# Transcript of Record — Six Companies of Cal. v. Joint Highway Dist. No. 13 of Cal.

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386402_0004%3A08

## Record

- **Collection:** Supreme Court brief
- **Document type:** Transcript of Record
- **Published:** January 1, 1940
- **Citation:** 311 U.S. 180

## Text

‘CLERK'S COPY. :

Vol. Vill
TRANSCRIPT OF RECORD

BOOK OF EXHIBITS

Supreme Court of the United States

OCTOBER TERM, 1940

No. 267

SIX COMPANIES OF CALIFORNIA, HARTFORD
ACCIDENT AND INDEMNITY COMPANY, ET AL,
PETITIONERS,

vs.

JOINT HIGHWAY DISTRICT No. 13 OF THE STATE
OF CALIFORNIA 3

ON WRIT OF CERTIORARI TO THE UNITED STATES CIRCUIT COURT
OF APPEALS FOR THE NINTH CIRCUIT

Ee ES EE ee RE a LE es ae a OR ee Se,

No. 9113

red
————_—

Gnited States

|

Circuit Court of Appeals

For the Rinth Circuit.

SIX COMPANIES OF CALIFORNIA, a corporaticn, and
HARTFORD ACCIDENT AND INDEMNITY COMPANY,
a corporation, FIDELITY AND DEPOSIT COMPANY
OF MARYLAND, a corporation, THE- AETNA CAS-
UALTY AND SURETY COMPANY, a corporation, IN-
DEMNITY INSURANCE COMPANY OF NORTH
AMERICA, a corporation, AMERICAN SURETY COM-
PANY OF NEW YORK, a corporation, MARYLAND
CASUALTY COMPANY, a corporation, UNITED
STATES FIDELITY AND GUARANTY COMPANY, a
corporation, THE FIDELITY AND CASUALTY COM-
PANY OF NEW YORK, a corporation, GLENS FALLS
TNDEMNITY COMPANY, a corporation, STANDARD
SURETY AND CASUALTY COMPANY OF NEW YORK,
a corporation, STANDARD ACCIDENT INSURANCE
COMPANY, a corporation, MASSACHUSETTS BOND-
ING AND INSURANCE COMPANY, a corporation, CON-
TINENTAL CASUALTY COMPANY, a corporation, and
NEW AMSTERDAM CASUALTY COMPANY, a corpo-
ration, Appellants,

vs.

JOINT HIGHWAY DISTRICT NO. 13 OF THE STATE OF
CALIFORNIA, a public corporation,

Appellee.

Oransrript of Rerovd

In Eight Volumes

VOLUME VIII
Book of Exhibits .

Upon Appeal from the District Court of the United
States for the Northern District of California,
Southern Division.

PARKER PRINTING COMPANY. 545 SANSOME STREET. SAN FRANCISCO

[CLERK’S NOTE: Excerpt from stipulation of
counsel re portions of record to be printed:
(1) It is stipulated that an agreed state-
ment of facts in the form hereto attached and
marked Exhibit ‘A’ shall be printed in the ree-
ord in lieu of plaintiff’s exhibits numbers 1, 5,
6, 8, 9, 11, 12, 13, 14, 15, 17, 19, 20 and 21.”’]

EXHIBIT “A”
AGREED STATEMENT OF FACTS

Defendant, by resolution of its Board of Diree-
tors, adopted on March 3, 1933, duly and regularly
approved the final surveys, plans and specifications
and detailed drawings and final estimate of cost
of the project which it proposed to construct. Said
specifications, plans and drawings so approved were
the same as plaintiff’s Exhibits Nos. 3 and 2, re-
spectively, introduced in evidence herein. Said esti-
mate of cost was the same as plaintiff’s Exhibit
No. 4.

Thereafter, by resolution of its Board of Direc-
tors, adopted January 3, 1934, defendant duly and
regularly approved the first amendment to said
specifications, plaintiff’s Exhibit No. 7 herein, and
thereafter, by resolution of its Board of Directors,
adopted April 3, 1934, defendant duly and regu-
larly approved the second amendment to said speci-

~ofications, plaintiff’s Exhibit No. 10 herein.

All of said specifications and amendments thereto
and said plans, surveys, detailed drawings and esti-

LE RANI

2 Siz Companies of California vs.

mate of cost were duly aua regularly approved by
the Director of the Department of Public Works of
the State of California. \ ?

On May 4, 1934, the Board of Directors of de-
fendant adopted a resolution to proceed with the
construction of the. project of defendant and direct-
ing that a notice to contractors be published that
sealed bids for the construction of defendant’s
_ project would be received until May 22, 1934.

Thereafter, said notice was duly and regularly
pubitshed. 9

On May 22, 1934, plaintiff submitted to defendant
a bid for constructing said project of defendant.
Said bid was in the amounts set forth in the con-
tract thereafter entered into between plaintiff and
defendant, plaintiff’s Exhibit No. 16 herein, and
was the lowest and best bid submitted.

On May 29, 1934, the Board of Directors of de-
fendant adopted a resolution accepting said bid of
plaintiff and awarding to it a contract for the con-
struction -of said project of defendant and author-
izing the execution of said contract.

Said contract was thereafter duly and regularly
executed by the parties thereto.

Thereafter, a bond for faithful performance of
the contract and a bond for the payment of ma-
terialmen and laborers were duly and regularly
filed by plaintiff with defendant. Both bonds were
dated June 12, 1934, and both were duly and regu-
larly approved by a resolution of the Board of
Directors of defendant, adopted June 14, 1934.

Joint Highway District No. 13 3

Attached to the cross-complaint herein is a full,
true and correct copy of said bond for faithful per-
formance, which is plaintiff’s Exhibit No. 18.

Defendant is, and at all times which are materia
to this case, has been, a duly and regularly organ-
ized and existing public corporation under the law
of the State of California. Prior to entering into
said contract with plaintiff, defendant | duly and
regularly complied with all the: requirements of
the laws of the State of California relating to its
organizétion, the construction of its project and
the awarding of said contract to plaintiff for the
construction thereof.

- Eh TAS, Mardin titty bh Venton’ 43,

ernie eo : ee a _
Nn... and harmless from any or all damage
or expense whatsoever.

(1) Insuranece—The Contractor at his own ex-
pense shall effect and maintain such Liability and
Workmen’s Cempensation Insurance as will pro-
tect him, the District and the District Engineer
from claims under the Workmen’s Compensation
Acts and from any other claims for damages for
personal injury, including death, which may arise
from operations under the contract, whether such
operations be by himself or by any subcontractor or
by anyone employed directly or indirectly by either
of them.

The Contractor shall also at his own expense
provide insurance against loss by fire, payable to
the District, to cover any and all structures or
property belonging to or in possession of the Dis-
trict and placed at the Contractor’s dispose] in
whole or in part, and also to cover all materials
accepted but not placed in the work which have
been included in the monthly estimates and which
have been or are to be taken over by the District.

The Contractor shall, before commencing work
on this contract, deliyer to the District Engineer
certificates from insurance companies cr_ their
agents stating “hat said insurances are in force
and will not be cancelled without written notice to
the District Engineer.

Joint Highway District No. 13 21

(m) Sub-letting and Assignment.—No sub-
contractor will be recognized as such and all per-
sons engaged in the work of construction will be
considered as employees of the Contractor and their
work shall be subject to the provisions of the con-
tract and specifications. Where a’portion of the
work which has been sublet by the Contractor is
not prosecuted in a manner satisfactory to the Dis-
trict Engineer, the subcontractor shall be removed
immediately on the order of the District Engineer
and shall not be employed again upon the work.

Neither the contract nor any part thereof shall
be assigned unless the Board of Directors first con-
sents in writing to such assignment. Such’ assign-
ment shall not relieve the Contractor or his bonds-
men from any liability whatsoever.

(n) Contractor Guarantees Work.—lIt is under-
stood that the Contractor is skilled_in the trade or
calling necessary to perform the work herein set
forth and that the District, not being skilled in
such matters, relies upon the Contractor to do and
perform all work necessary, and to do, supply and
furnish ali the acts and things necessary, at the
proper times and in the most skilful and desirable
manner, and the Contractor guarantees the work-
manship and materials furnished and supplied to
be the best of their kind. The acceptance of any
part or of the whole of the work does not operate
to release the Contractor or his bondsmen from said
guarantee. :

22 Six Companies of California vs.

(0) Dismissal of Workmen.—The District En-

7 gineer may, if he deem it necessary for the good of
the work, require the Contractor to dismiss any
workman on the work and such person shall not
again be employed on the work.

(p) Sanitary Arrangements. —The Contractor
shall make provision for and maintain in a sani-
tary manner at the work, all necessary and sanitary
conveniences for the workmen in accordance with
the rules and regulations of the Department of Pub-
lie Health, or the Department of Industrial Rela-
tions, acting in conjunction with said Department of
Public Health, and of all lawful authority.

(q) District May Perform Work.—(1) The
Contractor agrees that if the work to be done under
this contract shall be abandoned, or, if in the opin-
ion of the Board of Directors the work or any part
thereof is unnecessarily or unreasonably delayed,
or if the same is not prosecuted with the diligence

- and force specified, meant and intended in and by
the terms of the contract; or if the Contractor. is
wilfully violating any of the conditions or covenants
of the contract and specifications or of the plans or
of any part of the contract, or is executing the work
in bad, faith, the said Board of Directors sha]] then
have the power to notify said Contractor to discon-
tinue the work or any part thereof under the con-
tract, and thereupon the Contractor shall cease to
continue such work or such part thereof as the
Board of Directors may designate.

eas. oS SS eee a SS we Meee S se ES ae ea Ee gy ee ag bo) SS Guy ie pig Ie MR ee Serre a aro Ay r 7
oe oa ee ee 2S cid =o oes st? . S$meeh

Joint Highway. District No. 13 ee

94 ad Sta Companies of California vs.

under pressure. Each grout hole and grout con- —
nection shall have forced into it under a pressure |
as directed by the District Engineer, but not ex-
ceeding one hundred and fifty (150) pounds per
square inch, a grout composed of cement and water,
cr cement, sand and water, in proportions deter-
mined by the District Engineer. Sand for pressure
grouting shall meet all requirements for concrete
sand speciiied herein except as to grading, which
shall Le as follows:
One hundred per cent (100%) shall pass a

No. 8 sieve, and twenty per cent (20%) to

inirty-five per cent Gh) shall pass a No. 50

sieve. ta

Cement for pressure grouting shall conform to -
the requirements herein specified for Portland
Cement.

The apparatus for mixing and placing grout
shall be of a pumping type approved by the District
Engineer and capable of effectively and continu-
ously mixing and stirring the grout and forcing it
into the holes at any desired pressure up to one
hundred and fifty (150) pounds per square inch.
Grouting shall not be stopped in any hole until di-
rected by the District, Engineer. After the grouting
of the hole is finished, the pressure shall be main-
‘tained by means of a stop-cock or other suitable
device until the grout has set sufficiently so that it

~ ‘Tf ground is supported by steel ribs and liners,
spaces behind the steel shall be grouted prior to

Joint Hignway District No. 13 95

placing the tunnel lining. Grout as herein specified
for grouting rock shall be forced into the space
behind the steel, as directed by the District Engi-
neer, under pressure not exceeding twenty-five (25)
pounds per square inch.

Any unfilled space above the crown of the tunnel

which remains after concrete is placed, or any
space behind the tunnel lining which cannot be
filled with concrete as intended shall be grouted by
a pressure method satisfactory to the District Engi-
neer, and such grouting shall be done at such times
after placing concrete as the District Engineer may
direct. Grout and grout materials, and methods of
mixing and placing, shall be as herein specified for
grouting rock.

For the purpose of introducing grout through
the arch, a grout pipe system consisting of one inch
(1”) risers at intervals of approximately ten feet
(10°) shall be installed prior to the time the con-
crete is placed. The upper end of such risers shall -
be wrapped with burlap and wire in such a manner
that concrete will not enter the risers during place-
ment, but. that grout will be forced from the riser
into the space above the arch when pressure is ap-

plied, After grouting is completed, and the grout

= : . Ste Ti ae ee > 5 50 br ie = .
ewe Fork iets: Pe Ree SOREN dest os See tC ears
SPN A ee RNS STR ETT SO Ae aT Tet te Be? Oe
PPT. IST AIS SESE, PO ad RR Sones teed ecycks fab Vecbea eae SS ACE OES,

96 Six Companies of California vs.

Full compensation for grouting shall be consid-
ered as included in ‘the price “paid for “Tunnd §
Construction”’ as specified in Section 32 ‘hereof, and .
no additional allowance will be made therefor. /

Contraction Joints
17. Description.— Expansion and _ contraction
joints are to be constructed as shown onthe plans

or determined by the District Engineer. Joints to @

be filled with asphalt shall be carefully cleaned out §
and filled with asphalt having a penetration of from
one hundred and seventy-five (175) to two hundred
and twenty-five (225). Full compensation for con-
structing and filling expansion and contraction
joints, as herein specified, shall be considered as in-
cluded in the prices paid per cubic yard for con-
crete in structures, and no additional allowance will
be made therefor,

Drains and Weep Holes

18. Description.—Drains back of and weep holes
through walls and tunnel lining shall be provided
as shown on the plans or as directed by the District
Engineer. “Drains shall be constructed in accord-
ance with specifications in Section 23, ““Under-
drains,” except as otherwise shown on the plans or
directed by the District Engineer.

For all walls, the price paid per cubic yard of
concrete in place shafl include full compensation for
the furnishing and placing of all weep holes and
drains as above specified. ne See

ws
Joint Highway District No. 13 97

paid per lineal foot for ‘‘Tunnel Construction,”’
Section 32 shall include full compensation for the
furnishing and placing of all weep holes and drains

as above specified.

Lighting Conduit

19, Description—Conduit for lighting equip-
ment shall be galvanized or sherardized both inside
and outside and shall be.of the size called for on the
plans, At expansion joints, where the conduit passes
through diaphrams or brackets, a zine sleeve shall
be placed about the conduit and oiled or otherwise
treated to prevent adhesion to the concrete. The
length of conduit between junction boxes shall ~ot
exceed seventy feet (70’) ; wooden plugs shall he in-
serted in all open ends of conduits to prevent plug-
ging.

Full compensation for furnishing and placing con- =
duits with. all necessary fittings and incidental work
connected therewith shall be considered. as included
in the prices paid for other item§ of work and no
additional allowance will be made Badan

20. “Desegen, Seda care shall be taken to
construct parapets true to line and ‘grade.

- /
a '

98 * Siz Companies of California vs.

© / forms shall be oiled or painted with a coat of white
shellac as the District Engineer may direct. Per-
ceptible-breaks in the lines or parapets will be sufti-
cient causc for removal and rebuilding at the Con-
tractor’s expense.

21. Payment.—

Joint Highway District x 0. 13 99

widths shown on the plans, and as directed by the
District Engineer. “The pavement shall consist of
two (2) courses, namely, a waterbound base course
consisting of rock and screenings, compacted by
rolling and watering and of a depth not less than
six inches (6”) after final compacting, and a pene-
tration oil macadam top course two inches (2”) in
thickness after compacting, consisting of rock and
screenings compacted by rolling and bound and
sealed by applications of hot road oil or cold emul-
sified road oil, as hereinafter specified. ~

2. Waterbound Base Course: (a) Materials.—-
The broken stone for the waterbound base course
shall be crushed from sound ledge rock or. boulders,
of such character that it will compact and_thor-
oughly lock under watering and rolling so as to
make a stable, well keyed base. The rock shall be
free from. clay, loam, adobe, vegetable matter or
other“deleterious material. It shall have a coefficient
of wear of not less than eight (8) when tested in the
manner hereinafter sét. forth for ‘“‘ Abrasion Test of
_ Rock.” It shall be of such size that it will all pass
a sereen having circular openings three inches (3”)

in diameter and at least ninety-five per cent (95%) |

will pass a screen having circular openings two and
one-half inches (214”) in diameter; not. more.than
seventy. per cent (70%) will pass a screen having
cireular openings two inches (2”) in diaméter and

at least ninety-five per cent, (95%) will be retained

on a screen having eens oetea e

quarter inches. (1%”). in diameter. . iesivigace

ne ih te a an

100 Siz Companies of California vs.

Screenings shall be that portion of the crusher
run, including stone dust, which passes a screen
having circular openings three-quarters inch (%4”)
in diameter. Screenings shall be obtained from
rock of the same qualities as hereinabove specified
for broken stone.

(b) Constructing Base;—The bikes stone shall
be placed upon a subgrade prepared as hereinbefore
specified, and between side forms or headerboards
set to line and grade for the edges of the finished
pavement. If curbs and gutters are to be placed
they shall be constructed prior té the placing of the
rock, and headerboards: shall be omitted.

~The broken stone shall be placed. in two courses,
each course not to exceed four. inchiés (4”) in thick-
ness, measured tiefore rolling. Work on each course
shall be handled in a similar manner.

The broken stone shall be spread in a Jayer of

‘wnifoilin thickness, using either spreading boxes,

self-spreading vehicles, or by spreading from the
vehicle by hand. Dumping in piles: upon the sub-
grade will not be permitted. The course shall be
rolled with a self-propelled roller weighing at least
three hundred (300) pounds to the linear inch width

of tread, and rolling shall be done at the sides of —

the roadway first, gradually working toward the
broken stone thoroughly locked and keyed. Screen-

ings ‘shall'then be spread in’ thin’ layers and:each —
layer rolled dry untii no more screenings ‘can’ be —
forced into the voids. The surface ‘shall then. be’

Joint Highway District No, 18 101
inkled until the stone is thoroughly wet but not
iftently to saturate the subgrade, and again
led. Excess sereenings shall be scattered by light
eping, additional screenings shall be added as
| where voids develop, rolling and sweeping shall
continued until the: entire surface is completely
J

ps Sens eka:
Whe ata
be Py cael
x
S prrathens xy,

ge 4 ate)
Bale mat SUE aR

Side

pa os sais BSCR aR Mog tbe IIE a AI i Aes ey ot tie i?
Palos CM UB Ik (et It FT “ake wey Se a Ay oa tae AL x
ORS aby Dieta de abr pee a 5 ; 5

ote
pets ycats

Sr aire eens ranch em th reirEnt, NVR eM aaY see aoa w ger OL SAM 8 7 arm

136 Siz Companies of California vs.

positing of materials, as herein provided, timber,
ing, drilling, blasting, draining, ventilation, timber -
and removal, structural steel supports and removal,
and all concrete work as shown on the plans, inelud-
ing all concrete placed outside the ‘‘neat lines of
the concrete structure’’ and ali grouting; for all ma-
terial furnished and the transporting afid placing
of all materials; for all form work, including the
construction, erection and removal thereof; for all
finishing and painting of concrete surfaces; for all
ceilings and partitions; for pavement and curbs and
sidewalks; for water pipes and accessories; for all
drainage structures, pipes,
00'008'z¢ $ ‘pAnoaed og'T $34 ‘spé"n2 900% eV) S8BIQ “UOVABOXG [BanjonAyG “g
oo'0ns'or «$ «= ‘PA “es aed coo'o $38 ‘#p4 “B38 000'ODT'S yosqsesQ Z%
OO'OSL'TSZ $ ‘PA nosed gg’ $I" ‘SpA "NO Q00'8OL Supp T
(ereoy porempeg soopag UU) sowaqieg Aayewad owes]

yout ZI ‘Wealny edig [eeW peywsnsi0y “TZ

PAST ELI ED TRE TE PTS TEA IPTG GL IL ELT eS

o
8 : |
oo'orl'S «$= Used OFT $38. “4S THT OOTF | eg ten.
peysnii0g pezwi0jseg youl g ‘Suyesplepuyl “TP
00°08 $ youve 00'0S$ 3% t apoypuey, ‘OP
00°80T + qove oo'ges 3" g your gy ‘sejoudmey “6g
00'9% % yore 00'9Z8 3% t yout g ‘sejoyduey "gg
" 00°92 $ yous 00' NCS I t _ Youy g ‘sejoqdmey “1g
= 00°096 + yore 00'0RS 1*# I Ory BOTT 409UM WING “9s
oo'o00'rT «= ss 4282 00 00TS 3% Or cfl>y ‘SVOPAY AOgBM TAIOIG “SE
: 00°SL $ . youe OO'SLS 3* t sBuruedo your-pg ‘s19]U] A0jBM WIG PE
S woe ¢* youe 00'06$ 3” ? ado} Supeigy “sojoquem “Se
S 00°00 $ qou? 00'00TS 38 g ado, yopuy ‘sejoyuv “Ze
00'006 + 4282 00'06$ 34 1) sdo} prspunyg ‘sojoqueyy “TE
S oosse 46s «sSiC'H UT AO OST SIE «WU TY your g ‘siemeg edig PegLA OC
2 0oosr % ‘BUpsed COT HR WF UIOGT yout 9 ‘suemeg odig PopyA 62
= ooosl's $$ ‘wi unsed o's $38 “UIT OBS eX YUL 9E ‘GaeaTuH edig e#e19U0H peorozUTey “Bs
oo'sor'o9 «$F Used CFE SIE = «“3F WHOLIT cX >» FOUL HZ “WoaMH edig ser9UEH peosOzUley “LZ
g 00°OLT $ ‘wursed 007 $3® ‘HUGS «S>» WUE BT ‘jeaTny odig eyesoUeH peosofuyey 9%
m= O0PLL $ ‘wWuysed OVI $Ie “FUL OSF «» YOUL GT QaranH odig eyeroUeH peosoyupey “SZ
OO'SZtT $$ ‘Wumszed OCT $3e UI OSL » ‘WOUL ZL Weamy edig ejosom0H peosopurey “FG
00°805 $ ‘wuysed OST $3 5 UN OFE B>> ‘YOUL OL Weaup edig e3e19N0H Peorosupey “Es
00'0066 $ «33 Used OOS HIB «=F “MIT OOB'E Your gT ‘yeamny edrg TeIoW peyesn110H “ZZ

(wey, porwwpey soovag WE soveupieg Lopraend) emery

00° [£6'€89'E$

00'000'ST ¢
00°000'0Iz ¢

00°000'09 ¢

[830]
wus dummy]
wns duny
ung duny
wns du]
uns dunry
iy “uly aod ooo ~~ 6 UN 8

‘Uy 40d 09'00%S 1% = “35. “UT 006
‘4 “Wy ted Oo‘EzEs ye = “13. "UT, OOS

‘pA naded QO $1¥ “sp “no ORE

‘Ql aed gro $18 841 000'9F

‘DA na dad Q0'¢ $38 ‘spd “no Ozz

‘ Upaed Og $32 —13 “UT OFO
‘Ww uted O90 $38 «33 “UT OOF‘ZI
‘Uy sed OCT $38 «643 “ul OzO'Z

oryag NED cowwenyreg Asqrewnd)

Joint Highway District No. 13 168

The unit prices hereinabove set forth are the
prices bid by the second party and accepted by the
first party and payment shall be made to second
party on the basis of the units furnished of each
item hereinabove specified. The lump prices for
items 51 to 55 inclusive, hereinabove set forth, are
in each case the total prices to be paid by the first
party to the second party for the items therein
listed.

A copy of the bid of the second party is on file
with the Secretary of the Board of Directors of
the first party and is hereby expressly referred to
and made a part of this agreement.

It is hereby mutually understood and agreed by
and between the parties hereto as follows:

1. That the work provided for by this contract
shall be actually commenced by said second party
within (10) calendar ‘days from and after the exe-
eution of the same and shall be completed within
seven hundred twenty (720) calendar days from and
after the execution of this contract, time being of
the essence hereof.

2./ That the price te be- pale: ndid: weeiabaeaty
as hereinbefore provided shall be paid in legally
executed and regularly issued warrants of the said
first party, drawn on the appropriate fund or funds
of said Joint Highway District, as required by law
eee ae a
first. party.

3. hind thes cahd: Ratt sien), 00'S veghaidren.
painted District Engineer and his assistants and

164 Siz Companies of California vs.

agents shall, at all times during the progress of
said work, have free access thereto, and shall be
allowed to examine the same, and all the material
to be used therein, and if the same or any part
thereof shall not be in strict accordance with said
plans and specifications herein referred‘to, it shall
refuse to accept and shall reject said defective work
and material.

The whole of said work is to be done to the satis-
faction and approval of said first party and its
agents authorized to superintend the same, in strict
accordance with the plans and specifications here-
inbefore referred to.

4. That the second party is skilled in the trade
or calling necessary to perform the work agreed to
and done under this contract, and that the first
party, not being skilled in such matters, relies upon
the skill of said second party to do and perform the
work and labor necessary in the most skillful and
durable manner, and said second party guarantees
the same, and the aeceptance of the work does not
operate as a release to said second party or its
bondsmen from said guarantee. |

5. That the second party further agrees that
if the work to be done under this contract and
agreement shall be abandoned, or if this contract
shall be assigned by the second party, or if at any
time the District Engineer shall be of the opinion,
and shall so certify in writing to the said first party

Joint Highway District No. 13 165

that the said work or any part thereof is unneces-
sarily or unreasonably delayed, or that the said
second party is wilfully violating any of the con-
ditions or covenants of this contract, or is executing
this contract in bad faith, the said first party shall
have the power to notify the said second party to
diseontinue all work or any part thereof under this
contract, and thereupon the said second party shall
cease to continue said work or such part thereof as
said first party may designate, and the said first
party shall thereupon have the power to place such
and so many persons, and to obtain by contract,
purchase or hire, such animals, carts, wagons, impie-
ments, tools, material or materials, by contract or
otherwise, as said first party may deem advisable,
to work at and be used to complete the work here-
in described, or such part thereof as the agent
authorized to superintend the same may deem neces-
sary, and td use such material as they may find upon
the line of said work and-to charge the expense of
such labor and material, animals, carts, wagons,
implements and tools to the seeond party, and the
expense so charged shall be deducted and paid by
the first pariy out of such moneys as may be either
_ due or may at any time thereafter become due to
the-said second party under and by virtue of this
es ene . +.
_ In ease such expense is less‘ than the sum which
would have ‘been payable under this contract, if the

®

166 Siz Companies of California vs.

the said second party shall be entitled to receive
the difference, and in case such expense shall exceed
the last said amount, then the said second party or
its bondsmen shall pay the amount of such excess to
the first party on notice from the said first party of
the excess so due.

6. That upon notice of the completion of said
work, the said first party or its agent shall proceed
without delay to examine the same, and if found to
be in accordance with the aforésaid plans and speci-
fications and this agreement, shall accept said work
and shall notify the second party thereto, or jts
agents, of such acceptance.

7. Payments for said work will be made only
upon the certificate of the Distriet Engineer for
work actually performed. The District Engineer
shall measure the work on or about the first day of

.geoch month and at the time of completion of the
“entire work, and shali render a certificate on. or
about the tenth day «i gach month and at the com-_
-pletion of the entire w stating the amount of

* work performed: during the previous calendar

month, and during the current month, at the time
of eompletion. The Contractor shall then, at the
times above specified, be entitled to receive a pay-
ment from the District in an amount to be deter-

* mined as follows: Until the total value of the work
_ done since ¢éommiencement of performance of the —

contract exceeds Four Hundred Thousand Dollars
. ($400,000.00) the payment will be seventy-five per

i —/.

\

&

Joint Highway District No. 18 167

eent (75%) of the amount specified in the District
Engineer’s certificate; thereafter and until the total
value of the work done since the commencement of
performance of the contract equals One Million
Dollars ($1,000,000.00), the constant sum of One
Hundred Thousand Dollars ($100,000.00) will be
retained by the District out of said total value;
thereafter the progress payment will be ninety per
eent (90%) of the amount specified in the En-
gineer’s certificate, provided that no such estimate
of payment shall be required to be made when, in
the judgment of the District Engineer, the work
is not proceeding in accordance with the provisions
of the contract, or when, in his judgment, the total
value of the work done since the last estimate
amounts to less than Five Hundred Dollars
($500.00), except the certificate and payment re-
quired at the completion of the entire work.
“The acceptance by the Contractor of the final
ninety per cent (90%) payment for the completed
work shall be and shall operate as a release to the
District from all claims and liability to the Con-
tractor for anything done or furnished for or re-
lating to the work, or for any aet or negléét of the
District or its agent in any way affecting the work,
excepting the claim of the Contractor against the
District for the moneys herein provided to be paid
by the District to the Contractor thirty-five (35)
days after the acceptance of the contract: ' rae
“Thirty-five (35) days after the acceptance of the
work. by a certificate of acceptance duly rendered by

168 Siz Companies of California vs.

the Distriet Engineer and final approval and ac-
ceptance by the Board of Directors of the District,
the Contractor shall be eniitled to receive a «pay-
ment of the balance due under this contract in the
amount of ten per cent (10%) of the aggregate
amount of all certificates of the District Engineer.

8. That the said second party shall furnish and
deliver to the said first party, upon the execution
of this contract, a good and sufficient bond and
undertaking in the sum of One Million Eight Hun- .
dred Forty-two Thousand ($1,842,000.00). Dollars,
with sufficient corporate surety thereon, approved
by the Board of Directors of first party, conditioned
for the faithful performance of this contract by
second party, according to the terms and provisions
herein. : |

9. That the said second. party shall furnish and
deliver to said first party, upon the execution of
this contract, a good and sufficient bond and under-
taking in the sum of at least One Million
Eight Hundred Forty-two Thousand ($1,842,U00.00)
Dollars, approved by the Board of Directors of
first party, with sufficient corporate surety thereon
in aecordance with any law of the State of Cali-
fornia requiring the same and with an Act of the
Legislature of the State of California, entitled, ‘‘An
Act to secure the payment of the clams. of persons
employed by contractors upon public works, and
the claims of persons who furnish materials, sup- ,
plies, teams, implements.or machinery used or con-
sumed by such contractors in the performance of’

Joint Highway District No. 13 169

such works, and prescribing the duties of certain ©
public officers with respeet thereto,’’ and any Act
or Acts amendatory thereof.

10. That“eight hours’ labor shall constitute a
ay’s work for any one calendar day, and all work -
and labor performed under and in accordance with
the terms and conditions of this contract.

11. That no laborer, workman or mechanic em-
. ployed at any time by the said second party, or by
any subcontractor or subcontractors under it, upon
the work or upon any part of the work contem-
plated by this contract, shall be required or per-
mitted to work thereupon more than eight hours in
any one calendar day, except in cases of-extraordi-
nary emergency caused by fire, flood or danger to
life or property, or except to work upon public,
military or naval defenses or works in time of war;
provided, however, that within thirty (30) days
after any employee is permitted to work over eight
hours in any one calendar day due to such extraor-
dinary emefgency, the contractor or its, duly au-
‘thorized agent shall file with the Board of Di irectors
of the first party a report verified. by oath
forth the nature of the said emergency, w re-
port shal] contain the name of said worker and the
hours worked by h.m on said day, and failure to
file the said report within the said time shall be
prima facie evidence that no extraordinary emer-
gency existed. The contractor and each subcontrac-
tor shall. also keep an accurate record showing the
names and actual hours worked of all workers em-

170 Siz Companies of California vs.

ployed in connection with the said public work,
which record shall be open at all reasonable hours
to the inspection of the Board of Directors of the
first party or its deputies or agents, and to the
Chief of the Division of Labor Statistics and Law
Enforcement of the Department of Industrial Re-
lations, his deputies or agents. The. said second
party hereby agrees to forfeit as a penalty to the
said first party, out of any moneys becoming -due
to it from the said first party, under the terms of
this contract, the sum of Ten ($10.00) Dollars for
each laborer, workman, or mechanic employed” in
the expoution of this contract by said second party,
or by any “subeontractor under said second party,
for each and every calendar day during which said
laborer, workman or mechanic is required or per-
mitted to labor more than eight hours in violation
of the provisions of Section 653c of the Penal Code
of the State of California, and that the said first
party is hereby authorized and directed through
its proper representatives, to withhold and retain
from the. said second party, or from the said sub-
contractors under it, all sums and amounts which
shall have been forfeited pursuant to this stipula-
tion, as the property of the said first party, as pre-
vided for by Section 653c of the Penal Code of the
State of California,.and any Act or Acts amenda-
tory thereof; provided, however, that no sum shall
be so withheld, retained or forfeited, except from
the final payment; without a full investigation by
either the Division of Labor Statisties and Law En-

Joint Highway District No. 13 171

forcement of the State Department of Industrial
Relations or by said Board of Directors.

12. That the said second party shall, at its own
expense, before commencing work under this con-
tract, take out and at all times during the prosecu-
tion of the work hereunder, and until final comple-
tion and acceptance thereof, maintain, in full force
and effect, compensation insurance with an insur-
ance carrier satisfactory to said first party, éover-

ing the full liability of said second party to any

and all persons employed by said second party, di-
rectly or indirectly, in or upon said work, or their
dependents, in accordance with the provisions of
the Workmen’s Compensation Insurance and
Safety Act, Chapter 176 of the Laws of 1913 of the
State of California, and any Act or Acts amenda-
tory thereof.

And said second party failing to take out or
maintain such compensation insurance before com-
mencing work under this agreement, the same may
be taken out, maintained or renewed by said first
party at the cost and expense and in the name of
said second party, said cost and expenses thereof to
be deducted from any installment payment becom-
ing due to said second party hereundér.

13. That if any material, composition, process,
or any other thing so called for or required by the
plans and specifications heretofore adopted by the
first party is covered by letters patent, all royalties
and expenses thereof, all litigation therefrom, or

other things whatsoever,.which may develop as\a .
. ;

LIES ELLE Rh ME ES

172 Siz Companies of California va.

cost from the use of such material, composition,
process or any other thing which is covered by
letters patent shall be borne by the second party.

44. That any alteration or alterations made in the
plans and specifications which are a part of this con-
tract or any provision of this contract shall not op-
erate to release any surety or sureties from liability
on any bond or bonds attached hereto and made a
part hereof, and consent to make such alterations is
hereby given, and the sureties to said bonds hereby
waive the provisions of Sections 2819 and 2840, and
each of them, of the Civil Code of the State of
California. ;

15. That said second party and all subcontract-
ors under it shall pay all their laborers, workmen,
mechanics and employees on said work a salary or
wage at least equal to the prevailing salary or wage
for the same quality of service rendered to private
persons, firms or corporations under similar em-
aopenent, and which salary or wage shall not be less
than the general prevailing rate of per diem wages
for work of a similar character in the locality in
which the werk is performed, and not less than the
general prevailing rate of per diem wages for legal
holiday and overtime work, and which salary or
wage shall not be less than the stipulated rates con-
tained in a schedule thereof which has been ascer-
tained and determined by the Board of Directors of
the first party and which is now on file with the
Secretary of said Board and by reference incor-
porated herein, and made a part hereof, and a copy

Joint Highway District No. 13 173

of which is hereto appended and marked ‘Exhibit
&.”’ The said second party hereby agrees to forfeit
as a penalty to the said first party, out of any
moneys becoming due to it from the said first party,
under the terms of this contract the sum of Ten
($10.00) Dollars for each laborer, workman or me-
chanic employed, for each calendar day, or portion
thereof, such laborer, workman or mechanic is paid
less than the said stipulated rates for work done
under this contract, by it, or by any subcontractor
under it in violation of Chapter 397 of the Laws of
1931 of the State of California, and that the first
party is hereby authorized and directed, through its
. proper representatives, to withhold and retain from
- the said second party, or from the subcontractors
under it all sums and amounts which shall have been
forfeited pursuant to this stipulation, as the prop-
erty of the said first party, as provided by Chapter
397 of the Laws of 1931 of the State of California,
‘and any Act or Acts amendatory thereof; provided,
however, that no sum shall be so withheld, retained
or forfeited, except from the final payment, without
a full investigation by either the Division of Labor
Statistics and Law Enforcement of the State De-
partment of Industrial Relations or by said Board
of Directors. |

16. That the said second party and any subeon-
tractor or subcontractors under it, shall not know-
ingly employ or cause or allow to be empioyed upon
the work, or upon any part of the work contem-
plated by this contract, any alien, except in cases of

174 Siz Companies of California va.

extraordinary emergency caused by fire, flood, or
danger to life or property, or except upon public,
military or naval defenses or works in time of war;
provided, however, that within thirty (30) days
after any alien is permitted to work thereon due to
such an extraordinary emergency, the contractor
doing the work, or its duly authorized agent, shall
file with the Board of Directors a report, verified by
oath, setting forth the nature of the said »mergency
and containing the name of the said alieu and each
date he was permitted to work, and failure to file
the said report within the said time shall be prima
facie evidence that no such extraordinary emergency
existed. The contractor and each subcontractor shall
also keep, or cause to be kept, an accurate record
showing the names and citizenship of all workers
employed by him in connection with the said public
work, which record shall be open at all reasonable
hours to the inspection of the Board of Directors,
its deputies and agents, and to the Chief of the Di-
vision of Labor Statistics and Law Enforcement of
the State Department of Industrial ‘Relations, his
deputies and agents. The said second party hereby
agrees to forfeit to the said first party, out of any
moneys becoming due to it from the said first party,
under the terms of this contract the sum.of Ten
($10.00) Dollars for each alien knowingly employed
in the execution of this contract, by it or by any sub-
contractor under it, upon said work herein specified,
for each calendar day, or portion thereof, during
which such alien is permitted or required to: labor -

Joint Highway District No. 13 175

in violation of the provisions of Chapter 398 of the
Laws of 1931 of the State of California, and that
the first party is hereby authorized and directed,
through its proper representatives, to withhold and
retain from the said second party, or from any sub-

shall have been forfeited pursuant to this stipula-
tion, as the property of the said first party, as pro-
vided by Chapter 398 of the Laws of 1931 of the
State of California, and any Act or Acts amendatory
thereof; provided, however, that no sum shall be so
withheld, retained or forfeited, except from the final
payment, without a full investigation by either the
Division of Labor Statistics and Law Enforcement
of the State Department of Industrial Relations or
by said Board of Directors.

17. That no laborer, workman or mechanic em-
ployed at any time by the said second party, or by
any subcontractor or subcontractors under it, upon
the work or upon any part of the work contem-
plated by this contract, shall be required or. per-
mitted to work thereupon more than thirty hours
during any one calendar week, except in cases of
extraordinary emergency caused by fire, flood or
danger to life or property, or exeept to work upon
public military or naval defenses or works in time
of war; provided, however, that within thirty (30)
. days after any employee is permitted to work over
thirty hours during any one ealendar week due to
' such extraordinary emergency, the contractor or its
” @uly-authorized agent shall file with the Board of

eontractor under it, all sums and amounts which

Ov Oe oe ee a Se

176 Siz Companies of California vs.

Directors of the first party a report verified by oath
setting forth the nature of the said emergency,
which report shall contain-the name of said worker
and the hours worked by him during said week, and
failure to file the said report within the said time
shall be prima facie evidence that no extraordinary
emergency existed. The contractor and each sub-
contractor shall also keep an accurate record show-
ing the names and actual hours worked of all
workers employed by him in connection with the
said publie work, which record shall be open at all
reasonable hours to the inspection of the, Board of
Directors of the first party or its deputies or
agents, and to the Chief of the Division of Labor
Statistics and Law Enforcement of the Department
of Industrial Relations, his deputies or agents. The
said second party hereby agrees to forfeit as a
penalty to the said first party, ou’ of any moneys
becoming due to it from the said first party, under
the terms of this contract, the sum of Ten ($10.00)
Dollars for each laborer, workman or mechanic em-
ployed in the execution of this contract by said
second party, or by any subcontractor under said
second party, for each and every calendar day of
each week during which said laborer, workman’ or
mechanic is required or permitted to labor more
than thirty hours in violation of the provisions of
Section 653c-1 of the Penal Code of the State of
California, and that the said first party is hereby au-
thorized and directed through its proper represen-
tatives, to withhold and retain from the said second

Joint Highway District No. 13 177

party, or from the said subcontractors under it, all
sums and amounts which shall have been forfeited
pursuant to this stipulation, as the property of the
said first party, as provided for by Section 653c-1
of the Penal Code of the State of California, aud
any Act or Acts amendatory thereof; provided,
however, that no sum shall be so withheld, retained
or forfeited, except from the final payment, without
a full investigation by either the Division of Labor
Statistics and Law Enforcement of the State De-
partment of Industrial Relations or by said Board
of Diftctors.

18. That only materials and supplies substan-
tially produced in the United States shall be used.
In accordance with Chapter 226 of the Laws of
1933, only.such unmanufactured articles, materials
and suppligs as have been mined or produced in
the United States and only such manufactured
articles, materials and supplies as have been manu-
factured in the United States, substantially all from
articles, materials and supplies mined, produced or
manufactured, as the case may be, in the United
States shall be used in the performance of the con-
tract. If the contractor shall gail to comply with this
provision of the Laws of 1933, he shall not be
awarded any contract to which this act applies by
the first party for a peridd of three years from the
date of such violation.

19. That said Joint Highway District shal! not
im any way or manner be answerable or suffer loss,
damage, expense or liability for any loss or damage

SE ass Yate SES:

178 Siz Companies of California vs.

that may happen to said highway, highway tunnel,
the appurtenances thereof, or any part thereof, or
in, or about the same during its construction and
before acceptance, and the s9‘d second party shall
assume all liabilities of every kind or nature aris-
ing from said work, either by accident, negligence
or any cause whatever; and shall hold the first
party harmless from all liability of every kind and
nature arising from accident, negligence or any
cause whatever; save and except in the event of
damage to said tunnel, shaft or any other under-
ground structure comprising a portion of the work
to be performed under this contract, resulting from
an earthquake, the second party shall not be liable
for any expense necessary to restore such tunnel,
shaft or underground structure to a condition
equivalent to that which existed prior to the oceur-
rence of said earthquake, in excess of the sum of
Five Thousand ($5,000) Dollars; provided that the
second party shull be responsible for and shall re-
pair at its own cost and expense any such damage
not discovered and reported to the District Engi-
neer by the second party in writing within forty-
eight (48) hours after its occurrence; and provided
further, that such repair work directly due to earth-
quake action discovered and reported as herein
provided for in excess of Five Thousand ($5,000)
Dollars for each earthquake, will be paid for as
extra. work except for such portions thereof as:can
be fairly classified under appropriate items of the
contract, which portions shall be paid for “at the

Joint Highway District No. 13 179

unit prices hereinbefore set forth; that no payment
shall be made by the first party to the second party
for Joss of time or extra cost due to delays_result-
ing directly or indirectly from such cause. If com-
pletion of the whole work is delayed due to earth-
quake damage, an extension of time shall be granted
to the second party as set forth in section 4 of the
specifications.

The term ‘‘earthquake’’ as used herein shall be
limited to seismic disturbances recorded by recog-
nized observatories in Northern California which
have an intensity at the work of VII or more on
_ the Rossi-Forel seismic intensity scale, and for the
purposes of this proviso, any series of such seismic
disturbances occurring within any one twenty-four
(24) hour period shall be considered as a single
earthquake.

20. The following rules and reguiations adopted
by the Federal Emergency Administration of Pub-
lie Works, (hereinafter called the ‘“Administra-
tor’’) to carry out the purposes and control the
Administration of Title II of the National Indus-
trial Recovery Act, are required to be and form a
part, of all ‘the construction contracts on projects
to which a grant has been made under the terms of
said Act, and a grant having been made by the
United States under the terms of said Act to the
project for which this is the construction contract,
the same are hereby made a part hereof, binding on
all parties to this contract, to-wit:

OE A OAT RIE RD AAO LL ITED LOLOL RORY PRIMES. ts

ee Te

180 Siz Companies of California vs.

1. (a) Convict labor—No convict labor shall
be employed on the project, and no matefials
manufactured or produced by convict labor shall be
used on the project.

(b) Thirty-hour week.—Except in executive,

administrative, and supervisory positions, so far as
practicable and feasible in the judgment of the
Government Engineer, no individual directly em-
ployed on the project shall be permitted to work
more than 8 hours in any 1 day nor more than 30
hours in any one week:
Provided, That this clause shall be construed to
permit working time lost because of inclement
weather or unavoidable delays in any 1 week to be
made up in the succeeding 20 days.

2. Wages.—(a). All employees directly em-
ployed on this work shall be paid just and reason-
able wages which shall be compensation sufficient to
provide, for the hours of labor as limited, as stand-
ard of living in decency and comfort. Such, wages
shall in no evext be less than the minimum hourly
wage rates for skilled and unskilled labor pre-
scribed by the Administrator for the zone or zones
in which the work is to be done, viz:

Skilled labor, One and 10/100ths ($1.10) Dollars;

Unskilled labor, 45/100ths ($0.45) Dollars.

(b) In the ‘event that the prevailing hourly
rates prescribed under collective agreements or
understandings between organized labor and em-
ployers in effect on April 30, 1933, shall be above
the minimum rates specified above, such agreed

ete A OE Is SU NE, Oa I ee Ra oe

4

Joint Highway District No. 13 181

wage rates shall apply: Provided, That such agreed
wage rates shall be effective for the period of this
contract, but not to exceed 12 months from the date
of the contract.

(ce) The above designated minimum rates are
not to be used in discriminating against assistants,
helpers, apprentices, and serving laborers who
work and serve skilled journeymen mechanics and
who are not to be termed as ‘‘unskilled laborers.’’

(d) The provisions of this contract relating to
hours. and minimum wage rates for labor directly
employed on the“project shall for the purposes of
this contract, to the extent applicable, supersede
the terms of any code adopted under Title I of the
Act permitting longer hours or lower minimum
wage rates.

(e) All employees shall be paid in full not less
often than once each week and in lawful money of
the United States, unless otherwise permitted by
tue Government Engineer, in the full amount ac-
erued to each individual at the time of closing of
the pay roll, which shall be at the latest date prac-
ticable prior to the date-of payment, and there shall
be no deductions or rebates on account of goods pur-
chased, rent, or other obligations, but such obliga-

tions shall be subject to collection only by legal:

process: Provided, however, That this clause shall
not be construed to prohibit the making of deduc-
tions for premiums for compensation and medical
_ aid insurance, in such amounts as are authorized by
the laws of the State of California to be paid by
employees, in those cases ia which, after the mak-

ene ee rey Set Ota a een Tye Stee ak” ee a

182 Siz Companies of California vs.

ing of the deductions, the wage rates.will not be
lower than the minimum wage rates herein estab-
lished. “

(f) rs yeah vad aN Weis
: ep EO ina A Baa aS | De ye Fc BS Aaa

188 Siz Companies of California vs.

10. (a) Inspection of records.—The Adminis-
trator, through his authorized agents, shall have the

right to inspect all work as it progresses, and shall

have access to all pay rolls, records of personnel, in-
voices of materials, and avy and all other data rele-
vant to the performance of this contract. There
shall be submitted to the Administrator, through
his authorized agents, the names and addresses of
all personnel and such schedules of the cost fof
labor, costs and quantities of materials, and other
items, supported as to correctness by such evidence
as, and in such form as, the Administrator, through
his authorized agents, may require. The submission
and approval of said schedules, if required, shall be
a condition precedent to the making of any pay-
ment under the contract.

(b) There shal] be provided for the use of the
engineer inspector such reasonable facilities as he
may request. In casi of dispute the Government en-
gineer shall determine the reasonableness of the
request.

11. (a) Reports.—Every employer of labor on
the project shall report within 5 days after the
close of each calendar month, on forms to be fur-
nished by the United States Department of Labor,
the number of persons on their respective pay rolls
directly connected with the project, the aggregate
amounts of such pay rolls, and the man-hours work,
wage scales paid to the various classes of labor, and
the total expenditures for materials. Two copies of
each of such monthly reports are to be furnished to

Joint Highway District No. 13 189
the Government enginee:, and one copy of each to
the United States Department of Labor.

The contractor under any construction contract
shall also furnish to said Joint Highway District
No. 13 of the State of California, to the Govern-
ment. Engineer, and to the United States Depart-
ment of Labor the names and addresses of all sub-
contractors on the work at the earliest date prac-

(b) Copies, in triplicate, of all pay rolls for
work performed under this contract, whether done
by the contractor or under a subcontract or other-
wise, prepared on approved forms and certified
under oath by the contractor or his authorized rep-
resentative, shall be filed with the District Engi-
neer, within five (5) days after the close of \each
calendar month, showing the name of each em-
ployee, the State and county of his bona fide resi-
dence, the agency from which his name was ob-
tained, whether or not an ex-service man with de-
pendents, the class of work performed, the hours
worked each day, the ttal hours for each calendar
week, the total hours Yor the month, the wage rate
-paid, the total amount earned, deductions for board
and lodging, if any, and the net amount paid.

» The pay rolls shall be divided into three (3) sec- _
tions under which shall be appropriately grouped: _
» (1) Executive, administrative and supervisory
employees. )
» (2), Skilled labor.

» (3). Unskilled labor.
ay (th

*t

¥

190 _ Siz Companies of California vs.

Each of these classifications shall be grouped
separately and the totals for each group shown
under the following headings: hours per week,
hours for the month, amount earned, deductions
and net amount paid.

12. Signs.—Signs bearing the legend Public
Works Project No. 2231 shall be erected in appro-
priate places at the site of the project.

13. All reasonable rules and regulations which
the Public Works Administration may prescribe
toward the effectuation of the matters covered by
paragraphs 1 to 12, inclusive, shall be observed in
the performance of the work.

14. Subeontractors.—(a) Appropriate provisions
shall be inserted in all subcontracts relating to this
work to insure the fulfillment of all provisions of
this contract affecting such subcontractors, particu-
larly paragraphs 1 to 13, inclusive.

(b) No bid shall be received from any subcon-
tractor who has not signed U. S. Government Form
No. P. W. A. 61, revised (March, 1934).

15. Termination for breach.—In the event that
any of the provisions of subdivisions 1 to 14 inclu-
sive, of this paragraph 20 of this contract, are vio-
lated by the contractor under the construction con-
tract or by any subcontractor under any subcontract
on the work, said Joint Highway District No. 13 of
the State of California, may, subject to the ap-
proval of the Government Engineer, and upon re
quest of the Administrator, shall terminate the con-
tract by serving written notice upon the contractor
of its intention to terminate such contract, and, un-

Joint Highway District No. 13 191
_less within 10 days after the serving of such notice
such violation shall cease, the contract shall, upon
the expiration of said 10 days, cease and terminate.
In the event of any such termination said Joint
Highway District No. 13 of the State of California
may take over the work and prosecute the same to
completion or otherwise for the account and at the
expense of the contractor and/or such subcontrac-
tor, and the contractor and his sureties shall be
liable to said Joint Highway District No. 13 of the
State of California for any excess cost occasioned
said Joint Highway District in the event of any
‘such termination, and said Joint Highway District
may take possession of and utilize in completing
the work, such materials, appliances, and plant as
may be on the site of the work, and necessary there-
for. This clause shall not be construed to prevent
the termination for other causes provided in the
construction contract.

16. Definitions —The term ‘‘Act’’ as used herein
refers to the National Industrial Recovery Act. The
term ‘‘Government Engineer’’ as used herein shall
mean the State engineer (P. W. A.) or his duly
authorized representative, or any person designated
to perform his duties or functions under this agree-
ment by the Administrator. The term ‘‘engineer in-
spector’’ as used herein refers to State engineer
inspectors, resident and assistant resident engineer
. 4nspectors, and supervising engineers, appointed by
- the Administrator. The term ‘‘materials’’ as used
erein includes, in addition” to materials incorpo-
Paved in the project used or to be used in the opera-

192 Siz Companies of California vs.

tion thereof, equipment and other materials used
and/or consumed in the performance of the work.

21. The contractor shall comply with each ap-
proved code of fair competition to which he is sub-
ject, and if he is engaged in any trade or industry
for which there is no approved code of fair compe-
tition, then as to such trade or industry with an
agreement with the President under Section 4 (a)
of the National Industrial Recovery Act (Presi-
dent’s Reemployment Agreement), and the said
Joint Highway District No. 13 shall have the right
to cancel this contract for failure to comply with
this provision and may have the work called for by
this contract otherwise performed at the expense of
the contractor, and the contractor shall not accept
or purchase for the performance of this contract
or enter into any subcontracts for any articles, ma-
terials, or supplies in whole or in part produced or
furnished by any person who shall not have certi-
fied that he is complying with and will continue to
comply with each code of fair competition which
relates to such articles, materials, or supplies,
and/or in case there is no approved code for the
whole or any portion thereof then to that extent
with an agreement with the President as aforesaid.

22. Any person falsely certifying as to com-
pliance as aforesaid who submits any such pro-
posal, bid, contract, or subcontract, or accepts any
purchase order, may be pwnished as provided in
section 10 (a) of the National Industrial Recovery
Act, by a fine of not to exceed Five Hundred

($509.00) Dollars or imprisonment not to exceed

Joint Highway District No.13 , 193

six months, or both, and in event of any such false
certification by any such person, any contract, sub-
contract, or purchase order to which he is party
secured by or in furtherance of any such proposal
or bid may be canceled by the other party thereto,
and the unfinished portion thereof completed at the
expense of the person guilty of such false certifi-
eation and his sureties, if eny.

23. Whenever a-dispute shall arise between any
agercy of the said Joint Highway District No. 13,
and any bidder, contractor, supplier or other
person as to compliance with any code of fair com-
petition or with an agreement with the President
as aforesaid in connectionroken or shattered along or aear the line of dis-
* placement. But it shouk not collapse as a bridge
might whose piers were displaced, and it could be
soning nieensiag deg bis :. congernprerulee®
ee

is hn alien tO alnseivs es =

se ~ctenceieaaatia aia LLL LL LL LLL ALLO LLL LLL ALLL LIEN = ewe et
eT ee Sea es rete 9
‘ whew o_ pire «kcal tate

—— PO Se a

PEE OTT A AL RMS AS OID
a a ta a seams
ak has et fa

Pg ck eens

BROT RC BART POLINA TIE IES TE IE IS
ELE TARE ES BEIM EAL ANA OR ;
eee Spit gin NA Dr 3

+

222 Sie Companies (elevation 364.5 feet). The surface was
“swampy’’, water stood in the hole a few inches
below the surface, and for 33 feet down from the
surface was a body of soft wet clay carrying only
15 - 30% of small rock fragments and sand, and
yielding 70 - 85% of clay and mud. washings on
mechanical analysis; A 50-foot-high road fill was
planned to overlie this area. Such a load would
probably cause the soft clay to squeeze out, and
would give a slippery, soft, foundation for the em-
_ bankment. The conditions shown in holes\E and F._
on the next. higher berm are only a little. better.
In hole F water was struck at 4% feet add the
_ material encountered was watersoaked all the way
down (46 feet). There is a larger proportion of
rock fragments than in hole 8. [87]. .

Near and just below the “swamp” area toward
the southwest valley side, water seeps out and is
in part carried away from the fill surface in pipes.
It has the appearance of spring water, possibly —

*

228 Siz Companies of California vs.

coming from the bedrock in the vicinity. With the
idea of determining whether this water and the
‘‘swamp’’ water supply was entirely local and not
from the reservoir, holes E, F, on the 370 foot berm,
C at 382.7 elevation and G on the highest berm
(399 feet) were put down. These holes showed that
water passes through the whole dam continuously
to the ‘“‘swamp”’ area. The free water surface in
the holes was found, with reservoir water surface
at 415 - 420 feet elevation, to be as follows:

‘Elevation, Water
top of hole Surface
Hole 7, crest of dam 434.8 391.0

G 399.0 380.0
C 382.7 375.7
E ¢ 369.2 368.2
F 370.2 365.7

8 (swampy area) 374.5 364.0

If a fill should be placed along the downstream
slope of the dam, as originally proposed, it would
be desirable to remove the soft clay and provide
drainage for the water coming through the dam,
and for any spring water that may reach the sur-
face in the area involved. It is questionable whether
it would be safe to remove 33 feet of soft clay unless
the. reservoir and dam were first freed from most
of their water. Tt might start a movement or slough-
ing in that part of the dam that overlies the old
stream trench,

°

Joint Highway District No. 13 229

Conclusion. Surface examination and borings
have disclosed conditions that would require special
engineering treatment if a high road embankment
is to be placed diagonally across Temescal “dam.
Such treatment on the-one hand would incur expense
_ that would offset a considerable amount of straight
fill required if the dam is not used, and, on the other
hand, would involve risk of seriously damaging the
dam structure during construction of the embank-
ment, -I.therefore advised that the road be routed

-* below and clear of the main body ot of the lower

berm area of the dam.

Furthermore, I am of the opinion that with a
high water surface in the reservoir, and leaving the
dam just as it is, if a strong movement should recur
on the Hayward fault in such a way as to shear the
dam and subject it to the accompanying earthquake
shock, or possibly even without the direct shear if
a severe earthquake shock the dam, there would be
danger of its failure. I would advise, therefore,
that you arrange if possible for the maintenance
of a water level in the reservoir as low as feasible,
and that if the road crosses the valley, below the
dam, the highway fill be constructed on the theory
that it may possibly be\subject to the effeets of
failure of the dam.

The Railroad Crossing.
On the northeast side of the valley of Temescal

Creek the Savramento Northern Railroad runs par-
allel to the volley and must be crossed by the new

. ae ge

230 Siz Companies of California vs.

road. The railroad grade is here in an open cut
that lies between stations 50 and 52 and is about
23 feet deep along the center line of the proposed
road. Sheared serpentine outcrops on the west side
of the cut near the center line of the proposed road
grade. To the southeast the cut is in rhyolitic
detritus. This rhyolitic material occupies tle slope
up to and beyond the ald tunnel road. Where it is
in place, it shows general shearing. But most of
the material of the lower slope is slide, talus, and
wash from above. About 100 yards northwest of
the crossing of the Pacific Gas and Electric Com-
pany’s road over the railroad, serpentine comes in
on the east side of the cut rising to the northwest
until it extends upward about 35 feet above the
track. It continues along the cut to its northwest
end. On the lill slope above the cut a sheared
greenstone overlies the serpentine behind a concrete __
wall, and is overlain in turn by the rhyolitic mate- ©
rial, the contact between the latter two dropping
down to the southeast, so that only rhyolite is found
in the southeast portion of the cut. Several times
when examined, water was observed seeping into
the cut apparently from both sides, but chiefly
from the Northeast side, southeast of the end of the
concrete wall. Again on a small flat north of Sta-
tion 51 water seepage was observed. The railroad
engineers must have had some difficulty with sliding
or slumping in the cut, and protected it bra con-
crete wall, by continuous drainage ditches on both

Joint Highway District No. 18 231

sides of the cut, and a drain to a sewer with a per-
forated metal p.ate at surface te take off the water
which at times must be much more abundant than
when I observed it.

Any plan to make this crossing in the form of a
bridge or viaduct supported by piers- or columns,
would have to be carried out with great care and
special precautions in construction and in draining,
because of uncertain stability of the ground and
the likelihood that the sheared serpentine would
not withstand locally applied high stresses. One
plan suggested, that of placing the railroad within
an artifiicially constructed concrete ‘‘tunnel’’, on
which the highway fill will be placed, the tunnel
to be so constructed that the stress will be dis-
tributed throughout a monolithic floor, and not
locaHy concentrated, appears to me to be most suit-
able to the ground conditions. Not only would the
problem of satisfactory footings be solved, but the
fill would tend strongly to stabilize the sheared and
detrital material on the uphill side of the present
eut. In any case, I believe it would be well to take
appropriate measures to drain off the water that
AFT PUN ARA AOE IRS DORE aE She GR AE
the track.

Toward the creek from the lower end of the
railroad cut are evidences of an old landslide. A
number of large trees are growing on the slide
- material, and no noticeable action appears to have
taken place since the trees were planted. This
action may possibly have taken place at the time of

_

232 Siz Companies of California vs.

the 1868 earthquake, 62 years ago, and still show
the present tree growth. It may of course have been
still carlier. Evidence of similar action on a small
scale is found east of the railroad near the road
crossing. If a heavy earthquake follows a wet sea-
son during which the ground is well soaked it is
likely to start slides at a number of localities, as
was done by the earthquake of 1906. It is possible
that in the future a heavy earthquake under like
circumstances mighc cause slumping or sliding
in this vicinity, and also further along up to Station
60, especially if steep-sided cuts are made in the
rhyolitic talus and hill waste. Such an event is :
to be considered as a rare occurrence as it depends
on the concurrence of two unrelated factors one of
which recurs every. few years and the other at much
longer intervals. It might result in the slumping,
sliding or rolling from the upper slopes, of earth
and rock detritus onto the road. The chances are
very slight that the roadway itself would be carried
away. It may be noted here that along the Contra
Costa County extension of the old tunnel road, such
occurrences are not infrequent and take place after
practically every wet winter without requiring the
aid of any earth shock. While such action is pos-
sible along this part of the road, it may be expected
to be a very rare event.

From Temescal Creek Crossing
_.. to Tunnel Portal.
Between Stations 53+20 and 59+90 a cut is
planned. The material along this stretch is rhyo-

Joint Highway Distriet No. 13 233
litie hill waste and detritus. The excavation is to
remove up to forty feet or more of material and
may reach rhyolite in place. The bottom of the
cut will probably be entirely satisfactory for road-
way foundation. The hillside slope of the cut will
encroach on the old tunnel road which will have to
be set back by means of a lateral cut into the hill,
if it is to be retained as a road. If fairly firm rock
is not uncovered in the hillside slope of the cut for
the new road, this slope may be subject to slumping
or sliding after wet seasons.

After a short fill between Stations 59+90 and
606+40 the proposed grade crosses a spur in a cut
between Stations 60+40 and 62+50. This spur
shows outcrops of rather massive rhyolite and some
soil. The rhyolite is somewhat sheared with a cer-
tain amount of clay gouge in the fractures. The
eut will propably expose rock over much of its
course, and should be satisfactory for road founda-
tion.

Between Stations 62+50 and 65+85 the proposed
road crosses Temescal Creek on a fill. While on the

~, upstream part of the right bank there is a consider-

able amount of soil and hill wash, the downstream
part exposes rather massive though somewhat
sheared rhyolite. Throughout, underlying in part
hill wash and a thin covering of stream detritus
along the creek-way, in part exposed at the surface,
is rather firm rhyolite. The foundation for this fill
is entirely satisfactory, probably the best along the
whole road.

Pay ne ne Bab PS a RM oe Pay =

234 Siz Companies of California v8.

Between Stations 65+85 and 74+95 is a long
cut. The first 70 to 100 feet is in rhyolite as just
described and then passes into Chico shales and
sandstones. The contact is faulted and shows shear-
ing, but there is no indication that this is an active
fault or liable to any further displacements.

The surface depression roughly between Stations
67 and Station 69 is due to general erosion in the
Chico shales. These shales by their weathering
yield a elayey surface which becomes soft and slick
when wet. It is probable that the cut will remove
most if not all of such material from the surface
except along the deepest part of the depression.
This deepest part of the depression naturally
carries the bulk of the drainage from the higher
slopes. Not much water is involved but in the past it
has greatly softened the ground, and given rise to a
spring and swampy spots. Care should be taken
to handle the water and prevent a slick sliding-
surface developing under the fill. The waste from
this cut if used for fill on the creekward slope,
should be placed where it will cause no trouble
from its prepensity to soften when water-soaked.

Beyond approximately Station 69 the formation
carries ernsiderable sandstone with only subordinate
shale, to about Station 70, then more shale to about
Station 71, then more sandstone again. This sand-
stone is light brownish to grayish when fresh, and
while usually not a hard rock, should on the deep
eut make a good foundation and on moderate slopes

Joint Highway District No. 13 235

hold up well. There is some shearing in the rock.
Most of the better developed fractures and shear
planes dip back obliquely into the hill and would
eause no practical trouble. Between Stations 74+75
and 76+10 the road grade is to be partly on fill
and partly in cut. The fo ion between Stations
74+75 and 75+55 is chiefly shale, beyond this, to
Station 77 is a mixture of sandstone and shale,
more Ofpless broken up. With a considerable pro-

. portion of sandstone fragments and blocks in asso-

ciation with the shale, the clayey products of the
shale weathering will act as a binder and allow
satisfactory consolidation of the ffil, and will cause
‘no trouble if\the clay is not too abundant and, then,
not unless it’becomes water-soaked. Insofar as the
hill slope is steep, any part of the grade which in
the same cross section is partly. on eut and partly
on fill may suffer from a settling or sagging of the
fill with respect to the rock in the cut. Where the
fill is chiefly sandstone or even sandy detritus from
the sandstone, if its base is well founded, such action
will not take place. Shale or clayey fill ought not
to be based on the steep slope.

A test cut above Station 76+10 shows more shale
than sandstone. If this is the prevailing condition
in the slope of the road when made, it may be de-
sirable to reduce the ‘slope to a lowex angle.

Between Stations 76+10 and 794-76 the roadway
is to be placed on a fill across a branch of Temescal
Creek. It lies between two spurs of dominantly
Sandstone formation. The only special point to

.

a a a es ”

236 Siz Companies of California vs.

which attention may be called is that along the
tributary streamway and for some distance up the
right bank on the hillside to about Station 78+80
there is a considerable amount of clayey material.
Fortunately it is on a rather flat slope, and does
not appear to be so located as to be subject to water
soaking if covered by a fill.

Between Stations 79+70 and 82+40 the proposed
road. is again in a cut, the rock is chiefly a mod-
erately firm sandstone with subordinate shale. Con-
ditions in general are satisfactory. Beyond Station
- 81+50 the road will be partly in cut and partly on
fill and the same statement applies as was made for
the stretch between Stations 74+75 and 76+10.

A reef of stronger sandstone crossds the cre¢k
hetween Stations 83+50 and 85+10. Although it
has suffered shearing, it is excellent Magan for
eut or fill.

Between Stations’ 82+40 and 87+50 the sian
road again crosses Temescal Creek on a fill. Con-
ditions appear to be entirely satisfactory.

The cut from Station 87+50 to Station 89 exposes
shale and sandstone badly broken up. It stands well
on a steep slope when dry. If strongly water soaked,
as after a heavy winter, it would probably show
some slumping. The cut is not high, and the effect
on the road would not be serious. The present fill
taken directly from the cut, shows some settling
and development of cracks. It is probablérthat the
clay shale when originally excavated was more or

Joint Highway District Nu 13 237

less wet from the winter rains and shows the result
of drying and settling. If thoroughly settled and
rolled and protected from water-soaking it should
stand satisfactorily. —

Between Stations 89+00 and 90+50 a fill is placed
across a small natural drainage way. The fill about
30 feet high will probably be made up chiefly of a
mixture of sandstone and shale detritus with asso-
ciated clayey material. Reasonable protection from
water soaking will render it entirely satisfactory.
The underlying rock is shale. ~

Between Stations 90+50 and 93+50 is a cut in
rather badly broken sandstone and shale. Sand-
stone is dominant in the central part of the cut,
with shale dominant towards the ends. Some fresh,
hard, gray rock is found in base of cut. This cut
has a kigher side slope than the one between Sta-

tions 87+50 and 89, but will stand better, because
* of the sandstone in the higher part of the cut slope.
A fill over a small tributary lies between Stations
93+50. and 95+50. The statement made for fill be-
tween Stations 89+00 and 90+50 applies to this fill.
In the cut between Stations 95+50 arid 96+75, the
_eentral portion is occupied by a hard sandstone
reef. Softer sandstone and shale is found towards
both ends of the cut. The high slope of eut is satis-
factory and stable, and the material excavated makes
a firm and stabie fill, :
Upstream from this cut, sandstone is exposed
~about Station 97+-50 to 98+00, but beyond this-the

238 Siz Companies of California vs.

bedrock appears te be dominant'y shale. It is poorly
exposed. $

A long fill is proposed from Station 96+75 to |
Station 106+50. It practically occupies the bottom
of the creek valley. The grade of the original floor
is not high, and the side slopes are moderate. Rock
is only occasionally and poorly exposed, and is |
apparently chiefly Chico shale with subordinate thin
sandstone layers. There is a general development
of clay especially in the soil. Between Stations 98.
and 100. a tributary comes in from the north, and
between Stations 103. and 105. is a low sloped coun-
try which will normally feed water into the clay and
fill in wet seasons. The lowness of this part of the
fill and its stable position in the valley bottom, make
such conditions

Joint Highway District No. 13 2AT

action and air slacking. In the Lafayette and Clare-
mont Tunnels where water (a comparatively small
amount) came down through sheared clays or clayey
sands, a locally weak zone was produced that made
weight on the timbers, or slowly pushed them in
laterally. Such zones required special support. If
such zones occur along the proposed tunnel line they
are likely to be narrow, and not very serious.

In the flood that occurred in the east portal region
of the Claremont tunnel (flood water coming in from
San Pablo creek), the water filled the tunnel and
stood against walls and roof as well as floor. Por-
tions of the roof slumped down, causing consider-
able chambers-that ran 20 or 30 feet above the tun-
nel roof line. A number of timbers slipped in later-
ally, and in places timber sets collapsed before the
water was all pumped out. I mention this to illus-
trate the effect of water lying against an exposed
surface of the formation.

Along the proposed tunnel line conditions are very
good from this standpoint, as no important source
of underground water exists upgrade from the
Orinda beds. It should be easy to prevent the water
from the cherts working up into the Orinda region.
During construction and later, the tunnel bore
through the Orinda beds should be protected from
possible influx of water from the surface drainage
near the junction of the Tunnel Road and tae Fish
A aay (called on map, Claremont Avenue

tension).

248 ~§ # # #$Six Companies of California vs.

As naturally exposed at the ground surface, the
Qrinda formation slacks down into soil and gives
very few rock exposures. It is also subject to land-
sliding. Such a slide has taken place just below the
chert contact and about 100 feet north of Station
134. Its movement has been northward away from
the tunnel line. Another lies 50 - 100 feet south of
Station 136 and has moved eastward. These are
somewhat off the tunnel line, are superficial and
have affected the ground for a depth of but 15 - 30
feet where the tunnel lies 200 or more feet below
the surface. Landsliding in this formation does not
take place when it is dry and normally occurs fol-
lowing a rainy season, especially one of above the
average precipitation. As the slope of the ground
is fairly seep near the ea~* ~ortal, and as it may be
steepened and otherwise disturbed during tunndl
operations, the possibility of the sliding or slump-
ing of this formation in the portal region should be
kept in mind and guarded against.

Support. I believe that in general this formation
will stand well if reasonable care is taken in han-
dling it, except near the east portal where the over-
burden is comparatively slight, and the surface
influence may have weakened or may in the future
weaken the material sufficiently to require artificial
support.

Oil and Gas. As noted above, under the Mon- ©
terey Cherts, it is possible that some showings of
oil and gas derived from the cherts may be encoun-
tered in driving through the Orinda formation.

Joint Highway District No. 13 249
Their occurrence in this formation is so irregular
that their presence cannot be definitely predicted,
but it would be well in driving the tunnel to watch
for them and, in case their presence is noted, and
they can be easily recognized in this formation, use
care in blasting and have no open lights or flames.
See further the.statement under Monterey Cherts.

Tunnel Earthquake Relations.

As far as we have any definite evidence concern-
ing the faults that cut the proposed tunnel line,
their movements were connected with a period of
geological activity that is past. There is no field
evidence, or evidence from history or from our seis-
mographs that any movements have taken place
along these faults in receni times. While the evic -
ence is wholly negative, I believe that it is reason-
ably safe to assume that no fault will by its move-
ment cut or directly deform any structure that may
be placed in the belt under consideration. That
future movements will take place farther west near
the base of the hills is probable, and it is also likely
that the tunnel formations will be shaken by future
earthquakes. The rocks should, however, stand sat-
isfactorily even in the face of a severe shaking up
by an earthquake, any weak near-surface stretches
in the region of the portals possibly excepted. —

Tunnel in General.

~ Im a general way the rocks and rock structures
that would be encountered in the proposed tunnel

sabi

250 Siz Companies of California vs.

are favorcble from the engineering standpoint. The
strata mostly dip at high angles and are intersected
by the tunnel at a high angle to their trend. Such
a condition restricts the widths of belts that may
show local weakness or much water, and presents
the strongest arrangement of the type of strata
involved, and the easiest to dea] with in tunneling.

Throughout the main belt of cherts, the rocks may
be expected to be entirely self-supporting , indefi-
nitely ; in the fault belt of cherts and im the Orindan,
-with proper care in driving and handling, the rocks
should stand well and be self-supporting except pos-
sibly along certain shear zones which may require
local reenforcement to withstand local pressure (not
general weight). These statements do not refer to
any measures that may appropriately be taken to
prevent the detachment or tfalling of fragments or
blocks from the surfaces exposed by the tunnel, but
to general support of the mass of rock in the sides
and roof of the tunnel.

Near the portals the rocks will probably be found
weak and will require positive support to prevent
movement or caving.

The question has been raised as to the relative
desirability of a single larger tunnel or two smaller
ones. The relative advantages in operation of the .
finished tunnel or tunnels are outside the scope of
this report. The geological aspect is related to con-
struction and to the maintenance of the integrity of
the fiffished structure. I do not know of any geo-
logical considerations that would indicate that the

ne,

Joint Highway District No,13 251

smaller tunnels are feasible and a larger one not.
It is certain that in cases where support is necessary
or resistance to any possible earth pressure must be
provided, the forces or stresses involved will be
much greater with a larger tunnel and the problem
of handling such conditions to that extent more seri-
ous. I have at present no reason to say that the
larger tunnel would be impossible or that it would
constitute a risk that should not be taken.

From the East Portal of Tunnel
to Station 156+50.

From the east portal of the proposed tunnel ‘to
the end of the surveyed line Station 156+50, the
formations involved are the Orinda, as described in
the section on the tunnel, with comparatively thin
layers of alluvium along and near the creek lines,
and soil and hill waste on the slopes. The plan for
the highway is shown on a blueprint of Joint High-
way District No. 13 entitled Right of Way thru
Apartment Estates Club of America Incorporated
Property, and dated Sept. 1931. _

From Station 140+50 to about Station 147 the
roadway will be sunk into the ground, in part cov-
ered over (Station 140+50 and Station 142+19), in
part open above (Sta. 142+19 to Sta. 147). The
upper part of the cut will be in hill waste, soil and
alluvium, the lower, at least along some of the dis-
tance, in the Orinda formation. No special problem
arises as the result of the geological conditions. Any
- covering will have to be supported, and the side
walls will have to receivé such thrust as is occa-

252 Six Companies of California vs.

sioned by the seasonal wetting of the clayey ground.
Only comparatively smail stresse.: are involved.
From Station 147 to Station 156+50 the road is’
to be largely on fill with short stretches of cut on
' right or left. If the fill material is taken from the
tunnel it will contain a considerable amount of clay
in its make-up, becoming quite soft when water-
soaked. As the fill will be in the bottom of the valley
it cannot be subject-to any important sliding, and
as its side slopes are at a maximum only 10 or 12
feet high no serious slumping is to be expected.
The cuts made into the hillside affect but a small
distance along the road: The Claremont Avenue
Extension southeast lane between Stations 144+00
and 148+50, and the main road from Stations 154+
00 to Stations 156+50. Insofar as these slopes may
be in clay, they may slump onto the road after a
wet winter, but they are not high and the effects will
probably not be scrious. Between Stations 149+50 LG
and 154+00 the old tunnel road grade protects the
new road from any slumping from the hillside on
the east side. .The only place where some recent
slide movement was noted-is between Stations 149+
50 and 151+50 along this east side stretch. om
Respectfully submitted, (
(Signed) GEORGE D. LOUDERBACK,
| Consulting Geologist.

[Endorsement]: U. 8. Dist. Ct. N. D. Cal. No.
20101-R. Pitff’s Ex. No. 22. Filed April 13, 1938.
Walter B. Maling, Clerk. By J. A. Schaertzgr,
Deputy Clerk. 7 |

— — 8A

Joint Highway District No. 13 281
PLAINTIFF’S EXHIBIT NO. 62

February 9th, 1935.
District Engineer,

Inclosed find prints giving general idea of the

method we propose using in concreting tunnels,
Very truly yours,
SIX COMPANIES OF
CALIFORNIA.
By T. M. PRICE,
Project Manager.

TMP :k ,
Copy RB

[Endorsed]: U. S. Dist. Ct. N. D. Cal. No.
20101-R. Deft’s Ex. No. 62. Filed April 29, 1938.
' Walter B. Maling, eek, By J. A. Schaertzer,
Deputy Clerk.

q
By

Joint Highway District No. 13 313
PLAINTIFF’S EXHIBIT NO. 92 _

INDUSTRIAL ACCIDENT COMMISSION
Ni State Building
San Francisco
April 16, 1936
Six Companies of California,
1522 Latham Square Bldg.,
Oakland, California

Gentlemen:

You are hereby advised that the order of this
Commission covering the Broadway Low Level
Tunnels, dated February 29, 1936, is hereby re-
scinded, if the following conditions are complied
with:

1. Driving may be continued in the upgrade tun-
nel beyond the junction of the wall plate drifts to
the East portal and driving may be resumed in the
downgrade tunnel beyond the caved-in portion to
the East portal, if a method is followed as presented
by your drawing No. 119, dated April 10, 1936,
which consists in general of installing 8 x 10 timber
spreaders in each timber set and extending across
the tunnel approximately 19 and 27 feet respectively
above *%e finished floor of the tunnel; further by
continuing to use excavation, equipment which may
be operated beneath the lower spreader without
- interfering with it.

o~y

:
S|
|
4
:
|
4
%

$14 Six Companies of California vs.

The top spreader is to be installed immediately
after the completion of the segment set. The lower
spreader is to be installed immediately after the
core is excavated sufficiently to allow this spreader
to be installed. Two longitudinal timbers, 2 x 12”,
are to be spiked to the top of each lower spreader
to prevent bowing.

Two sets of hangers, two to each set, are to be
provided for both the bottom and top spreaders all
as per detailed drawing No. 119.

2. A wall }late system for driving the tunnel
will be permitted provided 12 x 12 plumb posts are
installed under each segment set, tightly wedged in
place. Batter pos ; may be used provided in plumb
posts are installed immediately after excavation is
done for such posts. The batter shall not exceed 6
to 15 from the vertical.

Dowels shall be installed in each A segment and
wall plate. (The dowel system will be accepted in
lieu of placing the spreader at the wall plate joint.)

The plates shall be blocked behind each segment
set and shall set on a firm and even bearing.

Provision must be made against undermining
the wall plates by the Bagley system of excavation,
and also against overshooting the side walls directly
under the wall plates.

3. In addition to the Fire Bosses keeping the
record of overbreaks as outlined under the Commis-
. sion’s order of March 16, 1936, the Fire Bosses shall
check the segment sets daily to determine if the

Joint Highway District No. 13 315

wall plates have settled, thereby loosening the wedg-
ing and packing of the segments.

The contractor shall also make a daily check of
the segment sets to determine if the wedging and
packing is tight.

If the segments are found to have become loose
rewedging shall be done.

4. The core of the tunnel section shall continue
to be sloped sufficiently to provide safety against
caving ground to the workmen drilling lifters or
similar holes.

Very truly yours,
(Signed) T. A. REARDON
Commissioner
(Signed) FRANK J. BURKE
Deputy Commissioner.

[Endorsed]: U. 8S. Dist. Ct. N. D. Cal. No.
20101-R. Plff’s Ex. No. 92. Filed May 5, 1938.
Walter B. Maling, Clerk. By J. A. Schaertzer,
Deputy Clerk. [160]

s “~

( Joint Highway District No. 13

pa

NERS Oe PE ep PUR OTL SAO,

00'0#9'S 00489 00°02 oo'ges'T
GL'TS0'82 00'022'9 GL Z2g'sT 00°60¢'T
00'0ST Pr'st 98°H0T 00°08
00°098'S G6LEST 8 =—«-sSOTLAGT. 00°92
00°00#'8 OLLes't 08 FEST OF LL2
00'088'98 sorsror ss'tgst. 00°598'8
00'0z9'8 ST'S8s Go'9PT'S 00°88
00'9%9'ET SGI _, £69098 00'S29'2
00'090'L22 OO TS9‘TE=" - 06'0F0'L6 OS" LLE*SE
goosz'zz«—««00'969°S 00°6S‘ZT 00°S00%.
09'006'86T. OF LZL'8S 00 0ZE FIT 09°292'Ss
0007S L. 00°9L0'T 00'089'8 00'res'%
00°000°99 00°20¢'s 00°86T 00°00S‘09
00°009"0b 0001602 =: 000828 00'S TT
00°006'82Z $ Oszgo'esIs OgEzr'zs $ OOVEV'ES $
(tt) (1)
jel omens 410 syeqser s0q?T
\ \ VAILSa nites

a : f ¥ we | #4 Se A, tale hy as
Vv LIGInx® S.INVC

my ‘MOWTATPGUS Yougy 407
soquy] (1) Supmoyg Pur “AOM JO SOReEID 10 SOATHORAS Tedjouyzg 070} PePLATPANS

Pe | bugs sas Si a 37 welt)
4 aka inp cesta is) 2S GR aad Pra PERSSE GY

F 4 Trin Neg Ze Eobie alee NS 3
. SE 'S9S HR e ot EEE toga Pig ee ee SOL TESS Bose ‘ - é ‘i Be wi ‘ 2
Fla i ‘a pisiiliebiaeeiaa SRNR NEF RIM MGT a ES oR eae

| SST Co SS OED eaNdeg: ‘somsouyoy “y -
To ‘A 19" M “BEET ‘ST Indy peng y 18 00009 . 00912 ‘8q] 000°9%
> 00002 00°268'T =e 00'808 ‘spd "nd Ogg
. 8 00°082'T 00°299 00°8¢S 00°06. ‘SU OFO
Z~ 00'090'8 00°9IT'T 00°9L6% 00°896'E ‘ “Atl O0F'SI
: 00°060F bLLOVZ = 9B 'ONE'T 00°2L2 :
00'S2I's 00'F66‘T 00°SL0'S 00'9¢
(Ht) (1) |
% j a3 5 a i a sae Bau *
- (penuyu0D) ¥ LIGIHXa §.LNVONGAaa rian 2s Cee
| |
;: |

Joint Highway District No. 13 337
DEFENDANT’S EXHIBIT D

PRELIMINARY REPORT ON THE GEOLOGY
| OF THE CLAREMONT TUNNEL |

’ Introduction
The following report has been designed with’a

| view towards forecasting in so far as possible the .

nature of the rocks and rock conditions which will

be encountered in driving the Claremont Tunnel.

Scientific details are lar 2ly omitted except where
| they have a direct bearing on the engineering prob-
| lems involved. Special emphasis is placed on the
“nature, hardness, and “standing ability”’ of the
} tocks which will be encountered; on the thickness
bf the various types of rocks along the line of the
| tunnel ; on the location of faults of consequence; and
_6n the possibility of encounteriyg water and’ gas.
The data presented herein is based on field work
ied out by the writer during April, 1926, Field
rvations were chert peor ha mgt fol-

wr

HG Es ~

Seri eee ©

“Tion. Needless to say, imperfect ‘surface exposures
fof the rocks make certain errors inevitable. Limits
I: “ f error will, where possible,’ be indicated at: —_
D eee

- 2 es
ms = . ‘ aS
o Fg tay? s Ue a | is By. eg tn, | Se at, SR

{interpretation rather than to’ inaccurate loca- |

— ,

URE i= Ee Re Bh tet UN” A AI APES

338 Six Companies of California vs.
GEOLOGY OF THE CLAREMONT TUNNEL
Sta, 0-to 66:
v Thickness 6600 feet. . -Orindan desaetiens Com-
posed predominantly of loosely , cementéd gravels —
and sandstones, and some shales. These rocks are 3
part of the same group as ‘now éxposed in the west —
heading (first 1100 feet) of the Lafayette tunnel,
and may.reasonably be expected to show the same
characteristics. | The relative abundance of~gravels, —
sandstones and: shales will approximate the propor- ~
tions of these rocks shown in the Lafayette tunnel, ©
though a slight increase in the proportion of gravels
may be expected to the westward. ~
These’ recks should. break and muck easily. Occa-
sional slabs will break along the bedding planes, but
with reasonable care such oversize breakage should
be occasional: only. - |
For. the first 1000 feet: the rocks: eiinthacaataiad
te be rather badly. broken-due!to the thin back; the —
cover being in.general:less than 100 feet through —
this distance, averaging About: 50 feet. PROBABLY —
-MORE'OR LESS TIMBER WILL BE RE- :
QUIRED HERE. Beyond: Sta. 10, however, and
especially beyond Sta. 19, the back rapidly thickens, —
so: that: the solidity. ofthe rocks and HENCE —
THEIR STANDING ABILITY. aHOLED CON- |
SEQUENTLY INCREASE.) or. :
Sis uiachblasistict tatdhhenkAcbecmeiniieed ;
between Sta. 0 and 66, though some seepages will —
undoubtedly be met .with. 3 é

og

doing Highway District N-.. 13 339

) Minor, faults «may ‘occur: within this zone but
should cause no: difficulties. No surface evidence
exists to suggest the presence of any pronounced

faults cutting this part of the. tunnel, except
possibly in the vicinity of Sta..23...Due to a thick
cover of brush and poor exposures, the Surface
-evidence-at this place is not conclusive}...
~The Orindan formation, is folded into:an anticline
(arch), the crest of which oceurs between Sta, 42
and 50. (See section.). Due.to. variable thickness
of the formation, the base of the Orindan. cannot be
definitely. determined here, so.that .a possibility
“ exists for encountering older underlying, rocks .be-
“tween the above mentioned stations, The.nature of
these cannot be forecast. The writer is of the opinion
however that the. base of the Orindan. will not be
‘penetrated, the tunnel remaining entirely.. within
J yp formation.
a i: he lesation, ofthe western; limit. of, the-Orindan
: (Gta, 98 is probably accurate within plus oF mina
Bla 66 to 58+50
_'"Phickness 2250 feet. - Composed’ slsciblly
ie ‘of lava flows with some interbedded fragmental vol-
tanic ‘material (tiffs and egglomerates) and eb a
“ona lavas ‘(chiefly andesites) consist od Hits
y ch are both hard and tough. Perey ite
‘Setween ‘Sta. 66 and 88 will ‘be of this nature
THESE ROCKS ‘WILL PROSRELY ‘STAND

Saw Siz Companies of California vs.
WITH A MINIMUM OF SUPPORT, BUT
DUE TO JOINTING MAY’ TEND TO BREAK
‘Intereolated with the lavas, a certain amount of
position of such layers cannot be accurately’ pre-
dicted, Such material, if encountered, may be only
slightly softer than the lavas themselves, due
to the contained lava fragments.

A gravel horizon occurs interbedded with the lava
flows. The gravels are entirely similar to the gravels
present in the Orindan formation. Approximately
200 feet of gravels should be encountered (about
Sta: 68 to 70) after the first 200 feet of lavas have
of gravels encountered may be modified by faulting.
The same gravel horizon, probably not over 100 feet :
thick, should again be encountered about 150 feet
from the’ western edge of the lavas (Sta. 86 to.87).
baat ig athe Nidan maleate os:
ness here cannot. be determined exactly. 34
: a i ig ag Seay gy ep
should be encountered at about Sta..68.. This fault
cannot be located..on the surface closer than about
200, feet; nor can its dip be accurately determined,
other than that it is steep to the east. In conse-
quence the indicated antersection with the tunnel .
may, be in error by several hundred feet. The inter-
section was obtained using a strike,of N..12 E., and
a.dip,of 80 degrees.east for the fault, 7

Joint Highway District No. 18 341

_(‘bundant water ia; be expected from the lavas
between Sta. 66 and 88. This question will be dis-
eussed later under the heading ‘‘Water Problems’’.
The western limit of the lavas, Sta. 88 plus 50,
is located with a probable accuracy of about 100

feet.

Sta. 88-+50 to 108.
Thickness 1850 feet. Orindan formation. ‘The
same group of rocks as oceur between Sta. 0 and
6. THE CONDITIONS HERE SHOULD BE
E SIMILAR EXCEPT: THAT THE
‘ROCKS ARE PROBABLY MORE PREDOMI-
NANTLY LOOSELY CEMENTED GRAVELS.
LITTLE TIMBER SHOULD BE § RE-
QUIRED SINCE THE ROCKS SHOULD
waa No great amount of water should

| x 108-118.

_, Thickness 1000 feet Claremont cherts. Consist
t thin layers (one to three inches) of hard but
e cherts, interbedded with thin (4 to %

: a ee ee

oa layers of shale. A few beds of sandstone

&

342 —=«-_ Siz Companies'of Californiavs.
The cherts are bounded on the west (Sta. 108)

by a major fault line. ihe fault. is located. with «:
_ probable accuracy of 50 feet. :

Sta. 118 to 171+50.

Thickness 5350 feet. Chico canaiibenia’ Compara-
tively soft compact massive sandstone, with only
occasional thin beds of shale and gravelly sand,
These sandstones should drill; break and muck
éasily. Whey should contain comparatively little
water, though occasional seepages may oecur, Where
dry these’ rocks should stand well and require little
support. Due to the massive nature of the beds,
slabbing should be infrequent. Altogether this group
of rocks would seem ideal for tunneling purposes,
The western boundary of the Chico sandstones
is a prominent vertical fault. Under ordinary con-
ditions this fault could be accurately located on the
surface. Unfortunately the surface chere is 4
closely built up section of Claremont, and in con-
sequence of the houses, gardens, and other surface
improvements, the position of the fault may be in
error by as “much as 200 feet. ,

Sta. 171+50.to 180-+60 (Portal).

Thickness 910 feet. Largely if not ontiniie, silica
carbonate rock. This rock when fresh is of moder-
ERS.EASILY AND. MAY BE-MORE OR: LESS
_ SOPTENED,. DECOMPOSED AND BROKEN
UP.

Joint Highway District No. 13 343
Silica-carbonate rock is well exposed between Sta.
181 and 184, but no exposures oecur between Sta.
171+50 and 181, due to surface improvements,
houses, gardens, etc. Silica carbonate rock may
occur through this interval, or its place may be
taken by Franciscan sandstone, a moderately hard,
tough rock where solid and fresh, but inelined to
be rather“highly sheared and fractured near the
surface. ERING WILL PROBABLY BE™
REQUIRED THROUGH PART OF THIS Dis-
TANCE SINCE THE BACK IS NOT GREAT.

Gas Problems.
Eirough two portions of the tunnel all precau-
tions should be taken to, gnard: against: gas.

Sta. 108 to 118.

The Claremont cherts between these stations be-
longs to the formation which is the source of much
of the oil in California. The cherte of. this belt,
even on the surface, have an appreciable bituminous
odor. While the structure here is not favorable for
‘the sccumulation of great quantities of gas, it
is practically certain that some gas will be en-
=

It will be recalled tad tha ledaen Wha’ ob
curred in the San Pablo-Wildcat tunnel of the East
oj Water Company a few years. back et

od4 Siz Companies of California vs.
Sta. 42 to 50. tis Higay's

\ilbiailin Ati iae Ss raaieliaRe bea neal
the Orindan formation, are not in themselves a
source of gas. But. the structure of these rocks be
tween the stations indicated is favorable for the.
accumulation of gas in quantity. The tunnel cer
tainly passes closé to the base of the Orindan, if it
does not actually penetrate it. The rocks beneath
the Orindan (nature not determinate but possibly
the Claremont cherts) may be looked upon as
potential source of gas. If conditions are such that
gas does occur as high up as the tunnel, it might
well occur in quantity, while the occurrence of. gas
here is purely a hypothetical condition, it is a pos-
sibility which should certainly be guarded against,

Water Problems

Sta. 66 to 88450.
Water in quantity need not be expected except
between Sta. 66 and 88. The lavas, the predominant
rocks between these stations, are prone to be tra-
versed by numerous fractures, the result of folding
and also shrinkage on cooling. The rocks therefore
tend to contain numerous open waterways. The
interbedded fragmental volcanic material likewise
tends to be porous. 3
The structure between Sta. 66 and 88, that of &
syneline or basin, is decidedly favorable for the
aecumulation of water, diverting all the surface
drainage of the area underlain by the lavas te :
the trough of the fold.

Joint Hightoay District No. 13 945

It may be pointed out that the wells of the East
Bay Water Gompany in upper’ Wildcat Canyon,
also the numerous’ springs Which occur on the
“east slope of the range (Sta. 50 to 60) derive their
age tl i sit is yo
Ievas which may, be expected in the tunnel may be
‘expected to have ‘some effect on the ultimate pro-
ducing capacity of these springs and wells.
* Water derived from these lavas in the tunnel may
be expected to be quite, free, from surface pollu-
tion, and might well be added to the water supply
of the Utility District.

| Faults ° -
© Three important faults will be intersected by the
~The tunnel will cut Pinole fault at Sta. 68 (pos-
sible error of location 200, fest). The movement on
this fault, which dips steeply to the east, has been
uch that the cist side ‘hat moved tip and south
“with respect to the west sidé.
~ The tunnel will cut, the Wildeat ‘falit;” whitch
‘@gain appears to dip’ steeply to fhe -¢ast;*at about
‘Bta/ 108, This. location is. probably aecurate to: 50
> salve east side of the fault appears to be the

I sero vih ct taise gene, online
“Vertical fault at about Sta. 171+50..The possible
“@rror of location of this fault may be.as much as
200 feet, The direction of movement on this fault is

ane ©

Pe oe

bh
7

ON eR nk tn Ene:

ance

ee an

fared Tie Ne FOES RRL Fe POR ey Be Reet Be AE age ET

346 —«- Siz Companies of Californias.
iSummary of Geology: of Claremont Tunnel. 4

(oe SF heat ey | Thtckmees ral. (seme fain ¥4 ; i2
0. 6, -v 1p) 6600, , Gravels, sandstones and shales |

“thas iallctde A a Seah

btteied

I ee
Baws

Meng oh

ie ae e 6 tah
Ai ian th Sgt shi

88-450 - 108 1950 Gravel, Orindan formation.
108 Sins) 1000' “Claremont cherts.
118 me Wildcat ¢ (ft Ate |
118 — 171+-50 5850 . Chico standstone. “

| Bd * (Bignsd). CHARLTON D HULIN,
‘University of California,

‘> Berkeley, Calif... twa Wie aeih kT oe
“[Bndoreed): 0. 8. Dist’ Of ND. Cal No
20101-R. . Deft’s: Bx. No. -D. Filed April 20, 1998

at

+ engea tT sEre tre veer Sga8
Eat h NE fe | iti 3429 fx

Diiiversity of California,’ piesa ee

Berkeley, Cal. Sas

My dear Professor—In the following summary of
! itions and methods used in meeting them, in
excavation of the Claremont tunnel, I have en-
deavored to give Station numbers where I had such
. in my possession; otherwise set numbers. *
It has appeared to me to be better for me to
follow the order of progress rather than that of
ioni although that involves working against
the station numbering.

“We encountered a small. amount of water after
"penetrating about twenty feet from the west portal,
but the ground was firm enough to avoid spile driy-
Baap pial

350 Siz Companies of California vs.

tended for approximately one hundred sixty-five
feet. There was some clay in the sand and gravel
convent; but the standing condition was favored by
an overlying strata of almost pure clay that almost |
followed to line of top of cap. _

When we passed thru this, we encountered about
twenty feet of a rather easy breaking reddish rock -
that required light blasting, but offered no unusual
difficulties.

The contact beyond.this formation was a sort of
‘‘gumbo”’ that mined easily and stood well for a
short period, when swelling began and it was nec-
essary to relieve pressures wherever possible to,
prevent breaking of the timber. In some cases this
corrective was not sufficient, and retimbering had to
be done intermittantly for about eighty or a hun-
dred feet. This heavy, constant pressure gradually
lessened as we proceeded with our excavation. bt to

station 164, plus 00.

At that point we encountered better standing
ground, that offered no unusual difficulties. Slight
quantities of water was encountered at intervals up
to about station 160, where the shale began to show
the presence of,gas in small quantities. The gas in-
creased slightly as we proceeded forward, being
most noticeable where the shale formation was
broken with aoft sandstone carrying a small quan-
tity of water. >

‘The shale worked easily and stood well for ra
short period, giving us time to erect six foot sets
after mucking out, the spiling v was s placed immedi:
ately after’ —

Joint Highway District No. 18 351

At set 636 a run of small particles of compara-
tively clean sandstone, foreed out by a quantity of
water sufficient to flood the tunnel to a depth of a
foot for a distance of several hundred feet occurred
at the end of the spiling just as preparations were
being made to erect the set. About three hours there-
after there was a gas explosion that injured a num-
ber of workmen. It appears that the gas ignited
as it was entering the tunnel, because the flame con-
eentrated about the point from which the run came,
and appeared to have pressure behind it.

’ Prom that point forward gas and water appeared
together when the disintegrated sandstone was en-
countered, tho in lesser quantities.

A year or so after having passed thru this forma-
tion weight began to show in the vicinity of sets
330 to 345, and 562 to 586, 619 to 634, 816 to 823,
984 to 1002. Relieving sets were erected to hold the
“At station 123 plus 31 to 121 plus 91, from whence
we merged from the Chico standstone section as
noted by Mr. Hulin, to the Chert, conerete invert and
arch were poured to take care of a ground swell and
éohsequent weight, and to act as a deterrant to a
spread of fire if oil were encountered in the cherts.
"We had made it a plan to stop excavation and —
pour invert whenever water of: sufficient quantity
was encountered to make track maintainance and
train operation diffealt. As @ consequence the in-
Vert was concreted to station 121 plus 91 when we
attacked the main body of chert. — .

352 Stz Companies of California vs.

When excavation was resumed at the last named
station we began to feel pressure oa our right. We
had proceeded about, ‘twenty-four feet when the
pressure became so great that relieving sets were
erected to support regular four foot sets. Suddenly
water broke out alongside in a quantity of probable
two hundred gallons per minute, and the pressure
was relieved.

ht catst ttt eenetatenedalieee festa belle
broken chert formation. For a few hours our pumps,
having a rated capacity of eight hundred gallons
could not handle it: This reduced in quantity to five
hundred eighty gallons within seven hours, when
the reduction apparently ceased. It was necessary
to drive spiling and erect breast boards from this
set 1052, when -the chert showed a tendency. to

Blasting was permissible then to set 1054 when
we again encountered water and badly broken chert,
forcing us to again resort to spile driving and breast
boarding. At set 1064 we again reached former
ground whieh permitted blasting until set 1065 was
reached when a further addition of water and bad
ground forced spile driving again. At set 1069 we
appeared to have found better going, tho we. had
later on to erect spiling before blasting the lower
part of the face. ulcer rece ahah
point of set1085 was reached, _.

From there on. until the chert was pasied.. ths
ground progressively stiffened, and some heavy
blasting was necessary to break the vertical. chert

Joint Highway District No. 13 853

‘Timbering was spaced up to a distance of twelve
feet between sets where ground was standing well.
At sets 1136 to 1139 we later had to erect two re-
lieving sets. |

e@undeddly speaking this vedtion) chert did tint take
weight after we passed thru it.

© Very little oil was found in the chert, and such as
was observed was more apparent in the slippery
sand followirig the water, which generally showed in
the broken formation as we approached nearer the
firmer cherts.

’ Leaving the chert we entered the Orindan, which
‘was very firm and hard to break, as was the ce-
mented gravels that fre juently appeared. ‘These ma-
terials gradually grew softer as we left the chert
behind and approached the lava. ‘Most of the oil
and oil gas we encountered was found on the contact
of the orindan with the cemented gravel. As we
approached nearer the lava the gas decreased and
the gravel increased, with water dripping in in-
creasing amount. The orindan’ section, generally
stood well under six foot timber spacing, but broke
blocky, and did not muck well. One mueker man
expressed it that it was like mucking wool.
‘When it was apparent we were approaching near
to the lavas and water began to show evidence of
decided increase, we discontinued excavation long
enough to bring our conerete invert to the then face.
~ On resuming mining, our second shot .bronght us
into the lava. The contact was reasonable soft, but
the ground stiffened to such an extent that we found

EB OOO EEE EE ee

354 Siz Companies of California vs.

it advisable to discontinue the use of jack-hammers
and proceed with leyners, The ground drilled well
and broke wel) and, tho containing some water, gave
promise of continuing leyner ground. At station
about. 89 plus 00 one of the shots in the right breast
penetrated a volcanic ash deposit lying in a suffi-
ciently loose state with a large amount of water, that
within three hours the face had broken im ‘against
our efforts to hold it and the ash ied with
a flow of fourteen hundred gallons of water per
minute partly filled the tunnel for a Gistance of
sixty feet before a sufficient bulkhead to hold it
could be erected, The pressure exerted longitudi-
nally forced collar braces from one and one half
inches to complete penetration of some of the eight
by twelve timbers. The ash surrounded the sets so
that none of them were completely knocked down. .

We dropped back to Station 94 plus naught eight
to 94 plus forty-eight where we had encountered
very heavy swelling ground and had found full
cirele sets at two foot spacing, constantly relieved,
while awaiting stability of the volcanic ash section,
and hoping, in the meantime, that water, pressure
would reduce. The quantity dropped to nine hun
dred gallons, and it appeared that it might be cut off
from the main tunnel by a short drift to our right,
which then appeared the direction of the supply.
This drift materially. relieved the pressure at the
face for a few feet and allowed us to excavate the

oe we reidGT ~~» ~— Y-wF cr ir be ce cee al

a ea FS rT ow FP eT ee eS ee

Tv

Joint Highway District No. 13 355
However, when we erected our breast boards and

‘began to press forward we found the main water

supply was coming from a point forward, and ap-
parently in the line of bore. As we drove our spiling,
each one a couple of inches, until a penetration of
six to eight feet was accomplished, we attempted to
open a small hole in the b board at the last. set
and advance a new one four feet ahead., This often
took hours, as the runs of fine ash with an ever in-

_ Neseaing quantity of water made it almost impos-
‘sible to

make the slightest opening in our former
breast boarding. We gradually advanced a small

-board on the end of a stull to a point four feet dis-

tant. This was our most difficult*feat, and the new

' breast board, however small, would aid in stiffening

the new . The next board, also advanced at the
end of still was then placed, after many at-
tempts, each stull being nailéd to the eap of the last
set. When two feet of new breast was well boarded,
the new breast boards were put in at an elevation
lower than the old breast board four feet back so
that the fine material could not flow out during ihe
placing of the new board. During all of this time we
had run after run of fine material, that it took all
our efforts to check—tho the total losses were never
enough to cause much of a void overhead, or permit
a sudden drop of material. When the new. breast
board was completed two feet down, one or the other
of us would creep over the old breast board and:
place the next lower new board. This sometimes re-
@ilted in hasty retreats and near strangulation as

356 Siz Companies of California vs.

the runs and water attempted to engulf its intended
victim ; and on at least one o¢casion emergency pull
by the remainder of the men present saved burial.

After getting thru this ash deposit, holes were
made in the overhead spiling, sufficiently large to
loosen and eause to run such overlying fine material
as was necessary to bring large boulders that showed
evidence of being there, down on the top of the
spiling to forestall a possible future run and drop
of material that might cause a collapse of the tim- ©
bering and resultant trapping and drowning cf the
crew. These boulders now rest on the timbering and
act as a reinforcement against a drop of others. |

We encountered an ever increasing quantity of
water unti! three thousand nine hundred twenty gal-
lons -per minute were measured on the wier. As we
proceeded we encountered new flows, and the area
left behind, gradually and fairly rapidly, decreased.

Spile driving and breast boarding were again nec-
essary in broken formations carrying large quanti-
ties of water at sets 1612 to set 1606, Stations 82+-92
to 82+82, 82+06 to 81+-75, 80+14to 79+84, 78+06
to 77+79, 76+28 to 76401, 74+98 to 74+55, 75+52
to 75+27, 78+25 to 72+74, tho at no other point
than the one in vicinity of Station 89+00 did we |
have runs that we found it diffieult to control.

In some of the latter breast board places we
could advance cur spiling with coal picks and moils,
and breast board as we pulled the muck away from —
the face. At other times we could breast boftd half —
way down the face and lightly shoot the toe to make —

te
at
+
rab
*
Sa
i~

Joint Highway District No. 13 405

We have nothing to do with how the tunnel is de-
signed—right or wrong—but the safety of the men
working there is what we are interested in. We
have Mr. Reinhardt here, who is an engineer of this
Commission, and he has filed a report with the
Secretary, Mr. Burke, which I will ask that Mr.
Burke please read.

~ Mr. Burke: This is an inter-communication from
the Department of Safety, dated San Francisco,

September 19, 1935, addressed to the attention of’

Mr. Reardon, Director, Department of Industrial
Relations, subject:

‘*Broadway Tunnel,”’
‘As per your telegram of September 17th, I
' made an inspection and survey of the Broadway
Tunnel this date and found the following condi-
tions: : |

‘There is approximately 1800 feet of full sec-
tion tunnel which is timbered and I would esti-
mate that 75 percent of this timbering has to be
removed and set back in order to clear the
forms on Design A, the original design, before
concreting can be done.

‘The investigation of the cave-in on August
28th, in which three men lost their lives was the
result of moving back one of these timber sets.
As far as my investigation could determine this
work was being done in a careful manner ac-
cording to standard practices and the cave-in

therefore was not the fault of the mechanical ©

operation, but due to a peculiar formation in

it AERA Ete Dat Gates Pata oa ved Hs oe 1h Na Fveine. dei kang

So 19th. It is entitled: ‘‘Preliminary—Joint Highway
District No. 13, State of California, Alameda
County,.Contra Costa County—Modification, Type
A Section,’’ and I would like to have Mr..Roggs, for
the purpose of the record, read a statement which
has been prepared, respecting this plan and the man-
ner in which it is offered, as a proposal.

Mr. Boggs (reading) :

‘‘The recommendation for a modification of
the plan for the Broadway Low Level Tunnel
which follows, is made solely because of the
delay of the Contractor in placing the perma-
nent reinforced concrete tunnel lining in the
portions of the tunnel bores which have been
excavated ——

Mr. Tinning (interrupting): Excuse me. I
should state in making this statement, we do not
want to be put in the position that our silence may
not be construed as an omission. We want to just

Pare eg 7

Joint Highway District No, 13 411

state our position in connection with offering this
plan—but we waive no rights.

Mr. Reardon: Mr. Tinning, we always carry
- our meetings on as an open forum, so that any one
who has ideas on safety—we will allow them to
speak on that subject.

Mr. Tinning: Thank you.

Mr. Boggs (reading):

_ “The recommendation for a modification of
the plan for the Broadway Low Level Tunnel
which follows, is made solely because of the
delay of the contractor in placing the perma-
nent reinforced concrete tunnel lining in the
portions of the tunnel bores which have been
excavated, but not lined with the permanent
lining called for in the plans and specifications. ”’

Mr. Thelen (Interrupting) : Reference is made
to the delay of the vontractor. We do not concede
, th&t there has been any unreasonable delay of the
contractor. It seems to me that the only thing the
Commission is interested in, is the safety.and what
shall be done to make safe conditions.

‘Mr. Reardon: _ This is an open forum. You peo-
ple realize I was President of the Board of Public
Works, and I carried on the work of public works
‘in the same manner, as I am now, with the assistance
of Commissioner MacDonald, and Twill allow Mr.
Tinning to submit his evidence.

_ Mr, Tinning: I am not asking that anything be
eonceded. We only want our definite statement as
to our position, as an excess of precaution. We

‘ ’
ie

4

3

*

satunenitemsinenibined -temetnetinenentnaaes ro SEES
eo, eee ats RR hak SSD hie este COTA ed. ce

412 Siz Companies of California vs.
waive nothing in connection with this plan. We are
simply trying to state our position, not trying to
put it to the side. “¢

Mr. Thelen: I may suggest that if references of
that kind are made, we may have to introduce evi-
dence tc show that the references are not justified.
We do not admit there has been any delay.

Mr. MacDonald: I hardly think we will rule on
the statement, but we will recognize and are com-
pelled to recognize Mr. Thelen’s right to file with
this Commission any supplemental statement he may
desire, setting forth the position of his clients.

Mr. Thelen: I think that is very very fair.

Mr. Boggs (Continuing reading) :

‘*These open sections of the tunnel bores are
supported by temporary timber supports which
have been generally intruded into the space
necessary for placing the permanent tunnel
lining in accordance with the Plans and &pecifi

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---