Case No. 18325
Dept. No. I

IN THE NINTH JUDICIAL DISTRICT COURT
OF THE STATE OF NEVADA
IN AND FOR THE COUNTY OF DOUGLAS

WILLIAM CODY KELLY, TRUSTEE

Under Trust Dated December 12, 1962
Plaintiff,
VS.

TAHOE REGIONAL PLANNING AGENCY, etal.
Defendant.

FINDINGS OF FACT
CONCLUSIONS OF LAW AND JUDGMENT

INTRODUCTION:

This matter came on for trial starting on the Sth day of
February, 1990, and was completed on the 6th day of March,
1990. The Plaintiff was represented by Daniel R. Walsh,
Esq., and Jon Yaple, Esq. The Defendant Tahoe Regional
Planning Agency was represented by Gary A. Owen, Esq.,
and J. Thomas Susich, Esq., of the firm of Crowell, Susich,
Owen & Tackes, Ltd. The Defendant State of California was
represented by Richard Skinner, Esq., Deputy Attorney
General for the State of California. The Defendant State of
Nevada was represented by Marta Adams, Esq., Deputy
Attorney General for the State of Nevada. The court consid-
ered the extensive testimony presented at trial, the numerous
documents and other items of evidence admitted and the
briefs and arguments of counsel, and thus being fully advised
in the premises hereby enters its Findings of Fact, Conclu-
sions of Law and Judgment as follows:

-D 2-

FINDINGS OF FACT FOR PARTS |
AND II OF THE COURT’S DECISION:

1. In 1963 William Cody Kelly [Kelly] heard about the
studies of the Fieischmann Foundation toward creating an
interest in regional planning at Lake Tahoe and was aware at
that time of the discussion of perhaps creating an interstate
agency to address problems that were occurring at the Lake.

2. The William Cody Kelly Trust [the Trust] acquired 44
acres of property adjacent to Lake Tahoe in Douglas County,
Nevada, from the heirs of Sara Hamilton Fleischmann in
September of 1966 for $500,000. [The Kelly property will
be referred to as “Uppaway” from this point forward].

3. Uppaway was originally acquired to serve as a per-
sonal residence for Kelly, however prior to acquisition Kelly
explored its development potential with a real estate
brokerage firm. Kelly was advised that the property’s
ultimate value after development would be between $500,000
and $1,000,000. Kelly wanted to make sure that, when
spending a sum of $500,000.00 for a residence, he could
recover his investment in the property. If he could not sell
the undeveloped land with existing- residence to another
person for $500,000.00, a means to recoup his investment
would be through subdividing the land. Planking Area
Statement No. 059, applicable to Uppaway, allowed single-
family residential development at a density of one residential
unit per acre.

4. At the time of Kelly’s purchase of the 44-acre parcel,
there existed on it the Fleischmann Mansion or “main
house”, comprising lot 19 of the present subdivision. The
mansion was an object of Kelly’s desire for a residence prior
to his purchase of the land.

5. Kelly moved into the mansion in May of 1966 under a
four-month lease-option to purchase. Kelly lived in the
residence with his family from 1966 until 1984. He contin-
ued to maintain a residence in the guest house on lot 17, but
at the current time he lives in Ohio. Apart from the

> 2.

Fleischmann Mansion, when Kelly purchased the 44-acre
parcel it also contained a caretaker’s residence (lot 7) and the
guest house on lot 17.

6. The Tahoe Regional Planning Agency [hereinafter
“TRPA”] was formed by the States of California and Nevada
and the United States of America through a bistate compact
in 1969. The 1969 Compact found a need, “to maintain an
equilibrium between the region’s natural endowment and its
man-made environment, to preserve the scenic beauty and
recreational opportunities of the region .. .” and to establish
“an areawide planning agency with power to adopt and
enforce a regional plan of resource conservation and orderly
development... .”

7. Under the 1969 Compact, TRPA enacted a land use
regulatory scheme requiring that local governments issue
permits for projects in accordance with TRPA’s regional
standards. In doing so, the local governments were intended
to utilize their own procedures but be bound by the substan-
tive regional standards enacted by TRPA. The scheme also
required TRPA to review permits for major developments
and variances. TRPA’s authority to approve or deny a
permit, however, was only fully exercised to the extent the
TRPA Governing Board could muster a dual-majority vote
under art. III(g) of the 1969 Compact. In other words, the
TRPA couid not act without an agreement on action by a
majority of both states’ delegations to the Governing Board.

8. Kelly first attempted to subdivide Uppaway in 1974.
Kelly submitted plans and maps to TRPA, approved by
Douglas County, which depicted a Planned Unit Develop-
ment [PUD] consisting of approximately 39 lots [“lots”
refers to a 2,500 square foot building envelopes within the
PUD] to be constructed in three phases. The property not
contained within the Lots is common property within the
PUD. The proposal was presented to the governing board of
TRPA as a “major development” and received the following
vote:

-D 4-

Five California Delegates Against
Two Nevada Delegates Against
Two Nevada Delegates For

One Nevada Delegate Absent

9. TRPA maintained, in an action before the Federal
District Court for the District of Nevada, that this vote
amounted to a disapproval of the PUD. The Court disagreed
as reflected in an order entered on October 24, 1975 holding
that under Article VI(k) of the 1969 Compact the action of
TRPA amounted to “no action” and that the subdivision was
“deemed approved” under the “dual majority rule”.

10. In July of 1977 Kelly created Uppaway Development
Company, a Nevada Corporation [UDC], and had the trust
convey 28 of the 39 lots to it while retaining ownership of
the remaining 11 lots. Kelly was president of UDC from its
creation until he resigned in 1984. He was also a member of
the board of directors until his resignation as president in
1984. The corporation was set up by Kelly upon advise of
counsel. Kelly gradually transferred UDC’s shares to his
children and grandchildren, as part of his estate planning.

11. The eleven lots, which the trust retained, were the
following:

A. The Hilltop Lots known as lots 33 through 39. All
of these Hilltop Lots lie within phase three of the PUD

B. Lot 7, the caretaker’s home near the entrance

C. Lot 17, the existing guest house, for which Kelly
was asking the sum of $195,000.00 in 1989.

D. Lot 19, the Fleischmann Mansion, which later sold
for $1.1 million.
E. Lot 32, a shoreline lot and foundation which was late
sold for $522,500.00.
12. Phases one and two of the PUD were substantially
completed and most lots within those phases were sold.

-D 5-

13. Kelly has derived substantial economic benefit from
the development of Uppaway Estates of which the Hilltop
Lots are a part.

14. In 1980 the TRPA Compact was amended by the
Nevada and California Legislatures and the United States
Congress. The amended compact deleted the dual majority
rule and mandated that TRPA adopt environmental thresh-
olds in order to protect Lake Tahoe.

15. On August 25, 1981 TRPA Ordinance 81-5 went into
effect implementing the Lake Tahoe Regional Water Quality
(208) Management Plan. Under the terms of this ordinance a
planning team was appointed to evaluate all subdivisions
within the Nevada portion of the Lake Tahoe Basin. This
team was required to inspect all Nevada subdivisions and
rate them for purposes of determining their compliance with
the plan.

16. Under the then existing procedures case by case
review of building lots and approval of building permits
could be conducted only within subdivisions which had been
rated as adequate or potentially adequate under TRPA
Ordinance 81-5.

17. Uppaway was evaluated and it was determined that
phases one and two were potentially adequate. Phase three
was rated as being in need of further consideration because
the subdivision improvements as to phase three had not yet
been constructed.

18. On October 29, 1981 Kelly was specifically notified
that the Hilltop portion of the PUD had been rated as in need
of further consideration. He was advised of the method for
appeal of the determination.

19. Kelly was notified once again of the phase three
evaluation in a letter dated January 21, 1982 and once again
was specifically advised of the appeal procedure. These
notifications advised Kelly that he could not proceed with
case by case review of the Hilltop lots until phase three
received a rating of adequate or potentially adequate.

-D 6-

20. Sometime during the Fali of 1981, Robert Lahmann,
an employee of Mr. Kelly, contacted TRPA with proposed
modifications to the Hilltop. Mr. Lahmann proposed moving
various lots, eliminating some lots and converting the rail
access system [funicular] to the Hilltop into a roadway.
Similar proposals had been make by Kelly through his
counsel as early as the late 1970’s.

21. Mr. Lahmann’s proposal was reviewed and he was
advised by letter dated December 23, 1981 that the proposal
would have to be submitted in the form of an application to
modify the Uppaway map and improvement plans.

22. In 1982 TRPA adopted its Environmental Threshold
Carrying Capacities as mandated by the 1980 compact.
Included in those thresholds were standards for water
quality, both in Lake Tahoe and in its feeder streams, and for
soil conservation, including the amount of impervious
surface which could be created without undue stress upon the
environment.

23. A meeting was conducted on June 4, 1982, in the
offices of Governing Board Chairman Bennie Ferrari con-
cerning the proposed changes submitted by Mr. Lahmann.
Mr. Kelly was represented at the meeting by attorneys
William T. O. Aird and Paul Hogan of the law offices of
Daniel Walsh. Also present at the meeting were Gary Owen,
TRPA’s attorney, and Gordon Barrett, a TRPA employee.

24. During this meeting Mr. Kelly’s representatives
argued for the changes. Kelly was most concerned that the
changes not be viewed as “substantial” in order to avoid
having to have the matter reconsidered by the TRPA Govern-
ing Board.

25. It was agreed at the meeting that Kelly’s proposed
changes, including the elimination of Lot 35, would not be
considered “substantial” by TRPA and that Kelly could
proceed without submitting the change to the Governing
Board.

7-

26. Shortly after the meeting Kelly informed TRPA that
he wished to eliminate lot 39 rather than lot 35. This change
was agreed to by TRPA in a letter dated June 23, 1982 from
Barrett to Walsh.

27. On July 22, 1982 Mr. Walsh sent a letter to TRPA
memorializing the agreement regarding the changes. This
letter was signed by Mr. Barrett and Mr. Ferrari. The letter
provided that Kelly would have to follow the normal case by
case review procedure before building permits could be
approved.

28. On July 27, 1982 Kelly submitted applications for
case by case review Concerning Lots, 33, 34, 35, 36 37 and
38. No appeal concerning phase three’s rating of “in need of
further consideration” was filed.

29. The case by case review office had numerous applica-
tions before it during the Fall of 1982. In January of 1983
Mr. Walsh was notified by TRPA that on site inspection of
the lots would have to be delayed due to the heavy snow
which occurred that year. On February 9, 1983 Mr. Walsh
acknowledged the snow problem in a letter to TRPA.

30. In July of 1983 Mr. Walsh sent a letter to Louis R
Doescher, TRPA’s attorney, complaining that he thought that
phase three had been rated as adequate under the subdivision
review procedure outline in Ordinance 81-5., Mr. Walsh felt
that by allowing subdivision improvements to phase three to
be constructed, TRPA was admitting that it was adequate
under the ordinance. Ordinance 81-5 provides that a rating of
adequate or potentially adequate can be given only after the
subdivision improvements have been constructed and
inspected.

31. TRPA continued to attempt to complete the case by
case review of the lots during the Summer of 1983. On July
21, 1983, TRPA offered to work with Kelly to attempt to
have the subdivision inspected during the Summer of 1983 in
order to try to gain a potentially adequate rating.

-_D 8-

32. On August 26, 1983 the Governing Board of the
TRPA adopted a moratorium preventing further evaluation of
case by case applications until adoption of an Amended
Regional Plan mandated by the 1980 amended compact. This
action was based upon the advice of counsel and concern that
continued approvals by TRPA prior to adoption of the
amended plan would be illegal as being in violation of the
compact and would place the property owners themselves in
potential jeopardy.

33. TRPA advised Kelly that it would attempt to immedi-
ately complete processing of the Hilltop case by case appli-
cations as soon as the moratorium was lifted.

34. On October 10, 1983 Kelly completed the subdivision
improvements which allowed phase three to be evaluated and
rated as potentially adequate.

35. On April 26, 1984 TRPA adopted its Amended
Regional Plan. This plan provided under section 4.20 that
completed applications on file before August 26, 1983 would
be processed under the old procedures. Thus Kelly’s appli-
cation would have been processed if the amended plan had
remained in effect.

36. On April 26, 1984, the same day as the amended plan
was adopted, suit was filed against TRPA by the Attorney
General of the State of California and the League to Save
Lake Tahoe in the Eastern District of California. As a result
of that suit a restraining order was issued by the Federal
Court on or about May 1, 1984, prohibiting TRPA from
acting to approve projects under the amended plan. An
opinion transforming the TRO into an injunction was issued
by the court on June 15, 1984. The actual preliminary
injunction order was signed on August 9, 1984. the August
9, 1984 Injunction was appealed by TRPA to the Ninth
Circuit Court of Appeals. The Ninth Circuit affirmed.

37. In his order converting the TRO into a Preliminary
Injunction, the court stated, among other things, that the
provisions contained within the 1984 Amended Plan allowing
processing of case by case applications under the old plan

-D 9-

[4.20] was in violation of the environmental thresholds,
among other things, and thus was illegal under the new
compact.

38. TRPA was_ thus. prohibited from _ processing
Mr. Keily’s case by case applications concerning the Hilltop
lots by action of the Federal District Court for the Eastern
District of California as approved by the Ninth Circuit Court
of Appeals.

39. Settlement negotiations were initiated in 1984
between the parties to the federal law suit in order to see if a
new plan could be developed which would comply with the
compact and environmental threshold carrying capacities.

40. It was decided to create a “Consensus Building
Workshop” [CBW] in order to develop a new plan. The
CBW was open to all interested persons and included local
residents and varied experts and authorities.

41. Lake Tahoe is in many ways unique among the large
lakes of world. Considering its surface area and volume,
Tahoe has a relatively small watershed which, in its natural
condition, produces few nutrients which enter the Lake via
the more than 100 streams which flow into Tahoe. As a
result, Tahoe is regarded as an ultraoligotrophic lake, and
only Crater, Lake, in Oregon, and perhaps Lake Baikal in
Irkutsk, U.S.S.R., are comparable large aline lakes in water
quality and clarity.

42. The retention time of water entering Lake Tahoe
approximates 700 years, meaning that, if sediments or
nutrients enter the Lake from any source, it can take about
seven centuries before such material may be removed by
outflow via the Truckee River, Tahoe’s only stream outlet.
This lengthy retention time requires a conservative approach
to allowing nutrient inputs to the Lake; once such nutrients
get into the Lake, they remain there virtually permanently for
all human considerations.

-D 10-

43. Since about 1960, when human development in the
Basin commenced at high rates, the amounts of phosphorus,
nitrogen and trace metals important to algal growth in Lake
Tahoe have increased beyond historical levels. Studies by
the Tahoe Research Group indicate that the algal growth rate
of Tahoe, itself dependent on nutrient input to the Lake’s
waters, has been increasing at a rate of about 5 1/2 percent
per year. As a consequence, Lake Tahoe is losing its famous
Clarity at the rate of about 1/2 meter per year. Unless this
growth rate of nutrient input to Lake Tahoe is halted and
even turned around, the Lake may be transformed forever
into an ordinary algae-ridden water body in as few as 40
years.

44. When TRPA put together its 1987 Regional Plan it
faced a Tahoe Basin which already was significantly commit-
ted to development. Large gaming casinos, ski-areas,
commercial and residential development with corresponding
destruction of important nutrient-stripping wetlands had
taken place in the prior three decades. Additionally, more
than 17,000 single family parcels, including Plaintiff’s,
remained in the inventory of unbuilt parcels, many located in
environmentally-sensitive areas: steep slopes, wetland,
and/or relatively erodible soils. Because the uncontrolled
development of ali these parcels would likely ensure the
permanent loss of Lake Tahoe to eutrophication in the near
future, TRPA, pursuant to the Compact, was required to
construct a regulatory matrix which included a reasonable
and responsible program for governing the future of these
undeveloped single family parcels. That program entitled the
Individual Parcel Evaluation System (IPES), after develop-
ment by the CBW, was adopted by TRPA as part of its Code
of Ordinances on May 27, 1987.

45. The new plan [1987 Plan], including IPES, went into
effect in July of 1987.

46. Kelly was thus required, due to the actions of the
Federal District Court for the Eastern District of California,
and the subsequent adoption of the 1987 plan, to have his

-D 11-

lots evaluated under the 1987 Plan, which included IPES.
before those lots could be developed.

47. Under IPES, TRPA sends a team of experts to evalu-
ate each vacant single family parcel, primarily for erosion
hazard and runoff potential. Each evaluated lot receives a
score, and then, in each of the five counties around the Tahoe
Basin, each such lot is ranked against its counterparts. Based
upon a Statistical formula, TRPA then established an initial
minimum score; those lots with scores above that minimum
were eligible to be developed, subject to other conditions not
at issue in this case, while those whose scores fell “below the
line” were required to wait for eligibility. The initial mini-
mum score established by this process was 725.

48. Kelly’s Hilltop Lots were evaluated under IPES and
received the following IPES Scores

Lot 33....679
Lot 34.... 531
Lot 35 629
Lot 36 . 758
Lot 37 615
Lot 38 . 635

Since Lot 36 received a score above 725 it is immediately
cligible.

49. Kelly appealed the remaining scores under Subsection
37.10.D of the Code of Ordinances and Rules of Procedure of
the TRPA. Under this procedure the appealed lots were
reevaluated under IPES by a new team and new scores were
issued. The appealed scores are

FS ee pt
Lot 34....694
©} - Pee sy,
Lot 37.... 702
Lot 38.... 693

Therefore under the IPES criteria all but three of Kelly’s
lots are immediately eligible

-D 12-

S50. IPES includes a process whereby, in each county
where certain conditions are met, which include such things
as installation of erosion control measures, monitoring of
water quality, and the like, the minimum IPES score to be
eligible will be reduced each year. As the “line” moves,
down, lots with lower scores will become eligible to build.
Theoretically, over time, all the vacant lots in the Basin will
become eligible to build, with those scoring the lowest being
last in line.

51. IPES makes an exception to the above stated general
rule for eligibility in that those lots which are part of what
TRPA calls Stream Environment Zones, or SEZs, are per-
manently barred from development because of the extreme
environmental hazard created by such development. None of
Kelly’s lots are within an SEZ.

52. Kelly argued at trial, and presented evidence contend-
ing, that IPES is not reasonably related to a reduction in the
continuing decline of Lake Tahoe. While there currently are
no studies comparing the full extent of natural nutrient
loading at Lake Tahoe versus that loading due to cultural
activities in the Basin, even small amounts of additional
loading from unnatural sources can play a disproportionate
role in upsetting Tahoe’s natural equilibrium.

53. The nutrients included by Kelly’s expert, Timothy
Durbin, in his budgets, i.e., dissolved inorganic nitrogen and
soluble reactive phosphorus, are not the only significant
forms of nitrogen and phosphorus in evaluating the causes of
algal growth and the eutrophication of Lake Tahoe. Al-
though the complete processes of the cycling of nitrogen and
phosphorus at Lake Tahoe have not been quantified because
of the complexity of the ecosystem, particulate and organic
forms of both nitrogen and phosphorus are an important, if
not more important, source of nutrients to the more than 100
forms of Tahoe algae because of the recycling of nitrogen
and phosphorus from one form to another and back again in
the natural cycles of each.

-D 13-

54. The processes to be evaluated in depicting a complete
nutrient budget for Lake Tahoe are far more complex than
the simple, two-chemical evaluation utilized by Mr. Durbin
to support his theses about the Lake. TRPA, in conjunction
with the Tahoe Research Group and the Lake Tahoe Inter-
agency Monitoring Program, have been engaged in an effort
to describe a thorough nutrient budget for Tahoe for some
years, but it will take much more work, time and funding
before the results are complete enough to describe all the
processes affecting algal growth in Lake Tahoe. However, it
is unnecessary, for policy making purposes, to have a com-
plete nutrient budget for Tahoe. Scientists studying the Lake
have identified a variety of sources of causes of eutrophica-
tion of Lake Tahoe, including land disturbance; TRPA is
well-justified in attempting to reduce or control those
sources of causes as they are identified, without waiting until
the total process can be more perfectly quantified, so long as
it continues as well to conduct further base-line and research
Studies.

55. Mr. Durbin’s budget analysis is further flawed in its
approach, whereby he attempts to explain all the nutrient-
contributing processes in Tahoe’s entire ecosystem by a
simple examination of an isolated part. Not only is it not
valid to extrapolate conclusions about other, entirely differ-
ent processes form such an analysis, Mr. Durbin’s efforts
ignored the extraordinary dynamism of the whole.

56. Since particulate and organic forms of nitrogen and
phosphorus are derived almost entirely from land disturbance
at Tahoe, Mr. Durbin’s failure to consider these forms in his
budgets results in those budgets being greatly oversimplified
in their attempts to describe nutrient processes at Lake Tahoe
as being derived primarily from atmospheric sources. For
Similar reasons, Mr. Durbin’s budgets fatally understate the
contribution of development to nutrient loading of total
nitrogen and total phosphorus to Lake Tahoe.

-D 14-

57. As Lake Tahoe has received greater quantities of
nitrogen from human influences on the Basin, other nutrients
are beginning to play more significant roles in governing the
growth and rate of growth of eutrophicating algae. At times,
phosphorus is the limiting nutrient in such processes, and
trace elements also seem to play critical parts in stimulating
algal growth. Since these nutrients all derive almost entirely
from land disturbance, as contrasted to atmospheric inputs,
Mr. Durbin’s failure to analyze fully these other nutrients is
another flaw in the conclusions he draws form his attempted
depiction of nutrient processes at Lake Tahoe.

58. While Mr. Durbin’s theoretical budget work rested
entirely on limited forms of nitrogen and phosphorus, by
which he attempted to draw valid conclusions about the
causes of Tahoe’s eutrophication, actual bioassay studies of a
variety of nutrients, performed under carefully controlled
scientific conditions, reveal that such causes are much more
complex than Mr. Durbin’s analysis comprehends.

59. Such bioassay analyses demonstrates that the simple
addition of nitrogen or phosphorus to Tahoe’s lake water
produces limited or no algal growth response. Similar results
are obtained when the chemicals contained in atmospheric
pollution are added to lake water. Such experiments come
closest to mirroring the simple processes analyzed by
Mr. Durbin’s work. On the other hand, when Tahoe stream
water, with all the complex chemicals, including nitrogen
and phosphorus in all their forms, as well as the various trace
elements, found therein, is added to Tahoe lake water, the
algal growth rate is highly stimulated. These experiments
tend to show that land disturbances in the Tahoe Basin,
which particularly enriches the input of particulate and
Organic nitrogen and phosphorus as well as trace elements to
the Lake via streams, is an important factor which TRPA
must address in its attempt to halt and reverse Tahoe

eutrophication.

60. Lake Tahoe, before modern human influence, was
able to maintain its ultraoligotrophic state notwithstanding
some natural nutrient loading from the atmosphere and from
its watershed. The amount of that natural loading is un-
known. Since the cause of Tahoe’s increasing eutrophication
Stems from the increment of nutrient loading introduced by
human behavior, Mr. Durbin’s depiction of the relative
amount of such loading, compared to total loading, misses
the point, even if such depiction were reliable. Even if the
increment from human behavior is quite small relative to the
total, controlling that increment is the most reasonable and
appropriate strategy for TRPA to undertake to restore the
Lake to natural equilibrium.

61. Even giving Mr. Durbin’s limited nutrient analysis
unwarranted credibility, he still concedes that land distur
bances from development in the Tahoe watershed contributes
at least six percent of the total load of dissolved inorganic
nitrogen to Lake Tahoe, and at least 3,000 tons of a total of
24,000 tons of sediment annually. While these amounts may
be small relative to the total inputs hypothesized by
Mr. Durbin, they are part of the human-induced increment
which has brought Lake Tahoe out of uliraoligotrophic
equilibrium, and thus are part of the loading which TRPA
properly must endeavor to reduce or eliminate.

62. Plaintiff’s experts produced no credible evidence that
atmospheric pollution is transported from the urbanized coast
and valley west of the Basin to Lake Tahoe. To the contrary,
defendants’ expert, Dr. Cahill, testified that the primary
airsheds from which prevailing winds blew into Tahoe were
in the Pacific and the northwestern continent — some of the
cleanest airsheds in the world. The bulk of atmospheric
deposition of nutrients on Lake Tahoe thus likely is produced
within the Basin itself.

63. Studies of Tahoe’s sediment core, conducted by the
Tahoe Research Group, demonstrate a profound change in the
diatom population of Lake Tahoe occurred around 1960,
coincident with the onslaught of modern land development in

-D 16-

the Basin. This diatom change is demonstrative of Tahoe’s
trend towards eutrophication, which began at that time. The
same sediment core studies show an increase in the rate of
sedimentation input into Lake Tahoe, which increase could
only have been caused by land disturbance, as opposed to an
increase in atmospheric pollution.

64. The sediment core studies did not show that Tahoe
suffered any lasting increase in either sedimentation rate or
nutrient input rate as a result of logging practices in the
Basin during the late nineteenth century. Such a result is
best explained by the testimony of Dr. Margaret Davis, who
described scientific studies of other lakes and watersheds
which underwent similar perturbations and reacted much like
Lake Tahoe has. In those other cases, the impact from
logging in past centuries was relatively minor, as natural
processes were able rapidly to recover from such distur-
bances. On the other hand, when permanent housing devel-
opment took place in the same watersheds, the nutrient and
sediment input to the affected lakes was much greater and
quite persistent.

65. The use of best management practices (BMPs) to
reduce erosion and runoff is valid strategy employed as part
of TRPA’s regulatory practice to reduce or eliminate input to
Lake Tahoe from land usage. BMPs, however, are not a
panacea. There are no guarantees that such practices will be
maintained over the life of the particular development whose
impacts are meant to be addressed by the BMPs, and TRPA’s
experience demonstrates that such long-term maintenance is
an exception, rather than the rule. When not maintained,
BMPS inevitably fail, and their value in controlling sediment
and nutrient inputs to the Lake commensurately dwindles.
Accordingly, it is not irrational of TRPA, in IPES, to deny
special credit to land developers like plaintiff for its installa-
tion of BMPs on its property — particularly because TRPA,
aS a matter of course in its 1987 Regional Plan, requires
every land developer to install at least a minimal level of
such BMPs.

-D 17-

66. Over time, unless the accumulation of silt and sedi-
ment in the Uppaway infiltration trench system is peri-
odically and effectively removed and disposed of outside the
Basin, the drainage control system in that development will
become ineffective in trapping such sediments. Eventually,
the system will fail altogether from overload.

67. Nutrient uptake processes take place, for the most
part, in the shallowest portion — no deeper than three or
four inches — of the soil profile. The infiltration of water

below this zone of uptake, as is accomplished by the infiltra-
tion system at Uppaway, impedes for a time the ability of
plants to accomplish nutrient removal, ensuring a nutrient-
enriched groundwater, but there is no indication that this
nutrient groundwater reaches the Lake from the slopes of
Uppaway.

63. Loss of vegetation through development causes the
loss of the ability of the natural environment to remove
nutrients from surface and near-surface waters, thus con-
tributing to nutrient loading of streams and groundwater.
The limitation in IPES on the creation of impervious surfaces
via development is a valid strategy to limit the loss of such
nutrient-stripping vegetation.

69. Cagwin soils make up most of the soils at Uppaway.
When those soils are compacted, they are susceptible to a
great deal of runoff and a high rate of erosion. These
problems are dangerously exacerbated during major storm
events such as when warm spring rain falls on a major snow
pack.

70. The results derived from the rainfall simulation
experiments of Douglas Guerrant, plaintiff’s expert, were
fatally affected by flaws in experimental design and
methodology. Of the four devices utilized in the experi-
ments, only one produced dat: that even plaintiff could
characterize as_ useful. However, in that experiment,
Mr. Guerrant, by raking the soil in the test plots which were
claimed to reproduce sites which emulated development,
created plots which were calculated to produce the highest

-D 18-

rate of infiltration — a condition not extant on actual
developed sites. As a consequence, Mr. Guerrant’s results
greatly overstated the ability of Uppaway’s soils to withstand
erosion and runoff upon development. Notwithstanding,
Mr. Guerrant’s results confirmed TRPA’s view that slope and
disturbance are major factors producing soil loss, and that
Cagwin soil, when compacted is highly erodible.

71. The study by Mr. Mahannah of five Tahoe water-
sheds, even if its limited scope is given credit, did not show
that construction does not contribute to nitrogen and
phosphorus loading of streams; indeed, Mr. Mahanna’s study
revealed that, in many cases, loading of those nutrients was
greater in the streamwater below development than above.

72. Phosphorus, nitrogen and some important trace
elements in Lake Tahoe are in fact increasing beyond their
historical levels.

73. Increased levels of nutrients are in fact causing
increased algal growth.

74. Increased algal growth and sedimentation do in fact
cause loss of water clarity.

75. Sediment and nutrient transport from so-called
“hazardous” residential areas are in fact having a meaningful
and pronounced effect on the contribution of phosphorus and
nitrogen and trace elements to the Lake.

76. IPES, as evaluated in this case, is an evenly applied
and non-discriminatory effort to control or reduce nutrient
and sediment inputs to Lake Tahoe from residential develop-
ment. TRPA’s IPES program, because it attempts to predict
the relative contributions of both organic and inorganic
forms of nutrients, dissolved and particulate, is properly
aimed at regulating the input of all these nutrients to the
lake from the development of single family homes in the
watershed.

77. The Hilltop Lots, the subjects of this action, maintain
current, substantial value under the regulations of the 1987
TRPA Regional Plan.

-D 19-

78. In addition to the above findings, the Court incor-
porates the findings set forth in the Court’s Order Partially
Granting and Partially Denying Motions for Summarv
Judgment signed on August 23, 1989.

Based on the above Findings of Fact, the Court makes the
following:

CONCLUSIONS OF LAW:

1. The Plaintiff having conceded at the hearing on
Defendants’s Motions for Summary Judgment that he was
not seeking monetary relief against individual members of
'RPA’s Governing Board, said defendants are entitled to
judgment against Kelly on any claims for relief alieging
damages against them

2. Despite major changes since 1979, the TRPA is still an
independent agency. The Plaintiff has produced legally
insufficient evidence to establish that the Agency is the alter
ego of either State Defendant; moveover, there is no evi-
dence that Nevada or California officials acted in an action-
ably tortuous or condemnatory fashion. The dismissal of the
State Defendants is therefore appropriate.

3. Plaintiff has no standing to collaterally attack a
neighboring federal court ruling nor has Plaintiff established
a basis for relief under a malicious prosecution theory
against the State of California.

4. The action of the Federal District Court for the Eastern
District of California cannot form the basis of a claimed
taking and therefore Plaintiff is entitled to no relief for an
alleged First English taking during the time the Federal court
injunction prevented TRPA from allowing Plaintiff to
develop his property.

5. Plaintiff, having proved no Constitutional violations, is
entitled to no relief under 42 United States Code Section
1983.

-D 20-

6. Plaintiff has failed to demonstrate that TRPA has
deprived him of procedural due process. Procedural due
process rights do not include the right to force an agency to
take action on permit application.

7. TRPA’s ordinances 81-1 and 81-5 were written to
apply to all property owners on the Nevada side of the Tahoe
Basin. Those procedures were evenly and properly applied
and therefore Plaintiff was not denied the equal protection of
the laws.

8. TRPA’s powers are derived from a federal Compact
ratified by the Congress of the United States. The Compact
itself is a congressional exercise of power under the Compact
Clause and amounts to federal legislation. As federal law,
the regional plan adopted by the TRPA preempts state law
and state constitutional provisions. Accordingly, any claims
asserted by the Plaintiff based upon Nevada’s Constitutional
provisions should be dismissed.

9. To date Plaintiff has received no building permits for
construction on the parcels in question. Having not yet
received building permits he has no vested rights as a matter
of law.

10. Plaintiff has failed to prove that TRPA’s conduct
concerning the regulation of building on Plaintiff’s property
was the product of inaction or discrimination directed against
Plaintiff. Given the context in which TRPA’s activities must
be placed, the court concludes that Plaintiff is not entitled to
estoppel relief as claimed in the complaint.

11. Plaintiff has an adequate remedy at law for any
temporary taking of his property anc therefore is not entitled
to estoppel relief.

12. There is no evidence of fraud or malice on the part of
TRPA and therefore Plaintiff is not entitled to punitive or
exemplary damages.

13. There is legitimate governmental interest in the
protection of the Lake Tahoe Region by attempting to insure
an equilibrium between its natural endowment and _ its

-D 21-

manmade environment. The Court has found that the IPES
system examines runoff and erosion hazard characteristics of
individual lots and anticipates the effect which development
may have on sediment and nutrient transport. Even though
the IPES point system, for the most part, discounts the
mitigating effect which best management practices may have
upon nutrient and sediment transport, it is, nonetheless
rationally based because it evenly and scientifically rates
runoff potential and erosion hazard which might ultimately
flow from the parcels it measures. Therefore, the regulatory
system predicated upon IPES is a valid exercise of the police
power.

14. The 1987 TRPA Regional Plan and its implementing
ordinances, including IPES, are facially constitutional.

15. TRPA’s 1987 Regional Plan and ordinances, includ-
ing IPES, substantially advance the legitimate governmental
interest in the protection of the Lake Tahoe Region.

16. TRPA’s 1987 Regional Plan and ordinances adopted
thereunder, including IPES, do not deny Kelly the economi-
cally viable use of the lots which are the subject of this
action.

17. Kelly has failed to present sufficient evidence that his
parcels have been permanently taken by action of the TRPA
since IPES contains a procedure which will allow the “cut off
line” to move downward thereby making it likely that all of
Kelly’s lots will eventually become eligible for building
permits. TRPA’s 1987 Regional Plan and _ ordinances
adopted thereunder, including IPES, do not, therefore, take
Kelly’s lots, the subjects of this action, without just compen-
sation in violation of the Fifth and Fourteenth Amendments
to the United States Constitution.

18. TRPA’s Ordinances 81-1 and 81-5, and each of them,
substantially advanced the legitimate governmental interest
in the protection of Lake Tahoe and did not deny Kelly the
economically viable use of his lots, the subjects of this
action. TRPA’s Ordinances 81-1 and 81-5, and each of them,
do not violate Kelly’s right to substantive due process of law

-D 22-

under the Fifth and Fourteenth Amendments to the United
States Constitution. TRPA’s Ordinances 81-1 and 81-5, and
each of them, did not, permanently or temporarily take
Kelly’s lots, the subject of this action, without just compen-
sation in violation of the Fifth and Fourteenth Amendments
to the United States Constitution.

18. Kelly is entitled to no damages for an alleged tempo-
rary taking during the period between August 26, 1983 and
April 26, 1984, known as the “moratorium”, since TRPA’s
suspension of review of building permit applications was
done in good faith for a significant public purpose and was
reasonable in duration given the complexity of the tasks
undertaken.

19. Kelly is entitled to no damages for an alleged tempo-
rary taking between April 26, 1984 and May 27, 1987, the
effective date of the 1987 Regional Plan, since the inability
of TRPA to authorize construction during this period was the
result of a Federal District court order over which TRPA had
no control.

20. Kelly is entitled to no damages for an alleged tempo-
rary taking after May 27, 1987 since Ipes [sic] is a rationally
based system calculated to help prevent degradation of Lake
Tahoe and thus benefits Kelly directly. Further, TRPA’s
1987 Plan, including IPES, does not violate Kelly’s right to
substantial due process of law under the Fifth and Fourteenth
Amendments to the United States Constitution.

21. As long as the benefit received by the property from
the ordinances is direct and substantial and the burden
imposed is proportional, the TRPA can force landowners like
Mr. Kelly to postpone their building plans for a reasonable
period of time.

22. Neither the 1987 Regional Plan for the Lake Tahoe
Basin nor the Code of Ordinances, nor any predecessor plan
Or ordinance, have deprived Mr. Kelly of his interest in
property in a manner requiring compensation under the Fifth
and Fourteenth Amendments to the United States
Constitution.

-D 23-

23. Neither the 1987 Regional Plan nor the Code of
Ordinances, nor any predecessor plan or ordinance, has
deprived Kelly of this right to equal protection of the laws
under the Fourteenth Amendment to the United States
Constitution.

24. Plaintiff is entitled to no injunctive relief.

Based upon the above stated Findings of Fact and Conclu-
sions of Law the Court enters its

JUDGMENT:

Judgment is entered as follows:

1. Based upon the findings and conclusions set forth
herein, as well as the findings and conclusions set forth in
the court’s order of August 23, 1989 partially granting and
partially denying motions for summary judgment, the States
of Nevada and California are dismissed from this suit as
parties defendant.

2. Judgment is entered in favor of TRPA and against the
Plaintiff as to the following causes of action and claims for
relief:

A. All malicious prosecution and conspiracy claims.

B. All claimed denials of civil rights.

C. All due process claims under the United States
Constitution.

D. All takings claims under the United States
Constitution.

E. All equal protection claims under the United States
Constitution.

F. All claims under the Constitution of the State of

Nevada.
G. All claims of vested rights.
H. All estoppel claims.
I. All claims for injunctive relief.

-D 24-

J. All claims for punitive and exemplary damages

K. Any and all additional claims contained within the
complaint as more fully set forth in the Court’s
Order Partially Granting and Partially Denying
Motions for Summary Judgment signed on August
23, 1989 and the Court’s Decision filed on July 13,
1990.

3. Defendant TRPA is awarded its costs in the amount of
$241,836.69 and its attorneys fees in the amount of
$7,500.00, (please see Court Order dated February 20, 1991
and the Explanatory Order filed of even date herewith).

FINDINGS AND CONCLUSIONS FOR
PART III OF COURT’S DECISION:

1. Uppaway Estates is a planned unit development of
44.45 acres located at Glenbrook, Lake Tahoe, Nevada.
Plaintiff Kelly purchased this property in 1966 which was
and still is zoned one acre residential by Douglas County
Ordinance.

2. In 1972 the estate contained three residences consist-
ing of the main house, a guest house and a caretaker’s house
From early on, Mr. Kelly intended to develop the property
because he thought 44.45 acres was too large for one
residence, and he thought he could recover his investment.

3. In 1972 the Tahoe Regional Planning Agency (TRPA)
adopted a Land Use Ordinance for the entire Lake Tahoe
Basin imposing population density controls and land cover-
age limitations. This ordinance limited development on the
Kelly property but allowed for variances if it could be
demonstrated that the project would not cause detrimental
environmental consequences.

Accordingly, Mr. Kelly sought to design a development in
such a way to demonstrate that it would cause no environ-
mental harm to Lake Tahoe, even though the land coverage

-D 25-

limitations imposed by the TRPA Land Use Ordinance would
be exceeded. In doing so he needed a variance.
Section 8.25 of the TRPA Land Use Ordinance provided:
Additional Land Coverage — Administrative Permit
“Land coverages in excess of those permitted in
any Land Capability District may be authorized by
administrative permit issued by the permit-issuing
authority upon a showing in a Land Capability
Report by the applicant, in accordance with the
applicable provisions of the Rules and Regulations
of Practice and Procedure, that:

ec * * ©

(2) the applicant’s proposed development, as
designed and located, will not cause the detrimen
tal environmental consequences on the land of the
applicant, or on other lands or waters, that were the
basis of the classification of the applicant’s land in
the applicable Land Capability District in the first
instance.”

4. The tentative map of Uppaway Estates which depicted
each building envelope as to site and size, was presented to
and, after public hearings, approved by the Douglas County
Planning Commission and the Douglas County Board of
County Commissioners in 1974. The project consisted of 39
residences on the 44.45 acres not to exceed 2,500 square feet
of impervious cover for each building envelope with the one
exception of the main residence built in 1938.

5. The permit issuing authority for variances in this case
was the Douglas County Board of County Commissioners.
The Douglas County Planning approved the project on
August 27, 1974. On September 20, 1974, the Douglas
County Commissioners approved the tentative map and
issued an administrative permit to allow land coverage in
excess of those permitted by the TRPA Land Capability
Districts on the subject property, pursuant to Sec. 8.25 of the
TRPA Land Use Ordinance.

-D 26-

“(T]he applicant’s proposed development, as
designed and located will not cause the detrimental
environmental consequences on the land of the
applicant or on other lands or waters, that were the
basis of the applicable Land Capability District in
the first instance.”

6. The tentative map and administrative permit were then
taken to the TRPA for review which held three separate
hearings before its Governing Board. Kelly presented
evidence and testimony of six (6) expert witnesses on soil,
geology, surface drainage, and the inherent design relation-
ship, water and fire hazard.

7. The TRPA Governing Board vote on the development
resulted in a lack of a dual majority, which, under the
language of the TRPA compact at that time resulted in
approval. However, TRPA wished to test this procedure and
filed suit against Plaintiff, Kelly and Douglas County at-
tempting to annul the Douglas County Administrative permit
and the “deemed-approved” mechanism. The United States
District court held:

(1) the project is approved under the compact
because of lack of dual majority vote

(2) that the Douglas County variance was legally
granted, permitting the excess ground coverage for
Uppaway.

The TRPA Governing Board concluded that further legal
action on behalf of the staff was unwarranted and the District
Court decision became final.

As a result of the Federal Court litigation this Court finds
that the issues presented to the Federal Court have been
fairly tried by a competent tribunal and the doctrine of res
judicata is applicable to these issues. However, events
occurring since approval have caused the parties to become
more and more uncertain about the exact application of the
Federal Court ruling to the hilltop. Examples include some
intervening changes sought to the subdivision itself and the

2 27.

evolution of a new Plan and several new Ordinances not
within the contemplation of the Federal Court.

8. To give these issues an historical setting, Mr. Kelly
planned to improve and sell off units in the development in
orderly phases, with the !akeshore lots to go on line first, the
tennis court lots to follow, and finally the hilltop that is the
Subject of this litigation. No unreasonable delays on Kelly’s
part interrupted this orderly procession.

9. In 1981 it was determined that a road to the hilltop
would be more suitable than a funicular and plans were
drafted for this purpose using no more coverage than that
authorized for the funicular. Among other reasons, the fire
chief and sheriff sought a road for purposes of fire protection
and law enforcement. On April 30, 1981, Mr. Barrett wrote a
letter to Douglas County reciting in pertinent part:

“TRPA staff considers this modification of
access and land coverage to be a significant
modification to the TRPA approval and, therefore,
subject to Governing Board approval.”

10. Robert Lahmann moved to Uppaway in 1976 to serve
as on-site manager for Mr. Kelly. He _ continued in this
position until 1982 (Tr. 333). Gordon Barrett, Senior Plan-
ner for the TRPA, was delegated the overall supervision of
the Uppaway project by TRPA Executive Secretary
Overynder.

11. In the summer of 1981 Mr. Lahmann prepared a draft
proposal to “settle all the issues” between the TRPA and
Uppaway. This overture proposed to eliminate two hilltop
lots to overcome Mr. Barrett’s objection to the hilltop lots.
Lahmann had advised Barrett that Uppaway had not been
over covered and would provide a survey.

12. In the fall of 1981 an application was made to the
TRPA for a building permit for lot 34. See Plaintiff’s
Exhibit 1-2 for location. The TRPA staff responded with a
letter dated October 29, 1981, reciting:

-D 28-

“On August 25, 1981, Ordinance 81-5 went into
eftect***"

“In processing your individual application, it
has been found that your lot is a critical land
capability area and is located within a subdivision
which has been classified as of in need of further
consideration. Therefore, your application will not
be eligible for review until (1) drainage and
erosion control improvements are made to the
subdivision, as per plans approved by the Agency
and the subdivision is then reclassified as either
“adequate” or “potentially adequate”; or (2)
adoption by the Agency of amendments to the
Regional Plan pursuant to Article V(c) of the
Compact.”

13. At this point in 1981 TRPA staff discounted the prior
approvals for Uppaway by the Douglas County Planning
Commission, Douglas County Commission, the TRPA and
the United States District Court. Ordinances 81-1 and 81-5
and the 1987 Regional Plan gave the TRPA staff (which has
never liked the coverage aspects of Uppaway) successive,
arguable reasons for reasserting jurisdiction

81-1 proscribes:

“|T]hose activities NOT having a_ substantial
effect on the land, water, air, space or other natural
resources of the Tahoe Region and are NOT
PROJECTS under the Tahoe Regional Planning
Compact, as amended and not subject to review
and approval of the agency confirming that such
activities will not have a significant effect on the
environment and thus exempt from the requirement
of preparation of an environmental impact state

ment.” (Emphasis added.)

-D 29-

81-1 Section 2

“Critical area. An area within the Region that is
of such sensitivity that any activily may substan
tially affect the land, water, air space or any other
natural resource in the region. (1) Critical land
capability areas, including high hazard lands (land
capability districts la, 1b, 1c and 2).”

Section 3.10

“Residential activities

“The residential activities set forth in Sections
3.11, 3.12 and 3.13 are not “projects” within the
meaning of the Compact * * * and are exempt from
the Agency’s review and approval.

3.12 New Residential Construction

“The following activities are exempt if they are
located in a subdivision approved by the Agency
after February 10, 1972, which subdivision was
approved without reliance upon sections * * *

8.25(2) * * * of the Agency Land Use Ordinance.”

Uppaway was approved pursuant to a variance granted
under section 8.25(2), but the TRPA was taking the position
that Ordinance 81-1 classifies the Uppaway hilltop lot as a
new “project”

14. Ordinance 81-5 purports to prohibit development in
land classified as high hazard

Section 12.60

“Except as otherwise provided by this Ordinance,
and subject to the exceptions set forth in this
Subsection, no person shall perform any grading,
clearing, removal of vegetation, filing or creation
of land coverage upon land within land capability
districts la, lc, 2 and 3. Said prohibition and
provisions of subsections 12.10, 12.20, 12.30 and
12.40 do not apply to:

-D 30-

“12.61 Approved Subdivisions

Land within subdivisions approved by
the agency’s land capability district
regulations, without reliance upon or
reference to sections * * * 8.25(2) * * *.”

15. Sections 12.10, 11 and 12 create classifications for
“adequate”, “potentially adequate” or in need of further
study. The TRPA letter of October 29, 1981, Plaintiffs
Exhibit 1-7, relating to hilltop lot 34 recites in part:

“It has been found that your lot is in a critical
land capability area and is located within a subdivi-
sion which has been classified in need of further
consideration.”

The TRPA advised Plaintiff that even though these lots
had been granted a prior variance upon a Douglas County
finding approved by the TRPA and reaffirmed by a federal
court that this “development will not cause detrimental
environmental consequences on the land of the applicant or
other lands or water of the Tahoe Basin,” that the Uppaway
hilltop lots were nonetheless subject to Section 12.11(c):

(c) “In need of further consideration” - poor
placement of roads and drainage structures in
relationship to natural features; unstable cuts and
fills, which are incapable of satisfactory rehabilita-
tion; unstable internal and downstream drainages
and waterways; land coverage generally exceeds
that permitted by the Agency’s Land Use Or-
dinance; and the lack in individual cases of substan-
tial construction of roads, utilities or drainage
structures.”

16. Plaintiff's choice in 1981 and 1982 was either to
disregard TRPA’s efforts to reimpose its jurisdiction and
face threats of fines of $5,000.00 per day, or to seek a
compromise. He chose the latter course, which was reason-

able under the circumstances.

-D 31-

17. In September of 1981 Mr. Kelly met with Engineer
Ernie Jones to request an update of the engineering drawings
for the development of the seven hilltop lots. Plans were
prepared and submitted to the TRPA in December citing all
lots below 30% slope to comply with the Bailey system
which had been adopted by the TRPA. Plaintiff’s Exhibit
1-9. Mr. Barrett responded with Plaintiff’s exhibit 10 stating
that Mr. Kelly “must submit an application to the Agency to
modify the final map and improvement plans of Uppaway.”

18. On January 21, 1982, TRPA staff wrote another letter
Stating that Ordinance 81-5 was applicable to the hilltop and
within an area “classified in need of further study.” In May
of 1982 Mr. Kelly’s attorney telephoned TRPA’s attorney to
advise that Mr. Kelly was going to proceed with the con-
struction of the Hilltop pursuant to prior approvals and court
order and that 81-1 and 81-5 are not applicable to Uppaway.
TRPA counsel wrote the following letter:

“Thank you for your telephone call yesterday
indicating Uppaway Estates intends to solicit bids
for construction of a road on the hilltop portion of
the subdivision. The purpose of this letter is to
formalize a means through which we might at least
clarify the issues involved in the proposed construc-
tion of the subdivision road. * * * *”

“TRPA maintains the amendment of the
Uppaway Subdivision map to approve the road in
lieu of the funicular was a substantial modification
of the subdivision, requiring further approval by
the TRPA Governing Body.” Plaintiff’s Exhibit
1-14.

19, The TRPA position was refuted by Mr. Kelly’s
counsel who continued to refuse to recognize the application
of 81-1 and 81-5 to the hilltop lots and refused to take the
approved hilltop development back to the Governing Board
of the TRPA.

-L) 32-

On May 19, 1982, TRPA counsel responded as follows

“Pursuant to our meeting today, I am writing to
confirm our understanding and agreement as

follows

1. Your clients shall submit, or cause to be sub
mitted, to Gordon Barrett of TRPA staff a copy of
all construction drawings and other pertinent
information with respect to the proposed construc
tion of improvements relating to Lots 33 through
39 of Uppaway Estates, including the proposed
road, TRPA agreeing that by submitting such
information, or by causing it to be submitted, your
clients do not waive or otherwise detract from any
legal right or contention possessed or maintained

by them: and

2. Your clients shall not commence construction
of said improvements until TRPA staff has had an
opportunity to determine whether the proposed
construction is substantially in accordance with the
subdivision plans deemed approved by TRPA
pursuant to the Tahoe Regional Planning
Compact.”

20. The TRPA letter was followed by a Kelly letter
reiterating his contention that the change from a funicular to
a road was not a substantial change and that the issues would
not go to the Governing Board, that they would instead b«
settled with staff and the Chairman of the Governing Board,
Bennie Ferrari. Plaintiff's Exhibit 1-16 TRPA counsel
responded that Gordon Barrett is “doing his utmost to
achieve an expeditious determination regarding substantial
conformance.” Chairman Ferrari was to make the final
determination.

21. A meeting was then held on June 4, 1982, between
TRPA Chairman Ferrari, Gordon Barrett and attorney Gary
Owen, acting on behalf of the TRPA, and Paul Hogan and
Bill Aird from the Law Offices of Daniel R. Walsh, repre-
senting Mr. Kelly. The primary issue was the development

-D 33-

of the hilltop lots including (1) the construction of the access
road to the hilltop instead of the funicular, (2) the construc-
tion of the hilltop road including all offsite improvements for
the lots and (3) construction of the lots. In consideration of
the elimination of lot 39, and the relocation of other building
envelopes to sites less steep than before, TRPA evidenced a
willingness to allow construction to proceed without further
action by the Board

22. Gordon Barrett approved the improvement plans for
lots 33-38 on July 22, 1982, in writing and with the TRPA
seal. Plaintiff's Exhibits 41, 43, 44, 46, 1-21, 1-21A
Pursuant to a request on behalf of Kelly, Mr. Barrett also
noted on the plans that the TRPA approvals were pursuant to
the July 22, 1982 understanding. Plaintiff's Exhibit 1-24.

23. Mr. Barrett testified that the major concern of Kelly
“was the legal status of these approvals and they seemed
fairly adamant that they were not going to go to the Board
lor any kind of approval.” Tr. 237. The only way Kelly
could avoid going to the Board was to be found in substantial
compliance with the previous approvals through the Court
Order. Tr. 237 Mr. Barrett found the plans to be in substan-
tial conformance, obviating compliance with 81-1 and 81-5.
Tr. 218, 219.

This Court also finds the construction work completed by
Mr. Kelly on the hilltop to be in substantial conformance
with the subdivision plans deemed approved by the TRPA
and the federal court and concludes that the changes made
were, in a jurisdictional sense, minor changes.

24. Applications for TRPA approval of building permits
for the hilltop lots on the consent calendar were filed with
the TRPA on July 28, 1982, six days after the agreement. A
fee of $220.00 was paid for each lot for a total of $1,320.00,
which has never been returned to Mr. Kelly.

25. Construction of the access road instead of funicular,
and hilltop road with offsite improvements for the six lots,
plus infiltration trenches, commenced immediately. Except

-D 34-

for some minor items, the road and all offsite improvements
were completed by October 1982. (Tr. 388-392, 397).

“In addition to the environmental protection
measures taken on the rest of the subdivision the
hilllop measures included a connection from the
roadside infiltration facilities up to each one of the
individual building sites so that any drainage that
was collected on the roof structures or on site of
each one of the lots would be provided with a
connection into the infiltration system so that any
of the water that was created on the individual
parcels would be integrated as a part of a master
storm drainage system. The plan was submitted to
and approved by the TRPA.” Tr. 273
See also Tr. 270, 271, 275, 278 and 283 for further
description of the hilltop improvements. Plaintiff’s
Exhibits 1-42 depicts the actual construction
conditions and 1-23 depicts the offsite improve-
ments after construction.”

26. Approved as being in substantial conformance with
prior approvals and court order were (1) the change from
funicular to road and the construction of this access road; (2)
the construction of the hilltop road and all offsite improve-
ments for the six lots and (3) the six lots.

27. Mr. Keily was finally able to apply for building
permits on a section of the subdivision which the TRPA
conceded as adequate under existing rules and procedures.

28. Building plans were submitted to Douglas County for
the purpose of obtaining building permits from the county on
November 22, 1982. Plaintiff's Exhibits 1-27. Building
permits were issued by Douglas County on December 30,
1982, for the six hilltop lots. Plaintiff’s Exhibit 1-28. Mr.
Kelly paid $1,600.00 for each building permit. On August
11, 1986, the Douglas County District Attorney issued an
opinion reciting in part as follows:

“It is my understanding that the permits were
issued originally with 6 conditions. Following the

-D 35-

approval Uppaway paid the required fees and
proceeded to complete the conditions outlined by
the Board of Commissioners. One of these condi-
tions states that “construction shall not commence
until all conditions are completed.” One of the
conditions which had to be completed concerned
approval by the Tahoe Regional Planning Agency
or a court of competent jurisdiction. Since TRPA
has not acted on these permits it would seem that
the process contemplated by the approval is still
ongoing, therefore, the permits are still active so
long as the approval of TRPA is being sought by
Uppaway and the agency has not taken final action
or the court has not decided the matter.” Plaintiff's
Exhibit 1-49.

29. The TRPA did not act on Plaintiff’s applications from
August, 1983, to April, 1984, on the basis of TRPA inaction
on the files; (nonetheless, there is no evidence of intentional
neglect or malice pertaining to this inaction over the winter
months of 1983/84. See next two numbered paragraphs.)
The California Attorney General’s office, then obtained a
preliminary injunction from the Federal Court in Sacramento
that prohibited the TRPA from acting on applications for all
building permits in the Tahoe basin.

30. During the period from 1982 through 1987, when Mr
Kelly’s case-by-case applications under Ordinance No. 81-5
were filed with and pending approval by TRPA, TRPA was
faced with the difficult and time-consuming task of im-
plementing the novel and complex planning approach of the
1980 Compact, including its pressing deadlines for the
adoption of environmental threshold carrying capacities and
a new plan and ordinances attaining and maintaining them as
well as meeting state and federal air and water quality
Standards. Added to this task was resolving the dilemma of
what to do about the 17,000, more or less, preexisting
Single-family lots, of which Mr. Kelly’s holdings were a
portion. Ordinance 81-5, adopted June 1981 and effective

-D 36-

August 1981, was an interim measure at least partially to
deal with the issue of the numerous lots in the State of
Nevada, and particularly those in high-hazard classifications
such as Mr. Kelly’s. The ordinance resulted in many case-
by-case applications, the processing of which, commencing
in August 1981, was occurring simultaneously with TRPA’S
compliance with the regional planning mandates of the 1980
Compact.

31. In addition, in early 1983, pursuant to a TRPA staff
indication that winter snow conditions precluded on-site
assessment of the proposed case-by-case lots, Mr. Kelly,
through his counsel, advised TRPA that Mr. Kelly would not
be prejudiced by the winter delay. During the spring and
summer of 1983 TRPA was processing numerous case-by-
case applications, but because of the Compact deadline for
adopting a new regional plan, it determined in August 1983
that it no longer legally could issue case-by-case permits,
including those pursuant to Mr. Kelly’s applications. In its
regional plan adopted in April 1984, however, TRPA specifi-
cally provided for the continued processing and approval of
case-by-case applications such as Mr. Kelly’s. That proce-
dure was not allowed to commence because TRPA’s 1984
Plan was immediately enjoined from taking effect, through
an injunction which prohibited TRPA from approving
development projects, including single-family residences,
until adoption of TRPA’s 1987 Regional Plan.

32. The TRPA 1987 Regional Plan and IPES were finally
adopted by the TRPA on July 1, 1987, which sought to deny
the development of the Plaintiff’s hilltop lots on the basis of
the content of the new Plan and Ordinances. This lawsuit
followed. Despite the delays, the Court finds actions of the
TRPA to be reasonable and justified under all of the
circumstances.

33. Kelly agreed to and did forfeit hilltop Lot 39 in
exchange for the TRPA promptly processing his applications
for TRPA approval of six building permits for Lots 33, 34,
45, 36, 37, and 38. The TRPA did not process these

-D 37-

applications and consequently they were never approved.
Plaintiff Kelly should be returned to the same position he
was in before he agreed to forfeit Lot 39. There was a failure
of consideration of the condition upon which he gave up Lot
39 in the first place. Mr. Kelly can file an amended map
with Douglas County to reinstate Lot 39. Reinstated Lot 39
will be considered in the same legal position as Lots 33, 34,
35, 36, 37 and 38.

34. Considering all Douglas County and TRPA prior
approvals and the federal court order, Mr. Kelly does not
have to obtain an allocation under Chapter 33 of the TRPA
ordinances for these seven lots. The TRPA cannot force
Mr. Kelly or the purchasers or assigns of these lots to stand
in line with everybody else in light of the history of this
development. The Douglas County building permits issued
for these seven (7) lots are above and beyond the TRPA
allocation to Douglas County. The exemptions for these lots
run with the land and can be transferred to purchasers or
assigns from Mr. Kelly.

35. Mr. Kelly, his purchasers or assigns will have to pay
the air quality fee of $1,000 and the $2,500 refundable
security deposit to assure proper completion of the residence
in compliance with Douglas County ordinances and permit
conditions. However, these lots are exempt from the water
quality mitigation fees imposed by TRPA ordinance for each
Square foot of new coverage. Mr. Kelly has already spent
considerable funds on mitigation. The fees Mr. Kelly paid to
the TRPA in 1982 as described in finding 24 above may be
credited against the fees that may be due the TRPA under
this finding.

36. As a specially-engineered “planned unit develop-
ment”, Uppaway is far more than a traditional subdivision.
What was “deemed approved” as Uppaway Estates under
Article VI(k) of the 1969 Compact was a tentative subdivi-
sion map for 39 vacant, 2,500 square foot lots and a permit
for “excess coverage” under Section 8.25 of the Land Use
Ordinance.

-D 38-

When Uppaway became legally approved, the subdivision
map was not just a device which created new and smaller
parcels from a larger parcel. The “approved” permit stated
exactly how many rooftops, roadways and driveways would
interfere with the natural state of the topography and the
nitrogen and phosphorus absorbing features of the soil and
vegetation. The specific placement of each building enve-
lope was set forth along with the exact amount of coverage to
be contained therein. A height limitation was included. The
utilities to each lot were delineated.

37. Section H of the Ray Smith report (Exhibit 39)
contains the “heartwood” of Mr. Kelly’s 1974 application
and allows for 4.88 acres of coverage (212,900 square feet).
This Court finds that the land coverage contained in the Ray
Smith report represents an already adjudicated issue favoring
Mr. Kelly, and the “deemed approved” stamp covers the
whole development, and in that sense, makes Uppaway
different from any other subdivision in the Tahoe Basin.

38. The development was engineered with an elaborate
infiltration system to control drainage and erosion. All hard
road surfaces tilt inward toward specially designed infiltra-
tion trenches working together with slope stabilization
measures on both sides of the roadways. The infiltration
system itself was purposefully over designed to protect
against fifty year storm events, although the TRPA regula-
tions at the time (and still) only required twenty year, one
hour storm event mitigation measures.

39. Never, during the period of time the system was
designed and installed, did the Plaintiff evidence any callous
disregard for the nutrient transport sensitivities of his
project. The design which he commissioned for the so-called
“offsite” improvements (every place but building pads) was
in every respect above-standard: the contractors did a
workmanlike job of installing the tilted roadways, the
infiltration trenches, the junction boxes and other facets of
the system; appropriate warning signs telling people to stay

-D 39-

off the rocks are strategically placed on roadways; the
asphalt appears evenly sloped and well-maintained.

There is absolutely no evidence that the infiltration
system has ever failed, at least in the upper reaches of the
subdivision where the hilltop lots are located, even though it
has been in place now for several years. The hilltop lots are
located in places which are as flat as feasible. The lots
themselves are quite a distance from the shores of the lake
and migrating water, even subsurface flows, would have to
pass through a portion of the redundant system, as well as
though several hundred feet of fairly heavily vegetated open
space before reaching the lake. As long as the infiltration
trenches are cleaned and maintained, the evidence shows that
the likelihood that the hilltop lots would generate nutrient
transport that would reach the lake is practically non-
existent. It would be reasonable for the TRPA to require
owners of property with systems like Uppaway to post a
performance bond to assure regular clean up and mainte-
nance of these systems.

40. To the extent that land coverage issues under IPES
are in conflict with the land coverage issue adjudicated by
the federal court decision, IPES must give way to the federal
court decision. The IPES system, which is built upon a
modified Bailey system, does not reflect such remarkably
new insights into the Tahoe ecology as to vitiate the basis for
the earlier approvals, given this Court’s finding of lack of
detrimental impacts, and the special de jure status of this
subdivision under the Federal Court ruling.

Nevada has a strong legal tradition sanctioning planners
from changing their minds about permissible uses after
existing zoning and land uses ordinances have encouraged a
developer to invest substantial sums in reliance on prior
representations. Mr. Kelly has spent substantial sums in
reliance upon his approvals, and the doctrine is properly
applied to this case.

41. Since this Court has found that the prior federal court
ruling is dispositive on the subject of how much gross land

-D 40-

coverage is available to Mr. Kelly, there is no legal impedi-
ment to Mr. Kelly preventing him from proceeding immedi-
ately to build or sell his seven (7) hilltop lots in a manner
consistent with these findings.

CONCLUSIONS OF LAW

1. The issues relating to the Plaintiff’s hilltop lots 33, 34,
35, 37, 38 and 39 have been fairly tried in 1975 by the
United States District Court for Nevada, and the doctrine of
res judicata is applicable to the following issues:

(A) The excess land coverage for Uppaway Estates
was approved by a variance legaily granted under
Section 8.25(2) of the TRPA land use ordinance.
(B) Uppaway was approved under the TRPA
Compact because of lack of dual majority vote.

(C) Considering all Douglas County and TRPA
prior approvals and the federal court order,
Mr. Kelly does not have to obtain an allocation
under Chapter 33 of the TRPA ordinances for these
seven lots. The TRPA cannot force Mr. Kelly or
the purchasers or assigns of these lots to stand in
line with everybody else in light of the history of
this development. The Douglas County building
permits issued for these seven lots are above and
beyond the TRPA allocation to Douglas County.
The exemptions for these lots run with the land and
can be transferred to purchasers or assigns from
Mr. Kelly.

(D) Mr. Kelly, his purchasers or assigns, will have
to pay the air quality fee of $1,000 and he $2,500
refundable security deposit to assure proper
completion of the residence in compliance with
Douglas County ordinances and permit conditions.
Mr. Kelly has already spend considerable funds on
mitigation. The fees Mr. Kelly paid to the TRPA

-D 41-

in 1982 as described in finding 24 above may be
credited against the fees that may be due the TRPA
under this finding.

(E) Since this Court has found that the prior
federal court ruling is dispositive on the subject of
how much gross land coverage is available to Mr.
Kelly, there is no legal impediment to Mr. Kelly
preventing him from proceeding immediately to
build or sell his seven (7) hilltop lots in a manner
consistent with these findings.

2. Kelly is not guilty of laches.

3. On July -22, 1982, an understanding was reached
between Plaintiff Kelly and the TRPA whereby access to the
hilltop would be by road rather than funicular; that Kelly
could proceed with construction of the hilltop road and all
offsite improvements for hilltop lots 33, 34, 35, 36, 37, 38.

4. The understanding of July 22, 1982, between Plaintiff
Kelly and the TRPA could not be implemented because of a
moratorium placed on the- TRPA by a California Federal
Court Order. There was a failure of consideration of the
condition upon which Mr. Kelly gave up Lot 39. Mr. Kelly
can file an amended map with Douglas County to reinstate
Lot 39 and the TRPA shall take no action to interfere with
Kelly’s right to obtain a Douglas County building permit for
Lot 39 or build thereon.

5. The actions of the TRPA during the period from 1982
to 1987 are not confiscatory and do not’ require
compensation.

6. Mr. Kelly’s Douglas County building permits for six
hilltop lots are still valid from the standpoint of the parties to
this litigation but, of course, remain subject to the jurisdic-
tion of Douglas County, and any of its ordinances, special
conditions, or regulations.

7. Building envelopes will not exceed 2,500 square feet
per parcel together with a small (380 square foot) allowance

-D 42-

for impervious coverage for driveways (see Explanatory
Order of even date herewith)

JUDGMENT

IT IS THEREFORE ORDERED, ADJUDGED AND
DECREED that Plaintiff William Cody Kelly may forthwith
proceed to obtain building permits from Douglas County for
hilltop lots 33, 34, 35, 36, 37, 38 and 39, and he, his pur
chasers or assigns, may construct residences on these [ots in
a4 manner consistent with the above Findings of Fact and

Conclusions of Law

JATED this Ist day of November, 1991

/s Charles M. McGee
DISTRICT JUDGI

-D 43-
CERTIFICATE OF SERVICE

Pursuant to NRCP S(b), I certify that I am an employee of
CROWELL, SUSICH, OWEN & TACKES, LTD., and that on
the 6th day of November, 1991, I deposited for mailing at
Carson City, Nevada, postage prepaid, a true and correct
copy of Notice of Entry of Judgment, addressed to

Richard M. Skinner

Deputy Attorney General
State of California

P.O. Box 944255
Sacramento, CA 94244-2550

Brian Chally

Deputy Attorney General
State of Nevada

123 West Nye Lane
Carson City, NV 89710

Jeffrey Blanck, Agency Counsel
Tahoe Regional Planning Agency
P.O. Box 1038

Zephyr Cove, NV 89448-1038

| also certify that a copy of the Notice of Entry of Order was
personally served by hand delivery on November 6, 1991.
during regular business hours, to the Law Offices of Daniel
R. Walsh, located at

Daniel R. Walsh, Esq

Capital Plaza

1100 East William, Suite 217
Carson City, NV 8970]

s/ Lauren Arends
LAUREN ARENDS

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386009_0524%3A06. Public record. Not legal advice.