No. 98-1894

In The

Supreme Court of the United States

+

PEGGY ANN BUCKLEY,
Petitioner,

CALIFORNIA COASTAL COMMISSION,

Respondent.

*

On Petition For Writ Of Certiorari
To The California Court Of Appeal,
Second Appellate District, Division Two

S

REPLY BRIEF

¢

MicHaet M. Bercer*

BerGer & Norton

A Law CorporATION

1620 26th Street

Suite 200 South

Santa Monica, CA 90404-4040
(310) 449-1000

Counsel for Petitioner

*Counsel of Record

COCKLE LAW BRIEF PRINTING CO., (800) 225-6964
OR CALL COLLECT (402) 342-2831

INTRODUCTION
I.

IT.

III.

TABLE OF CONTENTS

ie ee ee ee ee ee oe ee ee a ee a ae ee ae

THERE REALLY IS A PROBLEM WITH CALI-
FORNIA’S LAND USE JURISPRUDENCE. THE
COASTAL COMMISSION, AS ONE OF ITS
PRIME BENEFICIARIES, SIMPLY DOESN’T
WANT TO ACKNOWLEDGE THAT IT EXISTS
OR THAT NUMEROUS SCHOLARS AND
JUDGES HAVE CALLED FOR CORRECTIVE
i HED OO er re ange e ee ene

MR. AND MRS. BUCKLEY WERE DENIED PRO-
TECTIONS GUARANTEED BY THE 5TH
AMENDMENT. THE COURT BELOW, APPLY-
ING LANDGATE AND THE CALIFORNIA
SUPREME COURT’S CLEAR MANDATE TO
IGNORE THIS COURT'S 5TH AMENDMENT
DECISIONS, HAS CREATED A TEXTBOOK
CASE FOR THIS COURT'S REVIEW...........

THE COMMISSION UNDERESTIMATES ITS
POWER AND TENACITY .....................

PUTT TT Te Tee TTT Teer ere re tee

il

TABLE OF AUTHORITIES

Page
Cases
Agins v. City of Tiburon, 447 U.S. 255 (1980) .......... 7
Alexander v. Town of Jupiter, 640 So. 2d 79 (Fla. App.
S998)... co cvcnce sede needed eee EEL EE eee 8
Bowles v. United States, 31 Fed. Cl. 37 (Fed. Cl.
S9DE). .. veces vase nnvees 00a be SAE eee et 7
City of Monterey v. Del Monte Dunes at Monterey,
hed, CID SA. CGE CHRO ccc ec ease eas 10
Cumberland Farms, Inc. v. Town of Groton, 247
Conn. 190 omn.. TORE ks cia Deere ee as 8

First English Evangelical Lutheran Church v. County
of Los Angeles, 482 U.S. 304 (1987)... 2, 5, 6, 7, 8, 10

Grupe v. California Coastal Commn., 166 Cal.App.3d

CEL =) Pree ris rh Vy al eae 9
Healing v. California Coastal Commn., 22 Cal.App.4th

(M80 = ccc ee ares ok 4 a 2,3
Landgate, Inc. v. California Coastal Commn., 17

Cal.4th 1006, cert. den., 119 S.Ct. 179 (1998)... 2, 3, 7
Lucas v. South Carolina Coastal Council, 505 U.S.

GODS CEFR 2) sb ocnndeceeesddacee eee eer tet css 5
Nectow v. City of Cambridge, 277 U.S. 183 (1928)...... 6

United States v. Riverside Bayview Homes, Inc., 474
i WES EUW s bac ivcree neta eeu eee, 7

Whaler’s Village Club v. California Coastal Commn.,
173 Ca AGE. SE 200 CIPMSR a occas carers cei 8

TABLE OF AUTHORITIES —- Continued

Whitehead Oil Co. v. City of Lincoln, 515 N.W.2d 401

ee ee a ile as 4 6-4 dwaie 40-66%

Woodland Manor III Associates v. Keeney, 713 A.2d
806 (R.I. 1998)

CONSTITUTIONAL PROVISIONS

U.S. Constitution, Art. VI. cl. 2.....

U.S. Constitution, Sth Amendment ..................

OrHeR AUTHORITIES

Babcock & Siemon, The Zoning Game Revisited 235
I ea eg ares 4 bow e's ooh 0%

Ramirez, The California Supreme Court's Foreclosure
of the Compensation Remedy for Takings Claim-
ants: Assessing the Effect of Recent California
Supreme Court Opinions, 8 California Law & Pol-

icy Reporter 193 (April 1999).......0.0.000.0.....

.9

I
INTRODUCTION

No matter how vociferously the California Coastal Com-
mission asserts that it only claimed jurisdiction over the rear
of the Buckleys’ lot, and therefore they were always free to
build on the front part, the “STOP WORK” orders that the
Commission repeatedly posted on the property tell the true —
and very contrary — story. Each order (reproduced in the
Appendix) states:

“STOP WORK STOP WORK STOP WORK STOP WORK

* * *

“You are hereby notified to stop all unpermitted
work. No grading or construction or landfill is per-
mitted on this property. A Coastal Permit has not

been issued for this project.” (App., pp. 67, 68, 70,

71; underscore in original; italics added.)

The “Property Location” to which these orders applied
was identified as “6815 Dume Drive” (App., pp. 67, 68, 70,
71) — not part of it, or half of it, but the property at that
address, i.e., the entire lot owned by Mr. and Mrs. Buckley.
The Commission’s persistent attempt to deny this central fact
colors its entire brief,! and renders its analysis of little utility.
The Buckleys in fact had all the permits they needed. They
got them from Los Angeles County, the only entity with the
jurisdiction to issue them. They did not need a “Coastal
Permit” from the Commission for anything. As each of the
courts below plainly held, the Commission simply had no
jurisdiction over any part of this property. And yet it insisted

' See, for example, the Commission’s assertion that it “acknowledged
it had no jurisdiction” over the front half of the lot (Br. in Opp., p. 6), a
statement that is bluntly belied by the Commission’s own “STOP WORK”
orders that forbade “all” work on “this property” for which no coastal
permit had been issued by the Commission, to say nothing of the
Commission’s defiant assertion to the trial court that it would continue
asserting its supposed “jurisdiction” throughout the appellate process
(App., p. 50).

y

that wt could order all work on “this property” to cease, and it
enforced its will by threatening the Buckleys and their con-
tractor with a $10,000 fine that would increase by another
$5,000 every day. Those “STOP WORK” orders prevented all
use (as the contractor understandably fled when each was
posted), and thereby took the Buckleys’ property.

In addition to this crucial factual gaffe, the Commission
seeks to divert attention from the central legal issues by assert-
ing that Mrs. Buckley is merely seeking to reargue Landgate,
Inc. v. California Coastal Commn., 17 Cal.4th 1006, cert. den.,
119 S.Ct. 179 (1998), rather than her own case. Not so. The
case at bench was decided, as the Court of Appeal put it, “for
better or for worse” (App., p. 30), under the compulsion of
Landgate. It was not, as the Commission innocently asserts,
“ancillary” to the decision. (Br. in Opp., p. 9.) To discuss this
case, one has no choice but to discuss Landgate.

And there's the rub. Landgate, and perforce the case at
bench that applies it, amounts to nothing less than defiance of
this Court's holding in First English Evangelical Lutheran
Church vo County of Los Angeles, 482 U.S. 304 (1987). As
quoted in the Petition, pp. 15-16, First English plainly
decided that, where there ts a regulatory taking of property,
the period of the taking encompasses the time consumed in
litigation establishing thatva taking occurred. More than that,
First English reversed Calitornia’s contrary rule. (482 U.S. at
317.) But Landgate reinstated the California rule this Court
explicitly struck down in First English, and the Court of
Appeal applied it below.

This case, of course, adds the ugly wrinkle that the
“regulatory” acts of the Commission were never legitimate
regulation at all, but overreaching efforts of a government
agency seeking to impose its will by a raw exercise of power
~ without jurisdiction — on citizens doing no more than trying
to put their property to the perfectly lawful use of building
their family home.? And they had to be knowingly

> This ts no advocate’s hyperbole; the Commission has a track record.
For a hornble example of its similar excesses, see Healing v. California

3

overreaching, even though the Commission persists here in
disingenuously flogging its theory that it was authorized to
retain jurisdiction over part of a lot if it was “environmentally
sensitive.” (Br. in Opp., p. 2.) The statutes are in the Appen-
dix, at pp. 73-76. Ten times in the space of the two statutes
the Legislature used the word “lot” in describing what was
exempted from Commission jurisdiction. The Commission's
careful lawyers and skilled staff could not have missed that.
Moreover, when the County followed the statutes and
declared the Buckleys’ lot exempt, it referred to the “6815
Dume Drive lot” (App., p. 65), not a part of it. The Commis-
sion’s insistence that it had a “legitimate dispute” with the
Buckleys about its regulatory jurisdiction and was therefore
making a “legitimate use of the judicial process” to resolve it
(Br. in Opp., p. 8) is eyewash, and nothing more. Whatever
the Commission did, the use of the term “legitimate” to
describe it does violence to the English language.

THERE REALLY IS A PROBLEM WITH CALIFOR-
NIA’S LAND USE JURISPRUDENCE. THE COASTAL
COMMISSION, AS ONE OF ITS PRIME BENEFICI-
ARIES, SIMPLY DOESN’T WANT TO ACKNOWLEDGE
THAT IT EXISTS OR THAT NUMEROUS SCHOLARS
AND JUDGES HAVE CALLED FOR CORRECTIVE
ACTION

In the Petition, Mrs. Buckley presented not merely her
(or her lawyers’) views of California law. Rather, she col-
lected for this Court the views of 20 nationally recognized

Coastal Commn., 22 Cal.App.4th (1994) (property owner trying to build a
home for his family got from the Commission what the court aptly
characterized as “a long-term nightmare” [/d. at 1162]}). It is worth noting
that the Commission called the Healings’ 17-year regulatory nightmare a
“normal” delay in the planning process (/d. at 1171, fn. 7). Although Mr.
Healing received some relief in that case, its limited precedential value has
become nil after Landgate, which gutted the enforceability of such
landowner nights as may have existed at the time.

4

authorities in the land use field — from all points of the
scholarly spectrum, including some who bill themselves as
“police power hawks” and openly favor strong governmental
regulation of property. They all agreed that California’s harsh
treatment of property owners has become intense to the point
of inspiring black humor among practitioners elsewhere in the
country. (Pet., pp. 6-10, 18.) Mrs. Buckley also presented the
analysis of three members of the California Supreme Court
who have refused to go along with the intellectual rebellion
by that court's bare majority that refuses to follow this
Court’s decisions on prime issues of federal constitutional
law. (Pet., pp. 12-15, 18.)

The Commission's response 1s not analysis, but epithet. It
calls Mrs. Buckley's presentation “a diatribe setting forth the
petitioner's opinion of regulatory takings law in California”
(Br. in Opp., p. 4), without deigning to mention any of the
scholars or any of the Supreme Court Justices whose critiques
and explanations of California practice were summarized tn
the Petition.

If there were any rational way to dispatch that collected
wisdom, wouldn't the Commission have presented it? If any
responsible voice disagreed, wouldn't the Commission have
told the Court? But no. No citations: no defense; and no
justice for property owners in California. That is why Califor-
nia’s property owners need this Court's intervention. As aptly
summarized in the Table of Contents of the amicus curiae
brief of the National Association of Home Builders, the Cali-
fornia Building Industry Association, the Building Industry
Legal Defense Foundation, and the Home Builders Associa-
tion of Northern California, the rules applied by California
courts across a broad spectrum of land use law are uniquely
contrary to settled constitutional decisions of this Court. If
the Constitution 1s indeed to be the supreme law of the land,
binding on “judges in every state” (U.S. Const., Art. VI, cl.
2), then it must apply in California, just as it does everywhere

else.

5
II

MR. AND MRS. BUCKLEY WERE DENIED PROTEC-
TIONS GUARANTEED BY THE 5TH AMENDMENT.
THE COURT BELOW, APPLYING LANDGATE AND
THE CALIFORNIA SUPREME COURT’S CLEAR MAN-
DATE TO IGNORE THIS COURT’S 5TH AMENDMENT
DECISIONS, HAS CREATED A TEXTBOOK CASE FOR
THIS COURT’S REVIEW

The Buckleys’ property was plainly taken by the Com-
mission. Its actions prevented all use of the property, and its
prevention of the Buckleys’ landslide repair meant that the
landslide eventually inflicted severe damage on the entire
property. Even after the Court of Appeal held that the Com-
mission lacked jurisdiction to regulate this property in any
way, it denied any meaningful relief. There is no way that the
Buckleys can be restored to the position they would have
occupied without the Commission’s actions. The landslide has
permanently damaged the property. No development can even
be attempted on the property without first designing a feasible
remediation plan to mitigate that damage. Not to mention the
years of lost use and the changes in the market.

The only meaningful relief after the ruinous impact of the
Commission’s actions would be formally transferring title to
the property to the Commission (to legally acknowledge the
fact that the property was de facto taken) and to compensate
the Buckleys fully for the loss of their land. That is what the
trial court did. (App., p. 59.) But the appellate courts took it
away, leaving the Buckleys with an empty title to a damaged,
unusable lot.

The actions of California's appellate courts are directly
contrary to decisions of this Court like First English and
Lucas v. South Carolina Coastal Council, 505 U.S. 1003
(1992), as Mrs. Buckley explained in detail in her Petition
(pp. 12-19). The Commission’s response is based on either its
denial of the real impact of its serial “STOP WORK” orders
that prevented the Buckleys from even repairing a landslide
that was destroying their property, or a rendering of the

6

“California party line” about the meaning of First English,
which ts at war with what this Court decided.

First, the Commission's factual denial is flawed. The
Commission says that, according to both itself (Br. in Opp.,
pp. 5. 6) and the Court of Appeal (Br. in Opp., pp. 6, 8-9), the
Buckleys were not denied the use of their land because the
Commission wrongly asserted jurisdiction only over the rear
half of their lot and they could therefore have built a home on
the front portion. Wrong. The argument ignores each of these
things: (1) the Commission's repeated orders to “STOP
WORK” on the entire lot; (2) the County's order to repair the
landslide on the rear of the lot, which the Commission would
not permit; and, as the Court of Appeal concluded, (3) the
practical necessity of repairing the landslide before building
on any part of the lot, in order to protect the anticipated
construction and to protect neighboring property.*

Second, the Commission's legal denial ts equally flawed.
The Commission faults Mrs. Buckley for failing to show how
the delays she and her husband suffered at the Commission's
hands “were not ‘normal delays ... ° and therefore not
temporary takings under First English... . “ (Br. in Opp., p.
5.) This Court itself explained in First English that litigation
is not a “normal delay” in the planning process:

“In this case the California Court of Appeal
held that a landowner who claims that his property
has been ‘taken’ by a land-use regulation may not
recover damages for the time before it is finally
determined that the regulation constitutes a ‘taking’
of his property. We disagree, and conclude that in
these circumstances the Fifth and Fourteenth
Amendments to the United States Constitution

* Contrary to the Commission's assertion (Br. in Opp., p. 6), it is trial
courts that determine facts in California, just like everywhere else. And this
Court's decisions defer to such trial court fact-finding even when a state
supreme court has reached different conclusions. (E.g., Nectow v. City of
Cambridge, 277 U.S. 183, 186-187 [1928].)

7

would require compensation for that period.” (First

English, 482 U.S. at 306-307; emphasis added.)
Under First English, litigational delay is part of the taking,
not the planning process. Beyond that, the Commission's state
of denial led it to assert that Landgate “is consistent with the
teaching of First English that normal delays in the pursuit of
legitimate regulatory goals do not constitute takings.” (Br. in
Opp.. p. 9.) The audacity of that assertion is awesome. Land-
gate wholly undermines First English. It flatly contradicts
First English by holding that the delay caused by litigation ts
always part of the “normal planning process” and therefore
never compensable as a taking.

Contrary to the Commission's repeated assertion (Br. in
Opp.. pp. 6, 9, 10), this case is nothing at all like United
States v. Riverside Bayview Homes, Inc., 474 U.S. 121 (1985),
where this Court said that the mere requirement of seeking a
permit does not effect a taking. Here, the Buckleys obtained
all the permits they needed from the only agency with the
jurisdiction to issue them: the County of Los Angeles. The
Coastal Commission never had the jurisdiction even to con-
sider issuance of a permit. In Riverside Bayview, the regula-
tory agency had jurisdiction. The Commission now before
this Court did not. But for the Commission's wrongful asser-
tion of jurisdiction, the Buckleys would have quickly repaired
the unstable ravine before the landslide developed, built their
home (or sold the lot), and gotten on with their lives. (Com-
pare Bowles v. United States, 31 Fed. Cl. 37, 49 [Fed. Cl.
1994] [“The burden of plaintiff is to show that ‘but for’
the . . . government's action they would have been able to
realize their plans for the property allegedly taken.”].)

Thus, the Buckleys find themselves in the position of (1)
holding title to property that (2) a government agency has
officially prevented them from using for any economically
beneficial purpose for (3) a period that now approaches 10
years while (4) having neither jurisdiction nor any legal basis
for attempting to regulate the property at all. Under Lucas,
First English, and Agins v. City of Tiburon, 447 U.S. 255
(1980), the Commission took the Buckleys’ property ard the
Sth Amendment mandates compensation. The California

8

appellate courts, reinventing the law to evade this Court’s
holdings, overrode the trial court’s considered factual judg-
ment that a taking occurred (based on evidence that included
a view of the site) and held that the Commission’s “mistaken”
assertion of jurisdiction could not result in a taking, regard-
less of the impact on the Buckleys.* This Court’s intervention
is needed to provide justice to the Buckleys and to re-estab-
lish the Sth Amendment's primacy in California.

THE COMMISSION UNDERESTIMATES ITS POWER
AND TENACITY

In an intriguing tour de force, the Commission argues
(Br. in Opp., pp. 6, 9) that it never prevented the Buckleys
from making productive use of the front half of their lot and,
in fact, ever since the trial court entered judgment, they were
free to do as they pleased anywhere.

Nonsense. Throughout its existence, the Commission has
shown itself to be a formidable adversary — one that fights
tenaciously and wins more often than not. California property
owners prudently think twice before crossing the Commis-
sion.

For example, in Whaler’s Village Club v. California
Coastal Commn., 173 Cal.App.3d 240 (1985), beachfront
homeowners took emergency action to build revetments to

+ The cases cited by the Commission at Br. in Opp., pp. 10-11 appear
to be cases in which the regulating entity had jurisdiction to issue permits,
but erred in the process. In any event, even if they fully supported the
Commission here (which they don’t), the Commission would have done no
more than expose a conflict among state courts on this issue. In each of the
following cases, the courts decided that — consistent with First English —
compensation was mandated for the time consumed by litigation that
established the illegality of the regulatory action: Cumberland Farms, Inc.
v. Town of Groton, 247 Conn. 196 (Conn. 1998); Woodland Manor III
Associates v. Keeney, 713 A.2d 806 (R.1. 1998); Whitehead Oil Co. v. City
of Lincoln, 515 N.W.2d 401 (Neb. 1994); Alexander v. Town of Jupiter, 640
So. 2d 79 (Fla. App. 1994).

9

protect their homes from destruction by unusual, on-rushing
winter storms. Because of the exigence of timing, they did not
first seek the Commission's permission. The Commission
pursued them relentlessly, seeking to confiscate their land and
impose heavy fines. And the California courts saw nothing
wrong with that.

In Grupe v. California Coastal Commn., 166 Cal.App.3d
148 (1985), the Commission demanded that the owner of a
15,250 square foot lot dedicate 10,000 square feet of it (a
stunning 65%) to the public as a condition to building a home
on the truncated remainder. And the California courts saw
nothing wrong with that.

The Commission has fought landowners tenaciously
regardless of the environmental soundness of their projects.
Two well-known commentators (whose sympathies generally
lay with the regulators) described the Commission's perfor-
mance with respect to the Sea Ranch, a widely acclaimed,
environmentally superior project in northern California, as “a
sad story.” The details of that story, and of how the Commis-
sion delayed the project for a decade, while the cost of
everything rose dramatically and innocent lot purchasers were
prevented from building and left with nothing to show for
their decade of carrying costs, may be seen in Babcock &
Siemon, The Zoning Game Revisited 235 (1985).

Thus, when the Commission's lawyer told the trial judge
in the case at bench that the Commission intended to continue
asserting jurisdiction over the Buckley property until it ran
out of courts,’ they were justifiably concerned. The Commis-
sion’s suggestion that they should have taken the risk that
they would prevail on appeal, against the likelihood that the
Commission would come after them for those $5,000 per day
fines if they lost, rings hollow. Indeed, it is absurd.

5 “The Commission has represented to the Court, through its counsel,
that it will continue to claim its jurisdiction until all appeals are exhausted.”
(App., p. 50.)

10
CONCLUSION

California has been fooling this Court. In its most recent
regulatory taking case, this Court opined that:

“fe]ven the State of California, where this suit
arose, now provides a facially adequate procedure
for obtaining just compensation for temporary tak-
ings such as this one.” (City of Monterey v. Del
Monte Dunes at Monterey, Ltd., 119 S.Ct. 1624,
1644 [1999].)

Unfortunately, that “facially adequate procedure” is no
more than skin deep; there is no substance beneath the sur-
face. In fact, California property owners have no more rem-
edy for regulatory takings than they did before this Court
decided First English. In the words of a recent commentary,
the California Supreme Court has “foreclosed completely the
ability of persons who have suffered regulatory takings to
obtain just compensation.” (Ramirez, The California Supreme
Court's Foreclosure of the Compensation Remedy for Takings
Claimants: Assessing the Effect of Recent California Supreme
Court Opinions, 8 California Law & Policy Reporter 193
[April 1999].) As shown in the Petition, the California courts
have established their own parochial world, in which this
Court's decisions are paid lip service, while the rights pro-
claimed in them go unenforced.

It is time to restore California to the Union. Mrs. Buckley
prays that certiorari be granted, that California's rules be
brought in line with this Court’s settled jurisprudence, and
that the compensatory judgment entered by the trial court be
reinstated.

Respectfully submitted,

MicHaet M. BerGer*

BerGcer & Norton

Counsel for Petitioner