INDEX ©

7 '
Opinions below
_ Jurisdiction - -
— Question presented. ¥s
Statutory and cBntract provisions involv ed..
Statement —_... *
. Reasons for granting the writ. !
Conclusion. _..—. -

CITATIONS _
Cases: :

ann —

/

——
mm

nS |

—
i]

Allied Paint & Color Works, Inc. v. United States,
No. 27236, C.A. 2, decided August 29, 1962-.

‘Blake Construction Company, Ine. v. United States,
296 F. 2d 393- S evacandadéagsnecedcesdl=covnses

‘Fehlhaber v. United States, 138 C. Cls. ‘571, certiorari

denied, 355 | Bette Te eegeaee epee oe .

H. L. Yoh Company v. United States; C. Cls. No. 435-
455, decided April 7, 1961_.-.------.-----------
Hoffmann v. United States, 276 F. 2d Ee
Kihlberg y. United States, 97 U.S. 398-..--.- .---
Langoma Lumber Corp. v. United States, 140 F. jue.
460 affirmed; 232 F. 2d 886__.-.......-.:-------.
Lowell O. \West Lumber Sales Company v. United
ae SD Ree eee error

L. W. Foster Sportewear, Co. ¥. United- States, 145 wa

Supp. ee oe aa cael oes eaain
Mann Chemical Laboratories, Ine. v. United States,
174 F. Supp. 563-..--.
_ M. Berger Company v. L ‘nited States, 199 F. ‘Supp. 22
McKinnon v. United States, 178 F. Supp. 913, reversed,
I Bi aso Kav 5 eden nsawe sends snny /
Ripley v. United States, 202 US. a. re —

were logical weaknesses in our position. We —

concluded, however, that the intent ef Congress
in enacting the Wunderlich Act was in accord
with our conclusion, and we adhere to that con-
clusion in this ease.’ | |

After a de novo trial, at which a total of fifteen wit-
‘nesses testified,‘ the court concluded that the evidence —
did not support the administrative decision. Ibid.

"In Volentine and Littleton v. United States, 1236 C. Cls. -
638, 650, Judge Laramore, dissenting, recognized the logical
weakness in the court's position and urged that a “common
_ sense application of the Act * * * , considering the back-
ground of the legislation and the administrative procedures
available to aggrieved contractors,” required that judicial
review be confined to the administrative record unless it is
demonstrated that because of the procedure employed by the
appeals board the contractor was unable to adequately present
his case. . '

* As the Government pointed out in the Court of Claims, by
‘ presenting only four witnesses before the Claims and Appeal
Board respondent deprived that Board of fair opportunity
to decide the'case on substantially the same evidence that had
been presented inthe Court of Claims. *

/
Bok 7
courts, have had oceasign to ‘consider the question
there raised.* AH of the courts which have passed
upon the question, with the exception of the Court of
Claims. are of the view that administrative: decisions
rendered under the Standard Dispute Article of gov-
ernment contracts are to be reviewed on the adrainis-
trative record and sustained if supported by substan-
tial evidence. If a plaintiff ‘sues, however, in the
Court of Claims, rather than in a district court, he
niay obtain a trial d¢ nore. , :

#28 U.S.C. 1946(a) (2) imposes a $10,000 ceiling on district
court jurisdiction ovee government contract claims. Accord-
ingly, most government contract litigation is in-the Court of
Claims It is highly! signifieant, therefore, that such a wide-
spread conflict has ey developed on the precise issue here
involved. a

* AMied Paint & Cdlor Works, Inc. ¥. United States, No, 272%,
CA. 2, decided Au vo, 1962: Welle & Wells, ine. vf ‘nited
States, 269 F.2d 412 (CA. 8): Lowell O. West Lumber Salex
vo nited States, 270 F. 2d 12 (CLA. 9); United States v. Me-
Kinnon, 230 F. 2d M8 (CA. 9): Hoffmann v. United States, 276
F. 2d 199 (CLA. 10)$ Langoma Lumber Corp. ¥. United States,
140 F. Supp. 460 (E\D. Pa), affirmed, 232 F.2d 886 (CA. 3):
Mann Chemical Lahakutovies, Inc. ~. United States, V74 F. Supp.
Met OD. Mas): ZL. W.\Foxts + Sportawear Co. v. United States 145
F. Supp. 448 (ED. Pa): (sited States National Bank of Port-
land +. United States\ 17% F. Supp. 910 (D. Ore.): United
States ¥. Hamden Co-kperative Creamery Co. 1x3 F. Supp.
M1 (ED. N.Y.\, afi , 207 F. 2d 130 (CA. 2); M. Berger
Company United States, C. Cls., No. #35455, decided April 7, 1961.

12

It has been brought to light in public hearings —
that it is the exception rather than the rule that
contractors in the presentation of their disputes

} } he + ht . . bhi } . ¢} =
. . J . : c .

is _the-exeeption-rather_than the rule that—eon-
tracters—in-the—presentation oftheir disputes
are afforded an’ opportunity to~ become ac-
- quainted with the evidence in support of the |
Government’s position. It is believed that tf
the standard of substantial evidence ts adopted
this condition will be corrected and that the
records of hearing officers will hereafter con-
tain all of the testimony and evidence upon
which they have relied in making their. deci-
sions. It would not be possible to justify the
retention of the finality clauses in Government
contracts unless the hearing procedures. were
conducted in such a way as to require each
party to present openly its side of the contro-
- versy and afforded an opportunity of rebuttal.
_ [Emphasis added.] [H. Rep. 1380, 83d Cong.,

2d Sess., pp. 4-5.]
_ 3. The overwhelming majority of formal govern-
ment construction and procurement contracts contain
a “disputes” clause comparable to the one involved
here. The Court:of Claims is the principal forum
in which contract claims against the.government are
filed. Such suits may also be brought, however, in the

, 1B

district courts (note 6, supra). Certainly, a uniform
rule .of procedure | should apply’ irrespective of. the.
forum chosen. The administrative. boards involved
and the parties to the administrative proceeding are
entitled to know’ whether the administrative trial is
merely a “trial run” or a proceeding in which the
parties are obligated to put in their entire case.

CONCLUSION

For the foregoing reasons,. it Is respeetfully sub-
mitted that the petition for a writ of certiorari should
be granted. ' | —_—

. wa ARCHIBALD 3 :
Solicitor General.
‘ JoserH D. GuiLFoyLe,
Acting Assistant Attorney General.
Joun G. LAvGHLIN, Jr.,
Harvey M. GOLDBERG,
Attorneys.
OcToBER 1962.

APPENDIX A

Gn the United States Cour of Claims

No. 466-54 .
(Decided January “14, 1959)

CARLO. BIANCHI AND COMPANY, INC. v. THE
'* * UNITED STATES .
|
|
Mr. Robert W. Nnoe for the plaintiff. Messrs. Robert F.
Bradford and William H. Matthews were on the briefs.
Mr. Martin E. Rendelman, with whom was Mr. Assistant
Attorney General George Cochran Doub, for the defendant.
Coad mel .

_

Ru
OPINION

Mappen, Judge, delivered the’ opinion of the court:

‘The plaintiff claims. that/in performing a contract with
the Corps of Engineers of the War Department, it en-
countered changed conditions within the scope of Article 4_
of its contract which caused it to incur extra expense for
which the Government should lve paid but did not.

The contract was made in July 1946. The plaintiff was to
build an eatthen dam across Canacadea Creek at® Alniond,
Steuben County, New York.* One item of the work was the
blasting through rock of a tunnel some 710 feet long. The
blasted area was to be approximately 17. feet in diameter
and the finished hore after the construetion of the concrete
lining was to be 13 feet in diameter. All of the work under
the contract was completed on time, the contract completion
date. as extended, being June 36. 1949,

The Army Engineers had om ns test borings. in ‘the area
through which the tunnel was to be built... The inv itation for
bids, upon which the plaintiff had acted in submitting its
bid, contained the
and liner plates to a distance of 50 feet in from
end of the tunnel and for such additional distance as
conditions would require.

within the tunnel was such that should be
made for tunnel The Resident
| ‘took the position the tunnel
ees Say we Saray ay Ser 5 ep Sem
eac

35 |

- In view .of the now known facts. with feference to
the dishodgment or failure of large areas of the tunnel
roof, a condition which could have been anticipated and
Ceatee bad Ge Cepesument cosets te Der ogee *
r permanent tun ection, we now in request
that the pita pees ae me the ~~ - of the
permanent tunnel protection, t r wi neces-
and obvious corrective eaiees inci thereto,
~~ neg some expense. ‘ , I
y we have the courtesy of 2 prompt reply granti
‘to us the above-requested y Ghorleation’ F “s..

21. The letter of transmittal to Colonel Seybold ofthe
copy referred to above, bearing the same date, is quoted
below : ¢€

We are enclosing for your consideration land record
4 copy of a letter which we have today addressed to Mr.
D. E. Mather, Resident Engineer. subject matter
involved is of vital importance to the orderly progres-
sion of this project. It is not our desire to engage in
controversies with the Government, but we feel very
strongly that the conditions now existing could have
been avoided had we been granted the eqtherity we
requested. ‘ Ps.

22. On May 5, 1947, Colonel Seybold sent the following
letter to the plaintiff by registered mail : _-f

of even date addressed to my Resident Engineer re-

qaditional p protection i the tunnbl.
permanent in the t

I have caused an examination to be made of the
contract documents and the circumstances and events
that have preceded your request and I have found as

a. Contract drawing sheet No. 7 shows foundation
exploration data that indicates the type character
of the material that would be encoun during the
tunnel driving and lining operation. -

b. Paragraph SC-7a of the a a
, Contract drawing sheet No. 24 clearly indicates:
tunnel. protection 50 feet back from the face of each
. poptalofthetunnel © 7° a,
_ Paragraphs TP 4-03 (a) and\ (c) of the specifica-
the ‘also describes and indicates the limits of. tunnel
'" protection “as required for distances of eaeney .
‘feet-at. each end of the tunnel.” This limitation to
_ hold unless directed otherwise. ee io oe,
- © £, Paragraph TP 4-02 of the specifications contains ©
‘ @ statement that “temporary tunnel protection shall be
provided. where required for safety of the workman.” .
Under the terms of the contractual requirements cited -
above, 1 consider that the Government clearly and in.a
very exact manner indicated the extent to which the
Government would require and assume payment for
rmanent tunnel lining. I also consider that sufficient
Sats was available for you to make a proper considera-
tion of the tunnel-pretection which would be necessary ‘
. fot you to install in order to provide adequate protec:
_ tion against damage to completed work as well as the
safety of your workmen.. — ie SO ee gs
' A review of the records of my Resident Engineer ~
- indicates that he consulted with your representative —
prior. to the commencement of the tunnel work and
advised you fully and correctly as to the extent of both
. the Government’s responsibility and your responsibilit
oo tunnel lining beyond the limits required aad:
i for payment. at cat
“ ee indicates that you were peri- ~. >
odically aware of the gradual deterioration of the rock
in the tunnel which did not commence until the.tunnel
was.completely holed out, yet _ apparently took ne~ ,
.action to protect either yourself or the interest of the
Government. - : " ae ee
-It is my decision, in view of the above finding, that no
further tunnel ee will be placed. at the expense. of
.._ athe ‘Government. Furthermore, my Resident Forces
will be instructed to = that sdecuate precautions .
__be taken to insure the safety of all personnel when your
. tunnel operations are ‘resumed. ' a AS
an Ss to ‘appeal my decision in the matter, you
7s vised of your rights of appeal within 30 days from ~
date of receipt of this letter as provided under the terms
. of Article 15 ofthe contract. ‘i hie ;

37

23. The plaintiff. on May 29, 1947; filed + a timely appeal

from the contracting officer’s. decision. ”

24. On May 26, 1947, following a cinleneies at Baltimore
ee with Colonel Seybold and his staff, the plaintiff wtote the

following letter to tl.e contracting officer:

Reference i is made to the letter which we addressed to
your Resident Engineer on April 23, 1947, and to your
reply dated May 5, 1947 (File +NABVK). p

On the oceasion of our recent conference with you
-and members:-of your staff at Baltimore on May 12, we |
pointed out the importance of proceeding with the in-

. stallation of the tunnel lining, and therefore requested

that the Contracting Gfficer give us an- indication of the.
type and character-of permanent tunnel protection so
that we could place orders for the materials.- In re-

mse to our request the Contracting Officer directed
t at we submit for approval a description of the tunnel

. protection which we would recor

After careful eonsideration, and consultation with
Cabot Construction Corporation, our subcontractor on

~ the tunnel-work, and with our Consulting Engineer, Mr.

Miles N. Clair, Vi ice President, The Thom yo & Licht-
ner &.Co., Inc., Boston, Mass., ‘and with: F: J. Cran-

\dell of Liberty ’ Mutual Insurance Company, Boston, we

are of the opinion that the minimum permanent tunnel
protection which we believe will-meet the requirements
of the situation - adequ uately, and for which we request
the approval of.the Contracting Officer is the use of the ~
same ribs and liner plates as were used in the installation
at the portals, for the entire length of the. tunnel. ;

Due to the fact that this is a situation requiring im-
mediate attention and decision on the part of all con-
cerned, we earhestly suggest that you give the subject
your immediate attention and’ inform us »romptly:
whether or :.0t the above proposed type of tunnel pro-
tection is approved.

In taking these steps to assure progress of the work

‘in the interest of the government, we do not. waive any
- Frights related to the appeal we are taking to the ruling
’ contained in your letter of May [5], 1947. :

25. On June 13, 1947, the contracting: officer sent the plain-

tiff the following letter: -

Reference is made to your letter dated 26 May 1947
wherein you submit a proposal for the safe protection
of your workmen in the tunnel. at Almond — under
years ontract No, W-30- 1s0-

» backpacking above the linerplates, and the cleanup of the

fioor of the tunnel in preparation for the concrete work.
Following the installation of the ribs and liner plates and
the backpacking, it was necessary to do a completely new
job of cleaning out the invert of the tunnel. After the

. cleanup of the tunnel in March 147, sultequent roc k falls
‘occurred and the work of the machinery such as crawler

tractors and trucks and other types of equipment going back
and forth throngh the tunnel and the spillage of material
used in backpacking, caused the flapr of the tunnel to dis-
integrate to a certain extent. All of such loose material had
to be remnoved and the invert washed down before the con-
crete could be placed. Plaintiff, knowing that it would be
necessary to concrete during the winter months, was re-
quired to anf did prepare its concrete batching plant for
winter work which required completely enclosing the plants,
putting in a couple of steam boilers, piping, making installa-
tions to protect the materials before they were incorporated .
in the concrete, and also making provision to protect the
areas after the concrete had been poured. The work de-
scribed was done between mid-October and December 15.

.. Plaintiff commenced the concreting of the Almond Tunnel
on December 15, 1947, arfd 1 completed it on May 8, 1948.

34. The formation and-+nature of the rock ~tructure of the
Almond Dam Tunnel, the logs of the borings and the draw-
ings, were studied and investigated by numerous witnesses
appearing voth for the plaintiff and the defendant. They
included geologists, consulting engineers and engineering |
representatives of both plaintiff and defendant. From the
testimony of these witnesses it is apparent that.vertical in-
tersecting fractures containing mud or clay seams were

_ found throughout the tunnel.

46 . :

35. The vertical intersecting fractures containing clay or
mud seams were the basic cause of the rockfalls throughout
the tunnel. The vertical intersecting fractures divided the
rock into vertical columns. : The bedding planes were planes
of weakness, not open fractures, dividing the rock into blocks
or slabs. Mud was washed down trom above in many of the
joint cracks. When the tunnel was holed through the sup-
port of the columns of rock was removed and they were
supported only by friction along the fractures, and as a
result many blocks and slabs fell immediately after the
tunnel excavation was completed. The weather reports for
the area of the tunnel clearly show that precipitation for the
months of March and April 1947 was very substantial, the
total precipitation for April being 5.5 inches. This resulted

\

in the ground being saturated and the mud in the fractures —

_ being saturated and with water seepage working through

the fractures acting as a lubricant, washing the mud enn

out, caused many blocks of rock to fall.

The excavating of the tunnel took. place during the
winter months—December through March, and during this ,
period the ground above the tunnel was frozen and the
' water was frozen so that the cracks did not loosen up
through the mud seams. This accounted for the smallness of

the rockfalls during the excavation period. The bad falls ©

took place in the spring. These falls indicated that the
tunnel roof was not stable.

36. Another indication of the instability of the Almond
Tunnel was its change in excavated shape during the period
from the holing through on March 12, 1947, to the time
the plaintiff installed steel ribs and liner plates. The rock-
falls during this period changed the tunnel shape on. the
roof, haunches and invert. These changes are apparent from
the cross sections of the tunnel taken by the plaintiff's engi-
neers shortly after the holing through and at later dates

before the installation of steel ribs and liner plates, thus af- .

_ fording a comparison of the rockfall over a period from the
_ spring of 1947 until the fal] of 1947. These cross sections
', taken at 10-foot intervals of the tunnel consisting of 18

sheets were examined by the plaintiff's witnesses and by -

the defendant’s resident eng:neer.

47

The evidence establishes that, as indicated in plaintiff's
exhibit 52, there were many places of flat roof where large
slabs of rock had fallen out and that these large blocks of
rock having fallen out left an irregular roof with much over-
breakage beyond the intended line,-and that this condition
existed practically throughout the tunnel. These conditions
“indicated that the roof was unstable between stations 21+ 00
and 27+ 10.

The resident engineer’from his examination of plaintiff’s
exhibit 52 admitted that the Almond Tunnel had changed
its shape from the time of excavation to October 1947. The
assistant resident engineer of the defendant admitted from
his examination of plaintiff’s exhibit 52 that there was a
change in the invert shape at various stations and that at
certain stations the rockfalls were substantial, ay in
a change in the perimeter of the tunnel.

37. Another inuication ofthe instability of the roof struc-
ture was the fact that it would not corbel and arch well.
~ ~Nornrally in a shale formation a rockfall from the roof would

have a natural tendency to corbel itself and form an arch.
_ This did not occur however, in the Almond Tunnel where

rock fell leaving a flat roof, thus indicating that it would not
corbel and arch well. The flat roof sections were potential
locations for additional falls.

38. The specifications and the logs of the borings indicate
that for the first 50 feet in from the portals it would be ex-
pected that weathered rock would be found. Beyond that
distance the logs of the borings and the drawings containing
the descriptive legends indicate that unweathered rock would

’ be expected to be found in the tunnel interior. The plain-
tiff’s consulting engineer, Mr. J. Murray Riddell, had pre-
pared under his supervision. plaintiff's exhibit 116, based
upon his investigation and observation of the Almond Tun-
nel, including the drawings, logs of the borings and specifi-
‘ations. This exhibit is a drawing @f the tunnel profile
showing the various tunnel drill-holes and whether the rock
expected to be found in the area of each tunnel drill-hole was

weathered or unweathered based upon the designations in .

the logs of the borings contained in plaintiff's exhibit 4-B.

The distinction between weathered and unweathered shale

661298 O- 62-4

48

lies in the difference of the fractures and the presence or
non-presence of mud seams in the fractures. Weathered
rock has fractures and mud seams whereas unweathered rock
May have fractures but joint fractures would be a minor
exception and would not contain clay or mud seams.

The specifications prepared by the defendant's engineers
"were predicated upon the information contained on the draw.
ings including the drill hole legends of weathered and un-
weathered rock.’ From this irtformiation supplied the plain-
tiff the defendant represented that the plaintiff could expect
that rock of an unweathered nature would be found through.
out the tunnel beyond the 50 feet at the portals. Drill Holes
Nos. 13, 31, 32, 33, $7, and ‘59 indicated unweathered rock in
' thisarea. Such rock if unweathered as indicated in the drill
holes referred to would be structurally sound and would not
contain vertical intersecting fractures containing clay or
mud seams such as were found in this tunnel area.
~s The defendant's geologist testified that the logs «f the
cores shown in the drawings at Almond Tunnel were inserwd
to apprise the contractor as to the sub-surface conditions
and admitted that when the logs of the borings show weagh-
_ ered and unweatheréd rock a contractor should be reasonably
entitled to believe that the logs are correct and that un-
weathered rock would be found where shown.

39. It is clear from the evidence that the concreting oper-
ation in the tunnel could only be accomplished by supporting
in some manner the roof of the entire tunnel during the con-
creting tv insure that portions of the roof would not fall into

the wet concrete. This was admitted by the defendant's.

resident engineer and his assistant,

40. The defendant's witnesses drew a distinction between
_ temporary and permanent tunnel protection as to the ohjec-
.tive to be accomplished. They say that temporary protec-
tion is used to protect workmen and ii is still regarded by
them as temporary though it is embedded forever in concrete.
_ As to permanent protection, it is used only to preserve the
shape of the tunnel.

41. Prior to the performance of the work under the con-
tract: in suit, the defendant had had The Arkport Dam and
Diversion Tunnel constructed at « Tocation about four miles
from the Almond Tunnel. The rock in the tunnel at Arkport

49

contained more sandstone which is stronger than the shale
at the Almond Dam. The bore was 8 feet in diameter
(finished bore after ing). In the contract for the
construction of the A Dam and Diversion Tunnel,
the defendant specified that tunnel protection in the. form
of steel ribs and 2-inch wood lagging would be placed if in
the opinion of the contracting officer there was need for
such protection. The need at Arkport must have manifested
itself and the contracting officer so opined because such
_tunnel protection was installed throughout that tunnel. Mr.
_ Mather was the defendant's resident engineer for both the
Arkport and Almond jobs but despite the larger bore, ; corer
rock and shale at Almond, he withheld a recommendation
for the installation of steel supports for the center 610 feet
of the Almond Tunnel. |

42. Plaintiff prepared its bid on the basis that ‘the sub-
surface conditiens ir. ‘Ye Almond Tunne! after excavaticu
would be such that the roof-ef the tunnel would be suffi-
ciently stable ¢o permit plaintiff to-concrete-line the tunnel
without the necessity of first installing permanent tunnel
prvtection beyond the 50 feet at the portals. The flefendant
accepted the bid on that basis. The vertical intersecting
fractures containing clay or mud seams found in the tunnel
and the resulting rockfalls after the holing through of the
tunnel, making it impossible to concrete-line the tunnei
without first installing permanent tunnel protection throug!
out the tunnel, constituted unknown Conditions of an un-
_usual nature differing materially from those which plaintiff
“was justified in believing did exist and from those ordinarily
encountered.

43. The steel ribs installed by the plaintiff in tunnel
beyond the 50 feet at thé portals which had to ‘be left jn
place were embedded in the concrete within the neat line.

44. Plaintiff was ready to start the concrete lining of the
tunnel by May 1, 1947 in accordance with: its progress
schedule and had all necessary. plant and equipnient avail-
able either at the job site or within ready access to the job
site. The plaintiff did not have all of the equipment on the
job site because it was evident from the condition of the tun-
nel that it would be necessary to install permanent tunnel
protection so that plaintiff would not have been able to start

z enid i in his is letter: of transmittal :

ae

|

| siainttie by May 1... Plaintiff. reslized that it would. .

unable to start any concrete work ‘i in the-tunnel auntil: after
permanent tunnel protection had been- erected.‘ Plaintiff.

‘knew that effecting delivery of the supports after obtaining ©

approval for their installation and the work of; installing
them would take several] months. - |" ve

” The- resident -engineer admitted that-if the plaintiff had
had all of the concreting equipment on the job in April 1947,

the plaintiff could not have‘used it, because the plaintiff could

not concrete-line the tunnel without first — in’ pro-

"+. tection, which he termed temporary... - a
>. . 45, The acting district engineer, on Peweary. 10, 1948,
‘transmitted to the Chief of Engifieers, U. S. Army via the

Division Engineer, North‘ Atlantic Division at New York,the ~
contracti cer’s findings of fact, the contra¢tor’s appeal,
contractot’s comments, and his own comments, which con-_

tained a recommendation that the: contracting officer’s de-

* ‘cision be upheld an and thatthe claim for an\extra payment ‘
be denied. Following the above recommendati n, the acting

. . ° _@ 8 2.
“1 If the appeal is. sustained, ‘the con r would. .
be entitled to Pde from the ‘Appropriatio 1x3113
_ Flood Control, Genéral in the amount of approximately
_ $9,000.00, i. * if paid similar to payment’ under items
il nd 1 and would open the possibility for additional
claims for overbreak ahd contingent items throu
the. tunnel. This ‘is a continuing contract and
have nat been ah pees for payment of the instant
claim,
a | te a a or %

a oe

_ 4 On the Division Engineer by dendorsert \ |
ment to the mentioned in the preceding finding;

‘gent it on to the of Engineers concurring in the rec-.

- . ommendation of the District Engineer. . His endorsement ee

began “This appeal, involving approximately $9,000.00
¢¢°” That figure had been mentioned no where except in
the quoted portion of the preseding finding. ~ :, .*
47. The Corps of Engineers Claims and A peal Board on
Jus 1, 1948 held-s hearing on the Piet ‘peel. Wit.

~ nesses were heard on belt of the plaintift and the Govern-
"- ment. ©.
48. On: December 14, 1948, the plaintiff was wot ified of the

adverse: action by the Corps of Engineers Claims 3 and-Ap-.-
péal Board and. the Chief of Engineers upon. the plaintiff's —,

appeal. .

49: From all the evidanie: of record, it is foynd: that the 4 ;

failure and refusal of the resident engineer to recommend
and of the contracting officer to direct the installation of —

_ steel arch ribs and liner plates caused a disruption of the ~

sequentes of operations, as well as delay in the min
ance of the work by the plaintiff. It required that
'. ereting operations, . which the plaintiff could, and: would

bate performed in warm weather, be Secomplished i in whee

eather with resulting loss of efficiency, -

50.’ The finding as to the extent of such: delay is ime
for later determination.

“CONCLUSION oF LAW

Upon the. handing findings of fact, which are made a —
part of the judgmént herein, the court concludes as & matter. _

_ of law that plaintiff is entitled to recover and judgment will

determined a to Rule 38 (c).”

be entered to that effect. ales amount of — will-be re

3
«3

"APPENDIX B

gn the Gnited States Court of aims

No. 166-54 . : ww

(Decided May 9, oy a= y /

CARLO BLANCHE AND'COMPANY, INC. v. THE
UNITED STATES .

eneral William /]. decreas for defendant.
at’ INION : a
PeeeCourione: Hithe court's opinion of ass 14. 1959
(144 Ct: Ch S00). it was decided that the plaintiff was

1. Mattie en for plaintiff. Robert W. K noe vad |

Robert F. Bra gers briefs.
Gerson Bo Nrawer, with hom was cdxadatiant Attorney ;

entitled to dn equitable adjustment for the cost of installing ef - |

_ permanent supports in the tunnel, and the case was remanded
to the Trial. Commissioner pursnant to Ritle o8(e) to
determine the aniount. : 2

‘The Trial Commniss —_. now reported that Items 2

through 7. both inelus%? and Tten’ 16 were reasonably
_related to the cost of: inst: tling the tunnel supports and the
‘damages for the delay ine lout therefo and as a result of
the’ disruption to the bea liane eof. the contract work. The
court agrees. with: the Trial Cominissioner tliat the phan
is entitled to recover for such items, But the cotirt ts ‘of the
opinion thet the pkaiitiff rs calso entitled to reedyer its profit '
oon the cost of installing the’ peymianier: ried SApports and
the work ine ident thereto, whieli are Ttems £4: Yoand 16.
listed in finding 5 of the Conmngissioner’s reports 2.5

defendant, there Was jwéluded 15 percent protit before over

’
.

/ i.
: yi i Bg
ie ; + vA
a : ae

In the plameiths fet 1 which was. accepted by.

i

~
t
cas =
ae
- . _
° ~
=
« \
-

a3

head, taxes and insurance. Plaintuf is entitled to the same

profit on. these items. With the addition of this profit, so
computed, Items ; 3.45 and 16 amount to the following:

Tiein So ¢ Pitditigs Us) aes ; . EMS, 475. ai

Item 4 (Finding Sz). Teena FF
Item 5 + Finding 34)- pas Tae Bee
Item 16. (Finding 0) roe ners Sees Se |

The amount of recover v for Tye Min 2.6 and Tas fou. | Ios:

: the ‘Trial OlAMIssioner and ap proved by the court, is as
follows: . :

. 6
~ ~ Item 2 (Finding 26) > * a _ $8, 442 ON
™ Htemn 6 CF inding 261°, i ; ST IMM. ue

-- Item 7 ¢Pinding 38) . VAS T76 on

Items 2 to Toboth inelusrve. sind Prena a6 as thas amended,

amount to SPE616.56. which reece a Is entitled to,

-

. reeover.
P . Plaintiff ix. not “yahiiied to recover he additional items
elaimed in its amended petition filed March 9, 1959, for the

“reason that the additional’ items claimed therein have no —

relation to the cost_of the-imstalation of the permanent.

ing on the-items allowed abave by. reason of the exechtion
by. the court in its opinion filed on January 141959,
. Judgment willbe enteréd for plaintiff and agair-t the
e defendant in the sume ¢ f SIAL T36.
. Itisso ordered, . loft

as ° - 4 if
vs * PENDING, . ol I} ONMPT ebay ' ' ,
a 3 . ‘ Pe
a 5

! eet “The Cormurt, having = steered Age evic Mehrees the re poet of

Trial ‘Commissioner William Bo Quay. aud the briefs and’

argument of-counsel, makes et Of fact as, follows:

nto between it and the United State. through the Army

Engineer Corps asa flood conte! project. The phuntiff was.

paid about three and one. ‘ alf million dollars for the work,
cis sustaining, i net les~ of S27 000,

were

additional work: done and reisibursement for the increased

e. cysts Occ rasioned by Covermment delves and other: increased |

wide

4

tunnel supports: nos the plyintitl forec led from. na .

of the release, his nietter having heen heretofore determined

1. The plaintiff constructed an ‘earthen. dam and related |
works near Hornell.|New Vouk, persuaat te coutrset entered”

2. This action was nase to_recover “compensation for

Qos

P in

iy

‘costs * * *” due to the failure on the part of the defendant
to author'ze permanent tunnel supports and liner plates in
the tunnel which had been blasted through rock for a distance
ofTiifet. ©»: --
- §. The origingl petition claimed damages totaling $259,-
721.87. This total was made up of the following items
’ claimed : ae
Schedule of Plaintiff's Increased Costs

1. Cost of Removing Extra Overbreak During Original

TREE TE encncencosensccessccsssnnnbeoce . $1,082 7%

2. Cost of Removing Fallen Rock and Extra Rock to Io-
vert Subsequent to Completion of Tunnel Driving

ERTS EE Se eo PE a 9, Olin
3. Permanent Tunnel Supports Installed After March 25,
;, Sei Ra aeidiinnniaehs es.)
4. Backpacking Installation..__..........--.-----....-- 24, OT¥. 15
_5. Additional Concrete Placed__~_.--- sehen cibnicemern 11, 200. 00
tt. Heating Costs—Winter Concrete_____....._..._____- 45, 853. 08
7. Loss of Efficiency—Winter Concrete..........._____ 18, 560. 00
8. Excess Supervisory, Engineering and Administrative
Labo:—period 1-16-49 through 6-30-49____..._ _-_ 35, 250. 01
%. Cost of principal Items of Plant and. Equipment used
and Maintained on Contract after 1-16-49___._.____ 58, 118. 23
; : _ $283, 425. 75
(15% allowance for profit on itema 1-8, incl.)....... 26, 296.12
_ os e $250, 721. ST ’

4. The case proceeded to trial on the issue of liability.
On January 14, 1959, the court decided that the plaintiff was
entitled to recover, with the amount of recovery to be le-
‘termined pursuant to Rule 38{c). Finding 49 of the court
reads as.follows: 7 2

From all the evidence of record, it is found that the

_ failure and refusal of the resident engineer to recommend
and of the contracting officer to direct the installation
of steel arch ribs and liner plates caused a disruption of
the sequences of operations, as well as delay in the per-
formance of the work by thesplaintiff. It required that
concreting operations, which the. plaintiff cotild. and
would have performed in warm weather, be accomplished
in winter weather with resulting loss of efficiency.

5. On March 9, 1959, after leave granted by the court. the

plaintiff filed its second amendcd petition which increased

'
)

ee ee

’ a ' 55

the damages claimed to $680,066.01. This total was made up
of the Smoving! items :

Schedule of Plaintiff's Increased Costs
BY end cl BEA TOTS Pee
2. Gost of Removing Fallen Rock and Extra Rock in
Invert Subsequent to Completion of Tunnel Driv- —
Le an eee
8. Permanent Tunne! Supports Installed After March

:
é
5

EE Oe On me
4. Backpacking Installation__---_.-~_- Aiceminemenina .--- 29,392.12
5. Additional Concrete Phaced__-._...._--.-.----.---- 138, 607. 96
6. Heating Coste—Winter Concrete____.._...-.-.-----. 87, 189. 29
7. Loss of Efficiency—Wintér Concrete_-____..._.--._- 15, 776. 00
& Bxgtes Supervisory, Engineering and Administratiye .

Labor—period 1-16-49 through 6-30-49____.__--- 82, 367. 87

9. Cost of Principal Items of Piant and Equipment used
and Maintained on Contract after 1-16-49_..... © 49,400.51
10. Stockpiling of Impervious Material From Spillway
Excavation, and Later Re-excavating and Placing .
_ same in the Closure Section of the Dam Embank- sail
GEE ncannanesncndes atcnnmessnnsscadcnseusnsctioe 8. 261. 80
11. Excess Costs of odbintaising and Operating Earth
Handling Equipment in Construction of Dam Em-
ee
12. Excess Costs of Supervisory and Engineering Per-
sonnel Employed in Construction of ead Embank- ve
“GANGES crnnncleccqccccctocedacceccencesssecscosee 21, 1N6. 13
18. Salary of Assistant | Sassstatendans in Charge of Con-
crete and Structures May 1, 19480 August 7, 1947 .
(during which period no concrete was poured) Plus
Loes-of his Efficiency During the Period August Ze .
1947 to October 14, 1947_----------------------- 8, 116, 57
14 Cost of Maintaining Equipment for Concrete Opera-
‘tions, Idle from May 1, 1947 to August 7, 1947; also
Loss of Efficiency of such Equipment During the ;
’ Period from August 7, 1947 to October 14, 1947_--- _ 31 257. 03
15. Lose of Efficiency—Winter Rock Excavation for the
Spiliway December 5, 1947 through April 15,1948.. 14, 315. 89
’ 16 Engineering Consultant's Services re Type of Perma- ~~
nent Tunnel Protection Required Prior to Concrete

SAIOND deine patiiecccccetnceeesstapesseccocns um see
*
9600, 091. 55
(19% allowance for prodt on items 2-9 and 1-18
tuct ) : ------ 80,974.46

~——

6

pO a Tt NEE ON ©
ance thereof by the defendant, the 37th and final estimate -
was prepared by employees of the Corps of Engineers for

signature by the appropriate officer of the plainuff. It
showed a balance due plaintiff of $12,236.56. This was re
turned, signed by an officer of the plaintiff, together with «
release executed on behalf of the plaintiff which provided
in pertinent part as follows: '

Now, therefore, In consideration of final B nn go
under such contract in the amount stipulated above, the

——- Contractor hereby re the United
States of Ameria, its officers and from any and
all claims and demands whatsoever arising under or by
virtue of said contract, except as follows:
The contractor ress its iow to pursue Satine,
through appropriate channels, the subject matter o
> the various claims erg! to the Corps of En-
Claims and Appeals Board and docketed be-
that Board as A No. 14. The contractor
reserves the right. to pursue its ‘claim for
ing out of the use or non-use of
w Area Ne. 3; and also its claim
reason of the Government's
the contract the Ripra
i for placement in thé Rail

a

a
i

Executed this 1ith day of February, 1950. .

Thereafter, on March 9, 1950, a check in the sum of $12,-

» 736.56 was issued by the defendant and paid to the plaintiff.

This included a $500 amount which had been withheld on an
earlier voucher. _ c

“ 7. On May S, i47, the contracting officer had sent to the

plaintiff by registered letter his decision as to the installatign

of tunnel supports in the 610 feet of the tunnel which pro-

vided in pertinent part as follows:

It is my decision, in view of the above findi that

no further tunnel lining will be placed at the pont of

the Government. Furthermore, my Resident Forces

will be instructed to ire that te precautions
be taken to insure the safety of al] personnel when your
tunnel operations are

If you wish to appeal my decision in the matter, you
_ ate vised of your rights of appeal within 30 days from

A

r 4

57

date of receipt-of this letter as provided under the terms
of Article 15 of the contract.

& The plaintiff on May 29, 1947 appealed this decision of
the contracting officer by addressing a registered letter to the
Secretary of War in the following terms:

In connection with the provisions of Article 15 of our
contract with the War Department for the construction _
of Almond Dam, we herewith appeal from the decision
of the District Engineer undér date of 5 May 1947,
wherein the District Engineer ruled that “no further —
tunnel lining will be placed at the expense of the Gov-
ernment”.

We respectfully request the opportunity to submit
evidence and a brief in support a our appeal at the ap-

_ppropriate time.
é ill you kindly acknowledge receipt of this-appeal !

9. The above appeal was yyy with the Corps of Engi-
neers Appeal Board as Eng. C&A Board No. 14. After

~ much documentary information was submitted and a hearing

requested, a hearing was held on June 17, 1948 by the Board
in Washington at which plaintiff was heard by counsel and
the testimony of its witnesses. In his opening statement to
the Board, Charles A. McCarron, plaintiff's attorney, stated
in pertinent part as follows:

For the purpose of the record, I am Charles A. Me-
Carron, counsel for ——. Perhaps a brief state-
ment, may it please the Board, of the positica of the
appellant may be helpful in following the evidence as
Wu propose to present it. In many respects there are no
substantial differences bet ween the Government and the
contracter on certain of the basic facts that will elop
in this case. Mr. Fox has clearly stated the position of
the appellant to this extent that the appellant has lined
this entire ‘unnel with ‘steel liner plates and appears
before this Board asking in equity and good conscience
that it- be reimbursed by the Giovernment for the in-
stallation of these steel liner plates which the contrac- .
tor felt were absolutely necessary in order to line this
tunnel and complete the tunnel job because of the
character of the rock that was encountered in the course
of boring this tunnel, rock which could not be deter-
mined by the information available on the contract
drawings and cores that, were taken by the Engineers
prior to award of this contryct/ * * *

58
- 10. Asmay be seen from the cost of performing the work
of constructing the Almond Dam, and its related works, it

was a large undertaking. It required excavation of material .

of various kinds or classes from either borrow areas or cuts

including rock and placement of such of the material as was -

suitable therefor into embankment. In round figures in ex-
cee of 2 million cabic yard&of material were excavated

(aome of which was unusable and therefore wasted or thrown |

" gside) and alout one million six hundred thousand cubi
yards of material were placed in embankment. .
11. The contract provides in part as follows: |
Azriciz 16. Payments to contractor.

. ° °° "" @ e . *

(d) Upon completion and acceptance of all work re-

=— hereunder, the ampunt die the Contractor under ~

is coptract will be paid upon the presentation of a
after the Contractor shall furnished the Govern-
ment with a release, if required, of all claims against the
Government arising under and by virtue of this contract,

‘ other than such claims, if any, as may be specifically
excepted. by the contractor from the operation of the
release in stated amounts to be set forth therein.

* * s *
‘12. The specifications provide in part as follows:
, » * 2 - + *

SW-2. Principal Features. The work to be per-
formed includes the following principal features:
: (1) Diversion and care of stream during construction.

(2) Construction of approximately 1 linear feet
of earth dam.

(3) Construction of outlet works, consisting of intake
structure and operating house, concrete-lined tunnel,
stilling basin, and approach and outlet channels.

(4) Construction of s:ddle type —e, consisting
of concrete ogee spillway weir, a concrete-lined apron,
and approach and outlet channels. to

(5 Constrection of steel service bridge.

tf Construction of railroad protection embankment.

7) Relocation of railroad except ballast and track
~~ (8) Relocation of highway including embankment,
temporar) grave] pe rail and guide
(9) Construction of gravel-surfaced access

properly executed and dul ified voucher therefor,

- 59
10) Construction of lighting and power system.
~ (11) Installation of materials and equipment fur-
nished by the Government. _

The above general outline of 9 features does —
not in.any way limit the responsibility of the Contractor -
to perform all work and furnish all plant, labor and
materials required by the specifications and the plans
and drawings referred to therein.

. o * ° s

GC-5. Progress Charts, and Requireménts for Sun-
| day, Holiday and Night Work. a. The Contractor shall .
within five days or within such time as determined by
the Contracting Officer, after date of. commencement
‘of work, prepare and submit to the Contracting Officer
for approval a practicable schedule, showing the order
in which the Contractor pony to carry on the work,
the. daté on which he will start the several] salient fea-
tures (including procurement of materials, plant and
equipment) and the contemplated dates for completing
the same. The schedule shall be in the form of a
progress chart of suitable scale to indicate appropri-
ately the percentage of work scheduled for completion |
at any time.. The Contractor shal] enter on the chart
the actual progress at the end of each week or at such
intervals as directed by the Contracting Officer, and shall
immediately deliver to the Contracting Officer three
copies thereof, :

. The Contractor shal] furnish sufficient forces, con-
struction plant and equipment, and shall work such
hours, inc re night shifts, overtime operations and ~
Sunday and holiday work, as may be necessary to insure
the prosecution of the work in accordance with the ap-

roved progress schedule. If, in the opinion of the
Sealenclin Officer, the Contractor falls behind the
progress schedule, the Contractor shall take such ste
as may be necessary to improve his progress and the
Contracting Officer may require him to increase the
number of sh: ‘ts, and/or overtime operations, days of
work and/or the amount of construction plant, all
without additional cost tothe Government. _ )

c. Failure of the Contractor to comply with the re-
quirenients of the Contracting Officer under this pro-
vision shal! be grounds for determination by the
Contracting officer that the Contractor is. not prose- _
cuting the work with such diligence as will insure
completion within the time ified. Upon such de-
termination the Contracting Officer may terminate the
Contractor’s right to proceed with the work, or any

o

60
enpatable rt thereof, in accordance with the Delays-
a rticle of the contract.

40-8. Protection of Material and Work. The Con-
tractor shall at all times protect and ergy ae all ma-

terials, supplies and uipment of every
may

(including 'P Be oy Pw be Mme fur-
shed or o ) end all work performed. Al! reason

able eae of the yom Officer to inclose or
a. protect such ll be complied with.
termined by fencting Officer, material,
; aieuee tuple and work performed are not ade-
quately protected by-the Contractor such ry may
be protected the Government and the cost thereof
may be charged to the Contractor or deducted from any
. popapents due to him.

Speci Conprrions

SC-1. Commencement, Prosecution and Completion.
a. The Contractor will be ired to commence work
‘ Ser rary oy Aer pal calendar ee cee after —

date of receipt by of notice to to
said work with faithfulness and cnet andl 6 cum
plete the-entire work ready for use not ot later than 90 900
‘ paper wooly after the date of receipt by him of notice
wre! i preeeee. The time stated for completion shall in-
~ —_ clean-up of the premises.

time for completion of the contract
vit be mses Gaeeemene time lost due to flood -
re poloetye Sy wteped pow ba met oy result of
the stream ve and overtopping upstream
cofferdam orovided it it is built snd mnabitelned as speci-
fied in "Seciion I ‘of these specifications. No extension
of time will be granted for completion of the closure
section of the dam embankment which shall be on,

os, leted du the season in which it is st
ab ragrapk TPS01d) No extension of fime will be
made tet of the protected area after the time
fixed pa completion of the contract plus any authorized

extensions thereof or where the of the work is
due to fault or negligence of the Contractor, as deter-
mirted by the Contracting Officer. Time extensions al-
ptr gnc. The phage oe wh a) w= when
lad aul dase eouiins the day when

watering and clean-up ve been suffi-

! clentiy com to permit ‘Toutes of work within

/

61

the protected areas: provided that the work of: un-
wateritg and clean-up has been prosecuted in as rapid
‘ aft diligent a manner as practicable. Any extension
of time granted,the Contractor due to flooding shall not

* . be a basis of a claim against the Government.

¢. In the event that the total amount actually due the

Contractor for work performed hereunder exceeds the -

total estimated amount due under the contract as set
forth in. Article 1 thereof, the time for completion will
* be extended in pperine that such exces bears to

the total estimated amount due under the contract.
Should the total payments hereunder be less than the
total estimated amount of the contract, the date of com-
pletion as specified in paragraph a above will not be
affected. ;

SC-2. Liquidated Damages. \n case of failure on the
part of the Contractor to complete the work a ithin the
time fixed in the contract or any extensions thereof, the
Contractor shall pay the Government as liquidated
(lamages the suin of $250 for each caleuwlar day of
delay until the work is completed or accepted.

7 . *

SC-7. Physipal Data.
. /«

¢. Transportation Facilities. (1) Highways. State

Highway No. 36 grosses the dam site and is to be relo-.

cated in part under this contract. For protection of
highway traffic ‘during construction, see paragraph,
TP1-0. ~~ __.

(2) pp tian 2 Railroad passes the dam
site and is to be relocated i part under this contract.

The Erie Railroad and the Pittsburgh, Shawmut and:

Northern Railroad serve Hornell, New York. The rril-
roads report sidings at Hornell for the accommodation
ximately 190 cars. The Contractor shall in-
. vestigate the availability of sidings both at the site of
the work and elsewhere and 1 make all
arrangements with the railroads for the delivery of ma-
terials and equipment: For the protection of railroad
. traffic during construction, see paragraph TP 1-04. |
. > . . .
SC-19. Protection of Existing Structures. U’tilities
and Work.. a. The Contractor shall protect all existing
structures, utilities and work of any kind against damage
or interruption of service. Damage or interruption of
service resulting from failure to do sw shall be repaired
or restored promptly by or at the expense of the Con-
tractor. tits

‘ : 62
sir and water lines existing on site at t poder
Commencement of work under the contract. ‘All neces-

er not less 30 days prior to the date —
val. Where possible, utilities will be~

removed well in advance of construction operations, If,

ce 0
of the 30-day required notice Feried,
ys in

relocated by their owners cause de

' the con work, an extension of time for completion
work will be granted equal to the extent

' of such delay
be 5 esis of asim. inst the Government.
SC-20. Damage

.. responsible for

all

\

satisfacti

to Work. The Contractor shall be

work until completion and final ac~

compensation for the repairs of that
t work for which there are Sotgutoble

ma

. a sta8 8 s
° . 2°
‘ ‘ 4,

that such extension shall not”

.

tracting Officer -

“the cause of

we

63 |
SC-23. Work Areas. a. The unds, cnmpentadi: 5
ights-of-way and other ri aedenuery in the opinion
of the ening Olas er for the work under. this con-

tract, including those needed for access roadd, borrow
its and my em will be furnished by the State of

ishing rights-of-way, eas ments, etc.,
but in case the furnishing of - yptee - way.
causes 4 in prosecution of the sated the Contrac-

‘against the Government. ;
+ @ ® . _— * ? ‘ =
+ SC-24. Unwaterjng Wor is. Unless otherwise
specifically authorized, all permanent structures shall be
constructed -“in the dry.”: For this purpose the Con-
"tractor shall provide such cofferdams, diversion channels, -
' drains (including drain tile and French drains), flumes
or other temporary structures, and such pumpsand other. .~
equipment as may be necessary for unwatering founda- .
tions and work areas not included within the scope of
care and diversion of stream as ified in Section 1 of
Part IV of these specifications. Such structures shall be
subject to the approval of the Contracting Officer, but
; sa will not relieve the Coritractor of re-
, — ity for the-adequacy of the work. Upon com- —
pl ion of the work all such temporary structure’ shall _—
_ be removed-from the site. Under ee
ch in-

_ > with concrete after serving the — for whi

. tended. . Separate payment wil] not be made for pump-
ing, iding and removing any tempo protective
' works and we speci ve, and plugging un-
derdrains, but the cost ‘thereof shall be included in the
contract unit prices for the various items of the perma-
_ Mentwork, = “ : SS |
ae e «£2 ie Lie a
SC-27. Cooperation With Other Agencies. While
Ss _ under ye aa is:in progress, Re metas rr of
. the permanent way pavi new highway bri
and the relocation oft sllvead track wake wil
‘carriéd on at the site by other agencies. All agencies
simultaneously on work at the site shall have
‘equal rights to the use of such work and access areas

- 961208 O- 63-5
-

/

“4 ay
‘ * ?

as may be necessary for the conduct bf their respective
Sond ‘The Cetra all od r

_~others working at the site: The Contracjor will not be

‘ments of the contract, it. will
' ment thereof will be made in accordance: with Art

‘Tequired to maintain the nent hi ypaving,the —

new highway bridge or. the railroad t work as such
maintenance

will be thé responsibility of other agennies. |
‘8 8001:

SC-28, Final Examination and To mapa
as practicable after the completion of the entire work or

de by the Contracting Officer at. the site of the work.
If such work is found to comply fully with.the require-

of the contract.

_ Section I. Diversion or Srream axv, Prorecrion oF

TRaFFIC

Ey TP1-01. General. Work under this section shall con-

sist of the care and diversion of the stream and the
protection of highway and railroad traffic. The Con-

tractor shall furnish all equi t, materials, and labor .

required to accomplish the above work, all as indicated

on the .drawi specified herein, or directed by the

Contracting Officer. : Rotel c
_TP1-02. Care and Diversion of Stream During Con-

struction. a. General. At all'times prior to permanent —

’ diversion through the tunnel! the Contractor shall main-

_tain an unobstructed channel 150 feet wide, at valley
floor elevation ,\between the end of the embankment slope . -

_ and the opposite abutment. He shall be responsible for

: hat provided for in —

the
t i . SC-1 will not be allowed
for delays resulting from failuré on the part of the Con-
tractor to provide the neeessary protection.

fety of the work, and additional time other than —

operat uct his operations‘ :
‘.g0 # not to unduly interfere with operations of .

"any divisible part thereof as may be designated in these |
- specifications, a thorough examination théreof will be

accepted, and ond a A |

. b. Onder of work. poe cap | and permanent diver-

sion and control of the stream shall be accomplished as
indicated on the drawings. T:
be. provided during construction of the outlet works.
All other temporary protective works and temporary

_ diversion shall be completed prior to diversion of high-

way traffic. Permanent diversion through the outlet

. works shall be made only upon -written. instructions

from the Contracting Officer (see subparagraph TP6-
0ld)- and when the following minimum items of work
have been completed. .

ry protection shall.

sacipgpnac “al

—_

* 65 . ‘ °
(1) Outlet works’ to elevation 1265, including the
tunnel, approacK and outlet channels-complete, Wnd all

- Tipraparound the intake strutture. ri
. (2) The railroad relocation and protection and high...
way relocation complete; the dam south of the existing

highway to elevation 1320, and remainder of the dam.
= ikment, except the closure section, to elevation

; (3 All other ertinent work that may be directed: by’ nig
., the Contractin cer. By the time the closure sectién -
has been completed to elevation 1300, the ‘spillway ap- .

proach channel: excavation shall be completed to eleva-

tion 1294 and the remainder of the Hiway excavation _

‘shall be completed... All concrete -in the spill

monoliths 4 to. 11 inclusive’ of the weir, shall-be com. ‘

pated by the time the closure ‘section of the damem-. -
bankment has -been ‘constructed to. elevation 7ee. 3)...

* Monoliths 4:to 11-inclusive of the weir shall not'be

constructed above elevation’ 1294 until the closure sec- - «

way, except

_tion of the embankment has been: constructed ‘to eleva- -
tion 1310. All other work shall be completed daring the ‘

season in which .the émbankment : closure section is
completed. oy ee

ce. Temporary Diversion. (1) Stream Channel. The

relocated channel for temporary diversion of the stream
shall be constructed to. the lines, grades, and cross sec-

tions ‘as shown on the drawings. Materials from this as

excavation shall be temporarily stock piled in the pro-
tection levee as specified in subparagraph of? below

and later removed and disposed of.as direct

(2) Temporary Protective Works. A temporary

4 peatection Given shall he constructed upstream from the
"main embankment as indicated on Sheet No. 16 of the

dra Final location and extent of this levee shall

. be submitted by the Contractor for approval of the Con-

—

Officer. The protection levee shall -be con-
f channel excavation materials and will.require
al compaction, The Contractor shall provide

no, s or shall
© protectign of the outlet works effective to eleva-

for

tion 1245 upstream and 1230-downstream. by, leaving. .

‘unexcavated such portions of the approach and outlet.

channels as will provide the’ necessary protection or
otherwise protect the outlet works. If access oe
are made in the protective works, the Contractor shall

_. have gf the site sufficient sandbags to close the openings. .
The tractor shall be fully responsible for the ade-

of the — works except as provided in
paragraph

C-20, and any damage resulting from :

|
E
|

*. \ elevation 1265 at location and to the lines and

Sheet No. 16 of the drawings. It shall be

consisting
and impervious materials as indicated on the
Prior to construction of the cofferdam, the
' construct a permanent blanket on the
the dam embankment, extending from the im-

‘ga > — ad
bn act AZi. o:.

67

pear yr Learns | of lights around and in front of the work,

and the erection and maintenance of adequate warning,

and direction signs, shall be as required by the ©

New York State Department of Public Works, Division
of Highways. |

a ee ’ - . *

_ TP1-04. Protection of Railroad Traffic. The Con- |
tractor shall notify the Contracting Officer not lessthan |
15 days in ‘advance of the date he desires to enter: rail-

‘road p y so that due notice may be given the {
owners. Upon approval by the Contracting Sificer, the /
Contractor shall proceed with the work and continue .
without interruption, completing it in the sho time
oye Work on and adjacent to railroad rty

hall be performed with extreme care and in such # man-
ner that there will be no interruption of rail traffic.
Contractor shall furnish necessary flagmen and
comply with all requirements of the railroad relative to .
his operations. In planning and prosecuting’ construc-
tion. operations on rail - property, the tractor
shall work in close cooperation with the railroad, and
— details of his proposed method of operation
for thé approval of the railroad. On all adjacent
to the railroad the Contractor will be ired to pro-
vide such temporary prectection as may be deemed
by the railroad. The Contractor shall make —
arrangements with the railroad to pay all necessary
costs of temporary protection incl such costs as
the expense of flagmen provided by the railroad.
‘ -s ;

1, clearing of stockpile and — —, maintain-

ry
clearing and grubbing operations may be prosecuted as
the materials are Salter anabuahed m bee the objec-
tionable materials are separated from the suitable —

Secricn VI. EmsaNxuxnt

rotection, the access road, the highwa
on and the leven at Borrow Area 3. . For dumped
oat and rock in downstream toe trench’ see Section’
x Classification of Materials. Pome re er"
r are classified according to t ocation, an
_ method of placing as follows: siti

69

Type Lovetion . Placing
Impervious Core section of dam

Tranaition.

te Station
115+-00, road .
and tem de

24’’ layers—uncompacted

of the dam, in the

= - levee at ‘Borrow Area

: 38 and in the railroad
relocation. -. 12’’ layers—compacted

Random Highway relocation.

' between approximate

Station 115400 and
¢ Station 133+00 and

upstream from Sta-

tion 146+00. 8’’ layers—compacted
Select — Shell section on the ;
Pervious reservoir side of.the oe s s >
_ 13. The Almond Dan, as constructed, is an earthen flood
control dam having three principal] features common to such
dams, (1) a main dam consisting of an embankment con-
structed of compacted earthen materials; (2) an outlet works
for control of the reservoir, and (3) a spillway constructed -
at an elevation lower than the dam, ‘o drain off excess water
in the event of flood conditions. :

The main dam is constructéd to elevaticn 1320 feét. Con-
nected to it and extending upstream on the right abutment '
is a supplemental] extension or “arm” for the protection of a
relocated railroad and a state highway formerly | located
within the dam site which/were contained, in part, in cut be-
low the top elevation of the dam. Paralleling the-axis of the
dam a core trench, the purpose of which was to prevent seep-
age of water under the embankment, was excavated to below

Im accordance with established engineering practice, when references are
made to “right” of “left” it is assumed that one is facing downstream.

-*

the dam foundation extending from abutment to abutment.
The core trench was filled with impervious material and
compacted to the elevation of the foundation. The embank-
“ment was then constructed on top of the core trench. Neces-
‘sarily, the core trench had to be completed before the place-
ment of materials to any extent. could proceed in the area.
- of the foundation immediately above the trench.

. The outlet works, constructed in the left abutment of the
dam, is composed of three principal features, (1) a concrete
‘ intake and operating house which contains the gates and
'. machinery for controlling the flow through the outlet works;

(2) a horseshoé-shaped concrete lined tunnel 710 feet in —

length, drilled through the rock of the left abutment; (3) a
downstream stilling basin from which the flow through the _
tunnel returns to the natural stream bed below the dam. At -
the time of permanent diversion of the creek during the
construction period a permanent approach channel was ex-
cavated in the reservoir area above the dam to. direct the
normal water flow into the outlet works.

The spillway was-excavated in open cut inte rock in a
saddle to the left of the outlet works, the intake thereto being
excavated in rock down to elevation 1,294 feet. Immediately
adjacent to and downstream of the intake is a concrete weir
constructed across the spillway at crest elevation 1,300 feet,
20 feet lower than the crest elevation of the dam. The only
purpose of the spillway is to serve as a “safety valve” to pro-
tect the dam from waghout | in the event of unusual flood
conditions. +

14. In the course of construction there were certain =
tures in the sequence of operations peculiar to Almond Dam
which are pertinent to the consideration of damages i in this

case:
(a) To construct the dam: embankment it was necessary to.

- relocate a branch line of the Erie Railroad passing along the

intended site of the right abutment of the dam. Under the
contract the plaintiff was required to excavate for and pre-
pare a new subgrade for the railroad by cutting back into
the right abutment. The actual work of track relocation was
performed under a separate agreement between the Govern-
ment and the railroad.

74

(b) New York State Highway No_ 36 passed through the
valley generally parallel to Creek and bisected
the location of the proposed dam approximately at its can-
ter. Under its contract plaintiff was required to relocate and
* oonstruct a new highway in the right abutment of the dam in
close proximity to the relocated railroad. The site of the
new highway relocation occupied, in part, the old bed of the
relocated railroad tracks. The fine] surfacing of the new
highway andthe construction of » new bridge scross
Canacadea Creek were performed under a separate agree-
ment between the United States and the State of New York
after plaintiff had completed its highway work. It was s

rement of plaintiff’a contract that traffic over, existing
Tetashie Sd bo aietadiad tntll ho gow blehotg canen
pleted and opened to traffic.

“A telegraph line along ‘the old railroad bed had to be

relocated .by others ‘slong the relocated railroad bed. A
telegraph line and an 8-inch gas main along old Highway
- 36 also had to be removed by others.
‘ 15. In accorddnce with the plans and specifications as set
forth in finding 12, the various portions of the dam relating
_ to the instant claim for damages were required to be Con-
structed \in the following order :

A new subgrade for the open someeed
Po fond — back in right oe
ralroad Sinultanvony wf the construction of the new

dam embankment south of existing
*Hi 5 ery wy hy to elevation 1320.

3) 1 » roadbed for the of State wa
No. 36, of which was located on the site of old

x igoeinl vgn ca i
Sirected Ehoresn ond —__

75

(7) The creek was then to be permanently diverted
dn gh the completed diversion tansiel at which
work could commence in the section of the dam.
(8) The t coff upstream of the closure
section of the dam was thén to be built up to elevation

(9) The ion itself was then to be built up
to elevation 1300."

| (10) Concurrently with the building up of the closure

channel

section to elevation 1300 the spillway a
was to be excavated down to jon 1294. The reason

iversion were set out-so as'to minimize the effect of possible
vy flood conditions occurring during construction and

t prevent destruction of the partially completed dam, with
the resultant risk to life and damage to property which

occur in areas downstream of the work. ss

ly, the required sequence of operations provided
insurance to the Government and to the contractor

from financial loss had a flood occurred during construction
which could top that much of the embankment constructed
to date and result in a washout of theentire dam. :
- "The outlet works was not designed to carry off the flow of
the stream, during periods of flood. High watets in the
Canacadea Creek watershed could be expected normally im
the spring and fall months. However, the hydrographs |
which are a part of the contract plans, show that peak flood —
conditions could be expected during other seasons of the year.
_ ‘The highest flood condition recorded was during the month
of July 1935 when the run-off was 22,000 cubic feet per sc:
ond. This was about four times as great a volume as oc-

\

! ' . ea oe. «
. : . |

— . ‘

e %}

4 6 eek tae

curred during any: ghee period of flooding d ring the sini

1925-1941. It was ‘to protect @ such an unhoped for
contingency that-a heavy flood might occur duri ng! the period

of construction which caused the Governmentengineers who __
designed the dam, and those who prepared the specifications,

to spell out, the phases of truction which. would be re-

quired before the stream ream could be diverted. In. periods when ,
there had been no heavy rains.in the upstream watersheds, the

' stream was very small but there were two or three instances -*
during construction when high water ‘interfered with the | :

work. It can ‘be seen then why it was so important that the

work Of the railroad relocation and highway relocation, and _ |

the embankment along them, plus placement of embankment |
of more than half of the main dam, were required before

the stream could be permanently diverted through the tunnel.
17. The: plaintiff's witnesses have) testified that if. the

plaintiff had not been delayed by t Government in con-~

nection with tunnel -supports, it could have diverted the

- stream through the funnel abou a year earlier that tt did
so and that it could have finished all re aining embankment

in the 1947. work season. This testimony is not convincing

. for-three reasons. First, this would have required a major |
‘ change in the specifications as to how muclr work should be

firfished before permanent stream diversion with the chance

of great damage to embairkinent operations in event of heavy:

flooding as the tungel whs only designed to carry a flow of
4,000 cubic feet per second! withthe water at an eleration of
1,265. feet. The finished.dam wasat 1,320 féet elevation with

_ the crest of the spillway having an-elevation of 1,300 feet.

Secondly, there was Statp Highway 36 crofsing the main
dam area about in the centet and it would hate been-neces-

‘sary to depart from the specification as to the moyement’

of highway traffic during construction. It is true that
this traffic was detoured around the work area from May

to September of ‘1948, but if the stream had been div
in 1947, it would have made this detour extend for a period
. of about a year and one half, instead of from May 1948 to _
i: ae ey -1948. In this connection very great concern was
dicated by the state and county road authorities because -

Highway 36 carried 5,000 vehicles over a 12-hour period

a

a

me, 1%
each day, 1,000 of which were trucks; and aoe vehicles,
Waring the detour, liad to pass over a railrdad grade cross-
ing. Thirdly, the volume of excay ation, and actual place-
ment of embankment, as indicated in the-plaintiff’s payment

- “estimates, clearly. shows that it would not: _ cma

all embankment in the 1947 work season.
~ H&_Althoughi it was important to the progress of the work

‘from an overall] standpoint to coordinate construction of

| the dam einbankment_and-the spillway excavation w ith eon-

struction of the outlet works, which included cgnstruction

of the diversion tunnel, so as not to delay diversion of the

stream, the progress of construction of the dam and spillway
‘could have proceeded to a considerable extent independently
of, and without interference by, eutlet works construction.
The outlet works were ‘physically ‘outside the area of dam
‘embankment and spillway operations. ‘Phe equipment used

in outlet works construction consisted of the-concrete plant -
and related items, whereas dam and spillw ay construction,

prior. to’ diversiorty- employ ed earth-moving and compacting :
equipment such as scrapers, shovels, trucks, sheepsfoot ral- |

ers, bulldozers, ete.

As hereinbefore shown, in accordance avith the plans. and 7

_- sperification’s, before stregm diversion could be accomplished,

the contryctor was required to be at a stage of construction,

--where the failroad hid been relocated, the highway, in part,
relocated on the site of'the old railroad bed and traffic di-
verted thereon, the embankment south of oid State Highway
36 built up to elevation 1320, and the embankment ‘north
thereof built up to elev ation 1300 up to the closure section.

The outlet works, t fore, need not have e sbeert ready for.

stream diversion unti] the aforementioneds steps, with re-
spect to the progress ‘of construction of the: main embank-

" ment, had been reached.
‘ Dam embankment construction on the” other hard was —

related to spillway‘excavation: in that all suitable- common

materials excavated in the spillway were required to be .

utilized for placement in the dam embankment.

19. At the commencement of the work, in August 1946,
plaintiff submitted a progress schedule of work operations
as required: by the contract. Pertinent omen of ar work
were scheduled fnrgen as follows:

' &

78

8—Stripping and common excavation: . — completion
a. Railroad subgrade____.\ icing May 381, 1947
c. Spillway ; nttieeninicnnnn ae ae
4—Rock eacavation: .
_a. Railroad subgrade____: eee --- June 30, 1947
_ © Spillway ; al a --. June 30, 1948
5—Tunnel: nee wie
_” ‘b. Concreting eihinniitbniaigiintininien ... Aug. 81, 1947
| 1—Embenkment, : .-..,Nov. 15, 1948
9—Conorete: As
b. Intake and Stilling Basin pues -.. Nov. 15, 1947 .
Highway No. 36 closed en ------- Apr. 30, 1948
- Permanent stream diversion — ileus Aug. 15, 1948
Job as a whole EE TTD “_.-.. Jan. 15, 1949

The ‘progress schedule made no reference to the time of
temporary stream divérsion provided for under the contract. .
At no time during construction did the plaintiff, by writing —
‘or otherwise, indicate to defendant’s agents that it intended
_ to divert the stream through the completed tunnel earlier
than August 15,1948. : , |
. 20 During ‘the course of construction several key delays —
' affected the time when the dam embankment’ was finally
.built up to the point where stream diversion was permitted
under the contract. 7 ee: .
The plaintiff was\ dilatory in completing the railroad
_ Felocation and subgrade which were scheduled for completion
on June 80, 1947. This was not substantially completed until
October 9;.1947, at which time, because of the possibility of .
freezing conditions that late in the year, the Erie Railroad
Officials refused to relocate ite tracks. This work was not
‘. completed by the railroad until October 1948.
~The delay in railroad relocation in turn delayed relocation
of State Highway -36, part of which was to be on the old :
- Tailroad bed. The highway relocation scheduled for
April 30, 1948 was not completed and opened to traffic until
; October 13, 1948. | ;
| s+ &s Until Mighway 36 was relocated plaintiff could perform
_* ;.” @anr etnbankment operations north of old Highway 36 tos —
_ limited extent only. Construction operations ‘in that area
| “ were restricted by the specification requirements that State
Highway 36, which bisected the dam foundation, remain
, Open to traffic, and that closure section, 150 feet in width at

ere: 19 Pa |
_ the bottom, in the bed of Canacadea Creek, remain open un-—
_ til such time as diversion of the creek could be accomplished.
South: of Highway 36 embankment operations proceeded

in the summer and fall of 1947. “However, during the spring *
and early summer of 1947 very little embankment placement
was performed due .to poor weather conditions. Plaintiff |
later received an extension of time therefor.

21. Realizing that its failure to-timely relocate the state _
highway would result! in. delay of further embankment |
operations plaintiff, in the spring of 1948, took action to
break this bottleneck.

By agreement with the Superintendent of Highways,
Steuben County, New York, which agreement was approved
by the contracting officer and the New York State Depart-
ment of Public Works, plantiff was permitted to detour'the _
traffic from existing Highway 36 via an alternate route over -
a county road known.as Webb’s Crossing Road. The detour
was made effective May 28, 1948. Following'the elimination
of highway traffic through the dam site, embankment opera-
tions: proceeded expeditiously.

In the meantime concreting of the tunnel had been com- .
pleted by May 8, 1948 and sufficient concrete work had also

been completed on the intake works, operating house and. Ze
stilling basin so that by August 14, 1948, when the embank-

ment had: been sufficiently: built up to the required eleva-.
tion, the stream. was diverted through the outlet works.
Construction of the closure section of the dam commenced
immediately thereafter.

Permanent diversion of the stream was thus accomplished
-almost tothe day anticipated by the plaintiff on its original
‘progress schedule. (See finding 19.)

. 22. It is clear. that the work of concreting in the tunnel
"and also in tha.inlet works and outlet works was seriously

disrupted by the failure to authorize the installation of tun-
nel supports earlier than: the letter of authorization dated
August 11, 1947 which was received by the plaintiff about
August 14, 1947.. Th ~‘aintiff in the exercise of gound
. judgment, had engaged .. - ervices of numerous independent
qualified engineers for consultation as to what might be re-
quired in the way of support ‘for the tunnel. It acted on

a *
\

S

061298 O-62-6 ‘

80

the advice of such engineers, and about three weeks before °
authority had‘ been given to install the steel arch ribs and
liner plates in the tunnel, on July 25, 1947, placed its order ~
for the steel. ar ae
23. The plaintiff, on August 15, 1947, promptly began the
installation of the tunnel supports upon receipt of the steel
___¢ ind they were installed by October 8, 1947. The space above
" the liner plates had to be filled with backpacking, rock and
boulders which could ‘be handled by one man crawling be-
tween the liner plates and the overhead in the rock tunnel.
The backpacking operation was finished in October 18, 1947.
24. Since the delay incident to authorizing the tunnel sup- |
' - ports required concreting operations in winter weather, it.
then became necessary to winterize the concrete. plant and
this was accomplished by the plaintiff. Concreting oper-
_ ations in the tunnel commenced on December 15, 1947 and
continued until May 8, 1948. Concreting operations began
in the intake area sometime after J uly 25, 1947 but this work
could not move along expeditiously since the installation of
the tunnel supports and backpacking interferred. The
original plan of work operations submitted by the plaintiff
called for the concreting of the intake and stilling basin from |
early July 1947 to the close of the 1947 work season. These
‘two items were the inlet works on one end of the tunnel and
' the outlet works and stilling basin at the downstream end
_ of the tunnel. . .
25. The original plan of operation called for the plaintiff.
to do the: concreting of the spillway from’ April 15 to
October 31, 1947. It should be noted that’the Jocation of
the spillway was several hundred feet north of and generally.
’ parallel to the area of the stilling basin. | -
28. Subsequent to March 25, 1947, when the initial work
of cleaning up the floor of the tunnel had been accomplished,
after the tunnel had been holed through, there were addi-
tional falls of rock from the roof of the tunnel and the sides.
As « result, before placing concrete lining, it was necessary
to rescale both the sides and roof of the tunnel, pick up and
- load and haul out the rock that had fallen from the roof and
sides, also reclean the’ invert of the tunnel. This work was
performed from August 23, 1947 to October 18, 1947.

es. 81. \ |
Plaintiff's « extra costs of performing this work were as
follows: ‘

Direct labor, plus insurance, taxes and overbead___-___._. $1,187. 48
Field supervisory labor, plus insurance, taxes and .
het ES te TRE Se nial ea Sad Ek ee Leena, CN a 121.81 ©

Sublet work: Paid to subcontractof> pius overbead__\_____ 4, 620. 53
‘Hired equipment: Paid to equipment owners, \ plus

RE aitica tin ledcn ei aeaad 1, 415. 42
Use of-owned equipment: At 1947 AED Manual rytal ;
rates less 15% profit. ...------.-----_.----.-.---=---: 1; 083. 58

i autmatatemeinaniie

Total: Claim Item.2.............,...-.---...-..- $8, 442: 08

27. The plaintiff received official authorization from the
defendant to install the steel arch ribs with ard plates in
the Almond Tunnel, but at its own expense, by letter from
the Acting District Engineer dated August 11, 1947.

Plaintiff, however, ordered steel ribs and liner plates from .-

the manufacturer on July 25, 1947, which was’ as soon as
plaintiff knew the size of adequate supports which had to be
installed before concrete lining of the tunnel could proceed.
By that time plaintiff had been advised by its engineering
consultants, and the Liberty Mutual Insurance Company,
that the design of tunnel protection recommended by the
contracting officer was inadequate.

The plaintiff installed permanent tunnel supports in the
central 610-foot portion of the Almond Tunnel in the form
of steel arch ribs and liner plates, performing such installa-
tion between mid-August and mid-October 1947. This in-
stallation was exclusive of the two 50- foot inds for which
the plaintiff was compensated.

28. The plaintiff's extra costs for the labor, snsterialia, and
‘equipment used in the installation of the permanent tunnel
supports installed were as follows:

Direct labor, plus insurance, taxes and overhead. pqacesane | _ $1, 190. 38
‘Field supervisory labor, plus insurance, taxes and over-
+ _ ME GemninesGunensenntadedhbenbieedanansednns 134. 92
Cost of materials and other expenses, plus overhead_____ 23, 228.86 |
_ Sublet work: Paid to subcontractor, plus overhead ___-___- 5, 550. 65
Use of owned equipment, application of 1947 AED rental
Fetes, lens 1696 progt factor... ....................... 1, 143. 98

“oe aes . $31, 970. 91

Plus taxes, insurance and overhead a 3, 447. 90
: ) eo $35, 418. 81.

29. ‘As « result of the overbreak of rock in the Almond
Tunnel there remained a space between the bore of the tunnel
and the liner plates installed. The entire area between the
liner plates and the roof and the sides of the tunnel required
' backpacking with material which would prevent the further
. fall of rock and properly support the roof. This area re-
quiring backpacking was beyond the 50 feet of the inlet and
outlet portals of the tunnel. The contract did not require

ing where permanent supports were not required.

Below the liner plates the concrete extended out to the bore
of the tunnel and on the invert the entire area was filled with
concrete. Above the spring line and where the liner plates -
_ Were placed there was no concrete placed outside the plates.

The backpacking of fragments of stone was packed in
tightly and later, after the installation of the concrete lining
of the tunnel, the plaintiff pumped sand into the ares to fill
the voids between the stone following which grout was
_ pumped into the area under low pressure to make the area
solid. The stone backpacking was installed during the weeks

' ending August 30, 1947, through October 18, 1947. The sand

ing was installed during the weeks ending May 15,

1948 through July 3, 1948. ‘
_ 30.-The grouting which was performed subsequent to the
sand backpacking was the pumping into a given volume of
material of cement and water or sometimes cement, sand
and water to solidify the mass, to fill in the voids betweer.
the particles. If the changed conditions resulting in the
: fall from the roof of the tunnel had not occurred grouting
would not have been necessary and it was not a pay item in
the original contract but an extra cost to the plaintiff.

31. As the steel ribs were erected in the tunnel, the plain-
tiffs engineers took cross sections of the tunnel at least every
ten feet to determine the aperture of the whole tunnel so that

83

it could be drawn on cross sections. From the information
gained in this survey and computations by the plaintiff's
engineers, from the engineering information and the con-
tract specifications, the volume remaining bet ween the liner
plates and the roof of the.tunnel was computed and tabula-
tions made of the total volume in cubic yards between the.
points 50 feet in from each end of the tunnel. Thus, deter-

mination was made of the actual volume of space

above the

liner plates to the roof of the tunnel in the 610 feet where
the additional steel ribs were installed. - This volume of space —
that required backpacking and grouting amounted to 14,553
cubic feet. The plaintiffs engineering staff. determined the
percentage of voids which was the space not solidly filled
‘ by either stone or sand in backpacking that +had to be filled
with grout. The Percentage was determined by acceptable .
standard engineering practices and observation to be 40 per-
cent of the volume of the whole backpacked area bet ween the
~liner plates and the roof of the tunnel. The cost. of the
grouting was determined by applying to 40 percent of the
volume of the whole backpacked area the contract price of
$2.50 per cubic foot, less 15 percent for a profit factor on that

item.

32. Plaintiff’s extra costs of backpacking and
sure grouting totaling $29,332.92 were as follows:
Biome Backpacking :

Direct labor, plus insurance, taxes ont overhead...
Field a labor, plus insurance, taxes and

Cost’ of sean etc., plus overhead... 1
Sublet work: Paid to subcontractor, plus overhead__
Use of owned equipment: At 1947 AED renta) rates,
less 15% profit factor. ._......-----.-----------L:

Send Beckpacking : a
Direct labor, plus insurance, taxes and everest’...
Field supervisory — plus insurance, taxes and

. overhead th thei aha aieta tala :

Cost of materials, etc., plus overhead... _..______- a
Owned equipment : ‘At 1947 AED rental rates, lesa

Low Presewre niall cu. ft. — ( Voids)
* SRE ger ae ‘ wnee-------b------------- te

low pee.

84

Lees taxes, insurance and overhead _..-.-.-.--.--------- —$2, 008. 11
Plus 184 profit... ------.-------.-------.------------ 08. 47

Plus taxes, insurance and owerhead._---.-- --...---------. 2, 008. 11

Y ze | $33, 432. 30
33. The plaintiff placed additional concrete in the tunnel.

~ . "This concrete was placed in the tunnel outside the pay lines

established by the Government which was over and above the
volume of concrete paid for by the defendant to the pay lines.
The ultimate bore of the tunnel was larger in all its points
- throughout-its complete circumference than the position of
- the pay line. It was applied on the floor, or the invert of
the tunnel and on the sides and in the roof. The area above
the spring line where the steel supports and liner plates were
installed limited the volume of concrete placed to the liner
~ plate position but below the liner plates, on the sides and
on the invert of the tunnel, the plaintiff filled the entire
space between the tunnel forms and the existing rock sur-
face with. concrete. Payment was made only to certain
specified pay lines. The concrete placed beyond the
- specified pay lines has not been paid for by the Government.
? —— of the excese concrete was computed as to
volume by the plaintiff's engineers computing the volume of
the tunnel bore within the central 610-foot section as it
existed at the time of concrete lining. The plaintiff sub-
mitted in the record as Exhibit 81 a document entitled
“Summary Tunnel Volumes”. The computations show the
difference between the cubic yards of tunnel concrete paid
for by defendant and the amount actually placed, the dif-
ference being 644.61 cubic yards’as'a result of the changed
34 Plaintiff's extra costs of placing the additional con-
crete were as follows: 5 ,

Cu. yds.
Computed volume of concrete placed in tunnel. --------.--- 3, 020. 31
Less volume of tunnel concrete paid to plaintiff by United
States Engineer office on Estimate #36—final__.......-- 2. 375. 70

Additional concrete placed in tunnel... ........------ 644. 61

85

644.6) cu. yds. et the contract price of $25.90 per cu. yd.= $16,115.25—
- tetal claim incloding profit on Item 5.

35. The plaintiff's original schedule of operations did not
provide for winter concreting. The fact that permanent
tunnel protection in the form of steel ribs and liner plates
was not authorized earlier delayed the completion of the
’ installation of the steel ribs and liner plates. It was ap-
parent to plaintiff that the concrete would have to be poured
in cold weather and plaintiff made provisions for that work.
The plaintiff was required to, and did build a house to |
enclose its pumpcrete machine, insta]] a boiler for pre-
heating the water going into the concrete, enclose the batch-
ing plant and the cement plant and install steam boilers
and pipes to protect and heat the materials in the bins and
‘the stockpiles before they were incorporated in the concrete.
This preparatory work was done. between mid-October and
December 15, 1947. Plaintiff's work in carrying out the heat -
ing of the concrete before placement and subsequent to |
placement due to the fact that plaintiff had to place concrete
in subfreezing weather continued through the week ending
April 24, 1948. Plaintiff commenced the concreting of
the Almond Tunnel on December 15, 1947, and ee
on May 8, 1948.

36. Plaintiff's extra costs to prepare ee and handle heat
for winter concreting were as follows:

Direct labor and supervisory labor, taxes, insurance and

SE Sheba kitincdtandndtanectideredbindnatnhuse $26. OUR. 45

_ Cost of materials and other expenses plus overhead _____ 6, 643. OS
Use of owned equipment: At 1947 AED rental rates, less

15% profit factor_.....-- 4-----+------+------------- 4, 487. 76

Total claim ‘*em 6.........- cone Asiungesccas Qg we ae

37. As a result of concreting the tunnel, including the in-
side of the tunnel] and the inlet area, during winter months
the plaintiff suffered a loss of efficiency and as a consequence
incurred extra costs. The loss of efficiency was attributable
to men and machines not producing as much in winter or
subfreezing weather as would be produced during favorable
weather, to equipment freezing and being difficult to start,
to the fact that the equipment had to be shut down earljer
in cold weather in order to clean and protect it for cold

so

‘86

nights, and to the fact that carpenters erecting forms had to
work with gloves thus impeding their activity. On the basis
of an eight hour day the plaintiff would get only five hours
of work out of the equipment and employees engaged in the
winter concreting operation:
7 Plaintiff estimated that there was a loss in efficiency of

. 25 percent inits labor force and its equipment and every-

-: thing else which went into the cost of handling concrete in|

the winter time. This estimate was based upon the experi-
ence of plaintiff’s engineers in carrying on concrete place-
ment operations during the particular winter season. ‘This
estimate of loss of efficiency was corroborated by Mr. Miles
Clair, a consulting engineer with extensive experience with
respect to concreting, who was former chairman of the
American Concrete Institute Committee on Winter
Concreting.

Winter weather concrete operation at a location such as
Almond Dam, as compared with concreting in favorable
weather, reduces efficiency 25 percent below norma] efficiency.

38. The plaintiff computed its cost due to the loss of effi-
ciency in winter concreting by applying a 25 percent loss of
efficiency to plaintiff's cost of concrete which was 85 percent
of plaintiff's bid price of $25.00 a cubic yard or $21.25, thus
arriving at a figure of $5.3125 (25 percent of $21.25) a cubic:
yard as a factor, and then applied this figure to the number
of cubic yards that were poured during the period Decem-
ber 15, 1947 to April 13, 1948.

The extra costs plaintiff incurred by reason of loss of effi-
ciency in winter concreting were as follows:

Cu. yds.
Total concrete placed during period December 12, 1947
through April 13, 1948_ -.-. 2, 984.6
Less concrete placed in Erie Railroad culvert during
SUNG cccecceseeses = 15.0

Conssste pineed Casing ported to conaitien with tunnel__.. 2, 969.6
2,960.6 cu. yd. at $5.8125 per cu. yd.=$15,776.00. total claim Item 7.
39. The plaintiff paid for the services of the consulting

engineers who examined the tunnel to determine the need for

permanent tunnel protection. The amount paid was

. $2,820.47. The consulting engineers employed by the

plaintiff to advise on tunnel supports as being required were

Wien

AeA, tie ATS Pe ee
\
|

a ee ge ee ee

° ; . a ! 87
Messrs. J. Murray Ridell, James G. Tripp, and Miles N.

_ Clair, all engitfeering consultants. The plaintiff's costs were

based upon the invoices submitted by the engineering
consultants. The charges were reasonable. Adding 15 per-
cent profit to this amount results in a figure of $3,243.54.

40. Items of claims Nos. 2 through 7 inclusive, and item 16,
totaling $149,617.36, are reasonably related to the costs of
installing the tunnel supports and also the delay incident
thereto as well as the disruption to the balance of the con-
tract work. Other items claimed by the plaintiff bore no
reasonable relation.to the matter of failure to order instal-
lation of tunnel supports earlier.

CONCLUSION OF LAW

Upon the foregoing findings of fact, which are made a
part of the judgment herein, the court concludes as a matter
of law that plaintiff is entitled to recover, and it is therefore
adjudged and ordered that plaintiff recover of and from the’
United States the sum of one hundred forty-nine thousand
six. hundred seventeen dollars and thirty-six cents
($149,617. _

APPENDIX. C

UNITED STATES COURT OF APPEALS
For THE Seconp Crecurr
vividly
No. 202—September Term, 1961.
(Argued February 6, 1962 Decided August 29, 1962.)
_ Docket No: 27236 »
——

ALLIED PaINnT & Coton Works, Lye. es
‘ at |

Plaintiff - na P
a en

5 — Grates 0 OF AMERICA,

| Defendant Appellee.

|
Ps) aie
a
or
|

Before: | | ; :
=e Chief Judge, and

Swan and WarTerman, Circuit Judges.

Waterman, Circuit Judge:
Appellant, a paint contractor, brought the present action

"against the United States. in the U. S. District Court for

the Southern District of New York for breach of contract,
alleging that the Government failed to deliver a certain
quantity of phosphorescent -paint which it was the Govern-
ment’s duty to fu under the contract. This is an ap-
peal from the orderjof the district court dismissing appel-
lant’s complaint. Wp affirm the gourt below. 3

- On June 20; 1952) following an invitation to bid. appel-—
lant and the Govermnent entered into contract No. N3%3s-
77428 (hereinafter feferred to as contract No. 1), under
which appellant agteed to furnish the Government 7,644
paint kits to be delivered to various government depots
within 90 days after, the date of the contract. Each kit was
to contain a quart of phosphorescent paint, which was
called component “A,” a quart can of white primer, a quart
can of thinner, andja quart van of varnish. The contract
expressly provided that the 7,644 quarts of phosphorescent
paint, totalling 1,911 gallons, were to be Government-fur-
nished, and the Government was to deliver them in one
gallon cans to appellant's plant within 30 days from the.
contract date. . '

Contract No. 1 then provided that upon request by ap-
pellant the dates for appellant's performance would be ex-
tended if the Government delayed in supplying the Govern.
ment-furnished property, and though the Government would

| »- (>)

~

90

not be liable for delay 7 the delivery of the phosphorescent’
"paint or for failure to deliver, an equitable — in
the performance date or the price would-be made upon the.
written request ‘of the contractor. ‘The contract also.pro- ~
vided that the Governnient could increase or decrease the —
amount of property it was to furnish, and in such event, —
there was provision for price. or date ‘adjustments. ‘Al- ©
though title to the phosphorescent paint remained in the
‘ Government, appellant agreed, to assume the risk of loss

_after the property was delivered by thie. Government. The
contract stated that: a

(The. Contract, upon. idleness to it of any Govern- -

- ment-furnished property, assumes the risk of, and

- shall be’ responsible for, any’ loss thereof or damage

therety except for reasonable wear and tear Sade

“The contract also contained a “Disputes” clause, whereby

the parties agreed that disputes arising under the contract -

should be settled by the Contracting Officer, with the’ right

_ of appeal to the Secretary of Defense or his representative, .
: i e., the Armed Services Board of Contract Appeals.

_ Under contract No.-1 the Government was able to deliver
to appellant only 3,956 quarts (989 one. gallon cans) of

.. phosphorescent paint. Alt but 240 quarts of the paint were |
put up by" appellant in the specified quart cans, and were

combined: with the other required ‘products to complete

3,716 kits, which were delivered to, and paid for by, the .
Government. After delivery” of these kits’ appellant still.
had the remaining 240 quarts - of. Government- furnished

phosphorescent paint on hand.

Negotiations between appellant and the Government dur-—
ing 1953 led to the execution of & second contract, No. “383s-

97516, on January 7, 1954 (hereinafter referred to as con-
' tract, No. Hiae In this contract, appemeat _— to furnish

2.

‘
; 7 .
CRATE LTT es NR te SON GEG Sid Sl es no

ste

the Government 3 688 quarts of phosphorescent: paint -in
one quart cans at a price of $6.17 per quart. Th } was the »

‘exact amount of paint needed to complete contract No.1

-and was paint of the same type of phosphorescent paiat
ealled for by contract No.1.

Contract No. 2, unlike the earlier contract, contninseid no -
express words in the schedule, specifications, or: elsewhere,
stating that “The Government shall furnish to the Con-
tractor for use in connectiog with this contract, the ma-_
terial set forth below,” followed by a description of .any
“material.” Contract No. - did. provide, however, as fol-

lows: . , ae ee.

Chovviicsenwe FurnisHED MATERIAL

The Phosphorescent Paint to be furnished under this

‘contract shall be packaged and marked by the con- -

‘tractor so it mBy be used, without repacking or re-
- marking, as Component “A” of’ the Phosphorescent
' Paint Kits to be furnished. by the same contractor
_ under Contract N383s-77428 [No. 1]. :

‘Contract N383s-77428 [No. 1] provides that Component
_ “A” (Phosphorescent Paint) shall be supplied by the
Army as Government. Furnished Material in. the.
_ amount of 1,911 gallons; which amount is sufficient to
produce 7,644 Phosphorescent Paint Kits covered by

that contract; however, a quantity of 989, gallons only a

_ were available from Army stocks as Government Fur- -
-nished. Material.. Procurement of 3,688 quarts (922
gals.) under Contract N383s-97516 [No. 2] was, there-

. fore, necessary to effect. completion of Contract N383s-

rer 77428 [No. | re

_ Notwithstanding the nature of contract No. 2, the standard »
overnment-Furnished .Property” clause, which allocated

-. the risk of loss foy’such property, was also inserted. Sinee’

contract. No. 2 was a ewe cuntinct: instead of an
~ advertised one, the risk of loss by fire of the “Government-
| Furnished Property” was placed upon the Government, see
- $2 C. F. B. 13.502, but the insertion of this standard clause
created the ambiguity which caused the -present contro-
versy. .

tical to the one in contract ne. 1.

“6

Appellant manufactured 1 ,118 quarts of pliosphorescent

paint pursuant to contract No. 2, and these 1,118 quarts,
subsequently destroyed by fire, becamé the subject matter
out of which the action before us arose. Of the 1,118 quarts,
318 were inspected and accepted by the Government at
appellant’s plant on April 6, 1954, and 800 were inspected

and accepted by tlie Government at the plant on May 5,- ‘
1954. On each occasion, the Government inspector éxecuted -
a “Material Inspection and Receiving ses aici ” which re-

_ cited among other things: of

Government- furnished | property.

‘Material to be used for Contract N382s- 77428 [No.1]

by same Contencter for Component yn

_ Copies of diam reports were given to doneiiians chin

oe quently, the Government. paid appellant the purchase price

for these 1,118 quarts. _
After the Government had accepted the 1, lis quarts, they

- were kept i in ‘appellant’s plant. This paint was not mingled |

with the 240‘quarts which appellant .had previously re-

_ ceived as Government-furnished property under contract
No. 1. Appellant did not increase the dollar limit on its in- |

‘ventory insurance to reflect the oe the 1,118 quarts
manufactured under contract No.'2.

On May 31, 1954, appellant’ s plant was destroyed . by

fire. Included within the property lost were the 240 quarts

Cantenet No. 2 also contained a “Disputes” clause, iden- |

Seine Nene ters ta REMI en

.
of paint which were admittedly Government-furnished un-
der contract No. 1 and for which appellant acknowledged
liability, and the 1,118 quarts which had been manufactured
by the appellant under contract No. 2 and had been accepted
by the Government. .The appellant, by letter dated June 8,
1954, informed the Government of the loss of the two lots
of paint. In the letter, the appellant stated: “The first
60 gal. was material which we had left from Government

Furnished Material. The Balanée was made for Av lation.
Supply Office under Contract N383s-77428 [No. 1].”?. —

The Government, in a letter dated August 4, 1954, in-~ |

formed appellant that a determination had been made that: .
appellant was liable for both the. 240 quarts and the 1,118
quarts of paint thst had heen destroyed, .as both were

Government-furnished property under contract No. 1, under ° |

which the risk of loss was to fall upon the eontractor. |
On August, 19, 1954, appellant replied. It admitted its lia-

bility for the 240 quarts, but requested that the Contracting
Officer absolve it of liability for the 1,118 quarts because of
the language in the “Government-Furnished a. pro-

- visions of the second contract.

The Contracting Officer, on October 26, 1954, found ap-
_ peliant liable.for the 1,118 quarts of paint. The Contract-
ing Officer held: “Government Furnished Property clause

in contract N383s-97516 [No. 2] is.not applicable to and

does not supersede the Government Furnished Property
Clause of contract N383s-77428-{ No. 1}.” He found that
the loss of the paint occurred while it was “in the Con-
tractor’s custody pending inclusion as Government Fur-
nished Property in kits being furnished, under contract —
N383s-77428 [No. 1],” and thus appellant was liable for -

1°. At the administrative hearing an official of the appellant: testified
that the contract number recited in this letter was an unintentional
mistake, and that he meant to refer to contract No. 2.

\
s 94 =

replacement of such material under the provisions of. con-
tract No. 1.

Pursuant to the “Disputes” clauses of both contracts,
appellant, on November 24, 1954, appealed to the Armed
- Services Board of Contract Appeals. After conducting a
hearing, taking, testimony, and receiving briefs from both
parties, the Navy Contract. Appeals Panel of the Armed
Services Board of Contract Appeals, on June 24, 1957, filed
its findings of fact, and handed down a decision in which
it affirmed the ruling of the Contracting Officer. The Board
decided “that at the time of their destruction on 31 May
1954 the 1,118 quarts of paint were at Appellant’s risk
under the provisions. of Contract No. 1.”. The Board was
of the view that “under the circumstances disclosed, Con-
‘tract No. 2, even if deemed, to be ambiguous in some re-
spects, cannot be reasonably interpreted as providing that
paint manufactured under Contract No. 2 would ever be-
come subject to the Government-furnished property article
of Contract No. 2,” but rather that “Contract No. 2, in the
light of the conduct of the parties, is to be reasonably
construed as providing that paint manufactured under Con- -
tract No. 2 shall upon delivery become Government-fur-
nished property under Contract No. 1 and subject, there-
fore, to the Government-furnished property article of
Contract No. 1.” m |
Appellant also attempted, by an amendment ‘to its com-.
plaint filed after the hearing, to present to the Board of
Contract Appeals a claim for an allowance for the Govern-
ment’s alleged delay in furnishing paint under contract
No. 1. It invoked the clause of the contract relating to an
equitable adjustment, if requested by the contractor, in
price or date of performance for Government delays in
- furnishing material. The Board, however, refused to con-
sider this issue, as appellant had failed to raise it either ,
before the Contracting Officer or initially before the Board,

95

and “the case was tried by the wattios sally on the aques-
tion of where the risk lies.”

Thereafter, on February 25, 1958, appellant brouglit the
present action in the district court, seeking damages, first,
in the amount of $6,898.06 for the Government's alleged
failure to deliver Governiment-furnished paint under con-
tract No. 1, paint which appellant was required to replace
after the fire by purchase in the open market, and second,
additional damages in the amount of $3, 000.00, claimed to
have, resulted from the Government’s s alleged delay in de-
_livering Government-furnished paint under contraét No. 1.
The complaint alleged that the decision of the Armed
Services Board of Contract Appeals, adverse to appellant,
was “not based on substantial evidence” and “contained
errors of law.” Later, however,\a question arose as to the
scope of review in the district court under the Wunderlich
' Act, 68 Stat. 81 (1954); 41 U. S.\C. $§321-22 (1958),? for
the Government, on October 7, 1960, moved for an order
precluding the taking of sections by the district court
and directing that the scope of review be limited to a con-

2 ‘The Wuaderlich Act provides as ‘nmin: -

$1. Limitation on pleading contract-provisions relating to ) Gaality ; .
standards of review.

No ‘provision of any contract enteied into by the United States,
relating to the finality or conclusiveness of any decision of the head
of any department or agency or his duly authorized representative or
board in a dispute involving a question arising under such contract,
shall be pleaded-in any suit now filed or to be filed as limiting judicial
review of any such decision to cases where fraud ° by such official
or his said representative or board is alleged: Provid)d, however,
That any such decision shall be final and conclusive. unless the same
is fradulent (sic) or cupricious or arbitrary or so grussly: erroneous
as necessarily to imply bad faith, or is not supported by substantial

' evidence.

$2. Contract-provisions making decisinns final on eneiiiiia of law.

No Government contract shall cantain & provision making final on
_ & question of law the decision Of any administrative official, repre-
= or board. 3

>

6612908 O - 62-7

96

sideration of whether the decision of the Board was sup-.

ported by substantial evidence and was sound in law. The
court, in a memorandum opinion dated October 24, 1960,
granted the Government’s motion and held that the issues
before it would be determined solely on the record made
before the Board of Contract Appeals.

In its answer the Government had demanded judgment
disniissing the complaint. By an order dated July 17, 1941,
the district court granted this demand and entered judg-
ment in favor of the Government. In its opinion, reported
‘at 199 F. Supp. 285, the court divided the controversy into
two issues. The first related to the proper interpretation
of the contract provisions. This’ was treated as solely a

uestion of law. The district court held as to this issue
That the second contract did not supersede or modify the
first contract, but merely implemented it; and that the

“Government-Furnished Property” provision of contract

No. 2 was not intended to cover the paint to be manu-

factured by-appellant under that contract. |
The second issue before the district court, “whether the

“government accepted the paint and supplied it-to the plain-

tiff for performance of the’ first contract,” was described

by the court as.a “factual issue.” As to this issue the

court found that the Government, by leaving with appel-—

lant the paint which appellant had manufactured under
contract No. 2 and which the Government had acggpted and
paid for, furnished it to appellant for performance of
contract No. 1. Therefore, the district court agreed with
the Board that, under the risk-of-loss provision of Con-
tract No. 1, appellant was responsible for the loss of the
1,118 quarts of paint. Appellant then appealed to this
court. | | 6

There are two questions before us for decision: , (1)

whether the district court was correct in deciding the i issues

ee a eT

Tp oe Tee ee

97

before it solely upon the record made at the administrative
-hearing or whether it should have taken additional testi-
mony in a trial de novo, and (2) if the distriet court was
correct jin limiting the taking of evidence, whether it was
correct in its interpretation of the contract provisions.
The court below was right, at least initially, in consider-
ing the interpretation of the contract provisions a ques-

. ‘tion of law for its independent decision under the Wunder-

lich Act §2, 68 Stat. 81 (1954), 41 U.’S. C. §322 (1958). See
Kayfield Constr. Corp. v. United States, 278 F..2d 217 (2d
Cir. 1960) ; H. Rep. No. 1380, 83d Cong., 2d Sess. 5 (1954).
But see United States v. McKinnon, 289 F. 2a 908 (9th Cir.)
(per curiam). On the other hand, when it is necessary to
look beyond the four corners of a document to resolve the
intention of the parties, the question of the meaning of
the contract has often been considered a question of fact...
West v. Smith, 101 U. S. 263, 270 (1879) ; 4 Williston, Con-
» tracts §616 at 660 (3d ed.). 2

_, At first blush it may appear paradoxical for appellant
‘to insist thatethis issue is a “question ‘of law” within the
Wunderlich Act, and also insist that it be allowed to present .
additional evidence on the point in a trial de novo before.
the district court. We realize, however, that the terms
“question of fact” and “question of law,” may have various
meanings in various contexts. Therefore, we can imagine |
situations in which appellant’s argument would be internally
_ consistent. Cf. Kayfield Constr.:Corp. v. United States,
supra. We must decide mneee we are presented with one
of those situations.

The law is quite unsettled whether a district court re-
viewing the administrative ruling of oné of. the contract
disputes boards should grant a trial de novo and take tes-
timony, or whether it should limit its review to the record
made before the administrative board. The Court of Claims
has generally held‘that a trial de novo should be granted.

~

Volentme and Littleton v. United States, 145 F. Supp. 952
(Ct. Cl. 1956). Fehlhaber Corp. v. United States, 151 F.
Supp. 817 (Ct. Cl.), cert. denied, 355 U. 8. 877 (1957). The
district courts and the courts of appeals, on the other hand.
have tended to restrict court review to a review of the
administrative record. United States v. McKinnon, supra;
Lowell O. West Lumber Sales v. United States, 270 F. 2d
12 (9th Cir. 1959); Mann Chemical Labs., Inc. v. United
‘States, 174 F. Supp. 563 (D. Mass. 1958); L. W. Foster
Sportswear, Inc., 145 F. Supp. 148 (E. D. Pa. 1956) ; United
States Nat'l Bank v. United States, 178 F. Supp. 910 (D.
Ore. 1959). But see Blake Constr. Co. v. United States,
‘supra. Moreover, the legislative history of the Wunderlich
‘Act is inconclusive. See Volentine and Littleton v. United
States, supra at 955-57 (Littleton, J., concurring).

We agree with the statement by the Court of Appeals
for the District of Columbia Circuit in Blake Constr. Co.

+ v. United States, supra at 397, that “a practical approach

. to the allocation of functions is the guideline” we should
follow, but in so resolving the problem before us we reach
the opposite result from the one that court arrived at in
Blake. Here, the issue on which appellant wants the dis-
trict court to take additional testimony was squarely. pre-
sented to the Contracting Officer and to the Board of Con-
_ tract Appeals. There is nothing to indicate that appellant
was precluded from introducing before the administrative
tribunal whatever evidence it wished to present, and -ap-
pellant does not claim to have any evidence not known
of then and discovered afterwards. Moreover, appellant
has failed to point out what additional testimony, not pre-
sented to the Board, it desires to present to the district
court, and it concedes in one part of its brief that the basic
facts are not in dispute.

Appellant should have presented all its evidence to the
administrative board. If it had done so, the evidence would

o
?

.

ae

lade el ee ee

en ee en ee ee ee

have been available both to the administrative tribuna! and
to the district court. Since the parties had proceeded
through a full hearing before the Board of Contract Ap-
peals, the district court was quite. correct, under the cir-
cumstances here presented, in limiting its review to the
record made before the administrative board.: Cf. United -
States v. Hamden Co-op. Creamery Co., 297 F. 2d 130, 133
(2d Cir. 1961).

Thus we turn to the remaining question before us,
whether, on the evidence before it, the court below was
correct in its interpretation of the two contracts. We hold
that the district court’s interpretation was correct. The
‘two paragraphs of contract No. 2 quoted earlier in, this
opinion make it abundantly clear that it was the Govern-
ment’s intention in entering into that contract to obtain the
quantity of phosphorescent paint it needed to re its
obligation under contract No. 1.

Appellant concedes that the Government assented and
paid for the 1,118 quarts of paint that were destroyed.
Upon this acceptance these quarts became Government-
furnished paint ‘under contract No. 1, not under contract
No. 2. A reasonable construction of the two contracts is
that contract No. 2 implemented contract No. 1, and that
contract No. 1 remained in effect throughout the continu-
ing relationship between the parties. Since contract No. 1
placed the risk of loss upon appellant for “Government-
Furnished Property” under that contract, it follows that
appellant mrst bear the loss. :

Appe. % - fies heavily upon the “Government-Furnished ~-
Property” provisions of contract No. 2, which place the
risk of loss on the-Government for property to which those
provisions apply. These were standard provisions found
in all negotiated contracts of this type. It would appear
that the parties included these standard provisions with-
out considering exactly how the provisions would affect the

— 100
relationship between them. It would be an awkward inter-
pretation to infer that the present parties. by the inclusion
‘of this standard clause intended that the paint to be manu-
factured under contract No. 2 by appellant was to be
Government-furnished property under that contract.
pee a belated contention as to delay ™ the Govern-
ment is also without merit. |

The district court properly dismissed the complaint.
J udgment affirmed.