oo rTP ee

In the Supreme Court of the United States

OCTOBER TERM. 1973

No. . €3- 943

THE CITIZENS ENVIRONMENTAL COUNCIL, OAK

PARK HOMES ASSOCIATION, CRAIGMONT HOMES

ASSOCIATION. ROBERT J. McELWAIN, PHILLIP L.
CARR. et al..

Petitioners.
vs.

JOHN VOLPE, WILLIAM D. RUCKELSHAUS,
and ROBERT MORRISSEY,

Respondents.

PETITION FOR A WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF APPEALS
FOR THE TENTH CIRCUIT

WILLIAM H. PICKETT
801 Traders National Bank Building
1125 Grand Avenue
Kansas City, Missouri 64106
(816) 471-4115

Attorney for Petitioners

FL. Menpengatt, Inc... 26 Cherry street, Kansas Citv, Mo. 64106, 421-8036

I caer stesertcneeainaSedomins ileus Spmsaunee 1
os carat aces ehndeh eceanrs apabondenduniananawics 2
BS EEA Aa oe te OS 2

Statutory and Administrative Provisions Involved ... 2

he EE OCI 3
Reasons for Granting the Writ ..........2............eeseeeeceeeeeeeees 6
OEE SEE A SERS A Pe RR 19
Appendix A—Opinion, United States Court of Appeals,
ERR Re EE Rc eae EAR en Al
Appendix B—Order Denying Injunction ~........2220....... A6
Appendix C—Opinion, United States District Court
(AR Ta 2S BRR i ct ele Ne AQ
Appendix D—National Environmental Policy Act (Ex-
caren acres ai Mer Oi ik pO TD NSE RIOR A27
Appendix E—Environmental Impact Statement .............. A31

Appendix F—Letter to Robert W. Morrissey from

Jerome H. Svore, Regional Administrator, Environ-
nee Pees Bee A46

Appendix G—Department of Transportation Policy and
Procedure Memorandum 90-1 (Excerpts) .................... A48

Table of Authorities

CASES
Citizens Environmental Council v. Volpe, ........ F.2d
ete > E.RC. 1989 (10th Cir. 1973) -............................... 15

Committee to Stop Route 7 v. Volpe, 346 F. Supp. 731
A i a pcepaiomonmion 14

II

Conservation Society of Southern Vermont, Inc. v. Sec-
retary of Transportation, 362 F. Supp. 627 (D. Vt.

=) ARR as SEIN ret RRS AIA SP Ain PR cd 14, 15, 16
Environmental Defense Fund, Inc. v. Corps of Engi-
neers, 325 F. Supp. 749 (E.D. Ark. 1971) ................ 7, 11,12
Environmental Defense Fund, Inc. v. Corps of Engi-
neers, 348 F. Supp. 916 (N.D. Miss. 1972) .................... 7
Finish Allatoona’s Interstate Right v. Volpe, 355 F.
RN Te Ce, MR) BID essence teeters 15

Greene County Planning Board v. Federal Power Com-
mission, 455 F.2d 412 (2d Cir. 1972), cert. denied,
ats SL | ee ewer 13, 14, 15, 16, 18

Iowa Citizens for Environmental Quality v. Volpe, ........

F. Supp. ........, 4 E.R.C. 1755 (S.D. Iowa 1972) ........ 16,17

Life of the Land v. Brinegar, ........ fe. EE , 9 E.R.C.
Se Es BENE ths ears oionsccnemensencncniane 15, 16

National Forest Preservation Group v. Volpe, 352 F.

wane: ice CO ees. We) 16, 17
Natural Resources Defense Council, Inc. v. Morton, 458
Pe ee Cie a ccecccre secession 8
Northside Tenants’ Rights Coalition v. Volpe, 346 F.
Sma. Oe CHR ee arches 14
Pizitz, Inc. v. Volpe, 467 F.2d 208 (Sth Cir. 1972) ............ 16
Sartor v. Arkansas Natural Gas Corp., 321 U.S. 620
RRR RANE RESALE SRI eae Arte SEER LSD 19
STATUTES
ee ON corre eee ee oeh cece 2
eae me Oe tei 6,12
MISCELLANEOUS

Greis, The Environmental Impact Statement: A Small
Step Instead of a Giant Leap, 5 Urs. Law. 264 (1973) 8

In the Supreme Court of the United States
OCTOBER TERM, 1973

(GCE SC 2 Ua ark aos

THE CITIZENS ENVIRONMENTAL COUNCIL, OAK

PARK HOMES ASSOCIATION, CRAIGMONT HOMES

ASSOCIATION, ROBERT J. McELWAIN, PHILLIP L.
CARR, et al.,

Petitioners,
vs.

JOHN VOLPE, WILLIAM D. RUCKELSHAUS,
and ROBERT MORRISSEY,

Respondents.

PETITION FOR A WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF APPEALS
FOR THE TENTH CIRCUIT

The Citizens Environmental Council, et al., Petitioners,
pray that a Writ of Certiorari issue to review the judgment
of the United States Court of Appeals for the Tenth Circuit
entered on September 19. 1973.

OPINIONS BELOW

The opinion of the Court of Appeals is reported at 5
E.R.C. 1989 and a copy is attached hereto as Appendix A.
A copy of the order of the Court of Appeals denying an

injunction pending appeal to that court, is attached hereto
as Appendix B. The opinion of the District Court of Kansas
is reported at 4 E.R.C. 1970, and a copy is attached hereto
as Appendix C.

JURISDICTION

The judgment of the United States Court of Appeais
for the Tenth Circuit was entered on September 19, 1973.
The jurisdiction of this Court is invoked under 28 U.S.C.
Sec. 1254(1).

QUESTIONS PRESENTED

1. Is a general lack of detail in the environmental
impact statement (EIS) prepared for the Switzer By-Pass
project, particularly with reference to alternatives and
both air and noise pollution, sufficient to raise a genuine
issue of material fact as to the adequacy of the EIS, thereby
precluding the granting of summary judgment in favor of
the respondents?

2. Is the Federal Highway Administration and De-
partment of Transportation’s delegation of the preparation
of the Switzer By-Pass EIS to the Kansas State Highway
Commission, in violation of the National Environmental
Policy Act of 1969, sufficient to raise a genuine issue of
material fact, thereby precluding the granting of summary
judgment in favor of the respondents?

STATUTORY AND ADMINISTRATIVE PROVISIONS
INVOLVED

The pertinent provisions of the National Environ-
inental Policy Act of 1969, 42 U.S.C. Sec. 4321 et seq., are

3

set cut in Appendix D attached hereto. The pertinent pro-
visions of Department of Transportation Policy and Pro-
cedure Memorandum 90-1 are set out in Appendix G at-
tached hereto.

STATEMENT OF THE CASE

The northern portion of the proposed Switzer By-Pass
involves the relocation of approximately 2.76 miles of U.S.
Route 69 in the cities of Overland Park, and Lenexa, in
Johnson County, Kansas. The project begins at the north
edge of existing Interstate Highway 435, and the Switzer
Road Interchange, and extends north and west to existing
Interstate Highway 35. The project originated in 1959 in a
Kansas City Metropolitan Area Origin and Destination
Survey commissioned by the State Highway Commissions
of Kansas and Missouri. The survey specifically considered
population trends, population growth, passenger car reg-
istration and ownership, and labor force-employment in
Johnson County, Kansas.

The corridor location was determined prior to the
urbanization of this part of the Kansas City metropolitan
area, but the record of the hearing conducted by the Kansas

tate Highway Commission on April 2, 1959, is replete with
evidence that the area through which the proposed by-pass
would travel was undergoing rapid development, both for
residential and commercial uses. It was with the expecta-
tion that the selected corridor would eventually be densely
populated that the location was chosen. On August 26,
1959, the Kansas State Highway Commission was notified
by the Federal Highway Administration that the proposed
by-pass had been approved for addition to the Federal-aid
primary system. The state acquired right-of-way between
March. 1962 and July. 1964, prior to the development of the

4
‘=

area, as a measure of reducing acquisition costs. The land
acquired has remained under-developed.

On January 1, 1970, the National Environmental Policy
Act of 1969, 42 U.S.C. 4321 et seq., became effective. On
November 30, 1970, the FHWA issued a draft Instructional
Memorandum requiring preparation of an EIS for projects
receiving design approval after February 1, 1971, and
delegating responsibility for preparation of the EIS to the
state highway departments. (This Instructional Memo-
randum was superceded by Department of Transportation
Policy and Procedure Memorandum 90-1 (PPM 90-1) on
August 27, 1971. With regard to the authorization of dele-
gation of EIS preparation, the two regulations are sub-
stantially the same. )

A design hearing, considering the specific location,
major design features, relocation, and the economic, social
and environmental effects of the proposed by-pass, was
held in Overland Park, Kansas, on April 23, 1971. The
final EIS, which was prepared by the Kansas State High-
way Commission, was accepted by the Federal Highway
Administration on August 26, 1971. (The EIS is attached
hereto as Appendix E.) Design approval for the project
and authorization to complete plans, specifications and esti-
mates were given on November 16, 1971. This suit was
filed on November 23, 1971.

In substance, the amended complaint alleges that the
EIS prepared by the Kansas State Highway Commission is
inadequate because it fails to consider alternatives, or the
effects of the by-pass on noise or air pollution. It also
alleges the EIS is inadequate because it did not constitute
an independent determination of the environmental effects
of the proposed Switzer By-Pass by the Federal Highway
Administration, a division of the Department of Transpor-

5

tation, the federal agency ultimately responsible for the
project.

On May 4, 1972, Jerome Svore, Regional Administrator
of the Environmental Protection Agency, commented in a
letter to the Division Engineer of the Federal Highway
Administration:

Because of the lack of data on both air pollution and
noise levels which will result from the project, it is
impossible to determine the extent or impact of en-
vironmental damage. We suggest that data sufficient
to make these determinations be compiled before con-
struction is initiated.

The full text of Mr. Svore’s letter is attached hereto as
Appendix F.

Motions for summary judgment were made by Re-
spondents, pursuant to Rule 56, F. R. Civ. Proc. After con-
sideration of the pleadings, briefs filed by the parties and
amici curiae, and supporting affidavits, the district court
granted summary judgment for Respondents on January
3, 1973. Timely appeal was taken by the Petitioners, and
on September 19, 1973, the United States Court of Appeals
for the Tenth Circuit affirmed the judgment of the lower
court.

REASONS FOR GRANTING THE WRIT

1. The General Lack of Detail in the EIS Prepared
for the Switzer By-Pass Project, Particularly with
Reference to Alternatives and Both Air and Noise
Pollution, Is Sufficient to Raise a Genuine Issue
of Material Fact As to the Adequacy of the EIS,
and Thereby Precludes the Granting of Summary
Judgment in Favor of the Respondents.

The National Environmental Policy Act of 1969' re-
quires that a detailed statement of environmental impact
be prepared for any “major Federal action significantly
affecting the quality of the human environment.’? The
detailed statement, to be made by “the responsible Federal
official,’ is to cover:

(i) the environmental impact of the proposed action;

(ii) any adverse environmental effects which cannot
be avoided should the proposal be implemented;

(iii) alternatives to the proposed action;

(iv) the relationship between local short-term uses of
man’s environment and the maintenance and en-
hancement of long-term productivity, and

(v) any irreversible and irretrievable commitments
of resources which would be involved in the pro-
posed action should it be implemented.’

Given the incredibly broad spectrum of federal agency
activity which falls under the aegis of NEPA, the amount
of detail required in any particular EIS must of necessity

1. 42 U.S.C. Sec. 4321 et seq. (1970).
2. Id. at Sec. 4332(2)(C).
S

7

depend in large measure on the nature of the project itself.
Although no rigid rules are possible of application or en-
{crcement, the courts have developed fundamental princi-
ples to guide them, and as a result, there is a comparatively
uniform approach to the question of “sufficient detail.”
That approach usually takes one of two forms.

The first is the view enunciated by Judge Eisele in the
first Gillham Dam decision: NEPA requires the full dis-
closure of “all known possible environmental conse-
quences.”* The second, as suggested by Judge Keady in
the Tennessee-Tombigbee Waterway decision, is to apply
the more traditional “rule of reason” standard.’ In reality,
beth approaches are very similar, differing only somewhat
in degree rather than kind. As Judge Keady defined the
necessary detail:

. . . the EIS must be “marked by abundant detail or
thoroughness in treating small items or parts”; .. .
Thus, a Section 102 statement must thoroughly discuss
the significant aspects of the probable environmental
impact of the proposed agency action. By definition,
this excludes the necessity for discussing either in-
significant matters, such as those without import, or
remote effects, such as mere possibilities unlikely to
occur as a result of the proposed activities.*

Although Judge Eisele might perhaps require more delving
into the lesser probabilities and possibilities than Judge
Keady, both require a thorough report on the environ-
mental consequences of the proposed action.

4. Environmental Defense Fund, Inc. v. Corps of Engincers
of the United States Army, 325 F. Supp. 749, 759 (E.D. Ark. 1971).

5. Environmental Defense Fund, Inc. v. Corps of Engineers
of the United States Army, 348 F. Supp. 916, 932 (N.D. Miss.
1972).

6. Id.

a OIL e Ad et), da | 4

porn we mameny

8

This thoroughness must be evidence in the EIS in all
of the six categories listed in NEPA, but particularly in the
discussion of alternatives. The language of the Court of
Appeals for the District of Columbia Circuit is representa-
tive of the general view:

A sound construction of NEPA .. . requires a presenta-
tion of the environmental risks incident to reasonable
alternative courses of action.

We reiterate that the discussion of environmental ef-
fects of alternatives need not be exhaustive. What is
required is information sufficient to permit a reason-
able choice of alternatives so far as environmental
aspects are concerned.... (It is not) appropriate...
to disregard alternatives merely because they do not
offer a complete solution to the problem.’

As one commentator has recently suggested, two of
the three key factors to be considered in determining the
adequacy of an EIS are the amount of detail, i.e., “sufficient
information to alert the decisionmakers to the most prob-
able ‘or definite) environmental consequences of the (pro-
posed) project” and a listing and evaluation of reasonable
alternatives to the project.‘

The application of these principles clearly demon-
strates the inadequacy of the EIS prepared by the Kansas
State Highway Commission for the Switzer By-Pass.

The By-Pass is an expensive project involving the con-
struction of a major highway through a portion of Johnson
County which is becoming urbanized at a rapidly in-

7. National Resources Defense Council, Inc. v. Morton, 458
F.2d 827, 836 (D.C. Cir. 1972).

8. Greis, The Environmental Impact Statement: A Small
Step Instead of a Giant Leap, 5 Urs. Law. 264 (1973).

9

creasing rate. Yet while acknowledging that traffic de-
mands in the area are now several times greater than the
1964 estimates,* nowhere dces the EIS mention the effects
of 51,602 vehicles per day’ on ambient air quality. The
EIS does not once mention air pollution. Nor is there an
even remotely adequate discussion of the amount or effects
of the noise which will be generated by this volume of
traffic. The only references to noise are:

1. a suggestion: that reduction in traffic on Metcalf
Avenue, two miles east of Switzer Road, will de-
crease ambient noise;"'

2. the statement that the increased traffic would “in-
crease the noise level” but that an effort was made
to reduce the noise by selecting a depressed main
line design:’*

3. a repetition of the preceding statement.’*

With regard to alternatives, the EIS lists three which
were “considered”:

1. not constructing the project (developing existing
routes) ;

2. closing parallel streets:

3. not allowing access to local cross streets."

However, in the body of the EIS, the only “discussion” of
these alternatives consists of a bare three paragraphs which
simply state a conclusion such as:

9. Appendix E at A33.
10. Id. at A32.

1l. Id. at A34.
12. Id. at A35.
13. Id. at A37.
14. Id. at A35.

Ben

10

Any plan which would not use the existent right of
way would be inconsistent with commitments and
planning which has been made in cooperation with
local agencies, governmental units and the commu-
nity.”

It is respectfully suggested to the Court that those three
short paragraphs can by no stretch of the imagination be
said to be an adequate discussion of even the three alterna-
tives listed, much less any others, such as the development
of mass transit. And in view of the energy crisis now
facing this nation, it is mandatory that this project be
re-evaluated, thoroughly and objectively, particularly
when considered in relation to our dwindling energy re-
sources and the need for alternative modes of transporta-
tion to the passenger car.

The function of an EIS is clearly to provide the agency
decisionmaker with as complete information as possible
about the environmental consequences of the proposed ac-
tion, in order that the decisionmaker may consider this as
one of the factors before making a final decision to modify,
cancel, or proceed with the project. To use the EIS to
justify a decision already reached is to pervert and distort
the intent of Congress in enacting NEPA. Yet an exami-
nation of the phraseology of this EIS strongly suggests
that rather than community desire being one factor in the
objective evaluation of the Switzer By-Pass project, the
EIS is an exercise in self-justification for the project.

For instance, the language quoted above suggests this
view, as well as:

Alternative routes, after years of development con-
templating the construction of the project on existent

15. Id. at A35.

11

rights of way, are in conflict with existing and pro-
jected growth patterns. ”

Existing planned and controiled urban developments

.. and the continued urban growth that has formed
in the anticipation of the construction of this freeway
indicates an enhancement of the area of influence.
(emphasis added)

The total impression left by this EIS is that the only thing
which is important about the Switzer By-Pass is that it
be built along the previously planned route, and not that
the fundamental policy of NEPA—the full, good-faith con-
sideration of environmental effects before reaching a de-
cision—is to be followed.

This is not to suggest that the work which has already
gone into the project is not an important factor in the
decisionmaking process:

The Court ... is suggesting that the degree of the
completion of the work should not inhibit the objec-
tive and thorough evaluation of the environmental
impact of the project as required by NEPA... . as
the Court interprets NEPA, the Congress of the United
States is intent upon requiring the agencies of the
United States government . . . to objectively evalu-
ate all of their projects. regardless of how much money
has already been spent thereon and regardless of the
degree of completion of the work."*

16. Id. at A35.
17. Id. at A36.

18. Environmental Defense Fund, Inc. v. Corps of Engineers,
325 F. Supp. 749, 756 (E.D. Ark. 1971).

AM ALN 1

Irate

Pee en att ene

Brees: LUTTE OY

The court goes on to say:

The Court is of the opinion that the defendants may
approach the problem of the ongoing project differ-
ently from a new project, but the end product shouid
essentially be the same in both cases.”

In other words, the end result, whether for a new or an
ongoing project should be an objective evaluation of
environmental impact.

It is the belief of Petitioners that the lack of detail in
the EIS, the failure to adequately discuss alternatives or
noise pollution, and the failure to mention air pollution,
are sufficient to raise genuine issues of material fact which
warrant a full trial on the merits, rather than the grant-
ing of summary judgment for the Respondents.

2. The Federal Highway Administration and Depart-
ment of Transportation’s Delegation of the Prepa-
ration of the Switzer By-Pass EIS to the Kansas
State Highway Commission, in Violation of the Na-
tional Environmental Policy Act of 1969, Is Suffi-
cient to Raise a Genuine Issue of Material Fact,
Thereby Precluding the Granting of Summary
Judgment in Favor of the Respondents.

NEPA explicitly states that “all agencies of the Fed-
eral government shall . . . include in every recommenda-
tion or report on proposals for legislation and other major
Federal actions significantly affecting the quality of the
human environment. a detailed statement by the responsi-
ble official (about specified environmental problems).’”°

19. Id.
20. 42 U.S.C. Sec. 4332(2)(C) (1970).

13

The language of Congress is precise and explicit. The
federal agency “shall include . . . a detailed statement by
the responsible official.” (emphasis added) The “responsi-
ble official” is clearly the head of the federal agency mak-
ing the recommendation or report. Logic alone compels
this interpretation, since the purpose of the EIS is to aid
in the objective evaluation cf a project. If the preparation
of an EIS can lawfully be delegated to a state agency or
private organization which has a stake in seeing that the
project is approved. then there arises a high potential, if
not probability, that self-serving statements and assump-
tions will form the basis of the data presented in the EIS
for consideration by the agency decisionmaker.

This is precisely the view taken by the Second Circuit
in Greene Ccunty Planning Board v. Federal Power Com-
mission.“ There, the FPC had in essence delegated the
EIS for construction of high voltage power lines to the
Power Authority of the State of New York. The entire
project, exclusive of one segment under consideration in
the suit, was approximately 80‘: complete. Yet the Sec-
ond Circuit said:

(Section 4332(2)) is a mandate to consider environ-
mental values “at every distinctive and comprehensive
stage of the (agency's) process.” The primary and
nondelegable responsibility for fulfilling that function
lies with the Commission.

The Federal Power Commission has abdicated a sig-
nificant part of its responsibility by substituting the
statement of PASNY for its own. The Commission
appears to be content to collate the comments of other
federal agencies, its own staff and the intervenors and

(1973). 455 F.2d 412 (2d Cir. 1972), cert. denied, 409 U.S. 849

LEU ATES p 4

14

once again to act as an umpire. The danger of this
procedure, and one obvious shortcoming, is the poten-
tial, if not likelihood, that the applicant’s statement
will be based upon self-serving assumptions.** (em-
phasis added)

The court later notes that NEPA requires the agency’s own
EIS to accompany the project proposal through the exist-
ing agency review processes.~”

In an action to halt work on a 31-mile highway to re-
place a portion of U.S. Route 7 in Connecticut, the district
court ruled:

. . there is no more basis for the statute to be altered
by the regulation of the FHWA here than by the
F.P.C.’s interpretation of the guidelines of the Coun-
cil on Environmental Quality in Greene County.

. federal officials must prepare the final version of
the impact statement as required by the plain word-
ing of NEPA."

Similar results have been reached in both Wisconsin,”
and Vermont.*"

In the latter case, the court considered a factual situ-
ation almost identical to that at issue here. The Vermont
Highway Department had prepared the EIS under the

22. Id. at 420.
23. Id. at 422.

24. Committee to Stop Route 7 v. Volpe, 346 F. Supp. 731,
741 (D. Conn. 1972).

25. Northside Tenants’ Rights Coalition v. Volpe, 346 F. Supp.
244, 248 (E.D. Wis. 1972).

26. Conservation Society of Southern Vermont, Inc. v. Sec-
retary of Transportation, 362 F. Supp. 627 (D. Vt. 1973).

15

authority of PPM 90-1. The court heard testimony re-
garding the degree of cooperation, consultation and review
the Federal Highway Administration provided for the
preparation of the EIS, as well as testimony concerning
the Vermont Highway Department’s duty to follow its leg-
islative mandate with regard to highway construction in
general, and the project being challenged in particular.*
Based on Greene County and the evidence that the Ver-
mont Highway Department was as much of an interested
party as PASNY had been, the court ordered the Federal
Highway Administration to prepare its own EIS and is-
sued an injunction halting work on certain portions of the
project until the order had been complied with.

However, the decision of the Tenth Circuit in this
case, and a recent decision from the Ninth Circuit,** have
created divergent interpretations of NEPA on the ques-
tion of delegation.

Citing just a district court decision,*® and not discuss-
ing Greene County at all, the Tenth Circuit relied on a
record that contained only pleadings and affidavits, rather
than substantive testimony that could have been adduced
at a full plenary evidentiary hearing, to find that:

The SHC prepared the impact statement in consulta-
tion with state, federal and private agencies. The Sec-
retary of Transportation did not simply “rubber stamp”
the State’s work. He reviewed it and adopted it as
his own. This procedure is consistent with the goals
of NEPA.*"

7. Id. at 629-632.

9
28. Life of the Land v. Brinegar, ..... F.2d ...., 5 E.R.C.
1780 (9th Cir. 1973). ;

29. Finish Allatoona’s Interstate Right v. Volpe, 355 F. Supp.
933 (N.D. Ga. 1973).

30. Citizens Environmental Council v. Volpe,
5 E.R.C. 1989, 1990 (10th Cir. 1973).

. eater |

Beene
=
3
H
B
5
e
&
:
z.
&
&
&
>
E
4

A22

requirement that a draft Environmental Impact Statement
be circulated for comment is found in Section 7 of the
C.E.Q.’s Guidelines:

“A Federal agency considering an action requiring an
environmental statement, on the basis of (1) a draft
environmental statement for which it take responsibil-
ity or (2) comparable information followed by a hear-
ing subject to the provisions of the Administrative Pro-
cedure Act, should consult with, and obtain the com-
ment on the environmental impact of the action of,
Federal agencies with jurisdiction by law or special
expertise with respect to any environmental impact
involved.”

The draft E.I.S., therefore, is in essence an adminis-
tratively created device for facilitating consultation with
appropriate agencies. Nothing in the guidelines requires
that the draft statement be prepared in the first instance
by the federal agency responsible for the proposed action.
The only requirement set forth in C.E.Q.’s Guidelines is that
the federal agency “take responsibility” for the draft state-
ment which is circulated.

Moreover, Section 2 of the final Guidelines provide:

“2. Policy. As early as possible and in all cases pri-
or to agency decision concerning major action or rec-
ommendation or a favorable report or legislation that
significantly affects the environment, Federal agencies
will, in consultation with other appropriate Federal,
State and local agencies, assess in detail the potential
environment impact in order that adverse effects are
avoided... .”

The Interim Guidelines, Section 2, contained substan-
tially similar wording. Thus, both the Interim and final
Guidelines emphasized that state and local government
units were to be drawn into the F.H.W.A. administrative

~ oe 7 2 NS Pe hee 2G DL we oe en OS otek ee eae |
A23 |
a
2

process so as to assess in detail the environmental impact
of the proposed action to be taken. This consultation to
“assess in detail” by state and federal agencies acquires
added significance when considered in the light of the
unique F.H.W.A.—state relationship, 23 U.S.C. §101, et seq.
Section 3(d) of the final Guidelines stated:

se

‘. . . It is imperative that existing mechanisms for
obtaining views of Federal, State, and local agencies
on proposed Federal actions be utilized to the extent
practicable in dealing with environmental matters.”

The Interim Guidelines contained similar wording in Sec-
tion 2.

Both the F.H.W.A. draft Instructional Memorandum
titled “Interim Guidelines for Implementation of Section 102
(2) (c) of the National Environmental Policy Act of 1969”
(Ex. K), issued November 24, 1970, and PPM 90-1 (Ex. L,
par. 6b & i), issued August 24, 1971, which superseded the
I.M. with respect to N.E.P.A. implementation, required
that the State Highway Commission prepare the draft and
final Environmental Impact Statements.

It appears from the public interpretations made by
the Chairman of the Council on Environmental Quality
(C.E.Q.) that the agency has likewise accepted this pro-
cedure. (See testimony of Russell E. Train, pp. 261 and
263, Ex. X, “Red tape—Delays and Excessive Paper Work
in Administration of the Public Works Program.’’)

When considered in the light of the provisions and re-
quirements of the Federal-Aid Highway Act, the interpre-
tations by D.O.T. and F.H.W.A. of the N.E.P.A. and C.E.Q.
Guidelines countenancing state participation in preparation
of E.I.S., the procedures in this case do not appear clearly
erroneous and should be accepted as reasonable and prac-
tical, if not, in fact, necessary, if any substantial develop-
ment of transportation facilities are to be carried on in this
country.

I SR

2 Qe NRC IDRLIR em TRAE NRE

a) SATE MON Fe OE OA TO JOR POP ING 2

TTA, DIE Fut em 4

Pb PIO NY eRe

CARL IM See GON

Browse Push

GIB wes ei re ere ree

A24

Plaintiffs predominate purpose in maintaining this ac-
tion, judging by the emphasis placed on this issue by them
in the record, is to somehow require the use of a strip of
land, acquired several years ago for highway purposes, for
a public park and recreational area. They base their claim
in this regard on the provisions of 49 U.S.C. $1653(f) and
23 U.S.C. $138, and regulations promulgated thereunder.

Neither of the statutes apply to the situation before the
Court in this case. The land acquired for highway right-
of-way was not taken from publicly owned land used as a
public park, recreation area, or wildlife and waterfowl ref-
uge of national, state or local significance, as determined
by federal, state or local officials having jurisdiction there-
of. The right-of-way in this case, as revealed by the rec-
ord, was acquired from private owners of many tracts of
land.

Also, it appears that the City of Overland Park,
through which the largest segment of the right-of-way ex-
ists, has a City Park Department and has established a
City Park System as it is authorized todo. The undisputed
evidence is that the By-Pass right-of-way was never in-
cluded in the City Park System, was never intended to be
and that other and more practical and appropriate recrea-
tional facilities are being constructed in the neighborhood
for the benefit of those who live thereabout; Affidavit of
Larry Flatt, Doc. 51.

Since the right-of-way has never been designated for
use as a public park or recreational area, the laws relied
upon by plaintiff do not apply and their claim may not be
sustained. Penn. Environmental Council v. Bartlett, 454
F.2d 613 (3 Cir.).

It ought to be observed that the record discloses the
careful study and planning for this By-Pass Project by a
number of city, state, federal and metropolitan agencies.

Public hearings and discussions were held over a period of
fourteen years to consider the need, the advisability and
the feasibility of this By-Pass. The officers of the cities,
the county, the state, the federal government have studied
and approved its establishment. A great deal of public
money has been appropriated and spent to establish the
By-Pass which all the public officials charged with the
responsibility of doing so have approved. A Community
College. accommodating several thousand students in the
area, was located and built with the construction of this
By-Pass a major factor in arriving at a choice of location.
Zoning ordinances and programs of community develop-
ment have been established relying upon the eventual con-
struction of this By-Pass to facilitate the movement of traf-
fic and accommodate the great majority of people whose
interests and welfare are more than equal to the class al-
legedly represented by plaintiffs. To enjoin the construc-
tion of this highway after twelve years of effort to obtain
it because a relatively few persons wish it to be used as a
recreational area, is neither reasonable, practical or equi-
table. There must come a time, after the passage of years,
when a needed public improvement, such as this one, ought
to be built.

After considering all the numerous contentions of plain-
tiffs, the Court, after threading its way through the pro-
visions of several legislative acts and regulations adopted
thereunder, all of which, it should be assumed, were pur-
posely enacted or promulgated to be reasonably and sen-
sibly applied,* must find and determine the environmental
impact statement required by 42 U.S.C. $4332(2)(c) has
been prepared and submitted by F.H.W.A., that the pro-
visions of 42 U.S.C. $1857 requiring review and comment
by defendant Ruckelshaus, as administrator of E.P.A.. have
observed to the extent required by the statute as its ap-

“a See National Forest Group v. Volpe, D.C.Mont., Dec. 11,
ie.

4
&
:
5
8
i
=
:
=
E
Hl
;
¢
3

sagrieg 9

Pars

(peererrtecannarngs onneng pmveocavn ys

rh BE

Bitten. Bala

A26

plication is interpreted and applied by the responsible ad-
ministrators of the Council on Environmental Quality.

The Court further finds and determines that the record
before it shows conclusively that hearings required by 23
U.S.C. $128 and Policy Procedure Memo 20-8, have been
provided and that a determination has been made that the
project conforms to the needs of the locality as required
by 23 U.S.C. $109.

The Court must also conclude that no constitutional
right of plaintiffs have been violated. They came to a proj-
ect already announced and for which right-of-way had
been acquired. Having done so, none of their constitutional
rights could be violated.

The contention that the land acquired for a highway
right-of-way should be used as a public park and recre-
ational area is without merit.

After careful scrutiny of the voluminous record before
it, and after considering the circumstances and interests
of all the parties, the delay by plaintiffs in prosecuting their
case, and the commonsense application by the administra-
tors of the several governmental agencies in carrying out
the mandates of Congress, this Court concludes that the
pleadings in this case should be pierced and the actual is-
sues determined. In doing so, it is now found that no ma-
terial issue of fact exists and that the case is ripe for dis-
position by summary judgment.

IT IS THEREFORE THE RULING AND ORDER AND
JUDGMENT of this Court that the motions of the defend-
ants and the intervenors for summary judgment, be, and
they are, sustained, and plaintiffs’ action is dismissed.

Dated at Topeka, Kansas, this 3rd day of January,
1973.

/s/ George Templar
United States District Judge

A27
APPENDIX D

The National Environmental Policy Act

PURPOSE

Sec. 2. The purposes of this Act are: To declare
a national policy which will encourage productive and en-
joyable harmony between man and his environment; to pro-
mote efforts which will prevent or eliminate damage to the
environment and biosphere and stimulate the health and
welfare of man; to enrich the understanding of the ecologi-
cal systems and natural resources important to the Nation;
and to establish a Council on Environmental Quality.

TITLE I

DECLARATION OF NATIONAL
ENVIRONMENTAL POLICY

Sec. 10i. (a) The Congress, recognizing the pro-
found impact of man’s activity on the interrelations of all
components cf the natural environment, particularly the
profound influences of population growth, high-density
urbanization, industrial expansion, resource exploitation,
and new and expanding technological advances and recog-
nizing further the critical importance of restoring and main-
taining environmental quality to the overall welfare and
development of man, declares that it is the continuing
policy of the Federal Gcvernment, in cooperation with
State and local governments, and other concerned public
and private organizations, to use all practicable means and
measures, including financial and technical assistance, in a
manner calculated to foster and promote the general wel-
fare, to create and maintain conditions under which man
and nature can exist in productive harmony, and fulfill the
social, economic, and other requirements of present and
future generations of Americans.

5
i
t

PPMP IL IT EM Par

ar

os PY

Beteerocrs

| ee ns

A28

(b) In order to carry out the policy set forth in this

Act, it is the continuing responsibility of the Federal Gov-
ernment to use all practicable means, consistent with other
essential considerations of national policy, to improve and
coordinate Federal plans, functions, programs, and re-
sources to the end that the Nation may—

(1) fulfill the responsibilities of each generation
as trustee of the environment for succeeding genera-
tions;

(2) assure for all Americans safe, healthful,
productive, and esthetically and culturally pleasing
surroundings;

(3) attain the widest range of beneficial uses of
the environment without degradation, risk to health
or safety, or other undesirable and unintended conse-
quences;

(4) preserve important historic, cultural, and
natural aspects of our national heritage, and main-
tain, wherever possible, an environment which sup-
ports diversity and variety of individual choice;

(5) achieve a balance between population and
resource use which will permit high standards of living
and a wide sharing of life’s amenities; and

(6) enhance the quality of renewable resources
and approach the maximum attainable recycling of
depletable resources.

(c) The Congress recognizes that each person should

enjoy a healthful environment and that each person has a
responsibility to contribute to the preservation and enhance-
ment of the environment.

Sec. 102. The Congress authorizes and directs that,

to the fullest extent possible: (1) the policies, regulations,

ee eee ee 2D ee

A29

and public laws of the United States shall be interpreted
and administered in accordance with the policies set forth
in this Act, and (2) all agencies of the Federal Govern-
ment shall—

(A) utilize a systematic, interdisciplinary ap-
proach which will insure the integrated use of the
natural and social sciences and the environmental de-
sign arts in planning and in decisionmaking which
may have an impact on man’s environment;

(B) identify and develop methods and proce-
dures, in consultation with the Council on Environ-
mental Quality established by title II of this Act,
which will insure that presently unquantified environ-
mental amenities and values may be given appropriate
consideration in decisionmaking along with economic
and technical considerations;

(C) include in every recommendation or report
on proposals for legislation and other major Federal
actions significantly affecting the quality of the human
environment, a detailed statement by the responsible
official on—

(i) the environmental impact of the proposed
action,

(ii) any adverse environmental effects which
cannot be avoided should the proposal be im-
plemented,

(iii) alternatives to the proposed action,

(iv) the relationship between local short-term
uses of man’s environment and the maintenance and
enhancement of long-term productivity, and

(v) any irreversible and irretrievable commit-
ments of resources which would be involved in the
proposed action should it be implemented.

FD AE PETRY he

oo

rae

A30

Prior to making any detailed statement, the responsi-
ble Federal official shall consult with and obtain the
comments of any Federal agency which has jurisdic-
tion by law or special expertise with respect to any
environmental impact involved. Copies of such state-
ment and the comments and views of the appropriate
Federal, State, and local agencies, which are authorized
to develop and enforce environmental standards, shall
be made available to the President, the Council on
Environmental Quality and to the public as provided
by section 552 of title 5, United States Code, and
shall accompany the proposal through the existing
agency review processes;

(D) study, develop, and describe appropriate al-
ternatives to recommended courses of action in any
proposal which involves unresolved conflicts concern-
ing alternative uses of available resources;

(E) recognize the worldwide and long-range
character of environmental problems and, where con-
sistent with the foreign policy of the United States,
lend appropriate support to initiatives, resolutions, and
programs designed to maximize international coopera-
tion in anticipating and preventing a decline in the
quality of mankind’s world environment;

(F) make available to States, counties, munici-
palities, institutions, and individuals, advice and in-
formation useful in restoring, maintaining, and enhanc-
ing the quality of the environment;

(G) initiate and utilize ecological information in
the planning and development of resource-oriented
projects; and

(H) assist the Council on Environmental Quality
established by title II of this Act.

APPENDIX E

DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION

PREPARED BY THE STATE HIGHWAY
COMMISSION OF KANSAS

FINAL ;
ENVIRONMENTAL STATEMENT

ro PANT TINMD Ta eT

FOR

US-69 (SWITZER ROAD) IN JOHNSON COUNTY,
KANSAS

PURSUANT TO SECTION 102(2) (C)
P. L. 91-190

Wan

RE GY Pe er nee me

KANSAS HIGHWAY COMMISSION
FINAL ENVIRONMENTAL STATEMENT

69-46 U-083-3(22) Parts I and II
U.S. 69 Alternate (Switzer Road)
Johnson County, Kansas

SECTION I. Project Description

The project is located within the cities of Overland
Park and Lenexa, Kansas. It begins at an existing inter-
change of Interstate I-435 and US-69 (Switzer Road) and
extends 2.760 miles north and northwesterly to a proposed
directional interchange connection with Interstate I-35 im-
mediately north of 87th Street.

a ae nea Be

JED NE Sl EE i A SS <=

A32

The purpose of the facility is to complete a prolonged
and demanded improvement. In response to local requests,
the original rights of way were purchased in 1964. Con-
firmation of the need is reflected in the anticipated average
daily traffic (ADT) for the design year 1990 which num-
bers 51,602 vehicles per day.

The proposed project design envisions a four-lane di-
vided highway with depressed median. The design in-
cludes concrete pavement with stabilized shoulders for the
project proper; detours and frontage roads are to be con-
structed with asphaltic concrete. Full control of access
utilizing chain link fencing is included in the design to
afford maximum safety. At cross street locations, the
structures will include sidewalks for pedestrian traffic.
The project will be constructed within existing right of
way. To complete the design of the interchange locations
(103rd, 95th, and 87th Streets) to current safety standards,
additional rights of way will, however, be required at
these points.

The project location is further identified by the area
map, Figure 1 and the aerial mosaic, Figure II.

SECTION 2. The Probable Impact of the Proposed Project
on the Environment

The area is entirely urban in nature. Most of the
development has occurred since the original purchase of
rights of way in 1964 and has formed in anticipation of
the project. Controlling governmental units have regu-
lated such development to provide a planned and controlled
growth centered around the improvement. Areas not now
developed are or will, with the completion of the project,
follow the urban, industrial, and commercial patterns
existent within the project’s area of influence.

A33

There are no conditions existent which address the
interests of fish and wildlife. The fact that the project
has been protected from the surrounding city growth may
have attracted occasional wildlife in the form of rabbits
and prairie fowl.

Railroad facilities are not involved.

There are no known mineral deposits within the cor-

ridor and the expansion potential of such resources is
mute.

The project has been reviewed by State Historical
Society archeologists and found to be void of any indica-
tions of such sites. There are no known historical areas
in the area of influence.

There are no lands as defined under section 4(f) of
the Department of Transportation Act as related to public

parks, public recreational areas, wildlife refuge and histori-
cal sites.

The project is uniquely fitted to local traffic patterns.
Interchanges at 103rd Street, 95th Street and at 87th Street
will require improved geometrics to carry increased traffic
assignments. The improvement to local and long distance
travel mobility of the area has been recognized for a dec-
ade. Traffic demands have increased several times beyond
predictions made in 1964. The project will create a most
favorable environmental impact upon traffic quality and
its associated social and economic opportunity and will
compliment the existing and rapidly expanding residential-
commercial propagation of the area.

With the depression of the main line traffic lanes,

an opportunity to provide continuity of existing local
streets is afforded.

PEPPER ROE TET ER TAN IRIAN HRA

DeWCENNE NONE MONET ORA ApBE RAL CAEN, OME RA INE SMYTHE NL MTSE ME OR

pare

payee

DTI AWN HOM (Py PY

Re TRL

a ie

he OLA AR ADNAN LTR RT Arh

NAA Ahad ile ac LAP

re ett ee es

A34

The inclusion of early seeding and erosion control
measures along with bluegrass sod and placing of Select
Soil will establish initial and lasting pollution controls.

The proposed roadway will not significantly alter the
existing character of the area. The requirement for addi-
tional right of way at interchanges will force the relocation
of five families living in three duplex rental structures
and two families whose properties will be required. The
duplex owner also uses one apartment as an office. Ade-
quate replacement housing is available within a reasonable
distance. Local parallel streets will be rerouted. Circula-
tion will not be greatly affected at 103rd, 95th and 87th
Streets.

A carefully planned approach to the location and to
the design of this project has been made in close coopera-
tion with local, state and federal agencies. The impact
of the project upon the area environments, coupled with
the impact of projects being developed by others, has multi-
plied the favorable results which will be obtained.

Project 69-46 U-083-3(20) south of I-435 is presently
scheduled for construction at approximately the same time
as this project. Therefore, the continuity of the north-
south traffic using this portion of US-69 will be established.

The existing Metcalf Avenue portion of US-69 is lo-
cated two miles east of Switzer Road. The construction
of the Switzer Road location (this project) will reduce
traffic on Metcalf Avenue. Therefore, increased safety
at the existing intersections and entrances, along with de-
creased ambient noise, can be expected.

SECTION 3. Probable Adverse Environmental Effects
Which Cannot be Avoided

The displacement of three duplex dwellings and two
houses are unavoidable effects precipitated by the project.

— oe Sa a TR EEE

A35

A use of vehicular traffic would also increase the noise
level; however, an effort to reduce such effects was made
by selecting a depressed main line design which appre-
ciably muffles ambient noise levels.

Elementary school districts are not divided by the
project. Although high school and junior high school dis-
tricts were organized after the purchase of the right of
way for this project, it does form a division of such dis-
tricts. Harm to pedestrian traffic is minimized by provid-
ing sidewalks on cross street structures.

SECTION 4. Alternate Routes and Designs

Alternate routes, after years of development contem-
plating the construction of the project on existent rights
of way, are in conflict with existent and projected growth
patterns. The project is in complete compliance with the
transportation plan developed by the Kansas City Area
Metropolitan Planning Commission. To retain present
routing would result in local traffic stagnation and the
overloading of portions of I-435 and I-35.

Any plan which would not use the existent right of
way would be inconsistent with commitments and planning
which has been made in cooperation with local agencies,
governmental units and the community.

Design proposals have been generated by the progres-
sive analysis of alternate designs at the three proposed
interchange locations (103rd, 95th and 87th Streets). The
interchange designs are based on routing simplicity com-
bined with adequate traffic services for the design year
of 1990. Future internal expansion can be accomplished
as the need may arise.

epee ee Mee ne

DONA ALLRED BON PEE ME

HAART EL NR OT Ow

et AP FRE PRION TATE SED RH PRD TNE (P

PPR PUM MCL

ihe

ee

Bronisotiersie A SY Seah al A ie

A36

SECTION 5. The Relationship Between Local Short-Term
Uses of Man’s Environment and the Main-
tenance and Enhancement of Long-Term
Productivity

The proposed project is compatible with the antici-
pated social and environmental changes of this area of
Overland Park and Lenexa and enhances its potential as
a long-term productive facility.

A safer and more effective use of the present traffic
facilities will be created by the addition of this improve-
ment.

This facility will offer the potential for the accelera-
tion of planned and future development of the adjacent
area.

SECTION 6. Irreversible and Irretrievable Commitments
of Resources

The many elements which will go into this project
cannot be classified as irreversible or irretrievable commit-
ments of resources. If the facility is no longer needed as
a transportation network or if a greater need arises for the
area occupied by the highway facility, it can be converted
to the needed land use. Most highway construction ma-
terials are not consumable; therefore, conversion to other
uses may require the reshaping of the existing resources.
Air space as a resource is exercised in situations where it
is economical and feasible to do so. The use of air space
is not eliminated; its use in this project is now, however,
not contemplated.

SECTION 7. Problems and Objections

The coordination and cooperation of the county and
city officials and the assistance rendered by several inter-

ee Oe et

A37

ested citizens organizations and individuals has led to the

resolution of many problems which developed on this proj-
ect.

A few major design problems and objections have been
encountered. An objection to closing one of the parallel
streets has been overcome by the proposal of extending this
side street to an intersecticn approximately 275 feet farther
away from the highway ramp intersection. Another ob-
jection has been overcome by the proposal of including
access at one of the cross streets.

A proposal to not construct this project has been de-
termined invalid. A future traffic impasse along with ad-
verse social, economic and environmental consequences
would be created by this proposal.

SECTION 8. Summary of Steps Taken to Minimize Harm

The summation of the project’s use of the environment
terminates in a cumulative enhancement rather than abuse
of its effect. The project and its total effect was considered
from its inception; therefore, adverse effects were avoided
or prudently minimized.

A depressed main line grade design with short fill areas
to accommodate cross surface drainage will minimize the
ambient noise level, enhance the aesthetic and visual con-
tinuity of the established community, along with a minimum
of division and disruption of present cross traffic facilities.

SECTION 9. Summary of the Environmental Comments
Received at the Design Public Hearing

This summary of the environmental comments will
analyze both positive and negative effects along with ref-
erences to those comments received.

f
E
5
E
[
f

. . Oe
SRA SPNS RR NER NEEDED TIENEN TERTTIA NE EMT MELA BOY 3A SLOANE SEE YT ON POR
SPURS PEAR PTH om cen ; cat

* yal ee AN i

Bee ssctissxte

A38

Numerous comments and letters indicating very little
need for this project, mostly originating from one source
and amplified by an article printed in the Johnson County
Scout dated May 7, 1971 (ref. =65, =78 to =82, =85 to
+127, +177 to +186, +192 to +201, and =311) were re-
ceived. Reference +65 and +311 contained a statement
“up to a week ago very few people outside the commer-
cial interests promoting this project really knew what is
involved or whether or not it is a vital or necessary road
for the county”.

The Switzer Bypass portion of the US-69 highway
has been under consideration by the local county, city and
the State Highway Commission of Kansas since some time
in the 1950’s. (ref. +306 to +310)

A public hearing on the route location was held April
2, 1959. (ref. +307 to =309)

Right of way acquisition on the section north of I-435
was in the process during the period 1959 to 1964. (ref.
R/W records and +310)

Right of way acquisition on the section South of I-435
was acquired during the period 1963-64. (ref. R/W records)

This traffic corridor has been shown as an essential
route in all the planning studies for this area since 1959.
(ref. =2) These studies referred to include “Kansas City
Metropolitan Origin and Destination Study”—Wilbur
Smith and Associates (1959); “Report on Traffic Study
and Master Plan for Roads, Streets and Highways in
Johnson County, Kansas’—Black and Veatch (1967);
“Comprehensive Plan, Overland Park’—Hare and Hare
(1963); and “Cooperative Through Planning”—Metropol-
itan Planning Commission—Kansas City Region (1969

_. Note: Ref. # refers to the design public hearing page
identification number.

A39

annual report and prior reports). (ref. on file) This proj-
ect agreement (22) will service the local area whose
development has been and will continue to be generated
with the road being a major consideration of the planned
activity of the local community. If the northern project is
not constructed the continuity of this traffic corridor would
be broken and therefore the southern project could be re-
placed by a system of arterial streets which would not con-
centrate traffic at one point. Both projects are essential
to facilitate the movement of traffic in this traffic corridor.

Delegations of public officials and the Chamber of
Commerce of Overland Park requested the State Highway
Commission of Kansas to advance the construction of the
entire route (US-69 to I-35). (ref. =302 and +304)

All of the recited circumstances would indicate that
the project has had wide support and publicity, at least
since 1959. The physical evidence of the presence of the
right of way corridor prior to the residential development
and to the planning of the street system of this development,
shows conformance with the alignment of this route and
would seem to have been an adequate indication of the Com-
mission’s intention.

The statement is made that the primary purpose of
this project is to relieve congestion on the Metcalf Avenue
portion of US-69. (ref. =11, =37, =65, +168, =242 and
+311)

Although it is true that the relief to Metcalf Avenue
is a major benefit to be gained from the bypass, there are
many other important reasons for constructing this route.
Support of all local governing bodies including the cities of
Lenexa and Overland Park, the Metropolitan Planning
Commission, Johnson County, and the Junior College
is evidenced by their strong responses. (ref. +13, +17,

Se etn ntl tesa cs bh etl ie nhc i a a ld EER TN ee a

MPA

ARUN D ON LTA

= isha aes Matar) is Soca Sa

Set ats

aR Sk aes ORNS,

Ee

A40

2165-4166, 4222, 227-228, +230, +237, +264-+265
and Section 10-Page 8) Support for the project also comes
from many citizens as evidenced by their letters. (ref.
+161, +163, +170, +174, +190, +203, +207, +209, #211,
3215, $218, $224, +246, =248-2251, +253, #255, +258,
3267, +268, +270 and +274)

Traffic projections show that unless the portion north
of 1-435, this project, is constructed, the existing I-435
(from Switzer Road west to I-35) and existing I-35 (from
the I-435-I-35 junction north to 87th Street) would be
seriously overloaded by the design year of 1990. The sec-
tion of I-435 referred to would have a traffic demand of
over 120,000 ADT, well over its capacity. This same
section, if this project is constructed, would have a traffic
demand of approximately 86,000 ADT which would allow
an acceptable level of service on these sections of the In-
terstate System. (ref. see section 4 and traffic study)

Traffic studies show that approximately 5% of the
total traffic would be trucks. (ref. traffic study) Through
truckers and local truck stops and facilities would benefit
from this route; however the major benefit would accrue to
local traffic originating from adjacent areas and im-
mediately south of I-435.

This indicates approximately 95% of the principal
traffic served will be that of the community college and
the developing residential areas adjacent to the project and
extending south. (ref. traffic study)

The traffic and capacity problems just discussed are
a clear indication that the Commission has indeed con-
sidered alternates including the alternative of not con-
structing the Switzer Bypass portion north of I-435.

The suggestion that the land could be used for a park
if the highway was not constructed (this project). (ref.

A4l

+11, +16, +78 to +82, +85 to +127, +177 to +186,
+192 to +201)

The land in question was acquired partly by the State
Highway Commission and partly by the cities of Overland
Park and Lenexa for highway right of way. The portions
acquired by the cities were paid for by state highway funds;
Kansas law would not permit the Commission to donate
this land for park purposes or to permit such use by the
cities without full reimbursement to the state highway fund.
Part of the land was condemned and part of it was pur-
chased. By condemnation, the Commission can acquire
only an easement for highway right of way. (ref. KSA
68-413). By purchase it can acquire a greater interest
but would not be authorized to dispose of the right of way
so acquired by donation for park purposes, or by selling it
for a limited use, such as for park purposes.

The statements (ref. +311) imply that a representa-
tive of the State Highway Commission of Kansas had
made statements indicating that the Commission was not
really concerned about the effects on the environment or
the cost and was not willing to consider any alternate. As
has been pointed out, the Commission has considered a
number of alternates, including that of not building a road.

Our concern with the environment is evidenced by the
fact that a full environmental statement was prepared for
this project, circulated to over twenty Federal Agencies
as required by law, and this environmental statement was
available at the public hearing. (ref. +1) None of the
fourteen replies from the Federal Agencies commented un-
favorably on the environmental analysis. Only two agen-
cies had precautionary statements. (ref. attachments)

Very few of the comments (those referenced) made at
the public hearing or subsequent to the hearing spoke to

i
a

Biievintinin: i cee |

A42

specific environmental factors or to the environmental
statement. A few comments were rade and received about
preservation of certain trees and shrubs along the right of
way.

It appears that in most cases we shall be able to pre-
serve the trees mentioned or will replace them with ade-
quate landscaping.

In response to the individual asking for the construc-
tion of a higher fence than normally constructed (4’), we
propose to install a 5’ high chain link fence. (ref. +16)

In response to not close a parallel street, we are rec-
ommending that this street not be closed but to be ex-
tended to an appropriate intersection iocation. (ref. +15,
17, +18, =19, +20, +63, =129 to +145, +156, +158)

As with all projects the consideration of all environ-
mental factors is a very major item of concern to the State
Highway Commission of Kansas.

In the conclusion of this section, a number of state-
ments and letters indicate a real feeling of compliance to
the consideration and discussion of the environmental ef-
fects. (ref. +13, +14, +17, #18, $19, +21, +70, +161,
+163, =165, +168, +170, +172, =174, +188, +190, +203
to +288)

SECTION 10. Summary of the Environmental Com-
ments Received From Federal Agencies

Twenty-four Federal agencies and several state agen-
cies received a copy of the draft environmental statement
for their review and comment regarding this project.

Eleven of the Federal agencies responded with a con-
currence or no comment; ten did not respond and three
replied as follows:

A43

Department of Health, Education, and Welfare—“It is
suggested, however that precautions be exercised during
construction and with the finished product to insure that
mosquito breeding or other vector problems are not cre-
ated because of it.”

The proposed ditch grades and the drainage structure
design along with the construction specifications, should
preclude mosquito breeding and other vector problems.

U. S. Department of Agriculture-Soils Conservation
Service—“It does not appear that any existing conserva-
tion measures will be affected. Also there should be no ef-
fect on wildlife.” ‘However I believe it would be appro-
priate if the measures to be used, such as early seeding
and application of top soil were mentioned in the state-
ment.”

The proposed Project Water Pollution Control (Soil
Erosion), placing of Select Soil, permanent seeding, and
the landscaping of the intersection locations should ade-
quately cover these suggestions.

Department of the Army-Kansas City District-Corps
of Engineers - - - “The only effect we note will be a prob-
able lake access enhancement.” “No land requirements.”

The state agencies replied as follows:

Department of Administration-Budget Division - - -
“No State objections.”

Kansas State Park and Resources Authority - - - “No
conflict.” “For present and future recreation and park
plans and programs—coordinate with the local identities
of government.”

State Water Resources Board - - - “Would not affect.”

ee ee TS eee

Beaten By ee er ered

A44

The Metropolitan Planning Commission-Kansas City
Region replied as follows: “Is a key element.” “Will aid
and influence the shaping of future development.” “We
are in agreement.”

In that no specific negative comment was received
from the federal and state agencies addressed toward en-
vironmental features and that any comment offered was
positive in nature, concurrence in the draft environmental
statement has been given by all Federal Departments as
required by Section 102(2)(C), P.L. 91-190, the National
Environmental Policy Act of 1969.

PB

a

tty oyuutoyty fl
TAPUNVOR EPA e EVA RONER®
Se sock dee Oe

AMS Bid ML By

Bl ities EE sa Bash Ole Lleol IOS,

teeneeeennnenes Savou JOVINOUS
ao ee LINIWIAOUIWI

ata ae as a ee
0009 000b pune
(22/6: C90 9p 69 log
IN4aWLYVd3I0 NOISIG
SVSNVX JO NOISSINWOD AVMHOIH JLVIS
WL AQ OU Hid

VXINTT — = WUVd ONVIUTAD
(SSVd-AG WIZLINS)

FVII 69 “SN

ALNNOD NOSNHOF

DAO WET

__ Nt.

SSS |

eapayny bi
(sev

A46

APPENDIX F

ENVIRONMENTAL PROTECTION AGENCY
Washington, D.C. 20460

Mr. Robert W. Morrissey
Division Engineer

Federal Highway Administration
512 West 6th Street

Topeka, Kansas 66603

Dear Mr. Morrissey:

In response to the final environmental impact state-
ment which the Federal Highway Administration has filed
with the President’s Council on Environmental Quality
on the proposed completion of U.S. 69 (Switzer Bypass)
project No. 69-46 U832-3(22) and pursuant to Section 309
of the Clean Air Act, as amended, dated December 1970,
we have the following comments to make on the project’s
final environmental impact statement.

Two major environmental impacts of the project which
were not investigated in sufficient depth are air pollution
and excessive noise levels.

1. The statement points out that the freeway will
probably attract additional traffic. The traffic will be
moving at freeway speeds and will not emit as many
pollutants per car as stop and start slow-moving traffic.
However, it is not clear that there will be a net reduc-
tion in air pollutants in the area. Studies were not done
to determine what the ambient air pollution level will
be in the adjacent residential areas.

2. The noise level generated by the freeway traffic
moving at high speeds may be much higher than with

oN EE RA SA NY

A47

normal stop and start driving on local roads. Studies
should be made to determine if the projected noise levels
will exceed those acceptable for residential areas. We

suggest you see FBF, procedure memorandum PPM90-
2 “Noise Standards.”

Because of the lack of data on both air pollution and
noise levels which will result from the project, it is impos-
sible to determine the extent or impact of environmental
damage. We suggest that data sufficient to make these
determinations be compiled before construction is initiated.

Very truly yours,

Jerome H. Svore
Regional Administrator
ce: Mr. Dan Joseph
General Council, EPA

OP Net ae iy eee ee

S.Ter a RRNA EOS lal aie antes Lane dk cakes Coin inbe babel LEU PP GRAER LE PRETO AL SOR TI YP D

AGAINST

ee en aes

Bara Ce ah CORO TS

lee

A48

APPENDIX G

Transmittal 202
90-1
August 24, 1971

U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION

POLICY AND PROCEDURE MEMORANDUM

GUIDELINES FOR IMPLEMENTING SECTION 102(2)(C)

OF THE NATIONAL ENVIRONMENTAL POLICY ACT

OF 1969, SECTION 1653(f) OF 49 U.S.C., SECTION 470f

OF U.S.C., AND SECTION 309 OF THE CLEAN AIR ACT
OF 1970

Par. Purpose
Authority
Definitions
Policy
Application

er PP PP

Procedures

Appendix A—Procedures on Historic Preservation

Appendix B—Example of Design Concurrence Let-
ter

Appendix C—Location Stage Flow Chart
Appendix D—Design Stage Flow Chart

Appendix E—Environmental Statements—Contents
and Format

Appendix F—Evaluating Highway Section Environ-
mental Effects

Appendix G—lInter-Agency Review of Draft Envi-
ronmental Statements

DARN ACRES Ze ~ a

A49

Appendix H—Selections from PPM 20-8, dated Jan-
uary 14, 1969, for use with the National Environ-
mental Policy Act Guidelines

Appendix I—Purchasing Copies of Environmental
Statements

1. PURPOSE

To provide guidelines to highway departments and
Federal Highway Administration (FHWA) field offices to
assure that the human environment is carefully considered
and national environmental goals are met when developing
federally financed highway improvements.

2. AUTHORITY

a. Section 102(2)(C) of the National Environmental
Policy Act of 1969 (P.L. 91-190) states that all agencies
of the Federal Government shall:

“include in every recommendation or report on pro-
posals for legislation and other major Federal actions sig-
nificantly affecting the quality of the human environment,
a detailed statement by the responsible officials on - - -

(i) the environmental impact of the proposed action,

(ii) any adverse environmental effects which cannot
be avoided should the proposal be implemented,

(iii) alternatives to the proposed action,

(iv) the relationship between local short-term uses
of man’s environment and the maintenance and enhance-
ment of long-term productivity, and

(v) any irreversible and irretrievable commitments
of resources which would be involved in the proposed
action should it be implemented.

A50

Prior to making any detailed statement, the responsible
Federal official shall consult with and obtain the comments
of any Federal agency which has jurisdiction by law or
special expertise with respect to any environmental impact
involved. Copies of such statement and the comments
and views of the appropriate Federal, State, and local
agencies which are authorized to develop and enforce envi-
ronmental standards, shall be made available to the Presi-
dent, the Council on Environmental Quality and to the
public as provided by Section 552 of Title 5, United States
Code, and shall accompany the proposal through the exist-
ing agency review processes.”

b. Section 1653(f) of 49 U.S.C.1, Section 138 of 23
U.S.C., and Section 4(f) of the Department of Transporta-
tion Act (all of which are hereafter referred to as “Section
4(f)”) permits the Secretary of Transportation to approve a
program or project which requires the use of publicly
owned land from a park, recreation area, or wildlife and
waterfowl refuge of national, State, or local significance as
determined by the Federal, State, or local officials having
jurisdiction thereof, or land from an historic site of na-
tional, State, or local significance as so determined by such
officials (hereafter “Section 4(f) land’’) only if:

(1) there is no feasible and prudent alternative to
the use of such land, and

(2) such program includes all possible planning to
minimize harm to the Section 4(f) land resulting from
such use.

1. Section 1653(f) of 49 U.S.C. is identical to Sections 138
of 23 U.S.C. and 4(f) of the Department of Transportation Act
oo in Section 18 of the “Federal-Aid Highway Act of
1969.”

A351

c. Section 470f of 16 U. S. C2 provides that the head
of any Federal agency having direct or indirect jurisdic-
tion over a proposed Federal or federally assisted under-
taking in any State and the head of any Federal depart-
ment or independent agency having authority to license
any undertaking shall, prior to the approval of the ex-
penditure of any Federal funds on the undertaking or prior
to the issuance of any license, as the case may be. take
into account the effect of the undertaking on any district,
site, building, structure, or object that is included in the
National Register. The head of any such Federal agency
shall afford the Advisory Council on Historic Preservation
a reasonable opportunity to comment with regard to such
undertaking.

d. Section 309 of the Clean Air Act of 1970 (Public
Law 91-604), as amended, provides:

“(a) The Administrator (Environmental Protection
Agency) shall review and comment in writing on the en-
vironmental impact of any matter relating to duties and
responsibilities granted pursuant to this Act or other pro-
visions of the authority of the Administrator, contained in
any ... (2) newly authorized Federal projects for con-
struction and any major Federal agency action (other than
a project for construction) to which Section 102 (2) (C)
of Public Law 91-190 applies .... Such written comment
shall be made public at the conclusion of any such review.”

3. DEFINITIONS (as used in this memorandum)

a. Highway Section—a substantial length of highway
between logical termini (major crossroads. population
centers, major traffic generators, or similar major high-

2. This requirement is also found in Section 106 of the
National Historic Preservation Act of 1966.

RY MOS

page
v

RONEN PONTE AILL EGE TERING ARTI IO TENA PO RENN OF LELIT FY ENT AGS STR NE Cm MR Re DT

Bittern

A52

way control elements) as normally included in a single
location study. (See paragraph 6).

b. Agency Decision—FHWA approval of the location
of a highway improvement. (Subsequent approval of the
design; right-of-way acquisition; the plans, specifications,
and estimates (PS&E) or authorization to construct a proj-
ect within the highway section is not, for the purposes of
this memorandum, an additional agency decision. )

(1) A determination to prepare and process a sup-
plemental environmental statement would be the basis for
a new agency decision for either a highway location or
design. (See paragraph 6p).

(2) In accordance with the Secondary Road Plan as
permitted by Section 117 of Title 23 U. S. C., the approvals
of the location, design, right-of-way acquisition and con-
struction (PS&E) have been delegated to the appropriate
State highway department for highway improvements on
the Federal-Aid Secondary System.

c. Environmental Statement—a written statement
containing an assessment of the anticipated significant
beneficial and detrimental effects which the agency de-
cision may have upon the quality of the human environ-
ment for the purposes of:

(1) assuring that careful attention is given to en-
vironmental matters,

(2) providing a vehicle for implementing all appli-
cable environmental requirements, and

(3) to insure that the environmental impact is taken
into account in the agency decision.

d. Negative Declaration—a written document in sup-
port of a determination that, should the proposed highway

SPORE on

7a Ee Oe OS a IR Tae ES

secticn improvement be constructed, the anticipated effects
upon the human environment will not be significant.

e. Highway Agency (HA)—the agency with the
primary responsibility for initiating and carrying forward
the planning, design, and construction of the highway.
For highway sections financed with Federal-aid highway
funds, the HA will normally be the appropriate State high-
way department. For highway sections financed with
other funds, such as Forest highways, Park roads, etc., the
HA will be the appropriate Federal or State highway
agency.

f. Human Environment—the aggregate of all ex-
ternal conditions and influences (aesthetic, ecological, bio-
logical, cultural, social, economic, historical, etc.) that af-
fect the life of a human.

* + *

ENVIRONMENTAL STATEMENTS—CONTENTS AND
FORMAT

1. Environmental statements and combination en-
vironmental,Section 4(f) statements (draft and final)
shall have a title page similar to the examples attached
to this Appendix.

2. The following sections, as a minimum, are to be
covered in environmental statements:

a. A description of the proposed highway improve-
ment and its surroundings. The description should in-
clude the following type information: type of facility;
length; termini; basic traffic data, including trips for the
design year and anticipated new trips generated two years
after completion of the highway section; right-of-way width
(including existing ROW); lengths on existing and new
location; major design features such as number of lanes,

Cpe:

MOLES

a is ei i A atl a

Ps wvs

A54

access control, location of bridges and interchanges, etc.:
a general description of the surrounding terrain, existing
land use and propcsed land use (a map preferable), and
other existing environmental features; existing highway
facilities including their deficiencies; the need for the pro-
posal; the benefits to the State, region, and community;
an estimate of when the proposal will be constructed; and
the current status of the proposal with a brief historical
resume. Inventory of economic factors such as employ-
ment, taxes, property values, etc., should be included as
appropriate. The description should also include any in-
volvement with Section 4(f) land (Paragraph 3 of this
Appendix). A vicinity map(s) shall be furnished which
will show the proposed highway section and its relation-
ship to surrounding natural and cultural features such as
towns, lakes, streams, mountains, historic sites, landmarks,
institutions, developed areas, principal roads and highways
and similar features that are pertinent to a highway study.
Detailed maps, sketches, pictures, and other visual exhibits
should be used to show specific environmental involve-
ments as necessary. Maps and layouts of the proposed
highway/Section 4(f) land involvement should be suffi-
ciently detailed to give a layman reviewer a reasonable
understanding of the highway impact and proposed mea-
sures to minimize harm.

b. The probable impact of the proposed develop-
ment or improvement. The evaluation and discussion
should specifically emphasize significant beneficial and
detrimental environmental consequences upon the State
or region or community, as appropriate, of building a new
highway into or through an area, or modernizing the ex-
isting highway by upgrading and/or relocation.

(1) This section, for instance, would discuss and
evaluate the broad impacts on the area or regain such as

A55

the problems relating to anticipated increase in urbani-
zation or the probable impact of displacing people (if these
are significant elements of the highway proposal). Efforts
to minimize impact should also be discussed in broad items.
For example, measures necessary to insure proper rehous-
ing should be discussed rather than evaluating specific
number of people displaced by different alternatives and
other differences of the alternatives. The significant en-
vironmental impacts of alternative locations and, as appro-
priate, designs, including a “do nothing” alternative is a
proper subject for discussion under “Alternatives” para-
graph 2d of this Appendix.

(2) Impacts upon the narrow band (i.e., about
1000 feet) adjacent to the highway may be included when
significant to the whole of the region or community. How-
ever, the discussions under this section should address
the probable significant impacts of the highway proposal
(as opposed to individual alternative locations or designs)
which might include the probable impact upon such ele-
ments, factors, and features listed in paragraph 3 of Ap-
pendix F.

c. Any probable adverse environmental effects which
cannot be avoided should the proposal be implemented
such as water or air pollution, effect upon Section 4(f)
land, damage to life systems, urban congestion, threats to
health or other consequences adverse to the environment
identified under paragraph 2b of this Appendix. Adverse
effects should include those which cannot be reduced in
severity and those which can be reduced (but not elimina-
ted) to an acceptable level unless the reductiion is a result
of a different location in which case it should be included
in the discussion of alternatives (paragraph 2d of this
Appendix).

A56

d. Alternatives: The locations andor designs
studied in detail by the HA are to be described (narra-
tively and with maps ard other visual aids, as necessary)
and the probable beneficial and/or adverse effects of each
alternate (including a do-nothing alternative) identified
to the extent practicable consistent with the scale of the
proposed highway improvement and significance of the
impact. The exploration of alternatives should include an
objective evaluation and analysis of estimated costs (social
and transportation), engineering factors, transportation
requirements, and environmental consequences. The
description of alternatives will include information, as
appropriate, similar to that suggested in Section A of this
Appendix. The discussion of environmental impacts will
include more detailed impacts for each alternative than
the broad environmental consequences for the corridor
identified in paragraphs 2b and 2c of this Appendix. The
draft environmental statement should indicate that all al-
ternatives are under consideration and that a specific al-
ternative will be selected by the HA following the public
hearing. The final environmental statement will be pre-
pared for the selected alternative. Unless the final state-
ment is included in the location study report (design re-
port when prepared and circulated during design study),
the final statement should include a brief discussion of the
data supporting the se'ected alternative. This section
should also include a discussion of alternatives to the use
of Section 4(f) lands.

e. The relationship between local short-term uses of
man’s environment and the maintenance and enhance-
ment of long-term productivity. The short-term uses
should be evaluated (construction, changes in traffic pat-
terns, the taking of natural features such as trees, etc.,
and man-made features such as homes, churches, etc.) as
compared to the long-term effects (foreseen changes in

So AEE OS RRS We 2 ee

AS7

land use resulting from the highway improvement or other
similarly related items that may either limit or expand
land use, affect water, air, wildlife, etc., and other en-
vironmental factors).

f. Any irreversible and irretrievable commitments of
resources which would be involved in the proposed action
should it be implemented. Highways require use of nat-
ural resources such as forest or agricultural land, however,
these are generally not in sufficient quantity to be sig-
nificant. The improved access and transportation af-
forded by a highway may generate other related actions
that could reach major proportion and which would be
difficult to rescind. An example would be a highway im-
provement which provides access to a nonaccessible area,
acting as a catalyst for industrial, commercial, or residen-
tial development of the area.

g. Where unavoidable adverse environmental effects
are encountered, planning and measures taken and pro-
posed to minimize harm should be identified. These in-
clude procedural and standard measures which are re-
quired by standard specifications or standard operating
procedures such as erosion control, stream pollution pre-
vention, borrow pit screening or rehabilitation, fencing,
relocation of people and businesses, land acquisition pro-
cedures, joint development, etc. Measures unique to a
specific project should be discussed in detail. Examples
of such would be depressing an urban highway to mini-
mize audio and visual effects, providing buffer zones for
esthetic purposes, replacement of parklands, etc.

h. Final statements shall incorporate all comments
received on the draft (including environmental com-
ments contained in the public hearing transcript) along
with a discussion of the comments and suggestions. The
HA shall describe its disposition of the comments and
suggestions (e. g., revisions to the proposed development

&
-
<
re

NWN ARM CAN UAE 9 7

Se a RN Ce alin ees a

ST) Toe ke

Row

Ep cow ree 6

va eid un,

A358

or improvement to overcome anticipated problems or ob-
jections; reasons why specific comments and suggestions
could not be accepted; factors of overriding importance
prohibiting the incorporation of suggestions, etc.). This
section may be added at the end of the review process in
the final text of the environmental statement.

i. Measures to minimize harm to Section 4(f) lands
should be included under a separate paragraph even
though discussed elsewhere in the final statement.

j. Each copy of draft and final environmental state-
ments should be accompanied by a summary sheet pre-
scribed as attached to this Appendix.

3. The following information, when pertinent and
available, should be included in the combination environ-
mental /Section 4(f) statements. (See paragraphs 2a, 2c,
2d, and 2i of this Appendix.) To the extent practicable,
this information should be included in the draft to initi-
ate the necessary interagency review.

a. The description of the project (see paragraph 2a
of this Appendix) shall include information about the Sec-
tion 4(f) land in sufficient detail to permit those not ac-
quainted with the project to have an understanding of the
relationship the highway and park and the extent of the
impact, such as:

(1) Size (acres or square feet) and location (maps
or other exhibits such as photographs, slides, sketches,
etc., aS appropriate).

(2) Type (recreation, historic, etc.).

(3) Available activities (fishing, swimming, golf,
etc.). .

(4) Facilities existing and planned (description and
location of ball diamonds, tennis courts, etc.}.

we - mR OT eR re Se a ee a ee CE ee

A59

(5) Usage (approximate number of users for each
activity if such figures are available).

(6) Patronage (local regional, and national).

(7) Relationship to other similarly used lands in the
vicinity.

(8) Access (both pedestrian and vehicular).

(9) Ownership (city, county, State, etc.).

(10) If applicable, deed restrictions or reversionary
clauses.

(11) The determination of significance by the Fed-
eral, State, or local officials having jurisdiction of the
Section 4(f) land.

(12) Unusual characteristics of the Section 4(f) land
(flooding problems, terrain conditions, or other features
that either reduce or enhance the value of portions of
the area).

(13) Consistency of location, type of activity, and
use of the Section 4(f) land with community goals, ob-
jectives, and land use planning.

(14) If applicable, prior use of State or Federal funds
for acquisition or development of the Section 4(f) land.

b. A description of the manner in which the highway
will affect the Section 4(f) land (include within paragraph
2c of this Appendix) such as:

(1) The location and amount of land (acres or square
feet) to be used by the highway.

(2) A detailed map or drawing of sufficient scale
to discern the essential elements of the highway /Section
4(f) land involvement.

(3} The facilities affected.

a Be as

HEIR YT OMHMNT AT

eee ih rien ak aaa

nh SOTO GY Cha

RIL

Bevere AMET EY

A60

(4) The probable increase or decrease in physical
effects on the Section 4(f) land users (noise, fumes, etc.).

(5) The effect upon pedestrian and vehicular access
to the Section 4(f) land.

c. Aspecific statement (with supporting reasons) that
there is no feasible and prudent alternative. (Include
in discussion of alternatives, paragraph 2d of this Ap-
pendix. )

d. Information to demonstrate that all possible plan-
ning to minimize harm is or will be included in the high-
way proposal. (See paragraph 2i of this Appendix.) Such
information should include:

(1) The agency responsible for furnishing the high-
way right-of-way.

(2) Provisions for compensating or replacing the Sec-
tion 4(f) land and improvements thereon, including the
status of any agreements. (Include agreed upon compen-
sation, replacement acreages, and type land, etc., when
known. )

(3) Highway design features developed to enhance
the Section 4(f) land or to lessen or eliminate adverse
effects (improving or restoring existing pedestrian or ve-
hicular access, landscaping, esthetic treatment, etc.). .

(4) Coordination of highway construction to permit
orderly transition and continual usage of Section 4(f) land
facilities (new facilities constructed and available for use
prior to demolishing existing facilities, moving of facilities
during off-season, etc.).

e. Evidence that the provisions of Section 470(f) of
16 U.S.C. (Section 106 of the Historic Preservation Act
of 1966) have been satisfied when National Register Prop-
erties are involved.

~ N rine nern ge e

A61

SUGGESTED FORMAT—DRAFT STATEMENT

DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION

Prepared by

(Appropriate Highway Agency )
DRAFT

(Environmental Statement of Environmental/Section
4(f) Statement)

ADMINISTRATIVE ACTION
for

(Brief Description of Highway Improvement: Route,
Termini, County, City, etc.)

THIS HIGHWAY IMPROVEMENT IS PRCPOSED FOR
FUNDING UNDER TITLE 23, U.S.C. THIS STATEMENT
FOR THE IMPROVEMENT WAS DEVELOPED IN CON-
SULTATION WITH THE FEDERAL HIGHWAY AD-
MINISTRATION AND IS SUBMITTED PURSUANT TO:

SECTION 102(2) (C)
PUBLIC LAW 91-190
and
(when applicable)
Section 4(f)
PUBLIC LAW 89-670

Date Signature of Appropriate Highway
Agency Official

CLEARED BY FHWA FOR CIRCULATION AND COM-

MENTS

Date Signature of FHWA Reviewing Official

we NOIR ROL ar Mate PRA She Pe Upnieety

tis he at

Brcoane tere ennees

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385607_1646%3A1. Public record. Not legal advice.