# Petition for Writ of Certiorari — County of San Joaquin v. California Water Resources Control Board

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386013_1651%3A1

## Record

- **Collection:** Supreme Court brief
- **Document type:** Petition for Writ of Certiorari
- **Published:** January 1, 1998
- **Citation:** 522 U.S. 1048

## Text

“EL &O

or 721 OCT 27 097

Orfict UF tHe CLERK
In The

Supreme Court of the United States

October Term, 1997
e

COUNTY OF SAN JOAQUIN, et al.,

Petitioners,

VS.

STATE WATER RESOURCES CONTROL BOARD, et al.,

Respondents.
¢

On Petition For Writ Of Certiorari To The
Court Of Appeal Of The State Of California
Third Appellate District

¢
PETITION FOR WRIT OF CERTIORARI

+
NEuUMILLER & BEARDSLEE DANTE JOHN NoMELLINI, Esa.
A PROFESSIONAL CorRPORATION (Counsel of Record)
THomMaAS J. SHEPHARD, Esq. Danie, A. McDaniet, Eso.
P. O. Box 20 Nomellini, Grilli
Stockton, CA 95201 & McDaniel
Telephone: (209) 948-8200 Professional Law
H ae , Dyer, Corporations

pein he Tenner, LLP 235 East Weber Avenue
: P. O. Box 1461

M. Z , Esa.
— A. Seer nt Stockton, CA 95201-1461

KaRNA E. HArRIGFELD, Eso. elephone: (209) 465-5883

2291 W. March Lane, THomas M. ZUCKERMAN, Esa.
Suite B100 146 - 148 West
Stockton, CA 95207 Weber Avenue

Telephone: (209) 472-7700 Stockton, CA 95202

Brewer, PatripGeE & HERRICK Telephone: (209) 943-2004

JouN H. Herrick, Esq. Roserts & Roserts
P. O. Box 70383 Rem Roserts, Eso.
Stockton, CA 95267 311 E. Main St., Suite 202

Telephone: (209) 474-2509 Stockton, CA 95202
Telephone: (209) 941-8714

COCKLE LAW BRIEF PRINTING CO., (800) 225-6964 vi
OR CALL COLLECT (402) 342-2831 \ \

i

QUESTIONS PRESENTED

i. determinations under Rule 19(b) of the Federal
Rules of Civil Procedure, of whether to Proceed in the
absence of a necessary party, what is the weight to be
placed on Constitutional considerations, such as Due Pro-
cess and Equal Protection, when such considerations
come into conflict with sovereign immunity?

II. What is the standard of review on appeal of a
trial court’s determination pursuant to Rule 19(b) of the
Federal Rules of Civil Procedure that a necessary party
which cannot be joined is indispensable, and that the
action must be dismissed?

III. When, under Section 8 of the Reclamation Act of
1902, the federal government obtains appropriative water
right permits and seeks modification of permit terms and
conditions, do state courts have jurisdiction to review the
adjudicatory Proceeding in which the appropriative per-
mit was issued or modified?

il

QUESTIONS PRESENTED - Continued

IV. Is there a denial of Equal Protection in a state
water right proceeding before California’s State Water
Resources Control Board initiated on the joint petition of
California’s Department of Water Resources, and the
United States Bureau of Reclamation, when an interested
party with vested rights is denied judicial review of the
proceeding in state court due to the federal government's
assertion of its sovereign immunity, and the state govern-
ment’s assertion of its Eleventh Amendment immunity in
the United States courts, so as to avoid review in the
courts of both the state and the United States?

V. Is there a denial of Due Process in a state water
right proceeding before California’s State Water Resources
Control Board initiated on the joint petition of California’s
Department of Water Resources and the United States
Bureau of Reclamation, when an interested party with
vested water rights is denied judicial review of the pro-
ceeding in state court due to the federal government's
assertion of its sovereign immunity, and the state govern-
ment’s assertion of its Eleventh Amendment immunity in
the United States courts, so as to avoid review in the
courts of both the state and the United States?

VI. Are the courts of the United States and the state
without jurisdiction to provide complete review of an

adjudicatory proceeding of a state administrative body -

concerning appropriative water right permits of a federal
agency acting under the direction of Section 8 of the
Reclamation Act of 1902, and a state agency, which jointly
initiate proceedings before the body to modify their
respective permits?

ea eel

iii

PARTIES TO THE PROCEEDING BELOW

The Petitioners County of San Joaquin, Stockton East
Water District, Central San Joaquin Water Conservation
District, Central Delta Water Agency, South Delta Water
Agency, and Reclamation District No. 2072 are political
subdivisions of the State of California. R.C. Farms, Inc. is
a California corporation without parent, subsidiary, or
affiliate companies, and Alexander Hildebrand is an indi-
vidual resident of the State of California.

Respondent State Water Resources Control Board is
an administrative body of the State of California, and
Respondents John P. Caffrey, Marc Del Piero, James M.
Stubchaer, Mary Jane Forster, and John W. Brown, sit as
members of the Board.

Real Parties In Interest and Respondents are the
United States of America, acting by and through the
Department of the Interior, Bureau of Reclamation, and
the State of California, acting by and through the
Resources Agency and its Department of Water
Resources.

Intervenors and Respondents are Westlands Water
District, San Luis Water District, Panoche Water District,
Kern County Water Agency, Santa Clara Valley Water
District, Metropolitan Water District of Southern Califor-
nia, and State Water Contractors.

iv

TABLE OF CONTENTS
Page
Opinions And Decisions Below .................... 1
Wg S02 805s 6c 0s baa cak lok n bis cee 2
Constitutional And Statutory Provisions Involved... 2
5. CE Se ee RE ow IN 5
Fas “FE CINE ov 5 ac oc vases ncibeccense 5
B. Procedural Statement oo... siccsceseccvacs 10
Il. Reasons Relied On For Allowance Of The Writ.. 20
Pix. ROOIOOIA 6.ni's aha ves bk Ghee 20

B. The Circumstances Of This Water Rights
Case And The Federal Government's Partici-
pation Are So Compelling As To Warrant
The Exercise Of Discretion To Provide ;
NS oss cin kei cake contest ae 22

C. Review Should Be Allowed To Consider The
Weight To Be Accorded Constitutional, Com-
mon Law, And Statutory Concerns When Rule .
19(b) Determinations Are Made............. 25

D. Review Should Be Allowed In Order To
Resolve Conflict Among The Circuits As To
The Standard Of Review In Rule 19(b)
EE ona ook wind Cebn eb chedie sis 28

ees Ce 5 eRe ee ee 29

Vv

TABLE OF AUTHORITIES

Page
FEDERAL CASES
Burka v. Aetna Life Ins. Co., 87 F.3d 478 (D.C. Cir.
4 kA nia 4h Cha dens hehe co 5b ho hes cars 19, 29
California v. United States, 438 U.S. 645, 98 S.Ct.
2985, 57 L.Ed.2d 1018 (1978)...... Dy Fé Eke By Boe Ot
Chicago, B. & Q. R. Co. v. City of Chicago, 166 U.S.
226, 17 S.Ct. 581, 41 L.Ed. 979 (1897)... .......... 26
Dugan v. Rank, 372 U.S. 609, 83 S.Ct. 999, 10
eR Re REO dnd hans pie ou 5 sph cu lie bh Pad 5, 6
Keweenaw Bay Indian Community v. Michigan, 11
Rie, TOGA AE CAE, POG sk iu scks kev ves ceas'sc 19, 28
Lindsey v. Normet, 405 U.S. 56, 92 S.Ct. 862, 31
SE GE SRUT ABs os 5650s re pak ae cu eka aes bas 26
Provident Bank & Trust Co. v. Patterson, 390 U.S.
102, 88 S.Ct. 733, 19 L.Ed.2d 936 (1968)........... 27
Sindia Expedition, Inc. v. Wrecked and Abandoned
Vessel Known as the Sindia, 895 F.2d 116 (3d Cir.
| a cad ema an pi rayon Alene eey tenes deg 19, 29

Thunder Basin Coal Co. v. Southwestern Public Ser-
vice Co., 104 F.3d 1205 (10th Cir. 1997)......... 19, 29

Walsh v. Centeio, 692 F.2d 1239 (9th Cir. 1982) ....19, 29

Unitep STATES CONSTITUTION

Fourteenth Amendment, Section 1................. a 20
Due Process Clause............. 16, 20, 21, 26, 27, 29
Equal Protection Clause............. 20, 21, 26, 27, 29

Bleventh Amendment... 52. 6.066 6c os ci icc be 22, 24

vi

TABLE OF AUTHORITIES - Continued

Page

FEDERAL STATUTES AND RULES
16 U.S.C. § 1531-1544 -—- Endangered Species

RRR a ET OP ee ee Poe ee ye My 8, 21, 22
es ee ry eee Ee ery Oe ty 16
Oe Rhein a BRE hh ae Wadvedendavos paca cacewene cauen 2
33 U.S.C. § 1313 - Clean Water Act.......... 16, 21, 22
GS UBA Beek i cika tev wenss hen isis chia es 2
Central Valley Project Improvement Act, Title 34

of Public Law 102-675 (1992) .....0...0605 owesies 8, 21, 22
Public Law 99-546, § 103 (October 27, 1986).......... 7
Reclamation Act of 1902, 32 Stat. 390, Section 8

se bkeed sinh kweeb Gates bien > oh) Ble Be ale ae
Federal Rules of Civil Procedure, Rule 19....... passim
Rules of the Supreme Court of the United States,

RU SS occ ot awa ch cean ane Wake taku es Chane hae 2
CALIFORNIA CASES
County of San Joaquin v. State Water Resources Con-

trol Bd., 54 Cal.App.4th 1144 (1997)................ 6
United States v. State Water Resources Control Bd.,

SEE CP Ge CASO oes cp svevsvvedeusss 6, 7, 28
CALIFORNIA STATUTES
Code of Civil Procedure § 389................ 4, 18, 29
Codt of Civll Poncemure § 21060) iis. (ieee oie 13

Code of Civil Procedure § 1085............ccceeeees 13

Vii

TABLE OF AUTHORITIES - Continued

Page
Code of Civil Procedure § 1094.5................... 13
Public Resources Code §§ 21000, et seq. — Califor-
nia Environmental Quality Act.................... 13
PON SE EN ss Co cub bn ae oi ok AO. es | 23
Water Code § 1360 (currently Water Code § 1126) ..13, 24
etter pen Cag UOT TILT: PRIME REE TS ae Neate a ae 10
ne I oe ee Partie a ae 13
Water Code §§ 12220, et WI Pia 5a Siais ok vals Sas 13
Water Code §§ 12230, et Mb a4 chu wkubacdk ewes seca. 13

Water Code §§ 13140, et WON AS Aa eed Cows aha vad 23

merce o

1

OPINIONS AND DECISIONS BELOW

The Order of the Supreme Court of the State of
California, denying the Petition for Review in that Court,
is printed as Appendix 1 hereto at App.1, and is unre-
ported docket number $062126.

The Opinion of the Court of Appeal of the State of
California, Third Appellate District, affirming the Judg-
ment of Dismissal of the Superior Court, is printed as
Appendix 2 hereto at App.2, and is reported at 54
Cal.App.4th 1144.

The Ruling on Submitted Matter made by the Supe-
rior Court of the State of California, County of Sacra-
mento, wherein the Superior Court determined that the
United States Bureau of Reclamation was an indispens-
able party and that because the Bureau refused to waive
its sovereign immunity, the action would be dismissed, is
printed as Appendix 3 hereto at App.22, and is unre-
ported docket number 95 CS 01642.

The water rights decision of the State Water
Resources Control Board of the State of California enti-
tled “Order Denying Petitions For Reconsideration Of
Order WR 95-6, Which Approved Changes In The Water
Rights Of The California Department Of Water Resources
And The United States Bureau Of Reclamation Affecting
The Bay-Delta Estuary” is printed as Appendix 4 hereto
at App.27, and is unreported Order: WR 95-14.

The water rights decision of the State Water
Resources Control Board of the State of California enti-
tled “Order Regarding Petition For Changes In Water
Rights That Authorize Diversion And Use Of Waters
Affecting The San Francisco Bay /Sacramento-San Joaquin
Delta Estuary” is printed as Appendix 5 hereto at App.70,
and is unreported Order: WR 95-6.

The Judgment of Dismissal of the Superior Court of
the State of California, County of Sacramento, is printed
as Appendix 6 hereto at App.151, and is unreported
docket number 95 CS 01642.

JURISDICTION

The jurisdiction of this Court is invoked under Title
28, Section 1257(a) of the United States Code. The judg-
ment of the Superior Court was entered on February 21,
1996. (App.151.) The Decision of the Court of Appeal of
the State of California made on May 6, 1997, which peti-
tioners seek to have reviewed was rendered by the high-
est court of the State of California to which review could
be had. (App.2.) Discretionary review on the Petition for
Review by the California Supreme Court, the state court
of last resort, was denied on July 30, 1997. (App.1.) This
petition is timely filed under Rule 13 of the Rules of the
Supreme Court of the United States.

CONSTITUTIONAL AND STATUTORY
PROVISIONS INVOLVED

Section 1 of the Fourteenth Amendment of the Con-
stitution of the United States:

All persons born or naturalized in the
United States, and subject to the jurisdiction
thereof, are citizens of the United States and of
the State wherein they reside. No State shall
make or enforce any law which shall abridge the
privileges or immunities of citizens of the
United States; nor shall any State deprive any
person of life, liberty, or property, without due
process of law; nor deny to any person within
its jurisdiction the equal protection of the laws.

Section 8 of the Reclamation Act of 1902, 32 Stat. 390,
codified in pertinent part at Title 43 United States Code
section 383 provides:

Nothing in this Act shall be construed as
affecting or intended to affect or to in any way
interfere with the laws of any State or Territory
relating to the control, appropriation, use, or
distribution of water used in irrigation, or any

iii

3

| vested right acquired thereunder, and the Secre-
| tary of the Interior, in carrying out the provi-
sions of this Act, shall proceed in conformity
with such laws, and nothing herein shall in any
| way affect any right of any State or of the Fed-
| eral Government or of any landowner, appro-
| priator, or user of water in, to, or from any
: interstate stream or the waters thereof.

| Rule 19 of the Federal Rules of Civil Procedure pro-
vides:

(a) Persons to be Joined if Feasible. A
person who is subject to service of process and
whose joinder will not deprive the court of juris-
diction over the subject matter of the action
shall be joined as a party in the action if (1) in
the person’s absence complete relief cannot be
accorded among those already parties, or (2) the
person claims an interest relating to the subject
of the action and is so situated that the disposi-
tion of the action in the person's absence may (i)
as a practical matter impair or impede the per-
son’s ability to protect that interest or (ii) leave
any of the persons already parties subject to a
substantial risk of incurring double, multiple, or
otherwise inconsistent obligations by reason of
the claimed interest. If the person has not been
So joined, the court shall order that the person
be made a party. If the person should join as a
plaintiff but refuses to do so, the person may be
made a defendant, or, in a proper case, an invol-
untary plaintiff. If the joined party objects to
venue and joinder of that party would render
the venue of the action improper, that party
shall be dismissed from the action.

(b) Determination by Court Whenever
Joinder not Feasible. If a person as described in
subdivision (a)(1)-(2) hereof cannot be made a
party, the court shall determine whether in

4

equity and good conscience the action should
proceed among the parties before it, or should
be dismissed, the absent person being thus
regarded as indispensable. The factors to be
considered by the court include: first, to what
extent a judgment rendered in the person’s
absence might be prejudicial to the person or
those already parties; second, the extent to
which, by protective provisions in the judgment,
by the shaping of relief, or other measures, the
prejudice can be lessened or avoided; third,
whether a judgment rendered in the person’s
absence will be adequate; fourth, whether the
plaintiff will have an adequate remedy if the
action is dismissed for nonjoinder.

(c) Pleading Reasons for Nonjoinder. A
pleading asserting a claim for relief shall state
the names, if known to the pleader, of any per-
sons as prescribed in subdivision (a)(1)-(2)
hereof who are not joined, and the reasons why
they are not joined.

(d) Exception of Class Actions. This rule
is subject to the provisions of Rule 23.

California Code of Civil Procedure Section 389 pro-
vides:

(a) A person who is subject to service of
process and whose joinder will not deprive the
court of jurisdiction over the subject matter of
the action shall be joined as a party in the action
if (1) in his absence complete relief cannot be
accorded among those already parties or (2) he
claims an interest relating to the subject of the
action and is so situated that the disposition of
the action in his absence may (i) as a practical
matter impair or impede his ability to protect
that interest or (ii) leave any of the persons
already parties subject to a substantial risk of

ernie

5

incurring double, multiple, or otherwise incon-
sistent obligations by reason of his claimed
interest. If he has not been so joined, the court
shall order that he be made a party.

(b) If a person as described in paragraph
(1) or (2) of subdivision (a) cannot be made a
party, the court shall determine whether in
equity and good conscience the action should
proceed among the parties before it, or should
be dismissed without Prejudice, the absent per-
son being thus regarded as indispensable. The
factors to be considered by the court include: (1)
to what extent a judgment rendered in the per-
son’s absence might be prejudicial to him or
those already parties; (2) the extent to which, by
protective provisions in the judgment, by the
shaping of relief, or other measures, the preju-
dice can be lessened or avoided; (3) whether a
judgment rendered in the person’s absence will
be adequate; (4) whether the plaintiff or cross-
complainant will have an adequate remedy if
the action is dismissed for nonjoinder.

(c) A complaint or cross-complaint shall
state the names, if known to the pleader, of any
persons as described in paragraph (1) or (2) of
subdivision (a) who are not joined, and the rea-
sons why they are not joined.

(d) Nothing in this section affects the law
applicable to class actions.

I. STATEMENT OF THE CASE
A. FACTUAL STATEMENT

Many of the basic facts underlying this case have
been visited by this Court in Dugan v. Rank, 372 U.S. 609,
83 S.Ct. 999, 10 L.Ed.2d 15 (1963), and California v. United
States, 438 U.S. 645, 98 S.Ct. 2985, 57 L.Ed.2d 1018 (1978).

6

California’s great Central Valley Basin includes the Sacra-
mento Valley in the north, containing the Sacramento
River. The basin also includes the San Joaquin Valley, in
the south, which includes the San Joaquin River. (Dugan,
372 U.S. 612.) Due to heavier rainfall in the north, the
Sacramento River has a “surplus” of water, but its valley
has little available tillable soil. (Ibid.) The San Joaquin
River, however, “is in the contrary situation.” (Id.) The
San Joaquin River joins the Sacramento River in the Sac-
ramento-San Joaquin Delta (hereinafter “Delta”), before
the Sacramento River empties into San Francisco Bay and
the Pacific Ocean. (Id.) The region including the San
Francisco Bay is known as the Bay-Delta Estuary.

California has two massive water projects, the Cen-
tral Valley Project (hereinafter “CVP”) operated by the
United States Bureau of Reclamation (hereinafter
“Bureau”), and the State of California’s State Water Pro-
ject (hereinafter “SWP”) operated by the state’s Depart-
ment of Water Resources (hereinafter “DWR”). (United
States v. State Water Resources Control Bd., 182 Cal.App.3d
82, 97 (1986); see also County of San Joaquin v. State Water
Resources Control Bd., 54 Cal.App.4th 1144, 1147 (1997)
App.4-5.) The appropriative water permits necessary for
these projects are issued by California’s State Water
Resources Control Board (hereinafter “Water Board”),
and the Bureau’s CVP is the Jargest reclamation project in
the United States. The Delta provides a conduit for the
transfer of water by these two projects, which store water
in reservoirs and divert water from rivers flowing into
the Delta. (United States v. State Water Resources Control
Bd., 182 Cal.App.3d 97.) Pumps at the southern edge of
the Delta are utilized to lift water into canals for trans-
port south to farmers in the Central Valley and to munici-
palities in Southern California. (Ibid.) The Bureau and the
DWR have a combined total of some 34 permits for
various units of the CVP and SWP authorizing the diver-
sion and use of the Delta’s waters. (Id.)

7

Petitioner County of San Joaquin is located partly in
the Delta, the San Joaquin River traversing the southern
part of the county before it joins the Sacramento River
just west of the county. Stockton East Water District
(hereinafter “SEWD”) is a local water district formed
pursuant to a special act of the State of California, and
Central San Joaquin Water Conservation District (“CS]-
WCD”) is a water conservation district formed under
state law. SEWD and CSJWCD are located in San Joaquin
County, and have contracts with the Bureau for the sup-
ply of water from New Melones Dam, the component of
the CVP involved in California v. United States, 438 U.S.
645. Petitioners Central Delta Water Agency and South
Delta Water Agency are political subdivisions of the state
representing the interests of riparian water right holders
and others in the Delta area. Reclamation District No.
2072 is an appropriative water right holder in the Delta
area, and R.C. Farms, Inc. and Alexander Hildebrand are
riparian water right holders in the Delta area.

Water quality degradation in the southern region of
the Delta is caused not by ocean water intrusion, but
instead “mainly by upstream depletions of the San Joa-
quin River and salt infusion from irrigation waste — water
runoff carried by the San Joaquin River.” (United States v.
State Water Resources Control Bd., 182 Cal.App.3d 121.)
The project operations of DWR and the Bureau “are inex-
tricably interrelated”, and as early as 1960 the Bureau and
DWR entered into a preliminary agreement for the coor-
dinated operation of the projects. (Ibid., 182 Cal.App.3d
131-132.) In 1986, Congress authorized and directed the
Secretary of the Interior to execute and implement the
“Agreement Between the United States of America and
the Department of Water Resources of the State of Cali-
fornia for Coordinated Operation of the Central Valley
Project and the State Water Project” dated May 20, 1985.
(Act of Congress approved October 27, 1986, Public Law
99-546, section 103, amending Act of August 26, 1937, 50
Stat. 850.)

8

Due to the alarm of the water exporters generated by
regional impacts of the federal Endangered Species Act,
16 U.S.C. sections 1531-1544 (1973) and the Central Valley
Project Improvement Act, Title 34 of Public Law 102-575
(1992), urban and agricultural water suppliers incredu-
lous about the threats the two acts posed to their Delta
exports, began a series of private meetings with represen-
tatives of federal and state agencies, including represen-
tatives of the Water Board, the adjudicatory body that
would be required to rule impartially in the proceedings
that would come. (CT 7.)! The San Joaquin County and
Delta interests, including those petitioners representing
riparian senior water right holders, were excluded from
these meetings. (CT 7.) These meetings resulted in the
execution of a contract referred to as the “Principles for
Agreement on Bay-Delta Standards” (hereinafter “Princi-
ples Agreement”). (Ibid; App.154; AR Box B, item 50.)

The admitted reasoning behind the Principles Agree-
ment was to meet the environmental needs of the Bay-
Delta Estuary while avoiding reduction in exports.
(App.156, paragraph 1.) In other words, the purpose was
to make sure that the water required by the Endangered
Species Act and most of the water required by the Central
Valley Project Improvement Act for environmental pur-
poses, to correct some of the problems created by the
exports, came from somewhere other than the junior
exporters. Indeed, the Principles Agreement specifically
provides:

[I]t is understood that protection of these
species [threatened and endangered] shall result

in no additional water cost [a mandated reduc-

tion of project supply] relative to the Bay-Delta

protections embodied in the Plan. . . . (App.158,

para 2(b).)

1 References to the record are cited in the following
manner: “CT” for Clerk’s Transcript; “RT” for Reporter's
Transcript; and “AR” for Administrative Record.

ae 8 UT

9

Moreover, the Principles Agreement dictated the
action to be taken by the state’s Water Board, the very
adjudicatory body to which the parties petitioned for the
necessary changes in their permits:

Consistent with the Framework Agreement,
the SWRCB will finalize the Plan and imme-
diately thereafter initiate water right proceed-
ings to implement the adopted Plan. (App.159,
para. 4(b).)

The Principles Agreement further sought to specify
the action to be taken by the Water Board:

Not later than three years following adop-
tion of this Plan, the SWRCB shall assign
responsibility for the following flows, together
with other measures in the watershed sufficient
to meet the narrative criteria, in the San Joaquin
River at Vernalis among the water right holders
in the watershed. (App.163, para. 1.)

and

This process will be under the sponsorship
of CUWA/AG, which commits to an open and
collaborative approach involving CALFED and
the environmental community, It is agreed that
detailed implementation for these Principles
will be finalized before publication of the final
SWRCB standards, which is currently planned
by March 31, 1995. (App.166, para. 6.2)

Consistent with the Principles Agreement, the Water
Board did initiate the water right proceedings and essen-
tially adopt the operative terms thereof. (App.132-137,)

* CUWA/AG is an abbreviation of California Urban Water
Agency/Agricultural Water Users, and CALFED is an
abbreviation of California Water Policy Council and Federal
Ecosystem Directorate, (App. 154.)

10
B. PROCEDURAL STATEMENT

This matter arises from the Bureau and DWR’s joint
petition to the Water Board for changes in the permits of
the Bureau and DWR in order to implement the Princi-
ples Agreement, and the Water Board’s adoption of its
Order Regarding Petition For Changes lL. Water Rights
That Authorize Diversion And Use Of Water Affecting
The San Francisco Bay/Sacramento-San Joaquin Estuary,
being Water Rights Order 95-6 (“WR 95-6”; App.70). WR
95-6 approved changes in the water right permits for the
SWP and the CVP, authorizing the diversion and use of
water affecting the San Francisco Bay/Sacramento-San
Joaquin Delta Estuary. (App.132-140; CT 715-780.)

On February 28, 1995, the state’s DWR filed with the
Water Board a joint petition (hereinafter “Petition for
Change”) on behalf of itself and the Bureau as operator of
the CVP pursuant to California Water Code Section 1702,
requesting changes in their existing, junior appropriative
water rights permits (“permits”) for the SWP and CVP.
(CT 546-550.) The Petition for Change requested that
some thirty-nine (39) permits, all junior to the water
rights of riparians and earlier appropriators, be modified.
The Petition requested authority for a significant change
in operations of the projects by implementation of a “joint
point of diversion” allowing the Bureau and DWR to
utilize each other’s export pumping facilities when the
other has reached its export limitation contained in their
respective water right permits. The petition further
sought relief from specified water export limitations pre-
viously mandated by the Water Board during the months
of April and May, and sought to further modify the
permits so as to parallel a Draft Water Quality Control
Plan for San Francisco Bay/Sacramento-San Joaquin
Delta Estuary (Bay-Delta Plan), incorporating the ele-
ments of the Principles Agreement. (App.77.) Coinciden-
tally, the draft Bay-Delta Plan was also released by the

ers

ie a

11

Water Board on December 15, 1994, the date of the Princi-
ples Agreement. (App.76.)

On April 18, 19, and 20, 1995, the Water Board held
public hearings on the Petition for Change. All peti-
tioners herein appeared at those hearings and objected to
the approval of the Petition for Change. At the public
hearings, DWR and the Bureau featured the Petition for
Change as their joint project, and the state’s DWR
assumed the lead role in the presentation of their joint
interests. (CT 1316-1342.)

The federal questions of concern in this matter were
raised as they appeared. The first issue to arise pertains
to Due Process in the adjudicatory proceedings before the
Water Board, raised in the written Central Delta Water
Agency, et al. Statement of Issues:

The subject petition and hearing is a water
right proceeding involving vested property and
contract rights of numerous parties. These rights
involve economic values of hundreds of millions
of dollars. The SWRCB is expected to preside as
an impartial adjudicator in these water right
matters. When the State and United States are at
the forefront of exporting water from the areas
and watersheds of origin and are parties to this
Proceeding, the need for SWRCB impartiality is
essential.

Without SWRCB impartiality, the parties to
water rights proceedings are deprived of due
Process of law.

The task of maintaining impartiality is
made even more difficult when the very same
people through whom the appointments to the
SWRCB are processed become involved in the
matters coming before the SWRCB. The involve-
ment of the Secretary, California Resources
Agency and the Secretary for Environmental
Protection, California Environmental Protection

12

Agency, in the “principles for agreement” is evi-
denced by their signature to the agreement.

Demand is hereby made that prior to com-
mencement of the April 18, 1995, hearing, the
SWRCB members and its staff make a full writ-
ten disclosure to each of the parties filing notice
of intent to appear as to the following:

1) All contacts with any of the parties to
the “Principles For Agreement on Bay-Delta
Standards Between the State of California and
the Federal Government” dated December 15,
1994, pertaining to such agreement and the
negotiations leading to such agreement.

2) A general description of the nature of
each such contact...

3) As to any such contacts which involved
notes, recordings or written communications,
the location and times when inspection will be
allowed.

4) If any such contact involved any agree-
ment, commitment or concession as to the time,
nature or disposition of any SWRCB proceeding,
a written statement signed by the SWRCB mem-
ber or staff person setting forth the specifics
should be provided to each party.

If after such disclosure it appears that the
impartiality of any SWRCB member or staff per-

son has been compromised, then disqualifica-

tion should be addressed. (AR Box E, item 314,

pages 2-3.)

On June 8, 1995, the Water Board made its adjudica-
tory wate: rights decision, admitting the attendance of its
staft at meetings for negotiation of the Principles Agree-
ment, but rejecting the challenge to its impartiality and
adopting Order WR 95-6 (App.91). The Water Board
essentially granted the Petition for Change requested by

13

the Bureau and DWR, and authorized the joint points of
diversion. (CT 127-191; App.132-137.)

On July 7, 1995, petitioners timely filed a Petition for
Writ of Mandate in the Superior Court of California in
Sacramento County, pursuant to California Code of Civil]
Procedure sections 1094.5, 1085, and 1060, and California
Water Code section 1360 (currently Water Code section
1126). The Petition For Writ Of Mandate sought review of
WR 95-6 on the grounds that the Water Board was violat-
ing various California statutes, including the California
Environmental Quality Act (California Public Resources
Code sections 21000, et seq.). (CT 16-35, 40-42.) Entirely
independent of the challenge to the Water Board’s action
in adopting WR 95-6, petitioners sought a declaration by
the trial court that the Water Board had an independent
obligation to enforce the requirements of California Water
Code Sections 11460, 12220, et seq., and 12230, et seq. (CT
48-49.)

The Thirteenth Cause of Action of the Petition For
Writ Of Mandate raised the issue of the denial of Due
Process in the proceeding in the Superior Court of Cali-
forn.a seeking to review the action of the Water Board:

143. Respondent SWRCB has deprived
PETITIONERS of due Process of law as follows:

(a) By allowing staff, including those
with direct responsibility on water right matters
pertaining to WR 95-6 to Participate in
numerous private meetings with the water
exporters and their attorneys where water
allocations to meet Delta standards were dis-
cussed and where no notice was given to inter-
ested parties (including PETITIONERS) or the
public.

14

(b) By allowing SWRCB members to
receive communications pertaining to such pri-
vate meetings without notice to interested par-
ties (including PETITIONERS) or the public.

(c) By allowing staff, including those
with direct responsibility on water right mat-
ters, to participate in meetings where water
allocations to meet Delta standards were dis-
cussed without such meetings being duly
noticed and open to the public.

(d) By failing to disclose and allow the
inspection of all board and staff communica-
tions pertaining to the Principles for Agreement
by all interested parties prior to the close of the
evidentiary hearing on WR 95-6.

(e) By failing to allow inspection of
the November 29, 1994, “Confidential” mem-
orandum pertaining to “Delta Protection Stan-
dards” from the Chairman of the Water Policy
Council to the Governor.

(f) By failing to allow for cross-exam-
ination of those staff and board members shown
by the documents disclosed by the SWRCB to
have participated in meetings and negotiations
pertaining to said Principles for Agreement.

(g) By failing to allow for a hearing
prior to decision WR 95-6 dealing with whether
or not the impartiality of the SWRCB and/or
staff had been compromised by the “ex parte”
communications with the water exporters relat-
ing to said Principles for Agreement.

(h) Because the order, an adjudicatory
action and an administrative decision, autho-
rizes changes in terms so vague that Petitioners
must guess at its meaning in order to protect
their due process rights, WR 95-6 violates Arti-
cle I, Section 7(a) of the California Constitution.
(CT 46-48.)

15

On October 6, 1995, a stipulation for intervention was
filed with the Superior Court naming Kern County Water
Agency, Metropolitan Water District of Southern Califor-
nia, Santa Clara Valley Water District, Westlands Water
District, and the State Water Contractors (a joint powers
authority comprised of public agencies) as intervenors in
the litigation. (CT 249-254.)

In the Superior Court the Bureau made a special
appearance and elected not to waive its sovereign immu-
nity. (CT 664-672; App.23.) The Water Board brought a
motion for judgment on the pleadings requesting that the
trial court dismiss the action on the ground that the
Bureau was an indispensable party, and that in the
absence of the Bureau the case should not continue and
should be dismissed. (App.23; CT 688-710, 1204-1215,
1251-1261.) Petitioners then raised their concerns respect-
ing the denial of any opportunity for review of the WR
95-6 proceedings, in the context of their Memorandum Of
Points And Authorities In Opposition To Respondent's
Motion To Dismiss:

Probably the most important factor facing
the Court is that if the United States is deemed
an indispensable party, Petitioners will be com-
pletely denied any remedy in state or federal
court on the issues raised in this case. (CT 1303.)

On January 26, 1996, the trial court heard oral argu-
ments from the parties and the respondents argued two
points. (RT 4.) First, respondents claimed that petiticners
had an alternate remedy in an action pending in federal
court to which some of the petitioners were parties,
claiming that petitioners could pursue their state law
substantive claims in the pending federal court action
initiated previous to WR 95-6. (RT 4-7.) Petitioners Cen-
tral Delta Water Agency, South Delta Water Agency, Rec-
lamation District No. 2072, R.C. Farms, Inc. and
Alexander Hildebrand were not parties to the federal
court action and such action did not in any way review

16

the subject Water Board Order WR 95-6. (CT 389.) Sec-
ondly, the respondents claimed that they would suffer
prejudice because of the potential for conflicting judg-
ments should the case proceed without the United States
being a party. (RT 7-9.) On February 6, 1996, the trial
court granted the motion, finding the Bureau to be an
indispensable party, and dismissed the action. (App.25;
CT 1863-1867.) Thus, the trial court never reached the
substantive issues raised in the Petition For Writ of Man-
date, including the Due Process claim raised in the Thir-
teenth Cause of Action. The trial court did, however,
determine that petitioners had an adequate remedy in the
pending federal action to which the several petitioners
were not even parties. (App.24; CT 1865.) Judgment dis-
missing the action was then entered on February 21, 1996.
(App.151; CT 1868-1872.)

On April 18, 1996, petitioners filed a timely notice of
appeal to the Third Appellate District of the Court of
Appeal of the State of California. (CT 1885-1887.) The lack
of any remedy and Due Process issues were raised in the
Court of Appeal of the State of California, in Appellant's
Reply Brief:

Only in the rare occasion when the federal
government elects to consent to jurisdiction,
(historically when the federal and state govern-
ments are at odds) will a California State court
be allowed to review such a decision. To illus-
trate the potential damages of sustaining this
decision, if the SWRCB were to act in collusion
with the federal government or in a corrupted
manner, without regard to the due process
rights of an individual, there would be no
method by which a party could challenge such
an action. The checks and balances afforded by
our concept of due process would be eliminated.
(Reply Brief, 2.)

and

17

As such, sustaining the trial court’s decision
effectively slams the judicial door on any other
party who may be injured, eliminating their
Statutory right to challenge actions of the
SWRCB in State court, and any due process
review of decisions involving property rights.”
(Reply Brief, 4.)

and

A vital portion of this State regulatory
scheme provides affected parties with an oppor-
tunity for judicial review of SWRCB actions in
order to protect the property and due process
tights of those individuals which may be
affected by decisions of the SWRCB. (Water
Code Sections 1360, 1705.5, 1730 and 1840) This
fundamental right to judicial review cannot be
merged into and subsumed by a distinct dispute
with the federal government over project opera-
tions. (Reply Brief, 8.)

and

The Appellants’ claims against the SWRCB
rise above the dispute of some of the Appellants
with the federal government. The mere exis-
tence of this separate, albeit important, legal
dispute with the United States in federal court is
being used by the SWRCB as both a shield to
provide absolute immunity for their own actions
and a sword to deprive Appellants of access to
the judicial system. (Reply Brief, 8.)

and

Such a result would appoint the United
States gatekeeper to State court review. In order
to obtain the statutory and due process right to
review, a property rights holder would have to
obtain approval of the United States as well. The
gatekeeper would have to determine if, in that

18

instance, it wished to waive or enforce its sover-
eign immunity. Affording the federal govern-
ment such de facto veto over a State court’s
jurisdiction to review and protect fundamental
property rights undermines the practical and
legal meaning of such rights. (Reply Brief, 31.)

The decision of the Court of Appeal of the State of
California affirming the trial court’s decision filed on
May 6, 1997 (App.2.), did not specifically address the Due
Process claim, but did address the lack of a remedy. The
Court of Appeal determined that the lack of any remedy
was but one of the factors to be considered in determin-
ing if the action should be dismissed, that it was not an
outcome determinative factor, and that the Court was not
convinced that petitioners did not have an adequate rem-
edy in the federal proceeding to which some of the peti-
tioners were parties. (App.16-18.) The Court of Appeal
held:

There is sufficient similarity in the general
types of relief sought in the federal and state
actions to support the trial court’s conclusion
appellants have an adequate remedy in the
pending federal action. [footnote omitted]
(App.18.)

In order to determine the standard of review of the
trial court’s determination to dismiss, due to the virtual
identity of Rule 19 of the Federal Rules of Civil Pro-
cedure, and the California statute modeled after Rule 19,
Code of Civil Procedure section 389, the Court of Appeal
looked at the decisions of the United States Court of
Appeals, and found that the standard of review was for
an abuse of discretion.

The state Court of Appeal found as follows:

In the federal courts “[a] district court’s
determination of indispensability under [Fed-
eral Rule of Civil Procedure] 19(b) is reviewed
for an abuse of discretion.” [footnote omitted]

bc eeiciaiaeaicniiiaiiiiiiaiiiaiiiaiiiiail

19

(Thunder Basin Coal Co. v. Southwestern Public
Service Co. (10th Cir. 1997) 104 F.3d 1205, 1210;
see also Burka v. Aetna Life Ins. Co. (D.C. Cir.
1996) 87 F.3d 478, 483; Sindia Expedition, Inc. v.
Wrecked and Abandoned Vessel Known as the Sindia
(3d Cir. 1990) 895 F.2d 116, 121; Walsh v. Centeio
(9th Cir. 1982) 692 F.2d 1239, 1242.) (App.
12-13.)

In a portion of the footnote omitted from the above,
the state Court of Appeal alluded to the conflict among
the circuits, by virtue of the Sixth Circuit’s decision that
Rule 19(b) determinations are reviewed de novo citing
Keweenaw Bay Indian Community v. Michigan (6th Cir.
1993) 11 F.3d 1341 at 1346. (App.13.)

The issues were further raised in the California
Supreme Court in the Petition For Review:

The resulting iniquity and loss of peti-
tioners’ rights to the due process allowed by law
in obtaining review concerning their vested
water rights, directly resulting from the dis-
missal due to the lack of an indispensable party,
is not some isolated aberration limited to the
circumstances of this case. Nor is it unlikely to
repeat itself. (Petition for Review, 15.)

and

It should be noted that the riparian peti-
tioners’ water rights are vested water rights,
and there should be no opportunity for the
impairment or prejudice to such rights without
according petitioners the full measure of the
protections afforded by the processes estab-
lished by law. Otherwise, serious questions con-
cerning due process are raised. (Petition for
Review, 16.)

20
and

By elimination of the right of review, the
Bureau and DWR have virtually quashed the
due process of law. (Petition for Review, 19.)

The California Supreme Court denied the petition for
review without comment, so it did not specifically deal
with the issues. (App.1.)

II. REASONS RELIED ON FOR ALLOWANCE OF
THE WRIT

A. INTRODUCTION.

This case comes from the highest state court in which
review could be had and there do exist compelling rea-
sons for the Court to exercise its discretion to grant a writ
of certiorari. Review should be granted due to the unique
nature of the underlying controversy and the potential
impact of the dismissal. This case also provides the
opportunity to examine the factors and equitable consid-
erations involved when indispensable party determina-
tions are made, and the weight to be accorded
considerations of Due Process and Equal Protection. Fur-
ther, the state Court of Appeal looked to the decisions of
the United States Courts of Appeals for the standard of
review of a trial court’s dismissal due to the absence of an
indispensable party, which decisions are in conflict. The
state Court of Appeal thus determined the standard of
review of Rule 19(b) determinations, thereby deciding an
important federal question which this Court has not set-
tled, but should settle.

This case arises during a critical period in the histori-
cal development and application of law in California. It
concerns the location and operation of the world’s largest
reclamation project, which is operated by the federal
government, and the senior water rights of petitioners
who are riparians are implicated. Water is truly the most
precious but often abused and taken for granted resource.

ener

21

This case comes at a time when the state and federal
agencies devoted to developing and managing water
resources for export, and traditionally pitted against the
interests of the watersheds in which the water originates,
have been mandated by the Central Valley Project
Improvement Act of 1992 (Public Law 102-575, sections
3401-3412, 106 Stat. 4706-4731, hereinafter “CVPIA”), the
Clean Water Act (Title 33 United States Code section
1313), and the Endangered Species Act (Title 16 United
States Code section 1536, hereinafter “ESA”) to undo,
mitigate, and alleviate the environmental damage their
development and management has created. Due to the
dominant role played by the federal government in the
development of California’s water resources, the issue of
greatest concern embedded in this case is whether there
is to be any review of Water Board decisions when the
Bureau and the state are both interested parties. The
rulings below disallowing review are abhorrent to the
concepts of Due Process and Equal Protection founded on
traditional notions of fair play.

This case also brings into question the procedures to
be followed under state law, when the federal govern-
ment is involved, pursuant to Section 8 of the Reclama-
tion Act of 1902 and this Court’s decision in California v.
United States, 438 U.S. 645, 57 L.Ed.2d 1018, 98 S.Ct. 2985
(1978). While these questions arise in the context of the
standard of appellate rule in a determination under Rule
19(b) of the Federal Rules of Civil Procedure, the predom-
inant issue is the weight to be accorded constitutional
considerations conflicting with the application of sover-
eign immunity, when determining whether to dismiss
pursuant to Rule 19(b).

22

B. THE CIRCUMSTANCES OF THIS WATER
RIGHTS CASE AND THE FEDERAL GOV-
ERNMENT’S PARTICIPATION ARE SO COM-
PELLING AS TO WARRANT THE EXERCISE
OF DISCRETION TO PROVIDE REVIEW.

This case presents circumstances which are worthy of
this Court’s attention. If left to stand, the proceedings
below before the Water Board will be immune from
review, due solely to the federal government's refusal to
waive its sovereign immunity. In the world’s largest rec-
lamation project, the state and federal water exporters
will have as effectively avoided judicial review of the
Water Board proceedings, as if the administrative
branches of government had simply closed the doors of
the judicial branch, thus avoiding any checks and bal-
ances.

A truly dangerous precedent is established by allow-
ing judicial review in a water rights proceeding to be
entirely avoided by the federal government’s status as an
interested party, and its selective assertion of sovereign
immunity. It simply is not consistent with fair play to be
left to pursue only a part of an action in federal court,
where there the state enjoys the immunity of the Eleventh
Amendment of the United States Constitution and review
of the Water Board’s decision is not allowed. Such game-
smanship by the state and federal governments was cer-
tainly not what the framers had in mind at the
Constitutional Convention, and it is in conflict with the
determination by this Court that, pursuant to Section 8 of
the Reclamation Act of 1902, federal reclamation projects
must comply with state water laws except where such
laws are inconsistent with congressional directives. (Cali-
fornia v. United States, 438 U.S. 645, 664, 668, 673, 678-79,
98 S.Ct. 2985, 57 L.Ed.2d 1018 (1978).)

The Principles Agreement which led to this matter
was, quite simply, the Bureau and DWR water exporters’
response to the environmental restraints imposed upon

23

them by the CVPIA, ESA, and the Clean Water Act, in
order to minimize any loss or reduction of their export
water. While the physical method of satisfying the envi-
ronmental demands for water without reducing exports is
of great concern to those such as petitioners within the
watershed or area of origin, what is of even greater
concern is the method employed to obtain the unreview-
able legal sanction of the Water Board.

California Water Code section 174 provides for the
establishment of the Water Board which is to exercise
adjudicatory and regulatory functions, combining the
water rights and the water pollution and water quality
functions of state government. The Principles Agreement
represents a blatant and audacious attempt by the Bureau
and DWR, as well as the other signatories thereto, to
predetermine and influence the outcome of the Water
Board’s adjudicatory and regulatory functions. The Prin-
ciples Agreement provides:

Consistent with the Framework Agreement,
the SWRCB will finalize the Plan and immediately
thereafter initiate water right proceedings to imple-
ment the adopted Plan. In implementing the Plan,
the SWRCB will act in compliance with all provi-
sions of law which may be applicable, including,
but not limited to, the water rights priority sys-
tem and the statutory protections for areas of
origin. (App.159, para 4(b), emphasis added; see
also other quotations from the Principles Agree-
ment previously set forth at pages 8-9.)

Thus, the Bureau and DWR, junior appropriative
water rights holders, and other signatories, sought to
influence and dictate the outcome of the Water Board’s
adjudicatory proceeding as well as its regulatory pro-
ceedings in the adoption of a Water Quality Control Plan
pursuant to California Water Code sections 13140, et seq.
While the significance of this event itself should not go
unnoticed, nor unremedied, it truly was only the prelude
to the alarming events which would unfold after the

24

Water Board made its subject Order: WR 95-6, almost
entirely implementing the Principles Agreement.

Despite the fact that petitioners filed a timely petition
for review of WR 95-6, as expressly provided for in Water
Code section 1360 (currently Water Code section 1126), this
action was dismissed only because it was determined that
the Bureau, one of the very parties petitioning for the result
of WR 95-6, was an indispensable party which would not
waive its sovereign immunity from suit in state court. It is
unclear whether it was by design or unwitting fortune, but
the two operators of the most massive water expe’ system
in the world who themselves asked the Water voard for
changes in their permits did so without risk of judicial
review of a favorable decision by the Water Board. Since the
two operators were both proper parties, and due to the
Eleventh Amendment immunity of the state in federal court
and the sovereign immunity of the federal government in
state court, review could only be obtained if the Bureau
would consent to suit in state court or the state would
consent to suit in federal court. In this manner, the two
operators effectively reduced those who have a right of
review pursuant to Water Code section 1360 (currently Water
Code section 1126) to only themselves.

The consequential loss of petitioners’ rights to pursue
the review process allowed by law to obtain review con-
cerning their vested water rights is, should DWR and the
Bureau so desire, likely to repeat itself. This is due to the
substantially coordinated and joint nature and operation
of the state and federal water projects which lends itself
to, if it does not require by definition, joint petition
whenever the state and federal governments desire to
modify a permit to suit their plan of export.

The issues of law involved in this case transcend the
local context and subject matter in which they arise,
particularly since the decision of the state Court of
Appeal is a published decision. Left alone, the decision of
the state Court of Appeal will usher in not merely a novel
method of avoiding judicial review in water right cases,

25

but in any case in which the federal government's partici-
pation is significant enough to make the federal govern-
ment a necessary party. Left alone this case will be
provocative of a selective avoidance of effective review,
and a total undermining of the process of review not
merely of proceedings before the Water Board, but also in
any other proceedings before a state administrative
agency performing an adjudicatory function wherein a
federal agency is an interested party. By asserting sover-
eign immunity, the federal government can avoid review
of state agency decisions in which the federal govern-
ment has prevailed. The joint Participation of the state
and federal governments in funding everything from
roads to schools may thus be completely immunized from
any review of administrative agency determinations. In
such event the public’s confidence in those processes is
placed at great risk and is in jeopardy of being lost.
Under the circumstances, it is respectfully submitted that
review is appropriate.

C. REVIEW SHOULD BE ALLOWED TO CON.-
SIDER THE WEIGHT TO BE ACCORDED
CONSTITUTIONAL, COMMON LAW, AND
STATUTORY CONCERNS WHEN RULE 19(b)
DETERMINATIONS ARE MADE.

This case exposes the need to reconcile conflict
among the requirements of the United States Constitu-
tion, the common law, the Federal Rules of Civil Pro-
cedure, and the Reclamation Act of 1902. The conflict
arises from the requirements of Due Process and Equal
Protection, sovereign immunity, indispensable party, Rule
19(b) determinations, and the Section 8 requirement, as
determined by this Court, that makes “it abundantly clear
that Congress intended to defer to the substance, as well
as the form, of state water law.” California v. United States,
438 U.S. 645, at 675, 98 S.Ct. 2985, 57 L.Ed.2d 1018 (1978).
Review is appropriate to resolve the weight and priorities
to be accorded such requirements when they compete.

26

It should be noted that the riparian petitioners’ water
rights are vested water rights, and there should be no
opportunity for the impairment or prejudice to such
rights without according petitioners the full measure of
the protections afforded by the processes established by
law. Otherwise, petitioners are not provided with Due
Process or Equal Protection of the established law.
Review should be permitted because the determination to
dismiss the action below due to the assertion of sovereign
immunity by the United States results in an unwarranted
preference for the archaic common law concept of sover-
eign immunity, as against the requirements of Due Pro-
cess and Equal Protection set forth in the Fourteenth
Amendment protecting the fundamental rights of peti-
tioners. The common law concept of sovereign immunity
is a rule derived from the concept that the king can do no
wrong. But it is that very concept which provided the
fodder for the American Revolution, and provided the
impetus for the Declaration of Independence and the
United States Constitution. When sovereign immunity
collides with the Due Process and Equal Protection
clauses of the Fourteenth Amendment, sovereign immu-
nity should give way.

Although the proceedings below may have provided
petitioners with due process in form, the proceedings did
not provide petitioners with the substance of Due Pro-
cess, and this Court has indicated that “In determining
what is due process of law, regard must be had to sub-
stance, not to form.” (Chicago, B. & Q. R. Co. v. City of
Chicago, 166 U.S. 226, 235, 17 S.Ct. 581, 41 L.Ed. 979
(1897).) Although the Due Process Clause may not require
appellate review after a “full and fair trial on the merits”,
which is what petitioners should have obtained before
the Water Board, “When an appeal is afforded, however,
it cannot be granted to some litigants and capriciously or
arbitrarily denied to others without violating the Equal
Protection Clause.” Lindsey v. Normet, 405 U.S. 56 at 77, 92
S.Ct. 862, 31 L.Ed. 2d 36 (1972). Allowing sovereign

premenenatseseeine cianlciesnae i ariel ae nee

27

immunity to dictate the dismissal in this case denied
petitioners the right to appeal the Water Board’s decision,
providing the right only to the Bureau.

In Provident Bank & Trust Co. v. Patterson, 390 U.S.
102, 118-119, 88 S.Ct. 733, 19 L.Ed.2d 936 (1968), this
Court recognized that some factors in a Rule 19(b) deter-
mination of whether to dismiss may be so compelling by
themselves as to individually dictate a result:

The decision whether to dismiss (i.e., the
decision whether the person missing is “indis-
pensable”) must be based on factors varying
with the different cases, some such factors being
substantive, some procedural, some compelling by
themselves, and some subject to balancing
against opposing interests. (Emphasis added.)

The interests of Due Process and Equal Protection are
certainly more compelling than the interest of sovereign
immunity, particularly in this case where the Bureau uses
sovereign immunity merely to thwart judicial review of a
state’s administrative proceeding initiated by the Bureau
itself. Here it can be fairly stated that the use of sovereign
immunity has allowed the government to abuse its
power, employing the indispensable party determination
as an instrument of oppression engendering distrust.

The assertion and application of sovereign immunity
in this case further conflict with the express Congres-
sional directive in Section 8 of the Reclamation Act of
1902 requiring the federal government to acquire water
rights in conformity with state law, and this Court's
holding in California v. United States, 438 U.S. 635. The
concept that control of the waters should remain subject
to state law is substantially diluted, if it does not neces-
sarily provide a directive to the federal government to
comply with the full measure of controls imposed by
state law, including the basic component of allowing a
right of judicial review of the adjudicatory action taken
by the Water Board at the behest of the Bureau. To allow

28

judicial review to be avoided by a party initiating a
proceeding through the use of sovereign immunity by
that same party is inequitable and undesirable. If Rule
19(b) is a rule of equity and good conscience, the dis-
missal in this case must not be allowed to stand.

In its proper perspective, this is not a case in which
sovereign immunity was asserted during the preiiminary
stages at the trial court level, which was the adjudicatory
proceeding before the Water Board. (United States v. State
Water Resources Control Bd., 182 Cal.App.3d 82, 113
(1986).) In reality, the Bureau acting in accordance with
Section 8 of the Reclamation Act and the state’s DWR
themselves initiated the action to modify their permits,
and the filing in the Superior Court was merely a first
level appeal challenging the adjudicatory determination
of the state’s Water Board in WR 95-6. The Bureau thus
did not assert sovereign immunity until at the stage
reviewing the very matter it had joined in initiating
before the Water Board.

When in Rule 19(b) determinations, either constitu-
tional concerns or congressional directives are in conflict
with sovereign immunity, a singular compelling circum-
stance is present and should weigh in favor of the
requirements of the Constitution, and the directives of
Congress. This case presents an opportunity to clarify the
weight to be accorded various concerns when considering
dismissal in a Rule 19(b) case.

D. REVIEW SHOULD BE ALLOWED IN ORDER
TO RESOLVE CONFLICT AMONG THE CIR-
CUITS AS TO THE STANDARD OF REVIEW
iN RULE 19(b) DETERMINATIONS.

The state Court of Appeal determined that the Sixth
Circuit of the federal Court of Appeals has “explicitly
subjected Rule 19(b) determinations to a de novo stan-
dard” in Keweenaw Bay Indian Community v. State, 11 F.3d
1341, at 1346 (6th Cir. 1993). (App.13.) The District of

29

Columbia, Third, Ninth and Tenth Circuits, as noted by
the state Court of Appeal, have taken a contrary position,
reviewing for an abuse of discretion. (Thunder Basin Coal
Co. v. Southwestern Public Service Co., 104 F.3d 1205, 1210
(10th Cir. 1997); Burka v. Aetna Life Ins. Co., 87 F.3d 478,
483 (D.C. Cir. 1996); Sindia Expedition, Inc. v. Wrecked and
Abandoned Vessel Known as the Sindia, 895 F.2d 116, 121 (3d
Cir. 1990); Walsh v. Centeio, 692 F.2d 1239, 1242 (9th Cir.
1982).) (App. 12-13.)

The standard of review when a Rule 19(b) determina-
tion has been made is an important question of federal
law in need of settlement, since the circuits are in dis-
agreement. Consequently, and particularly in the circum-
stances of this case, it is respectfully submitted that
review should be ordered.

Ill. CONCLUSION

The weight to be accorded constitutional and statu-
tory concerns as against sovereign immunity concerns,
and the standard of review to be applied on review of an
indispensable party determination under Rule 19 of the
Federal Rules of Civil Procedure, and California Code of
Civil Procedure section 389, are of substantial import and
adequate to warrant, if not compel, review under the
circumstances of this case. Here the two primary
exporters of water in the State of California have been
permitted to manipulate the procedural process for
obtaining and modifying their junior appropriative water
rights permits, using their sovereign immunities so as to
deprive interested parties of the right of review and
redress after the adjudicatory proceedings before the
Water Board. If this is to be permitted, particularly when
the compromise of the underlying proceeding is in issue,
a serious flaw in our system of jurisprudence has been
exposed. By elimination of the right of review, the Bureau
and DWR have virtually quashed the Due Process of law
and denied petitioners Equal Protection. If this result is to
be sanctioned, it should be only after the scrutiny of this

30

Court. For all of the reasons set forth above, it is respect-

fully submitted that review on a writ of certiorari should
be granted.

Dated: October 24, 1997
Respectfully submitted,

Nome.unt, Gritu & McDANieEL
PROFESSIONAL _LAw CORPORATIONS

Dante JOHN NOMELLINI

APPENDIX TABLE OF CONTENTS
Page

Order of the Supreme Court of the State of Cali-
fornia, unreported docket number S062126,
PY Sie WOOF a bes Sisco eteadusce cee: App. 1

The Opinion of the Court of Appeal of the State of
California, Third Appellate District, County of
San Joaquin v. State Water Resources Control
Board, 54 Cal.App.4th 1144, filed May 6,
de oe RTP IER a App. 2

Ruling on Submitted Matter made by the Superior
Court of the State of California, County of Sac-
ramento, unreported docket number 95 CS
01642, filed February 6, 1996 ................ App. 22

Order Denying Petitions For Reconsideration Of
Order WR 95-6, Which A Me Changes In
The Water Rights Of The California Department
Of Water Resources And The United States
Bureau Of Reclamation Affecting The Bay-Delta
Estuary made by the State Water Resources
Control Board of the State of California, unre-
ported Order: WR 95-14, adopted September 6,
PP SAR AS Gob GRR SrETTVAsAceubb ed tienen coco. App. 27

Order Regarding Petition For Changes In Water
Rights That Authorize Diversion And Use Of
Waters Affecting The San Francisco Bay /Sacra-
mento-San Joaquin Delta Estuary made by the
State Water Resources Control Board of the
State of California, unreported Order: WR 95-6,
Rr IE Wt oko kr ies ass ce eevenuas App. 70

Judgment of Dismissal of the Superior Court of
the State of California, County of Sacramento,
County of San Joaquin v. State Water Resources
Control Board, filed February 21, 1996, unre-
ported docket number 95 CS 01642......... App. 151

ii

APPENDIX TABLE OF CONTENTS - Continued
Page

Principles For Agreement On Bay-Delta Standards
Between The State of California And The Federal
Government, dated December 15, 1994........ App. 154

App. 1

APPENDIX 1

Third Appellate District No. C023548
$062126

IN THE SUPREME COURT OF CALIFORNIA
(Filed Jul. 30, 1997)

COUNTY OF SAN JOAQUIN Et Al., Appellants

Vv.

STATE WATER RESOURCES CONTROL BOARD Et Al.,
Respondents

Appellants’ petition for review DENIED.
Baxter, J., did not participate.

GEORGE
Chief Justice

App. 2

APPENDIX 2

IN THE COURT OF APPEAL
OF THE STATE OF CALIFORNIA

THIRD APPELLATE DISTRICT

(Sacramento)

COUNTY OF SAN JOAQUIN et C023548
al, (Super. Ct. No.
Plaintiffs and Appellants, 95CS01642)
Vv. (Filed
May 6, 1997)

STATE WATER RESOURCES
CONTROL BOARD et al.,

Defendants and Respondents,

UNITED STATES OF AMERICA,
Blt... Ot Oi
Real Parties in Interest
and Respondents

WESTLANDS WATER DISTRICT
et al.,

ee

Interveners and Respondents.

APPEAL from a judgment of the Superior Court of
Sacramento County. Thomas Cecil, Judge. Affirmed.

Jeanne M. Zolezzi, Steven A. Herum, Karna E. Har-
rigfeld, Neumiller & Beardslee, John Herrick, Brewer,
Patridge, Gerlomes & Herrick, Thomas M. Zuckerman,
Reid Roberts, Roberts & Roberts, Dante John Nomellini,

eo

App. 3

Daniel A. McDaniel, and Nomellini, Grilli & McDaniel,
for Plaintiffs and Appellants, County of San Joaquin et al.

Daniel E. Lungren, Attorney General, Roderick E.
Walston, Chief Assistant Attorney General, Charles W.
Getz IV, Assistant Attorney General, Clifford T. Lee and
Linus Masouredis, Deputy Attorneys General, and Bar-
bara Leidigh, for Defendants and Respondents, State
Water Resources Control Board et al.

Maria A. liuzuka, for Real Party in Interest and
Respondent, United States of America, etc.

Susan N. Weber, David B. Anderson, David A. Sand-
ino, Daniel J. O'Hanlon, and Beveridge & Diamond, for
Real Party in Interest and Respondent, Department of
Water Resources.

Thomas W. Birmingham, William T. Chisum, and
Kronick, Moskovitz, Tiedemann & Girard, for Intervener
and Respondent, Westlands Water District.

Eric Garner, Best, Best & Krieger, and James Roberts,
for Intervener and Respondent, Metropolitan Water Dis-
trict.

Diane V. Rathmann, and Linneman, Burgess, Telles,
Van Atta & Vierra, for Interveners and Respondents, San
Luis Water District and Panoche Water District.

Kevin Haroff and Morrison & Foerster, for Intervener
and Respondent, Santa Clara Water District.

In this dispute, established water users challenge
restrictions imposed under new federal standards for
water quality and wildlife protection. The trial court
found the United States Bureau of Reclamation was an

App. 4

indispensable party and dismissed the action after the
Bureau refused to waive its sovereign immunity. The
plaintiffs appeal on equitable grounds; we affirm.

FACTUAL AND PROCEDURAL BACKGROUND

The United States Bureau of Reclamation (Bureau)
operates the Central Valley Project, the country’s largest
water reclamation project. “The Sacramento Valley, con-
taining the Sacramento River, lies in the northern portion
of the Central Valley, and the San Joaquin Valley, contain-
ing the San Joaquin River, lies in the southern portion.
The Sacramento River has a surplus of water because of
heavier rainfall in the northern region. . . . The San
Joaquin River, in contrast, does not supply sufficient
water for the extensive amount of tillable soil in its valley.
The [Central Valley Project] transports some of the Sacra-
mento River’s surplus water to the San Joaquin Valley
and permits the waters of the San Joaquin River to be
diverted for irrigation and other purposes to new areas
where water is scarce.” (South Delta Water Agency v.
Department of Interior (9th Cir. 1985) 767 F.2d 531, 534.)
The Bureau operates the Central Valley Project under
water rights permits from the California State Water
Resources Control Board.

California’s Department of Water Resources operates
the State Water Project. The principal facilities of this
project include the Oroville Dam, the Delta Pumping
Plant, and the California Aqueduct. (Wat. Code, §§ 12930
et seq.) The State Water Project also releases previously
stored water to the Delta and rediverts it. The Depart-
ment of Water Resources, like the Bureau, operates this

App. 5

project under permits from the State Water Resources
Control Board.

This action concerns the allocation of water
impounded by the Bureau at the New Melones Dam on
the Stanislaus River, which is part of the Central Valley
Project. (See California v. United States (1978) 438 U.S. 645,
651 [57 L.Ed.2d 1018, 1024].) The Bureau uses this water
to provide fish and wildlife restoration flows on the San
Joaquin River, and control water quality standards.

On June 8, 1995, the State Water Resources Control
Board adopted Water Rights Order 95-6 (WR 95-6), which
approved changes in the water rights permits for both the
State Water Project and the Central Valley Project.! On
July 7, 1995, the County of San Joaquin, Stockton East
Water District, Central San Joaquin Water Conservation
District, Central Delta Water Agency, South Delta Water
Agency, Reclamation District No. 2072, R.C. Farms, Inc.,
and Alexander Hildebrand (collectively, “appellants”),
filed a petition for writ of mandate, contending the use of
New Melones water for fish and wildlife restoration and
water quality violates California water laws and denies
the appellants their priority rights. Some appellants hold

' These changes modified the water quality standards for
striped bass spawning, the Suisun Marsh, export rates, and
operations of the Delta Cross Channel facilities. The changes
also permit the Bureau and the Department of Water Resources
to use each other’s pumping facilities when one has reached its
export limitation in order to improve fish protection. WR 95-6
also modified requirements for operating the New Melones
Reservoir with respect to the salinity water quality standard for
Vernalis, which is the point at which the San Joaquin River
enters the Delta.

App. 6

water supply contracts with the Bureau for New Melones
water; other appellants otherwise claim riparian rights on
the San Joaquin River or the Sacramento-San Joaquin
River Delta. The petition for writ of mandate contained
14 causes of action, all of which challenged WR 95-6 and
sought to modify the Bureau’s Central Valley Project
operations? The petition asserted violations of the Cali-
fornia Environmental Quality Act and the California
Water Code.

Appellants’ petition named as respondents the State
Water Resources Control Board and the five individual
Board members, and named, as real parties in interest,
the United States through the Bureau and the State of
California through the Resources Agency and the Depart-
ment of Water Resources. Subsequently, the Kern County
Water Agency, the Metropolitan Water District of South-
ern California, Santa Clara Valley Water District, West-
lands Water District, and the State Water Contractors
intervened as respondents.

The State Water Resources Control Board moved for
judgment on the pleadings arguing the Bureau was an
indispensable party, which required dismissal of the
action. At the hearing on this motion, the Bureau spe-
cially appeared and elected not to waive its sovereign

2 Appellants sought (1) to “set aside, vacate, and rescind”
WR 95-6; (2) priority of their interests to water stored in and
delivered from the Central Valley Project’s New Melones
Reservoir over others’ interests in the water; (3) to limit the
export of Central Valley Project water; and (4) to impose
additional environmental mitigation requirements on the
Central Valley Project.

App. 7

immunity. In a detailed ruling, the trial court found the
Bureau was an indispensable party and thus dismissed
the action without prejudice.

DISCUSSION

The sole issue presented in this appeal is whether the
trial court erred in finding the Bureau was an indispens-
able party, thereby necessitating dismissal of this action.
Contrary to appellants’ assertion, we review the trial
court’s determination pursuant to Code of Civil Pro-
cedure section 389, subdivision (b), for an abuse of discre-
tion, and find no basis for reversal.3

Section 389 provides: “(a) A person who is subject to
service of process and whose joinder will not deprive the
court of jurisdiction over the subject matter of the action
shall be joined as a party in the action if (1) in his absence
complete relief cannot be accorded among those already
parties or (2) he claims an interest relating to the subject
of the action and is so situated that the disposition of the
action in his absence may (i) as a practical matter impair
or impede his ability to protect that interest or (ii) leave
any of the persons already parties subject to a substantial
risk of incurring double, multiple, or otherwise inconsis-
tent obligations by reason of his claimed interest. If he
has not been so joined, the court shall order that he be
made a party. [{] (b) If a person as described in para-
graph (1) or (2) of subdivision (a) cannot be made a party,
the court shall determine whether in equity and good

° All further undesignated statutory references are to the
Code of Civil Procedure.

App. 8

conscience the action should proceed among the parties
before it, or should be dismissed without prejudice, the
absent person being thus regarded as indispensable. The
factors to be considered by the court include: (1) to what
extent a judgment rendered in the person’s absence might
be prejudicial to him or those already parties; (2) the
extent to which, by protective provisions in the judgment,
by the shaping of relief, or other measures, the prejudice
can be lessened or avoided; (3) whether a judgment ren-
dered in the person’s absence will be adequate; (4)
whether the plaintiff or cross-complainant will have an
adequate remedy if the action is dismissed for non-
joinder.”

Section 389 first sets out, in subdivision (a), a defini-
tion of persons who ought to be joined if possible (some-
times referred to as “necessary” parties). Then,
subdivision (b) sets forth the factors to follow if such a
person cannot be made a party in order to determine
“whether in equity and good conscience the action
should proceed among the parties before it, or should be
dismissed without prejudice, the absent person being
thus regarded as indispensable.” (Italics added.) The sub-
division (b) factors “are not arranged in a hierarchical
order, and no factor is determinative or necessarily more
important than another.” (See 4 J. Moore, Moore’s Federal
Practice J19.05[1][a] (3d ed. 1997).)

Here, no one disputes the United States is a party
which should be joined if possible under section 389.
subdivision (a). Therefore, the case turns on whether the
trial court properly applied the factors set forth in section
389, subdivision (b). The trial court expressly found all

|
j
|
|
:

App. 9

four factors indicated this action should not proceed with-
out the United States. As the trial court's ruling noted: “It
is clear that the Bureau, named as a Real Party in Interest,
falls within the purview of paragraph (2) of section
389(a). It is also clear that the Bureau is not amenable to
this Court’s jurisdiction and has refused to waive its
sovereign immunity. This Court must therefore apply the
four factors listed in subdivision (b) of section 389 to
determine whether, in equity and good conscience, the
action should proceed without the Bureau. [J] The four
factors listed in section 389(b) were briefed and argued at
length by the parties. The Court finds as follows: []] 1.
Petitioners’ requested relief would substantially prejudice
the Bureau’s rights. The water rights order which peti-
tioners seek to vacate (WR 95-6) modifies the Bureau’s
existing water right permits for the Central Valley Project
(“CVP”). To set aside that order would strip the Bureau of
many of its current permit rights and impede the
Bureau’s CVP operations; [{] 2. The Court concurs with
respondents that Sierra Club, Inc. v. California Coastal Com-
mission [citation] is controlling [because “set[ting] aside,
vacat[ing], and rescind[ing]” the Bureau’s permit “would
directly affect, and undoubtedly injure,” the Bureau's
interests]; [{¥] 3. The Court cannot grant petitioners’
prayer and then tailor it in such a fashion to protect
against prejudice to the Bureau. Contrary to petitioners’
claim, the impact upon the Bureau would not be ‘minor’
and would, in fact, seriously disrupt its operations; [{] 4.
A judgment rendered in the Bureau’s absence would not
be adequate. Three of the petitioners have filed suit

against the Bureau in federal court. That action involves

App. 10

some of the same issues raised in the instant case. Given
the overlapping issues in the two courts, a judgment in
this case, without the Bureau’s presence, could result in
contradictory legal obligations and generate further liti-
gation among the parties and/or real parties in interest;
[{] 5. Petitioners have an adequate remedy in the pend-
ing federal action. While not all issues will be addressed,
the Court concurs with respondents’ analysis in terms of
the focus of the relief requested by petitioners. In that
vein, the federal action can remedy the alleged miscon-
duct; and [{] 6. Given the nature of the rights and respon-
sibilities involved, the Bureau’s interests cannot be
adequately represented by the State of California. The
Bureau and the State have different water rights, own and
operate different project facilities, and are governed by
different laws and regulations. Moreover, WR 95-6 mod-
ifies the water right permits of the Bureau and State in
different respects. Consequently, each entity is affected
differently by that order. . . . [The court therefore] rule[s]
that the United States Bureau of Reclamation is an indis-
pensable party to this litigation under Code of Civil
Procedure section 389 which cannot be joined in this
action because of the sovereign immunity of the United
States. . . . This action shall be, and hereby is, dismissed
without prejudice... . ”

Since the trial court reviewed the propriety of the
United States’ participation in this action pursuant to the
factors and considerations set forth in section 389, appel-
lants attempt a “second bite at the apple” by claiming the
law is “well-settled” we must review this determination
de novo, citing Save Our Bay, Inc. v. San Diego Unified Port

App. 11

Dist. (1996) 42 Cal.App.4th 686.4 Save Our Bry indeed
subjects such a determination to de novo review, which
we find contrary to the available authority.

We first note the language of subdivision (b), section
389, refers to a determination “in equity and good con-
science.” “[T]he decision whether to proceed with the
action in the absence of a particular party is one within the
court's discretion, as governed by the various factors enu-
merated in subdivision (b) of section 389, Code of Civil
Procedure.” (Sierra Club, Inc. v. California Coastal Com.
(1979) 95 Cal.App.3d 495, 500, italics added; see also
Serrano v. Priest (1976) 18 Cal.3d 728, 753 (“in dealing
with the doctrine of indispensable . . . parties we should
... be careful to avoid converting a discretionary power or
a rule of fairness in procedure into an arbitrary and
burdensome requirement which may thwart rather than
accomplish justice” ], italics added, citations, internal quo-
tation marks, and fn. omitted; Kraus v. Willow Park Public
Golf Course (1977) 73 Cal.App.3d 354, 368 [“[i]t is for
discretionary and equitable reasons, not for any want of
jurisdiction, that the court may decline to proceed with-
out the absent party”], italics added.) It makes no sense
to grant the trial court an expressly discretionary power
to balance the equities, then reject the court’s evaluation
out of hand and balance the equities anew.

* Appellants also cite Cox v. County of San Diego (1991) 233
Cal.App.3d 300, 306, probably because this was the authority
cited by Save Our Bay. (Save Our Bay, Inc. v. San Diego Unified
Port District, supra, 42 Cal.App.4th at p. 692.) However, Cox did
not address section 389 or indispensable parties; Cox involved a
grant of summary judgment.

App. 12

We additionally note the California Legislature
amended section 389 in 1971 to conform to rule 19 of the
Federal Rules of Civil Procedure. (Law Revision Com.
comment, Code Civ. Proc., § 389 [“[s]ection 389 is revised
to substitute practically in its entirety Rule 19 of the
Federal Rules of Civil Procedure for former Section 389.
The words ‘without prejudice’ have been added to the
language of the Federal Rule in subdivision (b) of Section
389 merely to avoid any contrary implication that might
be created by the omission of the somewhat similar provi-
sion formerly found in Section 389. . . . Accordingly, the
explanatory note prepared by the Advisory Committee in
conjunction with the amendment of Rule 19 in 1966 is
particularly helpful in describing the nature and effect of
Section 389”]; see also Serrano v. Priest, supra, 18 Cal.3d at
p- 753, fn. 27 [section 389 was “enacted in 1971 to con-
form ours to the federal practice. .. . ”].

Due to the amendment of section 389 to conform to
Federal Rule 19, the California courts have noted the
propriety of using federal precedents “as a guide to
application of the statute.” (See Kraus v. Willow Park Pub-
lic Golf Course, supra, 73 Cal.App.3d at p. 368, fn. 9,
citation and internal quotations omitted; Conrad v. Unem-
ployment Ins. Appeals Bd. (1975) 47 Cal.App.3d 237, 241.)
In the federal courts, “[a] district court’s determination of
indispensability under [Federal Rule of Civil Procedure]
19(b) is reviewed for an abuse of discretion.”5 (Thunder

> The instant case implicates the standard of review only as
to subdivision (b) of section 389, and by analogy, Rule 19(b) of
the Federal Rules of Civil Procedure. This case does not raise,
and we do not address, the appropriate standard of review for

App. 13

Basin Coal Co. v. Southwestern Public Service Co. (10th Cir.
1997) 104 F.3d 1205, 1210; see also Burka v. Aetna Life Ins.
Co. (D.C. Cir. 1996) 87 F.3d 478, 483; Sindia Expedition, Inc.
v. Wrecked and Abandoned Vessel Known as the Sindia (3d
Cir. 1990) 895 F.2d 116, 121; Walsh v. Centeio (9th Cir. 1982)
692 F.2d 1239, 1242.)

The determinations under subdivision (b) “must be
based on fact-specific considerations. [Citation.] These
determinations are anything but pure legal conclu-
sions. . . . [T]hey involve the balancing of competing
interests and must be steeped in ‘pragmatic consider-
ations.” ” (Travelers Indemn. Co. v. Dingwell, supra, 884 F.2d
at p. 635.) The latitude inherent in subdivision (b) renders
the determination “more in the arena of a factual deter-
mination than a legal one.” (Envirotech Corp. v. Bethlehem
Steel Corp. (2d Cir. 1984) 729 F.2d 70, 75.) “The rule calls
for a pragmatic decision based on practical consider-
ations in the context of a particular litigation. . . . [T]he
district court has substantial discretion in considering
which factors to weigh and how heavily to emphasize
certain considerations in deciding whether the action
should go forward.” (Kickapoo Tribe of Indians v. Babbitt

determinations under subdivision (a) of section 389. (See
Travelers Indemn. Co. v. Dingwell (1st Cir. 1989) 884 F.2d 629, 635
[some courts have questioned whether Rule 19(a)
determinations are reviewed de novo, but “[n]o Circuit has
explicitly decided to review Rule 19(b) determinations under a
de novo standard of review”].) Since the Dingwell decision, it
appears only the Sixth Circuit, which Dingwell characterized as
indicating “no preference” as to the appropriate standard of
review, has explicitly subjected Rule 19(b) determinations to a
de novo standard. (See Keweenaw Bay Indian Community v.
Michigan (6th Cir. 1993) 11 F.3d 1341, 1346.)

App. 14

(D.C. Cir. 1995) 43 F.3d 1491, 1495, internal quotation
marks omitted.) The trial judge, who is “closer to the
arena,” is usually better situated than an appellate panel
“to survey the practicalities involved in the litigation.”
(Walsh v. Centeno, supra, 692 F.2d at p. 1242.) “ ‘The [dis-
trict] court’s trial management “should not be impeded
by second guessing at the appellate level except in those
rare instances when a clear abuse of discretion is firmly
shown.” ’ ” (Interspiro USA, Inc. v. Figgie Intern., Inc. (Fed.
Cir. 1994) 18 F.3d 927, 932, citations omitted.)

Accordingly, we review the trial court’s determina-
tion for an abuse of discretion, and find none. Appellants,
at least implicitly, acknowledge the trial court evaluated
the section 389, subdivision (b), factors. However, appel-
lants attempt to “retry” their case on appeal, asking us to
reweigh subdivision (b)’s discretionary factors in order to
yield a different result. In essence, appellants’ brief
explains how the discretionary factors could be balanced
to permit their lawsuit to proceed, but have not demon-
strated why these factors must be balanced in this fash-
ion. Appellants have not shown why the trial court, by
balancing the requisite factors and reaching a different
result, i.e. concluding the action should not proceed,
thereby abused its discretion.

By their own characterization, appellants deem as
“the most important fact” the potential denial of a rem-
edy. However, in reading appellants’ arguments closely,
appellants do not claim they are otherwise “without a
remedy,” but merely fear they could be without a remedy
should challenges to the federal proceedings prevail. Cit-
ing Vanoni v. County of Sonoma (1974) 40 Cal.App.3d 743,
appellants attempt to recast the case law to render the

Tera
a.»

eee ee ae ee eee

App. 15

remedy factor dispositive, stating the “inadequacy of a
remedy in state court alone is sufficient justification for a
court to hold that in ‘equity and good conscience’ the
action should proceed without the United States.”®
(Italics in original.) However, appellants fail to note a
trial court’s determination whether in “equity and good
conscience” an action should proceed or should be dis-
missed is based on the particular facts posed in a particu-
lar case after evaluating all of the subdivision (b) factors.
Depending on the particular case, a trial court might well
decide although three factors favor dismissing the action,
the strength of a fourth factor indicates the action should
proceed - or vice versa. This, however, is not such a case.

Section 389, subdivision (b), leaves the judge “with
substantial discretion in considering which factors to
weigh and how heavily to emphasize certain consider-
ations in deciding whether the action should go forward
in the absence of someone needed for a complete adjudi-
cation of the dispute.” (See 7 C. Wright, A. Miller & M.
Kane, Federal Practice and Procedure (2d ed. 1986)
§ 1604, p. 66.) Under appellants’ interpretation, the
unavailability (or in appellants’ instance, the possible
unavailability) of an alternative forum would always be

© Vanoni is less than compelling authority in this regard.
Vanoni’s analysis, in its entirety, reads as follows: “[A]ppellants
here would be left with no remedy in the state courts if their
action were dismissed for nonjoinder of the United States.
Because section 389 of the Code of Civil Procedure directs that
one factor to be considered by the court is whether the plaintiff
will have an adequate remedy if the action is dismissed for
nonjoinder, ‘equity and good conscience’ suggest that the action
should proceed.” (Id. at p. 747.)

App. 16

determinative, outweighing the other three statutory con-
siderations. This is not the law. (See Quileute Indian Tribe
v. Babbitt (9th Cir. 1994) 18 F.3d 1456, 1460 [“although
there exists no alternative forum... ., that factor alone
does not outweigh the other three factors”] ; Shermoen v.
United States (9th Cir. 1992) 982 F.2d 1312, 1319 [accord];
Confederated Tribes of Chehalis Indian Reservation v. Lujan
(9th Cir. 1991) 928 F.2d 1496, 1500 [“lack of an alternative
forum does not automatically prevent dismissal of a
suit” ].)

The availability of an “adequate remedy” is one, but
only one, factor which the trial court evaluates in making
its determination. Each case turns on its facts. To deem
the unavailability of an alternative forum a conclusive
factor in ail cases and circumstances would, in effect,
rewrite the statute, because the statute directs the court to
consider all four factors in making this determination.
(Cf. Piper Aircraft Co. v. Reyno (1981) 454 U.S. 235, 249-250
[70 L.Ed.2d 419] [discussing the factors considered for
forum non conveniens and concluding, “[w]e [will] not
lay down a rigid rule to govern discretion. . . . If central
emphasis were placed on any one factor, the . . . doctrine
would lose much of the very flexibility that makes it so
valuable”] .)

Moreover, in this case, we are not convinced appel-
lants lack an alternative forum.” The trial court found:

7 Appellants complain they may lack an alternative forum
because they cannot bring precisely the same claims in the
federal court. This is not the standard. As the trial court’s ruling
acknowledges, appellants cannot bring all of the same claims in
the federal case. However, the standard is whether appellants

App. 17

“Three of the petitioners have filed suit against the
Bureau in federal court. That action involves some of the
same issues raised in the instant case. . . . Petitioners have
an adequate remedy in the pending federal action. While
not all issues will be addressed, the Court concurs with
respondents’ analysis in terms of the focus of the relief
requested by petitioners. In that vein, the federal action
can remedy the alleged misconduct.”

The record contains the complaint filed in the federal
action. This complaint alleges the Bureau “reallocate[d]
200,000 acre feet from the New Melones Unit, directly
taking the water from users on the Stanislaus River in
favor of uses and purposes in the California Central
Valley,” “did not require any releases or bypass flows
from other CVP projects capable of releasing water to the
San Joaquin River and continued to export water for uses
in the Central Valley during the period of reallocation
from the New Melones Project. [The Bureau] ignored and
failed and refused to consider allocating water from other
CVP projects capable of releasing water to reach the San
Joaquin River and the Sacramento/San Joaquin Bay-Delta
Estuary.” The complaint also alleges the Bureau “real-
located] . . . approximately 127,000 acre-feet from the
New Melones Unit for the purpose of benefitting fish and
wildlife and for the use of this water outside of the place
of use provided for in the permits issued for the New

have an “adequate remedy,” not whether all issues are identical.
As discussed herein, the federal case challenges the Bureau’s
Central Valley Project operations and seeks to change the
Bureau’s operations of New Melones and the Central Valley
Project to make more water available to appellants, which is the
same general type of relief sought in the instant case.

App. 18

Melones Unit. ...” Among the fourteen remedies sought
in the prayer for relief are temporary, preliminary, and
permanent injunctions prohibiting the BUREAU from
depriving [plaintiffs] of their vested rights to a supply of
water and “prohibiting . . . the BUREAU from reallocating
water from the New Melones Project under the CVPIA to
any purpose of use or place of use outside of the purpose
or place authorized by the permits issued by the California
State Water Resources Control Board and to prohibit [the
Bureau] from storing or refusing to release water [for any
use] not authorized by the current purpose of use or
outside the place of use authorized by said permits. ... ”
(Italics added.)

There is sufficient similarity in the general types of
relief sought in the federal and state actions to support
the trial court’s conclusion appellants must have an ade-
quate remedy in the pending federal action.®

t
;
|

8 Referring to matters outside the record, appellants argue
they lack an adequate remedy in the federal court action
because the State subsequently asserted Eleventh Amendment
immunity against new complaints filed by appellants both in
that federal court action and in a new federal court lawsuit.
Appellants filed these new complaints after the trial court
dismissed the instant action. The trial judge is not
Nostradamus, nor is the trial judge expected to monitor the
various federal court actions and reevaluate indispensable |
party determinations to guarantee appellants a perfect
alternative forum. The trial court evaluates the four factors as
they exist at a particular point; there are no ironclad assurances,
nor could there be. An alternative forum could fail to provide a
remedy for any number of substantive or procedural reasons.
This is not to say the lack of an “adequate remedy” in federal
court is insignificant; indeed in some instances the state trial
court may conclude the lack of an alternative forum outweighs

App. 19

In appellants’ two remaining arguments, they again
attempt to “retry” their case: Appellants contend the
Bureau need not be joined because “an adverse judgment
will not prejudice the United States,” the other defen-
dants can “ably argue in the interests of the [Bureau],
because the affect [sic] of the relief would be the same on
both parties,”1° and “relief may be shaped to avoid any

the other three factors set forth in section 389, subdivision (b).
However, as explained above, the trial court’s determination
pursuant to section 389, subdivision (b), involves the balancing
of competing considerations at a particular point in time. No
one factor is conclusive under all circumstances, and the
determination is not revisited in light of subsequent events.

9 As part of this argument, appellants contend: “The trial
court incorrectly concluded that should the Appellants[ ]
receive the requested relief, vacating WR 95-6, it would result in
stripping the Bureau of many of its current permit rights and
impede the Bureau[’s] CVP operation.” Appellants characterize
the trial court’s error as failing to recognize “[w]ithout the
modifications to the permit, the operations of the CVP and SWP
would continue, unchanged.” If appellants lost, thereby leaving
WR 95-6 intact, the Bureau’s operations would continue
unchanged. However, if appellants prevailed, thereby
rescinding WR 95-6, the Bureau would lose certain rights under
the permits. We cannot deem the loss of current rights as
nonprejudicial simply because the Bureau would not lose all
water rights but would instead revert back to the rights it held
previously.

10 Appellants point to various similarities regarding the
application of particular provisions in WR 95-6 to the Bureau
and the State, and similarities in export pumping restrictions.
Appellants also note: “While the parties operate separately
owned facilities, they also jointly own facilities which are
operated according to a formal written coordinated operating
agreement.” However, the trial court expressly found: “The
Bureau and the State have different water rights, own and

App. 20

prejudice caused to the United States.”!! The trial court
conscientiously examined these factors, and reached
exactly the opposite conclusions. Appellants’ argumenta-
tive contentions are simply inadequate bases for reversal
of the trial court’s reasoned balancing of the discretionary
factors. 1

operate different project facilities, and are governed by different
laws and regulations. Moreover, WR 95-6 modifies the water
right permits of the Bureau and State in different respects.
Consequently, each entity is affected differently by that order.”
The trial court clearly found the differences outweighed the
similarities, and we defer to this finding.

11 In this argument, appellants contend the Bureau “will be
able to protect its ‘direct’ interest in the permits in any
subsequent hearing on the Petition for Change.” This has no
bearing on the ability of the Bureau to protect its interests in the
instant litigation. If appellants were to prevail, the Bureau
would suffer a restriction on now-existing rights. The fact it
might regain those rights after subsequent hearings is not a
manner in which the trial court can tailor relief, i.e. upholding
or rescinding WR 95-6. Appellants sought relief directly against the
Bureau. The petition prayed for preliminary and permanent
injunctions “restraining . . . Real Parties in Interest.” By seeking
to invalidate WR 95-6, appellants sought to take away changes
to the Bureau’s water rights permits, which directly affect the
operations of the Central Valley Project. Appellants’ assertions
an adverse judgment would not prejudice the Bureau are
preposterous.

12 Two additional arguments posed in appellants’ opening
brief require brief mention. Appellants assert the Bureau “holds
only legal title to the water” and “has no substantial interest in
the water,” emphasizing the Bureau “uses no water.” The

argument is highly misleading: the fact the Bureau does not
consume water is not synonymous with having no substantial
interest in the water. The Bureau has appropriative water rights
in the Central Valley Project. (United States v. State Water
Resources Control Bd. (1986) 182 Cal.App.3d 82, 106.) The Bureau

a ae a ee Ore eee ee CE eee ee,

App. 21

DISPOSITION

The judgment is affirmed. Respondents shall recover
their costs on appeal. (CERTIFIED FOR PUBLICATION.)

NICHOLSON, J.

We concur:
SPARKS, Acting P.J.

MORRISON, J.

owns the CVP facilities, has operational control and
responsibilities relating to flood control, water supply, power
generation, and fish and wildlife mitigation. The Bureau has
substantial property rights in its water rights permits, whereby
the Bureau diverts, transports, and stores water. The Bureau
clearly has a substantial interest in this litigation.

Appellants also essentially seek to create a new,
determinative, factor. They argue: “In instances where the
[indispensable party] rule has been applied [to dismiss an
action], plaintiffs have typically failed to provide an acceptable
excuse for slow and negligent conduct in naming the defendants or
real parties in interest. Here, in contrast, the Appellants timely
named the United States. ...” (Italics added.) The only case
cited for this proposition is Sierra Club, Inc. v. California Coastal
Com., supra, 95 Cal.App.3d 495. Sierra Club did not employ
timeliness as an additional factor. Rather, timeliness was an
issue in Sierra Club because the plaintiff failed to join a
particular individual before the statute of limitations ran, and
thus the individual “could not be made a party” to the action.
(Id. at p. 502: sce § 389, subd. (b) [“[i]f a person as described in
paragraph (1) or (2) of subdivision (a) cannot be made a party,
the court shall determine whether in equity and good
conscience. ... ”].)

App. 22

APPENDIX 3

COUNTY OF SAN JOAQUIN, No. 95 CS 01642
STOCKTON EAST WATER

DISTRICT, CENTRAL SAN Pi ni tn
JOAQUIN WATER

CONSERVATION DISTRICT,

CENTRAL DELTA WATER

AGENCY, SOUTH DELTA WATER

AGENCY, RECLAMATION

DISTRICT NO. 2072, R.C. FARMS,

INC. and ALEXANDER

HILDEBRAND,

Petitioners,
vs.

STATE WATER RESOURCES
CONTROL BOARD; JOHN P.
CAFFREY; MARC DEL PIERO;
JAMES M. STUBCHAER; MARY
JANE FORSTER; JOHN W.
BROWN; AND DOES 1 through
10, inclusive,

Respondents.

UNITED STATES OF AMERICA,
acting by and through the
DEPARTMENT OF THE
INTERIOR, BUREAU OF
RECLAMATION; STATE OF
CALIFORNIA, acting by and
through the RESOURCES
AGENCY, DEPARTMENT OF
WATER RESOURCES; and DOES
11 THROUGH 300.

Real Parties In Interest.

/

Ce

App. 23

This matter came on regularly for hearing on Respon-
dents’ Motion for Judgment on the pleadings on January
26, 1996, in Department 7 of the Sacramento Superior
Court, the Honorable Thomas M. Cecil presiding. Follow-
ing arguments from counsel, the Court deemed the mat-
ter submitted.

The underlying issues pending before this Court are
significant. Respondents’ present motion, however, only
concerns whether the United States Bureau of Reclama-
tion (“Bureau”) is an indispensable party to this litigation
under Code of Civil Procedure section 389, thereby neces-
sitating dismissal of the action.

It is clear that the Bureau, named as a Real Party in
Interest, falls within the purview of paragraph (2) of
section 389(a). It is also clear that the bureau is not
amenable to this Court’s jurisdiction and has refused to
waive its sovereign immunity. This Court must therefore
apply the four factors listed in subdivision (b) of section
389 to determine whether, in equity and good conscience,
the action should proceed without the Bureau.

The four factors listed in section 389(b) were briefed
and argued at length by the parties. The Court finds as
follows:

1. Petitioners’ requested relief would substantially
prejudice the Bureau’s rights. The water rights order
which petitioners seek to vacate (WR 95-6) modifies the
Bureau's existing water right permits for the Central Val-
ley project (“CVP”). To set aside that order would strip
the Bureau of many of its current permit rights and
impede the Bureau’s CVP operations;

App. 24

2. The Court concurs with respondents that Sierra
Club, Inc. v. California Coastal Commission (1979) 95
Cal.App.3d 495 is controlling;

3. The Court cannot grant petitioners’ prayer and
then tailor it in such a fashion to protect against prejudice
to the Bureau. Contrary to petitioners’ claim, the impact
upon the Bureau would not be “minor” and would, in
fact, seriously disrupt its operations;

4. A judgment rendered in the Bureau’s absence
would not be adequate. Three of the petitioners have
filed suit against the bureau in federal court. That action
involves some of the same issues raised in the instant
case. Given the overlapping issues in the two courts, a
judgment in this case, without the Bureau’s presence,
could result in contradictory legal obligations and gener-
ate further litigation among the parties and/or real par-
ties in interest;

5. Petitioners have an adequate remedy in the pend-
ing federal action. While not all issues will be addressed,
the Court concurs with respondents’ analysis in terms of
the focus of the relief requested by petitioners. In that
vein, the federal action can remedy the alleged miscon-
duct; and

6. Given the nature of the rights and responsibilities
involved, the Bureau’s interests cannot be adequately
represented by the State of California. The Bureau and
the State have different water rights, own and operate
different project facilities, and are governed by different
laws and regulations. Moreover, WR 95-6 modifies the
water right permits of the Bureau and State in different

GAS AE OT SE ae ape RSE RE SEN RE

5 oS? et Ce HY

App. 25

respects. Consequently, each entity is affected differently
by that order.

Accordingly, even after engaging in a balancing of
interests as urged by petitioners, the Motion for Judg-
ment on the Pleadings is granted. The matter is dismissed
without prejudice. Respondents are directed to prepare
an appropriate order, submit it to opposing counsel for
approval as to form, and file it with this Court.

Counsel for Petitioners are hereby notified that upon
the passage of 60 (sixty) days from the signing of this
order, the 18 (eighteen) cartons of administrative records
lodged with this Court on January 12, 1996, now in the
Court’s possession, be retrieved by counsel or they will
be destroyed by the Court.

/s/ Thomas M. Cecil
JUDGE OF THE
SUPERIOR COURT
Thomas M. Cecil
[seal]

CLIFFORD T. LEE, DEPUTY ATTORNEY GENERAL, 50
Fremont Street, Suite 300, San Francisco, CA 94105-2239

LINUS MASOUREDIS, DEPUTY ATTORNEY GENERAL,
2101 Webster Street, 12th Floor, Oakland, CA 94612-3049

THOMAS W. BIRMINGHAM, 400 Capitol Mall, 27th
Floor, Sacramento, CA 95814-4417

DAVID A. SANDINO, 1416 Ninth Street, Room 1118,
Sacramento, CA 95814

BARBARA LEIDIGH, STATE WATER RESOURCES CON-
TROL BOARD, 901 “P” STREET, Sacramento, CA
95812-0100

App. 26

MARIA A. ITIZUKA, U.S. DEPARTMENT OF JUSTICE,
ENVIRONMENT AND NATURAL RESOURCES DIVI-
SION, 650 Capitol Mall, Sacramento, CA 95814

GREGORY K. WILKINSON, 3750 University Ave, River-
side, CA 92502

OLIVE LEE THALER, MORRISON & FOERSTER, 345
California Street, San Francisco, CA 94104-2675

DANTE JOHN NOMELLINI, ESQ., 235 East Weber Ave-
nue, Stockton, CA 95201

\
JOHN HERRICK, ESQ., 2509 West March Lane, Suite 200,
Stockton, CA 95267

REID ROBERTS, ESQ., 311 East Main Street, Suite 202,
Stockton, CA 95202

THOMAS M. ZUCKERMAN, ESQ., 146-148 West Weber
Avenue, Stockton, CA 95202

JAMES F. ROBERTS, ESQ., METROPOLITAN WATER
DISTRICT OF SOUTHERN CALIFORNIA, 1111 Sunset
Blvd., Los Angeles, CA 90054-0153

KARNA E. HARRIGFELD, ESQ., JEANNE M. ZOLEZZI,
ESQ., 509 West Weber Avenue, Stockton, CA 95201-3020

ee ee Se ee ee en ae

App. 27

APPENDIX 4

STATE OF CALIFORNIA
STATE WATER RESOURCES CONTROL BOARD

In the Matter of Petition for
Changes in the Water Rights
Authorizing Diversion and

Use of Waters in the Watershed
of the Sacramento-San Joaquin
Delta, held by

CALIFORNIA DEPARTMENT
OF WATER RESOURCES and

UNITED STATES BUREAU
OF RECLAMATION

ORDER: WR 95-14

i

ORDER DENYING PETITIONS FOR
RECONSIDERATION OF ORDER WR 95-6,
WHICH APPROVED CHANGES IN THE WATER
RIGHTS OF THE CALIFORNIA DEPARTMENT
OF WATER RESOURCES AND THE UNITED STATES
BUREAU OF RECLAMATION AFFECTING
THE BAY-DELTA ESTUARY

1.0
2.0

3.0
4.0
5.0

App. 28

TABLE OF CONTENTS

PAGE
WORM OEE LEE } :

Apr 84 Apr 85 Apr 86 Apr 87 Apr 88 Apr 89 Apr 90 Apr91 Apr 92
May 84 May 85 May 86 May 87 May 88 May 89 May 90 May 91 May 92

M@ Base Case @ Preferred Alternative §
Source: DWRSIM studies
Exports are defined as pumping at Banks and Tracy

. : rate ag Ra ica ratte Pa ein TAO TAT EO Oe on eA RE
ooh yas ae Nin saa ae ae SF ET in eel ade -
s hae So ee hati aia i > .

Poe

App. 59

5.3.3 General Allegations of Harm

Next, San Joaquin argues that consolidation of the points
of diversion and other changes will cause an increase in
rates of diversion resulting in adverse effects on the
quality of water used by San Joaquin’s members. San
Joaquin does not explain how this will occur; nor does it
cite any evidence in the record to this effect. The record
shows that the authorized changes will not have these
effects. It is possible, however, that changes instituted by
the USBR to comply with the Endangered Species Act
could have these effects. The SWRCB did not require, in
Order WR 95-6, the instream flows at Vernalis that USBR
independently is providing for fish. Apparently San Joa-
quin believes that these flows may deplete New Melones
Reservoir early in the year, leaving inadequate water for
salinity control later. As explained in Order WR 95-6, the
USBR is not excused from meeting the agricultural
salinity requirements at Vernalis. Consequently, if the
USBR fails to manage its New Melones water supply
adequately to ensure that the salinity requirements will
be met, San Joaquin’s members could file a complaint
with the SWRCB alleging permit violations.

5.3.4 Changes for Striped Bass, Suisun Marsh, Delta
Cross Channel Operations, and Southern Delta
Agriculture

Next, San Joaquin alleges that Order WR 95-6 replaced
the water quality standards for striped bass spawning
and for Suisun Marsh protections with higher standards
which San Joaquin apparently believes will put more
demand on the waters of the San Joaquin River. Actually,

App. 60

the new Suisun Marsh standards require less salinity
protection than the previous standards. Also, the water
that flows into Suisun Marsh at Montezuma Slough is
primarily from the Sacramento River, and the flows in the
San Joaquin River are not a significant source of salinity
control for the Suisun Marsh. The new striped bass stan-
dard requires a lower (better) salinity than previously,
but this standard almost always will be met by the agri-
cultural salinity standard for that time period.

Next, San Joaquin contends that the change in the stan-
dard for Delta Cross Channel gate operation will cause
deterioration in water quality at Vernalis. This is physi-
cally impossible. The Delta Cross Channel is in the north-
ern Delta, connecting the Sacramento River and the
Mokelumne River. Vernalis is on the San Joaquin River at
the point where it enters the southern Delta. San Joaquin
also repeats its contention at this point that the changes
in export limits will result in additional exports. As
explained above, this contention is incorrect.

Finally, San Joaquin contends that the change in the Ver-
nalis agricultural salinity standard from that in condition
5 of Water Right Decision 1422 will cause the release of
water from New Melones rather than taking this water
from exports, reducing the quantity of water available for
CSJWCD and SEWD to buy from the USBR. This conten-
tion is erroneous. The change merely improves the stan-
dard when improvement is needed for crops and reduces
it when better quality is not needed for crops. The net
water supply impact of this change is zero. Further, water
for salinity control has been provided from New Melones
Reservoir since New Melones Reservoir commenced

MRO OID ate pau a CS Natet Ni LOR IN SO BORG SK tyes

App. 61

operating. Consequently, this change causes no added
burden on New Melones Reservoir.

5.4 Allegations of Conflicts of Interest

San Joaquin contends that the SWRCB has denied it due
process by having ex parte contacts with the parties to the
Principles for Agreement which was executed December
15, 1994. The Principles for Agreement is a recommenda-
tion to the SWRCB for adoption of a particular set of
water quality objectives and implementation measures
for what became the 1995 Bay-Delta Plan. The Principles
for Agreement was considered as evidence in a hearing
on a draft of the 1995 Bay-Delta Plan, and the plan
incorporates many of the features of the Principles for
Agreement.

The Principles for Agreement also discusses changes in
water rights to implement the Principles for Agreement
or to implement the water quality control plan. San Joa-
quin’s members are concerned that the SWRCB may
believe that it is bound by the Principles for Agreement
because the California Secretary for Environmental Pro-
tection signed it, and the SWRCB is under the California
Environmental Protection Agency. This fear is
unfounded. The SWRCB’s members serve four-year terms
and can be removed from office only by the Legislature
and only for dereliction of duty, corruption, or incompe-
tency. Further, the SWRCB is an independent agency and
is not bound by law to follow the direction of the Secre-
tary for Environmental Protection.

The SWRCB in its water right hearing received evidence
regarding the Principles for Agreement along with other

App. 62

evidence. In adopting Order WR 95-6, the SWRCB was
not bound by the Principles for Agreement. For example,
the SWRCB selectively approved only those changes
which it found were appropriate and did not harm any
interests. Further, it approved the changes for only a
limited period.

While some of the wording in the Principles for Agree-
ment may appear to direct the substance of the SWRCB’s
actions, the SWRCB believes this is merely an unfortunate
choice of words. The parties to the Principles for Agree-
ment had no authority to control the actions of the
SWRCB. Also, most of the directive language in the Prin-
ciples for Agreement is procedural, and is copied from
the Framework Agreement which was executed in June
and July 1994. The Framework Agreement sets a schedule
for agency actions directed toward resolving Bay-Delta
problems. The SWRCB signed the Framework Agreement,
agreeing to proceed on a time schedule but not agreeing
to the outcome. SWRCB’s procedures in the Framework
Agreement are the same procedures the SWRCB routinely
uses.

Some staff of the SWRCB attended some of the negotia-
tions or meetings that led to the Principles for Agree-
ment. During the negotiations the Executive Director, the
Assistant Division Chief for the Division of Water Rights,
and the Chief of the Bay-Delta Unit attended a few meet-
ings and provided institutional information. At the end of
the negotiations, these staff members attended some
meetings to listen to the parties go through their list of
agreed points. During the negotiations, no staff member
supported a particular interest, although staff did at
times provide input on procedural matters and reported

Pe eee rete t etn ~ f

FORME

App. 63

on discussions between the staffs of the SWRCB and the
U.S. Environmental Protection Agency on related issues
that were not the subject of negotiations. Although San
Joaquin implies that staff contacts with the negotiations
were not disclosed prior to the water right hearing that
led to Order WR 95-6, the Chairman of the SWRCB in fact
disclosed the existence of the staff contacts at the begin-
ning of the hearing on April 18, 1995. Additionally, it was
announced during the public workshops held in the fall
of 1994 that the staff would maintain contact with any
parties who sought to negotiate agreements. San Joa-
quin’s members participated in the workshops and could
have raised their objections when this was announced or
at any time after it was announced. Further, there is no
legal prohibition against the staff contacts since the staff
did not make the decision in Order WR 95-6 and did not
communicate the substance of the information received to
the members of the SWRCB. The Board members were
not involved, even indirectly, in the negotiations.

At the hearing, the Chairman of the SWRCB also pointed
out that no member of the SWRCB had attended any
meeting in which the Principles for Agreement was nego-
tiated. The members of the SWRCB are the sole decision-
makers with respect to Order WR 95-6. San Joaquin
nevertheless now assumes and argues that members of
the SWRCB engaged in ex parte contacts.

The SWRCB through its attorneys has provided CDWA, a
member of San Joaquin, access to all nonprivileged public
documents in the possession of SWRCB staff that relate to
negotiation of the Principles for Agreement. CDWA’s
attorney viewed these documents on May 31, 1995 and
requested copies of some. These documents are in the

App. 64

files of the SWRCB, and the SWRCB’s staff entered the
files in evidence at the start of the hearing. SWRCB’s
attorney provided the copies to CDWA’s attorney by let-
ter dated June 6, 1995. CDWA’s 2 «rney distributed
copies of the documents to all parties by letter dated June
7, 1995 and distributed copies to participants at the Board
meeting on June 8, 1995. CDWA’s attorney additionally
commented on the documents at the June 8, 1995 Board
meeting.

The members of the SWRCB pointed out at the Board
meeting when they adopted Order WR 95-6 that none of
them had any ex parte contacts regarding the Principles
for Agreement. While CDWA’s attorney pointed out that
a few documents related to the negotiations apparently
were directed to the Chairman during the negotiations,
the Chairman specifically pointed out at the Board meet-
ing that he did not read the documents. Other Board
members likewise pointed out that they were isolated
from the negotiations on the Principles for Agreement.

Finally, San Joaquin says that at the Board meeting for
adoption of Order WR 95-6, one of its members requested
a hearing on the impartiality of the SWRCB members and
staff, and was denied. The request at the Board meeting
was untimely. With diligence, San Joaquin’s member,
CDWA, could have obtained all of the information on this
subject before the Board’s hearing which commenced on
April 18, 1995. CDWA could then have presented this
material as evidence and have received a ruling based on
the evidence. Also, only certain staff had contacts with
the negotiations, and since there is no legal impediment
to the staff having the limited contacts that they had, a

App. 65

hearing on their involvement would not show any bias in
the decisionmaking.

5.5 Allegations of Vagueness

Lastly, San Joaquin suggests that it has been denied due
process because of vagueness in Order WR 95-6. San
Joaquin’s contention is based on SEWD’s apparent confu-
sion during the hearing over the parameters of the
change in points of diversion requested by DWR and
USBR and the effects of the proposed change. The diffi-
culties arose when expert witnesses explained the effects
of the proposed change and variations of the change.
Even though SEWD may have had difficulty understand-
ing the evidence, the SWRCB, which is required to judge
the evidence, has expertise in this area and understands
both the request and the evidence that was provided. As
a result of reviewing the evidence and the effects of the
change, the SWRCB prepared a change which, while it is
within the scope of the requested change, is considerably
narrower. Based on the data and the analytical methods
presented in the hearing, the SWRCB determined that the
approved change could not adversely affect the environ-
ment or harm other legal users of water.

At the Board meeting, SEWD made further protestations
of noncomprehension and now alleges confusion regard-
ing the approved change stemming from comments at the
Board meeting. Apparently SEWD’s confusion arose
because the findings in Order WR 95-6 point out that the
petition, if approved as filed, would have allowed an
increase in export yield from the southern Delta. Because
the petition could have allowed an increase in export

App. 66

yield, the SWRCB only partially approved the petition,
narrowing its approval to the point that there can be no
increased yield as a result of Order WR 95-6. In fact, the
change in point of diversion is simply a change in the
language of Term 3 of D-1485 to update it to the current
standards. This is in effect a denial of this part of the
change petition. SEWD ignores this. At the Board meet-
ing, SEWD asked for further explanation and the
SWRCB’s staff explained again that the order would
cause no change in water supply. The meaning of the
DWR’s and the USBR’s request is no longer an issue.

6.0 ISSUE RAISED BY PORGANS

Porgans alleges that the order is not supported by sub-
stantial evidence, but he does not specify what part of the
order lacks factual support. Nor does he specify the part
or parts of Order WR 95-6 to which he objects. Because of
its lack of specificity, Porgans’ petition is denied. Nev-
ertheless, the following discussion is included in this
order to clarify the order with respect to Porgans’ con-
cerns.

Porgans’ comments in Attachment B of his petition for
reconsideration address effects on striped bass. The
SWRCB assumes that Porgans is objecting to adverse
effects he believes Order WR 95-6 will have on striped
bass. Porgans’ concern apparently is based on Figures
VIII-37 and 38 in the ER. The third and fourth bars in
Figure VIII-38 show a lower striped bass population
under the preferred alternative (580,000) than would
occur if the SWRCB took no action to change D-1485
(620,000). This is the result of an error in preparing Figure

App. 67

VIll-38. The third bar, showing the striped bass popula-
tion if there were no action to change D-1485, should
show 560,000 striped bass using the calculation method
that was employed. This is consistent with the text and
graphs, which together indicate that the preferred alter-
native with a 1995 water supply demand level will pro-
duce striped bass populations which are essentially the
same as D-1485 with a 1995 water supply demand level.
The method used for calculating the future change in
striped bass population is the best method available to
the SWRCB, but like all models this method cannot pre-
dict the future population changes exactly. The calcula-
tion methods are explained in the text on pages VIII-34
and 35.

The ER is supported by the available evidence and sup-
ports the changes in the water rights of the DWR and the
USBR that were approved in Order WR 95-6. Porgans has
not established any deficiency in the evidentiary support
for Order WR 95-6.

Apparently Porgans’ principal difficulty is with the com-
parison of the preferred alternative to the 1984 through
1992 reference period. The ER compares modeled condi-
tions under the p

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386013_1651%3A1. Public record. Not legal advice.