_—

es Supreme Court Us.
No. 01-1134

IN THE

Supreme Court of the Hite Snwtesre CLERK

WILLIAM D. MCCARTY, DAVID W. HADLEY, JUDITH G.
RIPLEY, CAMIE J. SWANSON-HULL and DAVID W. ZIEGNER,
in their official capacities as COMMISSIONERS OF THE
INDIANA UTILITY REGULATORY COMMISSION,
Petitioners,
V.

MIDWESTERN GAS TRANSMISSION COMPANY and
SOUTHERN INDIANA GAS AND ELECTRIC COMPANY,

Respondents.

On PETITION FOR A Writ oF CERTIORAKI TO THE
UNITED STATES COURT OF APPEALS FOR THE SEVENTH CIRCUIT

BRIEF IN OPPOSITION FOR RESPONDENT
MIDWESTERN GAS TRANSMISSION COMPANY

Janet K. PLACE G. Danie KELLEY, Jr.
General Counsel Counsel of Record
NORTHERN PLAINS NATURAL WILLIAM P. DIENER
Gas COMPANY EDWARD P. STEEGMANN
1111 South 103rd Street Ice MILLER
Omaha, Nebraska 68124-1000 One American Square
(402) 398-7886 Box 82001

Indianapolis, Indiana 46282
(317) 236-2100

Attorneys for Respondent
Midwestern Gas Transmission Company

173289 g

COUNSEL PRESS \
(800) 274-3321 * (800) 359-6859

pale

1
CORPORATE DISCLOSURE STATEMENT

Midwestern Gas Transmission Company (“Midwestern”)
is a wholly owned subsidiary of Border Midwestern
Company. Border Midwestern Company is a wholly owned
subsidiary of Northern Border Intermediate Limited
Partnership. Northern Border Intermediate Limited
Partnership is owned by three general partners, two of which
are wholly owned subsidiaries of Enron Corporation and one
of which is a wholly owned subsidiary of The Williams
Companies, Inc. The Williams Companies, Inc. is a publicly
held company. Northern Border Intermediate Limited
Partnership also has one limited partner, Northern Border
Partners LP, a publicly held company.

il

TABLE OF CONTENTS

Corporate Disclosure Statement ...............-
TRONe OL COMDIIRE 66's ocd v6 Si ea ws eo evdes bees
Table of Cited Amtneettaes: os i. ccitnticcvcecatecees
TOES OF RINE: 6 is 5 kk hoses in ene Se h00 os
No Question Presented — Dismissal Required ....
Seatemnent OF Gee COMP io cceseencas ieee eee

Deregulated National Market And Open Access
Interstate Transportation ...............00008:

PE FOOOMEIE «én vise nnnkgddeceedeniaeees
FERC’s Unappealed Decision .............ee0:

The IURC (Petitioners) Defers Preemption Issue To
POGRN FOUND ok ks cv iN Si ewerke ee pawdenes

SIGECO Pursues More Litigation ..............

Fee EE ive edkawcc nen ou ka hewn bse

Corrections Pursuant To S. Ct. Rule 15.2 ........

Reasons for Denying the Petition ...............

Question 1 — Presents Nothing But Petitioners’
te rer er rer Terer, ero re 2 rey

Page

iv

xi

ill
Contents

Question 2 Presents Nothing ....-..------+++>:

Question 3 Presents Nothing — SIGECO’s
Harassing, Vexatious Litigation ...........+--

Seventh Circuit Correctly Determined FERC’s
Exclusive Jurisdiction Over Transportation Of
User Purchased Gas In One State To User’s
Facility In Another State. .........--++++eees

ccc vot ccdccevovctevcececcousees

21

29

iv
TABLE OF CITEDAUTHORITIES
Page
Cases:

American Gas Association v. FERC, 587 F.2d 1089
Cs St ER 6 ase Uh cosautes buedkanue's 7, 23

Associated Gas Distributors v. FERC, 824 F.2d 981
Set, GE EE Cb Soar eb ksi ans ooeRrs teee 7,23

Baggett v. Department of Professional Regulation,
Board of Pilot Commissions, 717 F.2d 521 (11th
Ge Res Ue i esee tan necknteh asenpeass 15

Norfolk & W.Ry. v. Public Utils. Comm'n, 926 F.2d
FOF GO COED wobec ccncdedwrevesicscs 15

Bud Antle Inc. v. Barbosa, 45 F.3d 1261 (9th Cir.
1995), cert. denied, 516 U.S. 1159 (1995) ..... 15

Bunning v. Commonwealth of Kentucky, 42 F.3d 1008
Se Ma SON bb ds Sed whededdeceVadeCevbecus 15

Cascade Natural Gas Corp. v. FERC, 955 F.2d 1412
SMa: SS 2 Cah C was 0b

14

and Scepter and no doubt purchases such gas in much, much
larger quantities.'®

What SIGECO is really seeking is exactly what Congress
sought to avoid when it required FERC to take away monopoly
power from the interstate pipelines, requiring them to unbundle
and provide open access non-discriminatory transportation. Now
SIGECO wants to have this monopoly power for itself and the
other LDC’s which would no doubt create the same anti-
competitive conditions that existed prior to Order 636 and be
subject oniy to regulation by Indiana so that the industrial
consumers are captives to SIGECO. There can be no doubt that
monopoly power in transportation will distort the competitive
gas sales markets which Congress sought.

REASONS FOR DENYING OR
DISMISSING THE PETITION

Question 1 — Presents Nothing But Petitioners’
Concoctions. Finding no conflict between the decision of the
Seventh Circuit and any of this Court or of the other circuits,
petitioners embark upon a repetitious series of misquotes to
create the illusion that the Seventh Circuit created a novel
“*seems’ preempted” exception to Younger. These are
patent misconstructions and this Court should summarily
dismiss the Petition because there is no attempt to comply with
S. Ct. Rule 14.1(a).

This Court in both NOPSI/ (where this Court found that the

New Orleans City Council’s actions were not clearly or facially
seeking to regulate or interfere with wholesale rates) and in
Utility Commissioners of Ohio (where this Court sustained
enjoining the State Commission’s actions and orders seeking to
regulate wholesale rates which were clearly and facially

~ preempted by the Federal Power Act), recognized that Younger
abstention is not required where State proceedings or law is

19. See In Re Southern Indiana Gas & Electric Company, 2000
WL 33181398 at * 3 (Ind. URC 2000).

15

clearly, patently or facially invalid as encroaching upon exclusive
federal jurisdiction.

The Seventh Circuit joined the holdings of the First, Sixth,
Ninth and Eleventh Circuits pursuant to Utility Commissioners
of Ohio and NOPSF° — that Younger abstention, which

20. P.App. 6a-7a, adopting Chaulk Services, Inc. v. Massachusetts
Commission Against Discrimination, 70 F.3d 1361 (1st Cir.
1995) (reversing the district court’s abstention, holding:
“a number of courts have held that Younger abstention is inappropriate
where a claim of preemption is ‘facially conclusive’ and/or ‘readily
apparent’, because no significant State interests are served. It is clear
that the State tribunal has acted beyond the lawful limits of its authority.”);
Bud Antle Inc. v. Barbosa, 45 F.3d 1261 (9th Cir. 1995), cert. denied,
516 U.S. 1159 (1995) (reversing the district court’s abstention under
Younger where it was “readily apparent” that State agency’s assertion
of jurisdiction was preempted under Federal law); Bunning v.
Commonwealth of Kentucky, 42 F.3d 1008 (6th Cir. 1994) (where the
Court concluded that abstention is not required in a case presenting
facially conclusive claims of Federal preemption), Gartrell Construction
Inc. v. Aubrey, 940 F.2d 437, 441-42 (9th Cir. 1991) (“no significant
State interest is served where the State law is preempted by Federal law
and preemption is ‘readily apparent.’ .. . Younger abstention is not
required. . . . Preemption is readily apparent under [Federal procurement
regulation]”); National Railroad Passeng: Corp. v. State of Florida,
929 F.2d 1532, 1537 & n.12 (lithCir. 1991) (“in the present case, the
new language of the Rail Passenger Service Act clearly indicates that
State and local laws are preempted; thus, the District Court would not
be required to abstain [under Younger] from enjoining any ongoing State
criminal proceeding”); Baggett v. Department of Professional Regulation,
Board of Pilot Commissions, 717 F.2d 521, 524 (11th Cir. 1993) (same);
Norfolk & W.Ry. v. Public Utils. Comm'n, 926 F.2d 567, 573 (6th Cir.
1991) (determining that FRA preempted State administrative rule,
preemption was “facially conclusive” so abstention not required);
see also Freehold Co.-Generation Associates v. Board of Regulatory
Commissions, 44 F.3d 1178-87 & n.6 (3d Cir. 1995), cert. denied,
516 U.S. 815 (1995) (“the alleged intrusive action is not by the federal
government, but, on the contrary, by a state regulatory agency.

We conclude that abstention is not appropriate in this case and does not
(Cont'd)

ee ee
«

16

“presupposes that the State has a valid interest that it is seeking
to enforce,” is not required

if the State does not hav such an interest, if for
example, it is seeking to regulate activities
that clearly are under exclusive federal control... .
See Chaulk Services, Inc. v. Massachusetts Comm 'n
Against Discrimination, 70 F.3d 1361, 1370 (1st Cir.
1995) and cases cited there. ... Mere defiance of
clear federal law removing an area from potential
State regulation is not such an interest.?’ [P.App.
6a-7a. |

Here, Indiana by statute, and SIGECO by the proceedings
in question, seek to regulate the interstate transportation of user
purchased gas in one State to the end-user’s facility in another
State. This, the Seventh Circuit found, adopting the three other
circuits that had so held (“It seems to us, as it has seemed to the
other courts to have addressed the issue, [see n.26, infra]’’) is
the transportation of natural gas in interstate commerce within
FERC’s § 1(b) jurisdiction, which in accordance with this
Court’s decisions is exclusive, preempting State regulation.
Northwest Central Pipeline Corp. v. State Corporation Comm'n,
489 U.S. 493, 506-07 (1989); Schneidewind v. ANR Pipeline
Co., 485 U.S. 293, 300-01 (1988).

Not able to challenge the correctness of the Seventh
Circuit’s adoption of the facially clear exception to Younger

(Cont'd)
warrant extended discussion”); Communications Telesystems Int'l v.
California Pub. Util. Comm'n, 196 F.3d 1011, 1017 (9th Cir. 1999)

(preemption must be “readily apparent” to prevent abstention).

21. Petitioners contend that NOPS/ broadly defines the State’s
interest as being the “regulation of utilities” by the State, Pet. 10,
but again selectively quote out of context, ignoring that the interest
referenced in NOPS] is not simply regulating utilities but rather the more
focused, limited State interest of “regulating intrastate retail rates”
461 U.S. at 377 (emphasis added).

and the adoption of the circuits which have found the interstate
transportation of user- owned gas in one State to and including
the last foot of transportation into the user’s facility within
FERC’s exclusive jurisdiction, petitioners embark upon the
concoction that the Seventh Circuit created a novel “ ‘seems’
preempted” exception to Younger.

Petitioners’ attribution of apparently dispositive significance
to the single, commonplace phrase “It seems to us” in the Court
of Appeals’ opinion, while ignoring the parallel use “as it has
seemed to the other courts” is at best is just plain silly — at
worst, misleading. Pet. 12-13. As the parallel construction of
this sentence demonstrates, the Seventh Circuit is describing
its own holding (“It seems to us”) in exactly the same terms as
it is describing the holdings of the other circuits to address the
issue. Petitioners do not and cannot contend that the opinions
of these other circuits (see pp. 22-26, infra) are anything other
than unequivocal holdings against petitioners’ position.
Described in the same terms (“seems”), so too is that
of the Seventh Circuit — it is not a gratuitous “quick look”,
Pet. 11, 13, nor has it “lowered the bar to ‘seems’ preempted,”
Pet. 14, or to a “lax ‘seems’ preempted standard.” Pet. 19.

Petitioners continue playing fast and loose in another
“straw man” argument — the notion that the Seventh Circuit
held the mere assertion of a preemption claim precludes Younger
abstention. Pet. 13-14. The Court of Appeals again did nothing
of the sort, but rather expressly recognized, in accordance
with NOPSI, that any such rule “would be question begging.”
(“This is not to say that a defense of federal preemption
automatically defeats Younger, the position rejected in [NOPS]T].
That would be question begging. The State court has the same
right and power to decide a defense of preemption as it does to
decide any other federal defense”) P.App. 6a-7a.

Petitioners then attack the circuits (now joined by the
Seventh Circuit) on the facially clear or readily apparent
exception to Younger as being a “full blown assault” by the

18

circuits on Younger. Pet. 13-14. (Pet:*-oners do not and cannot
identify a split in the circuits or identify even a single case
supporting their own position, nor is this fairly within any
question vresented.) The “assault” is yet another figment of
petitioners’ imagination. These cases are based on Younger,
Utility Commission of Ohio, and NOPSI and do no more than
to recognize the necessity of a valid State interest as an “entry
requirement” to the extraordinary circumstances needed to
justify abstention in the first instance. (See n.20, supra.)
The State perforce has no such interest where its actions clearly
encroach upon an exclusive federal domain and are thus facially
invalid. Utilities Commission of Ohio so holds with respect to
State encroachment upon FERC’s exclusive domain. 317 U.S.
at 469. To say, as do the circuits’ decisions, n.20, supra,
that such facial invalidity of the State’s asserted interest is
“readily apparent”, “conclusive”’, “facially conclusive”, “clear”,
etc. are but different words for the same thing. Petitioners are
casting about for error in the semantic nuances associated with
synonymous terms without ever establishing a contravention
of this Court’s precedents.

Question 2 Presents Nothing. Much like Question 1,
Question 2 is based upon a misconstruction that the Seventh
Circuit rejected abstention “based on an appellate assumption”
that the “regulatory commissioners are prosecuting the
State proceedings to serve the commercial interest of a
private utility....” As set forth above, the Seventh Circuit’s
decision is well grounded, not based on any assumption.
See also, infra, pp. 21-18. Obviously, there could have been no
such assumption by the Seventh Circuit — the TURC is not
prosecuting the State proceedings as petitioners represent.
Quite the opposite, SIGECO brought all the proceedings,
see infra, pp. 19-21. Petitioners voluntarily stayed SIGECO’s
proceedings “deferring the federal preemption issue for
resolution by federal forums”. M.App. 57a.

19

Question 3 Presents Nothing — SIGECO’s Harassing,
Vexatious Litigation. In Question 3, petitioners once again
misconstrue, by taking out of context, several words in the
Seventh Circuit’s opinion. Petitioners assert that “in addition to
its ‘seems preempted’ standard”, the Seventh Circuit assertedly
“swept away the rights of the State courts and agencies to decide
the constitutionality of State laws” where a Federal agency
“becomes first ‘seised’ of the dispute . . . to which the State is
not a patty.” Pet. 19. Of course, Indiana was a party to the FERC
proceedings. See n.15, supra.

But more importantly, the language upon which petitioners
seize is but a part of the Seventh Circuit’s analysis leading to its
conclusions that the injunction sought by Midwestern “merely
seeks to prevent vexatious litigation by a disappointed party,
namely SIGECO, in the FERC regulatory proceeding,” and that
SIGECO “must be enjoined from harassing the purchasers
and Midwestern by pursuing a State regulatory proceeding
aimed at undoing the results of a Federal regulatory proceeding.”
P.App. 6a, 8a. These conclusions of the Seventh Circuit can
only be viewed in the backdrop of its determination that Younger
“has no application to a case such as this. . . , In which, . . .
a federal proceeding (here before the Federal Energy
Regulatory Commission) overlapping the state proceeding
reaches completion while the state proceeding is still pending
at an early stage”.

The Court noted that SIGECO appeared in the FERC
proceeding in which Midwestern sought certification, and made
essentially all of the arguments against certification as it sought
to raise in the Indiana proceedings, including that FERC should
not rule before Midwestern received a certificate from the IURC.
P.App. Sa.

So what confronted the Seventh Circuit, assertedly requiring
abstention, was not merely [URC initiated proceedings against
Midwestern with Midwestern running to federal court — the
classical abstention case. Rather this case presents: (1) a first-

20

filed FERC case seeking the required FERC approval for
unbundled interstate transportation of user-purchased gas in one
State to the users’ facilities in another State, (2) filed before
SIGECO’s petition to the IURC, (3) a FERC decision while the
SIGECO petition had been voluntarily stayed by these
petitioners’ Order “deferring the federal preemption issue for
resolution by federal forums,” M.App. 57a, (which makes this
case an inappropriate vehicle for this Court’s consideration of
any Younger issue), (4) in which FERC proceeding, the State
appeared through the OUCC, (5) in which FERC proceedings
SIGECO made all the various objections which it sought to
remake before the URC, (6) which FERC decision neither the
State” nor SIGECO appealed as required to a federal circuit
court of appeals, 15 U.S.C. § 717r(b) — and (7) SIGECO filed
a further state court action against Midwestern, as well as two
subsequent IURC proceedings against Midwestern, “aimed at
undoing” the FERC decision.

If there was ever harassing, vexatious litigation, this case
is it — Younger does not require abstention, unless Younger is
“turned on its head”!

Interestingly, petitioners raise no error or challenge to the
Seventh Circuit’s determination that harassing, vexatious
litigation does not require Younger abstention. Such has never
been doubted in this Court’s decisions. Middlesex County Ethics
Committee, etc. v. Garden State Bar Association, 457 U.S. 423,
437 (1982) (because there was “no bad faith or harassment” or
other exceptional circumstances dictating to the contrary, the
federal court should abstain). Moreover, no principle of federal
law, whether comity or statute,”> is violated when state parties

22. “Ifthe state voluntarily chooses to submit to a federal forum,
principles of comity do not demand that the federal court force the case
back into the State’s own system.” Ohio Bureau of Employment Services
v. Hodory, 431 U.S. 471, 480, 97 S. Ct. 1898, 1904 (1977).

23. The situation presented here is similar to the “relitigation
exception” recognized under the Anti-Injunction Act, 28 U.S.C. § 2283,
(Cont'd)

21

and courts are enjoined from collaterally ..:king final FERC
orders. See Williams Natural Gas Co. v. Cit} -f Oklahoma City,
890 F.2d 255, 259-60 (10th Cir. 1989), cert. den., 497 U.S. 1003
(1990) (determining that an injunction should issue against State
proceedings enjoining an interstate pipeline company from
acting pursuant to a final FERC order which constituted an
impermissible collateral attack on the FERC order, and
abstention was inappropriate).

Seventh Circuit Correctly Determined FERC’s Exclusive
Jurisdiction Over Transportation Of User Purchased Gas In
One State To User’s Facility In Another State.

Petitioners and SIGECO want to exclude from FERC’s
interstate transportation — any transportation to an end-user,
or the “last foot’ into an end-user’s facility.2* No such language
can be found in the NGA.

(Cont'd)

which allows a federal court to enjoin state proceedings “that attempt to
readjudicate previously decided matters” creating vested federal rights.
See, e.g., Ramsden v. Agribank, 214 F.3d 865, 868 (7th Cir. 2000).
Like Younger, the Anti-Injunction Act prescribes a point of demarcation
at which comity concerns end and an enforcement of federal judgments
creating vested federal rights begins. In face of Midwestern’s federally
adjudicated right pursuant to the FERC certificates to provide interstate
transportation service to GPC and Scepter, no more than the Anti-
Injunction Act do principles of comity animating Younger abstention

prohibit issuance of an injunction against SIGECO’s “vexatious” and
“harassing” collateral attacks on the FERC decision. P.App. 6a, 8a.

24. Petitioners term this “direct delivery to a consumer”,
Petition p. 19, or “delivery service to an end-user consumer,” Pet. 18,
or “local delivery service” to end-use consumers. Pet. 17. SIGECO’s
view of the marketplace is that while the purchase of gas has been
deregulated, the second step — transportation from the wellhead to
the LDC — is within FERC’s jurisdiction but the final step is always
“local distribution by the LDC” reserved to the States. SIGECO Brief,
p. 6. SIGECO wants the “direct local service to reach all customers”
excluded from interstate transportation. SIGECO Brief 8.

22

The plain language of § 1(b) grants FERC jurisdiction over
“transportation of natural gas in interstate commerce” and
defines “interstate commerce’”’ as “commerce between any point
in a State and any point outside thereof... .” 15 U.S.C.
§ 717a(7). The language and its applicability to the transportation
of user-purchased natural gas in one State to the user’s facility
in another State is clear, unquestionable. It is, therefore, no
surprise that petitioners can find no support in § 1(b) or any
case of a Circuit Court of Appeals or of this Court’ that the last
foot of unbundled transportation of user-purchased gas in one
State to the user’s facility in another, is other than transportation
in interstate commerce. Just as the Seventh Circuit found
FERC’s jurisdiction to be clear and exclusive, other circuits
have likewise found FERC’s jurisdiction over such unbundled
transportation into the user’s facility to be “undoubtable” “hardly
conceivable” to find a better fit, “clearly within FERC’s
transportation jurisdiction”.*® This Court similarly found such

25. Petitioners reliance on General Motors Corp. v. Tracy, 519 U.S.
278 (1997) is simply wrong. 7racy did not rule on any issue in this case.
In addition to acknowledging the holding of the circuits at n.14,
this Court also noted the legislative changes since 1938 and that there
might be questions raised by such and “we do not decide this issue,”
519 U.S. at 305, n.13, and further noted that § 1(b) “remains unchanged,”
519 U.S. at 305, n.13 but did not discuss that 15 U.S.C. § 3431 limited
§ 1(b) and other provisions of the NGA from applying to “first sales”.
Petitioners’ reliance on Panhandle-Indiana and Michigan is also wrong.
These cases said nothing of “local delivery service” being outside
FERC’s jurisdiction. Both decisions were grounded in § 1(b)’s grant of
only wholesale, but not retail, sales jurisdiction to FERC and said nothing
whatever about unbundled interstate transportation. Indeed, this Court
in Tracy repeatedly described these cases as recognizing the power of
States “to regulate all in-State gas sales directly to consumers... .”
519 U.S. at 281. Of course, the NGPA/NGWDA raise issues as to
whether States can regulate “first sales”, whether in-State or out-of-
State in the new competitive national market. See n.8, supra.

26. See Michigan Consol. Gas Co. v. Panhandle Eastern Pipeline
Co., 887 F.2d 1295, 1300 (6th Cir. 1989), cert. denied, 494 U.S. 1079
(Cont'd)

23

within FERC’s jurisdiction. FPC v. Transcontinental Gas
Pipeline, supra.

There is no limitation on FERC’s interstate transportation
jurisdiction based on whether the gas is to be consumed or resold
or whether it is the “last foot” to consumption. “The Act gives
the Commission jurisdiction over interstate transportation
of natural gas as a separate and distinct matter, whether

(Cont'd)

(1990) (Michigan PSC enjoined from asserting jurisdiction over FERC
certificated unbundled interstate transportation of user-owned gas to
user’s facility where the Court found it “hardly conceivable” to find a
better fit with FERC’s interstate transportation jurisdiction); Michigan
Consolidated Gas Company v. FERC, 883 F.2d 117, 120 (D.C. 1989),
cert. denied, 494 U.S. 1079 (1990) (the Court had “no difficulty”
affirming FERC’s jurisdiction to grant a certificate of convenience and
public necessity for the interstate transportation to a user’s facility);
Public Utility Commission of California v. FERC, 900 F.2d 269, 273-77
(D.C. Cir. 1990) (unbundled interstate transportation of user-owned gas
is transportation of natural gas in interstate commerce does not end at
the “last foot of pipe” before going into the end-user’s facility); and
Cascade Natural Gas Corp. v. FERC, 955 F.2d 1412, 1416 (10th Cir.
1992) (FERC has exclusive jurisdiction to authorize unbundled
transportation services for user-owned gas to the user’s facility as such
“undoubtedly falls within” FERC’s interstate transportation jurisdiction).
See also United Distribution Companies v. FERC, supra, (FERC has
interstate transportation jurisdiction over LDCs’ capacity sales to
their own end-users because gas sales element was severed, unbundled
from the transaction, with FERC retaining jurisdiction over interstate
transportation component, 88 F.3d at 1153, and sustaining FERC’s
exclusive transportation jurisdiction and regulatory preemption of
States with respect to LDCs’ buy/sell agreements with their users,
id. at 1154-55); National Fuel Gas Supply Corporation v. Public Service
Commission of New York, 894 F.2d 571,579 (2d Cir. 1990), cert. denied,
497 U.S. 1004, 1105 S. Ct. 3240 (1990) (FERC has exclusive jurisdiction
concerning replacement of 1.6 miles of interstate pipeline and not
required to obtain a State environmental certificate because FERC has
the authority to consider environmental issues, “State may not engage
in concurrent site specific environmental review;” and see also American
Gas Association, supra, and Associated Gas Distributors, supra.

24

the transportation is for hire or for sale and whether this
sale is for consumption or resale.” United Pipeline Company v.
Federal Power Commission, et al., 385 U.S. 83, 89 (1966).
The independent jurisdictional grant over interstate
transportation allows FERC jurisdiction over curtailment plans
for both jurisdictional wholesales and non-jurisdictional retail
sales, because the Act does not limit the interstate transportation
jurisdiction, as it does the sales jurisdiction. See Federal Power
Commission v. Louisiana Power & Light Co., 406 U.S. 621,
636 (1972) (“Though the [NGA’s] application to ‘sales’ is limited
to sales of interstate gas for resale, the Act applies to interstate
‘transportation’ regardless of whether the gas transported is
ultimately sold retail or wholesale.”), approved in New York,
supra, 112 S. Ct. at 1022.

Just last month, in New York, et al. v. Federal Energy
Regulatory Commission, et al., supra, based on similar
unambiguous language in a nearly identical provision of the
Federal Power Act, 16 U.S.C. § 824(b), this Court affirmed
FERC’s regulation of unbundled retail electric transmissions
based on FERC’s exclusive jurisdiction over “the transmission
of electric energy in interstate commerce. ...” 16 U.S.C.
§ 824(b), see n.2, supra.

The statutory text thus unambiguously authorizes
FERC to assert jurisdiction over two separate
activities — transmitting and selling [just as does
the NGA over transportation and selling]. It is
true that FERC’s jurisdiction over the sale of power
has been specifically confined to the wholesale
market [as under the NGA for gas]. However,
FERC’s jurisdiction over electric transmission
contains no such limitation [neither does the NGA
for transportation]. Because the FPA authorizes
FERC’s jurisdiction over interstate transmissions,
without regard to whether the transmissions are sold
to a reseller or directly to a consumer [as does the

&
s
-

:
2
$
=
a
y
:
*
é

25

NGA over interstate transportation], FERC’s
exercise of this power is valid. [112 S. Ct. at 1024].

Change the words “transmission” to “transportation” and
“electric” to “gas”, and the cases are indistinguishable.

Petitioners’ reliance on the terms “local distribution” in the
proviso portion of § 1(b) (much like the proviso language of
the FPA) to encompass the last foot of interest transportation to
an end-user was rejected in all of the circuit court cases (and in
New York, supra, under the FPA).?’ This Court has repeatedly
held the proviso language is “surplusage” and does not limit
“any jurisdiction otherwise granted under § 1(b)” and is to be
strictly construed. Federal Power Commission v. East Ohio Gas
Co., 338 U.S. 464, 471 (1950) (the terms “local distribution”
in the proviso were “surplusage which was ‘not actually
necessary’ ”); Federal Power Commission v. Louisiana Power
& Light Co., et al., 406 U.S. 621, 638 (1972) (“it is well
established that the proviso was added to the Act merely for

27. Public Utilities Commission of California, supra, 900 F.2d at
276 (distribution conjures up receiving a large quantity of some good
and parceling it out among many takers. The legislative history of the
Natural Gas Act supports this view and undercuts any suggestion that
final delivery to an end-user transfers the terminal stage of transportation
into distribution); Cascade Natural Gas, 955 F.2d at 1418-21 (“local
distribution’ as Congress viewed the term, involves two components,
the retail sale of natural gas and its local delivery, normally through a
network of pipelines designed to supply local consumers” such that
“by-pass transactions did not entail the realm of local retail sales that
Congress intended to reserve to the States” Michigan Consolidated Gas
Co., supra, 883 F.2d at 121-22 (rejecting the argument that by-pass to
an end-user involves “local distribution” where the gas was purchased
out-of-State from third parties and the pipeline merely transported the
gas into an end-user in interstate commerce). See also Oklahoma Natural
Gas Co. v. Federal Energy Regulatory Commission, 906 F.2d 708, 710
(D.C. Cir. 1990) (local distribution is “a network of small local lines
used to transmit gas from a large interstate pipeline to individual
consumers spread out in a local geographic area — not a high pressure
line connecting an interstate pipeline to a single end-user”).

26

clarification and was not intended to deprive FPC of any
jurisdiction otherwise granted by § 1(b).”); Phillips Petroleum
Co. v. Wisconsin, 347 U.S. 672, 678 (1954) (“we noted that
‘{e]xceptions to the primary grant of jurisdiction in § 1(b)(1)
ought to be strictly construed’ ”); Interstate Natural Gas Co. v.
FPC, 331 U.S. 682, 690-91 (1947) (same).

The Circuit Courts of Appeal have uniformly held that the
meaning of “local distribution” is not merely transportation to
an end-user, but the breaking down, parceling out and sale of
gas to multiple users in a local area, n.27, supra. “Insofar as
Congressional committees spoke to the matter, therefore, they
appear to have viewed distribution as confined to its parceling
out function (and probably) even more narrowly, to parceling
out accompanied by retail sales.” Public Utility Commission of
California, 900 F.2d at 276 (emphasis in original).

Merely because transportation is provided by local
distribution companies to gas users does not mean that it is not
the transportation of natural gas in interstate commerce —
interstate transportation jurisdiction extends to the local
distribution companies’ sales of unbundled transportation
Capacity to the their own end-users where the gas sales element
and the transportation element are severed, unbundled with
FERC maintaining jurisdiction over the interstate transportation
element. See United Distribution Companies v. FERC, supra,
88 F.3d at 1150-56 (sustaining various aspects of Order 636’s
mandatory unbundling and that the interstate transportation
jurisdiction extends to FERC’s regulation of local distribution
companies’ capacity sales and buy/sell arrangements of
transportation to their end-users, and preempts State regulation
to the contrary.)

Aside from the clear language in § 1(b), later provisions of
the NGPA and the NGWDA also demonstrate that FERC’s
interstate transportation jurisdiction encompasses the last foot
of transportation of user-owned gas from out-of-State into the
user’s facility in-State. For instance, consistent with the historical

27

definition of local distribution, Congress in the NGPA expressly
defined “distribution companies” as engaged in the breaking
down and parceling out of natural gas and sales for consumption.
See NGPA § 2(17), where Congress defined a local distribution
company as “any person, other than an interstate pipeline or
intrastate pipeline engaged in the transportation, or local
distribution, of natural gas and the sale of natural gas for ultimate
consumption.” 15 U.S.C. § 3301(17) (emphasis added). Nothing
in this definition indicates that Congress ever considered
transportation of user-owned gas to an end user for consumption
(or at the “last foot”) to be the domain of local distribution.

In 1978 as a part of the Congressional effort to attack the
imbalances in the natural gas supply, Congress amended NGA
§ 7 to allow FERC to give preference or discriminate in
certificating unbundled interstate transportation of user-owned
gas to high priority users’ facilities. 15 U.S.C. § 717f(c)(2);
M.App. la-2a. If FERC did not have jurisdiction over
transportation of user owned gas in interstate commerce into an
end-user’s facility pursuant to § 1(b), the amendment would
make no sense. Concurrently, in the 1978 NGPA, Congress
sought to protect previous certifications for unbundled
transportation of user-owned natural gas into utility generation
units by prohibiting FERC from revoking any earlier granted
certificate for such transportation into generating facilities to
replace coal because of such use being an unpreferred use, i.e.
gas versus coal.. 15 U.S.C. § 3394(a): “[T]he Commission may
not . . . revoke or amend any certificate of public convenience
and necessity issued before January 1, 1969 under Section 7 of
the Natural Gas Act ... for the transportation of natural gas
owned by any electric utility. . .” for a ten year period after
November 9, 1978. App. at 3a. Again, Congress recognized
FERC’s § 1(b) interstate transportation authority over the
transportation of user-purchased gas in one State into the user’s
facility in another State.

28

Finally, in the 1992 Energy Policy Act, Congress expressly
affirmed the competition which it had encouraged, not only in
the integrated, competitive and unregulated national gas market,
but also competition in transportation markets. Congress
considered further amendments to the NGA and NGPA as a
part of the Energy Policy Act of 1992 including requiring 60
day notice to an LDC of a prospective bypass so state
commissions could consider providing more flexible rates for a
LDC to compete. See House Rept. No. 102-474(I) re proposed
Sec. 204, “Rules in Local Distribution Bypass Cases.” 1992
USCCAN 1953 (102nd Cong., 2d Sess., 1992) Instead, Congress
enacted a declaration that “natural gas consumers and producers,
and the national economy, are best served by competitive natural
gas wellhead market.” P.L. 102-486, Sec. 202, entitled “Sense
of Congress”.”®

In sum, Congress has created an integrated, deregulated
competitive national market for the sale and purchase of natural
gas, including sales to any end-user. It also recognized that for
there to be a market where the lowest cost producers could reach
the highest bidding purchasers, and vice versa, FERC had to
require unbundled, open access transportation. This allowed the
LDC’s and the industrial users to bypass the interstate pipelines
and purchase gas from others in the integrated national market.

Petitioners and SIGECO now argue the last foot of interstate
transportation to any consumer is subject to State jurisdiction.
If this is true, then all Congress accomplished in the last
25 years is to transfer the “market function subject to market
power” — that is, a monopoly power — from the interstate
pipelines to the LDC’s and to exclusive State jurisdiction.

28. Here, there is no plain meaning to overcome. In fact, the plain
meaning is established independently of the foregoing. See Solid Waste
Agency of Northern Cook County v. United States Army Corp., __ U.S.
__, 121 S. Ct. 675, 681 (2001).

29

That is ridiculous. If this were true, Congress would have
changed it, too.

CONCLUSION

The Petition for a Writ of Certiorari to the United States
Court of Appeals for the Seventh Circuit should be dismissed
or denied.

Respectfully submitted,
JANET K. PLACE

General Counsel G. DANiEL KELLEY, Jr.

NORTHERN PLAINS NATURAL Counsel of Record

Gas CoMPANY WILLIAM P. DieNeR

1111 South 103rd Street EDWARD P. STEEGMANN

Omaha, Nebraska 68124-1000 Ice MILLER

(402) 398-7886 One American Square
Box 82001

Indianapolis, Indiana 46282
(317) 236-2100

Attorneys for Respondent
Midwestern Gas Transmission Company

ts ena eed AES Ge Ut st AN RRO A HN et Na AS Np MAID Dein EOL ANTE ALI ARE Ee LIOR ITE

APPENDIX

la

APPENDIX A — ADDITIONAL STATUTORY
PROVISIONS

15 U.S.C.A.§ 717. Regulation of natural gas companies

* * *

(b) Transactions to which provisions of chapter applicable

The provisions of this chapter shall apply to the
transportation of natural gas in interstate commerce, to the
sale in interstate commerce of natural gas for resale for
ultimate public consumption for domestic, commercial,
industrial, or any other use, and to natural-gas companies
engaged in such transportation or sale, but shall not apply to
any other transportation or sale of natural gas or to the local
distribution of natural gas or to the facilities used for such
distribution or to the production or gathering of natural gas.

* * * *

15 U.S.C.A. § 717f. Construction, extension, or
abandonment of facilities

* * *

(c) Certificate of public convenience and necessity

(1)(A) No natural-gas company or person which will be
a natural-gas company upon completion of any proposed
construction or extension shall engage in the transportation
or sale of natural gas, subject to the jurisdiction of the
Commission, or undertake the construction or extension of
any facilities therefor, or acquire or operate any such facilities

2a

Appendix A

or extensions thereof, unless there is in force with respect to
such natural-gas company a certificate of public convenience
and necessity issued by the Commission authorizing such
acts or operations: Provided, however, That if any such
natural-gas company or predecessor in interest was bona fide
engaged in transportation or sale of natural gas, subject to
the jurisdiction of the Commission, on February 7, 1942,
over the route or routes or within the area for which
application is made and has so operated since that time, the
Commission shall issue such certificate without requiring
further proof that public convenience and necessity will be
served by such operation, and without further proceedings,
if application for such certificate is made to the Commission
within ninety days after February 7, 1942. Pending the
determination of any such application, the continuance of
such operation shall be lawful.

(B) In all other cases the Commission shall set the matter
for hearing and shall give such reasonable notice of
the hearing thereon to all interested persons as in its judgment
may be necessary under rules and regulations to be prescribed
by the Commission; and the application shall be decided
in accordance with the procedure provided in subsection (e)
of this section and such certificate shall be issued or denied
accordingly: Provided, however, That the Commission may
issue a temporary certificate in cases of emergency, to assure
maintenance of adequate service or to serve particular
customers, without notice or hearing, pending the
determination of an application for a certificate, and may by
regulation exempt from the requirements of this section
temporary acts or operations for which the issuance of a
certificate will not be required in the public interest.

3a

Appendix A

(2) The Commission may issue a certificate of public
convenience and necessity to a natural-gas company for the
transportation in interstate commerce of natural gas used by
any person for one or more high-priority uses, as defined, by
rule, by the Commission, in the case of —

(A) natural gas sold by the producer to such person; and

(B) natural gas produced by such person.

* - * *

15 U.S.C.A. § 3394. Limitation on revoking or amending
certain pre-1969 certificates of public convenience and
necessity

(a) General rule

The Commission may not, during the 10-year period
beginning on November 9, 1978, revoke or amend any
certificate of public convenience and necessity issued before
January 1, 1969, under section 7 of the Natural Gas Act
[15 U.S.C.A. 717f] for the transportation of natural gas
owned by any electric utility except upon the application of
the person to whom such certificate was issued.

* * * *

4a

Appendix A

15 U.S.C.A. § 3431. Coordination with the Natural
Gas Act

(a) Jurisdiction of the Commission under the Natural Gas
Act

(1) Sales
(A) Application to first sales

For purposes of section 1(b) of the Natural Gas Act
[15 U.S.C.A. § 717(b)], the provisions of the Natural Gas
Act [15 U.S.C.A. § 717 et seq.] and the jurisdiction of the
Commission under such Act shall not apply to. any natural
gas solely by reason of any first sale of such natural gas.

* * * *

Ind. Code § 8-1-2-87 Gas utilities; necessity certificates;
requirements

Sec. 87.(a) When used in this section, unless the context
otherwise requires:

(1) The term “gas” means natural gas, artificial or
manufactured gas, and mixed gas.

(2) The term “necessity certificate” means a certificate
of public convenience and necessity issued by the
commission pursuant to the provisions of this section, which
certificate shall be deemed an indeterminate permit.

5a

Appendix A

(3) The term “rural area” means territory within the state
of Indiana that is outside the corporate limits of a
municipality.

(4) The term “gas utility” means and includes any public
utility selling or proposing to sell or furnish gas directly to
any consumer or consumers within the state of Indiana for
his, its or their domestic, commercial, or industrial use.

(5) The term “gas distribution service” means the
furnishing or sale of gas directly to any consumer within the
state of Indiana for his or its domestic, commercial, or
industrial use.

(b) It is hereby declared that in order adequately to
protect the public interest in the distribution of gas to
consumers within the state of Indiana, it is necessary and
desirable that to the extent provided in this section the holding
of necessity certificates should be required as a condition
precedent to the rendering of gas distribution service in rural
areas of the state of Indiana.

(c) After February 26, 1945, no gas utility shall
commence the rendering of gas distribution service in any
rural area in the state of Indiana in which it is not actually
rendering gas distribution service on February 26, 1945,
without first obtaining from the commission a necessity
certificate authorizing such gas distribution service, defining
and limiting specifically the rural area covered thereby, and
stating that public convenience and necessity require such
gas distribution service within such rural area by such gas
utility; and no gas utility required by this section to hold a

6a
Appendix A

necessity certificate for any rural area shall render gas
distribution service within such a rural area to any extent
greater than that authorized by such necessity certificate or
shall continue to render gas distribution service within such
a rural area if and after such necessity certificate has been
revoked or transferred as in this section provided.

* * * *

Ind. Code § 8-1-2-87.5 Transportation of gas; necessity
certificate; application; public hearing; grounds for
granting certificate; revocation

Sec. 87.5. (a) For purposes of this section,
“transportation of gas” means physical transmission,
exchange, backhaul, displacement, or any other means of
transporting gas, including gathering.

(b) Any person, corporation, or other entity that:

(1) is engaged in the transportation of gas from outside
Indiana for direct sale or delivery to any evid use consumer
or consumers within this state;

(2) is engaged in the transportation of gas solely within
this state on behalf of any end use consumer or consumers;
or

(3) is an end use consumer engaged in the transportation
within this state of gas owned or acquired by such end use
consumer for use in this state, other than transportation on
the premises where the gas is consumed;

Ta

Appendix A

is a public utility as defined in section 1 of this chapter and
must obtain a necessity certificate from the commission
before it may engage in any activities described in this
subsection. This subsection does not apply to a gas utility
operating pursuant to an indeterminate permit or necessity
certificate issued under section 87 of this chapter, nor to the
production, sale, and gathering of natural gas produced in
Indiana.

Ind. Code § 8-1-2-87.6 Exemption of Indiana produced
natural gas; petition and hearing on rates for purchase
or transport

Sec. 87.6. (a) Except as provided in this section, the
production, gathering, sale, or transportation of Indiana
produced natural gas is exempt from this chapter.

(b) Any person, corporation, or other entity engaged in
the production, gathering, sale, or transportation of natural
gas produced in Indiana may petition the commission to:

(1) require a gas utility certified under section 86 or 87
of this chapter to purchase or transport Indiana produced
natural gas owned by the petitioning entity; and

(2) set the rates for the purchase or transportation of
that gas.

8a

APPENDIX B — OPINIONS, ORDERS AND NOTICES OF
THE FEDERAL ENERGY REGULATORY COMMISSION
ISSUED DECEMBER 16, 1998

Commission Opinions, Orders and Notices
Midwestern Gas Transmission Company
Docket No. CP98-538-000

Order Authorizing Construction and Operation of Facilities
Under Blanket Certificate and Denying Protests

(Issued December 16, 1998)

Before Commissioners: James J. Hoecker, Chairman; Vicky A.
Bailey, William L. Massey, Linda Breathitt, and Curt H
(acute)ebert, Jr.

On May 12, 1998, Midwestern Gas Transmission Company
(Midwestern) filed a prior notice request pursuant to its Part
157 blanket certificate issued in Docket No. CP82-414-000'
and the prior notice procedures provided in Sections 157.205
and 157.211 of the Commission’s regulations, for authorization
to construct and operate a delivery tap, a delivery lateral, and a
meter station. The proposed facilities will be used to transport
and deliver gas to anew customer, Grain Processing Corporation
(GPC), an industrial end-user. In accordance with the discussion
below, we will grant Midwestern’s request.

1. 20 FERC P 62,411 (1982). Southern Indiana Gas and Electric
Company argues in its protest that Midwestern erroneously relies
on a blanket certificate issued in Docket No. CP82-412-000 to
Midwestern’s affiliate, East Tennessee Natural Gas Company.
- Although Midwestern inadvertently used the East Tennessee docket
number in its prior notice application, we are authorizing
Midwestern’s request under its blanket certificate which was issued
in Docket No. CP82-414-000.

9a

Appendix B
I. Background and Proposal

Midwestern is a natural gas company under the Natural
Gas Act (NGA), engaged in the transportation of natural gas in
interstate commerce and the construction of facilities for the
transportation of gas pursuant to Part 284 and Part 157,
respectively, of the Commission’s regulations.

GPC is a manufacturer and marketer of various corn-
based products. It is constructing a new corn processing plant
in Daviess County, Indiana that it intends to make fully
operational during the summer of 1999. GPC plans to begin
receiving natural gas supplies in early 1999 to test its new
equipment before the plant becomes fully operational. GPC
requested service from Midwestern which then filed the prior
notice request at issue in this proceeding.

Midwestern proposes to install an 8-inch hot tap on its
30-inch diameter, 2100 Line in Knox County, Indiana, on its
existing right-of-way; install 2.84 miles of 8-inch lateral line
extending from the proposed hot tap to GPC’s new plant in
Daviess County, Indiana; and install a meter station with dual
6-inch orifice meter runs and electronic gas measurement
equipment (EGM) on a site provided by GPC. Midwestern
proposes to own, operate, and maintain the hot tap,
interconnecting pipeline, meter station and EGM.

In addition, Midwestern proposes to construct and install
a dual run, two-stage pressure regulator, gas heating facilities
and odorization facilities which GPC will own, operate, and
maintain.

10a

Appendix B

Midwestern states that the project will cost
approximately $2,760,000 for which it will be reimbursed
by GPC. The proposed lateral would have a maximum
volume of 40,000 Dth of natural gas. Midwestern plans to
deliver up to 10,000 Dth/d of natural gas to GPC.

During the winter of 1998/1999, Midwestern proposes
to commence delivery of small amounts of gas to GPC to
test GPC’s plant processing equipment pursuant to an
interruptible gas transportation agreement under Midwestern’s
Rate Schedule IT. When GPC’s plant begins full operation
during the summer of 1999, Midwestern will provide service
pursuant to a firm transportation agreement under Midwestern’s
Rate Schedule FT-A.

Midwestern states that it does not expect the addition of
the proposed facilities to have any significant impact on its
peak day and annual deliveries. Further, Midwestern states
that it will have sufficient capacity to accomplish deliveries
to GPC without detriment or disadvantage to its other
customers.

II. Interventions, Protests and Answers

Pursuant to Section 157.205(i), authorization to construct
and operate qualifying facilities under a blanket certificate
is automatic provided no protests to the activity are filed
within 45 days of the date notice is issued by the Commission.
If a protest is filed, authorization is granted if the protest is
withdrawn within 30 days after the 45-day notice period.”

2. See Sections 157.205(h) and (1)(2) of the Commission’s
regulations.

lla

Appendix B

If a protest is not withdrawn, the prior notice request proceeds
as an application for case-specific authorization.’

On June 1, 1998, in accordance with Section 157.205 of
the Commission’s regulations, notice of Midwestern’s prior
notice request was published in the Federal Register (63 Fed.
Reg. 29723). Within the 45-day notice period provided by
the prior notice procedures, timely, unopposed motions to
intervene were filed by the Indiana Office of Utility
Consumer Counselor; GPC; Proliance Energy, LLC; Northern
Indiana Public Service Company (NIPSCO); and Southern
Indiana Gas & Electric Company (SIGECO).* SIGECO filed
a request for an evidentiary hearing.

NIPSCO and SIGECO also filed protests to Midwestern’s
proposal which they have not withdrawn. They argue that
Midwestern’s construction and operation of the lateral
pipeline without state authorization would violate Indiana
law. Further, they contend that Midwestern’s proposal may
be anti-competitive, lacks market support, would result in
wasteful duplication of facilities, would increase costs borne
by SIGECO’s customers, and would have substantial adverse
environmental impact.

Midwestern and GPC filed answers to the protests.
SIGECO filed a response and motion requesting the
Commission to accept the pleadings SIGECO filed with the

3. See Section 157.205(g) of the Commission’s regulations.

4. Timely, unopposed motions to intervene are granted by
the operation of Rule 214 of the Commission’s regulations (18 C.F.R.
§ 385.214).

12a

Appendix B

Indiana Utilities Regulatory Commission (IURC) that are
related to this proceeding. Midwestern and GPC filed answers
and motions requesting the Commission to accept the
pleadings they filed with the IURC. While our rules do not
permit answers to protests or to answers,” we may, for good
cause, waive a rule.° We find good cause to do so in this
instance. To ensure a complete and accurate record, we will
accept all pleadings tendered to date for filing.

III. Discussion
A. Jurisdiction

SIGECO contends that Midwestern’s construction and
operation of the proposed lateral pipeline without state
authorization would violate Indiana law. SIGECO states that
it has filed a pending petition before the IURC, arguing the
point.’ SIGECO contends that Indiana law requires
Midwestern, as a gas utility in Indiana, to obtain a certificate

5. See 18 C.ER. § 385.213(a)(2).
6. 18 C.ER. § 385.101(e).

7. SIGECO filed a petition with the IURC requesting that it
issue an order directing Midwestern “to cease and desist from
engaging in the rendering of gas service in rural areas of Indiana,
including the transportation of gas from outside Indiana for direct
sale or delivery to consumers within the state” on grounds that
Midwestern’s proposed service to GPC would violate Indiana Code
sections 8-1-2-87 and 8-1-2-87.5. Midwestern has moved to dismiss
SIGECO’s petition arguing that the IURC has no authority to require
Midwestern to receive state authorization before it may provide the
service proposed in this proceeding.

13a

Appendix B

of public convenience and necessity from the IURC since
Midwestern would be transporting natural gas from outside
Indiana for direct delivery to an end-user within the state.®

SIGECO cites Public Service Commission of Indiana v.
Panhandle Eastern Pipe Line Company (Indiana v. Panhandle)
to support its argument that certain activities of natural gas
pipeline companies are subject to URC regulation.» SIGECO
maintains that the Indiana state court found, and the United
States Supreme Court affirmed, that the business of
transporting and selling natural gas for ultimate distribution
to the public is affected with the public interest mandating
state regulation and control. Further, the court found
Panhandle to be a public utility subject to state regulation
with respect to direct sales to end-users.

SIGECO and NIPSCO argue that the Commission should
not act on Midwestern’s application until after the IURC
issues a final order in response to SIGECO’s petition before
the IURC. They contend that the TURC should have the initial
opportunity to apply state law to the facts of this case and
_ that the TURC’s findings are material to the Commission’s
public convenience and necessity analysis.

8. Citing Indiana Code, Secticn 8-1-2-87.5 which states: [a]ny
person, corporation, or other entity that is engaged in the
transportation of gas from outside Indiana for direct sale or delivery
to any end-use consumer or consumers within this state must obtain
a necessity certificate from the [[URC] before it may engage in [such
transportation of gas].

9. 71 N.E. 2d 117 (Ind.), aff’d, 332 U.S. 507 (1947).

ee ee

l4a

Appendix B

SIGECO states that many of the issues before the
Commission, including the application of Indiana law to
Midwestern’s application, the extent to which the NGA may
preempt aspects of state law, and the manner in which these
jurisdictional boundaries should be drawn with regard to this
project, are also pending before the IURC. SIGECO contends
that the Commission should defer further action on
Midwestern’s application pending a decision from the IURC
on the issues of state law and the appropriate division between
state and federal authority as it applies to the facilities and
services proposed by Midwestern.

In that regard, SIGECO submits that the Commission
has shown substantial deference to state commissions on
jurisdictional determinations. For example, it states, in Order
No. 888, the Commission acknowledged in the electric
regulation context that defining the boundary between state
and federal jurisdiction would be highly case-specific, and
indicated that it would defer generally to state commissions,
applying the Commission’s seven local distribution
indicators, to determine “where to draw the jurisdictional
line” as to public utilities providing electric transmission
service.'°

10. Promoting Wholesale Competition Through Open Access
Non-Discriminatory Transmission Services by Public Utilities;
Recovery of Stranded Costs by Public Utilities and Transmitting
Utilities, Order No. 888, FERC Statutes and Regulations, Regulations
Preambles January 1991-June 1996 P 31,036, at pp. 31,783-84 (1996),
order on reh’g, FERC Statutes and Regulations P 31,048 (1997), order
on reh’g, Order No. 888-B, 81 FERC P 61,248 (1997), order on reh’g,
Order No. 888-C, 82 FERC P 61,046 (1998).

\

Rn ee

15a

Appendix B

Midwestern and GPC respond that no portion of the service
Midwestern proposes to provide to GPC involves the local
distribution of gas. Rather, they maintain, Midwestern will
provide interstate transportation of natural gas directly to an
end-user and thus the service is subject to the Commission’s
exclusive NGA jurisdiction.

Commission’s Response

Section 1(b) of the NGA gives the Commission jurisdiction
over the transportation of natural gas in interstate commerce,
the sale in interstate commerce of natural gas for resale, and the
natural gas companies engaged in such transportation or sale."
Section 1(b) reserves to the states jurisdiction over any other
sale of natural gas and the local distribution of gas.

Further, the Commission’s jurisdiction, where it applies
under the NGA, is exclusive.'? Thus, the Commission has
exclusive jurisdiction over the transportation of natural gas in
interstate commerce and the facilities used for such
transportation.'?

11. 15 U.S.C. § 717(b).

12. See Northwest Central Pipeline Corp. v. State Corporation
Commission of Kansas, 109 S.Ct 1262, 1274 (1989); Schneidewind v.
ANR Pipeline Co., 485 U.S. 293, 300-01 (1988) (Schneidewind);
Northern Natural Gas Co., v. State Corporation Commission of Kansas,
83 S.Ct. 646, 650 (1963); Public Utilities Commission of California v.
FERC, 900 F.2d 269, 274 (D.C. Cir. 1990) (California PUC); National
Fuel Gas Supply Corp. v. Public Service Commission of New York, 894
F.2d 571, 576-77 (2d Cir. 1990), cert. denied, 497 U.S. 1004 (1990)
(National Fuel).

13. Schneidewind, 485 U.S. at 299-301; National Fuel, 894 F.2d
at 576-77.

l6a

Appendix B

In interpreting the NGA and its legislative history, the
Commission and the courts consistently have held that the
transportation of natural gas by an interstate pipeline directly
to an end-user constitutes transportation in interstate
commerce, not local distribution, and, as such, is subject
| to the Commission’s exclusive jurisdiction.'* Both the
| Commission and the courts consistently have concluded that
tie-in facilities such as valves, meters and lateral lines
(i.e., the facilities Midwestern proposes to construct to serve
GPC) which are integrated with a pipeline’s interstate
transmission system, and which are designed to connect such
pipeline system to an end-user, are not local distribution
facilities.'°

14. See Cascade Natural Gas Corp. v. FERC (Cascade), 955
F.2d 1412, 1417-19; Oklahoma Natural Gas Co. v. FERC (ONG),
906 F.2d 708, 710 (D.C. Cir. 1990); Public Utilities Commission of
California v. FERC (California PUC), 900 F.2d 269, 277 (D.C. Cir.
1990); Michigan Consolidated Gas Co. v. FERC, 883 F.2d 117, 121-
22 (D.C. Cir. 1989), cert. denied 494 U.S. 1079 (1990); Michigan
Consolidated Gas Co. v. Panhandle Eastern Pipe Line Co., 689
F.Supp. 729,732-38 (W.D. Mich. 1988), aff’d, 887 F.2d 1295, 1300-
01 (6th Cir. 1989, cert. denied, 494 (1990); KN Wattenberg
Transmission Limited Liability Co. (KN Wattenberg), 81 FERC P
61,167, at pp. 61,739-90 (1997); Panhandle Eastern Pipe Line Co.,
64 FERC P 61,211 (1993); Mojave Pipeline Co., 41 FERC P 61,040,
at pp. 61,116-18 (1987), order on reh’g, 42 FERC P 61,351, at
p. 62,002 (1998) (Mojave).

15. ONG, 906 F.2d at 710 (lateral line connecting interstate
| pipeline to end-user is not a local distribution line); California PUC,
900 F.2d at 277 (acts which constitute interstate transportation remain
as such even though they end in deliveries to end-users through tie-
in facilities); KN Wattenberg, 81 FERC at p. 61,739 (a lateral is not

(Cont’d)

17a

Appendix B

Further, in determining where interstate transportation
ends and local distribution begins, the Commission has stated
that the term “local distribution facility” connotes a network
of small local lines used to transmit gas from a large interstate
pipeline to individual consumers spread out in a local
geographic area — not a high-pressure line connecting an
interstate pipeline to a single end-user. The courts have
agreed: “[d]istribution conjures up receiving a large quantity
of some good and parcelling it out among takers.””'®

In FPC v. East Ohio Gas Company (EastOhio),'’ the
United States Supreme Court held that Commission
jurisdiction extended over “the high-pressure trunk lines to
the point where pressure was reduced and the gas entered
local mains.”'* In California PUC, the court held that “acts
which constitute transportation for Section 1(b) purposes
under East Ohio remain such even though they end in delivery

(Cont’d)

a local distribution facility); Williams Natural Gas Co., 46 FERC P
61,160, at p. 61,559 (lateral which connects mainline to end-user is
an essential and integral element of the interstate transportation of
natural gas).

16. California PUC, 900 F.2d at 276; ONG, 906 F.2d 710.

17. 338 U.S. 464 (1950).

18. Id. at 470. In response to the Court’s finding in East Ohio,
Congress later amended the NGA by creating the Hinshaw exception
which exempts from the Commission’s jurisdiction transportation
by a company that operates exclusively in one state if its rates and
services are regulated by the state. See NGA § 1(c) 15 U.S.C. § 717(c).

18a

Appendix B

(at high pressure) to end-users.””'® The circuit court distinguished
a 1951 United States Supreme Court case that upheld Michigan’s
power to veto the retail sale by an interstate pipeline to a large
end-user despite exclusive federal jurisdiction over the interstate
transportation of the gas”° on the basis that the transaction at
issue involved the bundled sale of gas to the end-user.”' The
court stated that “under modern conditions where the end-user
often owns the gas and uses the pipeline solely for transportation,
application of East Ohio removes this fulcrum for state power.”
In Cascade, the court declined to decide the jurisdictional issue
based on the pressure in the line but instead relied on the fact
that the pipeline’s bypass of an LDC to directly serve an end-
user involved only interstate transportation and did not involve
a retail sale of gas by the pipeline to the end-user.”

Thus, under any of these lines of reasoning, Midwestern’s
proposed service to GPC constitutes interstate transmission of
natural gas, not local distribution. Midwestern will deliver the
gas to GPC at mainline pressure, there is no retail sale by
Midwestern to GPC, and Midwestern will not deliver the gas
through a network of small local lines connected to individual
consumers within a local geographic area.

19. 900 F.2d at 277.
20. Panhandle v. Michigan, 341 U.S. 329 (1951).
21. 900 F.2d at 277.

22. Id.

23. 955 Fi2d at 1420.

19a

Appendix B

SIGECO’s reliance on Indiana v. Panhandle is misplaced.
In that case, the Court found that states have jurisdiction over
a pipeline’s direct sale of natural gas to an end-user.
Midwestern is not proposing to make direct sales to GPC;
its proposal involves only interstate transportation of gas.
Further, the courts and the Commission have explicitly found
that Indiana v. Panhandle is inapposite where the pipeline is
merely transporting gas supplies directly to an end-user as
in this case.”

SIGECO’s reliance on Order No. 888 to support its
argument that the Commission should defer to the [URC
regarding our jurisdiction over Midwestern’s proposed
facilities and transportation service is equally unavailing. In
Order Nos. 888 and 888-A, the Commission never stated that
it would defer to states in determining whether the
Commission or the state has jurisdiction over electric
transmission. Indeed, the Commission emphasized that “if
unbundled retail transmission in interstate commerce occurs
voluntarily by a public utility or as a result of a state retail
access program, the Commission has exclusive jurisdiction
over the rates, terms and conditions of such transmission.”
Rather, the Commission explained that, where states
unbundle retail sales, “it will give deference to their
determinations as to which facilities are transmission and
which are local distribution,” provided the states making such
determinations apply the seven criteria established by the

24. Cascade, 955 F.2d at 1417-19; Panhandle Eastern Pipe Line
Co., 42 FERC P 61,076, at pp. 61,389-49 (1988).

25. Order No. 888-A at p. 30,335.

20a

Appendix B

Commission in Order No. 888,”° and it did so in order to allocate
costs and set rates properly for both transmission and local
distribution services.’

The circumstances discussed in Order Nos. 888 and 888-A
do not parallel those at issue in this proceeding. In Order Nos.
888 and 888-A, the Commission was addressing unbundled
retail transmission and the deference to be accorded a state
regulatory authority’s recommendations for drawing of a
jurisdictional line between Commission-jurisdictional and state-
jurisdictional facilities for purposes of allocating costs and
setting rates.”* Here, in contrast, we are not dealing with a state-
approved unbundling of retail sales or the cost allocation and
ratemaking consequences of such action by a state.

SIGECO contends that Midwestern’s and GPC’s argument
that the Commission has exclusive jurisdiction over interstate
transportation does not necessarily divest the IURC of its
jurisdiction over Midwestern’s proposal. SIGECO points to
General Motors v. Tracy (Tracy), in which the United States
Supreme Court discussed the evolution of state and federal
regulation of natural gas markets, including the changes that
have enabled large industrial customers to contract to receive
service directly from interstate pipelines, rather than from an
LDC.” According to SIGECO, the Court states that these

26. Id.

27. Id. at pp. 30,336-37.

28. Id. at pp. 30,336-37.

29. 117 S.Ct. 811 (1997).

2la

Appendix B

regulatory changes did not undermine the states’ authority
over matters that affect the service to be provided to captive
customers served by LDCs.*° Further, SIGECO contends, the
Court stated that the rate impact on an LDC’s captive
customers resulting from a large industrial customer choosing
to avoid service from an LDC had an impact on local interests
sufficient to support regulation by the state. Finally, SIGECO
maintains, the Court specifically refused to endorse decisions
of various courts of appeal that have ruled that the
Commission has sole authority to regulate bypass transactions
where the sale of gas occurs outside of the state and the
interstate pipeline company merely transports gas to the
industrial customers.*!

SIGECO’s argument that the Supreme Court’s decision
in Tracy supports SIGECO’s position that the IURC has the
authority to review Midwestern’s proposal is without merit.
Tracy did not address the specific issue raised by SIGECO
in this proceeding. In Tracy the Court was addressing a
challenge to Ohio’s sales tax exemption for gas sales made
by state-regulated LDCs, but not for sales by gas marketers.
The issue was whether the opportunities for competition
between gas marketers and LDCs to supply gas to end-users

30. Id. at 817.

31. Id. atn.14. (Specifically, the Court cites Cascade, 955 F.2d
at 1414-1422; Michigan Consolidated Gas Co. v. Panhandle Eastern
Pipe Line Co., 887. F.2d 1295, 1299-1301 (6th Cir. 1989), cert. denied,
494 U.S. 1079 (1990); Michigan Consolidated Gas Co. v. FERC,
883 F.2d 117, 121-122 (D.C. Cir. 1989), cert. denied, 494 U.S. 1079
(1990). The Court stated “[w]e express no view on the correctness
of these decisions”).

22a

Appendix B

require treating them as similarly situated for Commerce
Clause purposes. The Court held that they were not similarly
situated for claims of facial discrimination since the LDCs’
state-regulated bundled gas product was sufficiently
distinguished from the independent marketers unbundled gas
sales. Therefore, Ohio’s tax on independent marketers’ gas
sales did not violate the Commerce Clause.

In support of its conclusion that states have a legitimate
interest in regulating gas sales to consumers, the Court
referenced the NGA’s mandate that states have the authority
to regulate retail sales of natural gas (it.cluding direct sales
to industrial customers) and its prior decisions upholding
such mandate.*? The Court recognized, however, that the
NGA and the Commerce Clause prohibit the states from
regulating the interstate transportation of natural gas.”
Nowhere did the Court state or suggest that states have the
authority to regulate the interstate transportation of natural
gas by an interstate pipeline directly to an end-user.

Further, SIGECO erroneously characterizes the Tracy
footnote in which the Court states that it “expresses no view”
on the correctness of the decisions by several U.S. Courts of
Appeals upholding the Commission’s NGA jurisdiction to
regulate the transportation of gas by an interstate pipeline
directly to an end-user.** The Court’s statement in the footnote

32. Tracy, 117 S.Ct, citing Panhandle v. Indiana, 332 U.S. 507
(1947), and Panhandle v. Michigan, 341 U.S. 329 (1951).

33. 117 S.Ct. at 820-21.

34. Id. at 827, n.14.

23a

Appendix B

was not a refusal to endorse the referenced decisions; rather,
the Court explicitly disavowed any view on the bypass
decisions.

Further, the cited footnote in no way challenges or
undermines the integrity of the appellate decisions (two of
which the Court refused to consider upon petitions for
certiorari)*® that confirm the Commission’s preemptive
certificate authority over transportation facilities. Rather, the
Court’s denial of certiorari suggests that the Court found that
those cases either did not decide an important question of
federal law that needed to be settled by the Court or did not
decide an important federal question in a way that conflicts
with relevant decisions of the Court.*°

Finally, the Commission has rejected claims similar to
SIGECO’s contending that Indiana certification was needed
for an interstate transportation project. In Panhandle Eastern
Pipe Line Company, the Commission stated “[c]oncerning
the need for state certificate authorization, it is clear that
Panhandle’s proposal involves the transportation of natural
gas in interstate commerce over which the Commission has
exclusive jurisdiction. Thus, Indiana has no jurisdiction in

35. See Michigan Consolidated Gas Co. v. FERC, 883 F.2d 117
(D.C. Cir. 1989), cert. denied, 494 U.S. 1079 (1990); Michigan
Consolidated Gas Co. v. Panhandle Eastern Pipe Line Co., 689
F.Supp. 729 (W.D. Mich. 1988, aff’d 887 F.2d 1295 (6th Cir. 1989),
cert. denied, 494 U.S. 1079 (1990).

36. See Rule 10 of the Rules of the Supreme Court of the United
States.

24a

Appendix B

this matter and a state certificate is not required.”*’ We affirm
that decision here.

For all the reasons discussed above, we find that the
Commission has exclusive jurisdiction over Midwestern’s
proposal and that Midwestern is not required to obtain a
certificate from the IURC to construct and operate the
facilities or to provide transportation service to GPC through
those facilities.

B. Bypass Arguments

SIGECO states that GPC’s new plant is located within
SIGECO’s franchise area and is less than one-half mile from
its existing natural gas distribution system. Thus, SIGECO
argues, Midwestern’s proposal is an uneconomic and
unreasonable bypass of SIGECO’s system with potentially
severe impacts on it and its existing customers. Further,
SIGECO contends, to the extent that it is unable to serve
large industrial customers located within its service territory
because an interstate pipeline decides to provide direct
distribution service to an end-user, the fixed costs of
SIGECO’s distribution system will be spread among a
progressively smaller customer base. SIGECO argues that
this puts upward pressure on its rates which harms customers,
limits growth, and erodes its competitive position.

The Commission has held that pipeline service to new
customers who are not currently receiving gas service from

37. Panhandle Eastern Pipe Line Co., 64 FERC P 61,211, at
p. 61,612 (1993).

25a

Appendix B

a protesting LDC does not constitute a bypass of the LDC.**
Thus, the service to GPC proposed by Midwestern does not
constitute a bypass of SIGECO since SIGECO is not currently
providing such service to GPC. Rather, SIGECO’s protest is
based on the assumption that it will lose the opportunity to
capture GPC’s business for itself if the Commission grants
Midwestern’s request for a certificate. As the Commission
has stated, lost opportunity is not the same as cost shifting.
There are at present no LDC costs being recouped through
this potential market. Since this is a new plant, SIGECO
cannot claim reduced revenues or load, and neither the
duplicative facilities nor cost-shifting arguments are relevant.
Further, GPC will pay for the new Midwestern facilities;
accordingly, no costs will be shifted to existing Midwestern
shippers. What SIGECO really objects to is competition from
interstate pipelines. We have consistently held, however, that
the public interest is served by fostering such competition.”®

There is no merit to SIGECO’s claim that Midwestern’s
proposal would result in wasteful duplication of facilities.
Neither SIGECO nor Midwestern has ever served GPC, and
neither has existing facilities connected to GPC’s new plant
to do so. Further, GPC has agreed to reimburse Midwestern
for the facilities’ costs. Since GPC has requested service from
Midwestern rather than SIGECO, only Midwestern will
construct facilities and thus there will be no duplication of
facilities as alleged by SIGECO.

38. Texas Eastern Transmission Corp., 71 FERC P 61,020,
at p. 61,088 (1995); Mojave Pipeline Co., 69 FERC P 61,244, at
p. 61,921 (1994).

39. 50 FERC P 61,069, at p. 61,149 (1990).

26a

Appendix B

SIGECO also argues that Indiana state law prohibits
wasteful duplicative utility facilities and services.*° We have
found that Midwestern’s proposal falls within the
Commission’s exclusive jurisdiction. Thus, the cited Indiana
law has no bearing on Midwestern’s proposal.

SIGECO contends that GPC summarily rebuffed
SIGECO’s attempts to negotiate an agreement for utility
services to GPC’s new plant despite SIGECO’s allegedly
superior proposal. SIGECO states that it cannot determine
from Midwestern’s application whether Midwestern is the
lowest cost provider. Further, SIGECO submits, Midwestern
did not explain GPC’s unwillingness to consider SIGECO’s
service as an alternative to Midwestern’s. Thus, SIGECO
submits, there is no evidence to support a finding that
Midwestern’s proposal represents the lowest-cost alternative
or that there was a fair competitive process for GPC’s
business.

Midwestern denies that it has engaged in any
anticompetitive or unduly discriminatory behavior. GPC
states that, contrary to SIGECO’s contentions, SIGECO’s
representatives met with and provided service proposals to
GPC. GPC states that it considered a number of suppliers
and service providers for natural gas service to its new plant,
including SIGECO, Midwestern, and other interstate
pipelines. After its review of the various available service
options and providers, GPC determined that receiving natural
gas through a direct connection to Midwestern, an open
access interstate transportation provider, would be the most
cost-effective and otherwise appropriate option. According

40. Citing Indiana Code Section 8-1-2-86.

PO ee a ree

27a

Appendix B

to GPC, it gave fair consideration to SIGECO’s proposal but
simply did not determine that proposal to be its preferred
alternative. GPC maintains that its ability to obtain open
access transportation directly from Midwestern and the
resulting natural gas cost efficiencies, were crucial factors
in its decision to construct a new facility, to locate it in
southern Indiana, and in the potential success of the new
plant.

The Commission’s current policy is to allow competition
between local distribution companies and interstate pipelines
where there is no indication that the end-user’s choice of the
pipeline’s proposed service was the result of the pipeline’s
anti-competitive or unduly discriminatory behavior. This
policy is based upon a belief that on a national level, natural
gas consumers are better served by a competitive natural gas
market which encourages improved services at lower costs.*!

We note that GPC approached Midwestern and requested
Midwestern to establish a delivery point to provide
transportation service to GPC. Under current Commission

. policy, we strive to honor the decision by an end-user on
whether it is economic to undertake direct service from a
pipeline supplier.*? This policy allows all participants in
the natural gas market greater access to the market.
The Commission has stated that it is not willing to shield

41. See, e.g., ANR Pipeline Company, 71 FERC P 61,289 |
(1995); Paiute Pipeline Company, 68 FERC P 61,199 (1994);
Northern Natural Gas Company, 46 FERC P 61,270 (1989).

42. See Peoples Natural Gas Company, 59 FERC P 61,121, at
Pp. 61,475 (1992).

28a

Appendix B

local distribution companies from the effects of competitive
forces, because it believes that in the final analysis, all
consumers will benefit from the Commission’s pro-
competitive policies.*

| GPC made its choice to solicit the services of Midwestern
| based upon what it perceived its best interests to be. GPC

has merely exercised its right to seek competitive sourcing
| for gas services. It is difficult to attribute this to unfair
| competition on Midwestern’s part. Further, Midwestern is
| required to honor valid requests for open access service on a
| nondiscriminatory basis. Midwestern’s award of capacity to
| GPC was effectuated in full compliance with the terms of
| Midwestern’s tariff. Under these circumstances, we find that
| Midwestern has not engaged in anticompetitive or unduly
discriminatory behavior.

| SIGECO and NIPSCO are concerned that Midwestern’s
proposal to construct a pipeline with 30,000 Dth/d of capacity
in excess of GPC’s current needs means that Midwestern may
be seeking to create its own Indiana local distribution system.
SIGECO submits that Midwestern must make a subsequent
prior notice filing if it intends to use the proposed pipeline
facilities to serve additional customers.

Although we agree that Midwestern must make
subsequent prior notice filings if it intends to connect
additional customers to the proposed lateral pipeline, we

43. ANR Pipeline Company, 71 FERC P 61,289 (1995); Paiute
Pipeline Co., 68 FERC P 61,064, order deferring consideration, 69
FERC P 61,247 (1995), order on reh’g, 70 FERC P 61,227 (1995);
NorthwestPipeline Corp., 54 FERC P 61,191, at p. 61,574 (1991).

LE MR enema en eae

29a

Appendix B

disagree that Midwestern may be seeking to create a local
distribution system by constructing excess capacity.
Midwestern states that GPC requested it to install a pipeline
capable of accommodating a transportation quantity
of approximately 40,000 Dth/d, i.e., an 8-inch line, in
anticipation of GPC’s planned expansions of the plant.
Further, sizing the line to accommodate future expansions
will prevent future environmental disturbances and avoid
further inconvenience to landowners. F urthermore, no costs
will be shifted to existing customers as a result of
construction of an 8-inch diameter lateral because GPC is
fully reimbursing Midwestern for the cost of the facilities.
Under these circumstances, we have no reason to object to
the excess capacity Midwestern proposes to construct.

C. Request for Hearing

SIGECO requests an evidentiary hearing to address
alleged disputed issues of fact including the extent of any
duplication of facilities; whether GPC considered SIGECO’s,
or anyone’s, competing proposal; whether Midwestern’s
agreement with GPC represents the lowest-cost alternative
for GPC; a comparison of Midwestern’s and SIGECO’s
proposals to serve GPC in terms of the construction costs,
the capital and related operating expenses, the rates, terms,
and conditions, and the environmental impacts. SIGECO
argues that the Commission should at least require the parties
to submit the underlying service agreements between
Midwestern and GPC to determine whether the competitive
process was fair.

30a
Appendix B

The requirement for a trial-type evidentiary hearing
applies only to disputed issues of material fact that cannot
be resolved on the basis of the written record.“ We believe
that the parties had an adequate opportunity to present their
views and the Commission had an adequate record upon
which to base its decision. For the reasons discussed above,
we find that SIGECO’s protest does not raise any issues of
anti-competitive or unduly discriminatory behavior on the
part of Midwestern and that there are no material facts in
dispute in this proceeding requiring a hearing. Rather, the
evidence shows that Midwestern’s proposal will provide GPC
with options it desires to better serve its interests. For all the
reasons provided above, we find Midwestern’s proposai is
required by the public convenience and necessity.

As noted above, because of the protest to Midwestern’s
prior notice filing, the Commission treated the filing as an
application for specific Section 7(c) authorization. It is
the Commission’s policy not to grant Section 7(c) case-
specific authority to construct and operate facilities when
the applicant can do so under its blanket certificate.*
The Commission, therefore, will authorize Midwestern to
construct and operate the subject facilities under its Part 157
blanket certificate authorization.

44. See, e.g., Amador State Lines, Inc. v. U.S., 685 F.2d 333
(9th Cir. 1892); Boston Carrier, Inc. v. ICC, 728 F.2d 1508 at 1511
n.5 (D.C. Cir. 1984).

45. See Gas Transport, Inc., 50 FERC P 62,013 (1990);
Tennessee Gas Pipeline Co., 55 FERC P 61,437 (1991).

3la

Appendix B

IV. Environmental Analysis

On October 9, 1998, after reviewing Midwestern’s prior
notice application and the environmental comments by
SIGECO in this docket, the Commission’s staff issued a
Notice of Intent to Prepare an Environmental Assessment
For The Proposed GPC Sales Tap Project and Request For
Comments on Environmental Issues (NOI). Five parties
responded with comments regarding the NOI: SIGECO, the
U.S. Fish and Wildlife Service (FWS), the Federal Aviation
Administration, GPC, and Midwestern. These comments are
addressed in the Environmental Assessment (EA) prepared
by the Commission’s staff. The EA recommends several
mitigation measures, which we adopt and upon which this
order’s authorization is conditioned.

As discussed, Midwestern’s proposed facilities will be
used to provide gas service to a corn processing plant under
construction by GPC. Because the GPC plant is a
nonjurisdictional facility and already under construction, the
EA does not consider GPC’s plant.

The FWS states that the bottomland forest present in
Midwestern’s project area includes valuable habitat for
wildlife, including, potentially, the federally listed Indiana
bat and the bald eagle. The FWS states that the bald eagle is
not likely to occur in the project area and is therefore not of
concern. Further, based on mist-net surveys conducted by
Midwestern as requested by the FWS, no Indiana bats are
present. Thus, the FWS has concluded, and the EA concurs,
that the proposed project would not adversely affect any
federally endangered or threatened species.

32a

Appendix B

Midwestern has agreed to compensatory mitigation ratios
for restoration of trees within forested habitat of present
wildlife. However, long-term impact on present wildlife
nevertheless would be associated with the removal of the
trees; therefore, avoidance of tree clearing is preferable,
where possible. The Commission’s staff has determined that
Midwestern could avoid clearing one acre of bottomland
hardwood forest by relocating the exit point for its directional
drill. Therefore, to minimize the long term effects of the
proposed project, the EA recommends that Midwestern
relocate the exit point for the directional drill of the West
Fork White River east of milepost (MP) 1.54 to avoid the
bottomland hardwood forest. In addition, the EA recommends
that Midwestern not clear any trees between the east bank of
the river and the exit point for the directional drill.

The EA also analyzes the alternative plan submitted by
Midwestern to open-cut the West Fork White River in the
event directionally drilling fails. The EA finds that the
alternative plan is generally acceptable and would approve
the additional work space required should Midwestern have
to open cut. However, if Midwestern does has to cross the
West Fork White River using the open-cut technique, the
EA recommends that Midwestern:

a. limit the width of the construction right-of-way,
not including extra work spaces, to 50 feet through the
riparian area along the east side of the river;

b. replant trees within the temporary portion of the
construction right-of-way between MPs 1.45 and 1.49
according to the ratios suggested for this project by the IDNR;
and

33a

Appendix B

c. monitor the success of tree planting in accordance with
Midwestern’s Floodway Forest Mitigation Plan.

In its comments on the NOI, SIGECO raised the concern
that “the Army Corps of Engineers may have improperly
authorized this activity [the proposed project] under a nationwide
permit.” However, the U.S. Army Corps of Engineers (COE)
has subsequently confirmed that Nationwide 12 permit, issued
by COE to Midwestern on April 3, 1998, is appropriate for all
proposed project activities, including the crossing of Patrick
Ditch, the horizontal directional drilling of West Fork White
River, and the alternate open-cut method of crossing the West
Fork White River.

Midwestern proposes to use 100-foot-wide construction
right-of-way for its pipeline, of which about half will be
permanent right-of-way and half temporary construction right-
of-way. Midwestern has stated that the construction work area
would be reduced to the 50-foot-wide permanent right-of-way
corridor through wetland areas. Extra work spaces would total
about 8.4 acres. Of this 8.4 acres, 0.11 acre would be located in
the nparian, bottomland hardwood forest.

In reducing the proposed 100-foot-wide construction ri ght-
of-way width to 50 feet in wetland areas, the Commission’s
staff has concluded that 100 feet is wider than necessary to install
an 8-inch-diameter pipeline in other portions of the route.
Therefore, to minimize impact on the bottomland hardwoods
and upland forests, the EA recommends that Midwestern also
limit the width of the construction right-of-way through all
forested areas to 50 feet.

34a

Appendix B

In its comment on the NOI, SIGECO stated that “it
appears that Midwestern and the state expedited the historic
preservation and archeological review process to such an
extent that meaningful review was not done” and that
the review “may have overlooked cultural resources.”
We disagree. Midwestern contacted the Indiana State Historic
Preservation Office (SHPO) regarding the need for a cultural
resources survey of the proposed project area. In a letter dated
February 13, 1998, the SHPO indicated that most of the
pipeline alignment east of the West Fork White River had
been previously evaluated, and that based on the results of a
previous investigation, only that portion of the project west
of the river would require a survey.

Midwestern completed a cultural resources survey (west
of the West Fork White River) which covered a 150-
foot-wide corridor, extra work spaces and pipeyards.
Two prehistoric sites and two historic sites were identified
as a result of the survey. None of these sites were
recommended as eligible for the National Register of Historic
Places (NRHP). No evidence of any previously recorded sites
was identified. Subsequently, Midwestern contacted the
SHPO (letter dated March 26, 1998) identifying additional
access roads, a pipeyard, and access/ turning areas on the
east side of the river. In a letter dated April 24, 1998,
addressing both these additional areas and the cultural
resources survey report, the SHPO indicated that “the
proposed improvements to eastern access roads should have
no effect on significant archaeological resources, as long as
all construction is limited to previously disturbed areas” and
that no further investigation of the eastern pipeyard was
warranted. The SHPO also concurred that the four

35a

Appendix B

archaeological sites were not likely to yield significant
information, and no further investigation of the sites appeared
to be warranted.“

In further comments, SIGECO provided a brief records
and literature review of the “vicinity of Maysville” to
evidence that the area has a high potential for historic and
prehistoric resources. This potential already been identified
by the SHPO and was the basis for the SHPO’s conducting a
survey of the previously unsurveyed portions of the proposed
project. The survey report includes a literature review and
records search of the area within a three-mile radius of
the proposed project. The documented historical and
archaeological importance of the area notwithstanding, the
on-the-ground survey identified no NRHP-eligible cultural
resources. The Commission’s staff has reviewed and concurs
in the results of the SHPO’s cultural resources survey report.
Thus, we find SIGECO’s concerns unfounded and its
allegations unsubstantiated.

The no-action alternative would preclude Midwestern
from providing the proposed service to GPC. GPC would
then be forced to make alternative arrangements for natural
gas or to use other energy sources, such as fuel oil or coal.
Therefore, while denial of Midwestern’s application would
avoid the environmental impact identified in the EA, the use

46. The surveying and testing of the portion of the project east
of the West Fork White River is documented in a report meeting the
Secretary of the Interior’s Standards and Guidelines for the currently
proposed project. The report has been reviewed by the SHPO and
the Commission’s staff in accordance with Section 106 of the National
Historic Preservation Act.

36a

Appendix B

of fuels other than natural gas could result in more diverse
impacts, particularly on air quality.

The no-action alternative also would cause a delay in
Midwestern’s ability to provide gas service would affect
GPC’s plans to test its plant equipment, currently under
construction, in April 1999.

Aside from the no-action alternative, SIGECO stated that
it could provide natural gas service to GPC with fewer
facilities and less environmental impact than Midwestern’s
proposal. SIGECO’s franchise area. However, it is not clear
whether SIGECO could construct the necessary facilities in
the time frame required by GPC. Further, it is not known
whether SIGECO’s facilities could provide GPC with the
same levels of service proposed by Midwestern (i.e., up to
10,000 dekatherms of gas per day for plant start-up, with
expansion up to 40,000 dekatherms per day). Moreover, as
discussed above, GPC states that it considered and rejected
SIGECO as a gas supplier. GPC further stated that its ability
to obtain open access transportation directly from Midwestern
and the resulting natural gas cost efficiencies were crucial
factors in its decision to construct the plant.

Therefore, while the EA concludes that SIGECO’s
alternative may be environmentally preferable to
Midwestern’s proposal based solely on environmental
grounds, it is not likely that SIGECO could meet the time
frames required by GPC. Further, the Commission’s policy
of promoting competition, as discussed above, makes
SIGECO’s proposed alternative less desirable.

hme etn eed soba nia cms
LSS Ae TNE a Le a

37a
Appendix B

With adoption of the above-discussed recommendations
and implementation of the mitigation measures set forth in
the appendix to this order, the EA concludes that
Midwestern’s project would not constitute a major Federal
action significantly affecting the quality of the human
environment.

V. Conclusion

At the hearing held on December 16, 1998, the
Commission on its own motion received and made a part of
the record in this proceeding, all evidence, including the
applications and exhibits thereto, submitted in support of
the authorization sought herein, and upon consideration of
the record,

The Commission orders:

(A) Midwestern is authorized to construct and operate
the proposed facilities under its Part 157 blanket certificate,
all as more fully set forth in this order, subject to the
conditions set forth herein and in the appendix to this order.

(B) SIGECO’s and NIPSCO’s protests, and SIGECO’s
request for a hearing, are denied.

(C) Midwestern shall notify the Commission’s
environmental staff by telephone and/or facsimile of any
environmental noncompliance identified by other Federal,
State, or local agencies on the same day that such agency
notifies Midwestern. Midwestern shall file a written
confirmation of such notification with the Secretary of the
Commission within 24 hours.

Appendix B

Appendix
Environmental Mitigation Conditions

1. Midwestern shall follow the construction procedures
and mitigation measures described in its application and
identified in the environmental assessment (EA), unless
modified by this Order. Midwestern must:

a. request any modification to these procedures,
measures, or conditions in a filing with the Secretary of the
Commission (Secretary);

b. justify each modification relative to site-specific
conditions;

c. explain how that modification provides an equal
or greater level of environmental protection than the original
measure; and

d. receive approval in writing from the Director of
the Office of Pipeline Regulation (OPR) before using that
modification.

2. The Director of OPR has delegated authority to take
whatever steps are necessary to ensure the protection of all
environmental resources during construction and operation
of the project. This authority shall allow:

a. the modification of conditions of this Order; and

39a

Appendix B

b. the design and implementation of any additional
measures deemed necessary (including stop work authority)
to assure continued compliance with the intent of the
environmental conditions as well as the avoidance or
mitigation of adverse environmental impact resulting from
project construction and operation.

3. Prior to any construction, Midwestern shall file an
affirmative statement with the Secretary, certified by a senior
company official, that all company personnel, environmental
inspectors, and contractor personnel will be informed of the
environmental inspector’s authority and have been or will
be trained on the implementation of the environmental
mitigation measures appropriate to their jobs before
becoming involved with construction and restoration
activities.

4. Midwestern shall relocate the exit point for the
directional drill of the West Fork White River east of milepost
(MP) 1.54 to avoid the bottomland hardwood forest.
In addition, Midwestern shall not clear any trees between
_ the east bank of the river and the exit point for the directional
drill.

5. If Midwestern has to cross the West Fork White River
using the open-cut technique Midwestern shall:

a. limit the width of the construction right-of-way,
not including extra work spaces, to 50 feet through the
riparian area along the east side of the river;

40a

Appendix B

b. replant trees within the temporary portion of the

construction right-of-way between MPs 1.45 and 1.49

- according to ratios suggested for this project by the Indiana
Department of Natural Resources;

c. monitor the success of tree planting in accordance
with Midwestern’s Floodway Forest Mitigation Plan.

6. Midwestern shall limit the width of the construction
right-of-way through all forested areas to 50 feet.

Federal Energy Regulatory Commission

85 FERC P 61,358, 1998 WL 878038 (F.E.R.C.)

4la

APPENDIX C — ORDER ON MOTION TO DISMISS
OF THE STATE OF INDIANA,
INDIANA UTILITY REGULATORY COMMISSION
DATED JANUARY 27, 1999

STATE OF INDIANA
INDIANA UTILITY REGULATORY COMMISSION
CAUSE NO. 41197

IN THE MATTER OF THE PETITION BY
SOUTHERN INDIANA GAS AND ELECTRIC
COMPANY FOR THE INDIANA UTILITY
REGULATORY COMMISSION TO ORDER
MIDWESTERN GAS TRANSMISSION COMPANY TO
CEASE AND DESIST FROM ENGAGING IN THE
RENDERING OF GAS DISTRIBUTION SERVICE IN
RURAL AREAS OF INDIANA, INCLUDING THE
TRANSPORTATION OF GAS FROM OUTSIDE
INDIANA FOR DIRECT SALE OR DELIVERY TO
CONSUMERS WITHIN THE STATE OF INDIANA

RESPONDENT: MIDWESTERN GAS TRANSMISSION
COMPANY

ORDER ON MOTION TO DISMISS

APPROVED: JANUARY 27, 1999

BY THE COMMISSION:
Camie Swanson-Hull, Commissioner
Scott R. Jones, Assistant Chief Administrative Law J udge

RR

42a

Appendix C

On June 11, 1998, Southern Indiana Gas and Electric
Company (“Petitioner” or “SIGECO”) filed its Complaint
in the above-captioned matter against Midwestern Gas
Transmission Company (“Respondent” or “Midwestern’’).
On June 18, 1998, Indiana Gas Company, Inc. filed its
“Petition to Intervene of Indiana Gas Company, Inc.” which
appears in the following words and figures, to-wit:

(H.1.)

On June 23, 1998, Respondent filed its “Motion for
Extension of Time” which appears in the following words
and figures, to-wit:

(H.1.)

Said Motion was granted by docket entry dated July 16,
1998. On June 26, 1998, Northern Indiana Public Service
Company filed its “Petition of Northern Indiana Public
Service Company to Intervene” which appears in the
following words and figures, to-wit:

(H.1.)

On July 20, 1998, Respondent filed its “Motion to
Dismiss Petition, Or Alternatively for Stay and Certification
to the Court of Appeals” which appears in the following
words and figures, to-wit:

(H.1.)

Also on July 20, 1998, Respondent filed its “Memorandum
in Support of Motion to Dismiss Petition, or Alternatively

43a

Appendix C

for Stay and Certification to the Court of Appeals” which
appears in the following words and figures, to-wit:

(H.1.)

On July 27, 1998, the Board of Directors for Utilities of
the Department of Public Utilities of the City of Indianapolis
d/b/a Citizens Gas and Coke Utility (“Citizens Gas”) filed
its “Petition to Intervene of Citizens Gas and Coke Utility”
which appears in the following words and figures, to-wit:

(H.I.)

On August 18, 1998, the Petitioner filed its “Response
of Southern Indiana Gas and Electric Company to Motion of
Midwestern Gas Transmission Company to Dismiss Petition,
or Alternatively, for a Stay and Certification to the Court of
Appeals” which appears in the following words and figures, -
to-wit:

(H.I.)

On August 25, 1998, Indiana Gas Company, Inc. and
Citizens Gas and Coke Utility filed their “Joint Response of
Intervenors Indiana Gas Company, Inc., Citizens Gas and
Coke Utility and Northern Indiana Public Service Company
in Opposition to Midwestern Gas Transmission Company’s
Motion to Dismiss” which appears in the following words
and figures, to-wit:

44a

Appendix C
(H.1.)

On September 2, 1998, Respondent filed its “Motion for
Leave to File a Reply” which appears in the following words
and figures, to-wit:

(H.I1.)

Also on September 2, 1998, Respondent filed its
“Reply of Midwestern Gas Transmission Company to
Response of Southern Indiana Gas and Electric Company”
which appears in the following words and figures, to-wit:

(H.1.)

On September 8, 1998, Community Natural Gas
Company, Inc. filed its “Community Natural Gas Company,
Inc.’s Petition to Intervene” which appears in the following
words and figures, to-wit:

(H.L)

On September 23, 1998, Grain Processing Corporation
filed its “Verified Petition of Grain Processing Corporation
to Intervene” which appears in the following words and
figures, to-wit:

(H.1.)

Also on September 23, 1998, Grain Processing
Corporation filed its “Statement in Support of Midwestern
Gas Transmission Company” which appears in the following
words and figures, to-wit:

45a

Appendix C
(H.I.)

On September 28, 1998, the Petitioner filed its “Motion
of Southern Gas and Electric Company for Leave to File its
Response to the Reply of Midwestern Gas Transmission
Company and Grain Processing Corporation’s Statement in
Support of Midwestern” which appears in the following
words and figures, to-wit:

(H.1.)

Also on September 28, 1998, the Petitioner filed its
“Response of Southern Indiana Gas and Electric Company
to the Reply of Midwestern Gas Transmission Company and
Statement in Support of Grain Processing Corporation” which
appears in the following words and figures, to-wit:

(H.L)

On October 14, 1998, Community Natural Gas Company,
Inc. filed its “Community Natural Gas Company, Inc.’s
Statement in Support of Southern Indiana Gas and Electric
Company, Indiana Gas Company, Inc., Citizens Gas and Coke
Utility, and Northern Indiana Public Service Company” which
appears in the following words and figures, to-wit:

(H.1.)

On December 22, 1998, Midwestern filed its
“Midwestern Gas Transmission Company’s Second Motion
to Dismiss Based on FERC Decision” which appears in the
following words and figures, to-wit:

46a

Appendix C
(H.I.)

On December 30, 1998, Grain Processing Corporation
filed its “Request of Grain Processing Corporation for Ruling
on Motion to Dismiss” which appears in the following words
and figures, to-wit:

(H.1.)

On January 14, 1999, Petitioner filed its “Response of
Southern Indiana Gas & Electric Co. to Midwestern
Transmission’s Second Motion to Dismiss Based on FERC
Decision in Request of Grain Processing Corporation for a
ruling on that Motion” which appears in the following words
- and figures, to-wit:

(H.L.)

On January 14, 1999, certain of the Intervenors filed their
“Intervenors Indiana Gas Company, Inc., Citizens Gas &
Coke Utility and Northern Indiana Public Service Company
in Opposition to Midwestern Gas Transmission Company’s
Second Motion to Dismiss Based on FERC Decision and a
Request of Grain Processing Corporation for a Ruling on
Motion to Dismiss” which appears in the following words
and figures, to-wit:

(H.L.)

The Commission based upon the above-described filings
and the applicable law, now finds as follows:

47a

Appendix C

1. Pending Motions and Petitions. The Commission
finds that the Respondent’s Motion for Leave to File a Reply
filed on September 2, 1998 should be granted. The Motion
of Petitioner filed on September 28, 1998 for Leave to File
its Response to the Reply of Midwestern Gas Transmission
Company and Grain Processing Corporation’s Statement in
Support of Midwestern should also be granted.

The petitions to Intervene of Indiana Gas Company, Inc.,
Northern Indiana Public Service Company, Citizens Gas,
Community Natural Gas Company, Inc., and Grain Processing
Corporation should all be granted. The Respondent’s request
to take administrative notice of the Federal Energy Regulatory
Commission’s decision issued December 16, 1998 in Docket
No. CP98-S38-000 should be granted.

2. Background. The Petitioner is a corporation,
organized and existing under the laws of the State of Indiana
and is engaged as a public utility in the rendering of gas utility
service to the public in Indiana, including Daviess County.
The Respondent is a natural gas Company under the federal
Natural Gas Act (“NGA”) engaged in the transportation of
natural gas in interstate commerce and in the construction of
facilities for the transportation of gas. The Intervenor Grain
Processing Corporation (“GPC”) is a manufacturer and marketer
of various corn-based products and is constructing a new
com processing plant in Daviess County, Indiana, which it
intends to make fully operational during the summer of 1999.

According to the facts agreed upon by the parties, GPC
requested service from the Respondent who filed a prior noticed
request with the Federal Energy Regulatory Commission.

48a

Appendix C

The service which the Respondent would provide GPC would
be the interstate transportation of gas which GPC would
purchase itself outside of the State of Indiana. The FERC
docketed the Respondent’s request as Docket No. CP98-538-000
on May 12, 1998. The Respondent’s request before the FERC
was for authorization to construct and operate a delivery tap,
a delivery lateral, and a meter station, which facilities would
be used to transport and deliver gas to a new customer, GPC,
as an industrial end-user. In addition to the Complaint that
the Petitioner filed initiating this proceeding, Petitioner,
SIGECO, filed with the FERC a request for an evidentiary
hearing within the 45-day notice period provided by the prior
notice procedures of that federal agency. Additionally,
NIPSCO and SIGECO filed protests to Midwestern’s
proposal before the FERC.

3. SIGECO’s Petition. The thrust of SIGECO’s
Petition before this Commission is that the Respondent
threatens to render gas distribution service in rural areas of
Indiana without having obtained from the Commission a
necessity certificate authorizing it to do so. The Petition states
that the rendering of gas distribution service by the
Respondent without such a certificate would be unlawful,
unreasonable, and in violation of I.C. 8-1-2-87 (b). Further,
the Petition states that I.C. 8-1-2-87.5 requires that any entity
“engaged in the transportation of gas from outside Indiana
for direct sale or delivery to any end use consumer or
consumers within the state” must have a necessity certificate
from the Commission to do so. (Petition at page 2) The
Petition requests that the Commission investigate this matter
and find the Respondent to be in violation of I.C. 8-1-2-87 (b)
and/or I.C. 8-1-2-87.5 and order the Respondent to cease

————Eeeee

49a

Appendix C

and desist the rendering of gas distribution service in rural
areas of the State of Indiana, including the transportation of
gas from outside Indiana for direct sale or delivery to any
‘consumer within the State.

4. Respondent’s Motion to Dismiss. In its Motion to
Dismiss, the Respondent Midwestern argues that the
transportation of natural gas for GPC in interstate commerce
by Midwestern is subject to the exclusive jurisdiction of
the FERC under the NGA. 15 U.S.C. Section 717 (b). The
Respondent also asserts that because it will be serving a
customer and facility new to the service area, no issues of
by-pass are present. Thus, any action by this Commission to
assert authority over Midwestern’s transportation service to
GPC for gas which GPC purchases outside Indiana is
preempted by the NGA. In Support of its arguments, the
Respondent cites five decisions from federal courts of appeals
that have upheld the FERC’s exclusive jurisdiction to regulate
the interstate transportation of natural gas, including the
interstate transportation of natural gas directly to end users,
and rejecting state attempts to regulate such transactions.
See Cascade Natural Gas Corp., supra, (10 Cir.) 955 F.2d
at 1412-1419; Public Utilities Comm. of California, supra,
(D.C. Cir.) 900 F.2d at 274-276; National Fuel Gas Supply
Corp. v. Public Service Commission of N.Y., 894 F.2d 571,
579 (2™ Cir.), cert. Denied, 110 S.Ct. 3240 (1990); Michigan
Consolidated Gas Co. v. Panhandle Eastern Pipeline Co.,
689 F.Supp, 729, 732-738 (W.D. Mich. 1988), affd., 887 F.2d
1295, 1300-1301 (6 Cir, 1989), cert. Denied, 110 S.Ct. 1806
(1990) (Related case at Michigan Consolidated Gas Co. vy.
F.E.R.C., 883 F.2d 117, 121-122 (D.C. Cir. 1989),
cert. Denied, 110 S.Ct. 1807 (1990)); Public Service Comm.
of W. Va. V. FP.C., 437 F.2d 1234, 1283-1239 (4" Cir. 1971).

50a

Appendix C

In its Memorandum in support of its Motion to Dismiss,
the Respondent states that the FERC has addressed the nature
of its jurisdiction over interstate facilities in Indiana, in
circumstances similar to those in the instant Petition. In
Panhandle Eastern Pipeline Co., Docket No. CP93-116-000,
August 5, 1993, 64 FERC P61, 211, the interstate pipeline
requested authorization under 18 C.F.R. §§157.205 and
157.212 to construct facilities to provide firm transportation
service to a customer of a local distribution company. Both
the Office of the Utility Consumer Counselor and the LDC
filed Motions to Intervene and protested Midwestern’s
Application before the FERC. The LDC argued that the
pipeline transportation service would result in a wasteful
duplication of facilities and cost shifting among the LDC’s
customers. The LDC also contended that the customer might
be a public utility subject to the IURC’s jurisdiction under
I.C, 8-1-2-87.5. Another Intervenor before the FERC in the
Panhandle Eastern proceeding argued that the interstate
pipeline proposal should also be approved by the IURC, as
well as by the FERC. The FERC concluded that “it is clear
that Panhandle’s proposal involves the transportation of
natural gas in interstate commerce over which the
Commission (FERC) has exclusive jurisdiction” (citation
omitted). Thus, Midwestern argues in the instant cause,
Indiana has no jurisdiction in this matter and a state certificate
is not required. Alternatively, the Respondent argues that this
Commission should stay any further proceedings until the
FERC has issued its decision and order in Docket No.
CP98-538-000 and should certify the purely legal question
raised to the Indiana Court of Appeals for decision and
determination, pursuant to I.C. 8-1-3-10.

Sla
Appendix C

5. Responsive Arguments. SIGECO and the similarly
interested Intervenors supporting SIGECO’s position replied
to Midwestern’s arguments with the position that the five
federal circuit court decisions did not sufficiently support
Midwestern’s position that interstate transportation is the
same as local distribution of gas. They also argue that,
because the federal decisions cited by the Respondents are
from circuits other than the Seventh Circuit they are not
controlling authority for the purpose of adjudicating
SIGECO’s instant petition. Further, they argue that local
distribution occurs when gas is supplied to an end user and
that state certification is required for that service even when
the gas was purchased outside of the state of delivery. To the
extent a conflict exists between federal and state statutes,
SIGECO and the Intervenors argue that the Commission is
bound to support and enforce the Indiana statutes leaving
questions of constitutional law to other forums. SIGECO and
the similarly interested Intervenors are also opposed to the
certification of the legal question to the Indiana Court of

Appeals, arguing that the matter would most conveniently
be resolved by the IURC.

6. Respondent’s Second Motion to Dismiss.
On December 22, 1998, Midwestern renewed its Motion to
Dismiss based upon a FERC decision issued in Docket No.
CP98-538-000 on December 16, 1998 authorizing
Midwestern to construct and operate facilities to transport
natural gas for GPC. The Second Motion to Dismiss also
requested that the Commission take administrative notice of
the FERC’s decision, which is appended to the Motion and
which we have previously found should be granted. In its
December 16, 1998 Order, the FERC held that it has exclusive

52a

Appendix C

jurisdiction over Midwestern’s proposed service to GPC, and
that the service constitutes interstate transmission of natural
gas, and not local distribution. (FERC Order at pages 5-8)
The FERC also held that the proposed service to GPC
involves no interstate retail sale which may be regulated by
the states, rather that the proposed pipeline will be used solely
for transportation of gas in interstate commerce.

In its Second Motion, Midwestern argues that the FERC
decision collaterally estops subsequent litigation over the
issue because (1) the issues sought to be estopped are within
the statutory jurisdiction of the FERC; (2) the FERC was
acting in a judicial capacity; (3) the parties to that proceeding,
and to the proceeding before the IURC have had a fair
opportunity to litigate the issues before the FERC; and
(4) the FERC decision is subject to judicial review.
See U.S. v. Utah Construction and Mining Co., 86 S.Court
1545, 1560 (1966); McClanahan v. Remington Freight
Lines, Inc., 517 N.E.2d 390, 394 (Ind. 1988). In its Second
Motion, Midwestern also argues that if the TURC is not
inclined to dismiss SIGECO’s Petition, any proceedings in
this Cause should be stayed pending the outcome of any
rehearing before the FERC and/or judicial review before the
United States Court of Appeals as described by Section 19 (a)
and (b) of the Natural Gas Act. 15 U.S.C. Sec. 717 (r) (a)
and (b). In light of the FERC Order and the exclusivity of
judicial review under Section 19 of the Natural Gas Act,
Midwestern withdrew its prior alternative request for
certification of the legal issue by the Commission to the
Indiana Court of Appeals.

53a

Appendix C

7. Responses to Second Motion to Dismiss. Petitioner
and certain of the similarly interested Intervenors respond to
the Second Motion to Dismiss with two basic arguments.
First, that whatever the FERC’s Order says, the responsibility
of this Commission is to enforce the Indiana Statutes, and
that even though the FERC Order contains a determination
that it preempts the Indiana Statutes, the Commission’s
Statutory duty is to enforce, not invalidate, Indiana law.
See General Motors Corp. v. Indianapolis Power & Light
Co., 654 N.E.2d 752, 763 (Ind.Ct. of Appeal 1995), Sunshine
Promotions Inc. v. Ridlen, 483 N.E.2d 761, 765 (Ind.Ct. of
Appeal 1985), State ex rel. Bash v. Medical Licensing Board
of Indiana, 451 N.E.2d 691, 696 (Ind.Ct. of Appeal 1983),
Consolidated Rail Corp. y. Smith, 664 F.Supp. 1228, 1223
(N.D.Ind. 1987). Second, SIGECO and the similarly
interested Intervenors argue that the FERC Order does not
collaterally estop litigation of any question before this
Commission in this proceeding. In that connection, they argue
that the FERC had no Statutory authority to declare Indiana
Code Sections 8-1-2-87 and 87.5 invalid, and thus, the issues
which the Respondent seeks to estop this Commission from
considering were not within the Statutory jurisdiction of the
FERC. SIGECO and the similarly interested Intervenors also
argue that the FERC, in entering its Order, was not acting in
its judicial capacity, but rather as an interested party
advocating its own position. Thus, they conclude that they
did not have a fair opportunity to litigate the preemption issue
before the FERC. Additionally, the responsive parties argue
that under Indiana law, collateral estoppel only applies where
particular issues are adjudicated in one forum and are then
put at issue in a subsequent suit on a different cause of action
between the same parties or their privies. See McClanahan

54a

Appendix C

v. Remington Freight Lines, Inc., 517 N.E.2d 390, 394
(Ind. 1998). The argument follows that since the instant
proceeding was initiated prior to the issuance of the FERC
decision collateral estoppel would not apply.

8. Findings. The facts in this case, for purposes of
resolving the Respondent’s motion to Dismiss, are not in
dispute, and therefore, a hearing is not necessary prior to
this Commission’s rendering of findings thereon. The
Petitioner is a public utility rendering the provision of gas
utility service to the public in the State of Indiana including
Daviess County, Indiana. Intervenor GPC is a manufacturer
and marketer of various corn-based products and is
constructing a new corn processing plant in Daviess County,
Indiana. GPC has requested the services of the Respondent
for the purposes of transportation, in interstate commerce,
of natural gas which GPC intends to purchase outside of the
State of Indiana and have delivered to its facility in Daviess
County, Indiana. The Petitioner argues that such
transportation of natural gas, even if transported in interstate
comnerce to an end-use customer within the State of Indiana,
recuies certification under Indiana law even if the natural
zas is owned by the end-use customer prior to its
transportation. The Respondent argues that such transactions
fall within the NGA and thus are subject to the exclusive
jurisdiction of the FERC. The Respondent has supported this
position with decisions from federal circuits which have
- found that state assertions of jurisdiction for the purpose of
requiring certification for the provision of such services are
preempted by the federal statutes, and that the FERC’s
jurisdiction regarding such matters is exclusive. The
Respondent has also provided this Commission with a 1993

55a

Appendix C

FERC decision based upon facts similar to the instant
proceeding in which the FERC found that its jurisdiction
was exclusive.

The Petitioner and certain of the similarly interested
Intervenors have argued that the federal authorities which
the Respondent relies upon do not include Seventh Circuit
decisions, and thus, this Commission is not bound by them.
In assessing the arguments of the parties, we are mindful of
the fact that the Seventh Circuit, by which this Commission
is bound, has been silent on the issue presented in the instant
proceeding. Thus, we may only consider the five federal
decisions involving facts similar to those present in this
proceeding which the Respondent relies upon as persuasive.
The Petitioners and certain of the similarly interested
Intervenors have also argued that whether or not the Indiana
statute, to the extent it may conflict with the federal statute,
is constitutional, unconstitutional, or otherwise preempted,
is not a decision for this Commission to make, but rather,
the charge to this Commission is simply to enforce the state
statutes. This is a strong argument which may not be taken
lightly.

The Respondent’s Second Motion to Dismiss is based
upon a FERC decision issued on December 16, 1998
regarding facts common to the instant proceeding as well as
the proceeding before the FERC, and specifically finds that
the Indiana law requirement is preempted by the federal law.
The Respondent argues in its Second Motion to Dismiss that
the Petitioner and the similarly interested Intervenors are
collaterally estopped from challenging the preeminence of
the federal statutes. The Petitioner and the similarly interested

56a

Appendix C

Intervenors have responded with the argument that the FERC
is without authority to make such a ruling and that this
Commission does not owe the FERC’s decision deference
with regard to the FERC’s interpretation of federal and state
statutes in any event. Further, the Petitioner and the similarly
interested Intervenors argue that the FERC decision does not
collaterally estop the instant litigation.

We agree with the Petitioner that this Commission is just
as entitled to interpret statutes as is the FERC. We further
appreciate that our function as a state administrative agency
is to enforce the statutes entrusted to it, rather than to find
that such statutes are unconstitutional. However, the
Respondent has demonstrated that states in other federal
circuits have been unsuccessful in attempting to enforce state
certification statutes when federal jurisdiction has been
asserted exclusively. The FERC has recently removed any
doubt as to whether it would assert exclusive jurisdiction
over the proposed transactions as between the Intervenor GPC
and the Respondent Midwestern and while the FERC is surely
within its authority to assert jurisdiction over these
transactions, the exclusivity of t

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---