# Opposition Brief — Chicago, M. & St. PR Co. v. Clark

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386018_0512%3A4

## Record

- **Collection:** Supreme Court brief
- **Document type:** Opposition Brief
- **Published:** January 1, 1900
- **Citation:** 178 U.S. 353

## Text

Jn the Supreme Eourt of the Rnited States.

OCTOBER TERM, 1898, No. 773.

THE CHICAGO, MILWAUKEE AND
St. Pact Rattway Company,

Petitioner,
against
HEMAN CLARK,

Respondent.

Brief for respondent in opposition
to application for certiorari to the
Circuit Court of Appeals for the Sec-
ond Circuit.

This application is made on behalf of the peti-
tioner to review a decision by the Circuit Court of
Appeals for the Second Circuit, in favor of the re-
spondent, and against the petitioner, affirming a
judgment of the Circuit Court for the Southern
District of New York, entered upon the report of a
Referee in favor of the respondent and against the
petitioner for the sum of $88,084.86.

The recovery had by the respondent was for a
balance due under a written contract entered into
between the parties for the building of a railroad
by the respondent for the petitioner for the sum of
$3,954,600.

\ 2

After the completion of the work, the Chief Engi-
neer made a final certificate, in accordance with the
terms of the contract, bearing date March 3d, 1888,
by which he certified that it was a final estimate of
the amount and value of the work done and ma-
terials used in building the railroad, which had
been ‘‘ constructed, built, completed and finished, in
all respects, in conformity with the agreements of
said contract, except as the said Railroad Company,
party of the first part, has, by agreement with said
Clark, assumed the construction and completion
thereof.”

He then certified the amount due;

As per contract price $3,954,600
From which deductions were made

by him, amounting to 104,372 77
Leaving a balance of, $3,850,227 23
To which he added for items not

covered by contract, etc., 45,571 56

Making a total due to the respond-
ent of $3,895,798 79
See Record, pages 197-203.
To this amount, as certified by the
engineer, the petitioner credited
the respondent for materials sold
by him to it, and for certain re-
bates and other matters, the
sum of, 34,598 90

Making the sum of $3,930,397 69

There was no dispute in this case, but that that
amount due the respondent had never been fully
paid to him, unless by the transactions evidenced by
a receipt signed by him on March 9th, 1888. This
receipt, and it alone, it was claimed by the peti-
tioner before the Referee and in the Court below,
was a bar to any recovery by the respondent in this
action.

3

The respondent, on the other hand, claimed that
it was no bar, because the difference between the
amount earned and the amount paid, amounting to
$71,057.63, had never been released or discharged
by him and was still due and owing.

The sum of $71,057.63 claimed by the respondent
was made up of the following items:

ist. Deductions made by petitioner for
nutlocks furnished by it to respondent
and used by him in the construction
of the road, the amount not being ques-
tioned, only the liability, $9,558 63

2d. Deductions made by petitioner for
non-completion of the railroad on the
Ist day of June, 1887, in accordance
with an alleged supplemental contract
entered into between the parties, 40,000 00

3d. Deductions made by petitioner for
moneys paid to subcontractors without
right during construction, in all, 21,449 00

Making a total of $71,057 63

Of this amount the Referee refused to
allow the petitioner —

ist. The deduction for nutlocks, $9,558 63

2d. The deduction for the forfeiture
withheld by the petitioner for not
completing in time, 40,000 00

The only defense to the recovery of these items
by the respondent was the interposition by the
petitioner of the receipt as a bar.

The only other item allowed by the Referee was
the claim of the respondent under his fifth cause of
action, to wit, $2,425 for timber belonging to him,
converted by the petitioner to its own use, which
claim was not covered by the receipt.

4

It will be urged in the following argument that
the petitioner has not brought itself within the
statute allowing writs of certiorari from this Court
to the Circuit Courts of Appeal, nor within the
well-established rules laid down by this Court in
its decisions as to the issuance of such writs.

ist. Because the case affects no public interest,
but simply private rights.

2d. Because there is no conflict betwven the de-
cision in this case and those of this Court and of
the State courts; but, on the contrary, the decision
in this case is in direct line and full accord with the
decisions both of this Court and of the State
courts.

3d. Because the real ground of complaint by
the petitioner is that the Circuit Court of Appeals
did not apply the true rule of the decisions under
the facts found by the Referee, and therefore the
question sought to be reviewed by this Court is not
as to what the law is, but whether upon the partic-
ular facts in this case well-settled legal principles
were properly applied.

4th. Because no request was made by the peti-
tioner for a full bench on the argument in the
Court below.

Point I.

The power of this Court in certio-
rari will only be exercised where
the importance of the questions in-
volved, the necessity of avoiding con-
flict between two or more courts of
appeal, or between courts of appeal

.

5

and the courts of a State, or some
matter affecting the interest of the
nation in its internal or external re-
lations, demands such exercise.

e
In almost every case where an application such
as the one now made, is either granted or refused,
this Court takes occasion to say that the power of
the Court to issue a writ of certiorari to the Circuit
Court of Appeals, ‘‘should be exercised sparingly
and with great caution.”

Ex parte Lau Ow Bew, 141 U. S., 583.
Ex parte Woods, 143 U. §., 202.
Chicago and Northwestern R. R. Co.
v. Osborn, 146 U. S., 354
American Construction Co. v. Jackson-
ville T. K. W. R. Co., 148 U. S., 372.
Forsyth v. Hammond, 166 U. S., 506.

The rule of this Court in respect to certioraris to
the Circuit Court of Appeals is stated by Mr. Jus-
tice Brewer, speaking for the Court, in Forsyth v.
Hammond (supra), as follows: ‘‘So it has been
that this Court, while not doubting its power, has
been chary of action in respect to .certioraris. It
has said, ‘It is evident that it is solely questions of
gravity and importance that the Circuit Courts of
Appeals should certify to us for instruction; that it
' is only when such questions are involved, that the
power of this Court to require a case in which
the judgment and decree of the Court of Ap-
peals is made final to be certified, can be properly
invoked.” Ha parte Lau Ow Bew, 141 U. S., 583-
587. Ea parte Woods, 143 U.S., 202. Lau Ow
Bew v. U.S., 144 U. S., 47-58. Am. Cons. Co. v.
Jacksonville, T. and K. W. R. Co., 148 U. S., 372-
383. * * * ‘We reaffirm in this case the prop-
ositions heretofore announced, to wit, that the
power of this Court in certiorari extends to every

—

6

case pending in the Circuit Courts of Appeal, and
may be exercised at auy t'me during such pend-
ency, provided the case is one which, but for this
provision of the statute, would be finally deter-
mined in that court. And further, that while this
power is coextensive with all possible necessities,
and sufficient to secure to this Court a final control
over the litigation in all the Courts of Appeal, it is
a power which will be sparingly exercised, and
only when the circumstances of the case satisfy us
that the importance of the questions involved, the
necessity of avoiding conflict between two or more
Courts of Appeal, or between Courts of Appeal and
the Courts of the State, or some matter affecting
the interests of this nation in its internal or exter-
nal relations, demands such exercise.”

Forsyth v. Hammond, 166 U. S., 506.

Point II.

There is no conflict between the
decision in the case at bar and the
decisions of this Court, and of the
other Circuit Courts of Appeal and
of the State Courts, but, on the con-
trary. the legal principles applied
by the Court below are in direct line
and full accord with the decisions of
this Court and of the other Circuit
Courts and of the State Courts.

First. —The legal principles applved by the Court
below in deciding this case are, as stated in the
opinions delivered by the learned Judges, as follows:

7

(A). An agreement, which is known to the law as
‘*accord and satisfaction,” is a contract, and like
all other contracts it needs a consideration to make
it valid; without consideration it is nudum pactum.

(B.) A receipt in full, and payment of the balance
stated therein, cannot be sustained as an accord
and satisfaction, unless some benefit was thereby
secured to the creditor, which, but for the settle-
ment, he would not have had.

(C). Payment by a debtor of a liquidated amount,
presently due, and to which he has no defense
that can be urged in good. faith or with color of
right, is not by itself a sufficient consideration to
sustain the release by the creditor of other liqui-
dated claims against the debtor.

See Opinion Judge Lacombe.

(D). A promise by a creditor, having a liquidated
and undisputed demand against his debtor, which
is wholly due and payable, to discharge the residue
upon receiving payment of a part, is, according to
all authorities, nudum pactum and totally inopera-
tivé, because the debtor is under a legal obligation
to pay the whole demand.

A demand is not a disputed demand, simply be-
cause the debtor refused to pay or recognize it, for
if this were true, no case would ever arise for the
application of the rule.

It is disputed within the meaning of the rule
only when it is so far disputed as to presenta
‘* proper case for litigation.”

(EZ). In a case where the creditor having two un-
disputed and liquidated demands against the debt-
or, and the latter claiming to have cross-demands
or counterclaims against the creditor, refuses to pay
the creditor’s demands unless the validity of the

8

cross-demands is acknowledged and their amount
allowed to him by the creditor, the promise to al-
low the whole amount of the cross demands has no
consideration to sustain it, because in contempla-
tion of the law no benefit could accrue to the prom-
isor and no injury to the promisee. The promisor
derives no benefit because he allows the whole; the
promisee is not injured because he relinquishes
nothing.

See Opinion Judge Wallace.

These rules and principles of law, it is submitted,
are well settled and quite elementary. They are the
rules upon which decision of this case was based in
the Court below. ’

It is hardly necessary to say that they are notin
conflict with the decisions of this Court nor of
other Circuit Courts of Appeal nor of the State
Courts.

In fact, the true ground of complaint on the
part of the petitioner is not as to the rules of law
laid down by the Circuit Court of Appeals, but
that the facts shown in this case do not bring it
within their application.

What this Court is asked to do is not really to re-
solve a conflict in the law, but rather to determine
whether, upon the facts in this case, well-settled le-
gal principles were properly applied.

As said by Mr. Chief Justice Fuller in ex parte
Woods (supra), the power under Section 6 of the
Act of March 8d, 1891, *‘Could only be properly in-
‘“voked * * * when questions of gravity and
‘* importance were involved.

‘* This must necessarily be so, in any view, and
‘‘ especially when it is considered that the Circuit
‘* Courts of Appeal were created for the purpose
‘* of relieving this Court of the oppressive burden
‘‘of general litigation which impeded the ex-
‘* amination and disposition of cases of public con-
‘** cern and delayed suitors in the pursuit of justice.

“But in the interest of jurisprudence and uni:
‘* formity of decision, to use the language of the emi-
‘* nent jurist and statesman who had charge of the
‘* bill, provision was made under Section 6 for such
‘‘ supervision on our par: as would tend to avert
** diversity of judgments and guard against inad
“ vertence of conclusions in controversies involv-
‘ing weighty and serious matters.”

Ex parte Woods, 143 U. S., 202.

It is respectfully submitted that as there is no ques-
tion in this case of an erroneous decision on a ques-.
tion of law by the Court below, but only whether the
peculiar facts in this cage brought it within well-set-
tled legal principles, the action being simply between
individuals respecting personal and private interests,
no questions of gravity and importance were in-
volved within the meaning of the statute; nor is a
review of the decision necessary in the interest of
jurisprudence and uniformity of decision, nor to
avert diversity of judgments and guard against in-
advertence of conclusions in controversies involv-
ing weighty and serious matters.

Point III.

The legal principles above enunci-
ated were properly applied by the
Court of Appeals to the facts in the
case at bar.

First.—The wholé issue in this case, both upon
the law and upon the facts, was referred to a
Referee to hear and determine:

In such cases, as said by Judge Lacombe, the
tule laid down by this Court is as follows: ‘* As the
Court in its judgment ordered his findings to stand

10

as the findings of the Court, the only questions
before this Court are whether the facts found by
theJReferee sustained the judgment.

** As the case was not tried by the Circuit Court
upon a waiver in writing of a trial by a jury, this
Court cannot review exceptions to the admission or
exclusion of evidence or of findings of fact by the
Referee or of his refusal to find facts as requested.”

Shipman v. Straitsville Mining Co.,
158 U. S., 361.
Roberts v. Benjamin, 124 U. S., 64

The only question, then, which was open to the
Circuit Court of Appeals for review, was whether
or not the facts found by the Referee supported the
judgment rendered.

Seconp.—As already said in the statement, two
items only, claimed by the respondent to have been
erroneously deducted from the amount earned by
him under his contract, were allowed by the
Referee.

1st. A claim for nutlocks, $9,558 63
2d. A deduction for not completing the
contract in time, 40,000

Tuirp.—As to the item for the nutlocks, the
Referee made the following findings:

‘*9. That during the progress of the work the
defendant purchased and furnished to the plaintiff
and charged him for patented nutlocks, for which
the defendant paid $9,558.63.

‘10. That the said nutlocks so furnished by the
defendant were used by the plaintiff in the con-
struction of the road.

‘© 11. That there are no provisions in the contract
which require that the plaintiff and the plaintiff
never agreed that he should use in the construction

Tl

of the road under said contract any patented nut-
locks.

“12. That the plaintiff was ordered by the de-
fendant to put such nutlocks on the road at the
beginning of the work.

‘13. That he protested against their use, and
finally yielded, and used them in track laying up-
on the promise that the matter of the charge for
nutlocks should be adjusted after the completion
of the contract.”

See Referee’s Findings, Record, pages
112-113.

Upon the facts so found the Referee found as
conclusions of law:

“3. That the plaintiff is not liable to the defend-
ant for the sum of $9,558.63, the cost of patented
nutlocks furnished by the plaintiff to the defend.
ant and used by him in the performance of the said
contract.

4. That there was no obligation imposed by the
contract upon the plaintiff to furnish and pay for
patented nutlocks to be used in the construction of
said road.

5. That the plaintiff is not legally indebted to
the defendant in any sum whatever for patented
nutlocks furnished by the defendant and used in
the construction of the road under said contract.”

See Referee’s Findings of Law, Record,
page 118.

FourtH.—As to the right of the defendant to de-
duct the $410,000 penalty the Referee found the fol.
lowing facts. :

2.

“That immediately after the execution of the
said contract the plaintiff procteded to carry out

12

and perform the same, and did carry out and
perform the same, except.a portion thereof other:
wise agreed between the parties, and substan-
tially completed the same on or before the 1st
day of November, 1887, and the same was duly ac-
cepted by the defendant on or about the ist day of
March, 1888.”

5.

‘‘That the consideration for the performance of
said contract originally mentioned in said contract
was $3,914,600, but before the execution of said
contract by the plaintiff, by and with the consent
of the defendant, the consideration was changed
and made “om 600.”

6.

“That the plaintiff made and entered into a sup-
plemental contract whereby he agreed with the de-
fendant to complete his performance of said con-
tract on or before the Ist day of June, 1887, and to
allow the said defendant by way of forfeiture, in
case the said railway were not so completed by the
ist of June, 1887, the sum of $40,000.”

7.

That the defendant failed to furnish the plaintiff
with rights of way, as by said contract it had
agreed to do in time to enable the plaintiff
to complete his contract prior to the Ist
day of June, 1887, or prior to the Ist day of August,
1887, but, on the contrary, delayed the plaintiff in
the performance of said contract, at a point upon the
said road known as Minneville, until October 27th,
1887, by reason of the neglect, failure and omission
of the defendant to obtain the necessary right of
way at said point so as to permit the construction
of the road and completion of the contract at said
point.”

13

8,

“That the plaintiff was thereby prevented from
completing his contract on or prior to August 1st,
1887, and also on or prior to June Ist, 1887, by the
negligence, omission and fault of the defendant.”

See Record, Findings, pages | 11-112.

Upon the facts so found the learned Refereé held
as conclusions of law:

1.

‘¢ That the defendant is not entitled to charge the
plaintiff, or to retain and deduct from the amount
earned and payable to the plaintiff under said con-
tract the sum of $40,000 as a forfeiture or liqui-
dated damages for not completing the contract on
June Ist, 1887.”

2.

‘““That under the facts proved in this case, the
plaintiff is not legally liable to the defendant
for any damages for failure to complete the
contract within the contract time of the
time agreed upon, for the reason that the
plaintiff was prevented by the negligence of the
defendant, and its omission to procure the neces
sary right of way, completing the work in such
time.” :

See Record, Findings, pages 117-118.

Firra.—The only defense interposed by the pe.
titioner to the payment of these just claims, which
were a balance of the contract price earned by the
respondent for ‘work actually done, was a receipt
which the petitioner claimed amounted to an accord
and satisfaction between the parties, and was a bar
to the respondent’s recovery.

That receipt is set out in full both in the petition
for the writ and in the brief of the counsel for the

A4

petitioner, as well as in the opinion of the Circuit
‘Court of Appeals, and need not be set out in extenso
here.

The following is a summary ‘statement of the
transactions, as stated in it.

Summary.

Amount earned under

contract fixed by

engineer, $3,895,798.79 (not disputed. )
Amount allowed for

extras fixed by en-

gineer, ; 34,598.90 *
Total, $3,930, 397.69 «
Transporta-
tion fixed
bycontract $50,000. (notdisputed.)
Amount re-
tained as
security for
liens, etc., 40,000 a
Payment
in money,
etc., $,617,306.50 3,707,306.57 ~

Balance, $223,091.12
Payment for nutlocks, $9,558.63 (amount not
disputed.)
Retained for forfeiture, 40,000. (amount not
disputed fixed
by contract.)

$49,558.63

Balance, $173,532.49 (not disputed.)

“Ls

'' The transaction as shown by the receipt was in

effect as follows:
The petitioner conceded that the

balance earned under the contract by »

the respondent, after deducting all

undisputed credits, amounted to $223,091 12
But there were two items as to

which there was no dispute as to the

amount, but which the petitioner de-

ducted from the balance due the re-

spondent, amounting to 49,558 63

Leaving the conceded balance due
the respondent at all events,

$173,532 49

In the payment of the balance of $173,532.49 the
petitioner did not pay one penny more than it was.
legally bound to pay, and which amount it is con-
ceded was due to the respondent. But the petitioner
claimed that the respondent, in consideration of the
payment of the sum concededly due, agreed that
he would relinquish and release all his claim to the
items deducted for nutlocks and overtime, amount-
ing to $49,558.63.

In the Court below the respondent invoked the.
principles of law above mentioned, and claimed that
the receipt did not amount to an accord and satisfac-
tion, and was no bar to the respondent’s recovery.

Ist. Because, as to all the items paid, they were.
wholly liquidated and undisputed in amount.

2d. Because the payment of those liquidated un-
disputed items formed no consideration for the re-
lease of the balance of the claim.

3d. That the rule that payment by a debtor of a
part of his debt is not a satisfaction of the whole
applied, and that an agreement to release under

such circumstances was nudum pactum and unen-
forcible.

16

SrxtH.—-The court below held that the facts
found by the Referee brought this case directly
within the principles above enunciated; and refer-
ence need only be made to the opinons of the
learned Judges of the Court below to show the
reasoning upon which they held those rules apppli-
cable to this case.

Judge Lacombe, in his opinion, reasoned as fol-
lows: ‘‘ It appears, as has already been shown, that
at the time the ge in full or proposed ‘‘ accord ”
was prepared and submitted to plaintiff for his ac-
ceptance, the amount earned under the contract
($3,895,798.79) was a claim against the defendant
‘liquidated ” in the strictest meaning of the term.
Not only was it undisputed in the sense that de-
fendants were willing to Pay it but it was no longer
open to dispute, even if they wished to dispute it.
As to the work called for by the contract, that in-
strument bound the defendant to pay the sums
shown by the final estimate to be due whenever the
Chief Engineer should certify to proper completion,
and he had so certified.

The price for such work was fixed by the con-
tract itself. As to the extra work, the Chief En-
gineer had certified that he had ordered it—that it
was done and had fixed and determined the price
for it—and the contract bound the company to pay —
the price so fixed. Therefore, except for the —_

defense of payment, the company was wholly
without defense to the claim for that sum, $3.. -
895,798.79; it could not contest it in court ‘‘ with
good faith ” nor with ‘“‘any color of right.” Had

laintiff before March 9th, 1888, brought suit for the
fatanos of such sum remaining unpaid, after cred.
iting the defendant with all the items of payment
it asserted it was entitled to charge, the railroad
company could not, assuming that its officers were
* conscientious, even have verified an answer which
could have raised any issue or delayed plaintiff’s
entry of judgment beyond the time necessary to
notice a motion for. judgment upon the answer as
frivolous. As to the items of payment, which the
company insisted upon, all. were and always have
been conceded by plaintiff, except the cost of nut
locks and the overtime penalty. When, therefore,
both these items were credited to the defendant in

17

the receipt, it parted with nothing—not even a
right to litigate—in agreeing to pay and in ac-
tually paying the balance remaining of the liqui-
dated amount earned under the contract after de-
ducting all alleged credits for payment. Hence
there was no consideration moving to the plaintiff
by reason of the payment of this sum on March
Yth, 1888, and unless some other benefit to plaintiff
can be found to support it, his agreement implied by
receipt in full, to abandon all claim to the cost of
nutlocks and overtime charged, was without cuon-
sideration and nudum pactum.

- reference to the receipt in full, which is set
forth in the 13th Finding of Fact, it will be
found that the instrument disposed of another item
not hereinbefore referred to in these terms; ‘‘ And
whereas the further sum of $34,598.90 should be
credited to said Clark for materials sold by him to
said company, and certain rebates and other mat
ters of that description, etc. etc.” This sum is, .by
the statement of account set forth in such receipt,
credited to Clark, and is included in the $173,532.49,
paid to him upon his signing such receipt. From
what has been said before, it is plain that if at the
time of the transactions relied upon, as showing ac-
cord and satisfaction, this sum of $34,598.90, so
allowed to Clark, represented an unliquidated item,
the amount of which he would have to establish
by evidence in case he had sued to recover it, its
allowance to him upon the settlement of March 9th,
1858, would be a sufficient consideration to uphold
that settlement against him as an accord and satis-
faction of all his claims. ;

The findings of fact do not give much informa-
tion as to the details of this item.

It is suggested that the testimony in the case
shows that it covered surplus materials, such as
rails, spikes, bolts, etc., which Clark had brought
on the line of the work. but had not needed; that
it being more advantageous to sell them where they
lay than to transport them elsewhere, plaintiff hail
agreed with defendant that it would take them off
his hands, had made ‘a trade outside of the con.
tract.” But with the testimony this Court has
nothing to do. It sufficiently appears from the
findings that part at least of this sum was for
‘‘materials sold by (Clark) to said Company.”
From the engineer’s certificate, which is included in

18

the ‘findings, it appears that this item represented
no part of the work specified under the contract,
and no part of the extra work and materials or-
dered by him; that it was not included in his cer-
tificate, nor in the final estimate; that he made no
decision about it one way or the other, and appar.
ently that he never undertook to pass upon it.
Therefore, it was not liquidated by the original
contract, nor by any action of the engineer there-
under. Indeed, it is plain to a demonstration from
the findings, that the item in question was not in-
cluded either in the original contract or in the extra
work, and must represent an additional and inde-
pendent contract of sale. What the terms of
that contract of sale were the findings do not
disclose; if they were of such a character as
to leave the price, of the Article sold open
to future adjustment, and if no’binding agreement
of the parties had subsequently naiuated such price;
in other words, if on March 9th, 1888, the situation
was such that the plaintiff put to his suit could
have recovered this item only by proof of amount
furnished or of reasonable value, or of both, then it
was an unliquidated item; and its allowance to the
plaintiff on settlement would be a good considera-
tion to support the contract of accord and satisfac-
tion. If, on the contrary, before that time, either
when the independent contract was made or later,
the parties had settled on the quantities delivered
and had agreed upon the price, nut by some mere
expression of willingness to pay a particular
amount, but in such a way as to preclude further
litigation ‘“‘in good faith” or “‘ with any color of
right”—then the allowance and payment of the
$34,598.90 would not constitute good consideration.

The only light we have upon this question is
found in a single clause—indeed, practically in a
single word—of the 14th finding of fact: ** That
said receipt and paper contained an accurate, truth-
ful and undisputed account of all dealings between
said parties except in the matter of the forfeiture,”
etc.

It is quite manifest from the findings and con-
clisions that the Referee uses this word ‘ undis-
puted” as synonymous with liquidated. He was
evidently satisfied from the testimony that the prior
transactions between the parties were such that
this sum was not more open to dispute than was

19

the sum of $3,895,798.79 to which the Chief En-
gineer had certified. By what process it was so
liquidated does not appear in the findings, and no
one seems to have asked the Referee to find the
facts more specifically. We must take his find-
ing, therefore, as conclusive upon the question,
and assume that, either by agreeing for a price in
advance or subsequently by entering into some
binding agreement as to the.sum to be paid, the
defendant had lost its right to throw the plaintiff
into court as to that item. Its allowance and pay-
ment, therefore, could not constitute a good con-
sideration for the alleged accord and satisfaction.

Judge Wallace, in his opinion, said:

‘*The Referee found. as conclusions of law:
(1) That at the time of signing the receipt the
plaintiff was not indebted to the defendant upon
the item for nutlocks; (2) that the plaintiff was not
liable for the item of $40,000 debited to him for
failure to complete the railroad by June Ist, 1887;
(3) that when it rendered the statement of account
the defendant was indebted to the plaintiff in the
sum of $49,553.63, in addition to the sum of
$173.532.49 paid by it upon receiving the receipt;
(4) that the delivery of the receipt and the accept-
ance of the payment by the plaintiff did not consti-
tute a valid payment or accord and satisfac-
tion of the said sume of $9,558.63 and $40,0v0,
or either of them, or any part of them; and
that the plaintiff was entitled to recover the sum
of $49,558.63, with interest from March 9th,
1888. The assignments of error thus raised the
question whether the acceptance of $173,537.49 by
the plaintiff upon a promise to receive it in full of
all his demands was a settlement and satisfaction
of his demands against the defendant, which
amounted to $49,558.63 more than that sum. If
there was no consideration fur his promise, the
conélusion of the Referee was correct. If there -
was a sufficient consideration for it, the assign-
ments of error are good. * * * It is conceded that,
as to the part of the plaintiff’s demand established
by the certificate of the engineer, it was a liqui-
dated and undisputed demand against the detend-
ant in the sense in which these terms are used in
considering the validity of a promise to accept a
part payment in satisfaction of the whole demand.

=

20

The other part of the plaintiff's demand that for
the materials, etc., purchased of plaintiff by de-
fendant was, according to the Referee’s finding,
undisputed in fact between the parties, and this
being so, it is quite unnecessary to inquire whether
it was originally one in respect to which there
might have been a fair difference of opinion be-
tween the parties as to the amount due.

The statement of account rendered by the de-
fendant is evidence as against the defendant not
only that it was an undisputed demand, but
one the amount of which had been ascer
tained by the parties. If the amount had been
ascertained, it was a liquidated demand. As no
facts appear in the findings of the Referee to the
contrary, it is to be concluded that this part of the
plaintiff's demand was also liquidated as well as un-
disputed by the defendant. The case is not precisely
one where the debtor refuses to pay the whole of
an undisputed and liquidated demand, and exacts
a promise from his creditor to receive part in satis-
faction of the whole. Strictly it is one where the
creditor having two undisputed and liquidated de-
mands against the debtor, and the latter claiming
to have cross demands or counterclaims against the
creditor, refuses to pay the creditor’s demands un-
less the validity of the cross demands is acknow]l-
edged and their amount allowed to him by the
creditor. By the statement of account and the re-
ceipt annexed to it the defendant, in fact, took this
position and notified the plaintiff that as a condition
to paying the demands which it conceded to be
due the plaintiff, the latter must allow and deduct
the debited items for the nutlocks and the forfeiture.
Upon this state of facts a promise to allow the
whole amount of the cross demands has no con-
sideration to sustain it, because, in contemplation
of the law, no benefit could accrue to the promisor
and no injury to the promisee.

The promisor derives no benefit, because he allows
the whole; the promisee is not injured, because he ,
relinquishes nothing.”

It will thus be seen that both the Judges are en-
tirely in accord as to the law applicable to the
case, which, reduced to a concrete form, is simply
that an agreement without consideration is nudum
pactum and unenforcible.

21

It will also be seen that both of the Judges con-
cur in the view that, as a matter of fact, there was
no consideration for the release or discharge of his
claims by the respondent.

SixtH.—Upon the receipt, as an accord and bar
to the responadent’s recovery, the petitioner rested
practically its entire defense.

When asked whether it was just and right that
the respondent should be mulcted in the sum of
$40,000 for not completing the road in time, when
the conceded testimony showed and the Referee
found that the fault was that of the petitioner in
not obtaining rights of way, its only reply was, the
respondent has lost his right to payment by reason
of the receipt.

When asked whether it was just and reasonable,
and whether there was any provision of the con-
tract warranting it in taking from the respondent
$9,558.23 for nutlocks, its only answer was, the
receipt prevents the payment.

It was read, reread and read again at every stage
of the trial, and it was claimed constantly by the
petitioner that, no matter how just were the claims
of the respondent, the receipt was a bar to them
all.

It is claimed that the receipt stands as payment,
though no payment has been made. That it stands
for an account stated, though no account had been
rendered and no statement made; that it stands for
an accord and satisfaction without the slightest
proof of either the accord or satisfaction.

The defense, it is submitted, is not a just one,
and the Court below properly found that it also
was not a legal one.

It is believed that this Court will have no diffi-
culty in arriving at the conclusion that the rules of
law were properly applied by the Court of Appeals
to the facts found in this case. ©

22.
Point IV.

None of the cases cited and relied
upon by the petitioner conflicts with
the decision in the case at bar.

The decisions of this Court in the cases of U. 8S.
v. Child, 12 Wall., 232, and U.S. v. Adams, 7
Wall., 463, as well as the other cases in this Court,
relied upon by the petitioner, were distinguished
and held not applicable to the facts in this case, in
the opinion of Judge Lacombe, as follows: ‘* Analy-
eis of the leading reported cases will show that
although it is not always discussed in the opinion,
a valuable consideration is found to be present
wherever a defense of accord and satisfaction has
been sustained. The brief filed by the learned
counsel for plaintiff in error presents such a com-
prehensive selection of authorities that it will be
sufficient to refer to its citations. ,

First to be considered is a group of decisions of
the U. S. Supreme Court, where claimants for sup-
plies furnished to the Government were held fore
closed by wi ye in full and acceptance of part of
their original claims. It should be remembered that
the U. S. Treasury pays only out of appropriations
and upon audit. There being many claims for mili-
tary stores furnished during the Civil War, Con-
gress created a special board to pass upon their va-
lidity and amount. None was required to bring his
claim before such board, but if he did, payment was
at once secured to him of whatever amount the
board might find due, out of a special appropriation
made for that purpose. Payment on all of these
claims out of the ordinary appropriations had been
suspended by order of the Treasury Departinent.
‘* From the time the Secretary issued his order sus-
pending the payment, * * * they must be re-
garded as claims disputed (7. e.. the whole claim)
by the Government; and unless the board had been
constituted, could have been adjusted only by Con-
gress or the Court of Claims” (7 Wall., 463). In
all these cases the amounts paid in settlement were
unliquidated, since but for the finding of the board,
the Government could have litigated them all in good

28

faith, andin giving mareneer? ye the ei at the weed
time going to the expense of constituting a specia

tribunal to adjust the. claims, and ——s the
more expeditious payment of what might be found.
due, there was certainly abundant consideration to
sustain the settlement. U.S. v. Adams (1868), 7
Wall., 468; U. S. v. Child (1870), 12 Wall., 232; U.
S. v. Justice (1871), 14 Wall., 15. In Sweeny v.
U. 8. (1872), 17 Wall., 77, the claim wasclearly un-
liquidated as to every part of it, involving the ques.
tion of reasonable compensation; a circumstance
which appears from the opinion: ‘“‘ Enough appears
to satisfy the Court that the charter party was.
superseded and that the claim, in fact, was for a
quantum meruit, and as such that it was a proper
subject of compromise.” In U.S. v. Martin (1876),
94 U. S., 400, plaintiff, a laborer, claimed extra pay
under some construction of the eight-hour law. He
presented his claim to the auditor in 1873 and re-
ceived $205, giving a receipt in full. He subse-
quently brought suit for the balance in the Court
of Claims. The payment of the $205 was a suffi-
cient consideration, since the entire claim was
fairly disputable in the courts. In Baird v. U S.
(1877), 96 U. S., 480, plaintiff had a contract with
the Government to furnish certain locomotives.
The stipulated price was, first, a fixed sum for each
locomotive; second, any advance there might be, af-
ter acertain date. in cost of labor and materials; and
third, any damages resulting from giving the Gov-
ernment’s order preference over others. The fixed

price had been claimed and the damages recovered

hy suit. The plaintiff presented a claim for $151,588
for entire advance in cost which was audited and
allowed for $97,507, and plaintiff informed of the
principles upon which the adjustment was made.

He took draft for the amount and collected it. Held

an accord and satisfaction. Manifestly every dol-
lar of the claim of $151,588 was unliquidated and

susceptible of liquidation only by consent of the
Government or by. the courts. As<ent to an adjust-

ment at $97,507 was a valuable consideration.

Pray v. U.S. (1882), 106 U. S., £94, is not in point,

and in Boofington v. Tuyes (1886), 120 U. S., 19s,

there was abundant consideration in the abandon-

ment of a right to appeal. In Fire Ins. Assn. v.

Wickham, 141 U. S., 579, premature payment was
held a good consideration. :

24

- In Battle v. McArthur, 49 Fed. Rep., 715, plain-
tiff had a contract for grading a railroad, compensa-
tion was at fixed prices for the units of the different
kinds of work done. There had been a long dispute
as to the classification of hardpan by the engineers,
z. e., as to how many units of rock and earth exca-
‘vation respectively should be paid for. After the
work was done, and the amount of final estimate
was being settled on, a conference was had, of
which Thayer, J., says: ‘‘The percentage of loose
rock excavation thus demanded was not allowed,
but it caused the Chief Engineer to raise the classi-
fication some twenty per cent., and that increased
entered into the final estimate.” Here was a con-
cession and payment which certainly constituted a
good consideration.”

Every one of the decisions in the various States,
cited upon the petitioner’s brief in the Court be
low was also carefully examined and distin-
guished.

In every one of those cases, as pointed out in the
opinion of the Court below, some consideration
was present either by the giving up of some right
which the debtor had or the acceptance by the
creditor of some benefit which he would not have
received, except for the settlement and compromise
made.

Thus it will be seen that the Court below fully
recognized the rule of law that the settlement and
adjustment of a claim upon a consideration, would
be a bar to further recovery by the creditor against
the debtor.

While recognizing this rule, they held that the
facts found by the Referee showed that there has
been no accord and satisfaction between the par-
ties, because no consideration for the release of any
claim passed from the petitioner to the respondent.

25

Point V.

The fact that only two Judges com-
posed the Court rendering the de-
cision sought to be reviewed is no

ground for the issuance of a writ
by this Court.

It is not claimed by the petitioner that any re-
quest for a full Bench was made. If it had been,
the request undoubtedly would have been granted.
The petitioner took the risk and saw fit to argue
the case before two Judges.

As already said, the Judges in no way differ as to
the law applicable to the facts found by the Ref.
eree.

In the opinion of Judge Wallace, the finding of
the Referee that the claim for materials purchased
of the respondent by the petitioner was undisputed
in fact between the parties, made it unnecessary to
inquire whether it was originally one in respect to
which there might have been a fair difference of
opinion between the parties as to the amount due,
and that the statement of account rendered by the
petitioner was evidence as against the petitioner
not only that it was an undisputed demand, but
one the amount of which had been ascertained by
the parties, and that if the amount had been ascer-
tained, it was a liquidated demand.

See Opinion of Judge Wallace.

Judge Lacombe, in his opinion, inclined to the
view that it was not aecessary even to go to the
extent indicated by Judge Wallace, but that the
finding of the Referee that the receipt contained a
‘truthful, accurate and undisputed account”
showed that he was evidently satisfied from the
testimony that the ; rior transactions between the
parties were such that the sum of $34,598.90 was

26

not more open to dispute than was the sum of
$3,895,798.79, to which the Chief Engineer had certi-
fied; that the finding must be taken as conclusive up-
on the question and assumed that either by agreeing
for a price in advance or subsequently by entering™
into some binding agreement as to the sum to be
paid the petitioner had lost its rights to throw the
respondent into court as to that item.

See Opinion of Judge Lacombe.

Both of the learned Judges agreed in the con-
clusion that there was no consideration for the
alleged accord and satisfaction.

Point VI.

The application for the writ of
certiorari should be denied.

Respectfully submitted.

KELLOGG, ROSE & SMITH,
Attorneys for the Respondent,
120 Broadway,
New York City,
ABRAM J. ROSE,
Of Counsel,

et

IN THE

Supreme Court of the United States.

OcTOBER TERM, 1899,
No. 256.

CHICAGO, MILWAUKEE and ST.
PAUL RAILWAY COMPANY, .
Petitioner,
against
HEMAN CLARK,

Respondent.

BRIEF FOR RESPONDENT.

Statement.

This case comes before this Court upon a writ of
certiorari to the Circuit Court of Appeals of the
United States for the Second Circuit to review an
order of said Circuit Court of Appeals affirming a
judgment entered upon the report of a referee for
$88,084.86 by the Circuit Court of the United
States for the Southern District of New York in an
action brought by Heman Clark, as plaintiff,
against the Chicago, Milwaukee and St. Paul
Railway Company, defendant.

See Judgment, pages 229.230.
See Order of Circuit Court of Appeals.
See Writ of Certiorari.

2

This action was brought to recover on six differ-
ent causes of action.

ist. To recover under a written contract entered
into between the plaintiff and the defendant a bal-
ance unpaid of $71,057.63.

2d. To recover upon quantum meruit the sum of
$127,652.81 for work done in excess of that called
for by the contract and which was not ordered
under the terms of the contract in writing.

8d To recover damages for freight paid to avoid
delays, the sum of $2,196.

4th. To recover the sum of $127,652.81 for fraud-
ulent representations made by the defendant as to
the quantity of work to be done under the con-
tract.

5th. To recover the value of timber converted by
the defendant to its own use, the sum of $2,425.

6th. To recover for damages and increased cost
occasioned by the giving of wrong grades, the sum
of $89,833.33.

By consent of the attorneys for the plaintiff and
and the defendant, an order of reference was en-
tered on the 19th day of October, 1894, referring all
the issues in this action to William G. Choate, as
Referee, to hear and determine the same.

See Order of Reference, pp. 45 and 46.

The Referee appointed by that order having de-
clined to serve, an order was entered on the 3d day
of January, 1895, ordering that George Hoadly be
substituted as Referee in the place and stead of said
William G. Choate, and that ‘‘this action, and all
the issues therein, be, and the same hereby are,
referred to the said Hon. George Hoadly, as sole
Referee, to hear and determine the same.”

See Order, pp. 47-48.

3

The case came on for trial before the said Referee,
and a judgment was rendered by him in favor of
the plaintiff and against the defendant for the sum
of $80,479.35, with interest and costs.

A motion for a new trial under the rule adopted
February 5th, 1877, in the Southern District of New
York, was made by the defendant and overruled,
and the report of the Referee confirmed by Judge
Addison Brown.

Judgment was entered upon the report of the
Referee on the 6th day of April, 1898, in favor of
the plaintiff, for the sum of $88,084.86.

See Judgment, pp. 229-230.

A writ of error was sued out by the defendant to
review the judgment entered, by the Circuit Court
of Appeals for the Second Circuit, which Court
affirmed the judgment.

The defendant then petitioned this Ccart for a
writ of certiorari, which was granted, and, in pur-
suance of said writ, this case now comes before this
Court.

Pleadings.

The only items allowed by the Referee in this
case were the sum of $40,000, deducted by the de-
fendant from the balance due the plaintiff as
overtime penalty for the alleged non-completion
of the contract within the time stipulated: the
sum of $9,558.63, deducted by the defendant for
nutlocks furnished by it to plaintiff and used
by him in the construction of the road, and
the item of $2,425 for timber belonging to the
plaintiff, converted by the defendant to its own use.

It is only necessary, therefore, to call the Court’s
attention to the causes of action embracing these

three items, to wit, the first and fifth causes of
action.

For a first cause of action the complaint alleges
the making of a contract between the plaintiff and
the defendant on the 6th day of March, 1896, for
the building of a line of railroad for the defendant,
extending from a point in the City of Ottumwa,
Iowa, to Harlem Station, in Clay County, Missouri,
a total distance of 202.8 miles, in accordance with
the plans, profiles and specifications made by the
chief engineer of the defendant and under his
supervision and direction.

That for the work provided to be done under said
contract, the defendant agreed to pay the sum of
$3,954,600, subject, howeyer, to the right of de-
duction of $50,000 by the defendant for transporta-
tion as provided in said agreement.

That the plaintiff proceeded to execute and per-
form said contract and prior to the commencement
of this action had fully completed and performed
the same so far as permitted by the said defendant
and excepting such portions as were not required
by it to be done thereunder.

That the said work had been accepted by the de-
fendant and its Chief Engineer, who had certified
to the proper performance thereof, and that the
amount earned thereunder, after deducting the price
of work not done and adding thereto certain allow-
ances and rebates, as agreed upon, was the sum of
$3, 930,397.69/100.

That there had been paid on account of said con-
tract the sum of $3,859,340.06/100, leaving a balance
due of $71,057.63/100.

See Amended Complaint, pages 32-33,
folios 95-99.

For a fifth cause of action, the complaint alleges
that the plaintiff was the owner of 97,000 feet B.

5

M. of bridge timber of the full and reasonable
value of $2,425, which said timber had been brought
and placed upon the line of the work for his use in
completing the said contract.

That the defendant, without the knowledge and
consent of the plaintiff, took possession of the same
and converted it to its own use, to his loss and dam-
age in the sum of $2,425.

See Amended Complaint, page 36, folio
107.

The answer of the defendant, —

ist. Admits the making of the contract and the
commencement of the performance thereof and its
acceptance by the defendant and its Chief Engineer.

2d. Denies the amount earned and the balance
alleged to be due thereunder.

It then sets up the following affirmative de-
fenses:

ist. That under the provisions of the contract,
the Chief Engineer had certified for the work done
thereunder, that the plaintiff was entitled to
$3,895,798.79, from which the defendant claimed the
right to deduct for transportation, the sum of
$50,000; and the further sum, by way of forfeiture
for non-completion in the contract time, the sum of
$40,000; and that it had paid to the plaintiff, in
money, material, labor and transportation, a sum
in excess of the amount certified.

2d. That subsequent to the making of the final
certificate by the chief engineer and upon March
9th, 1898, an account was stated and agreed to be-
tween the parties as the amount earned and the
amount to be credited for payment under the con-
tract, and the balance due the plaintiff was fixed at

6

the sum of $173,532.49, which said sum was paid
by the defendant and received by the plaintiff.

3d. That on the 9th day of March, 1888, the
plaintiff acknowledged in writing that he had re-
ceived payment of said sum of $173,532.49 in full
satisfaction of all claims and demands of every
kind, name and nature arising from or growing out.
of said contract, except the sum of $40,000 retained
for future payments, and executed a receipt and
acknowledgment for the same.

That the said sum of $40,000 so retained had been
paid by the defendant for the purposes certified in
said receipt and agreement, and the sum of $521.75
in excess thereof, for which sum an affirmative
judgment was demanded.

See Amended Answer, pages 20 to 30,
folios 60 to 88.

The reply of the plaintiff is a general denial of all
the facts stated in the amended answer constitut-
ing a counterclaim.

See Reply, page 19.

To state the issues more briefly: The plaintiff
under his first cause of action claims the sum of
$71,057.63 as a balance due under the contract, to-
gether with the sum of $2,425 the value of timber
belonging to him and taken and used by the de-
fendant.

The defendant practically admits performance of
and compliance with the terms of the contract, but
sets up the following affirmative defenses:

ist. Payment in full.

2d. An agreement giving it the right to charge
the plaintiff with the sum of $40,000 forfeiture or

a———

7

damages for not completing the contract within the
contract time.

3d. An account stated between the plaintiff and
the defendant whereby a balance was found which
has been paid.

4th. A plea of accord and satisfaction growing
out of the execution of a receipt in full.

5th. The payment of the sum of $40,000 retained
by the defendant for specific purposes and the sum
of $521.75 in excess thereof.

Facts.

On March 6th, 1896, a written contract was en-
tered into between the defendant, the Chicago, Mil-
waukee, and St. Paul Railway Company, and
Heman Clark, the plaintiff, wherein and whereby
it was agreed that said Clark should construct and
fully complete, ready for rolling stock, a line of
railroad for the defendant from Ottumwa, Iowa, to
Hariem Station (afterwards changed to Randolph’s
Bluff), Clay County, Missouri, a total distance of
202.8 miles.

The work so to be done was to be in accordance
with the plans, profiles and specifications made, or
thereafter to be made, by the chief engineer of the
defendant, and under his supervision and direction
and to his satisfaction. ~

The price originally bid for the work was
$3,990,000, but was afterwards adjusted at the rate
of $19,500 per mile, which is $3,954,600 and almost
equal to a deduction of $40,000 from the original
bid.

The contract price inserted in the contract prior
to its execution by the plaintiff was $3,914,600 and
the contract was signed in that condition by the de-
fendant.

‘ se + *2y
a ae

But the plaintiff discovered the error and by
consent of the defendant the lump sum to be paid ~
was fixed at $3,954,600 before execution by the
plaintiff.

The contract originally provided that the work
should be completed by the Ist day of August,
1887.

The Referee, however, found that that provision
was modified by a supplemental agreement to the
effect that if the railroad was not completed by the
ist day of June, 1887, a forfeiture of $40,000 from
the contract price should be imposed upon the plain-
tiff.

The finding of the Referee was not based ona
written agreement between the parties, but upon
correspondence testified to at the trial, which the
defendant claimed established a contract.

The only evidence of the plaintiff’s assent was
parol evidence as to a telegram claimed to have
been sent by him, which had been lost, and as to
which there was no proof that he had sent it or au-
thorized its sending. The plaintiff expressly denied
that he had sent it or authorized it.

But whether the agreement to forfeit $40,000
was made or not, the evidence conclusively shows
and the Referee expressly found that the failure to
complete by the Ist day of June, 1887, was wholly
‘due to the failure of the defendant to provide the
rights of way so as to enable the plaintiff to com-
plete his work.

See Referee’s Findings, p. 112, fols.
335-336.

The obligation to furnish rights of way was ex-
pressly imposed upon the defendant as a condition
to be performed by it.

The contract provides ‘‘ For and in consideration
‘of the payments, covenants and agreements of

_——

9

“the party of the second part to be by said
‘second party made, kept and performed as here-
‘‘ inabove set forth, the party of the first part here-
‘by covenants and agrees to furnish, at his own
‘cost and expense, and at such time or times as
“not to delay the execution of the work in this
‘agreement mentioned and referred to, all the
‘lands now or hereafter marked out and desig-
‘nated by the said first party’s chief engineer for
‘‘ right of way, borrow pits, waste banks and sta-
‘ tion grounds of all kinds as the said lands may be
“required for the construction of the railroad cov-
“ered by this agreement.”

See Contract, p. 169, fol. 506.

The plaintiff continually called upon the defend-
ant to furnish rights of way, but it failed to do so.

The testimony shows that there were twenty-five
places where, until after June 1, 1887, the rights of
way had not been procured.

At a place called Minneville the right of way, for
a distance of 2,750 feet, was not procured until Oc-
tober 27, 1887.

Testimony Hegeman, p. 239.

The next day, after the final right of way had
been furnished. the contract was completed, and
the first train ran over the line on November 1,
1887.

See testimony of Russell, p. 378, fol.
1133.

After the completion of the work, in accordance
with the terms of the contract, the Chief Engineer
of the defendant made a final certificate, bearing
date March 3d, 1888, which was presented to it but
not to the plaintiff.

10

By that certificate the Engineer certified that it
was a final estimate of the amount and value of the
work done and materials used by plaintiff in build-
ing the railroad, including all extra work done by
him, and that the said railroad agreed to be built
had been ‘‘constructed, built, completed and fin-
‘‘ished, in all respects, in conformity with the
‘‘agreements of said contract, except as the said
‘* Railroad Company, party of the first part, has,
‘by agreement witi: said Clark, assumed the con.
‘* struction and completion thereof.”

He then certified the amount due:

As per contract price, $3,954,600 00
From which deductions were made by

him amounting to 104,372 77
Leaving a balance of $3,850,227 23
To which he added for items not cov-

ered by contract, etc., 45,571 56

—

———

Making a total due to the plaintiff, $3,895,798 79
See Certificate, pp. 197-203.
To this amount, as certified by the
engineer, the defendant credited the
plaintiff for materials sold by him
to it, and for certain rebates and
other matters, the sum of 34,598 90

Making the sum of $3,930,397 69

There was no dispute in this case, but that this
amount due the plaintiff was never fully paid to
him, unless by the transactions evidenced by a
receipt signed by him on March 9th, 1888. Tuis
RECEIPT, IT APPEARS, WAS SIGNED IN NEW YorRK
BY THE PLAINTIFF BEFORE HE HAD RECEIVED OR
SEEN THE CERTIFICATE MADE UP BY THE CHIEF
ENGINEER, AND BEFORE HE HAD RECEIVED ANY
FINAL ACCOUNT OF THE ITEMS MENTIONED IN THE

ore ora

11

RECEIPT OR HAD ANY KNOWLEDGE OF THEIR COR-
RECTNESS.

The first time that the final estimate of the
Engineer was seen by Mr. Clark was upon the trial
of this action before the Referee. It had been de-
livered to the defendant, and with the final ac-
counts had been sent by the president of the de-
fendant to Mr. Bond, its vice president, who had
an office in New York. Mr. Bond simply sent the
receipt with the check for the balance shown by
the receipt to the plaintiff, and did not forward the
final accounts nor the Engineer's certificate. This
was expressly admitted by Mr. Bond on the trial.

This receipt, it was claimed by the defendant,
was a bar to any recovery by the plaintiff in this
action for any claims.

The plaintiff, on the other hand, chained that it
was no bar, because the difference between the
amount earned and the amount paid, amounting to
$71,057.63, had never been released or discharged
by him and was still due and owing.

This sum of $71,057.63 was claimed by the plain-
tiff in his first cause of action and is made up of
the following items:

ist. Deductions made by defendant
for nut locks furnished by it to plain-
tiff and used by him in the construc-
tion of the road, and for which the de-
fendant rendered bills, from time to
time, the amount not being questioned
Oty Ce one nk Ka wwik twee eens $9,558 63

2d. Deductions made by defendant
for non-completion of the railroad on
the first day of June, 1897, in accord-
ance with an alleged supplemental
contract entered into between the

UN ci Soa ka ec dn ON 126 Sov ilae eee eek 40,000 00

12

8d. Deductions made for moneys
paid to subcontractors without right,
including the moneys paid in compen-
sation for the death of a.brakeman
during construction, in all............ 21,499 00

ere err eee $71,057 63

Of these amounts the Referee. has
refused to allow the defendant:

ist. The deduction for nutlocks.... $9,558 63

2d. The deduction for the forfeiture
withheld by the defendant for not
completing in time.................4. 40,000 00

The amount retained as payment for the nut locks
does not dppear specifically in the receipt, but it
is included in the sum of $3,626,865.20, claimed
to have been paid by the defendant on account of
the contract.

This was expressly so found by the Referee.
See Findings, p. 113, fol, 339.

The $40,000 appears specifically as deducted in
the receipt.

The only defense to the recovery of these items
by the plaintiff was the interposition by the de-
fendant of the receipt as a bar.

The only other item allowed for by the Referee
in this case was the claim of the plaintiff under his
fifth cause of action, to wit: $2,425 for timber be-
longing to him converted by the defendant to its
own use.

All the other causes of action aggregating $232, -
459.49 have been disallowed by the Referee.

The claims under those causes of action were for
increased cost occasioned to the plaintiff in the
prosecution of the work by the wrongful act and
fault of the defendant, its servants and agents, in

13

giving him wrong grades and in compelling him to
do more work than required by the terms of the
contract and in a more expensive manner.

As to the items allowed there is no claim or
pretense of payment, except as evidenced by the
receipt.

It will be argued by the plaintiff:

ist. THAT THERE IS NO QUESTION: OPEN FOR RE-
VIEW BY THIS COURT BECAUSE THIS CASE IS A COMMON
LAW ACTION, AND WAS NOT TRIED BY A JURY, NOR BY
THE COURT WITHOUT A JURY, UNDER THE PROVISIONS
or SECTIONS 649 AND 700 OF THE REVISED STATUTES
OF THE UNITED STATES, BUT THAT THE JUDGMENT
RENDERED WAS UPON THE DECISION OF A REFEREE
ACTING AS A COMMON LAW ARBITRATOR.

2p. THAT EVEN IF THE JUDGMENT RENDERED BE
CONSIDERED IN ANY SENSE A JUDGMENT UPON A TRIAL
BY THE COURT, THE ONLY QUESTION WHICH BY ANY
POSSIBILITY CAN BE PRESENTED TO THIS Court Is
WHETHER THE FACTS FOUND BY THE REFEREE SUP-
PORT THE JUDGMENT RENDERED.

3p. THAT THE JUDGMENT RENDERED IS FULLY
SUPPORTED BY THE FACTS FOUND BY THE REFEREE.

4TH. THAT THE RECEIPT OFFERED IN EVIDENCE BY
THE DEFENDANT IS NOT A BAR TO THE RECOVERY OF
THE PLAINTIFF FOR THE TWO ITEMS ALLOWED BY THE
REFEREE UNDER THE FIRST CAUSE OF ACTION.

5TH. THAT EVEN IF THIS COURT WERE AT LIBERTY
TO REOPEN AND REEXAMINE ALL THE FINDINGS OF
FACT MADE BY THE REFEREE THE EVIDENCE TAKEN
UPON THE TRIAL NOT ONLY FULLY SUPPORTS THOSE
FINDINGS IN EVERY PARTICULAR, BUT CONTRARY FIND-
INGS WOULD BE AGAINST THE WEIGHT OF EVIDENCE.

14
ARGUMENT.
Point I.

There is no question open for re-
view by this Court, because this case
is a common law action and was not
tried by a jury nor by the Court
without a jury under the provisions
of Sections 649 and 1700 of the Re-
vised Statutes of the United States,
but before a’ referee acting as a
common law arbitrator.

ist. THIS ACTION WAS A COMMON LAW ACTION TO
RECOVER A SUM OF MONEY CLAIMED TO BE DUE to
THE PLAINTIFF UNDER AND BY VIRTUE OF A CON-
TRACT MADE AND ENTERED INTO BETWEEN HIM AND
THE DEFENDANT, AND FOR DAMAGES BY REASON OF
THE WRONGFUL ACTS OF THE DEFENDANT, ITS SER-
VANTS AND AGENTS, IN THE PROSECUTION OF THE
WORK.

On the 19th day of October, 1894, the following
stipulation was made by the attorneys for the par-
ties:

‘Tt is hereby stipulated and agreed that
‘* the above entitled action and all the issues
‘* therein be referred to the Hon. William G.
‘* Choate, AS SOLE REFEREE TO HEAR AND DE-
‘* TERMINE THE SAME. It is further stipulated
‘‘ and agreed that judgment upon the Report
‘*of such Referee shall not be entered here-
‘in until after ten days’ notice of the filing
‘*of the report of the Referee and of the
‘‘ judgment proposed to be entered thereon
‘‘shall have been given to the opposite
“ce party.”

See Stipulation, page 46.

15

On this consent an order was entered on the said
day referring this action to Hon. William G.
Choate AS SOLE REFEREE TO HEAR AND DETERMINE
THE SAME.

See Order, page 45.

Mr. Choate declined to serve as Referee, and sub-
sequently an order was entered on the 3d day of
January, 1895, in which the previous order was re-
cited, and the Hon. George Hoadly was appointed
Referee in this action in his place and stead.

The only consent to the entry of the second order
was the stipulation appended to it to the effect that
the parties consented to the entry of the order.

See Order, pages 47 to 48.

It was under this second order that the trial of
this action was had and the decision upon which

the judgment in this action was entered was ren.
dered.

The defendant, in order to avoid the binding
effect of the decision and, if possible, to obtain a
review of the judgment, moved for a new trial
under the rule of the Circuit Court in the Southern
District of New York, passed February 5th, 1877,
before Hon. Addison Brown, prior to the entry of
the judgment. On the 6th day of April, 1898, a
judgment or decision was signed by Judge Brown
overruling the motion and adopting the findings

and rulings of the Referee as the findings and
rulings of the Court.

This decision was simply formal on the part of
the Court, without a re-examination of the ques-

tions involved, and upon the approval as to form
by the attorneys for both parties.

See Decision, pages 221-226.

16

This confirmation, if it may be so called, by the
Court, however it is submitted, was not sufficient
to open any question for review by this Court.

As said by the Circuit Court of Appeals:

‘*Great embarrassment results to the de-
‘* feated party where a Referee appointed by
** consent, in conformity to the State Code-
‘* of Procedure, has made his Report, and
**th Court has entered judgment thereon;
‘* nor has the existing difficulty been substan-
‘* tially overcome by the rule adopted by the
“three federal districts of this State pro-
** viding for motion for a new trial. —

‘**In view of the decisions, it is rather sur-
** prising that parties to common law actions
‘* in the Circuit Court consent to such refer-
s ences. ”

Parker v. Ogdensburgh and L. C. R.
Co., 79 Fed. Rep., 818-819.

Has, then, the defendant overcome the difficulty
in this case and is its procedure sufficient to open
for review any question whatsoever on this ap-

peal?

Second.—THE TRIAL OF THIS ACTION WAS NOT
HAD BEFORE A JURY, NOR BY THE COURT WITHOUT A
JURY, IN ACCORDANCE WITH SECTIONS 649 AND 700
OF THE REVISED STATUTES.

Ist. By Section 649 of the Revised Statutes it is
provided:

‘*Tssues of fact in civil cases in any Circuit

‘* Court may be tried and determined by the

‘* Court without the intervention of a jury

‘‘ whenever the: parties or their attorneys of

‘* record ‘file with the clerk a stipuldtion in

17

‘“‘ writing waiving a jury trial. The finding
‘‘ of the Court upon the facts, which may be
‘‘either general or special, shall have the
‘‘ same effect as the verdict of a jury.”

And by Section 700 it is provided:

‘*When an issue of fact in any civil
‘“cause in a Circuit Court is tried and
‘‘determined by the Court without the
‘‘ intervention of a jury, according to Sec-
_ ‘tion 649, the rulings of the Court inthe
‘*‘ progress of the trial of the cause, if ex-
‘‘ cepted to at the time, and duly presented
“* by a bill of exceptions may be reviewed by
‘*the Supreme Court upon a writ of error or
‘‘upon appeal, and when the finding is
‘* special the review may extend to the deter-
‘* mination of the sufficiency of the facts
‘* found to support the judgment.”

See Revised Statutes, Section 700.

The jurisdiction of the Circuit Court of Appeals
to review a judgment entered in a case tried in a
Federal Court otherwise than according to the strict
course of the common law, is limited to cases tried
in accordance with the sections above quoted.

Merrill vs. Floyd, 53 Fed. Rep., 172.

2d. THE CASE AT BAR WAS TRIED BY A REFEREE
ACTING AS A COMMON LAW ARBITRATOR.

To quote Mr. Justice Gray:

‘* Before the passage of this statute it had
“been settled by repeated decisions that in
‘“any action at law in which the parties
‘‘ waived the trial by jury, and submitted
‘‘ the facts to the determination of the Cir-
‘“ cuit Court upon the evidence, its judgment

18

‘was valid, but that this Court had no
‘* authority to revise its opinion upon the ad-
** mission or rejection of testimony, or upon
** any other question- of law growing out of
‘* the evidence, and therefore when no other

‘** error appeared on the record, must affirm
** the judgment.”

Bond v. Dustin, 112 U.8., 604.

The reasons for this were given by Chief Justice
Taney in Campbell vs. Boyreau, 21 How., 223.

In that case, which was an action of ejectment,
the parties agreed to waive a trial of the facts by
jury, and that the facts as well as the law should
be decided by the Court upon the evidence adduced
by the parties.

Evidence was offered on both sides, and the Court
proceeded to decide the facts in dispute and the
questions of law arising upon the facts so found,
and gave judgment against the plaintiffs in error,
who were defendants in the Court below. ‘

The Chief Justice said:

‘“It appears by the transcript that several
** exceptions to the opinion of the Court were
‘* taken at the trial by the plaintiffs in error—
‘*some to the admissibility of evidence, and
‘* others to the construction and legal effect
‘‘ which the Court gave to certain instru-
‘** ments of writing. But it is unnecessary to
‘* state them particularly, for it has been re.
‘* peatedly decided by this Court, that, in the
‘** mode of proceeding which the parties have
** seen proper to adopt, none of the questions,
‘‘ whether of fact or of law, decided by the
‘* Court below, can be re-examined and re-
‘* vised in this Court upona writ of error. * * *

‘* Indeed, und.: t*e acts of Congress estab-
‘lishing and organizing the Courts of the

19

‘* United States, it is clear that the decision
** could not be otherwise; for, so far as ques-
‘* tions of law are concerned, they are regu-
** lated in their modes of proceeding accord-
‘* ing to the rules and principles of the com-
‘* mon law, with the single exception of the
‘* Courts in the State of Louisiana, of which
‘‘ we shall presently speak. .And by the
‘‘ established and familiar rules and prin-
*‘ ciples which govern common law proceed-
‘* ings, no question.of law can be reviewed
‘‘and re-examined in an Appellate Court
‘‘upon writ of error (except only where it
‘* arises upon the process, pleadings or judg-
‘*ment in the cause), unless the facts are
‘“‘found by a jury, by a general or special
‘‘ verdict, or are admitted by the parties,
‘* upon acase stated in the nature of a special
‘* verdict stating the facts, and referring the
** questions of law to the Court.

‘* The finding of issues in fact by the Court
‘*upon the evidence is altogether unknown
‘to a common-law Court, and cannot be
‘* recognized as a judicial act. Such ques-
“tions are exclusively within the province
‘of the jury; and if, by agreement of par-
‘* ties, the questions of fact in dispute are
‘submitted for decision to the Judge upon
‘* the evidence, he does not exercise judicial
‘authority in deciding, but acts rather in
‘* the character of an arbitrator. And this
** Court, therefore, cannot regard the facts
‘*so found as judicially determined in the
‘* Court below, nor examine the questions of
‘* law, as if those facts had been conclusively
‘* determined by a jury or settled by the ad-
*‘ mission of the parties. Nor can any ex-
‘* ception be taken to an opinion of the Court
‘upon the admission or rejection of testi-

20

‘* mony, or upon any other question of law
‘* which may grow out of the evidence, unless
‘*a jury was actually impaneled, and the ex-
‘* ception reserved while they were still at
‘*the bar. The statute which gives the ex-
‘‘ ception in a trial at common law gives it
‘* only in such cases. And as this Court can-
‘** not regard the facts found by the Judge as
** having been judicially determined in the
‘* Court below, there are no facts before us
‘“upon which questions of law may legally
“‘and judicially have arisen in the inferior
‘** Court, and no questions, therefore, open to
** our revision as an appellate tribunal. Con-
*“* sequently, as the Circuit Court had juris-
‘‘ diction of the subject matter and the par-
‘* ties, and there is no question of law or fact
‘“open to our re-examination, its judgment
‘* must be presumed to be right, and on that
‘* ground only affirmed.”

Campbell v. Boyreau, 18 How., 135.
Kelsey v. Forsyth, 21 How., 85.

In the absence, then, of a trial by the Court with-
out a jury, as provided in Section 649 of the Re-
vised Statutes, AS THE FACTS FOUND BY A REFEREE
CANNOT BE TAKEN INTO CONSIDERATION BY THE AP-
PELLATE COURT, THERE IS NOTHING UPON WHICH
THEY CAN MAKE A REVIEW AS TO WHETHER OR NOT
THE JUDGMENT RENDERED BY HIM IS IN ACCORDANCE
WITH LAW.

In other words, the Appellate Court is precluded
from making any examination whatsoever, of the
record and no question is open to it for review,
either upon the facts or upon the law.

That the statute, Section 649, in no way changed
the rule of law stated in the decision before the
passage of the statute, has been expressly held by
this Court.

21

Mr. Justice Miller, writing the opinion for the
Court, said :
‘*The Judiciary Act of 1789, Section 12,
‘“* declares that the trial of issues in fact in
‘‘ the Circuit Courts shall in all suits, except
‘* those of equity and of admiralty and mari-
‘* time jurisdiction, be by jury. * * * Nu-
‘* merous decisions, however, had settled that
‘* this right to a jury trial might be waived”
‘by the parties, and that the judgment of
‘*the Court in such cases should be valid.
‘“* * * But as was shown in the recent
‘* case of Flanders v. Tweed, 9 Wallace, 425,
‘* this Court had held that no review of the
‘** decision of the Court below could be had
‘* of any ruling atthe trial where the parties
‘* had consented to accept the Court instead
‘* of a jury to decide issues of fact.”

The learned Justice then refers to the passage of
the Act of 1865, and continues :

‘*The question arises on this statute
‘‘ whether the mode of submitting a
‘‘case to the Court without a jury
‘‘was intended to be exclusive of all
‘‘other modes, so that if there is no
‘* stipulation in writing, waiving a jury, there
‘‘is error for which the judgment must be
‘‘ reversed. Although the language of the
‘* Section might admit of that construction,
‘* it is not the only one of which it is suscep-
‘** tible. As said in the case already referred
** to of Flanders vs. Tweed, the main purpose
‘* of the act undoubtedly was to enable the
‘* parties who were willing to waive a jury
‘* to have the case reviewed on writ of error
‘* when tried by the Court alone. This was
‘* rendered necessary, as shown by Mr. Jus-
‘* tice Nelson in the opinion in that case, by

22

‘* the former decisions based on the idea that
‘in such cases, the Court did not sit as a
‘* Court of law, but as quasiarbitrators. To
‘* remove this difficulty, the statute provided
‘*a mode by which the parties who agree to
‘* waive a jury should have tle benefit of a
‘* writ of error to the rulings of the Court on
‘* questions of law. * * * Wecannot be-
‘‘ lieve that Congress intended to say that
‘** the parties shall not, as heretofore, sub-
‘* mit their cases to the Court unless they do
‘* so by a written stipulation, but that it was
‘* the intention to enact that, if parties who
‘* consent to waive a jury desire to secure the
‘right to a review in the Supreme Court of
‘“any question of Jaw arising in the trial,
‘‘ they must first file their written stipula-
‘* tion, and must then ask the Court to make
‘a finding of such facts as they deem essen-
‘* tial to the review, and ask the ruling of the
‘* Court on points to which they wish to ex-
‘‘cept. If this is not done, the parties con-
‘* senting to waive a jury stand as they did
‘* before the statute concluded by the judg-
‘* ment of the Court on all matters submitted
** to it.”

Kearney vs. Case, 79 U. S., 275.

By THIS DECISION, THEREFORE, IT MUST BE HELD
THAT THERE STILL EXISTS THE RIGHT TO SUBMIT A
CASE TO THE DECISION OF THE CouRT OR A REF
EREE ACTING AS ARBITKATORS, AND THAT THE DECIS-
ION RENDERED, WHILE IT IS BINDING UPON THE PAR:
TIES, IS NOT SUCH A DECISION AS CAN BE REVIEWED
ON APPEAL.

Third.—THE JUDGMENT RENDERED IN THE CASE
AT BAR IS IN THE NATURE OF A COMMON LAW ARBI-
TRATION.

23

The consent by which the action was referred
provides that all the issues be referred to Honorable
George Hoadly ‘‘ AS SOLE REFEREE TO HEAR AND
DETEKMINE THE SAME.” This was a complete sub-
mission of the entire case both upon the facts and
the law to his decision.

It was in no sense a trial by the Court without
the intervention of a jury, as provided by Section
649, because it was a trial by a Referee, and, under
the decisions above quoted, this Court cannot re-
gard the facts found by him as judicially deter-
mined in the Court below. Nor can it examine any
questions of law, BECAUSE THERE ARE NO FACTS BE-
FORE IT UPON WHICH QUESTIONS OF LAW MAY LE-
GALLY AND JUDICIALLY HAVE ARISEN IN THE INFERIOR
Court, and, therefore, open to revision by this
Court as an appellate tribunal.

Fourth. —NorR DID THE SO-CALLED CONFIRMATION
OF THE REPORT BY JUDGE BROWN AND THE ADOP-
TION BY HIM OF THE FINDINGS OF THE REFEREE AS
THE FINDINGS OF THE COURT, BRING THIS CASE WITH-
IN THE PROVISIONS OF SECTION 649 FOR TWO REA-
SONS:

ist. Because there has been no trial by the Court
of the issues in this action, but simply an adoption
of the findings of the Referee entered by consent
of the parties and without a re-examination or re-
trial before the Court.

2d. Because there was no written stipulation filed
with the clerk waiving a jury and consenting to a
trial by the Court.

(A). The consent referring this case provided in
accordance with the rule in the Southern District
of New York that after decision by the Referee,
no judgment should be entered ‘‘until after ten

24

days’ notice of the filing of the report of the Ref-
eree and of the judgment proposed to be entered
thereon shall have been given to the opposite
party.”

See Stipulation, page 46.

After the rendering of the Referee’s Report, and
prior to the entry of the judgment, the defendant
made application to the Court for a new trial and
an arrest of the judgment, as provided by the
rule. Judge Brown, uper consent of the parties,
signed a decision which appears at page 221 of the
record. It was simply a formal decision overruling
the motion on behalf of the defendant for a new
trial and for an arrest of the judgment and adopt-
ing the findings of the Referee, both as to the
facts and as to the law, as the findings and con-
clusions of the Court.

This certainly was not a trial before the Court
without a jury, as contemplated or intended by
Section 649 of the Revised Statutes.

(B). Even if it be considered such a trial, then
there was no consent in writing filed with the clerk
waiving a jury and toa trial by the Court without
the intervention of a jury, as required by that sec-
tion.

The only consent in writing was the consent re-
ferring the action TO THE REFEREE TO HEAR, TRY
AND DETERMINE ALL THE ISSUES THEREIN.

In the decision signed by Judge Brown, the de-
fendant attempted to conform to the provisions of
Section 649 by inserting a statement to the follow-
ing effect :

** This cause coming on for trial and to be
‘* held at a regular term of the Circuit Court
‘* of the United States for the Southern Dis-
“trict of New York, held at the United

———_—

‘** States Court House, in the city of New
‘‘ York, before the Hon. Addison Brown,
** District Judge, without a jury, and a trial
‘* by jury having been expressly waived by
‘written consent of the parties duly filed
‘““with clerk of the Court, BY WHICH
‘* CONSENT ALSO IT WAS PROVIDED AND AGREED
“THAT THE Hon. WILLIAM G. CHOATE
‘* SHOULD BE APPOINTED REFEREE TO HEAR
‘* AND DETERMINE THE SAID ACTION AND THE
‘* ISSUES THEREIN.”

See Decision, page 221, folio 662.

While the decision recites that a jury trial was
waived in accordance with Section 649, the very
statement itself shows that that consent was the
one referring the case to Hon. William G. Choate
as Referee.

If, then, a trial by Referee is not considered a
trial before the Court without a jury, certainly a
consent referring au action to a Referee cannot be
considered as the written stipulation required by
Section 649 of the Revised Statutes consenting to a
trial ‘‘by the Court without the intervention of a
‘jury whenever the parties or their attorneys of
‘‘ record file with the clerk a stipulation in writing
‘* waiving a jury.”

In other words, a trial before a Referee cannot
be deemed a trial by the Court, hence a consent
referring the whole issues to a Referee cannot be
considered as a consent to a trial by the Court.

But the proceeding had before Judge Brown, if
in any sense it could be considered a trial by the
Court without a jury, WAS WITHOUT ANY CONSENT
OR STIPULATION AT ALL. The decision itself shows
that the only consent given was the consent to
refer the issues to the Referee.

26
It, therefore, follows :

Ist. THAT IF THE JUDGMENT RENDERED IN THIS
ACTION WAS NOT IN ACCORDANCE WITH THE PRo.-
VISIONS OF SECTION 649, IT WAS IN THE NATURE
OF A COMMON LAW ARBITRATION AND UNDER THE
DECISIONS OF THIS COURT NO QUESTION IS OPEN FOR
REVIEW.

2d. THAT IF THE PROCEEDINGS HAD BEFORE
JUDGE BROWN WERE EQUIVALENT TO A TRIAL BE-
FORE THE COURT, WITHOUT A JURY, THEN THERE
WAS NO STIPULATION CONSENTING ‘TO SUCH A TRIAL
FILED WITH THE CLERK IN WRITING WAIVING A
JURY UNDER THE PROVISIONS OF SECTION 649.

In either aspect of the case, there is no question
open for review by this Court, and the parties
‘* stand as they did before the Statute concluded by
‘*the judgment of the Court on all matter submit-

‘*ted to it.”
Kearny v. Case (supra).

POINT II.

Even if the judgment rendered be
considered in any sense a judgment
upon a trial by the Court, the only
question which by any possibility can
be presented for review, is whether
the facts found by the Referee sup-
port the judgment rendered.

THE WHOLE ISSUE IN THIS CASE, BOTH UPON THE
LAW AND THE FACTS, WAS REFERRED TO THE REF-
EREE TO HEAR AND DETERMINE.

The proceedings before Judge Brown, as claimed
under Point I, was simply a motion for a new

27

trial, under the rule in the Southern District of
New York, and was in no sense a trial by the Court.

But, if that proceeding be considered such a trial,
then this case is within that class of cases where
the parties consent to a trial by the Court without
filing a stipulation under Section 649; or where the
Court refers the case to a Master or Referee to hear
and report the evidence, and upon the coming in of
the report adopts the findings of the Master or
Referee as the findings of the Court and renders
judgment accordingly; or where the consent is to
a referee to hear and report to the Court; or where
a partial reference may have been ordered.

In such cases it has been decided over and over
again that the only questions before the appellate
court are whether the facts found by the Referee
sustain the judgment.

The appellate court cannot review exceptions to
the admission or exclusion of evidence or to find-
ings of fact by the Referee or to his refusal to find
fact as requested.

Shipman v. Straitsville Central Mining
Co., 158 U. S., 356.

Roberts v. Benjamin, 124 U. S., 64.

Boogher v. N. Y. Life Ins. Co., 103 U.
S., 90.

Bond v. Dustin, 112 U. S., 604.

Paine v. Central Vermont R. R. Co.,
118 U.S., 152.

Andes v. Slauson, 130 U. S., 435.

To the same effect are the decisions of the Circuit
Court of Appeals in the various Circuits.

Shipman v. Ohio Coal Exchange, 70
Fed. Rep., 652.

Board of Commissioners v. Sherwood,
64 Fed. Rep., 103.

Abraham v. Levy, 72 Fed.Rep., 124.

28

Merrill v. Floyd, 53 Fed. Rep., 172.
Wesson v. Saline County,73 Fed. Rep.,
917.

In Shipman v. Straitsville Mining Company, this
Court, speaking by Mr. Justice Brown, said :

‘*This case was referred by consent to Mr.
‘Harrison, a so-called Master Commissioner,
‘* as Referee, with instructions to report the
‘* testimony with the findings of fact and of
‘‘law to the Court. The fact that no such
‘* officer as ‘Master Commissioner’ is known
**to the law does not impair the validity of
‘* the reference, as it is perfectly competent
‘for the Court to refer a case to a private
‘* person (Hecker v. Fowler, 69 U. 8., 2 Wall.
** 123). And as the Court in its judgment
‘* ordered his findings to stand as the find-
‘*ings of the Court, the only questions be-
‘* fore this Court are whether the facts found
‘“by the Referee sustained the judgment.
‘ As the case was not tried before the Cir-
‘* cuit Court upon a waiver in writing of a
** trial by jury, this Court cannot review ex-
** ceptions to the admission or exclusion of
‘‘evidence or to findings of fact by the
‘* Referee, or to his refusal to find facts as
‘* requested.”

Shipman v. Straitsville Central Min-
ing Co., 158 U. S., 356-361.

The only question, then, which by any possibil-
ity is open to this Court for review is whether the
facts found by the Referee support the judgment
rendered.

99
Point III.

The judgment rendered is fully
supported by the facts found by the
Referee.

Of the seventy seven assignments of error filed
by the defendant in this case, it is submitted, only
one, to wit, the Seventh, raises any question for
examination by this Court.

The Seventh assignment of error is as follows:

‘That the said Circuit Court erred in
‘holding and deciding, upon the hearing
‘‘and trial of this action as aforesaid, that
‘‘ the findings of fact made by the said Ref-
‘‘ eree, as contained in his said report made
“and filed in this action on the 18th day of
‘* February, 1898, authorized said judgment
‘* for the plaintiff.”

See Assignments of Error, page 479.

This is the only assignment of error which raises
any question as to a ruling and decision upona
matter of law after the award of the Referee.

First.—THE FINDINGS OF FACT BY THE REFEREE
FULLY SUPPORT THE JUDGMENT RECOVERED BY THE
PLAINITFF UPON THE FIRST CAUSE OF ACTION.

The balance claimed by the plaintiff to be due
him from the defendant, amounted to $71,057.63.

It was reached in the following manner:
Amount earned under the contract,

as shown by the engineer’s certifi-

ONES ca eich saa cce cars icened) $3,895,798 79
Amount credited by the defendant

to the plaintiff for materials fur-

WE et x ccdoke wai cheexcnuxe Pas $34,598 90

NN ooo acdsee Ly $3,930,397 69

30

From this there was deducted the
following:

Amount of payments. $3,626,865 20
Less nut

locks

charged. .$9,558 63
Amount

paid for

dead

brakeman. 1,999 00 11,557 63

Balance... .... . $3,615,307 57
Transportation .... . 50,000 00
Final payment....... 173,532 49

Balance properly ex-
pended out of $40,-

000 retained....... 20,500 00 $8,859,340 06

Balance......... $71,057 63

These amounts agree with the engineer’s certifi-
cate and with the figures contained in the final re-
ceipt.

That balance was claimed by the plaintiff under
a full compliance by him with the terms of the
contract.

The defendant did not deny that that balance
had been earned, but sought to avoid its payment
by setting up various affirmative defenses, hereaf-
ter to be considered, under which it claimed the
right to charge the plaintiff with the following
items:

A penalty for not completing the con-

Greet om Fume Idk... wc cvccccececces $40,000 00
For patented nut locks furnished by

the defendant to the plaintiff and

SY UE Uk vas caked baewns. $9,558 63
Settlement of judgment of King &

“31

Wetherill against plaintiff's wish and
without his consent..............6- 19,500 00
Paying damages for killing brakeman. 1,999 00

——_ ———_— -— ——

MN caus cna ue ees welee $71,057 63

Of this balance of $71,057,63 claimed by the
plaintiff, the Referee has allowed two items only:

ist. The amount deducted by the de-
fendant, as liquidated damages, for non-
completion of the contract on June Ist,
RH Ra Vin Syne ote rey Ran eS $40,000 00

2d. The amount deducted by the de-
fendant for patented nut locks furnished
by the defendant to the plaintiff and
charged to him ............-+eeee sees: 9,558 63
It will be only necessary then to consider the
findings of fact by the Referee in reference to these
two items.
(A). As to the right of the defendant to deduct
the $40,000 penalty, the Referee found the follow-
ine facts:

2

‘‘That immediately after the execution of the
‘said contract, the plaintiff preceeded to carry out
‘and perform the same, and did carry out/and per-
“form the same, except a portion thereof, other-
“ wise agreed between the parties, and substantially
“completed the same on or about the first day of
‘November, 1887, and the same was duly ac-
‘cepted by the defendant on or about the first day
‘of March, 1888.”

5.

‘* That the consideration for the performance of
* said contract originally mentioned in said con-

32

** tract was $3,914,600, but before the execution of
‘* said contract by the plaintiff, by and with the
‘consent of the defendant, the consideration was
** changed and made $3,954,600.”

6.

‘* That the plaintiff made and entered into a sup.
‘*plemental contract whereby he agreed with the
‘* defendant to complete his performance of said
‘* contract on or before June Ist, 1887, and to allow
‘* the said defendant by way of forfeiture in case
‘* the said railway were not so completed by the Ist
‘* of June, 1887, the sum of $40,000.”

7.

‘* That the defendant failed to furnish the plaintiff
‘with rights of way as by said contract it had
‘‘ agreed to do in time to enable the plaintiff to
‘* complete his contract prior to the Ist day of June,
‘** 1887, or prior to the ist of August, 1887, but on
‘* the contrary, delayed the plaintiff in the perform-
‘* ance of said contract at a point upon the said
‘‘road known as Minneville, until October 27th,
‘* 1887, by reason of the neglect, failure and
‘omission of the defendant to obtain the neces-
‘sary right of way at said point so as to permit
‘* the construction of the road and completion of
‘* the contract at said point.”

8.

‘* That the plaintiff was thereby prevented from
‘* completing his contract on or prior to August Ist,
** 1887, and also on or prior to June Ist, 1857, by
‘* the negligence, omission and fault of the defend-
‘“ ant.”

See Findings, pp. 111-112.

33

Here, then, is a conclusive finding by the Referee
that the defendant failed in its obligation to furnish
rights of way to the plaintiff to enable him to com-
plete his contract within the contract time.

UpoN THE FACTS SO FOUND, THE LEARNED REF-
EREE HELD AS CONCLUSIONS OF LAW:

ist. ‘‘That the defendant is not entitled to charge
‘the plaintiff or to retain and deduct from the
‘‘amount earned and payable to the plaintiff under
“the said contract, the sum of $40,100 as a for-
‘* feiture or liquidated damages for not completing
“the contract upon June Ist, i887.”

vd. ‘That under the facts proved in this case,
‘‘ the plaintiff is not legally liable to the defendant
‘“ for any damages for failure to complete the con-
‘tract within the contract time or the time agreed
‘‘upon for the reason that the plaintiff was pre-
‘vented by the negligence of the defendant and
“its omission to procure the necessary right of
‘““ way completing the work in such time.”

See Findings, pp. 117-118.

(B). That the conclusions reached by the Referee
are fully supported by the facts found by him is
conclusively settled by the authorities.

It is a well-settled rule that where one party de-
mands strict performance as to time by another
party he must perform on his part all the conditions
which are requisite in order to enable the other
party to perform his part, and a failure on the part
of the party demanding performance to do the pre-
liminary work required, in order to enable the
other party to complete his within the time limited,

34

operates as a waiver of the time provision in the
contract.
Dannat v. Fuller, 120 N. Y., 558.
Stewart v. Keteltas, 36 N. Y., 388.
Grube v. Schultheiss, 57 id., 669.
Gallagher v. Nichols, 60 id., 438.
Weeks v. Little, 89 id., 566.

It is also weil settled that after the failure to
perform a condition precedent not only is the time
limit in the contract broken, but that thereafter
the other party has a reasonable time to perform.

In other words, after the failure to procure the
rights of way either before June Ist or August Ist,
the time limit was broken and the plaintiff had, for
the performance of his contract, such reasonable
time as might be proved to be necessary for the
completion of his work.

In the present case there was no proof of what a
reasonable time for completion would have been.

It should be sufficient for the Court to know that
the entire work was substantially completed within
a few days after the procuring of the last right of
way.

This doctrine is well settled in our Courts.

‘The time specified in the contract for perform.
ance had been abrogated and the obligation as to
time no longer bound either party. Thereafter
each party had a reasonable time in which to per-
form.” Opinion, RAPALLO, J.

Lawson v. Hogan, 93 N. Y., 44.
Dady v. The Mayor, 57 Hun, 559.
Willis v. Webster, 1 App. Div., 301.

These cases were decided upon the authority of
earlier authorities to the same point.

They are based substantially upon the doctrine
that the extension of time in days covering periods

eee

35

during the different seasons when the days are
either short or long, clear or rainy, cannot be
properly apportioned by the Court as between the
parties.

This precise point was raised in a case in the New
York Court of Appeals and was decided contrary to
the defendant’s contention

The Court says:

‘The contractor could gain nothing by
‘‘ haste and pressure in one direction so long
‘“‘as entire completion was delayed by his
‘‘employers. We cannot divide and appor-
‘‘ tion the fault. It is enough that damages
‘* were payable upon a failure of entire com-
‘* pletion, and that was rendered impossible
‘* by the defendant’s acts; and her executor
‘*cannot recover for a failure which she
‘*made inevitable. But for that we cannot
‘say that there would have been any delay
‘** beyond the contract time.”

Weeks v. Little, 89 N. Y., 570.
Willis v. Webster, 1 App. Div., 301.

The conclusion, then, of the learned Referee that
the defendant was not entitled to deduct the $40,000
forfeiture for non-completion by the first day of
June, 1888, is fully supported by the facts found by
him as to the non-performance of its obligations by
the defendant and its waiver thereby of the time
limit in the contract.

Second.—THE FINDINGS OF THE REFEREE FULLY
SUPPORT HIS CONCLUSION THAT THE DEFENDANT WAS
NOT ENTITLED TO CHARGE THE PLAINTIFF WITH THE
SUM OF $9,553.63, THE AMOUNT PAID BY THE DEFEND-
ANT FOR PATENTED NUT LOCKS WHICH WERE FUR-
NISHED BY IT DURING THE PERFORMANCE OF THE
WORK.

i,

36

This amount is included in the sum of $3,626,.
865.20 stated in the receipt as the amount of pay-
ment made by the defendant to the plaintiff under
the following heading:

‘*And whereas the said Chicago, Milwau-
kee and St. Paul Railway Company has paid
the said Clark to apply on said contract in
money, material, labor and transportation,
the sum of $3,626,865.20.”

See Receipt, page 114, folio 341.

The item for nut locks, although not specifically
designated, is contained in that amount.

See Referee’s Findings, p. 113, fol. 339,

There was no question in the case upon the fol.
lowing points:

ist. That the nut locks were furnished and paid
for by the defendant.

2d. That they were used in the construction of
the road.

The only point was as to which of the parties is
properly chargeable for them.

(A). As to the items for nut locks, the Referee
found the following facts:

9.

‘*That during the progress of the work the de-
‘* fendant purchased and furnished to the plaintiff
‘* and charged him for patented nut locks for which
‘* the defendant paid $9,558.63.”

10.

‘*That the said nut locks so furnished by the de-
‘* fendant were used by the plaintiff in the construc-
** tion of the road.”

=

‘‘That there are no provisions in the contract
‘‘ which require that the plaintiff, and the plaintiff
‘‘ never agreed that he should use in the construc-
“tion of the road under said contract any patented
* nut locks.

‘* That the plaintiff was ordered by the defend-
‘ant to put such nut locks on the road at the be-
‘* ginning of the work. That he protested against
“their use, and finally yielded and used them in
“track laying upon. the promise that the matter of
‘‘ the charge for said nut locks should be adjusted
“after the completion of the contract.”

37

11.

See Referee’s Finding, pages 112, 113.

UPON THE FACTS SO FOUND, the REFEREE FOUND
| AS CONCLUSIONS OF LAW:

3.

| “That the plaintiff is not liable to the defendant
“for the sum of $9,558.65, the cost of patented
‘‘ nut locks furnished by the plaintiff to the defend-
‘ant and used by him in the performance of the
‘* said contract.”

4.

‘That there was no obligation imposed by the
‘contract upon the plaintiff to furnish and pay for
‘* patented nut locks to be used in the construction
** of said road.”

5.

‘* That the plaintiff is not legally indebted to the

‘“ defendant in any sum whatever for patented nut-

) ‘locks furnished by the defendant, and used in the
‘ construction of the railroad under said contract. ”

See Conclusion of Law, page 118.

38

(B). The conclusions of the learned Referee are
fully supported by the facts found by him, as there
was no obligation upon the plaintiff to furnish
patented nut-locks, and they were furnished by the
defendant without the request of the plaintiff, and
used by him in the construction of the road solely
upon its request so to do.

ist. IF If Is CLAIMED THAT THEY WERE REQUIRED
TO BE FURNISHED UNDER THE CLAUSE OF THE Con-
TRACT REQUIRING THE WORK TO BE DONE IN A
WORKMANLIKE MANNER, THEY CANNOT BE §0
CHARGED.

The workmanlike manner under which this con-
tract was to be performed, was_ that particularly
specified and desiguated in the contract and speci-
fications themselves.

Nut-locks were not mentioned in the specifica.
tions and contract. They are a patented and ex-
pensive article.

If it had been intended to obligate the plaintiff
to furnish nut-locks, they should have been speci-
fied.

The explicit mention of all the other items of
track material, forbids the including of nut-locks.

This makes applicable the legal maxim, ‘‘ Mentio
unius exclusio alterius.”

2d. IF THEY ARE INCLUDED IN THE CONTRACT, THEY
MUST BE INCLUDED UNDER THE HEADING OR NOMEN-
CLATURE OF SPLICES AND BOLTS OF THE J. T. CLARK
PATTERN OR SPIKES AND TIES, STEEL RAILS, ANGLE-
BARS AND BOLTS, TRACK BOLTS AND TRACK SPIKES,
AND AS SUCH, MUST BE CHARGED FOR BY WEIGHT
UNDER THE CONTRACT.

Those are the only track materials specified in

the contract.
See Article 6, Section 1, p. 159.

i ae < s. |
+ - — © Be

—a——

39

Those were the only kind of track material speci-
fied in the contract, which could in any way cover
the nut locks.

They were the only classes of track materials
which the defendant was at liberty to purchase
and charge to the plaintiff.

The defendant’s witnesses, Delano, Moore and
Moll, say that nut locks are part of the track bolt.

It will be observed that in each of the three arti-
cles of the contract above referred to, track bolts
are specified.

Upon either of these theories, the defendant
would only have the right to charge the plaintiff
at the rates specified in the contract and not at the
exorbitant rate sought to be charged.

The contract fixes the sums to be paid as fol-
lows:

Angle bars, 1.65/100 cents per pound.
Track bolts, 2.60/100 cents per pound.

See Contract, Article 6, Section 1, p.
160, fol. 478.

In other words, the contractor was to be charged
by weight for those articles instead of by price
paid.

A correct calculation of all the nut locks used
upon the main line of this railroad shows the fol-
lowing facts :

352 joints were used for each mile of road ; there
were six nut locks on each joint or 2,112 nut locks
toa mile. The entire number of nut locks for 202.8
would be 428,313 nut locks.

From actual weight of locks used, 154 to 16 nut
locks made a pound.

If the defendant’s contention as to the interpreta-
tion of the contract is correct as to the weight of
the nut locks, the plaintiff could be charged only

40

for them by weight and as angle bars or splices at
the following rates :

As a part of the angle bars and at angle bar
price, 27,108 pounds of nut locks at .0165 per
pound, $441.11.

Or as part of track bolts at track bolt price,
27,108 at .026, $704.80.

Testimony of Hegeman, pp. 407-408.

The plaintiff claims that the patent nut locks
could not be required in any case under the terms
of the contract, but that if they could be required,
the defendant could only charge for them under
the two theories above mentioned the sum of
$447.28 or $704.80, instead of the sum of $9,558.63.

Third.—THE RECOVERY BY THE PLAINTIFF OF
THE SUM OF $2,425, THE VALUE OF TIMBER BE-
LONGING TO HIM CONVERTED BY THE DEFENDANT
IS ALSO FULLY SUPPORTED BY THE FACTS FOUND
BY THE REFEREE.

(A). The facts found by the Referee are as fol-
lows :

19.

‘*That in or about the months of March and
‘** April, 1888, the plaintiff was the owner of 97,000
“feet B. M. bridge timber then in the yard of
‘the defendant at Chillicothe and on the line of
‘* the railroad.”

20.

‘* That the said lumber did not conform to the
‘* standard of the defendant and was not purchased
‘* by the defendant from the plaintiff or allowed in
‘* the final certificate of the chief engineer under
‘* the contract in this action to the plaintiff.”

41
21.

“That in and about the month of June, 1888,
‘the defendant took possession of the said lumber
‘‘and converted the same to their own use without
‘assent or knowledge of the plaintiff.”

22.

‘That the value of the said lumber at the time
‘‘ of the taking in June, 1888, was $2,425.”

See Referee’s Findings, page 117.

Upon the facts so found, the Referee held as a
conclusion of law.

6.

“That the plaintiff is entitled to recover from
“the defendant the sum of $2,425, with interest
‘from June Ist, 1888, for the conversion by the
‘defendant of lumber belonging to the plaintiff.”

See Referee’s Findings, page 118, folio
354.

(B). There is no merit in the technical defenses
set up by the defendant to the recovery of that
item.

ist. It was not covered in the engineer’s final
estimate, for the reason that the estimate antedated
the conversion of the material.

od. It was not at all affected by the provisions of
the contract in regard to the final estimate, for the
reason that it is a claim entirely outside of the con-
tract and not arising under it.

3d. No question as to joinder of actions of tort
and contract can be raised.

42

As it appears upon the face of the complaint, it
must be raised by demurrer and is waived because
not so raised.

See N. Y. Code, Sec. 499.

The questions above considered, it is submitted,
are the only ones which are open, in any event,
for review by this Court, and as to those questions,
it is also submitted, there is no error of law in
the judgment upon the facts found hy the
Referee.

Point IV.

The receipt offered in evidence by
the plaintiff in error is not a bar to
the recovery by the defendant in
error for the two items allowed by
the Referee under the first cause of
action.

First. —THE FACTS FOUND BY THE REFEREE IN
RELATION TO THE RECEIPT, ARE AS FOLLOWS:

13.

‘*That upon the 9th day of March, 1888, the
‘* plaintiff signed and caused to be delivered to a.
‘* representative of the defendant a paper writing
‘‘or receipt presented to him by the defendant
‘“‘ for signature, of which the following is a copy;
‘and upon the signature thereof by said Clark,
‘‘ and its delivery by him to the defendant, the
‘* plaintiff was paid by the said defendant, the said
‘sum named therein of $232,532.40, less the sum
‘** of $40,000 claimed in said paper to be retained
‘* for forfeiture in not completing performance o

ans rita

43

‘“ his work under said contract on or prior to June
‘‘ Ist, 1887, and the sum of $3,626,865.30 included
‘therein, embraces said sum of $9,558.63 claimed
“by defendant to be due for nut locks. Said
‘* $40,000 so deducted and the actual amounts so
* paid, was $173,532.49.”

(Here follows a copy of the receipt):

14.

‘* That said receipt and paper contained an ac-
‘curate, truthful and undisputed account of all
‘* dealings between said parties, except in the mat-
‘* ter of the $40,000 deducted for time forfeiture. The
‘* $9,558,63 for nul locks embraced in the $3,626,868. -
‘© 30 and the lumber hereinafter referred to and
‘‘ herein valued at $2,425. Besides the above, the
‘‘ defendant has paid the $40,000 reserved as in-
‘‘demnity or security for the payment of claims
‘ against Clark and in addition thereto upon like
‘* accounts, the sum of $521.75.”

15

‘* That at the time of the signing and delivery of
‘‘ said last mentioned paper, the final certificate or
‘“ estimate of the chief engineer under the contract,
‘“had not been delivered to the plaintiff or any of
‘his agents by the defendant or the said engineer
“ and the contents thereof were not known to the
‘* plaintiff other than by reference thereto contained
‘‘in said receipt of March 9th, 1888.”

16

‘That no other final settlement of the accounts
‘under said contract had been had between the
‘ plaintiff and the defendant at the time that the

‘*said last-mentioned paper was signed and de-
* livered.” ;

44

17

‘*That at the time of the signing and delivery of
** said last-mentioned paper the question of the
* liability of the plaintiff for nut locks which had
*“been left by the parties to this action open for
** settlement and adjustment until after tne comple-
‘* tion of the work under said contract and had been
‘‘ referred by the defendant to the chief engineer
‘* under said contract, had not been passed upon by
‘‘ him; that the said chief engineer had referred the
‘* question for opinion to the defendant’s counsel,
‘* but had not at said time given his opinion in re-
** lation thereto.”

18

‘*That no account was ever otherwise than by
‘* said paper and a receipt of said money, stated of
‘‘the transactions under and connected with said
‘* contract between the plaintiff and the defendant.”

See Findings, pages 116-117.

UPON THE FACTS SO FOUND, THE LEARNED REF.
EREE FOUND AS CONCLUSIONS OF LAW.

7

‘That the signing and delivery by the plaintiff
‘‘ of the receipt on or about the 9th day of March,
‘* 1888, and the acceptance of the check of $173,-
‘* 532.49 under the facts and circumstances proved
‘* in this case were as to the two sums of $9,558.63
‘‘ charged for nut locks and $40,000 charged by
‘* way of forfeiture for non-performance in time
‘* wholly without consideration and in violation of
‘* the contract between the parties and do not con-
‘* stitute any bar to the recovery of the plaintiff for
‘the sums of $9,558.63 and $40,000 otherwise as
** due under the contract.”

45

8.

‘‘That the signing and delivery of said receipt, .
‘ and the acceptance of the check thereunder, do not
‘constitute a legal payment or accord and satisfac.
‘ tion of the said sums of $9,558.63 and $40,000 or
‘either of them cr any part or either of them.”

9.

‘That no account of the transactions under this
‘contract and of the claims sued on in this action
‘‘ was ever had or stated between the parties to this
‘action otherwise than by said receipt or paper of
‘* March 9th, 1888.”

See Conclusions, pages 118-119.

By this receipt, the defendant sought to estab-
lish

Ist. Payment.
2d. Accord and satisfaction.
3d. An account stated.

As to payment, the answer alleges:

““And the defendant alleges that it has
‘paid to or for the plaintiff, or on his ac-
‘count, under the said contract, in money,
‘‘ material, labor and transportation, as au-
“thorized and provided for in and by the
‘‘ said contract, a sum in excess of any and
‘‘all amounts which became due or were
‘‘ earned by the plaintiff under said contract,
*‘ or which had been certified to or allowed
“by the Chief Engineer of the defendant
‘Railway Company, including all extra
‘“ work performed or material furnished by
‘* the plaintiff under said contract, or in addi-
‘* tion thereto.”

See Amended Answer, page 24, fol. 71.

46

As to the account stated, the answer alleges:

After stating the making of the supplemental
contract and of the final} estimate and certificate of
the engineer, it alleges:’

‘*And thereupon and on or about the 9th
** day of March, 1888, an account was stated
‘* and agreed to by and between the plaintiff
‘and the defendant Railway Company,
‘“ whereby the amount of the compensation
‘*due to the said plaintiff Clark for all the
‘‘ work done and material furnished by him
‘* under the said contract of March 6th, 1886,
‘* for the construction of the railroad of the
*‘ defendant from Ottumwa, Iowa, to the
** Missouri River, including all extra work
‘* performed and material furnished of every
‘kind and description, less deduction made
‘‘ for work not done and work assumed by
‘‘ the defendant Company, was agreed upon
‘‘and fixed and adjusted at the sum of
“* $3,895,798.79. * * * And that the
‘* amount then due to said Clark on said con-
** tract was the sum of $213,532.49.”

See Amended Answer, 4th defense,
pages 27-28, fols. 81-82.

As to accord and satisfaction, the answer alleges:

** That thereupon, and on the said 9th day
‘* of March, 1888, the said defendant Railway
‘*“Company duly paid to the said Heman
‘* Clark the said sum of $173,532.49, and the
‘‘said plaintiff Clark thereupon acknowl-
‘* edged in writing that he had received from
“the said defendant Railway Company the
** said sum of $173,532.49, in full satisfaction
‘‘of the amount due to him on said esti-
‘* mates of said Chief Engineer of the defend-
‘‘ant Railway Company, and in full satis-

--

47

‘* faction of all claims and demands of every
‘‘kind, name and nature arising from, or
‘* growing out of, said contract of March 6th,
‘* 1886, and of the construction of said rail-
“‘ road, excepting the obligation of the said
‘* Railway Company to account for such sum
‘* of $40,000, as provided in and by the said
‘receipt and acknowledgment of the said
‘¢ plaintiff Clark.”

See Amended Answer, page 29, fol. 87.

This receipt, it will be noticed, has upon it no
seal and cannot, therefore, be treated as a sealed
instrument.

Upon it the defendant rested practically its entire
defense.

When asked whether it was just and’ right that
the plaintiff should be mulcted in the sum of
£40,000 for not completing the road in time when
the conceded testimony shows, and the Referee
found, that the fault was that of the defendant, its
only reply is the plaintiff has lost his right to pay-
ment by reason of the receipt.

When asked whether it was just and reasonable
and whether there is any provision of the contract
warranting it in taking from the plaintiff $9,558.23
for nut locks, its only answer is the receipt pre-
vents the payment.

It was read, reread and read again at every stage
of the trial, and it was claimed constantly by the
defendant that no matter how just were the claims
of the plaintiff, the receipt was a bar to them all.

It is claimed that the receipt stands as payment
though no payment has been made ; that it stands
for an account stated though no account has been
rendered and no statement made; that it stands
for an accord and satisfaction without the slightest

48

proof of the accord. The defense is not a just one,
and, it is submitted, is also not a legal one.

The receipt will now be considered in the three
aspects relied upon by the defendant :

Ist. ITS LEGAL EFFECT AS EVIDENCE OF Pay-
MENT.

2d. ITS LEGAL EFFECT AS AN ACCORD AND SATIS-
FACTION.

3d. ITS LEGAL EFFECT AS AN ACCOUNT STATED.

Second.—The legal effect of the re-
ceipt as payment.

(A). Jt is well settled that a receipt is simply
prima facie evidence of payment.

‘Receipts form a well-established exception to
‘*the rule that a written instrument cannot be
‘* varied or contradicted by parol evidence. One
‘“may thus contradict his own receipt. The ac-
‘*knowledgment of mere payment in a receipt is
** prima facie evidence only and may be rebutted
‘** by parol evidence showing that the consideration
‘* is different in kind or amount from that named,
** or that notes or checks were taken in payment;
‘** that it was paid only in part or not at sll, or that
‘* the consideration which did pass was illegal. In
** most of the States this may be shown, though
** the receipt may be in full of all demands or em-
** bodied in the consideration clause of an instru-
** ment under seal.”

Am. Enc. of Law, Vol. 19, page 115.
There are some States in which it is held that

where the receipt contains a seal, that it is not
open to oral explanation.

49

In the present case there is no seal upon the re-
ceipt, and there is no claim that any seal was ever
placed upon tt.

The decisions of all the States agree that in such
cases receipts are open to oral explanation.

It will be sufficient, in addition to this general
statement of the rule, to cite cases showing that the
same rule prevails in the Federal courts and in the
courts of the State of New York.

Fire Ins. Co. v. Wickham, 141 U. S.,
564.
Harris v. Davis, 44 Fed. Rep., 172.
‘€}

Judge Eart, of the Court of Appeals, thus very
clearly lays down the rule:
‘“The only question then for us to con-
- sider is whether the various receipts in full
‘‘ were so far conclusive upon the plaintiff
‘* that he could not show by parol ‘that the
‘‘ items for extra bonus paid ‘by him to the
‘* butchers were nevertheless his due.

‘‘ It has long been settled in this State, that
‘a receipt furnishes mere prima facie evi-
‘* dence of the facts stated therein, and that
‘‘it may be controverted or explained by
‘ parol evidence. This grows out of the fact
‘“ that a receipt is not a contract. Itisa

‘* mere declaration or admission in writing.
cet &

‘¢ It has never been intimated, in any case
‘‘in this State, that it made any difference
‘* whether the receipt was for a specified sum
‘‘ of money, or in full. The same rule ap-
‘* applies, and no reason is apparent why it

‘‘ should not. A receipt for‘a specified sum
‘‘of money contains a declaration that so
‘* much has been paid upon account, or for a

50

‘* particular purpose. A receipt in full con.
‘* tains a declaration that a certain sum has
** been paid in full of all claims of a certain
‘kind. or of all demands. Neither kind of
** receipt embodies any contract.. Both fur.
‘nish only prima facie evidence, and are
‘* valuable only as such. Both are equally
‘* open to explanation or contradiction.”

Ryan v. Ward, 48 N. Y., 207.
Miller v, Coates, 66 N. Y., 609.

(B). The transactions culminating in the receipt
show that the defendant has never actually paid the
amount claimed by the plaintiff.

It was conceded by both parties, and stated in the
engineer’s certificate, and in the receipt itself, that
there had been earned by the plaintiff under the
contract the sum of $3,895,798.79.

It was also not disputed, and likewise stated in
the receipt, that the plaintiff should be credited for
materials sold, and for rebates and other matters
of that description the sum of $34,598.90, making a
total of $3,930,397.69.

As to that amount being due, there was no dis-
pute whatsoever.

We start then with
the amount conced-
edly due to the plain-
ae ukh cewek es cas $3,930,397 69

The receipt states
that there had been
paid to the plaintiff to
apply on the contract
in money, material,
labor and transporta-
tion, the sum of..... $3,626,865 20

In this amount the
Referee found that

ee

51

the plaintiff’s claim

for nutlocks was in-

cluded. (See Find-

ings, page 166, folio

346.)
There had then been

paid in money, ma-

terial, etc., less the

claim for nutlocks, the

eum Bisa in cere ness 8,617,306 57
Claim for nutlocks. 9,558 63 $3,626,865 20

Leaving a balance
OF. xcikcwaee cakes $303,532 49
Out of this balance
the defendant sought
to otfset two items,
which were undis-
puted as to amount.
The items are the
amount charged for
transportation....... $50,000
Amount deducted
by way of forfeiture
for non-completion. . 40,000 90,000 00

od

Leaving a balance
OF cc kota ee ER owes $213,532 49
As against this bal-
ance the defendant re-
tained under the con-
tract, and it was not
disputed that it had
the right so to do, as
security for liens and
Cal. 6c. onks showne 40,000 00

Leaving a balance
ee akin earennt ean $173,532 49

52

It was this balance
that was paid by the
check and for which
the receipt was given.

The following statement will show more clearly
the transactions as shown in the receipt:

SUMMARY.

Earned under contract fixed by

IN vcciscn osc aiteacnemence-< $3,295,798 79
Amount fixed for materials, re-

bates and other matters of that

CN hin ss ccccd ccccecccnes 34,598 90

i vkdakawagew aakeness $3.930,397 69

PAYMENTS AND CREDITS.

Transportation fixed by contract. $ 50,000
Amount retained as security for

PN Mia its cciuoanunanseanee 40,000
Payments in money, etc......... 3,617,306 57 3,707,806 57
MIR bss sGaniesnawaneascs $223,091 12

Deducted for nutlocks........... $9,558 63
Deducted for overtime penalty.... 40,000 00 49,558 68
MND, aio wc dvntcncicinccalct $173,532 49

At the time of the receipt by the plaintiff of the
$173,532.49 there was no dispute, and could be none,
between the parties but that at least that sum was
due, asit was the difference between the amount due
the plaintiff, after deducting all offsets claimed by
the defendant in accordance with its contention.

IN OTHER WORDS, BY THAT PAYMENT THE PLAINTIFF
GOT SIMPLY THE AMOUNT WHICH, IN ANY EVENT, HE
WAS LEGALLY ENTITLED TO AND AS TO WHICH
AMOUNT THE DEFENDANT HAD NO DEFENSE TO ITS
‘PAYMENT.

53

Unless, then, the defendant can show that the dif-
ference between the amount due to the plaintiff, to
wit, $3,930,397.69, and the amount of the payment
for which the receipt was given, $173,532.49, has
been paid or released, the acceptance by the plain-
tiff of the sum of $173,532.49 in full payment
would be no bar to his recovery for the difference,
under the rule that payment by a debtor of a part
of his debt is not a satisfaction of the whole.

United States v. Bostwick, 94 U. S., 53.

Fire Ins. Co. v. Wickham, 141 U. S.,
564.

Ryan v. Ward, 48 N. Y., 204.

Gray v. Barton, 55 N. Y., 68.

Perkins v. Lockwood, 100 Mass., 249.

Curran v. Rummell, 118 Mass., 483.

McKay v. Myers, 168 Mass., 312.

Hodges v. Truax (Ind.), 49 N. E. Rep.,
1079.

Myers v. Green (Ind.), 51 N. E. Rep.,
942.

Fletcher v. Wurgler, 97 Ind., 223.

Marion v. Heimbach (Minn.), 64 N. W.
Rep., 386.

McIntosh v. Johnson (Neb.), 70 N. W.
Rep., 522.

Cincinnati v. Cincinnati Railroad Co.,
6 Ohio N. P., 140.

See also Fitch v. Sutton, 5 East’s Rep.,
230.

That the receipt in full of itself would in no way
bar recovery by the plaintiff if its effect was to dis-
charge an amount concededly due by the payment
of a part, was expressly decided by this Court in
FirE Ins. Assn. v. WICKHAM (supra).

In that case, speaking of the effect of a receipt in
full, Mr. Justice Brown said:

54

‘*It was not seriously contended in this
‘“‘case that the defendant was not legally
‘liable upon its policies for the expenses
‘* clearly incidental to the fire, of raising and
‘* saving the vessel as well as for the direct
‘‘injury to the vessel in consequence of the
“fire, and if the plaintiffs were induced to
‘* settle their claims for one-half the amount
‘*that was due them, and there was no con-
‘‘sideration for the relinquishment of the
‘other half, this suit willlie for the recovery
‘ofthe amount. The rule is well established,
‘* that where the facts show clearly a certain
‘*sum to be due from one person to another,
‘*a release of the entire sum upon payment
‘‘of a part is without consideration, and the
‘‘creditor may still sue and recover the
‘* residue.

‘‘If there be a bona fide dispute as to the
‘* amount due, such dispute may be the sub-
‘‘ject of a compromise and payment of a
‘‘certain sum as a satisfaction of the entire
‘‘claim, but where the larger sum is ad-
‘* mitted to be due, or the circumstances of the
““case show that there was no good reason to
‘*d

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386018_0512%3A4. Public record. Not legal advice.
