# Opposition Brief — Simpson Paper (Vermont) Co. v. Department of Environmental Conservation

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386011_1796%3A4

## Record

- **Collection:** Supreme Court brief
- **Document type:** Opposition Brief
- **Published:** January 1, 1993
- **Citation:** 507 U.S. 970

## Text

ie *Sorome Court, US [| oe
G) FTLE Db 3

No. 92-1012 | FEB 16 1993

In The

Supreme Court of the United States

October Term, 1992
*

SIMPSON PAPER (VERMONT) COMPANY,
Petitioner,

Vv.

DEPARTMENT OF ENVIRONMENTAL CONSERVATION
and SIERRA CLUB,

Respondents.

ie
vv

On Petition For A Writ Of Certiorari To The
Supreme Court Of The State of Vermont

,
-

JOINT RESPONSE OF THE STATE OF VERMONT,
DEPARTMENT OF ENVIRONMENTAL
CONSERVATION AND THE SIERRA CLUB IN
OPPOSITION TO PETITION FOR
WRIT OF CERTIORARI
¢

State of Vermont
Jerrrey L. AmMEsToy
Attorney General

by: Ronatp A. SHEMs
(Attorney of Record for
Respondent VT DEC)
Assistant Attorney General
Pavilion Office Building
109 State Street
Montpelier, VT 05609-1001
(802) 828-3171

Sierra Club

by: Howarp I. Fox, Esa.
(Attorney of Record for
Respondent Sierra Club)
Sierra Club Legal Defense Fund
1531 P Street, N.W.
Suite 200
Washington, D.C. 20005
(202) 667-4500

TABLE OF CONTENTS

Page
pt Fe Bs oc) . re ere ii
SERIE OEE SUE. Sates s 60 os casincaterecncccns 1
REASONS FOR DENYING THE PETITION......... 6

I.

Il.

Ill.

IV.

THE VERMONT SUPREME COURT’S JUDG-
MENT RESTS ON ADEQUATE, ALTERNATIVE
STATE GROUNDS NOT CHALLENGED BY
SUES VG WA 8 iin WUS b's wad be. 62 Ke mEVaE Eee O50 00

A STATE WATER QUALITY STANDARD NEED
NOT BE QUANTITATIVE TO BE AN “APPRO-
RIATE REQUIREMENT OF STATE LAW” .....

THERE IS NO CONFLICT AMONG THE STATE
COURTS CONCERNING THE ENFORCE-
ABILITY OF “DESIGNATED USES” UNDER
a Re RS eee

CLAIMS NOW RAISED BY SIMPSON WERE
NOT ADEQUATELY AND SQUARELY PRE-
SENTED TO THE VERMONT SUPREME

14

ii

TABLE OF AUTHORITIES

Page
CaAsES
Arkansas v. Oklahoma, ___ U.S. ___, 112 S.Ct. 1046
CPE « &:0 VUEE ORD Kn OE RSA aki eee Rene ceeeekas 13

Arnoid Irrigation District v. Department of Environ-
mental Quality, 717 P.2d 1274 (Or.App. 1986) ...14, 23

Avoyelles Sportsmen's League, Inc. v. Alexander, 511

yb a Oe, ee eee eee 2
Bangor Hydro-Electric Co. v. Board of Environmental

Protection, 595 A.2d 438 (Me. 1991)°............... 16
Banker's Life and Casualty Co. v. Crenshaw, 486 U.S.

FE CRE 20

H.Rep.No. 92-911, 92nd Cong. 2d Sess. 76-77
ES ae ia Noni OE AS SCE SA 2

ee

No. 92-1012
¢

In The

Supreme Court of the United States
October Term, 1992

7
SIMPSON PAPER (VERMONT) COMPANY,
Petitioner,
v.

DEPARTMENT OF ENVIRONMENTAL CONSERVATION
and SIERRA CLUB,

Respondents.

‘

On Petition For A Writ Of Certiorari To The
Supreme Court Of The State of Vermont
¢

JOINT RESPONSE OF THE STATE OF VERMONT,
DEPARTMENT OF ENVIRONMENTAL
CONSERVATION AND THE SIERRA CLUB IN
OPPOSITION TO PETITION FOR
WRIT OF CERTIORARI

v

STATEMENT OF THE CASE

The Connecticut River is New England’s grandest
and most important river. Rising in Northern New
Hampshire, it flows the length of Vermont and New
Hampshire and continues south through Massachusetts
and Connecticut, where it finally meets the Atlantic.

The Connecticut is also a working river. It has been
extensively developed to serve New England’s industrial,
waste disposal and electrical needs. The enactment of the

Clean Water Act, however, has obligated those who dis-
charge into the River to share in the restoration and
maintenance of its “chemical, physical and biological
integrity.” 33 U.S.C. § 1251(a).!

The Georgia-Pacific Corporation and its successor,
the Simpson Paper Company (hereinafter referred to as
“Simpson”), however, continue to strenuously avoid their
obligations under the Clean Water Act. Simpson owns
and operates the Gilman Dam in Lunenburg, Vermont
which, together with its impoundment, were built in the
early 1900s. Pet. App. 6a, 19a. It is operated as a hydro-
electric generating facility; electricity produced by the
dam powers Simpson’s adjacent paper mill. Pet. at 11.
The dam severely harms the Connecticut River’s chemi-
cal, physical and biological characteristics by flooding
several miles of the River and altering its natural flow.
Pet. App. 7a-12a, 21a-26a. All water that was oxygenated
as it flowed over the dam site’s natural drop in elevation
is now impounded and diverted under the dam and
through its turbines and deprived of the natural aeration
process. Pet. App. 20a-21a. What was once highly oxy-
genated, fast flowing white water is now flat water. What
was once a riverine ecosystem is now a lake-like ecosys-
tem.

1 The report of the House committee on Public Works
which accompanied the House bill from which the Clean Water
Act arose states that “the word ‘integrity’ as used is intended to
convey a concept that refers to a condition in which the natural
structure and function of the ecosystem is maintained.”
H.Rep.No. 92-911, 92nd Cong. 2d Sess. 76-77 (1972), reprinted in
1 Leg. Hist. 753, 763-64. See also Avoyelles Sportsmen's League, Inc.
v. Alexander, 511 F.Supp. 278, 286 (W.D. La. 1981).

RSTn ted ete see ey irked aie 47S

icons he Na Re Nid nace

The dam’s operation is governed by a license issued
by the Federal Power Commissior™~(now the Federal
Energy Regulatory Commission) in 1965 with an effective
date retroactive to January 1, 1941 and an expiration date
of December 31, 1990.2 Pet. at 11. That license adopted
operating standards developed in the 1930s when the
dam was first converted to a hydroelectric facility.
Because it was issued well before the 1972 enactment of
the Clean Water Act (CWA), the 1941 license does not
contain any provisions to protect the Connecticut River’s
water quality.

In September of 1988, Simpson applied to the FERC
for relicensure of the dam and simply proposed to con-
tinue operating the dam under the conditions of its 1941
license. Pet. App. 23a.

On August 3, 1988, as part of its application for
relicensure, Simpson requested a water quality certificate
from the Vermont Department of Environmental Conser-
vation. See 33 U.S.C. § 1341(a)(1); 18 C.F.R. § 4.38(c)(2)
(1988); 10 Vt.Stat.Ann. § 1004 (1987)°. Again, Simpson
asked to continue operating the dam under the same
terms as set forth in its 1941 license. Pet. App. 15a-16a.
Simpson made no proposals to comply with the Clean

2 On January 17, 1991, the FERC issued an annual license
allowing Simpson to continue operating the Gilman Dam under
the terms of the 1941 license. See 16 U.S.C. § 808. The FERC is
apparently awaiting the outcome of this matter before issuing
Simpson’s new license.

3 The Department of Environmental Conservation is within
the Vermont Agency of Natural Resources (VANR). 3
Vt.Stat.Ann. § 2802(a)(5) (1987). r

Water Act or to otherwise address the dam’s impact on
water quality. Id.

The portions of the Connecticut River relevant to this
matter are Class B waters. Pet. App. 3a, 1la, 20a-21a.
Class B waters must be managed to assure compliance
with water quality criteria established by Vermont’s
Water Quality Standards. The one criterion at issue in this
matter is for dissolved oxygen (DO); the criterion
requires that DO levels never fall below 6.0 mg/1 or 75%
saturation. Vermont Water Quality Standard (Vt. WQS)
3-01(B)(1)(a) (1987).

The Water Quality Standards also establish beneficial
values and uses for which the River must be managed.®
Class B waters must be managed so that they consistently

* Contrary to Simpson’s claims, Pet. 13-14, and despite the
DEC’s repeated and timely entreaties, Simpson made no effort
whatsoever to address the DEC’s concerns over dissolved oxy-
gen levels until well after Vermont had issued Simpson’s Water
Quality Certificate. Indeed, the Superior Court found that “the
record before the DEC is bare of any formal presentation by
plaintiffs of their proposed management plan despite knowl-
edge as early as 1983 that DO deficits existed downstream of the
dam.” Pet. App. 15a-16a.

5 A limited segment of the Connecticut downstream of the
Gilman Dam was a Class C water because of the discharge of
Simpson’s mill wastes. Vermont has since eliminated Class C
waters, 10 Vt.Stat.Ann. § 1253(b) (1987); this limited segment of
the river is now considered a “waste management zone.” 10
Vt.Stat.Ann. § 1252(d) (1991). The dam itself and the reach of the
River affected by the DO deficits are, and at all times relevant to
this matter have been, Class B waters.

6 The Vermont Water Quality Standards refer to designated
uses, 33 U.S.C. § 1313, as “beneficial values and uses.”

EN An SW ALE, inc NN lath I pAb Shs atti hs

—~

exhibit good aesthetic value, provide high quality habitat
for aquatic biota, fish and wildlife, and may be used for
swimming and recreation. Vt. WQS § 3-03(A).

Vermont issued Simpson’s water quality certificate
on July 28, 1989. Pet. App. 28a. The certificate requires
Simpson to spill 210 cubic feet of water per second (cfs)
over the crest of the dam from June 1 through October 15
of each year for the express purpose of meeting Ver-
mont’s DO criterion. Pet. App. 23a-24a. In addition to the
numerous findings relating to compliance with the DO
criterion, Vermont found that spillage “will also serve to
restore to a degree the aesthetics of this river reach. This
is particularly important during the high public recre-
ational use period.” Pet. App. 26a.

Simpson, maintaining that it should be allowed to
continue its “historical mode” of operation of the dam,
petitioned the Vermont Superior Court for review of its
water quality certificate. Record, Second Amended Com-
plaint for Review (1/4/91) at 7. Simpson’s exclusive
claim, as framed by its Second Amended Complaint,
related to compliance with Vermont’s DO criterion. Id.

The Superior Court affirmed the water quality certifi-
cate. Pet. App. 17a. It made numerous, detailed findings
supporting the DEC’s conclusion that DO deficits caused
by the dam necessitated the 210 cfs spillage requirement.
Pet. App. 6a-12a. The Superior Court also held that “[t]he
aesthetic determination forms a strong independent basis
upon which to uphold the 210 cfs continuous spill
requirement.” Pet. App. 14a.

Simpson appealed to the Vermont Supreme Court.
Simpson’s primary claim was that there was insufficient

evidence in the record demonstrating that spillage was
necessary to alleviate violations of Vermont’s DO crite-
rion. Resp. App. 18a-25a, 44a-58a. The Vermont Supreme
Court affirmed.

¢

REASONS FOR DENYING THE PETITION

Certiorari should be denied because, contrary to peti-
tioner’s assertions:

1. The Vermont Supreme Court’s judgment rests on
adequate, independent state grounds not challenged by
Simpson.

2. The Vermont Supreme Court affirmed a proper
exercise of state authority under § 401 of the Clean Water
Act.

3. There is no division among any courts concerning
the aesthetics and recreation issue addressed by the Ver-
mont Supreme Court.

4. Arguments raised by Simpson were not raised
before the Vermont Supreme Court, and in any event are
groundless.

I. THE VERMONT SUPREME COURT’S JUDGMENT
RESTS ON ADEQUATE, ALTERNATIVE STATE
GROUNDS NOT CHALLENGED BY SIMPSON

Although the Vermont Supreme Court’s Entry Order
rests upon two independent, substantive grounds, Simp-
son’s petition seeks review of only one of these grounds.
Simpson does not dispute the Vermont Supreme Court’s

primary conclusion that “[t]he spillage requirement was
amply supported by the evidence” —- evidence that details
the need to continuously spill 210 cfs to comply with the
dissolved oxygen criterion established by Vermont's
Water Quality Standards.

This Court, “from the time of its foundation has
adhered to the principle that it will not review judgments
of state courts that rest on adequate and independent
state grounds.” Herb v. Pitcairn, 324 U.S. 117, 125 (1945).
This principle rests on “the jurisdictional concern [that
the Court] not ‘render an advisory opinion, and if the
same judgment would be rendered by the state court after
we corrected its views of federal laws, our review could
amount to nothing more than an advisory opinion.’ ”
Michigan v. Long, 463 U.S. 1032, 1042 (1983) (quoting Herb,
324 U.S. at 126). The Court’s power pursuant to a writ of
certiorari “is to correct wrong judgments, not to revise
opinions.” Herb, 324 U.S. at 126; Coleman v. Thompson, __
U.S. __, 111 S.Ct. 2546, 2554 (1991).

Simpson bears the burden of establishing that the
Vermont Supreme Court’s judgment does not rest on
independent state grounds. Michigan v. Long, 463 U.S. at
1042, n. 8; Durley v. Mayo, 351 U.S. 277, 285 (1956). Simp-
son cannot meet that burden, because the Vermont
Supreme Court's decision provides a concise and “plain”
statement of the independent state grounds upon which
it rests. See Michigan v. Long, 463 U.S. at 1044.

Simpson’s claim that the Vermont Supreme Court
affirmed Simpson’s water quality certificate “on the sole
ground that aesthetics and recreation were an appropri-
ate basis for the spill condition,” Pet. 16, is without

foundation. Simpson framed the two substantive issues to
which the Court responded: “Plaintiffs lastly contend that
the spillage requirement was not supported by the evi-
dence and that it was beyond the DEC’s authority under
federal law to consider aesthetic and recreational factors
as grounds for a spillage requirement.” Yet. App. 3a
(emphasis added).

The Court ruled that the spillage requirement “was
amply supported by the evidence.” Pet. App. 3a. The
evidence with which Simpson took issue related exclu-
sively to compliance with Vermont’s dissolved oxygen
criterion. Resp. App. 18a-25a, 44a-58a. The Vermont
Supreme Court thus concluded that compliance with the
DO criterion warranted the spillage requirement.

The Court then held that “[nJot only were aesthetics
and recreation considered relevant, ease of administra-
tion and monitoring were fostered by the requirement.”
Pet. App. 3a. The reference to ease of administration and
monitoring was in direct response to Simpson’s claim
that its scheme to monitor and manage DO levels in the
Connecticut River was arbitrarily rejected by the DEC.
Resp. App. 16a, 23a-25a, 37a-44a. Indeed, the Superior
Court’s finding upon which the Vermont Supreme
Court’s reference is based states that:

the [210 cfs spill flow] proposed by the VANR
[Vermont Agency of Natural Resources] uses
spill flow at the dam, an easily gaged [sic] and
monitored parameter, to meet specific future DO
goals downstream of the project. The applicant's
proposed water quality management plan, which
depends on an unproven predictive water quality
model, would be difficult to monitor and enforce for

compliance with the goal of maintaining DO at the
sag point.

Pet. App. at 17a (emphasis added by the Superior Court).

Thus, even in addressing aesthetics and recreation,
the Vermont Supreme Court made it clear that its holding
on this issue was independent of compliance with the DO
criterion. Furthermore, the words, “not only” plainly
demonstrate that the Court did “not only” consider aes-
thetics and recreation as a basis for the spillage condition.

Simpson, despite having framed each of the issues to
which the Vermont Supreme Court responded, claims to
be “without explanation” for the Court’s reference to
“ease cf administration and monitoring.” Pet. 16 n. 35.
Nor does Simpson offer an explanation for the Court’s
conclusion that spillage is amply supported by the evi-
dence. The explanation is plain and simple - the Vermont
Supreme Court based its judgment on compliance with
Vermont’s DO criterion as well as aesthetics and recre-
ation. Simpson’s petition should therefore be denied. See
Michigan v. Long, 463 U.S. at 1042.

Il. A STATE WATER QUALITY STANDARD NEED
NOT BE QUANTITATIVE TO BE AN “APPROPRI-
ATE REQUIREMENT OF STATE LAW.”

Even if the Vermont Supreme Court’s clear ruling
concerning the quantitative dissolved oxygen criterion
could be ignored, the challenged certification must still
be upheld as a valid application of Vermont’s power to
apply its non-quantitative water quality standards - spec-
ifically, that portion of the standards that requires “water
of a quality which consistently exhibits good aesthetic

10

value . . . and recreation.” Vermont Water Quality Stan-
dards § 3-03, quoted at Pet. App. 3a.

Simpson’s entire argument concerning aesthetics and
recreation rests on a misrepresentation of what was actu-
ally decided below. According to Simpson, “[i]t is evident
that the only concern of the Vermont tribunals regarding
aesthetics and recreation was for the scenic vista which
supposedly would be presented by water spilling over
the Project crest gate to recreating tourists.” Pet. 23-24. To
the contrary, the DEC certificate clearly states:

Spillage of 210 cfs for protection of down-
stream water quality during the period June 1
through October 15 will also serve to restore to a
degree the aesthetics of this river reach. This is
particularly important during the high public
recreational use period.

Pet. App. 26a (emphasis added). It is this finding — not
Simpson’s imaginary finding concerning the aesthetics of
cascading water — that was affirmed by the Vermont
courts.

Once the clear water quality basis for the spillage
condition is recognized, Simpson is left with the far nar-
rower assertion that only quantitative water quality stan-
dards can form a proper basis for a § 401(d) condition on
a certificate. Pet. 22 (“Management goals such as promo-
tion of aesthetic ‘values’ and recreational ‘uses’ are to be
achieved through implementation of specific, quantifiable
‘criteria.’ ”). But § 401(d) authorizes conditions to ensure
compliance with “any other appropriate requirement of
State law,” not “any other appropriate quantitative
requirement of State law.”

ie

11

Indeed, not just designated uses, but criteria also,
may be non-quantitative. 40 C.E.R. § 131.3(b) (1991) (crite-
ria may be “expressed as constituent concentrations,
levels, or narrative statements representing a quality of
water that supports a particular use”) (emphasis added).
Simpson’s insistence on quantitative rules would thus
mean that some water quality criteria could be neither
implemented nor enforced.

Moreover, excluding the non-quantitative portions of
a state’s water quality standards from § 401(d) would
produce results opposite to those desired by Simpson.
Under § 401(a)(1), a state must deny certification outright
if the proposed activity does not comply with § 303 of the
Act.7 Section 303, in turn, expressly provides that a state
water quality standard “shall consist of the designated
uses of the navigable waters involved and the water qual-
ity criteria for such waters based upon such uses.” 33
U.S.C. § 1313(c)(2)(A) (emphasis added).

Thus, if an applicant’s discharge would violate either
the non-quantitative designated uses or the quantitative
criteria, the state must deny certification. If, as suggested
by Simpson, Vermont was precluded from imposing con-
ditions to assure compliance with its Standards, Vermont
would have no choice but to deny certification under
§ 401(a)(1) and thereby preclude the FERC from issuing a

7 Simpson does not contend that Vermont’s consideration
of aesthetics and recreation stems from any state law other than
Vermont's Water Quality Standards. Simpson concedes that Ver-
mont’s Standards were approved by the E.P.A. pursuant to § 303
of the Act and conform to the format imposed by EPA’s regula-
tions. Petition at 24.

12

license.8 Surely a license with conditions serves Simp-
son’s interest better than no license at all.

Simpson argues that, as a matter of law, compliance
with the numerical criteria constitutes full compliance
with any non-quantitative designated uses. Again, Simp-
son’s argument finds no support in the Clean Water Act,
which indicates merely that criteria are “based upon”
designated uses, 33 U.S.C. § 1313(c)(2)(A), not that com-
pliance with the criteria necessarily guarantees compli-
ance with those uses. Indeed, EPA’s regulations
specifically require that dams be operated to attain desig-
nated uses, 40 C.F.R. § 131.10(g)(4) (1991), and provide
that “[w]hen criteria are met, water quality will generally
protect the designated use,” 40 C.F.R. § 131.3(b)
(emphasis added). The EPA thus recognizes that there
will be instances where the use remains unprotected not-
withstanding compliance with the criteria.

Simpson’s argument thus boils down to the assertion
that the present case is not one of those instances - i.e.,
that the challenged spillage condition is not necessary to
ensure compliance with Vermont’s designated uses. Pet.
25 (“The DEC never proved or even claimed that DO
levels affect aesthetics or recreation.”) This contention
raises no federal issue, but rather concerns only Ver-
mont’s interpretation and application of its own Water
Quality Standards.?

8 § 401(a)(1) (“No license or permit shall be granted if
certification has been denied by the State, interstate agency, or
the Administrator, as the case may be.”)

9 Because the CWA expressly preserves the states’ right to
adopt more stringent requirements than those imposed by

13

This Court’s opinion in Arkansas v. Oklahoma, __ U.S.
__, 112 S.Ct. 1046 (1992), cited in Pet. 22-23, is of no
assistance to Simpson. In that case Oklahoma challenged
a permit for a discharge in Arkansas. Under § 401(a)(1), a
state has the right to issue a water quality certificate only
if it is the state “in which the discharge originates or will
originate.” Because the discharge originated in Arkansas,
Oklahoma was relegated to § 401(a)(2), which did not
require Oklahoma’s certification as a prerequisite to per-
mit issuance, but rather required EPA to make the appli-
cable decisions about compliance with Oklahoma’s water
quality standards.'° These circumstances provide the con-
text for the Court’s observation that “at least insofar as
they affect the issuance of a permit in another State, the
Oklahoma standards have a federal character.” Arkansas
v. Oklahoma, 112 S.Ct. at 1059 (emphasis added).

In this case, by contrast, the discharge originates in
Vermont,!! so that section 401(a)(1) applies rather than
§ 401(a)(2). Under 401(a)(1), the Vermont DEC, not EPA,
is charged with the duty of interpreting and applying
Vermont’s Water Quality Standards. Whether Vermont

federal law, § 510, there is no basis for this Court to hold that
Vermont's standards - either on their face or as interpreted and
applied by Vermont - are too stringent.

10 CWA § 401(a)(2) (“the licensing or permitting agen-
cy... shall condition such license or permit in such manner as
may be necessary to insure compliance with applicable water
quality requirements.”) (emphasis added). In Arkansas v. Okla-
homa, the “licensing or permitting agency” was EPA itself.

11 Specifically, the penstock (through which water from
above the dam is discharged into the river below the dam) is
located in Vermont.

14

has correctly interpreted its Standards poses no federal
issue.

Ill. THERE IS NO CONFLICT AMONG THE STATE
COURTS CONCERNING THE ENFORCEABILITY
OF “DESIGNATED USES” UNDER CWA § 401(d).

Simpson asserts that state courts are “divided;” while
some have “properly interpreted § 401 to preclude impo-
sition of conditions, or outright denial of a certification,
on non-water quality related grounds[,] . . . [t]he Vermont
Supreme Court has ruled to the contrary.” Pet. 19 (foot-
note omitted). The Vermont Supreme Court did no such
thing. Rather, it upheld application of the aesthetics and
recreation provisions of Vermont’s Water Quality Stan-
dards. Pet. 3a.

On the true issue posed by Simpson’s petition, none
of the cases Simpson cites (nor any others of which
respondents are aware) creates a conflict: none rules that
§ 401(d) conditions must be based only on the quantita-
tive or numerical portion of a state’s water quality stan-
dards.

Indeed, one of Simpson’s cited cases actually under-
cuts its position. In Arnold Irrigation District v. Department
of Environmental Quality, 717 P.2d 1274 (Or.App. 1986), the
Court held that § 401(d) conditions must go beyond water
quality standards and include water-quality-related por-
tions of county land use regulations:

Many uses of land may affect water quality,
even if they do not immediately result in direct
discharges to the state’s waters . . . If [the

15

state] .. . grants petitioners’ request for a certifi-
cate, it must require, as a condition of that certif-
icate, that petitioners comply with the water-
related portions of the Deschutes County land
use regulations.

717 P.2d at 1279.'2

And in a case not cited by Simpson, Maine’s highest
court rejected the narrow interpretation of “designated
uses” advanced by Simpson here:

Bangor Hydro contends that there is an irrebut-
table presumption that waters are “suitable for”
their designated uses if they meet the numerical
criteria of section 465(4)(B) [of the Maine water
quality standards) and that the Board has no
charter to inquire whether the designated uses
actually exist, or can exist, in a river. We dis-
agree.

_. . We cannot conclude that the designated uses
included in section 465 are mere surplusage. The
level of detail bespeaks a considered determina-
tion of the public interest. This legislative deter-
mination would be rendered a nullity if the
agency responsible for reviewing compliance
could consider only the numerical criteria and

12 The court also rejected a claim by conservationists that
because hydroelectric development was not specifically
included in the state’s § 303 designated uses, the state was
barred from granting a certificate to a hydroelectric project. 1d.
at 1279-80. The court did not hold or suggest, however, that the
state was barred from including § 401(d) conditions designed to
protect those designated uses. Certainly if non-quantitative
land use regulations are properly within the scope of § 401(d),
non-quantitative water quality standards must be as well.

16

not whether the designated uses actually were
achieved in a particular river.

Bangor Hydro-Electric Co. v. Board of Environmental Protec-
tion, 595 A.2d 438, 442 (Me. 1991) (footnote omitted).
Accord, id. at 442 n.4 (“The statutory statement of purpose
suggests the intent to include the narrative criteria as an
integral part of the water quality standards that the Board
must consider in its review.” )'

Likewise, none of the other cases cited by Simpson
hold or even suggest that non-quantitative water quality
standards do not constitute a valid basis for a § 401(d)
condition. The two New York cases hold that § 401 does
not empower the states to consider matters “unrelated to
their water quality standards,” but do not hold that non-
quantitative portions of state standards are unenforce-
able. Power Authority v. Williams, 60 N.Y.2d 315, 457
N.E.2d 726, 730 (1983); de Rham v. Diamond, 32 N.Y.2d 34,
295 N.E.2d 763, 768 (1973). Indeed, in a case not cited by
Simpson, Long Lake Energy v. Dept. of Env. Cons., 563
N.Y.S.2d 871 (A.D.3 Dept. 1990), a New York court relying
on Williams and de Rham held that enhancement of a
fishery and associated aquatic resources is within the
purview of the § 401 process.

The Connecticut case (which is currently on appeal)
overturned an outright denial of a § 401 certificate, where

13 Because the case before the Maine Court involved only a
state request for information, the Court did not rule on whether
the State could ultimately base a § 401(d) condition on the
designated uses. 595 A.2d at 443. Nonetheless, the Court’s rea-
soning strongly suggests that such a condition would be
upheld.

17

the denial was based on aesthetic concerns relating to the
quantity of water in the river. Summit Hydropower v. Com-
missioner of Environmental Protection, LEXIS 2177, *23,
(Conn. Super. July 20, 1992) (“The Commissioner con-
cluded .. . that the viewing of Cargill Falls is a recre-
ational use and that the project would have a detrimental
effect on the aesthetic quality of viewing the falls by
reducing the water level of the natural river flow.”). The
court specifically noted that “(t]he Commissioner does
not claim that the project will in any way affect the
aesthetics of the water itself, namely, how the water
looks.” Id. Accord, id. at *27 (“nor does the Commissioner
claim that the proposed project will affect the water qual-
ity of the Quinebaug River in any way’).

Finally, the Pennsylvania case held that § 401 does
not encompass “the impact of physical changes in the
river on aquatic resources and the effect of the project on
wetlands and fish migration.” Pennsylvania Dept. of Envi-
ronmental Resources v. City of Harrisburg, 578 A.2d 563, 567
(Pa.Cmwlth. 1990). The court did not address aesthetics,
and certainly did not hold that only numerical water
quality criteria are enforceable under § 401(d)."

4 The Pennsylvania and Connecticut courts suggested that
§ 401 only applies to a “discharge of a pollutant.” Summit, LEXIS
2177 at °27; Pennsylvania DER, 578 A.2d at 567. As indicated
below, this issue is not properly before this court, see pp- 19-20,
infra, so any conflicts among the state courts concerning it have
no bearing on the advisability of certiorari here.

18

IV. CLAIMS NOW RAISED BY SIMPSON WERE NOT
ADEQUATELY AND SQUARELY PRESENTED TO
THE VERMONT SUPREME COURT

The other arguments raised by Simpson in support of
its Petition were not raised before the Vermont Supreme
Court. This Court has made it clear that it will only
entertain issues that were both raised and adequately and
squarely presented before the state courts. Banker's Life
and Casualty Co. v. Crenshaw, 486 U.S. 71, 76-80 (1988);
Webb v. Webb, 451 U.S. 493 (1981). “At the mini-
mum... there should be no doubt from the record that a
claim under a federal statute . . . was presented in the state
courts and that those courts were apprised of the nature
or substance of the federal claim at the time and in the
manner required by state law.”15 Webb, 451 U.S. at 501
(emphasis in original). Vermont law, in turn, requires that
an issue be raised and “fairly presented” to be preserved
for appellate review. Lanphere v. Beede, 141 Vt. 126, 129,
446 A.2d 340, 341 (1986). The respondents enumerate
each of these claims and, though each is precluded, offer
a brief substantive response to each.

15 Rule 14.1 (h) requires a petitioner to “specify the stage in
the proceedings, both in the court of the first instance and in the
appellate courts, at which the federal questions sought to be
reviewed were raised; the method or manner of raising
them . .. and such pertinent quotations of specific portions of
the record or summary thereof, with specific reference to the
places in the record where the matter appears.” Simpson utterly
failed to comply with its obligations under this rule insofar as
the claims addressed in this section are concerned.

19

A. THE CLEAN WATER ACT

Relying on the statutory definition of the term “dis-
charge” (the key term in § 401(a)(1) that triggers the
applicability of the state certification requirement), Simp-
son suggests that state jurisdiction under § 401(a)(1) is
lacking because reduced dissolved oxygen levels attribu-
table to a dam do not constitute a “discharge of a pollu-
tant or pollutants.” Pet. 21-23, n. 51, quoting CWA § 502
(16). Simpson, however, affirmatively stated to the Ver-
mont courts that it “no longer contend{s] that the State of
Vermont has no authority at all to regulate the Gilman
Dam through the § 401 process, because the Dam and its
‘run-of-river’ operation is not a ‘discharge’ for purposes
of state and federal law.”** Motion to Amend Complaint

16 Simpson contended defore the Vermont Supreme Court
that the provisions enumerated in section 401(a)(1) “plainly
relate to objective water quality criteria and elimination of water
pollution.” Resp. App. 59a (emphasis added). “The term ‘pollu-
tion’ means the man-made or man-induced alteration of the
chemical, physical, biological, and radiological integrity of
water.” 33 U.S.C. § 1362(19). A dam is unquestionably a
man-made alteration of the physical, chemical (e.g. DO) and
biological integrity of water, and thus causes “pollution”.
National Wildlife Federation v. Gorsuch, 693 F.2d 156, 165 (D.C.
Cir. 1982) (EPA concedes that dams cause “ pollution”). Indeed,
Simpson conceded that “Vermont has duly enacted applicable
water quality standards and there is no dispute that those stan- —
dards and the [Clean Water] Act generally are applicable to the
Gilman Dam.” Resp. App. 60a. By conceding not only the appli-
cability of § 401 to “pollution,” but the applicability of Ver-
mont’s Water Quality Standards and the Clean Water Act to the
Gilman Dam, Resp. App. 59a-60a, Simpson further waived its
ability to presently claim otherwise.

20

(1/4/91) (granted, Jan. 16, 1991). Simpson cannot now
raise this issue.

In any event, Simpson’s quotation leaves out a key
word of the definition: “The term ‘discharge’ when used
without qualification includes a discharge of a pollutant,
and a discharge of pollutants.” § 502(16) (emphasis
added). See 2A Singer, Sutherland Statutory Construction
§ 47.07, at 152 (1992) (“It has been said ‘the word
“includes” is usually a term of enlargement, and not of

limitation. . . . It, therefore, conveys the conclusion that
there are other items includable, though not specifically
enumerated ... .’”) (citation omitted).!”

Simpson also neglects to mention that the FERC’s
regulations expressly require compliance with the
§ 401(a)(1) state certification requirement as a prerequi-
site to issuance of an FERC hydroelectric license. 18
C.F.R. § 4.38(c)(2) (1988).

B. THE FEDERAL POWER ACT

Simpson’s petition also claims, for the first time, that
“Vermont's broad reading of § 401 as applied to hydro-
electric projects amounts to a partial repeal of the Federal
Power Act (FPA) by implication.” Pet. 26-27. Simpson
never even cited the Federal Power Act to the Vermont
Supreme Court. See Bankers Life and Casualty, 486 U.S. at

17 National Wildlife Federation v. Gorsuch, cited in Pet. 23 n.51,
is of no assistance to Simpson because it construes § 402(a)(1)
(which applies to “the discharge of any pollutant”) (emphasis
added), not § 401(a)(1) (which applies to “any discharge into the
navigable waters”).

21

78. Simpson certainly never asserted that Vermont's
Water Quality Standards or the water quality certificate
were “repugnant” to the Federal Power Act. 28 U.S.C.
§ 1257(a). Simpson cannot now, for the first time, raise
such issues. Id; Webb, 451 U.S. at 496.

In any event, this claim has no merit. There is noth-
ing “implif[ed]” about the requirement for a state water
quality certification, the state’s power to attach condi-
tions to that certification, or the state’s power to adopt
and apply water quality requirements stricter than fed-
eral law: all are explicit on the face of §§ 401 and 510. It is
Simpson who would repeal a congressional enactment, by
reading into the Clean Water Act limitations that Con-
gress did not create. Indeed, Simpson’s argument would
contravene not only the letter of the CWA, but also its
underlying intent to “recognize, preserve, and protect the
primary responsibilities and rights of States to prevent,
reduce, and eliminate pollution.” 33 U.S.C. § 1251(b).’®

18 None of the Federal Power Act cases cited by Simpson
(Pet. 27-28) construe the Clean Water Act, and certainly none
provides any basis for disregarding the clear terms of CWA
§§ 401 and 510.

Equally misplaced is Simpson’s argument (Pet. 28) that FPA
§ 10(j) limits state authority to impose fish and wildlife condi-
tions. Simpson decided not to challenge the certificate’s fish
passage condition in the Vermont courts (Pet. 14 n. 31), and, as
stated above, never cited any provision of the Federal Power
Act to the Vermont Supreme Court. Accordingly, Simpson may
not raise that challenge here.

Finally, Simpson erroneously suggests that CWA § 102(b)(6)
limits Vermont’s authority to include spillage requirements ina
§ 401(d) certification. Pet. 26 & n. 53. Again, Simpson never
cited this provision before the Vermont Court. In any event,
§ 102(b)(6) applies only to “storage for regulation of

22

Second, Simpson argues that “[s]tate aesthetic or rec-
reational conditions unrelated to water quality could
frustrate FERC’s role as the exclusive forum for compre-
hensive licensing of hydroelectric uses of navigable
waterways.” Pet. 25. But as respondents have shown
above, the 210 cfs condition is related to water quality.

Finally, noting that Vermont and New Hampshire
reached different conclusions concerning the necessity of
a spillage condition,!9 Simpson also argues that “[iJn the
FPA, Congress vested exclusive licensing authority in a
single federal agency in order to avoid such inconsisten-
cies.” Pet. 26. This is a non-sequitur. Application of
§ 401(a)(1) in the boundary waters situation always raises
the possibility that one state will be stricter than another.
This possibility is just as real when both states base their
certifications on purely quantitative water quality stan-
dards (which Simpson concedes they may do) as when
one of them applies a non-quantitative standard. In either

streamflow.” (Emphasis added.) The challenged condition of
the DEC certificate requires spillage, not storage.

19 Simpson’s characterization suffers from several inac-
curacies. First, Vermont's spill condition is not “directly con-
trary to New Hampshire’s § 401 certification that the project is
in full compliance with that state’s water quality standards.”
Pet. 25. The Vermont condition was based on Vermont's stan-
dards, and therefore is in no way contrary to New Hampshire’s
conclusion that its own standards were met.

Moreover, Simpson’s assertion that the Gilman Dam is
located entirely in New Hampshire waters (Pet. 26) ignores two
other key facts: the “discharge” that gives rise to § 401(a)(1)
jurisdiction occurs in Vermont (see p. 13, supra), and the waters
above and below the dam are partly in Verraont. Vermont v. New
Hampshire, 289 U.S. 593 (1933).

23

case, the result is clearly dictated by §§ 401(a)(1) and 510:
the stricter condition controls. See Arnold, 717 P.2d at 1278
n.4 (court distinguishes First lowa Hydro-Electric Coop. v.
Federal Power Comm’n, 328 U.S. 152 (1946), stating: “In the
CWA, Congress has created an independent state role in
all federal actions involving discharges into navigable
waters; the question is not Congressional preemption but
what criteria Congress intended the states to consider in
deciding whether to issue certificates of compliance with
the act.”).

Vv. CONCLUSION

Simpson’s petition for a writ of certiorari should be
denied.

Dated: February 16, 1993

State of Vermont
Jerrrey L. Amestoy
Attorney General

by: Ronatp A. SHEMs
(Attorney of Record for
Respondent VT DEC)
Assistant Attorney General
Pavilion Office Building
109 State Street
Montpelier, VT 05609-1001
(802) 828-3171

Sierra Club

by: Howarp I. Fox, Eso.
(Attorney of Record for
Respondent Sierra Club)
Sierra Club Legal Defense Fund
1531 P Street, N.W.
Suite 200
Washington, D.C. 20005
(202) 667-4500

- Me Tokorepeere
Li aks Se ioag eee, :

za saieaa ERO ine eee 33
Vermont of New Hampshire, 289 U.S. 593 (1933)........ 5
Vincent v. Vermont State Retirement Boar, 148 Vt.

MER NOTES 6 cnt ntancukstunecasnoshenabeccs owas, 18, 25
Whitcomb v. DET, 147 Vt. 525 (1986)................. 33

In Re Williams Point Yacht Club, Docket No.
ER We moat ic kee = i NR BS ae eee 27

7a

CONSTITUTIONS, STATUTES, RULES
AND REGULATIONS

United State Constitution, 5th and/or 14th
Amendment ........-eccceeeeeeeeeeeees 3, 22, 25, 26

Vermont Constitution, Chap. I, Arts. 4, 7 and/or 9.... 25
Clean Water Act, Section 401, 33 U.S.C. §1341(a) . .1, 46

Clean Water Act, 33 U.S.C. §1341(d) .....------+++- 48
40 C.F.R. §131.3(b)......-. eee cece eee rece ener eres 48
3 VS.A. §801 et seq .......-- cece cece cere eeeeeeee 18, 34
3 VS.A. $809.20... ccc cece ec cc ere c eer ecebeneveceees 23
3 VS.A. §814(a)...... 002 e reece cece eee e eer er eres 18
B V.S.A. §2201.......-. cece eee r cere rene eeeerenereeee 26
10 V.S.A. §1024(a) ...-...- eee e eee eee ees 2, 20, 25, 26
10 V.S.A. §1099 ........- cece cece reece een eee rereeces 17
10 V.S.A. §1269.......- cece cece eer ee eer cnererencers 17
Rule 52(a), V.R.Civ.P.........0-e cece cree eee e eee recees 50
Rule 60(b), V.R.Civ.P. ......-.0 eee cece ence eee teens 30
Rule 75, V.R.Civ.P. .......-ceccceeeeeeeeeee 2, 16, 26, 50
Vermont Water Quality Standards...........------ 1, 47
Vermont Water Pollution Control Regulations,

ee en, cs che dbaw eueesctsecrvsss heen 17

MISCELLANEOUS

1 Koch, Administrative Law & Practice, §9.4, at 92

(1985 ed.) ..... ce ceeeececee eer ec ener ct eecseceeeees 19
1 Koch, Administrative Law & Practice, §7.23, at

Sea ee eee Pere teed ee ee oe 23

2 Koch, Administrative Law & Practice, §9.2, at 73 &
fn. 13 36

8a

SUMMARY DESCRIPTION OF
THE CASE AND PROCEEDINGS BELOW

This is an appeal from the Department of Environ-
mental Conservation’s (“DEC”) issuance of a “Section 401
Certification” for a dam and hydro-electric facility owned
and operated by Plaintiffs/Appellants on the Connecticut
River at Gilman, Vermont. See Printed Case (hereafter
“PC”) at 8-23. This facility provides electric power for the
use of the adjacent paper mill owned and operated by
Simpson Paper (Vermont) Co. (“Simpson”).! The 401 Cer-
tification is required by federal law in connection with
Simpson’s relicensing proceedings for the Gilman dam
facility, which are still pending before the Federal Energy
regulatory Commission (“FERC”). A 401 Certification
must be obtained from any state agency having jurisdic-
tion over a discharge into waters of that state, certifying
that applicable state water quality standards will not be
violated by the facility.2 A FERC license incorporating the
final 401 Certification is expected to be issued for a
minimum term of 40 years.

The only item still in dispute is the condition
imposed by DEC in the 401 Certification, requiring that

1 Georgia-Pacific Corp. formerly owned the entire mill
complex. It has also contracted to sell the hydro-electric facility
and dam to Simpson, but the transfer has not yet been formally
approved by FERC. G-P remains a nominal party only in this
appeal, and hereafter Appellants will be referred to as Simpson,
including actions taken by G-P prior to the mill’s sale.

2 See §401(a) of the Clean Water Act (“CWA”), 33 U.S.C.
§1341(a). Pertinent excerpts from the Vermont Water Quality
Standards (“WQS”) which were in effect at the time, are
included at PC 81-89.

9a

Simpson continuously spill over the dam, instead of
allow to pass through the turbines and generate electric-
ity, 210 cubic feet per second (“cfs”) of river water from
June 1 to October 15 of every year. PC 20. This condition
would be effective without regard to actual river flows or
water quality levels at any given time. Simpson proposed
but DEC rejected a management plan in place of the
continuous spillage condition, which would require Simp-
son to spill stipulated flows over the dam whenever
necessary to correct any actual or anticipated water qual-
ity violations.

Simpson simultaneously appealed the 401 Certifica-
tion to the Vermont Water Resources Board, and to the
Washington Superior Court under Rule 75, V.R.Civ.P.
DEC contested the Board’s statutory jurisdiction to hear
that appeal; the Board ruled that it did have appellate
jurisdiction. DEC appealed that determination to the
Washington Superior Court, which reversed and held that
the Board did not have jurisdiction over appeals from
DEC’s issuance of 401 Certifications. That judgment was
not appealed. During 1991 the Legislature passed an
amendment to the applicable statute which made it clear
that the Board did have de novo appellate jurisdiction in
such instances.? Simpson is the only 401 Certification
applicant in Vermont who ever has been or will be denied
de novo appellate review before the Board.

Simpson then pursued this action, which was the
alternative appeal under Rule 75. It first moved for a
remand to DEC for additional consideration and to take

3 See 10 V.S.A. §1024(a) (as amended 1991 Leg. session).

10a

additional evidence, and/or reconsideration of the trial
court’s informal ruling that the case would be decided
only on the administrative “record” and would not be
heard de novo by the court. The trial court denied that
motion on May 2, 1991, without written opinion or expla-
nation. The parties then briefed and orally argued the
merits — principally, Simpson’s contention that the contin-
uous spillage requirement was arbitrary and capricious
and not supported by substantial evidence — based only
on the administrative “record”. On October 2, 1991, the
court issued a written Opinion and Order, with findings
and conclusions, sustaining DEC’s 401 Certification in all
respects, particularly the continuous spillage condition.
See PC 24-37. On October 21, 1991, Simpson filed a
Motion to Amend and/or Make Additional Findings,
which was denied by the court, again without written
opinion or explanation, on December 16, 1991. Simpson
filed its Notice of Appeal on November 1, 1991. PC1.

STATEMENT OF THE ISSUES

1. Was a remand of the 401 Certification to DEC to
take additional evidence and/or for reconsideration, or
alternatively a de novo hearing on the merits in the Wash-
ington Superior Court, required under established Ver-
mont law, recognized principles of administrative law,
and/or Rule 75, V.R.Civ.P.?

2. Was a remand of the 401 Certification to DEC for
additional evidence and/or reconsideration, or alter-
natively a de novo hearing in Superior Court, required to
prevent violations of the 5th (“Due Process” clause) and
14th (“Equal Protection” clause) Amendments to the

lla

United States Constitution, and the Vermont Constitu-
tion, Chap. I, Arts 4, 7 and 9 which have occurred in the
absence of such further proceedings?

3. Ifa remand to DEC for additional evidence and/
or further consideration was not required as a matter of
law for the reasons contended in Questions 1 and 2
above, did the court below nonetheless abuse its discre-
tion in not ordering such a remand given all of the facts
and circumstances of the case?

4. Is paragraph 2 of Condition A of the 401 Certi-
fication (the 210 cfs continuous spillage requirement from
June 1 to October 15 each year) unsupported by substan-
tial evidence in the administrative record?

5. Is paragraph 2 of Condition A of the 401 Certi-
fication (the continuous spillage requirement) arbitrary
and capricious?

6. If paragraph 2 of Condition A of the 401 Certi-
fication cannot be sustained as a necessary water quality
restriction, was it beyond DEC’s and the trial court's
authority under applicable federal law to base such a
spillage requirement alternatively on generalized, non-
specific considerations of “aesthetics” and/or “recre-
ation”?

7. Were the trial court’s findings of fact and/or
conclusions of law, sustaining the 401 Certification in all
respects, clearly erroneous?

STATEMENT OF FACTS

The Gilman dam and impoundment on the upper
Connecticut River was originally constructed in 1900, and

12a

has been operated since then as a “run of river” project
which essentially passes on an instantaneous basis the
same volume of water which flows into it. It has been
licensed as a hydro-electric facility since 1965, retroac-
tively to January 1, 1941. Electricity generated is used to
power the adjacent specialty paper mill now owned by
Simpson; that plant produces approximately 70,000 tons
of paper each year and employs approximately 180 peo-
ple in the “upper valley” region of Vermont and New
Hampshire. River flows between 130 and 2,850 cfs are
routed through the hydro-electric facility; flows under or
over those limits are in fact spilled over the dam or
through its crestgate. The State of New Hampshire has
already issued its Section 401 certificate for the facility
which allows Simpson to continue operation of the dam
without any spillage requirement, having found that “run
of river” operation does not violate any New Hampshire
water quality standards.‘

4 The Connecticut River is, of course, located within New
Hampshire up to the low-water mark on the Vermont side. See
Vermont v. New Hampshire, 289 U.S. 593 (1933). The entire dam is
itself located in New Hampshire as is the “crestgate” through
which spillage mandated by Vermont will pass. The “power-
house” is partially in Vermont and partially in New Hampshire.
The New Hampshire Class B standard for DO is actually higher,
or more stringent, than the Vermont water quality standard then
in effect, requiring 75 percent saturation, whereas the Vermont
standard requires only 6 mg/I! of DO or 70 percent saturation.
PC 88; cf. Record on Appeal (hereafter “RA”), State’s Exh. I. At
22°C (71.6°F), the critical water temperature used in the com-
puter modeling relied on by DEC, 75 percent DO saturation
would be 6.56 mg/I.

13a

Upstream of the Gilman dam are numerous “point
sources” of pollution, both municipal and commercial,
which operate pursuant to their own state /federal waste-
water discharge permits, but which still contribute pollu-
tion loading to the river as it enters the Gilman
impoundment; included among these is the discharge
from the Simpson paper plant itself.5 There is also pollu-
tion from indirect sources such as agricultural runoff and
residential wastewater disposal. However, during these
Section 401 proceedings DEC agreed that it would
assume that all Vermont water quality standards are met
above the dam. The most critical of these technical
requirements for purposes of this appeal is the level of
dissolved oxygen (hereafter “DO”); DO is used up not
only by fish and other “aquatic biota” in the river, but
also by other identifiable pollutants, such as “biochemical
oxygen demand” or “BOD.” The Vermont DO standard in
the river segment at issue is 6 mg/I or 70% saturation, PC
88; at 22°C, which is the average high river temperature
during the summer, the stipulated minimum DO stan-
dard is 6.2 mg/l.

River flows exiting the facility’s tailrace, as well as
those at the foot of the dam whenever there is spillage,
were actually measured both before and after the Certi-
fication was issued, and have consistently been in excess
of 6.2 mg/l DO. There is also a measurable increase in
DO levels in the river for the first mile below the dam

5 The plant received a five-year renewal of its “NPDES”
discharge permit from DEC as of March 15, 1989, only 5 months
before the 401 Certification was issued.

l4a

during summer months, when that segment is free-flow-
ing, despite the fact that just below the dam Gilman’s
municipal wastewater — which is treated and subject to its
own direct discharge permit - enters the river. At about
one mile below the dam the river enters what under
typical summer conditions is the uppermost limit of the
Moore Reservoir. PC10, 96. The river becomes more
sedentary and begins to deepen; the Moore Reservoir,
which feeds the Moore hydroelectric facility operated by
New England Power, is one of, if not the largest
impoundment on the river.” It is well beyond that point,
some 2.4 miles downstream, that computer modeling pre-
dicts a slight “sag” or decrease in DO levels during
potentially extreme summertime conditions.®

® During winter months, the head of the Moore Reservoir
ordinarily comes almost to the foot of the Gilman dam. How-
ever, it is agreed that a DO violation is unlikely then, despite the
absence of a free-flowing downstream river segment, because
flows are higher and water temperatures are lower.

7 Moore Reservoir is approximately 11 miles long, 0.6 miles
wide and 30 to 150 feet deep; at “full pool” it has a surface area of
3,490 acres and a reservoir volume of 88.7 billion cubic feet of water.
See RA, Metcalf & Eddy 1983 Report, at B-3-2. In contrast, the
Gilman dam impoundment is approximately 2.9 miles long, 375 feet
wide, and 19 to 26 feet deep; it has a gross storage volume of 705
acre/ feet, or 30.1 million cubic feet of water, but “negligible” usable
storage capacity because the dam is operated as a “run of river”
facility. See RA, State’s Exh. F at A-4. Moore Reservoir is approx-
imately 3,000 times the size of the Gilman impoundment, over five
(5) times as deep, and unlike Gilman, actually stores water rather
than releasing it “instantaneously.”

§ Because of all the complexities involved, most analysis of
water quality is done through computer simulations, although
actual sampling -— such as that conducted for G-P and Simpson
in 1985, 1990 and 1991, respectively — is obviously preferable.

" |

15a

This computer prediction of a small DO “sag” down-
stream of the Gilman dam is dependent on the simul-
taneous concurrence of at least four independent
variables: maximum wastewater discharges from both
the much larger James river paper plant in Groveton,
New Hampshire (which eventually enters the Connecti-
cut river upstream of the Gilman impoundment), and the
Simpson paper plant itself; low river flows at a level
called “7Q10” (the lowest average volume of water which
historically one can expect once every ten years over a
period of seven days), which was calculated to be 373 cfs:
and critically high summertime water temperatures. In
addition to the necessary convergence of those four pri-
mary factors, DEC staff also hypothesized a negative
effect from diurnal “flux caused by algal respiration and
photosynthesis.” PC 15.9 Finally, DEC included in its

° The theory of diurnal fluctuation due to stratification and
algal activity in Moore Reservoir was emphasized by DEC staff late
in the permit application and analysis process, as another justifica-
tion for DEC to increase its proposed spillage requirement from 185
cfs to 210 cfs. This additional or alternative justification for substan-
tial spillage became necessary because (a) the refined computer
model was demonstrating no DO violation of even “sag” in the first
2-plus miles below the dam, and at worst only a smaller decrease in
DO of 04 mg/I in Moore Reservoir, and (b) DEC staff realized its
error in assuming until then that the Gilman mill’s discharge
entered below the dam. It is evident from the “record” that until
June 1989, DEC staff had intended to use spillage over the dam as
additional “compensation” for the pollutant loading which they
erroneously thought Simpson was adding below the dam. See PC 58,
60. That fundamental error was apparently why DEC was originally
willing to agree that all WQS standards were met above the dam
(where the mill discharge actually enters); by June 1989 it was too
late for DEC to retreat from that agreement, so it scrambled to come
up with another justification for substantial spillage.

16a

analysis the effect of substandard DO levels upstream of
and passing through the dam, despite its agreement to
assume that DO levels adove the dam were in compli-
ance. PC 13-14, 15. By melding together these various
elements, DEC staff devised a theoretical “DO violation”
of 1.2 mg/l which Simpson would be required to “cor-
rect” through continuous spillage over 4'/2 months. PC
15, 20.

Because it is so demonstrably unlikely that all the
necessary variables would converge so as to create an
actual downstream DO sag as hypothesized by the com-
puter modeling, Simpson initially proposed instead a
“Water Quality Management Program” which would con-
tinuously evaluate river conditions from July 15 through
September 15 of each year, and automatically spill suffi-
cient water over the dam to prevent any predicted or
likely violation of DO standards below the dam. PC 14,
43-44, 47-52, 65-66. DEC staff repeatedly informed Simp-
son that they were not interested in any such manage-
ment techniques and would insist instead on a simple,
continuous spill requirement. Simpson continued to offer
to revise and expand the plan to meet specific technical
concerns, but was met only with DEC’s “historic resis-
tance” to all such proposals. PC 48. Simpson nonetheless
formally prepared a final revised management plan for
submission to FERC; it was also provided to DEC in
August 1989, just after DEC had issued the Section 401
Certification because of a one-year processing deadline.

IE LET Ee ae | OPTS pm

17a

Although G-P’s formal August 1989 submission is
not part of DEC’s formal “record,”1° Simpson’s proposal
for such a plan was clearly and continuously discussed
with and rejected by DEC. Also not included in the
administrative “record” are (1) a January 1990 “Report on
Additional Water Quality Modeling Study” which was
submitted to refine the June 1989 computer modeling
analysis by (a) determining a more modern and accurate
7Q10 flow volume, at 400 cfs rather than 373 cfs, and (b)
dividing the relevant portion of the River into five pri-
mary study “reaches,” both above and below the dam; (2)
a December 1990 Water Quality Monitoring Study, which
updated and verified the actual sampling data last taken
in 1985, between August 15 and September 19, 1990,"
and (3) a November 1991 letter with “Results of Summer
1991 Water Quality Monitoring” conducted over 48 hours
from July 22 to July 24, 1991.12 PC 77-78. This last effort to

10 The State ostensibly contends that “the record” should
include no materials or information after July 28, 1989, but has
no compunction against relying on such materials when that
suits its purpose. See text infra, at 32-33. In any event the admin-
istrative “record” when the agency proceedings are informal, as
here, cannot be so rigidly controlled. See Point I(A), infra at
18-19.

11 Average flow volume during the period was 1,892 cfs,
well in excess of the critical 7Q10 flow of 373 cfs. At the point 2.4
miles downstream in Moore Reservoir where the computer-
predicted DO “sag” might occur, the lowest actual DO measure-
ment was 7.8 mg/I (90.9 percent saturation) at a temperature of
21,86°C.

12 This sampling occurred when river flows ranged
between 500 and 550 cfs, conditions near the crucial 7Q10 flow
of 373 cfs. At the critical Moore Reservoir sampling point, at
temperatures exceeding 25°C (22°C was the input parameter in

18a

obtain actual DO sampling data at river conditions
approaching (and even exceeding) the critical parameters
used in the 1989 computer projections, could not have
occurred any sooner than July 1991 because the necessary
“low flow” conditions were simply never experienced
throughout the permitting process until July 1991.

SPECIFIC FACTUAL DETERMINATIONS

While the foregoing Statement of Facts provides an
overview of this appeal sufficient for the Court’s review
of Issues 1-3, there are some additional and detailed facts
which are necessary for consideration of Issues 4-7 relat-
ing to the merits of the 401 Certification and whether its
key findings and conclusions are supported by substan-
tial evidence and not arbitrary or capricious.%

(A) The 1989 Computer Modeling

There is no dispute that in June 1989, late in the one-
year review process allowed for 401 Certifications, Simp-
son and DEC finally agreed on a computer model to
stimulate DO conditions below the Gilman dam. It is this
theoretical modeling analysis that is the linchpin of
DEC’s continual spiliage requirement, and while there is

the 1989 computer projection), DO was never less than 7.55 mg/
1, well above the Vermont DO standard.

13 As below, by proceeding to this next level of “on the
record” analysis, Simpson in no way intends to waive its argu-
ments that this type of review in this particular case was and is
inappropriate and a denial of Simpson’s substantive and pro-
cedural rights.

LFS NEM TLR RENCE EL Seta ORR: Herken ws

19a

no real disagreement on what it shows, there is strong
argument on what it means.

The final revised “DOSIM” model runs prepared for
Simpson, with input variables apparently agreeable to
DEC,14 showed that (a) under possible 7Q10 (i.e., 373 cfs)
river flow conditions, (b) at summertime river tempera-
tures of 22°C (71.6°F), and (c) with all upstream point
source discharges at maximum permitted levels, down-
stream of the Gilman dam there could theoretically be a
“sag” or temporary decline in DO levels from 6.3 mg/I to
6.1 mg.; before recovering to 6.4 mg/l, at distances below
the dam of 1.5 to 2.4 to 3.5 miles respectively. PC 69-76. In
other words, if all of those conditions occurred simul-
taneously, the refined “DOSIM” model predicted that for
a stretch of approximately 0.4 of a mile - at a location
more than two miles downstream of the dam - there
could be a de minimis violation of Vermont water quality

14 Simpson’s engineering consultants considered DEC’s
“DOSIM” computer program to be more simplistic and less
reliable than another, newer program available. However,
because DEC coula only run “DOSIM” and was insistent on its
use, Simpson relented. Apart from DEC’s mistaken assumption
about location of the Simpson mill’s direct discharge, see fn. 9,
supra, the consultants also refined the “DOSIM”. model in June
1989 in several other significant ways: the assumed river tem-
perature was changed to 22°C, the number of study reaches
below the Gilman dam was increased from one to three, the
river velocities in each of those stretches was adjusted, and
certain pollutant decay rates were changed to more accurately
reflect “standard engineering practices.” See RA, July 1989 KA
Study, at 7-11.

20a

DO standards (0.1 mg/1 if the standard is 6.2 mg/1).15 Id.
This potential “sag” in DO levels downstream of the
Gilman dam was acknowledged to be no more than 0.4
mg/1 of DO before recovery, PC 67, and any part of this
theoretical DO “sag” which does occur would be well
within the summertime limits of the downstream Moore
Reservoir.'®

There is no predicted violation of the DO standard,
or even “sag” in existing DO levels, at any point in the 1.5
mile “riverine” and “transitional” sections of the River
below the dam, under all adverse conditions as premised
above, and in fact there is a predicted increase in DO of
0.1 mg/l. PC 76. Admitting for the moment that this
computer prediction is an accurate prediction of what
would actually happen in the river under stipulated criti-
cal conditions — a colossally incorrect assumption, as later
sampling data has shown, see Point III infra, at 30-31 — still
one searches in vain throughout “the record,” the 401

15 Actually, the DO standard at 22°C would be 6.12 mg/l,
but because the “DOSIM” model is less accurate, and to be
conservative, Simpson agreed that the standard could be
rounded off to 6.2 mg/l. See RA, July 1989 KA Study, pg. 7, 94.

16 As finally run, the “DOSIM” model (see PC 76) had three
study reaches below the Gilman dam: The first 1.0 mile, which
would be “riverine” in nature and allow for some natural reae-
ration over shallow rapids and/or riffles; a “transitional” reach
of 0.5 mile at the presumed entrance to Moore Reservoir; and
the final 2.0 miles which are well within Moore Reservoir both
in vertical profile and hydraulically. See RA, State’s Exh. 1, fig. 1.
“Run E” (PC 76) must be read in reverse; mile 3.4 under “Dis-
tance” is the base of the dam, while mile 0.0 is 3.5 miles down-
stream in Moore Reservoir. The hypothetical “sag” would be at
miles 1.3-1.1.

21a

Certification itself, or even the trial court’s findings, for
any remotely rational or scientific explanation and anal-
ysis of how this DO “sag” is in Moore Reservoir actually
caused by lack of spillage at the Gilman dam, rather than
the effect of Moore Reservoir on pollutants added
upstream and downstream of the dam.

(B) Frequency Of Necessary High Temperatures

The seven-day average summer high water tempera-
ture in the Connecticut River at the project site, which
was assumed for all the computer modeling runs in June
1989, is 22°C (71.5°F), based on daily temperature read-
ings from January 1979 to April 1989 (except June 1984 to
August 10, 1985). Seven-day average river temperatures
in excess of 21.1°C (70°F) have typically occurred for
approximately a four-week period, from July 10 to
August 6 of each year. Seven-day average river tempera-
tures exceeded 65°F for approximately a seven-week
period, from July 7 to August 27 of each year. The highest
absolute temperature recorded during the period was
26.4°C (79.5°F), from July 30 to August 3, the highest
seven-day average river temperature was 21.9°C (71.4°F)
for July 10 to July 17. See RA, July 1989 KA Report, at 2
and Fig. 1. No violation of Vermont’s DO water quality
standard is likely to occur when river temperatures are
65°F or lower. Id.

It is thus beyond any argument that even “the
record” before DEC showed that, at worst, the high river
temperatures necessary, by definition, to trigger the mod-
eled computer result could only occur during a seven to
eight week period in July and August. Notwithstanding,

22a

DEC imposed a continuous spillage requirement from
June 1 to October 15, 4!/2 months of every year.

(C) Frequency Of Necessary Low River Flows

River flows of approximately 375 cfs (the 7Q10 flow
was assumed to be 370 cfs for the “DOSIM” model runs;
New Hampshire had actually calculated 7Q10 to be 373
cfs) are exceeded approximately 96-97% of the time over
the entire period of record (1941-1982) at the nearest
USGS gauge. See RA, State’s Exh. F, at A-3 and Fig. A-1.
In other words, the flow conditions needed to produce
the model result will statistically occur only 3-4% of the
time. Put differently, no violation of the Vermont DO
water quality standard is likely to occur, even down-
stream in Moore Reservoir, at flows equal to or exceeding
800 cfs,17 PC 12-13, but during the months of July, August
and September — which encompass the period of highest
river temperatures — flows of 800 cfs are exceeded 80%,

17 At flows of 800 cfs, there is also no actual measured DO
violation in the impoundment behind the Gilman dam. At mea-
surement Station 4, just above the dam crest, the lowest mea-
sured DO level, at a depth of 25 feet, was 6.25 mg/I at 70.7°F. See
RA, Aquatec Date Report (August 12, 1985, 8:45 p.m.). The DO
level at Station 4 at depths down to ten feet ranged from 6.3
mg/l (August 12, 1985, 8:45 p.m.) to 8.6 mg/I at one-half foot
(August 12, 1985, 8:45 p.m.; August 13, 1985, 8:20 p.m.). The
1991 sampling data, see PC 77-78, confirmed there are no DO
violations in the Gilman impoundment even at lower flows of
500-550 cfs. This calls into question DEC’s essential premise -
see PC 59-61 - that DO conditions behind the Gilman dam are
actually substandard (even though it purported to agree DO
standards were met behind the dam).

23a

70% and 70% of the time respectively. Id., Exh. I, at 4 and
Fig. 4-6.

Based on “the record” evidence alone - once the
focus is limited to July and August when high enough
water temperatures might occur — it is again beyond any
genuine dispute that low flow conditions below the
State’s admitted safety threshold (800 cfs) are likely to
occur at worst 30% of the time. Over a 62 day period, that
results in an admittedly mathematical average of 18.6
days in which the modelled result might occur.!® While
Simpson understands the need to be more conservative
than the mathematical average, that hardly justifies an
exponential increase to 138 days of continuous spillage
regardless of actual river conditions.

(D) Simpson Constantly Attempted to Engage DEC
In Substantive Analysis Of A Workable Alterna-
tive To Continuous Spillage

Since late 1986, when required informal discussion
began for this certification process with DEC, Simpson
has proposed some form of water quality monitoring and
intermittent dam spillage to ameliorate any downstream
DO violations which might occur under modeled condi-
tions — even though those effects, if any, occur well into
Moore Reservoir and there is no scientific proof they are
actually caused by the Gilman dam’s traditional “run of
river” operation. See PC 14, 43-44, 47-52, 65-66. Simpson

18 Of course, it is arguable that the real incidence is only
3-4% of 62 days, or a potential 2.5 days, since that is the statisti-
cal occurrence, on this record, of 7Q10 low flows.

24a

was well aware from the outset that DEC had already
determined to impose a spillage requirement to aid in
general re-aeration of the river, if it could come up with
any arguable basis to do so.!9 See PC 40, and Point IV(A),
infra at 38-41. Thus by January 1987 Simpson had pro-
posed to spill 100 cfs of water over the dame at any time
between July 15 and September 15 that (a) flows were 500
cfs or less, and (b) background DO levels were 6.2 mg/1
or less. PC 50-52.

DEC’s response was curt: “Tom [Willard] indicated
that the Department has historically resisted management
of the resource on such a frequent basis.” PC 48. In fact,
almost all direct discharge (i.e., wastewater treatment)
permits have conditions requiring daily measurement
and monthly reporting of various water pollutants; the
required technology is-well-established and familiar to
DEC. Essentially the same proposal was still on the table
in April 1987. Simpson’s monitoring/spillage proposal
was reiterated in substance in May 1989; at that time the
proposal was not limited to any particular combination of
background flows, spillage (although the proposed quan-
tity was in fact increased to 130 cfs) or DO levels, but
simply whatever “spillage may be necessary to maintain
water quality standards for dissolved oxygen.” That
generic proposal was repeated again on July 24, 1989. See
RA, State’s Exh. L. DEC never abandoned its “historic
resistance” to any management and monitoring plan

19 The “record” totally refutes the trial court’s conclusion
that Simpson did not propose an alternative management plan
until it “realized that DEC was serious” in June 1989 about
imposing continuous spillage.

Reh OR 1 Snel dee MED CREE SE hale TUL a MONS Oe ee

25a

regardless of the specific details of the proposal. Simpson
never made the “formal” or “specific” proposal that DEC
and the trial court concluded should have been offered,
because the specific details were wholly irrelevant to
DEC inasmuch as it unilaterally rejected the entire con-
cept.7°

ARGUMENT

I. UNDER VERMONT LAW AND PRACTICE THIS
APPEAL SHOULD HAVE BEEN REMANDED OR
ACCORDED DE NOVO REVIEW

(A) De Novo Review Is Provided By Law And Prior
Practice

Rule 75, V.R.Civ.P., under which this action was
brought, does not itself provide for the type of standard
of review in a particular case; that determination is to be
made in light of all the circumstances in a given action.
The original Reporter’s Notes state: “Rule 75(d) leaves to
specific statute or prior practice the questions whether
review in a given case is de novo. ...” Since there is no
“specific statute” applicable here - in fact it was the
Legislature’s failure to provide for a specific route of
appeal from issuance of a Section 401 Certification,

20 DEC’s final memo on the Certification prior to issuance
noted concerns abut enforceability of any management plan
made a condition to a 401 Certification. PC90. Putting aside the
utter cynicism of such a stance, that logic would apply as well to
the spillage condition it did impose. This concern was and
clearly is make-weight.

26a

thereby requiring resort to Rule 75, that creates the pri-
mary procedural dilemma here — one must look to “prior
practice.”

One element of relevant prior practice is that until
the State raised its jurisdictional objections in the com-
panion case, all appeals of 401 Certifications were heard
de novo by the Water Resources Board. Equally telling is
that every other water quality permit or license issued by
DEC was then and still is subject to de novo review by the
Board. See 10 V.S.A. §§1024, 1099 and 1269. Inasmuch as
issuance of a Section 401 Certification must be limited to
water quality issues,2! see Arkansas v. Oklahoma, 60
U.S.L.W. 4176, 4181 (Nos. 90-1262, 1266) (Feb. 26, 1992)
and Point V, infra at 46-49, relevant Vermont practice
indicates that de novo review is not only appropriate but
necessary.

Chapin Hill Estates, Inc. v. Town of Stowe, 131 Vt. 10
(1972), supports a de novo appeal in this instance. In
Chapin Hill the taxpayer had no specific statutory route of
appeal from a town’s decision denying a request to abate
property taxes, so this Court held that a Rule 75 action
was appropriate. The Court also stated that the town’s
decision was reviewable “in the nature of certiorari,” id. at
13, even though it is unlikely that the town’s determina-
tion was made on anything close to a quasi-judicial basis.
Finally, because the “record” before the trial court was

21 DEC’s own regulations provide from processing of 401
Certifications as if they were applications for a discharge permit
under Chapter 47 of Title 10. See Vermont Water Pollution Con-
trol Regulations, Rule 13.11, 5 Code of Vermont Rules, pg.
12033002.

27a

inadequate and lacked at least one essential fact, the
Court held that “review in the nature of certiorari may not
be limited only to the facts as found in the record. Fur-
thermore, the reviewing court is not precluded from tak-
ing testimony.” Id. See also Pyles v. Schmidt, 141 Vt. 419
(1982) (trial court apparently took evidence and made
findings in Rule 75 appeal).

The decision in Chapin Hill has never been over-
turned or critically distinguished in the ensuing 20 years.
Nonetheless, more recent decisions speak of cases under
Rule 75 as actions “which are in the nature of certiorari
and which do not contemplate de novo review .. . [but
are] confined to addressing substantial questions of law
affecting the merits of the case.” Molesworth v. University
of Vermont, 147 Vt. 4, 6-7 (1986). Chapin Hill is not dis-
cussed or even cited in Molesworth, and there is no men-
tion in the latter case whether there was any deficiency in
the “record” or any disputed questions of fact. The legis-
lature had clearly delegated tuition residency decisions to
the University, and there was no similar practice - unlike
here where de novo appeal was before and is now avail-
able of all other water quality permits, including 401
Certifications - which would compel a different pro-
cedure. Finally, the plaintiff in Molesworth did have an
intermediate right to present evidence and develop an
adequate record at that stage.”

22 Vincent v. Vermont State Retirement Board, 148 Vt. 531
(1987), appears to be uninstructive. There was no material dis-
agreement as to any of the facts; the essential dispute was a
question of law only. In any event the Retirement Board is given
the authority to create administrative rules pursuant to 3 V.S.A.
§801 et. seq., which provide for “contested case” procedures

28a

Moreover, any rational view of orderly administra-
tive procedures must hold that the failure to provide
Simpson a “contested case” type proceeding before
DEC,?3 removes any justification for subsequent appellate
review solely “on the record” and under a “substantial
evidence/arbitrary and capricious” standard. Professor
Koch in his treatise states that this traditional rule of
deference to administrative proceedings typically “exists
when the [agency] decision was made through a formal,
trial-like proceeding.” 1 Koch, Administrative Law & Prac-
tice, 9.4, at 92 (1985 ed.) (fn. omitted). He continues: “the
substantial evidence standard [applies] where an admin-
istrative decision must be made through trial-type pro-
cedures . . . , ie., formal adjudication.” Id.

However, when informal adjudication procedures are
followed by the agency, as here, “the record may not be
sufficient for judicial review” and in these limited circum-
stances the court may take additional evidence to test the
agency’s findings and conclusions.?4 Id., §8.23, at 30 (1990

and thus provide benefit applicants with a fair opportunity to
present evidence and develop a formal record for later review.

23 Appellants are and were clearly entitled to a formal hear-
ing on their application. See 3 V.S.A. §814 (a) and Point II (A),
infra at 22-25. However, Simpson was caught in the catch 22 of
believing that it would get its opportunity for a “contested
case,” if one became necessary, at the Water Resources Board -
just like every other 401 applicant before and after. Thus there
was no need to raise that complaint at the DEC level. Once
relegated to Rule 75 review, Simpson has made this claim at
every opportunity.

24 “Under [de novo] review the administrative record
becomes an object of attack along with the relevant final deci-
sion. The challenger, like any other plaintiff, must show by a

.

29a

Supp.) (cits omitted); §9.3 (1985 ed. & 1990 Supp.). The
trial court should have done so here, not only because of
the highly probative additional evidence that has become
available, see PC 77-78, and because DEC arbitrarily
refused to consider a management plan alternative to
continuous spillage, but also because the “record” is sim-
ply too informal and too amorphous to support any rea-
soned and objective review of the agency’s final decision.

Past and present practice with regard to appeals of
Section 401 certificates; the established practice of de novo
review of all other water quality permits; any principled
view of fair and orderly administrative procedure; and
the demonstrated deficiencies in the informal “record,”
all argue in favor of de novo review in this instance.
Simpson should be provided the opportunity - which it
has never had - to demonstrate at a “fair hearing” with
all available evidence, that its proposed method of opera-
tion of the dam (including Simpson’s proposed summer-
time water quality management program) entitles it to an
unrestricted 401 Certification. At such a hearing Simpson
would bear the ultimate burdens of proof and persuasion
that continued “run of river” operation (as modified) of
the Gilman facility, does not and will not result in any
degradation of existing water quality or violate any water
quality standards. The trial court’s order should be
reversed and the case remanded for that purpose.

preponderance of the evidence in the judicial record that the
agency decision is wrong. In doing so, the challenger may intro-
duce into the judicial record other evidence or request new or
different inferences from the administrative record.” Id. §9.3, at
88 (1985 ed.) (fn. omitted).

si eT eT eee eT ee ee ea eee

30a

(B) Alternatively, The Trial Should Have Remanded
This Case To The Agency For Further Proceed-
ings?® Under Existing Rule 75 Practice

Burroughs v. West Windson Board of School Directors,
141 Vt. 234, 237 (1982), establishes that even though a
court under Rule 75 may have “jurisdiction in the nature
of an appellate court only,” id., if in the case there are
“factual issues requiring a hearing” then the court must
remand the case to the originating governmental entity to
hold such a hearing or at least resolve the factual dis-
putes. Id.26 Simpson has identified several substantial
areas where there is a dispute over material facts: Is the
theoretical DO “sag” problem in Moore Reservoir actu-
ally caused by the Gilman dam and hydro-electric works?
Has the State in fact acted on the erroneous assumption
that the Gilman paper plant’s wastewater discharge
enters the river below rather than above the dam? See PC
13-14, 15. Did DEC in its actual analysis renege on its
agreement to assume that all water quality standards
were met at the dam, and base its continuous spill condi-
tion at least in part on a contrary finding? Id. Does the

25 The scope of those further proceedings has changed dur-
ing the time this case was pending below. In Simpson’s view, the
1991 changes to 10 V.S.A. §1024 (a), providing that any action of
the agency with respect to 401 Certifications is appealable de
novo to the Board, makes it no longer necessary to hold a “con-
tested case” hearing before DEC because the proper remedy is
now provided by the statutory right of appeal.

26 See also In Re Classification of Airport & Pond Brooks, 142
Vt. 458 (1983) (remand for correction of signature errors); In Re
Williams Point Yacht Club, Docket No. $213-89 CnC (April 18,
1990) (remand for reconsideration of public trust issues).

3la

additional water sampling data obtained in 1990 and 1991
support the computer model's theoretical DO “sag” pre-
diction? What exactly are the necessary “details” of the
water quality management program which Simpson pro-
posed as an alternative to continuous spillage for 4'/2
months, which DEC has asserted were lacking? None of
these questions can even be addressed, let alone resolved
on any objective basis, on the administrative “record”
presently offered by the State.

Remand of this case to DEC for further consideration
of these issues and supplementation of the record, will
serve the ends of justice by assuring that the matter can
be determined on all the best evidence available. These
proceedings may well be Simpson’s only opportunity to
adjudicate substantially restrictive permit conditions
which will be imposed in connection with a FERC license
lasting at least 40 years. Moreover, the evidence excluded
from the informal administrative “record” indicates that
there is no reasonable likelihood of water quality degra-
dation from “run of river” operation even without contin-
uous summertime spillage, and thus there is no real
danger of prejudice if such a remand is granted.

Il. DE NOVO REVIEW OR REMAND SHOULD HAVE
BEEN PROVIDED TO REMEDY CONSTITUTIONAL
DEFECTS

(A) Due Process

Simpson has a substantial property right in the pre-
sent mode of operation of the dam and hydro-electric
works as a “run of river” facility without imposition of a
summertime (actually 4'/2 months) continuous spill

32a

requirement. It has been operated as such for the past 50
years, and Simpson has invested significant funds in the
facility. But for the intervention of Section 401 and its
requirement that a state water quality certificate be
obtained, Simpson would have the right, as a riparian
user under common law, to continue the present opera-
tion of the dam subject only to FERC relicensing. Cf. Gour
v. Morse, 652 F.Supp. 1166 (D.Vt. 1987) (day care opera-
tor’s fundamental property right in continued opera-
tion).27

Moreover, imposition of the State’s continuous spill
condition increases significantly the cost of operation for
the adjacent paper mill, which must then purchase com-
mercial power to replace the hydro-electric power unnec-
essarily lost because of the arbitrary spillage requirement.
The re-issued FERC license now sought will last at least
40 years, hence it is imperative that the 401 Certification,
which imposes conditions more restrictive than necessary

27 See also Burroughs v. West Windsor Board of School Direc-
tors, 138 Vt. 575, 578 (1980). The existence of a protected prop-
erty right in flexible and may depend on established
relationships, prior practice and existing understandings. State
law determines whether a property or other fundamental right
exists, while federal law provides the procedural protections
which must be made available under the due process clause of
the 14th Amendment to the U.S. Constitution. See Robinson v.
Via, 821 F.2d 913 (2d Cir. 1987). Other property or fundamental
rights which have been recognized include electric service. Con-
dosta v. Vermont Electric Cooperative, Inc., 400 F.Supp. 358, 365
(D.Vt. 1975); parental custody, Paquette v. Paquette, 146 Vt. 83
(1985); and entitlement to educational credits or degrees already
earned, Merrow v. Goldberg, 672 F.Supp. 766 (1986), 674 F.Supp.
1130 (D.Vt. 1987).

if
ai aiacaaiieta abeaineiieaaasieiieaiiai

33a

to protect water quality, be given the closest scrutiny.
Vermont law is clear that, at some stage, Simpson should
have been and must be provided with a trial-type, formal
adjudicative hearing which would include at the very
least “an effective opportunity to defend by confronting
any adverse witnesses” or evidence, and to rebut any
other information relied on by the agency,?® a complete
and formal record of the proceedings adequate for subse-
quent review or appeal; an impartial decision-maker,”?
and a clearly-stated effective right to further administra-
tive and/or judicial review. 1 Koch, Administrative Law &
Practice, §7.23, at 575-76 (fns. omitted). Simpson has
enjoyed none of those basic procedural safeguards. See 3
V.S.A. §809; Appeal of Stratton Corp., ___ Vt. __, 2 Vt. Law
Week 411, 412-413 (No. 90-278, 10/11/91) (“an adjudica-
tion based on the particular facts concerning specific

28 Only after-the-fact, in preparing for the case below and
reviewing the materials designated by the State as “the record,”
did Simpson discover that DEC had obtained and apparently
relied on a mass of Connecticut River data unilaterally retrieved
from an EPA “Storet” computer. See RA, Cueto Aff., 44
(3/18/91). Simpson never received any notice of this data
retrieval or any notice of what use DEC intended to make of it,
and thus no opportunity at all to rebut it or any inferences
drawn by DEC staff. This episode is simply illustrative of the
procedural infirmities which infected this informal permitting
process, in violation of Simpson’s substantial rights.

29 While it may be acceptable for a “contested case” type
proceeding to be presided over by an agency employee who has
been designated by the agency as an “independent” hearing
officer, even that fiction was not followed here. The 401 Certi-
fication was clearly prepared by the DEC staff which was acting
as witness, judge and jury simultaneously; the Commissioner’s
signature was nothing more than a rubber stamp. See PC 90.

34a

parties . . . triggers procedural due process concerns
[and] more formal, trial-type procedures”).

Instead, Simpson has been relegated to an informal,
ad hoc procedure - solely because of the then-uncorrected
oversight of the Vermont Legislature in designating DEC
as the State’s section 401 agent but not providing any
route of review, unlike all other water quality permits -
which does not even remotely provide even minimal due
process, fair hearing and appellate review rights. In stark
contrast the State does provide procedural safeguards,
the right to a full hearing, and specific appellate review
for everything from unemployment compensation bene-
fits, see Langlois v. Department of Unemployment and Train-
ing, 149 Vt. 498 (1988), to inmate disciplinary hearings, see
In Re Nash, 151 Vt. 1 (1988); from regulation of insurance
company assets, see In Re Ambassador Insurance Co., 153
Vt. 417, 423 (1989), to termination or non-renewal of
teacher contracts, see Burroughs, supra fn. 26; from a real
estate agent’s license, see In Re DeSautels Real Estate, Inc.,
142 Vt. 326 (1982), to all manner of land use and environ-
mental permits, see 10 V.S.A. §§ 6085, 6089(a) (Act 250
permits) and 24 V.S.A. §§ 4471, 4475 (local zoning or
planning permits).

Before Simpson’s property rights in the present mode
of operation of the dam can be abridged or circumscribed
as the State seeks, Simpson must be provided at least one
effective and procedurally adequate opportunity to make
its case. Denial of such an opportunity to marshall its
evidence and fully explain and support its proposals
violates its rights to procedural and substantive due pro-
cess, and may even result in an unconstitutional taking of
Simpson’s property for public regulatory purposes. Cf.

35a

Nollan v. California Coastal Comm., 483 U.S. 825 (1987);
Bryant v. Town of Essex, 152 Vt. 29, 38 (1989); Perry v.
Department of Employment and Training, 147 Vt. 621, 623-24
(1987); Petition of Green Mtn. Power Corp., 131 Vt. 284, 293
(1973). Accordingly, construing Rule 75 in this apparently
unique circumstance to provide for de novo review, or
alternatively for a remand to DEC, not only appears to be
consistent with Vermont law and prior practice, it is the
only means available to avoid what would otherwise be a
substantial violation under both the United States and
Vermont Constitutions. See e.g., Vincent v. Vi. State Ret.
Bd., supra, 148 Vt. at 534 fn. 2 (Chap. I, Art. 4 of Vermont
Constitution construed to provide judicial review of
administrative decisions).

(B) Equal Protection

With the passage during the 1991 legislative session
of H.353,5° de novo review of all 401 Certifications by the
Water Resources Board, with all necessary APA trappings
- including a trial-type hearing, the right to confront
witnesses, and an impartial and detached decision-maker
~ has been confirmed. Simpson has thus become the only
Section 401 applicant in Vermont history - past, present
or future - who will have been denied the right of and
opportunity for review of a 401 Certification with a full
and fair hearing under minimal evidentiary and pro-
cedural safeguards. While it may be that this system of
informal DEC review followed by de novo review of 401

30 See 10 V.S.A. § 1024(a) (as amended).

36a

Certifications need not have been provided,! the Legisla-
ture has in fact done so for everyone but Simpson. Such
clearly disparate treatment has no rational basis and can-
not be sustained under either the Vermont Constitution,
Chap. I, Arts. 4, 7 and 9, or the 14th Amendment to the
United State’s Constitution. See, e.g., Alexander v. Town of
Barton, 152 Vt. 148 (1989). The legislative scheme as now
enacted for Section 401 appeals “ensnares” one individ-
ual entity, without any identifiable public good or benefit,
and without furthering any legitimate public purpose. See
Choquette v. Perrault, 153 Vt. 45 (1989).52

Rule 75, V.R.Civ.P., does not deny Simpson a de novo
hearing, but leaves that determination to be made under

31 However, for the reasons just stated, some kind of “con-
tested case” license proceeding is required at some stage
because of due process concerns.

32 The State will likely argue that the Legislature was pro-
hibited from allowing retroactive application of its 1991 curative
amendment to 10 V.S.A. § 1024(a). First and foremost, it was the
Legislature’s initial failure to provide a clear administrative
adjudicative system in this instance, that created the problem.
Second, legislation can in fact be retroactive if the Legislature so
states. See Burlington Firefighters’ Assoc. v. City of Burlington, 149
Vt. 293, 296 (1988). Third, the pending litigation over the Certi-
fication was no reason to deny relief; this was a procedural issue
only, and remedial legislation would not have affected the merits
of whether Simpson is entitled to a 401 Certification without
continuous spillage. See Myott v. Myott, 149 Vt. 573 (1988). More-
over, the Legislature has acted when the effect is potentially to
help one litigant over another in pending litigation. See, e.g., 8
V.S.A. § 2201 (as amended 1991). Fourth, this would not have
been “special litigation” designed to treat Simpson differently;
it would have simply insured that Simpson was treated just like
all other Section 401 applicants.

cial

37a

other existing law. Nor does Rule 75 prevent a remand to
DEC, for the reasons stated. Given all of the circum-
stances, de novo proceedings in this case, or alternatively
a remand to DEC, were required to eliminate an other-
wise unequal and unconstitutional burden placed on Sim-
pson alone. The judgment below should be reversed and
the case sent back to the trial court in accordance with
that principle.

III. THE TRIAL COURT ABUSED ITS DISCRETION IN
DECLINING TO REMAND THE CASE TO DEC

This case should alternatively have been remanded to
DEC, as a matter of the trial court’s inherent discretion, to
cure evidentiary defects and for DEC to reconsider the
entire application. Remands to administrative agencies or
tribunals for reconsideration have been granted in a
number of cases involving land use and other environ-
mental issues. See, ¢.g., In Re Maple Tree Place, 2 Vt. Law
Week 184 (May 17, 1991); Conservation Law Foundation v.
Burke, et al., Docket No. 1709-90 CnC (Chitt. Super. Ct.,
April 10, 1991) (Katz, J.); In Re Williams Point Yacht Club,
Docket No. $213-89 CnC, (Chitt. Super. Ct., April 18,
1990) (Martin, J.).

As argued previously, the matter can be remanded to
DEC, consistent with Rule 75, when it appears there are
essential issues that have not been initially decided by the
agency, or that “the record” needs to be supplemented
with additional evidence to make it complete and provide
a thorough basis for the agency’s decision. See In Re Maple
Tree Place, supra; Burroughs v. West Windsor Bd. of School
Dirs., supra., 141 Vt. at 237. Maple Tree Place squarely

38a

holds that “trial courts reviewing administrative deci-
sions have the inherent or implied authority to remand
the matter to the administrative agency in the interests of
justice.” 2 Vt. Law Week at 186 (cits omitted). The Court
then approvingly quoted the following rationale from the
Washington Supreme Court:

The provision for such a remand would seem to
be intended as a safety valve, permitting the
reviewing court to require a second look at situ-
ations and conditions which might not warrant
a reversal, but which, to the court reviewing the
record, would indicate to it that the . . . Com-
mission may have acted on incomplete or inade-
quate information; or may have failed to give
adequate consideration to an alternative route; or
may have weighted its evaluation of the matter
under consideration with the theory of the com-
plete infallibility of its own engineers.

Id. (cit. omitted) (emphasis added).

Those very concerns are evident here. In Maple Tree
Place the permit applicant wanted the administrative
body to reconsider its plan for phasing of a proposed
development; here Simpson contends DEC should at the
very least reconsider its arbitrary rejection of the pro-
posed spillage management plan, particularly in light of
the additional and previously unavailable 1991 evidence
of actual water sampling showing no DO violations
under critical conditions. This Court found that the per-
mit applicant should be given the opportunity to make

39a

that request of the administrative body, and so affirmed
the remand order. Id. 186-187.%°

Most crucially, there has been no objective, substan-
tive consideration by DEC of Simpson’s proposed mon-
itoring and management plan, and whether it would in
fact reasonably address any legitimate water quality
objectives. Cf. In Re Maple Tree Place. Also, there is lacking
in “the record” and DEC’s explanation and findings any
rational analysis of or support for either the magnitude or
time-duration of required spillage. Finally, there would
be no “prejudice” to the people of Vermont from such a
remand, in light of recent actual sampling data. PC 77-78.

The trial court misunderstood Simpson’s reliance on
Maple Tree Place in stating that a remand depends on a
party being “misled” at the administrative level. PC 35.
Simpson has never contended that it was “misled” about
DEC staff’s “historic resistance” to any type of manage-
ment plan; in fact, the complaint is just the opposite -
DEC’s open hostility to the entire concept made any
consideration of any specific or detailed proposal a use-
less gesture. Thus Simpson was in that sense effectively
“prevented from proposing [its] plan” in any meaningful
way or with any hope of truly constructive dialogue,
because DEC was always intent on spillage no matter

33 It is ironic that in Maple Tree Place, the major countervail-
ing consideration against a remand was the argument that statu-
tory de novo review of planning commission decisions prohibits
a remand for reconsideration. The Court found it does not. Of
course, no such consideration is present here - it is the failure to
provide de novo review (or some type of “contested case” pro-
ceeding) at any stage that is the problem.

40a

what the actual water quality ramifications.>4 Similarly,
Simpson made no “deliberate litigation choice” not to
propose a detailed management plan; its initial attempt to
do so, as early as January 1987, was rebuffed with the
¢lear message that any further efforts would be a waste of
time. Nonetheless, Simpson did continue to offer its pro-
posal and to prepare a more detailed plan, without DEC
input, resulting in the formal August 1989 draft.

The trial court’s analysis under the standards set out
in Maple Tree Place appears not to address some of the
important factors discussed by this Court. Although the
use of remand to an administrative agency as a “safety
valve” is briefly mentioned, no extended discussion was
provided of Simpson’s contention that this case is pre-
cisely one of those where the agency “may have failed to
give adequate consideration to an alternative route; or may
have weighted its evaluation . . . with the theory of the
complete infallibility of its own engineers.” 2 Vt. Law
Week at 186 (cit. omitted) (emphasis added).

At bottom the justification for remand under Maple
Tree Place is the “interests of justice,” id., which includes

* DEC staff’s assertion that an expensive, time-consuming
“intensive assimilative capacity analysis” — generally required
only for new sources of actual pollution discharges - was
required, PC 54, was simply DEC’s way of providing some
cover for its arbitrary decision not to consider any management
plan and instead to require maximum spillage. Id. The issues of
what magnitude and frequency of spillage is necessary to
address actual DO concerns, and what basic monitoring and
operational equipment is necessary to accomplish that result,
are not rocket science and no complex analysis was or is neces-

sary.

4la

but is not limited to the same considerations which
would justify a granting of relief from judgment under
Rule 60(b), V.R.Civ.P., see id. at 187. One of the well-
known grounds for relief in such instances is “newly
discovered evidence which by due diligence could not
have been discovered ...” Rule 60(b)(2). Subsequent
actual sampling above and below the Gilman dam has
confirmed that even at low flow conditions near the
critical 7Q10 level, and at temperatures which exceed the
critical 22°C level assumed in the predictive model, there
is still no DO violation at any relevant sampling point,
including the crucial Moore Reservoir, and indeed all
readings, except those at the mouth of the Johns River
upstream, are well above the DO standard of 6.2 mg/l.
See PC 77-78.

This actual sampling data was simply unavailable
during the period the Certification application was pend-
ing before DEC, and no amount of diligence on Simpson’s
part could have gotten it any sooner because river flow
levels are entirely beyond their control and during the
past several years have not even approached the critical
7Q10 level until the relative “drought” conditions of the
summer of 1991. If nothing else, this data casts consider-
able doubt on the efficacy of the computer model all
parties have relied on until now,°5 as wel! as DEC’s basic

35 At flow levels of 525 cfs on July 22, 1991 at 12 noon, and
temperatures above 25°C, DO readings ranged from 8.5 mg/l
just below the dam, to 8.6 mg/l further downstream at the
Gilman Bridge, to 8.1 mg/l at the relevant Moore Reservoir
sampling station; at 8:00 p.m., the DO readings there were 9.2,
9.1 and 9.2, respectively. PC 77-78. Defendants are certain to
complain that Simpson cannot be heard now to discount the

42a

operating premise that this reach of the Connecticut River
is already subject to “severe,” “critical” or “substandard”
DO conditions. A remand to DEC for reconsideration and
re-evaluation is entirely appropriate if not mandated by
the essential teachings of Maple Tree Place and Burroughs v.
West Windsor Board of School Dirs.

Finally, the trial court’s application of Maple Tree Place
apparently requires Simpson to prove in advance that a
remand to DEC “would serve [some] useful purpose.”
This requirement does not appear in either In Re Maple
Tree Place or Burroughs. The fact that DEC has not yet been
persuaded of the efficacy of Simpson’s proposals during
“informal discussions” during initial permit processing
or while this action has been pending (see PC 79-80), is
neither surprising nor conclusive. DEC has always had
one objective: to require continuous spillage for 4'/2
months for generalized aesthetic and recreational rea-
sons, and because it mistakenly believed until the last
minute that the mill’s direct discharge entered below the
dam. If, however, a remand were required by this Court
because Condition A as it stands is arbitrary and unrea-
sonable, or because such reconsideration is required in

very computer modeling it prepared and submitted during the
application process. The real point is that computer models are a
poor but sometimes necessary substitute for actual field data,
and that adequate sampling data simply was not available then
but is now. Summary rejection of clearly relevant evidence that
simply was not available before, begs the inevitable question
whether this process is ultimately a search for the truth and an
honest effort to address any water quality problems that actu-
ally exist below the Gilman dam, or is it something else entirely?

43a

the name of fairness and due process, such reconsidera-
tion is required in the name of fairness and due process,
DEC’s willingness to consider a management proposal
seriously, and pay it more than lip service, would
undoubtedly be greatly enhanced.

Secondly, the trial court’s reliance in this regard on
FERC’s preliminary Environmental Assessment in this mat-
ter — which the State submitted below —- only complicates
the issues. See PC 35-36. FERC’s analysis is ostensibly
independent and separate from DEC’s determination
under Section 401, and obviously occurred well after the
“record” in this case is asserted to have closed; it is
certainly nothing that DEC relied on in continually reject-
ing Plaintiffs’ voluntary spillage proposals from January
1987 on. To suggest that DEC staff would not give the
issue a full and fair reconsideration on remand because
FERC staff had purportedly come to its own conclusions,
would fly in the fact of ordinary presumptions that mat-
ters are not prejudged, even by administrative agencies,
until all the evidence is heard. Additionally, as noted
below, Simpson has strongly objected to the EA issued by
FERC staff and it has yet to be adopted by the Commis-
sion itself.

On the other hand, if such emphasis is given to
FERC’s preliminary comments regarding Simpson’s pro-
posed management plan, then FERC’s approach to such
issues generally becomes fair game. In fact FERC does not
generally consider such management plans to be
“unworkable” or “flawed,” and only recently has indi-
cated it will accept, if not impose a quite similar DO
monitoring and “as necessary” spillage requirement on

44a

the Central Vermont Public Service hydroelectric project
on the Lamoille River at Clarks Falls.56 See RA, Attach-
ment B to Appellants’ October 21, 1991 Motion to Amend.
It is thus questionable whether the EA prepared by FERC
staff in this case is really an independent analysis of the
water quality issues, or simply FERC stan's adoption of
Vermont DEC’s flawed analysis.

IV. EVEN ON “THE RECORD” INFORMALLY CRE-
ATED BY DEC, THE CONTINUOUS SPILLAGE
REQUIREMENT IS UNSUPPORTED BY SUBSTAN-
TIAL EVIDENCE AND IS ARBITRARY AND
CAPRICIOUS

Simpson disputes that the traditional rule of defer-
ence paid to administrative agency determinations, is
applicable here because no formal trial-type or “contested
case” proceedings were held below. Indeed that defect
contaminates the whole case and requires reversal and
remand to the trial court to hold de novo proceedings, or

36 The Lamoille Project’s monitoring requirements and “as
necessary” spillage condition is not FERC’s first or only
approval of such management plans. In 1989 FERC licensed 14
separate projects in the Upper Ohio River basin, each with their
own similarly crafted monitoring and operational plan
“whereby project operation could be rapidly altered to ensure
maintenance of a minimum DO concentration” in downstream
segments. See The City of Pittsburgh, Order Issuing License, 48
FERC 61, 362 at pg. 62, 302 (Sept. 27, 1989). See also In Re
Potomac Edison Co., 34 FERC 461,085 (1986), and Order on
Rehearing (June 7, 1991) (licensee simply required to maintain
minimum DO level of 5.0 mg/I, through monitoring and what-
ever means chosen by licensee).

45a

to DEC for further review and reconsideration. See Points
I-III, supra.

The cases generally cited by the State for the contrary
proposition — Caledonian Record v. DET, 151 Vt. 256 (1989);
In Re Tariff Filing of Green Mountain Power, 138 Vt. 213
(1980); Whitcomb v. DET, 147 Vt. 525 (1986) — all involved
appeals on a record created before an independent quasi-
judicial board or tribunal (e.g., the Employment Security
Board, or the Public Service Board), with established
evidentiary and procedural rules and an opportunity to
be heard in a careful and deliberate manner. If one traces
through the chain of citations found in the Vermont deci-
sions discussing the “scope of review” in administrative
appeals, ultimately every single one depends on the basic
principle of deferential review and presumptive validity
established in cases where there was a hearing before and
record created by a quasi-judicial board, or at least a
“contested case” type proceeding within the agency
under the Administrative Procedure Act, 3 V.S.A. §801 et
seq. (“APA”). See, e.g., In Re Handy, 144 Vt. 610 (1984); In
Re Devoid, 130 Vt. 141 (1972).

State Dept. of Taxes v. Tri-State Ind. Laudries, Inc., 138
Vt. 292 (1980), is an earlier administrative review case
that is often cited as the source of the judicial deference /
presumptive validity standard. Tri-State involved an
appeal of a withholding tax deficiency assessment; the
appeal to Superior Court followed a “contested case”
hearing in the Department of Taxes under the APA. Id. at
293, 295. This Court was careful to premise its holding on

that fact:
\

46a

[W]here the parties have had an opportunity to
develop the facts before the agency, the function
of the courts is solely to review the contested
case on the record established below . . . These
[APA] procedures include, inter alia, notice of
the hearing; opportunity for all parties to pre-
sent evidence, cross-examine witnesses, and
respond on all issues involved according to the
rules of evidence normally applied in superior
court; and maintenance of a full record of all
pleadings, rulings, evidence, exhibits, matters
officially noticed, offers of proof, and findings
and decisions.

Id. at 295 (cit. omitted). Indeed an actual “transcript” of
testimony was produced in Tri-State, as is the case in
almost all appeals from “contested case” proceedings.

This Court has more recently affirmed that where
this fundamental premise for the presumptive validity /
judicial deference standard does not exist, the administra-
tive decision is not treated as a Delphic oracle and will be
reversed. See In Re Petition of Burlington Electric Dept., 149
Vt. 300, 303 (1988). In that case the Court unequivocally
stated that:

this tenet [the presumptive deference standard]
only holds true where the administrative pro-
ceedings have provided notice and an oppor-
tunity to be heard .. . ‘the parties [are] given an
adequate opportunity to prepare and respond’

to the controlling issues ... the find-
ings . . . [are] ‘based exclusively on the evidence
and on matters officially noticed .. . ’ [and]

there [is] ‘full disclosure of the criteria under-
lying’ the order.

Id. at 303 (cits. omitted).

47a

The proceedings below lack all of the essential attrib-
utes noted in both Tri-State and BED. There was no real
and meaningful opportunity to be heard and create a
formal record for review, especially since the “controlling
issues” and “underlying criteria” were constantly shift-
ing, particularly late in the process when the Certification
was about to be issued in final form. As even DEC’s
“record” demonstrates, at the literal eleventh hour ~ after
Simpson’s consultants had reworked and refined DEC’s
“DOSIM” model with reasonably accurate input vari-
ables, which then showed no downstream DO violations
immediately below (i.e., for 1.5 miles) or attributable to
the dam, and at worst a D.O. “sag” of only 0.4 mg/I of
unknown cause 2.4 miles into Moore Reservoir — “diurnal
flux” suddenly became the issue.” Simpson attempted to
respond informally in the little time left; DEC’s response
was that it “understood the concept” of why “diurnal
flux” should not matter from a regulatory standpoint, but
simply “wouldn’t accept the argument.” See RA, July 1989
KA Report, at 13-14 & App. B Tel. Notes (7/19/89).

While Simpson disputes, for all of these reasons,
application here of the judicial deference /presumptive
validity standard, there can be distilled from some of the

37 The State’s essential premise on “diurnal flux” is sim-
ilarly unsupported by any evidence or objective analysis in “the
record” or the Certification itself. DEC staff simply “assumes
predicted DO analysis would be in the middle of this range [i-e.,
the computer model results}.” RA, July 1989 KA Report, at App.
B Tel. Notes (6/21/89). In this way an additional 0.8 mg/l of DO
was required to be compensated for, which constitutes 2/3 of
the purported “violation.” See PC 67.

48a

same cases a “standard of review” that is more appropri-
ate to this case if Simpson is, as a last resort, relegated to
that type of appellate review. In that event Simpson car-
ries the burden of demonstrating that DEC’s Condition A
is unsupported by the evidence or is arbitrary or capri-
cious. That burden will have been met by showing that
based upon the entire “record,” with the weight of
detracting evidence factored in as well, see 2 Koch, supra,
§9.2, at 73 & fn. 13 (1990 Supp.), there is no fair and
reasonable basis for DEC’s findings and conclusions on
this issue. Tri-State, supra, 138 Vt. at 294; In Re Orzel, 145
Vt. 355 (1985); Clark v. Weinberger, 389 F.Supp. 1168 (D.Vt.
1974), aff'd, 511 F.2d 1390 (2d Cir. 1975). In other words,
Simpson can show that DEC’s Condition A is not sup-
ported by “substantial evidence” if it demonstrates con-
tinuous spillage for 4'/2 months is based on evidence
which no reasonable person would accept as adequate to
support DEC’s conclusion. In Re McShinsky, 153 Vt. 586,
589 (1990).

When the uncontested evidence in this “Record” is
that the theoretical “sag” of 0.4 mg/I in DO levels more
than two miles downstream of the Gilman dam is
unlikely to occur 70% of the time or better and only in
July and August, if at all,38 and when the evidence is
clear that Simpson for more than three years proposed to
implement any reasonable monitoring and spillage plan
that would correct any actual or anticipated DO defi-
ciency in Moore Reservoir (even though the Gilman dam

38 It is conceded by DEC that at flows of 800 cfs or greater,
which do occur 70% or more of the time, no DO violation will
occur. PC 12-73.

49a

has not been shown to be the cause of that “sag”), imposi-
tion of Condition A requiring continuous spillage of 210
cfs every minute for 4'/2 months is arbitrary, unreason-
able, and unsupported by any relevant evidence which a
rational, unbiased person would find adequate. As the
Certification itself admits: “No-attempt was made to
determine the mixed [DO] concentrations necessary at
different river discharges in order to assure that the
downstream [DO] sag remains above standards.” PC 13.

Even if the impact of “diurnal flux” is included, it is
still evident that, irrespective of the necessary amount of
spillage (and that is all that “diurnal flux” adds to the
debate; whether a violation could occur at all is still
dependent entirely on the “DOSIM” computer predic-
tion), the “continuous” and “June 1 to October 15”
aspects of Condition A are wholly irrational, overbroad
and lack any fair and reasonable basis in “the record.” It
is clearly unnecessary in both magnitude of spillage and
time of duration to address any predicted DO “sag” in
Moore Reservoir — even assuming, which Simpson does
not concede, that the theoretical DO “sag” in Moore
Reservoir can be traced back to its doorstep at all.

Thus, while the punishment here does not even fit
the crime, the “record” fails to demonstrate that a crime
has actually occurred or that Simpson is the guilty party.
The most telling deficiencies, both analytically and/or
factually, are as follows:

50a

(A) DEC Was Pre-Disposed To Impose A Spillage
Requirement Based On Fundamentally Erro-
neous Misconceptions About The River And
Simpson’s Facility

In 1985 DEC issued to G-P a previous Section 401
Certification in connection with G-P’s replacement of one
of the four turbine/generator units at the project. In that
1985 Certification DEC stated, in part:

Due to pollutant loading and reduced re-aera-
tion caused by impounded waters and diversion
of flow at dams, there is a critical dissolved
oxygen problem in the Connecticut River.

. the Department will investigate oppor-
tunities to increase re-aeration at this site during
the relicensing process.

PC 40. As of April 1985, however, the only water quality
study actually conducted of the upper Connecticut River
indicated only that “model predictions show that Class B
standards may be violated in a substantial portion of the
study area during critical low flow conditions.” See RA,
1983 Metcalf & Eddy (“M&E”) Modeling Study, at 3-1
(emphasis added). Moreover, the same engineers clarified
their computer model predictions and conclusions in a
subsequent report prepared for these licensing proceed-
ings:

Modeling results indicated probable water qual-

ity standard violations under critical low flow

conditions for a substantial portion of the study

area. ... the large DO [dissolved oxygen] sag
from about river mile 324 to 312% is caused by

39 The Gilman dam is downstream, at about river mile 300.

5la

BOD [biochemical oxygen demand] exertion
from the James River discharge and by sediment
oxygen demand through this region.

See RA, 1985 M&E Study, at 2-4 (emphasis added). Clearly
it was the reach well above the Gilman dam that was the
focus of concern.

The James River Corporation paper plant in Grove-
ton, New Hampshire on the Upper Amonoosue River,
which empties into the Connecticut River upstream of the
Gilman project, has always been known and acknowl-
edged by DEC to be the largest single cause of dissolved
oxygen deficiencies in the upper Connecticut River:

The major affector of water quality in this reach
was the James River Corporation paper plant in
Groveton, New Hampshire. . . . the dissolved
oxygen levels incoming to any given project
along this reach are very dependent upon the
magnitude of the James River discharge.

PC 45-46. M&E 1983 concluded, however, that actual
“dissolved oxygen measurements taken above and below
the Georgia-Pacific Dam indicate a decrease [in DO
levels] averaging 0.1 mg/l.” Id., at 2-22. These measure-
ments were taken with the project in a normal operating
mode - i.e., passing all or most flows through the tur-
bines - and demonstrate that any DO deficit actually
caused by the Gilman project in 1983 was “negligible” (an
average of only 0.1 mg/l) and certainly not “critical.”
Intensive actual DO measurements over 48 hours in
August 1985, above and below the Gilman Dam, further
proved that at flows of approximately 800 cfs, there is no

52a

DO deficit caused by the project itself, and certainly not a
“critical” one.

The “record” relied on by DEC thus has never sup-
ported DEC’s 1985 premise that in this specific segment
of the Connecticut River applicable to the Gilman project,
there is a “critical dissolved oxygen problem” due to
“reduced re-aeration caused by impounded waters and
diversion of flow at dams.” PC 40. That incorrect and
unsupported premise has never been abandoned by DEC,
and from 1985 to the present has compelled DEC to
“investigate opportunities to increase re-aeration at this
site” — i.e., seek to condition this Section 401 Certification
with a continuous spillage requirement - without regard
to objective evidence of the Gilman project’s actual effect,
or lack thereof, on water quality standards. From the
outset DEC knew its stance was flawed and accordingly
this Certification would be “a major battle” (PC 58) and
that Simpson “disputed our findings and may appeal”
(PC 90).

Thus, in April 1987, before Simpson had formally
submitted its application for 401 Certification, and before
either DEC or Simpson’s consultants had performed any
of the more current computer model analyses of the
Gilman project’s actual effect on water quality, DEC again
confirmed its intention to impose a continuous spillage
requirement. PC 54. A year later, which was still before
any formal application, a continuous spillage requirement

*# Actual DO readings below the dam in 1985 ranged froma
low of 6.5 mg/l to a high of 8.05 mg/I at the bridge about 1,800
feet downstream of the dam, and from 7.1 mg/I to 9.45 mg/!
even further downstream. See RA, State’s Exh. I, App. C.

53a

was still uppermost on DEC’s agenda. PC 56. The initial
draft Certification prepared by DEC in January 1989, well
before any of the June 1989 computer modeling analyses
(upon which DEC now purports to base the permit) had
been performed, sought to impose a continuous spillage
requirement of 185 cfs. See RA. State’s Exh. L.

There is no “record” evidence that DEC indepen-
dently conducted more than one run of its own “DOSIM”
computer model analysis of predicted water quality
impacts caused by the Gilman dam project, in November
1988. PC 59-64. The only additional computer modeling
analysis, which was done in June 1989, was actually per-
formed by Simpson’s consultants, using modified input
parameters dictated by DEC. See RA, July 1989 KA Mod-
eling Study, at 7-11, 15-16, and Appendix B. Yet before
that final analysis was even undertaken, let alone com-
pleted, DEC in January and in May 1989 had already
decided to impose a continuous spillage requirement of
185 cfs, see RA, State’s Exh. L.*1 The compelling conclu-
sion is that since at least 1985 DEC has had the unswerv-
ing intention to require significant, continuous spillage at
the Gilman dam, come hell or high water.

‘1 The purported “sag” was 1.0 mg/I in the only DOSIM
run of record prepared by DEC (11/88) (PC 63), compared to 0.4
mg/l in “Run E” (6/89) (PC 76). Meanwhile, the spillage
requirement increased inversely, trom 100 cfs to 185 cfs in May
1989, to 210 cfs. in June 1989.

54a

(B) DEC’s “DOSIM” Model, Even After Refinement
By Simpson’s Consultants, Does Not Demon-
strate A Water Quality Violation Caused By The
Gilman Dam

“Run E” of the “DOSIM” model prepared by
Kleinschmidt Associates predicted a theoretical “sag” in
DO levels more than two miles downstream of the dam in
Moore Reservoir, of approximately 0.4 mg/I, under mod-
eled assumptions for critical low flows, high summer
temperatures, and maximum upstream wastewater dis-
charge levels. Nothing more, nothing less. The model
simply does not and cannot identify the “cause” of this
temporary “sag” in DO levels well into Moore Reser-
voir,#2 and there is no real analysis in “the record” or
discussion in the Certification to the contrary.

The Gilman dam and hydro-electric facility, and its
usual “no spill” mode of operation at river flows between
130 cfs and 2,850 cfs when all water passes through the
turbines, passes all river flows “instantaneously” and

«2 The “DOSIM” model also cannot calculate or account for
the effect of “diurnal flux” which DEC latched onto late in the
permitting process. Nowhere in “the record” is there any men-
tion of “diurnal flux” as a basis for spillage until June 1989. That
DEC staff may have latched on to data earlier submitted to
buttress their argument, does not show that the State’s early
DOSIM modeling “accounted for diurnal flux,” because the
model itself cannot. See PC 67. Fi

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386011_1796%3A4. Public record. Not legal advice.
