PEER Oe EI IME APO CL pe wl Re Maret ree P Eas MTSE I Fa ee Po ae ee

LN RY SM CRI a |
.

+

IN THE

SUPREME CourT

OF THE

UNITED STATES

October Term, 1902.

THE CREEDE AND CRIPPLE
CREEK MINING AND
MILLING COMPANY,

Petitioner,
y

THE UINTA TUNNEL MIN-
ING AND TRANSPORTA.
TION COMPANY,

Respondent.

Brief and Argumentin Opposition to Petition for
Writ of ertiorari.

In Forsyth v. Hammond, 166 U. S., 514, the
court, reviewing the cases, says:

“While not doubting its power, has been
chary of actions in respect to certioraris.”

LIT ESB ES ole F5 Pamne 8

—_-2—

“And further, that while this power is

co-extensive with all possible necessities,
and sufficient to secure to this court a
final control over the litigation in all the
courts of appeal, itis a power which will be
sparingly exercised, and only when the
circumstances of the case satisfy us that
the importance of the question involved,
the necessity of avoiding conflict between
two or more courts of appeal, or between
courts of appeal and the courts of a State,
or some matter affecting the interests of
the nation in its internal or external rela-
tions demands such relief.”
The contention is, that the Circutt Court of
Appeals in deciding this cause, announced certain
principles of law in direct conflict with the decis-
ion of this court in Calhoun G. M. Co., v. Ajax G.
M. Co., 182 U.S., 499. That this case involves the
identical questions, and facts, passed upon in that
case,

The facts in the Calhoun- Ajax case are, that
the Monarch and Mammoth Pearl lodes were
located prior to the location of the tunnel site.

That a receiver's receipt issued for the Monarch
and Mammoth Pearl, prior to the location of the
tunnel site.

In that case the court passed upon four propo-
sitions: three only have any bearing here, in fact,
one thereof, is controlling:

ist. Did the Ithica tunnel have a right of way
through the Monarch and Mammoth Pearl?

2nd. Did the tunnel acquire by virtue of its
location, the ownership to, and right of
possession of the blind veins cut therein, etc?

4th,

PE PCI Kia st Py

»

Whether or not the tunnel owners should
have been permitted to introduce evidence for
the purpose of showing that there was no dis-
covery of mineral in place in the Monarch and
Mammoth Pearl claims, priorto location of
tunnel site?

In that case, all these questions were answered

in the negative, and properly, because:

Ist.

2nd,

3rd.

(a)

(b)

(Cc)

(a)

The lode claims in that cause had been
segregated from the public domain, before
the location of the tunnel.

The lode claims had been entered for patent
by the issuance of a receiver's receipt, before
the location of the tunnel.

The land office at the time of the location of
the tunnel, had passed upon every question
necessary to make the lode claims valid loca-
tions, at which time, no other rights had been
initiated.

The said department by issuing receiver's
receipt decided prior to the issuance thereof,
the claims had been properly and_ legally
located

That a discovery had been made, (but the
time at which said discovery was made, was
not decided).

That the necessary labor had been per-
formed.

That the locators or Owners were entitled
to enter claims for patent.

f
b

tS ARI RO

—4—
4th. The Government had been paid for the land
embraced within the surface bounderies of the
lode claims by the owners thereof, and as such
owners of said claims, they were entitled to
Own, possess and enjoy the same not only as
against the United States, but against the
world. All this occurring before the location

of the tunnel site.

Under these facts and findings, the Ithica
tunnel had no more right to be located across
these claims, than it would have to be located
upon and across ground that had been patented
for years prior to its location.

In referring to the Opinion in the Crlhoun-
Ajax case, relative to collateral attack upon de-
cisions of the Land Department, Judge Sanborn,
in this case, says:

“Its decisions of questions within its jur-
isdiction, are impervious to collateral at-
tack. This was the question which the
Supreme Court answered in the Calhoun-
Ajax case, and which, if the language in
the opinion of that case is carelessly read,
wethout knowledge of. or reference to the
question before the court, it may seem to be
broader, a careful examination of the facts
which the record there discloses, demon-
Strates the proposition, that the decision
went no further.”’

In the Cathoun-Ajax case, at the time of the
entry of the Monarch and Mammoth Pearl for
patent, there were only two parties interested ijn
the claims, the locators thereof, and the United
States, as between these parties, the decision of

Nye ae . “ ’ Pe INIT bis oak 2 AORTA ID AER,

— 5 —
the Land Department was controlling, thereafter,

no one could initiate any title through the United
States to these claims.

This cause presents an entirely different state
of facts:

ist. The Uinta tunnel was properly and legally
located on the 13th day of January, 1892.

2nd. On this date it is contended, there was no
location of the Ocean Wave and Litile Mary
claims, notwithstanding the location certifi-
cates bear date, January 2nd, 1892, and that
no discovery of mineral had been made in
said claims or either of them until long after
the location of the tunnel.

A locatien certificate is not required by the
United States Statutes, nor by the statutes of all
the States, but in those States in which it is re-
quired, it is prima facie evidence only of such facts
as are required by the statute to be stated in the
location certificate.

Lindley on Mines, Vol. 1, p. 502;
Jones on Evidence, Sec. 521;
Campbell v. Rankin, 99 U. S., 261;
Jaulzen v. Arazona Co., 20 Pac., 93;
Pollard v. Shiyeley, 5 Colo., 309.

Lindley on Mines, page 502, in treating of this
question, says:
“Where such record is authorized, it is
prima facie evidence only of such facts as

are required by law to be stated therein,
provided they are sufficiently stated. * * *

Sp PE et NAIR Sd Ho

“oon

While many of the States require the date
of the discovery to be Stated in the rec-
orded certificate, we do not think that this
would be evidence of the Jact of discovery.
A discovery once proven, sugh a record
would, prima facte fix the date. The
question of discovery is the most impor-
tant of all the acts required in the pro-
ceedings culminating in the perfected loca-
tion. It isthe foundation of the right with-
out which all other acts are idle and super-

uous. With the exception of three States
(California, Idaho and Montana) the cer-
tificate is executed with no solemnity. It
is not either acknowledged or sworn to.
It isa mere ex Parte declaration in his own
behalf of the party most interested, * * *

The real purpose of the record is to
operate as constructive notice of the fact
of an asserted clazm and its extent. When
the locators right is challenged, he should
be compelled to establish by proof outside
of the certificate, all of the essential facts,
without the existence of which the certifi-
cate possesses no potential validity.”

We believe that the authorities are numerous,
that the location certificate is not the proper evi-
dence by which to prove the fact of discovery; but
at the most, the only claim that is made for it is
that such location certificate is prima facie proof
of the fact.

It is sought by the petitioner to make a loca-
tion certificate conclusive proof of the fact of
discovery and of the date of the same. If there
be force in the rule that such certificate is prima
facte proof, then, by the very meaning of the
words “prima facie,” the respondent was entitled to

—
introduce evidence to rebut it, and all evidence
upon this point was excluded, over the objection
and exception of respondent by the trial court.
While some degree of sacredness has clung around
the patents of the United States, limited however,
by the well considered decisions, in which it has
been stated that wherever the United States has
issued a patent without jurisdiction, the patent is
of no more validity than any other instrument
which confers no rights. We know of no sacred-
ness whick clings round a _ location certificate
made, as had been suggested by a learned author
on mining laws, without any solemnity, an ex parte
proceeding, made by a party who is the most inter-
ested one in the entire course of the location. It
would be an absurdity if litigation, in which prop-
erty of great value is involved, should be deter-
mined by the ex parte acts of the man who is most
interested himself; and that, too, at’ time when
there was no controversy and no reas « to contro-
vert in any manner the facts as set out in the loca-
tion certificate.

The patent is conclusive only of those facts
which are necessary in order to procure its issu-
ance. It is not conclusive of any fact which the
Land Department is not called upon to pass on.

Without a discovery, it would be an impossibility

for the Land Department to issue a patent. But
the “éme of discovery is not made an essential ele-
ment in the issuance of it, and cannot therefore be
precluded by the issuance. The time of location
and the time of discovery is not essential to the
issuance of the patent, and is not concluded

'
é
é
i
E

Fall AD LPR AAO D RARE RINT DAIRY TR BE AT EES RE # cara
te
°
é

The decision follows those rendered by this
court, and other Federal and State courts. They
are all in perfect harmony with the decision com-

SENET BE "RETREAT LT AMT LL TH ee

hata

plained of. :
The logical conclusion to be deducted from é
reading Justice Sanborn’s opinion, compels the ee
judicial mind to stamp it with approval. |
The decision above referred to can be found a

in the 119 Fed. Rep., at pages 164-170, and is as
follows: é
z

we aE fe
oy

Re a ee nate Oe eae eee

Statement.

“The writ of error in this case challenges the
trial of an issue involving the rights of the respec-
tive parties to the action to the possession of
the space within the bore of a tunnel where it
passes through two lode mining claims beneath the
surface of theearth. The Creede and Cripple Creek
Mining and Milling Company was the plaintiff and
The Uinta Tunnel Mining and Transportation
Company was the defendant in the action below,
and they will be so styled in this statement and in
the opinion which follows. The plaintiff was
the owner of two lode mining claims called the
Ocean Wave and the Little Mary, which were
entered for patent on August 5, 1892, and were
patented on December 21, 1893. The plaintiff
alleged in its complaint that these claims were
duly located and discovered on January 2, 1892.
The defendant was the owner of a claim to a
tunnel site which extended through these lode
claims beneath the surface of the earth and which
was located on January 13, 1892. It also owned
certain lode claims which had been located on
blind veins that had been discovered in the tunnel
after the lode claims of the plaintiff had been
patented. The mining claims of the plaintiff were
between the portal of the tunnel and the defendant's
lode claims and the latter had driven its tunnel
through the piaintiff’s claim and was using it as a
way to bring to the surface of the earth the ore it
was extracting from its blind veins. The real
issue was whether or not the defendant had the
right of way along the bore of its tunnel through

oa r ° TARO aD RIE OTE
ERG LN IRE LITE EE PE ERE Ne iin ei

the lode claims of the plaintiff, and the determina-
tion of this issue depended upon the priority of
their respective claims. The plaintiff asserted that
its claims were discovered and located on January
2, 1892. The defendant averred that its tunnel
was located on January 13, 1892, and that no dis-
covery of mineral in rock in place was made within
the lode claims of the plaintiff until after its tunnel
site was located. These averments of the defen-
dant were stricken from the answer and the evi-
dence which it offered to sustain them was rejected.
Exceptions were taken to these rulings and there
was a verdict and judgment for the plaintiff.”

SANBORN, Circuit Judge, after stating the case
as above, delivered the opinion of the court.

When the claim to a tunnel site has been
located before the entry of the conflicting lode
mining claims which have subsequently passed to
patents, is the question, whether discoveries of
mineral in rock in place were made within the lode
claims before the location of the claim to the
tunnel site, open to determination by means of
evidence or testimony de hors the patents? This is
the principal question presented by this record. If
the query were whether or not it is competent to
show by proof outside the receiver's receipts or
the patents that there had been no location of the
patented claims or no discovery of the lodes
therein before they were entered for patent, there
would be no doubt that a negative answer must be
returned to the question, for the reason that this is
an issue between the parties to a proceeding be-

IBN ae
— SEL PIES STE SEES OTE Dg FAL VF 1 NE REPT ERIE MEY PTAs FANNY TT WF oad

RT ee Ree

SO LT CS RGR Oe

| SG DOLL ELEN TORUS ATF

UAW TIDY oy Ho RAT, RS.

fore the Land Department, which that tribunal
necessarily considers when it permits the entries
of the lands, and its decisions of questions within
its jurisdiction are impervious to collateral attack.
King v. McAndrews, 111 Fed., 860, 863, 50C. C. A.
29, 32. This was the question which the Supreme
Court answered in Calhoun Gold Mining Co. v.
Ajax Gold Mining Co., 182 U. S., 499. 502, 503, 510,
and while, if the language of the opinion in that
case is carelessly read without knowledge of or
reference to the question actually before the court,
it may seem to be broader; a careful examination
of the facts which the record there discloses
demonstrates the proposition that the decision
went nofurther. In that case the receiver's re-
ceipts on the lode claims of the appellee had been
issued before the claim to the tunnel site was
located. (Page 502.) In a proceeding between
the lode claimants and the United States, the Land
Department had decided that mineral in place had
been discovered within the claims and had _per-
mitted their entry. Subsequent to this decision
and to these entries the owner of the claim to the
tunnel site located it across the lode claims and
upon the trial offered to prove that there had
been no discovery of mineral in place within those
claims before they were entered. The trial court
rejected the offer. The Supreme Court said:

“The ruling was right. The patents
were proof of the discovery and related
back to the date of the locations of the
claims. The patents could not be collat-
erally attacked.”

— LENT ELI ETA CO TA IAS BEB LIE ION

Yee eer

PREP cnee Towa te Sy Aa SRI IN PH RSs PHA RO PRE

— = Raa

Thus, it may be seen that the only proposition
there decided was that one who had initiated no
claim upon lands when they were entered by other
claimants could not subsequently collaterally at-
tack the decision of the Land Department that
there had been a discovery of mineral in place
upon the claims at some time before they were
entered.

Counsel for the plaintiff rely upon the decision
and opinion in this case and insist that it fairly sus-
tains the rulings of the court below. But there are
radical and controlling differences between the
question presented in that case and the issue of :
law before us in the case in hand

1. A judgment is binding upon the parties to
the proceeding in which it is rendered and upon
their privies. The parties to the judgments of the
Land Department by which it allowed the entries
of the lode claims in the case of the gold mining
company were the United States and the owners :
of those claims. No other parties had or claimed
any interest in the land at the time those entries

were made. The judgments and the patents ac- :
cordingly bound and estopped these parties and f
their subsequent assignees. They estopped all t
parties who initiated claims upon or interests in the :
lands under either of the parties to the proceeding f
subsequent to the judgments of the Land Depart- >
ment. The claimant of the tunnel site in that case :
initiated his claim under the United States, one of .
the parties to that proceeding, subsequent to the ;
judgments. It was therefore a privy of the United i
States and was estopped by the judgments of the f

RTM,

S.

S

™ *
Sasa ieee xa, . . .
Fg LET TUS LE MRS IU IY ASL PTE LER IH NLT PLE IL EPID EER ES ED

Land Department from proving that no discoveries
had been made upon the lode claims before these
judgments were rendered. This is not the case in
the action before us. The claim to the tunnel site
was located on January 13, 1892. The judgments
of the Land Department allowing the entries were
rendered on August 5, 1892. At that time there
were three parties interested in the land, the lode
claimants, the United States, and the claimant of
the tunnel site. Two of these parties, the lode
claimants and the United States. were parties to
the proceedings and were estopped by the judg-
ments and the patents. One of them was not a
party to any of these proceedings, to the judg-
ments or to the patents, and, upon familiar princi-
ples; was neither bound by them nor estopped by
them from presenting and proving according to the
established rules of evidence in trials under the
common law the fact that no discoveries had been
made on the lode claims before the location of its
tunnel site, the fact essential to the validity of its
claim upon, and interest in, the land.

Not only was the claimant of the tunnel site
not a party to the proceedings in the Land Depart-
ment which resulted in the entries and patents to
the lode claims, but it was neither required to be-
come such a party nor to submit its claims and inter-
ests in the lands to the adjudication of that depart-
ment at that time because its rights therein were
then too uncertain, contingent and intangible for
determination. When the applications for the
patents of the lode claims were filed, the blind
veins which have induced the use of the tunnel

through the lands in controversy had not been
discovered, the tunnel had not been driven into
the land, and it was impossible to know whether
or not the claimant of the tunnel site would ever
acquire any right to use this land for the purpose
to which it is now devoted. The claimant of a
tunnel site is not required by sections 2325 and
2326, Revised Statutes, to file an adverse claim and
submit his rights in the lode claims crossed to
adjudication by the Land Department upon the
filing of applications for patents to those claims
when his rights are at that time uncertain, con-
tingent and intangible. Enterprise Min. Co. v.
Rico-Aspen Min. Co., 167 U. S., 108, 112; Enter-
prise Min. Co. v. Rico-Aspen Consolidated Min.
Co., 13 C. C. A. 390, 399, 400; 66 Fed., 200,
209, 210.

2. The issue whether the discoveries in the
lode claims were made before the location of the
tunnel site in the Ajax Gold Mining Company’s
case was necessarily considered and adjudged by
the Land Department when it permitted the
entries of the lode claims. The finding that such
discoveries had been made before the date of the
entries was indispensible to the decision that the
lode claimants were entitled to make the entries so
that that finding must have been made by the
Department. But the location of the tunnel site in
that case was subsequent to these entries. Hence
the finding that the discoveries were made before
the entries was necessarily a finding that they
were made before the location of the tunnel site,
and it was, as we have seen, binding upon the

—

— 26—

claimant of the tunnel site, because it was claiming
a right initiated after this adjudication under a
party to the judgments.

It is not soin the case before us. The question
here is whether or not discoveries were made ia
the lode claims prior to January 13, 1902, the date
of the location of the claim to the tunnel site.
The determination of this question was neither in-
dispensible nor material to the adjudication made
by the Land Department on August 5, 1892, that the
lode claimants were entitled to enter the land, and
there is nothing to show that this issue was ever
considered or decided by that department in reach-
ing its conclusion. The only question relative to
the discoveries that it was required to determine
was whether or not they had been made prior to
August 5, 1892, when the entries were permitted,
and the decision of that question left entirely un-
touched the issue in this case whether they were
made before or after the location of the tunnel site
on January 13, 1892.

3. When the entries were made in the Ajax
Gold Mining Company’s case no claim to a tunnel
site had been located or staked upon or across the
lode claims, and the entries of them and _ the
patents to them vested the title in the claimants
free from any right or claim to a tunnel site.

It is otherwise in the case at bar. Theclaim to
the tunnel site was located and staked out across
these lode claims before they were entered.
Under the Revised Statutes and the law the entries
and patents of these claims vested the title to them
subject to the rights of the prior claimant of the

tunnel site just as they vested it subject to the
right of an owner of an adjoining lode claim to
follow on its dip through a side line and through
the patented territory of these lode claimants any
vein which has its apex in his claim. Enterprise
Min. Co., v. Rice-Aspen Consol. Min. Co., 13 C.
C. A., 390, 400; 66 Fed., 200, 210; Mining Co. v.
Campbell, 135 U. S., 286, 301; Hall v. Mining Co.,
Morr. Min. Rep. (3rd ed.), p. 282; Branagan v.
Dulaney, 8 Colo., 408, 412; Lee v. Stahl, 9 Colo.,
208, 210; Morgenson v. Milling Co., 11 Colo., 176,
179.

While, therefore. it is a flagrant attack upon a
patent to attempt to maintain a claim initiated sub-
sequent to the entry on which it rests, it is no such
attack to assert the rights of the claimant of a
tunnel site located before the entry of the land
against a patent of it toa lode claimant, because
under the statutes and the law such a patent always
issues subject to those rights.

Notwithstanding all these considerations, coun-
sel for the plaintiff insists that the defendant is
estopped from pleading and proving that no dis-
coveries of mineral in place were made in the lode
claims before the location of the tunnel site on
January 13, 1892, because certificates of location of
the lode claims were filed on January 2, 1892, which
declare that such discoveries were made on that
day, and it is a well-settled principle that pat-
ents relate back to, and take effect upon, the dates
of the initiation of the rights on which they are
founded.

— 9 a RINNE NE eC ERR RES

— yon

But the certificates of location are not con-
clusive proof of the facts which they recite against
those asserting rights adverse to their makers.
They are competent evidence of the fact that they
were made and filed, and hence of an important
link in the chain of the plaintiff's title. But when
the existence of the facts which they recite is chal-
lenged they are but the ex parte statements of in-
terested parties, and there is nothing in them or in
their relation to the property or the parties to bind
those claiming the lands adversely to their makers
or to estop them from establishing the truth by the
customary oral and written evidence.

Nor is there anything in the doctrine of rela-
tion to work such an estoppel. Grant that the
patents relate back and take effect as of the date
of the initiation of the lode claims, yet since the
patents are subject to the rights of the claimant of
the tunnel site when they are issued they are still
subject to those rights when they have related back
to the inception of the claims upon which they
rest.

Moreover, the averment of the defendant is
that no discoveries were made in the lode claims
until after the location of its claim to the tunnel
site. If this allegation is true, it may be doubted
whether the lode claims can be said to have been
initiated before the claim for the tunnel site was lo-
cated. “No location of a mining claim shall be
made until the discovery of the vein or lode with-
in the limits of the claim located.” Rev. Stat.,
Sec. 2320; Enterprise Min. Co. v. Rico-Aspen Min.
Co., 167 U.S., 108, 112. It is true that subsequent

discoveries may validate earlier locations and that
the latter may then inure to the benefit: of the
locators as against the United States and all
parties whose claims were initiated subsequent to
the discoveries. But they would inure to their
benefit as of the dates of the discoveries and not
as of the dates of the locations and they would
neither destroy nor affect intervening rights. The
marking of boundaries and filing of location certi-
ficates may precede discovery or discovery may
precede them, but no location is valid until both
are complete. The earlier act then inures to the
benefit of the locator as of the date of the latter,
subject to all rights which have intervened be-
tween them. Erwin v. Pergo, 35 C. C. A., 482,
485; 93 Fed., 608, 611; Jupiter Min. Co. v. Bodie
Consol. Min. Co., 11 Fed., 666, 676; 4 Morr. Min.
Rep., 411, 423; North Noonday Min. Co. v. Orient
Min. Co., 1 Fed., 522, 531; Zollars v. Evans, 5 Fed.,
172, 175; Strepy v. Stark, 5 Pac., 111, 114; Thomp-
son v. Spray, 72 Cal., 528, 533; Erhardt v. Boaro,
113 U.S., 527, 536. There was, therefore, no valid
location of the lode claims until the discoveries
within them were made and it is held by the Cir-
cuit Court of Appeals of the Ninth Circuit in Last
Chance Mining Co. v. Tyler Min. Co., 61 Fed.,
557, 565; 9 C. C. A., 613, 621, that a patent fora
mining claim only relates back to the time when a
valid location was first made. If this is a correct
view of the law, the patents in this case could not
relate back to.a time anterior to the dates of the
discoveries, and if those were subsequent to the

-_— =

location of the tunnel site they could not affect de-
fendant’s rights. :

If litigation for the possession of the property
in controversy in this action had arisen between
the lode claimants and the claimant of the tunnel
site at a time prior to the entries of the lode claims,
the question whether or not discoveries of mineral
in place had been made in the lode claims before
the location of the tunnel site would have been
decisive of the issue, and the testimony of witnesses
who knew the facts and other evidence competent
in the customary trials of such issues at law would
have been admissible to determine the question.
What is there in the entries and the patents to de-
prive the defendant of its rights to try this issue
now upon like evidence? Its claim to this land
had attached before those entries were made. It
was not a party to the proceedings in the Land
Department which resulted in the adjudication
that the lode claimants were entitled to enter it.
It was not required to file an adverse claim and to
submit its rights to the adjudication of that de-
partment when the applications for the patents
were made. The adjudication of the Land De-
partment which permitted the entries was ves znler
alios acta and ineffectual to estop the defendant.
The Department was not required to determine,
and it did not decide the question here at issue,
and under the statutes and the decisions of the
Federal courts the entries and the patents were
made subject to the rights of the claimant of the
tunnel site which had attacked before the Land
Department permitted the entries. Our answer to

— wnt

the question which this case presents is, that when
the claim to a tunnel site has been located
before the entry of-+ conflicting lode claims,
which have subsequently passed to patents, the
question whether discoveries of mineral in place
were made in the lode claims before or after the
location of the claim to the tunnel site was per-
fected is open to determination by means of the
testimony of witnesses and other competent evi-
dence de hors the patents in any litigation between
the parties involving their conflicting claims,
Last Chance Min. Co. v. Tyler Min. Co., 61 Fed.,
557, 365-7;9 C. C. A., 613, 621-623; Champion Min.
Co. v. Cunsolidated Wyoming Gold Min. Co., 75
Cal., 78; Iron Silver Min. Co. v. Campbell, 135
U. S., 286; Davis’ Adm’r v. Weibold, 139 U.S., 507.

The averments that no discoveries of minerals
in place within the lode claims had been made
before the location of the claim to the tunnel site
should not have been stricken from the answer of
the defendant, and its evidence to sustain them
should have been received. The question which
has been considered is decisive of the issue
whether or not the judgment below should be
affirmed, and, as the other questions presented by
the assignment of errors may not arise again, they
will not now be considered. The judgment below
must be reversed and the case remanded to the
court below with directions to grant a new trial,
and it is so ordered.

CHARLES J. HUGHES, Jr.,
Attorney for Respondent.

---