# Amicus Curiae Brief — Chemehuevi Tribe of Indians v. Federal Power Commission

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386414_0384%3A15

## Record

- **Collection:** Supreme Court brief
- **Document type:** Amicus Curiae Brief
- **Published:** January 1, 1974
- **Citation:** 417 U.S. 944

## Text

Tue CHEMEHVEVI Triee ov INDIANS ET AL., Petitioners, =

| Ge Oe ee
Feperat, Power Commission, Respondent.

Anwzona Pusiic Sznvice. CoMPANY ET AL., Petitioners,
v.
THe CHEMEHUEVI TRIBE OF INDIANS ET AL.,
| Respondents.

—_————

FepreraL Power Commission, Petitioner,
3 v.

THE CHEMERUEVI ‘TRIBE OF Tewrans ET AL.,
Respondents.

On Writs of Certiorari to the Unifed States Court of Appeals
for the District of Columbia Circuit

BRIEF FOR THE MONTANA POWER COMPANY, PACIFIC
POWER & LIGHT COMPANY. PORTLAND GENERAL «-
ELECTRIC COMPANY. PUGET SOUND POWER &
LIGHT COMPANY. AND THE WASHINGTON
WATER POWER COMPANY.

AS AMICI CURIAE

(The names and addresses of Counsel appear on the inside cover.)

Paess or Byron S. Avams Paurrina, Inc., Wasmineron, D. C.

=>,

. .
:

C

mict

lotunss for the A
Ww.

A

TR LAD ABA DE IAN POLRDEA LO D

TABLE OF CONTENTS

: Page
Dabereet: of the Amiel CORO 2c. 665 cc icSiseidsi ics 2
PS ook oe 5 Rhee sae ies be eaa nse Veet cuns 3
Conclusion i whsaw Cals Wik en bee W ae eenhaeee eee 14
TABLE OF CITATIONS
STATUTES :
Federal Power Act § 4(e), 41 Stat. 1065 (1920), as
aménded, 16 U.S.C. § T97(e) 3... 2... cccceess passim
Montana Environmental Policy Act, R.C.M. 1947, §§ 69-
a ih oe ee ws oven ge he 11, 12, 13,14 .
Montana Strip Mined Coal Conservation Act, R.C.M.
eB A nee ee ey ree 13
Montana. Strip Mining and Reclamation Act, R.C.M.
ge 8? Seen ee 14
Montana Utility Siting Act of 1973, R.C.M. 1947, §§ 70-
hg vow os tw eken re kens nea na 11, 12, 13

Montana Water Use Act, R.C.M. 1947, §§ 89-8-103 ff... 13

Nationa! Environmental Policy Act § 102(2)(C), 83
Stat. 853 (1970), 42 U.S.C. § 4332(2)(C) ..... 8, 10, 11

Wild and Scenic Rivers Act, 82 Stat. 906 uae as
amended, 16 U.S.C. §§ 1271 §. . 0 ove eens

MISCELLANEOUS:

Bureau of Reclamation, U. S. Department of - Interior,
Appraisal Report on ah eae W, yoming Aque-
WO TIT) ones tk kc cu rh fankcaces ee eNs sss 5, 7,8

Ecological Consulting Service, Report ‘e the Siete
Power Company: A Study of the Effects of heagaae
Withdrawal From the Yellowstone River (1974)..

North Central Power Study, Report of Phase I cit |

PEE ERROR BG IB Ne eI

BOR

ailetiedinieiineeeetbinieeaie

IN THE

Supreme Court of the United States

OcToBER TERM, 1974

No. 73-1380
THE CHEMEHUEVI TRIBE OF INDIANS ET AL., Petitioners,
v.
FEDERAL Power ComMMIssion, Respondent.

No. 73-1666
ARIZONA PUBLIC SERVICE COMPANY ET AL., Petitioners,
v.

THE CHEM)HUEVI TRIBE OF INDIANS ET AL.,
Respondents.

No. 73-1667
FEDERAL POWER COMMISSION, Petitioner,
%

THE CHEMEHUEVI TRIBE OF INDIANS ET AL.,
Respondents.

BRIEF FOR THE MONTANA POWER COMPANY, PACIFIC
POWER & LIGHT COMPANY, PORTLAND GENERAL
ELECTRIC COMPANY, PUGET SOUND POWER & —
LIGHT COMPANY, AND THE WASHINGTON
WATER POWER COMPANY,
AS AMICI CURIAE

The Montana Power Company, Pacific Power &
Light Company, Portland General Electric Company,
Puget Sound Power & Light Company, and The Wash-

BORNE Oer nr Secs Ree een i

2

ington Water Power Compauy file this brief as amici
curiae, pursuant to Rule 42 of the Court and with the
consents of all the parties.

INTEREST OF THE AMICI CURIAE

The five amici are investor-owned electric utilities
and are together the principal suppliers of electric
energy for commercial, industrial, and residential
purposes throughout the Northwest, serving parts of
Montana, Wyoming, Idaho, Washington, California,
Nevada, and Oregon, To meet the growing need for
electrical energy in the Northwest, these utilities have
jointly commenced construction of a coal-fired steam
electric generating project at Colstrip, Montana, in the
eastern part of the state and about thirty-five miles
south of the Yellowstone River at Forsythe, Montana.

The Colstrip project, which will ultimately have four

generating units with a total capacity of 2100 mw, will
use cooling water from the Yellowstone diverted pur-’
suant to an appropriative right under Montana law.
The first two units of the Colstrip project: are. now
being constructed jointly by two of the amici and are
scheduled to begin operation in 1975, The remaining
two units will be built by ali the amici and are
scheduled to commence operation in 1978 and 1979,
Fuel for the project will be supplied by a nearby coal

‘mine operated by a subsidiary of one of the antici.

The interest of the amici in the instant proceedings
is twofold. First, the Buffalo Rapids Irrigation

‘Project, Custer Rod & Gun Club, Tongue-Yellowstone

Beet Growers, and Trout Unlimited (hereinafter to-
gether ‘‘Buffalo Rapids”’) have jointly filed a ceom-

‘plaint with the Federal Power Commission to require

the amici to obtaima license from the Commission for

3

the Colstrip project under Section 4(e) of the Federal
Power Act, 41 Stat. 1065 (1920), as amended, 16 U.S.C.
§797(e). That proceeding thus raises in the Com-
mission the issues now pending before this Court
respecting the construction of Section 4(e) of the
Act. Second, Buffalo Rapids has filed an amicus
brief in this Court in which it argues that the projected
use of Yellowstone water for the Colstrip and other
projects demonstrates the need for reading the Act
broadly, enough to embrace steam plants within the
Commission’s licensing jurisdiction.

The arguments based upon the relevant statutory
language, legislative history, and the precedents in
support of the position of the Solicitor General and
of the Arizona Public Service Company et al. have
been adequately preseited in the briefs of those parties.
We shall therefore simply note our agreement in
general with those arguments and with the position
that Congress in enacting Section 4(e) of the Act did
not intend that the Commission embrace steam electric
generating plants within its licensing jurisdiction.
We shall, however, respond to the ad hominem argu-
ments made by Buffalo Rapids, because those argu-
ments erroneously are based on unsupportable factual
assertions about the Colstrip project of these amici.

ARGUMENT

The central contention of Buffalo Rapids through-
out its brief is that although the legislative history of
the Act ‘‘seems to focus on the hydroelectric basis for
the development of the’’ Act, the Court should give a
broad reading to the Act “to provide for a com pre-
hensive scheme of water development vis-a-vis power
production’? (Br. at 10; emphasis in original). With-

4

out this broad reading, argues Buffalo Rapids, there
will be no adequate federal regulation of steam power
plants using water from rivers such as the Yellow-
stone; and corporations like the amici, by exercising
state appropriative rights, will ‘‘pirate’’ these waters
and ‘‘dewater’’ rivers like the Yellowstone ‘‘with the
stroke of the pen’”’ (e.g. Br. at 9, 14-16). The example
Buffalo Rapids offers the Court in support of the
foregoing position is the use of Yellowstone water by
the amici for the Colstrip project, allegedly by way
‘of “‘a different factual perspective’ from the use of
Colorado River water by the ‘‘Four Corners plants”’’
(Br. at 2-3).

We show in this brief that Buffalo Rapids’
‘factual’? charges are untrue and sharply disputed.
The Court has no record before it respecting the
Yellowstone which would lend any support for a
reading of the Act so broad as to embrace the licensing
of steam plants. The analogy to the Colstrip project
is not apt, both because of the very small amounts of
water involved as compared with the flow of the river
and with uses other than for power generation, and
because of the extensive federal and state regulation
and environmental review to which the Colstrip project
is subject apart from FPC licensing.

1. We agree with Buffalo Rapids as to the need for
“factual perspective’’, especially respecting the
charges made about the Colstrip project and the al-
leged ‘‘dewatering”’ of the Yellowstone River by the
amici. The facts are that the average annual flow of
the Yellowstone into the Missouri River, just east of
the Montana border in North Dakota, is about 9 million

7 SEPSIS

Sat ON Spit AES

5

acre feet.‘ This is net of all depletions—municipal,
agricultural, and industrial. At normal operation,
which will not be reached at least until some time in
1979, the Colstrip project will divert from the Yellow-
stone for consumptive use about 30,000 acre feet per
year, or only about one-third of one percent of the
river’s present average annual fiow.? That miniscule
diversion for Colstrip should be contrasted with the
average annual diversion for agricultural purposes by
Buffalo Rapids. During the period from 1966 to 1971
Buffalo Rapids and three other reclamation projects
diverted annually an average of 424,000 acre feet —

1 Caleulations of the amount flowing into the Missouri differ.
One measures the average annual flow from 1911-1970 at Sidney,
Montana, a few miles downstream from the North Dakota border,
at 12,980 efs, or about 9.4 million acre feet. Ecological Consulting
Service, Report to the Montana Power Company: A Study of the
Effects of Water Withdrawal From the Yellowstone River, Table
IX at 39 (1974) (‘‘Data taken from Water Resources for Mon-
tana, Part I. USDI, USGS, 1961-1971’’). The Bureau of Ree-
lamation’s Appraisal Report on Montana-Wyoming Aqueducts
(1972), p. 3, estimates that the ‘‘{a]verage annual discharge into
the Missouri River is about 8.8 million acre-feet’’. For these pur-
poses we accept the estimate of Montana Governor Judge in a state-
-ment relied upon by Buffalo Rapids (Br. at 6) as to ‘‘a near an-
nual flow of about 9 million acre feet of water at our border.”’

2The annual consumptive use for Colstrip of about 30,000—out
of 9 million—acre feet assumes normal operations at 80% of ca-
pacity. The diversion will be pursuant to an appropriative right
claimed and to be perfected under Montana law, and no water will
be purchased from the United States. Given the small amount of
water to be diverted and the fact that state regulatory authorities
will require the project to be equipped with a storage pond capable
of supplying the plant’s requirements for nearly two months, the
Colstrip diversion will not be dependent upon the regulation of the
stream flow by a government dam. Thus, there is no support for
the allegation by Buffalo Rapids (Br. at 8) that the amici will
use ‘‘surplus water’’ from a government dam within the meaning |
of Section 4(e) of the Act.

5
3
:
s

if

| RRR WR EN tae Cotas

6

nearly fifteen times that calculated for Colstrip.* The
average annual diversion during that period by the
Buffalo Rapids irrigation project alone was 84,561
acre feet. Under the doctrine of prior appropriation
applicable in Montana, these agricultural uses are fully

- protected against the Colstrip or any other subsequent

use.

These circumstances illustrate, first, the fact that the
Colstrip diversion will not have any significant impact
on the flow of the Yellowstone — and no impact at all
on existing uses. These circumstances also demon-
strate that FPC licensing jurisdiction over steam
plants will not itself give the federal government com-

_ prehensive authority to regulate the use of water from

the Yellowstone or any other river. Moreover, in
addition to the demands for water for reclamation-
agricultural. projects, there are. significant additional
demands for industrial, municipal, recreational, and
agricultural uses which would not be covered’by FPC
licensing jurisdiction over steam plants.

Beyond the Colstrip project, there is no evidence
before the Court or otherwise available of which we are
aware giving any meaningful estimate of the future
demands on the Yellowstone of the magnitude com-
plained of by Buffalo Rapids. The Colstrip project
is the only steam generating plant currently under
construction which will use water from the Yellow-
stone River system. In making its sensational allega-
tions concerning potential uses, Buffalo Rapids relies

3 Ecological Consulting Service, supra n. 1, Table Vid~et 35

(‘Data taken from Crop Production Summary, Federal Reclama-
tion Projects—Region 6. USDI, Bureau of Reclamation, 1966-
re ae P

4 See n. 3 above.

aaa

7

(Br. at 2-3) on halite far ‘‘potential’’ electric’ power
development in a multi-state area from the ‘North
Central Power Study,” a joint federal-industry study
which was not continued after its first exploratory
phase. It is clear even from its description by Buffalo
Rapids, however, that that Study did not attempt to
estimate what development would ultimately take place.
Rather, the primary fecus of the Study was simply to
identify locations within a five-state area where suf-
ficient strippable coal reserves and water supply could
be made available to support generating plants of 1000
mw or more. °

The other sources relied upon by Buffalo Rapids
(Br. at 3-5) are equally hypothetical. They clearly
rely either upon the North Central Power Study (see
Br. at 3) or upon the Burean of Reclamation’s
Appraisal Report on Montana-Wyoming Aqueducts
(1972) (see Br. at 5). That reportfalso the first phase
of a study project whose funding was not continued,
only “‘identifie[d] water resources ... that may be
available for development’. of coal resources in the
Northern Great Plains states ‘to convey water from
sources to points of possible use’’ ( Report, Cover
Letter of the Project Direetor, April 1972). The
report assumed, ees investigation of its own, a
maximum ultimate demand of 2.6 million acre feet per
' year — an assumption based upon certain contracts
giving options to purchase water in the future from
the Bureau of Reclamation, ‘indicated interest’’ in
additional water by ‘‘[e]nergy companies”’, and the
-“reeently completed power study’’ discussed above
(Report at 11). The report concluded, nevertheiess, |

. Seé, c.g.. North Central Power Study, Berets of Phase I at 11
(October 1971).

s

’

ihr ape

8

that even ‘‘in the driest vear,”’ and ‘‘after meeting all
existing water uses. and after having supplied potential
industrial water needs,”’’ ‘‘there will be ample water
to"meet fuiure municipal. and agricultural needs”’
(Report at 31).°

Buffalo Rapids points to a number of ‘‘options”’
and ‘‘applications’’ for the purchase of Yellowstone
water fromm Bureau of Reclamation dams for industrial
uses referred to in the foregoing-Appraisal Report
(Br. at 5,6). But i#*making its charges that the river
will be ‘‘dewatered’’ as a result, Buffalo Rapids
assumes that all such options and applications will be
exercised or granted to the maximum extent. In 1967
the Department of Interior began entering into option
contracts for the sale of water stored behind Bureau
of Reclamation dams in the Yellowstone and Missouri
River systems, and several applieations for additional
option contracts have been filed but not granted.
However, in papers filed by the Department of Interior
within the last few weeks in litigation in the District
of Columbia, it was revealed that no such option con-
tracts have been entered into since 1971; that ‘*[nJo
water has been released pursuant to [these] options
or contracts’? dating back to 1967; and that ‘‘no
applications for release of water pursuant to options
or contracts’? are now pending.* Moreover, it cannot

®The report noted that an “environmental impact statement as
required by the National Environmental Policy Act of 1969 will
be prepared prior to initiating feasibility investigations’’ Report
at 30).

7 Affidavit of William W. Lyons, Deputy Under Secretary of

the Department ofj Interior at 5; Answers of Defendant Rogers .

C. B. Morton, Secretary of Interior, to Plaintiffs’ Revised Supple-
mental Interrogatories to Federal Defendants, Nos. 27, 28 (Novem-
ber 1974), Sierra Club Et Al. v. Rogers C. B. Morton Et Al., Civil
Action No. 1182-73 (D. D.C.), appeal pending, No. 74-1389 (D.C
Cir.).

9

be determined from an application or claim (by con-
tract or appropriation) for an amount of water how
much water will ultimately be put to beneficial con-
sumptive use. For example, the initial appropriation
claim tiled under Montana law for the Colstrip project
vas for 181,000 acre feet of water per year, but the
total annual consumptive use now projected for the
entire Colstrip project will only be about 30,000 acre
feet. It cannot be assumed that other so-called esti-
mates of future water claims upon the Yellowstone of
the kind relied upen by Buffalo Rapids will not prove
similarly greater than original ‘safe’? estimates.®

In short, the facts régarding the Colstrip project do
not support Buffalo Rapids’ extravagant claim that a
broad reading of Section +(e) of the Act is necessary to
prevent a ‘‘dewatering’’? of the Yellowstone. The
Court should not be asked to base its construction of
an Act of Congress on unproven and untrue assertions
that ‘‘corporations”’ are about to ‘‘pirate’’ the Yellow-
stone and ‘‘dewater’’ that river.

2. Nor is a strained reading of the Act to provide
the FPC licensing jurisdiction necessary to prevent
“the uncontrolled exhaustion of the region’s water
resources,’ as Buffalo Rapids claims (Br. at 16).
The Buffalo Rapids brief asserts that unless this Court
gives licensing jurisdiction to the Commission ‘‘a pri-
vate utility can, without any Federal guidance or
control whatever, pirate massive amounts of water

8 The Notice of Appropriation by the United States for the Buf-
falo Rapids reclamation project, Dawson County, Montana Docket
No. 193324, dated June 17, 1938, was for 1,340 cfs from the Yellow-
stone system, or approximately 970,830 acre feet per year, more
than ten times the average annual diversion of 84,561 acre feet for
that project some thirty years later.

10

from public streams” (Br. at 15), and that ‘‘water-
ways’’ like the Yellowstone, ‘‘dewatered at the
laissez-faire whim of the corporations, ery out for
some scheme of comprehensive Federal regulation”’
(Br. at 14). But the claim that there will be no
adequate regulation if the Commission does not reg-
ulate disregards the pervasive federal and state reg-
ulation and: envitonmental review of every phase of the
Colstrip project; “the exainple Buffalo Rapids proffers
for the Court’s attention.

To be sure, there is no other federal licensing juris-
diction over the siting per se of steam power plants.
However, because of the **checkerboard”’ arrangement
of federal and privately owned lands in the Great
Plains and in Montana in particular, federal regula-
tion, with environmental review, is pervasive. Thus,
the federal approvals which the owners of the Col-
strip project either have sought or will seek include
permits for the construction of transmission lines
across federal lands, the granting of new mining leases
of federally owned coal necessary to provide fuel for
later stages of the project, and approval of mining
plans. Each of these approvals by the Departments of
Interior or Agriculture will require an environmental
impact statement under Section 102(2)(C) of the
National Environmental Policy Act, 83 Stat. 853
(1970), 42 U.S.C. § 4832(2)(C), and that impact state-
ment will take into consideration the essential features
of the project and their impacts, if any, upon the
relevant environment. Indeed, the Bureau of Land
Management of the Department of the Interior and
the\Forest Service of the Department of Agriculture

have ulready commenced the preparation of an environ-
mental impact statement under NEPA respecting these

11 ‘
and other aspects of the Colstrip project; and the
Deputy Under Secretary of Interior has directed
that the impact ‘‘statement should cover the power-
plant, its transmission line, the water pipéline, the
-coal mine, and anv related ancillary facilities and
rights-of-way.’’* And, should application ever be made
to the Bureau of Reclamation by the developers of
Colstrip or any other industrial project for actual
purchase and delivery of water, Interior has made it
clear that an environmental impact statement will
be required under NEPA in each instance. "

Additional legislation for regulation and environ-
mental review by the State of Montana covers every
aspect of thé Colstrip project.. The Montana Environ-
mental Poliev Act, R.C.M. 1947, §§ 69-6501 ff., is
virtually identical to NEPA on the federal level and
applies to all state actions with respect to the con-
struction of a power plant and all associated facilities,
as well as all coal mining activties. Under the
Montana Utilitv Siting Act of 1973, R.C.M. 1947,
§§ 70-801 ff., no power facility may be constructed or

® Memorandum to the Director, Burean of Land Management,
from William W. Lyons, Deputy Under Secretary, U.S. Depart-
ment of Interior (February 22, 1974).

1° Letter from Martin H. Oleson, Jr.. Acting Regional Director,
Bureau of Reclamation, U.S. Department of Interior, to all holders
- of option contracts under the Industrial Water Marketing Program
(May 20, 1971).

'! Buffalo Rapids suggests the possibility of further federal reg-
ulation in the form of inclusion of a ‘‘part of the Yellowstone
River . . . under the Wild and Scenie Rivers Act,’’ 82 Stat. 906
(1968), 16 U.S.C. §§ 1271 ff. (Br. at 9). As Buffalo Rapids’ brief
itself reveals, however, the portion of the river under study
reaches ‘*from Gardiner to Pompey’s Pillar in Montana’”’ and is
no closer than forty miles upstream from the amici’s point of di-
version.

12

operated in Montana without a certificate of environ-
mental compatibility apd public need by the Montana
Board of Natural Resources and Conservation. Ap-
plications under this act are now pending for permis-
sion to construct the second phase of the generating
plant, two 500 kv transmission lines, and a pipeline to
earry.water from the Yellowstone River to Colstrip. ”
A six-volume draft environmental impact statement
respecting these applications has been prepared pur-
sant to ‘‘MEPA’’,”* and some nineteen public M tings
have been scheduled.

The Montana Board of Natural Resources and Con-
servation has already passed upon applications by the.
amici under the Siting Act to construct the facilities
necessary to divert water from the Yellowstone for use
in connection with the first phase of the generating
plant, including the construction of a water pumping
station, water pipeline, and power transmission line
from the river to Colstrip (Order of March 1, 1974).”

12 The construction of the cenerating plant itself for the first
phase of the Colstrip project was commenced prior to the enact-
ment of the Siting Act and is therefore not covered by that Act.
However, as the discussion in the text discloses, the associated fa-
cilities and environmental equipment necessary for the operation
of even this first phase are cov.yed by the Siting Act.

13 Montana Department of Naturai Resources and Conservation,
Draft Environmental Impact Statement on Colstrip Eiectric Gen-
erating Units 3 & 4, 500 Kilovolt Transmission Lines and Asso-
ciated Facilities (November 1974).

14 Letter announcement of the Montana Dept. Nat. Res. & Cons.
(October 10, 1974).

15 Thus, Buffalo Rapids asserts incorrectly (Br. at 6) that the
Montana legislature has passed a ‘*3-year moratorium on water di-
versions from the Yellowstone River.’’ The statute suspends the
g-anting of new permits for appropriations for three years or
until ‘‘a final determination of existing rights has been made’’

13

The action taken by the state with regard to these
facilities was preceded by an environmental impact
statement as required by ‘‘MEPA”’’.”® A similar appli-
eation by the amici for a transmission line from Col-
strip. to Broadview, Montana was cousidered and
approved by the Board of Natural Resources and Con-
servation (Order and Certificate. of November 15,
1974), and the Board had before it an environmental
impact statement as to this portion of the project also.”

Moreover, the Montana Utility Siting Act, R.C.M.
1947, §§ 70-801 ff., requires the State Department of
Health and Environmental Sciences to certify that a
proposed power facility will not violate established
state and federal air and water anti-pollution stand-
ards. The first phase of the Colstrip generating plant
has been so certified by that Department (Permit No.
513-111472, April 23, 1973) after the preparation of an
environmental impact statement which assessed all the
various water and air pollution control equipment with
which the Colstrip project is to be equipped.”

All mining operations associated with the Colstrip
project are governed by the Montana Strip Mined Coal
Conservation Act, R.C.M. 1947, §§ 50-1401 ff., which

under the state’s new Montana Water Use Act (R.C.M. 1947,
§§ §9-8-103 ff). Moreover, the Act ‘‘does not apply to applications
to appropriate water for use by a utility facility for which a cer-
tifieate of environmental compatibility and public need is granted
pursuant to the Montana Utility Siting Act of 1973’’ (R.C.M.
1947, § 89-8-109), as is the case with the proposed diversion for
the Colstrip project.

16 Tssued by the Mont. Dept. Nat. Res. & Cons. in January 1974.

17Tssued by the Mont. Dept. Nat. Res. & Cons. in June 1974,
with an addendum in October 1974.

18 Tssued by the Mont. Dept. Health & Env. Sciences in March
1973."

14

requires approval of mining plans on an annual basis
by the Montana Department of State’ Lands. Finally,
the Colstrip mining operations are also governed by
the Montana Strip Mining and Reclamation Act,
R.C.M. 1947, §§ 50-1034 ff. That Act may well be the
strictest mining reclamation law in the United States
and requires a mining operator to submit reclamation
plans for approval and to post a bond that all acreage
disturbed by strip mining is to be successfully re-
claimed.” And, all approvals ofgmining and reclama-
tion permits under these statutes must also be accom-
panied by environmental impact statements under

‘*MEPA’”’,

Whatever may be the case in other river basins, then,
the state and federal regulation respecting steam power
plants in Montana which draw water from the Yellow-
stone River or its tributaries is pervasive. Aeccord-
ingly, there simply is-no substance to Buffalo Rapids’
argument that this Court should read the Federal
Power Act broadly on the ground that without FPC
licensing jurisdiction there will be no adequate regu-
lation.

CONCLUSION

There js nothing in the record of this case or in the
arguments of counsel for Buffalo Rapids which would
warrant stretching Section 4(e) of the Federal! Power
Act in the fashion urged by the Chemehuevi Tribe and
by Buffalo Rapids. The dimensions of future develop-

19 Surface Mining Permit No. 00003, issued on December 17,
1973 by the Department of State Lands to the Western Energy
Company, a subsidiary of one of the amici operating at Colstrip,
requires a bond of $2,796,860 for reclamation of the acreg cur-
rently being mined.

15

ment of steam electric generating plants in the
Yellowstone River system cannot be predicted at this
time, but the facts regarding the Colstrip project
clearly do not support Buffalo Rapids’ argument in.
favor of FPC jurisdiction. Instead, they demonstrate
the absence of any need for such a strained reading of
the statute. A project that will divert only one-third
of one percent of the average annual flow of the Yellow-
stone River and which has been and will be scrutinized
in virtually every detail by agencies of both federal and
state governments, surely cannot accurately be said to
demonstrate that the nation’s rivers either are ‘‘being
dewatered’ “with a stroke of the pen”’ or ‘‘ery out for
some scheme of comprehensive Federal regulation’ by
the Federal Power Commission. Moreover, since the
amount of water needed for the project is so small com-
pared with known agricultural, municipal, and other
industrial uses, even the strained :reading of Section
4(e) of the Act would not confer upon the Commission
the authority necessary for a comprehensive regulation
of the river. For these and other reasons advanced in
the briefs of the Solicitor General and the Arizona —
Public Service Company ct al., the decision of the court
of appeals should be affirmed insofar as it held that the
‘project works” clause of Section 4(e) of the Act does
not apply to steam generating plants and reversed inso-
far as it held that the ‘‘surplis water’’ clause does
apply to steam plants. There is no warrant for any
other reading of the statute.

Respectfully submitted,

16

ee eet Tei

Francis M. SHEA

RicuHarp T. Conway

4 Davip BootH BEERS

: SHEA AND GARDNER

734 Fifteeuth Street, N.W.
_ Washington, D.C. 20005

Wruiam H. CoLpiron
MELVYN RYAN
40 East Broadway
Butte, Montana 59701

: Warren Hastinas
! 621 S. W. Alder Street
Portland, Oregon 97205

Dovc.ias P. BIEGHLE
WILLIAM S. WEAVER
PERKINS, COLE, STONE, OLSEN
& WILLIAMS
1900 Washington Building
Seattle, Washington 98101

ALLAN P. O’KELLY
PAIneE, LOWE, CoFFIN,
HERMAN & O’KELLY
1400 Washington Trust Bank
Building
Spokane, Washington 99204

RicHarp D. Bacu
Rives, BoNYHADI
& DRUMMOND:
1400 Public Service Building
920 Southwest Sixth Avenue
Portland, Oregon 97204

Attorneys for the Amigf Curiae

WRU eit

Of Counsel:

SHEA AND GARDNER
734 Fifteenth Street, N.W.
Washington, D. C. 20005

Dated: January, 1975

Beeiwsivien 5g RAG RAY
a
”

Ay

By
Se

Zs

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386414_0384%3A15. Public record. Not legal advice.
