# Appendix — United States v. General Dynamics Corp.

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386414_0099%3A07

## Record

- **Collection:** Supreme Court brief
- **Document type:** Appendix
- **Published:** January 1, 1974
- **Citation:** 415 U.S. 486

## Text

-

eR Sas SY Ces

Na ane

OB PEON HET SIGE INL RI. SINE

a ms % ">

U Sr.
NITED STATES OF AMERICA, ‘

Year

ELECTRIC COAL COMPANIES, and FREEMAN

ON APPEAL FROM THE UNITED STATES DISTRICT COURT
FOR THE NORTHERN DISTRICT OF ILLINOIS

Supreme Court of the United States

OctToBER TERM, 1973

No. 72-402

UNITED STATES OF AMERICA,
Appellant

Vi

GENERAL DYNAMICS CORPORATION, THE UNITED
ELEcTRIc CoAL COMPANIES, and FREEMAN
CoAL MINING CORPORATION

ON APPEAL FROM THE UNITED STATES DISTRICT COURT
FOR THE NORTHERN DISTRICT OF ILLINOIS

INDEX

Government Exhibits:

Gx + en et Sorat eee
1

Gx 2 seed Boer Gone Sree ee
1961

GX 38— Annual Report of General Dynamics Corporation

1
8
1962 5
GX 4— Annual Report of General Dynamics Corporation
Gx 5 Annal Report of Generai Dynamics Corporation :
GX 6— Annual Report of General Dynamics Corporation
Gx SS

DX 170— Article entitled “Alberta Agency Backs Northern
Natural On Bid To Export Gas To U.S. Midwest,”

The Wall Street Journal, December 17, 1969 ____.

DX 171— Article entitled “Consumers Power Announces
Plans For Atomic Plant—Dow Chemical Will Be

Chief Customer Of New Facility; Cost Put At

$267 Million—Completion Is Slated In 1975,”

The Wall Street Journal, December 15, 1967 ___.

DX 172— Article entitled “Jersey Standard Joins List Of
To Make Nuclear Fuel—Subsidiary To

see: nancial ee asides a Phe ok

search Assigned To Battelle Institute,” The Wall

Street Journal, March 20, 1969

DX 173— Article entitled “In 1970: 23 Utilities Will Ask
Bids On 29 Nuclear Units,” Nucleonics Week,

January 15, 1970

DX 174— Article entitled “The Anti-Atom Nuts,” Chicago
Tribune, January 20, 1970.

DX 175— Article entitled “Consumers Power Announces
Plans For New Plant—Pumped Storage Facility
Set For 1973: Detroit Edison To Share Cost And
Output—Outlay To Total $186 Million,” The Wall

Street Journal, November 28, 1967

INDEX

Defense Exhibits :—Continued

DX 176— Article entitled “FPC Aide Again Approves Con
Edison Bid To Build Power Project; Protests
1ikely,” ‘The Wall Street Journal, August 7,
Dx 177— Article entitled “TVA Plans To Start $155 Million
Project At Raccoon Mountain—Plan Will Include
4 Reversible Pump-Turbine Units With Total Ca-
pacity Of 1.4 Million Kilowatts,” The Wall Street
Journal, January 19, 1970.
DX 178— Article entitled “Geophysics,” Time Magazine,
July 26, 1968
DX 179— Article entitled “Earth’s Own Power Source,”
Chicago Daily News, January 8 ere

DX 181— Excerpt from transcript of Hearings before the
Joint Committee on Atomic Energy, 99th Con-

Necessity.”
DX 182— Article entitled “New England Affiliation Slated
—Utiilty Concerns Plan Affiliation,” New York
Times, June 12, 1968.

DX 183— Article entitled “Boards of Iowa P&L And Iowa-
Illinois G&E Approve Merger Plan—New Entity,
Towa Energy Corp., Plans To Retire The 2 Utili-
ties’ Outstanding Preferred Shares,” The Wall
Street Journal, July 22, 1969

DX 184— Article entitled “Ayrshire Collieries Asks Bids of
5 Firms—Coal Concern Invites Offers To Pur-
chase Or Merge With It; Replies Expected Next
Month,” The Wall Street Journal, November 27,
1968

DX 185— Article entitled “Ashland Oil Plans To Buy Or
Lease Ayrshire Assets—Boards Vote Proposal
That Includes The Sale Of Coal Royalties To
Third Firm—Pact Involves $125 Million,” The
Wall Street Journal, January 22, 1969

DX 186— Article entitled Pressed say ae Sign
Merger Accord—Acqu Producer
By Metals Firm Valued At Minimum Of $626
Million—Boards And Holders To Vote,” The Wall
Street Journal, April 24, 1969

1158

1159
1160

1161

1162

1163

1164

1165

1166

1167

1168

a,

Today, More and More Apartment Building Own-
ers Are Turning To Gas Heat. Things Stay
Cleaner Inside And Out,” Chicago Sun Times,
May 16, 1967
DX 188— Advertisement entitled “1977 The Year Our City
Died.” Philadelphia Inquirer, December 4, 1967_
DX 189— Advertisement entitled “You Can Heat 2%
Houses With Modern Oil For What It Costs To
Heat 1 House With Electricity!”
DX 190— Advertisement entitled “We're Helping Main
Street Switch To Nuclear Power.”
DX 191— Advertisement entitled “This Pollution Was
Caused By Burning Money. How Much Of It Was
Yours?” Fortune, March 1, 1968
DX 192— Advertisement entitled “What's Gas Energy
Doing To Make Industry Nice To Be Near?”
American Gas Association, Inc.
DX 193— Advertisement entitled “How Nuclear Science
pom ee fo American

DX 195— Advertisement entitled “Who Offers You 24-Hour
Plant Site Location Service On The 60-Mile IIli-

.¢, nois Shore? Peoples Gas, Of Course.” The Peoples

Gas Light And Coke Company And North Shore

Gas Company

For Complete Chicagoland Plant Site Informa-
tion,” The Peoples Gas Light And Coke Company
And North Shore Gas Company... >>>
DX 197— Advertisement entitled “The Perfect Salt Substi-
tute,” American Natural Gas Company
DX 198— Advertisement entitled “St. Louis’ Tallest Office

That Saves With Natural Gas,” American Gas
Association, Inc.
DX 200— Advertisement entitled “Natural Gas Energy

1169
1170

1171
1172

1173

1174

1175

1176

1177

1178

1179

1180

1181

1182

INDEX
Defense Exhibits :—Continued

DX 201— Advertisement “What Do You Call It?
No Matter What You Call It There’s A Lot More
Coming From Gas There's A

Produce Electricty, Cooling and Heating.” Amer-
ica Gas Association, Inc.
DX 204— Advertisement entitled Buy All Year

Gas Energy For Heating, Cooling And Electric
Boe pnd Saves $1,000 2 Month.” American

1184

1187

1188

1189

1190

xvi 3 INDEX

Defense Exhibits :—Continued

DX 213— Advertisement entitled “Texas Gas Invites You
To The Wireless House.”
DX 214— Advertisement entitled “Here’s The Story Of The
Gas Fuel Cell. It’s Electrifying.” American Gas
Association, Inc.
DX 215— “Nuclear Steam-Generation of Electricity: Its
Implication for the Future of Coal Transport by
Railway and Water,” by John C. Spychalski, JCC
Practitioners’ Journal, (July-August, 1967) __.
DX 216— “The Story of Coal,” The Petroleum Situation
(October 27, 1969 and November 28, 1969)
DX 218— Chart entitled “The Prime Interest Rate, 1928-
1968,” Chicago Daily News, December 18, 1968 _
DX 219— Letter dated March 9, 1970 from V. H. Clark,
Secretary- , Electric Energy, Inc., to
Reuben L. Hedlund _
DX 220— Letter dated June 29, 1942 from Frank F. Kolbe
to B. L. Slack
DX 221— Letter dated July 23, 1954 from Frank F. Kolbe
to Herman G. Schenck
DX 222— Letter dated June 11, 1956 from Frank F. Kolbe
to Nye F. Morehouse
DX 223— Brochure entitled “Taum Sauk, Union Electric’s
Pumped—Storage Hydro Plant.” _
DX 224— Press release, University of Chicago, January 19,
1970
DX 225— Letter dated May 25, 1960 from Ward B. Cham-
berlin, Jr., Office of Chief Counsel, General Dy-
namics Corporation to Robert A. Bicks, Acting
.. Assistant Attorney General, Antitrust Division,
Department of Justice and exhibit C thereto.
DX-227— November 1, 1968 Memorandum from R. H. In-
man to R. J. Hepburn re Freeman analysis of
Kerr Mine
DX 228— Excerpts from the Minutes of the Board of Di-
rectors of The United Electric Coal Companies

the
poena Questionnaire for the Freeman Coal Mining
Corporation
DX 230— April 18, 1970 letter from Mr. Allen Van Wyck,
Chairman of the Board of Illinois Power Company,
to Donald G. Kempf, Jr. _
DX 231— April 14, 1970 letter from K. E. Bowen, President
of Central Illinois Public Service Company, to
Donald G. Kempf, Jr.
DX 282— Brochure entitled “Low Cost Electric Power and
Dependability . . . Through MAPP”... ==»
DX 233— Brochure entitled “Mid-America Interpoo] Net-
work—MAIN”

xviii INDEX

Deposition Exhibits:

Abrahamson Deposition Exhibit 1—Front Cover of 1967
Annual Report of Wisconsin Power & Light Company___
Abrahamson Deposition Exhibit 1A—Back page of 1967
Annual Report of Wisconsin Power & Light Company__
Beck Deposition Exhibit 1—Letter to Antitrust Division,
Department of Justice, Chicago, Illinois, from C. V.
Beck dated November 14, 1968
Brazzale Deposition Exhibit 1—Document entitled “Heat-
ing Fuel Economic Analysis” for the Federal Office
Building and United States Courthouse, Chicago,
Illinois
Burton Deposition Exhibit 1—Document entitled “Solicita-
tion, Offer, and Award Contract GS-05S-4945” issued
August 1, 1967
Camicia Deposition Exhibit 1—Keystone’s Map of the Coal
Fields of the United States _
Gallagher Deposition Exhibit 3—Mineral Industry Surveys,
Bituminous Coal and Lignite Distribution, Calendar
Year 1967
Griswold Deposition it 3—Report of the Secretary of
Health, Education, aad Welfare to the Congress of the
United States enti “Air Pollution by Federal Facili-
ties” and dated January 1968
Griswold Deposition Exhibit 4—Second Report of the Secre-
tary of Health, Education, and Welfare to the United
States Congress entitled “Air Pollution Abatement by
Federal Facilities” and dated January 1969... =
Griswold Deposition Exhibit 5—Document entitled “Oper-
ating Experience with Wet-Dolomite Scrubbing” by
J. F. McLaughlin, Executive Assistant, Union Electric
Co., St. Louis, Missouri, and J. Jonakin, Products Man-
ager, Air Pollution Control Systems, Combustion Engi-
neering, Inc., Windsor, Connecticut, presented at the Air
Pollution Control Association Annual] Meeting in New
York City on June 22-26, 1969
Jensen Deposition Exhibit 12—Memorandum from Burl C.
Jensen to Mr. R. H. Inman dated June 7, 1965 _.. ____.
Jensen Deposition Exhibit 18—Memorandum from D. H.
Emling and B. C. Jensen to Mr. R. H. Inman dated June
7, 1966
Kolbe Deposition Exhibit 2—Annual Report of The United
Electric Coal Companies 1956
Kolbe Deposition Exhibit 4—Annual Report of The United
Electric Coal Companies 1958
Kolbe Deposition Exhibit 7—Annual Report of The United
Electric Coal Companies 1961
Kolbe Deposition Exhibit 12—Letter to Mr. W. B. Hillery,
unsigned, by the President dated February 27, 1957 __

Page

1409
1410

1411

1412

1413
1415

1416

1456

1470

1502
1519

1521
1526
1530
1582
1533

INDEX
Deposition Exhibits :—Continued

man to Mr. R. J. Hepburn dated May 10, 1961.
Kolbe Deposition Exhibit 42—Annual Report of The United

Kolbe Deposition Exhibit 51—Annual Report of The United
Electric Coal Companies 1948
Kolbe Deposition Exhibit 57—Annual Report of The United
Electric Coal Companies 1954
Kolbe Deposition Exhibit 59—Paul Weir Company Valuation
of Physical Assets of UEC as of December 31, 1959. __
Kolbe Deposition Exhibit 60—Document entitled “Regarding
Need For Additional Stripping Equipment at Fidelity
Mine” dated June 17, 1966 and signed by J. M. Morris.

Kolbe Deposition Exhibit A—Comparison between Truax-
Traer Coal Company and The United Electric Coal Com-
panies

Company, January, 1956” of Theron G. Gerow, Mining
Consultant and Engineer
Kolbe Deposition Exhibit L—Letter dated September 12,
1960 from J. M. Morris to Mr. Frank Nugent
Kolbe Deposition Exhibit N—Memorandum to Mr. R. J.
Hepburn from T. H. Latimer dated October 3, 1955

No. 2,825,064, dated July 27, 1948, entitled “Explosive
Composition, Robert W. Lawrence, Wilmington, Dela-
ware, assignor to Hercules Powder Company, Wilming-
ton, Delaware, a corporation of Delaware” acted cabana
Kolbe Deposition Exhibit T—Letter from Mr. Keane,
_ Assistant General Manager of Hercules ‘owder Com-
pany, to The United Electric Coal Companies dated
June 27, 1956
Kolbe Deposition Exhibit W-1—Letter from Frank Kolbe to
Harry LaViers dated February 25, 1958

1571
1587
1628

1629
1681

1634

1639

burn from “President” dated December 8, 1957
Heine Depouttion Exhibit X-1—Latter from RJ Hepburn

to Frank Kolbe dated November 29, 1957 __ Be
Kolbe Exhibit X-2—Memorandum from T. H

Kurtz Deposition Exhibit 9—Bituminous Coal Facts 1966. 1656
Kurtz Deposition Exhibit 10—Bituminous Coal Facts 1968. 1657
25—Memorandum from T. H.
Latimer to Mr. R. J. Hepburn dated September 25,
1964 1662
Latimer Deposition Exhibit 88—Memorandum from T. H.
Latimer to Mr. R. H. Inman dated July 19, 1966... 1664

Latimer Deposition Exhibit 48—Memorandum from T. H.
Latimer to Mr. R. J. Hepburn dated February 10, 1961. 1665
Exhibit 1—General Dynamics Proxy

17, 1959 from R. J. Hepburn to Mr. J. M. Morris .... 1678
Morris Deposition Exhibit 4—Letter from Mr. John M.

Morris to Mr. Frank Nugent dated January 10, 1966... 1680
Morris Deposition Exhibit 5—Letter from J. M. Morris to

Mr. Frank Nugent dated March 14, 1966 ..... 1682
Morris Deposition Exhibit 14—Letter dated May 3, 1965

from J. M. Morris to Mr. Frank Nugent _...........—s-—:« 1683
Morris Deposition Exhibit 31—Memorandum from R. J. Hep-

burn to Mr. J. M. Morris dated January 24,1961... _ 1686
orris

to Mr. T.

burn to Mr. J. M. Morris dated July 17,1962. —»-.1689

Tarzy to Mr J. M. Morris dated February 14, 1961.

Morris Exhibit 47—Letter from T. H. Latimer to
Mr. G. I. dated November 20, 1957

- to Mr Jebn Morn Sd hc a aie au
gent

Morris 59—Letter from G. H. Utterback
to Mr. Robert S. Overbeck dated November OT ictiniat

Morris Deposition Exhibit 60—Letter from Mr. RS.
beck to Mr. G. H. Utterback dated December 18, 1962 ___

and
Alumin Company of America dated May 8, 1965___
Morris Deposition Exhibit 62 Letter dated Septestoy if

for the effective period of the date of award through
June 30, 1968

Coal

1959 pete
Nugent Deposition Exhibit 2—Financial Freeman

Coal Corporation; Year Ended December $1,

1960

Nugent Deposition Exhibit 5—Financial Freeman
Coal Mining Corporation; Year Ended December 81,
1963 __

Nugent Deposition Exhibit Freeman

. 1718

1714

1715

. 1741

1744

1747

1750

1753

1756

INDEX

Deposition Exhibits :—Continued

Nugent Deposition Exhiibt 7—Financial : Freeman
eet oe December 31,

Nugent Deposition Exhibit 8—Financial Reports: Freeman
Coal Mining Corporation; Year Ended December 31,

1966
Nugent Deposition Exhibit 9—Financial Reports: Freeman
ee et eee Year Ended December 31,
Nugent Deposition Exhibit 11—Annual Report of the Chi-
oR ag apace desea wetter: gm Sieetinegd
ear
Nugent Deposition Exhibit 16—Advertisement of Freeman
Coal Mining Corporation in 1967 Keystone Coal Buyers
Nugent cong Exhibit 17—Advertisement of antag
Electric Coal Companies in the 1967 Keystone Coal
Buyers Manual
Nugent Deposition Exhibit 19—Advertisement of The United
Electric Coal Companies in the 1968 Keystone Coal
Buyers Manual
Nugent reg ey Exhibit 20—Advertisement of The United
Electric Coal Companies in February 1968 issue of The
Black Diamond
Nugent Deposition Exhibit 22—Letter dated February 13,
1968 from Reuben L. Hedlund to John T. Cusack re
Dividends Paid to MSC, Freeman, GD on the Stock of
UEC, January 1, 1959 to December 27, 1967_...___._
Nugent tion Exhibit 29—Annual Report of The United
Coal Companies 1964
Nugent Deposition Exhibit 35—Invitation for Tenders of
Common Stock of The United Electric Coal Companies
by General Dynamics Corporation dated October 5, 1966_
Nugent Deposition Exhibit 88—Map entitled “Shipping Coal
Mines In Illinois” prepared by Jack A. Simon, State of
Illinois, Department of Registration and Education,
State Geological Survey, dated January 1, 1966 _.._._.
Nugent Deposition Exhibit 39—Letter from Tom Tarzy to
Frank Nugent dated December 11, 1964 and Chart Show-
— Midwestern Coal Consumption by Utility Plants,

Nogsat Depstion, Eehibit «Minutes of The United
Electric Coal Companies Board of Directors Meeting
held October 28, 1960 re Capital Appropriation for UEC.

Nugent Deposition Exhibit A—Letter from Frank Kolbe to

Henry Crown dated October 9, 1956

1774

1776

1786

1793

1794

1796

1797

INDEX

Deposition Exhibits :—Continued

Pedersen Deposition Exhibit 5—United Electric Coal Com-
panies Computation of Provision for Federal Income
Taxes, Month of October 1966 and Ten Months Ended
October 31, 1966

Redard Deposition Exhibit 1—Keystone Steel and Wire Com-
ae ne te Eepietaass We Sustioe dated April 26,
1 ot

Simon Deposition Exhibit 1—Simon, J.A., An Evaluation of
Illinois Coal Reserve Estimates, 1968

1847

1381 *

WEST CENTRAL REGiGN
POWER SURYEY
1970-1999

se y
pene

A REPORT
to the FEDERAL PCWER COMATISSICN

Prepared by

THE WEST CENTRAL
REGIONAL ADVISORY CCRIMITTEE

The West Central Region comprises about one-fifth of the
conterminous United States and includes about 14% of the

population. The region is outlined on the map, Figure 1,
below.

The region extends from Lake Michigan and the Illinois-

Indiana state line on the east to an irregular line through
eastern Montana, Wyoming and western Nebraska. In the north-south
direction, the area extends from the Canadian border to an
irregular mid-continent line including most of Nebraska, northern

Missouri and all of Illinois. The West Central Region corresponds

to PPC power supply ereas 13, 14, 15, 16, 17 (excluding the Kansas
City area), 26, 27, 28 and 40.

The principal load centers are

region, and are concentrated in
Milwaukee, Minneapolis-st. Paul,
and St. Louis.

The non-coincident peak load for 1965 in the
was 24,290 megawatts and the projection
1970, 70,610 megawatts for 1980, and 13

1383

detailed in the following tabulation.
1990 of about five and one-half times

anticipated population growth of 40
used per person is expected to increase from

to 18,500 kwhr in 1990.

Pigure 2
LOAD GROWTH IN THE WEST CENTRAL REGION
(MEGAWATTS )

percent.

located in the eastern half of the
the metropolitan areas of
Omaha, Des Moines, Quad Cities
ion of the region is an area of
responding low load requirements with

West Central Region

S are 35,930 megawatts for
1,680 megawatts for 1990 as
This indicates a load in
the 1965 load compared to an
The total energy
4,800 kwhr in 1965

1965

40 (Excl .EEInc)
40(EEInc only)

Total (Non-

3, 344 (w)
6,733 (s)

2,943(s)

2, 984 (Ww)
2,471 (s)

2,529(s)
— 565 (“)

24,290

coincidental)

Total (Non-

23,920

coincidental summer season)

The task force based th

independent judgments o
forecast for the region as a whol

4,660 (w)
10,070 (s)
4,530(s)
4,280(s)
3,730(s)

3,835 (s)
735 (w)

35,930

34,830

8,510(s)
19,810(s)
9,720(s)
9,210(s)
7,160(S)
1,820 (w)
1,900 (w)
4,390(s)
7,355(S)

—233 (5)
70,610

69,780

3,680
8,070
13,255

131,680

130,240

(S) denotes summer peak
(W) denotes winter peak .

ese load projections on a
£ the util

ities in the region.
e is higher than that appearing in

pooling of the
This current

1384

the 1964 National Power Survey. As an example, the 1980 forecast
of 70,616 mw compares with the previous forecast of 61,050 mw, an
increase of about 15%. The principal reason for this increase is
the continued rapid growth in the economy and growth in utility
sales and peak loads during the period subsequent to the 1964
National Power Survey effort.

Substantial fossil fuel resources are located within the region,
with approximately 370 billion tons of recoverable coal reserves
believed to exist. Additionally, a recent report indicated
additional reserves could amount to 225 billion tons of recover-
able coal reserves in unmapped and unexplored areas. Although
the bituminous coal resources have made a considerable contribu-
tion to the supply of electric energy to date, the sub-bituminous
coal supply in Montana and Wyoming and the lignite coal reserves
in the Dakotas and Montana are receiving new attention with the
advent of unit-train transportation and improved burning tech-
nology. As a matter of interest, one county in North Dakota
contains 71 billion tons of lignite coal. This is the largest
tonnage for coal bearing counties in the nation.

The natural gas reserves in the region comprise less than 1% of
the total reserves in the United States. The crude oil and
natural gas liquid reserves approximate 2% of the total liquid
hydro carbon reserves in the United States.

The fossil fuel survey indicated that the average price of coal
f.0.b. mine has increased about 10% for coal obtained from
Illinois, the highest producing coal area in the region, during
the period 1961-1966. Rail transportation has predominated in
the movement of coal in this region, and within recent years the
cost of coal transported by rail has been reduced substantially
on selected*movements of coal shipped by unit train. During
1966 about 22% of coal for the region was shipped by unit train,
27% by rail-barge, and 11% by rail-lake.

Large investor-owned utilities are the principal suppliers of
electric energy to the major metropolitan centers in the eastern
portion of the region. Rural electric cooperatives are well
established throughout the entire region and the generation-trans-
mission type (G & T) cooperatives are functioning in Iowa,
Minnesota, North Dakota, South Dakota and Wisconsin. Public
agencies are the principal suppliers of electric energy in
Nebraska. The largest numbers of municipal systems in the region
are found in PSA 17 (188), PSA 28 (138), ana PSA 16 (110).

Nene. wre

1385

In the West Central Region there are 85 investor-owned systems,

261 cooperatives, two Federally-owned systems, and 701 publicly
owned systems, comprised mainly of municipal systems and public
power districts. Investor-owned companies serve 83.8 percent of
the energy requirements in the region, the cooperatives 2.6 percent
and the public agencies (other than Federal) 6.9 percent. The
Federal Government generates 6.7 percent of the electric energy

in the region, its output being sold principally to municipalities,
public power districts and cooperatives. In 1965 about 38 percent
of all the power generated by G & T cooperatives in the United.
States was produced in the West Central Region with cooperatives
in PSA 16 alone accounting for about one-half of this amount.

The five largest of the 85 investor-owned electric systems supply
nearly 60 percent of the electric loads in the region. Common-
wealth Edison Company of Chicago alone accounts for about 27 per-
cent and Union Electric Company of St Louis for about 11 percent
of the regional load. The largest municipal system in the region
is Springfield, Illinois, which had a peak load in 1967 of 170
megawatts or about one-half percent of the total regional load.

Public power districts are the principal suppliers of electric
power in Nebraska. Many towns in the state are served by
municipal systems. Some of the municipalities provide their own
generation but most obtain their power from public power districts
which carry out the principal generation and transmission functions
in the state. Public power districts and cooperatives in Nebraska
are also the principal agencies for the distribution of power.
There are no investor-owned utilities providing electric service

in Nebraska.

The Bureau of Reclamation is the marketing agency for hydro-
electric power from Federal projects located in the Missouri River
Basin. The power is marketed largely to customers having prefer-
ence under Federal Law, i.e., municipal systems, public power ,
districts and cooperatives, over a transmission network which
generally has a voltage of 230 kilovolts. Numerous wheeling
arrangements have been made by the Bureau with utilities in the
area for delivery cf power’to such preference customers.

There is a total of 1,049 electric systems serving the region.
With the exception of 71 isolated systems comprising .57% of the
total service, all the systems are interconnected and operate in
parallel with the vast majority of electric utilities in the
United States. By 1970, the interconnecting transmission system
will be overlaid with a 345 kv transmission system in the eastern

S-4

1386

half of the region and an overlaying EHV system in the western
half will have been begun. The pattern of transmission develop-
ment anticipates that the 345 kv system in the eastern half will
be substantially augmented during the 1970-1980 period and a

765 kv system will have been started. In the western half of the
region the transition to a 500 kv system will be initiated. By
1990, several east to west 765 kv transmission lines are antici-
pated with their extension through western Minnesota, the Dakotas
and the state of Nebraska at 500 kv to interconnect with the
western systems.

Consideration of probable increasing fossil fuel costs, increasing
concern for air pollution, fossil fuel transportation difficulties,
and the anticipation of relative decreasing nuclear fuel costs
with the development of fast breeder reactors have resulted in a
considerable emphasis on nuclear generating plants. Although
about 90% of the electric energy produced in the region is.
presently supplied by fossil-fuel generation, by 1990 nuclear
generating capacity is anticipated to comprise 57% of the region's
capacity. Nuclear generation is expected to supply nearly 70%

of the region's energy requirements by that time. While the
quantity of coal burned annually is indicated to increase from

51 million tons in 1966 to 69 million tons in 1975, the regional
use of coal apparently will remain relatively constant at about
65 million tons for the remainder of the study period.

Generating capacity of 79,832 megawatts is projected by 1980 to

_ supply a non-coincident summer peak of 69,780 mw with a reserve
of 15.6%. By 1990, generating capacity of 151,041 megawatts is
projected to cover a non-coincident summer peak of \W30,240 mega-
watts reflecting a reserve of 16.6%. An importation of 800 mw
of hydro pOwer from Canada is included in each of these reserve
calculations. Additional reserve of an undetermined amount exists
because of the diversity of load between utilities within the
season. About half of the 1990 capacity is shown to be in units
of 800 megawatts or larger. Generator unit size up to 2000 mega-
watts and total plant size up to 4000 megawatts are included.

There are six power pools within the region and three major
regional coordinating groups. These organizations permit the
coordination of planning of transmission and generation and the
coordination of operating these facilities. Such coordination is
made possible through the direct work of committees and task forces
comprised of representatives of individual utilities on the

pool level, and of representatives of pools and areas on the
regional level. Two offices have been established to provide
coordination of hour-to-hour and day-to day operations.

S-5

1387

Additionally, liaison established with contiguous regions pro-
vides continuity in the development of interconnections at the
boundaries of these organizations and in the operating of
mutually~affected facilities. As further coordination develops
in increasing depth, it is anticipated that a single regional
coordinating organization will evolve with the major planning
and operating responsibilities being carried on by five area-wide
groups. The interworking between these five groups then will be
coordinated within the one principal organization.

S-6

1388

INVENTORY OF FOSSIL FUEL RESOURCES

INTRODUCTION

The purpose of this report is to update the 1964 National Power
Survey, Vol. II, Advisory Committee Report No. 21 on Fuels for
Electric Generation, prepared by the Fuels Special Technical
Committee.

In updating Report No. 21 we have not attempted to change or
modify the extensive and authoritative background material in

that report, which represents the best advance thinking on industry
fuel problems by some of its foremost members. Instead we have
supplemented that report where changes have occurred in the price
of fuel, the cost of transportation and methods of transport.

The West Central Region fossil fuel reserves are reported in
detail by individual counties in each state. The reserves are
tabulated by class of reserves as to whether they are “measured,”
“indicated” or “inferred” and by thickness of the coal beds.
Measured reserves are those for which tonnage was computed from
direct measurements. Indicated reserves are those for which
tonnage was computed partly from specific measurements and partly
from responsible assumptions based on available data and geologic
evidence. Inferred reserves are those for which quantitative
estimates are based on a broad knowledge of the character of the
bed or the cegion, but for which there are few, if any, actual
measurements. This detailed information on coal reserves should
be useful to system planners in selecting future sites for large
thermal power plants.

Other task force committees have prepared reports on load proj-
ections, types of generation, air pollution and nuclear power;
therefore, this report does not include information on those sub-
jects. If the reader desires information on productive capacity
of the coal industry, future projected prices of various fuels or
other related information regarding fuels, it is suggested he con-
sult the report of Puel Resources, Requirements and Costs for
Electric Generation in the Eastern United States which was pre-
pared by a committee that included representatives from the
Federal Power Commission, the Bureau of Mines and the Office of
Oil and Gas, Department of the Interior.

II-1

‘1389 :

SUMMARY
During the period 1970-1990, electric generation will be dependent
upon five basic forms of energy -- coal, gas, oil, hydro, and
nuclear. This report is concerned primarily with fossil fuels.
The availability of approximately 370 billion tons of recoverable
: Coal reserves in the West Central Region is more than sufficient
to meet the electric utilities' requirements in this region through
the year 2000. A recent report indicates additional reserves in
this region could amount to 225 billion tons of recoverable coal
reserves in unmapped and unexplored areas.! Coal, however, will
be faced with continuing pressures from other forms of energy, and

based on present trends the most significamt competition will be
from nuclear energy.

Mechanization and handling of coal at the mine will continue to
improve. Some of the new developments in underground mining in
recent years have been the use of a mobile bridge conveyor which
has increased the Productivity from a continuous miner substan-
tially, the underground push button miner, the installation of
long wall mining equipment, and the application of computer simu-

‘In determining the type of fuel to be used for electric genera-
tion a number of factors have to be reviewed and evaluated, each
of which will have a bearing on total fuel costs for any one
location. The cost of transportation, anti-air pollution devices,

lity and price of fuels, the final determination in selecting a
fuel or fuels for a particular plant must be based on the specific
facts pertinent to that plant and its location. :

A fossil fuel survey, questionnaire was sent to twenty-six
electric utilities Which consume approximately 90 percent of the
coal used for electric generation in the West Central Region. The
questionnaire inquired as to producing district, tonnage burned,
£.0.b. mine price, average BTU per lb. received, cents per million
BTU f.0.b. mine, methods of transportation used, freight rate,
haulage distance, and tonnage per shipment. 5

This survey indicated that in the period 1961-66 the average price
of coal f.0.b. mine has increased from 15.03 to 16.57 cents per
million BTU or an increase of 10.18 percent on the coal obtained !

1. Averitt, Paul, 1968 U.S. Geological Survey.

II-2

1390

in District 10. (36 million tons of 46 millions tons reported for
the region).. The average annual increase in the cost of District
10 coal in the five year period 1961-1966 amounts to 1.9 percent
per year. Due to the less significant tonnages reported in
relationship to tonnage produced, a comparison of the price in-
creases for coal obtained from other districts is not shown.

Rail transportation in the past has predominated in the movement
of coal in this region, and within recent years the cost of coal
transported by rail has been reduced substantially on selected
movements of coal shipped by unit train. Based on the 46 million
tons reported in the survey for the year 1966, approximately 10
million tons, or 21.8 percent, were shipped by unit train,
12,200,000 tons, or 26.6 percent, were shipped by rail-barge, and
5,280,000 tons, or 11.5 percent, were shipped by rail-lake. The
amount of coal shipped by conveyor and captive shuttle train
during the period 1970-1975 will increase by 11,000,000 tons ver-
sus a 7,000,000 ton increase for unit train shipments.

The average rail freight cost in the West Central Region for
coal shipments in 1966 amounted to $1.97 per ton on a tonnage of
23,500,000 tons, or approximately 46 percent of the coal consumed
in this region. The unit train freight rates reported in the
survey when compared on a basis which considers railroad owner-
ship of all equipment indicates that the mills per ton mile range
from 10.3 mills per ton mile for an 85 mile haul to 7.2 mills for
a 138 mile haul and down to 5.0 mills for a 355 mile haul.

Past projections indicated that unit train freight rates could
level out at a cost of 4 mills per ton mile for hauls between
350 miles and 600 miles.? However, no hauls of 400 to 500 miles
at 4 mills were reported. The inability of the utilities to
obtain a low@r cost than 5 mills per ton mile is partially sub-
stantiated by the fact that as of the present date between now
and 1975 approximately 10,000 megawatts of nuclear capacity is
planned or considered for installation in the West Central
Region.

In the five year period 1961-1966 the consumption of gas for
thermal electric generation increased from 0.223 to 0.260 trillion.
cubic feet or at an average annual rate of 3.11 percent compared
to a 7.73 percent average annual increase in coal consumption in
the same period. The average cost of gas for the region in the
same period increased from 25 to 25.3 cents per million BTU or by
1.2 percent. Zz

2. 1964 National Power Survey, Vol.2, Advisory Report No. 21, Pg. 338
II-3

1391

| Table A, page II-5, indicates the electric generation

by coal fired plants in the West Cehtral Region will increase
from 124.8 billion Kwh in 1970 to 155.3 billion Kwh in 1990 and
nuclear generation will increase from 17.5 billion Kwh to 489.1
billion Kwh in the same period. Table B, page II-5 indicates
coal consumption will increase from 60.4 million tons in 1970 to
65.7 million tons in .1990.

Table 1, page II-ll, lists the remaining coal reserves in the
West Central Region by percent sulfur content and approximately
72.7 percent of the reserves in the region contain 1.0 percent
or less sulfur. However, most of these low sulfur coal reserves
are located in the States of Montana and North Dakota and most
of the coal consumed in the region is obtained from the State of
Illinois.

Table 2, page II-12, indicates ‘the coal consumed for electric
generation in the West Central Region in 1966 had an average
sulfur content of 2.8 percent which is slightly more than the
2.3 percent average sulfur content of all coal consumed by the
electric utilities in the United States.

The growing demand for air pollution abatement regulations has
contributed to a major shift from the use of coal for electric
generation to nuclear energy. In the West Central Region in 1966
approximately 72 percent of the electric generation was produced
in coal fired plants and 1 percent by nuclear plants. Present
projections illustrate that by 1990 approximately 22 percent of
the electric generation in the region will be produced in coal
fired plants and 70 percent ‘by nuclear plants.

The natural gas reserves in the West Central Region as of
December 31, 1966 amounted to 1.33 trillion cubic feet or less
than one percent of the total reserves in the United States.
Based on the projected United States cumulative natural gas
requirements for the period 1966 to 1990 of 680 trillion cubic
feet the reported reserves of this region could supply only 0.20
percent of these requirements.

The oil consumption in the West Central Region represented less “
than one percent of the total fuel consumption for the region.

The crude oil and natural gas liquid reserves in the region amount
to 0.813 billion barrels or approximately 2 percent of the total
liquid hydrocarbon reserves in the United States.

In the State of Illinois as of July 1, 1965, the latest revised
estimates of coal remaining in the ground totaled 140,700 million

II-4

emi@— = em — el —

mt —

—m.. i. mm i. mm lL mm. tL. —m -1L
me (678 nw oe s me a we ua
no eS “9 2 2.8 1 2 $4

nmr

reece

fi
: Yalil i

i

.
Fuel quantities tm eiliiens of tone of coal, barrele of off and MCT «f gas.

1893

tons in reserves, of which 63,900 million tons are classed as
measured and indicated and 76,800 million tons as inferred, all
of which is of bituminous rank. The reserves are well distri-
buted over an area of 38,000 square miles or 67 percent of the
State's area in 78 counties of the 102 counties in Illinois... The
minimum thickness of coal considered in preparing this estimate
was 28 inches, except for areas of strippable coal where an
average thickness of 18 inches was used.

Coal seams in Illinois are at depths ranging from a few feet to
several hundred feet below the surface. Ages ago, the coal
bearing formations were downfolded into a huge spoon-shaped basin
centered in the southeastern part of the State. As a result, the
beds minable by underground methods lie at the center of the
basin while along the outer rim in a total of 40 counties, approx-
imately 19,000 million tons of strippable coal lie near enough to
the surface to be recovered by strip mining.

Tonnage figures alone, however, cannot demonstrate the full
importance of Illinois coal reserves. The thickness of the beds
is also extremely important since this aspect has a bearing on
mining methods and, therefore, Productivity. Most of the remain-
ing coal reserves are in coal beds thick enough to permit
effective mechanical mining.

The estimated original coal reserves of Iowa total 7,236 million
short tons, of which 3,500 million tons are classed as measured
and indicated reserves and 3,735 million tons are classed as
inferred. A total area of about 1,316,040 acres in 37 counties
was included in the reserve calculations; an additional area of
about 1,291,830 acres in 44 counties is indicated by the currently
available information to be favorable for the presence of coal
beds more than 14 inches thick. The total recorded coal produc-
tion of Iowa through 1963 is about 356 million tons. Assuming
that for each ton of coal produced another ton has been made
unrecoverable, the remaining reserves of the State are about
6,524 million tons.

Past estimates of the coal resources of Iowa were highly general-
ized and were based solely on an assumed total area underlain by
coal of potential economic interest and on an assumed average
thickness of coal within that area. The estimate of Campbell and
Parker (1909), the most frequently quoted, of 29,160 million tons
included coal 14 inches or more thick in an area of 12,560 square
miles. The present detailed estimate by Landis (1965) is smaller
than the older generalized estimates and covers a much smaller
area. This estimate of Iowa coal reserves is on a bed-by-bed

II-6

1394

original reserve basis. The ratio is about one-fourth as ‘much
reserves in about one-sixth as much area.

About one-third of Missouri is underlain by bituminous coal-
bearing strata, and coal has been mined in 55 of the 63 counties
in which it occurs. Coal deposits occur in an area of some 24,000
square miles extending northeastward across the State from Jasper
County to Clark County. The estimated original coal reserves of
Missouri total 23,977 million tons.

In the years since the Hinds (1912) estimate of 79,393 million
tons was made, stratigraphic studies have indicated that many of
his correlations of coal beds were in error and that the persis-
tence in thickness which he assumed cannot be demonstrated in
many localities. Coal beds thin and thicken from one area to
another and in many instances in very short distances. An addi-
tional factor of considerable importance in the area north of the
Missouri River is that glacial drift-occupies the position of
coal beds in many places. Details of this relationship can be
established only by drilling or mining but, in general, consider-
able areas are affected.

A re-evaluation of Missouri's original (before mining) coal
resources was made by Searight (1966) on a county-by-county basis.
Current information does not support the large resources indicated
by Hinds, and these have consequently been adjusted downward. In
some noe ca only 10 percent of the previous estimate has been
reta » and others have been cut to as little as one percent of
the earlier estimate. The total tonnage represented in the present
estimate of 23,977 million tons is less than one-third that of
1912 estimate figures. The total cumulative tonnage mined in the
period 1840 through 1967 has been approximately 313 million tons.
The coal réfaining is, therefore, estimated to be approximately
23,335 million tons.

The original coal reserves of Montana total 222,047 million tons
as estimated by Combo and others (1949). This estimate includes
2,363 million tons of bituminous coal, 132,151 million tons of
subbituminous coal, and 87,533 million tons of lignite. The
reserves were estimated according to standard procedures of the
U.S. Geological Survey with several minor exceptions as follows:
for bituminous coal the thickness categories used were 14 to 24
inches, 24 to 36 inches, and more than 36 inches, instead of the
standard categories of 14 to 28 inches, 28 to 42 inches, and more
than 42 inches, which were established after the Montana work was
underway. For subbituminous coal and lignite standard categories
of 24 to 5 feet, 5 to 10 feet, and more than 10 feet were used.

II-7

Pie ae
-1395

The Montana coal fields cover 35 percent of the total area of the
State. Reserves are present in 35 out of 56 counties, but are
concentrated largely in the Fort Union region and the Powder River
Basin in the eastern part of the State. Big Horn, Powder River,
and Rosebud Counties alone contain more than half the total in
the State. For the past several years considerable exploration
has been conducted by mining and petroleum companies and currently
(April 1967) revised estimates indicate the presence of deposits
of strippable reserves totaling about 8 billion tons.

The original lignite reserves of North Dakota, as estimated by
Brant (1953), total 350,910 million tons of which 9,522 million
‘tons are classed as measured, 50,120 million tons as indicated,

and 291,268 million tons as inferred. The reserves were estimated
according to the standard procedures of the U.S. Geological Survey.
All the lignite included in the estimate. is less than 1,200 feet
below the surface and about 70 percent of the total reserves are
less than 500 feet below the surface.

The reserves are well distributed over an area of 28,000 square
miles in 23 counties in the western half of the State. Of several
counties with large reserves, Dunn County is conspicuous in
containing 71 billion tons or about one-fifth of the State total.
This is also the record reserve at for coal-bearing counties
in the United States.

The original lignite reserves of South Dakota, as estimated by
D. M. Brown (1952), total 2,033 million tons, all of which is
less than 1,000 feet below the surface. The reserves were esti-
mated according to standard procedures of the U.S. Geological
Survey. The lignite reserves are concentrated in six counties
in the northwestern part of the State. Harding County contains
nearly 84 percent of the estimated reserves, but most of past
production has been obtained from Dewey and Perkins Counties.

II-8

1396

INVENTORY OF FOSSIL FUEL RESOURCES

During the period 1970-1990; electric generation will be depen-
dent upon five basic forms of energy -- coal, gas, oil, hydro,
and nuclear. This report is concerned primarily with fossil fuels.
The availability of approximately 370 billion tons of recoverable
coal reserves in the West Central Region as shown in Figure 1 and
listed in Table 1 are more than sufficient to meet the electric
utilities’ requirements through the year 2000. Coal, however,
will be faced with continuing pressures from other forms of energy,
and based on present trends the most significant competition will
be from nuclear energy.

In determining the type of fuel to be used for electric genera-
tion a number of factors have to be reviewed and evaluated, each
of which will have a bearing on total fuel costs for any one
location. The cost of transportation, anti-air pollution devices,
storing, handling and disposing of the fuel product are economic
factors which can make a low cost fuel the most expensive fuel.
Therefore, while a general picture can be drawn of the availability
and price of fuels, the final determination in selecting a fuel or
fuels for a particular plant must be based on the specific facts
pertinent to that plant and its location.

During the past twenty years the coal industry has contributed a
great deal to the stability of fuel prices. Mechanization of the
mines has enabled the industry to either reduce or at least main-
tain within reasonable limits the price of its product, in spite
of continuing increases of over-all price indexes. During the
period 1970-1990 it is expected that there will be continuing
improvement in the mechanization and handling of coal at the mine.
Some of thenew developments in underground mining in recent years
have been the use of a mobile bridge conveyor which has increased
the productivity from a continuous miner substantially, the under-
ground push-button miner, the installation of long wall mining
equipment, and the application of computer simulation techniques.

Although coal is available in sufficient quantities in the West
Central Region to supply the entire energy requirements of the
electric utilities in this region, competition will determine the
extent to which coal will penetrate each market.

Ii-s

- 1897

temperature to 86°F. Cooling towers are included in the design
of two large nuclear plants presently under construction in anti-
cipation of state agency temperature limitations of 86°F. for
mixed water or 5° over ambient. Capital costs for cooling facili-
ties to date are estimated at $10,000,000 for plants totaling
2700 megawatts,

One utility in the area is constructing a 20 megawatt plant utili-
zing @ recently developed air cooled condenser. This plant is to
be a prototype for larger plant installations now under considera-
tion. Because this type of facility eliminates the need for large
quantities of cooling water, it may provide greater freedom in the
siting of moderate size generating facilities.

In addition to state and local agencies, the Air Quality Act of
1967 introduces a new factor. The Secretary of Health, Education,
and Welfare is to designate air quality regions and issue criteria
and control technology documents. The governors of states
involved will have approximately nine months to draw up standards
acceptable to HEW and another six months to establish a method of
control for the region. Additional research and development of
control technology is being funded under the Air Quality Act, but
to date the control strategies commercially available to the
utilities are largely the use of Pprecipitators and high stacks.

The concern of Wisconsin companies for proper and effective
control of air and water pollution has been expressed by the
formation of an active task force on air and water criteria.

This task force, which is sponsored by the Wisconsin Utilities
Association, has been working with the Wisconsin State Department
of Natural Resources to provide the Department with data/on the

onsin utilities. It is hoped that the results of these studies
will provide the industry with knowledge that can be used to
Properly assess the degree and consequence of water and air pollu-

The problem of air pollution weighs heavily in the choosing of
generation sites, the type of fuel used, the capital costs of
equipment to maintain acceptable conditions, and ultimately on
what the cost to the customer will be. The future will remain
uncertain until air quality and emission standards are defined
more clearly and equipment for reducing sulfur emissions is deve-
loped and becomes available commercially.

| Ge Se.

III-6

1398

oer?
COORDINATED PLANNING AND DEVELOPMENT

I. Structure of the Industry

Fifty-one interconnected systems currently generate approxi-
mately 95% of the energy consumed through electric utility
service in the West Central Region. Table I below provides
1967 data as to number and size of these major utilities in
the various ownership segments of the industry. This group
generally can be described as consisting of those systems
providing virtually all of the high voltage system facilities
in this region.

Table I

Non-Coinci- Energy

Type of dental Peak Gen Cap Prod
Qwnership Utilities Load (Mi) _ (M4) (1000 MyH)
Investor-owned 25 22 954 26 032 118 566

Rural electric Gs?

cooperatives 19 1 657 1 382 5 646
State 6 1 461 1 120 4 226
Pederal ~ jl} 746 2 048 9 692
51 26 818 30 582 138 130

1967 load and capacity data for the individual major utilities
in each ownership segment are shown in Appendix A.

In addition to these major utilities there are about 1000
other utility entities involved in generation and/or distri-
bution of electric energy. These are identified as to type
of ownership, size and general location in Appendix B.

Iv-1

II.

13899

Trends in the Development of Coordination Mechanisms

At present, nine coordinating organizations function within
the region as follows:

Wisconsin Public Service Corporation-Wisconsin
Power and Light Company-Madison Gas and Electric
Company Pool

Wisconsin-Upper Michigan Systems

Illinois-Missouri Pool

Iowa Pool

Mid-America Interpool Network

Mid-Continent Area Power Planners

Missouri Basin Systems Group

Nebraska Public Power System

Upper Mississippi Valley Power Pool

Coordination areas of these organizations are shown in
Figures 1-3. Appendix ¢ presents first a brief summary and
then detailed information on each body and its structure,
purposes, and activities.

It' is emphasized that there are no particular discontinuities
in the pattern of interconnections at the boundaries of these
organizations. Numerous other interconnection agreements and
inter-relations exist that Provide mechanisms for liaison and
continuity in coordination across the region as demonstrated
by the examples enumerated below:

1. MAIN and MAPP have overlapping membership with
eight utilities being members of both of these
organizations. This liaison arrangement is
deemed particularly desirable for close co-
ordination in planning and operation along the
recently completed Twin Cities-Mi lwaukee-Chicago-
St Louis-Twin Cities 345 kv loop. Operation of
this loop and all other interconnecting trans-
mission lines, and those otherwise mutually
affected, is provided through established opera-
ting committees, through system simulation
Operating studies, and through continuous liaison
between the respective coordination offices. The
studies consist of current year Operating studies,
transfer capacity studies, and extreme disturbance
studies. The areas of coordinated planning are
handled through the planning arms of each of the
organizations. Much of the Planning is based upon

Iv-2

the aggregate load and capability forecasted and
includes not only consideration of new facilities
s but also the future use of the interconnecting
transmission facilities and power transactions to
effect optimal use of generating equipment.

2. MAPP and MBSG liaison on projects of mutual interest
is handled through the Intersystem Coordinating
Committee. This committee was established by the
respective organizations in 1965. Prior to the
establishment of the MAPP Coordination Office and
the associated Coordinating Committee, the Inter-
system Committee organized an interim task force
to review relay operating practices to assure that
relaying of mutual interest would provide a relia-
ble operation. Progress has been slow in the area
.of joint planning of transmission and generation
and the committee itself has recently proposed
that its parent organizations reconsider its
membership and better define its responsibilities
in the interest of improving progress.

3. .All members of the Iowa Pool and UMVPP belong to
the MAPP organization and have thereby broadened
their capabilities in the traditional pooling
activities of coordinated planning of generation
and transmission, including power transactions, and
coordinated operation of generation and transmission
including short and long term maintenance scheduling,
economy energy interchange, voltage profiles, auto-
matic under-frequency load shedding, and dispatching
procedures. This broadening comes about through the
overview afforded in considerations. of the Planning
Committee which is geographic in its representation
and through participation in the Coordinating Com-
mittee associated with the Coordination Office.

4. All members of the Wisconsin Power Group and Illinois-
Missouri Pool belong to the MAIN organization.

5. MAPP-MAIN-UMVPP-Iowa Pool liaison, together with
USBR participation in the MAPP Coordination Center,
has resulted in development of an extensive tele-
type communication system permitting broad area
coordination on day to day operating matters.

The area is presently served by three teletype

Iv-3

Se

1401

systems, all of which employ rented telephone
company facilities. Cost sharing varies in each
of the three systems ranging from equal shares to
formulas using both number and size of systems

- involved, Teletype stations are located in the
dispatching offices of the participating systems
and the coordination centers. Use is limited to
exchange of operating information and weather
information.

The present systems are:

MAIN 15 terminals - 5 in Wisconsin, 4 in
Illinois - 2 in Minnesota (MAPP & NSP),
2 in Missouri (UE & AEC), 1 in Little
Rock, Arkansas (SCEC) 1 in Canton, Ohio
(AEP ECAR)

UMVPP. 10 terminals - 1 in North Dakota, 1 in
South Dakota, 6 in Minnesota, 1 in
Wisconsin, 1 in Iowa

USBR 1 in South Dakota

IOWA POOL 10 terminals - 2 in Minnesota (MAPP &
NSP), 7 in Iowa, 1 in St Louis,
Missouri (UE)

The UMVPP and Iowa Pool systems will be replaced in
April 1969 by one MAPP system containing 25 terminals.
This will include the present terminals plus new
terminals for other MAPP members and adjacent utili-
ties. The system will be comprised of 2 terminals
in North Dakota, 6 terminals in Minnesota, 2 in
Wisconsin, 2 in South Dakota (including USBR), 8 in
Iowa, 2 in Nebraska (OPPD and CPPD), and 3 in
Missouri (UE, St Joseph L&P and KCP&L). The MAPP
system will utilize 100 wpm teletypes under the
contraql of an automatic polling device located in
the MAPP Center. All transmission will be by
punched tape except during emergencies when an
emergency override will permit manual transmission.
Cost sharing will be according to a formula intended
to recognize size of systems, mileage between adja-
‘cent terminals, and benefits accruing equally re-
gardless of size. ’

Iv-4

IIi.

1402

6. As planning of Specific facilities reaches a
point in progress where the coordinating organi-
zation is agreed on the basic function and design,
the participating utilities are represented on a
number of task forces having responsibility for
design, contractual arrangements, and use. The

Projections of as so Requirements
The following discussi £ possible future organizational

fifty-one systems identifiea in Section I as providing 95%
of the electric service in the region. It is, of course,
recognized that corporate consolidations will very likely
reduce the number of separate entities in the future. How-
ever, there is no basis for Predicting the specific patterns
or timing such consolidations may follow other than a general
reference to those already announced to be under study.

By 1970, MAPP intends to increase the coordination among the
various parts of the MAPP organization, including the Iowa
Pool, the UMVPP, and its Nebraska members by developing a
super-pool agreement. This consolidation will result in
these five sub-regional systems remaining as workable co-
ordinating entities within the West Central Region:

Commonwealth Edison Company

Eastern Wi8consin Utilities (including the
Upper Peninsula) _ >

Illinois-Missouri Pool (including Central

Illinois Light Company)

Mid-Continent Area Power Planners

Missouri Basin Systems Group

Each of these systems will exercise primary responsibility
for planning and operation within their area, particularly
with respect to economic matters.

With regard to reliability-oriented coordination, MAIN would
continue with its present inter-pool operation in the eastern
part of the region. Reliability-oriented coordination for
the western portion of the region is expected to be provided
by the recently executed Mid-Continent Area Reliability Co-
ordination Agreement either expanded to include MBSG members

Iv-5

. eR me a ——_— _—

1403

or through liaison arrangements with a separate MBSG
reliability group.

Future patterns of generation and transmission developments
prepared by the WCRAC contemplate 765 kv and 500 kv trans-
mission lines across the region in the 1980's. These lines
will provide capacity for meaningful power exchanges on a
region-wide basis and also inc se the interdependency
among systems, particularly with "respect to reliability. It
is therefore proposed that a single West Central Reliability |
organization be established by 1980. In view of the large
number of systems involved, manageability considerations
y dictate an interpool-type organization such as MAIN with the
five above-identified area systems as members...

The foregoing material relating to future coordination
patterns has been presented at meetings of the MAIN, MAPP
and MBSG organizations in an effort to solicit views of
utilities not represented on the WCRAC.

IV. Problems and Solutions

Operation of an electric power system is a complex matter
involving the consideration of innumerable electrical elements
and many people. Taken as a whole, the configuration changes
from season to season, from day to day, and from hour to hour.
To operate all of the interconnected electrical systems within
a region in a truly coordinated manner becomes a tremendously
complex matter requiring knowledgeable people, the necessary
equipment and communications for the required overview, and of
equal importance a strong desire on the part of all of those.
so engaged. That this coordination.can be accomplished, and
must be accomplished, is fully appreciated and has been taken
on as a challenge of considerable substance by the utilities
in this region.

It is recognized that the true strength of the operation is
in the local knowledge of each area's needs and the resources
available to supply these needs. The requirement then is for
a coordinating effort which will supply the involvement neces-
sary to do the job but which will not unnecessarily interfere
in operations that can be adequately handled locally. Further-
more, it cannot be expected that a coordinating effort can be
arbitrarily overlaid on the existing operation. Instead a co-
ordination evolution is required which will gradually develop
the capability of the coordinating organization and, in turn,
the confidence of the participating systems with a resultant

Iv-6

ee

- 1404

growing. willingness to accept the decisions and judgement of
the coordinating personnel and to encourag® their efforts.

Within the West Central Region there are variations in the
nature of systems and load densities across the region pro-
ducing differences in coordination problems and requirements.
Por examplé, a relatively few systems along the eastern edge
of the region (Eastern Wisconsin Utilities, Commonwealth
Edison, and the Ill-Mo Pool) generate almost 60% of the
region's requirements while serving 15% of its area. As a
result, pooling and interconnection arrangements appropriate
for this area are markedly different than those applicable
to the large number of systems serving the remainder of the
region. Many types of utilities are represented with varying
characteristics including that of size and of financing within
the major groupings. Because of the hour-to-hour vital need
to have a reliable operation, the coordinated operation of
these systems has proven to be an endeavor not significantly
affected by this dissimilarity. In the area of planning.
substantial strides have been made in coordinating planning
of both generation and transmission. As previously noted,
only MAPP and MBSG have yet to fully coordinate their efforts.
This situation is recognized by both organizations and is
under active consideration. -

Interregional Coordination

There are two formal arrangements for interregional coordina-
tion identified as such. These are the liaison arrangement
between MAIN and ECAR, and MAIN and MAPP membership in the
National Electri¢™Reliability Council. Beyond these there
are numerous bilateral interconnection agreements and other
established channels for coordinated planning and operation
with electric systems in adjacent regions.

The USBR hac membership in both the Western Systems Coordina-
tion Council (WSCC) and the MAPP Coordination Committee and
MAPP operating representatives attend WSCC operating meetings.
These arrangements, along with these inherent within the USBR,
provide liaison with the west lying region.

™“
Some multi-system coordination activities involving other
regions are: The MIIO Agreement among Commonwealth Edison
and five major utilities in Indiana and Michigan, which, ;
among other returns, resulted in system performance studies
in ¢epth which included Commonwealth Edison Company as a
participant and enveloped the eastern portion of this region.

Iv-7

1405

The Twin Cities-Kansas City 345 kv Coordinating Agreement -
among four MAPP members and Kansas City Power and Light
Company and St Joseph Light and Power Company in the South
Central Region, which provides for the exchange of power
and energy with the aim of optimizing the utilization of
generation and bettering reliability. And the East-West
Tie Closure Task Force, which was formed for the express
purpose of studying the feasibility of and the procedures
for closing the Bureau of Reclamation ties between the
eastern and western portions of its Missouri River Basin
systen, and hence interconnecting the western region systems
to the remainder of the U.S. interconnected systems.

The Manitoba HyGro Electric Board, although not yet inter-
connected with United States systems, participates in plan-
ning activities through its membership in the MAPP organiza-
tion. As a result, negotiations for the 1970 construction

of a Winnipeg-Grand Porks 230 kv interconnecticn have now
been completed and construction and operating contracts
signed. This interconnection will have a capacity of about
200 mw although it is being initially regarded as having a
nominal 100 mw capacity for purpose of scheduling power and
energy. This interconnection will provide Manitoba Hydro
with interconnected operation with the U.S. syetems, will
make unnecessary the construction of thermal capacity, will -
provide a market for future excess power and energy, and will
provide a source of energy during dry years. For the U.S.,

& power supply will be provided which is diversified in the
source of the power and has prompt availability. The seasonal
load diversity will permit mutually advantageous seasonal
power exchanges and the reliability on either side of the
boundary will be improved from the improved diversity overall. >
No unusual problems have been encountered in its planning

even though the facility is being installed by such diverse
interests as two investor-owned utilities and one G & T
cooperative on the U.S. side, and by a Canadian Crown Corpora-
tion on the Canada side. Peasibility studies for a second
230 kv interconnection between Manitoba and the Garrison,
North Dakota area are scheduled to be undertaken jointly by
Manitoba Hydro and a number of MAPP and MBSG members.

MOTE: Boundaries indicate general areas and do not necessarily
include all systems within an area.

=

Pigure 1

Iv-9

1410

SSS

1411

.
1724 RAILWAY EXCHANGE eLDG.

ie Pe. coos
> pfewren«
wn cers

"| ke* 35 t96e
dy § BF Ls Izsty

hk Lee nas fh, RN

Ss

le CONVEAT Two $0,002 #[MR BomeRS WHICH AKE STOKER
FiRe> AT PResanT To Burn EITHER GAS OR ON.

2. IST A¥o,000 THEREMS@ 622 f/THERM, BALAWME @ S-2¢ -
ADD OS¢/rHernM, Pur cnase Gis ADJUSTMENT AND
-SH¥Jo CITY UTMITy TAx-

3 MAG On 16 0.46% SuULPHVR MAX,

|
2
¢;

rua.
COnsusPT! On C. O04 (Gel tons) “
(Humber) — 2eu,200 |
a. com (Por ton delivered im Bin) .
s. os Rer. Pag
50. cae c. om len delivered ia tank. ig ‘Tm
©. onae
12. we a. OTe PER oT OF EL
aS FIRED 8. Grricsency
4. new Gustmcten [FUEt 0% SToS : 232021, ry TE
. ne x — _—e ” seem ccm _——
c WTA ecT2:4s 30,000 65,0007 ©o ~
Sos be,ges°2| 21 202=
a ee ee eee 2
ct : L7z & = 99 =
& 2% _i.._t u.1._.& 200 =
&. mectc rove Bo2o37T roe
4. Se °. Stam soe ¥ ‘) axa 237
> gad 6. pwwins on (STM. Te 4 ce re Zsa-
&. SEPRECIATION & INTEREST (8% of Line ° = = £722") fe =
- 4. oman (Specs ty) .
BF AOIRE wpm wh eee bos Ib] 30022) {5 b20= lI 10 259 |n2¥se 2
1 woe suLecteD — ~— ,
a. com (uodernizety “ [Ve on Cle as (1) fectty
‘+6. ameams -

2 Makes Le

“Computed on besis of actus! mohthly rates applicable. GSA 22"s> 1289

SPECIAL AND SUPPPLEMENTAL PROVISIONS
SPECIAL REQUIREMENTS

een te nares Feed See ree Cae Tee
vision, to use the Contracts listed herein

E
¢

QUOTATIONS: (a) As used in this schedule the term
“F. O. B. Mine (cars)” means

:
at
;

unit price. A price quoted ; i
out explanation or qualification shall mean free

cars at the mine. (b) Whether or not this schedule
shows that bids on any item are invited on

of F. O. B. cars destination or delivered-into-bins at desti-
nation the bidder may submit such bids, indicating in the
item the basis thereof. In connection with a delivered-in-
to-bin destination quotation, the bidder- shall state the
truck loading point.

Awards will be made on either an F. O. B. mine

(shipment to be made on Government Bills of Lading,
or on commercial documents to be converted to

243

—_

sa

84

se

Ht

sE8e
eee

ee

4 afi
pil

“He
s

ilits
chia?

His
EE

on coal offered
of Mines does not have
the
latest
shows the
offer

|
2

7

KEYSTONE'S MAP OF THE Cdl

_ KEYSTONE COAL BUYERS MANUAL

wv

~ “eGR?

ite : Hee I Hf

: . a =

HE i ny
ihn na HF iti i Ha
tal ake aeTeREE bet
ea i
ty ae fl Hag i
la ull - tt Bh oad uu
ite it if l tf He TF o

i nt
et sites Ha HEL i! ie

ae 17 my
Eames * oe ee

S.e*® 5.8.
oa 43

22 &° 884
ane ©

aeesa" © o. a:
SS a
[aE

TAG 33433

ee te

ia He i

i yl

| : jal F lala q

fulin i |

it q fits ue lj i! ste hi i fi

CALENDAR YEAR OF 1967 (cont.)

aces eee ee

(In Thousand net

Re te See
| 2a ey

| e2.... ne
| Bea

F°RHG GES" g,,
’ ee a

DISTRICT OF ORIGIN 1

aaa 88. gea88 Zz

az. 38 Rge"R RERRE AMe ss

Bases BREE RI RASRZ $2.

é aea*s dae

*-. ©

pa ns al
CONSUMER USE
» and Mexico

} ne

ih i
a i

si :
ii, lt
diy ri it

TP je

—~

TABLE I « DISTRIBUTION OF BITUCINOUS COAL AND LIGNITE PRODUCED IN THE UNITED STATES DURING THE CALENDAR YEAR OF 1967 (cont. )
Net Tons)

? GR ta ovis a2: SOP ites
ET es ne ar he ae
1 TGR aR re Si $E.8% an
a ON a> ie
S| trees weeee Lt Si
“t siemeerea 7.
i mes oe
betne 6906s — ann
BE feesk seses — 7
Pe :
ee Th 1 i, ia hla,
iF i! fii ‘he lhe

1424

o| S879 pe sg RE © = ae
ili q as A gar 2
M4 | SS
fl” % ESS 2P88F an an
RnGian
ee ee age
i= =I m1
3 ; a g.*8 ps 23 #8 a ane ga 5
an $ BA*E G65°8 94%.“ ...., ga°d
“ — hea an eae -faesed~00es — me
i | aon EG a al a mn

“aa

:
A yf i i Lt
ia in 4 ihe ‘i fi

See footnotes at end of table.

] [gel =
| esas Ps eres
| Feast
: “Ris 836° 2 amin .. § 9.a8 88.58
~ ee an OF 3 nr DA |
Peas
i|-E ro ap ee a Rea 8.863
ae “7

3
BS aged .. & Gga8

= 7

». RA A a2 a, eee eeee os

DISTRICT OF ORIGIN 1,

“uw NAN Ft WN

TABLE I - DISTRIBUTION OF BITUMINOUS COAL AND LIONITE PRODUCED IN THE UNITED STATES DURING THE CALENDAR YEAR OF 1967 (cont.) (In Thousand Net Tons)
3 and 6

North Carolina, (continued) «

Truck, total
Retail dealers

All others

Eg eee ae ses
eta 84" 64 C4 e FSS 8 $.73 macs ASRS
— =
a so, 25,. 2 2
“#8. GB nmevm S8898 & 8.82 85.83 = ae
a7
=| | ESAREE mmm 8. .88 § $899 BRSRG .. GER*
8 AAT :
, s wR ae Pte ee Re BS SS SAR
:
3 pera fri Carre
: BRORA GG" EAMES EGRE 88029 RE ga°8
8 8 : .Y ‘
on :
mili a a uk dk
WP i teah, Gaah, ath Pau, Ha
nee ae nat
jgedaa padaa j a jie [lla Ho jis :

1440
j . @ Boe s Wy st. ee
S| [BE SR Tae, ibe tie
_faaaes... i FEE mw,
=a ~_
Fs E ot 4 KS &.E.5 MeM eens a ar Pavey
4! (s eememerosmerr
— |
= 5 S10 ChFE Wet ee ees a
ea |:
Se oT rik eee
ul |: 7
g
2 m ee tesey rire see ee
5 *
og | og’ Sat Riaee age aete> 4g goa aaaa ae.
: : a :
iz
© | ge fg Pog F
is ee a tathiec chiles
& 3 ofa ok 5 ie ,.&
Pll dled Ho aida dd
~ |aEE’*2a3. Haj. F2, 34 HE ita, iM, ie af [5
g (PP pisidl que aud oa: gall 33 A 1 i
fiidia {dla pla jada i Huh | fia Ha ji

4,

{ARLE 1 - DISTRIRUTICN OF BITUMINOUS COAL AND LIGNITE PRODUCED IN THE UNITED STATES CURING THE CALENDAR YEAR ¢
(in Thousand Wet Tons)

1441

dhemnict oF ontoIa 1
1

fi

oe.

i i, ii,
i i tt wat fi fyi Fe ut ;

See footnotes at end of table.

(In Thousand Net Tons)
2

1442

DIATRICT OF ORIGIN Jy

re a 7 ae a]

TABLE I ~ DISTRIBUTION OF BITUMINOUS COAL AND LIGNITE PRODUCED IN THE UNTTED STATES DURING THE CALENDAR YEAR OF 1967 (cont.)

iy i i he Le i,

lis fis ‘lls ju i if i! E i il

ft

See footnotes at ond of table.

1443
3 © ve ee
*
g ‘ eevee eeeee ee -» B RRS BR SE RASS aw
“ ~~ aw

mee mere -8000 60 & 006 BS Stu SQ weww oe
of 28. ORS 3 3
3

8 8hR SFEMR GI" an § ¥.. EE. eee ee

DISTRICT OF ORIGIN 1)

TABLE I - DISTRIBUTION OF BITUMINOUS COAL AND LIONTTE PRODUCED IN THE UNTTED OTATES DURING THE CALENDAR YEAR OF 1967 (cont.)
{in Thowsend Het Tons

Peat == x —'
$ z,2F SR, & RZIR se . mm % *eeee *eee se
|
3
3
x 4 ef ‘ seee seeee *eee ee

:

Hy ‘elias

iM yo By
a Hi i ui ne

i
i

i! finds il

See footnotes at end of table.

3 > BOR BePe OOM kk cack cca®™ an

zi‘ eee seee srtee ‘ seee ee 8 8 - Sam ee

a we hae Ge. tea cae

om SE. OR

q 4.08 78.09 9e? a

— mn.

n n nm a“
ee ‘ ee

DISTRICT OF ORIGIN 1,
17

a ———— ees

|

, Pat Rae gp —
th,
Hf Mil bi : tt
i i

ii ih

iz 4

fa (Mi my 1 i i

See footnotes at end of table.

1445

RAF sg ase

.» RRA RRer =F RB SR...

aR? &. 6 —

REE .. REA RRA BA

-~ = =
~~ a an

cont.
18

=. 22
.

i
ae

ip ®
[

E 2

=| |:

: : :

: % ++ BANS B ge BgeA = £ HR RER BAB

|

ay! i i
i tMdabacr f
a Maal Ed ely
g] [Ada HE fila Ulla fla Ele fle fis

1446

a “eae wT aise fale
3
SOM AS een eee ye
1D : 2 98 8." AEE

a’ cna
Jac & ES Rees 2 aR gan
ip ae ee 9" > 4.4-ES
} i3I: 2 $E a8 938 R
3 - REPRE sons we ee
] |- aga aga
" 22.88, 8,8

2 fs Ra ae a SPE GATE “" E RQNE SPER BRRRE

27s ”~

he | |
iit! L, ‘ ly ij t~

i yy yah a Ha
ae a

1447

.» & BG BhR-*

DISTRICT OF ORIGIN Y

TABLE I - DISTRIBUTION OF BITUMINOUS COAL AND LIGNITE PRODUCED IN THE UNITED STATES DURING THE CALENDAR YEAR OF 1967 (cont.)

California, total (
ts
ts

ji
in fit

See footnotes at end of table.

1448

g J . ee z e aah er AS ed PE

= ad a - «a
. 86 § &,*8 sf ; eS sete 2,8

an
+S B88 8 es
ao
a ~
s siete tin ct a
5. ee We Me bse seater aeeeess ce 2:
F gs - ean an 4 eo aH
e SS * SOUR OAS Cet et 4 eee

3 : Fay ance “aa aN RR ag = aa om
”

se & AS“2 aR “2 ee? . oo es ao ee | Ran, dt waa

o § Ba-8 __ *e*epvpees Sa, a a3 "* PTO

Merve ts ce 79+ bem eed obo a de oh
(In Thousand Net Tons
2

All others
See footnotes at end of table.

Tidewater, total

«. 2
»
0

ay
ch 32

39n eaANSKOO
bestncad wis ad gt At n st at st at
7 wrotwo a0 soruieta MOLLWKLISEG 40 ZiVi8

ToL Tol aNeTORT UT)
(“au00) 196t 40 WVEX BVOKIPIVO MK OMTNNG SAVES GUAINN BAL KI ORONOONE BIINOKT GAY ‘TOD SNORIWIE 40 NOTLNETULEIG = 1 SIEVE

8

£107USAUT oUTU UT sPuBYyo oN

soekotdme .
09 SeTwS Puy souT ye pesn TeOD

seyuedwoo uvt pee
Seyuedmos se79g pertUn

BRR att 3 3,

fe

" 9 mee 2

FE mIOTWO 40 LoTuieta

[sor Ton puwsnouy Ur)

(+9409) 196T 40 MVE MVONFIVD BML ONTUNd SAIVIS GALINA SHL MI GFONdOUd ALINOIT GNV TVOD SMONIWALIG JO NOIUNGIUISIC - I FIaVL

TABLE I - DISTRIBUTION OF BITUMINOUS COAL AND LIGNITE PRODUCED IN THE UNITED STATES DURING THE CALENDAR YEAR OF 1967 (cont.)
(In Thousand Net Tons)

DISTRICT OF oxIoIN 1

}

Canadian commercial docks

Vessel fuel
U.S. dock storage

va
Great Lakes movement:
Tidevater movement:
Coal used at mines and sales to
employees
Het change in mine inventory

States of destinations, etc., are shown

respondent figures)

of movement,

in footnotes, it is for purposes of concealment of individual

FOOTNOTES (Where special combinations of consumer uses, methods

4

shipments.

itorage for which consumer uses are not available

th all-rail shipments.

-reil shipments.
1 shipments.

yor, and private railroad are included with truck
Shipments vie Great Lakes are included with all-rai
a]

river are included wi

bunker fuel, the destinations of which are not available.

exports and United States tidewater dock s

via tramvay, conve

Shipments via river and ex-
Shipments via tidewater are included with all

1452
i. RE SER
3 ¥ : ers :
Mi sha ea
je bb eee eg RR
: Ws) 3 34*8
= et
: i ¥ - seit tinal al
i i Bees aan a
| é § a i See
6
g
eile] Tate
1 i TERE!
i 8 § & RES 4
au fe oe TELE ry
ute
5 3
: Mal a iin
i gw? RG aR gas
i & R yaxogsa
ME Head. Be GRERE?
R" so eeress
Bi - . aa_3F i
G1), lel doscat ole fll :
: f jit REE Hee :
is : 4 all pagece’ $3 RAL &
Jesh (iis iday ta np
i iii viii Hl i.
‘ ae. 9s "! anh Ee H 2 g 4 d
bslatiststtl PI dal

Sexo" wmoyeTYO ‘euetstnoy ‘sesueysy
Te107 T[eaqueD {neg 3894
JddyeetsstH pue cweqeTty

oossquuay,

a

.
anane eo aae

*

CEE

bags

g
ORR? f SSPRBE R SHR AE

REUSAR B
p AZERS R AGSRSREE RES ER

=
=

> = 7 =

z

z

T

9

990"
o'er

my
at
e6t' OR

6

T

9

~~
“4

BIE we Sk O88

(SuoZ yom pavenogy aI)
QNV 196T 40 SHVEL UVONTIVD AHL ONTANA SALVIG GALINA BBL MI GaONdOUd BLINOTI GV TVOO SNONDMLIE 40 MOLINGTMISIA 40

1454

, i

tii

~~"

2 ia] Stee Pree
: fd] [pe eee
1 OL, assis
7 Ae
AD oe
ts g/SBe F628
TLE baa aie te
a A ee
[Se i oF Fie
aif .
slgengegaqegee a fee gs
Ba Fe
f
F
i i
altel i
is is

1455

“STQWTIAS 30 B28 OTB Jo SUOT{SUTISEP ON ‘TEN; 2eqKUNG SeyNTOUT ‘seAsnoy |
. {elQut yea Jou 928 Semn AeENEUOD BTYA 40j PEI048 HOOP JOVERSPTS SOINIG POTTER pus sys0dxe seessene sopntoxe £ |

orn Corerrss }
24 Seasion

sexe [me |

formes hf A- eg oe

‘& th»/es

AIR POLLUTION BY
FEDERAL FACILITIES

REPORT
OF THE
SECRETARY OF HEALTH, EDUCATION,
AND WELFARE

CONGRESS OF THE UNITED STATES

IN COMPLIANCE WITH
PUBLIC LAW 90-148
THE CLEAN AIR ACT, AS AMENDED

JANUARY 1368

APRIL 1, 1963.—Ordered to be printed

———

U.S. GOVERNMENT PRINTING OFFICE
P3868 WASHINGTON : 1968

1457

‘SENATE RESOLUTION 261
Submitted by Mr, Raudoipk of West Virginia

In Tur Sevare or Tue Unitep Stares,
Agreed to April 1, 1968.

Resolved, That there be printed as a Senaie document the report of
the Secretary of Health, Education, 2nd Welfare, entitled “Air
Pollution by Federal Facilities”, in complixnee with the provisions of
title I, section 111(b) of the Clean Air Act, Public Law 90-145, es
amended; and that there be printed 2,500 additional copies of such
document for the use of the Committce on Public Works.

Attest:
Francis R. Vaeo,
Secretary.
By Darrepyi Sr. Criainze,
Chief Clerk.

§

ss

1458
LETTER OF TRANSMITTAL

Tue Secretary oF Heattu, Epucation, aNp WELFARE,
Washington, D.C., February 7, 1968.
Hon. Henert BH. Huspurey,
President, U.S. Senate,
Washington, D.C.

Dear Mr. Paesrent: In accordancé with the provisions of title I,
section 111(b) of the Clean Air Act, Publie Law 90-148, as ,
there is transmitted herewith a report on measures being taken to
control — emission of air pollutants from Federal facilities.

: Wizsur J. Cone,
Acting

(1m)

1459
AIR POLLUTION BY FEDERAL FACILITIES

INTRODUCTION

The Clean Air Act, es amended, emphasizes the need for Federal
leadership and assistance to State and local agencies in the contro!
of air pilbation, In addition, the act indicates that the Federal agencies
shall cooperate with the Department of: Health, Education, and
Welfare and with any air pollution control agency in preventing
and contrelling air pollution frem the facilities for which they ere
a It also provides for the establishment of classes of air
pollution sources fur which limited permits could be issued and further
requires the Secretary to submit an annual report to the Congress
on the status of such permits and compliance therewith. The language
of the act is such that the Secretary ts given discretion with respect
to the classification and permit procedure to be established.

In addition to the act mentioned above, the program of abaiemeiit
and control of air pollution from Federal facilities is governed by
Executive Order 11282, dated May 26, 1968, entitled “Control of Pol-
lution Originating from Federal Installations,” by the “Performance
Standards and Techniques of Measurement” prescribed by the
Secretary of Department of Health, Education, and Welfare, issued
June 2, 1956, in response to “Sec. 5 Standards” of Executive Order
11282 and by Bureau of the Budget Circular No. A-78 issued on
August 6, 1966, and seni to the heads of executive departments and
establishments. '

It is expected that several vears effort will be required to full
control air pollutant emissions from Federal establishinents in wien
ance with the best current practices. ‘i’ provide the necessary technical

tidance for this overall effort, the National Center for Air Pollution
Contre! of this Department has established a Federal Facilities
Section, the staff of which will devote full time to the surveillance
of air pollution problems arising from Federal act ivities, the extension
of sachalirel ussistance to other agencies and departments, and to
studie. of the schedwing of the necessary improvements in control
of the emissions at Federal establishments.

ACCOMPLISHMENTS

The Performance Standards accompanying Executive Order 11282,
through section 76.5(¢)(1), called for the Secretary of the Department of
Health, Education, and Welfare to establish by regulation limits on
the emission of sulfur oxides to the atmosphere from Federal facilities
within 6 months of the effective date of the standards for Standard
metropolitan statisticel areas or standard consolidated areas which
have a population exceeding 2 million end a population density
exceeding 15,000 persons per square mile. The result of this require-

a

intention to adopt--30 days after the publication of the notice—
m

ific limits on the emission of sulfur oxides in these three arezs.

30-day effective time limit was extended by the Secretary of the
Department of Health, Education, and Welfare for an additienal 90
days at the request of an industrial trade association which was con-
cerned about impact of the proposed regulations on certein seg-
ments of the fossil fuel industry. The proposed limits were published
in final form in the March 23, 1967, issue of the Federal Register to
be effective October 1, 1968. ;

The limitations on sulfur oxide emissions for Federal facilities in
these three heavily polluted areas are sufficiently stringent to cause
serious ane and poe Spe ys ape received indicates that all
agencies int to comply with the regulations gs rapidly as possible.
This compliance is related closely to the efforts of the air pollution

~

control agencies in these cities to relieve poet oe prnine of excessively

high to sulfur oxides and is an t example of coo
intgQhimeninebintaham
During 1967, 2 number of studies of special Federal ns of air

of problems associated with fuel supply nationally and with specitic
er is on New York, Philadelphia, and Chicago. The Department
of Defense initiated a program of testing fuel oil for its sulfur content
since the current military and Federal specifications on fuel oil permit
sulfur contents which are considerably in excess of that associated
with current and anticipated limits. Several directives were issued to
military commands to put this new program into effect immediately.
Laboratory resources of the Department of Defense will be utilized

Toxic propellants continued to be a problem during 1967.
Potential beryllium emissions have been controlled, largely because
of the Public Health Service policy statement on beryllium issued in
1966, and through the t cooperation by the two princi
igencies concerned (DOD and National Aeronautics and Space Ad-

ic polluti h toxic chemicals under developmeni f
tion with toxic i for use
aad os

compounds of berylliuin long-range toxicity for some humans.
Therefore, no amount of ium should be tely emitted to
the atmosphere, except circumstances directly relevant to
defense of the Nation.

New justification for the longstanding Federal concern about con-
renninstllans af: She auhdenh shecmgbadh hep ten vkanteanmeeane of

1461

3

beryllium arising from any activity of government, was provided by
a recent court decision. In October 1967 & Pennsvivanic j jury awarded
$109,120 to a 45-year-old mother on the ground tbat her serious lung
was caused by beryllium fumes emitted to the atmosphere by
an industrial plant located several miles from her residence. (Heck v.
id a Corp., Berks County, Pennsylvania Court of Common

wy = that court decision produced no pee pe in the conserva-
tive Health Service policy toward control of beryllium, it did
stimulate intensified activity within the Department of Defense to
assure enforcement of the st sire by guidelines issued earlier to control
any rocket motor tests apeans “7 the national defense. It also stim-
ulated serio need for toxic rocket propellant
preys Pose obacn.: stare sing ones one enh when virtually a
researeh Govelopaians Siavelving beryllium as a propellant had

st
ivity also was continued in Chattanooga and Hamilton County,
—— because of continued interest of citizens of the area in general
ution abatement, because of complaints the emis-
sions from the Volunteer Army Ammunition Plant in Hamilton County
or because of technical problems involving efforts to control sulfur
oxides, nitric oxides, sulfuric and nitric acid mists, red water inciner-
ator wastes and other contaminants. ‘The Abatement Program is
studying the air pollution situation of the entire area and air pollution
from the ammunition plant. The most ificant recommendation
made to the Office of the Surgeon General, ment of the Army,
by the Public Health ec ae a to install catalytic reduction units
o the plant to reduce markedly the emissions of nitric oxides to the
from Os nitric acid plants at the Volunteer Army Ammu-
nition Plant.

Special coo tion continues with the Tennessee Valley Authority
through its Division of Health and Safety. In addition to participating
in an advance review of TVA’s phased and orderly plan prior to its
submission to the Bureau of the ass the Federal Facilities See-
tion and ‘meteorological personnel of the abatement also
reviewed TVA’s current plans to control air pollution its new
plant in berland City, Tenn. This plant will burn a high-sulfur
coal which is the most readily available fuel in the aa wih needed
and will have one or two 1,000 foot stacks equipped re. md
efficient (99 percent) electrostatic precipitators to eels part te
emissions, depending on final engineering design decisions. Although
there is not considered chy Sg ain han: gpm 7 prntoren ay
of removing sulfur oy from these stack gases. TVA
that these oxides may be er eee ae
of control mechanisms in the future when they are developed. >
should be noted here that considerable research is underway by the
Public Health Service and TVA, by the Bureau of Mines of the
Department of the Interior and by private utilities and chemical
ere vane ty hg technology to remove sulfur oxides from stack

gases of powerplants.
Most of the activity by the Federal Facilities Section of the abate-
ment program involved $2 626%

| i F a

a i

Jollet Army Ammunition Plant, Joliet, (Mt.
Fort Benjamin Harrison, indianapolis, ind. _.
Granite City, pee 60

j
i
&

Jayna 041; SHY) 404 WENSAS GONEIIUND DHOUS j>ns SHO] ‘eIyOPEHYd ‘sJ0\UeD BUIuses) JOs)UOy OFeweQ +
ssyennorens fae 01 wins Be Seieeean poe meee Wd ji0 oyiem wrepion a
ne on 1610110q Wo SWAEIE PUT £10)20;9P OKOUIS Jo HOHeVEYSUY ““" ~~“ 8A ‘MOHON *puRys) Aouesy’ s0\U0D Adding jerey
yp 1 NO Opeyi1151P Z “ON 10 190) ae ee 8 (ot eat eee? A'W ‘sueqiy “1S "penydson jeaen
pus ‘ou Depuien 1 Sveus¥P 2 "OM &H 10M Lem ITO » Con Due 9 on nnd nena “°° oo“ MINOONR “WOH HY fone
tip pus Bujusng wodo syeupunie : 0 SVeNEIP Z "ON OF NO [9M Jenp{a99 y “ON WHO, OAUOD “~*""~** “eene org aime eine oon em
. “9 Foypung ioe de gee Enya mths dm me Shee ene Oe ee dys wae
mel to we ae pe seeta nes tig oon an enter os
sate uousdtbe conan ie tim sjesearan wee Uiteeg-j0us8) vpeuyse 3509 99/01 avedesd 9} wy “2B “y BuN29105 40; Aemsepun

SUOK|OFON “WiNUN Kew 4M{jAS uOdZad | Poufe;UDD Sey ‘/9BT ‘T ‘ACN DUIS soa hd Rai ai Bd ‘@ASUYOT ‘20)U0 Juewdo)oA0g ayy [eAEN)

AeW Ut payedjonue jenosdde AiQASv3 ‘g9Gt 280A je2sy WY perojdwod yrofosd pes shi she st A'N ‘umopsBuno, ‘Ayyoes Suyyyesy onsosoy

aeah Ul UOISLBAUOD 40)10q 10) Pojo(dwor ejewnse Cid “8961 4¥OA Jeary ‘

Uj sudr PUG 20qGRI28 104 Sv3 Aq panoidde JO OPBDyN199 YM

Wafosd yepoods “wNwyKew An)r5 Worse T paugequod sey "7961 “T "ACN ous posn fang “"~,'N ‘AyUNOD sudeNd ‘suEgiy ‘IS ‘sULgIY ‘IS ‘JeNdsoH
“AWAY IC WEVA OF Burdyd se3 youedg

8 SUCly “WINUIKe INNS 4UI2,00 | POuYeIIOG Sey ‘LZ9ET “T “AON SOUjS poiNdoid jong “~*""*~*"~ A'N ‘way yo01R ‘4004 MOK ‘YORE wee
“WALA PKOUL NYAS YU9DIEI | POUseIUOD SHY ‘79GT “[ “AON SOULS poINscId jong AyD YIOA MON “s9jUIG ZUYIELL mires ° aa
*Csuoqanias soyeseujoul) g-1y Y29[0Id (eyeds 40) peryouine ui}saq sBupy “UAjyoOoIg Cofyynoig oueis JeieN) paekdiag
‘og Mog ‘10,99 Buyuresy OAsOsoy Sds09 oUIeW pUe fereN
MS cee eee ANN ‘uc Bujuny ‘soyuag Suuiery ersosoy

“AN "Aig wapden ‘uAtyo03g ‘von
“0g BIS (BAON JO KOvUY Bujsnoy pesopay ‘souewy reunntin
‘og ‘AND wopieg ee $UIOD GUNICW JS] ‘SIOENDpPPOY

0G eer err ere fer { N wodoody ‘nue Jururesy ansssoy

0g eer eee ee ee oe N ‘ysemon ‘pac “us OAI9L904 ant

| eR Sener errs rn‘ v9 Aussie 10ju99 diyureay ansasay

‘og CeCe ee meee ene tN yoqezy} "10489 Bunuyesy OAOSoy

04 -* eee ewe oki 3) ‘ayiey “‘yodag uo uAuMYy

“WUE ANNs WL9IIEd | POUjeWUOD Sey ‘Z96] ‘| “AON DUIS paindo! Pag Cree nnree ene soiny f'N ‘UOsND “224LOD Buyuyesy OALasoy
*Ausly s@pUn eq [Mm VOR 'N

| AMUPISYL 996% ‘Og BUNF PaHedianua womysyreIsosg "y961 280A [z5y) poyo;dus0D Uiseg “euuoreg (1099 Ajadng 40 ed) Bupsno}4 YBnos0Gspj09

"B9GI ‘OC SUNG POYajdisEd OQ 04 SyuK} ASLIO}s OUNOseT J0;OUI NO LyojM) PodaauN NS “AON *eUJOU MEH ‘QUOI, Me} “Jodeg UOHjUnWuY jeaen

"oe
Pd eune fa PosOjdwod aq 0} SHU) eSes0}s Ousosed JO;OW UO sjo]Us potmougas ‘uieees
PACIICO fi He] UO} e\S-UO OF BuYHLY osnyos yoUNUOD ! ponjweorip setae” hia adi AGN ‘WONeY ‘WOH IS-AVy JEL xnYy Jeary
“SIP OSAjOI PUB 4O1jUOD BROWS J9}10q 404 ‘29g ‘S| “BHy PoYajdwiod aJrwAS? YS09 JoV[o.g ““""T* TTT sso waysog *vozsog ‘purddiyg eng 4
“(OHOwS s0pes9UF9UJ [01jUG3 0}) ABMUOPUA 42 ford UB\sog *-* one Rye! JOAIIS * peste BIUCUPIC [VAC Y
‘POs9PIO 516)20,0p GYOWS *“""pyy ‘ysCOg S99 ‘Asojesoyy } YOIeOSEY jeAeN
8961 J8QWOAON “dep VONo\dwWOD pajewsy ‘vONoMIsU09 JepuN juCIa JUkoy May “TTT TTT PW ‘siiodeuny ‘Awapesy jeaty ‘s'f

"HUY, Are pUES @ 204 Payrtmos suBtg ***"*"~ WeND “WuIOd BJOK ‘WeNY ‘19;U59 SHIOM IIGNG
“AWIDE) VOReLIWN® GyoWS jooyrs BuAYSyasy 40) parejduioa OEUiy}>9 4809 joBlorg ~ “YI ‘SOHET JeMsD ‘SaxeT CoD Powe dupuers [eaey
‘ANY AS Oded | 40 Yury & peYy Sey ‘Z95) ‘| ‘AON GOUIS Pasn Jang ‘jueid
-s0m0d Wye 10) $0914) jONYOD Jo UASOp 40) POPsEME JORIYNOD “JOn) [eALUe jo Jude ii!
804 $$ 40) ‘8961 ‘| ‘AON BANDAS Wuejdsomod Ujoul OY) 105 sed wWsy 410) papeme {2ENUOD ‘SOHBT JeIIQ ‘SeXeT JeAID ‘IN}UED Sy10Mm IGN AAEN
© eee Naga RCO ES “*AO1AUe}*) Uone}S ay jeaey
“SAYRE yuaasad | JO Wauifxew @ poujejuoo sey “7gg1 ‘T ‘AON dauIs peunoos wee re eee Wb HiRd 456404 ‘UONejg SIUeUpICO jareN
‘Wemen ‘Ninjcuoy
“MUPUCS Aseyjues 404 posedaid Susaq suoferyio0ds pie ewe’! ‘WiOd $,s0qIeg “WUJog $,10qQIeg ‘UONeIS Jy JeAeN
Sujwsng-ueco zZ soejdex 0} jypuey Aseyues Spuowworey) “ajajdwos Apnys Suseoujduz ~****~ @p ‘Auegiy ‘Aueqiy ‘seWu09 Ajddng sdiog suey

~

#9) 1OGIAG

Ie
ron inte fy arn a ay ar Terese “neg Cojmurmy Weg “yseH wotO) sy puETyIET

Fee ne ee ral doled om tbelt tated heteee ae ment -—-- ee ee ©2310 | iy HyIIOg
Due spinoy AgqueTs Ye pojjersuy 41)2-y0p Ca cali, nag * Hearn Wi ioN

eV lgaet Way 0} paqeysut Saree pus ro}oep eyous =o ‘wea ie ac

[Rt ny syn aces foe oe tony ty snd - Raa eats =

“mopon *

eyows cee fens sane srterecccone*mn SOpOM ‘s8URD SyIOM TIGRE jeAey
vo Buyyom 3 9 -¥ UupUe LinyuE w petod wai pe pos ng tad “""-""-ar weg wma ‘hes (Uy
ngs ey aes sy ii emmcheap hate
ry enon 4 ai pur ener yor vagal Sm ice santlae don eae
2m) rfeng “wnmrom sens wens’ | posiiues 699 hE tue patos ong“ “Ag ‘maasy monn ‘eroug morym ‘VoReIS Hy 1eAeN
peroyny wenn myn woered | sey ‘196 bore ~~ seececccecensss*mg ‘mudepeyyd yodeg Addag jexsy
Siocon woenes 3809 yoefesd esedesd oy wy 3 lang *rneteasecnscense cen

Ra See RSET eet wer en

PeMUALOD—SSEI YVIA WWISKs ONIUNG NOLLVTIVISNI AB SS3IUDOUd 40 LNOd3Y IVANNY -

penugueg—) XIONIddV

e
Sujuyequos Bujyoos “pasnooid Bujoq mou njjns yuersed g’o 2: note te ny " tim ‘AW OAIOSOY AY GADI MO;NM
#UOD yO 19) g Oe Ba) “Ape, yy
" “syue} 13a WO Sjoyuy padrowgng ****"*-*+*- 04 Yoingttig sodyny WdINgsiitd s0,e01H
“po SUE) JON} UO S}ojuj poTsaWIqng “**"*"~-*-++~ “**"*BaN0 ie UEWRLY “props AojsBuyy
“worje20d9 } ypu) Seite, 9° Waa ee CHO “SAYY “wSey A204 HY SMyIy

ere ar NNER lym gwen

saeeeeeseces N ‘wunos "BONEDS B2!04 sy CUNIOY -
eeee ‘a atten ‘Y,

19nj 40, wenn py id mod es wy ydunqsyeid

ae \ouuog @ HV pitng jeuoyjey
tio boseslnd ye MON snyRS MOY ;

“og
: { Pojapoyss ynooseyg
“896T matt Aq vonesode uj oq a peers MII’ “JOVCLOUIIUI-s0p
“POIYS UOHeUIqiUOD 20) B96 dy Ut popieme y2e1}uUG9 LoWjansjsuas pue paysjdums ulicag ‘sno Yg ‘seQUaQ UO BUOY) PUe JUD jerxyNeUdIOY

“L961 48q

“MWOADN POYO}AWIOD “syuey OXes0;s ounosed ‘183-006 ut Souy Padsaugrs jo UoNepc}Suy owees-"=""" "Sst ‘MOG ‘Seg a5104 IY I0|S39y
‘ “696 Ase0 U) Paysaye 9q 0) Sed yesmeu Oo} vorsi0augo jen) coer said uy teed “Seen UiN ‘SuDwO; Wenow loseg — onan?

Woyeidiwes popoedag “ued 9Fre}us Oy JDe/ord Ut Papnjom s¥B wrnjeu o) UerrssAtoD ln *woresg 0210 ‘fh
atweaves } pus wou jue hf un vai t CSRS ae bunt eae, 2004 te ewes
wormede yusid Supojuow as019 ewes a oadomy) Of AY JaAQsom
i 7 wiidel iecuieseg uy pases wht - “se """ssew ‘plojpeg ‘Gy6{ Wid prety woosuey ‘9 )
@ Kensepan uB\s0q ‘s0,e0u19u) 10) poou Soywuswia asny } ry : seesnees""DW ‘sBuldg dwied ‘eseg o2104 ny smoupuy

‘soot te 300 roby pro dole kon ‘peers 8 sexe ston m poMise oocee hy aH) ‘AND so1s80g “seg o2164 sty sjepsyseg
8961 Aine 20) payNpoyrs jnosceyg ‘pepsoY s¥2u0} OU J0YLIEICE vt “ores Ay HOUY 1194 “UOHRIS 69104 HY YeUNOW MoUs

Foy eee reer e == aMol “AND KDI ‘asuquiy Aig x
TISTIINLAND suey “uoners e104 109 Aug even
UE owey ‘o6eg 92104 sy synueyy
“WE “OUNAHOG ‘UONR)S 22105 Hy o1\1AoN0g

WO "SuyqQoy s9UIem ‘seg 82105 11y Suyqoy

Fup veoy Ye papleysy; \Lowd nds Suypuey yse ssajysng ~*---+- fan.

Sebaseed Perfornance

a "Based on the pilot plant experience, Combustion blisivion
“has guaranteed that the air polluticn contro} systen (APCS) would’
perforn as follows: a eee ees se |
“ss ae The sulflr oxides leaving the APCS are equivalent to
burning a fuel containing 0.5% sulfur when sulfur in the fuel
is no greater than 3.4%.

2. The particulate matter ; removal fron the flue gas —e

the APCS will be 998.
“ Qperating Experience

‘il bi

I. D. Fan Inlet ar

The reheater is a finned tube heat exchanger with close
spaced tubes and fins. Cleaning of the heat exchanger was in-
tended te be done by 3 eater wash syster using the scrubber spray

_ +3-

1506

Water. The wash systen consisted of sprays logated abore and
belox the reheater. Originally it was planned that washing

would be done et half load with the scrubber inlet and outlet

dampers closed. The final design was worked out with oa Tine
‘washing planned. — : ~

After spproxinotely 12 hana of senasahial on coal, the
wash systen was operated to determine whether it would function
properly. Sone of the kash water carried over, to the I.D. fans.
-t was “observed to be leaking out of access doors in the fan
inlet boxes. After a few hours, 1.D. fan vibration increased.
Inspection showed a heavy bul dup. of deposits on the fan blades
with a thickness as great as 1 in, in ‘spots. Sand biasting was
required to remove the deposits. ate eh ee a yi 8 ere

It was apparent fron this experience that moisture must
be kept out of the fans. Drains were installed initially on
the fan inlet boxes. These were later changed to an eductor
system. Also, top rehéater sprays would not be used when the

scrubber was on line and botton sprays would ‘be used carefully.

Xo further problems were experienced with fan blade deposits.
Normally there is no moisture carryover from the reheatcr.
Moisture has dlen observed coming fron the inlet box drains.
during start- up and curing — ~fen operation. -

Overflow Drains :

Another early problem. «as the deposit of calcium sulfate

on the overflow drain screens (Fig. 4a). These deposits formed
in 2 short period of time (less then 24 horrs) in sufficient

amount to restrict the water flow and cause a high water leve)

next
Operating period.
Slarifier Systen

The Clarifier ond slurry purping system has operated
successfully eee caly ninor problems evicenced st this tine.
Plugging of the pusp suction has occurred a nunber of tines due
to restrict! ons caused by peover-operzted butterfly valves.
“These have been Changed to plug valves to minimize the restric-
' tion. Solies concentrations of 20 to 30% by weight have been
“measured in the clarifier underflow. A short term concentra-
tion of 50% by weight was measured on one- occasion.

Plune Heating Syster

Except for the reheater See previcusly described,
the heat exchange systen has operated satisfactorily. Flue
gas temperature entering the rcheater has typically been
120 F end has been 190 to 200 F leaving the reheater. As

expected, a vapor plune exists when ee ‘and nemddsty
“conditions eictate. During noderate weather, a ‘vapor plume’
frequently exists during night and early morning hours and
disappears as anbicnt temperatures increase and reappears in
' the evening.

While plume appearance is stin important and of. concera,
the experience with 1. D. fen blade deposits Suggests a cor-
pelling reason for plune reheating that kgs not apparent before.
It is doubtful that fan blade deposits can be avoided if reheating
is not provided. :
Boiler Operation

Minor nodifications vere made to the limestone pulverizer
78-

1511

% cininice rejects which were quite high ia early qntiaties
A nex feeder €rive was installed to give better contro) in
*the 1] to 3 rpo range needed for this systen.

No problens have been expericaced with the furnace ‘and
convection pass ef the boiler, with one exception, Buildup
of. deposits were found in the vicinity of stean aspirated 0,
probes which were backwashed with water. Thess will probably —
be changed to air cleaning probes. Fal) ovt. of solids teatenesé
in the air heater hopper requiring more frequent cuptying of
the hopper. This vas particularly troubJesone at half load
whem one scrubber was operated and gas velocities leaving the
air heater were low. Some modification to the air heater hopper
and to the removal system will probably ey SY

Future Plans

As of this writing, plans are to start ¥P the APCS about
June }, 1969. Kork on modifications is going ahead, but
construction trade ‘labor disputes may delay the completion of
this work. If delays are encountered, it may be necessery to
postpone the operaticn of the systen watil fall to avoid
possible forced outages of the unit during peak load periods.
| It is expected that a portion of the clarifier underflow
will be recycled to determine if additive loss can be* reduced.
A long operating period is needed to determine reliability of
the system and to establish operating and maintenance costs.

Sunnary
Operation of the APCS has revealed problems that were not

evident in the snall pilot plant which was operated at one of

-9-

1512

Detroit Feison'’s plenty. This in itself is pot surprising,
since the exirapelaiion fre= a snl) pilot plant to a full-scale
_ wait of the Meramec size cust be dene with considerable risk.
Combustion Enginecring and Union Electric recognized that this
would be a development preject and thet inevitable problers
would occur which would require design changes. To be candid,
we should say that trouble occurred where we aid not expect
‘trouble ‘and did not occur, as yet, where we expected it.

In the seven and one-half months since the systen was first
started, there have been 31 days. that the systen has operated
on coal. A number of modifications hove been ‘made, ‘Most of
the major problens appear to have been corrected, but more
operating time is needed to confirm this. The systen is now out
of service for further modi fications and ve ¥en to start up
again in June. : ; a ors ;

The systen has deanisusices that ‘it will remove the amount
of eulfer dioxide expected a) though complete and forma) accep-
tance ‘tests have not been perforned. Particulate renoval. has
not been determined. Although the system cannot be consideied

commercially acceptable at this time, a great deal has been
learned from this development project and both Conbustion
Engineering and Union Electric are optinistic about the ultimste ~

workability of the systen.-

An extended period of operaticn is shen in order to
establish the reliability of the system and to determine oper-
ating and maintenance costs. ‘After heving obtained this inforsa-
tion, we wil) be able to deternine the epplicabi li ty of the systca
for both existing and new lerge units. :

-)0-

1513

Reterence

Plualcy, A. Lv, Shidécn, 0. D,, Shutko, F. W., and Jonakin J.,
“Renoral of SO? and bust from Stack Gases" PROCEEDINGS OF THE
AMERICAN POSER CONFERENCE, Velume XX!X, 1967

Bibliography

McLaughlin, J. F. and Jonakin, J., "SO, Trapped In Full
Scale Syste, “ELECTRICAL WORLD, November 13, 1967

Jonakin, J. and McLaughlin, J. F., “Operating Experience
with the First Ful) Scale System for Removal of S02 and
Dust from Stack Gases", American Ppwer Conierence, April 1969

o2i«

'O D{AIIOLY VOT JO UOTICIG DowWesN Ze POTLeISUy Wo3shs TOsIUOD UOTanTIOd Ay :1 *BEy

1514

- —_.
pquanitiantinns 3 dss }
”~, © oe ad —— 3" — Pe - ‘
ane “<> r} —_—— a PCS
eager tw , y { —— ——_ : BSf iy. ‘

‘ ‘
. ‘y ‘ns

weet Tha aR | aA eT gig eres

/
ll
\ {

: % : ta
—. « d a Yay “ #12 yh tee fi moremter 0°. oee ©
ne ar TT oe pm “ne “ted pr Be pay SP ¢ ea ‘ ;
““Eiee TE A se 8 ee ee es Be i*

bbs Be hh eee oe’ Px ¥: ye ioe ES ,- 3 Ae $ 2 4 £° Mie, 4 * om :

. = ‘ of & “ pos - i 2 mig ns Oe . ‘

ie A

, fa =a . J oe id , i.

= ‘ 5 aime gh $i

— - st ‘te, a ae - pa

{ a. S “. : al et P {joe Ja ey 4) J

iy Me: ; es whe a ff - re ae

. ; = a, ° i

ene Po cet onl i ig. — = ot

afete,t i. Coe. f ee “ £

>} ae ST : Fae if

ots ‘ —— ¢

UT
il
i

> oe -

ee ee
~'

oe eee vee

wersks TeAouos, 29s Jo D}aemoyrs tz *Bhy

WSdcS10 OL

ror 2
fan onmusss "oe “Ft wus
UBits C- ig 7 ‘a Io
easy fo UZONVHOXS — | | | j
CNV ys Xs “avaH
16 TOA , Me He, oN
a: | used | ee a
- . O39 A | gly a. Sar aE: bd
i | neues LJ | Se
| TTT eee :
: re UIT ij Sv xovLs : » wieens
| UZLSINZO ee | ' bead
: a J aaa ZOVNUN »
bonis OL | ee oF oe

%

HM
—@

i

ifs |
tht > ;
o¢ |
|

"¢?

Caaieetatied

Deena ew
‘

{-

IP Pet A

’

atner,
¢

wy F

——_——

ret re eee

TV e

Fig. 4a: Overflow drain screens before modification

sereens

2S aoe SS OD Ot Om Ce om ees Se eee tim: Seere tere

2 8 .
oy PR. a
. 3 «s
syle. mh %
é

nen DON eS 8 ete
Sees

fter nodification

4

A) ,
oe oe Ol be wens’
’

‘
+
+ tye
oe aad
*
at
the

—a

é
bese ao ee ee eee
es

_ 7 . -

Fig. S$: Water table sodels of scrubber and duct work — a. show poor
. @istributicn; b. Close-up of inlet showing dead boundary lerer
condition; c. turning vane which eliminates boundary larer con-
dition; d. ladder vanes vhich e)ininate poor distribution uacer

bed; and c. Gver21) view vith modifications installed.

Ate Rib:
7 +
ale He i

: preetiyabigeedyss 3
yell i: lieu
AHH THE isaal HEE

iPEypL:

—

Hf cL
RATES P

iF
Ts |

PEERS

Jen. Dep. EXxHIsiT 13

June 7th

1966

Mr. R. H. Inman

ROODHOUSE FIELD

this field there is an estimated

HL) pey Her Be Pe
Sobcggesttess gegqedoat wis 52s
: - seit cttaae sagee tgs
5 ie is PLL ee 32 aa
aH RE TE i HL
ee BE PE Hividpe
srs “Sea pt 8 e-em
LPL abt lau ie Ha
aL iedyteas Serie HO

Sr Tee Heer

sett leiden

5 ie

ail
rT itis

rifitiin

aa

HE

ite

ea° sail

ite

La

Ei

Lift

53%

fi 4 443 | Hien

ByPiasiy
ties ll

tee Stu:

fal iy HT
a2 Ei al
peli 7.

REDS
283° 4 3 #8

BshE3
go ages Weenies offs

ict

ini:
pddbay tere He

fe: ia
Bg By o
ii Sheed

é 543 g232 iagt
iH iat ls ar

=

utiles fat ae

4 td Bs ie i

aba etapa ie aes ey BH
ft ie il ihe! He 4 ifs ,
‘ln Hf i

iH ae: waqaes Deer at e533

& 13is
la RAE an iis
HF

1525

would be 19¢, but if you include the Model 702 Kochring .
dragline, the cost per ton would be 23¢.

It should also be noted that on the list of options that
should come up before the Board meeting, those listed
beginning with Albert Bateman in Green County expire
in September rather than August as stated on the list.
If there was another Board meeting in August we still
would have approximately 90 days to decide on these 8
tracts. These represent 6 of the 8 tracts that we would
consider keeping if we intend to prospect this field further.
The other 2 that we recommend to keep—Hanneberg is
in the 5,000,000 ton area and the Kenneth Tillery which
we suggest we keep only 40 acres possibly could be
dropped and if anything developed we could pick these
up at a future date. In the meantime this would give
us approximately 90 days before the others were expiged
to pick up additional tracts wheré“we feel the greatest
potential lies and give us a better chance to rule on the
Roodhouse Field. I had only noticed that these dates were
wrong since we last talked about the Roodhouse Field.

Attached are 2 copies each of the analyses of 4 cores
taken at the Roodhouse Field. Also attached is an aver-
age of these 4 analyses along with the comparison study
of the No. 2.coal in other areas of Illinois.

We now have on file, Corps of Engineer maps and 15’
quadrangles of the area. °

DHE & BCJ/ah

1526

Kolbe Deposition Exhibit 2

“3

ae eae
Nt nt

“?

WN wr eee ne
Ss
ll

—
.

-~-

mitt

ii

a is

ay idl

1528

The use of this excavator in a pit with a shovel makes possible the recovery of coal with over-
burdens up to 100 fect. Three or four times as much material is moved in a month with
“wheels” as was moved with the draglines they replaced. The use of a “wheel” with: a shovel
permits the shovel to operate at its greatest efficiency. Drilling and blasting from the ledge
created by a “wheel” on the digging side of the pit reduces those costs because the material
moved to form the ledge does not have to be drilled or blasted. The much wider pits made
posible with the use of wheel excavator has improved the operating performance of the entire
pit including the coal loading shovels and truck haulage units. The “wheel” and a shovel work-
ing together can economically strip coal which could not have been mined before at a profit.

SAVLING COAL In order to reduce the cost of transporting coal from the pit to the
preparation plant, we are using larger truck haulage units than formerly. We have recently ac-
ayguired our first fifty-ton trucks which will haul about 505% more than the units they replaced.
2
PRESARATS 32. SF SGAL FOR 257.2) Modern industrialization makes
great demands on the washing, siz::g, and quality pre aration of coals. All of our mines are
equipped with preparation plants designed to meet these demands. Our two most recently con-
structed plants are of the new “heavy media” design. These “heavy media” plants provide a finer,

p SN i ad
~ ™ — }
- -.~8 -————— G :
-
ae
"ae, i
~
-o > -
p ¥ ~
Pe
. % *
- Dd =
zz
z -
re a is
R .,
; :
. — —s _ - _
° t
. a + .
-" ; . ‘ “. q
isthe - —~ 2 ~ a -
> hen tr 7 —,
™ ‘ iy . wo ~
ae. : = thee
16, 1989.

1547

Kolbe Deposition Exhibit 51
The United Electric Coal Companies - 1948 Annual Report

© sameness FIDELITY UNE, OvOvein, limon BUCK HEART MIME, Conton, Bimon CUBA MINE, Cube, tino
‘ RED RAY MINE, Freeburg, Mines SOLAR MINE, Ruthyile, Hingis BUFFALO CREEK MINE, St Chories, Ky.

ATEN YEAR RECORD OF GROWTH IN SERVICE

/ >» terest im coal, it may mever have oc-. ” power. In a handful of coal weighing
_ curved to you that, with the exception Iss than o pound these is ensugh power
of food and water, coal fe perhaps the . to raise a weight of 33,000 pounds sixty
most ianportant and vital product known | feet. All the potential power of our s0-
~ !. to man. and ie ‘our greatest and most ~ serve of oil and natural gas and of the

: dependable source of use energy. ° > . “water in our dams combined is only a

/ Even though you have an unusual in- © ' Our economy is designed to function on
#

~~. 2 Stit have more than a nominal effect on our projections and then only ~ :
@using the late years when the present worth factor is low. a

rt : We have made careful checks on plant and equipmest. Ta our
; operating results represent a reasonable expectancy from the

> equipment in use. ‘ '
Fos Our value of $23,446,225 as of December 31, 195) exceeds the i:
> Pook value of $16,902,703 of that same date by $6,543,522. The amount |
of $16, 703 is the sum of $16,321,169) and $581,534, the amount
” setually paid ea option contracts. If this excess were added to the —
ghastholders* equity as of that date, the total would have been =.
$26, 669 93880 i> apres : eaeiaginbs heat!
. Bint ob e.8s, aN id = ee Dy: re " . cae i> oa hs
es Stk Respectfully gubaitted, © x: ;
, GH ei ee ee Se: ys FF ie ee ete j

wi’

ae

——

- _ Or
4 at Average ... December
| | aS 1952 1258 for_i Tears 2B .° RR Raeiection for 37 Tem
Ae Production in Tons 900,360 1,077,608 iplh2y775 1,206,885 1,097,508 1,085,027 '15250,479 = $62,680 - 583,072 "_ 22,067,152 1,298,067
B. Total Cost of Production, Berton = Fer Toa Per Ton Ber Ton Eex Ton Per Ton ‘Pert Pert = Pert © ft Pe
he 1769 2.9520 $e e : a
————- awe ew ee ee oe ee ee ee ee
> tion 0.268% 2838 0.2921 042721 0.2880 0,2812 a. a ee eee “042280
mgd apa aeas x 303769 303203 $225 363350 Seat 380,595 $02,153 (750,359)

i
:
:
:
:
:
:
inet
:
:

3-3 Doprectation - * 92696 pa ee 041866 3. pees ey o-snee 0 wf f
G Gross Cash Generation. ‘ 2-: $0. 7... $0.9201 dy iz Beast ; $06
ee 2a a ee es = sea = (98,389) (#8025017) eee —

ge

:
f

17002 15.72 Vre88. Tho TAL09
: 28055 16.75 Eatin

35.91 18.42
17.86 22.10 20070 22.02 2.75 2329 Ze
38.92 2-88. 3647 Bek} 32.70 sd

Bi

- i A He . . - ; ; : .
Production in’ fons 2,251,077 gee SBS 2,351, 076 = |. 50435300
Batinated Gross Cash Generation ($2) 384,480. $1L0593 = 2,0057 | 527,532 140057

Iecs Reinvestrent . . ay oe : —e :
Ye Cash Generation orc oS GOCRaST aS #60057 mises ie

Present Worth Factors

Present Vorth as of 12/31/1959 ‘ $2,652, 625 : $14809,885 aie “ps, 00,08
‘£84 promint worth of Salvag> Valus PR pho I

Total Vi of Decondo ; :
‘Sen peau inn wae 17506

Myer
t
F
:

|

:

929,780 1,da7 a3 1,308,779 14327,086 2,248,951
oo ee a a Oe
6 : ,
es . * 'e
302879 : Stas 300582 30 303030
304509 . 301207 323643. 715 307605
‘Mies = 5 a Sie Oes75
' 002223 : 002455 0.3340
* cea : 063751 003162
a ae
$0.
«$865, 068) a ss G08). (6821,070) ‘(S8904285) ($905,208)

$1,384,821 eerie
2,855, ag 9209

Tale for Projection for 25 Years:

moat. 6,097,513 tons © $0.07 per ton, “426,826 -
| 23, 511,549 tons, Book Value 804, 037
> pees 0g ne ted at . - ree
2 per years
$9,126, 717 oe $2,011,308 4s total dy
Ascunea cost of Verking Capital 1s : Seance
1.25 percent of Sales’ Realization. 406, 430

B.AoT. ite

’ Production in fons

#15493, 522° fuiséesns”
- BNDB, 2 . $2, 6019
FS Depreciation ae Oehhg2 0.526
Sustained Depletion “Q2OUNS 2" 020256. 9.0762
_ Total ea | 33331 75 5 303893. =. . 302029
O, Het Sales Realisation 969685 2 oghg Ronne
Be Total Cost ‘ oe os 32029
me Pre Tax Profit — 06304 wey Oe 0%. 068719
7. Nct Profit after riz ohge ze cr ee . cee
--.. ADDa,:: .. . Stee ge at
B-3 Doprocintion 2 Oeh707 >: Oghh32 On 5285:
Sustained Depletion i 29,0966 ms oue
@, Gross Cash Generation ( $0 SD): (hoon ae ,
H. “Book Valnes, in $3 , : nn
+ Up». Coal lends
+: 2e.: Plant & Equipment
Se * York in Progress
foe
Golontar Year
119,569 209,199
Ror Ton dnount Per Tea
$2.6156 43, 505 $245980
le : % 0.
063779 82, 365 >) 3937
300540 ‘Ba057 320500
3.8895 pine :
028295 156,899 0.7500
Oe. ‘Toes STs?
(4157, 328)
¢ 12,187
162,365 ie
7,552
15012
27202
SONPUTATLON OF VAITES
‘Promustion in Toms oy 208199 *
‘Estimated Grogs Cash Generation $214,762 . - $1,0267
t of tal
Assumed cost of working capi ae 4

1558

EXTANT Z
‘ BAUER MEE
Expicotion for 12 Yoora ‘ SEPURATION OF vareg
A, Production in Tons Deh69 = (789,289) Produstion in fons 9,471,469
Be Zotal “re af Sremeation, , dent Rex Ton Sstinated Grong Gath Gneration $12,974,202 $1.3065
“4. “Oaete other thas bd, D4 ae Ce nw(ie25 porooat of Salew es come
= Sas rectation ao ——— yodihzas nak ‘s ene Fo
dts lien eecttoatten $4,725,212 $542500- ‘Present Vorth Factor,
3B. Zotal Coot Bee 3.6009, 12 years at 10 yorcent 0.5678
"Z. Foteral Incoxs Tax onde,
‘¥. Mot Profit after 312. passe: «|| ees Procaut Werth as efDeemnber 32 1959, $6,350,525,
ADD: gee (POLE ea oe dacant of ioventm==%
29 Beoreesticn “"2223,352" —* (0,185 renaining to te mis as 6?" aS
Ie. ‘Hod Prettt after JI? en .
A *. porcont of Rot zon Realisation 16046 — aides haus $50, ed _wrowt
a: cic ick sami x Pa: $3»8752450
“ 3 : o
f ‘Royal tyt or tons © ne $ 433,042
>) Foot 7739, Book Value $1,123,352
Necessary Reinvestment estimated at
9,471,469 tond © $0.06 per ton $ 568, 288 €
Estinated Original Investacnt in
Plent and Equipment = - saat
Estimated. Value, 12 years hence : "500,
Amcent to be depreciated $3, 068, 288
Estimated total Original Investment in Planté Bontyaens $4, 000, 000

Tnvestaent as of December 31, 1959 -. $2,046,920
Renointer of Tnvestaent in Plant and Zyxiynent |
“tq de made as of Decesider.31, 1999 - $2,953,080

Buckhsart,
Including
RRART

Book Valuos as of December 31, 19592 ph
oom lands, Feo $2, 220, 410

Tends, Purchase -

vies ope be ang t 2,806,

r

ho ae $5,071,173

eee Options 6
fetal... . $22,080,152

Projections:

4om=al Production 1,296, 057

Yoltoving & ard on per-ten besiss
Estimated Sales Realisation — $5300

$ 300,8R. ry 75037
2,986,955 aontnn

a 6,097,513
$5,502,153 $35,609,002

: wutoee $3-£209
Estinstod Total Costs = * 24833, BheR
| Eatinated Profit before) Dodoral 1.0919 066007 003512
Eotimated Profit after ) Income fax 0.7085 0.5800 0.2587
Zotimated Gross Cash Generation $1.0371 $2.0593 $0.4832
Percentage ef Bales Realization” .
* Recovered as Profit after FI? 15.64 19-52 6.62
Recovered a Gross Gash Generation 22.89 69 12.69
Paul’ Woir Company's opinion of
Value as of December 31, 21959 $9,160,413 $3,796,305 $3,463,939

FOOT NOTES:

(a) The total amount, : $870,693, of classification "General".
is allocated ty use UeE. Ce has not furnished break-down,

te) Of this, $29,000, there de ‘a Dalance Qut‘ef $19,500.
This dalance dus is not show under Liabilities on

the balance sheet,

$22,187

162, 365

Active Steel Buildings & _ River
Mineg Borgoe Fquiment foxminal Strip Unlexeround,
Bey oe
Be! 054 a | ee: Ul 8, 565,050
$18,224,519. G5, 300 $200,000 $150,000 $1,912,005 oe
399 685 1,840,510 27, 97. "682 Bisas or
859,035 2, 120,328 sie 122, 294

$20, 768, 040 $415, 300 $200,000 $150,000 $1,912,635 sist thecone

ZHACTIVE COAL, RESERVES
Book Valua, Payzonts Kcto on

Fo \-Canton Field $ 476,308 $492,073(a)
Inuustry Field _ 537,570 '78,825(d)
Gaylo 145, 866 -
leFlore County, Oklahoma 45,125 -
Buffalo =: 100, 000 “s
Caba 43, rs) -
Perry County teas mee =
Sotal Strip n7acter = $570,858
less — 22, 500(e)
Bet Book Valus $1,912,885"

1,840,520

1561

04
ae

1562 |
KOLBE DEPOSITION EXHIBIT 60

REGARDING NEED FOR ADDITIONAL STRIPPING
EQUIPMENT AT FIDELITY MINE

In the so-called Green Pit where we are currently work-
ing, the overburden is such that the 1650-B can
nearly all of it without any additional stripping equip-
ment. Toward the end of the field, a helper would be
desirable to maintain production and :

This Green Pit will be mined out within two to
and-a-half years. Beyond that, the estimated reserves
Fidelity that can be stripped is 23,000,000 tons.
gation of the three different areas prising
000,000 tons shows overburden depths and hard
requiring a helper for the 1650-B to mine it out
nomically and to mine all of the 23,000,000 tons. W:
out a helper, our production would be reduced
current rate of 180,000 tons per month to about 125,
tons, with a resultant increase in cost. Also, of this

tons

3

Ee
seeeiehed

estimates have been developed.

1. Bucyrus-Erie has a standard design and has built
a wheel for Peabody and one for Truax. It is high
enough for us, but for our purpose certain modifi-
cations of design seem necessary. They put a price
on their standard design of $2,500,000, and an esti-
mate on transportation and erection of $400,000.
While we don’t know exactly what the change in
design we would need would cost, they have indi-
cated that the engineering and other factors in-
volved would cost somewhere in the neighborhood
of another $400,000. So it appears we are thinking
about something over $3,000,000 for a Bucyrus ma-
chine in place and ready to operate.

[En

wheels at

B

ie

a

i

E

ed Hi hata

any capital charge for
Marion 5561. This is

cost, using our own
and ee canes
ro) -
include

total
and
, erection
from the

65388

way below the cost of

difficulties, we could
Erie.

today.

are within reason but for

still be

rE:
Hie

i

isi,

1565
felbe Dep.&x. ola

IG or

having its principal office in Chicago, linois, (hereinafter called
“United"), and ALUMINUM COMPANY OF AMERICA, s Pennsylvania
cozporation having its principal office in Pittsburgh, Pennsylvania,

(hereinafter called "Alcoa"), aE >

WITNESSETH:

WHEREAS, Alcoa desires to obtain options to purchase the
coal and coal mining rights in and under certain lands located in Perry
County, State of Illinois, together with all other available minerals
and mineral and mining rights in said land, and

WHEREAS, Alcoa desires that said options be obtained without
| disclosing the identity af Alcoa, and
: WHEREAS, United has indicated its willingness to obtain eaid
options in the name of United and hold said options in trust for Alcoa and_
thereafter at the request of Alcoa, assign and convey said options to
Alcoa, and :

WHEREAS, Alcoa shall, from time to time, desire United to
perform or cause to be performed certain prospecting, drilling,
| @xploration and other work on said lands or relating to said lands, and

WHEREAS, United has indicated its willingness to perform or
cause to be performed such prospecting, drilling, exploration and other
work, .

NOW THEREFORE, United and Alcoa, in reliance upon the
covenants herein contained, hereby covenant and agree as follows,

1566

intending to be legally bound thereby:

1. United shall undertake to obtain, in its own name and without
disclosing that it is acting for Alcoa, recordable and assignable options
for the purchase of the coal and coal mining rights, together with all
other available minerals and mineral and mining rights, in at least
Eighteen Thousand (18,000) acres but sot more than Twenty-Five Thousand
(25, 000) acres of land located east and nozth of Pinckasyville, Perry
County, Illinois as outlined in red on the map marked “Exhibit A“ and
attached hereto, paying to the owner ot owners of said land as consideration
for each option so obtained the sum of One Dollar ($1.00) per acre of land.
United shall, in so far as is practicable, obtain said options in such «
eee

"ese in writing, by Alcoa, each
option so obtained by United shall be in the form marked “Exhibit B",
attached hereto, and shall provide for the payment td the owner or owners
of said land, in the event the option is exercised, of a total purchase
price not to exceed the sum of Fifty Dollars ($50.00) per acre of land.

= (D United shall without undue delay cause each option so obtained
to be recorded in the appropriate records of Perry County, Miinois.

@ United does hereby acknowledge and declare that it will hold
said option in trust for Alcoa, and that United will not claim to have any
right, title or interest in said options to its own use or benefit. United
does hereby covenant with Alcos that it will, immediately after the
same has been recorded, convey and assign and deliver each option so
obtained by United to Alcoa or to such other person or corporation as
Alcoa shall in writing nominate or appoint. : |

——- ee

4
4 . “Ze
é

1567

©) At such time as Alcos shall designate, United shall cause
the optioned lands to be properly drilled on approximately one-half
mile centers and shall cause the cores to be examined and logged by
& competent consulting engineer. United shall cause the coal samples
to be analysed by Contmercial Testing Laboratory ia Chicago, Mlinois
and shall promptly deliver to Alecs the results of such analysis.
© nor defore the tenth day of each mouth, United shall
invoice Alcoa for, and Alcoa shall thereafter promptly pay, such
| chaxges as shall be due and owing to United by Alcoa oa account of
: performance hereundéz by United during the previous moath. ene
charges stall consist ofthe following: 4
: 4 ” de" Payments made to the owners of land optioned in
= eccordance with the terms hareol and the cost of
" * pecording the options,
" maployed by United solely for the purpose of obtaining
‘oO Aa amount which is equal to one and one-half times
the portion of the salaries of United's engineering
_"- gné land acquisition employees which is attributable
‘to United's performance hereunder on the basis of
| actual time spent by such employees in performance
” The actual cost of causing the drilling, examination
” and logging of cores, ant enatpets of samiphea to be
" Porloxmed pursuant to Article 8 hezect.

1568

B; Expenses incurred for meals, lodging, transportation,
eee : “

+ United oka, at any time upon receipt of written notice
from Alcoa to do so, immediately cease, or temporarily suspend,
the obtaining of options hereunder.

8. This agreement may be terminated by sither United o7
Alcoa by giving thisty (30) days prior written notice of euch termination.
9; In the event Aleos decides to drop the options acquired
under this Agreement, said options shall at the election of United
to Alcoa of all charges theretofore paid by Alcos to United pursuant
to the provisions of Paragraph 6 hereot, plus any yenewal payments

10, Motlees to United provided fas hares shal be deemed to
‘ be vrepesty given whed deposited im the United Sates mat registered ©

binding upon the parties hereto and their respective successors and
aseigne.

IN WITNESS WHEREOF the pastiss hereto have caused this
agreement to be excguted by theis éuly anthozined officers the day

County of God )

~~

s cle
cortify that on the 7” day of to prepare only to sicds of com, 24 ale x0.
Teo various othty sisos could’ be prcdzned at tho FléMity wekor. feta
would mike far e cheap end eoonceionl-to-riin wachar at tho Shakers poop
esticc.

Por a cénsclideted eerpeny, the lost Vinginin tomceo ose nob hav>
cS ENR purpesa 23 in the prosons feu: company, a3 in a comsolidatcsé -
ccapary $% wonlft bo only 2 {2fth of th tots? ortpat, trstoed of a third,
and if ecxtaia exponsicn thes u> aro eanterplnbirg weve prt throngh, +:
vould

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386414_0099%3A07. Public record. Not legal advice.
