness might be at risk
due to insufficient training, exercises, manpower, or resources or it could indicate a
unit that is capable of contributing more to current operations.
Impacts and implications are significant.
Training: Time and resources for effective training lacking. There are
minimum resources and a minimum time required for basic military preparedness so
that units may retain the capabilities required of them. For many units, the minimums
established by their services are not currently available.
Concerns. The effects on units and personnel with current high levels of activity
are of increasing concern to defense officials and senior officers. The major concerns
voiced during testimony before the Congress are these:
! Readiness: As activity levels increase, time for realistic combat training is lost,

equipment requires more maintenance, supply stocks are diminished, and
personnel are displaced.
! Modernization: Time and money spent on operations is not available for other

priorities. The man-power intensive maintenance of aging systems, systems

CRS-5
which are under increased stress, is increasing the workload and the cost to
maintain equipment resulting in even higher activity levels.
! Quality of Life: Commanders are increasingly forced to choose between

spending scant resources on either training or “quality of life” improvements
such as base support facilities or family-oriented programs.
! Personnel: Fatigue and disillusionment may afflict some as they perceive a

future full of family separations, limited opportunities, and reduced benefits.
Reenlistments and recruitment: although both remain strong, commanders
testify that the dedicated all-volunteer force is growing weary, dampening
enthusiasm for military service. Surveys reveal that pilot retention is dropping
rapidly due to high OPTEMPO, which decreases individual flying proficiency
and increases family separations, and due to a forecast long-term hiring surge
by the Airlines. Although most pilots say they prefer military aviation, the pull
of family and a stable lifestyle is significant.
Internal DoD actions to ease the pace of activity. The Global Military Force
Policy (GMFP) is a DoD step toward managing both short-term requirements and the
long-term sustainability of U.S. forces. The policy effectively reduced commitments
for high demand units to the point where most can now accomplish their required
training. The Navy has reoriented the way it does pre-deployment training and
reorganized its force to reduce unit activity levels. The Air Force now fills its
requirements from organizations world-wide. The reserve component, mostly
through volunteers, is carrying part of the load. Such actions demonstrate the ability
of DoD to accommodate to new realities without increased spending.
Modernization Issues are Dynamic. New weapons systems and technologies
may enable DoD to posture fewer, more capable forces. In some cases, new systems
can lower the pace and the cost of operations. In theory, this effort would free forces
to train for and engage in operations other than war. In a fiscally strained
environment however, the resultant force structure may be subject to dollar-driven
cuts that could well recreate a condition the modernization sought to relieve: too few
people doing too many things. Also, better capability often creates the impression
that military forces can now do more than was previously possible. Many new
technologies complement rather than supplant older technologies. For example, the
Air Force’s new J-STARS (Joint Surveillance Target Attack Radar System) does for
the ground war what the AWACS (Airborne Warning and Control System) does for
the air war. Even these systems need to be supplemented. Due to the effect terrain
has on J-STARS in Bosnia, new unmanned aerial vehicles are working with J-STARS
to provide a more complete picture. There is no overlap and both systems are in great
demand. In operational terms, increasing capability increases mission effectiveness
but does not necessarily mean that fewer forces are required to complete a military
mission. It does mean that the forces involved can accomplish the mission with lower
risk, fewer casualties, or less collateral damage, or that they can do so more
expeditiously.
Force Structure: Dangers and dynamics. The dangers involved in not
balancing force structure with commitments are many. Too few forces prepared for
high-intensity combat could result in local defeat, higher casualties, and longer

CRS-6
conflicts. Too few forces capable of a wide range of operations results in high
OPTEMPO/PERSTEMPO for those qualified units, and missed opportunities for the
nation. Force structure options under consideration by DoD and the Congress center
on practical ways to reduce the forces required for major contingencies; to reduce the
time and effort required to prepare for them; to increase the number of units capable
of executing multiple types of non-combat operations; and to increase the
participation of the reserve components. Force structure actions benefit from taking
into account both OPTEMPO and PERSTEMPO limits, and budget and readiness
considerations. The following relationships are pertinent (assuming demand remains
constant or increases):
! As force size decreases, OPTEMPO generally increases.
! As active force size decreases in favor of the reserve components, OPTEMPO

tends to increase due to the limitations on the availability of the Guard and
Reserve.
! As the number of specialized units increases, OPTEMPO for those types of

units decreases; however, with a finite force structure, the increase in such
units is at the expense of other types of units.
! New units with missions similar to high OPTEMPO units might reduce the

latter’s overall OPTEMPO; however, recent experience with both the Joint
Stars ground surveillance aircraft and the Predator UAV suggests that this is
not inevitable.
! As new weapons and capabilities that reduce manpower and support

requirements come on line, PERSTEMPO decreases.
! As long as very high demand for deployments of military force exists, whether

for military or foreign policy purposes, efforts to reduce OPTEMPO and
PERSTEMPO will be difficult.
! Increasing the size of the National Guard and Reserve at the expense of the

active force will generally result in higher tempos, as the reserve components
are generally less available than the active force. Many defense observers see
support and specialized functions in the reserve components as a key building
block in developing the affordable force, operating at acceptable OPTEMPOs,
that is required. Some movement in this area is underway. At the same time,
there is a widely held perception that the reserve component should “never be
viewed as the key building block”3 because its near-term warfighting capability
cannot match that of the active force.
The Quadrennial Defense Review debate may help. The debate over the
Quadrennial Defense Review (QDR) will help clarify the problem and the range of
options. Real solutions may be difficult to divine as the specifics of measuring the

3

According to the planning staff of the National Guard Bureau in response to a draft of this
report.

CRS-7
workload on U.S. forces, the actual costs to the treasury, and the opportunity costs
are elusive. Although DoD is aggressively implementing management and procedural
solutions, this approach has its limits. DoD has little control over external
requirements. The quandary facing QDR planners is how to organize, train, and equip
U.S. forces to meet the requirements of both the two-MRC scenario and the
unpredictability of other operations in support of national objectives. Given current
demands, say military advocates, any decision that reduces funding, manpower, or
equipment can have immediate negative repercussions unless commensurate
reductions in unit obligations are made. Others are not convinced. Until the demand
issue is deliberated, understood, and dealt with, discussion of strategic resource
tradeoffs to balance the defense budget under the guise of the QDR may be
premature. Because DoD and the Congress are just beginning to understand the
implications of operating in the current environment, premature action may be counter
productive and may even exacerbate the current situation.
To many observers and to some in Congress, the great promise of the QDR lies
in the potential to redefine defense requirements. There is little debate in Congress
over the current stress on DoD. The debate surrounds the future posture of U.S.
forces and the resources that may be available to support them. The strategy of the
Bottom-Up review levied certain requirements on the military. If those requirements
are viewed differently in the QDR debate, U.S. forces could then be reorganized,
repostured, and possibly repositioned in such a way as to extensively mitigate the
negative aspects of current and projected demands.
Although many in Congress strongly support a “strategy-driven” approach to the
QDR, the current fiscal realities may force some “budget-driven” decisions. This
latter emphasis is viewed by many as a return to historical patterns of force
hollowness following major conflicts. In either case, it is apparent that the QDR must
deal effectively with the competing demands of increased military deployments,
reduced forces, and constrained budgets to ensure that the force is capable of meeting
the nations needs now and into the early 21st century.

CRS-8

Background and Analysis
There is little disagreement that U.S. forces are very busy. Although assessed
levels of readiness are high, there is growing concern that the current pace of
operations may not be sustainable. In addition to maintaining a robust warfighting
capability, the military is now heavily engaged in executing the National Security
Strategy of Engagement. How best to fulfill these dual requirements is the subject of
the Quadrennial Defense Review debate. Based on current requirements and
commitments, U.S. forces are under some strain; however, should requirements,
commitments, or capabilities change significantly after the QDR debate, the force
could be in a better position to meet today’s challenges or it could be in a worse
position. Congressional interest in either scenario is keen. Many views expressed in
Congress are comparable to those of Representative Sisisky and Representative
Dellums speaking to the Service Secretaries (House National Security Committee
Hearing on the FY 1998 Defense Budget, March 12, 1997).
SPENCE: Mr. Sisisky.
SISISKY: But let me tell you what the real problem is and why our concern. All
we’ve heard, we’ve heard it from the Defense Department, we’ve heard it from
you, we’ve heard it from the chiefs of staff, that we’re as ready as we’ve ever
been. Readiness, number one priority. And I believe that. But let me tell you, the
things that we’ve heard in the last few weeks is that we’re not going to be that
ready in 18 months. The morale is low.
And then I keep reading these things: two Army divisions may go, two carrier
battle groups may go, things like that, some more wings in the Air Force may go.
I saw some interesting figures yesterday...The Army across this world had 33,000
people deployed plus 100,000 deployed in regular stations. The 33 were just in
Bosnia and other places. As I understand it, only 20 percent of the Army is
combat forces. Now that may be a sliding figure. And obviously, the other people
are over there, too. But that’s 100,000. You take two divisions out of there, I
don’t know where we’d go. And I doubt very seriously whether you’d have an
Army that you’d be very proud of.
DELLUMS: The reason why I raised the issue of the Quadrennial Review to all
of you, is that if indeed the Quadrennial Review is a serious process, all of these
distinguished witnesses are an integral part of it. And (if) what is on the table is
a total re-look with potential for change, then all of these prognostications about
the future, what future are (we) talking about? You can only be extrapolating
based on present strategies, present doctrine, present force structure based on
present requirements.
If the Quadrennial Review changes all of that, then how can you predict something
you’ve not figured out as yet? We don’t have the Quadrennial Review before us.
So all these alarming statements about readiness shortfalls, modernizations
shortfalls, strategy problems, force structure implications, you can’t — you can’t
get there from here until we finally have the Quadrennial Review document before
us. That will frame the budget for fiscal year 1999.
So you cannot extrapolate based on fiscal year 1998 what’s going to happen
several years down the road...And I would caution my colleagues that talking

CRS-9
about where all these dangers are at this point is not appropriate and not relevant
until such time as we determine the Quadrennial Review. If the Quadrennial
Review simply underscores the status quo, then maybe everybody’s right. But if
it is a substantive point of departure, then everything then has to be framed in that
new paradigm, not the old paradigm.

The bottom line for Congress is how to fund, under resource-constraints, shortterm demands for military forces, long-term needs to maintain effective forces, and
commitments to service personnel. Notwithstanding substantial force cuts, the U.S.
military is by far the most capable on earth. There is a perception that threats to the
nation are much reduced from those of 1950-1990. There is also a perception that
U.S. military force can play a deterrent, decisive or a pacifying role in most conflicts.
Both views, whether right or wrong, affect the debate surrounding the Pentagon’s
budget. Unfortunately, during the transition from a high threat / low activity to a low
threat / high activity military posture, an attempt to satisfy both old and new
requirements may have occurred. As a result, some military advocates today hold that
any reduction in resources, without a commensurate reduction in commitments, will
likely result in increases in OPTEMPO/PERSTEMPO that take DoD above “the
breaking point”. General Richard E. Hawley, Commander of Air Combat Command,
summed up his analysis of the current situation:
Then, of course, there is the Quadrennial Defense Review and the potential that it
will lead to further reductions in our already heavily committed force structure. As
a primary provider of air combat forces to our joint warfighters, I advise caution
as we contemplate this course. Our nation’s strategy of global engagement is a
sound one. But it is one that is imposing heavy strains on our already
much-reduced force structure. Many of the men and women whom I meet as I
travel around Air Combat Command are tired. We are testing their commitment
to “service before self” and, so far, they have not been found wanting. But there
are limits on how much we can ask these wonderful people to give. It is my sense
that we are close to that limit. Once we cross that fine line, the exodus will be
devastating and difficult to reverse. We must find a way to keep our force
structure and our commitments in balance. I believe we can do that.4

General Hawley has taken action within his command to significantly reduce the strain
on his force through internal management practices and he has done so without
increases in either funding or resources. Time will tell if these changes are sufficient.
In any case, innovation in a time of resource constraints may prove to be the most
useful approach as DoD learns to operate in a high demand environment.

One Force, Two Strategies: The QDR and Greater Demand
The Quadrennial Defense Review (QDR) mandated by the 104th Congress
reviewed the structure and mission of the nation’s armed forces. The report, out in
May 1997, will, if implemented, replace the last review conducted in 1993. Then
Secretary of Defense Les Aspin’s Bottom-Up Review established the requirement to
fight two nearly-simultaneous major regional contingencies (MRC) as the overarching

4

From a speech to the Air Force Association Symposium, January 30, 1997, in Orlando,
Florida. Accessible on the World Wide Web at http://www.aef.org/ol7.html

CRS-10
requirement for the National Military Strategy. In statements before leaving office,
former Secretary of Defense Perry clearly restated the two MRC scenario as the
primary consideration for posturing the nation’s defense. In establishing a base-line
force structure capable of engaging in a two-MRC conflict, defense planners in 1993
assumed a peacetime activity level for U.S. forces that would enable the vast majority
of combat and combat-support units to quickly swing into action. The intervening
years have seen a dramatic increase in the activity of U.S. forces in non-MRC
operations while at the same time the size of the armed forces has decreased
significantly. These smaller forces are now engaging in military operations that are
larger, longer, more intense, and more complex than those anticipated in 1993. The
result is that some combat forces earmarked to transition to MRC duty in the BottomUp Review (BUR) may not be available as predicted. Further, the high activity levels
are straining some military budgets, curtailing training opportunities for deployed
units, increasing wear and tear on some equipment, and depleting some wartime
stockpiles. The task facing defense planners is how to organize, train, and equip U.S.
forces to meet the requirements of both the two-MRC scenario and the
unpredictability of other operations in support of national objectives.
With no apparent threat, the QDR debate will not necessarily reemphasize the
two-MRC scenario as the guiding principle of the National Military Strategy because
defense planners now contend with a non-Cold War National Security Strategy in
which military forces play a significant peacetime role. The BUR was completed
prior to the administration’s announcement of the National Security Strategy of
Engagement and Enlargement; therefore, the BUR force structure focused primarily
on the requirements of high-intensity combat and did not anticipate the additional
requirements which would be levied on U.S. forces (See figures 1 and 2 below).
Although its main purpose remains the defense of the nation, the military’s role as an
element of national power is expanding. Maintaining the equilibrium between an
expanded peacetime role, which may prevent conflict, and the required wartime role,
which is to win conflict quickly, is the key challenge.
A peacetime Major Regional Contingency equivalent. Figure 1, from the
Bottom Up Review, displays the anticipated “Conflict Dynamics” upon which the
current force structure was based. According to DoD officials who worked on this
analysis, the requirements for Peacekeeping/Peace Enforcement and Humanitarian
Operations were, in retrospect, understated.5 These same officials characterize DoD’s
current level of effort as equivalent to one major regional contingency (MRC). Figure
2 adjusts the original “Conflict Dynamics” based on this assessment. The original plan
was for U.S. forces to quickly win the first MRC in order to prepare for the possibility
of a second MRC occurring nearly simultaneously. The effects on U.S. forces of a
prolonged first MRC and the associated risk that would follow in the second were a
major concern. Sustained operations over the last five years, assessed as equivalent
to one MRC, are therefore, cause for concern. These same DoD officials have
testified before Congress that we may be going through an exceptional time and that
the current level of effort will probably subside. Without clear strategies for
withdrawing from operations in Northern and Southern Iraq, Macedonia, Bosnia and

5

According to Deputy Under Secretary of Defense Louis C. Finch who worked on the BUR
proposals. Interview with the author.

CRS-11
elsewhere, and with the ever-present dangers of potential flash points like Rwanda,
Zaire, the assertion of an “exceptional time” comes into question. For example, the
final withdrawal date for U.S. forces in Bosnia is not certain now and will remain so
if the prospects for renewed civil war are not reduced.6
Understanding the current and projected demand on U.S. forces is an important
early step in developing a National Military Strategy and a force structure capable of
meeting these compelling obligations. Key measures of that demand are the pace or
tempo of military operations and the demands for duty away from home that such
operations place on individual service members. It is important to measure and
understand these demands in order to make appropriate strategy, force structure, and
readiness decisions.

6

For more on the future debate over the withdrawal from Bosnia, see NATO and Bosnia: A
Looming Transatlantic Debate. CRS Report 97-480 F by (name redacted) (April 22, 1997).

Figure 1. Anticipated nature of military requirements or “Conflict Dynamics” as published in the Bottom Up
CRS-12
Review. Column one indicates the anticipated level
of peacetime activity; column two, the level of activity
associated with one MRC.

CRS-13

Figure 2. Bottom Up Review analysis of “Conflict Dynamics” adjusted for actual operations from 19921997 which may equate to 1 MRC. The “Exercises” added to each column indicate the effort required to
prepare for the missions depicted.

CRS-14

Capacity vs Commitments: A dynamic relationship
The assessment of current and projected demands enables planners to understand
the capability available for any new National Military Strategy. The strategy, once
derived, will determine the force structure required. Force structure decisions
influence readiness determinations. To preclude surprise and to react quickly to
aggression, a certain amount of the force must be in a high state of readiness. The
remaining readiness decisions are based on the projected requirements of military
plans written to implement the National Military Strategy (e.g. Days available prior
to deployment). The required readiness levels of units determine their training,
equipment, and personnel needs and priorities. It is in these areas, training,
equipment, and personnel, that high demands create the most turbulence. Therefore,
in understanding the turbulence created within the force by higher than planned levels
of activity, one can understand the impact on readiness and the efforts required to
maintain that readiness; the impact of readiness requirements on force structure
decisions; and the impact of force structure decisions on the ability of the military to
meet the requirements of the strategy. In summary, planning to execute the strategy
must account for current and projected demands on the force in order to posture a
viable military to meet the nation’s needs.
The left side of figure 3 below illustrates this sequence. The strategy, devised
to meet the challenges to national interests, is the framework for force structure
decisions; based on the force structure, readiness levels are determined that ensure the
forces can execute the strategy. This static process is typical of peacetime planning.
As long as forces maintain their required readiness levels, execution of the strategy
is assured. In a dynamic environment characterized by high demands on portions of
the force, readiness levels and a unit’s capacity to operate are constantly in flux
because units are preparing for, engaging in, and recovering from operations. In this
case, the relationship is circular in that changing readiness levels, which should
indicate a unit’s capacity to engage in operations, affect the military’s ability to
execute the strategy. To understand the extent to which the military’s ability to
execute the strategy is affected, it is important to not only know the capability of the
unit but also the unit’s capacity to engage in and sustain operations. Current
readiness measurements show a snapshot of capability. Clearer assessments of
capacity are required in a fast paced environment because, with the surplus capacity
of the Cold-War force diminished, the ability of U.S. forces to quickly “surge” up to
a high intensity level and/or their ability to sustain operations over an extended period
are important considerations. Issues surrounding readiness levels and the combat role
of the Army National Guard are key aspects of this debate.
“How busy are U.S. forces?” and “Can they do more?” or “Should they do less?”
are pertinent questions framing the current debate over the role of U.S. forces in the
world today. To answer these questions requires an understanding of the relationship
between capacity and commitments. Although capacity is beginning to stabilize
following the drawdown of U.S. forces, commitments are anticipated to fluctuate at
high levels. As commitments increase and run concurrently, there theoretically comes
a point where capacity is degraded. Finding this point in order to achieve balance
between the requirements of the National Military Strategy and the new missions
inherent in the National Security Strategy is the challenge confronting defense
planners. Further force structure cuts to combat and combat

CRS-15
Figure 3. Strategy, force structure, readiness dynamic for planning or “peacetime” and operations or
“wartime”

CRS-16
support forces engaged in current operations should be closely analyzed to ensure the
United States retains the capacity to meet probable threats and obligations.
Measuring Commitments and Capacity. The current DoD system, the Status
of Resources and Training System (SORTS), measures training, personnel, and
supplies and includes a commander’s assessment. SORTS does not measure the level
of effort required of the unit to attain high ratings or the extent to which the unit is
committed to operations. It does, however, use a “Commander’s Assessment” to
gauge the overall readiness of the unit. According to DoD officials testifying before
Congress, this assessment was used in 10 percent of SORTS reporting to increase the
readiness rating of units and it was used in a fraction of one percent of the reporting
to lower a unit’s readiness rating.7 This system, long the subject of congressional and
GAO scrutiny, reflects a snapshot of capability based on objective standards. It is not
predictive nor does it reflect a unit’s capacity to “turn-up” the level of effort.
Measurement of both the ongoing level of effort, indicated by hours and days worked
for example, and the extent of a units commitments away from home station would
improve the assessment of a unit’s capacity for increased activity.
The measurements available to indicate the activity of U.S. forces are
OPTEMPO and PERSTEMPO. Operations Tempo (OPTEMPO) is the rate of U.S.
forces involvement in all military activities. OPTEMPO in this report refers to this
general meaning of the term.
The services also use OPTEMPO as a
programming/budgeting term that indicates, for example, steaming hours for the Navy
and combat vehicle usage for the Army. The Air Force’s flying hour program is one
gauge of the “OPTEMPO” of its combat units. Further, OPTEMPO is often used to
describe only the pace of contingency deployments excluding other unit activities such
as exercises and training deployments. Units are affected in varying degrees by all
these activities and so, for OPTEMPO to be a meaningful measurement of unit
operations it should include all unit activities.
Personnel Tempo (PERSTEMPO) is a subset of OPTEMPO and is the amount
of time spent away from home, usually measured in the number of nights service
members spend away combined with all activities in which a service member is
engaged. The post-Cold War drawdown of the U.S. armed forces coupled with
increased use of the military has led to a much higher than planned rate of activity,
OPTEMPO, for many military units and significantly increased the time spent away
from home, PERSTEMPO, for the military personnel involved.

Measuring OPTEMPO/PERSTEMPO
In order to discuss policy options and implications, the general terms OPTEMPO
and PERSTEMPO will be used in this report as defined above. Service definitions
may vary; therefore, where important differences exist, they will be noted.

7

Gebicke, Mark, Director, Military Operations and Capabilities, General Accounting Office.
Testimony before the Military Readiness Subcommittee of the House National Security
Committee March 11, 1997.

CRS-17
Since measuring OPTEMPO indicates actual unit activity levels, which
encompass everything the unit does, with the purpose of gauging unit capacity to
accomplish proposed missions, the sum of all endeavors, regardless of purpose,
provides the most accurate assessment. All the services use a variety of OPTEMPO
categories to measure specific activities. These “OPTEMPO” measures do not clearly
indicate the overall pace of the unit. Naval OPTEMPO measurements provide the
clearest picture of unit activity because the ship is not only the weapon system, it also
defines the unit and provides the platform for conducting operations, training, and
exercises. Steaming hours in the Naval definition generally equates to a surface unit’s
rate of activity; however, in port activities and temporary duties away from home port
also contribute to the rate of activity and are not reflected in ship OPTEMPO.
Similarly, embarked Marine Corps units can define part of their OPTEMPO in Naval
terms. The Army and Air Force OPTEMPO considerations are less clear-cut and
therefore harder to measure. The Army refers to vehicle mileage, in budgetary terms,
as OPTEMPO. Again, this is a sub-category of a units activity, not a complete
measurement.
The scope of tempo-related problems is difficult to measure as data collection
by the services was not designed to indicate the impact of OPTEMPO/PERSTEMPO;
consequently, reliable indicators of unit and individual repercussions are only now
being developed. In addition, some data analysis may be misleading because averages
of large groups do not adequately reflect the burdens on discrete elements.
Why measure OPTEMPO? OPTEMPO measurements are important because
they aid planners in predicting requirements and managing commitments.
Understanding current and projected demands enables the military to sustain readiness
by quantifying the obligations to engage in operations, train and exercise the force,
develop personnel, and maintain and acquire the requisite equipment to do so. In
today’s resource-limited defense environment, such an understanding should
contribute to maximizing efficiency and avoiding wasteful, redundant, or potentially
damaging practices.
Why measure PERSTEMPO? In general, personnel tempo or PERSTEMPO
is the amount of time spent away from home for DoD personnel. PERSTEMPO,
which is different for each person, indicates the time spent in all professional activities
and reflects the remaining time available for personal and professional development
activities. Service members can have a high PERSTEMPO while never leaving their
home base due to, for example, extended shifts over long periods. Individual tempos
may differ from those of the unit because individuals may have official travel,
professional education, or change-of-station requirements above those required by
their unit obligations. Even so, the primary factor contributing to the significant
recent increases in PERSTEMPO is unit deployments for operations and exercises.8

8

For a thorough discussion of PERSTEMPO issues including recent data, effects on readiness,
and DoD actions to mitigate the impact of high PERSTEMPO, see U.S. General Accounting
Office. Military Readiness: A Clear Policy is Needed to Guide Management of Frequently
Deployed Units. Report Nos B-271135 and GAO/NSIAD-96-105. April 8, 1996.

CRS-18
No single standard for PERSTEMPO exists within DoD. Difficulties arise
in evaluating PERSTEMPO measurements because each service defines levels of unit
and individual activity differently and they each have a different definition of what
constitutes high activity. Deployments are also defined differently by each service; for
example, training rotations to the National Training Center do not figure in the
Army’s measurement of deployments yet they are clearly an activity that contributes
to PERSTEMPO. According to a 1996 GAO report Military Readiness: A Clear
Policy is Needed to Guide Management of Frequently Deployed Units:
It is difficult for DoD to determine the actual time that either military personnel or
their units are deployed. This information is important to planning and managing
contingency operations. Although all services now have systems to measure
PERSTEMPO, each service has different (1) definitions of what constitutes a
deployment, (2) policies or guidance for the length of time units or personnel
should be deployed, and (3) systems for tracking deployments.9 (See Table 1
below)

GAO, and others, have recommended a single formula for measuring time away from
home: one day away equals one day deployed. DoD has not established a
comprehensive definition and DoD’s management of PERSTEMPO-related issues will
continue to be difficult. Service cultures, mission characteristics, deployment
timelines, and sustainment requirements account for most of the differences in service
definitions and hamper efforts at establishing a universal definition. Even so, the
Joint Staff, at the direction of the Chairman, Joint Chiefs of Staff (CJCS), is working
toward a common definition and an accurate measurement system.

Table 1. Service-specific Deployment Definitions and Policies
Measurement

Army

Navy

Air Force

Definition of
Deployment

7 days or more

56 days or
more

1 day or more

10 days or
more away
from home
station

Policy or
regulation
limiting
deployments

No policy, but
goal of no
single
deployment
over 179 days

Yes, policy
limits
deployments to
180 days/6
months

No policy, but
maximum
desired level of
120 days per
year

No policy, but
goal of no
single
deployment
over 6 months

System
tracking
capabilities

Unit and
individual

Unit only

Major weapon
systems and
individual

Unit only

Source: GAO10

9

Ibid.

10

Ibid.

Marine Corps

CRS-19
Comparing Navy and Air Force approaches. Each service necessarily tailors
its respective forces and deployment guidelines to the requirements of the missions
it performs and the levels of readiness required of its forces. The Navy, which rotates
forces forward to overcome the lagtime involved in deploying forces to a fastbreaking crisis by sea, keeps forward-stationed forces at high readiness while units in
home-port are in varying states of readiness. The Air Force, whose forces deploy into
combat within 48 hours of notification maintains high levels of readiness across the
force. These differing requirements are reflected in the OPTEMPO and
PERSTEMPO of each service.
Navy PERSTEMPO Rules. The Navy has stringent rules regarding
PERSTEMPO but an individual measurement system is not employed. There are
three tenets of the Navy policy:
! Deployments will be no more than six months from the time they depart

homeport until the time they return to homeport.
! The turn-around ratio, that is, the number of days at home compared to the

number of days on a deployment, will not exceed 2.0/1. (Note: the Navy
defines a deployment as 56 days or more at sea.)
! 50% of a sailor’s time over the past three years must have been spent in

homeport.
Waivers to this policy require approval of the Chief of Naval Operations. In 1996,
according to the Navy staff, there were only 5 waivers granted Navy-wide and these
were to take ships for required maintenance to facilities away from homeport. In
1997, there has only been one waiver, again for maintenance.
According to Navy officials who track PERSTEMPO, the Navy’s turn-around
ratio that is, the time between deployments must more than double the time spent on
the last deployment averages between 2.4-2.6 to 1 although some aviation units may
be closer to the 2.0 limit. While it is true that the turn-around ratio has diminished in
recent years, it still remains well-above the Navy goal for most units.
Individual sailors may, at times, experience higher PERSTEMPO if
reassignments occur between deployments. A sailor coming off a deployment that is
reassigned to a ship preparing for a deployment is likely to be hard pressed. The Navy
does not track individual PERSTEMPO, but, based on the rules for unit deployments,
the maximum three-year average for most sailors should be around 180 days.
Air Force PERSTEMPO Policy. The Air Force has no specific rule regarding
PERSTEMPO. Air Force policy is that, as a goal, individual PERSTEMPO should
not exceed 120 days per year. This policy is consistent with the Navy’s more
stringent 2.0:1 turnaround ratio in that 120 days away plus 240 days at home roughly
equals one calendar year (See figure 4 below). The Navy uses deployments, any
continuous sea duty that exceeds 56 days away, to measure the 2.0:1 ratio. Figure
5 shows the effect of additional activities away from home station on Navy
PERSTEMPO. The Navy policy of 50 percent of one’s time spent at home over the
three preceding years ensures that additional activities don’t take sailors beyond a

CRS-20
PERSTEMPO of 182-183 days per year. The Air Force policy of 120 days per year,
one-third lower than the Navy requirement, is based on readiness requirements.
Deployed naval forces maintain a high state of readiness while stationed in potential
hot spots. Non-deployed naval forces, their missions covered by deployed naval
forces, cycle through stages of refurbishment and retraining as they prepare for their
next deployment. Periods of unreadiness are planned into this cycle as Naval
personnel and equipment “standdown” from deployed operations. Figure 6 shows this
cycle. Air Force units, on the other hand, maintain high levels of readiness at all times
because of the potential need to deploy worldwide on short notice. This continually
higher state of readiness, compared to non-deployed naval forces, requires more
dedicated training time at home station to maintain. Therefore, the Air Force 120 day
policy affords units the time to train in order to maintain continually high readiness
ratings. The policies of both services are designed to support the nature of their
unique contributions to joint operations and are tailored to their specific needs.

CRS-21
Figure 4. Theoretical comparison of the OPTEMPO of a Navy carrier air wing versus an Air Force fighter
wing showing an equal “deployment” load. Compares a three-year Navy deployment cycle with the Air
Force policy of 120 days away per year. In both cases, the PERSTEMPO burden appears to be 360 days in
3 years as depicted in the center. Source Air Combat Command

CRS-22
Figure 5. Many Naval aviation units also train at Fallon NAS, NV beyond 6-month deployments at sea. In
this case, the depicted aviation unit's three-year PERSTEMPO is 460 days vice 360 days. Source Air
Combat Command.

CRS-23
Figure 6. Cyclical readiness levels of a Navy carrier deployment rotation. During the 460-day Navy
PERSTEMPO period in this example, readiness levels are reduced while preparing for the next deployment.
The Air Force, with a more rapid response commitment from homestation, maintains readiness at C-1/C-2
for all units. Source Air Combat Command

CRS-24

Measuring Readiness in OPTEMPO Terms
NO “Opportunity Cost” evaluation. Theoretically, assuming adequate
funding, acceptable readiness levels can be maintained indefinitely at certain
OPTEMPO and PERSTEMPO levels. These levels have not yet been identified
making it difficult to assess how long readiness can be sustained under certain
conditions. Further, there is no “Opportunity Cost” system for evaluating the relative
worth of DoD actions. In other words, there is no way to know the price, in nonmonetary terms, such as readiness, for current operations thereby making quantitative
assessments difficult. “What didn’t we do because we did Operation X?” is a question
that can now be answered only in specific instances, anecdotally and nonquantitatively.
Future readiness measurements should be able to predict, based on OPTEMPO
and PERSTEMPO, how long the current level of effort can be prudently sustained.
An effective system for estimating an acceptable OPTEMPO and PERSTEMPO limit
would be unit-specific, would be tied closely to the unit’s training program, and
would depend on several factors including personnel experience, equipment
capabilities, weapon system age, and mission type.
PERSTEMPO measures cannot drive unit deployment decisions. Any
system of measurement should account for continuous personnel rotations between
units that can exacerbate the PERSTEMPO problem. A units OPTEMPO is the
major portion of an individual’s PERSTEMPO. When individuals are reassigned,
their PERSTEMPO includes the previous unit’s deployed time. Were they to stay in
the original unit, service management practices would ensure they were given a break.
After they move, the breaks accrued by the former unit do not carry over with them.
Often times, individuals returning from a deployment will transfer to a unit preparing
to go on a deployment. Assignments to remote locations, where the PERSTEMPO
is 365 days a year, that precede or follow an assignment to a unit with a high
OPTEMPO strain individuals the most. This drain on individual readiness should be
a key concern of an effective management system. Certainly, the reverse also happens
where individuals miss deployments due to reassignments. The number of units
currently involved in operations and exercises makes the former problem more
common than the latter condition. Although it is important to identify high
PERSTEMPO individuals, units must be able to deploy with all their assigned
personnel in order to maintain the unit integrity and cohesion that are essential to
successful operations. Leaving soldiers behind because they have exceeded a
PERSTEMPO ceiling is not considered a workable alternative.
Readiness and OPTEMPO/PERSTEMPO. The important aspect of
OPTEMPO/PERSTEMPO analysis is in the indication of capacity. As noted, SORTS
reporting does not indicate capacity. Highly stressed units and individuals cannot
perform as well, or for as long, as well-rested ones. Under SORTS, a commander
assesses the unit’s ability to “go to war” today not its ability to sustain or to increase
a high level of activity. Capacity, whether a unit or an individual “probably” can do
more or whether they should rest and/or reconstitute, needs to be a part of the overall
readiness evaluation of U.S. forces because of the combination of smaller forces and
higher workloads. The current situation for many units approaches comparison to

CRS-25
combat where fresh units are rotated to the front allowing forward units the
opportunity to rest and to reconstitute.
The services are working to develop new ways to measure stress on units. Air
Force Studies and Analysis (AFSAA), working closely with highly stressed units in
the Air Force, developed the following list of personnel and equipment indicators in
order to evaluate the stress effects of sustained high workloads.

Unit Indicators of High Stress
(Acronyms are defined at the bottom of the list)

Table 2. Indicators of Personnel Stress
Level of Stress Produced
Low

Medium

High

Avg Ops TDY days per year

<90

90-120

>120

Highest TDY AFSCs in Ops

<90

90-120

>120

Avg duty week for Ops*

40-45hrs

45-55hrs

> 55hrs

Avg Mx TDY days per year

<90

90-120

>120

Highest TDY AFSCs in Mx

<90

90-120

>120

Avg duty week for Mx*

40-45hrs

45-55hrs

> 55hrs

Aircrew flying time waivers

0

<5%

>5%

* Includes work done at home such as answering emails, reading reports, etc.

Level of Stress Produced
Low

Medium

High

Statics/Demos/Capabilities per 1 PAA

<2/yr

2-5/yr

>5/yr

Major exercises participation per year

2-3

1

0

Number of personnel NMR

<10%

10-20%

>20%

Aircrew/personnel training waivers

0

<5%

>5%

Delays in upgrade training/qual.

0

<10%

>10%

Avg Specialty experience: officers

>4 yr

4-1 yr.

<1 yr

Avg Specialty experience: Ops enlisted

>4 yr

4-1 yrs

<1 yr

Avg Specialty experience: Mx enlisted

>4 yr

4-1 yrs

<1 yr

Manning of critical Ops AFSC’s

105-95%

95-85%

<85%

Manning of critical Mx AFSC’s

105-95%

95-85%

<85%

CRS-26
Balance of field grade officers assigned*

5-15%

15-25%

5<>25%

Officer Separation rates

<10%

10-20%

>20%

Enlisted Separation rates

<10%

10-20%

>20%

1st Term Reenlistment rates

>75%

75-50%

<50%

* In addition to unit leadership. This may not apply to non-flying units

Level of Stress Produced
Low

Medium

High

Career broadening assignments *

>50%

50-30%

<30%

Selection Rates for SOS

>70%

70-40%

<40%

Pursuing college degrees: enlisted **

>35%

35-25%

<25%

Pursuing advance degrees: officers ***

>50%

50-30%

<30%

Disenrollment from course work

<10%

10-25%

>25%

Field conditions &/or min per diem
TDYs

No

One

Both

* For senior Captains & Majors. Career broadening as defined by Unit leadership. That is, doing
a job in other than one’s specialty.
** Include E-4's and higher
*** % of Promotable O-3's thru O-4's w/o master’s degrees

Level of Stress Produced
Low

Medium

High

Accrued leave exceeding 60 days

0

1-25%

> 25%

Fathers missing child’s birth due to TDY

0

1-3

>3

TDY within 30 days of child’s birth

0

1-3

>3

Taking leave at a desired time period/yr *

100%

99-60%

< 60%

Working Thanksgiving or Christmas **

<20%/1

>20%/1

20%/>2

Family Maltreatment Incidents

0

1-2%

> 2%

* Given 3 “1 week” choices of leave/year, could the member take leave during one of these choices
** Includes New Years. Avg per person for an average tour length of 3 years

CRS-27

Table 3. Indicators of Equipment Stress
Level of Stress Produced
Low

Medium

High

Fix Rate (Code 3 breaks)*

>75%

75-70%

<70%

Avg Delayed Discrepancies per A/C

<30

30-35

>35

Repeat Reoccurrence Rate

<2%

2-4%

>4%

Cannibalization Rate

<8%

8-12%

>12%

NMC due to Supply

<15%

15-20%

>20%

NMC due to Maintenance

<10%

10-15%

>15%

Availability of Depot Support

<1 mos

1-2 mos

>2 mos

Delay of Major Upgrades

<3 mos

3-6 mos

>6mos

Delayed Scheduled Inspections

0

1-5

>5

Delayed Depot Inputs

0

1 A/C

>2 A/C

Spare Engines per Mobility Package

>2

1

0

* Code 3 means an aircraft is not fully mission capable

Notes:
“Ops” refers to individuals who operate or support the operation of aircraft.
“Mx” refers to maintenance personnel who prepare, repair, and maintain aircraft.
“TDY” refers to “Temporary Duty” or days away from home.
“AFSC,” Air Force Specialty Code, refers to one’s career field.
“Statics/Demos” are requirements to take airplanes to airshows and open houses
“PAA” is “primary aircraft assigned,” so that 24 PAA means that a unit owns 24
mission aircraft.
“NMR” and “NMC” stand for “Non-Mission Ready” for individuals and “NonMission Capable” for aircraft (A/C) respectively, and indicate those not available
for combat operations.
“SOS” is “Squadron Officer’s School;” the career-enhancing professional military
education for Air Force Captains.

A New Readiness Paradigm Emerging
For most units, high levels of OPTEMPO/PERSTEMPO are currently brought
about by the combination of the military drawdown and the unanticipated rise in
peacetime obligations. A DoD-wide system for measuring OPTEMPO/PERSTEMPO
was never previously undertaken. The strategic focus of the Cold War worked to
minimize the current problem. The military capacity of the Cold War era, which was
usually large enough to minimize detrimental impacts of unit operations and repetitive
personnel deployments, obviated the need to measure OPTEMPO and PERSTEMPO.
In addition, units with high deployment rates spent a significant portion of their time
away from home training and exercising their primary capabilities. The resulting

CRS-28
common understanding that high unit activity equated to high readiness reflected the
reality of the time. Today’s emerging reality reflects fewer forces engaged in a wider
variety of missions at a time when resources are constrained. With today’s missions,
high unit activity does not necessarily equate to high readiness and may, some assert,
be detrimental to readiness for combat. As understanding of current experience
increases, measurements of OPTEMPO, PERSTEMPO, and their effects, while not
yet sufficient, are improving rapidly.

Counting Capability: The Best Way to Assess Capacity
What can we do with the forces we have available? And
What part of our capability is not currently available? These are difficult
questions to answer under the current approach to understanding OPTEMPO,
PERSTEMPO, and readiness. By counting only the number of personnel deployed,
and by making distinctions between deployments, operations, exercises, and other
duties, the total effect on U.S. forces is not apparent. Any activity that takes service
members away from their units affects, to some degree, that unit’s capability. Any
sub-unit removed from a larger unit, has a significant impact on the larger unit’s
capability to execute its assigned mission.
It is important to capture the ebb and flow of U.S. capacity to execute warplans
and to sustain military strategies; a system that indicates current U.S. capacity to
perform military assignments, which is dynamic, is needed. The current system
indicates only the readiness of forces postured for static warplans and not whether
those forces can effectively sustain the planned operations. To do this, some senior
military officers interviewed for this study suggest referring to any activity that takes
a unit away from home station as an “Operation.” Since the effort that goes into
planning, executing, and returning from these events is akin to that for operations, and
since the unit is “not available” while off station, classifying activities in this way
yields meaningful data. The smallest unit that should be assessed in this way is also
the building block of military capability; the unit that can operate as an independent
entity.
Battalions, squadrons, and ships. These officers suggest counting Army
battalions and Air Force squadrons deployed to “operations” as the measure of
commitment and the indicator of capacity. The “building block” units would report
as preparing to deploy, deployed, recovering from deployment, ready, or non-mission
capable. Since the services have a finite number of battalions and squadrons, this is
a quick indicator of the “Status of the Army” or the “Status of the Air Force” and is
akin to the Navy’s daily reporting on ships. In addition, “cannabalized” units, that is,
units that were required to provide assets to another deploying unit might be listed as
“non-mission capable.”
Estimating time and effort to extricate and redeploy as C-1. One of the key
assumptions of the Bottom Up Review was that units involved in peacekeeping,
humanitarian operations and exercises could be quickly extricated and redeployed to
combat. The experience of the last five years, coupled with known limitations of
strategic lift assets, indicate that taking a unit out of Bosnia, for example, and directly
inserting it into a combat environment is not as simple as previously suggested. The

CRS-29
degradation of combat skills is the most significant limiting factor in this approach.
The time required to regain high combat status prior to re-engaging in operations
should be a key consideration in estimating U.S. capacity to execute warplans.
Therefore, counting forces off-station in terms of the smallest effective
independent combat element, that is, battalion, squadron, or ship, and realistically
evaluating the time required to return the unit to combat-ready status following its
redeployment, assuming it can be objectively and soundly done, is considered to be
an improvement over simply reporting a “snapshot” of personnel, supplies, and
training under SORTS. This approach, similar to the Navy’s, takes into account the
vagaries and uncertainties involved in fast-paced operations.

Why OPTEMPO Is High
The causes of high OPTEMPO are numerous. The drawdown of U.S. forces
and the necessary demands of maintaining a force ready to fight two Major Regional
Contingencies (MRC), which includes a demanding exercise schedule, are significant
challenges but were foreseen by defense planners. The increased length, size,
intensity, and complexity of recent military operations other than war (OOTW), and
the military’s expanded role in carrying out the National Security Strategy were
unforeseen at the time of the 1993 Bottom-Up Review and have combined to drive
OPTEMPO and PERSTEMPO well beyond envisioned levels.
Overseas presence down = fewer forces for more tasks. The reduction of
overseas presence requires fewer forward-based forces to perform more tasks thereby
raising both the workloads on the forces and the costs of the operations. CONUSbased forces must travel farther and longer to reach deployment areas. Of the 674
Army facilities closed world-wide since 1989, 593 were overseas. U.S. Air Forces
Europe (USAFE) reduced from 16 main and 37 minor operating bases to 6 and 14
bases respectively. Nine USAFE fighter wings totaling 636 aircraft were reduced to
3 wings with 168 fighters total. Commensurate personnel reductions from 62,000
down to 27,000 were made while the U.S. Army now counts only 125,000 soldiers
in Europe, Panama, and the Pacific combined. Naval and Marine Corps contributions
to ongoing operations are usually included as part of pre-planned deployments. Here
too, PERSTEMPO complications arise when forces returning from duty are quickly
returned to deployed-status for new operations.
Specifically, concurrent complex operations continue to challenge the Pentagon;
among them are operations in Bosnia, extended 18 months to June 1998 and perhaps
longer, northern and southern Iraq, and counter-drug operations. At the same time,
the increased use of military forces in support of the Clinton Administration’s
National Security Policy of Engagement has contributed significantly to the increase.
For example, Partnership for Peace (PFP), the engagement of the countries of central
and eastern Europe along with those of the former Soviet Union, has entailed a
significant increase in commitments of U.S. forces to bilateral and multilateral
exercises and international events. PFP builds closer relations and the ability to work
together with NATO by committing military forces to combined exercises, military
exchanges, and international training. Events are held as far east as Kazakstan in
Central Asia to Norway in the north and Spain in the south. USAFE’s participation
in PFP in 1996 totaled over 400 such instances, up from only 65 in 1993. Army

CRS-30
forces in Europe face an even tougher PFP challenge as ground participation requires
more coordination and a greater commitment of resources. In addition, dividing units
for these small “exercises” interrupts their training schedules.
Exercises, as illustrated in Figure 7, are a key aspect of the military readiness
program and therefore, consume a large amount of time and resources. At the end
of the Cold War, the Joint Chiefs of Staff maintained a comprehensive five-year
exercise plan which, during the drawdown years, was not appreciably altered to
account for the reductions in available forces. This schedule, planned to exercise a
global-war-based force, contributed to high OPTEMPO and PERSTEMPO.
Recently, DoD has taken significant steps to lessen the strain of exercise demands by
reducing the number of exercises, combining similar exercises, and eliminating some
redundancies. Work still needs to be done on managing the force requirements of
regional Commanders-In-Chief as they plan their annual readiness exercises in order
to balance these demands with the requirements of an expanded foreign policy. While
exercises are a large part of current operations, they are within the control of DoD;
many real world operations are less so.

CRS-31
Figure 7. Combat Air Force (CAF) training exercises in the U.S. and the decreasing number of FighterWing Equivalents (FWE) on the same chart. (COPE THUNDER is held in Alaska) The number and type of
exercises contribute to OPTEMPO. Source: Air Combat Command.

CRS-32
Some critics of the President attribute the Clinton Administration’s willingness
to use military forces in an ever-widening range of operations to a combination of
available military competence and White House inexperience (the experience of
Secretaries Perry and Christopher notwithstanding). This view holds that the new
administration, beset by international crises and determined to pursue a domestic
agenda, “discovered” that the military was a highly efficient and very successful
organization that would “carry out orders.” Despite a “professed aversion” to the
military, the pace of international events, coupled with a general disinterest in them,
led to quick action to “send in the troops.” Initial successes led to even more use of
U.S. forces as the administration learned the political value of “keeping a lid on
events.”
Others see the increased use of military units in peacekeeping and humanitarian
operations as the natural outgrowth of victory in the Cold War. This view holds that
intervening to prevent or contain conflict is wiser than waiting for conflict to grow
and that the moral imperatives of preventing starvation and genocide outweigh the
actual costs. While still others see a U.S. military force that is supported more
substantially with resources than any other in the world, that does not face a large
critical threat, and see no reason to protect it from useful proactive employment.
Regardless of perspective, the military itself is also responsible for the increases.
Military culture and military imperatives are contributing factors in high levels of
OPTEMPO and PERSTEMPO.11 The statement “We never met a deployment we
didn’t like” is indicative of the military’s willingness to “fight any foe, bear any
burden”. The can-do attitude of the military culture prevents many in the services
from demanding relief from excessive tasking. Further, careerism, especially in the
command structure, may inhibit ambitious officers from turning down additional work
no matter how valid the complaint. Competition for resources within and between the
services can contribute to military “volunteerism”. The business adage, “you get what
you reward” holds true in the military and the military rewards operational success.
The need for decisive victory is an oft re-learned military lesson that compels
commanders to maintain the best capability against potential adversaries and to
engage with the most forces possible. The military culture contributes to high
OPTEMPO/PERSTEMPO. Given direction, the military culture can work to lower
it.
The changing nature of military operations. Increased use of the military in
the post-Cold War era entails more than just the number of major operations involving
U.S. forces. The nature of post-Cold War operations has changed as these efforts
tend to be larger, more intense, more complex, and of longer duration (See figures 8
through 12) In addition, many of these large, complex operations are running
concurrently in widespread locations creating new challenges for all aspects of
military operations. An internal Air Force study describes the context of the new
environment:
The increase in demand for USAF assets and personnel has come at a time when
USAF inventory, personnel, operating locations, and budgets have experienced

11

GAO Report Nos B-271135 and GAO/NSIAD-96-105. April 8, 1996. page 11

CRS-33
dramatic downsizing. The USAF aircraft inventory has declined 31 percent during
the past five years. USAF active uniformed personnel have also steadily declined
since 1990, from 535,233 to 400,409 in 1995, while personnel permanently based
overseas have decreased at a faster pace, almost 40 percent since 1990 - most of
these reductions from forces based in Europe, which have fallen from 63,000 to
27,000 in the last six years. Even with DoD wide resources falling nearly 13
percent since 1989, USAF budgets have declined nearly 22 percent over the same
period. Taken in sum, this increase in operational tempo against the backdrop of
declining inventory reveals a three-fold increase in the intensity of USAF
operations since 1989.12

Figure 8: Intensity of USAF operations is increasing due
to increased commitments and a reduced number of
aircraft..

12

Final draft of “Today’s Air Force: The Use of Air and Space Power Across the Spectrum
of Peace and Conflict” prepared by DFI International, January 1997. Includes Figures 8, 9,
and 10.

CRS-34
While the intensity and duration of events are increasing, Figures 8 and 9, the total
number of overseas events is decreasing, Figure 10, due to the inability of forces
engaged in operations to conduct large-scale exercises. This makes sense as more
forces are tied up in operations for longer periods, less time and fewer resources are
available for training exercises. Figures 11 and 12 show specific examples of these
trends.
Figure 9. Operations involving USAF assets are
becoming longer

CRS-35
Figure 10. As commitments to operations increase and
lengthen, total number of events and participation in
exercises decrease

Why High Optempo Is a Problem
The cumulative effects of the post-Cold War drawdown coupled with an
increased use of the military in a greater range of international crises has led to a
sustained high level of operations for many units and critical personnel. In the past,
large military forces provided the capacity for the U.S. to engage in operations other
than war with little degradation to readiness or effectiveness. Minor commitments
were met using a large pool of resources so that most units did not suffer the effects
of repetitive deployments or continuous interruptions to their training cycles. Now
with the capacity of the global-war-based force diminished, the continuing use of
forces dedicated to the National Military Strategy in operations other than war
(OOTW), that is, in operations other than those for which they are organized, trained,
and equipped, may be hampering DoD’s ability to execute its short and long-range
plans and programs in support of its many fixed obligations.
However important operations other than war may be to U.S. security in the
post-Cold War world, a sustained high tempo of military operations may have
detrimental affects on short-term readiness and long-term military effectiveness. For

CRS-36
example, temporary reductions in readiness, temporary loss of finely-honed combat
skills, increased depreciation rates of some military hardware, and delays in
modernization and acquisition programs can all be tied to a higher than planned rate
of activity. Units returning from deployments often require extensive periods to
recover their pre-deployment level of readiness. The 1st Armored Division, upon
completing its Implementation Force (IFOR) duties in Bosnia was put on a 100-day
recovery program by its commander.13 In this case, the ability to maneuver as a
complete unit and to coordinate its maneuvers with other large ground forces, was the
essential task in which it was the least proficient. Air Force pilots attending Red Flag
exercises following long peacekeeping deployments are showing reduced abilities
compared to their “stateside” counterparts. After each deployment, Marine
maintenance units are working significantly harder and longer to maintain their aging
equipment. This higher than planned rate of activity has interrupted and may continue
to interrupt the funding streams for other DoD programs as the Pentagon is forced
to pay for unplanned operations from existing accounts.
As the capacity to absorb these unforeseen operations is reduced, competition
for resources within DoD and within the federal budget will increase. There is
concern that long-term, the cumulative stress associated with open-ended operations
may lead to chronic and insidious problems such as declines in morale and retention.
These declines would increase costs as replacements must be recruited and trained.
For example, to replace a combat-ready pilot with 8 years experience, costs, on
average, $4.3 million and takes several years. Other problems are reductions in
overall proficiency and experience levels, delays in routine and depot maintenance,
depleted or dislocated logistics, and premature fatigue in some weapon systems.
Replacing weapon systems sooner than planned can lead to major disruptions in longterm acquisition strategies.
Congressional understanding key to successful innovation. Congress is
keenly interested in the readiness of U.S. forces, in the quality of life of U.S. military
personnel, the size and shape of the military’s forces, and in the annual review of the
defense budget. OPTEMPO/PERSTEMPO issues facing all the services have
significant implications in these areas. Congressional action on key military issues can
either positively or negatively affect the armed forces’ capacity to sustain its current
pace. A clear understanding of the new dynamics of operating the Department of
Defense with smaller forces and budgets and increasing demands is a key focus for
Congress and the debate on the Quadrennial Defense Review.14

13

From a speech by Major General Nash, commander of IFOR and the 1st Armored Division
to the NATO-Russia IFOR Lessons Learned Conference, April, 1997.
14

For a further discussion of these issues, see Goldich, Robert L. and (name redacted),
Defense Policy: Threats, Force Structure, and Budget Issues. CRS Report 96-729 F,
Updated September 9, 1996.

CRS-37
Figure 11. Decreasing end-strength and increasing deployments by personnel. Source: Air Combat
Command

CRS-38
Figure 12. Increasing commitment to overseas operations by Air Combat Command Forces. Source: Air
Combat Command

CRS-39

Maintaining a Viable Force
Continuity in Training. A key to the long-term well being of U.S. forces is
continuity of training. Too high OPTEMPO/PERSTEMPO has implications for
military effectiveness in that it interrupts individual and unit training cycles. In order
to maintain a force capable of meeting the demands of high-intensity combat, the
individual military services develop short and long-term training and exercise plans for
their forces. At the same time, they blend these requirements with their peacetime
commitments around the world. The services budget to pay for these ongoing
training and exercise activities as well as to develop and acquire modern equipment
to replace existing systems. All of these requirements are planned for and
programmed into the Defense Budget. Forces not engaged in required training,
exercises, or ongoing commitments are available and can engage in other activities
with little detrimental impact on their readiness. Unplanned operations or other
activities that repeatedly interrupt the training cycles or that reduce the time available
to maintain combat readiness, can have adverse effects. In other words, there are
minimum resources and a minimum time required for basic military preparedness so
that units may retain the capabilities required of them. For many units, the minimums
established by their services are not currently available.
A comparison of Figures 13 and 14 (below), provided by the Air Force’s Air
Combat Command (ACC), shows the effect of high activity levels on unit training
time. Figure 13 shows the planned 160 days for readiness training while currently,
there may be only 80-120 days available. Figure 14 shows the effect of unplanned
additional contingency days and exercise days. These additional contingency and
exercise days violated the Air Force’s own 120-day limit resulting in 136 days “off
station”. Figure 14 shows the added burden of inspections and local exercises which
reduces the actual training days available number to 80-120 days. “Surge days” are
those days when a unit flies almost double its daily flying load in order to “catch-up”
to either its flying-hour requirements, its training requirements, or to make up for
flying lost due to inclement weather. These days are an extra burden on maintenance
crews and minimize the time pilots have for thorough preparation and post-mission
analysis and therefore are not suitable for in-depth combat training. “Productivity
days” are days off accorded by the commander for meeting flying goals. These down
days are an important part of a unit’s rest/recovery cycle and are used as a positive
motivator by operational commanders.

CRS-40
Figure 13. Theoretical annual schedule of an Air Force F-15 squadron given a deployment commitment of
120 days per year. A comparison of figures 13 and 14, provided by the Air Force’s Air Combat Command
(ACC), shows high activity levels reducing available unit training time.

CRS-41
Figure 14. Unplanned additional contingency, exercise, inspection, and local exercise days reduce the
number of actual training days available to 80-120 days indicating that both external and internal factors
contribute to high OPTEMPO and PERSTEMPO. Source: Air Combat Command

CRS-42
Bottom Line: Sustaining a high operational tempo difficult. In theory,
peacetime militaries can only sustain a finite level of activity beyond that required to
maintain military readiness and effectiveness through training, exercises, and
maintenance. High activity beyond this sustainment level can be “surged” for short
periods with little detrimental affect; however, engaging in lengthy activities not
related to preparing themselves for their primary missions diminishes the involved
units’ capacity to fulfill their assigned responsibilities. Over time, the cumulative
affects of lost training time, missed exercises, unprogrammed expenditures, and
extended deployments degrade the overall capability of the force. In practice, U.S.
military forces, with innovation and dedication, have risen to meet these near-term
challenges; yet, there is growing concern that long-term problems may result if
today’s obstacles are a result of a fundamental mismatch of resources and
requirements.

Value of Monitoring OPTEMPO/PERSTEMPO
High OPTEMPO/PERSTEMPO then, may provide some indication that U.S.
forces may be exceeding their designed capabilities in some areas and failing to meet
their planned objectives in others. Understanding OPTEMPO/PERSTEMPO does
not provide insight into the validity of either the current two-MRC strategy or the
policy of pursuing broader military engagement in the world at-large. Understanding
OPTEMPO/PERSTEMPO may, however, indicate whether or not U.S. forces are
reasonably capable of meeting current and proposed obligations and in what areas
change and/or innovation may be required.
OPTEMPO/PERSTEMPO and the QDR. The key OPTEMPO and
PERSTEMPO-related questions in the debate on the Quadrennial Defense Review are
a) whether or not the armed forces of the United States are sufficiently structured and
prepared to meet the requirements of the National Military Strategy, b) whether or
not the current requirements levied on the armed forces are too high, resulting in
substantial implications for what the military strategy should be. Measuring
OPTEMPO and PERSTEMPO and comparing those measurements with other factors
like readiness levels, personnel retention statistics, and unit evaluations will give some
indication of what level of activity U.S. forces, as currently postured and engaged, are
capable of sustaining.

CRS-43

Current Trends15
The Chairman of the Joint Chiefs of Staff, General John Shalikashvili gave the
following testimony before the House National Security Committee in February of
1997:
One of the strategic consequences of the post Cold War period is that the U.S. has
been able to reduce military force levels. Since 1989, the active all-volunteer force
has been reduced by 700,000 people — about a third of the active force. The
Army has gone from 18 active divisions to 10, a 45 percent reduction; the Navy
from 566 ships to 352, a 38 percent decline; and the Air Force, from 36 to 20
fighter wings, down 45 percent. These are the lowest force levels since before the
Korean War. The Defense Budget has also been cut by about 40 percent since
1985. In FY98, it will represent only 3.0 percent of the Gross Domestic Product,
the lowest since before World War II.16

In addition, Marine Corps end-strength was reduced by 12 percent. Table 4
below summarizes the drawdown.
The armed forces are much smaller but are more operationally active than their
Cold War predecessors. Since the fall of the Berlin Wall in 1989, America has
committed forces to nearly 40 crises. Operational deployments increased 300 percent
over Cold War levels. At the same time, the size of the military has been reduced to
pre-World War II levels. On average, the last ten years have seen a more than onethird reduction in the size of U.S. forces. Since 1986, the Air Force alone downsized
36 percent and reduced overseas presence by 40 percent. The combined result of
smaller size and increased activity is illustrated by the following: in 1993, the Air
Force deployed 28,900 of its 441,533 personnel; by 1996, the figures rose to 63,000
of 385,000, a 118 percent increase. While this number reflects a small percentage of
the total force, it is a significant percentage of those forces capable of deploying.
Unfortunately, statistics indicating the number of deployed individuals as a percentage
of those available to deploy are not tracked by DoD. However, on any given day, the
Army estimates 35,000 soldiers are deployed up from 21,500 in 1996. Other military
obligations contribute to higher PERSTEMPOs. While the average number of

15

Some have drawn an analogy between the current situation facing the U.S. military and a
major league baseball team battling in the playoffs. The games are very close, most are
extending into extra innings, some, well into the night, and the players, stressed by the travel,
the interrupted schedules and the intensity of the competition, are getting tired and may be
losing focus. Now, not knowing if they’ll be in the World Series or not, the manager is using
starting pitchers in relief on two days and even one day rest because nobody remembers who
comes in second. Should the team make it to the World Series, no one knows if they’ll be
ready...but, what’s the point of having an expensive team if you’re not going to use it?
The challenge facing QDR planners is how to rest the team, practice fundamentals,
retain enough good players to be a contender, and play a 162 game season, when revenues are
down, when free agency is tugging at the best players, when the season has been compressed,
and overseas franchises have been added to the league.
16

Statement of General John M. Shalikashvili before the House National Security Committee,
February 12, 1997.

CRS-44
steaming days per quarter has shown only a slight increase in the Navy, this result was
achieved through aggressive management and reduction of training days at sea.
Although these days are projected to remain stable, the Navy budget projects
exceeding deployed OPTEMPO limits through FY 1999 based on projections in
support of current contingencies (See Figure 15). The likely trends for all services are
upward (See “Future Trends in OPTEMPO/PERSTEMPO on page 53).

Table 4. Force Structure Drawdown
Army

Navy

Air Force

Marines

Cold War

18 Divisions

566 Ships

36 Ftr Wings

3 Divisions

1997

10 Divisions

352 Ships

20 Ftr Wings

3 Divisions

Change

-8 Divisions

-214 Ships

-16 Ftr Wings

-0 Divisions

45%

38%

45%

12%

% Decrease

Note: Marine Corps reductions occurred in manpower not in force structure.

Current pressures may be creating trends toward innovation thereby helping
DoD come to grips with the new realities of the post Cold War era. In many cases,
the pressures involved in doing more with less have led to innovations and “new
thinking” in the deployment of forces and in planning for modernization. Increased
use of reserve component forces, new training methods and priorities, cross leveling
requirements in order to “share the load” within and between the services are all
enabling DoD to meet current demands. The Air Force’s creation of an Air
Expeditionary Force and its development of a doctrine for its use are born out of the
necessity of the day. Some observers suggest that the necessity of meeting today’s
demand has accelerated reform with DoD and the military departments. Coupled with
budget-constraints, the push toward innovation in all areas may be, in the end, of
tremendous benefit to the country.

A Conceptual Framework: Decreasing Size vs Increasing Workload
Smaller forces, increased commitments equal higher workloads.
Conceptually, reducing the workforce while increasing the commitments, even with
the addition of management efficiencies, will result in higher per capita workloads.
At the point that higher workload would begin to diminish returns is generally
considered the point of maximum efficiency. According to the Chief of Staff of the
Army, General Dennis Reimer, the Army reduced manpower by 36 percent while
increasing deployed operations by 300 percent. In this case, the combination of
personnel reductions and mission increases results in a purely mathematical 625
percent increase in workload. The reduction of personnel alone, without an increase
in the workload, nets a per capita increase of 156 percent. The reduction of force
structure by 45 percent, without an increase in the workload, in both the Army and
the Air Force equals a 185 percent increase. These theoretical increases alone would
require substantial commitments to reform, restructuring, and innovation. The
addition of a significant and sustained level of operational deployments and
international exercises without additional resources compounds the dilemma. Gone

CRS-45
unchecked, such increases would be unsustainable. The difference between the
mathematically increased workload and the actual workload can be attributed to
management efficiencies, reorganizations, increasing the workload on individuals and
units, depleting surplus accounts, and other actions that ensure the services can
accomplish their requirements with the forces they have. One indication of the actual
increase in workload is PERSTEMPO. In testimony before the Congress, the Army
estimates that its officers and senior non-commissioned officers from deployable units
spend 180-190 days away from home annually, while junior soldiers spend 140-155
days away. Understanding how the Army and the other services absorbed the
increased load during the drawdown to reach today’s level of effort is essential to
planning for the future. This analysis raises the question: What has DoD stopped
doing, what is DoD doing less of, and does doing less compromise readiness?

Table 5. Estimated PERSTEMPO Days Annuallya
Army

Deployments
Only

Operational
Units:
140-155
Jr Enlisted
180-190
Sr
NCO/Officer

Target

Avg 146b

365

120-150

Air Force

Marines

<120 days

By policy,
not more
than 182183 days

All duty

Korea

Navy

except U-2 (148),
RC-135RJ (148),
A/OA-10 (146),
F-16L (136),
F-16GP (135),
HC -130 (121),
HH-60G (120)

177 Atlantic
159 Pacific
181 Cbt Spt

By policy, not
more than
120 days
TDY
365

50% over
past 3
years at
home

120

Deployments
should not
exceed 6
months

a

This table was compiled from data presented in testimony to the House National Security
Committee during hearings from February to March 1997 and from data provided by the office
of the Deputy Chief of Staff for Personnel, Headquarters, United States Air Force.

b

Based on an average turn-around ratio of 2.6-2.4:1 reported by the Navy staff

CRS-46
Figure 15. Ship steaming days per quarter deployed and non-deployed 1971-1999. Fluctuations from the
goals reflect real world operations, FY 1996-FY 1999 levels for known contingencies. Source: FY 1998/FY
1999 Department of the Navy Budget.

CRS-47
What is the percentage of troops involved in current operations? The
percentage of deployable combat and combat support forces committed to operations
may be higher than estimated by DoD. These are the forces whose readiness is
measured and reported. Many DoD officials and outside observers, however,
continue to define the size of current commitments as a percentage of DoD
endstrength. To get an accurate picture of the impact on U.S. capabilities, it is
important to exclude the portion of DoD that is not eligible or qualified to engage in
current or combat operations when gauging the importance to U.S. defense interests
of current obligations. According to GAO, quoting Army officials, only 63 percent
of 495,000 Active Army soldiers are in combat or combat support units and therefore
are eligible to deploy17. Also, calculation of this percentage should be based on the
explanation of Army operations and readiness officials who estimate that for every
unit deployed, one more is preparing to deploy, and one is recovering from
deployment. In addition, one more unit is used to provide personnel and resources to
the deploying unit. The result is that, at times, as much as a 4-1 ratio of units/soldiers
can be involved or affected by deployments. In May 1997, the Army estimated
35,800 soldiers deployed (not including those on assignment without their families to
Korea) of which, 7,500 were from the reserve components. Therefore, 63 percent of
495,000 divided into 4 x 28,300 = 36.3 percent of the Active “deployable” Army was
committed to and/or affected by deployed operations. The addition of the 27,500
soldiers deployed to Korea to the 4 x 28,300 nets a 45.1 percent of the active
“deployable Army” currently engaged in supporting operational deployments.
Whereas, 35,800 divided by the total FY98 authorized “Total Force” end-strength of
1.1 million nets a mere 3 percent and it is 6 percent of the active Army of 495,000.
Bosnia and Korea are sizable operations for the Army. U.S. Army Europe
maintains two active Army divisions. The SFOR commitment in Bosnia requires one
complete division staff and almost 8,000 soldiers. To keep this commitment, the
Army must obligate key elements of 3 divisions to the effort; more than is available
in the two stationed in Europe. As stated, when the 1st Armored Division was on a
100-day recovery program, the 1st Infantry Division was in Bosnia, and the follow-on
forces for the troops currently in Bosnia were beginning to prepare. Rotations to
Korea, in PERSTEMPO terms, that is, to keep individual PERSTEMPOs
manageable, affects enough soldiers to man 3 divisions (See “Korea” below). These
two commitments can involve a significant portion of the Army’s 10 divisions.
Regional exercises also require a significant commitment. The Army at certain times
can find itself long on commitments and short on forces.
The other services are also significantly affected by current operations. Air
Force readiness officials estimated that as of May 1996, 13 of 20 Fighter Wing
Equivalents were required to support current operations. Therefore, 65 percent of
the combat fighter force was committed in some way to ongoing missions. The Navy
and Marine Corps routinely have 30 percent of their forces “deployed” at sea with
another 20 percent of the Navy “underway” at sea which means that on any given day,
50 percent of the Navy’s ships are at sea. These rough estimates support the assertion
of some DoD officials that the level of effort for all ongoing contingencies is

17

GAO Report NSIAD-97-66. “Force Structure: Army Support Forces Can Meet TwoConflict Strategy With Some Risks.” February 28, 1997. p. 19.

CRS-48
equivalent to fighting one major regional contingency. Forces permanently stationed
overseas can, as in the case of Korea, be considered as involved in current operations.
The large number of forces involved is both problem and solution. Reducing the
number of fighter wings involved in operations would probably raise the OPTEMPO
above their 120-day ceiling, lower the readiness, and increase the time required to
recover. The services are balancing the load across the entire force which means more
forces are used to keep OPTEMPO within reasonable limits. The expeditionary Navy
and Marine Corps, which support current operations with their forward deployed
forces (e.g. in the Indian Ocean and the Mediterranean Sea), were designed to keep
OPTEMPO and PERSTEMPO within limits; however, increased activity and reduced
resources are affecting their forces too.
Korea: Compounding the PERSTEMPO problem for individuals. For the
36,000 Americans serving in Korea, roughly 95 percent do so without their families.
Assignment to Korea, with a minimum tour-length of one year, guarantees a service
member a statistical PERSTEMPO of 365 days. Selection for Korea duty is without
regard for one’s previous PERSTEMPO level. A soldier coming off the annual Army
operational average of 140-150 days per year away from home ends up with a twoyear average of 255 days away from home when returning from Korea. Assuming
that the same soldier is reassigned to an operational unit following Korea, the threeyear average would equal 218 days per year. For officers and senior NCOs, the twoyear average would be 275 and the three-year average, 245. By comparison, the
Navy policy of 50 percent of one’s time spent at home over three years results in a
182 day maximum annual average.
An example: What it takes to keep within tolerable limits. The figures below
illustrate the requirements of a high OPTEMPO environment. The Air Force’s “Rivet
Joint” electronic surveillance aircraft, which is a “Low Density/High Demand”
(LD/HD) asset, that is, an aircraft of which there are few but for which there is great
demand, has significantly increased its workload since Desert Storm. As illustrated
in the following charts, in order for the Air Force to meet its stated requirement to
keep PERSTEMPO below 120 days per year, it must increase the ratio of aircrews
to aircraft. Figure 16 shows that prior to Desert Storm, mission requirements meant
that 19 crews would keep the tempo below the threshold. At that time, the unit had
22 crews. Following Desert Storm, the increase in mission requirements raised the
number of aircrews required to maintain the PERSTEMPO threshold at or below 120
days to 26 fully-trained, mission-ready aircrews. This 27% increase in assigned
aircrews would require the Air Force to take aviators from another resource or to
train more aviators causing either a potential shortfall for the losing units in the first
case, or a reduction in aircrew experience levels in the second; either way, the move
would increase costs. In addition to adding aircrews, maintenance and support
personnel would need to be added to assist in managing the extra flying load on the
unit. This example of a unit in extremely high demand shows both the dramatic
increase in mission requirements and the significant actions required, in this instance,
to bring the workload back within tolerable levels.

CRS-49
Figure 16. Number of airborne surveillance crews required to meet requirements prior to Desert Storm.
Source, Air Force Studies and Analysis

CRS-50
Figure 17. Increase in crew requirements required to keep airborne surveillance PERSTEMPO below the
Air Force goal. Source, Air Force Studies and Analysis

CRS-51
“It’s NOT war” — Home Station Hurt. The higher than anticipated use of
U.S. forces and the associated effects are not limited to deployed units. The forces
involved in operations are not the only ones experiencing higher than normal activity
levels. Headquarters staffs are pressed, in some cases severely, by the combination
of ongoing operations and other international obligations. Headquarters personnel
deploy to many locations in support of operations leaving their colleagues
undermanned at a time when work requirements are highest. This is an example of
“home-station hurt,” a phenomenon whereby the depleted manpower at home is
forced to accomplish 100 percent of the routine tasks in addition to the ongoing
support tasks required by the deployments. This phenomenon is not limited to
headquarters and other small staffs. Bases from which troops deploy, and any units
which send personnel suffer some level of “home-station hurt.” In these cases, the
OPTEMPO and PERSTEMPO of the non-deployed personnel increases as well. The
increase, measured in longer work hours and other indicators of personnel stress,
may also have detrimental affects on unit morale and individual and unit effectiveness.
The non-deployed forces do not receive the additional pay, medals, and positive
reinforcement as their deployed counterparts yet work extended hours in support of
the same commitments and more. Further, when it’s time for those affected by
“home-station hurt” to deploy, many do so in a degraded capacity due to their already
high activity levels. This aspect of high OPTEMPO and PERSTEMPO can be a
significant factor in morale and should be considered in policy decisions affecting
OPTEMPO and PERSTEMPO.
Trends in retention and reenlistments. The trend toward greater use of
military forces has sharpened the focus on readiness and retention. Former Secretary
of Defense Perry made readiness and quality of life issues his priorities during his
tenure in order to avoid the pitfalls of a hollow force. While concerted action has
ensured at least short-term stability and an acceptable level of readiness, many
analysts point to signs of cracks at the fringes of effectiveness. In testimony before
Congress, service personnel chiefs continue to warn of impending problems with
retention and re-enlistments. Statistics show no immediate declines; still personnel
officials, who base their views on surveys of and discussions with military members,
anticipate future declines because current statistics are historical, not predictive. Air
Force pilot retention and pilot willingness to accept bonuses for continued aviation
service are both dropping. In FY97, only 32 percent of eligible Air Force aviators
accepted a pilot bonus to continue their service. Army recruiters are seeing evidence
of the public’s perception of too numerous deployments.

Pentagon Efforts: Protecting long-term military effectiveness
The Pentagon is aggressively tackling OPTEMPO issues within its purview. The
Global Military Force Policy (GMFP) established a mechanism to provide relief to
overworked units. Under this policy, Commanders-In-Chief cannot, without the
Chairman’s adjudication and the Secretary’s concurrence, use forces that have already
exceeded their time allocated to non-readiness related activities. This policy is
designed to give “Low Density/High Demand” units a break from near-continuous
operations. Although this policy has had success, it has limited application. The
policy does begin to address DoD’s chief challenge in managing OPTEMPO: How
does the Pentagon “Just Say No”?

CRS-52
An example: Air Force Global Sourcing. To reduce the excessive burden on
heavily tasked units, European-based forces for example, the Air Force uses a “Global
Sourcing” policy that fills operational requirements from organizations world-wide.
The graphs in figure 17 below show the effect of “sharing the load;” spreading
requirements over geographically-diverse units.
Both the Global Military Force Policy and the Air Force’s Global Sourcing are
examples of crisis-driven innovation in which the Pentagon finds low-cost solutions
while managing an acceptable level of risk. As high OPTEMPO levels continue, the
necessary prioritization of requirements may lead to other such innovations as senior
decision makers are forced to make choices. Monitoring the burden on units and
individuals should be an important activity while DoD undergoes these transitions.

CRS-53 TDY loads while U.S.-based and Pacific-based
Figure 18. European-based USAFE aircraft have reduced
aircraft have increased their share of the burden of current operations through “Global Sourcing.” Source:
CRS from DoD data.

CRS-54

What Do the Facts Mean? Understanding the Implications
This section explains the effects of high activity levels within the echelons of the
Department of Defense. The cause and effect relationships described below provide
an explanation of the potentially deleterious effects of excessive OPTEMPO and
PERSTEMPO. High OPTEMPO/PERSTEMPO manifests itself in different ways
depending upon the area of focus. Individuals and units face different challenges in
meeting current demands, while the services and DoD have their own unique sets of
problems and responsibilities. Increases in OPTEMPO and/or PERSTEMPO affect
each level differently as do changes in policies and procedures.
At the individual level. High PERSTEMPO means people, while generally
satisfied engaging in military operations, are not able to meet other demands and goals
such as Professional Military Education (PME), specialized training that will enable
them to advance in their careers, and important family obligations. When individuals
believe their goals and aspirations are at risk due to higher than anticipated military
requirements, their willingness to continue in military service diminishes. A sense of
satisfaction comes from being highly proficient at one’s chosen and assigned duties.
Pilots, for example, lose proficiency and motivation, when their combat skills erode
because they were engaging in peacekeeping operations. The high number of
Training Waivers, that is, authorizations to fly without completing requisite training,
granted to pilots by the Air Force is indicative of this decline in capability. In
addition, predictability in their lives is a key factor in maintaining morale regardless
of the pace of operations. Equal consideration should be given to individuals
remaining behind as their PERSTEMPO increases in order to cover the dutie

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/crs%3A98-41. Public record. Not legal advice.
