# Transcript of Record — United States v. United Engineering & Contracting Co.

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386002_0322%3A1

## Record

- **Collection:** Supreme Court brief
- **Document type:** Transcript of Record
- **Published:** January 1, 1914
- **Citation:** 234 U.S. 236

## Text

_TRANSCRIPI OF RECORD.

SUPREME COURT OF THE UNITED STATES.
| Ooronan Tere, leas

a No. gat. £81.
3 THE UNITED STATES, APPELLANT,

va.

THE UNITED ENGINEERING AND CONTRACTING
COMPANY.

APPEAL FROM THE COURT OF CLAIMS,

FED NOVEMBER 22, 1919.

- @3aa7)

j
x
> t
yt ti Sy
ar. 7
,

i, ? ae ,
4 y
* Marl % i

: ; * . %
*) - ,
eS he
\ ¢

oe

SUPREME COURT OF THE UNITED STATES.

OcTOBER TERM, 1912.

No. 852.
THE UNITED STATES, APPELLANT,
Vs.

THE UNITED ENGINEERING AND CONTRACTING
COMPANY.

APPEAL PROM THE COURT OF CLAIMS.

INDEX. Original. Print.

No a wah ese ew eas ae eN ches MOR ENE ROR SOE EN ER RIERS AUS |
Appendix to petition............... 502 e eee eens 13
Exhibit A.--Contract No. 876, September 15, 1900...............-- 13
B.—Agreement No, 876-A, January 21, 1901.............-. 40

©. Supplemental Agreement No. 876-B, February 16, 1908. 44

DD. Supplemental Agreement No. 876-C, March 7, 1903... 46

NR Be, cc aK GS RNKESDECREN TS CREDA DRC EEA RASS RASS aN 53
Argument and submission... ..... 2... 2.02.2. eee ee eee neces 54
PRN OE ORE Sink ac cs nena cn enatunesscantencsecentsnectaees 55
INE NE ck eis yak ec kw odes 4k ce yee sha Nawe sy howe KEREAS SESE SS 61
PRIOR ccpadeatns sac5lsakbaN soni se hier sche aso eann cheeky bree yecke 61
eS EES PELE TET COCT TE TETAS TE ee CER Ch 78
Motion to amend findings and for a new trial............-.------------ 79
rr Ps Oh CNN, oo ac ccc ac ncbane sen sbevs sve eaeenSaksneceee 84
Application for appeal........ 2... 2... ec ence e eee e teen eee eee eeecs &5
Clerk’s certificate. ........... GES eOCuL RSNA ENGRAEREEARAMS AC EMR OMS RES 86

N3533—13——1 I

> = age

UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO. 1
1 I.—Petition.
Filed December 9, 1907.
In the Court of Claims of the United States.
Tue Uniren ENGINEERING AND Conrractine Company, ,
claiment.

oR.
Tue Unirep Srates.

No. 30072.

To the honorable the judges of the United States Court of Claims:

The petition of The United Engineering and Contracting Com-
pany. a corporation, respectfully shows as follows:

I. Your petitioner is a corporation, duly created and existing
under the laws of the State of New York, for the purpose of carry-
ing on a general engineering, construction, and contracting business,
and has its principal office and place of business in the city and State
of New York. Your petitioner has at all times borne true faith and
allegiance to the Government of the United States, and has not in any
way aided or abetted or given encouragement to rebellion against the
said Government.

II. That on or about the 15th day of September, 1900, vour peti-
tioner entered into and executed a contract in writing with the
United States, which was represented in the making and execution
thereof by Mordecai T. Endicott, Chief of the Bureau of Yards and
Docks, Navy Department, acting under the direction of the Secretary

of the Navy, in and by which it agreed, for the sum of seventy-
2 nine thousand four hundred and_ thirty-five dollars ($79,-

435.00) to furnish all necessary materials, labor, tools, and
appliances for the construction and completion, in all respects, of a
pumping plant for dry dock numbered three (3) at the United States
navy vard, in the city and State of New York, in accordance with
and subject to the conditions and requirements of the plans and
specifications attached to and forming a part of said contract. Said
contract was known as No, 876, and a true copy thereof is hereto
attached, marked * Exhibit A.” and is hereby referred to and made a
part hereof.

IIT. That subsequently and on or about January 21, 1901, your
petitioner entered into and executed with the United States, which
was represented in the making and execution thereof by Mordecai
T. Endicott. Chief of the Bureau of Yards and Docks, Navy Depart-
ment, acting under the direction of the Secretary of the Navy, a
further and supplemental contract, in writing, in and by which it
agreed, for the additional compensation therein stipulated of forty-
two thousand eight hundred and eighty-five dollars ($42,885.00), to
make certain changes and alterations in the work which it was called
upon to perform and the materials which it was called upon to
furnish under the provisions of said original contract No. 876. Said

2 UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO,

supplemental contract was numbered 876-A. and a true copy thereof
is hereto attached. marked * Exhibit B.” and is hereby referred to
and made a part hereof.

IV. That subsequently and on or about February 16, 1903, your
petitioner entered into and executed with the United States. which
Was represented in the making and execution thereof by Mordecai
T. Endicott, Chief of the Bureau of Yards and Docks, Navy —
ment, acting under the direction of the Secretary of the Nay y.2
further and second supplemental contract. in writing. in and by
which it agreed, for the additional compensation therein stipulated

of nine hundred and fifty-nine dollars and eighty cents
3 ($959.80). to furnish all of the material and labor for and to

construct three (3) hatches in the roof of the pump well being
constructed under said original contract No. S76. in accordance with
specifications and plans attached to said second supplemental con-
tract and forming a part thereof. Said second supplemental contract
was No, 876-B. and a true copy thereof is hereto attached, marked
* Exhibit C.” and is hereby referred to and made a part hereof.

V. That subsequently and on or about the 7th day of March, 1903,
your petitioner entered into and executed with the United States,
which was represented in the making and execution thereof by
Mordecai T. Endicott, Chief of the Bureau of Yards and Docks,
Navy Department, acting under the direction of the Secretary of the
Navy, a further and third supplemental contract in writing. in and
by which it agreed, for the additional compensation therein stipu-
lated of six thousand seven hundred and eight dollars and five cents
($6,708.05), to modify the work being done under said original con-
tract No. 876 as indicated and illustrated by a copy of the report of
the board and plans attached to said third supplemental contract
and forming a part thereof. Said third supplemental contract was
No. 876-C, and a true copy thereto is hereto attached, marked
“Exhibit D,” and is hereby referred to and made a part hereof.

Your petitioner avers that it fully and completely performed, in
accordance with the provisions of all of the aforesaid contracts and
the specifications and plans forming a part thereof, said pumping
plant, and said plant was duly accepted by the defendant. acting
therein through its duly authorized officers and agents in charge of
said work; whereupon your petitioner became entitled to the amount
of compensation fixed and agreed upon in and by the aforesaid
contracts, to wit. the total sum of one hundred and twenty-nine
thousand nine hundred and eighty-seven dollars and eighty-five

cents ($129,987.85); but your petitioner avers that it has been
q paid at various times between the date when said original con-

tract No. 876 was executed up to and including the 10th day of
August, 1906, when the last payment was made, only the sum of one
hundred and twenty-three thousand nine hundred and eighty-seven
dollars and eighty-five cents (123.987.85) for the work done and
materials furnished under said contracts. and the sum of six thou-

_

UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO. 3

sand dollars ($6,000.00) was then and ever since has been withheld
from your petitioner by the defendant, acting through its duly
authorized officers and agents, as a penalty improperly imposed by
the officers and agents of the defendant for two hundred and forty
(240) days of alleged delay in the completion of said pumping
plant, at the rate of twenty-five dollars ($25.00) per day.

And your petitioner avers that after the execution of the supple-
mental contract No. 876-A, which extended the time for the comple-
tion of said pumping plant, which had been fixed by the original
contract. both your petitioner and the officers and agents of the
defendant in charge of said work found that, owing to the many
changes. alterations. and modifications that had been made and were
necessary to be made in the plans for the construction of said plant,
no date of completion could be fixed or determined upon in advance,
and in the supplemental contracts No. 876-B and 876-C, which
were thereafter executed. the date of completion which had thereto-
fore been fixed was ignored and waived and no further formal
extension of time for completion was mentioned.

This petitioner further avers that whatever delay there may have
been in the completion of the work was due primarily to the experi-
mental and impractical character of the design, to the mistaken
location of the pumping plant, to errors made in the plans and speci-
fications therefor prepared by the officers and agents of the de-
fendant, and to the interruption and interference with this peti-
tioner’s work caused by the defendant using said dock, in which
said pumping plant was being constructed, while said work was in

progress.
5 Wherefore your petitioner claims that there is still due to
it by the defendant and that it is entitled to recover from the
United States the sum of six thousand dollars ($6,000.00) on account
of the work done and material furnished under the previsions of the
contracts hereinbefore set forth.

VII. Your petitioner further avers that during the progress of
said work the officers and agents of the defandant in charge and
control thereof, in addition to the work and materials called for by
the aforesaid contracts, ordered and required your petitioner to fur-
nish the work and materials ‘temized below in order to make altera-
tions in and additions to said pumping plant which were not speci-
fied in nor contemplated by the aforesaid contracts and the plans
and specifications forming a part thereof, but which alterations and
additions were deemed necessary and essential by the officers and
agents of the defendant in charge of said work to cure errors in their
original designs and to fit the plant for the purpose for which it was
intended; and this petitioner, pursuant to said orders, made such
alterations and additions, all of which were accepted by the defend-
ant, acting through its officers and agents authorized to accept the
same. and the defendant received and has ever since enjoyed the bene-
fit thereof.

4 UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO.

And this petitioner avers that said alterations and additions and
the fair and reasonalle value of the work and material necessarily
entering into the same are as follows, to wit.

1. For furnishing and setting. in or about June, 1902. one additional
sixteen-inch valve for by-pass between drainage pumps, in addi-
tion to the one called for by contract No. ST6-A_~_~-------__-- $442. 20
2. For furnishing and setting. on or about July 11, 1903, one sixteen-
inch Ludlow foot valve not called for by any of the afore-
said contracts. __. ~~~ en Ray SE et La 114. 40
6 3. For substituting in or about June. “1902, two new
forty-tive-inch Rensselaer valves to replace
two old Southwark valves with wedge gates. —-----_- $1. 385. 00
Less allowance agreed upon between petitioner and the
chief engineer in charge of said work for old valves_ 450. 00
—_———— $935. 00
4. For furnishing and fitting, in or about November, 1901, covers
or gear casing for valves to protect the men engaged in oper-
ating the same, which were not covered by the aforesaid con-
SSS a REE es Se ee art AS ee AE eae 479. 05
. For furnishing and placing in position during the months of May,
June, September, and October, 1902, piles to support pipes for
the connection to Dry Dock No. 2. and furnishing and placing of
hew piles to support the altur-bearers of Dry Dock No.3. in addi-
tion to the piling provided for in contract No. ST6-A__------~ 1,139.50
6. For furnishing. in or about September, 1902, materials and labor
for sheet piling to remedy a leak in the dock, which was not
contemplated or provided for in any of the aforesaid coutracts_ $25. 84
. For amount paid during the month of September. 1902, for addi-
tional compensation for night work of excavators. boiler-
makers, dock-builders, and other workmen employed in and
about said work in the construction of the new suction chamber,
being work net contemplated or called by the aforesaid con-
Gn eR A IE ARES Ppa mre ne rege eens eee 636. 44
8. For labor and materials furnished between the months of January
and June, 1903, in the reconstruction of the old suction cham-
ber, which work was not included in or provided for in any of

a

the aforesaid contracts..................... ——se
7 . For materials and labor furnished i in 1 Oc tober, 1904, in renew-
ing and putting in condition the electrical operating de-

vices on two valves in pits connected with Dry Dock No, 2_—- 21. 73

10. For making changes in designs of lubricating devices in May,

1944. caused by changes made in the pipe line by the engineers

in charge of SR SSR Gr a ER eet EE 11.02
11. For altering and modifying. during the month of November. 1M,

the system of operating electrical devices for opening and clos-

ing the valves_._---_--- OTT io a NN LL ES oes 91. 20
12. For labor and material furnished between October 1, i908. and

January 1, 1904, in supplying and installing prcoelt wiring, in

niddition to and different from that required by the afore-

I I ie arin ect cre ernie ee

2S Rd fe ee Ee | Se EET eee ae | ey

Wherefore your petitioner claims that an obligation arose upon
the part of the defendant to pay to it the sum of ten thousand six
hundred and thirty-eight dollars and seven cents ($10,638.07), the
fair and reasonable value of the work and material above itemized;
but your petitioner says that no payment has ever been made to it
by the defendant for or on account of any of said items, and it is
justly entitled to recover of the United States the total amount
thereof. to wit. the sum of ten thousand six hundred and thirty-eight
dollars and seven cents ($10,638.07).

ee

al

UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO. 5

VIII. Your petitioner further avers that during the progress of
said work upon said pumping plant the officers and agents of the
defendant in charge and control thereof, in addition to the work and
materials called for by the aforesaid contracts, ordered and required
your petitioner to furnish the following work and materials in order
to make certain repairs and alterations in and additions to said

pumping plant which were not specified in or contemplated by
8 the aforesaid contracts and the plans and specifications forming

a part thereof, but were made necessary by and grew out of
delays resulting from changes and modifications in the design and
location of said plant and by changes and alterations in the work and
materials which this petitioner was ‘alled upon to furnish under the
aforesaid contracts, and this petitioner was thereby subjected to great

loss and damage in the following particulars, to wit:
1. For labor and materiel] furnished during the months of October
and November, 14. to repair the volute of drainage pipe No.
1, which burst as the result of excessive pressure which the
officers and agents of the defendant had allowed to accumulate
in the water-supply system of the navy yard, to which your
petitioner had been ordered to connect its priming system --- $385. 00
2. For furnishing labor and materials on or about October T, 1904,
for a reducing valve to be placed in position in the priming
system to prevent a recurrence of the break last above men-
Py Ae a a gta eT) Fe cicreiuitaecieeeee 32. 72
3. For furnishing. on or about November 11. 1904, labor and mate-
rials to repair elbow on drainage pipe No. 2. broken on that
day as the result of excessive pressure in the priming system,
caused as described in item 1 ebove...---=-----=+---—-+--——-— 282. 25
4. For furnishing labor and material on or about February 3, 1%,
for a new valve and suction pipe in Dry Dock No. 3. which was
cracked by the freezing of water in Dry Dock Xo. 3. which had
been flooded by the officers and agents of the defendant in
charge thereof without notice to petitioner_----------------- 604. 00
. For labor and material furnished in and about May. 1904, to repair
and restore the pumps and pump shafts. which had become
rusted and damaged while waiting for the electrical machinery
to be placed in position, the installation of which was delayed
by the officers and agents of the defendant in charge of said
Sa cs ek oe tice vomcto ns nt ncmrina o 1, 560. 87
9 6. Cost of insurance upon the electrical machinery stored
in the yard during the aforesaid period of delay------ 217. 80
. Expenses of erector of electrical machinery in coming

qu

1

the same. which installation was postponed by delays

caused by the officers and agents of the defendant in

charge of sald work---------------------- $104. 66
Repairing motor to keep pump well free from water while

awaiting the decision of the officers and agents of the

defendant in charge of said work in regard to re-

pairing the bottom of the pumping Ce ie A 110, 15
Cost of renovating and restoring electrical apparatus after

it had become rusted and damaged by the long period

of storage in the yard, caused by the delay in the

work, occasioned by the officers and agents of the

defendant in charge of said work._----------------- 3. 841.98

4,056. 79
S. Cost of extra superintendence and for watchmen and for materials

and supplies required to keep the pump pit clear of water dur-

ing the long period of delay aforesaid and during the installa-

tion of the electrical machinery, which wits retarded by the

frequent docking of SEENON nnn enews enone sesweseenennnnn 9, 182. 66

Se en eae en acess _ 16,322. 09

6 UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO,

And your petitioner charges that the defendant has received the
benefit of all of said repairs, alterations, and additions and was and
is solely responsible for all the damages and additional ex-
10 penses to which this petitioner was subjected, as above item-
ized, whereby and by reason whereof an obligation arose upon
the part of the defendant to pay to it the reasonable value of said
repairs, alterations, and additions, and to reimburse said petitioner
for its said damages and additional expenses; but your petitioner
says that no payment has ever been made to it by the defendant for
or on account of any of said items and it is justly entitled to recover
of the United States the total amount thereof, to wit. the sum of
sixteen thousand three hundred and twenty-two dollars and nine
cents ($16,322.09).

IX. Your petitioner says that no assignment or transfer of its
aforesaid claim or any part thereof or interest therein has ever been
made, and your petitioner is entitled to the several amounts above
stated after allowance of all just credits and off-sets.

Wherefore your petitioner prays judgment against the United
States for the total sum of thirty-two thousand nine hundred and
sixty dollars and sixteen cents ($32,960.16).

Tue Unrrep ENGINEERING AND ContrractinG Company,
By Davin L. Hoven, President.

{Seal The United Engineering and Contracting Company, city
of New York, 1899. ]

Attest : Freperick Woo ey.

Secretary.

State or New York, City of New York, ss:
I, David L. Hough, being first duly sworn. do depose and say that
I am the president of the United Engineering and Contracting
Company, a corporation, which corporation is named as party claim-
ant in the foregoing petition. I have read the said petition and know
the contents thereof, and the facts therein stated are true to the best
of my knowledge, information, and belief.
Daviv L. Hoven.
11 Subscribed and sworn to before me this 27th day of Novem-
ber, A. D. 1907.
E. S. Rue,
Notary Public, 163, N. Y. County.

[Seal E. S. Rue, Notary Public, New York County.]
McKenney & FLannery,

Hibbs Building, Washington, D. C.,
Attorneys for Claimant.

(Endorsed :) Original. In the Court of Claims of the United
States. No.30072. The United Engineering and Contracting
Company, claimant, vs. The United States. Petition. The clerk will

UNITED STATES vs. U
please file.
Wayne MacVeagh. Frederic
nery, William Hitz, Hibbs
Washington, D. C.

The motion of claimant's at
printed petition filed Dee.
J. Ranxpo.pn,

Ass’t C1. C. C.

13 I1.—.1 pp ndia
CLAIMA
Contract No. 876, dated Se]
Engineering & Contracting

. of the Bureau of Yards
Filed December

Con

This contract. made

14
first part.

under the direction of the Sec
part.

Witnesseth. That for and
inafter specified the party
agrees to and with the party

First. That the said party
and deliver,
Yard. New York, N. Y., all t
appliances
pumping plant for dry dock
and will construct

Re oe OF ag ene

with. and subject to, all the c

NITED ENGINEERING AND CONTRACTING CO.

Filed Dec. 9, 1907.

10,

Filed Dec. 9. 1907.

and Docks.
ing plant for Dry Dock No.

and concluded
fifteenth day of September, A. D. 1900, by and bet»
Engineering and Contracting
with offices at 13-21 Park
itself, its successors. and legal representatives. party of the
and the United States, by Mordecai T. Endicott,
Chief of the Bureau of Yards and Docks.

of the first part hereby covenants

at its own risk and expense,
for the construction

and completely
calendar months from the date of this contract.

7

Court of Claims. Law offices of
D. McKenney, John Spalding Flan-
Building, 728 Fifteenth St. NW..

MEM.
torneys for leave to omit exhibits from

1907, was allowed Dec. 15, 1907.
By roe Court.

to Claimant's Petition.

nt’s EXxuIbit A.

tember 15, 1900, between the United
Co. and the United States, by the Chief
Navy Department. for pump-
3 at New York Yard.

9, 1907, Court of Claims.

tract No. 876.

at Washington, D. C.. this
en the United

mn of New York,
N. Y.. acting for

Company, a corpora’
2ow, New York,

Navy Department, acting
retary of the Navy, party of the second
payments here-

and

in consideration of the

of the second part as follows, viz:
of the first part will provide, furnish,
at the United States Navy
he necessary materials, labor, tools, and
and completion, in all respects. of a
numbered three (3) at said navy yard,
install the same within seven
in strict accordance
onditions and requirements of the plans

and specifications appended hereto and forming a part of this con-

8 UNITED STATES Vs. UNITED ENGINEERING AND CONTRACTING CO,

tract, for the sum of seventy-nine thousand four hundred and thirty-
five dollars (S79.435.00).

Second. The party of the first part further covenants and agrees
to forever protect and defend the party of the second part in the
full and free vse and enjoyment of any and all rights to any inven-
tion, machine, or device which may be applied as a part of the work
herein specified and contracted for, either in its construction or use
after completion, against the demands of all persons whomsoever.

Third. The party of the first part further agrees that if during
the progress of the work it shall be deemed, by the party of the
second part, necessary or desirable to make any changes or modifica-
tions in the said plans and specifications, affecting the cost of the
work to be done hereunder, said changes or modifications, and the
amount of the inereased or diminished compensation to be paid

the party of the first part in consequence thereof, shall be
15 stipulated and agreed to in writing by the parties to the con-
tract before the work contemplated by such changes or modi-
fications is begun: and such increased or diminished compensation
shall, when exceeding $300, be assessed by a board of naval officers
appointed for the purpose. and shall be based upon the actual cost.
And this contract further witnesseth,

Fourth. That the party of the second part, for and in considera- *

tion of the foregoing, and for and in consideration of the faithful
performance of this contract by the party of the first part. duly
certified to by the inspecting officer appointed for that purpose, and
the acceptance of the work as satisfactory on the part of the United
States, do hereby covenant and agree, to and with the party of the
first part, that there shall be paid to the said party of the first part,
for the full and entire completion of the said pumping plant. the
sum of seventy-nine thousand four hundred and thirty-five dollars
($79.435.00), upon approved bills certified and drawn in the usual
manner, and payable through such navy pay office as the party of
the first part may elect, within ten days after warrants for the same
shall have been passed by the Secretary of the Treasury. in the fol-
lowing manner, viz.. as provided in paragraph twenty-nine (29) of
the specifications aforesaid.

Fifth. It is mutually understood and agreed that no payment or
allowance to said party of the first part will or shall be made by the
United States for or on account of this contract, except those pay-
ments herein specified, and that, when not otherwise specifically pro-
vided, ten per cent. will be withheld from the amount of each of such
payments as security for the full completion and performance of the
covenants and agreements hereof by the said party of the first part,
and that the final payment made hereunder shall include the amounts
so withheld.

Sixth. It is further mutually and expressly covenanted and
16 agreed, and this contract is upon the express condition that
no Member of or Delegate to Congress, nor any officer of the

_————

UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING co. g

United States, naval, military, or civil, is. or shall be, admitted to
any share or part of this contract or to any benefit to arise therefrom ;
that any transfer of this contract, or of any interest therein, to any
person or party by the said party of the first part, shall annul this
contract so far as the United States are concerned ; that if said party
of the first part shall fail or neglect in any respect to perform this
contract or any part thereof as provided, it may at the option of the
United States be declared null and void, without prejudice to the
right of the United States to recover for defaults herein, or violations
hereof, and for such default the United States may demand and
recover of said party of the first part, as liquidated damages, a sum
of money equal to the penalty of the bond attached to and forming
a part of this contract.
In witness whereof the said parties hereto have hereunto set their
hands and seals the day and year first above written.
Tur Unrrep ExGixbertine AND ContractinG CoMPANY,
D. L. Hoven, President.
[Seal The United Engineering and Contracting Company, city of
New York, 189. |
Attest:
F. Woorry, -1ssf See.
Tue Unrrep States,
By Morpecat T. Expicorr.
Chief of Bureau of Yards and Docks,
Acting under the direction of the Secretary of the Navy.
Signed and sealed in the presence of—
Wa. M. Suiru,

As to M. T. E.
7 (Copy.)

H. Y. D.

The United Engineering & Contracting Company. Consulting & Con-
tracting Engineers, 1-21 Park Row.

New York, September ith, 1909.
Admiral Morvecar T. Expicott,
Chief of Bureon of Yards and Docks,
Navy Department, Washington, D.C.

Sin: We have the honor to refer to our proposal, made this day,
for providing and installing a pumping plant for Dry Dock No. 3
at the navy yard, New York, and to refer especially to paragraph No.
69 of that specification, under the terms of which we would say:

We propose to attain the end sought for by the method outlined
in a letter which we are informed is submitted to you by the General
Electric Company. or by the use of some modification of such
method as may be developed to be of equal or better ‘service (in ac-

Aine.
pe ete

10 UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO.

cordance with the views of your burean during the designing and
construction of the apparatus which we furnish), should we be
awarded the contract.
Very respectfully, your obedient servants,
Tur Unxeren Excineerine & Conrrverina Co.
D. lL. Hoven, President.

Sealed proposals endorsed “ Proposals for pumping plant ~ will be
received at the Burean of Yards and Docks, Navy Department,
Washington, until b o'clock September 8, 1900. and then and there
publicly opened, for providing and installing a pumping plant for
Dry Dock No. 3 at the navy yard, New York. For plans. specifica-

tions, and forms of proposal address “ Commandant, Navy Yard,
New York.”

Morpecar T. Expieorr,
Chief of Burean,
Angust 9, 1900, |

1s Specification No. LOST. for a pumping plant for Dry Dock

No. Sat the United States navy yard, New York, under appro
priation “ Navy yard. Brooklyn, N.Y... pumping plant, Dry Dock
No. 3.

Act approved June 7, 1900,
Cleneral conditions.

1. Intention. Tt is the declared and acknowledged intention and
meaning to provide and secure a complete and substantial pumping
plant, according to the general plans and specification, to the entire
satisfaction of the Chief of the Burean of Yards and Docks and
the civil engineer in charge. Any details omitted from either plans
or specification, or from both, the performance of which is necessary
to the construction, of which the civil engineer in charge shall be
the judge. shall be supplied by the contractor as though fully de-
seribed and shown, and withont additional expense to the Govern-
ment.

2. Contract The contract to cover the work to be done will be
based upon this specification, which will be attached to and form a
part thereof.

3. Omissions and misdeseriptions.. The omission from the contract,
or from the plans, specification, or other papers attached thereto and
forming a part thereof, or the misdescription of any details of work,
the proper performance of which is necessary to fully carry out the
intention above expressed, shall not operate to release the contractor
from performing such work, but the same shall be fully and properly
performed in the same manner as though fully and correctly shown,
described, and required in and by the contract, and withont expense
to the United States in addition to the contract price.

-—

UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO, 11

4. Diserepancies. Should any discrepancy exist between plans

and specification, or any parts of either, or should the

1 language of any part of the contract be ambiguous or doubt-

ful. the civil engineer or other officer or agent of the United

States in charge of the work chall decide as to the true intent and

meaning. subject only to appeal to the Chief of the Burean of Yards
and Docks.

5 Control of work. -The United States, hy its officer in charge of
the work or other authorized representative, shall at all times have
full control and direction of all werk under the contract, and all
questions, disprites, er differences as to any part or detail thereof
chall be decided: by such officer or representative, subject only to ap-
peal to the Chief of the Burean of Yards and Docks.

G. Faeilities. ‘The contractor will he allowed reasonable space at
the site of the work and access to the same for receiving, handling,
storing. and working material, but he shall confine both employees and
material to the space assigned. Upon the completion of the work,
and before final payment on accent of the same. the contractor shall
remove all of his surplus material machinery. tools, ete., from the
naval station.

4. Employees. “The contractor chall employ only competent, care-
ful. orderly persons upon the work, and if, at any time, it shall
appear to the officer in charge that any persen employed upon the
work is incompetent, careless, reckless, or disorderly, or dhisebevs or
evades orders or instructions, er shirks his duty, such person shall
be immediately discharged from and net again employed pen the
work.

& Time of commencement of work. The contractor shall com-
mence work immediately after the execution of the contract and
continue without interruption, unless otherwise directed by the
United States by its officer in charge of the work or other authorized
representative, or otherwise hereinafter provided.

0. Delays and suspensions. The United States reserves the right

to reasonably delay the commencement of the work, and to
20 suspend operations at any time and for any period. Should
such delay or suspension cause a change in the cost of the
work, such change shall be determined as provided in paragraph 17
of this specification.
10. Time of completion. The entire work shall be completed in
every respect and particular within seven calendar months from the
date of the contract.

11. Extension of time.—-Extension= of time for the completion of
the work can only be allowed and made, in writing, by the Chief of
the Bureau of Yards and Docks. Any and every extension of time
must be specifically made and shall not be implied from any cause
under any circumstances.

12. Damages for delay.—In case the work is not completed within
the time specified in the contract, or the time allowed by the Chief
of the Bureau of Yards and Docks under paragraph 11 of this speci-

12 UNITED STATES VS. UNITED ENGINEERING 4 ND CONTRACTING CO,

fication, it is distinctly understood and agreed that deductions at the
rate of $25 per day shall be made from the contract price for eacl
and every calendar day after and exclusive of the date within which
completion was required up to and including the date of completion
and acceptance of the work, said sum being specifically agreed upon
as the measure of damage to the United States by reason of delay
in the completion of the work; and the contractor shall agree and
consent that the contract price, reduced by the aggregate of damages
so deducted, shall be accepted in full satisfaction for all work done
under the contract.

13. Unavoidable delays.—Unavoidable delays are such as result
from causes which are undoubtedly, or may reasonably be presumed
to be, beyond the control of the contractor, such as acts of Providence,
unusual storms, fires (not the result of negligence), fortuitous events,
inevitable accidents, ete. Should the progress of the work be, or seem
likely to be, delayed at any time by such causes, the contractor shall

at once notify the officer in charge. in writing, of the occur-
21 rence, in order that a record of the same may be made. Should

it be decided that the delay was unavoidable, a corresponding
extension of time for the completion of the work may be allowed,
but it is distinctly understood that should the contractor fail or neg-
lect to notify the officer in charge as above provided, such omission
shall be construed as a waiver of all claim and right to an extension
of time for the completion of the work on account of such delay.

14. Avoidable delays.—Avoidable delays are such as result. from
causes which the contractor might, by care, prudence, or foresight,
have guarded against or prevented. Should the progress of the
work be delayed at any time by such causes, the contractor distinctly
and specifically agrees and consents that the amount of any and every
expense to the United States, caused by such delay, may be deducted
and withheld from any payment due or becoming due to him on
account of the work, and that the contract price, reduced by such
amount, shall be accepted by him as full compensation for the work
done under the contract.

15. Progress of work.—If at any time the progress of the work
shall, in the opinion of the officer in charge. appear to have been such
as to indicate that the work is not likely to be completed within the
time allowed, he shall report such opinion to the Chief of the Bureau
of Yards and Docks, who may, in his discretion, declare the contract
null and void, without prejudice to the right of the United States to
recover for defaults or violations thereof.

16. Annulment of contract.—Should the contract for any reason
be declared null and void, the contractor shall thereupon become
indebted to the United States as for ascertained and liquidated dam-
ages in a sum equal to the aggregate of all payments made to him
on account of the contract, and undertakes and promises to refund
the same to the United States on demand. And the contractor shall
further agree that the United States may hold all material delivered

and work done under the contract and all machinery, tools, ap-

a

- |

UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO. 13

22 pliances, ete., upon the site of the work or used in connection

therewith pending the completion of the work covered by the
contract. Upon the annulment of the contract, a board of officers,
or other representatives of the United States, shall be appointed,
which shall ascertain and determine the value of all material deliv-
ered and work done, including a fair and reasonable margin of
profit thereon, and upon the approval of the findings of said board
by the Chief of the Bureau of Yards and Docks, he may proceed to
complete the work according to the contract in such manner and by
such means as he may deem advisable, and may, in his discretion, use
or employ any material, tools, machinery, appliances, etc., belonging
to or furnished by the contractor for use in connection with the work
covered by the contract. Upon the completion of the work, should
the total cost thereof exceed the contract price, the difference shall
be charged to the contractor who undertakes and promises to pay
the same upon demand; and the contractor shall be entitled to receive
the amount found due by the board above mentioned, including any
10 per cent reservation from payments previously made, but no
allowance shall be made for profit which the contractor might have
made by completing the work, nor for any excess of the contract price
over the total cost of the work.

17. Changes.—The United States reserves the right to make such
reasonable changes in the contract, plan. or specification as may
be deemed necessary or advisable by the Chief of the Bureau of
Yards and Docks. Should any change in the contract. plans, or
specification affect the cost of the work, the amount of the increase
or decrease in cost shall be estimated by the officer in charge, and, if
estimated to be more than $300, shall be determined by a board of
not less than three oflicers to be appointed under the direction of the
Chief of the Bureau of Yards and Docks: and the contractor shall
agree and consent that the contract price, increased or decreased

by the amount of the increase or decrease in cost caused by
23 any change, estimated or determined as specified, shall be

accepted in full satisfaction for all work done under the con-
tract : Provided, however, That any changes to be made shall, before
being made, be stipulated and agreed to, in writing, by the parties
to the contract.

18. Extras.—The contract price shall cover all expenses, of what-
ever nature or description, connected with the work to be done under
the contract. No allowance whatever will be made for additional
or extra work or material except under the provisions of paragraph
17 of this specification.

19. Patents.—The contractor shall forever protect and defend the
United States in the full and free use and enjoyment of any and all
rights to any invention, machine, or device which may be applied as
a part of the work, either in its construction or use after completion,
against the demands of all persons whomsoever.

20. Contractor’s responsibility.—The contractor shall be respon-
sible for the entire work and every part thereof, and for all tools,

14 UNITED STATES VS. UNITED ENGINFERING ANP CONTRACTING CO,

apphances, and property of every description used in’ connection
therewith. He shall specifically and distinctly assume all risks of
damage or injury from any cause to property or persons used or em-
ployed on or in connection with the work, and of all damage or
injury to any person or property. wherever located, resulting from
any action or operation under the contract or in connection with
the work, and undertakes and promises to protect and defend the
United States against all claims on account of any sueh damage or
injury.

21. Contractor's supervision. The contractor shall give his per
sonal attention to the work at all times. and shall be present. either
in person or by a duly authorized representative, on the site of the
work continually during its progress, to receive directions or
instructions from the officer in charge.

22. Verbal modifications. It is distinetly understood that no

verbal statement of any person whomsoever shall be allowed
24 in anv manner or degree to modify or otherwise affect the

terms of this specification or of the contract for the work,
Changes shall be made only and strietly acording to paragraph 17
of this specification.

SPRATAL CONDITIONS,

23. Deseription and location. The work to be dene will consist
of the erection, complete, ready for operation, of a pumping plant
for Dry Dock No. 3. New York Navy Yard. and will include the
construction of a well or chamber of the dimensions shown, located
near the entrance of the dock: all necessary machinery as provided
herein. including pumps, motors, piping. and connections, as shown
on the plan. The chamber under the ends of the suction pipes must
be sufficiently enlarged to admit of water flowing freely to the pipes,
both old and new.

24. Work.—The contractor must furnish all engineering skill. all
labor, skilled and common, all tools, machines. and materials to
construct the same, and all labor, tools, and material required to
make trials of the efficiency and sufficiency of any and all parts of
the work. on completion. The entire work is to be carried on and
completed in each and every detail in the most thorough, substantial,
and workmanlike manner, according to the full intent and meaning
of this specification and accompanying plans, to the entire satisfac-
tion, approval, and acceptance of the civil engineer in charge, and
of the Bureau of Yards and Docks.

25. Inspection.—The Government shall at all times, by the civil
engineer in charge. have full and free access to the work in progress
for the purpose of inspection. and all the work and material de-
scribed in this specification and shown on the plans shall be executed
to his entire satisfaction. All orders for material or finished work
shall be endorsed “ Inspection by Burean of Yards and Docks, Navy
Department.” The contractor or his agent shall promptly notify

a

UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO, 16

the civil engineer in charge and the Chief of the Bureau of
yh Yards and Docks of the placing and location of orders for

material or finished work, and shall, at the time of placing
euch orders, forward to the bureau three copies of the same, and also
three sets of all working drawings or other matter pertaining to the
work,

26, Inspection at mills and) shops. The contractor or his agent
shall promptly notify the Bureau of Yards and Docks, or its author-
ized representatives, of the manufacture of materials in mills or
finished work in shops. and of the readiness of the same for
inspection and test. The bureau's inspectors shall be furnished by
the contractor or his agents with copies of all orders. manifests. plans,
or other data required by them for the complete inspection of mate-
rial or finished work and shall be given every facility for inspecting
all material and workmanship and all processes and operations affect-
ing the material without additional charge. ‘The acceptance of mate-
rial and workmarship is provisional on its compliance with the
specification and plans: and should any material or workmanship
prove defective at any time before final acceptance, it shall be rejected
and at once replaced ina satisfactory manner by the contractor with-
out additional cost.

97. Inspection during erection. During the work of reception and
erection the civil engineer in charge shall have authority to cause
any inferior or unsafe work to be taken down and altered at the
contractor's expense: and it is distinetly understood that the civil
engineer in charge shall have full power to reject any material he
may deem unsuitable for the purpose intended or which is net in
strict conformity to this specification.

98, Schedule of prices. After signing the contract. and before
the first payment is due, the contractor will submit to the civil engi-
neer in charge for approval a schedule of prices for material worked
into place.

29, Payments. At the end of each month the civil engineer
26 in charge will make an estimate of the amount of work done
under this specification during that month, based upon the
approved schedule of prices. A voucher for this estimate will be
submitted to the commandant for his approval. and after the ap-
proval of the Chief of the Bureau of Yards and Docks the contractor
will be paid the amount of the voucher, less 10 per cent reserved until
the completion and acceptance of the plant. Before any payment
is made the contractor shall furnish satisfactory insurance on the
material for which payment is desired, with loss. if any. payable to
the Chief of the Bureau of Yards and Docks for the United States.

DATA.

30. Drawings.-The general design and details of construction are
shown upon the plans which accompany this specification and are
to be considered*a part of it. Before any work is done, the con-

93333—13——2

a

16 ~=UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING Co,

tractor must furnish accurate drawings of all shop work and all
details not here included. These must be approved, in writing, by
the civil engineer in charge. Approval of drawings will be of a
general nature and will not relieve the contractor from the respon-
sibility for errors or omissions that may oceur therein, which shall
be remedied and made good whenever discovered. These plans sub-
mitted must show all details of steel and iron work, glass construe-
tion, brick, cement, ete.. and when approved are to be considered an
integral part of this specification. The contractor must furnish one
full set of drawings upon tracing linen, the same to be retained in
the office of the civil engineer at the New York Navy Yard. and as
many prints of these drawings as may be required in the course of
the work. Suggestions as to acceptable details can be obtained at
the office of the civil engineer at the New York Navy Yard. Should
a conflict exist between the plans and specification, the civil engineer
in charge shall be the judge as to the true intent and meaning, sub-

ject to appeal to the Chief of the Bureau of Yards and Docks.
27 31. Grades and lines.—All necessary grades and lines will

be furnished by the civil engineer in charge. to enable the con-
tractor definitely to locate the position and elevation of his structures,
but he must furnish the required engineering skill to properly erect
them. No work will be begun until the civil engineer in charge has
definitely located all necessary points, but thereafter the contractor
will be held responsible for them. Should any such be disturbed
through carelessness. the cost of replacing the same will be charged
against the contractor and be deducted from any money found due
at final settlement.

MATERIAL,

32. Round piles.—All piles are to be of spruce, at least 6 inches
in diameter, exclusive of the bark. at the point: 12 inches, exclusive
of the bark, 3 feet from the butt, and of sufficient length to show a
final penetration not exceeding 1 inch under the last blow of a 3.000-
pound hammer falling 15 feet. The piles must be entirely satisfactory
to the civil engineer in charge.

33. Sheet piles.—Sheet piles are to be of long-leaf yellow pine,
sound, free from all knots, except small sound knots. 6 feet from butt
or driving end, which will be allowed; free from dope or soft spots
and injurious shakes. Piles are to be beveled on contact sides to suit
the radius of curvature; the piles shall be driven until a satisfactory
depth shall have been reached, in the opinion of the civil engineer
in charge, said depth, however, not to be less than 40 feet.

34. Sand.—All sand must be clean and sharp, of uniform texture,
free from sewage, mud, clay, mica, paper, leaves, chips, and all other
foreign matter, and not show, when shaken with water and after
subsidence, more than 5 per cent, by volume, of silt. It must be
specially freed from such material by screening and washing, if so
ordered by the civil engineer in charge, and must be entirely satis-
factory to him.

—

UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO. 17

28 35. Gravel.—All gravel must be clean, sea-washed, silica

gravel of best quality. It must not contain pebbles larger than
2 inches in greatest dimension, and none of it shall pass a screen hav-
ing 100 meshes per square inch. It must be specially freed from all
foreign material by screening and washing, if so ordered by the civil
engineer in charge. The gravel must be entirely satisfactory to him.

36. Broken stone.—All broken stone used must be of granite, hard
gneiss, or other material proved to be of good quality and acceptable
to the civil engineer in charge. It must be of such size as to pass
through a ring 2 inches in diameter and be held upon a ring one-half
inch in diameter. It must consist of angular fragments of stone,
and must be specially freed from all foreign materials by screening
and washing. if so ordered by the civil engineer in charge.

37. Water.—All water used shall be fresh and clean, free from
earth. dirt. or sewage. and shall be used in such quantity as the civil
engineer in charge may direct.

38. Cement.—All cement used will be tested by the Government
as soon as delivered, and only such will be accepted as conforms to the
following specification: Except where otherwise specified, it must be
the best grade slow-setting Portland cement. showing no change of
volume in setting. and no warping, checking, or cracking of edges or
curface. Neat briquettes must develop a tensile strength per square
inch of 200 pounds in twenty-four hours and 550 pounds in seven
days. The cement must be delivered long enough before time for use
to allow of the required tests being made and acceptable cement pro-
vided should the first prove unsatisfactory. It must be packed in
strong, well-coopered barrels. lined with moisture-proof paper. weigh-
ing at least 400 pounds, or in strong, cotton-duck bags holding one-
fourth or one-third of a barrel by weight. The contractor must give
n certificate from the manufacturers to the effect that the cement has

been seasoned for at least thirty days before leaving the works.
29 39, Concrete.—All concrete must be made of cement, accept-

able sand, and acceptable gravel or broken stone. The ingre-
dients must be measured by volume in the condition ordinarily han-
dled. These ingredients must be mixed in such proportions that the
cement exceeds the voids in the sand about 25 per cent and the dry
mixture of cement and sand exceeds the voids in the gravel or broken
stone about 25 per cent. These proportions will be determined for
the given articles of sand and gravel or stone used, and the proper
proportions for use made known. With the materials commonly
employed at the navy yard, New York, these proportions are about
1 to2 tod. The methods of mixing and placing the concrete must
be acceptable to the civil engineer in charge, and will be constantly
subject to inspection and change if found unsatisfactory. All un-
satisfactory work must be removed and replaced by the contractor.

40. Bricks.—All bricks used will be best quality selected red, well
and evenly burned, of uniform color and size. They must not absorb
more than 10 per cent by weight of water.

—_

18 UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO,

41. Mortar—All mortar used must be mixed of sand and cement
in the proportions ordered by the civil engineer in charge, depend-
ing upon the character of the work. No cement mortar must be used
after it has begun to set.

42. Glass.—All window glass used is to be first-quality double-thick
American glass, free from irregularities and blisters, clear and true.
Skylight glass must be }-inch ribbed glass, uniform and true.

43. Galvanized iron.—All galvanized iron used must be of the
gauge shown upon the drawings. The black plate must be of soft
open-hearth steel, and each sheet must be evenly and thoroughly
coated, showing no imperfect or uncoated spots. Each sheet. in what-
ever shape or position, must be thoroughly fastened to its supports,

to the entire satisfaction of the civil engineer in charge.
30 44. Builders’ hardware. Builders’ hardware and fittings will
be of first-quality bronze and satisfactory to the civil engineer
in charge, to whom samples must be submitted before such articles
are used,

45, Steel.—AIL structural steel will be made by the open-hearth or
Bessemer process with not more than five one-hundredths of one per
cent of phosphorus for basic steel, and not more than one-tenth of
one per cent of phosphorus for acid steel.

46. All tests and inspection of steel will be made by a Government
inspector at the place of manufacture before shipment. Every
piece will bear the inspector's mark.

47. The tensile strength, limit of elasticity, and ductility shall be
determined from standard test pieces, cut in the presence of the
inspector from the finished material of each heat, and planed, milled,
or turned parallel, and have a cross section of at least one-half square
inch; and the elongation shall be measured upon an original length of
8 inches, except when the thickness of finished material is five-six-
teenths of an inch or less, in which case the elongation shall be meas-
ured in a length equal to sixteen times the thickness. Two test
pieces shall be taken from each blow, one for tension and one for
bending.

48. Finished bars, plates, and shapes must be free from injuries,
seams, flaws, or cracks, and have a workmanlike finish. A variation
in weight or cross section of more than 2} per cent from that specified
will be sufficient cause for rejection.

49, The structural steel used (except for rivets) shall have an ulti-
mate tensile strength of from 55,000 to 65,000 pounds per square inch;
an elastic limit of one-half the ultimate strength, and a minimum
elongation of 23 per cent in 8 inches, and must stand bending 180
degrees without sign of fracture, to a curve, the inner radius of
which equals the thickness of the piece tested, both cold and after
being heated to a cherry-red color, and then quenched in water of
60° F., and have a reduction in area of not less than 40 per cent at

the point of fracture.
31 50. All rivets must be ef steel having an ultimate tensile
strength of 52,000 to 62,000 pounds per square inch, an elastic

oni

—

UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO. 19
im
limit of not less than 30,000 pounds per square inch, an elongation
of not less than 25 per cent in 8 inches. with a reduction of area
of not less than 50 per cent at point of fracture. It must stand bend-
ing 180 degrees and close flat. upon itself without sign of fracture.
Specimens must stand cold hammering to one-third the original
thickness without flaying or cracking.

51. Rods in tension must have threaded ends upset, so that the
diameter at the base of thread will be greater than that of the bar
before upsetting.

32. The workmanship must be first class in every respect. Rivets
must completely fill holes, have full heads of approved form, concen-
trie with rivet, and in full contact with the surface. The rivet hole
will not exceed the diameter of the rivet more than one-sixteenth of
an inch, All holes must be clean-cut, without torn or ragged edges,
or fracture of material. Rivet holes must be accurately spaced in
order that the several members will come together without the use
of driftpins, which will not be allowed for the purpose of bringing
parts together when the holes are inaccurately punched, Where
holes do not perfectly mateh they will be made to match by reaming,
in which case a rivet of a larger diameter will be used, Built mem-
bers when finished must be true and free from twists, kinks, buckles,
or open joints between component pieces. All abutting surfaces of
compression members must be planed or turned to even bearings so
that they shall be in such contact throughout as may be obtained by
such means. All field connections must be made by rivets.

33. Paint.—All -teel work, immediately on completion and before
exposure tothe weather, shall be cleaned from all mill scale. rust.grease,

dirt. and foreign matter by scraping. hammering. and brushing
32 with wire brushes, and to the catisfaction of the officer in charge,

and given one coat of pure red lead in pure raw linseed oil,
freshly mixed before application, in the proportion of 25 pounds of
lead to 1 gallon of oil. Contact surfaces shall be cleaned as above and
each shall receive one coat of the above mixture of lead and oil before
assembling. After the steel work is erected, all surfaces that will
be covered by walls or floors shall receive a thick coat of pure
asphaltum.applied hot. All other surfaces of steel work, not otherwise
specified, shall receive two coats of Dixon's siliea graphite paint No.
9 delivered at the building site in original packages and applied
without addition of other materials, or a paint composed of graphite,
pure linseed oil, and driers in proportions to make a paint equal in
quality thereto and approved by the civil engineer in charge. All
exposed steel shall receive two coats of pure white lead in linseed oil,
tinted as directed. AIL surfaces of architectural iron requiring the
same. in the opinion of the civil engineer in charge, shall receive two
coats of approved paint after erection.

4. Protection of material—All material used in the construction
must be delivered upon the ground ina condition for thorough inspec-
tion. It must be properly protected from the weather and from
injury, to the satisfaction of the civil engineer in charge. Any

20 UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO,

injured material must be immediately removed and replaced with
satisfactory material.

PUMPING PLANT.

55. The general arrangement of machinery and appliances consti-
tuting the pumping plant are shown on the accompanying plan.
Slight variations due to details of machinery accepted may be made
by the civil engineer in charge.

56. Pump well.—There will be a continuous row of tongued and

grooved sheet piling completely surrounding the pump well.
33 These piles must be driven between guide wales, cut to proper

curvature, and properly bolted to a sufficient number of guide
piles. Bearing piles must be driven in the location shown, properly
cut off, and covered with concrete, forming the bottom of the pump
well, Upon this foundation must be constructed the brick wall in
the manner shown, The outside of the wall must be thoroughly
plastered with cement mortar and the space between the wall and
sheet piling filled with clay puddle, so placed as to be impervious
to water, The inside courses of the wall must be laid in properly
colored mortar and have two coats of linseed oil applied. The pump
house will be floored over with steel girders, beams, and concrete
arches; the concrete filling over arches will extend above the floor
beams 3 inches, well rammed and troweled. Over this concrete deck
will be laid, in the very best manner known to the trade, a 1-inch
coating of Kosmocrete or granolithic covering. The concrete floor
in the pump house will be overlaid with a 1l-inch coating of Kosmo-
crete. A waterproof ventilator is to be installed as shown. An
entrance house of steel frame with corrugated galvanized steel cover-
ing will be constructed in the very best manner and of the very best
material and workmanship, as shown on the plan. Two steel chan-
nels will form the stair stringers, and 12-inch channels will form
the treads for the stairway. Treads are to be secured with three rivets
at each end to 3 by 25 by ;y inch angle clips. A galvanized iron rail-
ing will be put up around stair well hole and on the outside of the
stairway: well fastened.

57. Pumps.—The capacity of the pumping plant operating at its
average safe efficiency shall not be less than 150,000 gallons per
minute.

58. There will be three main pumps of the vertical centrifugal
type, directly connected to three independent electric motors by
suitable couplings. Each pump shall have an average capacity of
not less than 50,000 gallons per minute, and shall be of a nominal
size of not less than 42 inches.

59, The pumps shall have balanced suction pipes. and the

34 pump cases shall not be less than 1} inches thick, suitably
ribbed and braced and pointed in such manner as to admit of

easy erection and taking down for examination and repairs. The
shafts shall be of forged steel, fitted with proper high-speed bearings

i

UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO. 21

and stuffing boxes. The suction elbows are to be made in halves,
to provide for removal in case repairs are necessary. The suction
and discharge pipes shall be made of steel plates not less than one-
half inch in thickness. and the discharge pipe shall be of not less
than 45 inches internal diameter. All piping shall be fitted with suit-
able gate valves located inside the pump-house wall where directed.
The valves shall have double gates fitted with bronze faces and seats,
and with bronzed fitted stems and stuffing boxes, made to operate
hydraulically and by hand power.

GO. There will be one drainage pump of the vertical centrifugal
tvpe clirect connected to an independent electric motor by a suitable
coupling. It shall have an average capacity of not less than 6,000
gallons per minute.

61. The drainage pump shall have balanced suction pipes, and
the pump case shall not be less than three-fourths of an inch thick,
suitably ribbed, braced, and jointed in such manner as to admit of
easy erection and taking down for examination and repairs. The
suction and discharge pipes shall be made of steel plates not less than
three-eights of an inch thick, and the discharge pipe shall not be less
than 16 inches internal diameter. The drainage pump and piping
shall be fitted and equipped ina similar and corresponding manner
to the main pumps and piping.

62. An auxiliary pump of a make and type approved by the civil
engineer in charge and operated by an electric motor shall be in-
stalled in the pump well and arranged for draining the suction well,
operating valves. and priming the centrifugal pumps with fresh
and salt water from yard system and overboard, with valves,
piping, ete.

63. The auxiliary pump shall have a maximum capacity of

not less than 75 gallons per minute. Its discharge shall
35 connect with a main discharge pipe outside the gate valve,

and all its connection pipes shall have suitable stop valves
near the outlets. For the purpose of collecting drainage water a well,
° feet in diameter and 2 feet 6 inches deep. will be formed in the
bottom concrete; said well to be in the lowest part and to have a
3-inch plank covering over it.

64. Air pump.—A suitable air pump must be installed direct con-
nected to a proper motor, for priming all pumps. The same must
be approved by the civil engineer in charge.

6d. Ventilating fan.—The contractor will furnish and put in place.
as may be directed, an acceptable exhaust: fan, direct connected to a
proper motor, with all necessary piping for ventilating pump pit.

(4. Motors.—The design, material. workmanship, and finish of
all electrical machinery and appliances must be equal to the best
quality of similar machinery and appliances made by the Westing-
house Electric and General Electric Manufacturing Companies.

67. Main pump motors are to be wound for a constant potential
of 500 volts, direct current, to be of the open type, multipoler, with

22) UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO,

a field coi! for each magnetic pole. Field frame is to be east in two
parts, for ready separation in ease of repairs. Field coils are to he
interchangeable, and. if componnd wonnd. series and shunt coils
are to be separate, Armatures sre to be built up of thin sheet step]
and slotted for the enils. They must be well ventilated and perfectly
balanced. Armatnre coils are te be ba reowornd and are to be insulated
in the most perfect manner pessible in order te obtain a motor which
will be proof against dampness. Armatures sre to he two-cirenit or
cross connected, so that a brush ean be removed for cleaning or
inspection withont disturbing the electrical balance. Commnitators
must be large so as to give » small potential difference between adja
cent segments: they must have sufficient neck se that connections will
he above the brush surface. Brushes are to be carbon and are
Be not to exceed in density 30 amperes per sqnare ineh. Brush
holders are to be fitted with , a ‘
ti i " i . F
“a a? > , ° "
al ’ . e “ ,
, ’ ‘ , .
et ° : ‘
heat " ‘ i
he | ’ a? * ‘
t ° , . rv . ~¢
* ' - .3 ‘
yat . ;
’ ‘ ‘ ’ ow P
at t ‘ fe 7
g . pare a ’
s . . . 7 -
4 ad , ? .
f*}~4 ™
ter beset ; .
ss ' -
Weer » ~«wwerrrer " 3 vw
, , aot , oo . ‘ —
nT } PP j . —_ - '
tatenia ” ’ att ad nat
net ‘ ce ' . ve at : 7s)
: + ae- oe ‘ ox? . . |
wire > P rs ‘ " '
€TILet iti Cher none +1 t ’
hes 24 u f Orr2 Y ah: at: ’ o

TRIPP AVATER VE PSI PROP hehe ANT Ones Pare ee be wi

Tis tahini ite Died the etait netina ted nn eee TTL
with Che gelation: ad efanelond of the Fine Didone titer Noennia
Fiesty, cotvel we ene peevela fee prprienee eapeby tite Pree thee pened grein, it} wae
peapineedd Fay Clie empetinn fe etn gee te Fivenriody tthe bergen eden at thre
eebehitisserad veved anf Bey ore aay

The nyptne Vivegy Cheeni Pree be Wat chee teehee re ratlead Pree sopeedece Chee
combine tee Obie cnteteaes Chen pene Title Bee prveebeperber
that, ao the crt potree tebe frig prepbete coped copbvetereebiel a
se prlene tes bee rypierateel he ther tebe tbe. thr cher nf thie ce tee ad
He Helene Fey tered thy riper teenes ry P Ober terete seper be Ohya wroug
sevteelitiesnye vypnetdeenneed tee peeeageragihee 07 Ptr) eer) Me a
WWics cones vnnvend eles Gee eagep eon ce dt Dy PPebe rorvpetrcent prety one bbe Heeb ipepes bree that
the ctve ab ware poverperseneed dey bie Cone eetedeerd bee thee ple teeret eet core nee prety
fesvavetty wate thee ota ndaeed af thee | ee ee Scr deebireee ever
wervalel Tye Premes eller tice Bren thee prree pores TO oeeed cee ctebvetenee biel peged
Anrabl oe the hevegree orem nteed Pee Ch Pree Be ea en tMeteebe thee e bee erercr ey?
po ett et bead Ger terrence Chee tbeeeee

Vivchagre ty bee peepee Poser innge Chee rerppet erred aren cP bbe pererer genera
plan yey OD tediee PONE eo cet Pree thy eee Vorrerdenegs LO theepe ree pee cared
oavy vned bees oy Ober eb mates teen cvpeee 0p Femabs mabng cgobeery cerry
ae om | addy Ghee ce ten qe cote 16 thee abe oF BRorsrcde logs oped bbe cet Pree
we cold wate cy cteey Deetesegrenege fee thre pees eed abby beebhe ovk mr bere Py
systome of cupply tn the mace 4 pel go pergeeteeed bry thee cerbraeet. thre

eloped © Sy oben of per neentegy thy petepeepe ep thy pereerepy webb erga feety

neelerl The prreccure of theo reepertice yaborne wae aebyjpaet bey
cepedele te tobe beets five fine preve prerce tt thy att cote fPoetargs af fa] try
yg ceca bieny of pace ab Eaten cee thy for I, eotes otanes Pre cate prety wee

Tin the pyserned dy ced Ode derbee Tird the cryhente rf thrarty prrget Ney | rong
a ypoord of clatmrant ic parting Sostere Foeseced coer op pecreht cef oerchebagy prpae
sate comnmood bie the Crecennent te one ce the cithee of carl watap

eyetenie weblyd metre te the eboirermtet oped oebbeet phe fvivht

*% Phe clasmant amediatele re pared soirl bresk. veel te, Prveocralh

weotelonte of sy Jilee peterne toy Prevtrvce privced a porbucie g valves in
sail pretbetiige & volo Nabe ithetoncding this prreesribitre Pre alten
rf lbonpenpe No ¥ wee cubcequenthy broken by bike presenre in One
sy the other of col water eetome Claimant itmmerhatelo reps par}

his brenk. the cost of all which to the claunmant was 8699.9

The CGiovernment contends that under paragraph 74 of the oper

Seations the clarannt Pers poeedy ible for the entire work ancl aver?
pu rt thereof, and for all tools. applances, and property? of avery cla.
rei ption used in connection therewith tnd further if is fherarvt
seeded that the claunant ° shall specifically and distinetiy assning
il nicks of damage or input from any canse to propert Y cerns
* = i ‘ ]

and to protect and defend the fo niter)] States against all
tases on account of any such damage or injur

We do not think the construction conter decd) for Sv fhe trovern-
nent ie well founded, as here the findings show that tre oreaks foam

he sodden pressure were caused by the Government withont aotica

—

58 UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING co.

to the claimant and without its fault. The difficulties thus encoun-
tered were not such as claimant in the performance of its contract
was bound to assume.

The claimant had not agreed to assume the risks which the Gov-
ernment might impose by acts not contemplated when the contract
was entered into, and for these reasons the claimant is entitled to
recover on this item the amount so expended, $699.97.

Replacing broken valve-——During the progress of the work the
Government, on its own account, installed in the pump pit an elee-
trical heater so near the valve therein that thereby the same became
heated, and while in this condition and during a high tide and a
western storm in conjunction, the caisson of Dry Dock No. 3 was in
danger, and as a precautionary measure the engineer in charge caused
said dry dock to be partially flooded to equalize the pressure on said
caisson, thus filling the suction pipe leading to the valve with cold
water, causing the same to crack, to replace which the claimant
expended the sum of S604.

The Government contends that it was the duty of the claimant to
have made provision against expansion and contraction caused by
changes in temperature, though the contract makes no provision
therefor. This contention may be well founded as to ordinary changes
in temperature causing expansion and contraction, but not to such
extraordinary changes caused by the action of the Government. That
is to say, the failure of the claimant to make provision against such
extraordinary changes can not be construed as the omission of a
detail the performance of which was essential to carry out the incen-
tion of the parties. Nor can the difficulty resulting from such omis-
sion be considered as one of the risks which the claimant was to
assume in the performance of its contract. Flooding the pit to
equalize the pressure on the caisson caused by the Government in-
stalling on its own account an electrical heater in the pump pit,
whereby the claimant was damaged, can not be regarded as a risk
which the claimant assumed or which was in contemplation by the
parties when the contract was entered into. Therefore the claimant
is entitled to recover on this item the sum of $604.

Renovating electrical machinery.—The electrical machinery was

delivered at the navy yard some time prior to May, 1903, when
17 the work was being delayed by the Government. but the same

could not be installed because the pumps were not in place.
The installation of the pumps was delayed for about 11 months after
May 1, 1903, because the claimant’s subcontractor was unable to get
certain castings necessary for the installation of the pumps.

During most of the period of delay the electrical machinery was
stored by the claimant under a shed covered with weather or tar
paper, which was not sufficient to protect said machinery from the
elements, and it became rusted. As a result of inefficient storage,
for which the Government was not responsible, the claimant was
required by the engineer in charge to overhaul and renovate the
machinery before installing the same.

UNITED STATES VS, UNITED ENGINEERING AND CONTRACTING CO. 59

The Government contends, and we think rightly, that the delay in
installing the machinery was not due to the delay of the Government
when the machinery was delivered at the yard, but was due to the
failure of the claimant’s subcontractor in getting ready the castings
necessary for the installation. Furthermore, the renovation of the
machinery was not made necessary by the delay of either party, but
was from insufficient storage or housing by the claimant, for which
the Government was not responsible.

The requirement of the engineer in charge that the claimant over-
haul and renovate the machinery to the extent it did before installing
sume may have been unreasonable, but under the findings we are
unable to reach the conclusion that the expense to which the claimant
was put was caused by the Government. On the contrary, had the
claimant exercised reasonable care in protecting the machinery from
the weather, as by paragraph 54 of the specifications he was bound
to do, the same would have been in good condition when ready for
installation. By paragraph 66 of the specifications the claimant had
agreed that “the design, material, workmanship, and finish of all
electrical machinery and appliances must be equal to the best quality
of similar machinery and appliances made by the Westinghouse Elec-
tric and General Electric Manufacturing Companies.” To meet this
requirement, in the opinion of the engineer in charge, it -was nec-
essary to overhaul and renovate the machinery so found to have
been rusted from exposure to the weather. For these reasons the
claimant is not entitled to recover on this item.

It follows from what we have said that the defendant’s motion
for a new trial must be overruled. The motion to amend findings
is allowed in part and overruled in part, but the former findings of
fact and opinion are withdrawn and modified findings and opinion
are this day filed nune pro tune as of May 13, 1912, the judgment as
then entered to stand.

Howry, J.. was not present when this case was tried and took no
part in the decision.

78 VI—Judgment of the court.
Filed May 13, 1912.
Tue Unrrep ENGINEERING AND CONTRACTING COMPANY
vs. No. 30072.
Tue UnNIrep States.

At a Court of Claims held in the city of Washington on the 13th
day of May, 1912, judgment was ordered to be entered as follows:

The court, on due consideration of the premises, find for the claim-
ant, and do order, adjudge, and decree that the claimant, the United
Engineering and Contracting Company, do have and recover of and
from the United States the sum of eighteen thousand eight hundred
and fifteen dollars and seventy-seven cents ($18,815.77).

By Tue Cowrt.

_——

60 UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING co.

79 VII.—Defendants’ motion to amend findings of fact and for
a new trial.

Filed July 19, 1912.

Defendants’ motion to amend the findings of fact and for a new

Come now the defendants, by their Attorney General, and move
the court to amend the findings of fact and for a new trial, alleging
as grounds therefor error of fact, as more particularly set out in and
by the amendments to the findings hereinafter set forth and error
of law in the conclusion of law and judgment of the court. as here-
inafter specified.

ERROR OF FACT.

z.
Finding X.—Item 4 (p. 4).

Strike out the phrase, “in accordance with the custom of the
trade.” in the first sentence of said finding.

Insert at the end of the first sentence of said finding the fol-
lowing:

“It was not the custom of the trade for manufacturers of

80 valves to furnish gear casing for the same, in the absence of

a special requirement in the specifications therefor.” Ras-
muson, qs. 12 and 13, p. 265; xq. 25, p. 267; Hough, q. 42, p. 240.

“It is and was customary in the installation of machinery involv-
ing danger to life or limb to cover the gearing or other dangerous
parts thereof with a casing or other means of protection.” Allen,
q. 20, p. 303, 304: Hollyday, par. 7, p. 214: Rasmuson, xq. 24, p.
266: Hough, qs. 38, 42, pp. 239, 240.

Insert. after the word “ were.” at the beginning of the fourth line
of said finding, the following:

“Intended by claimant to be”

Insert. at the end of said sentence, the following:

“ But this scheme was abandoned by claimant before the plant was
ready for test, whereupon it became necessary for a workman or
workmen to be stationed in close proximity te said valves during
their operation, and in addition thereto the defendants built a plank
walk across the top of the pipes in the pumping plant for the pur-
pose of facilitating the movements of the workmen in going to and
from said valves. In passing along this walk and in attending the
valves during their operation the workmen were brought into close
proximity with the same.” Bellinger, qs. 29-36, p. 323; Allen, qs.
17-20, p. 303; Hough, letter of October 10, 1904, p. 177.

Strike out the third sentence in said finding, beginning with the
words “after the plant” and ending with the word “ workmen,”
followed by a semicolon.

—

UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO. 61

$1 Item 5 (p. 5).

Strike out the clause, “of which defective piles the Government
had knowledge through its engineering officers, but gave no other or
further information to the claimant than that stated,” which occurs
about the middle of the paragraph.

Item 12 (p. 6).

Insert after the word “ trade.” in line 7, the following: “ of build-
ing wiring.”

Strike out the clause. “ which would have been effective for use
underground as well as overhead,” which occurs near the middle of
said paragraph. Ingram, qs. 21-24, p. 334; Hill q. 18, pp. 315, 316;
q. 22, p. 317; xq. 3, p. 318; rdqs. 5 and 6, p. 319.

Add the following paragraph:

“ Where electric current is to be conducted in closely confined con-
duits or in well or pits where the air can not circulate freely, the wire
conducting the same must be larger than for building wiring, where
the air can circulate freely, to protect the insulation from being
destroyed by overheating.

“ The operation of the motors in the pump well, where the wires
connecting them with the switchboard were located would raise the
temperature of the surrounding atmosphere to a much higher degree
than the outside air. It was therefore necessary to have wires from

two to two and a half times as large as those proposed to be
82 furnished by claimant to safely conduct the required current.”

Ingram, qs. 22-36, pp. 334, 335; Hill, q. 16, p. 316; Gustafson,
q. 15, p. 262.

Finding XI.—Breakage in drain pipes (p. 6.)

Strike out the clause, “and to excessive use at times of the fresh-
water system for city purposes,” in the last line of said finding, and
insert in lieu thereof the following:

“And by reason of the fact that at certain times in the day and on
certain occasions in the week there was a cessation of the use of large
amounts of water from the city fresh-water system.” Hough, qs. 67,
68, p. 247, xq. 122, p. 254; Claims, par. 2, p. 222.

Strike out the clause, “ caused by the Government in one or the
other of said water systems without notice to the claimant and with-
out its fault.” at the end of the first sentence of the second para-
graph of said finding, and insert in lieu thereof the following:

“In the fresh-water system.” Hough, xq. 122, p. 254.

II.

ERROR OF LAW.

The court erred—

First, because on the facts stated in the eighth finding of fact
judgment should have been rendered for the defendants instead of

ee |

62 UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO,

the claimant: second, because the judgment of the court on item 4 of
the tenth finding of fact is contrary to the law and the evidence
83 in the case; third, because the judgment of the court on item 12
of Finding X is contrary to the law and the evidence in the
case; fourth, because the judgment of the court on Finding XI is
contrary to the law and the evidence in the case.
Joun Q. THompson,
Assistant Attorney General.
Pure M. Asurorp, .1ftorney.

84 VIII.—Order filed November 11, 1912.

The defendants’ motion for a new trial is overruled.
Defendants’ motion to amend findings is allowed in part and over-
ruled in part.
Former findings and opinion withdrawn and a modified findings
and opinion this day filed nune pro tune as of May 13, 1912.
Judgment as entered May 13, 1912, to stand.
By tue Court.

85 IX.—A pplication for, and allowance of, appeal.

From the judgment rendered in the above-entitled cause on the
llth day of November, 1912, in favor of claimant, the defendants,
by their Attorney General, on the 12th day of Nov., 1912, make
application for, and give notice of, an appeal to the Supreme Court
of the United States.

Joun Q. THompson,
Assistant Attorney General.
P. M. A.
Filed Nov. 12, 1912.

Ordered: That the above appeal be allowed as prayed for.
Nov. 12, 1912.
By rue Court.
86 In the Court of Claims.

Tue Unirep ENGINEERING AND CONTRACTING COMPANY
vs. No. 30072.
Tue Untrep States.

I, John Randolph. assistant clerk of the Court of Claims, hereby
certify that the foregoing are true transcripts of the pleadings in
the above-entitled cause: of the findings of fact and conclusion of
law. and opinion of the court; of the judgment of the court; of the
motions of the defendants for a new trial and for amendment of
the findings of fact and of the order of the court thereon: of the

em

UNITED STATES VS. UNITED ENGINEERING AND CONTRACTING CO. 63

application for allowance of appeal to the Supreme Court of the
United States and allowance of same.

In testimony whereof I have hereunto set my hand and affixed the
seal of said Court of Claims at Washington, D. C., this 19th day of
November, A. D. 1912.

[ SEAL. | Joun Ranpoiren,

Assistant Clerk Court of Claims.

(Indorsed on cover: File No. 23427. Court of Claims. Term No.
siz. The United States, appellant, vs. The United Engineering and
Contracting Company. Filed November 22d, 1912. File No. 23427.

O

N3523—138——_5

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40386002_0322%3A1. Public record. Not legal advice.