# Petition for Writ of Certiorari — Great Lakes Dredge & Dock Co. v. United States

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386009_1160%3A1

## Record

- **Collection:** Supreme Court brief
- **Document type:** Petition for Writ of Certiorari
- **Published:** January 1, 2002
- **Citation:** 535 U.S. 955

## Text

@ Fires
011152 FeB - 4 2002

OPFICE OF THE CLEA
No.

In The
Supreme Court of the United States

+
GREAT LAKES DREDGE & DOCK COMPANY,

Petitioner,

VS.

UNITED STATES OF AMERICA,

Respondent.
¢

On Petition For Writ Of Certiorari
To The United States Court Of Appeals
For The Eleventh Circuit

ee
Vv

PETITION FOR WRIT OF CERTIORARI
®

JoHN W. Ketter, Esa.
JoHN Ketter & Associates, P.A.
121 Majorca Avenue, Suite 200

Coral Gables, FL 33134
Tel: 305/445-7801
Fax: 305/445-8920

Mark Hicks, Esa.
Counsel of Record
Hicxs, ANDERSON & KNEALE, P.A.
799 Brickell Plaza, Suite 900
Miami, FL 33131
Tel: 305/374-8171
Fax: 305/372-8038
Attorneys for Great Lakes

I.

Il.

Ill.

QUESTIONS PRESENTED

Whether a nonsettling defendant found liable under
the National Marine Sanctuaries Act, 16 U.S.C. §1431
et seq., is entitled to credit for plaintiff’s settlement
with a joint tortfeasor based on the “proportionate
share” approach set forth in McDermott, Inc. v.
AmClyde, 511 U.S. 202, 114 S.Ct. 1461, 128 L.Ed.2d
148 (1994).

Whether the United States has a right to recover
damages under 16 U.S.C. §1443 of the National
Marine Sanctuaries Act where the lands and injured
natural resources at issue are owned by and under
the jurisdiction of a sovereign State, and the United
States has no proprietary interest therein as required
for the recovery of damages under Robins Dry Dock
& Repair Co. v. Flint, 275 U.S. 303, 48 S.Ct. 134, 72
L.Ed. 290 (1927).

Whether the “superseding cause” defense set forth
in Exxon Company, U.S.A. v. Sofec, Inc., 517 U.S. 830,
116 S.Ct. 1813, 135 L.Ed.2d 113 (1996) and admiralty
law’s longstanding “assist tug” defense are available
in an action under 16 U.S.C. §1443 of the National
Marine Sanctuaries Act.

il

LIST OF INTERESTED PARTIES AND
CORPORATE DISCLOSURE STATEMENT

The following is a list of all interested parties includ-
ing parties to the proceedings below:

1. Honorable R. Lanier Anderson III, U.S. Circuit Chief
Judge, Eleventh Circuit.

2. Honorable Ted E. Bandstra, U.S. Magistrate Judge,
Southern District of Florida.

3. The Board of Trustees of the Internal Improvement
Trust Fund for the State of Florida, Plaintiff.

4. Honorable Stephen P. Brown, U.S. Magistrate Judge,
Southern District of Florida.

5. Coastal Marine Towing, Defendant.

6. Honorable Edward B. Davis, U.S. District Judge,
Southern District of Florida.

7. Honorable Peter T. Fay, U.S. Circuit Judge, Eleventh
Circuit.

8. Florida Department of Environmental Protection,
Plaintiff.

9. State of Florida, Department of Environmental Pro-
tection, Attorneys for Plaintiff, State of Florida.

10. Fowler, White, Burnett, Hurley, Banick & Strickroot,
P.A., Attorneys for Defendant, Coastal Marine Tow-

ing.
11. Great Lakes Dredge & Dock Company, Defendant/
Petitioner.

12. Mark Hicks, Esq., Appellate Counsel for Defendant/
Petitioner Great Lakes.

13.

14.

15.

16.

17.

18.

19.

20.

eh

22.

LIST OF INTERESTED PARTIES AND
CORPORATE DISCLOSURE STATEMENT - Continued

John W. Keller, III, Esq., Attorney for Defendant/
Petitioner Great Lakes.

John Keller & Associates, P.A., Attorneys for Defen-
dant/Petitioner Great Lakes.

Alan R. Kelley, Esq., Attorney for Defendant, Coastal
Marine Towing.

Honorable Joan A. Lenard, U.S. Judge, Southern Dis-
trict of Florida.

Sylvia F. Liu, Esq., Environment and Natural
Resources Division, U.S. Department of Justice,
Attorney for Plaintiff/Respondent, United States of
America.

Maureen M. Malvern, Esq., Attorney for Plaintiff,
State of Florida.

John A. Mueller, Esq., Environment and Natural
Resources Division, U.S. Department of Justice,
Attorney for Plaintiff/Respondent, United States of
America.

Robert A. Oakley, Esq., Environment and Natural
Resources Division, U.S. Department of Justice,
Attorney for Plaintiff/Respondent, United States of
America.

Honorable Paul H. Roney, U.S. Circuit Judge, Elev-
enth Circuit.

Lois J. Schiffer, Assistant Attorney General, Environ-
ment and Natural Resources Division, U.S. Depart-
ment of Justice, Attorney for Plaintiff/Respondent,
United States of America.

iv

LIST OF INTERESTED PARTIES AND
CORPORATE DISCLOSURE STATEMENT - Continued

23. Sharon Shulter, Esq., Attorney, U.S. Department of
Commerce, National Oceanic and Atmospheric
Administration.

24. Honorable William C. Turnoff, U.S. Magistrate
Judge, Southern District of Florida.

25. United States of America, Plaintiff/ Respondent.

26. United States Department of Commerce, National
Oceanic and Atmospheric Administration.

27. United States Department of Justice, Environment & -
Natural Resource Division, Attorneys for Plaintiff /
Respondent, United States of America.

Pursuant to Supreme Court Rule 29.6, Petitioner
informs that Great Lakes’ parent corporation is Vectura
Helding Company, L.L.C.

TABLE OF CONTENTS

Page
CIEE IIS PREDIC CGD 0 5.0ccvcccovsesanecrercans i
LIST OF INTERESTED PARTIES AND CORPORATE
DISCLOSURE STATEMENT ............0csccceees ii
pet 8 ge Bitte ty rr Perms Vii
CP OTD MRAE ss carcenee cdsbinpcaveevensuueecss 1
POE EUUG 08 o win avieveda¥aevecaunsierttitee 1
STATUTES INVOLVED IN THIS CASE............. 1
STATEMENT OF THE CASE AND FACTS......... 2
REASONS FOR GRANTING THE WRIT ........... 7

I. The Eleventh Circuit’s application of a dollar-for-
dollar/pro tanto setoff of Coastal’s settlement
and refusal to calculate Great Lakes’ liability
under the “proportionate share” approach on the
asserted basis that liability under the NMSA is
joint and several squarely conflicts with this
Court’s decision in McDermott, Inc. v. AmClyde
and other lower court decisions interpreting
Ft PPC TTOP ere FTP ery rrr oer re nk 7

II]. The Eleventh Circuit has decided important
questions of federal law regarding the interpreta-
tion of the liability, damage and defense provi-
sions of the NMSA which should be settled by
UE RG Sain das winecaddcaeveeeeeenclaatn 13

vi

TABLE OF CONTENTS - Continued

Page

A. Because Congress incorporated the maritime

rule of Robins Dry Dock in the NMSA, the
United States was barred from recovering dam-
ages under 16 U.S.C. §1443 where the lands
and associated natural resources at issue are
owned by and under the jurisdiction of the
State of Florida and the United States has no
proprietary interest therein..................

Great Lakes was entitled to assert maritime
law's “superseding cause” and “assist tug”
defenses which were not preempted by the
POUND 6 Von ce vuddenvecsushouvkeseeeebeeian

CAIPOG AMINES 0 si Vandacieveseucasbeeteseleeee

13

Vii

TABLE OF AUTHORITIES

Cases

Amoco Production Co. v. Sea Robin Pipeline Co., 844
ee Te COU Ge Behe a ccc vcvcccncesececses

Arnold M. Diamond, Inc. v. Gulf Coast Trailing Co.,
BES Ge Bee Te Ga WOOO) ce ckcevrescececseés

Askew v. American Waterways Operators, Inc., 411
U.S. 325, 93 S.Ct. 1590, 36 L.Ed.2d 280 (1973) .

Baker Carver & Morrell Ship Supplies, Inc. v.
Mathiasan Shipping Co., 140 F.2d 522 (2d Cir.
Ps e060 ed cc0 esse caves es steneeswecteseeddas

Ballard Shipping Co. v. Beach Shellfish, 32 F.3d 623
CON C.F v0 bcc tnccedisevucsecagsenssnvese

Banks v. Yokemick, __ F.Supp.2d __, 2001 WL
1549229 (S.D. N.Y. December 3, 2001)...... 11,

Barnes v. Andover Company, L.P., 900 F.2d 630 (3d
| Ferree rere Tr ere rte

Central State Transit & Leasing Corp. v. Jones Boat
Yard, Inc., 206 F.3d 1373 (11th Cir. 2000)......

Consumer Product Safety Commission v. GTE Syl-
vania, Inc., 447 U.S. 102, 100 S.Ct. 2051, 64
ESE FU COIN: ob cen ccenctscncceveceeseune

Daubert v. Merrell Dow Pharmaceuticals, Inc., 509
U.S. 579, 113 S.Ct. 2786, 125 L.Ed.2d 469 (1993)

Diesel Tanker Ira S. Bushey, Inc. v. Tug Bruce A.
McAllister, 1995 A.M.C. 806, 1994 WL 320328
Sa Pie OE hin ccsencccancevnseeeeiexcnees

Eichenholtz v. Brennan, 52 F.3d 478 (3d Cir. 1995) ....

iar

Viii
TABLE OF AUTHORITIES - Continued
Page

Expressions at Rancho Niguel Association v. Ahman-
son Developments, Inc., 103 Cal.Rptr.2d 895 (Ct.
WS SE a Kav ease es dvds ceeds tivieied inc. 11

Exxon Company, U.S.A. v. Sofec, Inc., 517 U.S. 830,
116 S.Ct. 1813, 135 L.Ed.2d 113 (1996) .. 6, 25, 26, 28

In re Kendall Square Research Corp. Sec. Litigation,

869 F. Supp. 53 (D. Mass. 1994)................ 11, 12
In re the Exxon Valdez, 1995 A.M.C. 1397, 1993 WL

FP ee ee GE I Vii oo di vd ek acbdu0dis0nads 16
In re the Glacier Bay, 746 F. Supp. 1379 (D. Alaska

ek ee RE EE PEPE ELIT LEAS eI TLE 16
In the Matter of the Complaint of Allied Towing Corp.,

478 F. Supp. 398 (E.D. Va. 1979) ............0c00ce 21
In the Matter of the Complaint of Oswego Barge Corp.,

COU Fee GP CE GO BOOED oc ivevevncccccconescs 16, 28
Isbrandtsen Co., Inc. v. Johnson, 343 U.S. 779, 72

S.Ct. 1011, 96 L.Ed. 1294 (1952)..............0e0c. 15

Kapsis v. Port Authority of New York and New Jersey,
712 A.2d 1250 (N.J. App.), cert. den., 724 A.2d

We I WI 56 oa bod cow kesa ti bicbiiicekus: 11
Local 875 I.B.T. Pension Fund v. Pollack, 49

F. Supp.2d 130 (B.D. N.Y. 1999)........ccccccccccs 12
McDermott, Inc. v. AmClyde, 511 U.S. 202, 114 S.Ct.

1461, 128 L.Ed.2d 148 (1994).................. passim

Middlesex County Sewerage Authority v. National Sea
Clammers Association, 453 U.S. 1, 101 S.Ct. 2615,
OP Came GN SF civic cee riedkeedesdnsleenk 18

Miles v. Apex Marine Corp., 498 U.S. 19, 111 S.Ct.
S17, 112 L.Ed.2d 275 (1990)..... 0... cccescccccccce 15

ix

TABLE OF AUTHORITIES - Continued

Page
Pollard v. Hagan, 44 U.S. 212, 3 How. 212, 11 L.Ed.
kt) PPPPEPererrrerrercrerrrr ere errr ee TTTs
Reserve Mooring, Inc. v. American Commercial Barge
Line, LLC, 251 F.3d 1069 (5th Cir. 2001)........... 14
Robins Dry Dock & Repair Co. v. Flint, 275 U.S. 303,
SD DAZ. TPA: TE Eee BOO CREF De cievcnceciess passim
Slaven v. BP America, Inc., 958 F. Supp. 1472 (C.D.
le BEE bab hiss enh bcs Kav A pres heer FELee Hennes 12

TBG, Inc. v. Bendis, 160 F.R.D. 621 (D. Kan. 1995) .... 12

The ‘Connecticut’, 103 U.S. 710, 13 Otto 710, 26
SR I i i ee de eee a 26

Treasure Salvors, Inc. v. Unidentified Wrecked and
Abandoned Sailing Vessel, 569 F.2d 330 (5th Cir.

SO as hava Sate nae 0bdb 0649) 0 6 640s One Chez Et ee es 20
United States v. California, 436 U.S. 32, 98 S.Ct.

Re Bee Bk. eerrrrererr ere rer rr rrr 21
United States v. Florida, 425 U.S. 791, 96 S.Ct. 1840,

Sa Se CUE honk hs 04 ska cep erineeec eset 24
United States v. Great Lakes Dredge & Dock Com-

pany, 259 F.3d 1300 (11th Cir. 2001).............06. 1
United States v. M/V Miss Beholden, 856 F. Supp.

GOD GED. FAR. FIP e occ accccivccccvcs sdemewan wees 18
United States v. Ray, 423 F.2d 16 (5th Cir. 1970)...... 20
United States v. Reliable Transfer Co., 421 U.S. 397,

95 S.Ct. 1708, 44 L.Ed.2d 251 (1975)............00. 11

Westinghouse Credit Corp. v. M/V New Orleans, 39
Pe Pe GD Ge SP eben dncrenerssiasvevdne 10

x

TABLE OF AUTHORITIES - Continued

Page
STATUTES AND ACTs
Antiquities Act, 16 U.S.C. §431 et seg................ 20
Comprehensive, Environmental Response, Com-
pensation and Liability Act [“CERCLA”], 42
es EE Ma eiviid ect sdewckededseleavas. 17, 18
Clean Water Act [“CWA”] ................... 17, 18, 27
Florida Keys National Marine Sanctuary and Pro-
tection Act [“FKNMSPA”], Pub.L. No. 101-605,
104 Stat. 3089 (1990) amended by P.L. 102-587,
1992 H.R. 5617, 106 Stat. 5039 at §2209
8 BOP Pre Ero ner bent eae 1, 6, 21, 22, 23
Federal Water Pollution Control Act [“FWPCA”],
OP Wee UE e et cndsaveveusstecreensaceekécs passim
Marine Protection and Research and Sanctuaries
EF I Eb obevebvinvdetvecexcccvcene. 1, 15, 18
National Marine Sanctuaries Act [“NMSA”], 16
Urs CPUS Fo cc cceccvedbivedécedecoces passim
Outer Continental Shelf Lands Act [“OCSLA”], 43
aes MG CR bs vadkvssdcsbeboieddesssCsides il 20

Oil Pollution Act [“OPA”], 33 U.S 7. §2701 et seq....17, 27
Submerged Lands Act [“SLA”], 43 U.S.C. §1302 ..20, 21

Trans-Alaska Pipeline Authorization Act

[“TAPAA”], 43 U.S.C. §1651 et kas: 12, 16, 17, 27
OTHER
Ce Ps SUE MI ki oc avn vcdc dc ccuwcssccus. 22

46 CER. §64.05-1 & 4.03-1(b) ..... 2... cc cece cee cee 3, 26

‘eit

TABLE OF AUTHORITIES —- Continued

H.R. Rep. No. 100-739, 100th Cong., 2nd Sess., Pt.
Dy OE Bee CI oi bos dccncctccacescenvessssssseceese 18

Tankersley, “The Robins Dry Dock Rule: The Tar
Baby of Maritime Tort Law,” 25 Tul. Mar. L.J.
BFE CTD oo sccccccdndctsvesvsnsvececsvecessoes 14, 17

OPINIONS BELOW

The opinion of the United States Court of Appeals for
the Eleventh Circuit entered in this case is cited as fol-
lows: United States v. Great Lakes Dredge & Dock Company,
259 F.3d 1300 (11th Cir. 2001). The lower district court’s
order of September 27, 1999 setting forth its findings of
fact and conclusions of law is unpublished. Both deci-
sions are reproduced in the Appendix (“App.”).
(App.1-43).

JURISDICTION .

The Eleventh Circuit’s decision was entered on July
30, 2001. (App.1). Great Lakes’ petitions for rehearing and
rehearing en banc were denied by the Eleventh Circuit on
November 5, 2001. (App.44-45). This petition has been
filed within 90 days of the denial of rehearing. The juris-
diction of this Court is invoked pursuant to 28 U.S.C.
§1254(1).

STATUTES INVOLVED IN THIS CASE

This case involves the National Marine Sanctuaries
Act [“NMSA”], 16 U.S.C. §§1431-1445 (a subcomponent of
the Marine Protection Research and Sanctuaries Act
{[“MPRSA”]), and the Florida Keys National Marine
Sanctuary and Protection Act [“FKNMSPA”], Pub.L.
No. 101-605, 104 Stat. 3089 (1990). The text of the
FKNMSPA and the most pertinent sections of the NMSA

(§§1432, 1433 & 1443) are reproduced in the Appendix.
(App.46-71).

STATEMENT OF THE CASE AND FACTS

The facts which are material to consideration of the
questions presented are set forth in the Eleventh Circuit's
opinion and the district court’s findings of fact and con-
clusions of law.! The following is an overview of those
facts.

In May 1993, Petitioner Great Lakes Dredge & Dock
Company (“Great Lakes”) hired Coastal Marine Towing
(“Coastal”) to tow 500-foot lengths of dredge pipe and
other equipment from Boca Grande on the west coast of
Florida to Green Cove on the east coast of Florida.
Coastal supplied two tugs, the Miss Necie and the Cap-
tain Joe and their crews. Great Lakes supplied two assist
tugs, the Volunteer State and the Cavalier State.
(App.2,21).

At all times during the trip, the Volunteer State was
to assist and receive its instructions from the Miss Necie
and the Cavalier State was to assist and receive its
instructions from the Captain Joe. (App.21).

While proceeding through the Florida Keys National
Marine Sanctuary, one of the pipes in a raft towed by the

1 Additional facts set forth in the record in the consolidated
action below will be designated as “R.Doc.__,” referring to the
docket in Case #97-CV-2510, and “R.2Doc.__,” referring to the
docket in Case #97-CV-10075. Trial testimony will be cited as
“TT” followed by the date and page number.

Miss Necie dragged the sea bottom creating a pipe scar
approximately 13 miles long. (App.2,23).?

Due to a navigational error by the Miss Necie, which
was being followed by the Captain Joe, the flotillas got
off course. The Captain Joe momentarily ran aground
while trying to pass the Miss Necie. (App.2,24).3 The
Captain Joe then attempted to pass the Miss Necie again
and ran hard aground in seven feet of water. Great Lakes’
assist tug, the Cavalier State, was tied to the Captain Joe.
Thereafter, the Captain Joe unsuccessfully tried to get off
the bank. (App.2,24-25).4

The following day, sanctuary and state officials
helped devise a plan to extricate the Captain Joe. At high
tide, the Captain Joe was powered off the bank by a
combination of its own motor and the Cavalier State. The
grounding of the Captain Joe left behind a channel 120
meters long, eight to ten meters wide and two meters
deep. The grounding destroyed 7,495 square meters of
sea bottom, consisting of turtle grass, manatee grass and

2 Both the United States and Great Lakes agreed that the
pipe scar recovered on its own within three years and this figure
was used to quantify damages in the Habitat Equivalency
Analysis. (App.4,24). :

3 Had the Captain Joe stopped immediately upon touching
bottom, and reported the incident to the authorities as required
by 46 C.F.R. §§4.05-1, 4.03-1(b), no further damage would have
occurred.

* The captains of neither the Captain Joe nor the Miss Necie
saw fit to wait until daylight or seek other assistance in order to
ascertain the best way off the grounding. Had either done this,
or complied with the law by reporting the matter to the
authorities, the blowhole damage would have never occurred.

finger coral. The extrication of the Captain Joe also cre-
ated a large hole, or “blowhole,” 120 meters long by nine
meters wide. (App.2-3,25).5

It is undisputed that the submerged lands and associ-
ated natural resources at issue are owned by the State of
Florida and located within the Florida Keys National
Marine Sanctuary.

The Respondent United States (on behalf of the U.S.
Department of Commerce, National Oceanic and Atmo-
spheric Administration) brought an action in the United
States District Court for the Southern District of Florida
against Coastal and Great Lakes under the NMSA for the
destruction caused to the sanctuary resources. The State
of Florida also filed a complaint against Coastal and
Great Lakes which was consolidated with the federal
case. (App.3,20).®

The first day of trial, Coastal settled its claims with
the United States and the State of Florida for $618,484.86.

5 The parties are in dispute as to whether the Cavalier State,
which received its orders from the Captain Joe, played any role
in causing the blowhole damage. The Eleventh Circuit credited
the district court’s finding that “[s]ome combination of the
Captain Joe’s own engines and the Cavalier State’s pulling
during the failed attempts to extricate the tug had actually
dragged the Captain Joe further along the bank.” (App.10,25).
The uncontroverted testimony, however, was that the propellers
of the Captain Joe caused the blow hole - nothing else.
(TT4/6/99 at 16,24,27; TT4/5/99 at 96,97,102,122,124,129-130).

© The State of Florida’s complaint in admiralty sought
damages under willful and negligent trespass theories.
(R.2Doc.10).

The settlement satisfied Florida’s claims against Great
Lakes as well. (App.3,20).

After a bench trial, the district court granted in part
and denied in part the relief sought by the United States.
The court found Great Lakes strictly liable for all
“response costs” and “damages” to the sanctuary under
§1443(a)(1) of the NMSA. (App.3,6,30-33).7 The court also
ruled that the total damages assessed against Great Lakes
would be offset by the government’s $618,484.86 settle-
ment with Coastal. (App.42).

The district court subsequently entered final judg-
ment against Great Lakes in the amount of $368,796.97.
(App.5,13).

On appeal by Great Lakes and cross-appeal by the
United States, the Eleventh Circuit affirmed in part and
reversed in part. (App.1-18). As it pertains to the ques-
tions presented in this petition, the Eleventh Circuit
affirmed the district court’s liability determinations as
well as the reduction of the judgment by the amount of
Coastal’s settlement.

The Eleventh Circuit rejected Great Lakes’ argument
that the United States had no claim for “damages”
because the submerged land and associated resources at

7 Pursuant to the NMSA, “response costs” include costs of
actions taken to minimize the destruction of sanctuary
resources. 16 U.S.C. §1432(7). “Damages,” on the other hand,
include compensation for (1) the cost of restoring, replacing, or
acquiring the equivalent of a sanctuary resource and the interim
loss value of the resource pending restoration; (2) damage
assessment costs; and (3) reasonable monitoring costs. Id.
§1432(6).

issue were owned by the State of Florida and the United
States had no proprietary interest therein as required
under Robins Dry Dock & Repair Co. v. Flint, 275 U.S. 303,
48 S.Ct. 134, 72 L.Ed.2d 290 (1927). The court of appeals
held that the United States could recover the damages
claimed in this case under the express terms of the NMSA
and the Florida Keys National Marine Sanctuary Act.

(App.6-7).

The Eleventh Circuit also determined that Great
Lakes was strictly liable under §1443 of the NMSA, that
“each defendant [i.e., Great Lakes and Coastal] is a legal
cause of the damage,” and that the injury was not solely
caused by Coastal for purposes of establishing the “third
party” statutory defense under §1443(a)(3)(A).
(App.10-13).® In doing so, the court of appeals failed to
address Great Lakes’ argument that it was not liable
under admiralty law’s longstanding “assist tug” defense
or the “superseding cause” doctrine set forth in Exxon
Company, U.S.A. v. Sofec, Inc., 517 U.S. 830, 116 S.Ct. 1813,
135 L.Ed.2d 113 (1996).

Finally, the Eleventh Circuit rejected Great Lakes’
alternative argument that, by reason of the pre-trial set-
tlement between the United States and Coastal, Great
Lakes’ liability had to be calculated under the “propor-
tionate share” approach set forth in McDermott, Inc. v.
AmClyde, 511 U.S. 202, 114 S.Ct. 1461, 128 L.Ed.2d 148
(1994). The court of appeals approved of the district

8 To support its finding that Great Lakes’ conduct gave rise
to statutory liability, the court of appeals focused on Great
Lakes’ acts and omissions in the preparation and maintenance
of the pipe rafts. (App.10).

court’s dollar-for-dollar reduction of Great Lakes’ liability
by Coastal’s $618,484 settlement amount. The Eleventh
Circuit found the “proportionate share” approach inap-
plicable on the stated basis that Great Lakes and Coastal
were jointly and severally liable under the NMSA and the
damages were indivisible between the two. (App.12-13).9

+

REASONS FOR GRANTING THE WRIT

I. The Eleventh Circuit’s application of a dollar-for-
dollar/pro tanto setoff of Coastal’s settlement and
refusal to calculate Great Lakes’ liability under the
“proportionate share” approach on the asserted
basis that liability under the NMSA is joint and
several squarely conflicts with this Court’s decision
in McDermott, Inc. v. AmClyde and other lower court
decisions interpreting AmClyde.

This Court’s decision in McDermott, Inc. v. AmClyde,
511 U.S. 202, 114 S.Ct. 1461, 128 L.Ed.2d 148 (1994) consti-
tutes binding precedent and the Eleventh Circuit’s failure
to follow AmClyde is grounds for certiorari review. While
Great Lakes contends that it was improperly found liable

° As reflected in its opinion, the Eleventh Circuit also
rejected Great Lakes’ contention that the district court
misapplied Daubert v. Merrell Dow Pharmaceuticals, Inc., 509 U.S.
579, 113 S.Ct. 2786, 125 L.Ed.2d 469 (1993) and erred in
awarding damages based on the Habitat Equivalency Analysis.
(App.7-9). On cross-appeal, however, the Eleventh Circuit
agreed with the United States that the district court erred in its
damage assessment. The opinion reverses and remands for the
district court to reassess whether a “no action” plan is
appropriate for primary restoration of the grounding site.

(App.13-17).

to the United States under NMSA, assuming arguendo
that Great Lakes is liable, the Eleventh Circuit plainly
erred in refusing to give Great Lakes a settlement credit
based on the “proportionate share” approach set forth in
AmClyde.

The Eleventh Circuit rejected Great Lakes’ alternative
argument that it is only liable for its proportionate share
of damages and affirmed the district court’s dollar-for-
dollar or pro tanto setoff of Coastal’s $618,484.86 settle-
ment. The Eleventh Circuit’s ruling was based on its
determination that Great Lakes and Coastal are jointly
and severally liable under the NMSA where “each defen-
dant is a legal cause of the damage and the damage is
indivisible between the two.” (App.12-13).

Respectfully, the Eleventh Circuit’s holding is in
direct conflict with this Court’s decision in McDermott,
Inc. v. AmClyde as well as with lower court decisions
interpreting AmClyde. The proportionate share approach,
and not the pro tanto approach, governed the setoff of
Coastal’s pre-trial settlement. Precisely as in AmClyde,
this case involves a voluntary settlement and not a judg-
ment against multiple defendants. Moreover, application
of the proportionate share approach would not be pre-
cluded by or inconsistent with the imposition of joint and
several liability under the NMSA. The fact that injury/
damages may be indivisible does not preclude the equita-
ble apportionment of fault for that injury. Further, not
only has AmClyde’s proportionate share approach been
applied to setoff determinations under other federal stat-
utes but federal/maritime common law should in any
event be used to fill the interstices of the NMSA.

OO

In AmClyde, this Court addressed the issue as to how
nonsettling defendants in federal maritime cases are enti-
tled to credit when a plaintiff settles with one of several
joint tortfeasors. 511 U.S. at 208. The Court rejected the
pro tanto or dollar-for-dollar credit approach and ruled
that the proportionate share approach applied. Under the
latter approach, the settlement diminishes the claim the
injured party has against the other tortfeasors by the
amount of the equitable share of the obligation of the
released tortfeasor. Id. at 209. Significantly, this Court
expressly held that the proportionate share approach
does not in any way conflict with the rule of joint and
several liability. The Court reasoned:

[T]here is no tension between joint and several lia-
bility and a proportionate share approach to settle-
ments. (footnote omitted). Joint and several
liability applies when there has been a judgment
against multiple defendants. It can result in one
defendant’s paying more than its apportioned
share of liability when the plaintiff’s recovery
from other defendants is limited by factors
beyond the plaintiff’s control, such as a defen-
dant’s insolvency. When the limitations on the
plaintiff's recovery arise from outside forces,
joint and several liability makes the other defen-
dants, rather than the innocent plaintiff, respon-
sible for the shortfall. Ibid. (footnote omitted).
Unlike the rule in Edmonds [v. Compagnie Gener-
ale Transatlantique, 443 U.S. 256, 99 S.Ct. 2573, 61
L.Ed.2d 521 (1979)], the proportionate share rule
announced in this opinion applies when there has
been a settlement. In such cases, the plaintiff's recov-
ery against the settling defendant has been limited
not by outside forces, but by its own agreement to
settle. There is no reason to allocate any shortfall to

10

the other defendants, who were not parties to the
settlement. Just as the other defendants are not enti-
tled to a reduction in liability when the plaintiff
negotiates a generous settlement .. . so they are not
required to shoulder disproportionate liability when
the plaintiff negotiates a meager one.

511 U.S. at 220-221.10

Other circuit and lower courts have likewise recog-
nized that AmClyde’s proportionate share approach is not
precluded by or in conflict with principles of joint and
several liability. In Westinghouse Credit Corp. v. M/V New
Orleans, 39 F.3d 553 (5th Cir. 1994), for example, the Fifth
Circuit stated:

. Under the proportionate share
approach, the finder of fact must determine the
total damages from all joint causes and the pro-
portion of each tortfeasor’s share of joint lia-
bility. Although principles of joint and several
liability survive, a nonsettling defendant cannot ini-
tially be assessed any amount of damages larger than
his proportionate share of all damages as determined
by his proportionate share of all liability. Thus,
under AmClyde, the nonsettling defendant is no
longer entitled to a “credit” based on prior settle-
ments. Rather, under AmClyde, it is the plaintiff
who takes the risk of either a poor settlement or a
favorable settlement with other defendants. However,
the proportionate share rule, like its predecessor the
pro tanto rule, applies only in cases in which there
has been a settlement by a joint tortfeasor... .

39 F.3d at 554-555.

10 Unless otherwise noted, all emphasis has been supplied
by counsel.

11

Similarly, in applying the proportionate share
approach to calculate a settlement setoff in a federal
securities action, the court in In re Kendall Square Research
Corp. Sec. Litigation, 869 F. Supp. 53 (D. Mass. 1994) dis-
cussed AmClyde and “how the proportionate share approach
is entirely consistent with the principles of joint and several
liability.” Id. at 55. The district court concluded that “[t]he
proportionate fault approach [ ] requires apportionment of fault
among jointly and severally liable tortfeasors.” Id.

The Eleventh Circuit’s rejection of the proportionate
share rule and affirmance of the district court’s pro tanto
setoff of Coastal’s pre-trial settlement is clearly at odds
with AmClyde. To the extent Great Lakes could have been
found jointly and severally liable with Coastal under the
NMSA, such a finding permitted application of the pro-
portionate share rule. See Banks v. Yokemick, ___ F.Supp.2d
__, 2001 WL 1549229 *20 (S.D. N.Y. December 3, 2001)
(AmClyde proportionate share setoff rule applies to the extent
defendants were jointly and severally liable for the same
injury).

The fact that an injury may be indivisible hardly
precludes the equitable apportionment of fault/respon-
sibility for that injury. See United States v. Reliable Transfer
Co., 421 U.S. 397, 408, 95 S.Ct. 1708, 1715-16, 44 L.Ed.2d
251 (1975); see also Expressions at Rancho Niguel Association
v. Ahmanson Developments, Inc., 103 Cal.Rptr.2d 895, 898
(Ct. App. 2001) (under equitable indemnity principles,
allocation of damages between defendants who are
jointly and severally liable for an indivisible injury is
based on each defendant’s respective fault); Kapsis v. Port
Authority of New York and New Jersey, 712 A.2d 1250,
1256-1257 (N.J. App.), crt. den., 724 A.2d 803 (N.J. 1998)

12

(indivisibility of causation of plaintiff’s injury does pre-
clude factfinder to judge relative culpability of each
party’s acts).1!

Further, while the Eleventh Circuit's only stated basis
for not applying the proportionate share rule in this case
is the alleged existence of joint and several liability for
indivisible damage, any argument that AmClyde is other-
wise inapplicable to federal statutes such as the NMSA
would be untenable. Courts have repeatedly applied
AmClyde’s proportionate share approach (also referred to
as the “proportionate judgment reduction method”) to
cases involving federal statutory liability schemes and
irrespective of their connection to admiralty law. See, e.g.,
Eichenholtz v. Brennan, 52 F.3d 478, 487 & n.16 (3d Cir.
1995) (federal securities and RICO Statutes); Banks, __
F.Supp.2d __, 2001 WL 1549229 at *10-*22 (federal civil
rights statutes); Local 875 I.B.T. Pension Fund v. Pollack, 49
F. Supp.2d 130, 133 (E.D. N.Y. 1999) (federal securities,
RICO and ERISA statutes); Slaven v. BP America, Inc., 958
F. Supp. 1472, 1475 (C.D. Cal. 1997) (federal TAPAA Act);
In re Kendall Square Research Corp. Sec. Litigation, 869
F. Supp. at 55 (federal securities laws); TBG, Inc. v. Bendis,
160 F.R.D. 621, 623 (D. Kan. 1995) (federal securities
laws).

“1 Ironically, another panel from the Eleventh Circuit
recently interpreted the AmClyde proportionate share rule as
extending not only to situations where the settling and
nonsettling defendants are joint tortfeasors but to situations
where the defendants act together to cause a single indivisible
injury. See Central State Transit & Leasing Corp. v. Jones Boat Yard,
Inc., 206 F.3d 1373, 1377 (11th Cir. 2000).

13

Moreover, there are no setoff or contribution provi-
sions of the NMSA evincing any Congressional intent
that courts not apply the proportionate share rule.
Accordingly, AmClyde must be used to “resolve ‘intersti-
tial’ questions that Congress has left open in federal
statutory schemes.” See Banks, __ F.Supp.2d ___, 2001 WL
1549229 at *11. Courts have recognized that AmClyde
extends beyond maritime actions and constitutes a “fed-
eral common law rule of decision.” See id. at *14.

Respectfully, because the Eleventh Circuit’s decision
turns AmClyde on its proverbial head, certiorari review
should be granted. The proportionate share rule applies
irrespective of whether liability is joint and several under
the NMSA or whether the damage is indivisible. Any
liability of Great Lakes must be reduced by the amount of
Coastal’s proportionate share of fault.

II. The Eleventh Circuit has decided important ques-
tions of federal law regarding the interpretation of
the liability, damage and defense provisions of the
NMSA which should be settled by this Court.

A. Because Congress incorporated the maritime
rule of Robins Dry Dock in the NMSA, the
United States was barred from recovering dam-
ages under 16 U.S.C. §1443 where the lands and
associated natural resources at issue are owned
by and under the jurisdiction of the State of
Florida and the United States has no propri-
etary interest therein.

The Eleventh Circuit’s determination that the NMSA
does not incorporate the longstanding “proprietary inter-
est” rule set forth in Robins Dry Dock & Repair Co. v. Flint,

14

275 U.S. 303, 48 S.Ct. 134, 72 L.Ed. 290 (1927) disregards
settled principles of statutory construction. Not only
must the NMSA be read with a presumption favoring the
retention of time-honored maritime principles, but Con-
gress specifically declined to include the language used
in other environmental liability statutes which courts and
commentators have found as demonstrating Congres-
sional intent to preempt the Robins Dry Dock rule. More-
over, under the express terms of the NMSA, a person is
only liable to the United States for the destruction of a
sanctuary resource within a “marine environment” which
is limited to “submerged lands over which the United
States exercises jurisdiction.” 16 U.S.C. §1432(3). Where,
as here, the property at issue is indisputably state-owned,
and the United States has no proprietary interest therein,
the United States has no statutory right to recover dam-
ages.

The issue whether environmental liability statutes
such as the NMSA incorporate or preempt the longstand-
ing Robins Dry Dock rule is of great public significance .
and has yet to be addressed by this Court. See Tankersley,
“The Robins Dry Dock Rule: The Tar Baby of Maritime
Tort Law,” 25 Tul. Mar. L.J. 371, 401-404 (2000). Pursuant
to Robins Dry Dock, a plaintiff in a maritime tort action
must suffer physical damage to a proprietary interest in
order to recover economic damages. E.g., Reserve Mooring,
Inc. v. American Commercial Barge Line, LLC, 251 F.3d 1069,
1070 (5th Cir. 2001).

In the case at bar, the Eleventh Circuit specifically
rejected Great Lakes’ argument that Robins Dry Dock was
incorporated in the NMSA so as to bar the United States
from recovering damages. (App.6). The Eleventh Circuit

15

found this argument contrary to the “express language
and scheme of the relevant statutes.” (App.6). The court
of appeals reasoned that §1443(a)(1) of the NMSA autho-
rized the United States to recover damages for injury to a
sanctuary resource,!? and that the seagrass resources at
issue were within the Congressionally designated Florida
Keys National Marine Sanctuary. (App.6-7).

Respectfully, the Eleventh Circuit’s analysis disre-
gards not only settled principles of statutory construction
but the plain text of the NMSA.

Statutes which invade general maritime law are read
with a presumption favoring retention of long established
principles except when a statutory purpose to the con-
trary is evident. Isbrandtsen Co., Inc. v. Johnson, 343 U.S.
779, 783, 72 S.Ct. 1011, 96 L.Ed. 1294 (1952). Further,
courts must assume that Congress is aware of existing
law when it passes legislation. Miles v. Apex Marine Corp.,
498 U.S. 19, 32, 111 S.Ct. 317, 112 L.Ed.2d 275 (1990).

There are no statutory provisions within the
NMSA, which was first promulgated in 1988,!5 showing

12 16 U.S.C. §1443(a)(1) provides in relevant part:

Any person who destroys, causes the loss of, or
injures any sanctuary resources is liable to the United
States for an amount equal to the sum of -

(A) the amount of response costs and damages
resulting from the destruction, loss, or injury. . . .

13 See P.L. No. 100-627, 1988 H.R. 420, 102 Stat. 3213 (1988);
S. Rep. No. 595, 100th Cong., 2d Sess. (1988). Sections 1431-1445
of the Marine Protection, Research and Sanctuaries Act were
amended and redesignated as the National Marine Sanctuaries
Act in 1992 and 1996. See P.L. No. 102-587, 1992 H.R. 5617, 106

16

Congressional intent to disavow the longstanding propri-
etary interest rule. To the contrary, Congress’ purposeful
non-inclusion of language which courts and commenta-
tors have found to evince an intent to preempt the Robins
Dry Dock rule in other environmental liability statutes
fully demonstrates the maritime doctrine’s retention in
the NMSA.

In In re the Glacier Bay, 746 F. Supp. 1379 (D. Alaska
1990), for example, the court faced the issue whether the
Robins Dry Dock rule was incorporated in or preempted
by the strict liability provisions of the Trans-Alaska
Pipeline Authorization Act [“TAPAA”], 43 U.S.C. §1651 et
seq. 746 F. Supp. at 1382-1386. In determining that the
maritime rule of Robins Dry Dock was preempted, the
court focused on Congress’ inclusion of the statutory
language “[nJotwithstanding the provisions of any other law”
under §1653(c)(1). 746 F. Supp. at 1384. Based on the
Second Circuit’s interpretation of the same “notwith-
standing”-proviso in the Federal Water Pollution Control
Act [“FWPCA”], 33 U.S.C. §1321(f)(1), see In the Matter of
the Complaint of Oswego Barge Corp., 664 F.2d 327, 339-340
(2d Cir. 1981), the court construed the language in
TAPAA to mean that the strict liability for environmental
harm under §1653(c)(1) “was not to be modified by any
preexisting law, whatever its source.” 746 F. Supp. at
1384. Accordingly, the court held that TAPAA’s strict
liability and damage provisions did not incorporate the
maritime common law rule of Robins Dry Dock. Id. at
1385-1386. See also In re the Exxon Valdez, 1995 A.M.C.
1397, 1993 WL 787392 *2-*6 (D. Alaska 1993) (finding

Stat. 5039 (1992); P.L. No. 104-283, 1996 H.R. 543, 110 Stat. 3363
(1996).

17

“Congress partially abrogated federal maritime law,
including Robins Dry Dock, in enacting TAPAA”).

As it did with TAPAA and the FWPCA (also known
as the Clean Water Act [“CWA”]), Congress also pur-
posefully included a broadly worded “notwithstanding”-
clause in the strict liability provisions of the Oil Pollution
Act [“OPA”], 33 U.S.C. §2701 et seq. See id. at §2702(a)(1).
Noting that oil pollution has become a major political and
legislative issue, commentators have concluded that Con-
gress specifically did this to preempt application of the
Robins Dry Dock rule to these statutory schemes. See Tank-
ersley, supra, 25 Tul. Mar. L.J. at 403-404; see also Ballard
Shipping Co. v. Beach Shellfish, 32 F.3d 623, 630-631 n.6 (1st
Cir. 1994) (“[m]ost commentators have read [OPA] - as its
language and legislative history suggest — to override the
Robins Dry Dock rule”).

Significantly, Congress likewise inserted a preemp-
tive “notwithstanding”-clause in the strict liability provi-
sions of the Comprehensive Environmental Response,
Compensation and Liability Act [“CERCLA”], 42 U.S.C.
'§9601 et seq. While worded differently than the clauses
found in TAPAA, FWPCA and OPA, the language
included in §9607 of CERCLA ostensibly indicates a Con-
gressional intent to preclude application of the Robins Dry
Dock rule to that statutory liability scheme. Section
9607(h) provides:

The owner or operator of a vessel shall be
liable in accordance with this section, under
maritime tort law, and as provided under sec-
tion 9614 of this title notwithstanding any provi-
sion of the Act of March 3, 1851 (46 U.S.C. 183ff)

[46 App. U.S.C.A. §§ 182, 183, 184 to 188] or the

absence of any physical damage to the proprietary
interest of the claimant. :

18

While it has been stated that the liability and damage
provisions of the NMSA were generally modelled after
those contained in the FWPCA/CWA and CERCLA, see
United States v. M/V Miss Beholden, 856 F. Supp. 668, 670
(S.D. Fla. 1994); H.R. Rep. No. 100-739, 100th Cong., 2nd
Sess., Pt. I, at 22 (1988), the noticeable absence of a
comparable “notwithstanding”-clause in the NMSA can-
not simply be ignored when discerning whether Congress
intended to include or preempt the Robins Dry Dock rule
in the NMSA.

To be sure, like CERCLA, the NMSA also contains a
discrete limitation of liability subsection. Section
1443(a)(4) provides:

Nothing in sections 175, 181 to 183, and
183b to 188 of the Appendix to Title 46 or sec-
tion 192 of the Appendix to Title 46 shall limit
the liability of any person under this chapter.

Unlike §9607(h) of CERCLA, however, §1443(a)(4) of
the NMSA contains no language indicating preemption of
the Robins Dry Dock rule. The Eleventh Circuit plainly
erred in failing to consider Congress’ purposeful decision
not to include any preemptive language in the NMSA. J
Middlesex County Sewerage Authority v. National Sea Clam-
mers Association, 453 U.S. 1, 22, 101 S.Ct. 2615, 69 L.Ed.2d
435 (1981) (comparing similarity between MPRSA and
FWPCA).

That Congress intended to incorporate the Robins Dry
Dock rule in the NMSA and preclude the United States
from recovering damages where the submerged land and
natural resources at issue are state-owned and the United

19

States has no proprietary interest therein is also evi-
denced by the language actually used in the NMSA. See
Consumer Product Safety Commission v. GTE Sylvania, Inc.,
447 U.S. 102, 108, 100 S.Ct. 2051, 64 L.Ed.2d 766 (1980).
Pursuant to the definitions contained in the NMSA, lia-
bility to the United States is limited to situations where
injury is caused to submerged lands over which the
United States federal government, as opposed to individ-
ual States or foreign nations, have jurisdiction.

Under §1443(a)(1), a person may only be liable to the
United States for causing injury to a “sanctuary
resource.” Pursuant to the definitions contained in the
NMSA, a “sanctuary resource” must be part of a
“national marine sanctuary.”14 A “national marine sanc-
tuary,” in turn, must be part of a “marine environment.” 15
And under §1432(3), “ ‘marine environment’ means those
areas of coastal and ocean waters, the Great Lakes and
their connecting waters, and submerged lands over which
the United States exercises jurisdiction, including the exclu-
sive economic zone, consistent with international law.”

14 16 U.S.C. §1432(8) provides:

“sanctuary resource” means any living or
nonliving resource of a national marine sanctuary
that contributes to the conservation, recreational,
ecological, historical, research, educational, or
aesthetic value of the sanctuary[.]

15 16 U.S.C. §1433(a) provides in relevant part:

The Secretary may designate any discrete area of
the marine environment as a national marine
sanctuary....

20

While the term “jurisdiction” is not defined in the
NMSA, courts focusing on Congress’ usage of that term
in the Submerged Lands Act [“SLA”], 43 U.S.C. §1302,
and the Outer Continental Shelf Lands Act [“OCSLA”],
43 U.S.C. §1331(a), have concluded that the term “delin-
eat[es] the relative powers of the United States federal govern-
ment on the one hand and the governments of other countries
and of the several states on the other.” See Amoco Production
Co. v. Sea Robin Pipeline Co., 844 F.2d 1202, 1205-1206 (5th
Cir. 1988).

Here, as defined under the NMSA, the property
where the pipe scar and grounding incidents occurred
was subject to the “jurisdiction” of the sovereign State of
Florida and not the United States federal government.
Thus, the United States had no Statutory right to recover
damages. See United States v. Ray, 423 F.2d 16, 18-22 (5th
Cir. 1970) (United States could not recover damages, had
they been sought, for tortious injury to submerged coral
reefs outside of United States’ jurisdiction under OCSLA
where United States had no property right in submerged
reefs); see also Treasure Salvors, Inc. v. Unidentified Wrecked
and Abandoned Sailing Vessel, 569 F.2d 330, 338-340 (5th
Cir. 1978) (United States could not claim interest in
wrecked vessel under Antiquities Act, 16 U.S.C. §431 et
seq., where wreck was located on submerged lands out-
side of jurisdiction of United States).

To be sure, given that the submerged lands at issue
were within the State of Florida’s jurisdiction, and the
United States had not otherwise been given any propri-
etary interest in such lands, the United States simply had
no constitutional power to recover damages for injury to
such State property rights. Cf. Pollard v. Hagan, 44 U.S.

EE

21

212, 230, 3 How. 212, 11 L.Ed. 565 (1845) (“Th[e] right of
eminent domain over the shores and the soils under the
navigable waters, for all municipal purposes, belongs
exclusively to the states within their respective territorial
jurisdictions, and they, and they only, have the constitu-
tional power to exercise it.”); cf. also United States v.
California, 436 U.S. 32, 41, 98 S.Ct. 1662, 56 L.Ed.2d 94
(1978) (holding that, by operation of Submerged Lands
Act, State of California has dominion over and propri-
etary interest in submerged lands).

While the United States federal government certainly
has sovereign power to regulate conduct or recuperate fed-
eral costs actually incurred within a State’s territorial jurisdic-
tion, such power must be distinguished from a State’s
sovereign right to recover damages for injury to proprietary
interest in lands owned by the State. See Askew v. American
Waterways Operators, Inc., 411 U.S. 325, 327-335, 93 S.Ct.
1590, 36 L.Ed.2d 280 (1973) (distinguishing Federal Act
which permits recovery of cleanup costs incurred by fed-
eral government as a result of oil spills in state territorial
waters with Florida Act which permits State to recover
for damages to property interests); cf. In the Matter of the
Complaint of Allied Towing Corp., 478 F. Supp. 398, 402-404
(E.D. Va. 1979) (where FWPCA permits recovery for
cleanup or replacement costs actually incurred by gov-
ernment, defendant’s settlement with United States for
FWPCA liability did not satisfy Virginia’s state law claim
for damages to state-owned natural resources and prop-

erty).

Respondent will likely argue that Great Lakes’ posi-
tion is belied by the terms of the Florida Keys National
Marine Sanctuary and Protection Act [“FKNMSPA”],

22

Pub. L. No. 101-605, 104 Stat. 3089 (1990), amended by
Pub. L. No. 102-587, 1992 H.R. 5617, 106 Stat. 5039 at
§2209 (1992), which designated areas within the State of
Florida including the submerged lands at issue, as well as
§1443(d)(3) of the NMSA which provides:

Amounts recovered under this section with
respect to sanctuary resources lying within the
jurisdiction of a State shall be used under para-
graphs (2)(A) and (B) in accordance with the
court decree or settlement agreement and an
agreement entered into by the Secretary and the
Governer of that State.

Neither the FKNMSPA nor §1443(d)(3), however,
resolve the significant issues of statutory construction
presented by this case.

First, the relevant liability and damage provisions of
§1443(a)(1) are expressly tied to the definitions set forth
in §1432. The State of Florida, and not the United States
federal government, owns and exercises “jurisdiction”
over the submerged lands at issue. Further, the State of
Florida’s non-objection to the inclusion of state-owned
lands in the sanctuary designated in the FKNMSPA was
not a relinquishment of State jurisdiction or sovereignty.
See FKNMSPA at Section 5(c). Indeed, the United States
appears to have recognized this principle in formulating
the regulations governing the FKNMSPA: “The [Florida]
Board of Trustees has not conveyed title or relinquished
authority over any state-owned lands or other state-
owned resources by agreeing to include state-owned land
within the Sanctuary boundary.” 62 Fed.Reg. 32156
(1997).

23

Second, the language used in §1443(d)(3) only
strengthens the proffered interpretation of the term
“jurisdiction” in §1432(3). Congress was fully aware of
the critical difference in meaning between the “jurisdic-
tion of a State” (§1443(d)(3)) and the “jurisdiction” of the
“United States” (§1432(3)).

Third, and significantly, the Eleventh Circuit’s opin-
ion does not discuss or even cite §1443(d)(3). And for
good reason. The requirements of this subsection have
not been satisfied. There is no evidence of any agreement
in place between the Secretary and Governor of Florida.

Fourth, if §1443(d)(3) somehow creates an ambiguity
in the interpretation of NMSA, it is all the more reason
why this Court should undertake certiorari review. Fur-
ther, the FKNMSPA does not contain any damage or
liability provisions and merely states under Section 5(a)
that the designated “Sanctuary shall be managed and
regulations enforced under all applicable provisions of
[the NMSA] as if the Sanctuary had been designated
under such title.” The terms of the FKNMSPA reflect the
federal government's authority to regulate conduct but are
totally silent as to any alleged authority to recover damages
for injury to a proprietary right.

And fifth, even if §1443(a)(1) could be construed as
permitting the recovery of damages for injury to sub-
merged lands over which a sovereign State exercises
jurisdiction, pursuant to Robins Dry Dock, the statute must
in any event be read as only embracing those state-owned
lands wherein the United States has otherwise obtained a
proprietary interest such as, perhaps, by express contrac-
tual assignment. See Arnold M. Diamond, Inc. v. Gulf Coast

24

Trailing Co., 180 F.3d 518, 523-524 (3d Cir. 1999) (finding
question of fact whether there was an assignment agree-
ment between company and United States Navy to per-
mit circumvention of Robins Dry Dock doctrine).

In the case at bar, there is no record evidence that the
State of Florida relinquished or assigned its proprietary
interest to the United States. To the contrary, Florida
brought its own damages action against Great Lakes and
Coastal which was settled and set off from the judgment
in favor of the United States.

Lastly, the Eleventh Circuit overlooked the signifi-
cant ramifications of construing the NMSA to impose
liability upon a private party where the land is owned by
one sovereign yet the damages are to be paid to another
sovereign. State and federal governments often disagree
and contest their respective interests. See United States v.
Florida, 425 U.S. 791, 96 S.Ct. 1840, 48 L.Ed.2d 388 (1976).
Private parties should not be placed in the middle. More-
over, what if the injuries alleged in this case had been
caused by vessels owned or operated by the State of
Florida? It cannot be said that the federal government has
a right of action against Florida for injuries to natural
resources owned by Florida. If the United States cannot
maintain a cause of action against Florida for injuries to
state-owned land, then, under the NMSA, the United
States is no more able to assert a claim for damages
inflicted by a private party to state-owned land.

25

B. Great Lakes was entitled to assert maritime
law’s “superseding cause” and “assist tug”
defenses which were not preempted by the
NMSA.

In holding Great Lakes strictly liable to the United
States, the Eleventh Circuit also erroneously precluded
Great Lakes from relying upon maritime law’s “supersed-
ing cause” and “assist tug” defenses. This Court should
grant certiorari review and clarify that such defenses are
available in an action under §1443 of the NMSA and are
to be decided by the trier of fact.

Although the Eleventh Circuit specifically found that
both Coastal and Great Lakes contributed to the indivis-
ible damage so as to form a basis for joint and several
liability (App.12), the court failed to consider whether
Coastal’s actions were in fact the “superseding cause” so
as to relieve Great Lakes of liability under this Court’s
decision in Exxon Company, U.S.A. v. Sofec, Inc., 517 U.S.
830, 116 S.Ct. 1813, 135 L.Ed.2d 113 (1996). Under Sofec,
“ ‘the doctrine of superseding cause is . . . applied where
the.defendant’s negligence in fact substantially contrib-
uted to the plaintiff’s injury, but the injury was actually
brought about by a later cause of independent origin that
was not foreseeabie.’” Id. at 837. The superseding cause
issue “is left to the factfinder, subject to limited review.”
Id. at 840-841.

Here, Great Lakes contends that any causal negli-
gence on its part as it pertains to the preparation and
maintenance of the pipe raft was plainly superseded by
the unforeseeable actions of the crew of Coastal’s Captain
Joe which ran aground and caused the blow hole.

26

(App.10,21-25). Had the Captain Joe stopped and
reported either of the grounding incidents, as legally
required by 46 C.F.R. §§4.05-1 & 4.03-1(b), or waited for
daylight to view the situation, or sought assistance, no
blow hole damage would have occurred. Pursuant to
Sofec, the district court, as trier of fact, was duty-bound to
determine whether the actions of Coastal effectively cut
off Great Lakes’ liability.

In determining that there was sufficient evidence of
“causation” to impose liability under the NMSA, the
Eleventh Circuit also referenced the actions of Great
Lakes’ assist tugs during the voyage.!° The Eleventh Cir-
cuit completely overlooked, however, that, under well
established principles of maritime law, an assist/ helper
tug cannot be held responsible for merely obeying orders.
See, e.g., The ‘Connecticut’, 103 U.S. 710, 712, 13 Otto 710,
26 L.Ed. 467 (1880); Baker Carver & Morrell Ship Supplies,
Inc. v. Mathiasan Shipping Co., 140 F.2d 522, 525 (2d Cir.
1944); Diesel Tanker Ira S. Bushey, Inc. v. Tug Bruce A.
McAllister, 1995 A.M.C. 806, 1994 WL 320328 *11 (S.D.
N.Y. 1994).

Here, the district court expressly found that “at all
times during the trip, [Great Lakes’] Volunteer State was
to receive its instructions from [Coastal’s] Miss Necie”
and “[Great Lakes’] Cavalier State was to receive its
instructions from [Coastal’s] Captain Joe.” (App.21).
Great Lakes cannot be held liable where its assist tugs did

16 For example, the Eleventh Circuit relied upon the factual
finding that “[s]ome combination of the Captain Joe’s engines
and the efforts of Great Lakes’ tug, the Cavalier State, dragged
the Captain Joe farther along the bank.” (App.10).

27

nothing more than follow the orders of Coastal and the
government authorities involved in extricating the Cap-
tain Joe.

Respondent will likely argue that the “superseding
cause” doctrine and “assist tug” defense are preempted
and inapplicable to an action under §1443 of the NMSA.
Respondent contended below that, pursuant to
§1443(a)(3)(A), the NMSA only allows a defense where
the injuries are “caused solely” by the actions of the
“third party” and that, here, both Coastal and Great
Lakes contributed to the damage.’”

There is nothing in the NMSA, however, to suggest
that the defenses listed in §1443(a)(3) are exclusive. To the
contrary, the fact that Congress saw fit to only state in
§1443(a)(4) that various other statutory sections do not
limit liability demonstrates that other maritime defenses
are not preempted. As detailed above, Congress did not
include in the NMSA the “notwithstanding the provisions
of any other law”-proviso as it did in the FWPCA/CWA,
OPA and TAPAA which would have demonstrated Con-
gressional intent that the strict liability provisions not be
modified by preexisting common law. See 33 U.S.C.
§1321(f)(1); 33 U.S.C. §2702(a)(1); 43 U.S.C. §1653(c)(1); see

17 16 U.S.C. §1443(a) provides in relevant part:
(3) Defenses

A person is not liable under this subsection if that
person establishes that -

(A) the destruction or loss of, or injury to, the
sanctuary resource was caused solely by an act of
God, an act of war, or an act or omission of a third
party, and the person acted with due care....

28

also, e.g., In the Matter of the Complaint of Oswego Barge
Corp., 664 F.2d at 339-340.

Further, the “causation” requirement in the NMSA is
set forth under the provisions of §1443(a)(1). Maritime
law’s “proximate causation requirement, and the related
superseding cause doctrine” must therefore be deemed
incorporated into the statute’s liability provisions. See
Sofec, 517 U.S. at 836. There is no evidence that Congress
intended to preempt federal maritime or common law in
this regard. See, e.g., Barnes v. Andover Company, L.P., 900
F.2d 630, 637 (3d Cir. 1990) (“statutes ‘invad[ing]’ com-
mon law or general maritime law are read with a pre-
sumption toward retaining familiar principles”).

Accordingly, because the Eleventh Circuit’s inter-
pretation of the NMSA conflicts with settled principles of
Statutory construction, and further because this case
involves an environmental liability scheme of significant
public importance, certiorari is appropriate.

*

29

CONCLUSION

For the foregoing reasons, the petition for writ of
certiorari should be granted. .

Respectfully submitted,

Joun W. Ketter, Esa.
JoHN Ketter & Associates, P.A.
121 Majorca Avenue, Suite 200

Coral Gables, FL 33134
Tel: 305/445-7801
Fax: 305/445-8920

Mark Hicks, Esa.
Counsel of Record
Hicxs, ANDERSON & KNEALE, P.A.
799 Brickell Plaza, Suite 900
Miami, FL 33131
Tel: 305/374-8171
Fax: 305/372-8038
Attorneys for Great Lakes

App. 1

[PUBLISH]
IN THE UNITED STATES COURT OF APPEALS,
FOR THE ELEVENTH CIRCUIT
D.C. DOCKET No. 97-02510-CV-EBD

UNITED STATES OF AMERICA,

Plaintiff-Appellee-
Cross-Appellant,

INTERNAL IMPROVEMENT TRUST FUND, et al,
Plaintiffs-Appellees,
versus
GREAT LAKES DREDGE & DOCK COMPANY,

Defendant-Appellant-
Cross-Appellee.

Appeals from the United States District Court
for the Southern District of Florida

(Filed July 30, 2001)

Before ANDERSON, Chief Judge, RONEY and FAY, Cir-
cuit Judges. .

RONEY, Circuit Judge:

Defendant Great Lakes appeals the judgment against
it in a suit for damages brought by the United States
under the National Marine Sanctuaries Act for damage to
the Florida Keys Marine Sanctuary caused by a grounded
tugboat and dredge pipe. The government's cross-appeal

App. 2

concerns the district court’s ruling that no primary resto-
ration is required for the grounding site. We affirm the
district court’s decision on liability, but we vacate a por-
tion of the damages award, specifically that no action is
the best alternative for addressing damage at the ground-
ing site. We remand for further factual findings regarding
this question.

I. Facts

In May 1993, Great Lakes Dredge & Dock Company
(Great Lakes) hired Coastal Marine Towing (Coastal) to
tow 500-foot lengths of dredge pipe and other equipment
from Boca Grande to Green Cove on the East Coast of
Florida. Coastal supplied two tugs, Captain Joe and Miss
Necie and their crews. Great Lakes supplied two assist
tugs, Volunteer State and Cavalier State.

While proceeding through the Florida Keys National
Marine Sanctuary, one of the pipes in a raft towed by
Miss Necie dragged the sea bottom creating a pipe scar
approximately 13 miles long.

The following facts caused grounding site damage
which is the subject of this appeal. Due to a navigational
error by Miss Necie, the flotillas got off course and Cap-
tain Joe ran aground in seven feet of water trying to pass
Miss Necie. Great Lakes’ assist tug, Cavalier State, was
tied to the Captain Joe. Sanctuary and state officials
helped devise a plan to extricate Captain Joe. At high
tide, Captain Joe was powered off the bank by a combina-
tion of its own motor and the Cavalier State. The ground-
ing left behind a channel 120 meters long, eight to ten
meters wide and two meters deep. The grounding

App. 3

destroyed 7,495 square meters of sea bottom, consisting
of turtle grass, manatee grass and finger coral. The boats
also created a large hole, or “blowhole,” 120 meters long
by nine meters wide.

The United States brought this action on behalf of the
U.S. Department of Commerce, National Oceanic and
Atmospheric Administration (NOAA) under the National
Marine Sanctuaries Act (NMSA) of 1972, as amended, 16
U.S.C. § 1431-1445, for the destruction caused by the
grounding of the sanctuary resources, primarily sea-
grasses, in the marine sanctuary. The State of Florida also
filed a complaint against defendants, which was consoli-
dated with the federal case. The first day of trial, Coastal
settled its claims with the United States and the State of
Florida for $618,484. The settlement satisfied Florida’s
claims against Great Lakes as well, and Florida is not a
party to this appeal. The State of Florida did file an
amicus brief in support of the United States’ positions
concerning liability and damages, but argues only lia-
bility.

After an eight-day bench trial in April 1999, the
district court granted in part and denied in part the relief
sought by the government. The court ruled in favor of the
United States on liability, finding that Great Lakes was
strictly liable under the NMSA for all damages to the
sanctuary. Regarding damages, the government sought
compensation for implementation of both its primary res-
toration plan and its compensatory plan.

Under the primary restoration component of dam-
ages, the government is entitled to recover the cost of
implementing its plan to restore or replace the injured

App. 4

resource, or the cost of acquiring the equivalent of the
sanctuary resource, if it cannot be restored or replaced.
See 16 U.S.C. § 1432(6)(A). Both the government and |
Great Lakes agreed that the pipe scar recovered on its
own in three years, so the damage caused is not a part of
this appeal. As for the grounding site, the government
proposed a plan to use imported sediment to fill and
restore the grounding site, one of three alternative pri-
mary restoration plans considered by the government.
The district court determined that another plan, the “no
action” plan for the primary restoration of the grounding
site was appropriate, but that the U.S. should recover the
cost of physical and biological monitoring of the site.

The district court also held that the government was
entitled to damages for compensatory restoration, which
is compensation for the interim lost use of the resources.
at the pipe scar and grounding site during the period
from destruction to recovery. See 16 U.S.C. § 1432(6)(A).
Recovery for lost interim services is in the form of sea-
grass restoration projects at other suitable locations
within the Sanctuary. The district court determined that
the Prop Scar Restoration Program developed by the
government is an appropriate compensatory restoration
project that would provide seagrass services equivalent
to those lost due to the injuries caused by Great Lakes at
both the grounding site and the pipe scar. The court also
held that the government’s reliance on the Habitat Equiv-
alency Analysis (HEA) was appropriate to scale the com-
pensatory seagrass restoration project. Based on these
determinations, the district court awarded to the govern-
ment, its response and assessment costs; compensatory
and monitoring costs; and permitting and supervision

App. 5

costs. The district judge required the government to recal-
culate the appropriate damages by simple mathematical
computations based on its findings of fact. On March 1,
2000, the district court entered final judgment against
Great Lakes in the amount of $368,796.97, the figure after
setting off the settlement amount paid by Coastal.

On appeal, Great Lakes argues the district court erred
in finding Great Lakes liable to the United States because
(1) suit by the United States not authorized under com-
mon law; (2) Great Lakes was not vicariously liable for
Coastal’s actions, and (3) the method used to assess resto-
ration was faulty. On cross-appeal, the United States
argues the district court erred in approving “no action”
as the primary restoration plan for the grounding site.

II. Applicable Statutory Provisions.

The National Marine Sanctuaries Act governs the
designation and management of federally protected
marine areas of special significance. Congress enacted the
NMSA in response to the increasing degradation of
marine habitats and in recognition of the need to protect
marine ecosystems. See S. Rep. No. 100-595, 2d Sess. 1
(1998), reprinted in 1988 U.S.C.C.A.N. 4387. The NMSA
confers authority for the designation and management of
marine sanctuaries on the Secretary of Commerce, 16
U.S.C. §§ 1433, 1434, who has delegated these respon-
sibilities to the NOAA.

The NMSA imposes civil liability on “any person
who destroys, causes the loss of or injures any sanctuary
resource.” 16 U.S.C. § 1443.

App. 6

The Attorney General, at the request of the Secretary,
may commence an action against any person or vessel
who is liable for response costs and damages. 16 U.S.C.
§ 1443(c). “Response costs” include costs of actions taken
to minimize the destruction of sanctuary resources.
§ 1432(7). “Damages” include compensation for (1) the
cost of restoring, replacing, or acquiring the equivalent of
a sanctuary resource and the interim loss value of the
resource pending restoration; (2) damage assessment
costs, and (3) reasonable monitoring costs. 16 U.S.C.
§ 1432(6).

3. Discussion.

1. Whether the National Marine Sanctuaries Act
Authorizes Damages to the United States Gov-
’ ernment for Injuries to Sanctuary Resources.

At the outset, we reject Great Lakes’ argument that
the government has no claim for damages in this case
because the property at issue is state-owned and the
United States therefore has no proprietary interest. See
Robins Dry Dock & Repair Co. v. Flint, 275 U.S. 303, 308
(1927). This argument belies the express language and
scheme of the relevant statutes. On November 6, 1990,
Congress enacted the Florida Keys National Marine Sanc-
tuary Act (the “Sanctuary Act”), Pub.L. No. 101-605, 104
Stat. 3089 (1990), which designated 2800 nautical miles of
coastal water in the Florida Keys as the Florida Keys
National Marine Sanctuary. The Sanctuary Act provides
that “[t]he Sanctuary shall be managed and regulations
enforced under all applicable provisions of [the NMSA]
as if the Sanctuary had been designated” thereunder.

App. 7

Sanctuary Act, § 5(a). In this case, the United States seeks
damages from defendants for a violation of § 1443 of the
NMSA, which imposes strict liability for damage or
injury to any sanctuary resource. See, e.g., United States v.
M/V Jacquelyn L., 100 F.3d 1520, 1521 (11th Cir. 1996); 16
U.S.C. § 1443(a)(1). The NMSA plainly authorized the
United States to recover the damages it seeks for injuries
to seagrass resources. The NMSA explicitly provides,
“Any person who destroys, causes the loss of, or injures
any sanctuary resources is liable to the United States for
an amount equal to the sum of . . . the amount of
response costs and damages resulting from the destruc-
tion, loss, or injury... .” 42 [sic] U.S.C. § 1443(a)(1){A).

2. Whether the District Court Erred in Awarding
Damages Based on the Habitat Equivalency Anal-
ysis.

The United States sought damages under § 1432 of
the NMSA for “the cost of . . . acquiring the equivalent of
a sanctuary resource,” and for the value of lost use of the
resource “pending acquisition of an equivalent” resource.
In other words, to compensate for damages sustained and
for lost interim services at the blowhole and pipe scar
sites, equivalent sites were selected for restorative or
replacement actions. The Habitat Equivalency Analysis
(“HEA”) was used to scale (quantify the size of) the
equivalent area to be restored, and therefore, to quantify
the damages for lost interim services and the acquisition
of equivalent resources.

Great Lakes argues that the district court erred in
accepting the HEA for two reasons: first, use of an HEA is

App. 8

not appropriate under Daubert v. Merrell Dow Pharmaceuti-
cals, Inc., 509 U.S. 579, 590 (1993) as a methodology for
determining damages in this case; and second, the under-
lying “scientific data” plugged into the mathematical
equations as input parameters could not pass muster
under Daubert.

The Supreme Court has interpreted the Federal Rules
of Evidence to require scientific evidence to be both rele-
vant and reliable. See Daubert, 509 U.S. at 795. In Daubert,
the Supreme Court set forth four factors, among others,
that a trial judge may consider in determining the
reliability of scientific testimony: (1) whether a theory or
technique can be and has been tested; (2) whether a
theory or technique has been subjected to peer review
and publication; (3) the known or potential rate of error
of a particular scientific technique; and (4) whether a
theory or technique has been generally accepted. See
Daubert, 509 U.S. at 592-593. These factors do not consti-
tute a definitive checklist, and courts have ample discre-
tion to assess “whether the reasoning or methodology
underlying the testimony is scientifically valid, and
whether that reasoning or methodology properly can be
applied to the facts at issue.” See Daubert, 509 U.S. at
592-93.

The district court did not abuse its discretion when it
determined that use of the HEA was appropriate and that
the underlying scientific data satisfied Daubert. Our
review of the evidence indicates, contrary to Great Lakes’
assertions, that the HEA was peer reviewed and accepted
for publication prior to trial. See e.g. R13-151, 185-87, in
which Dr. Brian Julius, who introduced the HEA, dis-
cussed the peer review and publication of the HEA.

Ha WER RS 1? AR a MD AOI. “9 i aa

App. 9

Great Lakes remaining arguments address the quality
of the data that went into the HEA and differing inter-
pretations of the underlying data, all of which were ade-
quately addressed by the district court. Specifically, Great
Lakes challenges (1) the calculation of compensatory res-
toration, that is the validity of the data used to determine
the recovery rates of the injured sites; (2) the feasibility of
the compensatory sites as equivalent sites; the “com-
pressed succession” technique, which is a planting tech-
nique that achieves a more rapid rate of seagrass recovery
by temporarily substituting a faster growing species,
Halodule, for the slower growing Thalassia, and then
allows Thalassia to recolonize the stabilized area; and (3)
the HEA’s sensitivity to major changes in fundamental
input parameters. The district court addressed these
objections in its July 28, 1999 Order, stating that evalua-
tion of the data put into the HEA and the arguments
relating to data interpretation are relevant when the
court, as fact finder, weighs the evidence and determines
how much weight to give each experts’ opinion. Our
thorough review of the record reveals no error in the
district court’s acceptance of the HEA. We note that nec-
essary modifications to the HEA were ordered by the
court and complied with by the United States, arguably
rendering the HEA more reliable.

App. 10

3. Whether the District Court Erred in Finding Great
Lakes Vicariously Liable for the Actions of Coastal.

Great Lakes argues it was held vicariously liable for
damage when “[t]here was no proof at trial that Great
Lakes’ conduct violated this statute with respect to the
blowhole,” and “the trial court did not address whether
the U.S. proved a prima facie case.”

We hold that the district court’s factual findings sup-
port the determination that Great Lakes’ conduct gave
rise to strict liability under the NMSA. Specifically, the
court found Great Lakes was responsible for helping
Coastal’s vessels maneuver the tows, maneuver the 500-
foot long pipe rafts, and assist with unanticipated prob-
lems. Great Lakes was responsible for preparing the pipe
rafts and ensuring they were safe and seaworthy, and it
failed to test the pipes before the trip. Great Lakes failed
to send a welder or crane operator with the flotilla who
could have made any needed repairs. Great Lakes failed
to provide Coastal crews with any direction once notified
about the sinking pipes and instead arranged for a
welder and crane operator to meet the flotilla at Mara-
thon. Great Lakes failed to notify the lead tugs that any
pipes were dragging. The dragging pipes caused a 13-
mile pipe scar. The dragging pipes slowed down the Miss
Necie, which caused the Captain Joe to maneuver sharply
to avoid a collision, resulting in running aground. Some
combination of the Captain Joe’s engines and the efforts
of Great Lakes’ tug, the Cavalier State, dragged the Cap-
tain Joe farther along the bank. The grounding and
attempts to extricate the Captain Joe from the site
resulted in injuries to sanctuary resources.

App. 11

Contrary to Great Lakes assertions, these factual
findings are supported by the record evidence and are
not clearly erroneous. These facts are sufficient to demon-
strate causation sufficient to impose liability under the
NMSA.

Great Lakes argues that the district court improperly
denied it the affirmative third-party defense under
§ 1443. The Act provides three defenses, only one of
which is applicable to this case. Under the statute, a
person is not liable if that person establishes that the
injury to sanctuary resources was “caused solely
by ... an act or omission of a third party, and the person
acted with due care.” § 1443(a)(3)(A). This provision is
substantively identical to those statutes upon which the
NMSA was modeled, the Federal Water Pollution Control
Act Amendments of 1972 (Clean Water Act) § 311(f)(1), 33
U.S.C. § 1321(f)(2); and the Comprehensive Environmen-
tal Response, Compensation, and Liability Act of 1980
(CERCLA), § 101 et seq., 42 U.S.C.A. § 9607(b)(3). The
district court correctly determined that under no view of |
the evidence could Great Lakes satisfy either of these
elements of the defense.

The district court held Great Lakes was strictly liable,
relying upon United States v. LeBeouf Brothers Towing Co.,
621 F.2d 787 (5th Cir. 1980), a case in which the Fifth
Circuit, under a similar strict liability provision in the
Clean Water Act, rejected the argument that an indepen-
dent contractor acting for and under the control of a
defendant employer is a “third party” for the purpose of
absolving the defendant employer of liability under the
statute. In that case, the Fifth Circuit rejected a vessel
owner’s argument that it was not liable under the third-

App. 12.

party defense provisions of the Federal Water Pollution
Control Act Amendments of 1972 (Clean Water Act)
§ 311(f)(1), 33 U.S.C. § 132, for the accidental discharge of
oil by an independent contractor tug crew hired by the
defendant. The court concluded that the defendant held
ultimate control over hiring the contractor, specifying its
itinerary, and retaining the contractor throughout the job.
LeBeouf, 621 F.2d at 789-90. The court also concluded that
the third-party defense was not intended to protect a
party from the acts or omissions of those acting under its
control or on its behalf. 621 F.2d at 790. Otherwise, “the
statute’s comprehensive scheme for preventing and
cleaning up oil spills would be undermined if barge
owners like [defendant] could escape strict liability
merely by hiring out their operations to tugs.” 621 F.2d at
789. In this case, the district court correctly reasoned that
the remedial purpose of the NMSA and the need to
encourage oversight with independent contractors
requires an equally strict reading of the NMSA’s third-
party defense.

Great Lakes has simply failed to prove that the injury
was solely the result of Coastal’s actions and that Great
Lakes acted with due care. Great Lakes contends that
even if it is liable, it should only pay for a proportional
share of damages. Where, as in this case, however, each
defendant is a legal cause of the damage and the damage
is indivisible between the two, the district court correctly
held that liability under the NMSA is joint and several.
This holding is consistent with cases finding joint and
several liability under the CWA and CERCLA. See e.g.,
United States v. M/V Big Sam, 681 F.2d 432, 438-39 (5th Cir.
1982) (CWA); Redwing Carriers v. Saraland Apartments, 94

App. 13

F.3d 1489, 1512, 1513 (11th Cir. 1996) (CERCLA). The
evidence supports the district court’s findings of facts
regarding joint and several liability. The court’s_factual
findings indicate that Great Lakes caused damage at both
the pipe scar and the blowhole. Although the district
court did not expressly address the divisibility of the
injuries, it is clear from the evidence Great Lakes’ actions
during the entire incident were inextricably tied with
Coastal’s actions. The resulting injuries cannot be attrib-
uted to any one defendant. Although the district court
concluded that Great Lakes was jointly and severally
liable, it did in fact reduce Great Lakes’ liability by
$618,484,86 [sic] or approximately two-thirds of the judg-
ment, in recognition of Coastal’s payment of that amount.

A review of Great Lakes challenges to the court’s
evidentiary rulings regarding the admission of affidavits
with attached summaries and supporting documentation
of two experts, Wiley Wright and Michelle McQuillan,
reveal there to be no abuse of discretion in the various
rulings.

4. The United States’ Cross Appeal.

The United States’ cross-appeal concerns the district
court’s ruling that “no action” is the appropriate plan for
the grounding site. The government alleges that the dis-
trict court erred in relying on the hearsay report of a non-
testifying government consultant and clearly erred in
certain factual determinations, including that natural
recovery would occur in 70 years. It argues that approval
of a “no action” plan is contrary to the NMSA and the
agency’s expert judgment.

App. 14

As contemplated by the NMSA, the NOAA devel-
oped a restoration plan for the injured resources and the
grounding site and the pipe scar. Under the NMSA, dam-
ages include: (1) the cost of replacing, restoring, or
acquiring the equivalent of an injured sanctuary resource
(“primary restoration”); (2) compensation for the interim
loss of resources and services from the time of injury
until resources recover to baseline (“compensatory resto-
ration”); (3) damage assessment costs; and (4) reasonable
monitoring costs. 16 U.S.C. § 1432(6). The agency recom-
mended compensatory restoration for both the pipe scar
and the grounding site. The agency did not recommend
primary restoration for the pipe scar because it was
recovering naturally in a timely manner, but it did recom-
mend primary restoration for the grounding site.

The agency narrowed down to three the viable alter-
native plans for primary restoration of the grounding
site: (1) a “no action” plan; (2) a site regrading plan, and
(3) the “imported fill” plan. The government recom-
mended the third option, the imported fill plan, but the
district chose the no action alternative.

The court made the following findings: (1) it was not
convinced the plan would restore the bank to its original
condition; (2) it concluded the grounding site would be
expected to fully recover on its own in roughly 70 years
and (3) it raised concerns about potential construction
risks. In reaching this conclusion, the court misin-
terpreted the evidence and testimony before it, and
certain of these findings are not based on the evidence.

One of the more significant factual errors was
the court’s finding that natural recovery without any

App. 15

interference would take approximately 70 years. The evi-
dence clearly indicated that this seventy-year period
upon which the district court relies is in fact the amount
of time the grounding site is expected to achieve full
biological recovery after implementing the United States’
primary restoration plan. The Report from J. Harold Hud-
son, Regional Biologist, Key Largo National Marine Sanc-
tuary, Exh. 18 states in the “PROGNOSIS FOR
RECOVERY”:

Complete recovery of this site to pregrounding
conditions is not expected to occur without
human intervention . . . Infilling of channelized
areas of the grounding site is an essential first
step toward site recovery. If no other remedial
action is taken it is anticipated that complete
overgrowth of the site by seagrasses and corals
to pregrounding levels could occur in 75 to 100
years.

The government’s biologist, Judson Kenworthy, testi-
fied that the recovery horizon for the slower growing
Thalassia grass was seventy-one years for an area the size
of the injury at the grounding site. R-12-79, 81. Govern-
ment expert Brian Julius, elaborated that the seventy-one-
year recovery rate was based on the assumption that the
government’s primary restoration plan would be com-
pleted. R13-155-156, 170.

There is evidence in the record that natural recovery
without human intervention would take much longer, as
much as hundreds of years. Government expert Dr.
Joseph Zieman testified that if the bank were left alone,
recovery “would take a long, long time. Many, many
decades to possibly hundreds of years.” R-13-116.

App. 16

Thus, the court’s finding that the government's pri-
mary restoration plan will not decrease the recovery
period is clearly erroneous.

The court also relies on report of Dr. Kevin R. Bodge,
to support its statement that “the morphological signa-
ture of the injury will be visible for many years to come
irrespective of what plan is implemented.” As an initial
matter, the government challenges the district court’s
reliance on the Bodge report at all, because Bodge was a
non-testifying government consultant and his report was
admitted into evidence for the limited purpose of
explaining other experts’ testimony. Assuming for pur-
poses of this argument that the Bodge report was prop-
erly considered, the district court relied on it for evidence
unsupported in either the report itself or other record
evidence. The report only compared the no action alter-
native to a berm-transfer alternative, not the govern-
ment’s infill plan. The report therefore provided no
opinion on the government’s plan’s potential effect on the
sited morphology.

We must also note that the Bodge report’s recommen-
dation of “no action” was a qualified one based on sev-
eral critical assumptions: that the banks are stable, the
sediment is not chronically disturbed and the rubble is
not susceptible to erosion. The court made no findings as
to whether these underlying assumptions were met.

The evidence in the record indicates that biological
recovery of the site’s resources would eventually occur
only after the site had been stabilized. Kenworthy testi-
fied that the site would remain unstable “[uJntil the phys-
ical topography of that site is brought back to as near as it

App. 17

was prior to the grounding event.” R-12-113. See also
McCabe’s testimony, R-13-57-58 (“[i]f you do not fill it
you are still going to be continually subject to hurricane
wave impact .. . It is never going to stabilize.”); and
Zieman’s testimony regarding the infill R-13-114 (“[M]y
paramount recommendation is no matter what happened
that [it tried] to fill in that crater in there and get it back
to some type of near conforming bank top surface.”)

The statutory scheme under the NMSA explicitly
authorized the Secretary of Commerce, acting as trustee
for sanctuary resources, to take “all necessary actions” to
prevent or minimize the destruction or loss of, or injury
to, the resources. 16 U.S.C. § 1443(b)(1). Under these
circumstances, where several key findings made by the
district court were based on misinterpretations of the
record, we deem it necessary to remand for further con-
sideration, with particular attention paid to the question
whether the fact that it is the government’s plan rather
than the “no action” plan that provides for recovery in
approximately seventy years, and how the other factors
weigh in against that element. Recognizing that part of
the court’s order assumes the government will continue
to monitor the effects of the no-action alternative, we
assume the government will take this opportunity to
update the court on any new information that would aid
in the district court’s decision.

By this decision, we do not intend to indicate that a
“no-action” plan would not ultimately be the option of
choice. But the choice, in which some discretionary judg-
ment may be involved, should rest on correct findings of
fact supported by evidence in the record.

App. 18

AFFIRMED IN PART, VACATED IN PART AND
REMANDED.

App. 19

UNITED STATES DISTRICT COURT
SOUTHERN DISTRICT OF FLORIDA
SOUTHERN DIVISION
IN ADMIRALTY
CASE NO. 97-2510-CIV-DAVIS/BROWN
CASE NO. 97-10075-CIV-DAVIS/BROWN

UNITED STATES OF
AMERICA,
Plaintiff,

V.

GREAT LAKES DREDGE &
DOCK CO.,

Defendant.

BOARD OF TRUSTEES OF
THE INTERNATIONAL
IMPROVEMENT TRUST
FUND OF THE STATE OF
FLORIDA and FLORIDA
DEPARTMENT OF
ENVIRONMENTAL
PROTECTION,

Plaintiffs,
Vv.

GREAT LAKES DREDGE &
DOCK CO.,

Defendant.

App. 20

FINDINGS OF FACT AND
CONCLUSIONS OF LAW

(Filed Sep. 27, 1999)

THIS CAUSE came before the Court on claims by the
United States of America and the State of Florida against
Great Lakes Dredge & Dock Company (“Great Lakes”)
and Coastal Marine and Towing (“Coastal”) for damage
caused by a grounded tugboat and dredge pipe to the
Florida Keys National Marine Sanctuary. Plaintiffs sought
damage and response costs pursuant to the National
Marine Sanctuaries Act, 16 U.S.C. §§ 1431, et seq.

On the first day of trial, both the United States and
the State of Florida entered into a settlement agreement
with Coastal, whereby all claims against Coastal were
dismissed. The terms of the settlement agreement were
set forth and approved by this Court on April 15, 1999.
Under the agreement, the State of Florida’s claims against
Great Lakes were also satisfied. Thus, the United States
proceeded to trial solely against Great Lakes.

The matter was tried before the Court from April 5,
1999 through April 14, 1999. The Court enters the follow-
ing Findings of Fact and Conclusions of Law pursuant to
Rule 52(a) of the Federal Rules of Civil Procedure. To the
extent that the Findings of Fact may be considered Con-
clusions of Law, they shall be so considered. Similarly, to
the extent that the Conclusions of Law may be considered
Findings of Fact, they shall be so considered.

H
s
§
%

App. 21

I. FINDINGS OF FACT
A. Background

In May of 1993, Great Lakes was demobilizing a
dredge project in the Boca Grande Channel off the west
coast of Florida. Great Lakes orally hired Coastal to tow
the dredge pipe and other equipment from Boca Grande
to Green Cove on the east coast of Florida. Under the
agreement, Coastal was to supply two tugs, the Captain
Joe and the Miss Necie, plus crews. Great Lakes was to
provide two assist tugs, the Cavalier State and the Volun-
teer State, to accompany Coastal’s vessels to Green Cove.
During the voyage, the Great Lakes’ assist tugs would be
responsible for helping Coastal’s vessels maneuver the
tows, provide an extra set of eyes to monitor the pipe
rafts, and to assist in the event of unanticipated prob-
lems.

Coastal’s lead tug, the Miss Necie, was towing two
rafts made up of several five hundred foot dredge pipes.
The Miss Necie was assisted by Great Lakes’ assist tug,
the Volunteer State. At all times during the trip, the
Volunteer State was to receive its instructions from the
Miss Necie. Coastal’s second tug, the Captain Joe, was
towing a derrick barge with a crane and other dredging
equipment and one raft of 500 foot dredge pipe. The
Captain Joe was assisted by Great Lakes’ assist tug, the
Cavalier State. At all times during the trip, the Cavalier
State was to receive its instructions from the Captain Joe.

Great Lakes was responsible for the preparation of
the pipe rafts and ensuring that the rafts were watertight,
safe and seaworthy. Great Lakes used its own crane,
welding equipment, and crews to prepare the tows. Great

App. 22

Lakes, however, failed to test the pipes to confirm that
they were airtight, despite being asked to do so by
Coastal’s operations manager.

On May 26, 1993, the Great Lakes-Coastal flotilla
departed from Boca Grande en route to Green Cove.
Great Lakes instructed Coastal to keep the derrick barge
with the crane close to the Ms. Nessie [sic] pipe rafts in
case something went wrong. Great Lakes, however, failed
to send a welder or crane operator with the flotilla who
could have made any required repairs.

Coastal initially contemplated that the tugs would
take their tows south along the west coast of Florida to
Key West, and then proceed up the east coast of Florida
to Green Cove. One day out of Boca Grande, however, it
was discovered that some of the pipes in the Miss Necie
pipe raft were lower than normal in the water. The crew
of the Volunteer State inspected the pipe raft and deter-
mined that the pipes were low, but that they had not sunk
to the bottom.

A Great Lakes employee aboard the Volunteer State
reported the sinking pipes to the lead captain of the Miss
Necie. The captain of the Ms. Nessie [sic] then notified
various officials at Great Lakes and Coastal about the
sinking pipes and inquired as to the appropriate course of
action. What followed were a series of conversations with
officials at both companies, whereby no one in charge
would render a decision. Officials at Coastal maintained
that only Great Lakes could grant permission to stop the
flotilla, while Great Lakes referred all questions back to
Coastal officials.

App. 23

Instead of providing Coastal crews any specific direc-
tion, Great Lakes arranged for a crane operator and
welder to go to Marathon to meet up with the flotilla and
fix Ms. Necie’s tow. Having failed to attain permission
from Great Lakes to stop the flotilla and out of concern
for approaching bad weather, the Miss Necie elected to
proceed through the Florida Keys National Marine Sanc-
tuary (“Sanctuary”) to Marathon where the Great Lakes
repair crew would be waiting.

B. Seagrass Damage

1. Pipe Scar

At this point, the Miss Necie, Captain Joe, and their
respective assist tugs all changed course to proceed
through the Sanctuary. The Volunteer State, acting as an
extra set of eyes for the Miss Necie, continued to report
that the tow was holding together and that it could safely
continue its course. As was later discovered, however, at
least one pipe on the Miss Necie was so low that it
dragged along the sea bottom as the flotilla entered the
Sanctuary.

The dragging dredge pipe created a pipe scar approx-
imately 13 miles long (the “Pipe Scar”) and destroyed
18,280 square meters of sea bottom. The affected area
consisted primarily of sea grasses and other sanctuary
resources, including Thalassia (23%), Syringodium (76%),
and small amounts of sand, sediment and algae (1%).}

1 In arriving at this figure, the Court relied almost entirely
on the United States’ estimates of the composition of the sea
bottom prior to the creation of the Pipe Scar. The Court found

App. 24

Both the government and Great Lakes have agreed that
the Pipe Scar recovered on its own in three years and that
no restoration at the site is necessary.

2. Grounding Site

While proceeding through the Sanctuary, the Miss
Necie began to slow due to the dragging of the dredge
pipe. The Captain Joe, following immediately behind the
Miss Necie, failed to notice how much the Miss Necie had
slowed until it was almost on top of her. Captain Trice, in
charge of the Captain Joe at the time, ordered the Cava-
lier State (which was attached to the rear of the tow) to
“back her down”, i.e., to help slow the Captain Joe.
Captain Trice then tried to pass the Miss Necie on the
right. Realizing, however, that he would not be able to
successfully execute that maneuver, Captain Trice
brought the vessel back hard to the left. In executing the
move to the left, he avoided a collision with the Miss
Necie but momentarily ran aground on a bank in the
Sanctuary.

Again, Captain Trice asked the Cavalier State to back
up the Captain Joe and its tow. Captain Trice then swung
the Captain Joe to the left or port side of the Miss Necie.
As the Captain Joe came alongside of the Miss Necie this
time, it ran hard aground. Captain Trice tried to get the
Captain Joe off the bank to no avail. The Miss Necie, on
the other hand, was able to continue forward and

that the government’s expert studies of the damaged areas were
more thorough and precise than were Great Lakes’.

Oe

App. 25

eventually brought itself to a stop outside of Marathon
without further incident.

On the following morning, the Captain Joe was still
hard aground. Some combination of the Captain Joe’s
own engines and the Cavalier State’s pulling during
failed attempts to extricate the tug had actually dragged
the Captain Joe further along the bank. The local sanctu-
ary authorities arrived on the scene later that afternoon to
assess the situation. Working together with Coastal and
Great Lakes, the authorities devised a plan to extricate
the Captain Joe from the bank. Finally, at around 2:00
a.m. on the morning of May 27, during the highest tide,
the Captain Joe was removed from the bank.

The grounding of the Captain Joe destroyed 7,495
square meters of the sea bottom and bank (the “Ground-
ing Site”). The Grounding Site, prior to the incident,
primarily consisted of Thalassia (69%), Syringodium
(30%), and porites coral, sand and other sediment (1%).?
Natural recolonization at the Grounding Site has been
very slow, and a full recovery of the seagrasses at the Site
is likely to take many years.

2 In arriving at this figure, the Court relied almost entirely
on the United States’ estimates of the composition of the sea
bottom prior to the creation of the Grounding Site. See Hudson
Report, Exhibit 18. The Court found that the government’s
expert studies of the damaged areas were more thorough and
precise than were defendant'’s.

App. 26

C. Seagrass Restoration

In accordance with federal regulations, the govern-
ment has developed a plan to address injuries at the
Grounding Site and Pipe Scar that involves two compo-
nents — 1) primary restoration; and 2) compensatory res-
toration. See 60 Fed. Reg. 39804, *39805 (August 3, 1995)
(codified at 15 C.F.R. Part 990). The primary restoration
plan addresses restorative actions taken at the actual
injury sites that attempt to return the injured resources
back to their baseline condition See id. The compensatory
restoration component addresses restorative or replace-
ment actions at other sites within the Sanctuary to com-
pensate for lost interim services of the destroyed
resources.

1. Primary Restoration Proposal

The government's primary restoration plan seeks
only to redress injuries at the Grounding Site since the
parties and the Court agree that the Pipe Scar has recov-
ered naturally and that no on-site restoration there is
necessary. Although experts for both Great Lakes and the
government are in accord that the Grounding Site has
also begun to recover naturally, each disputes the extent
of such recovery. The government maintains that the
Grounding Site is highly unstable and will not recover to
pre-grounding morphology for a number of years with-
out on-site intervention.

As part of its primary restoration plan development,
the government evaluated several restoration alternatives
to address the injury at the Grounding Site. Of the several
restoration plans it initially considered, the government

App. 27

identified what it considered to be the three most viable
alternatives, the 1) imported fill plan; 2) no action plan;
and the 3) site regrading plan. The government then
selected the imported fill plan as its recommended alter-
native to restore the Grounding Site.

a. Imported Fill Plan

Under the imported fill plan, the government pro-
poses filling the Grounding Site with imported limestone
rock, sediment, and reinforcement boulders, in attempt to
restore the site to pregrounding morphology and provide
a stable substrate for vegetative recovery. In addition, the
plan calls for the installation of more than thirty stainless
steel stakes at the site that will assist the government in
visually monitoring sediment movement within the area.

Implementation of the imported fill approach would
require substantial construction and work activity over
the Grounding Site, and any natural recovery of the site
would likely be destroyed by filling the area. Neverthe-
less, the government maintains that the imported fill plan
is the best alternative because it provides the greatest
chance of returning the Grounding Site to its preground-
ing morphology, stabilizing the area, and creating the

3 The Court does not address the site regrading alternative
in detail because it is just a variation of the imported fill
alternative. The concept behind it and the risks associated with
it are similar. Like the imported fill option, regrading the site
requires moving sediments into the Grounding Site trench area.
Rather than using imported fill, however, the government
would use sediments graded from the south berm area of the
Grounding Site.

App. 28

best potential for seagrass recruitment. The cost of physi-
cally restoring and monitoring the Grounding Site under
the imported fill plan is approximately $894,690.00.4

b. No Action Plan

The second alternative the government considered in
developing a primary restoration proposal is referred to
as the no-action plan. Under the no-action plan, no action
would be taken at the Grounding Site other than periodic
monitoring to ensure that recovery continues. The injury
would be left alone to adjust and evolve toward a natural
equilibrium or stable condition over time. Any natural
restoration or regrowth that has occurred would be left
intact. Although the recovery period cannot be deter-
mined with precision, the evidence presented suggests
that the Grounding Site would recover naturally in
roughly seventy years. The government maintains that
this is not the best alternative for primary restoration
because it does not achieve the objective of restoring the
site to its original condition.

2. Compensatory Restoration Proposal

As compensation for lost interim services provided
by the resources destroyed at the Pipe Scar and Ground-
ing Site, the government intends to implement compensa-
tory restoration projects at other sites within the

* Specifically, the government has asked for $480,257.00 for
the actual physical restoration of the Grounding Site. In
addition, the government asked for $308,041.00 for physical
monitoring of the site and $106,392.00 for biological monitoring.

App. 29

Sanctuary. In 1998, the government conducted a survey to
identify potential seagrass restoration projects in the Sanctu-
ary that would be similar in scale and nature to the 6.36 acres
of seagrass destroyed at the Pipe Scar and Grounding Site.

The government determined that the most viable
off-site compensatory restoration project would be to
transplant seagrasses into boat-impacted areas that have
subsequently been designated no-motor zones (“Prop
Scar Restoration Project”). The Prop Scar Restoration Pro-
ject contemplates restoring sea grasses into prop scars by
introducing Halodule grass and bird stakes to initiate
compressed succession of sea grass regrowth in the dam-
aged areas. Compressed succession is a planting tech-
nique intended to achieve a more rapid rate of seagrass
recovery by temporarily substituting faster growing
Halodule grasses for the slower growing Thalassia. This
sequence promotes suitable conditions for Thalassia to
recolonize, in addition to stabilizing the sediment and
establishing a functional seagrass habitat.

The government determined the appropriate scale of
the Prop Scar Restoration Project using an assessment
methodology known as the Habitat Equivalency Analysis
(“HEA”).5 The HEA determines the quantity of the

5 The HEA is appropriate to determine the scale of
compensatory restoration projects when 1) the primary category
of lost on-site services pertains to the ecological/biological
function of an area; 2) feasible restoration projects are available
that provide services of the same type, quality, and comparable
value to those that were lost; and 3) sufficient data on the
required HEA input parameters exist and are cost effective to
collect. See Fisher, 977 F. Supp. at 1198.

App. 30

equivalent habitat necessary to be restored and/or cre-
ated, so that total resource services gained through resto-
ration equals total resource services lost due to the injury.
See Fisher, 977 F. Supp. at 1198. The government con-
cluded using the HEA that 2.19 acres of seagrass habitat
must be restored under the Prop Scar Restoration Project
to compensate for the interim loss of seagrass at the Pipe
Scar and Grounding Site. ’

II. CONCLUSIONS OF LAW
A. Statutory Scheme

Remedies for damage to the Sanctuary are governed
by the National Marine Sanctuaries Act (“NMSA”) of
1972, as amended, 16 U.S.C. § 1431, et seq. Congress
enacted the NMSA in response to “a growing concern
about the increasing degradation of marine habitats.”
S.Rep. No. 595, 100th Cong., 2d Sess. 1 (1988), reprinted
in 1988 U.S.C.C.A.N. 4387. The NMSA protects important
and sensitive marine areas through the establishment of
marine sanctuaries. See Fisher, 977 F. Supp. at 1199. The
purpose of the sanctuaries is to preserve sensitive areas
for conservation, recreational, aesthetic and ecological
value.

B. Liability under the NMSA

The NMSA provides for strict liability to the United
States for damage to any “sanctuary resource.” See, e.g.,
U.S. v. M/V Jacquelyn L., 100 F.3d 1520, 1521 (11th Cir.
1996); 16 U.S.C. § 1443(a)(1). The only available defense
under the NMSA is that “the destruction or loss of, or
injury to, the sanctuary resource was caused solely by an

App. 31

act of God, an act of war, or an act or omission of a third
party, and the person acted with due care.” 16 U.S.C.
§ 1443(a)(3)(A) (emphasis added).

Accordingly, Great Lakes argues that under the
NMSA, it is absolved of liability because it was Coastal’s
acts and/or omissions that actually caused the Pipe Scar
and Grounding Site. This argument fails, however, under
the reasoning set forth in United States v. LeBoeuf Brothers
Towing Co., 621 F.2d 787 (5th Cir. 1980). In LeBoeuf, the
Fifth Circuit, under a similar strict liability statute,
rejected the argument that an independent contractor
acting for and under the control of a defendant employer
is a “third party” for the purpose of absolving the defen-
dant employer of liability under the statute.

In LeBoeuf, the defendant employer hired an indepen-
dent contractor tug crew to load and unload cargo at
places and times designated by the defendant. See id. at
788. The independent tug crew accidentally discharged
oil into the Mississippi River, and the United States
brought suit against the defendant employer under the
Federal Water Pollution Control Act (“FWPCA”) to
recover the costs of cleaning up the oil spill. See id. The
FWPCA, in language strikingly similar to the NMSA,
provides that the owner or operator of a discharging
vessel is strictly liable to the government for the costs of
cleaning up spills unless the discharge was caused solely
by an act of God, an act of war, or an act or omission of a

6 The Eleventh Circuit, in Bonner v. City of Prichard, 661 F.2d
1206, 1209 (11th Cir. 1981), adopted as binding precedent
decisions of the former Fifth Circuit rendered prior to October 1,
1981.

App. 32

third party. See id. Under this provision, the defendant
employer argued that it was not liable because it was the
acts or omissions of the third party independent tug crew
that caused the spill.

The Court rejected the defendant’s argument and
held that an employer of an independent contractor can-
not avoid strict liability under the FWPCA for an oil spill
caused by the contractor because the employer “held
ultimate control over [the contractor] by hiring it in the
first place, specifying its itinerary, and retaining it

\ throughout the job.” See id. at 790. The court reasoned
that the third-party defense was not intended to protect a
party from the acts or omissions of those acting under its
control or on its behalf. See id.

In reaching this conclusion, the Fifth Circuit relied, in
part, on the fact that the FWPCA is a remedial statute that
should be interpreted in a way such that liability can be
easily imposed for environmental damage.’ See id at 789.
The court reasoned that the statute’s comprehensive
scheme for preventing and cleaning up oil spills would
be undermined if barge owners could escape strict lia-
bility merely by hiring out their operations to indepen-
dent contractors. See id. Furthermore, the court concluded
that a broad interpretation of the third party defense
would be entirely inconsistent with the statute’s other
defenses that include only very narrow exceptions, such
as acts of God, acts of war, and instances in which the

” This rationale was later ratified by another Fifth Circuit
opinion, which the Supreme Court declined to review. See
United States v. Hollywood Marine, 625 F.2d 524 (5th Cir. 1980),
cert. denied 451 U.S. 994 (1981).

COR Arun ie eine ac eR AE Rs 2 5 cE EN NIN
is ees ee Se PO a eee SAY

-~

App. 33

government’s own negligence is the sole cause of a spill.
See id.

This Court finds that the NMSA, like the FWPCA, is
a remedial statute that should be interpreted in a way
that will effectuate its remedial purposes. The FWPCA
and NMSA have very similar provisions for remedial
action and limited categories of defenses that were
intended to provide a straightforward means to impose
liability for environmental damage. Therefore, the narrow
interpretation of the third party defense set forth in
LeBoeuf applies equally in actions under the NMSA, and
Great Lakes cannot rely on the defense to avoid liability.®
Precluding Great Lakes from asserting the defense for the
actions of those acting on its behalf and under its control
“promotes the goals of the statute and of traditional tort
policy because it will encourage [owner-operators] to
select [independent contractors] carefully and to insure
against potential losses.” See id.

Accordingly, Great Lakes is strictly liable under the
NMSA for damage to the Sanctuary, whether caused by
itself or Coastal, because Great Lakes “held ultimate con-
trol over [Coastal] by hiring it in the first place, specify-
ing its itinerary, and retaining it throughout the job.”

8 Although there is some limited meaningful argument
from the parties as to Coastal’s status, it is clear from the facts,
and by comparison to the facts in LeBoeuf, that Coastal was an
independent contractor.

App. 34

C. Damages

Title 16 U.S.C. § 1432(6) and related case law set forth
the parameters for compensation for injury to Sanctuary
resources. See, e.g., United States v. Fisher, 22 F.3d 262 (11th
Cir. 1994); Fisher, 977 F.Supp at 1201. Under the NMSA,
the government is entitled to compensation for imple-
mentation of both its primary restoration plan and its
compensatory restoration plan approved by the Court.
See id.

1. Primary Restoration

Under the primary restoration component of dam-
ages, the government is entitled to recover the cost of
implementing its plan that restores or replaces the injured
resource, or the cost of acquiring the equivalent of the
sanctuary resource if it cannot be restored or replaced. See
16 U.S.C. § 1432(6)(A); Fisher, 977 F. Supp. at 1201. In
determining whether the government’s proposed primary
restoration plan is feasible and whether its costs are
justified, a court must “make a complete examination of
both the environmental factors involved and the prac-
ticalities of the situation.” See United States v. Joseph
Moretti, Inc., 526 F.2d 1306, 1310 (5th Cir. 1976)

It is inherently difficult for courts to measure the full
effect and impact of any environmental disturbance.
Attempts to reverse the effects of a disturbance or injury
and to restore the environment to its natural state carry
no guarantee of success. See United States v. Sexton Cove
Estates, Inc. 526 F.2d 1293 (5th Cir. 1976). A court must
consider the cost of the plan in relation to its prospects
for success. See United States v. M.C.C. of Florida, Inc., 772

App. 35

F.2d 1501 (11th Cir. 1985). A court should not order a
restoration plan when its contemplated results prove too
speculative and its implementation too costly. See id. Any
restoration plan must be carefully designed to confer
maximum environmental benefits. At the same time,
however, the law should be tempered with a touch of
equity. See Sexton Cove, 526 F.2d at 1301. A defendant
should not be assessed damages for a restorative program
when the site is naturally recovering on its own, or the
impracticality of implementing a restorative program and
the unlikelihood of the program’s success warrant against
it.

The Court has carefully considered the government's
recommended restoration plan, its costs, and its benefits.
For the reasons set forth below, the Court rejects the
government’s determination that the imported fill plan is
the best alternative for primary restoration of the
Grounding Site. Rather, the Court concludes that the no-
action plan evaluated by the government provides a more
suitable alternative for primary restoration of the site.®

9 Courts have considerable latitude in determining the
appropriate remedy in environmental damage cases, and the
Court is not bound by the government’s recommendation as to
the best plan for restoration. See United States v. Board of Trustees
of Florida Keys Community College, 531 F. Supp. 267, 275 (S.D. Fla.
1981) (determining that development of an alternative remedial
plan was preferable to the government’s plan for total
restoration). Although a court cannot order a remedy or
compensation for environmental injury without a specific plan
for restoration having been suggested or submitted before it,
there is a specific plan before the court in the instant case. See
United States v. M.C.C. of Florida, Inc., 772 F.2d 1501, 1507 (11th
Cir. 1985) (court may not award damages without a specific

App. 36

The government’s proposed plan to use imported
sediment to fill and restore the Grounding Site contem-
plates results too speculative to justify its significant fis-
cal and ecological costs. First, the Court is not persuaded
that placing sediment and stabilization boulders at the
Grounding Site will restore the bank to its original mor-
phology (even if this could be precisely determined).
Although the government maintains that restoring the
site to its original morphology is the primary benefit of
the imported fill plan, its own experts have concluded
that no restoration plan will ever restore the Grounding
Site to pre-injury condition. The morphological signature
of the injury will be visible for many years to come
irrespective of what plan is implemented.’

Furthermore, by almost all government expert
accounts, the Grounding Site is expected to fully recover
on its own within roughly seventy years. The govern-
ment has failed to present any convincing evidence that
the imported fill plan will significantly reduce this natu-
ral recovery period. Nor is there concrete evidence that
the restoration plan will promote longer-term stabiliza-
tion at the Grounding Site or better recruitment of sea-
grasses than natural recovery would provide. In fact,
evidence suggests that in-filling the Grounding Site
trench will destroy all natural recovery that has occurred

restoration plan before it). The Court is adopting the no-action
plan that the government has already evaluated and determined
to be a viable option for primary restoration.

10 See Bodge Report, Exhibit 97.

11 See Hudson Report, Exhibit 18; Zieman Report, Exhibit
79; Kenworthy Report, Exhibits 49, 51, 58, 60.

Se
‘ee ee Ce ee ee ee |

App. 37

up to this point and cause harm to previously
undamaged biota.

It also appears from the government's expert reports
that the proposed restoration project entails a consider-
able risk of further disrupting or damaging the site. Fill-
ing the site with imported rocks and reinforcement
boulders would require extensive construction and per-
sonnel directly over the site.13 The necessary use of
barges, tugs, and other large machinery during the resto-
ration project raises the potential for further impacts in
the swift, shallow waters surrounding the Grounding
Site.14

The Court is also concerned that filling the Ground-
ing Site with rocks, boulders, and steel rods may create
additional navigational-and environmental hazards in the
shallow waters of the Sanctuary. Evidence presented at
this trial demonstrated that boats strike bottom and run
aground in the waters off Florida’s coast on an
alarmingly regular basis. Generally, such a groundings
have not resulted in hull breaches or pollution spills.
However, placing boulders and steel rods in the already
shallow Sanctuary waters may increase the potential for
significant hull damage and pollution leaks should
another vessel strike the site in the future. Given the
regularity of groundings in this area, further collisions
are not an altogether unlikely scenario.

12 See Bodge Report, Exhibit 97.

13 See Enwirommental Development Report, Exhibit 70.

14 See id., Bedge Report, Exhibit 97 (invasive action
requiring large volumes of material and/or large vessels would
significantly increase risk of additional damage to site).

App. 38

For all of the foregoing reasons, the Court will not
approve the government's imported fill plan for primary
restoration of the Grounding Site. Instead, the Court con-
cludes that the no-action plan evaluated by the govern-
ment is the best plan for primary restoration. The no-
action plan is non-intrusive and requires no one-site con-
struction. Thus, the potential for further grounding asso-
ciated with construction equipment and vessels is
avoided. Furthermore, several years have passed since
the grounding incident, and considerable natural recov-
ery has occurred up to this point. The no-action plan will
allow existing regrowth and unaffected areas to remain
intact. The Court believes that it would be counter-
productive at this date to in-fill the trench and destroy all
natural regrowth, as well as risking adversely impacting
previously undisturbed adjacent areas. Nevertheless,
because full recovery cannot be assured at this point, the
government shall continue surveying and monitoring the
site under the no-action plan to establish baseline data
and assess potential instabilities.

The Court concedes that this is not an entirely satis-
factory result. Great Lakes is responsible for significant
environmental damage and should be required to pay the
price for its actions. Nevertheless, the government has
failed to demonstrate to the Court that the speculative
results contemplated by in-filling the Grounding Site
trench are worth engaging in extensive construction at
the already ecologically sensitive site and destroying
years of natural regrowth. This court will not order a
primary restoration plan at significant fiscal and ecologi-
cal cost without some measure to ensure the plan will
work and not cause greater environmental damage. In the

App. 39

struggle to repair damage already done, the Court is
wary of doing greater harm.

2. Compensatory Restoration

In addition to recovering primary restoration com-
pensation for restoring or replacing the injured resources,
the government is also entitled to compensation for the
interim lost use of the resources at the Pipe Scar and
Grounding Site during the period from destruction to
recovery. See 16 U.S.C. § 1432(6)(A); Fisher, 977 F. Supp. at
1201. Recovery for lost interim services will be in the
form of seagrass restoration projects at other suitable
locations within the Sanctuary. The Court concludes that
the Prop Scar Restoration Program developed by the
government is an appropriate compensatory restoration
project and will provide seagrass services equivalent to
those lost due to the injuries caused by Great Lakes at the
Grounding Site and Pipe Scar.

The United States’ reliance on the Habitat Equiva-
lency Analysis (“HEA”) to scale the appropriate compen-
satory seagrass restoration projects for both the Pipe Scar
and the Grounding Site was appropriate, including the
use of a 3% discount rate to calculate damages. The Court
concludes, however, that the government’s HEA calcula-
tion for the Grounding Site is incorrect only to the extent
that it fails to reflect its own experts’ conclusions with
respect to the composition of the sea bottom. The HEA
input parameters used by the government assume that
the entire area consisted only of Thalassia, rather than the
combination of Thalassia (69%), Syringodium (30%), and
other sanctuary resources (1%) that is reflected in the

App. 40

government’s expert report accepted as correct by this
Court.15 The failure to include the appropriate ratios of
Syringodium in the parameters artificially inflated
the value of the HEA. Accordingly, the HEA figure
must be recalculated using the appropriate Thalassia/
Syringodium ratio as described by the Court above and in
the Hudson Report.

To the extent that it is changed by the newly-figured
HEA, the government’s $357,556.00 damage estimation
must be recalculated using the same criteria and formula
that the government applied in its original damage deter-
mination. When recalculating this figure, the Court does
not intend that the parties review new evidence or revisit
the government’s methodology or process by which it
arrived at its compensatory restoration cost estimation.
Rather, the Court envisions that the parties will engage in
a purely mathematical recalculation of compensatory res-
toration costs taking into account the corrected HEA
value.

3. Response and Assessment Costs

The United States is also entitled to recover its
response and damage assessment costs and interest pur-
suant to 16 U.S.C. § 1432(6)(C) & (7). Damage assessment
costs, however, do not properly include attorney’s fees.
See Gen. Elec. Co. v. U.S. Dep’t of Commerce, 128 F.3d 767,
779 (D.C. Cir. 1997). The government’s proposed
$343,622.00 response and damage assessment estimation

15 See Hudson Report, Exhibit 18.

\

i

App. 41

is correct in all respects, except to the extent that it
includes attorney’s fees.

The Court is unable to ascertain what portion of the
government's $343,622.00 figure is attributable to attor-
ney’s fees. From the evidence already presented before
this Court, the government shall determine the amount of
attorney’s fees it included in the $343,622.00 response and
damage assessment figure and deduct that amount. In
addition, the government must recalculate the interest on
the new response and damage assessment calculation
after attorney’s fees have been subtracted.

CONCLUSION

Accordingly, upon due consideration of the evidence,
the arguments of counsel and the record, it is

ORDERED AND ADJUDGED that:

1. Judgment is entered in favor of the United States
against Great Lakes for the damage caused at the Pipe
Scar and Grounding Site;

2. The government's claim for $480,257.00 to imple-
ment its recommended primary restoration plan at the
Grounding Site is DENIED.

3. The government is entitled to compensation for
the cost of physical and biological monitoring of the
Grounding Site. From the evidence already presented
before the Court, the government shall recalculate its
proposed physical and biological monitoring costs to
reflect the Court’s c6énclusion that the no-actio