Supreme Court, U.S

¢) FILs oD

932045 JUN 22 19%
NQBNCE ME THE CLERK

IN THE
SUPREME COURT of the UNITED STATES

OCTOBER TERM, 1993

JAMES CrTy COUNTY, VIRGINIA,
Petitioner,

U. S. ENVIRONMENTAL PROTECTION AGENCY AND
U. S. ARMY CORPS OF ENGINEERS,
Respondents.

Petition for Writ of Certiorari
to the United States Court of Appeals
for the Fourth Circuit .

PETITION FOR WRIT OF CERTIORARI

WILLIAM B. ELLIS FRANK M. MORTON, III
Counsel of Record County Attorney

McSweeney, Burtch & Crump James City County

Post Office Box 1463 101 Mounts Bay Road

11 South Twelfth Street Post Office Box JC

Richmonc, Va. 23212 Williamsburg, Va. 23187

(804) 783-6805 (804) 235-6612

Attomeys for Petitioner James City County, Virginia
SY
> \
'y

)

QUESTIONS PRESENTED

1. Whether the Environmentai Protection Agency. having
long interpreted § 404(c) of the Clean Water Act require
consideration of whether a "practicable" alternative to a project
is or is not available, may ban construction of a public water
supply reservoir without ever considering a final judicial
determination that no "practicable" alternative exists?

2. Whether the Environmental Protection Agency’s finding
that placing fill for the Ware Creek Reservoir would cause
“unacceptable” effects is entitled to undiminished deference
notwithstanding that: (a) the Agency’s original finding was
judicially invalidated as wholly without record support, (b) the
Agency quickly reached the same result on remand without any
important change in the administrative record, and (c) the
Agency’s finding is contradicted by those of other federal and
State agencies sharing simiiar authority under the same statute

to ban Reservoir construction for the same reasons?

TABLE OF CONTENTS

QUESTIONS PRESENIED 2355 66 (3 0%.5 ns
TABLE OF AUTHORITIES. .....65..62 0.68 655055
PRE QR 650856 SSRIS. PDR I
FUT 6 ives Row and CA CARRE

A. Water Supply Planning ........... eet aia
B. Initial Regulatory Proceedings ............
1. The Corps of Engineers ........06.05

2. Virginia’s State Water Control Board ....

D. Regulatory Proceedings on Remand ........

Se Mie hos vac dnvedensankese la

REASONS FOR GRANTING THE WRIT ......... 17

I. beta eye songs non etn

Permits EPA to Ignore an Applicant’s Needs
and the Lack of Any Practicable Alternative

Means of Meeting Them, and to Focus Entirely
Oth WOOT PUTTY on ccc ccc ccc ccc cccccccene 17

A. This Is an Important Federal Question ...... 17

B. The Decision Below Conflicts with Prior
Decisions of this Court...............-- 22

1. The Decision Below Failed to Require
EPA to Adhere to Its Long-Standing
pe ee eT eh Pee 22

2. The Decision Below Failed to Require
EPA to Articulate an Adequate Rationale
EES EO are 23

3. The Decision Below Failed to Defer to
EPA’s Long-Standing Policy ........... 24

4. The Decision Below Improperly Granted
Discretion to Ignore Relevant Factors . . . . 25

C. The Decision Below Conflicts with a
Decision of the Court of Appeals for
the Second Circuit .........cccceseceees 26

II. This Court Should Decide Whether Courts

Must Defer to Agency Findings Despite
Obvious Reasons to Doubt Their Analyses ...... 28

a

er : iss 4 * : wow ae,
CONCLUSION oceeerebidecesice Ueebae Shee BU wen 30
ASPERGER, 3.05 bred bill on Sl te

pb bee ewmbae A-1
: ras

TABLE OF AUTHORITIES

Cases

Atchison, Topeka & Santa Fe Ry. Co. v. Wichita

Bd. of Trade, 412 U.S. 800 SU Ba ob i's 5 Si ose 23
Barnard v. Carey, 60 F.Supp. 539 (N.D. Ohio 1945) ..... 29
Bersani v. Environmental Protection Agency, 674

F.Supp. 405 (N.D.N.Y. BPS. 08S A 3 18, 25, 27
Bersani v. Robichaud, 850 F.2d 36 (2d Cir. 1988),

cert. denied 489 U.S. 1089 CSP). 6 9s 5, 25, 27, 29
Burlington Truck Lines, Inc. v. United States,

$7) UB. SOR OO ik estat, wes oy ok Oo 23
Camp v. Pitts, 411 U.S. 138 NUE bdiiccia v oes « « au ot) where 21
Chevron U.S.A., Inc. v. Natural Resources Defense

Council, Inc., 467 U.S. 837 as ono oa ba vs 24
Friends of the Earth v. Hintz, 800 F.2d 822 (9th

, 3, EPS oe naa eee 4
General Electric Co. v. Gilbert, 429 U.S. 125 rae 29
James City County v. Environmental Protection

Agency, 758 F. Supp. 348 (E.D. Va. eo ae 12, 29

James City County v. Environmental Protection
Agency, 955 F.2d 254 (4th Cir. 1992) .......... 14, 29

James City County v. Environmental Protection
Agency, 23 Envtl. L. Rep. 20,228 (E.D. Va. 1992) . 15-16

James City County v. Environmental Protection
Agency, 12 F.3d (4th Cir. 1993) ...... 16, 17, 20, 24-26

Louisiana Wildlife Fed’n, Inc. v. York, 761 F.2d
1044 (Sth Cir. 1985S)... ie eo ie eee eis 4

Motor Vehicle Mfrs. Ass’n v. State Farm Mut. Auto.
Ins. Co., 463 U.S. 29 (1983) .............. 21, 23, 25

Natural Resources Defense Council, Inc. v.
Securities & Exch. Comm’n, 606 F.2d

SORE Sais Gale BPFED oa eb ecka idee ee ccececeass 30
Newport Galleria Group v. Deland, 618 F. Supp.

BEEP CE SOUR 6 0 6o a PEERS Rae ssw 25, 28
Secretary of Agric. v. United States, 347 U.S. 645

CAPONE heme dean died Cade wae hee aan e eo 23
Securities and Exch. Comm’n v. Chenery Corp.,

53 US. 296 OG nase cS eae 65S PRAM 24

Statutes

Me a BI i 6k hh EEA i 3
Oe Naa BEM 4h bo odd ovat hudson 3
PALS OA Ss AS A A ee 3

Clean Water Act
Section 401(a), 33 U.S.C. § 1341(a) .......... ...4,9

Section 404(a), 33 U.S.C. § 1344(a) .............. 3

vi

Section 404(b)(1), 33 U.S.C. § 1344(b)(1) ..... 3, 4, 19
Section 404(c), 33 U.S.C. § 1344(c) . 4, 12, 14, 18, 24, 26

National Environmental Policy Act
Section 102, 42 U.S.C. § 4332 .........-5--0eeee 6
Regulatory Materials
Council on Environmental Quality
Forty Most Asked Questions Concerning CEQ’s
NEPA Regulations ..........-++00+eeee00: 6
Environmental Protection Agency, § 404(c) Regulations
Preamble, 44 Fed. Reg. 58,076 (1979) ..... 4, 5, 18, 22
GO Cie WUNO MEMO) cc ccc ccccccccccccces 5, 26
TE ER ieb0 ne tivedocncehedesske 4
Publications and Other Materials

B. Schwartz, Administrative Law § 10.35 (2d ed. 1984) ... 29

*
:

-
.
“~

*s

7

*
,

-

A p
: or
‘ie i he % a fe
. i - S PE nh FN wi Sp ES ane 3 .
ee ee abe ——~* — NEPA requires consideration of all reasonable alternatives
to a project regardless of whether they can be implemented by the
permit applicant. Forty Most Asked Questions Concerning CEQ’s
NEPA Regulations, 46 Fed. Reg. 18,026, 18,027 (1981). The Corps did
so in this case:

Every regional alternative discussed, and im fact, every
regional alternative ever identified, was addressed and found
to be engineeringly or economically infeasible,

6

“cooperating agency" in preparing the Final Environmental
Impact Statement ("Final EIS"), which considered every
alternative suggested and analyzed their environmental effects.

On July 11, 1988, the Corps found that the County’s need
for an expanded and more-reliable water supply was
“overpowering” and that constructing the Ware Creek Reservoir
was the only "practicable" means of meeting that need. Record
of Decision (July 11, 1988), App. A-3. The Corps based its
findings on some sixteen water supply studies, including the
Final EIS and other comprehensive assessments of potential
regional water supply solutions. See e.g., Corps, Water Supply
Study: Hampton Roads, Virginia (1984), AR A-52; SWCB,
James Water Supply Plan (March 1988), AR A-25. But of the
29 "regional" projects the Corps investigated, EPA opposed 28
and the last proved impracticable.‘ The Corps’ District
Engineer concluded:

I find that the consequences of not developing a reliable
water supply ... are too dangerous and damaging to
contemplate as an alternative. Given the seven years
which this project has taken to get this far, I am not at
all convinced that James City County could develop
another source of water in time to forestall the
potentially disastrous system failure which the Peninsula
could realistically face by the end of [1999] if this
project were not allowed. Though there has been much

environmentally more damaging, or contrary to the specific
policies of affected State regulatory agencies.

Letter from District Engineer Col. J. J. Thomas to EPA Regional
Administrator James M. Seif (Aug. 29, 1988), Administrative Record
("AR") C-25.

* Record of Decision, App. A-(5); Corps, Analysis of the
Proposed Discharge With Respect to Section 404(b)(1) of the Clean
Water Act (July 11, 1988) ("404(b)(1) Analysis"), App. B- (3-4).

7

hi.

study and more talk devoted to regional solutions over
the past several years, the fact remains that such an
alternative does not currently exist and does not appear
to be even likely in the future.

Record of Decision, App. A-3.

The Corps also considered the environmental effects of the
Reservoir and assisted the County in preparing a Mitigation
Plan to offset them. The Corps determined:

[T]he gross adverse environmental impacts of the
project are substantial, but mitigated to the extent that
they are acceptable.... There is no evidence, and
there are no substantiated statements, to indicate that
this project would cause any adverse cumulative impact
on the Chesapeake Bay. I find that the project would
have a very beneficial impact on municipal water
supplies, a very beneficial impact on both lake and
anadromous fish habitat, a positive impact on
recreational opportunities, and no significant or long
term impact on shellfish beds. The project would have
a mixed impact on wildlife associated with aquatic
ecosystems (three out of seven evaluation species
benefitting from the project).

404(b)(1) Analysis, App. B-11. The Corps specifically found the
Mitigation Plan was most likely to replace 230 acres of the 381
acres of vegetated wetlands potentially affected by the project.
Record of Decision, App. A-10.

The Corps evaluated the effects remaining after mitigation
in light of the lack of any practicable alternative -- local or
"regional." It concluded the Reservoir’s effects were adequately
mitigated and acceptable. 404(b)(1) Analysis, App. B-11. The
Corps therefore proposed to permit the placement of fill for
Reservoir construction.

2. Virginia’s State Water Control Board

The SWCB also considered the effects of the proposed
Reservoir as required by § 401(a) of the Clean Water Act.
App. K-1. Like the Corps, the SWCB evaluated the Reservoir’s
effects in light of the County’s need for water and the absence
of any practicable alternative. On December 22, 1988, it
certified that the Ware Creek Reservoir complied with all
applicable environmental laws, standards and policies. App. C-
1.

3. EPA

EPA chose also to assess the effects of placing fill for the
Reservoir under § 404(c) of the Clean Water Act. App. K-3.
On July 10, 1989, EPA issued its Final Determination
prohibiting the placement of fill for construction of the Ware
Creek Reservoir. EPA said that the “acceptability” of the
project’s effects should be judged in light of whether less-
damaging alternatives are available. But unlike the Corps and
the SWCB, EPA claimed alternatives were practicable, citing
several smaller projects. Final Determination, App. D-73-88.
EPA agreed with the Corps that no larger, "regional" project
was available:

Clearly, the Corps applied regional considerations in its
evaluation of the availability of practicable alternatives
to the Ware Creek proposal as a local water supply
project and factored in its concern that a reservoir on
Ware Creek is a necessary component of a regional
water supply. However, as noted by the Corps and
James City County, within the current institutional
framework, the County does not have the authority to
effect a regional water supply plan. Nor have
institutional arrangements with the state and
neighboring local jurisdictions been made to even
propose such a plan.

‘. App. D-92. Relying on the claim that several smaller
alternatives were practicable, EPA said the adverse effects of
the Ware Creek Reservoir were “unnecessary” and therefore
"unacceptable." App. D-7.

In further contrast to the Corps and the SWCB, EPA did
not consider that the Mitigation Plan might reduce the effects
of the project to an “acceptable” level. Instead, EPA asked
whether the Mitigation Plan would achieve "no net loss” of
wetlands (rather than no “unacceptable adverse effect"). EPA
found the Mitigation Plan "inadequate" because it would not
entirely offset all impacts to wetlands:

The proposed acreage is insufficient to replace the
extent of wetlands that would be lost. [App. D-64.]
= * a

[While the County’s proposed wetland creation efforts
are generally feasible, there is no information suggesting
that the wetland creation effort would produce the
existing cover-types or produce them in their current
proportions or, therefore, that the created wetlands
would exhibit the current range of habitat values. [App.
D-65-66, emphasis added. ]

EPA also did not consider whether the Mitigation Plan
might reduce effects below the “unacceptable” threshold because
it claimed “practicable alternatives" were available:

[I]t would be inappropriate to approve the proposed
project based upon the offered mitigation given EPA’s
finding that there are practicable, less environmentally
damaging alternatives. ... [App. D-61.]

° as *

* App. D-59-60. As EPA’s counsel later admitted, "The

agency’s policy [concerning mitigation], if anything, is no net loss.”
Transcript (July 28, 1992), Court Record ("CR") 72 at 46.

10

[A]ctions to minimize the environmental effects of
permit proposals should follow the sequence: avoid,
minimize and restore, in decreasing order of
preference. . . . EPA believes there are practicable, less

environmentally damaging alternatives to satisfy the
Projected water supply needs of James City County.
Therefore . . . EPA believes the mitigation plan to be

EPA’s Final Determination thus treated the Mitigation Plan as
a commendable -- but ultimately irrelevant — gesture. App. D-

72.
Cc.

JCCI

The County challenged EPA’s action in the District Court

for the

Eastern District of Virginia. There, EPA argued:

EPA has reasonably determined that the “acceptability”
of adverse effects on the environment can best be
evaluated in light of all relevant factors, including
concerns such as the availability of alternatives. ...
Since Congress, in enacting section 404(c), tried to
strike a balance between environmental protection and
economic growth, see, e.g., 1 A Legislative History of
the Water Pollution Control Act Amendments of 1972
(1973) . . . at 816-17, this interpretation of the statute
furthers the legislative intent. Moreover, since this

interpretation of the statute has been EPA policy since
1979, . . . it is entitled to even greater deference than
might be accorded to other kinds of agency
interpretations. ®

6
Summa

Reply Memorandum in Support of Defendants’ Motion for
ty Judgment (Sept. 14, 1990), CR 37 at 2-3.

1]

When asked what role the community’s need for water should
play in that assessment, EPA’s counsel said it would be a very
important factor if no practicable alternative was found:

EPA considers that to be a critical consideration.
[Municipal water supply] is one of the considerations
specified in 404(c) so it is certainly a factor. And EPA
would -- if EPA found there were no alternatives
available at all, in other words, that to veto the project
here meant James City County would not have enough
water, that would be a very difficult decision for EPA to
make.
. e * \

But we don’t have that case here before us. ... EPA is
certainly authorized to say the environmental
consequences are so [adverse] that we are going to veto
this project even though you won’t have enough water.
EPA is authorized to say [that]. But they are also
required to consider the water supply.

Transcript (Sept. 21, 1990), CR 38 at 49-50.

On November 6, 1990, the District Court held that EPA
failed to bear its burden of establishing that practicable
alternatives existed to the Ware Creek Reservoir. EEPA’s
contrary claim was not only unsupported, it was disproved by
the administrative record. 758 F. Supp. at 353, App. E-7-9.
The District Court set aside EPA’s prohibition and directed the
Corps to issue the permit it had previously decided to issue.

The District Court denied EPA’s request for a stay pending
appeal on February 7, 1991, owing to "James City County’s
demonstrated need for a reliable water supply and the
overwhelming public interest inherent therein.” EPA did not
seek a stay from the Court of Appeals. The Corps issued the
permit to James City County on March 1, 1991, and the County
proceeded with preparations for construction.

On appeal to the Fourth Circuit, EPA continued to say that
whether effects are “unacceptable” under § 404(c) must be

12

assessed in light of all relevant information — including whether
practicable alternatives are or are not available:

The statutory term “unacceptable” must certainly
authorize the Agency to consider and balance a wide
variety of pertinent factors, including the scope and
severity of a project’s environmental effects in light of
the benefits to be obtained from it.

Reply Brief for Appellants EPA and Corps of Engineers (May
16, 1991) at 8-9. EPA insisted there were practicable
alternatives, but asked for a remand even if the court concluded
otherwise:

[A] remand is both legally required and essential to
allow the EPA to decide whether the County’s section
404 permit should be vetoed even if the County lacks
alternatives to the Ware Creek Reservoir.’
*- *+ *
[Ajll EPA really seeks here is the opportunity to decide
for itself whether this project’s adverse effects are so
“unacceptable” as to warrant the Agency’s veto even if
the County lacks practicable alternatives.*

Faced at oral argument with the panel’s obvious concern for the
water needs of James City County, EPA’s counsel volunteered
that, if the agency was granted a remand, it would complete it
within sixty days.

On January 29, 1992, the Fourth Circuit agreed with the
Corps, the SWCB and the District Court that the exhaustive
studies in the administrative record established that no

” Brief For Appellants EPA And Corps Of Engineers (April 18,
1991) at 45.

* Reply Brief For Appellants EPA And Corps Of Engineers
(May 16, 1991) at 10.

13

practicable alternative existed. It said the record evidence made
that conclusion "unavoidable" and it refused to permit EPA to
contend otherwise on remand. 955 F.2d at 259-60, App. F-12-
13. Stressing EPA’s voluntary commitment to act within sixty
days, the Fourth Circuit granted EPA’s requested remand. As
the District Court later summed up, "the Court of Appeals gave
the EPA sixty days in which to determine whether, in the
absence of alternatives, the Ware Creek project was
‘unacceptable’ within the meaning of the Ciean Water Act.”
App. H--2.

D. Regulatory Proceedings On Remand

But on remand EPA did not acknowledge the lack of a
practicable alternative to the Ware Creek Reservoir in any way.
Instead, it merely refrained from discussing what EPA
continued to call "the availability of less environmentally
damaging practicable alternatives to the Ware Creek water
supply impoundment... ." Final Determination on Remand
(March 27, 1992), SAR 17 at 47, App. G-72.

Though EPA’s first prohibition said the supposed availability
of alternatives made the Reservoir’s effects unnecessary and
therefore “unacceptable,” its second failed to consider that the
established absence of alternatives might make those effects
necessary and therefore “acceptable” under § 404(c). EPA's
Final Determination on Remand of March 27, 1992 did not
consider James City County’s need for the reservoir, the
absence of any alternative, nor the potential consequences of
failing to build it. Nor did EPA explain its failure to consider
any of these factors.

Nor did EPA’s decision on remand evaluate whether the
effects of the project might be rendered “acceptable” by the
Mitigation Plan. Notwithstanding the established lack of
alternatives, EPA again dismissed the Plan because it would not

14

achieve “no net loss.”
E. JCCll

Back before the District Court, EPA’s counsel was pressed
to explain EPA’s failure to consider these factors. He provided
a response exactly opposite EPA’s prior position:

THE COURT: Do I understand that you take the
position that the lack of any water supply and the effect
upon James City County is something that you can
completely rule out, you don’t “=e to look at that at
all? I take that from your brief -- that’s the reading I
took of it.

MR. CARSON: Your Honor, that’s correct.

Transcript (July 28, 1992), CR 72 at 31. Meanwhile,
environmental groups supporting EPA as amnici curiae attached
to their memorandum portions of a preliminary draft of yet
another “regional” water supply study prepared by consultants
to the City of Newport News. Based on this non-record
material, amici curiae argued that the County’s water needs
could be met by an alternative project.

The District Court set aside EPA’s second prohibition on
August 4, 1992. It did so for two independent reasons. First,
the District Court held that EPA was required to consider but
“completely ignore[d] James City County’s desperate need for

* _ EPA restated the derivation of its "no net loss” policy and said
it was using § 404(c) to implement that policy. App. G-57-59. It then
again found the Plan “inadequate” because, "[t]he proposed acreage
is insufficient to replace the extent of wetlands that would be lost"
(App. G-63, emphasis added) and “there is no information suggesting
that the wetland creation effort would produce the existing cover-types
or produce them in their current proportions or . . . current range of
habitat values." App. G-64 (emphasis added).

15

water." 23 Envtl. L. Rep. at 20,229, App. H-3. The District
Court was unmoved by continuing argument from amici curiae,
based on non-record "evidence," that EPA’s failure to consider
this matter should be excused because yet another “regional”
source was entering the regulatory gauntlet. Second, the
District Court found that "the environmental data in the
administrative record also fail to provide substantial support for
the EPA’s position." This was "primarily because of [EPA’s]
failure to consider the mitigation plan adequately." 23 Envtl. L.
Rep. at 20,229, App. H-4. But EPA also overlooked
uncontradicted evidence that the Ware Creek watershed will be
timbered and developed even if the Reservoir is not constructed
(thus displacing wildlife without mitigation). 23 Envtl. L. Rep.
at 20,229-30, App. H-6.

EPA did not seek a stay of the District Court’s decision and
the Corps accordingly reinstated James City County’s § 404
permit. Preparations for Reservoir construction resumed.

On appeal, EPA’s counsel sought to explain EPA’s policy
regarding alternatives. He said if a practicable alternative
exists, EPA will consider that fact in deciding if the project’s
efiects are "unacceptable." But if no such alternative exists,
EPA will ignore that fact and focus only on matters of water
quality. Reply Brief for Appellants EPA and Corps of
Engineers (Feb. 16, 1993) at 10. The Fourth Circuit
summarized this argument as follows:

The EPA ... asserts that while it may in its sole
discretion consider the need for water, the only
requirement placed on it by Congress is to consider the
project’s potential adverse impacts on the environment.

12 F.3d at 1335, App. I-10.

In its decision of December 30, 1993, the Fourth Circuit
noted that § 404(c) of the Clean Water Act is ambiguous as to
what EPA must consider:

[EPA’s] authority to veto to protect the environment is

16

practically unadorned. It is simply directed to veto
when it finds that the discharge “will have an

adverse effect on municipal water supplies,
shellfish beds and fishery areas ..., wildlife, or
recreational areas."

it said that the only factor clearly and unambiguously identified
for consideration in § 404(c) is water purity. On that basis, the
Fourth Circuit excused EPA from considering any factor other
than water purity and reversed the District Court. 12 F.3d at
1336, App. I-12.

The Fourth Circuit also reversed the District Court’s finding
that EPA’s allegations regarding the effects of the Reservoir
were not adequately supported by the administrative record. It
did not address EPA’s failure to consider the matters cited by
the District Court. Instead, the Court of Appeals cited EPA’s
findings and conclusions and said, "the district court erred in
failing to recognize the deference due the EPA’s
determination." 12 F.3d at 1338, App. I-17-18.

The Petition of James City County for Rehearing and
Suggestion for Rehearing in Banc was denied by the Fourth
Circuit on March 25, 1994. App. J-1.

REASONS FOR GRANTING THE WRIT

I. THIS COURT SHOULD DECIDE
WHETHER § 404(c) PERMITS EPA TO
IGNORE AN APPLICANT’S NEEDS AND
THE LACK OF ANY PRACTICABLE
ALTERNATIVE MEANS OF MEETING
THEM, AND TO FOCUS ENTIRELY ON
WATER PURITY.

A. This Is an Important Federal Question.

In the fifteen years since EPA published implementing
regulations, it has pursued the § 404(c) process to completion

17

twelve times. It has blocked a municipal landfill, a flood
control project, three municipal water supply reservoirs, two
recreational impoundments, three agricultural operations, a
shopping mall, and two warehouse complexes. Each of the
last five EPA actions has involved a public water resource
project.

As important as the direct consequences of these completed
§ 404(c) actions are to the communities involved, they are just
"the tip of the iceberg." For each project EPA has blocked with
a completed § 404(c) action, it has blocked many more with
threatened or proposed § 404(c) actions. As with its completed
prohibitions, targets of EPA’s threatened actions often are large
public infrastructure projects undertaken by state and local
governments -- including water resource projects, transportation
improvements such as roads, ports and airports, municipal waste
management facilities, and educational and recreational centers.

Furthermore, EPA claims that “one of the basic functions
of 404(c) is to police the application of the 404(b)(1) guidelines"
by the Corps in its permit decisions. 44 Fed. Reg. 58,076,
58,078 (1979). EPA thus admittedly uses § 404(c) in selected
cases to compel the Corps to apply EPA’s policies to § 404
permitting generally. An excellent example is provided by
EPA’s decision to block construction of the shopping mall in
the Bersani case, thereby compelling the Corps to accept the
EPA policy called “sequencing."” If EPA, as its counsel claims,

‘° Up to EPA’s final § 404(c) action regarding the Attleboro
Mall, the Corps allowed a permit applicant to make its preferred
project the least damaging alternative by performing beneficial
“mitigation.” Bersani v. Environmental Protection Agency, 674 F.Supp.
405, 410 (N.D.N.Y. 1987). EPA contended the least damaging
alternative must be identified prior to consideration of any mitigation,
and called this “sequencing.” EPA blocked construction of the mall
saying an alternative was available to the applicant that -- prior to
consideration of mitigation -- was less damaging. After EPA’s
prohibition was upheld by the Second Circuit, the Corps renounced

18

has indeed decided that the alternatives provisions of the
404(b)(1) guidelines must be applied so that the lack of any
alternative is irrelevant, then that policy is potentially applicable
to every § 404 permit decision.

In many communities across the country, public
infrastructure facilities of the kind at issue in this case simply
cannot be built without placing fill in areas subject to § 404.
And the 404(b)(1) guidelines allow issuance of a permit only for
the single, least-damaging alternative. That means, in such
communities, the Corps and EPA (not state, regional or local
planning departments) determine what water supply is tapped --
if any, what transportation project is built -- if any, what waste
management facility is constructed -- if any, and what
educational and recreational centers are permitted -- if any.

James City County is one example of communities
nationwide with pressing infrastructure requirements. The
evidence in the administrative record is uncontradicted
concerning the County’s need for water. Water levels in its
wells are falling, and water quality is deteriorating as brackish
water enters an overdrawn aquifer. The County has abandoned
several wells already and predictions are that it must soon
abandon more in order to maintain Safe Drinking Water Act
standards. On top of this, the County’s population of residents
and tourists continues to grow. The District Court quite
properly described the County’s water situation as “desperate.”

The immediate, practical consequence of the decision below
for the citizens of James City County is to ban construction of
the water supply finally adjudged to be their only "practicable"
source. According to the Corps, the result could be "too
dangerous and damaging to contemplate" -- a “potentially
disastrous system failure" by the year 2000. Record of Decision,

its policy. It now issues permits only for projects that are the least
damaging prior to consideration of proposed mitigation work.
Memorandum of Agreement between the Environmental Pr otection
Agency and the Department of the Army et cet. (Nov. 15, 1989).

19

App. A-3. The Corps’ finding that the health and safety
(including fire protection) of this community is directly
threatened by EPA’s action is fully supported by the
administrative record.

Even though they contend the consequences of EPA’s
action are irrelevant under § 404(c) and admit that EPA never
considered them, EPA’s counsel and amici curiae found it
necessary to argue -- on the basis of non-record "evidence" --
that no ill effects will occur. The Fourth Circuit felt compelled
to do the same. Referring to the submissions of amici curiae as
"[r]jecord material," it speculated that the City of Newport News
may succeed in licensing and constructing a Black Creek or
King William Reservoir, that the needs of James City County
may thereby be met, and that such a project may produce more
water with less adverse effects.”

The Fourth Circuit's use of this material -- and disregard of
the overwhelming contrary evidence in the record -- was legally
and factually in error. The material was not part of the
administrative record, and EPA expressly disclaimed any
reliance on it.” Judicial review is limited to "the administrative

"12 F.3d at 1334, n. 1, App. I-8-9, n. 1. That EPA, amici
curiae, and the Fourth Circuit each felt it necessary to highlight
supposedly irrelevant, non-record material demonstrates that the
consequences of EPA’s action are actually highly relevant to whether
effects are acceptable or unacceptable.

” EPA’s counsel described the history of these documents as
follows:

[T}hese documents are neither part of the administrative
record in this Section 404(c) proceeding, nor were they relied
upon in any way as a basis for the Remand Determination.
They come before this Court as a part of the judicial record
below, where amici Southern Environmental Law Center
("SELC"), et al., endeavored to make the district court aware
of the realities outside the cocoon woven in litigation.

20

record already in existence, not some new record made initially
in the reviewing court." Camp v. Pitts, 411 U.S. 138, 142 (1973).
Furthermore, “[i}t is well established that an agency’s action
must be upheld, if at all, on the basis articulated by the agency
itself." Motor Vehicle Mfrs. Ass'n v. State Farm Mut. Auto. Ins.
Co., 463 U.S. 29, 50 (1983). This material should have played
no role in the decision below.

The Fourth Circuit also overlooked what the administrative
record does contain regarding its speculations. For example, it
reveals that EPA and other agencies have already nixed a Black
Creek project on multiple occasions.” Regarding Newport
News’ King William Reservoir, the record contains the
following EPA comments: "The purchase of water from
Newport News is legitimately not attractive on a long-term
basis, since it is simply not cost-effective." Final EIS, AR A-31
at 5-11. It shows that, even with the optimistic assumption that
all of its existing wells will remain sound, the County will need
water within just a few years. It thus cannot await the uncertain
conclusion of lengthy licensing and the inevitable litigation
which must be completed before construction of another project
might possibly begin. It also shows that the Ware Creek site
will not remain available as a fallback - it soon will be
timbered, developed, and lost as a potential water supply.

The Fourth Circuit originally ruled that EPA bears the
burden of demonstrating that an alternative is practicable. It
ruled that EPA not only failed to do so, but that the record
proved the opposite. It attempted to close the issue once and
for all. Now -- more than a decade after James City County
"entered the market" for a water source - it has cited

Reply Brief for Appellants EPA and Corps of Engineers (Feb. 16,
1993) at 6.

” _ A reservoir on Black Creek augmented with water pumped
from the Pamunkey River was one of the 28 "regional" projects
investigated by the Corps but rejected by EPA and other agencies.
Record of Decision, App. A-8, A-12.

21

preliminary, non-record materials concerning a new crop of
supposed alternatives. On that basis, it revises history and
suggests that this case is about how -- not whether -- the
County’s water needs will be met. If that is permitted to stand,
then no finding of a lack of alternatives will ever be final.

This case will decide whether the courts will allow EPA to
exercise the tremendous power of § 404(c) irresponsibly and
without any meaningful judicial review. The decision below
held EPA may completely disregard the needs of communities,
their lack of any other practicable means of meeting them, and
the likely consequences of its action. That is a question of
obvious national importance. The unreasonableness of the
Fourth Circuit’s holding is not altered by speculation that this
County may -- or may not -- eventually find another source of
water.

B. The Decision Below Conflicts with Prior Decisions
of this Court.

1. The Decision Below Failed to Require EPA to
Adhere to Its Long-Standing Policy.

EPA’s long-standing policy plainly says EPA “can take into
account the fact that the alternative sites or methods are or are
not available, so that the loss of resources is avoidable or
unavoidable.” 44 Fed. Reg. 58,076, 58,078 (1979). EPA’s
counsel confirmed this policy in JCC I, saying EPA would have
to consider the County’s water supply needs if it found no
practicable alternative to the Ware Creek Reservoir. See page
12, above.

EPA adhered to this policy so long as it was able to
summon a practicable alternative to the project it was reviewing.
But when faced by JCC J with the lack of alternatives in this
case, EPA made an abrupt and unexplained about-face. It did
not consider the County’s need for water and the absence of
alternatives on remand, and did not explain its failure to do so.

This Court has repeatedly held that an administrative

22

agency is bound by its long-standing interpretations of law and
its own regulations unless and until it clearly acknowledges a
change in policy and provides a reasoned explanation for it.
Atchison, Topeka & Santa Fe Ry. Co. v. Wichita Bd. of Trade,
412 U.S. 800, 807-08 (1973); Motor Vehicle Mfrs. Ass'n v. State
Farm Mut. Auto. Ins. Co., 463 U.S. 29, 41-43 (1983).

The decision below did not require EPA to follow, or to
explain its failure to follow, its long-standing, plainly-stated
policy. It is in conflict with this Court’s settled rule of
administrative law and should be reviewed for that reason.

2. The Decision Below Failed to Require EPA to
Articulate an Adequate Rationale for Its Action.

The only explanation for EPA’s failure to consider the lack
of any practicable alternative to the Ware Creek Reservoir
came post hoc from EPA’s counsel during this litigation. At
that time EPA’s counsel claimed that when no alternative exists,
EPA may ignore that fact. The decision below apparently
accepted that this was the actual basis for EPA’s failure to
consider the lack of alternatives to the Ware Creek Reservoir.

An administrative agency must itself “articulate a satisfactory
explanation for its action including a ‘rational connection
between the facts found and the choice made.” Motor Vehicle
Mfrs. Ass’n, 463 U.S. at 43 quoting Burlington Truck Lines, Inc.
v. United States, 371 U.S. 156, 168 (1962). That connection
cannot be supplied after-the-fact by agency counsel during
litigation. Burlington Truck Lines, 371 U.S. at 169 ("For the
courts to substitute their or counsel's discretion for that of the
Commission is incompatible with the orderly functioning of the

“See also Secretary of Agric. v. United States, 347 U.S. 645, 653-
54 (1954) (Interstate Commerce Commission failed adequately to
explain its departure from prior regulatory practice when it could not
be determined whether the agency simply disregarded facts found or
whether it modified its normal regulatory doctrine).

23

process of judicial review"). If the grounds stated by the agency
are inadequate, “the court is powerless to affirm the
administrative action by substituting what it considers to be a
more adequate or proper basis." Securities and Exch. Comm’n
v. Chenery Corp., 332 U.S. 194, 196 (1947).

Here, EPA articulated no connection at all between an
important fact found (the lack of any practicable alternative to
the Ware Creek Reservoir) and the decision made (to block
Reservoir construction). One cannot know whether EPA
negligently or willfully disregarded the absence of alternatives
or, as EPA’s counsel belatedly claimed, made a conscious policy
decision to ignore the lack of any practicable alternative. By
permitting EPA’s counsel to supply an explanation post hoc, the
decision below conflicts with the foregoing decisions of this
Court.

3. The Decision Below Failed to Defer to EPA’s
Long-Standing Policy.

The Fourth Circuit did not merely allow EPA’s counsel to
provide a new, previously missing policy to explain EPA’s
conduct. It actually accepted and enforced that policy. In so
doing, it displaced the contrary statutory interpretation
announced long ago by EPA itself. In place of the rule stated
in the preamble to EPA’s § 404(c) regulations ("the
Administrator can take into account the fact that the alternative
sites or methods ... are not available"), the Fourth Circuit
substituted one articulated only by EPA’s counsel in litigation
(“while [EPA] may in its sole discretion consider the need for
water, the only requirement placed on it by Congress is to
consider the project’s potential adverse impacts on the
environment"). 12 F.3d at 1335, App. I-10.

This too violates the prior decisions of this Court. In
Chevron U.S.A. Inc. v. Natural Resources Defense Council, Inc.,
467 U.S. 837 (1984), this Court held that an agency’s properly-
adopted and reasonable interpretation of an ambiguous
statutory provision will not be displaced by a federal court.

24

This rule has been applied extensively when regulated entities
seek to vitiate a regulatory policy. No exception permits an
agency which has failed to follow its policy to disavow it
through counsel in subsequent litigation.

The decision below displaced EPA’s long-standing statutory
interpretation that whether alternatives are or are not available
is relevant to determining if the effects of a project are
acceptabie or "unacceptable." It did not inquire whether that is
a reasonable interpretation. It did not consider that other
courts have found that it is.“ For these reasons as well, the
decision below is contrary to the prior decisions of this Court
and should be reviewed.

4. The Decision Below Improperly Granted EPA
Discretion to Ignore Relevant Factors.

Finally, the policy offered by EPA’s counsel and accepted
by the Fourth Circuit -- that EPA may consider whether
alternatives exist when an alternative is found, but may ignore
the matter when no alternative is found -- also violates prior
decisions of this Court. When a factor is relevant to an
agency’s decision, it is arbitrary and capricious for the agency to
fail to consider it. Motor Vehicle Mfrs. Ass'n, 463 U.S. at 43.
Agencies have no discretion to consider some relevant factors
and to ignore others, or to consider relevant factors some of the

* Bersani v. Environmental Protection Agency, 674 F.Supp. 405
(N.D.N.Y. 1987), aff'd sub nom Bersani v. Robichaud, 850 F.2d 36 (2d
Cir. 1988) cert. denied 489 U.S. 1089 (1989); Newport Galleria Group
v. Deland, 618 F.Supp. 1179 (D.D.C. 1985).

* Trial courts in negligence actions often follow the rule that
whether a traffic light is red or green when a motorist enters an
intersection is a factor relevant to determining negligence. The
Fourth Circuit’s decision is like permitting the trier of fact to consider
the color of the light if it was red, but not to consider the color of the
light if it was green.

25

time, or when they support an agency’s preordained result.” To
hold otherwise -- as did the Fourth Circuit -- would make a new
principle of administrative law out of an old joke: "Heads, the
agency wins; tails, the permit applicant loses."

The decision below violates fundamental principles of
administrative law long enforced by this Court and should be
reviewed.

C. The Decision Below Conflicts with a Decision of the
Court of Appeals for the Second Circuit.

The Fourth Circuit concluded that EPA may consider only
water purity under § 404(c):

Ultimately, however, recognizing the EPA’s expertise
and concentrated concern with environmental matters,
Congress gave the final decision whether to permit a
project to that agency. Its authority to veto to protect
the environment is practically unadorned. It is simply
directed to veto when it finds that the discharge “will
have an unacceptable adverse effect on municipal water
supplies, shellfish beds and fishery areas. . ., wildlife, or
recreational areas." ... This broad grant of power to
the EPA focuses only on the agency’s assigned function
of assuring pure water and is consistent with the
missions assigned to it throughout the Clean Water Act.

’ That is particularly true in this case because EPA’s own
§ 404(c) regulations provide, “In making this determination, the
Administrator will take into account all information available to
him... ." 40 C.F.R. § 231.1(a), 44 Fed. Reg. 58,076, 58,083 (1979).

% James City County has never contended that the absence of
an alternative necessarily entitles it to a permit. Rather, the County
contends the absence of alternatives is a factor supportive of permit
issuance which EPA was required to consider.

26

12 F.3d at 1336, App. I-12. Its decision in this regard conflicts
with the decision of the Second Circuit in Bersani v. Robichaud,
850 F.2d 36 (2d Cir. 1988), cert. denied 489 U.S. 1089 (1989).

In Bersani, the Second Circuit was asked to review EPA’s
prohibition of fill for construction of a shopping mall. EPA’s
Final Determination said:

As a matter of common sense, as well as regulatory ;
practice, the "acceptability" of an adverse effect may }
depend on the extent to which that effect is avoidable. ;
The alternatives provisions, as well as other portions of :
the section 404(b)(1) Guidelines, thus are necessarily é
relevant to a section 404(c) determination.” t

The District Court for the Northern District of New York had
ruled as follows:

The court finds the EPA’s interpretation that the
evoidability of a loss may be considered in corjunction |
with its magnitude in determining whether it is t
“unacceptable” within the meaning of Section 404(c) and E
“significant” within the meaning of the implementing
regulation is reasonable. This interpretation does not
violate the plain language of the statute or the language
of the pertinent regulations. i

Bersani v. Environmental Protection Agency, 674 F.Supp. 405, 415
(N.D.N.Y. 1987). On appeal to the Second Circuit the ft
applicant conceded that EPA may consider whether alternatives i
do or do not exist. But it claimed that determination must be
made as of the time it made its permit application (when it had

* Final Determination of the Administrator for External Affairs

the Sweedens Swamp Site in Attleboro, Massachusetts

Pursuant To Section 404(c) of the Clean Water Act (May 13, 1986),
CR 62 Exhibit 4 at 14 (emphasis added).

27

no alternative) -- not as of the time it “entered the market" for
its project as EPA contended (when it did have an alternative).
The Second Circuit said the existence of alternatives must
be determined as of the date an applicant “enters the market."
It therefore found that EPA’s § 404(c) action was properly
based on the availability of a
alternative. To reach this result, the Second Circuit necessarily
accepted EPA’s contention that factors other than water purity
and the magnitude of environmental effects arc relevant to
assessing whether effects are acceptable or "unacceptable" under
§ 404(c). The Second Circuit relied in part on the reasoning of
Newport Galleria Group v. Deland, 618 F.Supp. 1179, 1182 n. 2
(D.D.C. 1985) ("[I]}t would be extraordinary if Congress granted
the EPA a veto power over the Corps’ permit decisions, but
precluded it from reconsidering those issues the Corps
considered in deciding to grant the permit in the first place").

Il. THIS COURT SHOULD DECIDE
WHETHER COURTS MUST DEFER TO
AGENCY FINDINGS DESPITE OBVIOUS
REASONS TO DOUBT THEIR ANALYSES.

Ordinarily, agency process is given a “presumption of
regularity” and the findings of an agency are entitled to
substantial deference. But there are circumstances in this case
that this Court and various Courts of Appeals have determined
require greater scrutiny of the agency process. The decision
below ignored these “danger signals" and broadly deferred to
EPA’s findings.

First, this case involves joint administration of a single
regulatory program by three agencies, cach with statutory
authority to block permit issuance based on environmental
issues. One agency, EPA, has disagreed extensively with the
other two, the Corps and the SWCB. Both of these found the
Reservoir complied with all applicable environmental
requirements. To the extent a court might defer to EPA’s

28

findings, it would necessarily disregard those of the Corps and
the SWCB.

In such circumstances, this Court has found that federal
courts need not defer to one agency’s findings. General Electric
Co. v. Gilbert, 429 U.S. 125, 144-45 (1976) (where the denial of
benefits for pregnancy disability would be treated as an unlawful
employment practice by the Equal Employment Opportunity
Commission but not by the Wage and Hour Administrator,
court need not defer to EEOC). See also Barnard v. Carey, 60
F.Supp. 539 (N.D. Ohio 1945) (faced with conflicting findings
by two agencies as to whether “Soya Butter” was
“oleomargarine,” court decided the question). According to
Professor Bernard Schwartz, when faced with this situation "the
reviewing court should decide the question for itself” based on
the weight of evidence in the record as a whole. B. Schwartz,
Administrative Law § 10.35 at 664 (2d ed. 1984).

In the same regulatory context presented by this case, the
Second Circuit was "not thoroughly persuaded" it should defer
to an EPA interpretation of the Section 404(b)(1) guidelines
which conflicted with the Corps’ interpretation. It accordingly
did not do so. Bersani, 850 F.2d at 45. The decision below is
thus in conflict with the decision of the Second Circuit on this
issue as well.

Second, the presumption of regularity ordinarily given to
EPA’s actions has already been conclusively rebutted in this
case. The District Court and the Fourth Circuit have both
invalidated EPA’s claims in this case that a reservoir is not a
“water dependent activity” and that several small water supply
projects are "practicable" and “available” to James City County.
The Fourth Circuit found that EPA ignored "uncontroverted
evidence to the contrary" to reach that result, that "there was
not substantial evidence to support the EPA’s conclusion,” and
that “the record makes this conclusion unavoidable.” 955 F.2d
at 260, App. F-12-13. The District Court more directly called
EPA’s findings "nonsense" and "pure nonsense.” 758 F.Supp. at
352, 353, App. E-8-9.

Despite this -- and despite EPA’s failure even to

29

acknowledge the lack of alternatives it declared -- the Fourth
Circuit granted complete deference to EPA’s findings on
remand. The Fourth Circuit similarly failed to note EPA’s
departure from its consistent and long-standing rule and the
fact that it reachec the same result on remand after less than 60
days’ deliberation.

The D. C. Circuit Court of Appeals has determined that
such facts demand -- not deference -- but "more exacting

scrutiny” of the agency’s findings:

More exacting scrutiny will be particularly useful when
for some reason the presumption of agency regularity
... is rebutted, as where . . . the agency has arrived at
an identical result after remand from a reviewing court
for further explanation of reasons, e.g., Food Marketing
Inst. v. ICC, 587 F.2d 1285, 1289-90 (D.C. Cir. 1978);
accord, Citizens to Preserve Overton Park, supra, 401 U.S.
at 420; or when an agency has departed from its
consistent and longstanding precedents or policies, see
Office of Communication of United Church of Christ v.
CAB, No. 76-1878 (D.C. Cir. Sept. 11, 1978), slip op. at
13; International Union v. NLRB, 459 F.2d 1329, 1341-
42 (D.C. Cir. 1972).

Natural Resources Defense Council, Inc. v. Securities & Exch.
Comm'n, 606 F.2d 1031, 1049-50 n.23 (D.C. Cir. 1979). The
decision below is thus in conflict with a decision of the D. C.
Circuit on this point.

CONCLUSION

For the foregoing reasons, the petition of James City
County for a writ of certiorari should be granted.

Respectfully submitted,

WILLIAM B. ELLIS FRANK M. MORTON, III
Counsel of Record James City County

McSweeney, Burtch & Crump Post Office Box 8784

Post Office Box 1463 101-C Mounts Bay Road

11 South Twelfth Street Williamsburg, Va. 23187

Richmond, Virginia 23212 (804) 253-6612

(804) 783-6805

Counsel for Petitioner James City County, Virginia

June 22, 1994

APPENDIX A

UNITED STATES ARMY CORPS OF ENGINEERS
JULY 11, 1988

84-0614-06 RECORD OF DECISION

I have reviewed the Final Environmental Impact Statement
(FEIS) for James City County's proposed water supply reservoir,
and the comments received in response to the October 9, 1987
Public Notice. As part of this review I have also prepared an
analysis pursuant to Section 404(b) (1) of the Clean Water Act,
which is appended to this Record of Decision.

Based on my 404(b) (1) analysis, I find that this project does
comply with the December 24, 1980 Guidelines, with the miti-
gation which is proposed. This is not an easy determination, since
a substantial acreage of special aquatic sites (wetlands) will be
flooded. However, I find that an impressive effort has been made
to avoid, minimize, and compensate for these wetland losses, to
the extent that the net loss has been reduced so as not to cause
a significant degradation to the waters of the United States. I also
find, after considering my Final EIS (and the comments it gen-
erated) as well as the 1984 Water Supply Study, Hampton Roads,
Virginia conducted by Norfolk District and the 1987 James
Water Supply Plan conducted by the Virginia State Water Con-
trol Board, that there are no practicable alternatives which would
be less damaging. The Ware Creek wetlands perform many of the
functions listed in 33 CFR 320.4 (b) (2) and I consider them to
be a valuable public resource. With the reservoir in place, the
remaining wetlands within the Ware Creek watershed will con-
tinue to perform these functions, although some will be per-
formed to a somewhat lesser extent. The wetland creation within
the reservoir will help assure that the reservoir will also be a very
productive aquatic environment, and the wetlands created down-
stream of the dam will help offset the loss of detrital input into

fel

the York River. The breaching of Cranstons Pond dam will re-
connect hundreds of acres of wetlands which have been isolated
from the Yarmouth/Chickahominy/James River system for most
of a century, and, while this will not directly offset the loss to the
York River, both the York and the James flow into the Chesa-
peake Bay. For this reason, and since no commentor has given
any evidence to the contrary, I find that the cumulative impact of
this project to the Chesapeake Bay will not be significant. Based
on my FEIS, I find that there will be a net benefit to navigation;
the slight loss of navigation in Richardson Millpond and Ware
Creek being more than made up for by the creation of the new
reservoir. Navigation can be an important factor in the public
interest review, but in this case it is limited to recreational doat-
ing in a region with many similar opportunities, and is not par-
ticularly important. Energy conservation and development can
also be a very important public interest factor, but I find that the
energy needed to construct and operate this project is not of
significant quantity or concern. (The energy which would be
needed for some of the alternatives, particularly desalinization,
would be much greater and would be of more concern.) With
regard to fish and wildlife, the U.S. Fish and Wildlife Service
(FWS), the National Marine Fisheries Service (NMFS), and the
Virginia Department of Game and Inland Fisheries are all op-
posed to this project. All three contend that the project is not
mitigated on a 1:1 basis for fish and wildlife losses. I concur in
general with their contention, although I note that none of these
agencies has suggested any specific mitigation which would be
needed in order to achieve a 1:1 replacement, and that for cer-
tain species of fish and wildlife the project would substantially
improve habitat. After seven years of discussion this project with
agencies, organizations, and individuals through the NEPA pro-
cess, I find that the mitigation which is currently proposed is all
that can be reasonably expected and is adequate to avoid an
unacceptable wetland functional loss. I note that James City
County is currently negotiating with FWS, the Virginia Depart-
ment of Game and Inland Fisheries, and the Environmental Pro-

Ac2

tection Agency (EPA) to see if additional wetland mitigation
outside of the Ware Creek watershed and outside James City
County would induce them to drop their objections and convince
EPA to cease its consideration of a permit veto. These negotia-
tions are occurring outside the public interest review process,
although if some kind of settlement is achieved, any such addi-
tional mitigation could be made a permit condition, if requested
by the County. As discussed herein, though, I find the mitigation
presently proposed to be adequate to prevent the project from not
being in the public interest.

As stated in 33 CFR 320.4 (m), "Water is an essential resource,
basic to human survival, economic growth, and the natural en-
vironment." I find that the consequences of not developing a
reliable water supply, as outlined in paragraph 2.102 of the FEIS,
are too dangerous and damaging to contemplate as an alternative.
Given the seven years which this project has taken to get this far,
I am not at all convinced that James City County could develop
another source of water in time to forestall the potentially disas-
trous system failure which the Peninsula could realistically face
by the end of the next decade if this project were not allowed.
Though there has been much study and more talk devoted to
regional solutions over the past several years, the fact remains
that such an alternative does not currently exist and does not
appear to be even likely in the future.

I am greatly concerned over the environmental losses which the
EPA, FWS, NMFS, and others have pointed out, and I agree that
not all of these losses will be completely mitigated. I also find,
though, that the mitigation will reduce the net effect of the losses
to the point where they will not significantly degrade the waters
of the United States. Were it not for the overpowering need for
the project and the lack of practicable alternatives, I could not
justify this project as being in the public interest. The need can-
not be overlooked by any responsible party, though, and the
evidence concerning the lack of practicable alternatives is over-

Ac3

whelming. For these reasons I find this project not to be contrary
to the public interest and find that a permit should be issued,
requiring all of the environmental mitigation discussed in the
FEIS which is described as being successful and effective.

The following are comments received from agencies, organiza-
tions, and individuals during the October 9-November 9, 1987
comment period (later extended through November 24).

By letter dated November 23, 1987, Region III of the Environ-
mental Protection Agency (EPA) commented on the FEIS.
EPA's comments are addressed below:

COMMENT: The project would significantly degrade more
that 425 acres of unusually diverse and productive wetlands.

RESPONSE: I concur that the existing wetlands are very pro-
ductive and diverse, and I would much rather see them main-
tained in their present condition if some other feasible and rea-
sonable solution to the water supply problem could be found. The
425 acre figure includes vegetated wetlands as well as shallow
water habitat which may support vegetated shallows. As noted
in the FEIS on pages 5-37 and 5-38, these wetlands are diverse
and productive, but not unique. Other creek/wetland systems in
this area are similarly diverse and productive.

COMMENT: The wetland mitigation plan will not completely
compensate for habitat losses, other wetland functional value
losses, or wetland acreage.

RESPONSE: I recognize that the proposal described in the
FEIS does not constitute 1:1 mitigation of vegetated wetlands in
terms of either habitat or acreage. At a November 19, 1987
meeting between the Corps, the National Marine Fisheries Ser-
vice, the U.S. Fish and Wildlife Service, and the Environmental
Protection Agency, my staff asked for specific suggestions for

A4

additional wetland mitigation. To date we have received none. By
CEQ regulation (40 CFR 1503.3 (d) EPA and FWS are required
to inform me of any such wetland mitigation which they consider
necessary ("When a cooperating agency with jurisdiction by law
objects to or expresses reservations about the proposal on
grounds of environmental impacts, the agency expressing the
objection or reservation shall specify the mitigation measures it
considers necessary to allow the agency to grant or approve
applicable permit, license, or related requirements or concur-
rences"). EPA was a cooperating agency and has jurisdiction by
law under Section 404(c) of the Clean Water Act. EPA agreed
in 1985, as a cooperating agency, to perform a wetland functional
values assessment for inclusion in the FEIS. EPA never prepared
this analysis. The County has proposed extensive wetland miti-
gation within the reservoir and downstream in Ware Creek. In
addition they have found another site within the County but
outside the Ware Creek watershed (Cranstons Pond) where they
propose a very innovative and appropriate form of mitigation;
turning an existing reservoir back into a wetland. There are no
other wetland mitigation sites within the Ware Creek watershed
and there is a reasonable limit to the geographical area which can
be expected to be searched for additional wetland mitigation
opportunities in the absence of specific suggestions. Thereforc,
I believe a reasonable requirement of mitigation has been reached,
considering the total public interest and in the absence of alternative
water supply solutions. Consequently, I believe that the project is
adequately mitigated and environmentally acceptable.

COMMENT: The project will degrade water quality both
within the reservoir and downstream.

RESPONSE: The FEIS notes that the reservoir will probably
become eutrophic, or at least upper mesotrophic, as are most
other reservoirs in Virginia's Coastal Plain. This has not kept these
reservoirs from being used as water supplies, however, 2nd many
are extensively used for fishing and boating. I know of no evidence

AeS

SS eee eae eT On Se Te Ope ee a

that the project will "degrade" the downstream water quality of
Ware Creek. Reservoirs normally act as efficient sediment and
nutrient traps and this, combined with the guaranteed minimum
release, may actually improve downstream water quality.

COMMENT: The potential cumulative impacts to the Chesa-
peake are "evident".

RESPONSE: Norfolk District asked EPA, in its capacity as a
cooperating agency for the FEIS as well as the lead agency for
the Chesapeake Bay Program, to identify these cumulative im-
pacts and their effects on the Bay so that they could be included
in the FEIS. By letter of December 11, 1985, EPA agreed to do
so and to submit a final report to the District by September 1,
1986. The study has never been performed. The December 11,
1985 letter stated "We appreciate the opportunity you are pro-
viding EPA in this decisionmaking process." EPA was given
every reasonable opportunity to constructively contribute to the
NEPA process as a cooperating agency (40 CFR 1501. 6(b)). By
failing to do so, EPA has substantially reduced the force and sig-
nificance of its objections to this project concerning loss of
wetland functional values and cumulative impacts on the Chesa-
peake Bay. Because of their general expertise in these two areas
I would normally give great weight to their comments, but in this
case I do not find them persuasive. (See "Forty Most Asked
Questions Concerning CEQ's National Environmental Policy Act
Regulations", Federal Register Vol. 46, No. 55, March 23, 1981;
response to question 14d, page 18031.) I find no evidence of any
significant adverse cumulative effect this project would have on
the Chesapeake Bay.

COMMENT: This project would set a precedent of allowing
significant environmental degradation for limited returns. Other
water supply impoundments have been proposed for this area of
Virginia.

RESPONSE: I concur that it is probably not a good policy to
generate only incremental solutions to a regional water supply
problem, and I would prefer to avoid doing so. However, no
practicable regional solution (or solutions) has ever been sug-
gested by any agency, organization, or individual which has been

determined to be environmentally acceptable by EPA, the U.S.
Fish and Wildlife Service (FWS), and the National Marine Fish-

eries Service (NMFS). The Norfolk District has been on

since 1984 (Water Supply Study Hampton Roads Virginia), and
the Virginia Water Control Board as recently as 1987 (James
Water Supply Plan), projecting a regional water supply deficit by
the year 2030 of between 35 and 40 mgd. All agencies with
expertise in this area are in agreement that an additional water
supply is needed. The history of water supply development on the
Peninsula in this century has been one of incremental develop-
ment of surface (direct withdrawal and reservoir construction)
and groundwater resources which are then tied into a regional
network. Since many years of study by sevezal local, State, and
Federal agencies have not identified any acceptable or feasible
long term regional alternative, continuation of incremental devel-
opment appears to be the only practicable solution available.

COMMENT: EPA isconvinced that less damaging alternatives
to the proposal exist but remain unidentified.

RESPONSE: If less damaging alternatives remain unidentified,
it is not for lack of effort. Our 1984 Water Supply Study iden-
tified approximately 29 alternatives to meet the water supply
needs of the Peninsula. EPA supported only one; a pipeline to the
James River above Richmond, which, at the minimum instream
flows recommended by the FWS would have a safe yield of 14
mgd or less. (This assumes that such a pipeline would be hooked
into the existing Newport News water system of reservoirs. By
itself, the pipeline would have no safe yield without somewhere
to store water for use during times when flow in the River is less
than the minimum instream flow). In an independent effort, the
Ac7

Virginia State Water Control Board developed its own list of
regional alternatives for the Peninsula in its 1987 James Water
Supply Plan. EPA has been involved with the Ware Creek EIS
since its initial scoping letter of May 12, 1981 and EPA was a
cooperating agency for the Final EIS. To maintain that a prac-
ticable alternative could he identified with yet another study is not
supported by the record and begs the question why this seven-
year effort, with numerous opportunities for input from EPA (as
well as FWS, NMFS, and other agencies and organizations), has
not succeeded in identifying such an alternative or alternatives.

By letter dated November 24, 1987, the U.S. Fish and Wildlife
Service (FWS) commented on the FEIS. This letter was later
submitted under a December 22, 1987 cover letter from the U.S.
Department of Interior Office of Environmental Project Review.
Since the Department's cover letter primarily summarized and
reiterated the FWS letter, the FWS comments are addressed
below:

COMMENT: The Corps should have evaluated this project
from a regional perspective and not just a local one.

RESPONSE: The FEIS in its very first paragraph placed this
project in a regional perspective, and several alternatives ana-
lyzed were considered as both local and regional alternatives
(e.g.: groundwater, desalinization, James River pipeline, etc.).

COMMENT: Scoping failed to identify, and the FEIS failed to
discuss, multiple source alternatives.

RESPONSE: Scoping may have failed to identify multiple
source alternatives, but they were considered anyway. The FEIS
discusses a Pamunkey/Black Creek alternative, a Pamunkey/
Crump Creek/Ware Creek alternative, and a Pamunkey/Ware

Creek alternative, and it points out that groundwater and the
James River could incrementally produce 10 and 13-14 mgd,

respectively.

COMMENT: The FWS takes exception to the Corps statement
that denial of a Ware Creek reservoir would mean that no accept-
able reservoir sites exist on the Peninsula.

RESPONSE: I find no discrepancy with the conclusion in the
FEIS that denial of this permit implies that no environmentally
acceptable reservoir site exists on the lower Peninsula. FWS, for
instance, has either actively opposed, cr at least not supported,
every water supply reservoir either proposed for construction or
considered as an alternative on the Peninsula since the Little
Creek Reservoir was permitted in 1975. This includes all of the
alternative reservoirs discussed in the Corps Water Supply Study
and this FEIS. The 3 Dam alternative is unacceptable to FWS as
described in the FEIS except with additional (unspecified) miti-
gation. As noted in a response to an EPA comment above, CEQ
regulations require cooperating agencies with jurisdiction by law
to request specific mitigation if they find the proposal lacking.
FWS has jurisdiction by law under the Migratory Bird Treaty Act
yet made no suggestions for additional wetland mitigation dur-
ing the comment periods for either the Draft or Final EIS.

COMMENT: FWS notes that the project would have substan-
tial adverse impacts, as described in its Habitat Evaluation Pro-
cedures (HEP) analysis (Appendix A to the FEIS). Also, the
Service feels that destruction of the existing Blue Heron rook-
ery should be assumed.

RESPONSE: I do not substantially disagree with the specific
results of the HEP analysis, which was an interagency effort in
which my staff participated. I also recognize that FWS has taken
the position that gains in one habitat cover type cannot be mea-
sured against losses in another habitat cover type. I note, though,

Ad

that the Fish and Wildlife Service Mitigation Policy speaks of
"goals" of no net loss of habitat value, and I think that in most
situations one cannot convert 1200+ acres of mixed habitat cover
types into open water habitat without losing some net habitat
value for at least one cover type. If one refers to Figure 4-5 in the
FEIS and sums the total average annual habitat units (AAHU's)
lost and gained for all cover types, one finds that the 3 dam alter-
native would cause a loss of 754 more AAHU's than the proposed
project. The HEP is only one measure of project impacts, and
some of the proposed mitigation is not reflected in its results (e.g.,
since the HEP does not consider whether a wetland is directly
connected to a downstream estuary, reconnecting the wetlands
above Cranstons Pond to the Yarmouth/Chickahominy estuary
is not given any credit). As stated in the FEIS, approximately 167
acres of wetlands can be counted on to be successfully created
within and downstream of the Site V reservoir and in Cranstons
Pond, and another 128 acres within the Site V reservoir woulc
become vegetated to some extent with wetlands, for a total of 295
acres (167 acres worst case). In addition, breaching the Cranstons
Pond dam would reconnect and enhance the value of between 340
acres (FWS estimate) and 506 acres (County estimate) of up-
stream wetlands which are presently isolated. Using an interme-
diate figure of 230 acres of wetland creation and the lower fig-
ure of 340 acres of wetland enhancement, I find that the 425 acre
wetland loss will be adequately mitigated. We are in basic agree-
ment that relocation of the existing Blue Heron rookery is specu-
lative and should not me expected to occur.

COMMENT: FWS recommends that the 3 dam alternative be
selected, with additiona! mitigation, over the proposed Site V
alternative.

RESPONSE: Selection of the 3 dam alternative would provide
only 65% of the safe yield of the proposed configuration and
would also flood 65% of the wetland acreage. In terms of mil-
lions of gallons of safe yield versus acres of wetlands flooded, the

A-10

two are virtually identical. The Site V alternative would postpone
the onset of mandatory water restrictions and rationing for a
somewhat longer period than the 3 dam alternative, and this is a
legitimate distinction. Site V also has a greater potential for fu-
ture expansion, as discussed later. Further, the 3 Dam alternative
would be acceptable to FWS with additional mitigation. None is
specified in the November 24 letter, although when our respec-
tive staffs met at Norfolk District offices earlier in November, one
of the subjects discussed was how additional mitigation could be
ach:*ved. To date I have received no such suggestions.

COMMENT: Additional alternatives should be investigated
before making a permit decision on this project. The specific
alternatives are enumerated below.

RESPONSE: First, I would point out that FWS recommended
very strongly against two of these alternatives (Chickahominy
and Pamunkey Rivers) in their comments on the Corps Water
Supply Study - Hampton Roads, Virginia. The scope of the analy-
ses which FWS now presents as being "necessary to determine
the relative impacts" exceeds the scope of the entire Ware Creek
EIS anc rivals that of the entire Northside portion of the Corps
Water Supply Study. Given FWS's historic position on these
alternatives, I believe the burden falis cn them to provide some
evidence that they are now in some way both reasonable and
environmentally preferable to Site V.

1. Chickahominy River: After considering the verbal
comments of FWS, NMFS, and EPA staff at the November 19,
1987 meeting and their written comments on the FEIS, I asked
James City County to provide me with clarifying information
relating to the storage capacities of reservoirs of differing eleva-
tions located at Site V, and they are shown on Enclosure 1. In the
course of gathering this information, the elevations of I-64 as it
crosses the various branches of France and Bird Swamps were
determined more exactly than before. At the lowest crossing, the

Acli

road is approximately at elevation 40 msl, or five feet above the
proposed Site V pool elevation of 35 feet. This means that vir-
tually any raising of the reservoir to accommodate a pumpover
from the Chickahominy River would also require raising the
interstate. This is not out of the question, but it does mean that
an entirely new NEPA issue would be raised; on which would
require bringing the Federal Highway Administration into the
process as either a joint lead agency or, at least, a cooperating
agency. A higher reservoir at Site V could, combined with an-
other source such as the Chickahominy River, remain a possible
regional alternative, and James City County may pursue such a
project in cooperation with other Peninsula localities, but it
clearly goes beyond the scope of this EIS, especially with the
additional environmental studies which FWS recommends.

2. Pamunkey River: FWS, EPA, and NMFS have, indi-
vidually and separately, recommended against supplying the
lower Peninsula with Pamunkey River water on at least seven
occasions between 1981 and 1987. EPA has even threatened to
refer any such project to the Council on Environmental Quality.
Now, with a permit application from Hanover County to with-
draw water from the Pamunkey River imminent, FWS (and
NMFS) recommend that this source also be reevaluated as an
alternative for the lower Peninsula. I cannot accept this, absent
some rational explanation from all three agencies of how one
Pamunkey River withdrawal can be environmentally unaccept-
able while two withdrawals merit additional study.

3. Groundwater: As explained in paragraphs 2.104 -
2.108 of the FEIS, approximately 10 mgd of potable groundwa-
ter are believed available in the lower Peninsula area. This figure
is corroborated in the State Water Control Board's 1987 James
Water Supply Plan. A greater quantity could jeopardize the ex-
isting resource. This would be a local alternative for James City
County, but would completely eliminate this as a source for the
additional 30 mgd which would still be needed by the rest of the

Ac12

Peninsula by the year 2030.

4. James River: As discussed in paragraphs 2.141 - 2.143
of the FEIS, a pipeline to the James River above Richmond could
add an increment of 13-14 mgd of safe yield to the lower
Peninsula's existing water supply system. This alternative has
been strongly opposed by the City of Richmond, which has ques-
tioned its legality (see paragraph 2.141 of the FEIS). It is also
discussed in more detail elsewhere in this Record of Decision and

in the 404(b) (1) Analysis.

5. Mandatory Use Restrictions: This is discussed in para-
graphs 2.109 - 2.111 of the FEIS, See also paragraph 2.102 under
the No Action alternatives and Subpart B of the 404 (b) (1)
analysis.

6. Expanded Reservoir Configurations: The 3 Dam alter-
native has only 78% of the capacity and 65% of the safe yield of
the Site V alternative, even though the 3 Dam alternative involves
reservoirs with pool elevations 5 - 15 feet higher than the Site V
alternative. Therefore, raising the pool elevations of the 3 Dam
reservoirs could never achieve the capacity of the yield to be had
by raising the Site V reservoir, which is discussed above. The 3
dam alternative as it is presently proposed would require raising
Route 168Y, but the three reservoirs could be raised to higher
elevations without raising I-64. An investigation would have to
be made to see if the three dams could be raised tc the point
where they would have the capacity to constitute a regional al-
ternative with augmentation from the Chickahominy River before
‘his could be considered an engineeringly feasible alternative.
Had this alternative been raised during the scoping process
(1981-1983) instead of the end of 1987, the extensive informa-
tion the FWS's November 24 letter calls for to determine the en-
vironmental impacts on the Chickahominy River of such a pro-
posal might have been obtained by this time. (Even so, FWS staff
indicated at the November 19, 1987 meeting that any impact on

Ac13

the Chickahominy River wetlands downstream of such an intake
would be considered unacceptable by the Service.) It would be
unreasonable and contrary to the intent of NEPA (40 CFR
1500.5) to call a 1-2 year halt to the decision process now while
this information is gathered, especially with no clear indication
that this would be either a feasible or an environmentally prefer-
able alternative to Site V.

By letter dated November 10, 1987, the National Marine Fish-
eries Service (NMFS) commented on the FEIS. This letter was
later submitted under a brief, November 16, 1987 cover letter
from the U.S. Department of Commerce, National Oceanic and
Atmospheric Administration, which did not include any addi-
tional comments. Also, the NMFS submitted additional com-
ments on November 12. The NMFS comments are addressed
below:

COMMENT: Dissolved oxygen in the release water should
have been discussed.

RESPONSE: The State Water Control Board has dissolved
oxygen standards for different classes of waters in Virginia and
commonly imposes these standards within their 401 Water Qual-
ity Certificate. Conditions of 401 Certificates are made a part of
Corps permits. Whatever standard is imposed will have to be met
by the County.

COMMENT: The wetland mitigation plan is not adequate.
Wetlands created within the reservoir would not perform the
same benefits for the downstream estuary as do the existing
wetlands.

RESPONSE: Approximately 49 acres of tidal fres!:water wet-
lands would be inundated by the proposed project. These would
be mitigated by 27 acres of tidal wetlands created iu borrow sites
downstream of the dam. In his November 25, 1987 letter com-

A-14

menting on the FEIS, Dr. Glenn Kinser of the U.S. Fish and
Wildlife Service stated "The Service believes, however, that this
marsh creation, if successful, will adequately compensate for the
loss of estuarine fizh nursery habitat inundated by the reservoir."
A sizeable portion of .he wetlands to be inundated are located
upstream of the existing Richardsons Millpond dam, so their
contribution to the York River and the Chesapeake Bay is pre-
sumably similar to that of the mitigated wetlands which would be
created within the proposed reservoir. The Cranstons Pond miti-
gation would create additional acres of wetlands with a direct
downstream connection in addition to reconnecting several hun-
dred acres of existing wetlands with the Yarmouth Creek estu-
ary. If directly-connected wetlands are, indeed, more valuable
than those located above a dam, I would expect that the func-
tional values of these hundreds of acres would be substantially
increased. The proposal described in the FEIS does not consti-
tute 1:1 mitigation of vegetated wetlands in terms of acreage or
habitat value. As mentioned above, though, NMFS was asked in
November 1987 for specific suggestions for additional wetland
mitigation. To date they have not done so.

COMMENT: The Cranstons Pond mitigation is not considered
to adequately compensated for the potential anadromous fish
habitat lost due to the implementation of Site V. NMFS believes
that future regulations may require dams such as at Cranstons
Pond to have fish passage devices, anyway. Also, downstream
road improvements should be made immediately.

RESPONSE: The anadromous fish recovery plan NMFS men-
tions may or may not become implemented and it may or may not
cover dams, such as Cranstons Pond, which are not presently
used for any purpose subject to a State or Federal permit and are
not located on a navigable water of the United States. It also
probably will not require improvements in downstream road
crossings which may interfere with fish passage. Enforcement of
specific requirements of any such eventual plan are speculative.

Ac15

If made a part of a Corps permit, restoration of this known, his-
toric anadromous stream would be a certainty and would be
enforceable under the Clean Water Act. Improvement of the
Route 632 culverts would also be made a part of any Corps
permit, although it would not have to be done "immediately". The
Fish and Wildlife Service has recommended that the lake be
drained and planted in stages, and that the dam be left in place
until the lake bottom is fully vegetated. I see no reason to require
the culvert work before then. The Service has also stated, in Dr.
Kinser's letter mentioned above, that ". . . we believe that the
Cranston's Pond breaching will provide adequate compensation
for the blockage of potential river herring spawning habitat at
Ware Creek if the culverts under Route 632 downstream of the
dam are replaced with a bridge, bottomless pipe arch, or larger
culverts set at the appropriate invert."

COMMENT: The presence of downstream shellfish should not
be downplayed simply because the grounds are presently con-
demned.

RESPONSE: I do not consider the shellfish in Ware Creek to
be an insignificant resource, but neither do I consider that they
would be adversely affected by this project, except for possible
temporary impacts due to construction-related turbidity.

COMMENT: Alternatives were dismissed because they would
not satisfy the regional need, although the Ware Creek reservoir
is a local project. The future needs should have been based not
just on safe yields of the existing systems, but on water use re-
strictions. Groundwater, local intergovernmental procedures,
and interbasin transfer should have been discussed more. NMFS
recommends a regional approach to the Peninsula's water sup-

ply problems.

RESPONSE: I find it somewhat inconsistent that in the same
paragraph NMFS first criticizes the FEIS for considering regional
A-16

needs instead of James City County's needs, and yet \ater states
"In short, a Regional solution is needed". The Ware: Creek project
must be viewed as the County's attempt to help solve its own
water supply problem which also constitutes a sizeable part of
and contributes to the overall regional water supply deficit. Safe
yield is a term which may be defined in many ways. Regardless,
conservation and mandatory restrictions are discussed in para-
graphs 2.102 and 2.109-2.111 of the FEIS, and in Subpart B of
the 404 (b) (1) analysis. A deficit projection of 35-40 mgd has
been corroborated by the State Water Control Board's 1987
James Water Supply Plan. Groundwater, local intergovernmental
procedures, and interbasin transfer are discussed in the FEIS in
Section 2 as well as in the response to the NMFS comment 3.09
found on page 5-43 of the FEIS.

COMMENT: NMFS does not recognize HEP as being a valid
procedure for evaluating estuarine fish habitat.

RESPONSE: I do not necessarily disagree with NMFS' criti-
cism of HEP, but it was specifically requested by the U.S. Fish
and Wildlife Service and, presumably, is of use to them. NMFS
offered no alternate methodology which it preferred, as required
by 40 CFR 1503.3 (b). With the FWS in advocate of the HEP
methodology, and EPA an advocate of the Adamus methodol-
ogy (which it agreed, but later failed, to perform), and NMFS an
advocate of no methodology, it was impossible to please all three
cooperating agencies.

COMMENT: Aminimum release equal to 30% of the mean an-
nual flow should be required.

RESPONSE: I know of no justification of a 30% mean annual
flow recommendation other than the Tennant Method. I concur
with the Virginia State Water Control Board (October 30, 1987
letter from Mr. C.E. Easlick to Mr. Charles H. Ellis, III of the
Virginia Council on the Environment) that the Tennant Method

Ac17

is not applicable in tidal situations such as this. Absent a techni-
cally supported rationale for this recommendation, I see no rea-
son to require a higher minimum release.

COMMENT: Both groundwater and the James River pipeline
alternatives would provide as much or more water to the County
than the Ware Creek Reservoir alternative and would be environ-
mentally less damaging.

RESPONSE: This is partly true, but ignores many factors. A
James River pipeline would cost approximately three times what
the Ware Creek alternative would and is strongly opposed by
Richmond area municipalities. If any kind of minimum flows are
imposed on such a withdrawal, as are recommended by all envi-
ronmental agenci¢s, the pipeline would have to be hooked into
a storage system (reservoir (s)) in order to store water during
times when flows are less than the permitted minimums. At
present the only such storage system in existence is owned and
operated by the City of Newport News, and if a James River
pipeline were hooked into this network, it would only increase
the system safe yield by an increment of 13-14 mgd at most. As
noted above, this small contribution toward the 2030 regional
need would merely postpone the regional problem by a few years.
If the pipeline were not hooked into the Newport News system,
James City County would either have to build a reservoir of its
own to store the water for use during times of low flow or else
find another source of water during times of low flow. intuitively,
times of low river flow are also usually times when other surface
water systems are being strained and are generally without any
surplus to sell to any other users. Ten mgd of groundwater is all
that is thought to be safely available in the Peninsula area, and this
will undoubtedly be tapped in ile future to help supply Peninsula
localities. Unless polluted or depleted, the ten mgd of groundwa-
ter will remain available and will not cost substantially more to
develop in another ten years than it would now. As residential
development occurs around the Ware Creek watershed, though,

A-18

the proposed reservoir site may not still be realistically available
in another decade.

COMMENT: Other alternatives should be investigated, or inves-
tigated further, including desalination, additional Chickahominy
River withdrawals, changing the operation of Lake Moomaw in
Alleghany and Bath Counties, and a combined withdrawal from the
Pamunkey River for both Hanover County and James City County.

RESPONSE: Desalination is discussed in the FEIS. NMFS
does not give any reason for studying it further or suggest any
new ways in which it should be studied. Additional Chickahominy
River withdrawals and a combined withdrawal from the
Pamunkey River for both Hanover County and James City
County are discussed above. This is the first time anyone has
suggested that changing the operation of Lake Moomaw, near
the West Virginia border, should be investigated as an alterna-
tive for this project. There is nothing to indicate how this alter-
native might work or any evidence that it might be environmen-
tally preferable to Ware Creek.

By letter dated November 12, 1987, the U.S. Department of
Interior, National Park Service commented on the FEIS. The
Park Service's comments are addressed below:

COMMENT: A portion of Ware Creek is currently listed on the
Nationwide Rivers Inventory. The proposed project would pre-
clude further consideration of Ware Creek as a potential segment
of the National Wild and Scenic Rivers System.

RESPONSE: The portion of Ware Creek currently listed on the
Inventory is "from confluence with York River to Richardson
Mill Pond". The minimum length of a waterway necessary for
continued listing, according to the Park Service, is five miles.
Between 5.1 and 5.2 miles of Ware Creek would be left intact if

A-19

the proposed project were constructed. In their letter, though, the
Park Service notes that the dam "would fall within the 1/4 mile
corridor of the river, and would have a substantial impact on the
undeveloped quality of the stream." There is no explanation as
to why the existing portion of Ware Creek listed on the Inven-
tory does not stop 1/4 mile short of the base of the Richardson
Mill Pond dam, itself a manmade structure impacting the unde-
veloped quality of the stream. Although the Service notes that the
project would affect the scenic quality of the corridor, would
reduce freshwater flows, would alter vegetational patterns,
would "eliminate" anadromous fish habitat, and would have
wetland mitigation areas located within the corridor, I note that
under that category of "Outstandingly Remarkable Values" on
the Inventory list, Ware Creek is not marked under any of the
columns, which are titled Scenic, Recreation, Geologic, Fish,
Wildlife, Historic, Cultural, and Other. Both Ware Creek and the
Poropotank River are included on the Inventory as tributaries to
a stretch of the York River, which is checked under the "Other"
column as "Hydrologic (An extremely unique segment of a
sparsely developed high order tidal river.)" I do not know of any
reason why the five mile segment of Ware Creek downstream of
the proposed dam would not continue to be, and contribute to
this segment of the York River's being, a sparsely developed high
order tidal river. Nevertheless, it is up to the Park Service and not
the Corps to make this determination and there is no requirement
for them to explain their rationale to me. There are 87 waterways
and segments of waterways in Virginia listed on the Inventory
which has existed in final form since 1981. None of these has been
promoted to Wild or Scenic River status. Construction of this
project may, for technical reasons, remove Ware Creek from
further consideration as a Wild or Scenic River, but it will not,
in my opinion, (supported by the Final EIS) significantly dimin-
ish its status as a very attractive, sparsely developed tidal estu-
ary with high values for fish and wildlife habitat. In its August 10,
1980 "Memorandum For Heads of Agencies", the Council on En-
vironmental Quality state that "Where agency action could effec-

A-20

tively foreclose the designation of a wild, scenic, or recreational
river segment, the President has directed the agency to consult
with HCRS" (now the National Park Service), but the Memoran-
dum went on to note that the President's directive does not pro-
hibit such action after the consultation and after "studying, de-
veloping and describing all reasonable alternatives". My staff has
mét with and corresponded with the National Park Service about
this project on several occasions going back to 1983. Alternatives
to the project which would not conflict with Ware Creek's Inven-
tory status have been extensively investigated in the Draft and
Final EIS's and have found to be unreasonable.

COMMENT: The project's most severe impact would be due to
the diminished freshwater flows, causing significant impacts on
the existing tidal freshwater wetlands.

RESPONSE: I do not agree that this is necessarily the most
severe impact, however this will occur. There will be no loss in
wetland acreage due to diminished freshwater flows, though, and
there is no reason to believe that the assemblage of wetland plant
species which will replace the existing species will be any less
valuable.

COMMENT: Mitigativn of anadromous fish habitat in the
Yarmouth Creek watershed (Cranstons Pond) will not make up
for the loss of such habitat in Ware Creek as far as listing on the
Nationwide Rivers Inventory, even though both Ware Creek and
Yarmouth Creek are listed on the Inventory and the mitigation
may allow for future expansion of the Yarmouth Creek Nation-
wide Rivers Inventory segment.

RESPONSE: This is the Park Service's interpretation of Coun-
cil of Environmental Quality guidelines. Since the Park Service
manages the Inventory, it is up to them to make such determina-
tions. I find this to be a rather narrow interpretation, though,
especially given that Ware Creek is only potential habitat for

Ac21

anadromous fish while Yarmouth Creek is a known anadromous
fish stream. This is also inconsistent with an earlier recommen-
dation from the Park Service that "the Corps develop a method
to permanently conserve another stream or river reach similar in
quality and size to the Ware to compensate for the adverse effects
of the project" (July 29, 1983 letter from J. Glenn Eugster (NPS)
to Karen Mayne (FWS)). As a factor in my public interest review,
I believe that this mitigation for anadromous fish habitat will more
than make up for the potential loss.

COMMENT: There is insufficient information in the FEIS for
the Park Service to determine whether the 3 dam alternative
would foreclose further consideration of Ware Creek as a poten-
tial National Wild and Scenic River.

RESPONSE: As noted in the FEIS on pages 5-35 and 5-36, the
Park Service indicated in 1986 that the 3 dam alternative would
cause the delisting of Ware Creek, and in June 1987 they indi-
cated that the 3 dam alternative would not cause delisting. In this
(November 12, 1987) letter the Park Service indicates that they
do not have enough information to make a determination, so I am
uncertain of the Park Service's position on this alternative. Such
vacillation on the part of a Federal commenting agency is very
frustrating. If the Park Service needed more information, they
had several opportunities to ask for it and did not.

By letter dated November 30, 1987, the Commonwealth of
Virginia, acting through the Virginia Council on the Environment
commented on the FEIS. The Council's comments are addressed
below:

COMMENT: The mitigation plan does not completely make up
for the loss of wetlands and the large net wetland loss would,
therefore, work against Virginia's Chesapeake Bay restoration
efforts.

Ac22

RESPONSE: Refer to responses to EPA and NMFS comments
(above) on mitigation. These wetlands perform many functions
and the simple comparison of existing wetland acreage with post-
project wetland acreage overlooks some important factors. The
existing wetlands will not be replaced with shopping centers or
housing developments; the reservoir itself will create over 1200
acres of new fish and wildlife habitat. As the HEP analysis shows,
some existing species will gain habitat from reservoir construc-
tion while other species will lose habitat. In terms of water qual-
ity, the reservoir will act as a very efficient sediment and nutri-
ent trap, similar to that function presently performed by the ex-
isting wetlands. True, the reservoir will also trap most of the
detritus produced by the wetlands created within and upstream
of the reservoir, but those wetlands which currently exist up-
stream of Richardsons Millpond are already cut off from this
detrital contribution. The creation of the new wetlands down-
stream and the breaching of Cranstons Pond will also create
additional detrital contributions. The Cranstons Pond mitigation
will not directly benefit the York River estuary, but both the York
and the James flow into the Chesapeake Bay, so the Bay would
still receive this benefit. If the Commonwealth is convinced that
the project would seriously hinder its ongoing efforts to restore
the water quality of the Chesapeake Bay, it can act through the
State Water Control Board to deny the required 401 Water
Quality Certificate. I do not feel, though, that this project would
be inimical to the goal of restoring a cleaner Chesapeake Bay, for
the reasons stated above.

COMMENT: This project is preferable to the 3 dam alternative,
groundwater, and desalinization in terms of meeting the County's
future water needs.

RESPONSE: Concur.

COMMENT: The project's effects on downstream oyster beds
have been adequately addressed and mitigated.

Ac23

RESPONSE: Concur.

COMMENT: The permit decision should be postponed to al-
low for discussions of interjurisdictional sharing of the project
benefits, more regional wetland mitigation, combination of this
project with other water sources, acquisition of wetland areas for
future protection, and expansion of such recreational opportu-
nities as pedestrian trails.

COMMENT: On March 30, 1987, my predecessor, Colonel
Claude D. Boyd, met with Virginia Secretary of Natural Re-
sources John Daniel and EPA Region III Administrator James
Seif to discuss Virginia's role in regional water supply planning
and development. At that meeting, Secretary Daniel explained
that the State could not take a more active role without direction
and approval by the General Assembly, which has not been forth-
coming. A meeting was held at Norfolk District on November 19,
1987 with the Corps, FWS, EPA, and NMFS to discuss regional
alternatives. I agreed to withhold my decision pending investiga-
tions which I required of James City County into raising of the
normal pool elevation of the reservoir. There was no agreement
among the agencies involved in this November meeting as to
what other additional study was needed or desirable. In the in-
terim, James City County has approached the City of Newport
News about the possibility of an interconnection between this
project and the rest of the existing Newport News water system.
Combining this project with other sources of water remains a
possibility, but it is unreasonable to withhold a decision further
while the extensive informational requirements are met (see, for
instance, the additional information the FWS indicates in its
November 25, 1987 letter would be necessary). I believe that the
reservoir as it is described in the Final EIS will provide recre-
ational opportunities greatly in excess of what is currently avail-
able. Additional items such as pedestrian trails should be dis-
cussed between the County and the State.

A-24

By letter dated December 7, 1987, the Virginia Department of
Game and Inland Fisheries commented on the FEIS. The Depart-
ment notes that it supports the comments contained in the No-
vember 30, 1987 letter from the Virginia Council on the Environ-
ment; finding the environmental impacts of the project unaccept-
abie, asking that a permit be withheld until a regional solution can
be reached, and recommending 1:1 replacement of habitat. I ac-
knowledge the Department's comments, but for the reasons I
have given in my responses to the Council's letter and others, I
cannot concur.

By letter dated November 9, 1987, the Virginia Department of
Transportation comm :nted on the FEIS. The Department indi-
cated that not all of its previous concerns have been completely
addressed and informed me that all work affecting roads and
highways must be coordinated with and approved by the Depart-
ment and/or the Federal Highway Administration. I acknowledge
the Department's comments and I am willing to include this
coordination and approval as a condition of a Corps permit.

By letter dated November 21, 1987, the Chesapeake Bay Foun-
dation commented on the FEIS and included several objections
to the proposed project. Many of their comments were similar or
identical to those of EPA, FWS, and/or NMFS, which are ad-
dressed above. Those which are original or require an additional
response are discussed below.

COMMENT: The Foundation commented on the Draft EIS
that additional discussion should be given to groundwater and
reverse osmosis, but they find the treatment given in the Final EIS

is still inadequate.

RESPONSE: This is why it is so important for comments on a
Draft EIS to be specific. The final EIS did, indeed, expand the

Ac25

discussions of these two alternatives. I find the fact that the
Foundation is still not satisfied to be a reflection of the general-
ized nature of the original comments (page 5-65 of the FEIS).

COMMENT: Combinations of several of the alternatives which
were considered individually should have been investigated.

RESPONSE: Certain combinations were analyzed in the FEIS.
Consideration of every conceivable permutation and combination
of the individual alternatives would be an unreasonable and,
perhaps, impossible task.

COMMENT: There is no mention of wetland acreage currently
surrounding Cranstons Pond which would be lost due to its
breaching.

RESPONSE: There exist only small, isolated pockets of wet-
lands around the perimeter of the Pond, due to its stee,» sides.
Virtually all of the wetlands upstream of the dam to be breached
are upstream of the Pond and would not be adversely affected.

COMMENT: The downstream mitigation areas will become
brackish marshes; not freshwater marshes.

RESPONSE: Concur, assuming the VIMS modelling effort is
accurate. There is no evidence that such areas have lower func-
tional values.

«° MMENT: Ifthe accumulated sediment will be periodically
removed from the headwater impoundments, they will lose much
of their habitat value.

RESPONSE: Vehicular access to these areas several years af-
ter reservoir construction will be excremely difficult or impos-
sible. For this reason, the HEP analysis assumed that these areas
would eventually fill with sediment (over the 50 year planning

A-26

period) but would remain wetlands because of continued upland
drainage and saturated soils.

By letter dated November 23, 1987, the Southern Environmental
Law Center commented on the FEIS. Some of their comments were
similar to those of EPA, FWS, NMFS, and/or the Chesapeake Bay
Foundation, which are addressed above. Those which are original
or require an additional response are discussed below.

COMMENT: The project would significantly degrade the wa-
ters of the United States and, therefore, would be contrary to the
404 (b) (1) Guidelines.

RESPONSE: As explained in my 404 (b) (1) analysis, this
project, with the proposed mitigation complies with these Guide-
lines. I recognize, as indicated by the Center, that FWS has clas-
sified these wetlands as Resource Category I, but this has noth-
ing to do with the Guidelines. Notwithstanding the FWS mitiga-
tion policy, my 404 (b) (1) analysis shows that this project would
adequately mitigate for the lost functional values of these wet-
lands so as not to cause a significant degradation of the waters
of the United States. As discussed in the responses to the Na-
tional Park Service comments, above, the loss of Nationwide
Rivers Inveniory status for Ware Creek (for largely technical
reasons) would not significantly diminish the values which led to
that status.

COMMENT: The 3 dam alternative would be less damaging
and must, therefore, be selected over the Site V alternative.

RESPONSE: The 404 (b) (1) Guidelines (which the Center
references as requiring a less damaging alternative to be selected)
specify that such an alternative be both less damaging as well as
practicable. As stated above, the ratio of the 3 dam's yield to the
acres of wetland flooded is identical to the ratio for the Site V al-

A-27

eS ee eee a

peel tine deer ae
SE RN AST eS ae oe aa

ternative, so as far as wetlands are concerned, the 3 dam alterna-
tive is not less damaging unless the difference in yield can be made
up with another less damaging unless the difference in yield can
be made up with another less damaging alternative. Simply mak-
ing up the difference in yields between these two alternatives with
an increment of groundwater does not make for a realistic com-
parison, considering the remainder of the unmet 2030 regional
need (and it is the regional need that the Center agrees must be
considered). Site V, all safely available groundwater, as well as
an additional 20 mgd source would be needed to meet that re-
gional need. All other alternatives to make up this 20 mgd short-
fall have been shown to be either not practicable or more dam-
aging than Site V. Unless a practicable, acceptable regional al-
ternative or combination of alternatives can be identified to sat-
isfy the entire 40 mgd deficit, it must be assumed that the incre-
ment of additional safe yield necessary to make up the difference
between the 3 dam yield and the Site V yield would have to come
from a source which would be more damaging than Site V.

On November 24 and 25, 1987, James City County submitted its
comments on the FEIS and its views concerning the comments
of the projects opponents. Attached to these submittals were a
groundwater assessment prepared by a consultant to the County,
a feasibility study of reverse osmosis prepared by another con-
sultant to the County, and an update of the county's latest Mas-
ter Water Plan. For the most part I concur with the County's
comments and they are reflective of several of my own, as out-
lined above. For that reason I do not intend to repeat them here.
I find that the County's submittals concerning groundwater and
reverse Osmosis tend to support my own independent findings
that these are not feasible alternatives to the County. I did not
verify them, though, since I did not rely on them in reaching my
own findings. In its comments, the County contends that its
mitigation plan provided 1:1 mitigation for wetland acreage and
functional values which would be lost. For reasons explained in

A-28

my FEIS and elsewhere in this Record, I do not believe that all
of this mitigation will be successful and I did not count on it in
my evaluation. This is a judgement which cannot be verified for
several years, and if the County is correct in its contentions, so
much the better.

Other letters supporting the Site V reservoir project were re-
ceived from several cities (Hampton, Newport News, Norfolk,
Poquoson, Richmond, Suffolk, and Williamsburg), counties
(Charles City, Chesterfield, Gloucester, Hanover, Henrico, King
William, and New Kent), elected officials (State Senator William
E. Fears, Delegate George W. Grayson), organizations
(Appomattox River Water Authority, Hampton Roads Sanitation
District, Hampton Roads Water Quality Agency, James City
Ruritan Club, James River Basin Association, Peninsula Planning
District Commission, Richmond Regional Planning District
Commission, Virginia Peninsula Economic Development Coun-
cil, and Williamsburg Chamber of Commerce), and individuals
and corporations (Royal E. Bowyer, Delmarva Properties, Incor-
porated). Most consisted only of statements of support, and the
remainder either supported my responses to certain of the ad-
verse comments addressed above, or pointed out errors or inac-
curacies in the FEIS of a technical or editorial nature which do
not affect the permit decision. I accept these comments as evi-
dence of considerable public support from not only the areas
which would directly benefit directly from the project, but also
from other municipalities and organizations which have experi-
ence and technical expertise in dealing with water supply issues.

11 July 88 4s/ J. J. Thomas
Date J. J. Thomas
Colonel, U.S. Army
District Engineer

Ac29

APPENDIX B

UNITED STATES ARMY CORPS OF ENGINEERS
JULY 11, 1988

This analysis is made pursuant to the 404 (b) (1) Guidelines (40
CFR 230) as printed in the Wednesday, December 24, 1980

Federal Register.

teristics of the Aquatic Ecosystem: The project would convert
approximately 1217 acres of wetlands, upland forest, and exist-
ing lake habitat into a water supply reservoir. Current patterns
will change and result in the reservoir trapping more sediment and
probably more nutrients than the current system. This will dimin-
ish downstream turbidity somewhat, although the existing wet-
land system normally does a good job of sediment trapping also.
The downstream sections of Ware Creek will become more sa-
line on average, although the range of extremes will not be
changed. The reservoir will probably be upper mesotrophic-to-
eutrophic. The existing benthic community will change and that
part of the reservoir bottom below the photic zone will not sup-
port vegetation. Periodic water level fluctuations within the res-
ervoir will expose some denuded slopes. Existing water levels
fluctuate seasonally (in nontidal areas) and daily (in tidal areas).
The total aerial extent of the Ware Creek aquatic ecosystem will
increase by almost 800 acres.

Acuatic Retain: No desancnd or codanaeael species will rat
adversely affected by this project. Finfish habitat will be greatly
expanded and improved (freshwater fish, represented in the U.S.
Fish and Wildlife Service's Habitat Evaluation Procedures (HEP)

Bl

analysis by largemouth bass, would have their habitat increased
by 900 average annual habitat units (AAHU's), while estuarine
fish, represented by juvenile spot, would have their habitat re-
duced by less than one average annual habitat unit). The degree
of eutrophication expected would not have an adverse effect on
fish habitat within the lake, based on other water supply reser-
voirs in the area. Of other wildlife associated with aquatic eco-
systems, the HEP analysis predicted the following: pileated
woodpecker habitat increased by 142 AAHU's, grey squirrel
habitat decreased by 81 AAHU's, American woodcock habitat
decreased by 1141 AAHU's, beaver habitat increased by 316
AAHU's, wood duck habitat decreased by 150 AAHU's, yellow
warbler habitat increased by 3 AAHU's, and red-winged black-
bird habitat decreased by 39 AAHU's. The entire HEP is found
in Appendix A of the Final EIS and is ciiscussed in Section 4 of
that document. Downstream wetland vegetation will experience
a change in species composition, due to higher average salinities.
This is also discussed in Section 4 of the FEIS. Shellfish were not
included in the HEP analysis, but there will be no expected ad-
verse impact on shellfish downstream in Ware Creek except for
possible increased turbidity during construction. The lower parts
of Ware Creek and the adjacent York River are turbid, and the
shellfish which inhabit these areas are presumably adapted to
these conditions.

: i : The
project would flood 381 acres of vegetated wetlands and up to
44 acres of vegetated shallows (the percentage of the shallows
actually vegetated with rooted aquatic vegetation was never
measured). Some of this acreage will be mitigated (see Subpart
H, beiorv). The contribution of these special aquatic sites will for
the most part be lost to the downstream environment with regard
to detrital production and wildlife habitat, although the wetlands
and vegetated shallows upstream of the existing Richardson
Millpond dam are already sequestered in this way. The water
quality functio «s of these special aquatic sites, in terms of sedi-

B-2

ment trapping and nutrient retention, will continue to be per-
formed by the proposed reservoir. The erosion protection pro-
vided by the wetlands will be mostly lost, although sediment will
be trapped within the reservoir, as noted above. Flood protection
is not a significant function in this case, since flooding in this area
is almost entirely tidal flooding, and downstream development is
sparse. Bre2ching the dam at Cranstons Pond will recreate the
direct detrital input connection of the hundreds of acres of wet-
lands currently upstream of that dam, but this will benefit the
Yarmouth/James system and not the Ware/York system.

iba will ll provide a safe yield of 9. 43 million raises per ibdhay
(mgd), which will meet practically all of the County's projected
2030 water supply deficit of 10.6 mgd, and will represent ap-
proximately 1/4 of the region's 2030 deficit of 40 mgd. Water-
related recreation2! opportunities will be enhanced. The reservoir
will be surrounded by a buffer strip in which development would
not be allowed. The aesthetic impact of the reservoir relative to
the existing conditions will vary from individual to individual,
although the number of people visiting the reservoir will probably
greatly exceed the number who visit the existing site. Ware Creek
is presently listed on the Nationwide Rivers Inventory, meaning
that it is a potential candidate for inclusion in the National Wild
and Scenic Rivers System. According to the National Park Ser-
vice, this project would have the effect of removing Ware Creek
from further consideration. Rivers on the Nationwide Rivers
Inventory, of which there are approximately 90 in Virginia, have
no legal status or protection until and unless they become listed
as part of the National Wild and Scenic Rivers System. To date
none of the Inventory waterways in Virginia has ever been el-
evated to the System. There are currently no ongoing efforts to
raise Ware Creek from the Inventory to the System. The
President's directive on Nationwide Inventory waterways does
not prohibit actions which would cause a waterway to be delisted,
provided the action agency has gone through consultation with

B3

the National Park Service and after "studying, developing and
describing all reasonable alternatives". Both have been done in
this case.

Subpart G: Evaluation and Testing: The discharge material will
consist of native material or material which will be chemically and
ph > lly i t ( . )). No t ti is . i j tl . t

3 inimi tse Effects: Many alterna-
tives to this et were cuainenedl in the FEIS, including alter-
native dam configurations within the Ware Creek watershed,
several site alternatives outside the watershed, alternatives in-
volving nonreservoir and nonsurface sources of water, and tech-
nologically innovative alternatives. A guaranteed minimum fresh-
water release will help minimize downstream effects. Preserva-
tion of a buffer strip around the reservoir and adoption of restric-
tive zoning within the watershed will help to minimize adverse
water quality effects of future human development within the
watershed. Breaching the Cranstons Pond dam will mitigate any
adverse effects this project may have on anadromous fish. The
Cranstons Pond will also reestablish a direct connection of hun-
dreds of acres of upstream wetlands to the downstream estuary
as well as create new wetlands in the bottom of that existing
pond. Wetland mitigation within the Ware Creek watershed will
occur both within and downstream of the reservoir by grading
upland areas, constructing small checkdams, and planting areas
with wetland species. The wetland mitigation will not recreate an
equivalent acreage to that lost by flooding the reservoir, however.
Additional minimizing and mitigating measures are described in
Sections 2 and 4 of the FEIS.

Subpart B: Compliance With the Guidelines: Viewed narrowly,

as a reservoir, this project would have to be considered water
dependent. Since the basic purpose is to provide water to the
citizens of James City County, though, and since at least some of
the water currently utilized comes from groundwater, water

supply in general is not dependent on a discharge into waters of
the United States. The "rebuttable presumption" that other alter-
natives exist which do not involve discharges into waters of the
United States has been completely satisfied, though. In every
case, there has been a clear and explicit showing in the FEIS or
the Record of Decision that all other alternatives are either not
practicable or are more environmentally harmful than the pro-
posed discharge/project. Since this project has significant impli-
cations both locally and regionally, both local and regional alter-
natives were investigated in the FEIS. Additionally, in 1984 the
Norfolk District completed an extensive Congressionally-man-
dated study of regional alternatives (Water Supply Study Hamp-
ton Roads Virginia) and in 1987 the Commonwealth of Virginia
completed its own comprehensive study of statewide water sup-
plies and needs, including the James Water Supply Play which
covered the James City County/Peninsula area. It is noteworthy
that the water supply problems in this area have been studied so
extensively and independently at the Local, State, and Federal
levels. Both the FEIS and the Water Supply Study were exten-
sively coordinated with Federal advisory agencies, including the
Environmental Protection Agency, the U.S. Fish and Wildlife
Service, and the National Marine Fisheries Service. The Water
Supply Study determined the 2030 regional deficit as being 40
mgd and, of the three principal regional alternatives given de-
tailed reviews, only the James River pipeline alternative was rated
by the aforementioned Federal agencies as being environmentally
acceptable. However, at the minimum instream flows specified
by these agencies, the yield of this alternative would be reduced
from 40 mgd to 11 mgd, rendering it a non-practicable regional
alternative. The James Water Supply Plan substantiated a re-
gional 2030 deficit projection of 40 mgd (35 mgd with conser-
vation) and identified a similar range of regional alternatives as
the Water Supply Study, but included a 10 mgd increment of
groundwater; the maximum considered safe to avoid significant
degradation of regional groundwater supplies. Since the James
River pipeline alternative could not supply a 30 mgd increment

B5

(under the recommended minimum instream flows), this would
still be a non-practicable regional alternative. These alternatives
were also analyzed in this FEIS, and the U.S. Fish and Wildlife
Service recommended a higher set of minimum instream flows for
the James River pipeline alternative, which would raise the safe
yield of this alternative from 11 to 13-14 mgd, but the National
Marine Fisheries Service is still on record as advocating a higher
minimum flow. Even 13-14 mgd is not sufficient to constitute a
practicable regional alternative. No agency, organization, or
individual has ever provided the Corps with any evidence that any
regional alternative(s) would be both practicable and environ-
mentally less damaging than the proposed project. The County
has recently contacted the City of Newport News and offered to
connect the Site V reservoir to a Newport News existing raw
water pipeline which runs nearby. Connecting the Site V reser-
voir to the overall Peninsula water supply system could have a
synergistic, as opposed to additive, effect on the regional safe
yield, since it could allow water throughout the system to be
stored and utilized in a more efficient manner than having mul-

tiple reservoirs operating independently.

With regard to local alternatives, many were discussed in the
Draft and Final EIS's, including reservoirs in other basins in James
City County, other reservoir locations and configurations within
the Ware Creek basin, limiting growth, groundwater, conserva-
tion, purchase from other raw or treated water suppliers, desalin-
ization, and wastewater reuse. The James River pipeline alterna-
tive mentioned above could provide sufficient water so as to
constitute a local alternative if the County could arrange to uti-
lize Newport News’ system of reservoirs to store the water from
the pipeline for use during times of low river flows (an arrange-
ment which, without Newport News' assistance and approval,
would be impossible to achieve). In response to this FEIS the City
sion strongly opposed the pipeline alternative. In addition to
stating that the FWS's analysis of this alternative (Appendix D of

B6

the FEIS) significantly underestimated both the project's costs
and Richmond's water demands, and overlooked Richmond's
legal rights to 645 cfs of river flow as a separate item when fig-
uring minimum flow requirements, the City and the Commission
maintain that diverting James River water from above Richmond
to the Peninsula would be an illegal interbasin transfer. Construc-
tion costs would be 3-4 times greater than the Ware Creek alter-
native and James City County would have to obtain agreements
from the other political jurisdictions along the pipeline route.
Even if the potentially significant legal barriers to this alternative
are disregarded, the need for a complex contractual arrangement
with Newport News, the strength of Richmond-area opposition,
and the extra cost combine to make this an impracticable local
alternative, although it has possible technical feasibility. Of the
other out-of-basin reservoir sites, all would either involve signifi-
cant adverse environmental impacts or are much too small to
supply the water needed to fulfill the basic project need. The FEIS

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---