| WAR DEPARTMENT DO BOT RECORD
OFFICE OF THE CHIEF OF ORDNANCE
WASHINGTON, D. C. EDSeynelds/jrn/331i
22 August 1947

“”

SUBJECT: Tests of Fertiliser Gade Ammonium Bitrate

\ .

10s Commanding General \
_ Aberdeen Proving Ground
Maryland

y
%
*

Fo

1. Forwarded for your informtion and guidance are copices
of 24, atid 34 indorsement to letter from Ficatimny Arsenal] te
thie office dated 7 July 1947, file 0.0. 64/150, subjects
"Investiration of Fertilizer Grade Ammonium Bitrate,” and letter
to FPPAP dated

L. It is requested that your Office order 20,000 pounds of PGAN
to be seat to Aberdeen and that this arsenal be notified of ite arrival
at the Proving Ground.

5. When ell the bemd moaifications have been nade and prelininery
experimental work at this Arsenal completed, the eajity bcmos will te
sent to Aberdeen Proving Ground. A Test Program Request will be prepared
outlining detaile for conducting each test. It is understocd thet
Aberdeea Proving, Ground will conduct theee tests with the cooperetion
of technical personne] from this Arsenal.

>» 6 The comments of your Office om the test program outlined in
the above peragrephs are requested. Assuming these tests are ta be
completed before the White Sands Tecete, a1] work at thie Areenal is
counection with this project will be expedited.

/e/ W. 8. LARNED
| ff WW. B, WARMED

Colonel, Ord Dept
Comman diag ‘

- 28623 i

asi

ANG RARE hewn

en) Oe

OLAS AE MEN HB Sot

AS A tN NEI ATI thi Tiles shen itr il Se ee ee Lee oe

102

Subjects Investigation of Fertilizer Grade Ammonium Nitrate

0.0. 46/150 : 3rd Ind HDReynolds/jrh/3414,
ATTH:; O8DIM

ORnDBB 4,71.869/198-29

WD, Ord 0, Washington

LiRriksen/rr/2224
Test Program “equest No. 2730
Picatinny Arsenal, Dover, §. J.
6 October 1947 ;
le Material for Test

a. Tan (10) tons of fertilizer grade ammonium nitrate (FGAN).
This material has already been received at Aterdeen Province Ground

fron Ravenna Arsenal.

be One (1) 4,000 pound T-8 and four (4) 12,000 pound 7-19
bambe have been modified and are identified as follows:

Ammunition
Lot No. Date Card No. Item
Pi-E-I0ez ae oo : :
PA-€-1085 £6398 12,000 lb. bomB (2)

* These and the following equipment for use in these tests will be

sent to the Proving Ground frap thie Arsenal by truck:

(1) ‘Thermocouples

(2) Thermocouple lead wire

3) Potentioneter for use with therroce:ples
. 4) Résistance wire

(S) Asbestos

(6) Pellets of FCAN and paper

Ce Asserbly and loading of the bombs to be done st the Froving

Ground as outlined below under "Recommended Test Program” with the
cooperation of personnel from Picatinny. .

2. Procurement Authority

&- Allotaent advice (for work at Hicatinny Arsenal only)
roe aie dian Shits (000. 464/150, ORDSB £71.-869/198-29, 34

be Project Klos = None
C+ RAD No. = None

3+ Arsenal Expenditure No.
XeO. 321 (95/228)

105 ge!

"A

ject of meson or Experiment

To investigate the sensitivity of fertiliser grede amacaiuz
nitrate to explosion.

5. Lecal Tests | ee

It has been shown that PGAN can be caused to detonate under
certain conditions of temperature, confinement, etc. These tests
are outlined in Tables 17 and 16 of PA Technical heport Bo. 1656.
Each of these tests invclved approximately 5-10 pounds of FGAR.

,

Oo ject of Tests

To determine whether moderetely large quantities of FPGAN
(1500-3000 pounds) cans be caused to detonate under eny of the five
(5) ditferent test conditions outlined below in detail under
* Rs commended Test Procedure”.

7. ped tts ticn in Detail of laprovements mace Since Last Frov ing

Gr

Zo previous tests mace at Froving Ground.
»

6. Precautions in Handling and Testing

@. 6 smoking shbuld be permitted by any personnel engaged
in any of the handling operations of PUAN, es;ecially dvring and

efter loading the test bombs.

bd. Each test, requires some degree of control. Asseyming
detomtion of the FOAN will occur ia each test, the distance
from the test bomb to a suitable barricade which wil] house
personnel and control] equipment, is left to the diseretioa of the
Proving Ground.

CG. Small scele tests at this Arsenal indiceted the possibili-
ty that bombs containing heated FGAN aay rupture and behave lixe
® rocket. Therefcre, precautions gust be taxen against euch «
hasard. The 4,000 1b. bomb should be partially buried nose-dem
im the ground. Por test purposes each 12,000 lo. bomb mst be

tested with the bese lower than the nose at an angle of about *

20 to 70 degrees with the horisontal. As a precaution it is
suggested that each 12,000 1b. bemb be partially buried sese-
first in the side of a hill or trench, or be laid in a sloping
lauacher-trench and pointed to sea.

23528

.

J/

9. History Sketch

The Texas City disaster of 16 and 17 April 1947 occasioned
considerable investigation st this Arsenal into the characteris-
tics of the FGAs involved to try to determine the possible cause
for the explosion. ‘the laboratory teste indicated that both the
nitrate and bags were of satisfactory quality and no deficiency
in this respect was resporsible for the fire which preceded

explosion .

However, during the course of this investigation, « number
of tests were made which showed that, when under controlled con-
ditions, a 5-10 pound quantity of PGAF could be made to detonate.

These tests, together with supplementary laboratory data, indicated that

the detonation of the POAN at ‘exas City may*have been initiated

by an explosion of gaseous products formed during the combustion of
nitrate and paper. This work is all reported in Technical Repdrt No.
1658.

It was considered desireable, therefore, to extend these

information already gained, try to simulate conditions which may
have existed on the ships "Orandcamp* and "High Flyer” before
detonation of the whole mass occurred.

10. ~ Recounended Test Progren

For each of the proposed five tests, there i
duplicate, « workin: sketch which shows the set-up to be used
(Drawing Nos. PI-7-556-560 inclusive). ‘The onjy changes sade

:

ait
He
z
ie
: 1
re
i
ii
i

:
.
i

Ei
Ee
i
i
5
tT
A
5

i
i
i
:

ef
:

bat
i
il
efit
ti
its
3
at
rE
O97 0—0g © SU OTEM S70
AM irow eFIO AMO
CAC AIFAX

s~

‘oe pe AME BGA Selene oN Be lange
, ’ ; > BG AISE HLA BT AC SAME VA Od
, i. ; sy 3 SOLFELI LN CL A¢ VOCE CO. ot: shite i
2 O- STALL BUNS, OOF W/ONX 96.7
LEMOS, VROMPEC O hi JH A? SE SFIS
© MMO RL S15 TAPCO WME FOR SATO
MULMD VIO 8 IGLOFYMIE
WMLS FO Oe RCE LUCENE
r LOS TV OL, WAL.

Oe Te A PID ee
Cale oer ee wer ‘vee Sidi: > Seton

3 Be oy
4 _- — - ~ - Pe mE TOA. the Spec

(AestOe =

ROIS oo
_ 2olg0 OAT Wait faa
LEE 2--. bed Sak
, ee

vf ¥ o>:

1 25675) FOOL
2 FI8/ Me. ae ha Be

ar

PROPOSED ABO MEL FE 7ST
bE MME A] ABE LEN PROVE CROUND
70 DETERMINE 1 ME SENSITWIT YF FER
UMER CRE Hi MONON MHTRATE 7D
EXPLOSION. (72°57 WO

2); i

fa-74-¥7 4

Pare bsg FS
PP Z6P EF ERP

‘fi

Fo

“X, : a im ‘
vwee td a pen nig dt

amt
eS aie

2

Te,

Sd, SMOVYALIO OL

MOAE SHO? PID 14

Ts,

ON LOML NOISC

a {
Oe hee

eh A

PF

i ae SE

~ +,
are; a

WVA SATEA? PR-7-565C
Tas - tt 72 VACUUM PLNAe
A Bo AES MO A yb FE A-

= nae —_—

{

P| '
NK

CUP ep
‘

Sy,
by Ss Wt

7 2

: . J f]
es , . :
as m, meee Me Le. a ;
4 . 4 é . 5. ; CU wr
¥ ay = :

a
,
A +" .

ae * | ~ ; :
OND Lil THOA TA (FAN,
OLLS ~ BAL OED

‘ew
—™ me, y

- ~ “ oe
‘ P a
‘ \ ABLE CrtwN Po “Ai ic ? > .
‘ ~

469 B ABERDEEN PROVING GROUND § uetead

ra a ‘ow

. ‘ ( “AH rest

&

-

os eo ins x aa oF 62 ae " 5 Se had ; “3 " ~~ aie Fee me x
ag Cy ws 7 VOR, = $k nc? P.. ¥ , 4 ‘3g Vaan

>
61 § ABERDEEN PROVING GROUND § 8 January 1948
ject No. EP-FG-1. Bomb, 12000-1b, T10, Loaded with $300 lbs. of FPOAR
fore Heating; Test 1C, Evacuated. Reer view showing blow out diec.

———

a ae OCLs Sle Vee ‘5 ABERDEEN PROVING GROUND » 8 January ix48

. > | , " 15 \ ’ o 4 . 4+ "7 ?
‘ be No. I i romo, AcUVNVeid., lO, Loadec with 2 J id8.
4 ’ F . | , 4
“ « ee ; ast \ . 7a ate wice view.

& ABERDEEN PROVING GROUND § 18 December 1947

“ 498
rojfect } EP-FG-1l 12000 1b. Bomb T10 loeded eith wooden dunnage and
300 lb. of PGAN before ignition, Test 2a, Left Rear Viee.

28645

@ 150499 pesemsotza_ 8 ABERDEEN PROVING GROUND 8 18 December 1247

Profect No. EP-PG-1. 12000 lb. Bomb T10 loaded with wooden dunnage 3
1600 1b. of PGAN before ifnition, Test 2A, left side view.

a @

23698) f

Per.

iter 18
a)

, rid

ASO7LO B ABERDEEN PROVING GROUND § 15 January 1948

Project No. EP-PG-l. Repre entative Pragments of 12000 lb. Bomb T10
After Detonation with 2000 lb. of PGAN.

Es ; © >

Ff 2: 65]

Ron & ABERDEEN PROVING GROUND 8 15 January 1948
Project No. EP-FG-l. Crater after Detonation of 2000 lb. of PGAN in
12000 1b. Bomb T10. Test 2.

23652

Arr€uD1Ik D

Physical Test Laboratory resort

2365.5

131

f U

with we (2) irce-constaatan therme- References Bone

ef iron-constaaten; exe elesed bond iastrumented with two (2) ehresel-
alumel thermocouples and two (2) 300 ft. leadwires ef chresel-alusel.

- @ A Vented dom? was set w@ with two (2) iren-constentan theres-
couples installed and measuring circuits were effected between ench
thermocouple and a designated recording pyrometer. The closed bead was
instrumented in a like manner except that the thermocouples and leadwires
were of chrone)]-al wel.

3. Continuous temperature recordings were made throughout each test
end the chart speed of each recomier was governed to a rate of travel of
12Z* per heur.

%, All noted odeervations during the teste were mete ey the Aberdcen
Preving Ground project engineer.

Yor thermocouple locations and charts see Appendix A.

1 Incl .
Appendix &
Approved: A Z Z Z Pe Signed: * 4 farkey
R. P. Witt, “Ss. W. Parker,
Chief, Materiales Testing
Physical Test Laboratory. Section.

23654

i
'v ‘8 'N NI YOWW

: eee ae demenaon

Asepnnepted by

ee a : rer Rares
ati |
| 1400)|) 1500
| ir Lieethd i: |
' j hit tidy
bi tt +t
' | -?
2 int
| 5
4-4
i }
i] i -

is RSE OSE SRS
an

& ee nae NSD
a
ms i
me
a _- ;
a
* aa ieee

+ -- ‘
:
1— }
= 1 ;
|
'

; j ’ '
an di ee ee ©
*1 I
a

eee
a | a
—_
—
ene

= i |
od ee . =
eg | | |
2213 = OR] == E |
a aes
9 9E= {
= ao = q
; - , ra oe er = t a
>} —————— Missense) Pesan.
t oe etal ~ ana: —_ = oy — —_

———
—
. ——
‘ —
‘4 ——
een
~ -_— ee eee af * ~ —-
—> — —_—— ~~ — —_—
——— — ee _— —s — 4
- — a ———— =
Tee — = — 7 -
—
ee ee
— a» | Cae ae a
—— ee ee a _—————— ;
— Se a ee
ee
—_ r prot pecaira —— ee ne
- — —o
ee ——a
ace ——— — ~~ 7
a ~ ~-— + — —
— ee a ae ae a _— —
—— ————

1—!
\n
~“

yo

f
AFFSNDIX E
Calowutions 5
Ub)? -%

F © 60,000 x .0070 © 5560 péi

Pressure required to olow cif vese ;late of bomp

Force on inside ot comb bese ;late * Fressure x area

s ls.7) é Dre

Fp = © auc

“2. ee -~—-e- --~—°-* -—- “ere ~—--—- -* - TRA? Bee a he ae

Grgt

Be Maite NE RS Ee SS.
, aaa ‘

salt

23661

ark

—~- ©. oe

LOFeByze 4a 4eULD
@40ms UAcCsQ xsep 4404 ZUNOEE 1] BUS

Oat

sne eat

—. . ly

“té

- ¢— oe “22 -? ‘ an ee i. mae rrTrr . ear - -s - ’ TT? 4 nk |
it iy : AVE | ; if YS ia I hit ' it | LT 4 bi if
| | Hil) BT Jo Pere A | "y I! iD m4,
5 | ' , | ;
4 ee eee te # ee el '
, | |
SES 1 . = —— aqua ———F - - . — + —— — = —
® 2161
Goyeqwe Fujlewesoey
‘@Rows 8F;4A FEnGre {Teng |
mm ,
eed had Ae} ete + tee ey eee lnediad wen ot ee te ey we ~~ u
' t ’ ) ! i
| ; | , i eTst
|
GOles|ae uwieuesd |
@XOWS ©254UA QunGwe eFs0] : |
Sexe ve t
|
St —- | £261 |
Bypee fas Puy egesoeg
@nowse BAO1g BEF Gumeew e#4e7
61 Lest

GOlSSTSe Ful ewe250e¢

®xyOUs GALLQ pes PUWMOTW ENE pen

——- oe

OPERATING PRACTICE
AMMONIUM NITRATE PROGRAM

NEBRASKA ORDNANCE PLANT

23662

| otifieation to Evetsls (erator for

] res — ae TO E°™ -&s

fignel Used by Kce{tic Operator

£ teaming Out Dray Off Line Pricr io '

}.i-Pan,

E teaming Out Goorense: ind Drar Of
Eignal Ved by Ecttie OQecrator fo- F
l:sttlo Charge

tees

6633

-Pan

opping

lve
st

142

Jun 2 37

Faragraph
12, 208.5

12,208 .6

12,209.2.
12,209.2.
12,209.2.7
12,200 .2.8.
12,20°.2.9
12,209.2.10
212,209.2.11
12,209.2.12
12,209.2.1
12,209.2.23
12,209.2.15
12,209A
12,20°A.1
12,209A.2
12,209A.°
i2,cO9A.
32 ,209A.5
12,20SA.
12,216
12,230.1
12,210.2
rs
12,210.
12, 210.
12,210.
12,211
12,211.21
12,211.
12,211.

Title

ig 4-
jx

Signal used by Kettle Operator for Condition of

First Charzo

Signal Used by Kett'.e Operator for Second Kettle

Gharge

Signel Used by Xettle Operator for Vompletion of

Second Cherge

Signal to Steam Out Let Down Valve

Signal to Close Lot Down Valve
How to Operate Liquor Valve

Housekeeping and Inepection Duties of Ai-Pon

Operator

GRAIXING KETTLE OPERATION
Xettle Preparation
Clenning Kettle

Seal Kettle Door

Preheat Kettle

Release Steam Pressure
Charging Kettles

Sigzal for Kettle Operator to Hi-Pan Operator

for Draw Off line 3

Signal for Kettle Operator to Hi-Pan Operetor

tioa

Signel for Kettle Operator to Hi-Pan Operator

for

Upon Comlotion of Charge
Starting of Plows
Charging Second Fettle

Signel Uoon Completion o7 Charge

Signal to Shut Off Steas
Housekeeping for Spillazu
Aa@aition of Yax to Kettlo
Introducing ater to xettle Jac
When to Drop Kettle

How to Drop Kettle
Housekeeping of Kettles and Flo
Responsibility of Lead OQverctor

ket

or Area

Charging
Signel for Kettle Crerater te Hi-Pan Operator

GRAINING KUIVLE OPERATION DURING POWER FAIANZ

Poeition of Start~Stop Switch
Use of Stean end Elimination of
Kettle Prenrration Yhen Power R
Use of Bar in Starting Xettle
Disvositicn of Material if Kett
Forcing Kettle

CONVEYIIG GPAINED AL?'O" LUN }ITR
Operation Belt Conveyo>-

Truck Position «t Grainiag Duil
Pilling Truck

Trusk Operators Responsibility
Truck Operation

Water
estored

le Does °*

ATE

diag

o~

Truck Position at Central Bagging Building

OPERATION OF CEHTRAL BAGCING
Operation of Equipsent

Capacity of Truck Unloading Hopver

Check for Foreign Material
Shutting Down Equipment

23664

g
Aq
ore
te
|
ae
#
+
2
4
oe
J

12
12
12
12
12
12
12
12
12
le,
12
12
12
12
12
12
12
12
12

RL ee NY
Dee Sea ere

iS

Vv eere

°°
NY

~*~ ae
e

RRRRRBP

.
wi

rb
on
a +

BRE

ne ne
Wann fue Sure

B

Title

Housekeeping

CPERATIOZ CLAY FOPP¥R

Charging Clay Hopper

Disposition of Empty Bags , '
Use of Fork Truck

Operators "Pesvonsibdility

PACKAGI''G OF AMMONIUM NITRATE IFO PAP R BAGS

Beg Supply
Position of “ag or
Operaticn of Sca/
Reading o: Scale
Correct Weisht ?
Sampling |

(4) Veut pressure from tank car.

(5) Diseonnect air hose on car.

(6) Steam out header and hose.
(7) Insert 2 owing tee

(8) Commect steam to 2 tee

Vent pressure slowly.

(11) Open car ant check ear for crystals.

(12) Replace done cover,

(13) Wash outside of car free froe crystals.

(14) Raise remp and fasten securely.

(15} Rewove blue flag when ewiteh is reedy to be made.

23671)

7-847

12,203

TRLQAD TO TANK CAR OF BAL

12 Pe —+— Jat it te in stand-by

condition.

Piaadie Ted Lb size fon Er spe «> If itquar core are to
. » eobify the boile> rowie so timt they can
have tbeir staerni-by boiler in readiness.

idaner_Atcreae Bnaca---Ti aicrete storage teaaks should
checked to determine thas an adequate spece is
available to receive lignor:.

Eeeniog lines of Grates -- Steam out beater.

- Etart al> compressors, »
precautions recocaended by the manufacturer.
Check the lubrinaticn en4 35 Ghar cisqutts cagyly of
water is flowing tirough the in‘ srcoolers.

oe mPa Sat ae
5 exce « When unloading from tank
car. Temperatcre of liquor shold be cooled to 120
by air and toppings an som as possible.

‘fabing HUbee Ae abate -- A revresentetive six le of
quer sent to the laboretory for ana-

2Rb7 2

=e

12, 204.9
_ 12,204.10

12,204.11

¢:
,205.1

12,205.2

@ 2s

12,208.1 -

12,206,2

'12,206.3

12,2064

, 12,206.5
2 12, 206.6

Circulating Line Texperatare Control.-Cieck Circ?
lating line to sec that texperatire does noi expeed
129° ¥. Normal operating tenpereture ic to be 212°8. °

fospechipe-Cirenlaviag_bise ~- Cheek liquor circe-
twice each shift. If leaks are found,

sien Gaaalieas ck ina,

Jnereching Storage Tank — Che: botton of storage ;
tanks ce co If a leak is foun, t

th hot water. Blow water tive that pressure
th :

wo If circulation is
¢ a oot of line with air.
the line. For short periods of time, water

may be circulated from water s-orage tank.

_ Before charging, sare
gure there are no

_ foreign objects in

_ bi-pan, eeprcial ly

Gare cf Air lances -- Steam ont air lences for from
20.to 30 seconds. This is also to be done twutween
each charge. :

Gare of ietdomn Yahya -- Check autlet valve of hiepan
aes valve is closed. :
jutaainaiion of ats —~ Open air walwy slightly on

licuor to Hi-Pan -- silks satan teen nein hee | | Be eure ccreen is on
’ édrewoff line and clean.
~ — 7411 pan to gxige appram
imately when couble charcs is used; 45009 when Steam on hi-pan coils
single charge is used. . ie not to emeed 1009
- preseure

L 2k

SAFETY

2,207

B12, 207.1

-~ When tauperature

increase air slightly so mate-
When tempera’

saree egitation.
*

See that air agitation is

wniform over surface.

.

reaches F.,
rial stays in

12,207.2

{iF ut rine all “abt

t Hoon $2eg,g 3035,
He irae bi pied
$358 Heetiiiie dibasai ait

Ld
mi af
a9” i:
foots
a i
a3 5 3
982 9 dss
43 i
AR
or 8 86
ae a Shs
1 @e 3.

out drew off line

until kettle operator turns off blue light.

23674

~
*
"> |
Re
aS
es
he
~,
rs
ee!
> 22,209.1
. ? a

12,209.1.1

12,209.1.2
12,209.1.3

L 12,209.24
»

12% 158 |

SaFETY
PREG ADT] Oi

fern steam on gently to
avoid splashing over
edge of hi-pan, Make

gare plug valve is closed
before steaming goose neck.

Be sure you understand
signals. When in doult,
beth operators will come in
contact end decide how to

‘proceed,

Signal to Close let Down Valve -- When red and blue
lights are turned off close valve.

Henle Seagate higuer-lalre — Liquor valve should
never t except hand. Do not use wrench.

-- Bi-Pan Operator will keep hi-pan roc
clean at all times, and will report anything unusual
or equipment cut of order to his lead operator.

Esttic Preperation Plows must be sbut off
during cleaning operetion.

Cleaning Kettle -- Kettles and plows must ie Keep hands and foet out of

cleaned before charging. kettles while plows are
running.

Seal Kettle Door -- Close door snd seal with nitrate.

Preheat Kettle -~ Kettle should be preheated for
5 minutes 4f kettle js rot already hot.

Rslenee_Sisea“-comure — Shit off steam and re- Operators should wear
pressure if steam has been used. gloves.

23675

12,205

2 Charging Eetties

2.1 Sjgnal for Kettle Opsrator to Fi-Pan Operator
or Draw Off Ling Steening.--Steaz out draw off
ling for approxiastely 2 sinntes.

2.2 88 for Kettle

amen Compietion.--Signal Hi-Pan

® step has been completed (rea light).

203 Signal for Kettle Operator 30 Hi-Pan Sperater
for Soe EK lace draw o

pipe kettie.

Signal Hi-Pan Operator to discharge liquer.

(Both

2.4

Signal for Kettle Operat
°

n Completion of Charge.
mately 7500 pounds/(dry weight) of liquer before

mately 7500 pounder (807 v

lighte off.)

or to Hi-Paa

Operater
Draw off spproxi-

Signalling Hi-Pan (Operator to stop the flow ef
liquor (red light).

2.5

proces

Starting of

Ovs.--Start plows during charging

2.6 char Second Kettle.--When draw off line bas
eae 1e

drained, place draw off line over waste line and
signal Hi-Pan Orerator (doth lighte on) te steae

reined, place draw off pipe ever second
kettle and proceed as of first kettle. *

rh S28 ene 3 of Charge
kettle hee

.~-Whea second

rgeé and draw off line

out drav off line apprezipately two aisctes.

2.9

Shut off Steas.--Signal Hi-Pan Opereter

Cc 2:38 wifes te
ignts o te
Rousekeeping for 3pillage.--Waeh down any nitrate

spillage from kettle or grates.

ata

8 off stean.

Kettle.-—Whea asterial is

2.10 Addition of to

suger and teeperature is 290° FP. or belew,

eo known qtantity ef was added.

656 of waz. Wax dDuckets to be calibrated

23676

156

Sars
PRECAU 7) OMS

Maximum steas : res. 3re
allowed ia kettle ..ckst
40 pounde.

Be eure draw off pi:e
ie over drain, and
eafety device locked is

place.

Operator gust weer face
ehield. Stand clerr o%
draw off line when stear-
ing ous on drawing liguer
into kettles.

Do not clind into
kettles. Keep firm hold .
on draw off pipe.

Watch out for seplacihing
of hot liquor.

When moving draw off
pipe froa one rettle to
the aext, place scoop
‘shovel under draw off
pine to avoid svilliag
of liqaid aitrete on
fleors, grates, and
kettles.

+
Be eure draw off lise i
over Grain and eafety
devices ie locked is

place.

Keep hands, *eet ani
tools oud of rettls
door.

Wez is net te de aided
whee material ezree2e
200° P. . ;

a “~
ae oe
ws Se 2 , Me tle.

- 32,209.2.42 eee waz ie thescoughiy
@ ie ready to arep. :

12,209.2.85 a Opes kettle end break hole
r ettiag hal flew inte hopper

12,209. '.L8

12,209. 2.45 Aagspenerbin ber of [eek Cpereter et Operaters
responsibie for reporte and will

bring sas fiato office at ead ef his shift.
CONVEY] BO GRATED AIORIUM BIT SAR

ae

r mas vanen kettles are emptied.
A maxioum of 2 kettles are.emptied. A maxima
ef 2 kettles will te allewed is hopper at one

and dewn oa beld.

(12,80
“. 12,210.2

4

} time.
ater wi cading hopper
ia Daildings.
12,210.3 i --~freck Opsrater will start sagar
‘ empty: ag ead filliag truck anf will step
& flew when trusk ie full.
: , ee e's asibility.--In case of
inclement vee ° ver will close 114 ea
| track, thus protecting grained material.
"* 12,220.5 Sense Leeration.—Prenspers trusk load to Central
Bg.
12,210.6 Pe t ai ga
sition 8 erer

| & uniceading hopper at Central Bagriag.
&
236 77

De aot exceed grea
epeed limit. Yateh
fer other vebicles
aad personnel.

Yer

9-23-47 | ety 12,2ih4

SAFITY
: , * REGAUTIONS. 5
12,200 GRAINING KRITIS OF RATION UFDiG FO HR FALL) ;
12,205A.1 Position of Start-Ston Switch-~Checke all lrettier
tq see thet Start-Stop cwitcher are on Stop
Pesition, ie
12,20°A.2 Use of Steam and Lliminction of Water—If water Do not exco ri 60 }

is being used in kettle jecxets for cooling turn vounds,
off water and turn stear into jackets. Jeave

astern on settle jackets rntil power is restored.

Use by ness steem at this time aad bring prescure

un to 20 lbs. on cuage.

12,20°A.3.. Kettle Prenaration tIhen Power Restored—When nower
; s resto sides and bottom o ttle with
screper to see if crust is looses. If crust is
loose screve away in from. of vlow blades. If
moterial is hard use a small amount ef water ve
tween meterial and kettle.

12,20GA.4 Use of Bar in Starting Kettle-—when kettle is
' Yeady use a crow bar cerase through upricht arms '
of plow blades to start kettle.
12,209A.5 Dienosition of Material.if Kettle Does Not Start--Do not shovel
does not start easily shovel anmonium onto floor or initio
nitrate into an empty kettle and save as much of paper bage,.
it as i: possible.

12,2090.6 Forcing Ret tie—pe not attempt to etart a
ettle t 8 not apnperr as though it would
start ecsily.

236705

1-8-47

l2,c1l
1c, 211.3

12,211.2

12,211.3

12,211.4

1z.211.5

12,712
12, 712.1
1c 222.2

17,212. 3

GPRAAS}ON CERYRAL BASOIEG.
2 .—-Mart each piece of
prent ia ollewing sequsned.

(1) Start ehaker screens

(2) Start bucket elewnter te shaker ecreaag

(3) Ptard corey sonreyor;

(%) Start rotary cccler;

(2 Start —— egal a ere LB;
Start t hopper cerew

(7) Stert clay feeder screy ) *tstancousiy

of Gal Eo
ene t at co tise. 6
to tep of baffel Before dumping another load.

fer Mat

aats is r; be gure there is

no foreign cbjeets dumped in hopper. If there
iq immediately cat off all motors.

Saving Down Beuipaens.——then chatting dow
equipment, use sane ayetes as starting up, caly

im reverse. Bzazple:
a. Tarn off ecrey cenveyor ia trusk unloading
| hopper;
b. Ghat off elevator to rotary eoeler, ete.,
umtil last piece of equipmest is emat off.

Eousegeeping.—-Keep hooper roem ané floor area
switches clean at all tines.

CP i 4

Charging Clay Fopper.--Fill clay heppor with elay.

Disposition of Reply Bage,--Pisce capty tage in
paper tote % . :

Use of Fork -~-Use fork truek to plaes
saitete of ne On working platforms and ferk
truek to remove eapty pallets.

23079

.--Bever Gump
mast be dows

-~-Cheok all treeite as

Alwaye Oe eure everyone
ie im the clear. ;
Meshises and equipnest
will 208 be placed ia
operation wumtil al)
gaarads have been
replaced.

Hopper attemdant will
notify track driver

whem ready to J imp.

‘Hepper room and floor

area arcuad switches
wust be kept c) san at
all times.

Free passage vey mei
de maintained at all
times to switchs.

Eo@p working platfors
and floor clear at all
times.

Drive fork lift
camticously and blow
hora at all bling
cornere and doorways.
Be careful of trucks
backing tats hopper
rooms,

12,212.4 peers asid -~°18 fe alee tbe Clay
per Operator's to Bring pallets of bags
to bagging loomtion. These is never to be sere
than two paliete of tage at this location at aay
one tine.

12,23 PACKAGING OF AMMOBIUN NITRATR LTO PAPER 2a0g

@e.23.1 Beg SPELT ~~ Keep @ geod eupply of Mage on hand = Work area must be cisan
et all times. Pick ep paper beg free pile at at @ll times. Cleanii-
side of seales. : neee prevents socidvots

& Z
12,°13.2 Position of on ---Open south (*
c positioa f op on packaging

machine. Position clamps over mouth of beg. }

pm

12,213} Operation of Soale.—Grasp lever on side of Wateh ont for handle on
hopper that contrels flow of nitrate free soals,
hopper.

12,213.44 Reading of Soale.--Pull lever to open hopper,
thes filling dag. Obdseerve marker on seals
and slow flow as pointer appreaches the full
mark. Whes gointer reaches mark, have hopper
clesed.

12,223.5 Correct Weight.--It is ispertant that tags be
weighed accurately. Any overage aust be dipped
out. Call Shift Foreman ary time you find the
scales not weighing accurately.

12,713 6 Samping and Inepeotion.—Samples to be taken ae | |
outlined in sampling procedure. Bage are te be 5

eS check weighed as outlined in Inspection Preee-
Gure. Tesperesare of materis. in tage is to be
Getermined and bage are not te be filled with
materiel exseeding 190° PF.
. ne

12,213 Tf Pro for Se -+-Break all tags dow Keep convayer and sur
0 that tep o @ etraight. Curved top Bage rounding floor area
make poer sewing. Assist dagger in keeping bag glean at all tines.
conveyor and floor clesa.

12,214 SEWING PAPER BAGGED AMMOBIUN BITRATE
12,Q4.1 Position ef Bag.--Ae bag gored from bagging con-
t veyor to sewlag machine coaveyor, position bag

for sewing. (Straightes wrinkled tope of bere
when secessary. )

Z3680

1-637

12,25.2

12,24.3

@. as

aad repeat eperations, .1 te .3, inelucive. If
bag iv Gamaged, retag material. Setify your
eapervicsr if tage are net being broken dow
properly. .
1?, 214.5 Conéition.-—Bages aust be kept free frea ell Keep fleer area clean
oon fea gush ae cil, aitrate Gust, nitrate and neat all tines.
pelution, water, ete. Be contaminaeted tags will
& be leaded inte box cars.
12,215 ARA oF CAR FOR
12,215.21 nepection.—-Oper oar door and inspect car for Important that car is
fia roof and geneTal condition. Glean sar free from content saats
ef all dedris and dirt. ee Jf ome each as calfur, lize
— ecal éast, om.
12,215.2 Ereperetice.—» gare @1) loose boards and nails Watch step, there my be
are ven down ané all deat nails Fenoved. wpright asilse on fleor.
G2. «Car Liaiag Peper.--Piace car lining paper on
oor ef car, and any drmaged places on wali of

12,215.4 Dunnege.—Duanage will be placed om tack side of
car. if lum*er is used, the dunnege will be

flush with inside of car and to the height ef sa
the leaded car. When thie is done, proceed to

‘leading doermy, then duanage cppesite side in
eame manner after car is loaded.

2365 |

a

12,26

LS |

12,216.1

\2,216.2

12, 216.3

12,216.%

$°

12,216.6

12,216.7

“~~

If ctoel strapping ie eeod, etrap villi be
fastene4 to eash side ef ear co that thie will
Ait the ceater of every other row of the bags,
starting at the Yotten sow. (See attached die

_ gras.) Then nee streteher and draw bands very

ight, Clamp together and Gack wp ceribearé
over strupping, de eure sade of strappiag are
covered with cardboard go that ends of stvupping

will aot pamsture bags.

Place etrepping oa eppeaite side of car
menner. When car ie sompletely leaded
cardboard aside, inside tetweea strapping and
bags. Tack carddoard tato place.

LOaDINO OF BOX OARS FOR SUTPMERT

Box Car $ing.--Spcet oar at leading platfers
at Cen Building.

tally Shees Tally chest vill be placed insite
of car. o telly chest ie used for marking
the mumber of bage per fow as placed in car.

Position of Canveyor.-——-Place extension conveyor
in ear or flezoveyer in car if available.
Start flemveyor.

Responsibility Car vests stare bag free oon-
wayor and carry to end cf car and preceed to
Lead car in preecribded gananer. (See attached
sa ee

peanege an Doormny.--As loading in doorway of
Gat ie completed, secure proper dunnsge in door
way of car.

Responsibility Chief Caz Leeaet.—-Chtef Car
Loader will remove. 5 7 + which will de

| given to the dest. Supervisor at the end of shift.

4

Reevoneidility Aset. Suift See cae and

& Supervisor will verify count in car and *
sign shipping documents which he in tura will
place in car.

Beno Bags, Fen eapty bage will be placed in
Oar. ;

Closing of Car Doors.~-Doors will Be clesed aad

sealed. Seale must corterposd with shipping :

accuments.

23682

~—“e--~-~ --~

i)
Se

12,218
SAPETT
PRECAUTIONS °

Be very careful while
estretahing steel strap-
ping es 1% may break oF
est leces. Vear gloves
while perforaiag this
ope ration.

Keep fingers and hantis |
wat of flexzoveyors.

Watch fiagers and hends,
while slesing bez car
doors.

a a i i i i

3-4]

12,216.10

12,216.11

217

12,2723

vor

loaded car and spot empties ané pro

2

Switch Crew.--Call switeh crew to pall est
ord we
abdove. ; rm

Presoribded Leading.--All care aust be leaded as
prescribed em shipping documents. Material macé
mot Be loaded that dese not apet specsifienticns
and car gust act leave the eres until the cen
tents are approved by the laberstery. SBrekes
begs or bage that ere net sewe properly will be
returned to bailding for retagging or reeeviag,

SEVING MACHINE ABD SCALE MA [ET RRARCR

Seving Meer he Raintesnnce .~~Raeb soving wachisa
is to out of operation evary eight
houre apf theroughly cleaned and ciled.

Scale Maintensnceg.--Use a pres@are of] can and
thoreughly clean scale pivets with ksrosene
twice a shift.

Tre
at least three tines 6
are ecourate. Methed: Plaee two (2) 30 lb.
weights inside of an empty nitrate bag and sue-
pead from bag holder. Adjust seale eo that
garker on scale centers en line.

of Scale [a

Greasing of %.--Grease ail éentrai
bagging equipment once per shift and eheck al)
Dearings twice per shift.

23683

ALL ei] mst be wiped up
aad eily rage ker% in
mete] coatainer vith.114.

Do mot edjust sachinery
while in gaotien. All
guards mast be replaced —
before mashinery is
again operated.

@.. INITIAL AND NO. —
CAR CAPACITY

DATS

/

SAMPLE

CAR SIZE
TALLY CARO 2h 4O'g”

BRAKE END

ow

@ x4
ARE
rey
| aOR EIS

§ket
@:_.
10. xe
ies
12 wba
TE
,

||, a ae

| We certify that the avove count ly correct.

OPPOSITE

ow Ne.
9 . eee

2,5 4

» er

eee 2

—

220.

SHIFT START
SHE T Fimigsn

DOCRWAY -

sw

| .
\ Sea ee

+ “2_

Pelitgr, 96

laa.

Trtal

im car

Time started
Loadsng

Time Finished

Loading

ay js preperly leaded and dunnaged

Tpe

isad Cor Leader

Asst The Gepervecr

1633

;

SamPVe CAR $i7f

Lengthy 4p 4

CAR INITIAL AND NO. .

CAR CAPACITY ————-4 222
~

Ds TE

SHIFT START ____

SMIFT FinisH

“4 1. oe
1€2. 2 24s :
oe Eee ; eee’
4,22. «22. +2G. |
en el er oe
5.22 622 \g. 5" :
) RoE SAN 4. |
+70 3.22 er ad
ead
10.22 10.260 Nessie 4
WSscaainies cei Bolster. uy
12.72 _ w7eQ L326
eo. t wewllle
Mice Nici eas 8
hal ie peers a
Tre £LO r0.WlQ ——
Time Firsres
Loading

ele

We certity thet the above ceunf is correct.
car properly loaded and gunnraged.

e3@ Car toad’

23654

| CAR Sicé
ae SAMPLE Lenglh 36’

TALLY CAKD

- INITIAL AND NO
CAR CAPACITY... 22

SHIFT START

DATE
SMmIFT FINISH
ts E e we eee aes way
Pees Racca SENET,
oT ee
ge , Ss eee
. Pad a
4 ee a) 428
pa De ccceattiaiataas
ak 3 @
- (SNES 7
a Rea
“Reon lat 9.

10,444 ~ Scion:
Te a OR
12 HQ
1 LOD

}

14 14.
Time started
15. me «Lana

Tot Lae 8

Time Finnned
Lésding

&

;

W reity thet the above ouat is Correct. The
tar > Properly leaded and Junnaged

.

4

Lead Cor 4 eeder

a

o-* Saat Svperviter

168
C#IKS:4e
SAMPLE * erat ©:

TALLY CARD

CAR iatTiAL AND NO a

E22.

CAR CAPACITY

DATE SHIFT TAT B
SMIFT FitsSh

BFAKE END OPPOSITE .DCORWA
teow No. Row No. Row N-
' * cama ices
dete 2h ye
S caiccne Societies D eaiiasiiinn
‘jarae ee. 5 Pee ihr
6 veers irate
ee i 2 6. 6

7. cenmeanatinis 7 ,_ Pe ad Rid
Se s, 2 Se aN
Biscssiontebiiiiee © casonicain Reet et
19,24. 10 2 Cio
Lee pees Beles 24

LGd.
a car lle

DD aniecsiatiaiadn

|

Time siante@ °
FW: cntrenane 000. ? Soperriser

23685

CAR Si2h
” eee mpagtt fo 6”
@ae wiTiat AND No.
CAR CApAciTY LL 22 és
DaTe SmiFT START.
SHIFT FimwiS1 Ss
es , /
. LF >. 9. 4A
Pa i 2. 3
r 6 4. PY +4e@
§. cme a
6 hfe. VA. 3 Sats
: /) (% py i + i

~~ aitin Wine MDB , ai of Ch ‘

3 | ram 1 pth a
Office Memorandum ¢ UNITED STA1i8 GOVERNMENT

: GC Tibbitts Atew (71146

to. : Field Director of Ammniticn Plant, Joliett, T11QATE: 6 May 1947
from : Chief, Safety & Security Division, 0cO ere We

SUBJECT: Safety Survey Report = Iowa Ordnance Plant

1, There is forwerded herewith copy of Safety Survey Ncport of Iowa Ordnance

Plant, Burlingten, Iowa, covering results of survey made on 14 thru 25 April 1947. .

2. This report is submitted for your information and for action relative to
such items as come under the jurisdiction of your service,

"

1 Inel CARROLL H. DEI TRICK
Safety Survey Report (in dup) Colonel, Od Lept .

ces; Chief, Field Sv
Chief, Int Sv

DO NOT RECORD
ist Ind | FRTaylor /pr /5204

OFDAP, Chief, ORDLY-S, 27 May 1947
TOs oo,’ Chief, CPDGU

1. A copy of subject report was submitted to Iowa Ordnance Flant for correc-

tive action as recommended in paragraph 5. lows has advised that such corrective
acthon is as followe:

a. Excessive amoumts of Ammonium Nitrate dust in Building 3-12 have been

cleaned up. The two bagging hoppers from which the dust originated have been covered,

thereby eliminating large accumulations in the future. Also a standard wash-down

procedure has been set up to eliminate any further small accwmilations in the future.

5's Operators of graining houses ‘are being cautioned and instructed to keep
exits cleared at all times. This condition will be cleared up upon receipt of addi-

tional vehicles which have been approved for, issue.
? *

Ce At the present time the contractor is sonducting a Job Instruction Fro-
Ee which shall be finished within the next two or three weeks. Upon sompletion of

¢ Job Instruction Program, the Job Safety Training Program will be started.

/ 1 Inod

T. Le GAINES
w/a ;

‘e"p

23689

”

(a et em aera mee on

mms : / 6
KE0 & : iQ) tH" FCO F

= : PCy a
Chief, afew 4 Seourity iv, 0CO 6 my 1947
ro dunegh J. mora, fafery Knginesr, hafety 4 Leeuwriy liv, OCo |
Samely Swreay nepert ~ Iam Ordrenes Plant | 4

the flering is a regert of :afety furvey of Teme Ordmene Plant CR at
yn Ee Si mag J. Mare, iatety Engineer of thir | ivieion of 14 = thry ° 3
.

6
x

‘>
¢
>» Wa

. ]

+
ee

set
“a

wy
a
‘ +
4

eS

179) B

cutiecsts ‘afety 'urvey pert - Towa Ori Pl G my 1947

Te: Chisf, safety . eourity itv, WO
(2) (0 vtorere, Vageninver ar! J yluoe)

7
fucve ave 275 sandar! tylem an! 14 slove round mapas U6.
‘Thase are 24,%%,991 lin oy MT, 16,660,770 Lbs of rnokeless
pownles’, 4,271,2°)) inn af Vompos‘*tan 't, 483,150 re of
touyl, FFD ,629 lve a° bole pomdar, $4,249 ahe of olac~
pomler, 7,445 lim of Leud amide, 2,514 l'a 0° fulseine ve
of morcury, 1,'X%) lbs of MW an! emouniy ion a) >omhe
ntored in the above wen cioned mi,aginne, . ack iv ‘e done
to permit’ surve tllanod. tyre are no conn. le Saulldinys
oovainity, aii’ ion ar oxclon tives, \e,e74.iun oon rol
is fool, Ther te no -runh ur debris 4 dw arnen, re
breake ars well minained. he overeallea ey o¢ Ve
areas ‘# ond,
(3) ( torqe, ine utilities)
these uf nw acara,e of #x lonives or @ ois ton in tine ©.
bulld vice a7 tils eo abliatca nce
(4) ( urve Lianos)
| ‘hore 6 & Gurve Llaice proram in apern*.on ani 1 wak 4
| is: «41 don Balelye “uF Fe & Liste
"B') Ss
f&) ¢ enevn -on)
tere ate no Pena LO operu t. OT Bo Wiis |v AWA 1% 1%
(J) © owrie om ds” Crap a ejes on axial)
Siere: £3 "Oo chest Yruc..o": CM Bi “eS BCT HLA
Dt te bg. # B HOLES ls Ve
: rh \é. 6's ad > a it "ro. ynrt )
: Yep concom PL PH SO PITMAN IF ATA FAL oat SOP ene: — .
: S ‘was? OO. . Me Be (ee ite ie | Ver le
; cornlen. wil Fe eran ' Oe iv ‘ae Reg Re She es
: are Jtrns OTOLODOF e las i: 2s Sey ULiaer & ar ee
3 ts otkimeIrme Lie Teruo ‘ oe Les ee ee a Se
3 wr Cale og ed gy itn Goh es aD TO 2 tse
:
& ,
3 -
23691 2,
, ;
‘
i

hiawekeopin ° orl man, eoroee lve Vrecg tyros? Us -a@l; doo

preven’ Wie reoccurrence 9 ‘he &oove wise le

2 - eae t aearree renee |
Be he exeosni on e'wunyp of Ft

equipaen., iixuuares am: floor: oF
taken °o preven aocusula ion of d wt

he

23693

aout iions & 1: prac’ 1008.

‘ae Peary:

het

the Guard ani Fire ‘epar‘aen‘s are comp lned and cons ist

onium Arn a dies oO “ne leis,
bulletin, 3—12 shoul |

+ AN: Mako ues

>

ubject, (nie ourve, eport |e Lae 4 me Cay U4”
fog shir, ‘afes -eurhy tr, UC

%e | wtiins Siioul: ow tale am sowetures fe “> vw preven.
vlockin J Osi &. Sm omen tnglh ice US “eet Aco e TA: & NPte

Se Te oxploe mm 6m.) ae Y Yetrst PO, mus & walk Ue & ares
an Boon sw DONRiblee

:
F
:
;

~
4 sd

Le Noah dale 2

O) tet oie 6 od bi teh it:

fr

™

rea
;
. ~

OC0 Y bSeuerumpare

“ds JOH DRAPE -
me 28 April 1947

IOWA ORDNANCE PIANT
Burlington, Iowa

TO: Chief, Safety & Security Division, 0CO
From: Mr. Joseph J. Moore, Séfety Engineer, Safety & Security Division, OO

3 Subject: Safety Survey Report - Iowa Ordnance Plant oes
:. The following is a report of Safety Survey of Iowa Ordnance Plant,
q Burlington, Iowa, made by ur. Joseph J. Yoore, Safety Engineer of this Division
4 on 14 thru 25 April 1947. ; : “8
x 1. PERSONNEL AT THE ESTABLISIMENT 4efoe
a. Lt. Col. J. 5. Jefferds is the Commanding Officer.
. be. Mr. Je Re Long~is the Safety Officer.
- c. Mr. Je Re Long is the Safety Director
3 dad. Mr. John Bush is the Safety Engineer, there are no Inspectors. :
. @. Total number of Employees. Male Femele. Total »
Ordnance af 338 21 359
: Fifth Army 114 5 119
Signal 4 3 7
Emergency Export Corporation 264 i 266
TOL 751

There are 6 Commissioned Officcrs
2. MISSION OF THE ESTABLISHMENT

@. Storage of high explosives, smokeless powder, ARYO and finished

> ammunition and inert component parts comprise the mission of the plant in addi-

ee tion to maintenance of 100% standby ccndition. Ammonium Nitrate fertilizer project

e Started production & Janvary 1947.

Z 3. SATETY SURVEY FINDINGS
s a. Fire Prevention and Protection
Pe (1) There is one stetion equipped with 1 = 1000 gallon per mimite

—— esas a as eee ehlhlC KhCw CLT rT OC lO ll rl hc lll TN rr rm we ei we ne ,h—Uc hc! hUC hUCU ShlUr lh;

Lee See * i ; ee fo , seo hag
et #4

paper, 1 = 750 gym purper, 1 = brash truck, and 2 - 1500 ,
gallen tank Weteretler trucx. ‘there is first aid fire-
fighting equipment in buildings and areas of the plant. It
was otated there is ample supply of water for fire Sighting ‘
purposes. Auxiliary firemen are appointed on each working

shift.
be Bxuhosives aid Ammnition Safety | | ;

(1) (Storage, Outdoor)
There is no storage of explosives or ammmition outdoors

at this establishzent.

(2) (Stormge, Magazines and Igloos) |
There are 275 standard igloos and 34 aboveground magazines.
there are 24,904,391 lbs. of INT, 16,686,770 1bs of smokeless
powder, 4,271,200 lbe of Composition B, 483,150 lbe of tetryl, |
273,620 Ube of B.C. powder, 54,240 bc of black powder, 7,48
lbs of lead aside, 2,519 lbs of fulminate of mercury, 1,79
be of PEIN and ammunition and bombs stored in the above mentike:|
magazines. Stacking is done *o ee # surveillance. There are |
no combustible buildings containing ammunition or explosives.
Vegetation control is good. There is no cone pie debris in th
areas. Firebreaks are well maintained. ‘the over-all safety °!
the areas is good.

(3) (Storage, Line Buildings) |
There is no storage of explosives or ammunition in line builé |
ings of this establishment.

(4) (Surveillance)

There is a surveillance program and the work ‘is being done '

safely. -

25696 :

186

Subject:

To:
(5) (Demilitarization) af

There are no demilitarization operations at this cs*ablish-
ment. |
(6) (Renovation)
There are nc renovation operations at this establichnent.
(7) (Destruction of Serap and Peject ‘faterial )
there are no deatmiction of scrap and reject materisls at
ni this establishment.
(8) (Ammonium Nitrate Program)
— Aumoniun Nitrate Progran is being handked by the Emergency
[Export Corneration. Mr. H. Y. Wood ts the Plant Superin—
tendent and mF. Aaron Cox is the vafety Ensineer. There
are 266 employees. Production of the fertilizer started
8 January 1947. Present rate of production is 261 tons
per day. Only 3 of the 4 graininr houses are in operation.
Temperatures of the Ammonium Witrate from high pan to grain-
ing kettle 320° (Ammonium "Nitrate will fudge at 310°); grain
kettle to nitrate bugry 215°; nitrate buggy to bag 160° to
, 200°, All loaded bacs with a cpasaenct of 190° * 200°
are set aside and cooled to a tempere tare of 170° cr less
x before they are loaded ‘nto the box cars for shipnen*.
Temperature of anodic after they hens been loaded
into larges ch the Mississippi River are 105° to 115°.
The housekeeping and house-—cleaning in the buildinss of

Line 3 and the Amionium Nitrate Area were poor because of
the following conditions,

23697

Subjects .
Tos
Excessive amount of Ammonium Nitrate dust on ledges,
equipment, fixtures and floorg. Poor control of greases, 2
oils, clean rags, arc flare of electric welder, welding a
operations near ammonium nitrate, shop work being done ee
near operations, temporary wiring near ammonium nitrate, yi
“tk oe-6VER : os
men stepping on moving conveyor to GreesGewer, door ways a
- and oxigts blocked rith nitrate bugries, and no fire symbols 3
on buildings. a
»
+3
3 “3

“2

188

“Tt
’ .
4

Subjects 3 ‘
Tor

c. Industrial Safe
accident rate

(1) ‘he/frequency/for this establishment for the month of April
is 7.93 for 126,055 manhours. The existing safety standards
of the plant are good. There is ample protective equipment.-
Physical safeguarding of equipment is cood. There is well
eqaippéd hospital with a contract surgeon and nurse in attendance

d. Transporta*ion and traffic Control

(1) ‘The railroud and higtway facilities of the establishment are

good. Tue to the reduction in the guerd department there is

e tendency for some of the drivers of vehicles to speed. The

_ subject of speeding is being brought to the attention of all
employees by their supervisors in Safety Meetings.

e. Construction and Facilities

(1) ‘the ctaff houses and practically all remps of Line 3A are of
frame construction, (There are 7? buildings and 7 barns in
the staff residence and plant area). All explosive process
and storage buildings hav* lightning protection. The lightning
protection systens have been tested and found to be satisfactory.
These tests were conducted within the past year. It was states
that the electric power, staan generating, and sewavye System
are adequate.

f. Plant Protcction

(1) ‘he Guard and Fire Departments are combined and consist of
the following personnels
1 Chief, 4 Crew Chiefs, and 22 Fire Fighter-Ouards

g. Disaster Plan

The Disaster Plan was revised 1 February 1947. It was stated

- 23699 \

Subjects

that it is adequate to cover present conditions. & copy

has been sent to Safety & Security Division for approval.

3
“re Safeguarding Military Information

(1) Military information ishandled sapieneiues to Army Regulations.

It is kept in a locked safe in the Administration Building.
i. Explosives (Job) Safety Training.
(1) The Explosives Safety Training program is being conducted
by the Safety Engineer and the Supervisors of the Establishment.
Manuals have been requested feom-eur-office in order that all
supervisors of tho Ordnance Department and the Emergency Export
Corporation may be able to teach the employees the Explos ive

Safety Course as approved by Safety and.Sacurity Division.

b. ‘the storage of ammmition in aboveground magazines has been arranged

so that the need. for a waiver has been eliminated. r
c. ‘the Ammonium Nitrate area and process buildings were wees on an
average of once each day, due to the mumerous wisafe sete and comlitions noted.
Conferenses were held with plant management and their safety departmen* with the
idea of od imina ting the above sete and condi tions, also suggesting ways of pre=-
vent ing the above te happen again. Owing -to thie condition it is suggested thet-
this plant-bs inspected about 10 daly 1947.
_d. If Safety end Security Division is of the opinion tit Ammonium Nitra
operations should be treated as Class 9, Xt is recommended that Building No. 3-12

. ee ‘
23700 |

=e

a sae

. : “ ’ :
' age 7 , te
. oe . tal -
¥ ~ my
5 . ,/
. ,
: a
, 5 =

(3) (Storage, Line Buildings)
There is no storage of explosives or ammnition in lins

buildings of this establishment. «

(4) (Surveillance)
There is a surveillance program and the work is being
done safely.

(S) (Demilitarisation)
There are no demilitarisation operations at this estab-
lishment.
(6) (Renovation) ;
There are no renovation operations at this establishment.

(7) Destruction of Scrap-and Reject Material
There are no destruction of scrap and reject materiels
at this establishment.
(8) Ammonium Nitrate Program
Ammonium Nitrate Program is being handled by the
Emergency Export Corporation. Mr. H. V. Wood is the Plant Superintendent
and.Aaron Cox is the Safety Engineer. There are 266 employees. Production
“Of the fertiliser startod 8 January 1917. Present rate of preduction is
261 tone per day. (Qnly 3 of the 4 graining houses are in operation. Tem-
peratures of the Ammonium Nitrate from high pan to graining kettle 320°
(Ammonium Nitrate will fudge at 310°); Grain kettle to nitrate buggy 215°;
nitrate buggy to bag 160° to 200°. All loaded bags with a temperature of
190° to 200° are set aside and cooled to a temperature of 170° or less before
they are loaded into the box cars for shipment. Temperature of the fertilizer
after they have been loaded into barges on the Mississippi River are 105° to

Wie Sandra tnn of alte Led hat.

Sc. Industrial Safety; fn

(1) The, frequency.for this establishment for che month of
April is 7.93 for 126,055 manhours. The existing safety standards of the
plant are good. There is ample protective equipment. Physical safsguarding
of equipment is good. There is a well equipped hospital with a contract
surgeon and nurse in attendance.

25 apr 7
“qd. Transportation and Traffic Control

(1) The railroad and highway facilities of the establishment
are good. Due to the reduction in the guard department there is a tendency
for some of the drivers of vehicles to speed. The subject of speeding is
being brought to the attention of all employees by their supervisors in
Safety Meetings.

e. Construction and Facilities

(1) The staff houses and practically all ramps of Line 3A
are of frame constrictions (There are 77 buildings and 7 barns in the staff
residence and plant anga). All explosive process and storage buildings have
lightning protection. The lightning protection systems have been tested and
found to be satisfactory. These tests were conducted within the past year.
It was stated that the electric power, steam generating, and sewage systems
are adequate.

f. Plant Protection ’

(1) Thequard and Fire Departments are combined and consist

of the following personnel: 1 Chief, 4 Crew Chiefs and 22 fire-fighter guards.

ge Disaster Plan >

(1) The Disaster Plan was revised 1 February 194,7., It was
stated that it is adequate to cover present conditions. A copy has been sent

to our-gffice for approval.

h. Safeguarding Military Information

(1) Military information is kept- according to Army Receistions.

It is kept in a locked safe in the Administration Building.
i. Explosives (Job) Safety Training

(1) The Explosives Safety Training program is being conducted
by the Safety Engineer and the Supervisors of the Establishment. Manuals have
been requested from our office in order that all supervisors of the Ordnance
Department and the Emergency Export Corporation may.be able to teach the
employees the Explosive Safety Course as approved by our office.

?
4. “Remarks : Fy.

a. The Safety Organization is sound and function, satisfac-
torily as set up. All personmel exhibit an active kntwledge and interest in
safety. Supervisory, surveillance and safety functions are clear cut and are
properly coordinated. :

23707

25 apr 47

aa

The storage of ammunition in above ground magazines has been
arranged so that the need for a waiver from-our-oefftee has been eliminated.

- The Ammonium Nitrate area and process buildings were visited
on an average of once each day due to the numercus unsafe acts and conditions
noted. Conferences were held with plant management and their safety depart-
ment with the idea of eliminating the above acts and conditions, also sug-
gesting ways of preventing the above to happen again.

bins Owing to the-above conditions it is suggested that this plant
be inspected about 10 July 19:7. m , :

“tf cz affies is of the opinion that Ammonium Nitrate operations
should be treated as Class 9, I recommend that Building #3-12 be shut down
and cleaned up. Before operations begin a thorough safety inspection be made
and all requirements of the Safety Marmal necessary for safe operations of
the line be instituted.

~-’ Purther recommendation is that an Explosives (Job) Safety Training

program be started immediately to eliminate the violations of procedures
prevalent in the graining and Line 3 areas.

A

A) tay — re He clin, | if

Recommerdiati ons

Fe
j s ; : { a,
a vf wa eats aa pe oe ae —- cial
vA = , "af rs .

pita Fn ee - Soom, Sets , 2. yA 2
—— . ae —~ .®, —_ a a Yo--- SE Se

é
Se ee — — a De
Sa 7 ; /
S ee /f aaa PA
ent : oS a a A — me

pigs pe - --— — lla td — >» = — ee
0. Oo. oTe4 B 9519 |
.

29 23716 ~~

.

ve can 2s ; eae, a. Arte F Ae ,
wg ra a4 | }

/ f | es ‘\ sf ona ‘ | ;

Ff Lk od. : ica: y/ LI ae Peete ac? Saleem ae L : a

Lewin Eel Bi Ses = /
CY 4. C2214: i5-O 2x. hihi Pag © od = Se A : 2. £:.
Sai ee it , js ea

LAL? Ei ¢ ‘
wk CA-~ Rai I. : r ¢ mR a"
€ parasite PAA gee we eh te Cr et

ig
BN

. ALGL- = AWD Leg ey tr OA.

ee © Be oer os
ap wd ver pee

Ag
ee ed es
2 As
tet he

Ie, , , ee
Biree ar Be ae. I te rh (ori iat es tae fit- Eo
Avs

S

OCo S/W 217 :

Sive

ee ae
ree (bf)

ae ag 6

S-6519 os 6 sevenewarr remem: avne ven

23718

a

=
’
.
/ o?
3 ~ae~
al P
-- f

fN\)>

mates Ee aay ee

Geb

219

Yrplo bs:

SQEQN SA

os
eo om |

™ Arenas | ee ox 2 _ : | ‘ .
i % vy 7 4g font ee LA Ay Y. iy ~ x z
mer = at tes a Fae pe LS
‘ ,

Sh
is
h
a i ft

; Me
: O. ©. Form 5794 are
| 95 Te AAU eH weNR OFC e Lem
4

See rT

— .
pm AT RE a ; =
,
: “ \
a >.
* od
‘A
‘1 indie ° ‘
q fF 5
, .
id i fe, 38 o£.
.

222

OWA

—_ '
EI ES 5 ,
co Ci /iL Gi: — hfe tne : O -

/ ca
) e ee car

©.0O Form 5704

35 9. eee

a
4
ey,
~

; r WAR DEPARTMENT
& OFFICE OF THE CHIEF OF ORDNAY CE
FIELD DIRECTOR OF AMYUNITION PLANTS RECORD
JOLIET, ILLINOIS
TlHaines /ojr/S222
ORDLY=S 333/12616 Iowa
9 April 1917

ORDCW 333/L8

SUBJECT: Inspection of Decontaminated Areas

TO: Commanding Officer
Iowa Ordnance Plant

S Burlington, Iowa o

1. During the past few weeks there have been several instances of
the finding of explosives and hazardous items in installations which
have been reported as decontaminated. The continued discovery of these

dangerous items makes it necessary that immediate and ade

ial is discovered and removed from the premises. 41) buildings should
be thoroughly inspected. This includes boiler houses, change houses,

3. In areas previously reported as decontaminated, it has been

reported, for example, that one igloo has been found fl]

of miscel-

lanecus items of ammunition, carboys of acid have been found in aban-
doned buildings, a can of black powier was found in a boiler roan,
and that rounds of small arms ammunition were found in a store

house.

/s/ Joel G. Holmes
JOEL G. HOLMES

Colonel, Ord Dept
Assistant

vi; 23723

INGTON ik... AC cw, 70

r0: ir, WA, Johnston Apri. 19/1447
- \
SUBJECT: lag Teuporatures AS 900, 18
Ba
( pte.

1, On Thureday April 17, 1%7, the following individuals “cade
an inspection of the Federal Setgad Ling facilities at the

+o
2. The method of handling the bags was inspected and checked
from the time they opened the x Car until they were actually

loaded-into the barge. Aji ) edures were in order,

3. Fith the a Fessen didi thermometer, tenpsratures were
taken bags that had been leaded into the barge.
These as to temperature, were made by actually
climming fertiliser and determining ty sense
of to to be warm. Several readings vere’

to 105 degrees. One reading ms obtained
ef 115 This was the highest temperature recorded,
Saved on this information it was the opinion of this greup
that the loading precedure mas satisfactory from a safety
standpoint.
y, v. Beod %

RV sath Superint endent

oo: Messrs, Jchn BR, Long

Joe Moore :
J, O, Chapman

7" ww VF Ve aS SS ww wwe

WAR DEPARTMENT Me

OF AMMUNITION PLARTS

SUBJECT: September Performance Analysis . ~

TO: Commanding Officer
Iowa Ordnance Plant
Burlington, Iowa

i. Analysis of the Control Reports received by this office,

covering the Renovation and Demilitarization Program for the month of

September shows the following performance:

Your | Industry

Installation Averere

1 ~ Percent of September Schedule Completed ; 70.2% 53S
2- Dollar Performance (Earned Dollars/Dollars Spent) 133.2 43.
3—Man Hour Performance (Earned MH/Actual MH Used) 92.3% 77.0%
Y- Cost per Direct Labor Man Hour $2.08 $5.25

2. The completion of 70.2% of the September Schedule is under-

+

ya

Standable since this amount was the balance to be dore on the schedule.

In other words, it is the equivalent of the 100% performance.

-__The Dollar Performance of 133.3% indicates an appreciable

Savinzn was made and your inetaliation [s to be commendec Tor thts ~

seneenernmmnnltl aetnmmnsnemeat ween amore desecrea. Fe er ne ss” ie
* fine work, ee oe

° the Man Hour Performance of 92. also is ve

dicates good p anning b the Operations Department.

ood and in-

- the Cost ver Direct Labor Man Hour of $2.08 also indicates
ood planning and a welt balance overhead. Yr SORPartYor—es—ere—te -
— Tae Goa for the month of Wenten Your Teeter! retorts enown
teeta

Rap tiers 9) 40 Wemyss oe oe, . «og “ee La ®*

7 er

6. It is noted that your instaliation did not use the new "S-hedcule
2", Porm 00-1113, on your reports for the month of October. The request
from this office for the use of his form was made in the letter dated
"ay JOEL G. ROLMES
Colonel, Ord Dept
Assistant

28426

_ i
iii, | Caer,

JOM COMIC Pat D E
BRITON, JOM O00 ¥ /S a
. {Dp
fe MEBTIZG ELD APRIL p |
gz. Y, gg ace ee te oer
Ca & 2 Pierce p Dept ca a oeear
ag teed Safety & Security Granch ¥. R, Canpbel)
J. 3. Ghapmen Aaron Cox
H, H, Gevb ‘A. Jd. Marta
A, &, Mausner R, Jd. Im
a, ©, Meurer
ag

A chais ccs Ke ci oe r
been making a safety cuiit of the plant ani will take pert in the mesting.

Mr, Cox reported that the Frequency for Merch wus 25.00, Severity,

based on the 900 days on the toe injury of Carl Melson, eas 22.50, The
Frequency here to date is 21,10 and Severity to dete, dased on the same
900 days, 1.26,
Causes of injuries during March were as follows; :
1s& Striking against
55% Struck by “
18% Caught in between Es
64 Falls, different levels a

3% Slipping, strains, etc,

Part of body affected: \ |
m = neck injuries
208 Arme

3% Feet and [foes
Agency: Machines and Eqiiipment :

7% Graining wettles or hi-pans
7% Conveyor, industrial trailers
7% Steam hose or pipe

164 Other /

~~

%,

255

F i
Pd ae:
33 qs
5.

\

Friday.
vets Howat
noe Department
request but explained that their dspartment

recently a Mr. McCauley had been

on
in
of their operation,

brought to
held
brought
to
. outline and adopt it to Job defety Training

Progen

JoTeke.

lead opere
from the

y, Lh HS

lend some assistance
our
that
phase

Yegriun 4 dy HE
_— cat vali
4d 1

know firsthand what he thinks of our operation hers.
are his comments ami suggestions:
i. raga An ee Shae Oe Sees Se Oe Sree on

ary
They
the
Plante
die tod
and

speeding
has more
Ordnance, Department.
id to the Ordmance Department personnel —/

equipment and wonderful
ioned that be saw a bus speeding the other day.

O00 ,000 miles were traveled

dapartment of the War Departaent with no

some of the best

of Mowember 4

the jurisdiction of the
m applied

pointed out that the Ordnance Departaent
stic
eent

other

have

morth
under

endl

E23

Mr, Moore's office makes this recosment ‘Sion.
where the paper bags have been found charre fram

greece
cases
He

PS

to ammonium nitrate
It is quite resistive

that it will detonate,

that there would probably be directive,
respect be paid

done in the past.

stated
ting thet more
beer
is known

it

ile

Je

4.

36
6.

76

9

ll,

ad 3 =
Housekeeping, House Cleaning =~ Building 3-12

In going through Building 3-12 last Tuesday, Mr. Moore said he didn't
think it looked a bit good, the next day he thought it looked fins,
and the day following it didn’t look so good again although it wasn't
as bad as the firet day he saw it. He stated that the quickest

way to climinate accidents is through housekeeping, Housekeeping is
first, house clesening second, ‘

Unsafe conditions - these can always be traced beek to poor house-
keeping.

Unsafe acta ~ the third ites,

Control of greases and oils = These are foreign substances and should
not be too close to ammonium nitrate,

Control of clean rags ~ A lot of nice clean rags were seen in @ paper
sack. This is not so good, |

Poor control of arc flare of electric welder « People having to work
near electric welderc, even though they are not welders are subject
to "kleg” eyes. Mr. Moore stated he had seen very serious cases
resulting from just having to work near the arc, He has discussed
thie with Mr. Long in regard to members of the Fire Departaent who
are sent out to observe welding operations, wearing dark glasses,

Any man using an oir hose for cleaning purposes should wear goggles,

Poor control of welding operations near amponium nitrate fertiliser -
Some jobs of work could be done in other locations, If it hes to
be done near operations it should be isolated as much as possible.

The removal of hinges on TN? buggies should be expedited

8.93 with 112.908 man hours worked, For February it was 9.04 with
hems worked, When thay see this report they ask
master with a high frequency for the number of
wan houre worked, They don't pay any attention to the severity, but
it is a good thing to heve. The insurance company watches the

severity more than frequency when thay see the severity rate
going tp tiny start putting a safety enginser on the jod orertine
out dome. = :

cts. He would suggest

a
laying the foreman off, If the foreman doesn't go along you can't have
to lay a foreman off so
@ at all = you get another

+.
17. Mr. Moore said he thought the housekeeping and housecleaning was good
in the graining houses when he was there.

that he mentioned these items to call the attention of
fact that he had seen them ~ many things he had not

& they would be straightened out, 4s said that if corrective
re not taken he would have to mention that he had talked things
with this person and that person in his report, He said he would

ck again and inspected and found then corrected,

*, Weod advised the
for @ couple of weeks

“3
j
:
8
E
F
7
d
:
E
g
g
1

_The following camments and suggestions were made by Mr. Long:

2, Mr. Long stated that he could see an improvement in our operations —
right along,

2. Que probles that his department is much concerned with is the dissipation »

of heat in the loaded cars, He Suggested, as a measure of aiding in
dissipating this heat, leaving the car doors Ope: until the car is
ready to be pulled cut. What ¢ ¥ are striving for is ventilation

23730)

>

36

; ednesday
and Mr, Moore from FDAP, and others in making &
inspection of your operation at Burlington. Since Mr. Moore
was making a safety audit for the Field Director, I am =
sure that he was reasonably well inxpressed with the type
af housekeeping that he observed on that cocasion,.*

There wee a noticeable improvement cover the confitions of the
Plant in
sometime ago with Mr, Thomas, It looks like the organised
plan

complimented on the improvement. I can't help but observe,
however, that it has been sy experience at these Amsoaiu
Mitrate Plants, that it takes everyons keeping everlastingly
at it twenty-four hours a day to keep one of these plants in
shipehare comiition so that the housekeeping looks tiptop at
ail times."

PRODUCT ION
Our main housekeeping problem is also a production problem - the regrinis
in Building 3-10. Saturday a bulletin was put out on the

operation. The grinders from Cornhusker are in transit and will be
installed, one in each house, when they arrive, —

This preblem etarts in the manufacture of scrap, We ere running about as
of predustion or About 20 ton per day. In runming a brief time study on
the grinding operation, Mr, Food found they were
minutes, At this rate, they can in four hours grinding time on anyone
shift, 12 ton or 24,000 peunds. it is reasona ble to assume thet ons
truck can make five trips allowing. one hour and 24 minutes for one
One truck with 50 cans requires 58 minutes to one hour to make the ‘
\

:

8
:
5
y

23431

™m
a
]

-6-« .

+
rr
ef
ty
FE
i:
g
iy
5
g
8
&
3
:

bgt ecey
f
He
4H
ih
HEE
gilts
eit
Hf
“a
ssf

:
e
f
¢
8

i, Inme reported that during the past week wax has averaged .713, The week
of April 4th to 10th the average was .903, This doesn’t seem like much of a
drop, but figuring it in dollars and cents, it is $49.34 per day.

Temperatures are running nicely at Building 3-12, dropping down during the
week fram 200 to 190 withcut any trouble. Usually average about 10 bags
fer every two lots that were too hot, Quality seems to be coming up good
all the way around, Sag weight averaged 101.54 or .04 of a per cent higher,

Grein sise is slipping down again. Our average for the month to date is
about 42.6, and will probably be about 42 for the month, Mr. Ihne is of the
opinion that “dusters” are still the cause. He thought the two lead operators
we had brought from Cornhusker were contributing to these “dusters” due to

their methods of cooling the kettles. o
Any request for samples in connection with our product shipped to Texas City

must heave the onal approval of Mr. Wood, and in of his absence,

Br, Chapman. is to safeguard ourselves up to the point where we are

retaining 200 grems of these samples for our own protection. Mr. Ihne has
placed these samples under lock an key. ,

TANK FARM
Mr, Codd undo a study of heating time of tank cars and between April let
and Sth heated tiem in an hour and a half, At this rate the cost of hoating
® ear would be £124.80. Heating time on other cars have run from 2,67 hours
to 3.07 hours. He feels that it is the tendency to leave the heat on cars
when it is close to shift change tims for the oncoming shift to finish. He

g

SF
te
:

that he has taken temperatures where the cars were from 220 to 230°.

Mr, Cobb the tank car unloading procedure and an
this operation uniform on all cars.

23732

~~

Water consumption was discussed, Phe water Gepartment have advised thet

our asege is very inconsistent and will jump from 3,000 gallon per minute ”
up Lr)

6,000 gallon, In Jammry 2,700, February 4,900 and
siroh 87300. We have increased fron 1f in : ) te 22 to Petrunry
to 308 in March, en

°° a. Chapman
Shift Supervisors ~ C, H, My W
R. Le Foster aM

237933

238

di

OC & Y ra

REPORT OF TRAVEL
TO .
AMMONIUM NITRATE INSTALLATIONS
4-9 DECEMBER 1946

SECTION I. PURPOSE OF VISIT

i. Visits were made by the following persons to the following Plants
and Works engaged in the production of either Anhydrou~ Amaonia, Amsonius
Nitrate Solution or Grained Ammonium Nitrate;

Persons

Mr. Le G. Porter Department of Agriculture, Washington, D. C.
Mr. He. Tf. Bennett bed

Mr. K. D. Jacobs : ° %

Captain C. D. Lyons OPFDAP, Joliet, Illinois

Plant or Forks

Missouri Ordnance Works Louisiana, Missouri
Cactus Ordnance Forks Dumas, - Texas
Jayhawk Ordnance Yorks Pitteburg, Kaneas
Milen Arsenal Milen, Tennessee
Holston Ordnance Forks Kingsport, Tennessee
Radford Arsenal Radford, Virginia

3. The following two Anhydrous Ammonia plants were Visited on 8 @ 4
Desember 1946 by the above personnel from the Department of Agriculture;

4. Visite were made to the various ingtallations at the requsst of the
Department of Agriculture. If “ppears that the primary purpose of visit uae

}

>
=~

286

REPORT OF PRAVEL (Oontd) :

for the purpose of allowing the Department of Agriculture to obtain first-
hand information as to tne progress of the fertiliser program and to allow
them to evaluate Plants and Works being used in the program; i.e., cvst of

product, eondition of buildings and equipment, and possible life of plant.

SECTION II. OBSERVATIONS

1. Miseourt Ordnance Works

a. Necessary informaticn required was furnished by ur. George
Ripley, Plant Manager and Lt Col Bassett, Cosmanding Officer.

be Information desired pertained to: (1) Coste, (2) Process, (3)
Labor Supply, (4) Condition of Equipment, and (5) Plant Preduction.

Ge Rehabilitation work is progressing at a satisfactory rate at
this plant with the first four units to be inte produstion by 31 Deocesber
1948. At capacity this will give approximately 160 tons of Anhydrous Ammonia
per day. The fifth wit will probably be put inte production in March 1946.
Delay is due to reesipt of Compresscr Cylinder fram Ingersoll-Rand Company.
The Commanding Officer has obtained necessary priority assistance and’is ex-
pediting in every possible way delivery of Cylinder.

4. Plant was operating at reduced rate due to lack of tank oars and
to impending freight embargo.

2. Cactus Crdnance Works

. a. Party was accompanied on inspection trip by Captain J. R.
Schecter, Executive Officer and Mr. C. R. Griffin, Plant Manager.

be Information requested was general in nature and essentially thet
requested at Missouri Ordnance Works. Quite a bit of interest was shown in
the equipment ani material necessary to complete another ammonia unit at the
plant. The Plant Manager furnished a breakdown of costs on the completion of
this unit to representatives of the Department of Agriculture. It was esti-
mted that for approximately 4@ million deliars, this unit could be operating

in six months.

¢. Production was curtailed due to freight embargo. It is esti-
wa ted that all units will be in production by 31 December 1946.

3. Jayhawk Ordnanee Works

a. At the invitation of Mr. C. Y. Thomas, Vioe President of Spencer
Chemical Company, an inspection trip was made to Jayhawk Ordnance Yorks,

a a ee et i v
/

REPORT OF TRAVEL (Contd)

Pitteburg, Kansas. The plant is at the present tims being operated by Spenser
Cyemical Company om a lease basis.

b. Uf interest to the group -was the produetion of Anhydrous Ammonia

end the production of neutral liquor at the one plant.- Production of eamacia
“ds adequate to make approximately 600 tons of neutral liquor. This escumt ef
‘liquor is not being produced at the plant due to the limiting factors cf their

Hitrto Acid plant.

©: Information was also furnished to the effect that facilities te
produce dry ico from waste carbon dioxide and sethazol were to be oomstructed
in the near future.

d. All data requested relative to all phases of the plant was fur-
nished with the exeeption ef costs data.

4. Wilem Arsenal

a. Inspection ef the graining facilities at thie plant was made in
the company of Mr. Bolten, Shift Supervisor for Silas Mason Company, and
Captain George Constan.

b. Preduction data, labor supply and the various phases of operations
were discussed.

Ge Plant was operating at time of inspection at better than
acheduled rate. Departaent of agriculture representatives were very moh in-
terested sinos it was the only graining plant visited and since one of the
members had not before seen a graining plant in operatica.

5. Holatom Ordnenes Yorks

a. Plant inspection was aade in the company of Major Beatty, Xm
manding Officer, and other representatives of Ordnance and Liberty Powder Ce.

bd. Boilers which were transferred from New York Ordmance "orks ere
expected to be geporating steam by 20 December 1946. This will enable plant
to meet production as sohs@iled in January 1947.

6. Data relative to habor, sosts, production, and operations way
furnished as requested.

«

6. Radford Areenal

nore

rn 8 a. Group wae accompanied on tour by Captain Farmer and the Hercules
Powder Company day supervisor.
Pe]

23736

rer Pw yy Ow 9 & gery wv =a ws o eA. ae

288

REPORT OF TRAVEL (Contd)
3 &

be. Plant was operating eat a limited rate with a majority of the
work ou the Acid Area complete. There wae etill a omal) amount of work to
be dane on the neutralisers,

SECTION IIIT. CONCLUSIONS AND RECON‘ DATI OMS

1. It appears that the purpose of the visit by representatives of the
Department of Agriculture was to: (1) Study progress being made by the Ord-
nance Department in completing necessary rehabilitation work to place plants
into operation and (2) make recommendations relative to sontinuing operation
of plants in the Tar Department Program ofer a long period of time und the
bringing int» preduction of additional units to inorease the overal) program.

2. Ae has previously been brought out, information requested was:
ae Operating Procedures
b. Production
Ce Labor Supply |

de Costs

S. All data requested was readily furnished and the Department of
Agriculture mubers expressed their great appreciation for the courtesies
show during their visits te the various Plants end Works.

SSCTIOM IV. CORRECTIVE ACTION TAKEX

Scns.
at A yd,
C. BD.
Dan Captain, Ord Dept
oe
23737

di

i
vi

r. itl i

cbs 3
yon

i wl
iH i

cl

i

i
ae Ht

chat (a

fa i
Alp
irl
iu

HHT i

HTH

fie

ik

bit

H
it

ie
i

4.

cil

al i

ay all

:

a J
i

ual

¥

t

Ath it it am Hl

OE /kva,

234034

pate —
Memora ¢ UNITE _GOVERNMENT
O~~r ”, 3 J 9. F ILIA DCSadth/vh

osha 5206
DATE: 1} October 2946
Bipy—tty— —epretee yon , eee

FROM : Chief, ORDLY-L i re a ee nee ae oe
SUBJECT: Report om Substitution of hea B for PRP in Coating famoniua Nitrate

Inclesed is a copy of Report No. 6, on the investigation by the Midwest
Research Institute, on the substitution of Wax B for PRP in coating fertiliser

_grede ammonium nitrate. scliea ita, OD
1 Inel {- J. NM. PRARRE
Cy Rpt Wo. 6
ORDLY 319,1/37765 Gen'l lst Ind ° “HDReynolds/$ch/3314

Chief, Ammunition Div, I. S., 28 Uctober 1946
6... Chief, ORDLY-L

1. Subject report has been discussed with Safety and Security Division.

2. Safety and Security requests that flash points of both PRP and Yiax B
be determined and, in addition, determinations be made of the flash points
of NHq4 NOz coated with PRP and with Wax B.

5S. It is requested that the above information be forwarded to Safety and
Security Division thru this office,

eo Incl O. reo

ae

w/a Col, Ord Dept

se
23740

G.

_ ORDLY-L 319.1/37755 Gen'l 2d Ind a

Chief, ORDLY-L, 20 November 1946

Wie tt x Oe
Ft —ehtet; te Div; 1-97
TO: Chief, Safety & Security Div

i, Attached hereto is copy cf letter dated 13 November 1946 from the
Spencer Chemical Company in reply to inquiry from this office for the data call-
ed for in lst Inaorsement. It is believed tiat the data contained in this iett=
er from Spencer Chemical Company gives sufficient information to establish the
suitability, from a safety standpoint, of tiax B product for “ccatine ammonium ni~

td

trate fertilizer, é

2. It is the opinion of this office that determination of flash point of
ammonium nitrate coated with PRP and Wax B would be a hazardous operation and it
is therefore recommended that no further attempts be made to obtain this data.
No further action will be taken by this office unless specifically directed to

order this work done,

1 Ined jo J. Ne PRARRE
Incl 2 - Cy ltr fm Spen

cc
Chief, ORDIM

23741

000 #26 .

SPENCER CHEMICAL COMPANY
P.O. Box 604
Pittsburg, Kansas

Development Department November 13, 1946
File: 906D,.2.7

; } |
Office, Chief ef Ordnance

Field Director of Ammunition Plants

Joliet, Illinois «

Attention: Mr, J. Ne Pearre
Dear Mr, Pearre:

Your letter of inquiry in regard to flash pointe of PRP arid Wax B, and of +
ammonium nitrate coated with these compounds, was apparently misdirected to

Wahoo, Nebraska and, although issued under date of November 1, 1946, reached
my desk only yesterday. \

Tuen *noz4/9a*° TLY LIdHO

I have received recent informatien from the Mid-Continent Petroleum Corporatien
at Tulsa that the flash point on thejr Wax B product is 460 F plus or minus 5°F
and fire point 505°F plus or minus 5 F by the Cleveland Open-Cup Method of test.
I am sorry to advise that we have no informatien en the flash point of PRP and. ‘
do notghave the necessary ‘aboratory equipment to determines the flash point i

- accurately, From past exparience in the petroleum testing business, I should j
expect the flash point of any PRP wixture to be at, or near, the fiash point ©
of the paraffinewax component and considerably under the flash point of WAX B
since the latter is a higher aeeeceter weight compound than is the paraffin
type Wax.

SIGTHO
TO:

As to the flash point of ammonium nitrate coated with either of the subject
coating a,ents, it appears to me that this would be a dif*icult, if not in-

- pessible, test to make, since ammonium nitrate begins decomposition or dis
sociation at about 340 F and may decompose violently at temperatures approach- = ({
ing the flash points ofthe waxes used for coating. I should say, therefore, \
that we would not care to undertake the latter test,

You have been kind enough to ask my opinion as to whether or not it would be
advisavle to have the work involwed in testing done by an outside laborateory,
and I do believe that this wo.ld be the desirable procedure. For determinatien
of the flash points of PRP ami Wax B, I would recommend that a laboratory
engaged in testing of petroleum products be contdcted, such as the C, J. Tagiia-
due Company or the Cross Laboratory in Kansas City, Missouri. Fees for such
tests vary but should not exceed $15.00 per deterudantion, by A.S.T.M. method,
and I cannot stress too strongly the necessity of insisting on this standard

of procedure,

7 c.

. ‘ ’ ' ' - ' , , 9
L~ Y ’ ial, . . ‘>-yY~ --~

eS ———————— Le lle

208

Mr. J. N. Pearre

Joliet, Dllinois
November 13, 1946

I hope that the for egoing informati
on satisfies vour
sorry that the inquiry was delayed in reaching thie Bois ig ee

Yours very truly,

WHY: ve W. We Yeandle
‘ ‘ Director, Development Dept.
a
C
. 0

p
ae

?

- ‘ef

~ ° Low -
¢
©

23743

EEE EEE EEE NSIS NOUPG EG OEY MC TCEVTT OPEB eye

O00E &

REPORT NO 23 ,

DATE 5 December 1946

AMMONIUM NITRATE PROGRESS REPORT

° ,
Reference is made to Report No. 14 dated 19 September 1946 in which
certain basic data was furnished‘and which remains the same for each Plant
and Works except in those instances ane changes are shown below or were pe
reflected in Reports No. 15 thru 22 inclusive. |

I. ANHYDROUS AMMONIA
PLANT OR WORKS: CACTUS ORDNANCE WORKS

PER CENT OF REHABILITATION COMPLETED:.- 75 (10% increase)

NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION
OR CONSTRUCTION: increase)

OPERATIONS AND PRODUCTION: Two (2) trains in operation; startup
dates for No. 3 & No. @ trains are estimated to be 5 & 20 December

respectively.

BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS WORKS: Shortage of tank
cars has necessitated a cut-back in opsrations at this installation.
November production - 2,332 tons. |

O

~ e:

PLANT OR WORKS: MISSOURI ORDWANCE WORKS 3

PER CENT OF REHABILITATION COMPLrTED: 93.2 (9.4% increage)

EQUIPMENT carat $3

PeR CENT INSTALLED: 93.2 (9.4% increasgo)

OPERATIONS AND PRODUCTION: It is estimated tnat No. 3 unit will start

up approximately 5 December and No. 2 unit approximately 15 December.

Startup date for No. 1 unit has been serious:y retarded due to the ea
fact that a casting to be supplied by Ingersoll-Rand was defective, :
Startup date is estimated to be 1 March 1947.

PERS UT TE Spy ewe YET ey r+ § £9 © € 6 Vee lg

301

AMMONIUM NITRATE PROGRESS REPORT 5 December 1946

Bil ER’ SUMMARY OF PRQGRESS BEING MADE AT THIS WORKS: November pro-
duction - 1,164 ton Unless ammonia ig not affected by the embargo,

production at this installation will be greatly curtailed.

Startup of No. 3 & No. 2 units will be made but No. 5 & No. 4
units will be shut down provided ammonia is embargoed. This procedure
is oeing adopted in order to break in the No. 3 & No. 2 units.

f

Construction at this installation has progressed to such an ex-
tent that the Corps of Engineers have been notified to terminate the
construction contract as of 13 December 1946. The Operating Con-
tractor, Hercules Powder Company, has agreed to complete any necea-
sary rehabilitation work. '

v :
PLANT OR WORKS: MORGANTOWN ORDNANCE WORKS —

BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS WORKS: 5,583 tonsa of
ammonia were produced during November. 4y production has now been
reduced to less than 100 tons per day periding a decision with respect
to embargo. At the present rate, Morgaritown can operate for approxi-
mately fourteen days.

*
PLANT OR WORKS: ORIO RIVER ORDNANCE WORKS

PER CENT OF REHABILITATION COMPLETED: 95 (3% increase)

“dIEF SUMMARY OF PROGRESS BEING MADE aT THIS WORKS: November pro~ z
duction - 2,551 tons. Coa str made necessary to cut back pro-
duction at this installation.

-II. AQUEOUS AMMONIUM NITRATES
PLANT OR WORKS: HOLSTON ORDNANCE WORKS

PER CENT OF REHABILITATION COMPLETED: 79 (4% increase)

PER CENT OF CONSTRUCTION COMPLETED: Process Work - 88 (8% inorwase)
Boiler Plant - 56 (34% increase)

2
Fr
ais | 23745

YS rage te ee ee ee al Ee wey ‘aeeaee- — Oe eee ee
—_— — = — - — ee —_— —_ — — a, al

Y/

PM WATE 40CReSS REPORT 5 December i934".

— mm — men

toe SBNY 2 'oTALLED:. 95 (8% increase)

~~ oo

Athy GUMMAS > GF PROGRESS BEING MADE AT THIS WORKS: 546 tons

PLANT OR WORKS: MILAN ARSENAL

BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS ARSENAL; November pro
duction ~ 6,071 tons. This figure represents 571 tons over and abov:

schedule.

Milan has storage space for &,000 tons of fertilizer.
EF : :

?

5 December 1946

305

dn
a

PLANT OR WORKS: NEBRASKA ORDNANCE PLANT

PER CENT OF REHABILITATION COMPLETED: 85 (10% increage)

PER CENT OF CONSTRUCTION COMPLETED: 62 (12% increase)

NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION

C : increase)

EQUI PMENT

PER CENT RECEIVED: 94 (4% increase)

PER CENT INSTALLED: 70 (15% increase)

‘
BRIEF SUMMARY OF PROGRESS BEING MADE AT THIS PLANT: ‘This instal-

Iation is to commence Operations week of © December 1946.

PLANT OR WORKS: RAVENNA ARSENAL

PER CENT OF REHABILITATION COMPLETED: 80 (5% increase)

PER CENT OF CONSTRUCTION COMPLETED: 70 (7% increase)

NUMBER OF CONTRACTOR PERSONNEL ON SITE ENGAGED IN REHABILITATION

’ decrease)

EQUIPMENT ae

a

PER CENT INSTALLED: 75 (9 increase)

BRIEF SUMMARY OF Ook s® BEING MADE AT THIS ARSENAL: 458 tons of
e ser ¢ ammonium rate were p on ring November.

Ravenna has storage capacity for 10,000 tons of ammonium nitrate

‘(fertilizer grade).

—y
23749

~@ @

306

AMMONIUM NITRATE PROGRESS REPORT , & December 1946

iV. GENERAL
ee the enbarce and the drastic effect that it may have
upon operation of fertilizer installations, the following teletypé
was sent 5 December 1946 to subject installations:
"IN VIEW OF CRITICAL SITUATION CAUSED BY EMBARGO, THE
FOLLOWING INSTRUCTIONS ARE ISSUED: BRING NO NEW UNITS
INTO PRODUCTION UNLESS PRESENT OPERATING UNITS HAVING
EQUIVALENT CAPACITY ARE SHUT DOWN. CONTINUE REHABILI-
TATION INCLUDING IDLE TANK CARS. OPERATE AT MINIMUM
RATE TO UTILIZE RAW MATERIALS AND/OR STORAGE TO FULLEST
EXTENT. RETENTION OF OPERATING PERSONNEL TO BE ON
BASIS OF CONTRACTOR'S RECOMMENDATION WITH LEAST DELAY
FOR STARTUP. KEEP SEPARATE COST ON EXPENSES INCURRED
AS RESULT OF EMBARGO AND REPORT TOTAL AMOUNT TO THIS
OFFICE IN LUMP SUM AS SOON AS POSSIBLE AFTER LIFTING OF

EMBARGO." ©

3. WW. SMILEY /
Mejor, Ord
Assistant

; , \f7'' 308
e t ‘ © : :
- ae , = 5 °
| ae
» é ~ , 3

Chief of ladustrial Service
Chief of Ammmition Div, I. 8.

Bffect ef Freight Babargo on Fertiliser Program

1. This office has been advised by the Transportation Corps that the enberge
on freight, which becomes effective midmight Thursday, 5 Desembe>, will prohibit
the shipment of fertiliser end the rew materiale therefor (ammonia and amoniua

_ mitrate eclution). In view of this situation, the Ordnance Department has tue
Jehcices with respect to the fertilizer progrem: Ape oe Rg

a. Aek the Transportation Corps to request permits for the shipment of .
anhydrous smmonia and asmonium mitrate solution, (approximately 80 carleade per day).
The Transportation Corps has unofficially advised this office that thay believe that
such permits might be obtained. Since the urgent request of the Departecat of ante
Agriculture for permits to ship ccmmercial fertiliser was refused, it is not
believed that jsormits for the shipment of War Department fertiliser would be granted,
However, the graining plants could store the finished produet in warious lead line
buildings for a period of at least 1 - 2 monthe at the present rates of production.
Thies office has checked with Safety and Security and they have no cbjection to the
storage of this mterial in this type of storage. |

3 b. Shut down the ammonia, ammonium nitrate solution, and graining plants
as scon as the storage at the amzonia plants has been filled, imeluding tank care
now on the tracks, and the solution plants have provessed all of their ammonia
steoks. ‘This, of course, would necessitate laying off thousands of workers and
the re-recruitment of these wirkers or replacements for them, in the evext the
progrem is renewed, would present a very difficult prebdlem. in view of the knom
short-term mature of this program.

Tae ETS Toy Cote ine Siete op peer ome aie pens ees ae ihe a SNP Boats Bl
“3 Pa ee) Brey Wea SSAA RE Al tye ab geb ls whine ee he AMR TET aS
Scie, ARICA,

5
4

HRC A ah S Tyitm oS Mat ope Gs et ese 4S 4 € $5 “i e wg? ee esnis AY are NOC ASE tsi f we , wey Sek S78 Rey ey ‘ pean Ae ii. r eS Ft jie he
PROM Mien Pitt en Mor APR EN MERE Saree COTES Oe oT CEU Nant y Ther eee menwer EM rn ae Nese eee eee,

“a 4
4 Sans ma Pee LSS oe
SEA AK ERNE Qa

ARIE IE AOS MLNS FF AIRING 5 PO RRL INN EN IO EGE

OP agent tery

SS Bi, ORIEL Uy

2. In view of the fact that the request of the Departaent of Agricul ture
to permit the whipment of commercial fertiliser was denied, this office recommends
that mo effort be made to obtain permits for the shipment of either the finished
fertiliser or the components; such as, anhydrous ammonia and ammonium nitrate
solution. However, in view of the following excerpt from Mr. Snyder's letter of
28 May 1946 to the Under Secretary; "Accordingly, I request the Yar Departasnt to
undertake such a program without delay and to take whatever actica is
to expedite the attainment of maximum production”, it is suggested that this matter
be referred to the Office of the Under Secretary for final decision. tid

r

|
5 fg
. . b 2

AID SEM IANS

0. K. JAK
Col, Ord Dept

23751

ea

Gy. 24 Ind ata 30 Rov 46
winch

¢

CROLY-L 471[00/80866 Gon’) 6th Ind

om

“WOhief, Amumition Div, I. 8., 28 Novenber 1946
TO: Chief, Safety end Security Div
For your inforantion and ccameate.

” ey
td

1 Inc ees O. M. JAK
n/e te Col, Ord Dept

3

For | | 23752

J. H. PRARRE

é>4} hi Shea sate ,
ee Cae ta ie a BBY et

BA indie
x ise bp
PDE uel Ve Se

Pid >
Dadiotind hitters

hie as
Pgs KM

ROME LSTA Pn tae Nee
Rigo i “4G SS eT ha VeRO fae Mahe i Pee? he

‘ ae PU os Apis Wg re Id | Dicks bee a
ER te ee ea rk ate: ren eed vor des ogee are

win Dit Leer ® | : Yoo
Cer gh RO hae ae ead

PRS oo NA ag OCS SON Big
vg aPar KS Ed Sono d binkl | Le

muy 1@ Novenber 1046

MEISEL NA LEBEL LE LE OCG ELLE I ERS EF DIDI i

\
\
‘
ve OR

2235 23733. °OO1k

0C0 ¥ £3

7 Voveanier 194°

-* . - q . + . ” a *,". meses Os
STaubard) OMfPATIIC PROCES Poe PT UL.

-—* «=e

*

sunctions of the *-vwnition Jsivision, Industrial Sacvier, sydnance Soparcment.

——_——— er oe

Responsibie for complote planning of tie wirufacturing crogram and
mainteinin; liaison with other Governri atal ¢comcics, such as Office of
war fobili:ation and kesonversion, Civiidian irocuction .dainistration, °

: and the Ofice of Vefonse “Transportation, with onriicalar eomphesis on

a the supply «i coke and tan cars for the program. ‘ho foctunition D: vision
* maintains close contact with the Transportation (orps ca the tani: cnr

x supply program. re

Ammunition ‘:ivision Porsonnel to contact revarding rrovran:

Colonol w, if, Jank - Chief, ArmunStion bivision, 27-443, 'Lxt. 6769
% ir. HM. 4. Roynolds ~ Technical assistait, 28-448, ixt, 3314
% Dr. it. U, Bongis - Chief, Facilities trench, Amminition Div, 2i-430
| Uxt. . Commodity >

e, Guantity (number of earloads), woight and cube

d. Date available and daily shipping capacity

@. Overseas destination or marks

~

3, Transportation Corpse arranges port and shipping progran.

a. Freight Traffic Branch advises Ocean Traffio Branch, Water
Transport Service as to the commodity, overseas destination, quantity,
when and at what rate avail.l)s» and the preferred port, together with
auch details of the ob.igation as are known, and requests that a ship be
bertned on a specified date consistent with these factors.

b. Ocean Traffic Branch indicates whether the proposed port
is acosptable and when vessel will be on berth. Also whether arrival at
port as scheduled will provide efficiert ship loading or whether stook
piling is essential (stock piling or storage will be avoided when feasible
to minimise cost; if oasential, storage will be arranged by Freight Traffic
Branch, Commercial Traffic Service, in collaboration with Osean Traffic
Branch, Water Transport Service).
vs

4. Preicht Traffic Branch issued TCR releases to Teohnical Service,

specifying port and dates ship will load, with required forwardine, schedule.

5. Froight Traffic Branch nseumes responsibility for rail movement
from origin to port, taxes steps to assure proper car supply and advises
Ueean Traffic Eranoh irmediately of any change in actual cargo availability.
Freight Traffic Branch maintains record of movement to the extent néo-
essary to protect vessel requirements.

a. Freight Traffic Branch advises AAR as to everall car require-
ments ia accordance with monthly projection and of each release furnished
ané talss corrective action with the AAR arid individual carriers in the
event of a deficiency in oar supply.

23758

‘ STANDARD OPFRATING PROCIDURUS FOR THis GAR DEPARTEIT
F’RTILIzrR GRAIL A.LONAU NITRATE PROGRA. (CONT'D)

6. Ocean Traffic branch ie responsible for berthing the vessel
as acroed and immediately advises Freicht Traffic Dranch of any change
in vessel datos, Cceon Traffic branch arranges for loading of ship
from cars o.- port storage and for the sailing of tho vessel.

a Corps rersonne] involved in Super vicion of Fertiliser

uC?
Colonel Kenneth |., saa sxxeoutive to AC of T Ext. 72626
Planning, Intelli;ence and Hovemonts Division
sotoasl J. kt. Uessersmith, chier Ext, 2482
tir. &. RR. Tasxer : Ext. 71368
>
Commercial Traific Service
Colonel 2. C. R. Lasher, Chief Lxt. 2872
Lajor D. L. Smith, Executive — Ext. 6605

Majo> L. Db. Lally, Chief, Freight Traffic Branch Ext. 2719
Mnjor J. i, Higgins, Deputy Chie/, Freight Traffic kxt. 2946

Branch

ir. 11, FP. Dowell, Chief, Port Control Unit (kcleases),

Freight Traffic Branch Ext. 5630

Viater Transport Lervice

colonel W. 5. Eliiott, Chter Ext, 5175
Lt. Col. T. S. Lowry, Executive Ext. 51765
Mir. ric ‘J, Jones, Chief, Ocean Traffic Branch Ext. 2675
Mr. &. L. Marshall Ext. 4617
ir. . J, Kilroy axt. 4590

Punctions of the Office of the Quartermaster Geroral.

1. Mission

a. by directive of the Secretary of War procurement has been
directed and contracts have been made with various commercial producers

of nitrogenwma fertiliser with the following coutrect stipulation:

"On and after 1 January 1947, the War Department will deliver
on request to the contractor or a third party (Including
covernmental agencies) designated by the contractor a quantity
of emmonium nitrate fertilizer produced in War Depertaent
fecilities equal in terme of nitregsn content to the nitro-
genous fertilizer purchased from the contractor under this
directive. Not more than 50 percent of the quantity so to be
delivered will be made available @uring the period

March 1947 and not more than 60 percent will be made available
during the month of April 147. Any undelivered quantity will
be made available during the period May-June 1947".

jo 9759 /

f

STANDARD OPTRATING FROCRDURKS FOR Tie ‘iAR DEPART UT
GRADE AMMONTUM NITRAT.. ROGRAL. (CONT'D)

b. The Secretary of Nar has also directed The Quartermaster
General to act as the agent for the “ar Department in effecting any
delivery of fertilizer, the return of which is requested by a contractor
under the terms of paragraph 1 a. cited above. ote

o. It ‘has been turther directed ‘that the Quartermaster Corps will
undertake the distribution of ali urdnanco produced fertiliser grade armoniun
nitrate whether for shipment to « port of embarkation for ovorsess shipment

- or for redistribution and replacement to commercial producors currently under

contract with the wusrtermaster Corps.
2. STAFF RESPORS IPILITIES:

?

In the furtherance of this mission the following staff sections
of the Supply Division, Office of the Quartermaster General will be
reaponsible for the following actions: /

‘ t f

a. Procurement Policy Branshs

(1) Will establish policies and procedures by which all -
activities of the staff and operating agencies of the
Quartermaster.Corps will be governed when such activities
pertain to the distribution of Urdnance produced fer-
tiliser crade amncnium nitrate. , ,

(2) Will be the central point of contact with the other
technical services concerned in this program; namely,
the Ordmance Depertment and the Transportation Corps.

(3) Will receive copies of production forecasts and produoctica
echedales from the Urdnance Department end notification
of any drastic changes in schedules or published programs
that may affect the operation.

(4) Will receive and distribute instructions and ordere of

the Quartermaster Goneral pertaining to the program and s

transmit the same to the appropriate agency. .
bd. Gencral Supplies Branch:

(1) W411 iseue all procurement directives indicating operating
they will have no means of epotting care over & weekend.

Shipping inctruetions have arrived trem .uartermaster Corpe for first two
woeke' produetien. Contractor, however, neode reutings.

A diseuseienm on production reports gava, in detail, to Comumnding Officer
end contractor, information desired by FDAP. Teletype report will be suusitted
daily until further notice in ccecrdanse with code requested by FIMP.

itilan will wash ous approximately 400,000 te $00,000 pounds of THY en their

I

| hoe
aif . 23762

225

Ropers ef Travel to Milen Arsenal eae 6 November 1946

a

present progran. Wash house is not adaptable without alterations for drying
and flaking this asterial to prepere for sale. They are now burning reclained
- THT. A y Tom :

Good housekeeping was in evidence all throwh the plant. nor

A discussion on inspection developed possibility of a bottieneck in
shipments of fimished product. Contractor desires to ship cars without waiting
for acceptance. Ordnance plans to analyse each car and contractor gays he will
have to do the same to conform with terms of contract,

aS

Productien is «xsected to get under way some tine Monday. There may be
two bot tlenecka at this installatios:

a. Waiting for completion of snalyses of finiched material before shipment.

b, Inability of Ordnance personnel to spot al) the solution scars nmecded
for a weeks’ production during a five-day peried, in which Ordnance will operate.

*
It is recommended that 100 percent analysis of finished iota of ennonivun
nitrate be performed by either tle contractor or Urdnance and that spot checks

be made by the party not making 100 percent analyses.
It is recommended that arrangements be made to provide, if nevessary, ever-
time for the Diesel engine crew in order that the @Olution cers can be spotted

on Saturdays and Sundays and movement of empty liquor solution care and full
grained ammonium nitrate cars from the plant during these two days.

OE mone COME a nt

The two above reccamendations have been referred to the ndmdiietreation
and Inspection Sections ef this office,

. DUNCAN C. SMITH
Q Technical Adviser

*

$F 23763

ag
S
®
9
%
S

aguy saavics rences
GCRRAANCE DEPASTHERT © See

—~ “ @2r i
sy ‘is

418g OO!

Sevee, Kee
4

| /
’

a

¢
>
,

Se

4
NF
ost
ry
ant
POA
%
Bes
i.
ey
wae
Be

AEse

ke

\y

oh

‘

Shipment of Ammonium Nitrate

-
ry

Te

‘
‘

a?

k i,

.
yi ae: . apne DP a ne eI Ree tits Gk Ee LS LON sige eee Se ais Ue
flail ih ik pte gaa citi th ceae Wiad Tn A te tvthet ware. Gx as Tig ote ot) ORS hr oF ft Se

pei ea. ae Cs” UR ase CP YE Cs Tae Bale ate : SS Ae

ieee eS era a Bis Se Tite WR 6 ae 20 Pai culate iY 2 SCARS MIT CRAIN StS SP ite bey OT TRAE ep agus (ia
Ee ne Ree Eee ad “ aa ChaNS pepe ee Ss SRS Sh pete ER RHE RE ets tay bs Ee Wines sal bit a PERRIS : 23 at ai as nat
Ds? av Was Ske pee ee RS Le aoe ae hi NaS Bien es Bi oe aioe grate Seok 2

~~

>

i é
-«
~
> a
phates 6 TR nt

Ld

-

-

—

theguant of nents Bitte it 1
: — 3 duns 19h?
| She. OD mh tes OB ni
fe Dea tes te
2 iy 2967).
+o vecmenenads then eomicinet os gercgvegit Sy 65h Sema ee Ads

eed
ote ea eb we nonetery Br sengTiaked ky pour af Yaa, Cee Tieting some eam
of cermapratsnee far sigartars of the Unter Searetesy = ver : So
ay
“st |
V5

stroked eapy of vopart free Of Tlee G@itef ¢,
. .
. ¢ , °
4.»
*
e ® t 7 ye
, ~ e s
’
‘ ¢ .
.
-
a ° -
.
. .
‘ a. s
: » . oy
‘ ® : eo - : ° “ " ~ ‘S
s . - - _ ko
. ° : ‘
. . 7 :
;* . ‘ e
° . + ‘ . -
- anid . a
. . *
. . {*
.
‘ ”
. ‘
*
- 4.
.
= #
\
‘ 3 bs
-
+ ° x
3
e =
Sad * r
e-
.* - *
° .
‘ e .
S
‘ e +9
. i
. =
é 24
’ -

,
.
4b Bs

SP ihe bb oy
oH ges.
LE Pe Be

*

7

.
se Legge
Cee re
A th

‘
$

Sig
e
50) eas
Of a

’
\
¢
’
ogen
ee

at Pees
[AY Ptuw ae

5 tak Ys

y
Verne
ne
peers

én
fe
A
‘
>
.
.
.
*
r: “«
Ae *
eh Fels fee

Vt Meh oe
Tree oP bikie Pia
Eat oe fart

| WD, Ord ©, Machington 26, 3. 60, 29 my 1807

: ' Raver aromal has tern yequested te cubalict te eveenn2
| Maan sLlotmant 706-1898 P 180 A 117ER0D to cover tote ef homuniom Fitwets

ORDNANCE SEPARTBENT

ARSENAL

PIC

— eaune / 7/ g69/199-19

23773

Yo

* CR AD ASA NR AERC RI Sn pSliia ONC I INGRED E ak es

as

OCD WU) “539 :

SR AOS
ORDNANCE DEPARTMENT ~ - reaopn
PICATINNY ARSENAL WRTomlinson/PFuacy/rr
Dover. New Jeansay ioc 2223
| MAY sed
Gn EbY 19 et.
weg |
SUBJECT: Investigation of Ammonium Nitrate Fertilizer ~f-
7 —>
TO: * Chief of Ordnance _\~—=
* Washington 25, D. C. | Bee Eh Bi
| | | Si
' APTENTION: ORDIM Vy o~
1. In accordance with the Pat ae reached at a conference in the

Office of Chief of the Industrial Division, 16 May 1947 a swmary re-
port of the work done on the subject investigation during the week
ending 23 May 197 is inclosed. There is also inclosed a summry of
the work to 15 May 1947, not previously reported to _— Office.

2 In the first mentioned report conditions neseabart for the
spontaneous ignition of Ammonium Nitrate (A.N.) fertiliser are in- |
disated. Further work is being ame to establish the minimm conditions.
The first report also shows the progress of analyses to determine the .
presence of impurities in the bags used for packing, and the conditions
which cause charring of the bags with and without fertilizer present.
Preliminary experiments made in an effort to cause detonation by heat
ang on rate of detonation of A.N. fertilizer are also recorded. It is
indicated that the fertiliser can be detonated in a 1$ inch file when
confined in Shelby steel tubing at a density of about-1.0 gm./cc. and
beostered with 50 gm. of RDX Composition A-3. An attempt is being made
to determine the rate of detonation. .

FOR THE COMMANDING OFFICER: .

7 ee

ae * , 15 Maya’

; Ce. R. DUTTON
1. Summary Rept, 23 May 4 be trip) Col, Ord Dept
in trip) Assistant

1 " .

'y?
23774 a ays

‘BaSNI

. {"
*, Z '
' @ se
~ a f
he dak eg i,
\

SECURITY CL2 CATION t1/ eng!

WAR DEPARTMENT

DISPOSITION FORM | - 307°

OCOISE Zam

toChief of Ordnance - fromDirector of Service, ae
on Supply & Procurement, WDGS 1 may 1ga7 Co

1. Attention is invited to attached copies of correspondence from this office to
the Ghief of Transportation and The Quartermaster General in connection with the
ject matter. In this connection it will be noted that special effcrt has been reque
to effect timely and expeditious shipments of ammonium nitrate manufactured in plants
operated under°the supervision of the Ordnance Departmet. It is desired that the
production of ammonium nitrate in such plants be continued to the highest possible
degree and that all deterring factors be eliminated.

2. Itis accordingly requested that conbelenaa Ordnance activities continue their
efforts to achieve this objective and that continuing difficulties preventing such
accomplishment b. reported to this office. |

"BY ORDER OF THE*SECrETARY OF WAR

posP/2) 22085 — Shipment of pana we Nitrate at

y

~

NS

I

- Aes
| } ee
& we i ” ; % a
rn aaa Fg seat ‘ab
} 2 Incis LeR. LUTES, Lieutenant General, GSC is es
l-Cy DF to C/Transportation Director of Service, Supply and Procurement @ © mS
2-Cy DF to The GG (gt Rated
Copies furnished:
Under Secretary of War ae
Chief, Civil Affairs Div., /SS , . »
A
=4
(ite Vials Rade /
; seek iy i 2 12D ’

WD AGO Foam 897 ioe é 4°) Lt GOVERSMART PROSTING OFFICE 19486 ~D9580

MAY ‘946

it

at

i i
ni i

i ih

ath Fr i.

3 task

a

Lae fy Grd dept, 1h ey WT

‘Seo Mane fer Keceré on Case T12h7

23778

oo
» z
3z

PFN 471.86/1
‘type Sor-l 3 , Type SGFr-2
Requirement 8 moiXe e t are Mire
ry 2 a % ‘
Flash Point ; *-= ¢ °-- Pitekateall ry S20°F ,
Viscosity, Saybolt Universel, lOOOF. 4 --
/ = z A |
) 2 = ral
ts/ c-
2 i g
. $0
= f
3 }
| B F
i 7 '
-4

= Sti.

ere
_* a*

on

i —_ = yo

\ © AS

fi ly
it

j
it

ii At yi

i!

i
Wa

iat

Ht 1
i

iy

a

.
if |

i

a Lil

i

CO 45( 50)

i

el

vl

Hit

Ne

lit

i
it

igh

Lil

Ht
t it

il i i

We Wt :

ee Pe

ree RICO

23789

.
“See
Pid. COtn .OCKTONE OAD BE AOBGREPOIEED UY CAREOM GOry A... AGGSURGED TS
x
“SS
REO CED nw
TO WEDURE PROSEPT ATTENTION WAR DEPARTMENT ranaynsite/ 36/PO
REVI SGPER TO
OF¥YICK OF THE CHIEF OF ORDNANCE >
| WASHIMGTOM, BD. SG.
ATTErom OF : $
a | Dy 13 Marek 1967
Re
‘ © ,
SUBJECT: Shipping Orders on Pertiliger Urade Ammonium Hitrate :

TOs The .uartermaster Generai

—- ~ ~

ATTSTIOM: Major Mellhaney, Temp A, 2603

1. ‘nelosed is a copy of & memorandua’ from the Field Director of
Ammunition Plante to this cffies dated 4 Marah 1847, subject: Shipping
orders on Pertiliser Oreds Ammonium Nitrate, file 0.0. 471.86/441,
with inclosures,.

2. It is requested that your office consider the recommendations
meds in inclosure memorandum and advise this office of your coments e
or recommendations or action taken.

POR THE CHIEF OF ORDMANC®:

\
1 Inol O. Me JAMK
Cy ¥Yamo dtd 4 karoh Col, Ord Dept |
_ w/8 inols Assistant
\ fA.
\ é
} ‘
|
: eee: .
: ay vi
i WA ?, \ ‘
; oes :
me 7
ee ay
Yiag. Gro. CY *
c “

23796

y - es Tas
Saree ; 4 p Sts bees

RSCORD
Mice Memorandum * UNITED STATES GQYERNMENT

=? f £6~ 11 War CDLyons/ok/5205
TO ; OCO, ATTN; ORDIM “~~ DATR: 4 Merch 1947

From : Field Director of Ammunition Plants,
ATTN; ORDLY-E

suBjEcT: Shipping Orders on Fertilizer Grade Pe a Nitrate

1. Reference is made to the attached copies of shipping orders covering ship
ment of fertilizer grade Ammonium Nitrate for the month of March 1947,

9B 1H OD

2, Attention ie invited to the fact that shipping instructions attached were ~\
all issued, with the exception of one, on the 28th day of February 1947 by the aN
Quartermaster Purchasing Office, New York, N. Y. It was the underetanding of this —_

_ office that all graining plants would be advised of shipmente in sufficient time
~ “4n order to sllow them to plan ahead and to eliminate the necessity of storing

nished material. The late date of issuance has also been generally true in past
.. months,

a 3. It is to be noted that shipping ordere require that 25 empty bags are to
be included in e&@ch car to cover’ breakage, On the basis of the present sohedule -
65,000 tans, and at the present market price of bage - 13 cents each, the value of
empty bags placed in cars, over & l2-month period, totals approximately $53,000.00.

4. Shipping orders also require thet repships be made on e@ch shipment from
the graining plants in general to the foilowing;

®. Quartermaster Purchtsing Office, New York, N. Y.
b. Consignee or Consigne:s
7
5S. The above, information is brought to your attention for such action as your
office may feel is necessary; however, it is suggested that the following reccamen-
dations of this office be soted upon;

&, Quartermaster Corps be again requested to issue shipping instructions
by the 20th of each month for the following month in order to ellow for proper
pleaning at plant level ss regards handling, storage and ordering required box oars.

| db, That Quartermaster Corps be requested to replenish Ordnance operating
‘ funds being expended in sending empty bags with eash shipment, since it is felt that

the range of expenditure of production funds should not be extended beyond the
shipping of the loaded oars, in the absence of the adaptation of this recommends-
tion, it is suggested that the Quartermaster Corps be requested to contact all

ocneignees and &sk that 811 empty begs received and not used be returned to plent
of origin,

ee sc. All repships sent from plents on finished meteriel be on & collect
= basis, °

6. Action on the above recommendations, or comments relative to sans wy ySar

fice, will be @ppreciated,

of .
/ : ; i YW fs

6 Inole

5:0. 30-2806168-47 30-280-10908-47 JOEL G. HOLaES wae te ey
| 30+280+156=-47 3042801 55-47 Colonel, Ord Dept / Qn
4-30-280-124-47 30=280+157-47 99791 . Wile hin 2%

-f ar ‘

eae

we eee

Clo iv 6
ad
RECORD
es 471.86/2023 lst Ind AJClear/he/221,

Ord Dept, Picatinny Arsenal, Dover, NJ oa yga/
TO: Chief of Ordnance, Washington 25, 1, ATTN: ORDGU

l. As requested in paragraph 4 of this letter vests have been con-
ducted to determine the ignitability of the submittec ammonium nitrate
fertilizer bags. These results are given in Chemical Laboratory hKeport
No 120235 which is inclosed in duplicate.

2. On the basis of the data given in this report it appears un-
likely that the reported fires were due to contact between the hot
ammonium nitrate fertilizer and the Duplex paper bag stock since the
data show that the bags must attain a temperature of approximately 700°F
before ignition, accompanied by flame, takes place. The fact, however,
that the bag stock treated with ammonium nitrate charrea moderately when
heated for two houre at 300° ¢ 5°F does not permit this possipiJity to
be completely eliminated particularly since it was reported in paragraph
3 of this letter "that the fertilizer is bagged at temperatures of
approximately 190°F to 2,0°F in Duplex paper bags" and "placed immed-
iately into box cars under relatively restricted conditions of free
air circulation". However, the fact that the data show that the bags
teSted with ammonium nitrate readily ignite and burst into flame when
placed in contact with a lighted cigarette even at about room teapera-
ture (74°C) indicates that such contact could have readily caused the
reported fires.

FOR THE COMMANDING OFFICER:

ZesAD

1 Inci
. : C. R. DUTTON
41. Lab Report No 120235 (in dup) | wip 23-2 Col, Ord Dept

Samples w/d ( Assistant

—

i3QN!

ee

a 00, ({>¢7™

, ie ee en R™ "RD
; ao INES RS Bie BOR TY SNE AE iN PE CAR CO REO RREE
JBMonier /JABatley,/pb/6551
ro aoe WAR DEPARTMENT 3

SS ee

2A

a
ics 554

: 4 March 1947

SUBJECT: Ignition Temperature of Ammonium Nitrate Fertilizer Bags

TO: Commanding Officer \
Picatinny Arsenal a

Dover, New Jersey be

le Two (2) fires have recently occurred in bagged ammonium nitrate, “e
fertilizer grade, after being piaced in freight oars. ~~
2e Reporte of the two incidents referred to indicate that # discarded ™
cigarette is the suspected cause in each instance. -

‘

Ge

.

3+ Beoause of the similarity of the accidents ani owing to the fact
that the fertilizer is bagged at temperatures of approximateiy 190°F to
240°F in duplex paper bags placed immediately into box oars under relatively
restricted conditions of free air ciroulation, tnis office suepects that
the fires may have resuited from the normal high temperature fertilizer
in combination with easy ignitability of the duplex bag stock.

4. In order to determine if the duplex bags may contribute to a
potential fire hazard, it is requested that tests be conducted at your
arsenal as scon as practicable, using the samples of bage inclosed to
ascertain the icnitability of the material. It is recomended that the
time of exposure, not exceeding two (2) hours, required for ignition of
the samples at temperatures between I70°F and 900°F be determined. Tests

may be conducted within the temperature range mentioned, in increments of |
100°,

5. Since the cause of the recent firez is obscure, any information

that you may have regerding the possibie oontributory factors wiil be
appreciated. :

BY CO.ZIAND OF MAJOR GENERAL HUGHES:

Oe SE las, CARROLL H. LEITRICK
Samples of Paper Containers Colonel, Ord Dept
BUY Assistant
craves
AR
supe
‘3 of

23733

oy fe ee O COW 8,
ho OE Rr RE TR SEGED Vo ~conmasseneee erovdlim, aasenee enmuee IY CARED EC v

WAR DEPARTMENT

[el OE OOM ANM CIE LAT
ITO ORE

uate /

mv ¥7 56-9 foe 21 February 1947

SUBJECT: Sample of Ammonium Mitrate Bag “-
»

TO: War Department
Chief of Ordnance
Washington 25, D. C,

#.

Attn: Safety & Security Division
In compliance with letter dated 18 February 1947 from Office,
Field Direetor of Ammunition Plants, file ORDLY-L 471.86/9539, and
memorandum from your office dated 12 February 1947 listed as in-
closure to cited letter, there is inclosed a sample of an ammonium
nitrate bag, similar to the type used at the time of the recent fire
and taken from warshouse stock, Also inclosed is a semple of an un-
burned portion of a bag taken from the destroyed box car of fertilizer.

. Dept.
7 ad
°) 2 Incls,
w Incl. 1 - Sample bag warehouse stock
oe Incl, 2 - Sample bag from fire

@.:
cc~ OFDAP, Joliet, Illinois

Attn: ORDLY-L ay

Awe ee be.

4
oe S3aP (Pres. Div.) FROM: WD, ord O DATE: 7 Feb 47 CQ@QIKET BO. 3

3 (ORD IM) HDReynolds/jrh

l. The Ordmanee Depertmont has had no experiemse with the seperation of 4 eum
pletely integrated fertiliser plant and is therefore net in a position te make any
recemmendations on this matter.

Ve .

2. However, based om the experiance ef the Ordsanes Departennt i= the mamafacture
of miteie easid, meutralising, and gruiming, it is visualised thet
10,000 aeres of land would have te be aequired in addition te
s0Oasree ef the Mergantem: Urdmance Werks. While this effice
of the expenditures whieh would be required for sush an expans e
believed that completion ef the additional facilities recemasaded on the basic dispesi-
tien fore would cost appreximately $15,000,000 and would roquire « minima of 1f manthe

@ 2 years, under prosent—day conditions, te camplete.

-
§

g
S

5. It ie suggested that the Departaent ef Agricultars, whi in
vith ccumereial eperations ef this mature, would be in a mush better pesi

POR PRE CHIXP oF ORDMANCE:

IHN]

ee

Ac

OLo 18(37)"-

Pe ne

TGs G@ief of Grénence Fitis @ Presere- DOH, Smeainte.
OCH. Leg | a |

COL Nehe KORE.

ee ee

POR TSS RITE OF CMT EE, SUPPLE OD PRO:

163 / aN

2 923796

a

a

mie

oor VEL
wan ‘DerAmT MENT " - | I Zi )
DISPOSITION FORM | :
mi ™ yoosp/El Pe [eames of Amoniua Mitrste
=e" Se

ra : ,

l. The present Civil Affaire Divieiom progres calls for manufacture of 681,, 000
tons of ammonigm nitrate, This cast tas lly computed to everage $47.50 per
toa. Difficulties in connection aith task air availability have increased this cost
considerably te date, Civil affairs Divisiam budget fer. 198 includes funds for an
additions) quantity ef armonies mitrate ia Gxcess ef 00,000 tow. Ths present care-
tien weilises 16 » Operetiag in « chgig, with & plants producing aniyirouws
spmcmga which is stripped by teak ear te 6 ta which nitrate the solution, hich, in
turn, is shipped to 6 plants fur greining manufacture of the fimisaed fertilizer,
This systee wag set cp on a shért term operation. It is clearly Gmeconomical to 4 la
tera operattos, Witbout the benefit ef any technical ‘mowletige 4A this matter, it is.
clearly epident ~bat integration ef sdlution and groining foci lit&es at Morgantown or’
in the vicirdt of Morgantown is a highly economical snd desirable methed of operation
for Leng term manufacture. ‘The need for tenk cars san he completely elixtnusted or
reduced te am irrelevant a!nigum, The saving in transportation sesta, in hanfling end
by contimoas operation would retire the investaent made in the edtitional facilities
installed, in a relatively shert time, ‘The Morgantown facility is stated to hove
capacity production of arhydrows ammonia which would permit menufecture of 30,000 2
of anemia nitrate per month. ,

2, Inasmuch as the Department ef Agriculture hes evinced consideret le interest
in this program, it is felt that the expense of such & step wuld be mainly berne ty
the Department of Agriculture om « basis of placing the facility 42 the disposal of
the Agricultare Department cool yg gee operation upon completion of the Wr Bepart-
aent requésements, No compute is available as to what the fertiliser @ :
under menmefacturing conditions es-@etlined above, however, an index.ss t# ppot Om
is availa¥ie on the basis of havihg paid 64) per vom for fertiliser we be
industry. ‘This cost included tasf-car henling en the pert of the manu
included bis profit in the sale te the Government, It is understoot that ‘comereis]
mrmufacturerp' coste are in the neighberhood c? $51 of §32 par ton without wiilisetéen
of integrated facilitiess iy 5

*

ef

.
.

*e

*
=

wt

(2£) ST 000

6

bCo (37)

Ss

WAR DEPARTMENT
ORDNANCE DEPARTMENT

DIDIAMA
puneaiom Bitrate - Safety Masarés

IND
Safety & Seourity Broach
Ruscutive Divisien s
Office of the Ghief ef Ordnance, WF
Gaghingten 95, D.d.

Birester ef Safety

tt BEPLY
saree TO Ques 600.96 BA

OO. ATF YI0

ro

tank eers whieh

leaning nara

nitrate faciliticses

ing amounts ef inmguritics, gach ag rust,

ere whieh has oryetallised

es

lL. The comtrester-eperator of the amecniun

terial, it is requested
te the hasards involved

epesitien ef the above m
2

Pending 4i

2.

f

om

TOs Guisf, Imepestion Branvh, 000
rats tre Baward BD, Lard, Inspostion Premet, 000
SUBJECT: Safety Survey - Curnbusker Ordnance Plant _

The fellowing is o re_urt of cafaty eurvey of Corshuasker Ordnance Plant,
he Grant Island, Nebraska, mode by Hr. Réwerd 0, Lord, Safety Engincer, of tats
* ‘wanch om 25 Aurust through 29 August 1947. 7
1, PERSOMNEL AT THIS RSTABLISAMEST
a. Captain 0. , Hirsch, Commamiing Officer

Be Mir, Be Me Lamgemme, Civilian Sefety Direster
(Serves as Pire Chief in addition to the atove duty)

Ce ‘The Commanding Officer is the Gafety Officer at this establishusst.

de Parscenel at this Eetablishsumts ‘
, Basti ERPBOLS Terkel,
Bmergenty Export Corporstica 158 $ M4
Oe rere 60 4 64.
Peat Bngimecr 23 2 24
Officers ee ae 3
ahh i 255

36 SAFETY SURVEY FLEOINI6
Be Fire Prevaniion ami Protection
(1) Simos May 1947, the Pire Departes= has been eperating 0s 6
combined Pire-Fighter Gusrd Force, workin: om a two~platecs
system. There were orlisimelly three fire stations at this

°

23798

(3)

addition thereto, the Commanding Officer is corfrcated with

locality makes this vegetation vory dry, forming the owtetami-
ing fire hazard at this establishment. It would be extremely
difficult to proporiy fight any large vegetation fire with
the minimised mmser cf firefighter cuerd: at the present
tine.

23800

—_ aad LP SATE “7 “
Teers ic ao rescovation srozram at thi. o. tabi bment.
«
ae
E
23802. o

vai astazt man HE
it lll ued ep
Fie yet ddgg2y tay
3453 jabisy F He ih
ivedsgity batty ih
peatla RL Tp

A PHRIE x8 a all

HEATH EE bie absis

Ce

(1) The secident frequency rates for this evtablishment for the
reporting periods of the year 1947 to date are »» fellows:

Member of Le: t-

HA oOooOnooem™

-_— or

taint
Hla

iss

ihe i HE Ht

i fein
a a |

al 5

és

ui \

nr

XO

QC)

tr ah La
t i EH

a At F + it
Te

Ha it I
ji ii ut HH
If ht it 3J i

epereted for imiividual lime ani buildiag uce shore

¥ gki2a oes
igus il
| sill i
Et oe air AEE :
(ein
ri fifty fp
4s 3 Hil HT
jab a akedatae yada

23805

Se

Tne Commanting Offieor, ss 6 result ef the drastic reduction fa

feree of his porseanal effective | Puly 19" Me Seton the Tire
Chief act us Civiliam Sefety Direstor. Tae Fire

Chief, Hr. Lingeman, is a.perestly vell qualified to nemile this
pesition, but tte divided respomeiudlities lesves « sinimum snrunt
of time for him te perform nis safety pelicisy.

Qperstions of tho safety board ani cosmittecs have ben omamereted |
im the previous pertion ef this report.

and there is uot suffisieat persome) ia bina firefichter
forse te properly police these ereas at ali times, i

a

© ee
; 4

rom,
A@@itiemel, perseumal ic negscsary te accomplish this purpuse gviskly,

Re AL) herd owfeced reeds within the confines ef this estabiistment
oheuld be repaired iamc@dately to prevert ancessive demage to autemotive equipment
and te permit the leag tern storage of high explosives to bs effisiently sesup~
lished iz storage

Ps)

their effoetive heights because of the storage
tain the confines of these magazines,

area,
given immediately te the adheranse to the requirecent of Ordsanse Safety
Geol, OO Perm 7224 dated 3 May 1945, Par. Gl-d, Page 89, revtrictines the maber
of esgeaines in ome Black te a total of 100. If the original a> rovsl of these
place permitting the building of this establishmect as cramted by the Chief of Ord.

| f, & tire rack should be imetelled in the garage for the protection
of the oparater ropairizg levee rimmod tires ‘ay 47
the witr visited icatinny Arsgal on 13 ‘ley 47 tp Ascuse with
purgormel of thet arsenal and llr, app of Offices, Field DLrector of
kammnition Plante, Joliet Arsene], developments of prior tests relating to
fertiliser crade ermomium itrete ax to expend the testin: ro-rem %toe
inelule investigation of oon itione dissevered durin: tre writer's
roost trip to Ravenna Aregnal.

Colomel Je i. “arris and then cutlined the findin:s at Yevenna Apparel
to %. “Ankenbach, Ur. “ap fra OFDAP wes present at the later dissusei on.

%, Seo,lees of charred emoniua nitrate bé&-s obfained et “avErnna
ware left at ‘cotinny for exeninstion and malysis.

%e The eircumstances prevailing at the time of a spontancous
“ire in ba ped fertiliser rrede emonivm nitrate at the Lame Star
o~ nance “lant (operated by the “Llas Vasan ‘ompany), sometime in e. ly
13427 @.) attributed to the inadvertent aixing of a cleanine compound in
the nitrate costing operation was ¢diseuseed. It was stated that
laboratory teste wuld be devised to estib iah if sodium sulphite and
other cleaning materials could intuce tesparature riees in exxriua nitrete

Le ity to the fact tint charred bas containim nitrate have
boon ¢igeovered with infrequamt recularity, Ms °R?P intiscated that a

cuted. It ie uMferstood that r. “app will vieit the munifecturers of
the baca those cfficss ame Located in tiew Yark.

3 @ |

1. he conclusions dram from the discussions inticated tint
Leber atery terete wulo be oortumted to investicate the causes of bag
detertoreticn end te stabligh, if possible, the deleterious effete
of contaxtinanta on the stability of fertiliser crade emonius ni rete.

+ Additional recomendations othar than utlined in preceding

parncraphs were not ra dBe
a
J, a. VATU

Ly

398

“ ; nf fz :
HOY RA,
Hy
ae Sadat ley /ex/6331 =
Chief ef Ordzaace 2 Mey 47

Chief, Safety & Jeeurity Div

Additiome] iawestifation of chearesteristies of Ammonium Bitrate
at Pileatiany A rsenal

i. In order to expend the existin imvestirfetion imvolvin the explosive
ontrecteristies of Ammonium Nitrate to imelude teats end detormimetions in cana
meetion with spemtaneous i-mitions of the Material J. 4. Betley, from this of~ wie . as
bbe iu a iba? want
ig a Tee

% A. BATLZT

® RECORD

ORDBB-T 471.86/2023 ist Ind adClear/ne/ 321s
OO 471.86/439

Ord Dept, Pieatinay Arsenal, Dover, BJ MR 137
TO: Chief of Ordnanee, Washington 25, DO, ATT!: CGap@
l. As requested in paragraph 4 of this letter tests have been sen-

2. Gm the basis of the data given in this report it appears ua~
likely that the reported fires were due to contact vetween tke het
amoniua nitrate fertiliser and the Duplex paper beg steek sines the
data show that the bage must attaiz « teapereture ef approximately 70°F
before ignition, aceompanied by flame, takes place. Tae fast, however,
that the bag stosk treated with emmoniaa nitrate charred aaddratcig «hee
heated for two hours at 300° 4 S°F does net permit this pessibility te
be completely eliminated particulerly since it ms reported ia paragraph
3 of this letter "that the fertiliser ie bagged at teaperatures ef
approximately 190°F to 240°F in Duplex paper bage" and “placed iamed-
jately into bax ears under relatively restricted conditions ef free
air circulation". However, the fact thet the data shoe that the bags
tested with ammoniua nitrate readily ignite and burst inte flame whee
placed in contact with a lighted ciguratte even at abewt roca teapere—
ture (74°C) indicates that sush contact could have reedijy caused the
reported fires.

FOR THE COMMANDING OFFICER:

1 Insl Cc. kh. TTS

1. Lab Report Be 120235 (in dup)
Saupe we oe
> ape Y

407

000 25

@&

Ae seen: Re titans gis Hh Fa®

PY. YSF

7

0.0.47);

4 Baeek 1967

il

i

Sead: Leeckeicee Teperesar) of arsuesdnes Fi araey frat. sew Rage

ih j

4

IN REPLY

WAR DEPARTMENT

comes es wicarions co «=O CORNHUSKER ORDNANCE PLANT

THE COMMANDING OFFICER

reren ro ORDOS

————————

ATTENTION...

GRAND ISLAND. NEBRASKA Markhan/ct

10 January 1947
wo 160/ @ § 5

SUBJECT : ‘Sar Dept. Insurance Agreement

TO: Ordnance Insurance Section ‘
Office, Chief of Ordnance
~ Washington 25, D. C. |

l. Transmitted herewith in accordance with OPI
paragrapa 4,045.3-is War Department Insurance Agree-
ment exscuted by the Emergency Export Corporation and
R. B. Jones & Sons, Inc., their Insurance Advisor, in
connection with Contract W-49-010-ORD-48.

(a the

P| Capt., Ord Dept
Commanding
Virel. |

23830

POST OFF\CH ANDO
TE. G@GRAPH ADDRESS
GRawd BLAND NEBR
——
FPReiGeT AMD EAPaTSe
acorras
¢ 8 @@Q RAL #04
uP RAILROAD
COPLANT NEBR

}

Oat

TeLEPHoME
3300
Te. arvrrvre

G ig§-285

TELEGRAPH
weseTvtrn on™
PosTAL TEL AAPM
.

4Y479/

PEGee
ae (a

Paes a wn

sy

F i
s¢ J &’’

i>

ty 7

,
AS
“EF

~~

-

we”

| =
ree
QO

000 WAed

—

1. &. B. JONES & SONS INC., a corporation organized and existing
under the laws of the State of Missouri, of 301 West Fleventh Street,
Kansas City, Missouri, hereinafter called the "advisor", agrees, in con-
sideration of a fee to be determined in the sanner hereinafter set forth,
to render complete insurance advisory service to F