# Joint Appendix — Power Reactor Development Co. v. International Union of Electrical, Radio & MacHine Workers

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386410_0022%3A02

## Record

- **Collection:** Supreme Court brief
- **Document type:** Joint Appendix
- **Published:** January 1, 1961
- **Citation:** 367 U.S. 396

## Text

cuseisteand wen if RRL meee Sore te iat Bs re SA aA hr ese

Peg Le ae,

‘ni

Seb

arte

Os i LT OR ROY ee a OE oO aS

Re ee

w eo

ae Bee es
.

+
te

Ss RAN piatomee Re ES

=

INDEX

Voitume_ I

_~ Oral Testimony Taken Before the

Hearing Examiner ............

WITNESSES

Acker, Ernest R.

Direct Examination by Mr. Reid

J

Cross Examination hy Mr. Sigal »

Cross Examination by -

Mr. Maslowski ..............
Cross Examination by

Mr. Morrisson ..............

Recerd
age

262
269-273
273-279
327--341

345-346.

379-381

387-388

448-449
467-469

494-502

505-509
513-515
636-640

690
" 707-708

729-733
- 761-763

778-794

826-827

Appendix
age

Coe

II.

Record | Appendix
Page. age:
Re-cross Examination by’

ee Re heer e: 841-843 6263

Bethe, Hans A. heh :
Cross Examination by Mr. Sigal \1145-1147 64-65
Fields, Kenneth £. | :

Cross EXamination by Mr. Sigal 2705-2707 65-67

el 2743-2744 67-69

2753-2754 69

McCullough, C. Rogers aes :

Cross Examination by 5
Mr. Morrisson ........... ... 2999-3003 70-73,
Milis; Mark | ;

Cross Examination by Mr. Sigal 3278 73-74
2 ° = ‘ $

Radley, H. Monroe

Direct Examination by .
EEG, PROPPOON. oo ce ks aa 3285-3286 74-75

Cross Examination by Mr. Sigal 3286-3305 75-90 °
Cross Examination by | :
Mr. Claytor ..:.0..5.7...0: 3305-3318 91-101.
~ Cross Examination (resumed) by | : ae
Mr. Claytar’..../.......6.003 3320-3322 101-103
‘Re-direct Examination by "ele i |
Mr. Morrisson .............. 3322-3325 103-105

“TIL

: ; hicnad ae Aprendir.,
; ; : Page Page
Re-crosy Examination by a
Bs MS os cc as ces 3325-3326 105-106 -
Wolman, Abel ~
Cross Examination by .
Mr. Claytor ......... -tscoacse | QeOd—Geel-. 107-110
Acker, Ernest R. (recall) >
- Cross Examination by Mr. Sigal 3392 “111
. \ 3398-3403 112-116
~~ 3408: =—s«446

3432-3484 117-159

Cross Examination. (continued) by - .
GME sto 3486-3528 ° 159-193
3536-3539 193-196
. _ 3542-3545 196-199 |
3557-3558 199-200

. Fields, Kenneth E. (recalled)

Cross Examination (resumed) by :
Pe ere rr rte - 3570-3585 200-213

if 3603-3604 ~ 213-214

3614-3616 214-215

Cross Examination by e |
“| Mp. Clayter 1.00.00... Mee - 3621. + 25.

| McCarthy, Walter J.,-Jr. (recalled)

‘Direét Examination by | |
Mr. Claytor ... Q. Your answer is, then, that it does give the cost

of each item. A. It doesn’t give the cost, Mr. Sigal.

It gives the estimaic of the cost at which cach item is

included in the _

[329] :

- PRDC construction estimate. In other words, it gives the. -
cost which we will be relieved of by reason. of receiving
these components from APDA.

10

_ 330

Q. Are you drawing. a distinction between the actual
s cost of the item and the cost that-is included in the esti-
mate? A. I am drawing a disinction between tbe cost to
APDA, which is purchasing and erecting this equipment,
and the cost at which those items are included in our cost
estimate, that is, PRDC cost estimate. :

Q. I see. Do you have, then, a ‘statement showing the
cost to APDA of each item and the cost to PRDC of. the
same item, and so on, for all the items which APDA will
transfer to PRDC. A. I want to be sure that I under-
stand your question and that I am giving you a responsive
answer. I have a list which shows the items, the cost
attached to each item in the PRDC construction estimate.
The cost.to PRDC will be nothing because they will reeeive
this equipment. in APDA without charge.’ The cost to

_ APDA has only been determined of course to the extent

that orders have actually been plated and bids for the
equipment have, been received from manufacturers.
Q.. Do you have that list??. A. Yes. r
Fhe Presiding Officer: Vill this be an exhibit,
Mr. Reid? © is

[330]

’ Mr. Reid: Not ours, no.
Mr. Sigal: Shall we mark this Acker No. 62
The Presiding Officer: Acker No. 6. -The docu-
ment will be marked Acker No. 6 for identification.
(Acker Exhibit No. 6 was marked for identifica-
tion.) ’ :
The Presiling Officer: ‘Will you furnish the Re-
porter a copy? ~
Mr. Claytor: Yes, we wilh. ”

f
°

11 ; ,

330

By Mr. Sigal: :

Q. Is this list which we have. identified as Acker No. 6
complete for all of the equipmen. anc devices which APDA
will provide to PRDC? A. Yes, jt is. : i
—Q. You have listed in the first column the ‘estimate
material cost. What does the estimated material cost
cover? A. It covers the finished cost “of the particular
piece of equipment referred to.

Q. That is the manufacturing cost? A. That is right.

Q. Does that inelude design cost?) A. No, it does
not. |

Q. Does.it include engineering eost? A. To the exten
that the manufacturer, did any engineering in connection

with it, yes. ae. .

[831]

Q. But to the extent that APDA did any engineering,
it dees not? A. No, it does not.

Q. Are you familidr with the estimate of the design
‘and engineering costs to APDA of these items listed on
Acker No. 62 A. Not specifically, no. -

(). Are you familiar generally? A. Yes, I know what
APDA has spent and proposes to spend for design and
development costs. .

Q. But you do not know what the design and engineer-.
ing costs are specifically with, ‘reference’ to each one of:
these items? A. No, I don’t.

(). The second colund is headed estimated installation
labor. What labor is that? A. That is the labor of erect-
tion on the site of these various items of equipment.

Q. Is APDA going to install each of these items in
the reactor plant of PRDU? A. That is right.

.

12

BARE Sa CE RS |

Pe NE Ar ea VTP g Re A Te OUT tw
Re Wursre tT yetg t at past | ; "e

‘A.

333

Q. At what point does PRDC accept transfer of these
items—prior to installation or when the installation is

complete?) A.- After APDA had completed the tests.

[332]

Q.. And before installation? A. No, no. After they
have complet ted their tests of the complete installation? -
Q. Of the complete installation? A. That is ‘right.

Q. The tests you are referreng to are the tests in the
reactor itself? A. The test of this particular equipment
which APDA is going to build and finance itself.

‘Q. You have listed a column entitled contingencies.
Do you know how the figures ‘were arriv ed at there? ~A,
Those contingencies are the portion of the contingency
items included in the PRDC construction cost estimate |
which relate to these various components.

Q. Do you know how the figures were determined?
A. They represent varying percentages of the direct.
material and labor costs.

Q. -Well you explain that satel’ A. In some
eases where the design is completed, where we have re-
ceived ‘manufacturers proppsals or made contracts with
manufacturers for the manufacture of the equipment, the

‘contingeney item might -be -10 per cent.

Q. You say it might be 10 per cent. How do you— |

I can fdentify particular items if you are itnerested
incknowing that. .

[333]

Q. Yes, take a particular item on which you say the

‘ contingency is 10 per cent, how do you arrive at the 10

per cent? A. That is based on experience in estimating

13

333

conventional steam station plants. Where we don’t have ¢

the background of experience that we have in connection
‘with éonventional piants, we would use‘anything from 15
per cent up to 30 per cent contingency. So it is a judg-
ment figure,-Mr. Sigal. Those are judgment figures.

Q. You mean based on. past experience? A. Based-

on past experience or current experience based’ on’ the
exposure to unknown or uncertain elements.

Q. Let us take the very first item, reactor vessel.
You have a contingency there of $171, 600 age inst a total
cost labor and material of $1,144,800. A. Yes.

-Q. Wiil you tell us how you arrived at that contin:
gency? A. On the basis of a percentage applied to that
direct material and labor cost. bas”

Q. Yes. How did you arrive at the percentage? We °

are now talking about a reactor vessel which has never

been built before. -A. That is included, Mr. Sigal, in’

a-vategory listed in our construction estimate, which is
—* ‘an exhibit in this case, under. a heading called reactor
plant construction. I
eae [334] ae
beg your pardon. a.moment. ne referring to his
papers.) |

That is included under’ a heading in our construction :

‘ estimate called reactor: plant equipment, and the reactor

vessel is included in a group of material as.to which

we.have assigned 2 contingency: item of 15 per cent.

The. particular reason for that is that the reactor vessel ,

itself is the largest single. element in that category and
we have.a proposal and have placed an order with the

Combustion Engineering C ‘ompanly for that reactor vessel

‘ata — “which i is shown. ;

14

i y,
SLEEPY EER er PEABO REIS Fa es
bas be »¥ +

PS ie

=f

OE gr Pee cA

DS lis Bn NO eo erg lae’>

LC wite Ot aiesed

ag MES

335

@. You placed an order fur the reactor vessel at the
price which is shown? A. No, because there are ther
. elements aside from just the purchase of the reactor vessy!

itself. Of the $1,062,000, the reactor vessel, based on the
proposal af Combustion Engineering, is $915,800.

Q. What is that figure? Is that the. contract price?
A. That is. the Combustion Engineering proposal on
which an order has been placed with Combustion Engineer
ing. nn :

_ Q. For the reactor vessel?) A. For. the reactor ves-
o eee

Q. Why did vou charge $1,062,000 for. that item? A.
T say there are other items included there.

Q.. In this reactor vessel item?, A. That is right.
~Q. What other items are included?

[335]

A. There is an allowance for extras ae as: loop stub
'. piping also, thermocouples, expansion joints, for. nuclear
operation, We have an item to cover escalation. There
is heating system material., That is heating coils for
keeping the sodium fluid dutlug ‘the reactor -shutdbwn.
There i is the exection cost. There is the rest of the reactor
vessel. Therevis the reaction cost of the heating system.

Q. Is that all ineluded ° in the million dollar item? A.
There is steel shie ding. The entire item which we have
listed here as reactor-yessel, steel shielding, internal str "ue-
tutes, and heating system, in our estimate adds: up to
$1,37 3,900. We will receive this vessel and other portions
of that equipment from APDA to the extent that it relieves
that total cost of $1,373,000 by $1,316,000. .

335 | : / : . . . -

Q. What is the difference? What does that difference
represent? A. The difference is in items whieh PRDC
will itseif provide..

Q. Mr. Acker, getting to the uestion that I asked you
originally, how did you ‘determine or how did APDA
determine this , contingency of $171,600 for ‘the item
of reactor vessel?! Did they’ apply just a = mathe-
matical formula and say ‘‘This is what it will
*, or was it related to some more specific information
and possibility. A. It was a mathematical application of

” he?’

15 per cent

; , [336]

to the material and labor costs based-ot our judgment
as to the exposure that \ e had for contingencies for this
class of item. |

Q. Wet experience have you had or has PRDC had
with the building of reactor vessels?) A. This is our
first experienve. ,

Q. So you can't rely on your experience to determine
what the contingency is, can yout A. Generally«speak-
ing, that is right. Maybe, but I would like to point out
again, as [I said, that the major portion of the tést. of.
this item is based on a proposal and an order which is
already placed at a figure. So as to that portion of the.
total we see ho reason that we should go any further than
u 15 per cent contingency. fi .

Q. Then your -centingengy is not related to the ques-
tion of whether or not PRBC has dc.ermined the prob-
lems of safety with 1espect to the reaetor vessel? * i
don't understand your question. -

Q. I would like to know, Mr. Acker, whether thir eva.

4

16

p” . a 337
tingency reflects to any extent any problem or doubt with
respec] to whether or not the reactor vessel as designed.
Will meet the neyd. AL This contingency iteni, Mr. Sigal,
is not intended ‘to provide fo cha. os in the design or
So structure of the’ equipment. :

. ‘ ; ”
[337] |

AQT see. Thai is irue with every contingeney item
Which is mentioned in this estimate and inthe other
estimates. that you have submitted? A. That is true,
except to the exte ut that the “design of some of the items
may not have heen completed as vet and if modifieation
of those items is necessary then the contingeney- item
would cover the cost of the modification, .

Y. But generally speaking, certainly, so far as. what.
you have presented hére, the contingencies do not include
the cost of design if chang s are required? — A. It might
cover some of the cost of design’ changes hut not the
construction of @ new picee of equipment which is te.

replace one whieh js included here. : :
LN W hether or net it does incluile design costs, you
are not certain? I
Q. I will state it affirmatively. Is it not true’ tnat the 4 4

29.

388

statements you have submittéd indicate that PRDC will
operate fer only ten years? A. That is not true.
Qe That is not true? A. No.

[387] }

Q: On the next page, page 7, in paragraph E it says,
‘The Commission will and hereby does waive its use
‘charge for special nuclear material used in connection with
the project for the period commencing with the effective
date of this contract and endiny five years after comyhence-
_ment of operation of the reactor plant as established in
accordance with the provisions of Article I.’?:

Tf this contract is signed, say, this month, March 1957,
‘and thé plant doesn’t go into operation until sometime in:
1960, ean you explain why the Commission would provide
special nuclear materials for the period ‘between the effec-
tive date of the contract and the date when the ractor
goes into operation? A. During that period the fuel

elements would be Cx
. [388] - ,
[38g] °

| expected to be fabricated and Seite nuclear material is
necessary for that purpose.

Q. In 1957? A. Not necessarily i in 1957.
» Q. The allocation provides for nuclear materials from:
the effective date of this contract. That is what it says
here. Why would you need nuclear materials in 1957? A.

3 T don’t think we do. I think we are cheduled to need them
mn 1958. hey : .

Sud i
«

PN tae
ESR 2

Feiss Oe

or

Die os,

388
Q. That is what the agreement provides. A. I can’t
see any objection to that, Mr. Sigal. : 3

ee ¢ ® & | 2
[448]

« Q. Asa matter of fact, this whole project rests on the
proposition that it can not operate unless AEC buys
plutonium produced in this reactor? A. I think that is

a fair statement. It could be operated—No, I thik that
is a perfectly fair statement.

7 ’

[4491

Q. In: any ev wi certainly PRDC wili not operate this
plant if it can not sell its plutonium to the governnient,
to AEC? A. That is true. :

[467]

Q.. As a matter of fact, I assume you know, Mr. Acker,
that no fast breeder reactor has been built which has
survived all tests made? A. I think that is a fact.

Q. So there is now no experience in any organiza-—
tion, be it AEC or PRDC, with respect to the building of
a successful fast breeder reactor which is safe.

[168]

A. I would not make that statement, Mr. Sigal.

Q. Because you have no ne of it yourself? A.
That is right. \

Q. You say that the risk to PRDC is roughly the cost

24

494
of building the reactor, naniely, about $40 million. Well,
what— A. I would say it is contributions to which the
_ wember conipanies are committed plus the amount of the
loan which they will haye guaranteed.

Q. That is about $38 million? —
* Q. Yes. A. I don’t know that it has made any pro-
vision. If it had made provision, Mr.-Sigal, it would not.
he a risk. |

Q. ” When yowsay that there is a risk in proceeding now
are you asserting that if the schedule can no{ be met,
PRDC will abandon the project rather than put any more .
money into it in order to build it at a later date? A. No,

I am not saying that at all. .

Q. All right, then, I am asking you what. arrangement
has PRDC made to meet the risk that its original plans
may not work out? A. -It has made no arrangement.
Whatever arrangements

[469].
were made would depend on the circumstances at the time
that it was faced with that decision,

eo eo sd

[494]
By Mr. Sigal: ste
Q. Mr. Acker, will you look at page 5 of this exhibit, .
this summary? A. I have it, Mr. Sigal. ;
Q.. That shows at the end of the total estimated plant
cost; is that right? A. That is right.

25

494 ee

Q. $32,400,000? “A. That is right. ;
'*Q. That does not’ include, does. it, certain other. engi-
; neering and research matters that are necessary during .
construction ? ‘ ! |

For éxample, ; that item does not ‘neds the $5 million
that PRDC says it will spend during constructien, does
it? -A. That is right. ; |
QQ. Can you tell us w hat is the actual cost of construc-

tion, including all items spent during the period that you

eall the construction period? A. That’ would be shown
"on page 7. Do you have a page 7 to your exhibit? ak
; /. :

| [495] | :

Q. Yes. A.. $43;216,000. . -
Q. Is that cash outlay by PRDC? A. No, that includes
$7 million, received in test equipment and devices_ and

‘research-and development expense by’ APDA.

Q. .So aecording to that figure, fhe amount of money °

~ actually expended by PRDC w ould be $36,216,000; is that
right? “A. That is right.
- Oo If that is the amount actually expended during. that
period, what amount will PRDC have in its reserves at
the time that cotistruction is completed? A. As I remem-
ber it, Mr. Sigal, PRDE€ will have a balance at the end.
of the-construction period of $3,499,000. |

Q. How do you deriye that figure? P I think that
is stated in my testimony,: Mr. Sigal.

_ The Presiding — Officer: Page 13 of your testi-

mony?
By Mr. Sigal: . . 8
€). You stated that in | the first. paragraph on page 13.

Si F..) 2 . Qe
» ~

ac

496

Can you tell us bow you derived this. figure? A, Yes,

*

anticipated total resources of PRDC, including the: $7
mitiion from APDrA,. dsy $45,540,000, The reactor cost,
overall, includiag the $7 Million value placed on the contri-
hutions of APDA, is $43, : 216,000, and the difference, I” -
think,’ is $9,394.00. . i
If you add to that the provision for working capital

(496)

Ww hich we expect to fees at. the end. of the construction
period i in-hand, you get'a total of $3,499,000. *

Q. If you are going to include that. $1,175,000. -as ‘a
statement of your excess Over costs® nh certainly you
ought not to include that same $1,175 ee the statement
of your construction expense,, should you, Mr. Acker?
A. It depends on how you want to show it, Mr. Sigal.
pn is a provision which must be made and must be

‘ailable during. a construction period involving expendi-
sped of this size to provide pr meeting payroll, meeting
all kinds of expenses from time to time.™

It, in effect; Mr. Sigal, is the amount that you hope to
maintain and expect to maintain and should maintain in®
your bank account #6 meet whatever disbursements are
necessary, Tt is not considered as an expendable ifem, j in.
other words. It is a provision for evening out your ex-
penditures*over a-period.:

Q. It is not a fund or a sum that you 1 spend? A. That
Is right. ‘ : r

Q. So to %all it a cost of. construction, as you do on
page %, is stretching it. a little, isn’t it, Mr. Acker? A, I
don’t think so. I think it is an item that any .0dy faced
with the construction of any plant must take into eon-

e Nee ‘ °

°

496 ig

sideration: The money must be provided whether it is
expended or left over-at the end of the period. . It has
to. be fn hand and has ‘to be in the bank available for use.

oe re [497] aes

Q. In any event, your statement, is that this is not a tis
that you intend to expend? A. That is right.

“Q. During the construction peri dt: A. That is right.
You will see. by the same token, Mr. Sigal, that it is con-
finued all through the spennee period, as well.

_ Q.. Yes. ve

- Does this construction estimate, this exhibit, indicate

all the expenses, that ‘you anticipate having during the‘con- .

struction period? A. It does.

Q. This does not cover any expenses that go ne the’

-eonstruction period, does it? A.. Let me check that. °
Yes, this includes an item of $550,000 for initial opera-

tion from’ low to full load which covers the cost of the’
test year which immediately follows the completion of |

construction. ‘
W hy did you include that item in the construction

estimate if this i is not aitributable to construction? A. It — 7

is a question of judgment as to where to put that kind of
item, Mr. Sigal. Is the test year. part-of the construction
period or is it a part of the operating period?. ‘That is
just a question of semantics, it seems to me.

m™
[498] |
QQ. In. your opinion, at least as this exhibit reflects, the
test year is part of the construction period? “A. To the
extent that we hav e-ineluded -the cost of conducting the

an

a . | 28

499 |
test: during: the test year in the construction estimate. It
might be put that way. Ti really doesn’t make any differ-
ence, Mr. Sigal. You have to-maké the proVision either
way; however you want to characterize it. .

Q. This is for the purpose of analyzing your statement,
Mr. Ackers “All T am asking is, is it not true that PRDC
judged this to be a construction cost inasmuch as it included .
the item in its construction estimate? A, I suppose that

_inference could be drawn. It seems to me it is academic.

Q, Is it’a fair. statement to say that in your testimony
whenever you refer to construction and its cost, you refer
to the matters ‘which are jneluded. jn this construction esti-
mate? A.. That is right. ;
> Q. . Will you examine Item L,. that is, the detail on the
preoperation testing after construction? A. Yes, é

{). The introduction .to this Statement—by the way, I
am quoting fromAtem L in Aeker Exhibit No. 7 for iden-
tifieation—quite: “% ; .

4 - “This capital item is an expense that occurs be-
fore the plant is ready for commercial operation.
It includes

[499]

only operating expenses and does not include any

of the costs of money or taxes other than social
security taxes. a
“The expense i§ incurred after completion of the

plant construction and before it becomes critical. It
includes final adjustments to all plant equipment,
minor changes-and an item for inspection’and testing

of the initial loading of core and blanket elements.

3 ‘Tn addition, the expense covers several weeks that

Poe

: -

°

499

are required for thie progressive loading of the re-
actor -eore, carefully: measuring’ the approach to

criticality after the addition of, one-third of the core -

elements anid again after each additional element is

added to the core. The hold-down plate is lowered, |
the reactyr locked, - control rods lowered -after .

each. element addition.’

The cost of that item is $350,000, estimated. — A. Right.

Q. The deseription there indicates what has to be done
up’to the point of reaching criticality, doesn’t it? A. That
is right, up to the point of beginning of operation = the
plant. . . :

Q. The actual imecuaiu’ A. That is right..

Q. Of: course, it includes, as it says, the insertion of
nuclear fuel into the reactor? A. Yes. . Obviously that
can’t be done until we get an

[500] ~ y
operating permit. | |

Q. ‘Is that so? A. That is right. , |

Q. Where does it say that, Mr. Acker? A. It semi
~ say that.

Q. You know that of your own knowledge! A. I believe
. that to be the fact. ;

Q. Is there anything in the record which: “$0 indicates?
A. Not that I know of.’

Q. Will-you turn over to Item N which j is titled, ‘*Tnitial
Operation, Low to Fufi Load’’?

‘‘This allowance provides for the cost of one year’s
operation that,is required to bring the reactor to a
condition of safe operation at full load. After the

reactor becomes critical it is loaded to give a small

30

G

en ne

“501
heat output and the control and safety rods-.operated
‘to determine their effectiveness. These tests are
repeated many times in the process of calibrating
control roads and proving that the safety rod char-
acteristics dre satisfactory.

‘After these tests which require several months,
other tests estimated to take about six months will
be performed. These tésts- required to prove reactor

| stability include a Jong series of tests with oscillat-
ing reactivity applied to the reactor core with pro-
grammed reactor’ a

[5019
loadings and oscillator frequencies.”
A. Right. —— ee
Q.. Are you prepared to explain that second paragraph?
* ie Te erat Ce
ie (Laugliter.)

You knew the answer in advance, Mr. Sigal.

Q. In any event, Mr. Acker, it is clear from this state-
ment that this refers to a procesy which is involved in the
~ operation of the reactor after it reaches criticality? A.
That is true, Mr. Sigal. - : : |

Q. I assume you are aware of the fact that perhaps the
most dangerous period in the life of a reactor is the moment
of bringing it to criticality? A. I cannot state that as a
nuclear expert, Mr. Sigal, but- just as a layman I would
assume that that would be a proper statement.

_ This operation obviously is another that could not be
undertaken until we have an operating license. res

Q. Under this statement, Mr. Acker, it appears that the

“501.”

preoperation testing in the initial operation to full load
will begin somewhere around 1959 or 1958? A. It is sched-
uled for the end of 1959. ‘The preoperational testing would
be at the end of 1959. The initial operation low to full load
is scheduled for 1960.
Q. -The entire year? You mean it will begin in 1960T
- (502) : .

A. That is right.. Our program and all of our operating
schedules have set aside the full year 1960 for that opera
tion.

Q. Will you look at Figure No. 1 which was referred to
before in Mr.. Amorosi’s testimony?

You will note there on. the right-hand side of that

figure, under 1960, that the pxeoperation testing is to begin
in December of 1959. The criticality date is set at Decem-
ber 15, 1959, according to this picture; is that right? . A. |

According to this statement, that is true. I think there is | |

a difference in terminology.

Q. Mr. Acker, I don’t know whether the PRDC repre-.
‘ “sentatives differ i in their use of these words, but this figure
uses the precise language that you have used” in, the con-
structionestimate. A. That is true, Mr. Sigal.

Q. Thjs whole year of 1960 is shown as devoted to pre-
operation testing.” If a year is devoted to that, then it _
would appear that another year, 1961, will be required for
the second operation, namely, the initial operation low to
' full load, according to your own statement. A. .Mr. Sigal,
that is not the intent. There is a confusion of terms here,
~ and I will readily admit it. The preoperation testing as_.
included in Mr. Amorosi’s exhibit is the item which we dis-

»>

*

506

cussed before in our construetion estimate designated N,
Initial Operating, Low to Full Load:

# > +.

[505]

ita I think I asked es earlier about a possible
breakdown of the $5 million &timate on research and de-

velopment by PRDC, and your statement was that that

. Wasn’t available. A. That is right, there is no specific

schedule of proposed research and development expense.
That is an allowance for whatever we may do or be re-
quired to do:

Q. There is an item of $4 million by APDA for similar

work. Is there any breakdown of that? A. That is in-

1959, which is in evidence in this proceeding.

Q. . You have no other breakdown’ than what appears
on that exhibit? A. I have none.

Q. You are aware, are you not, Mr. Acker, thatthe ex-

- eluded in the APPA budget for the years 1957, 1958: and

perts and consultants for PRDC anticipate that there may -

[506]
be substantial. changes in components dtring the course
of construction and prior to the time they actually get
‘into operation?. Are you aware of that? A. During the
course of construction?
Q. Yes. By ‘‘construction’’ I am: taking it up to the

_ ~point of actual operation. A.’ There may be changes re-
’ quired as a result of the test of the APDA equipment and -

devices which they propose to furnish to us.
Q. Or as a result of the rescarch work done by APDA

33

506 ee bs aa ar

. or PDRC there may be changes required? A. That is con-
ceivable; yes. Ea , i
Q. Or work done by AEC? A. That is conceivable.

Q. Or any eonsultant that you may use for this pur-
pose? A. Yes. The reason that I qualified what I said
previously was that all that work that you refer to will
be in the course of completion during this three-year con-
struction period ficcessively.. If the result of some of the
tests that are to be made show that changes are required
in any of the proposed components of the reactor plant
before they are actually fabricated, then, of course, we will
not be subjected to additional cost for new items.

Q. What happens if you learn about these things after
the designs are frozen? x

ae a [507]

A. Then we are exposed to additional costs for new design.
If the piece has been. fabrieated, we are ee exposed
to the cost of replacement.

Q. What provision ‘have you made to meet that con-
tingeney? A. We have $5'million, as I told you, which is
unassigned for the most part.

In- addition, in our estimate we show as the estimated
cost to us of the efaipment and devices which APDA will
furnish us about $4,100,000. In our financial statement

we have estimated the value of those pieces of equipment

and devices at $3 million.
That is in on both sides of the equation. We have con-
sidered that as a cost in our financial schedules and we

liave considered it as a receipt. We could have put it in -

dollars on either side. .The difference between ‘that’ $3
million which we have in our financial schedules and the

OL aAB Hay Oeste eh | attain He ange oe oe a

°
ean eh BE so DA

iene vmtrintteny,

508°

#4,100,000 which is included for the same items in our con-
struction estimate, perhaps $1,100,000, would be available -
for such changes and adjustments as hdve to be made.

YQ. So your estimate, then, is that you will have $1
million available for that ‘purpose? .A. We will have $1
million, plus whatever portion of ihe $5 million which wéuld
be available for the purpose, as well. . 3

Q. Let us assume: Mr. Acker, that the amount required:
to make the changes exceeds $5 million or $6 million.. What

[508] :

will PRDC do to meet that contingency?, A. Mr. Sigal,
you are asking me personally. I am not the least bit con-
cerned about that. These ‘companies will: have put in $25
million, and will have put into APDA reserve previously
$6,700,000, something on that order. ‘With that kind of |
investment in a very important project, I see no possibility
—-if you want to quahify it, I will say no reasonable pos-
sibility—that these companies would not come forward and
put up the additional money required to‘complete the job
which they had undertaken. :

Q. The fact is, Mr. Acker, that PRDC does not have the - -
resources now, it doesn’t have any comniitments to take ~
care of any of the contmgencies you are now mentioning,
does it? A. Yes. - po
: Q. What is ‘the provision?, A. It has the $1,100,000
that-I spoke of, plus whatever portion of the $5 million that
could be used for that purpose. ace ,

Q. My question to you was, suppose the additional costs
exceeded $6 million? Where. is PRDC going ‘to get the
money? A. I thought I indicated that very clearly, Mr.

"-
oo)

508

Sigal, that it would come in*my opinion from the member
companies who, I think, would be glad to put up the addi-
tional money required.

Q: My question to you, Mr. Acker, i is, is. it not: true

Rag. a

that-at the present tinre there is no commitment from any- .

hody ;
‘eal

any member of PRDC, to give oné cent more than they have
row committed themselves to give ‘in these lette ters of com-
mitment? A. That is perfectly true, but I would like to
say that it would be most difficult to get anybody to make
a commitment for an unknown amount. ©

“

*. *

[513] °

' By Mr. Sigal: ; ;

Q. ‘Do you know what force that containment vessel is
planned to contain? A: I am not qualified in that field,
Mr. Sigal.
_ Q. If it should turn out, Mr. Acker, that the estimate
is. wrong, is it not quite possible that the entire vessel
_ will have to be rebuilt? Qbviously, ‘if if is too weak to
*-eontain the force for which it is intended— A. If the
calculations upon which the sfréngth of the vessel was
_based are wrong, it might have to be rebuilt or it might
have to-he reinforced or an additional might have. to is
— outside. ‘Anything might happen. .

Q. Are you aware that there is a serious question in
i3 case as to what nuclear accident might have to be con-
-fained or the force of such an accident? A. Yes, I am
aware of that.

36

i. é
A ARO“ eacas te tat ata Ld S00

515 -

-Q. Hasn’t PRDC gone ahead and wade its plans with
respect te the kind of vessel it will order Without waiting
for final experimental results on this question?

[514] cs . # %

A. That is true. -Those experimental results would be.

expected to confirm the theoretical calculations of the
engineers and scientists who have made the assumptions.

on which the design was based. Peay :
The Presiding Officer: Mr. Acker, did. you ‘finish

your statement? — . * |

The Witness: -Yes, I. did.

By Mr. Sigal: ‘4 |

{)..- That vessel would have to be ordered and built prior
to the time that those experimental ‘results: are available,
won’t it, Mr. Acker? A. That is right. That is one of
the financial risks that we are assuming,

Q. Are you prepared to say that the members of PRDC

will go so far as to pay for the complete rebuilding and
' redesign of the reactor in the event the experiments show

serious fault in the whole structure? A. You mean just

the reactor itself, or the reactor plant. .
Q. I mean the whole project. Are they prepared to -

start from seratch to redesign and-rebuild the reactor? A.

No, T am not prepared to say that, Mr. Sigal. »

QQ. Let me eall your attention, then, Mr. Acker, to this

statement which appears in the testimony of Mr. Bethe, .

page 56. \

[515]

AL I have-it, Mr. Sigal.

515

Q. I’ call your attention to the last full paragraph on .
page 56. I will read it.

‘*To measure in particular the prompt positive’
temperature coefficient, we shall reduce the flow of:
coolant to a very small amount, possibly shutiing it
off completely, and wé shall use very low power,

_ perhaps_one percent of normal operating power. If
then the power oscillation is in phase with the re-
activity oscillation, this indicates a positive prompt

-temperature coefficient; if it has the oppdsite phase,
then the temperature coefficient is negative. If in
this experiment, contrary to what I betievexwill be
the fact, the temperature coefficient should turn out
to be positive, we shaii take the reactor apart and.
redesign it.’’ —

Did Mr. Bethe make that statement with the authority
of PRDC officiais? A. I have no knowledge of on what
basis he made taat statement.

Q. You are not prepared to state that PRDC wiil take
the reactor apart and redesign it if it turns out that it is
so seriously defective as indicated? A. Iam not prepared
to state that. That would be a management decision, Mr.
Sigal, obviously, which could be made only at the time and
under the eireumstances. .

. (636) °° 4)

Q. Since we are on that exhibit, I would. like to ask |
just a few more questions.
Mr. Acker, I would appreciate: it if you would make one

more mathematical calculation. ‘Have ‘you brought your .
© +

“Ny

38

BUM ies

iD

la DSUs ah geass ie

637

tide rule this morning? AL No, | aid not, sir, It-is in
Poughkeepsie, ’ . . i
Qa We calculated the figures derived from dividing the
estimated income of PRDC for plutonium sales by 106 for
each. year; is.that ‘right? A. That is right.

~ Q. We, 1 think, did not finish those calculations.

The figure 106 per year is taken from Intervenor’s Ex-
hibit No: 1, which shows that PRDC estimated the produc-
tion would be 106 kilograms of plutonium per vear; is that

right? A. Yes, _@ cs
Q. Now, assume that that figure 106 is. ‘an average an-

‘nual production. for 10 years; that would mean the total
production

[637]

for the 10 years would he 1060 kilograms ; is that right?
A.. On that assumption, yes. oe
Q. On that assumption, yes. ,
Will you please divide the figure- 48,623,000 by 1060? A.
That is approximately $46. on .@
Q. Per gram? A. Per gram. mes ;
Q. Mr. Acker, f think you heard Mr. Morrisson, counsel *

.

°

: for ‘AEC, state yesterday that the price per gram of

plutoninm which the AKC will pay to licensees:who produce

it beginning July 1,°1962, will be $12. 7
Mr. Chytor: b object, your Honor. That is an
incorrect statement, I believe,

Mr. Sigal: T thought that is what was said. -Tf-
that is not correct, let me read to you, Mr. Acker,
the release issued by AEC on this subject dated No-
vember 18, 1956; ;

The Witness: Yes.

3g

637

By Mr. Sigal::
re, “The Atomic Energy. Commission. has estab- —
lished guaranteed fair prices to be paid for plu-
_tonium and Uranium 233 produced in atomic re-

~ actors operated under license-in the United States
and delivered to the Commission for the one-year ;

_ period beginning July 1, 1962.

“The prices ate, for plutonium metal, $12 per.

a gram. For Uranium 233 nitrate, $15 per gram of
> U- a8.

s

‘ : a
ce °c 638 |
- [638] age
‘These prices are ome on the ‘éstimated -fuel
value of the materidJs and are identical with those

* .* to be. paid fo; these products of reactors abroad
- fueled with material supplied by the United States.’’

we “A. Yes. :
& Mr. Sigal:. I ‘pid like to call Mr.: Claytor’ s°
‘ attention to the language Mr. Morrisson used yester-
day if he still has any question about it, on page E
600 of the transcript: .

‘“‘There is a further. unclassified price of $12 a
gram which has been guaranteed from June 30, 1962
to June 30, 1963.’’

Mr. Claytor: That is right. “I thinkayou said

_ after 1962. I got the. impression that applies to the
‘rest of the period.
Mr. Sigal: I had no such intention. :
Mr. Claytor: Wery well. It is correct now, any-
; way. 9 .
Mr. Morrisson: “} think we should clarify the

gn* me,

40°" -

ra

bd

so Pah aay oni JIE ee eee
- °

Ce ene

on which these figures are

ae oie oS ll

| .
é , se ae A
record in one ‘other respect, Mr. -Examiner, Mr.

Sigal’s statement was that I said that the $12 price,

Was the price which the (dmmission would pay.

That is not what I said. T said that is a price which

has been guaranteed. i
. The Presiding Officer: noticed that; yes,

Mr. Sigal: | greatly appreciate the correction. T
‘think that is very illuminating. | think the ap-
propriate — 8

.

~ [639]

argument will come at a‘later date as’ to what the
‘significance of the difference is, -

By Mr. Sigal: =

Q. PRD presumably Was aware of this release at the
.time it was made, would you not say, Mr. Acker? That

is, November 18,1956? -A. Yes. We have a copy of it.
°Q. You have a copy of it? A. Yes, ,

Q. You stated céarlicr that jthe Exhibit XXIX which
gives the estimates of income for the operating period was
prepared in the latter part of December, 1956: is that

right? It is dated December. 31, 1956. A. That is right.
But in all fairness, Mr. Sigal, we have been making studies

“

7“

based for some period before
that time,a matter of months. So that some of the figures
reflect considerations which were determined a long time

prior to December 1956. e

Q.> You mean that the considerations that you had in
mind in December 1956 did not include the announced
price, or this announcement of AEC in November 1956?
A. They took that into consideration; ves.

5 a |

a a

. 2

Y

639 =
*Q. In so far aS any calculations for the year beginning

July 1, 1962 are concerned, they presumably took into con-

- sideration this announcement of AEC, did they not?

; [640]
A: They certainly did.

Q. And furthermore, with respect to any calculations
for the years thereafter, they took into consideration this
announcement of the AEC? ‘A. They took into considera-
tion, Mr. Sigal, evérything that we knew. at that. time.

. Q. Everything that. you knew in pretest of 1956?

A. —* is. right.

‘ ¢

« (690)

Q. And at the present time vou have no commitments
of any kind from your member companies or banks for the
contribution or loans in.exeess of the amounts which have
previously been- testified to, is that — A. That is
— .

s € *
_ Cross Examination by Mr. Maslowski
[707] . | *
Q. There has been,a considerable amount of discussion
in so far as the loan guarantee is concerned, dnd in so far
as this assistance is concerned that the members of APDA .
may be giving PRDC. Were there any special reasons for

"this kind of a setup? “A. Do you mean with the two dif-
ferent organizations?

42

LNs rey

al te ei Sn ne >

729
Q. Yes. A. . Yes.” The APDA group was a group in--
terested) primarily oe Ber

[708]

in research and development, and the ereation of a con-

ceptual design and study of the whole problem of, the ap-
plication of nuclear fission to the production of electricity, .

or heat that could be used for the production of electricity. |

Th®LRDC group represents such members of APDA, with

‘several. others added, who were interested in carrying the

research and development work on from that point, and
actually putting up their money to construct a demonstra:

‘tion reactor plant. It just represents a difference in the

particular interests of the members of each group, bearing
in mind that there are a number of companies that are
common to both.

* s+ &
.

“

Cross Examination by Mr, Morrisson
| [729] |
Q. As. I understand your testimony, of the other day,
Mr. Acker, you indicated that the contingencies in general
are not intended to.cover design changes. Is this correct?
A: That is my understanding, == os
Q. What provision, then, have you made to cover the
cost of possible alterations in the designs of the reactor

*

plant? A. To cover the alterations, the cost of the re-

‘ design, or of the equipment that might have to be sub-

stituted for something already purchased? |
(). Let’s cover it both ways. First of all, the possibility

“729
that design changes may be be made prior to the time the
equipment is ordered, which increases its cost; secondly,
the possibility that design changes may. be made after
equipment has been obtained so that it is necessary to
_ serap that equipment and substitute something else.. A.
We have discussed before in this proceeding the

| [730]
$5 million allowance that{we have in the PRDC over-all
cost estimate for research and development work. I would
think that design changes would be covered by that item.
You will remember that there i is an aggregate of $142 ,000 of
~ eontraets allocated to that ttem to date. In addition, the
amount at which we have the test equipment and devices
to be received from APIA, included in our cost .estimate
‘the approximately $4.1 million, whereas, in our financial
. figures, we have taken that in at only $3 million. So the
difference would be available in our resources to take care
.of equipment changes. I would. think that the $5 million
would be available for design, and approximately $1 mil-
lion would be. available for changes in equipment. If either
ot both items were not sufficient to take care of modifica-
tion of plant equipment, we would expect.that our member
companies: would’ be glad to put up whatever additional
amount were required. There are, however, no’ commit-
ments on their part to do so.
a: want to come back to that in a moment., Let | me
ask you this: Is the $5 million intended as a provision
for increased procurement costs that might result from
design changes, or increase in construction cost? A. No,
it is not. It could be, if there were any available, but

——

44

731

that is not the intent of the item in the ceatiiliinds esti-

mate. “It is for research and development, re- design, any-

thing of that ‘kind.

shed [731] =

on]
Q. And there are a nimber of. -at least, possibilities in

which additional research and development might he found.

necessary? A. That is right.
Q. Let me‘ inquire a little more about this $1 million

item which, as T unde ‘rstand, is the difference between the |

#4.1 million, ‘in Which there is ineluded in the construction
estimate the cost of those components w hich APDA will
procure, and the $3 million which is charged as APDA’s
contribution to the project. Tsthat a correct explanation?
A. Right. : ;
Q. Exhibit XXTI to the license application, or suppose
eall it license Exhibit XXI—~
The, Presiding Officer: To distinguish it from
Acker?

Mr. Morrisson: Yes.

By Mr. Morrisson:

Q. That is the agreement between PRDC ant APDA?
A. That is right.

Q. Article 1-B of that agreement states, does it not,
that the equipment and devices referred to in that article
will be transferred on a where-is, as-is basis, and APDA
will be compensated therefor on the basis of the’ salvage
value of such equipment .and devices as determined by

agreement. Is not this $1.1 million. then, an amountyw hich

PRDC | ie.

ae

\

BE)

‘

732
[732]

is obligated ito pay to APIA in compensation for the equip-
ment and devices which APDA will transfer? A. No. In
connection gvith the salvage value, discussions between _
- APDA and#RDC fix the basis on which the salvage value

will be caleulated, and it. has “been _agreed—that-it would,

—be-the sérap value of the metal involved in the APDA
test facilities and devices. Based on calculations as to the
quantities of various classes of ‘metal involved and the
serap_ values of’ such metals, the salvage value, for purpose
of calculation at, this time, is indicated at about $55,000.

Q. Where does that appear in the cost of construction
that PRDC would pay? A. I don't think it appears, Mr.
Morrisson. .

Q. This is not a final agreement as to the salvage value,
but it is the present basis of the discussion? A. That is

* our estimate of what it would be at this time, that is right.

Q. Then is not the actual contribution made by, APDA
to this project, that is, in addition to the $4 million which
it is to put up for research and development, is not its ac-
tual contribution the difference between $4.1 million, which
it will pay for these components, and the $55,000 which
it will receive for tham? A. I would say that-was a a fair
statement.

Q. This is the amount that APDA will “ out-of- pedhiet
in connection with its participation in the construction

: [733]
of this component test facility? . A. Yes. . If its costs are
in accordance with our estimates and our own cost, estimate.

46

ee

PUN oR Lentils

.
isis teeth

*«

. 762

[761]

QQ. Has the management of PRDO considercd the magni
tude and cost, of these possible changes and made any. de-

‘terminations as to w hether the financial ar rangements w hich
they_have made will be adequate to take care of thissort of

change? A. Tam really glad to have ihe opportunity to
clarify our position on that matter, Mr. Morrisson. | he-

lieve I testified previously in answer to Mr. Sigal’s question -

somewhat along the same, Tine to the effeet that Ww hen we

were

(762)

faced with whatever #ecommendations we might have from

Dr. Bethe in particular it would be a management decision
at the time depending on the circumstances. Twas thinking
as the chairman of. the finance committee of PRDC at that
time principally in the financial concept. So far as the

safety ‘features of this reactér are concerned, it is the

full intent of the manageme nt of PRDC to accept and
abide by the recommendations of its consultants, its nuclear

experts in this fieled-sand in particular and specifically, if

you will, Dr. Bethe. I can not conceive that the manage.

_ ment of PREC would go forward with this project if there

were any question by thetr own consultants as to the safety
of the reactor, and of course it is ébyious that the reactor
can not. be’ operated Without’ a license, from the AEC » and

wit is my understanding that they, teo, have tobe satisfied
as to thé safety 6f the reactor.

As aguinst the possibility of éhanges having*to be ‘elie

in connection with the recommendations of our consultants,

| will say that we do not have the complete financial situd-

tion that we might be faeed with covered. by firm commit-

47

se oe eeeges

\ Be :
ments at this time, but | express my own opinion, as a re-

sult of discussions with my associates in this project, that
haying gone forward to the extent that we have in finaneing
this project and with the interest that we have in its comple-
tion, 1 have every confidence that these companies will put
up the additional funds necessary to take care. of whatever

©

adjustments,
[763]

- changes, modifications are required.

Q. You say this is your opinion’ based on diseussions
with your associates. Has this matter specifically been
diseussed with the member companies? A. We have had ,
many discussions, Mr. Mérrisson, as to the future possibili-
ties in connection. with modifications and changes of this -
reactor plant.

[778]

Q. This comes to a question I was going te take up with
' you anyhow. On the table that shows the caleulation of
‘steam revenue you have shown an increase in net, plant’
capability starting from about 103,000 kilowatts in 1961 and |
increasing to 155,000 in 1966, and subsequent years? ee
Right.

Q. This corresponds, I take it, to a similar ineresase
in the table entitled ‘Calculation of Plutonium Reserves,”’
it says here, but I think that should be “Revenue”’, should
it not? A. Where-is that reference?

Q. There is a small sheet as part of Acker fixhibit No.
10 entitled ‘‘Caleulation of «Plutonium Reserves.’’ I be-
lieve the word should be ‘*Revenue’’ rather than ‘*Re- -

48

ED! Bath Wal RL, eee eet Menai fo toy

779

"serves.’’ These pages are not numbe red ed can t identity

it more directly than that.

That show’ an increase in reactor power level. expressed
in megawatts of heat running from 300 in 1960 up- to o-
by 1966, and subsequer, years. me

| (779)
A. That ix true, Mr. Morrisson. [ would like to eall at-

tention to the fact that quantities of plutonium produced
are omitted from this exhibit in as much as they would

lead to possible calculations from which the price schedule
‘for the plutonium could be derived Again the assump-

tion on which we have based, our’ plutonium revenues is
that the eurrent’ classified schedule will continue in effect

throughout the operating period.

Q. I was asking you at the: moment only about the re-

~ actor power level and the‘change in that power level which

is shown on these two exhibits. A. I would like jus: to
clarify what I said a little further, and that is that my

understanding i is that the present price, schedule for ‘pluton-

ium provides for different prices for different qualities of
plutonium. The price announéed for the period beginning
June 1, I think it is, or July 1, 1962 through July 4, 1963,.
is published as a base price, and our plutonium revenue
figures are based. on’ the assumption that-there would be
different prices available during that year and thereafter
for different qualities.of plutonium.

The _Presiding Officer: Should that pre ibit be cor-
rected so the word ““reserve’’ is changed to ‘‘re-
venue’’?

Mr. Claytor: TI think we should note on the rec-
ord that the heading of the sheet entitled “*Caleula-

49.

779
tion of Plutonium Reserve’? in Acker Exhibit No.
10 for identification
' [780]
should read. ‘*¢ ‘aletilation of Plutonium Baw rnay >
not ‘*Calculation of Plutonium Réserve.’’
‘The Presiding Officer: Very well, the amendaient
may be made.
Mr. Morrissgns. Thank you. ai

Pa 6 Si SSR ON naan Wilh Saati a

7

« 2754

Mr. Sigal: I would like to have an answer for the
record, a -

Phe Presiding Officer: : I think he-will testify that
there is no criterion outside of those published in the
Federal Register.

The Witness; That is true:

* . *

[2753]

Q. Is there any agreement or arrangement of any kind
between AEC and PRDC relating to the charges which AEC
will make ‘for the tise of special nuclear materials after
June 30, 19602 A. Just a m. aute. The charges we will
make to PRDC for the use of special nuclear material?

Q. Specifically for the uranium which you will deliver to

PRDC. A. There is a provision in the contract that waives
the use charge for five years, I believe, of the operation *

the plant, after a license is issued to operate.
You are perhaps not referring to this?

[2754]

Q. I want to make it eléar. I am _ asking now. ia the ,
period after the period of the waiver. A.” Icknow of no
agreement for anything beyond what is in me contract on

' that waiver provision.

Q. _The contract makes a provision for ” waiver of |
use charges? A. ‘Fea.
Q. For the first five years after the license is granted? ,
A, Yes,

. mt -
4

ape ne

2754

C. ROGERS McCULLOUGH

_ + (2999) .
a |
Cross Examination.by Mr. Morrisson
Q. Dr. McCullough, there has been a great deal of dis-
“eussion in this proceeding about. the whole problem of
evaluation of reactor hazards, the special techniques. and
‘special problems which have beer presented by such evalua-
tion.

I would like to inelpde in the record a statement of your. ;

general views on these questions of hazard évaluations,
and for that purpose I would like you to look at the tran-
script of the hearings before the Joint Committee on Atomic
Energy on Governmental Indemnity for Private Licensees
and AEC Contractors Against Reactor Hazards, at pages
47 and 48, the passage that I have marked, and ask you if
you still agree with the views expressed in that passage?

ene [000

Mr. Morrisson: If he says that he does, Mr. Ex-
aminer, then I would like to have that passage read
into the record as a portion of Dr. McCullough’s tes-
timony, rather than take the time of asking specific
questions addressed to this point, “because I think it
well expresses the point I am trying to get: at.

The Presiding Officer: Very well.

Mr. Morrisson: For reference, { am starting at
the middle of page 47 and carrying through to the
second full paragraph on page 48,

70)

one.

Se Tie, ee

* 3001

The. Witness: Do you wakli me ‘to read this to
myself? se

The Presiding Officer: Yes, sir.

Mr. Morrisson: Just to be sure that you concur
‘now in the views ‘expressed in that passage,

The Witness: I aecept this. .

The Presiding Officer: Let Mr. Maslowski see
it, please.

In order to save time, the statement. may be in- ,
corporated in the record at this point, if that is
agreeable with you, Mr. Morrisson.

Mr. Morrisson: Yes, Mr. Examiner.

(The information referred to is as follows:) |

Dr. Me Cullough: I think this is the right atti-
‘tude, sir.

[3001]

‘Care must-be taken to insure that there is a low
probability of: accidents with nuclear reactors be-
cause these machines sfore fission products. I think :
it is worth reiterating that these products are more
toxie per unit weight thah- any other industrially
known materials by a factor of a million to a billidn.
‘It depends on what standards you take. If these
materials should be permitted -to escape there is
a-possible hazard to large numbers of people and
many square miles of territory.

«‘*Because of this possibility of a major denies,’
even though i it has a low probability, it is justifiable
to take unysual precautions that the design, construc-
tion, and operation are sufficiently conservative.

“*T think it is worth while. pointing out that for

=~

ai

3001

oe

the first time in-any major industrial development
an attempt is being made to foresee: the possible acci-

dents or disasters, and to take positive steps to .

prevent them. The introduction of this new philoso-
phy poses difficult problems. But because of the po-
tential hazard to people, and even future genera-

- tions, it is Imperative to face and solve these prob-

lems... °

‘‘Tt should be made clear:that the hazards associ-“

ated with nuclear reactors or any other peaceful ap- .

_ plication of atomic energy are related to the highly
~ toxie

13002]

radioactive materials which are generated.

‘These facilities that we are talking about. do not
have an explosion hazard in the sense of a possible
detonation which would devastate large areas by
blast or heat effect. :

‘‘The nuclear reaction is an extremely dynamic

one. A nuclear reactor can increase in power level

thousfinds of times in a fraction of a second if. it is
improperly designed and controlled. There is ‘no
other machine that I am aware of that has this
possibility of such sudden changes in energy ‘out-
put. 6 oy

‘*As a result, fuel elements, control elements, and
the structure.-of the reactor itself can be melted
or even vaporized if a nuclear runaway accident

-should happen. By the proper careful design and

the inclusion of ‘reliable controls and safety devices,

‘

3278

it is believed that nuclear runaways can be prevent-

ed or, at least, reduced to a very low probability.

‘‘Qne must recognize that the best known devices
a

are not infallible. Even such well-known things as

railroad rails break, turbine shafts shatter, trolley
wheels come off and locomotive braking systems fail.
One must admit that thete is always a possibility
that a reactor accident ean occur.

‘The dynamics of a nuclear reactor are such that

[3003]

if a nuclear runaway is once started no human being
can respond rapidly enough to stop it. However, re- .
actors can be designed to be self-limiting. Precau-
tions in maintenance and operation can be taken.
The reactor thus can be prevented, in all probability,
from ever starting a nuclear runaway.”? s

MARK MILLS
[3278] :

Q..

~ Cross Examination by Mr. Sigal:

Do you see anything urgent so far as either the nu-

clear aspects are eoncerned or the social aspects are con-
cerned that this schedule be adhered to. A.- I have a feel-
. Ing this is really outside of my competence, but let me an-
swer a little bit indirectly. Practically all advanced tech.
‘nological developments take’place with a sort of combined

.

mr ey

3278 3 EAs oe

construction and research and development pe necessary
dovetailing of these things and it seems to me that just
how this is done really pretty mueh, has to be left up to the
people doing it. They are the ones who can see the best
‘ways to schedule different parts of the job in view of de-
velopment information they see coming along that will in-
fluence, in view of the fact*some parts of it are not sensi-
tive to the kinds of information that.they believe is likely to
be developed and pertinent and so on. |

[3285]

* Mr. Morrisson: Mr. Radley, will. you take the,

stand, please.

H. MONROE RADLEY was called as a witness and hav-
ing been first duly sworn, was examined and testified as -

‘follows:
Direct Examination by Mr. Morrisson

Q. Will you state your name and address for the ree-
ord? A. H. Monroe Radley, 3701 R Street, N. W., Wash-
ington, Dd. ¢.

; Q. Are you the H. Monroe Radley. who auieaeks narra-
' tive testimony consisting of nine pages which was recent-
lv filed in the proceeding? A. I am.

Q. Mr. Radley, will you look at page 2 of that testimony
on the first line. -It states ‘‘From 1942 to 1948 I was an
engineer’? and so forth. Are those dates correct? A.
That should be 1943.

Q. 1943 to 1948? A. That is correct.

Mr. Morrisson: Mr. Examiner, the date- was |

74 ;

a Se

ee ee

—~, -
a:

3287

»
‘

changed in ink on the copy that was filed with the
| reporter this —

[3286] _

morning. T neglected to call attention to it at that
time,
The Presiding Officer Perfeetly all right. -
Mr. Morrisson: That i is all [ have. “
The Presiding Officer: Ver y well. Mr: Sigal, you
- may cross examine.
Se
Cross Examination by Mr. Sigal
Qy. Mr. Radley *, On page 6 of your statement, you say
that PRDC appears to you to have under estimated the
cost of on site labor’ A. Yes, that is true.
Q. You give your reasons for your conefusion. Can
you give us some statement ‘of the order of magnitude
of the under estimation of that labor cost? A. I think that |
_ is. where a considerable pertion of the overrun is found.
. The present estimate of on site labor is about $3
million, isn’t it? A. I believe it is $5 million.
Q. lam sorry, ves. A. $5,235.000.
Q. In your view it is an under estimate by some sub-
stantial figure? A. Yes.
\. Ts it two million, three million?

[3287] 7

A. Lam not prepared to say the exact amount.

« Q. But nevertheless it is substantial with reference
to the total amount of the estimate of on site labor.

- [3295]

A. I think se.

Q. To what extent? A. I don’t think, the problem is

perhaps as acute, although T am really not an authority on
waste disposal systems. : ;

Q. But so far as your available experience on the cost
of waste disposal systems is concerned,.you do have this

- information with respeet to the pressurized | w ater reactor?

» A. Yes, I have that.

Q. And that shows $3 million. A.- Roustly. .

Q. Is that system completed acid A. It is under con-
struction.
2>Q. So that $3 edition even n there is an estimate or is that
a fixed figure? A. I think it is a fairly firm estimate.

‘Q. You say on page 8 that the company has allowed
only $17,200 for miscellaneous parts and in your opinion
this should be 20 to 25 times higher. So can we say roughly"

in your opinion the, firure would be around $400,000? A.

_ that. &

Threento | four hundred thousand dollars, something like

32 |

—-.
=
oe
. oe ta
: 3297
Q. Then in the same paragraph you make reference to
~ the $100,000 allowance for plant equipment adjustments,
which should be doubled, and you said this should be
doubled or

FES ae aS Oe eS

tripled, Can you make a choice there? Can we quadruple
it for the sake of variety?’ Av I think the testimony ought :
io.stand the way it is. ewe
Q. You will put it between two and three hundred thou-
sand dollars? A. Yes, something like that.
) Q. Then the next paragraph on the same puge, you say
while it is difficult to point out line items in the estimate
which appear ‘to be out-of line from your experience, you
.. hevertheless point out some of them, which are estimated
_ at too low a figure. Can you be a little more.specifie about
_ the particular items you have mentioned? You:say, for
example, ‘that $30,000 for heating, lighting and ventilation
is too low. What wou!d be nearer to the probability as you
see it?’ A. Ordinarily for buildings of this type, heating, -
lighting and ventilation will run 20 to 30 per cent. I think, .
this particular building will: have to have a fairly costly
ventilation system.
Q. That is 20 to 30 per cent of what? A” Of $428,000
That may be somewhat high, though. eS hg
Let me correct that and say 15 to 20 per cent.
- Q. So that the cost at ‘the minimum: in your opinion
would be around $75,000? is Yes, perhaps.

[3297]

Q. That would be chow 15 per cent. So‘ftar.as the
figure for the element decay and storage building is econ-

§3

be

——
s .
: w
. -
, e 7
A .
: é
ar”

3297 .
cerned, are you satisfied’ with that figure? You did not
mention thit as one of the items which you underestimats va.

But I wonder whether you considered that in connection -

with the other. — ’ . -
f The Presiding Uftieer: What was that magnet
Mr. Sigal: The $4: 28,0100 figure. “ee
The Witness: | Kave no information on the size
of that structure at all. There is a sketeh in APDA
115 and this ¢stiaate, so it PS a little difieult for me
to say much about whether it is too small.

By Mr. Sigal:

Q. The next item mentioned is the cost per eubie yard
for the concrete work around the reactor. Is that item
included in another figure or didn’t you just give any figure

_ for that at all?) A. That is given in Acker Exhibit 7.

Q. Yes, but I mean you don’t state any figure for it.
A. The figure is $57 a cubic yard for the reinforcing steel
and forms... My expe rienee is‘that conerete areund p reac-
tor will cost consicde rably more than that. Several times
that figure... ark y 7

(). Several times $572 A. Yes, dependiig on condi-
tions. | don’t know too much _

[3298]

bout this job as to the details. I just have these sketches.

But it could easily cost $125 or $150 a yard for. this par-
ticular concrete . 7% —

Q. So what does it come to? A. 1 really don’t know.”

I made up no amount for that.
Q. Does the exhibits give the number of eubie yards?
Mr. Claytor: Could t ask if we are talking about

ae 84

ee an

3299

Hem B-l in Acker Exhibit 7, just to be sure which
eenerete it is? : ;
The Witness: Yes, that is the concrete Tam talk-
ing about. Opis ists
The Presiding Officer: Is that the hot cave?
Mr. Claytor: Re ‘actor foundation, vessel founda-
“tion and external conerete work.
The Witness: 2,130 eubie’ yards.

Mr. Claytor: Lo beg your pardon. That is item
B-3. | | a |
The Witness: You are ‘right. ;
Mr. Clastor: That is why I was confused as to,
wy hether it Was item, B-1 or B-3.

The W ithess ; It is the inte rnal work around the
reactor. That is B-3.

Mr. Claytor: Just to clarify this, if 7 may, Mr.
Radley, this entire item is estimated at $1, 488,400.

Mr. Morrisson: Mr. Chairman, may I ask if the

_ Witness has this exhibit™before him?

[3299] -
The Presiding Officer: “He may have. it.
The Witness: Yes, it is Acker 7.
Mr. Sigal: I thought he*had it.
‘Mr. Morrisson: | wanted to be sure,

By Mr. Sigal:

Is that correct? A. That is correct, with contin-

rencies,.

Q. Yes. On the basis of your estimate what would that
figure com» to, or whieh item in that group of figures would
_ You changet A. I would increase the allowance for con:

ca

3299

Q. From what to what? A. I really have not intended
to increas¢., I merely point out this as one of the items
in the estimate which appears to be low to me.

Q. In any event, as fdr as this particular item is con-
cerned, you would say that the cost would be two to three
times as high as _ they estimate? A. Just the coiicrett,
which is really not a large part of this.
| Q. Just the concrete? A. Yes.

Q. You don’t make any comment on the rest of it?. A.

- Not on the total amount. oe : °
The Presiding Officer: Isn't it a fact that they
have
[3300]

-under estimated everything here in Acker 7 with

relation to these costs? I read your testimony and I

~. Was ‘concerned a little bit because it Iooked as if

- they were under estimating everything.

The Witness: I don’t mean to give that impres-
‘sion that everything was under estimated.

The Presiding Officer: A lot of things. There is

a lot under estimated in that Acker exhibit, is that |

right? — 5
~ The Witness: a ‘that j is the burden of my. testi-
mony, I presume. ,

The Presiding Officer: That is the way I read it.

By Mr. Sigal:

Q. The next item you wisiiianaid. ‘-. Radley, is the
hot cave for two cells of $378,200. What would your esti-
mate of that'be? A. I really have no estimate for that hot
cave, but I think that is lov. Hot caves are very difficult to

~ 86

. ae 3301
estimate unless you have all the details. | think for the sort
of work they will be dong they will spend more than that:
for the cave. :

Q. Can you give seme notion of where it might land?
A million? A, Perhaps a half million. .
The Presiding Officer: Under estimated?

The Witness: No, the-total cost might be half a

2 [3301]
- million doilars, let us say, roughly, _

| By Mr. Sigal: °

- Then you go on to say that it is probable many costs .
* £ e . .

have been overlogked since each line item in the estimate
has’ to inelude éertain work: related thereto, and is not

mentioned or deseribed, and’ you point out electric Wiring -

between buildings. Did you make any attempt to list the
various items which may have been overlooked or under
estimated? I mean a more complete list? You have given
some examples. - 1 wonder if you would try to be more ex-
haustive? A. I could give a few more examplés. I think
the core will turnout to be under estimated.
- Q. What do you have to say about that?°A. The amount
given seems low for a Eroject of this size by comparison
‘with other cores, : |

Q. To what extent? _A. IT really have no idea as to
what it will cost. a:

Q. Can you give us your experience with other cores?
A. Cores can cost as much as $10 million. *

Q. Iam sorry. A. Cores ean cost as much as $10 mil-
lion. : ae

101

he

3320 § |.

Q. It is fargely labor costs included there that were

low? A. Yes. | | | .

Q@. You think, then, that the material costs on that item”
are about right? A. Well, it i? a wttle difficult. Ypu see,

you take this

[3321]

item conde mix. in place. That includes hath material
and labor, —t presmine fst y-conerete ont there, TF

think it-is ‘large ‘ly in the labor.

Q). So on that-item it is the $10 per unit per ‘cubic vard .
labor cost that you partic ularly had in mind? A. Yes.

Y. Now, could [trefer vou to the next page, Item B-4,
the sub-item heating, lighting and ventilation? . ( ‘ould ‘you |

give me some idea of what proportion of that expense you

have assumed is heating, what preportion is lighting, and
What proportion is ventilation? A. [haven't made as-
sumptions on that basis. T inerely took it as a percentage
of the total. — - ‘ :

Q. As a percentage of the tot: il? AL As a pereéntage *
_of the total cost. |

(J. So that on the basis of the analysis you have made,
vou eouldn’t break it dow np! A. T-couldn’t do that here.
I probably’ gould in my office. T believe T said yesterday
that I theught probably the ventilation requirements were
underestimated for this sort of a facility.

Mr. Claytor: Mr. Examiner: yesterday vou asked
me if T could obtain an approximate figure:for the
amount of engineering services and expenses to
Cocnmonwealth Associates that. have been paid: to
date. T have an approvimaté figareas of nah

ey

Ww2 ~

-

ee

3322
[3822] «
the end of May. T hat is $325.90, otit af a total es-
timated amount -of ‘* #0),0000. Ng ere

The Presiding Officer : Thank vous Mr. Claytor.
Mr. Claytor: That is all J have. Mr. Examiner.
~The Presiding Officer ; I necessarily, Mr. Radley, on the basis of the evidence already

in the: record depends upon the costs -to Commonwealth
: Associates. In. giving the opinion that the costs would be
at least $1,800,000, vou must have assumed that certain
expenditures by Commonwealth Associates would have to
he covered by the $1,800,000. Tam trying to explore what
expenditures by Commonwealth - Associates vou assiimed>
would be covered. A. Engineering costs. Maybe I ean
answer it this way. Exgineering eosts consist basically of :
two things. One is the direct charges and the overhead
charges, e |
The Presiding Officer: Let him answer the qués-
tients. f at wo

——

331

; ron

,
*

M&.-Clavtor. ! thought lie tinished, Mr. Examin-
er. d
Phe Witness: [ finished, s

bv Mr. Claytor: ; ; ee y
“ee - Q. So direct expe Nses of doing the work ine luding pay-
. roll, incinuding out of pocket expenditures for travel, and
so forth, A. T rave ‘l, telephone, ¢ Xpediting.
(). Plus a fair share for ove Then alloc able for che job.
A. That is the us ual practice,
Q. How about a reasonable fee or profit to the e wer -

ing firm? A. Yon an said eae! is not ie jude S iN, i here

ge 13311]

-@. Tam asking you. I think the evidence is silent about .
Whether the it is included or not. ‘lam trying to find

out whether.if giting your opinion that the figure should
~ be $1,800,000 you assumed that figure of $1,800,000 would
include: in accordance with normal. practice a. reasonable
fee or profit to Commonwealth Associates. A. Lypresume

, because. when I said 15 perce.t included for engineering

is a®ough percentage, actually the profit on these engineer-
ing contracts i*not of sufficient mepersonee ~ make much
difference one way or another. '

Q. Now. T would Ike to turn %o cians item, ‘the item
Which you deseribe in-Your direct testimony on page 7 as
indirdet and overhead expenses in connection with the con-
struction of thes project. Tt is your assumption, is it not,
that this is te include the construction engineering super
vision by United Engineers and Constructors? A. |

we better look’ at the testimony on United Envineers, |
think they are just: ‘doing inspection on this for $225,000,
which hasn't anything to do with this at all.

~

mL)

think: —

3314

Q. Thai is right.. A. To w hith there are certain in-
direet costs which are ee here as $2,977,000,

Q. That is right. : A, That is a standard construetion
accounting procedure. pinata of who «oes that, these
costs: are going too low,

QQ. And in aecordance witht stapidarrel « construction and
accounting procedures, one of the indireet costs that would ©:
“be included in a figure such as this would normally be the
ordihary indirect everhead expenses of running w hatever
office has to be run, having vour own employees supervise
to the extent that they do supervise your actual construe-
tion, consultation with your contractors, and that type of
fhing is an item of jndirect and overhead expense. ‘That
is the only question I have. .A. What is your question?
~Q. My question is this.’ In accordance with ordinary
construction and accounting precedure, do you include in

[3315]

indirect and overhead expenses, ‘the heading for indirect
and overhead expenses, such items as the cost of running
the office, the cost of having your own employees coordinate
the work of the different contractors and what I would
eall general overhead...

The: Presiding Officer: Mr. “¢lavtor, it ean’t be
both indirect labor and overhes id. It has to be one
or the other now, : :

Mr. Claytors The way he deseribes: this item in

°*

his testimony, Mr. Examiner, is indireet and over-
head. expenses. My inquiry’ is to find ont if the
type of expense which | have described is normally
covered under that heading.

The Presiding Officer: Tt cannot be indirect laber

and overhead at the same time It has to be one
. ~ or the other. '

. —. Mr. Claytor: This is so.) Lam asking whether it
is cotisidered to be an indirect expense or an over:
head expense, efther or both. |

The Presiding Officer: That is a tair question.

The Witness: “The question in accounting term-
inology | would say this item includes both indirect
and ov erhead costs. pao ionisonans

By Mr. Claytor:
Q. By which you include the types ol expe aditures |
have just mentionéd. °- @

&>

[3316]

_A. ‘Right here on.J the whole thing is spelled out..
Q. My difficulty, Mr. Radley, may partly be with ‘the
deseription in J. The description in J does not specifically
mention such.items as the eost of renting an office, for
instance, the cost of maintaiiing supervisory personnel on
the payroll, and I would assume that if there are such eosts”
in connection with the construction of a project, regular
construction and accounting procedure would -eall for
those Gosts to be included in an item suelf as this. A. That
-is my understanding of J.
Q. Thank you. A. Let me correct that. T don't want
to say that what you said is right. I want to sav that item
J deseribes their costs.

* . @. Yes, T understand that item J deseribes our cost.
I still feel we must clear up this. Perhaps I can get at it
this way. es ;

Let.us assume that-# reactor constrnetion project from
the beginning of construction has on its pavroll a manage

a
»

ne 99 —

\

@ °

3323 Re ee ns ?

as being possibly underestimated. lni-the. first: place, vor
stated the core, estimate as $205,000, 1s “not the actual
figure on Acker-7 somewhat lhigher than that, when one

_takes into aeeount imstallafion cost and contingencies? A,
-¥es. Twas speaking from memory, The 205 is for the fuel
elements only, I believe.

Q. Do you have the actual installation cost? It is’300-

Z
and-some thousand, 1 isn ‘t it , A. I think it is about ae.

a

installed. k .

Q. You stated in the leer ‘part of ps age 3301, that cores:

can cost as much as $10 million. Did. you mean in so shat-

ing to imply that you thought the’ core for this reactor.

might cost as much as $10 million?. A. | No, 1 did not.

Q. Mr. Radley, you have stated in your testimony in
rather general terms that you believe the construction cost
had been ‘underestimated by. several million dollars. Are
you prepared to give an estimate as to what you believe the
construction of this projet will cost?

[3324]

A. Nov am not. ' hae a

Q. CAn you indicate why 4 you do not feel in a position
to give a specifie estimate on -this construction eost? A.
It is because of the la@k of ifformation on the project, the
uncertainties that remain.

“= Q. In other words, you a not feel tha’ the opportunity }

that you have had to review this project, the information

that has been available to-you, has placed you in a position

in Which vou could give th: Lond of estimate that yeu would

normally be expected to give on a COMMISSION project, is

that right? A. That is true. : 29
i). Do ven helieve it ds possible that this project could

; 5

™ ee

CURR ORN, wLBUCKT She SE

a)

he constructed for the estimated cost of $32,400,0007 A..
Ido wot, . e .

Q. Mr.Radley, as T understand the reeord, there is an-
excess available to the company of a little over $2 million

between.what the company has stated as its cash require-

ments, and the funds available to them ‘througl. cammit-
tents and loans. - c : 7 |

Let me explain how. 1! arrive: at that figure.

Mr. Acker, at page 16 of his written téstimony, states
the eash requirements. at $36,216,000, ® This is arrived, at
by deducting from the total, cost of $43,216,000/" ain amount
of $7 million which is.sfated to be a contribution by APDA..-

That figure of $36,216,000 is less by-a little more |

[3325]

>than $2 million than the -total of, commitments of

$23,540,000, and bank loans of $15 million, to all of which
Mr.- Acker has testified. -
So there is a difference here of somew hat more than $2.
million. Z ae
Do you believe it likely that the construction cost of the
reactor will exceed the ‘estimated Cost by more than $2
million? eS

$3Za
Se Q. Can you-staie what additionai types ef information
you would need from PRDC in order te arrive at’a spe-
cific estimate? A. 1 can give you sort of a general idea.

Q. That is all | am asking for, yes. A. ¢ Tife sketches in
the APDA-I15 are not adequate, for one thing, to show the
size of- the buildings. . They are not

[3326]

deseribed very completely. There are not yery many di-
mensions anyplace. Theré are a great inany uncertainties

as to what is reqaired in the project. There is a general: 3

lack of information throughout. : “.

Q. When you say a general lack’ of information, you are
now talking about the design of the building? ~A. Well,
that is just an example. |
' ~¢ Yes. ‘All right, are there any additional types of
information ttt you could get frojy a report, say, on their
. accounting procedures? Would #6u want that? A. That
would be helpful, too, yes. a

Q. Do you think that thére is enough information pro-
vided now to determine what the operating costs would be?
A. Tam not qualified on operating costs.

(). “Would you not want. the same types of information
with respect to everhead, indirect casts, and-so forth, with
respect to wperating costs and accounting as you would
for coustruction costs and accounting? _A. I say, operat-
ing costs are out of my field. |

Mr. Sigal: That is ail. .

The Presiding Officer: 1+ there anything further
of this witness?

If-not, vou may be exeusedse Thank vou, Mr’ Rad-
lev. :

% . . ~

1thi, : ©

3436 |

QY. And you are assuming au inereasé in all vour der |
eosts, all your other prices, at 4.2 pereent a vear? AL Not.
necessarily 4.2 percent a year, Mr. Sigal. That is on the
basis of the escalation formula provided for in the schedwie © |
for the price of plutonium. ‘

(). The escalation is based‘on ~ increase in the BLS
cost of living figures? A. ‘That Gs right. |

Q). Can you estimate that there is going to be this in-
crease in the price of plutonium over this ten-year period? .
A. I certainly can estimate it, yes.

Q. I mean, what is the rational basis of your corelu-
sion that the prices are going to go up at the rate of 4.2
percent a year? A. On the basis of the. trend from 1955
to‘date. T hat. i is the best thing I know of.

Q. You think’ the prices will continue to go up yearly
on that trend? A. I think itisa realistic assumption for

this purpose, - 7 ;

'- Q. Nevertheless, you have not taken that trend into
‘consideration with tespect to any of your construction and.

x

aes [3437] . , |
operating cost, or prices other than plutonium, have you?
A.. Yes. Not that exact 4.2 pereent, «0.

Q. What figure have you used? A. We have escalated
coal cost as the basis for our steam revenue.

We have escalated, we have provision for escalation en
labor and our construction pstimate.

And I would have to retresh my mind as to thé other
elements of eur. either -construction or operating costs
which we have ineluded escalation in.

Q. Do vou have provision for escalation of your pro-

120

timate your income to be? A. That is right.

‘made any provision for the contingency that* your’ pln-

3438

y .

duction. cost throughout jtie Utivear operating. period?

A. Some elements of the cost, ver.

.. What elements of the cost? A. LT said T wouk
have fo refresh my, mind on that, Mr. Sigal. 1 know: that
the steam price is es lated. pe . ;

Q. In regard to your statement here in Ac kar Exhibit
26, you say that. if. the plutonium prices are esealated 4.2
percent a vear, your income, ASSUTTIN a biasig of twelve

. dollars per gram, would be $22,422,000 in a ten-year period. *

A. That is righ:
Q. Which would be $10, $28,000 less than you now es.

Q. Taking that tensmillion dollar difference, have vou

[3438]

‘ °
tonium income would be ten million dollars less than
you have now estimated? A. No, because it is a com-
pletely unknown quantity as to = the government price
of plutonium will be after,June 30, 1963.

(). But it is a fair conclusion, is it not, “Mr. Acker, that
whether -vour reduced income is on the order of ten mil-
lion dollars or eighteen million “collars, PRDC_ reactor
could not operate on the basis of the reduced income? A,
No, I will not.say that. s ,

(). “You would not say that? A. No. :

Q. How could you operate it? A. We. could operate
it if the member companies felt that it was of sufficient
importance to go ferward with the project to put up the
additional operating funds required. | Ss |

Q. And, of course, there is not now an. undertaking

121

3594

ABEL WOLMAN | 7 ,

Crass Examination by Claytor

[3357]

Q. Dr. Wolman, in, your opinion,. does ‘the question of
whether or not this construction now goes forward at this
site involve any question-of public safety? A. It does not
to my mind.

Q. It is a question of heladieieg: the expenditures of
PR. D. C's money against the probability that the facility
may or may not be permitted to be operated. Is that
how you view it? A. That is correct. :

Q. Now, Dr. Wulman, you have mentioned both in your
narrative statement and this morning a number of items of ©
additional information which you think should be supplied.
. In your opinion, is this the additional information that is
needed in order to enable. you to reach the kind of defini-
tive conclusion about the environmental’ suitability of the
site which you should make prior to operation of this ,re-
actor? A. Thai is correct. |

“Mr. Morrisson: I did not hear the witness’ an-

swer,
The Witness: ‘*That is correct.”’
°. e

By Mr. ( ‘laytor

Q. Om page 18 ef your narrative: testimony you say,
there are ‘certain specific problems with respect to the
proposed site which would have to be resolved before a.
determination could be made as to

107

™

3358 . -
£3358].

ssuitabilityog the site even. for a reactor whose stability

and basic siateby had been established.’. This is what you

by all h > ° > ’
meant when you mace that statement in effeet!. A. That
“~ bs #
ds correct. ° 0% Mat

QQ... Asn! is the same Prue with respect to the statement

on page 20 of ‘your narrative stateme nt where, you say

that noGlefinitive determination with respect to Gite suita-

hility gf the site ean be niade until cert vin ‘additional in~

formation is supplied? A. That is true,

Qe Now, Dr. W olman, if: adequate” information’ is de-
veloped in the categories. which you have discussed. in your
diretét testiniony and also this morning, will there be, in
your opinion, sufficient informatron to enable you to give

. & final and definitive evaluation of this site? A. T believe

« $

that is correet. .
Q. Now, Dr. Wolman, on page.14 of your direct testi-
monyfvou say that in-vour opinion the proposed site would

‘be satisfactory from the point of view of its accident po-

tentiality for a reactor that is inherently safe and reliable
if it could .be shown that no crediple accident can release
figsion produets. into the atmosphere. A. Yes..

Q.. Again onspage 19, you say at {Me bottom of the page _

that, based on information ayhilable and assuming ade-
quate ) :

ae aes

containment and facilities and procedure. for the disposal -

of waste’surrounding populations would probably not- be
Meee A ” ‘ ‘
endangered by normal operation. A. That is my claim.

Q. Now, Dr. Wolman, assuming that the reactor is ade-

a

eae eee oer

ar ine

7 4 | | 3360

quately shewn to be sate, stable aud reliable, and that no

credible accident. can’ Hreach the containment building,.
would it be fairto summarize your opinion fs saying that,
although there is not vel suflicient uiformation te enable
you to reach definitive cguclusions, there isc rather sut-
fidient information to enable. you to say that this sfte ap- .
pears genefally suitable from the standpoint of pubite
safety for a reactor of this power? A. With your two
assuniptions, T would say that that is true with one reserva-

_tioh 1 would still want to. wait upon the results of jhe

nieteorological studies. If they turn out to be very un-
favorable, [ would then have a further reservation even
as to the suitability of the site. a, , e
Q. Well, ever,if the meteorological ‘Studies should turn
out to be very unfavorable, are ‘there not provisions which
could be made which might enable a reagtor of this power.
to be operated on this site? A. Tam sire that there are.
They would have to again be taken into account. “They

would have to find their way into the design and construe-
‘tion so as to reduce, by another

- [3360]
magnitude the possibility or, the prob ability of a release
under. unfavorable: meteorological conditions.

Q. Then the.addition of the meteorological condition
really means that we must make another assumption be-
fore we say that on the information we now have that this
site is generally suitable from the standpoint of public
safety for a reactor of this power, and that ag additional
asspmption is if the meteorological conditions turn out to
be quite unfavorable we may have to make some addition-
al changes in the actual containment or in other protective

valculated ‘what our total plutonium) revenue. would be
during the proposed ten-year operativg period on the basis
of twelve dollars for plutonium as the base price as: of
the middle of 1955, escalated ‘in aecordance with the pro-
visions of the schedule to date and assuming the same
annual escalation applicable in the future years.

Mr. Morrisson: Exeuse me. The. witness paid

as of the middle of 1955; is that cor reet?
‘The Witness: Yes.

‘ Mr. Morrisson: Using the twelve dollar price -

57?

ae the middle of 195: ?
The Witness: T hat is right.

Mr: Claytor: Escalated in aecordance with In-

tervenor’s Exhibit .

By Mr. Sigal:
~Q. Do you have the document, Mr. Acker? A. Yes.

—(Q. What do you have? Y ou have a docume nt making —

these ealeulations. May we see copies of it?
Mr. Claytor: Off the reeord.

a 117

3433
if th ¥ ;
The Presiding Officer: Off the record.

(Disenssion off the reeord.)

By Mr. Sigal: ;
Q. Now, the paper vou have referred te contains a

[3434] |

figure showing: plutonium revenues based on a plutvaium
price of twelve dollars per gram after June’ a), 1962, on
unescalated and escalated bases? oe
Mr. Morrisson: If there is going ‘to be a diseus-
sien of this paper, I wonder if it would not help to
*have it marked for identification.
Mr. Sigal: Do you want this introduced as yours?
Mr. Claytor: I would suggest if we are going
to have examination on this that we mark a paper
consisting ofa single sheet entitled ‘‘Plutonium Rev-
enues based on Plutonium Price of Twelve Dollars _
per Gram after 2Fune 30, 1962;-on wrescalated and
escalated hases.”’
T suggest we mark it for identification as Aéker
Exhibit No. 26. ,
The Presiding Officer: The ‘document just _de-
: scribed will , be marked for identification as Aéker

Exhibit No. 26.. +9 | ace rn
(Acker Exhibit No. 26 was marked for identifi-
"cation. ) : cae ; :
By Mr. Sigal: *” 9

Q. Mr. Acker, I eall vour attention to the first column
of this exhibit. This shows, that at twelve dollars ‘per
‘gram your total receipts during the operating period
1962 to 1971 willebe $14,139,000, A. That is right.

~ 418

a Sn

- 3436

Q. “And it also shows that this would be $18,611,000

less than your present estimated revenue, assuming thir-

ea [3a35y -

ty dollars per gram ufeséalated price afters June iy
1963. .A. -That is right. 7

Qe What provision, if any, has: PRDC made. for the
contingency that the price after June 30, 1963) will he
twelve dollars-per gram? A. We have made no provi-
sion as yet, Mr. Sigal. I think, however, we should say.
that that would be an extreme assumption because on the
basis of the present schedule there is escalation provided
so that it would be more realistic to use the second columu

‘showing a, reduction of plutonium revenue of $10,32 28,000)

as a measure of what additional provision we might have
to make.

Q. Well, whether or not it is more reasonable or real-
istie to do so is not something that you are ih any position
to say at this time, are you, Mr. Acker?) A. I think Tam.
on the basis of ‘my own judgment. _

Q. That there is going to be this increase in price over
the period of time involvéd?| A. F think that is a fair
assumption, yes... |

> «What is your iatienlien Ww! ith regard to the in-

‘crease in prices? A. 4.2 pereent per year!’
Q. Per year? A. Ksealat ion applicable under the
schedule. : eS tacias * . . .
time to time as against a construction schedule. This is
- & °

10

3451

an evolution process of fabricating these compietely new
components, ,

There are changes in design that occurred during the
~ eonstruction and fabricating period. There is a tremend-

. , .
us

£8450] -

amount of research, metallurgy that has to be resolved,
and there are many factors that are so completely different
from anything-that the manufacturers have ever been up
against before that I would bet my bottem dollar that you
will not find a reactor vessel that has heen delivered on the
original promised date.

(). When was the contract for the-reactor vessel let,
Mr. Acker? A. 1 don't remember the date, Mr. Sigal.
But my recollection is that we had. fully expected the re-
actor vessel first to be delivered last October.

Mr. ¢'laytor: Mr. Sigal, I believe from our ree-
ords it is indicated that the order was first Piseed | in
the fall of 1955.

Mr. Morrisson: That is at page 25#6 of the tran-
script. T looked it up this morning.

by Mr. Sigal: |

(). Was it actually let, in 1945. Mr. Acker? A. ! he-

lieve so, Mr. Sigal.

“(). At the time vou testified in this. ease, Was it not re-
ferred to as a proposal?

[3451]

A. -I would not without refreshing my mind as to my tes-
timony, I would not reeall what terminology T used.

131

3451

\

ae

7 would net want to.say without refreshing my mind on

my written testimony or written transcript.as to how Tr
did characterize this. But it is a faet that we had a pro-

posal against which an ordér had been placed.

Q. | simply eall your attention.to Acker. Exhibit 7, item
(, reactor plant equipment, in which the reactor vessel is
referred to as a proposal to APDA. A. Yes.

QQ. This was in Mareh 1997, . |

Mr: Claytor: Anil Acker -Exhibit 20 states this

- ¢ . .
as one of the items on order hy APDA.

By Mr. Sigal: \

(). “So that apparently was ‘put-on order some time
around March of 1957! A. IT’ think it was put on order
long before that, Mr. Sigal.# .

(. In any event; Mr. Acker, it does appear again from
your own testimony that the difficulties involved in the
manufacture of this item have necessitated an increase in
the anticipated period of m anufacture of something i in the
neighhorheod of 50 per cent. — A, Yes.

(). Or more perhaps?’

4
[3452]
3 A. Maybe.

()... Do you have any assurance that other complicated
items involved in this reactor will not be del:tved.50 per cent

longer in the time required for manufacture? A. I
don’t liave any assurance any more than vou have any-

thing else in Nife, Mr.. Sigal. hat is.a possibility. We

do not foresee any such similar delay would affect any
other element. . .
(As a matter of faet.-in March of 1957 when you tes-

132

3453

tified, vou saw no reason for a delay in the manufacture of
this vesselsby six or eight months, did you?. A. That is
right. |

Q. But you say now no other item is likely tos be de-
layed so far as its manufacture?) A. Tsay now T know of |
no other item as to which we cont expect that kind of de-—
lay. 7

Q. Why will the delay in the manufacture and installa-
tio of the reactor vessel cause an 8-month delay in the

\ entire project in as much as many other items are on manu-
- facture simultaneously with the reactor ‘vessel? A. It.

would be because it is such an important, component of the

-wholé structure that. to thé extent that it is delayed: the

completion of the whoie plant is delayed similarly,
(Q.° But the manufactare of the plant itself,

[3453]

Mr. Acker, is ta be completed long before 1961, When-you
talk about the plant structure aside from the reactor? °
A. Well, T an’ not. saying that there are many other ele-
ments of the plant cill sot have been’ completed before |
that time. Let me give you an example of what I am talk-
ing about. If we are building a steam station and. the de-
livery of the turbine is delayed for eight nionths, why, the
comple tion of the plant is delayed for eight months. This
ix in the nature of that kind of equipment.

(). Is it in the same nature, Mr. Acker? ‘The entire
jilant aside. from the reactor components thems: ves is to
he vomploted in 1958, is it not? A. Under this stretch-out
it is ip ited the plant may not be completed until Septem-
her —

“9

tas

3453 og

Q. That is just my point, Mr. Acker. Why will a delay
in the manufacture of the reactor vessel delay the entire

project in as much as most of these other items proceed . °
simultaneously as far as their manufacture is concerned?
Mr. Claytor: Mr. Examiner, he has answered the

Pict Nam factor inno!

question twice. ;

Mr. Sigal: He has given a conclusion, Mr. Ex- — -
aminer. He has not explained why the delay is
caused.

The Witness: I have given you my best explana-

* tion
[3454]

as to the reason for the delay of the reactor vessel,
I say the plant can not be completed until the re-
actor vessel is installed and if there is an &8-month
delay in the delivery of it as against the original
final completion date fer the whole plant, I think
it is entirely reasonable to assume that there will be
the same. delay in the: completion of the whole plant.

FULT PRG MESO NRC LAM i ye

By Mr. Sigal:
Q. Is it yeasonable to assume that?) Why could not all
the components be ready for installation when the reactor
vessel itself was installed?) A. Mr. Sigal, we will use our
| very best efforts to get this plant in operation just as

rapidly as we can, I can assure you that.

Q. I welcome your assuraice, Mr. Acker. What we
want here is facets. I want to know whether or not you
know w hy the delay of the installation of the reactor vessel
to January 15, 1958, requires a delay until August 1961
in the completion of the reactor. ~~, - @

a

.
* ee) r
$s ESTER RI st My Mee TTS omy on retovtsetunel

ee on

ps TE MESS LE

Seidh .wsees

Sal

panties te > oe Ren bee

5
ME Hr BB Lt es

By 2G aah oy 3155

Mr. Claytor: Mr.. Examiner, he-has already ex-
plained how it works. Ht is exactly’ like a steam
turbine in another plant. I feel that the explanation -
in answer to that question is already on the record
and it is adequate. 1 think asking it over and over
again comes under the heading of harassing the wit-
ness, ‘ ,

*.

[3455]

Mr. Sigal: We are not talking of steam turbines.
That is the first I have heard that there is any rela-
tion between steam turbines and reactor plants.

The Presiding Officer: Well, the witness was

‘drawing the analogy in comparison with a steam

turbine. I understood what he was driving at in
answer to your question. T think you are_asking
the question over again. ~~

Mr. Sigal: But he has not given any answer.

The Presiding Officer: He has given you what is
his best judgment as to the reasons for the delay.

Mr. Sigal: The point J am trying-to arrive at,
Mr. Examiner, is whether or not Mr. Acker is quali-
fied to have a judgment on the matter. . :
-Now Mr. Acker is not a builder. Mr. Aéker he.
never witnessed the building of a reactor filant.

The facts here show that the reactor vessel will
be installed, they expect, around January 15, 1958.
Their evidence here indicates that they will complete

construction of the entire plant by August 31, 1961.

I am asking why the delay of the several ies
in the manufacture of the vessel requires a stretch-

3455

>. out, of the entire project, so late after the installa-

4.

tion_of the re: actor vessel. Mr. Acker simply says
that is how it-is. If that is an answer, if that is
the best that Mr. Acker can do, then perhaps we will

have to have somebody who is qualified to

y

[3456]

answer the question. But certainly Mr. Acker has

‘not answered the question.

~The Presiding Officer: Mr. Sigal, I think vou have
made your point and I think Mr. Acker has given
his answer and as to what his judgment i is or is not

Tam afraid will be up to the Commissiort to deter-

mine and not the examiner

Mr. Sigal: The point I ani ciakiae, Mr. Piaminer,

is the point I started out with this morning.. We are
not given the opportunity of cross examination here
because Mr. Acker does not kriow and .we have not

“had a word that anybody else will be put on the

sthnd who does know. The man who wrote this
letter>Commonwealth Associates, all those, responsi-
ble for thé actual building ‘of this reactor, have never
shown up in this hearing. We have never been able

to examine anvbody-who is actually responsible for’

the building of this’ reactor.

The Presiding Officer: Mr: Sigal, whatever weight :

is to Le given to the testimony of. Mr. Acker. is ae

’ the determination of the Commission. T do not think

we ought to: pursue the point any further.

By Mr. Sigal:
Q. Mr. Acker at the boitom of the page of Exhibit
XLII this sentence appears, the last sentence on the page:

(136

s
%
z
‘4
Bie

1 ite x:

eaticnabinteatond

ae

F Sgt ‘
ea Sah oS erat:
(CHAE SSR aS

-

set RA Sch a geis Secoeh MRIEN nels Mebiattoatyts eT

SAI Aa GAZ DRY
y .

FR le SARA

&
4

©

_ing the construction ‘and test period for the longer

3458

’

- In addition we _ that Overhead and administra-
tive costs which we have never inchided ii our‘construction
, : ay
+ £3457] |
estimaté and which we understand has been estimated by
your staff at, $1,816,000 to December 31, 1960 would also
have to ke increased to cover the additional time allocated
to construction and testing.” .

Can you é¢xplain that sentence, please? A. .If you have
a longer construction period, what they are saying is that
vou will have a longer period of administrative expense.
And responsive to that factor in estimating the new cost,
over-all cost, we now ,estimate that°for the original period
plus the stretch-out period the administrative expense
would increase to $2,170,000.

(). Tam sorry, you lost me, $2 million w hat?) A. Tam
saying instead of $1,516,000 of administrative 6 xpense dur-
con-
struction period, the administrative. expense would be
$2,176,000. Lae ar ‘ Xs

(). Now, are you including the increase in the cost of
your financing as part of your administrative expense?

“A. No. .

(). - Where did vou get sce figure of $2 million plus?

Mr. C laytor: Mr. Sigal; it is on schedule No. 2 of
Exhibit XLITI.

By Mr. Sigal: = aes :
_ Q. Which figiare are vou referring to, Mr. Acker? A.
The figure on schedule 2 of Exhibit XLITI. TI am
: [3458]
referring to the item, next to the last item on the page,

137 p

3158. A

‘administrative expense”? totalling for the new stretehed-
out construction period $2,170,000. |

Q. Is that a correction of this figure of $1,816, OOO? A,
Is that a what?’ .

Q. Correction. : _

I want to know where this figure of $1,816,000 came from.

Has it ever appeared before? A. Certainly. It has been -

evidenced in this proceeding right from the start.
(). J ask you where does it appear.
. > Mr. Claytor: Exhibit XXVIII. Ht also appears
in Mr. Acker’s original narrative testitnony at page
15.
y Mr. Sigal:
b This figure of, $1,816,000 is referred to by Mr. Moul-

ton as a figure which has never been included i in your con- .

struction estimate.

Now, is Mr. Moulton wrong?) A. No, Mr. Moulton made .

‘merely the construction estimate hut he did not in his fig-
ures include the administrative expense during the con-
struction period. We added those as a result of our own
‘estimate. . He is merely saying that he has not been re-
sponsible for estimating that element: of the cone{raction
cost in the past.

Q. -What rT have tried to inquire into, Mr. Acker, is. the

[3459]

meaning of this sstilaiaa in this letter.

‘Now, if this has always been included as a part of your |

estimated expense and cost, whether -you did the con-
struction or otherwise, Mr. Moulton apparently, found it
necessary to make a specific ‘reference to the fact that it
has not been included in the construction estimate.

138

ry
'

ni nals PUB pai LO vba teasittiak pbs

3460"

Tam asking why he did that. A. I simply think he did it
to clarify what his estimates covered, the estimated plant
cost. To do that he’ is calling attention that he ,hasn’t in
the past included this. administrativ ¢ éxpense itenr but that

~ we should take this into account and make such change as

is necessary to reflect the higher cost in the longer construe-
tion period,

Q. Now, you’ will notice the very last phrase in. that
sentence that the additional.time is allocated. to construe-
tion and testing. .A. Yes. :

(). It agpears that Mr. Moulton did not consider the —

‘stretch-out to he caused entirely by additional construction -
time required. Isn't that what appears from this state-

ment? A. Not to me, Mr. Sigal.

*Q. Does not Mr? Moulton say that additional time is
allocated te construction and testing? A. Yes, so far as

‘the administrative expense is concerned.

3463

[3163].

begin on September 1, 1960. A. It states that it _ end
August 31, 1961, one year. ; , :

Q: It says ‘This construction pe riod includes the year
1956 and extends through the pre-operational testing end-
ing August 31, 1961.”’

Now that does not say that pre-operational: teating he-
gins on Se ptember 1, 1960? XN. Mr. Sigal, T assume you
remember that All through ‘this testimony, cértainly all
through my testimony we have always talked about one
year of pre-operational testing. :

Q. I know what you are talking’ about, Mr. Acker. I
am trying to find out what these documents mean that have
been introduced in evidence, You talked about a good
many things in March 195 TW inch have been changed since
March 1957.

Now, I do not see in this material that has bee intro-
duced today that in anything except possibly the letter in
Exhibit XLIT that your pre-operational testing will begin
September 1, 1960. °
Mr. Claytor: I thought-that was Mr. Acker’s

testimony about three times and it certainly is now

in the reecerd. If there is any doubt about it it has —

heen dispelled in the last ten minutes. ,
The Presiding Officer: I thought the witness

(3464)

centeined that, Mr. Sigal.
Shall we be in recess for‘about five sendin’
(Brief recess. )

142

.
nite halen ty LOD SAS Lie nan Dea DA See wh Te FOS «

.
ane pikes

me \esznacinnien: ina 2d he

i sy Der ie bs
PIAA PLA AL OL IAA LAAN ALA EA

e

S
- _ -
3465
* *
~The Presiding Officer: The hearing will be in
order, ;
By Mr. Sigal: 0 7°.

QW) Mr. Acker, vow say on page 10 of your supplemental

testimony that PRDC is not yet able to adopt a new
definitive construction schedule. The question of schedule

«revision isestill under study by Commonwealth Associates.

What is the reason for this delay in arriving at the
definitive construction schedule? A. Because of the study
which Commonwealth Associates is) currently making of
each individual item: of the construction schedule. . That
has not been concluded as vet. |
Q). Construction of the reactor started a vear ago? A.

Yes,

-

Q).. And: construction has been going on throughout the -

vear, is that right?
(). Despite that fact, the construction schedule is not
vet defimite?) A. That is righit. 2
(). Now what is there in the nature of the details of
the problems of constrnuetion whieh has prevented {‘om-
monwealth Associa +s and PRD from arriving at a defini-
tive construction schedule?

[3165]

A. Some ‘of the design work has not been completed.
There are items as to which additional research work is

required,

(). What design work has not -been completed? A,
DE you want me to try to give vou specific items? One
that comes to, my mind is—

(). “Well, are yon in a position to testify— A. If you

A455

)

3465

will let me alswer, I will say that one that comes to my
mind as an example is the Cask ear, That is under study
af the moment.eby "Or. Zinu’s organization. And. the study
has not yet been completeal.

The design has not been made of it... So that we have
nothing definitive on which to ask: for bids. That situa-

tion has: to be reappraised to fit into the construction

sehedule. .There are additional items of that kind.

@. What additional items do vou know about? A. The
fabrication of the fuel elements. Those are the ones that
come to my mind immediately.

(). Who would have more detail on-the problems? A.
Mr MeC'arthy would. | :

QQ. He would know which items have not yet been. de-
“signed or the designs hays not been completed? A. He
would bs mere qualified to testify along those lines than T
am, te -

(). In addition to design problems, what other problems

£3466]

are there that have delaved the schedule? A. I think it
woud be principally design. ‘

%. 1 understand, but what vther probiems are ‘there

hesides design? A. That cause the delay?

Q. Yes, that make it impractic: able te determine a speci-

fic construction schedule. A. I have not said it was im-

practical tegdetermine a specific construction schedule.

(). Or whieh has delayed the determination 6f a sched-
ule? A. | don’t know of any other items, Mr. Sigal. _As_
I said, I think the delay would be principally: because. of the
design ‘problem.

“

144

Pee yA peti cbs,

a - Dae 3467
} ‘ ; : 53

, . Mr. Claytor: Exeuse me. | think Mr. Aeker is
‘ speaking of the delay in the construction. ——

| I think that Mr. Sigal’s question, if T understood
% | it correctly, which was a htt'e difficult to understand,

‘is why we do not yet have a new revised definigive «
- construction schedule, . That is a delay in the crea-
tion of the schedule as distinguished from the delay
in the construction, Is that right? Ae
Mr. Sigal: Yes.
The Witness: 1 thought IT answered that pre-

“Ieee

, viously, Mr. Sigal. T thought T said that was under
H . way at the moment. -

. ° ee [3467]
iz- ; ; Ss ats “
J Whatever time it takes’ to’ revise the “construction

4 schedule based on the study of each individual item.

‘ still to be fabricated, ordered, and so forth, what-

; ever that delay ts it is. Whatever time is required °

i we have to stand for it. |
"By Mr. Sigal: |
, W. Then so far asthe schedule that is now indicated
4 that also is a tentative matter? A, _T stated that previ-

‘ously, ves. | ,

Q. And there js no assurance in so far as PRC itself
y: ix concerned that the construction of the reactor will be
a’ completed br September 1, 1960, is there? A. | Nobody

ean ever have such assurance, Mr. Sigal.

i. . Of course, if the construction is delaved beyond

what vou now indicate, of Course your construction eosts

i will he inereased beyond those that you now estimate. I+
) - that- not true? AL 4 think it is entirely, possible thet

: ; 145

Se ene a eee

cheno F

3467 « ‘ 4
“some element of your construction cost would ke Increased. a
Certainly your Administrative cost, during construction ;

would be.
Again d would like to point out that we feel confident:

that the $6,000,000 that we have available would cover, i
such a delay as well as unforeseen increases in cost.
-- . Now I call your attention ‘to Exhibit No. oo
A. T have it, Mr. Sigal, _§

Now this exhibit is- entitled. “Comparison of. the
pe

he: | [3168]

77

Construction Estimates and Commitments.’? And it shows
the comparison of the major-itetns involved in the construe-
tion of the reactor and concludes with a showing that the-

overrun at the present time comes to a4 per cent. A.

That ts right
-(). However, if you would examine the individual items, | +3 >
Mr. Acker, the over-run on the large items -particularly

rd
BAe Hotes,

a far greater than, 7.4‘per cent. A. That is. true, ;
QQ. lor example; T call your attention to. the iiquid ‘
inetals, item D-3, intermediate heat exelianger, the over- }
run there is 183 percent... : ao |
In the case of two bonnes primary sodium piping, the is
over-run is Mi pef cent. -? ;
In the case of the secondary containment, the primary i
sodium. system, over-rin is 300 per cent. _ rt
Mr. Morrisson: Is that an over-run of 183 per .

cont? ; “ }

Mr. Claytor: It is 183 per cent of the original ; '
oe estimate. ~ . ” . ;-

Mr. Sigal: | don’t think we need comments from
everybody around the t table, Mr. Examiner, T am _ yy

e : q

460°
F

3469
only reading what this-says. If the witness wishes
to correct what appears on the exhibit, he can
“Correct ‘it. .

Mr. Morrisson: [just wanted to have it correct |
in the record, | .

: [3469]

The Witness: +1 will state that your statenient
is incorrect as read from the exhibit. The 1838
figure that you sec, if you look at the top of the
column, it is percentage of the estimated cost repre-
sented by the Order or commitment, so that that
would be an over-run of 83 per cont.

‘By Mr. Sigal:

Q. The statement there is 183 per cont of the original
cost? — That is right.
eo Q. And the two loops of primary sodium piping shows
147 per cent of the original cost.

The secondary containment of the primary sodium SVS-
tem shows 300 per cent of the original cost,

Now, the iquid metals: system shewn on this snhebe
is far and away the largest item on the schedule, is it not, —
intermediate heat exchanger, A. That individual item
is the largest om the schedule, ves,

(). Now it appears, does if not, from this schedule that
the over-run is found primarily i in the reactor Items them-
selves rather than in the, shall we say normal construe-
tion cost? .A. That is true. .

(). So far you have had experience with these costs,
so far as in construction, improvement, excavation and

forth, . i : ; ‘

“147

3470. eerie a erat

’

soi rile Tea

[3470] | “
your estimates. were fairly sound. A. Yes. :
Q. As to the item with respect to the reactor, it‘appears
that your estimates were quite low compared to what
the costs turned out to be. x4. On the basis of these

individual items, that is correct.

(). Under the circumstances, to say that your. over-
run is only 7.4 per cent is stating an average which does
not reveal the, significant proBlem of estimating the costs
of the unique structures involved in this reactor, isn’t
that right?) A. 1 agree -fully that it is an average and
the nature of an’ average is that it does not reveaf the +

individual items which make it up.

@. It would also appear, would it not, that as time
goes on and you get into the manufacture of the items
which are of this unique variety, namely, the special com-
ponents of the reactor, it would appear that your estimates
are likely to understate the cost in the same order as you
understated them\ with reference to the liquid metals
system? A. No, I-don‘t agree with that, Mr. Sigal.

Q). Why don’t vou agree with that?) A. Just because

that has happened with respect to individual items here

does not mean that it will obtain
[3471] i
throughout the balance of the construction schedule: 7 F
Q. But the point I théught you agreed with me on was
that when. you were getting to the manufacture of the f
unique items as 1 call them, your estimates have proved . |
to be quite unreliable, A. .As to those that are presented $

here, that is true.

148. ef

LEE IT eo

i

pepe te sd tea Mole pit

ew

3472

(. What. reason is there to expect that your,estimates
will prove more reliable with regard to the same type
of component parts that vou have not vet come to? A.
Because there is no reason to expect otherwise. It seems
to me it is entirely open-ended, Mr. Sigal. 1 can, not say |
as to whether all the balance of the items inthis category
would be equally under-estimated.

Q. -I did not say that you ean say, Mr. Acker. Tam
suggesting that you are also in ne position to say that
they will not be under-estimated to the same extent. ALL
will agree with that. But I think it would be unreasonable’
for me to make either statement, Mr. Sigal. They will
be what they are and again I would like to urge that we
feel that we have adequate resources to cover them, what
ever that may be. wy

Q).- Of course you will recall, Mr. Acker, that when you
testified Several months ago that vou were quite confident
that the estimates that “you reported then were sound.
You remember that?

A. Yes, FT do., : ae

Q. You had no reason at that time to believe that
the costs would be substantially greater than vou estimated
them, at that time to be.

Now yeu do have experience and your experience show -
that with respect fo these more complicated items, items
in which manufacturing experience is ‘extremely limited,
your estimates have proved to be quite unsound? A. As
to,these particular items, that is true. ;

149

”

3473 een

[3473] |

(). Now, are you in any position to give any estimate—-
perhaps you have already answered.this question before—
are you im any position to report any estimate with-
respect to the extent to which your construction costs will
exceed, your previous estimates? A. “No, I am not, Mt.
“Sigal; at this time. .
Q. Is anybody in the PRDC organization pr are to

"do that? A: I don’t think anybody i is, Mr. Sigal. T will

say again, that .it is our best judgment that the overrun

will be under the iesources tha’ we have available to meet.

them. mae a ea,

“?| Now, on page 12 of your supplemental testimony

you say, ‘*Ne subsiantial additional maferial to be incor-

porated in the reactor has been placed on order by APDA

since the preparation of Acker Exhibit No. 20... °

When was that exhibit prepared, Mr. Acker? A. Where

ix that statement, Mr. Sigal?

Q. On page 12. ae Mh ay.

1. Mr Claytor: Acker Exhibit 90, i believe the
record, will show, was piepared at the time of
“fire Acker’s cross examination which | believe was
‘in Marek. The record will show. eae

Mr.-Sigal: . The exhibit itself does not show. It
was some time in March that this exhibit was: pre-
pared. a Rh Se og eee

i5\” Mr. Sigal: ;
Q. Your testimony then indicates that between March

[3474]

“1957 and August 1957 ° no- substantial additional ‘material
has heen placed | on order,

: ae

oe ES RS

3475
It seems to me te be a long time during the construe-

. - ~
tion period not to have placed on order materials neces-
sary for the construction of this reactor, Mr. Acker. Can:

‘you explain the reason for’ that? A. This applies , to
APDA, this statement, Mr. Sigal; not to PRDC. - %

Q. That is right. A.: The facet is that APDA have

covered the bulk.or a wehatanial part of the t test facility
- at that time.

Q. You say they have already placed on order the

substantial bulk,of it. Is that the reason they have not

placed on order any more? A. I say that at. that time
they had. placed’ a substantial amount of the orders for
thee test components, and no additional orders have been

_ placed since then,

Q. -That is. what you say, but there is a substantial
amount yet to be placed on order by —- ‘ A. That
is right. : . .

4). Now, Task you why, if you can tell us, APDA has.)
not, during this intervening ‘period of at least four months,
placed anything more on order? oA. Because they have
not been ree ly te, Mr. Sigal.’ Qe

(). Obviously they haye not done it. Do you know why

\ t
[3475]
they are not ready to do so? A.. Because they still have
some design and research work to do before the additional
orders for materials are pkaced.

Q). Do you know on what items they are: still doing

design work Which they are supiposed to put on oxder?

NX. It would not ne ossarily be design. It could he design
a
or” investigation, but the orders have not been placed

.*

a: 151

3475

as yet for the core, | think that orders have now heen
or are about to be placed-on sodium pumps. That was
another item. that took fong livestigation and negotiation.
I think those would be the princi ipal items that have been
delayed. | E

Q. Then your testimony is that the r-ason that APDA

has not placed wany ‘orders im any substantial quantity

since March is that the design has not yet been completed
on those items? A, Or their ivvestigation of’ a particular
‘item has not been completed.

Q. So they have not gotten to the design stage, you
mean, on some items? A. IT do not mean that. 1 do not
mean that no design work has been done on some of it.

Q. Isn't that what you mean by the ‘investigation is
going on? A. It could bé an investigatio’ on what manu-
facturer } . |

‘ :

[3476]

could "fabricate the equipment.

). Now, at the bottom of page 12 of your supple mental
testimony you say that you think. that your estimates are
more realistic than much of Mr. Radley’s testimony seenis
to indicate, ‘Ts it vour position, Mr. Acker, that Mr. Rad-
lev’s estimates are not realistic? AL Th some respects,
Ves, , ; o.*
(In what respects? A. To begin with, Mr. Sival,
in comparing estimates for large construction projects oY
this type, if seems to me that ‘you must be sure that
your basis is correef to begin witht I think that Mr. Rad-
ley’s concept of a power reactor construction estimate was

that of one organization ule raking to do the job hegin-

*
mes cee

ER nar ree Sore

ne
\ $477

‘
(). Who is on a.non-profit basis?’ A. United Engineers
and Contractors, ; : ¥ 6
ea
153

ca

(). They are doing this for you without any profit?
A. On a non-profit basis, cost reimbursable basis. We
assume that if it were on the conyentional basis, that we
were hiring men to build a steam plant for.a utility com-
pany, that the estimated cost would increase $500,000 at
least. .

So that to get.a comparable figure in our case for the.
usual concept of indirect and overhead. expense, I think |

you would have to add that figure, at least.

[2478] ©
Now, in‘ addition, APDA has undertaken to do researeh
: : ; i i
and other work for us during the construction .perfod and

cheir administrative expense during PRDC's construction
period is estimated at $2,250,000, |

Q. What is that for, you say’ A. That is the admin-
istrative expense of APDA during PRDC’s construction
period. | |

(). $2 million? A. Right.

(). For administrative expense alone? A. -For ad-

- ministrative expense during the. PRDC eonstruetion pe-

riod.

(). You mean on

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---