TABLE OF CONTENTS

PRELIMINARY STATEMENT ...

EN eae eee ee eee ee

JURISDICTION OF THE COURT ..........---..----c-scecceesesneeseseceeeesenencenenneenseses

QuesTIONS PRESENTED

STATUTORY PROVISIONS INVOLVED ..............---c--00eecee-eee-eee

STATEMENT OF THE CASE

ARGUMENT:

A. Laches i aisciniianiniasinstasisitiieiiupitienbmpeiin nsintlaaisaigiins

B. Applicability of § 102 of NEPA and § 128(a) of Federal-Aid
Highway Act of 1968. 7
ConcLusION 19
CERTIFICATE OF SERVICE 19

TABLE OF CITATIONS
Cases

Arlington Coalition on Transportation v. Volpe, 332 F.Supp.
1218 (E.D. Va. 1971) 2

Arlington Coalition on Transportation v. Fugate, 458 F.2d 1323.
(4th Cir. 1972) 1, 13, 15

Citizens to Preserve Overton Park v. Volpe, 3 E.R.C, 1510 (W.D.
Tenn. January 5, 1972) .
Clark v. Volpe, 4 E.R.C. 1254 (E.D. La. 1972) 6

Concerned Citizens v. Volpe, 4 E.R.C. 1042 (3rd Cir. April
28, 1972) 12, 14

Conservation Society v. Volpe, 4 E.R.C. 1226 (D. Vt. June 2, 1972) 13
Elliot v. Volpe, 328 F.Supp. 831 (D. Mass. 1970) 6

Page

Environmental Law Fund v. Volpe, 3 E.R.C. 1941 (N.D. Cal.
March 22, 1972) 9, 14

Harrisburg Coalition v. Volpe, 330 F.Supp. 918 (M.D. Pa. 1971) 6

Keith v. Volpe, ...... E.R.C. ...... (C.D. Cal. July 7, 1972) .............. 15
Lathan v. Volpe, 455 F.2d 1111 (9th Cir. 1971) 6
Nolop v. Volpe, 333 F.Supp. 1364 (S.D. S.D, 1971) -.........---....-.2.. 6
Pennsylvania Environmental Council v. Bartlett, 315 F.Supp. 238
(M.D. Pa. 1970), aff'd. 454 F.2d 613 (3rd Cir. 1971) .............. 6

Road Review League v. Boyd, 270 F.Supp. 650 (S.D. N.Y. 1967) 6
San Francisco Tomorrow v. Romney, 4 E.R.C. 1065 (N.D. Cal.

April 25, 1972) 15
Ward v. Ackroyd, 4 E.R.C. 1209 (D. Md. June 8, 1972) .............. 14
Statutes
Federal-Aid Highway Act of 1958, § 128(a), 23 U.S.C. § 128(a) .. 2
Federal-Aid Highway Act of 1968, 23 U.S.C. § 101, et seq. ............ 3,7

Federal-Aid Highway Act of 1968, § 101(b), 23 U.S.C. § 101(b)....5, 6

Federal-Aid Highway Act of 1968 § 128(a), 23 U.S.C. § 128(a)
2, 11, 12, 13, 16, 19

Federal-Aid Highway Act of 1968 § 138, 23 U.S.C. § 138 ................ 4
28 U.S.C. § 1254(1) 2
National Environmental Policy Act of 1969, 42 U.S.C, § 4331,

et seq. 7, 9, 10, 11, 12, 13, 15, 18, 19
National Environmental Policy Act of 1969, § 102, 42 U.S.C.

§ 4332 2,4
Virginia Code (1950), as amended:

Section 33.1-90 16

Other Authorities

Department of Transportation Policy and Procedure Memorandum

20-8 10, 16

Council on Environmental Quality Guidelines [36 Fed. Reg. 7724
(1971) ] 11

Supreme Court of the United States

DOUGLAS B. FUGATE, Commissioner, DEPARTMENT
oF Hichways, CoMMONWEALTH OF VIRGINIA,
Petitioner,
v.

ARLINGTON COALITION ON
TRANSPORTATION, er AL.,
Respondents.

PETITION FOR A WRIT OF CERTIORARI TO THE
JUDGMENT OF THE UNITED STATES COURT OF
APPEALS FOR THE FOURTH CIRCUIT

PRELIMINARY STATEMENT

Douglas B. Fugate, Commissioner, Department of High-
ways, Commonwealth of Virginia, prays that a writ of
certiorari issue to review the order of the United States
Court of Appeals for the Fourth Circuit entered on April 4,
1972, and modified on May 9, 1972.

OPINIONS BELOW

The opinion of the court below is reported at 458 F.2d
1323, and is included herein as Appendix A.

a

The order of the court below granting an injunction
pending appeal is included herein as Appendix B.

The opinion of the District Court for the Eastern District
of Virginia, Alexandria Division, is reported at 332 F.Supp.
1218, and is included herein as Appendix C.

2

JURISDICTION

The order of the Court of Appeals for the Fourth Circuit
was entered on April 4, 1972, and modified on May 9, 1972.
The jurisdiction of this Court is invoked under 28 U.S.C.
§ 1254(1). ”

QUESTIONS PRESENTED

1. Whether under the facts of this case the respondents’
claims are banned by the equitable doctrine of laches.

2. Whether under the facts of this case the Virginia State
Highway Commissioner should be required to comply with
the National Environmental Policy Act and conduct a new
location hearing for Arlington I-66 pursuant to § 128(a) of
the Federal-Aid Highway Act of 1968, where approval for
the location and design of the project was given prior to
the effective date of either act.

STATUTORY PROVISIONS INVOLVED
The statutory and regulatory provisions involved are set
forth in Appendix D and include the following:

(1) Section 128(a) of the Federal-Aid Highway Act of
1958, 23 U.S.C. § 128(a).

(2) Section 128(a) of the Federal-Aid Highway Act of
1968, 23 U.S.C. § 128(a).

(3) Section 102 of the National Environmental Policy
Act of 1969, 42 U.S.C. § 4332.

—

3

STATEMENT OF THE CASE

This is an appeal from an order granting a declaratory
judgment and injunctive relief against federal and state
officials concerning the proposed construction of a six-mile
section of interstate highway (hereinafter I-66) in Arlington
County, Virginia. This highway is a part of the Interstate
System of Highways authorized by 23 U.S.C. § 101, et. seq.
Pursuant to this statute the highway is constructed by the
States under a federal grant whereby 90% of the cost is paid
by the Federal Government and 10% by the States (Stip.
(1), App. 47). The section of I-66 in question, as planned,
is to be constructed in a corridor connecting I-495 and the
Theodore Roosevelt Bridge.

A public hearing was held in 1958 to consider a corridor
for the highway (Stip. (2), App. 48). The present location
was approved by the Bureau of Public Roads (predecessor
tothe Federal Highway Administration) in 1959 (Stip. (3),
App. 49). Right-of-way authorizations which commit
federal funds for right-of-way acquired pursuant to au-
thorization, were given for the entire length of the cor-
ridor between January 12, 1961 and January 11, 1965 (Stip.
(7)(a), App. 52). Design approvals were given for the
entire project between June 23, 1961 and August 7, 1968
(Stip. (9), App. 54).

Beginning in 1958 and continuing to the present there
has been extensive newspaper coverage in the locality of
the I-66 project, and the general route has been published
on many occasions since that date. The Arlington County
General Land Use Plan has shown the location of I-66 since
1961; and Arlington County’s planning with respect to
zoning, traffic, utilities, etc., has relied upon this location.
In addition numerous businesses have relocated in reliance
on the present location (Stip. (11) (d), App. 57).

4

As of January 31, 1971, more than 924 parcels of land
had been acquired in the corridor in question at a cost of
$28,670,123.07. In this corridor 94% of the 619 dwellings
have been acquired, only one of the 69 businesses remained
to be acquired, and 76% of the 628 families and 85% of the
80 businesses caused to be relocated have done so. The esti-
mated cost to complete the acquisition of right-of-way way
$5,329,876.93. In addition $1,500,000.00 for preliminary
engineering has been expended (Stip. (8), App. 54).

In February, 1971, the respondents filed suit in Federal
District Court for the Eastern District of Virginia, Alex-
andria Division, requesting that right-of-way acquisition
and construction with respect to I-66 be enjoined on the
bases, inter alia:

(1) an environmental impact statement should be filed
pursuant to § 102 of the National Environmental Policy Act
of 1969.

(2) a 4(f) statement should be filed pursuant to § 138
of the Federal-Aid Highway Act of 1968.

(3) a new location hearing is required to consider the
environmental effects of the entire project.

(4) a new location hearing is required to consider the
economic effects of the expansion of Routes 29-211.

The Commissioner denied all allegations and in addition
asserted the defenses of sovereign immunity, lack of federal
question and laches. The District Court found for the de-
fendants on the merits and dismissed the action.

An appeal was taken to the Court of Appeals for the
Fourth Circuit, raising all of the aforementioned issues. In
reversing and remanding the case the court found in favor
of the appellants-in-error as to the substantive issues and

5

against the Commissioner, both as to a lack of federal ques-
tion and laches. Inasm---ch as the Commissioner intends to
file an environmental impact statement and a 4(f) state-
ment and intends to conduct a hearing to consider the
economic effects of the expansion of Routes 29-211, these
issues are not before this Court. The Commissioner raises
~ only the questions of the requirement of a new location
hearing for the entire project to consider the environmental
effects and the denial of the claim of laches.

ARGUMENT
A.
Laches

The court below in discussing the doctrine of laches found
the requisite elements for its invocation; however, it de-
clined to assert it against the appellants therein:

“Nevertheless, we decline to invoke laches against
appellants because of the public interest status accorded
ecology preservation by the Congress.” (App. 7)

In effect the court has declared that as a matter of law
laches cannot be a defense in ecology cases. We submit that
this is in error.

In declining to permit the defense of laches in an environ-
mental suit, the court has once again advanced the cause
of environmental protection at the expense of every other
Congressionally-declared public interest. Apart from an in-
terest in avoiding the inordinate expense and wastage of
road user funds, there is also a significant public interest
as expressed by Congress in the early completion of the
Interstate System of Highways. 23 U.S.C. § 101(b), pro-
vides:

6

“It is hereby declared to be in the national interest
to accelerate the construction of the Federal-Aid High-
way System, including the National System Of Inter-
state and Defense Highways, since many of such high-
ways, or portions thereof, are in fact inadequate to meet
the needs of local and interstate commerce for the
national and civil defense.
“It is hereby declared that the prompt and carly
of the National System of Interstate and
Defense Highways, so named because of its primary
importance to the national defense and hereinafter re-
ferred to as the “Interstate System’ is essential to the
national interest and is one of the most important
objectives of this Act... .”

The court, however, made no mention of these interests,
much less, gave to them any weight.

It is significant that no other court in the consideration
of a claim of laches has used this approach. In those cases
where the defense of laches has not been sustained, the
denial has been due to a finding that there was due diligence
in bringing the action or that there was not substantial preju-
dice to the defendant, or both. See Nolop v. Volpe, 333
F.Supp. 1364 (S.D. S.D. 1971); Harrisburg Coalition v.
Volpe, 330 F.Supp. 918 (M.D. Pa. 1971) ; Elliot v. Volpe,
328 F.Supp. 831 (D. Mass. 1970) ; Pennsylvania Environ-
mental Council v. Bartlett, 315 F.Supp. 238 (M.D. Pa.
1970), aff'd 454 F.2d 613 (3rd Cir. 1971) ; while two cases
involving the defense of laches in a claim pursuant to NEPA
have sustained the defense: Lathan v. Volpe, 455 F.2d
1111 (9th Cir. 1971) ; Clark v. Volpe, 4 ERC 1254 (ED.
La. 1972). See also, Road Review League v. Boyd, 270
F.Supp. 650 (S.D. N.Y. 1967).

In summary it is submitted that there was undue delay
on the part of respondents in bringing this action and that
the petitioner has suffered prejudice thereby. Accordingly,

-_

7

this case should have been dismissed Pursuant to the equit-
able doctrine of laches.

B.

Applicability Of § 102 Of NEPA And § 128(a) Of
Federal-Aid Highway Act of 1968.

i icy

Act (NEPA) and the amendments to the Federal-Aid High-

way Act of 1968 will be applicable to ongoing highway
projects, stated :

(1) “We believe that Arlington I-66 has not pro-

gressed to the point where the costs of altering or

abandoning the proposed route would certainly out-
weigh the benefits that might accrue therefrom to the
general public.” (App. 7-8) (Emphasis in the original. )

a “Ses (D)oubt about whether the critical stage
has been reached must be resolved in favor of ap-
plicability.” (App. 10)

It is respectfully submitted that the test adopted by the
court provides an uncertain and unworkable standard.
In adopting the “certainly outweigh” test, the court has

of the statute. By this approach, the court has apparently
intended to reject a rule of thumb in favor of a rule of
reason, assessing each case on its facts and determining from
those facts whether striking the balance in favor of ap-
Plication of the environmental Statutes, with the concomitant
delay and expense, would be appropriate. Petitioner respect-
fully submits, however, that by attempting to implement
this approach through the language previously quoted, the

|

court as a practical matter has been equally as arbitrary as
had they chosen to utilize cutoff dates. The court’s opinion
en
Wile have all of the steps al
cakes townsde commwustion of Adages 1&6 och
of the steps yet to be taken and have concluded that
this highway has not yet reached that state of com-
that cuts off application of Section 102(c).”
(App. 12) (Emphasis in original.)

No criteria are offered by the court for this conclusion; it
is impossible for States and federal agencies to assess other
projects with any measure of confidence to determine the
applicability of this decision. Indeed, the “I know it when
I see it” approach taken by the court can only result in
extensive and unnecessary litigation over every ongoing
project, resulting in delays which Congress certainly never in-
tended or envisioned in enacting the environmental statutes.
While money may be no object when natural resources are
at stake, it must not be forgotten that in many major on-
going projects, such as Arlington I-66, much more than mere
dollars are involved. A case such as this, where many
families have been uprooted and relocated, where county,
State, and private planning has relied on the completion
of the highway as proposed for 13 years, where the right-of-
way already purchased, unless utilized for transportation
purposes, cuts a naked and useless swath through an urban
area, requires more judicial explication than mere fiat of
the reasons for the court's ruling.
Furthermore, the “certainly outweigh” test by its own
terms indicates that its operation cannot result in any-
thing but another arbitrary cutoff point. Even without re-
solving all doubts in favor of applicability, the “costs” and
“benefits” referred to by the court are simply not susceptible

ee cetie

of measurement, especially when the costs must certainly
outweigh the benefits. It is a comparison between apples

no pollution is created through the use of electric engines?
Do the costs ever outweigh the benefits? Indeed, if they do
not in this case, where (as the court found) 93.9 percent
of all dwellings, 98.5 percent of all famili and 84.6 per-

be found in the recent case of Environmental Law Fund vy.
Volpe, 3 ERC 1941 (N.D. Cal. 3-22-72). In that case the
court stated, as did the court below, that NEPA was

10

Congress’ strongest statement of environmental policy and
that the courts must be diligent in the enforcement of its
provisions. The court noted, however, that the Council on
Environmental Quality in its Guidelines for the implementa-
tion of NEPA had recognized the need to distinguish between
new projects and projects already in progress as of January
1, 1970. These latter projects were to comply with the re-
quirements of NEPA only to the “maximum extent prac-
ticable” rather than to the “fullest extent possible.” The
next task was to decide when the maximum extent prac-
ticable required application to the particular highway proj-
ect. Clearly, said the court, if design approval had not been
granted by January 1, 1970, it was still practicable to require
compliance with NEPA as envisioned by PPM 20-8.’ Even
where design approval had been obtained prior to that
date, however, compliance might still be practicable depend-
ing on the facts of the case. In such situations, the court
recommended four factors to be considered :

(1) Community participation in the planning of the
project.

(2) The state’s consideration of environmental factors in
its own planning.

(3) The likely harm to the environment if the project is
constructed as planned.

(4) The cost of halting construction while the NEPA
statement is prepared and filed.

Petitioner believes that in the balance of these factors the
Court would reach a different conclusion than it did with
regard to Arlington I-66 but, even if it did not, the adop-

1 The court rendered no opinion as to projects approved between
January 1, 1970 and February 1, 1971. See note 12.

11

tion of this test would provide State and federal officials with
guidelines which could be applicd to other ongoing projects
instead of the visceral reaction effect of the “certainly out-
weigh” test. It is not important in terms of the facts of the
instant case whether an environmental impact statement is
required, in that one has already been prepared and circu-
lated in its draft form; and, indeed, the final draft was near
submission on the eve of the decision of the court below.
Such a requirement is important of course with respect to
providing a basis for a selection of future courses of action
by governmental agencies with respect to highway projects.

Even more significant is the court’s application of the
“certainly outweigh” test to Section 128(a) of the Federal-
Aid Highway Act of 1968 to require a relocation hearing
on Arlington I-66. The fallacies of this argument are that,
as pointed out supra, even the Council on Environmental
Quality, which is charged with the implementation of
NEPA, has not applied the “fullest extent possible” standard
to ongoing projects, but has applied the “maximum extent
practicable test.” Secondly, neither of those standards apply
to the public hearing provisions of § 128(a) of the Federal-
Aid Highway Act. By their terms, they apply only when a
NEPA statement must be filed, not when amendments to an
unrelated statute must be applicable to projects which had

consequences not fully evaluated at the outset of the project or
program.” 36 Fed. Reg. 7724 (1971).

12

complied with the original requirements of that statute prior
to the effective date of the amendment; yet, through some
curious juxtaposition of NEPA and the Federal-Aid High-
way Act of 1968, the court required a retroactive applica-
tion of the provisions of the latter act on the basis of language
found in the former.’ In other words, the Court here decides
not just whether NEPA should be applied retroactively but
whether § 128(a), and all other new statutes or regulations
for that matter, should be applied retroactively, and it uses
the same “certainly outweigh” test, without any objective
standards, resulting in the uncertainties hereinbefore men-
tioned. The court below further stated that there was no
retroactive application of the statutes in question. It is
respectfully submitted, however, that for the court on the
one hand to require the petitioner to conduct another hear-
ing when the previous hearing admittedly was lawful at
the time it was held* and on the other hand to assert that it
is simply applying NEPA to the facts as they exist today, is
to engage in semantic sophistry. There can be no doubt that
NEPA and § 128(a) are being retroactively applied.

Other courts have recently considered the question of the
retroactivity of NEPA and reached a variety of results. The
only recent decision by a circuit court is Concerned Citizens

13

v. Volpe, 4 ERC 1042 (3rd Cir., April 28, 1972). In that
case the plaintiffs sought to have a highway enjoined for
failure to comply with NEPA and § 128(a) of the Federal-
Aid Highway Act of 1968. Both location and design ap-
proval were given prior to the effective date of either of
the acts. In refusing to retroactively apply these acts to an
ongoing federal project, the court stated:

“Plaintiffs next contend that the defendants failed to
comply with the public hearing provisions of § 128(a)
of Title 23, as construed by Policy & Procedure Memo-
randum (PPM) 20.8 issued by the Department of
Transportation, 23 C.F.R., Part I, App. A (1972).
These provisions were discussed at length in this court’s
opinion in Wildlife Preserves, Inc. v. Volpe, 443 F.2d
1273 [2 ERC 1094] (1971). And, as was there recog-
nized, they do not apply retroactively to projects which
received federal design approval prior to passage of
either provision. Id. at 1274. The effective date of
§ 128(a) of the FAHA is August 23, 1968. Id. PPM
20.8 became effective on January 29, 1969. Pennsy]-
vania Environ. Council, Inc. v. Bartlett, _..... lem
[3 ERC 1421] (No. 19453, filed December 1, 1971).
The district court found that final design approval oc-
curred in this case no later than 1967. And the record
clearly supports this finding. Therefore, we agree with
the trial court’s ultimate conclusion that § 128(a) of
the FAHA and PPM 20.8 were not here applicable.”
4 ERC 1044.

Thus, the standard for a determination of retroactive ap-
plication of NEPA and the Federal-Aid Highway Act of
1968 in the Third Circuit is in direct conflict with that de-
lineated in the instant case in the Fourth Circuit. A case
illustrating the difference is Conservation Societ y Vv. Volpe,
# ERC 1226 (D.C. Vt., June 2, 1972). In that case the
court rejected the “broad view” (ACT) advocated by the

< m RAO Ra

14

plaintiffs and the “narrow view” (Concerned Citizens,
supra) offered by the defendants in favor of the guidelines
as suggested by the Environmental Law Fund case, supra.

Another case in which a preference for the Environmental
Law Fund approach was favored is Ward v. Ackroyd, 4
ERC 1209 (D.C. Md., June 8, 1972) ; however, the court
was bound by the decision in the instant case. In adopting
the “certainly outweigh” test the court observed:

“While bound by the test, I respectfully must dis-
agree with the test established by the Fourth Circuit
in Arlington Coalition for determining when a project
has reached the critical stage of completion beyond
which the revisions to 23 U.S.C. § 128(a) do not apply.
Without remanding the case for a factual determina-
tion, the Fourth Circuit panel in Arlington Coalition de-
termined on unknown facts by unknown criteria that
‘the cost of altering or abandoning the proposed loca-
tion would not certainly outweigh whatever benefits
might be derived therefrom,’ Such a standard is vague,
subjective and extremely difficult to apply unless it
means that the costs of changing would never outweigh
the benefits of changing. In this case, the problem of
application of the standard has been alleviated some-
what because of the great factual similarity of the rele-
vant circumstances here with those in Arlington Coali-
tion. If anything, I-66 had progressed substantially
further toward completion than has Segment 9 of
I-70N. If, as the Fourth Circuit has held, NEPA re-
quires application of revised § 128(a) to a project
which has passed the point at which old § 128(a) used
to apply but which has not yet reached the ‘critical
stage of completion,’ this court believes that standards
of the type set forth in Environmental Law Fund v.
Volpe, 3 ERC 1941 (N.D. Cal., decided March 22,
1972) are more appropriate for that determination.”
4 ERC 1224-1225, n. 71.

15

This represents an eloquent expression of the erroneous
holding of the instant case.

Other cases which have considered the retroactivity of
NEPA issue and which have adopted various standards are:
Keith v. Volpe ...... ERC ...... (C.D. Cal., July 7, 1972) (the
standards are essentially those of ACT, but there is more
emphasis on design approval as a significant factor) ; San
Francisco Tomorrow v. Romney, 4 ERC 1065 (N.D. Cal.,
April 25, 1972) (the court appears to base a decision as to
the retroactivity of NEPA to an urban renewal project on
whether there have been significant design changes subse-
quent to January 1, 1970, the effective date of NEPA) ;
Citizens to Preserve Overton Park v. Volpe, 3 ERC 1510
(W.D. Tenn., January 5, 1972) (NEPA was held to be in-
applicable because the approval of location occurred prior
to the effective date of the act, notwithstanding that a 4(f)
submission was required.) Thus, it_is manifest that there is
a need for this Court to provide a definitive standard in this
very complex and controversial area of the law.

The reasons this particular holding is of great significance
to the State are several. Firstly, as stated previously the
precedential effect of this holding has momentous implica-
tions for other ongoing projects. Secondly, as to Arlington
I-66, the requirements of compliance with NEPA and
§4(f) are not unduly burdensome as these statements have
been prepared and submitted, while the requirement of a
new public hearing not only creates additional delay and
expense” but may place the State in difficulty under Virginia
law which requires that Property acquired for highway

* Present estimates are that a new hearing is at least a year away,
and the cost of the study by independent consultants will be in the
neighborhood of five to seven hundred thousand dollars. These costs
are exclusive of the ultimate additional expenses due to inflation, both
as to land values and construction éosts.

16

construction must be resold to its original owner if not so
used within 12 years. Va. Code Ann. § 33.1-90.° Thirdly,
the requirement of a new public hearing raises the specter
of further protracted litigation of a kind in which the State
would be at a decided disadvantage, since if the current plan
is not abandoned, opponents of the highway are certain to
claim that objective consideration was not given to alterna-
tive routes due to the massive investment in the current
location. Furthermore, the court’s opinion is unclear whether
a new design hearing must be held as well as a location hear-
ing, and opponents of the highway are once again certain to
assert that retroactive application of § 128(a) demands
retroactive application of the two-hearing requirement of
PPM 20-8 as well.

In order to justify a decision to order a new location hear-
ing with attendant costs of seven to eight hundred thousand
dollars exclusive of inflation costs, it would appear that_at
a minimum there should exist a reasonable possibility of
substantial alteration in the project as presently planned as
a result of such study and hearing. The court below justified
its requirement for a new location hearing on the premise
that I-66 might not now be needed in light of the proposed
rapid rail service to the Rosslyn area, which service was not
considered at the time of the 1958 hearing (App. 28).
Several observations appear to be in order:

1. As the court noted, the rail service in part is scheduled
to be located in the I-66 median. If such median is not
available, rapid rail service may never be constructed.

2. The court assumes that rapid transit could alleviate
the need for a highway. Yet, there is absolutely no evidence,

* This section was amended effective July 1, 1972, to exempt from
its operation highways delayed by litigation. Whether this amendment
can lawfully relate to property already acquired, as in I-66, remains
to be decided.

17

including the traffic studies offered as exhibits by the re-
spondents to support this, In fact all of the affirmative
evidence supports the need for a highway in addition to the
rapid transit. It is not enough to say that rapid transit was
not considered. There should also be some evidence to show
rapid rail transit could replace the highway. There has been
none and there can be none,

The respondents recognized this. It is for this reason that
they used a “scatter gun” approach to arguing the need for
a new location hearing. They apparently hoped that lack
of quality as to their individual arguments with respect to
changes in population, traffic patterns and job locations, as
well as unforeseen rapid transit, could be overcome through

the sheer quantity of those arguments. Yet, the court below

seized upon one of these elements and elevated it to a level

greatly disproportionate to its merit. In fact the plan of

rapid transit is a concomitant, not an alternate, mode of

transportation with respect to the traffic facilities here in
question.

3. While it is true that rapid transit was not considered
in 1959, at the time the location of I-66 was approved, as
early as 1962, a consideration of such service had begun
(Stip. (23) (d), App. 63). It cannot be doubted that there
has been reevaluation over a period of ten years by the
appropriate agencies of a need for I-66 in light of rapid
transit. In fact there was no need for a new hearing with
respect to rapid transit because no information was available
to indicate that such service could meet the traffic needs of
the area. As Previously stated all of the evidence affirma-
tively showed that, indeed, the highway was needed, as well.
Assuming, therefore, that the highway is needed, it is
almost inconceivable that there could be a substantial altera-
tion of the present location. Apart from the economics in-

18

volved, environmental considerations alone would dictate
that a virtually undeveloped corridor be utilized for high-
way purposes, rather than displacing hundreds of families
and businesses elsewhere in the area.

While it is true that the “monitoring” of the traffic needs
of the area is not the same as holding public hearings to
solicit the opinions of affected persons, it is submitted that
the existence of monitoring is an important fact in the
determination whether there is a likelihood of change in
present plans as a result of a new study. Given the absence
of evidence to support the argument that either (1) the
highway is not needed, or (2) that there is a preferable
location, one can only conclude that the likelihood of a sub-
stantial change with respect to the present plans for the
project even after the expenditure of seven to eight hundred
thousand dollars for the study is extremely slight. It is sub-
mitted therefore that not only do the costs of abandonment
of this project exceed the potential benefits; indeed, the costs
of a restudy of the project do so.

In summary, it is submitted that Congress simply did not
intend this type of protracted litigation over the minutiae
of ongoing projects, and that Congress did not intend, in its
understandable concern for future damage to the environ-
ment, to give disgruntled landowners ammunition to end-
lessly delay sorely needed projects which had complied with
the laws and regulations as they existed at the time of their
planning, and whose planners could not have been expected
to foresee the continually expanding requirements imposed
by judicial decisions under the National Environmetal Policy
Act. This Court should not permit a “certainly outweigh”
test to be used to further such delays. On the contrary, it
should recognize the needs of all the citizens, including legi-
mate environmentalists, and adopt a test for the application
of these statutes that takes into consideration the complex

EWALD I PHATE ALINE AT) TOILE TIME OED

19

realities of life as well as the hypothetical theories of en-
vironmental crisis.

CONCLUSION

Petitioner submits that the decision below should be re-
viewed in that it adopts an unworkable standard with respect
to the applicability to the federal highway program of the
National Environmental Policy Act of 1969 and the Federal-
Aid Highway Act of 1968, resulting in serious consequences
to the nationwide program in general and to the Common-
wealth of Virginia in particular. Such decision is also in
conflict with those of many other jurisdictions, including the
Court of Appeals for the Third Circuit.

Respectfully submitted,

ANDREW P. MILLER
Attorney General

Stuart H. Dunn
VANN H. LeEFcor
Assistant Attorneys General

Supreme Court-State Library Building
Richmond, Virginia 23219

CERTIFICATE OF SERVICE

I, Andrew P. Miller, Attorney General of Virginia, a
member of the Bar of the Supreme Court of the United
States and one of counsel for the State Highway Com-
missioner of Virginia, hereby certify that on this the 7th
day of August, 1972, three copies of the foregoing Petition
For A Writ Of Certiorari were served upon counsel of
record herein by depositing the same in the United States

Post Office, first class postage prepaid to Lawrence J. Latto,
Esq., 734 15th Street, N.W., Washington, D. C. 20005,
Robert S. Lynch, Esq., Department of Justice, Room 2344,
Ninth and Pennsylvania Avenue, Washington, D. C. 20530,
Charles McDonnell Radigan, Esq., 1415 N. Courthouse
Road, Arlington, Virginia 22201, Arthur B. Vieregg, Jr.,
Esq., Post Office Box 547, Fairfax, Virginia 22030, James
Tate, Esq., Assistant U.S. Attorney, Post Office Building,
Alexandria, Virginia 22313 and Robert Funicello, Esq., 1346
Connecticut Avenue, N.W., Washington, D. C. 20036.

Anprew P. MILLer
Attorney General

~ i i tee

FitiktD
AUS 7 S72

“WICHREL RODTK, /R.CLERK

+° FILE COPY
,»

y IAPPENDIX|

.

Supreme Court of the United States

“F2- 215

DOUGLAS B. FUGATE, Commissioner, DEPARTMENT
or Hichways, ComMMONWEALTH OF VIRGINIA,
Petitioner,
v.

ARLINGTON COALITION ON
TRANSPORTATION, er at.
Respondents.

Anprew P. Miter
Attorney General of Virginia
Stuart H. Dunn

Vann H. Lercor
Assistant Attorne ys General

Supreme Court-State Library Building
Richmond, Virginia 23219

te
oo ine!

we

TABLE OF CONTENTS

Page
Appendix A
Opinion of the United States Court of Appeals for the Fourth
Circuit 1
Order—Entered May 9, 1972 28
Appendix B
Order—Entered November 24, 1971 29
Appendix C
Memorandum Opinion—Entered October 8, 1971 _................ 30
Order—Entered October 8, 1971 43
Appendix D(1)
Federal-Aid Highway Act of 1958 _ 43
Appendix D(2)
Federal-Aid Highway Act of 1968 .. 44
Appendix D(3)
National Environmental Policy Act of 1969 44
Appendix E

Stipulation as to Facts—Filed June 9, 1971 47

APPENDIX A
Opinion of the United States Court of Appeals for the Fourth Circuit
Decided April 4, 1972

* * *

Craven, Circuit Judge:

This is an ecology case. It is the declared public policy of
the United States to protect and preserve the national en-
vironment “to the fullest extent possible.” National Environ-
mental Policy Act of 1969, 42 U.S.C.A. § 4332 (NEPA).
The NEPA is a value judgment by the Congress that in
order to “foster and promote the general welfare” each
generation of Americans must, beginning now, act “as
trustee of the environment for succeeding generations.” 42
U.S.C.A. § 4331. We hold that even essential highway con-
struction must yield to the congressionally structured pri-
ority.

Appellants are individuals who live in Arlington and own
land in the path of the proposed highway, and associations
whose objectives are the preservation of environmental and
community values and the development of a sound transpor-
tation system in the Washington metropolitan area. Appel-
lees are the Secretary of the United States Department of
Transportation, the Commissioner of the Virginia Depart-
ment of Highways, and their agents. Intervening appellees
are the Arlington and Fairfax Counties Chambers of Com-
merce. Appellants filed suit in February 1971, seeking a
declaration that in the planning of the segment of Interstate
Route 66 (I-66) scheduled to run through Arlington County,
Virginia, appellees violated certain federal statutes, and an
injunction restraining appellees from proceeding with the
planning and construction of this part of I-66. The district
court refused relief and this appeal resulted.

On November 24, 1971, we granted appellants’ request

App. 2

for an injunction pending appeal. State appellee Fugate
and his agents were enjoined “from condemning additional
land for . . . Interstate-66 located in Arlington County, Vir-
ginia, and from requiring the appellants . . . to vacate their
properties in the county.” Federal appellee Volpe and his
agents were enjoined “from approving, pursuant to 23
U.S.C. § 106(a), plans, surveys, specifications and estimates
for . . . Interstate-66 located in Arlington County, Virginia.”
We conclude that the federal statutes invoked by appel-
lants are applicable to Arlington I-66 and must be com-
plied with before further steps may be taken towards con-
struction of this highway. Compliance means not only
reconsideration of the proposed location of Arlington I-66
in the light of environmental, social, and economic policies
set forth in the statutes; it means also suspension of work
on Arlington I-66 pending this reconsideration. Further in-
vestment of resources by appellees in the proposed route
would render alteration or abandonment of the proposed
route increasingly costly and, therefore, increasingly unwise.
If appellees were thus allowed to limit their options during
their reconsideration of the location of Arlington I-66, re-
consideration would be a hollow gesture. See Calvert Chffs
Coordinating Committee, Inc. v. Atomic Energy Commis-
sion, 449 F.2d 1109, 1128 (D.C. Cir. 1971). We reverse the
decision of the district court and remand this case for entry
of an order enjoining further steps towards the construction
and acquisition of right-of-way for Arlington I-66 pending
reconsideration of the proposed location of this highway in
accordance with the applicable statutes. Upon entry of such
order, our injunction of November 24, 1971, will expire.

I. Factual Background

Interstate-66 is scheduled to extend from I-81, near Stras-
burg, Virginia, over 75 miles to the Potomac River in Arl-

__

App. 3

ington County. The section in controversy begins at the
Arlington County line, after the highway has passed through
Fairfax County from the Washington Beltway, and ends at
the Theodore Roosevelt Bridge. For the route of I-66
through Arlington, appellees intend to use 9.6 acres of Bon
Air Park and about 5 acres of Spout Run Parkway. Bon Air
Park is a tract of land acquired by Arlington County for
park and highway purposes and presently used for a park.
Spout Run Parkway is a park owned by the federal govern-
ment and administered by the National Park Service. It is
planned that I-66 will be connected in Spout Run Parkway
to another proposed interstate highway, I-266, with a bridge
to be constructed across the Potomac at a point called
“Three Sisters.” Whether and where I-266 and the Three
Sisters Bridge should be built have been the subject of con-
siderable public controversy and litigation. See D.C. Fed-
eration of Civil Associations v. Volpe, 434 F.2d 436 (D.C.
Cir. 1970) ; D.C. Federation of Civic Associations v. Volpe,

F.2d... (D.C. Cir. 1971). If the proposed 1-266
route to the Three Sisters Bridge is built, the 31.6 acres of
Spout Run Parkway will be conveyed to the Virginia De-
partment of Highways in exchange for funds to acquire the
same number of acres along George Washington Parkway,
and 13.97 acres of Spout Run Parkway will be used for I-
266. After emerging from Spout Run Parkway, I-66 is
scheduled to converge with Lee Highway for about one mile
until it reaches the Potomac. Lee Highway, currently a
three-to-four-lane road, will be separated at this point by
the six lanes of I-66 into four eastbound lanes south of I-66
and four westbound lanes north of I-66, so that for about
one mile there will be a fourteen-lane road.

Before a highway may be constructed with 90 percent
federal funds as a part of the Federal Interstate System, the

FLATT EMG EN ot EPPO GT GETHIN

App. 4

procedure set out by the Federal-Aid Highway Act, 23
U.S.C.A. § 101 et seq., must be followed. First, a route must
be selected by the highway department of a state ‘and ap.
proved by the Secretary of Transportation. 23 U.S.C.A.
§ 103(d) (1) & (e). Next, the state highway department
must submit to the Secretary for his approval a “program
. .. of proposed projects” that the state wishes to construct
with its portion of the funds appropriated for highway con-
struction. 23 U.S.C.A. § 105(a). Then, the state highway
department must submit to the Secretary for approval “such
surveys, plans, specifications, and estimates for each pro-
posed project included in an approved program as the Secre-
tary may require.” 23 U.S.C.A. § 106(a). This is known as
“P.S.&E. approval.” As.a prerequisite to P.S.&E. approval
for each “project,” the state highway department must cer-
tify to the Secretary that it has held public hearings on the
location for each project and must submit a transcript of
the hearings to the Secretary. 23 U.S.C.A. § 128. Following
P.S.&E. approval, project agreements covering construction
and maintenance are entered into between the Secretary and
the state highway department. 23 U.S.C.A. § 110. Adver-
tisements for bids may then be published and construction
contracts awarded. Finally, the highway is constructed under
the supervision of the state highway department. 23
U‘S.C.A. §§ 112, 114.

The next step towards the construction of the Arlington
County “project” of I-66 appears to be P.S.&E. approval.
The public hearing relating to the location of this project
was held in October 1958. In February 1959, the Virginia
State Highway Commission chose the Fairfax-Bluemont
Drive corridor as the location for Arlington I-66, and their
recommendation was approved by the Federal Bureau of
Public Roads in June 1959. This process was given extensive

_—

newspaper coverage. The route selected has been shown in
the Arlington County General Land Use Plan since 1961.
_ Arlington County has relied upon the proposed route in its
zoning, traffic, and utilities location planning, and numerous
| businesses have located near the proposed route. By January
11, 1965, acquisition of the right-of-way for the entire Arl-
ington I-66 project had been approved, and by July 28,
1966, acquisition-of-right-of-way agreements between the
state highway department and the Secretary had been
entered into for the entire project. In the proposed corridor,
93.9 percent of all dwellings have been acquired; 98.5 per-
cent of all businesses have been acquired ; 75.6 percent of all
families have been relocated; 84.6 percent of all businesses
have been relocated ; and 84.4 percent of all necessary right-
of-way has been acquired. The cost of these acquisitions, for
which the state has been reimbursed pursuant to the acqui-
sition agreements, was $28,670,123.07. The estimated cost
to complete the acquisition of right-of-way is $5,329,876.93.
The Commonwealth of Virginia has expended $1,500,000
in preliminary engineering which will not be reimbursed by
the federal government. In short, most planning and pre-
liminary work has been done. Most of what remains to be
done is actual construction, which has scarcely begun: a
0.298-mile approach to the Theodore Roosevelt Bridge, mis-
cellaneous construction work on the bridge, and a 10-foot-
by-10-foot box culvert under Lee Highway near Kirkwood
Road. A series of on-site inspections of the Arlington I-66
route was conducted between 1961 and 1968 by state and
federal officials. During these inspections, plans for the de-
sign of the highway were compared with actual conditions
for the purpose of finalizing plans to be submitted to the
Secretary for approval.

App. 5

ms
«’
ar
S Py

App. 6

Il. Jurisdiction and Laches .

Before turning to appellants’ claims, we dispose of two
obstacles put in their path by appellees. First, Appellee
Fugate, Commissioner of the Virginia Department of High-
ways, Claims that he is not subject to federal jurisdiction. Be-
cause the challenged activities of his department—condem-
nation of right-of-way and eviction of the landowners—are
authorized by state law and could be carried out inde-
pendently of the Arlington I-66 project, he claims that no
federal question exists with respect to these activities. 28
U.S.C.A. § 1331(a). We disagree, because these activities
would not in fact be independent of this project. See Named
Individual Members of the San Antonio Conservation So-
ciety v. Texas Highway Department, 446 F.2d 1013, 1028
(5th Cir. 1971); Morningside-Lenox Park Association v.
Volpe, 334 F. Supp. 132, 146 (N.D. Ga. 1971). Appellee
Fugate does not suggest that the Commonwealth of Virginia
no longer seeks to build this highway with federal funds. If
we were to find—as we do—that federal law requires that
the proposed route for Arlington I-66 be reconsidered, ac-
quisition by the state of right-of-way along the proposed
route during the reconsideration would make proceeding
with the proposed route increasingly easier and, therefore,
a decision to alter or abandon the route increasingly undesir-
able. Thus the challenged activities of the state highway
department would make a sham of the reconsideration re-
quired by federal law.* Action of a state highway depart-
ment, challenged because furthering a project that under
federal law allegedly must be reconsidered, is a matter in
controversey arising under the laws of the United States. Fed-

1In Ely v. Velde, F.2d .... (4th Cir. 1971), the court declined
to enjoin state officials from proceeding with a federally funded proiect
covered by the NEPA. In that case, however, the problem of the effect
of the state’s action on federal law was not before the court.

YORE TTA RT MEE IEE LE LIN MIM VE MRALRREA A SPE AAT TARE IS

App. 7

eral jurisdiction over such state actions is essential to preserve
federal question jurisdiction in the application of federal
statutes. It is a form of pendant jurisdiction, but based upon
necessity rather than convenience and limited to preventing
emasculation of remedy clearly available against the federal
respondents.

Secondly, appellees claim that appellants’ suit should be
barred by laches. Appellees as representatives of the general
public and specific interest groups will be prejudiced by ap-
pellants’ delay in bringing suit if the proposed route for Arl-
ington I-66 is altered or abandoned. Most of the right-of-way
for the proposed route has been acquired; Arlington
County’s planning with respect to zoning, traffic, and loca-
tion of utilities has been based upon the route; and the loca-
tion of numerous businesses has been chasen in reliance upon
the route. Appellants could have brought suit earlier to
minimize or avoid this harm; all of the relevant statutes
were in effect by January 1, 1970, but appellants did not file
suit until February 19, 1971. Nevertheless, we decline to in-
voke laches against appellants because of the public interest
status accorded ecology preservation by the Congress. We

*In Lathan v. Volpe, F.2d (9th Cir. 1971), the court held
that laches precluded a challenge to the validity of a hearing on the
location of an interstate highway. The hearing in that case was chal-
lenged because it was allegedly procedurally defective. In our case
appellants complain because no hearing was held on certain, effects
of the proposed route for Arlington I-66. See Part V. The public,
we think has a greater interest in the outcome of the present suit.
Furthermore, there is no indication in Lathan that the public’s stake
in the suit was considered at all. In Triangle Improvement Council
v. Ritchie, 314 F. Supp. 20 (S.D.W.Va. 1969), aff'd 429 F.2d 423
(4th Cir. 1970) (per curiam decision), cert. dismissed, 402 U.S. 497
(1971), laches was held to bar a suit challenging the validity of a
hearing on the location of a highway. The basis of the complaint is
not stated in the opinion. The court believed that the complaint was
without merit, however, and presumably concluded that the public
interest would not be served by the suit. As discussed in Part V, we
believe that the complaint in our case is valid.

ee

App. 8

believe that Arlington 1-66 has nor*progressed to the pom
where the costs of altering or abandoning the proposed route
therefrom to the general public. In their reconsideration of
the proposed route, the Secretary of Transportation and the
Commissioner of the Virginia Department of Highways may
decide, of course, that the costs do outweigh the benefits. If
the opposite conclusion is a reasonable possibility, however,
as it is here, the congressional declaration of policy in the
relevant statutes of the importance of the benefits that might
accrue demands that the merits of the question be con-
sidered by the appropriate agencies.

Ti. Section 102 of the National Environmental Policy Act of 1969

We hold that the federal appellees must file and consider
an environmental impact statement in accordance with Sec-
tion 102(C) of the National Enviromental Policy Act of
1969 (42 U.S.C. § 4332(C) ) before taking further steps to-
wards the construction of Arlington I-66. Section 102(C)
reads as follows:

—

App. 9

(ii) amy adverse environmental effects which
cannot be avoided should the proposal be imple-
mented,
(iii) alternatives to the proposed action,
(iv) the relationship between local short-term
uses of man’s environment and the maintenance
and enhancement of long-term productivity, and
(v) any irreversible and irretrievable commit-
ments of resources which would be involved in the
4 action should it be imo! ,

Prior to i detailed statement, the responsi-
Ate Poderal Odsal hell cna enann St sumpend
comments of any Federal agency which has juris-
diction by law or sep rane with vexpect to any
environmental impact i ved. Copies of such state-
ment and the comments and views of the appropriate
Federal, State, and local agencies, which are au-
thorized to develop and enforce environmental stan-
dards, shall be made available to the President, the
Council on Environmental Quality and to the public
as provided by section 552 of Title 5, and shall ac-
review processes ;

It is undisputed that prior to the filing of this suit no Sec-
tion 102(C) statement had been prepared for the project in
question. It is also uncontested that this six-to-cight-lane
highway is a “major Federal action significantly affecting

- the quality of the human environment.” Appelices claim,
however, that Section 102(C) is not applicable to Arlington
1-66 because this project was in progress prior to January
1, 1970, the effective date of the Act. Arlington 1-66, how-
ever, was and is a project ongoing after the effective date of
the Act. We believe that applying Section 102 to Arlington
1-66 would not violate the rule invoked in Brool-s v. Volpe,

wt

App. 10

319 F. Supp. 90 (W.D. Wash. 1970), that a statute does not
have retroactive effect absent a clear indication that Con-
gress so intended. For reasons subsequently stated, we think
applying Section 102(C) to this highway would simply not
be a retroactive application of the Act. See Named Indi-
vidual Members of the San Antonio Conservation Society,
supra at 1025.

Doubtless Congress did not intend that all projects on-
going at the effective date of the Act be subject to the re-
quirements of Section 102. At some stage of progress, the
costs of altering or abandoning the project could so definitely
outweigh whatever benefits that might accrue therefrom
that it might no longer be “possible” to change the project
in accordance with Section 102. At some stage, federal action
may be so “complete” that applying the Act could be con-
sidered a “retroactive” application not intended by the Con-
gress. The congressional command that the Act be complied
with “to the fullest extent possible” means, we believe, that
an ongoing project was intended to be subject to Section
102 until it has reached that stage of completion, and that
doubt about whether the critical stage has been reached
must be resolved in favor of applicability.

We must stress as forcefully as that this lan-
guage does not provide an hatch for footdrag-
ging agencies; it does not make ‘A's procedural re-

somehow “ 1 ” Congress did

requirements discretionary.

not intend the Act to be such a paper tiger. Indeed. the

ype of environmental consideration “to the
extent possible” sets a high standard for the

agencies, a standard which must be rigorously enforced

by the reviewing courts.

Calvert Clifs’ Coordinating Committee, supra at 1114. See
also Ely v. Velde, ... F.2d _.... (4th Cir. 1971) ; Morning-

—_

App. 11

side-Lenox Park Association, supra; Environmental Defense
Fund, Inc. v. Corps of Engineers, 324 F. Supp. 878 (D.D.C.
1971). The cases refusing to apply Section 102(C) “retro-
actively” to projects ongoing at the effective date of the

work which had into this
and planning costs, but to have it completed is on
orderly manner

The only duty remaining on the Secretary after Novem.
ber 20, 1969 was to make a final inspection of the proj-
ect after construction. 23 U.S.C. 117(c). For all prac-
tical purposes, therefore, final action on the

App. 12

In Elliot v. Volpe, 328 F. Supp. 831 (D. Mass. 1971), con-
struction contracts had been awarded and actual construc-
tion had begun.

We cannot, of course, define for all cases the point of com-
pletion beyond which Section 102(C) is no longer applic-
able. We are certain, however, that Arlington 1-66 has not
yet.reached that point: P.S.&E. approval has not been given,
construction contracts have not been awarded, and actual
construction on the highway itself has not begun.
Appellees claim that the district court correctly held that
Section 102(C) is not applicable to Arlington I-66 because
design approval for this project was obtained on January
21, 1971. Section 5 of the Federal Highway Administra-
tion Instructional Memorandum of November 30, 1970,
states that an environmental study is not mandatory for
projects obtaining design approval before February 1, 1971.
We have held that Section 102(C) is applicable to a project
until it has reached the state of completion where the costs
of abandoning or altering the proposed route would clearly
outweigh the benefits therefrom. In light of the “to the
fullest extent possible” language, we have compared all of
the steps already taken towards construction of Arlington
1-66 with all of the steps yet to be taken and have concluded
that this highway has not yet reached that stage of comple-
tion that cuts off application of Section 102(C). Manifestly
the date of design approval alone does not accurately meas-
ure whether Arlington I-66 has reached the crucial stage,
and determining the applicability of Section 102(C) by this
standard alone would be arbitrary and capricious agency
action and an abuse of administrative discretion. Adminis-
trative Procedure Act, 5 U.S.C.A. § 706(2(A).

The district court suggested and appellees assert that Sec-
tion 102(C) is not applicable to highways. We disagree. In

"so spel aaa a a OPER SET TT ‘
- ; Sue - =

App. 13

the introduction to this section Congress demands that “pub-
lic laws of the United States shall be interpreted and ad-
ministered in accordance with the policies set forth” and that
“all agencies of the Federal Government” shall comply with
the requirements of the statute. Without a doubt the De-
partment of Transportation was intended to be included
within this sweeping language. See Named Individual Mem-
bers of the San Antonio Conservation Society, supra at 1024.
We read the cases relied upon by the district court and dis-
cussed above to mean that the refusals to apply the National
Environmental Policy Act were occasioned not by a “high-
way” label but because construction had reached an ad-
" vanced stage of completion. Pennsylvania Environmental
Council, Inc., supra; Elliot, supra; Brooks, supra.

Finally, the district court held and appellees claim that
the question whether Section 102(C.) must be complied with
is moot because the Secretary has agreed voluntarily to file
an environmental impact statement. We disagree. Filing a
report without suspension of work on Arlington I-66 until the
report has been considered by the Secretary is not the sort
of compliance that is likely to change the result. Section
102(C) contemplates not only that a report be compiled but
also that the Secretary take into account the information
contained therein in determining the final location and de-
sign of a highway. \ oe

This statute does not limit the authority of any govern-
mental agency in any permanent or conclusive manner.
It does, however, contain a mandate that action can be
taken only following complete awareness on the part
of the actor of the environmental consequences of his
action and following his having taken the steps required
by the Act.

National Helium Corporation vy. Morton, P26 ......

App. 14

(10th Cir. 1971). We are led to this conclusion by language
in Section 102(C)—e.g., “proposed action,” “should the pro-
posal be implemented,” “alternatives to the proposed ac-
tion” —and the congressional intention to actually affect and
preserve the environment, expressed in the declaration of
policy in the Act (42 U.S.C.A. § 4331) :

(a) The Congress, recognizing the profound impact
of man’s activity on the interrelations of all

(b) In order to carry out the policy set forth in this
chapter, it is the continuing responsibility of the Federal

grams, and resources to the end that the Nation may—
(1) fulfill the responsibilities of each generation

as trustee of the environment for succeeding genera-
tions;

PA REI TE GES

App. 15

(2) assure for all Americans safe, healthful, pro-
ductive, and esthetically and culturally pleasing sur-
roundings;

(3) attain the widest range of beneficial uses of
the environment without degradation, risk to health
or safety, or other undesirable and unintended con-
sequences ;

(4) preserve important historic, cultural, and
natural aspects of our national heritage, and main-
tain, wherever possible, an environment which sup-
ports diversity and variety of individual choice;

(5) achieve a balance between population and re-

source use which will permit high standards of living
and a wide sharing of life's amenities; and

(6) enhance the quality of renewable resources
and approach the maximum attainable recycling of
depletable resources.

(c) The Congress recognizes that each person should
enjoy a healthful environment and that each person has

a responsibility to contribute to the preservation and
enhancement of the environment.

When the Secretary decides whether the proposed route
for Arlington I-66 should be altered or abandoned because
of information contained in the environmental report, he
may, of course, take into account previous investment in the
proposed route. Morningside-Lenox Park Association, supra
at 145. Further investment of time, effort, or money in the
proposed route would make alteration or abandonment of
the route increasingly less wise and, therefore, increasingly
unlikely. If investment in the proposed route were to con-
tinue prior to and during the Secretary’s consideration of
the environmental report, the options open to the Secretary

App. 16

would diminish, and at some point his consideration would
become a meaningless formality.

Given the purpose of NEPA to insure that actions by
federal agencies be taken with due consideration of
environmental effects and with a minimum of such ad-
verse effects, it is especially important with regard to
federal-aid highway projects that the § 102(2) (C)
statement be prepared early. If defendants’ contention
were accepted—that no environmental impact state-
ment is required until the final approval state—then it
could well be too late to adjust the formulated plans so
as to minimize adverse environmental effects.

Once the highway-planning process has reached
these latter stages, flexibility in selecting alternative
plans has to a large extent been lost. To paraphrase the
District of Columbia Circuit, “In the language of
NEPA, there is likely to be an ‘irreversible and ir-
retrievable commitment of resources,’ which will in-
evitably restrict the [highway officials’] options. Either
the [highway planners] will have to undergo a major
expense in making alterations in a completed [plan] or
the environmental harm will have to be tolerated. It is
all too probable that the latter result would come to
pass.” [Calvert Cliffs’ Coordinating Committee, supra
at 1128.]

Lathan v. Volpe, ...... F.2d ......, .....- (9th Cir. 1971).

We hold that appellants are entitled to an injunction
against any and all further work on Arlington I-66 pending
preparation and consideration of the environmental report.

IV. Section 138 of the Federal-Aid Highway Act of 1968 and
Section 4(f) of the Department of Transportation Act of 1966

We conclude that before further steps are taken towards
the actual use of Spout Run Parkway and Bon Air Park for
the route of Arlington I-66, federal appellees must ascertain

PETA IE OEE RTO SS ae RE

App. 17

that there is “no feasible and prudent alternative” to the use
of these parklands and that the project includes “all possible
planning to minimize harm” to the parklands, in accordance
with Section 138 of the Federal-Aid Highway Act of 1968
(23 U.S.C.A. § 138), and Section 4(f) of the Department
of Transportation Act of 1966 (49 U.S.C.A. § 1653(f). The
language of these sections is virtually identical and reads
(49 U.S.C.A. § 1653(f) ) as follows:

(f) It is hereby declared to be the national policy
that special effort should be made to preserve the natu-
ral beauty of the countryside and public park and
recreation lands, wildlife and waterfowl refuges, and
historic sites. The Secretary of Transportation shall co-
operate and consult with the Secretaries of the Interior,
Housing and Urban Development, and Agriculture, and
with the States in developing transportation plans and
programs that include measures to maintain or enhance
the natural beauty of the lands traversed. After August
23, 1968, the Secretary shall not approve any program
or project which requires the use of any publicly owned
land from a public park, recreation area, or wildlife
and waterfowl refuge or national, state, or local signifi-
cance as determined by the Federal, State, or local of-
ficials having jurisdiction thereof, or any land from an
historic site of national, State, or local significance as
so determined by such officials unless (1) there is no
feasible and prudent alternative to the use of such land,
and (2) such program includes all possible planning to
minimize harm to such park, recreational area, wildlife
and waterfowl refuge, or historic site resulting from
such use.

It is undisputed that Sections 138 and 4(f) have not been
complied with. Appellees claim, however, that these sections
are not applicable to the use of Bon Air and Spout Run
parks because these parks are part of a project “approved”

App. 18

before August 23, 1968, the effective date of the Acts. Even .-.

if date of approval were the criterion for the applicability of
these sections to projects ongoing at the effective date of the
Acts, these sections would be applicable to Arlington I-66
because the Secretary’s “approval” is necessary at several
remaining stages of this project: the Secretary must “ap-
prove” the surveys, plans, specifications, and estimates for
the project, 23 U.S.C.A. § 106; the Secretary must “ap-
prove” each construction contract awarded, 23 U.S.C.A.
§ 112(c) & (d); and construction will be “subject to the
inspection and approval of the Secretary,” 23 U.S.C.A.
§ 114. See Named Individual Members of the San Antonio
Conservation Society, supra at 1025 n. 23, in which the
court applied these sections to a highway which had been
“approved” both before and after the effective date of the
Acts. Date of approval, however, is not the criterion for ap-
plicability, because according to this criterion every project
being built with federal funds would be subject to these sec-
tions since the Secretary’s “approval” extends through con-
struction. We agree with the district court that Congress
did not intend that all projects ongoing at the effective date
of the Acts be subject to these sections. At some stage short
of completion the costs already incurred in a project could
so outweigh the possible benefits of altering or abandoning
the proposed route to avoid using parkland or to minimize
harm from the use that because of the stage of progress
alone “no feasible and prudent alternative to the use” would

*Bon Air Park is located in the I-66-1(43)73 project segment;
authorization for the acquisition of this segment occurred on June 28,
1962, and the agreement for acquisition of this right-of-way was en-
tered into on July 28, 1966. Spout Run Parkway is located in the
1-66-1(35) 75 project segment; acquisition authorization occurred on
March 8, 1962, and the right-of-way acquisition agreement was entered
into on January 28, 1963.

_—

App. 19.

-+ exist and “all possible planning to minimize harm” would
have been done. We disagree with the district court, how-
ever, that because these sections are not applicable to some
ongoing projects they are not applicable to all ongoing proj-
ects. Congress has declared through Sections 138 and 4(f)
that conservation of parkland is of the utmost primary im-
portance. Citizens to Preserve Overton Park v. Volpe, 401
U.S. 402 (1971). Congress has also directed in Section 102
of the National Environmental Policy Act (42 U.S.C.A.
§ 4332) that “to the fullest extent possible . . . public laws
of the United States shall be interpreted and administered
in accordance with the policies” set forth in the declaration
of policy of the Act (42 U.S.C.A. § 4331 ), quoted above in
Part III. We are compelled, therefore, to conclude that
these sections are applicable to a project until it has reached
that stage of progress where the costs of altering or aban-

‘doning the proposed route would certainly outweigh what-
ever benefits might accrue therefrom, and that doubts about
whether this stage has been reached must be resolved in
favor of applicability. Arlington I-66 has not yet reached
that stage of completion. The parklands have not been ac-
quired, P.S.&E. approval has not been given, construction
contracts have not been awarded, and construction on the
highway itself has not begun. The court in the San Antonio
case emphasized the date of approval as the factor de-
termining applicability of these sections. The holding: in that
case is not inconsistent with ours, however, because these
sections, we think, would have been applied to the highway
in that case under our standard: P.S.&E. approval had not
been given for the use of the park in question, construction
contracts for the portion of the highway to run through the
park had not been awarded, and construction of the portion
to run through the park had not begun. In Wildlife Pre-

CHI ey eee
as

App. 20

serves, Inc. v. Volpe, 443 F.2d 1273 (3rd Cir. 1971), the
court declined to apply Sections 138 and 4(f) retroactively
to a highway ongoing at the effective date of the Acts. The
factor determining applicability in that case, we believe, was
the stage of completion of the highway; construction con-
tracts had been awarded and construction had begun. As
suggested above in Part III, a project might be so nearly
complete that applying these sections to it could be termed
“retroactive” application.

The district court adopted appellees’ contention that Sec-
tions 138 and 4(f) are not applicable to the use of Bon Air
Park and Spout Run Parkway because these parks have not
been determined “significant” by the federal or local of-
ficials having jurisdiction thereof. Furthermore, the court
viewed the willingness of both local and federal officials to
use these parks for highway right-of-way as a determination
that these parks are insignificant. Because “the very exist-
ence of [these sections] indicates that protection of parkland
was to be given paramount importance,” Citizens to Pre-
serve Overton Park, supra at 412-13, we must interpret these
sections to mean that land used as a public park is presumed
“significant” unless explicitly determined otherwise, in a
manner envisioned by these sections, by the appropriate
federal or local officials. There is no such determination
before us with respect to Bon Air and Spout Run parks.’
We conclude, therefore, that these parks are “significant”
and protected by Sections 138 and 4(f). In the “signifi-
cance” determination envisioned by Sections 138 and 4 f°.
the desirability of using the particular parkland in question
as a highway must be ignored and only the value of the park

* Additionally, the plan to replace Spout Run Parkway with other
parkland in the same vicinity indicates to us that Spout Run 1s er-
nificant as a park.

App. 21

as a park can be considered. See Named Individual Mem-
bers of the San Antonio Conservation Society, supra at 1026.
Were this not so, land valuable to the community as a park
could be used for a highway even though “feasible and pru-
dent alternatives” existed because federal or state officials
had decided that using the park for highway purposes was
desirable according to criteria other than whether such al-
ternatives existed, the only criterion allowed by the Acts.
For this reason, the choice by federal and local officials to
use Bon Air and Spout Run parks for Arlington 1-66 stand-
ing alone is not a determination that these parks are not
“significant” as parks.*

Finally appellees claim that the question whether they
must comply with Sections 138 and 4/f) is moot because
they have agreed to comply voluntarily. We disagree because
voluntary compliance alone does not give appellants full re-
lief. In the first place, as discussed above in Part ITT, suspen-
sion of work on Arlington 1-66 is necessary if the Secretary's
determination under Sections 138 and 4 f is to be mean-
ingful; continuing investment in the project at its present
state of development would render alternatives to use of the
parks less feasible and prudent. In the second place. the
Secretary's determination with respect to Spout Run Park-
way will be meaningful only if made after it is known with
reasonable assurance whether the proposed 1-266 and Three
Sisters Bridge project will be built and. if ©. where the
bridge will be located. Pursuant to an order of the Circunt

*We have been adviesd ty cone that subweguenn te the dere
Courts open. on January & 1972 the Arie Csounm Beast
adopted the following statement “The Arhmeion Ciuwrm Bound dhe
Cares specfealh that Bon Aor and Sprout Room quaridiamds ae of smeamew
Semhrance te Arhinetem and are more ee ee
mrad neght of way ~ Qur demon worth wesnert am the swmife-cerce
of these parklands does met descend aoe thie erecting

a

——— a

App. 22

Court of the District of Columbia, the Secretary is now in
the process of reexamining the proposed location for the
1-266 project. D.C. Federation of Civic Associations vy.
Volpe, F.2d (1971). Although the district court's
finding that “(t)he Three Sisters Bridge is not a part of
1-66—ncither is the proposed connecting road, 1-266” is not
clearly erroneous, it failed to consider the relationship be-
tween the projects. If the I-266 project is not built at all or
if the location of the bridge is changed, it is apparent that
avoiding Spout Run Parkway for the use of I-66 will be
more feasible and prudent because present plans call for
1-266 to connect with I-66 in this park.* In order to specify
the appropriate time for the reconsideration of the proposed
use of Spout Run Parkway, we must first decide the thres-
hold question of whether reconsideration is required at all.

V. Section 128(a) of the Federal-Aid Highway Act of 1968

We conclude that before further steps may be taken to-
wards the construction of Arlington I-66, the state appellees
must hold a public location hearing in accordance with Sec-
tion 128(a) of the Federal-Aid Highway Act of 1968 (23
U.S.C.A. § 128(a)).” When the 1958 public hearing on

* Appellants claim that continuing with the 1-66 project in the face
of the uncertain status of the Three Sisters Bridge is in itself arbitrary
and capricious action on the part of the Secretary. Consideration of
this claim is unnecessary because our order that the Sections 138 and
4(f) determination must be made after the Three Sisters Bridge dis-

te has been resolved, coupled with our injunction of further work on
1.66 -66 until the determination is made, gives appellants the same relief—
injunction until the dispute is settled—that they request under this
claim.

* We agree with the district court that Arlington I-66 is excluded
from the hearing requirements of the Federal Highway Administra-
tion's Policy and Procedure Memorandum 20-8, 23 C.F.R. Part 1,
Appendix A. Section 6(d), which contains the guidelines for projects
on which a hearing has been held before January 14, 1969, applies
only to projects which have not received location approval.

SR ERT Rh wee Y= . Tomer my

_—

App. 23

We think that the requirements added to Section 128 (a)
apply to a highway ongoing at the effective date of the

cies” set forth in the declaration of policy of the Act (42
U.S.C.A. § 4331), quoted in Part III above. As we have
concluded in Parts III and IV above, Arlington I-66 has
not yet reached the critical stage of completion. It is dis-
tinguishable, therefore, from those highways actually under
construction to which Section 128(a) as amended was held
inapplicable. Wildlife Preserves, Inc., supra; Elliot, supra.
Our case is distinguishable also from Triangle Improvement

een

App. 24

Council v. Ritchie, 314 F. Supp. 20 (S.D.W.Va. 1969),
aff'd 429 F.2d 423 (4th Cir. 1970) (per curiam decision),
cert. dismissed, 402 U.S. 497 (1971), in which the effect of
the National Environmental Policy Act upon the hearing
requirement of Section 128(a) was not considered.
Furthermore, we think that the new hearing on the loca-
tion of Arlington 1-66 must not only seek information about
the social effects of the proposed location, its impact on the
environment, and its consistency with the community's urban
planning goals, but also must seek information about the
economic effects of the location in light of the proposed
rapid rail service to the Rosslyn area. One line of the pro-
posed Washington Metro will run along the same route as
Arlington I-66 to Rosslyn. At the time of the 1958 hearing,
this development was not anticipated." From today’s vantage
point, the economic effects of Arlington 1-66 might be sig-
nificantly different than projected in 1958—rapid rail serv-
ice might better satisfy the needs of this area than would
1-66. Moreover, Arlington I-66 has not yet reached the stage
of completion where alternation or abandonment of the pro-
posed route is impossible. We are certain that Congress in-
tended that if there is a reasonable possibility that a mistake
has been made in the planning of a project as expensive, dis-
ruptive, and permanent as a highway, and if that project
can still be altered or abandoned, the project must be held
in abeyance pending determination of whether a mistake
has in fact been made. We cannot accept the district court's
decision that a new hearing on the economic effects of Arl-
ington I-66 is unnecessary because “the transportation needs

* Although rapid rail service in the Washington metropolitan area
was being planned in 1958, a line in the general area of Arlington 1-66
was not planned. See National Capital Planning Commission, Trans-
portation Plan for the National Capital Region (1959) .

I ON PT ,

App. 25

of the area have been monitored over the years by the many
agencies responsible therefor—and the officials charged by
law for selecting the location for I-66 have reaffirmed their
choice on numerous occasions up to the present time.” Sec-
tion 128(a) requires that included in the information con-
sidered in evaluating the economic effects of a highway
must be information obtained at a public hearing. Study by
experts is not the equivalent of a public hearing, and con-
tinuing evaluation of the economic effects of Arlington 1-66
based only on such study is, therefore, not consideration
within the meaning of the statute.”

Appellants claim also that a new public hearing must be
held on the economic effects of the juncture of Arlington
1-66 with Lee Highway. At the time of the 1958 hearing, the
plan to divide and expand Lee Highway apparently had not
been formulated and, therefore, was not considered. We
agree with appellants that because a fourteen-lane highway
might have significantly different economic effects than a
six-to-eight-lane highway in tse same location, the 1958
hearing cannot be considered to have taken into account the
economic effects of the highway as planned. As discussed
above, since the proposed route can still be altered or aban-
= ; = ; , :;
ee ae the number of jobs available in

suburbs has increased more rapidly than the number
available in the District, that businesses have located in substantial

economic effects of Arlington 1-66 would be different than expected
in

was .
that changes in the highway system within the city of Washington were
not so unforeseeable as to require a new hearing.

App. 26

doned in response to information obtained from a hearing,
we think that a hearing in addition to the 1958 hearing must
be held on this portion of the highway. We believe, however,
that the hearing held to consider the design of the portion
of 1-66 including Lee Highway on September 29, 1970, and
continued on December 7, 8, and 9, 1970, satisfies the re-
quirements of Section 128(a). Although Section 128(a) re-
quires a hearing only on the “location” of a proposed high-
way, the regulations of the Department of Transportation
require a hearing on the “design” of a highway as well. Fed-
eral Highway Administration, Policy and Procedure Memo-
randum 20-8, § 6, 23 C.F.R., Part 1, Appendix A. This, we
think, is recognition by the Secretary that the effects of a
highway’s location depend not only on the corridor of a
highway but also on what type of highway will occupy the
corridor. Since the economic effects of the Lee Highway
section of Arlington I-66 might be substantially different
than expected in 1958 because of the design of this portion,
a hearing on the design alone of this portion is sufficient.””
Section 128(a) contemplates that information gathered
from a public hearing be “considered” by the state -highway
department in fixing the location of a highway. As discussed
above, reconsideration of the location of Arlington I-66 will
be meaningful only if further expenditure of time and effort
in the present route is suspended. Therefore, the progress of

© Appellants also claimed below that the 1958 proceedings violated
Section 128(b) of the Act because a tape recording of the 1958 hear-
ing rather than a written record was submitted to the Secretary. Sub-
sequent to the 1958 hearing, the Department adopted regulations per-
Highs only written records of the Section 128(a) hearing. Federal
Administration, Policy and Procedure Memorandum 20-8,
§ ac) y (1), 23 C. F. R., Part 1, Appendix A. We agree with the dis-
trict court that a tape recording i is the functional equivalent of a written
transcript and that even were it not, the Secretary's regulations should
not be given retroactive effect.

WSO FRET PT IA PR EEO ,

App. 27

the present route must be enjoined pending certification by
the state highway department to the Secretary that a new
public hearing has been held (or that the opportunity for
such a hearing has been afforded) to obtain the information
required by the 1968 amendments and that the reconsidera-
tion of this information and the information obtained at the
design hearing on the Lee Highway portion of Arlington
I-66 has been accomplished.

VI. Relief

In summary, we hold that further acquisition of right-of-
way and construction of Arlington I-66 must be enjoined
until federal appellees have

(1) filed and considered an environmental impact
statement, in accordance with Section 102(C) of the
National Environmental Policy Act, and,

(2) ascertained that there is “no feasible and prudent
alternative” to the use of Bon Air Park and Spout Run
Parkway (the determination with respect to Spout Run
Parkway to be made after the resolution of the Three
Sisters Bridge controversy) and that the project in-
cludes “all possible planning to minimize harm” to these
parklands, in accordance with Section 138 of the Fed-
eral-Aid Highway Act and Section 4(f) of the Depart-
ment of Transportation Act,

and until state appellees have certified to the Secretary that
a new public hearing has been held (or that opportunity
for such hearing has been afforded )

(1) to obtain information about the social effects of
the proposed location, its impact on the environment,
and its consistency with the community’s urban plan-
ning goals, and .

App. 28

(2) to obtain information about the economic effects
of the proposed location in light of the planned rapid
transit service to Rosslyn,

and that the information obtained from this hearing and
the hearing upon the design of the Lee Highway portion of
Arlington I-66 have been considered, in accordance with
Section 128(a) as amended of the Federal-Aid Highway
Act.

On remand the district court will enter an appropriate
judgment granting injunctive and such other relief as may
be necessary.

Reversed and Remanded.

* * *

ORDER
Entered May 9, 1972

On petition to rehear we modify our prior opinion to de-
lete (page 40, slip opinion) the requirement that federal
appellees shall not proceed until after Three Sisters Bridge
is finally located or finally abandoned.

Whether Three Sisters Bridge will be built and where it
will be located are factors that cannot be ignored in deciding
what to do about I-66 and I-266. But our judgment shall not
be construed to prevent simultaneous consideration of all
three inter-related propects and their probable impact on
each other.

s/ J. Braxton Craven, Jr.
United States Circuit Judge

a

App. 29

APPENDIX B
ORDER
Entered November 24, 1971

The appellants, plaintiffs below, seek an in junction pend-
ing their appeal from an order of the district court denying
their prayer for an injunction against construction of that
portion of the federal interstate highway designated as
Interstate-66 located in Arlington County, Virginia.

Without considering all of the issues pressed by the appel-
lants, it is sufficient to say that the record raises substantial
question about the legality of constructing a section of the
highway through a national park and the legality of pro-
ceeding without the environmental impact statement re-
quired by law.

Therefore, with the concurrence of Judge Craven and
Judge Russell, it is ADJUDGED AND ORDERED that
Douglas B. Fugate, Commissioner, Virginia Department of
Highways, and his officers, agents, employees, and attorneys,
and those persons in active concert or participation with
them who receive notice of this order are enjoined and re-
strained from condemning additional land for that portion
of the federal interstate highway designated as Interstate-66
located in Arlington County, Virginia, and from requiring
the appellants, Vera Koehler, Harold D. McCoy and Eliza-
beth Snedden to vacate their properties in the county.

It is further ADJUDGED AND ORDERED that John
A. Volpe, Secretary of Transportation, his officers, agents,
employees, and attorneys, and those persons in active con-
cert or participation with them who receive notice of this
order are enjoined and restrained from approving, pursuant
to 23 U.S.C. § 106(a), plans, surveys, specifications and
estimates for that portion of the federal interstate highway

=

App. 30

designated as Interstate-66 located in Arlington County,
Virginia.

This injunction shall remain in full force and effect pend-
ing the appeal of this case, or until further order of the
court; provided that the appellants, or someone in their be-
half, shall post bond in the penalty of $100.00, conditioned
as the law directs.

John D. Butzner, Jr.
United States Circuit Judge

* * *

APPENDIX C
MEMORANDUM OPINION
Entered October 8, 1971

The plaintiffs want this Court to stop further construction
of I-66 through Arlington County. The defendants and in-
tervenors insist that this interstate highway be completed
without further delay.

The plaintiffs are four residents of Arlington owning land
in the corridor selected for the highway and two unincorpo-
rated associations interested in the preservation of environ-
mental and community values, including sound transporta-
tion planning in Arlington County.

They contend that a new location or corridor public hear-
ing must be held before further action can be taken in re
the planning and construction of the highway—first, be-
cause state authorities failed to submit a transcript of the
1958 public hearing to the Secretary of Transportation prior
to federal approval as required by 23 U.S.C. § 128—second,
because the 1958 hearing in any event was outdated due to
the passage of time—and third, because the 1968 amend-
ment of § 128 requires consideration of the economic and

Ns Seem ee) ta nea a le , PUT

—

social effect of the highway’s location and its impact on the
environment.

The plaintiffs also contend that the 1958 hearing is in-
sufficient to permit the use of I-66 funds for the planning,
relocation and construction of a Portion of Lee Highway
(US 29-211) in that this item was then neither mentioned
or discussed—and that the Secretary of Transportation is
in clear violation of § 138 of the Federal Highway Act, 23
U.S.C. § 138, and 4(f) of the Department of Transporta-
tion Act, 49 U.S.C. § 1653(f), both of which provide that
the Secretary shall not approve any program or project
that contemplates the use of any public park unless he has

| determined that (1) there is no feasible and prudent al-

| ternative for the use of such land, and (2) such program
includes all possible planning to minimize harm to the
park.

Lastly, the plaintiffs say the Secretary of Transportation
has violated § 102 of the National Environmental Policy
Act, 42 U.S.C. § 4332(c), by failing to require the filing
of an environmental impact statement before permitting
further completion of I-66 after the effective date of the
Act.

The defendants are the Secretary of Transportation and
the Division Engineer of the Federal Highway Administra-
tion, and the Commissioner of the Virginia Department of
Highways and the Recorder of Deeds of Arlington County,
Virginia. (The latter has been dismissed as a party de-
fendant.) The intervenors are the Arlington County Cham-
ber of Commerce and the Fairfax County Chamber of
Commerce.

The defendants insist that the Congress of the United
States has entrusted to their discretion the desirability and
necessity for the construction of I-66 and that their exercise

App. 31

App. 32

of this discretion is not subject to review, absent arbitrary
and capricious action. They do not-question judicial review
of their administrative actions subject to the provisions of
the Administrative Procedure Act, 5 U.S.C. § 701, et seq.
—They further say they have fully complied with all fed-
eral and state statutes requisite to the location and construc-
tion of I-66.

The Commissioner of the Virginia Department of High-
ways asserts the additional defense of sovereign immunity
under the Eleventh Amendment of the Constitution of the
United States.

The intervenors say their respective counties have re-
aligned their highway systems and have predicated much
of their business and industrial zoning in reliance upon the
building of I-66. Further, that millions of dollars of public
and private money has been spent on both private and pub-
lic developments, much of which will be seriously impaired
or lost if the completion of the highway is either unduly
delayed or abandoned.

Both claim laches on the part of the plaintiffs in not
timely filing this suit.

This case was heard and decided upon the well prepared
stipulation of facts and exhibits and agreed issues of law,
all of which have been filed herein and made a part hereof—
and upon the briefs and argument of counsel.

A brief summary of the stipulated facts and history of the
development of I-66 discloses that it is a part of the forty-
one thousand mile system of highways authorized by Con-
gress in 1956, 23 U.S.C. § 103(e). The highways are built
through Federal-State cooperation—the Federal govern-
ment, ninety per cent of the cost; the State, ten per cent—
Actual construction is undertaken by the State with prior
Federal approval of the successive steps required to com-
plete the project.

_—

App. 33

I-66 connects Washington, D. C., with I-81, a major
inland north-south route running through the Shenandoah
Valley—and provides major arterial service along the cor-
ridor through northern Fairfax and Arlington Counties and
to the center of the District of Columbia.

The building of an interstate highway begins with the
inclusion of the route on the interstate system, which places
a route on a map connecting points without specification of
the place on the ground where the road will be built.

Next, the corridor for the highway is chosen by the State.
There is are no established limits to the width of the cor-
ridor—anything from five hundred yards to a half mile—
Corridor approval by the Federal highway officials is pre-
ceded by a public hearing at which alternate corridors are
presented for public comment, at which interested citizens
are given an opportunity to record their views as to the
effect of the proposed highway on the community.

After the corridor has been approved the engineers and
survey crews further narrow the location of the roadway
as the design is developed—Eventually a detailed location
is made and approved. Thereafter acquisition of the neces-
sary right-of-way is authorized—Federal funds are then
committed to the extent necessary to acquire the right-of-
way.

The total mileage of I-66 is 75.4 miles, 25 miles of which
have been completed.

The Virginia Department of Highways began prelimi-
nary studies for the location of I-66 through Fairfax and
Arlington Counties prior to 1958 and completed three of the
studies regarding the location of the highway in April and
October 1958.

A public hearing was held in Arlington on October 29,
1958 to consider a corridor for I-66 through Arlington. Four

App 34

alternate routes were then oomedered and discuswed) Thy:
Federal and State engmeers and seame od the polammifls wry
present at this hearmne. Thos hearing fell word a semuilian year
ing held before the Ariimewm Cones Beaord) om Seppe ier
27, 1958, at which tame citerss and one asHermarors jee
sented thear views.

The Arimeten Count Board remoniwendied than Comndior
No. 2) Farfax Drve-Bhaceencat Dower te agree! ly
Virginia State Highwas Common adhogied thie meen.
mendation on February 25. 198 ad! sufmvitved! thee sere
to the Federal Bureaw of Putte Reet om Mla eo
Additonal miormanm was sulted! the thee Drom +
Renonal Eneweers. ard! the Farias Drone -Bhecmonn Do
cornder was formals adbogmed) om fuser 4 58

On Februar &. |OH) Federal! ftcialh ethernet! in 8)
gama Departmecan of Hace ans than thee pnutidher thcavrepe |) li
an Octvolser 29_ 8 thalthillked thee menqeerrenmeness hl OF TS
€ 128 amd than mo achdhineomalll teeavreme wae reuervert!

fee 16! aed! ORY ruc oF ca aeeqpurestom, wae ayurtbrornpeer
few the tonal bemertth) o@ Bi) freon tthe Beltrecam tee Rowdicn:
The autial acquestvem wae for oe lbs fe MR a pr ier
was expanded) ve cutie lhepmpe Wwe eercressiaers andidirmomn! 1
thowmatecens warm fuged! one x aero cates Hinerwverem fem dM,
ame! Pras || Oth,

Crit medoecariom pprroyerts eveme aupgprrercedt! am SR te)
Oi, NR aul) 18711)

Pulbller feeaeremes we comster thee prrormomerd! dheneerm od) | tthe
eet We gedit: Bones art!) aed! Tom Movers eure belt
van Drecwnntiere 7 8 axed! @ 101)

Freon thee dharee of ther Worcavmom agoaprrenseall ommane U2 tpyyerentl
@ Ugur! Yad! Here aecrqpuerrert! ep Aoriheneeteor: aeerd! Pinvetttor (coun
ree actuate WH! thevelihenecs: genet!) GIF tbemrtioresen, at a est
SPASM NLS Wheerseealie dhevelibimes are!) ome lhentine

| ——e Sebi ncaa sates"

fa 5

ApoTgpMenttt vier weet! tee line anengpmenrrert! aes asp. cessinaemeneentl ceromt) afi seorrye:
HSMM AMD) Bevonmgs Hegasemnttbredl! geesssenmes Aipcre Heasresdbree gear! ‘i!
Hpowesrmvessiivess Hegrore lbverere rredborcuveent!

Whee Wirrctrmns: Binavee Hbestbresam Werpunrnrorens: bhp pINIEY one
a rmen@ABionp) caemat!! a: bea adheres Hor rmereressaners: iwareddtevaiererrs sera:
mmacrerrtames:—— Jpoutmn: ‘fred! idmengprerctsinomey- vesidttd. pobbenee iin: eaeanit Sbyse cr ‘lbterene
wnmatite: lhevotimemsiogs tin) (94K)! tne adhere TW hpesee faredhe!’ tenporeretorone
Hhesevre all! tbneverp, dtonereneorermseend!! thy: idermeens ardbtcceemton: bee 2 ond.
seemmeniesl! cteonreverennermy: leur! tonerer reuanetbnend) ide iby: anette oon gd
IpNOTEEE,

Whee ypnvestetea: sparnypronterd! Wonczevutoms aft WME sa tierees onnonvend ”
Whee Syilbimecteor Cionenere: dermenel!) Taran’ oe Mbaey ossteree bE:
cetane! ‘thee cererpnesrend! ccronnticdtony Hor: T44ds. Hane Hbperees rpasdbdbndt teen! ote iberesy!
TRAVAIPAAADHETES. ony OtEEERD! onerereeMtonY tater bgee diyeee

Monon “54 carerwes oft Mom Ais Wet gees tae ratieete Hop onpe
ti) ccromemnerernions ect Hd: Tee penne fae semeends (ter thee Upped
wectees te dbesmaertnesverd! oon ote: Mkttbienerrny cone « eepeeread TLannaed
ee Albaee cdiesrerd! Skeperme aft SHR cap caeranetaeddrorerrty oo speepggeds
Wpermecnzers: afi OHH! TENG omseaner of! anand! cesste canecantidered! fis Sotbten:
‘rene Ctongemaes ffor ppaeetdi corned! Hetedbeccras: sentempnewees

Agoyparorssionessredd: (Gree aneeres of) Syme Mere Wetedcents cd is
‘eedbrers: Hone Th By pee

IB inthe pparropproweeed! HW UMRS or onttee ithe: hives Metres Wettie
8 Ubveddh: weonmaee ater oad eee Mean Wirrtisosn otf le
‘rammrcresetend ore othe WM itrertietas Merraetereeeny af Wi tetheccn a
cunerres OY oeabhaneds cacti! thee catdbterred: fey 1 uaa. tes greed or pe
‘wenodiarererd) Hos: caneeanedindinten af) cera ardiament odie os penyee
Wetbtinrettom: Mentions:

TY ibe tbontidbers cane) WUE care ony Honddh: ocneestdbees ch cctbpeets
Bak gpanerts att tbe MAE ppersatertt: scrmnaes ordre ty die: treveeyt
HY TARE asi) Hee catereernspere: Tbtese cee crompnettterres! crrped ony
iporsvereed! Mragerane alli h

Miorentony ah) VLG Hanes bpereey ceamaettanreee! ott Bedbtaperr egy
Coanannres IM sanibess rane Hamann Hever it dbp genet crmpeh hhedte

a

App. 36

Theodore Roosevelt Bridge, 1962—construction on the
bridge over Little River, 1963—median barrier and guard
rail on the bridge, 1963—box culvert under Lee Highway
near Kirkwood Road, 1968.

The Old Dominion right-of-way was acquired in 1965—
The Metro took an option in 1967 to use the median of the
right-of-way for rapid transit—The option was exercised
April 24, 1970— Major design features for 1-66 was of Glebe
Road for joint use with Metro have been completed.
Right-of-way acquisition approval for division and ex-
pansion of Lee Highway (29-211) between Kirkwood Road
and Lynn Street was given in January of 1961 and April of
1962.

The State defendants’ claim of sovereign immunity under
the Eleventh Amendment of the United States Constitution
is without merit—This is not a suit brought against the
State of Virginia—It is a suit brought against its Commis-
sioner of the Department of Highways to compel him and
others to comply with the requisite Federal laws in the build-
ing of 1-66 through northern Virginia. Suits involving various
aspects of interstate highway projects have been filed in the
Federal courts—None have found jurisdiction over State
officials lacking. See Citizens Committee for Hudson Valley
v. Volpe, 302 F.Supp. 1083 (SDNY 1969), affirmed 425
F.2d 97 (2nd Cir. 1970) ; Citizens to Preserve Overton Park
v. Volpe, 401 U.S. 402 (1971) ; Ely v. Velde, 321 F.Supp.
1088 (EDVa. 1971).

Although this suit could and probably should have been
brought sooner, the delay—standing alone—is hardly suf-
ficient to justify dismissal—It has been considered, however,
in determining whether the errors complained of were pre-
judicial to the plaintiffs.

eg Owe PP ag se atin

App. 37

The plaintiffs have failed to sustain their claim—that a
new location or corridor hearing must be held before further
work can proceed—by law or fact.

The transcript requirement of 23 U.S.C. § 128(b) was
satisfied by the submission of a complete tape recording of
the October 29th public hearing—It was reviewed ex-
tensively by the Federal officials and was only a part of the
evidence that was considered in deciding upon the present
route.

PPM 20-8, in effect at the time of the 1958 hearing, pro-
vided that “a public hearing shall be held and a transcript
made thereof”—Nothing then was said about a written
transcript. Tape recordings were then and now used in cer-
tain phases of federal court proceedings—and often heard
by Circuit and District Court judges—in lieu of written
transcripts.

The fact that PPM 20-8 was amended June 16, 1959—
some seven months after the date of the public hearing and
twelve days after date of approval—stating that tape record-
ings will not be accepted as a transcript does not vitiate the
October 29th hearing: first, because the amendment is not
retroactive; and secondly, because the question was specifi-
cally raised by the Virginia Location and Design Engineer
in his letter of November 18, 1959—and the Federal of-
ficials, after reviewing the matter, advised the Virginia De-
partment of Highways on February 25, 1960 that no ad-
ditional hearing was required.

Submitting a tape recording instead of a written trans-
script at best constitutes harmless error.
Neither is a new location hearing required because of the
alleged changes in the transportation situation during the
past thirteen years or because of the 1968 amendments of
§ 128.

Time alone is not enough, especially when the record dis-
closes that design planning and actual construction have

App. 38

continued uninterrupted from the date of the corridor ap-
proval to the date of the filing of this suit.

The transportation needs of the area have been monitored
over the years by the many agencies responsible therefor—
and the officials charged by law for selecting the location for
1-66 have reaffirmed their choice on numerous occasions up
to the present time.

The evidence in this record supports their decision to
continue the originally approved location of 1-66 without a
new location hearing—and it will not be disturbed.

PPM 20-8 as amended January 14, 1969 is not applicable
because 6(d) of that PPM exempts projects which received
location approval prior to January 14, 1969—The corridor
for 1-66 was approved June 4, 1959—The plaintiffs’ re-
liance on D.C. Federation of Civic Associations v. Volpe,
316 F.Supp. 754 (DCDC 1970) is misplaced. See Elliot v.
Volpe, 328 F.Supp. 831 (DC Mass. 1971), and Wildlife
Preserves v. Volpe, F.2d (3rd Cir. 1971).

Although the plaintiffs now tacitly concede that a new
corridor hearing would not change the location of 1-66, they
insist that the 1959 corridor approval did not include the
division and relocation of Lee Highway between Kirkwood
Road and Lynn Street.

The Congressional declaration of policy for the construc-
tion of the interstate system, as set forth in 23 U.S.C. § 101,
states “existing highways located on an interstate route
should be used to the extent that such use is practicable,
suitable and feasible. . . .”

The Federal Highway Administrator has always con-
strued this policy to mean that it should and may include
the cost of improvement of local roads when necessary or
convenient to accommodate the traffic related to the inter-
state roads being built.

ila aacacmammamae

App. 39

The grade separation structure and interchange at Lee
Highway near Kirkwood Road, including the ramps and
roadway coming off the ramps, and the separation structure
from Veitch Street to North Lynn, were both approved to
provide local access and to replace disrupted service—The
transcript of the 1958 hearing and the subsequent design
tion of Lee Highway here questioned was within the corridor
as approved in June of 1959.

The Federal officials have concluded that the 1958 public
hearing adequately considered the essential features of these
plans. They have also approved the costs of these local im-
provements as a part of the cost of 1-66. These determina-
vant statutes. See Udall v. Tallman, 380 U.S. 1 (1965).

Further public hearing on this phase of the building of
1-66 is not required.

Next, the plaintiffs seek to stop further construction of
1-66 by invoking the provisions of § 138 of the Federal-Aid
Highway Act, 23 U.S.C. § 138, and 4(f) of the Department
of Transportation Act, 49 U.S.C. § 1653(f), both of which
provide that the Secretary of Transportation shall not ap-
prove any program or project that contemplates the use of
any public park until he has made certain determinations.

They claim the Secretary of Transportation approved
construction of the culvert for Spout Run Creek—the desien
for the whole segment, including five acres of Spout Run
Parkway and the 1968, 1969 and 1970 utility relocations—

Although they do not contend these statutes are retro-
active, they say they should be construed to cover all work
begun after their effective dates—August 23, 1968 for § 138
and April 1, 1967 for § 1653 (f)—since the purpose of the

— =

App. 40

statutes is to bar the use of park land for highway purposes
except under certain conditions.

To do so would require the abrupt halt of all work then
being performed on all interstate highways that traversed
any park land regardless of the percentage of completion or
costs incurred—Clearly that was not the intent of Congress.
These statutes are not applicable to interstate highways ap-
proved prior to their effective dates—I-66 was approved
June 4, 1959.

The Court of Appeals for the Third Circuit expressly
held in Wildlife Preserves v. Volpe, supra, that these statutes
were not to be given retroactive effect. See also Triangle Im-
provement Council v. Ritchie, 314 F.Supp. 20 (SDWVa.),
affirmed 429 F.2d 423 (4th Cir. 1970).

The box culvert under Lee Highway and the utility re-
locations complained of do not directly involve any of the
so-called park land—The box culvert is some 950 feet from
the nearest publicly owned land, the construction of which
was authorized more than a month prior to the effective
date of 23 U.S.C. § 138. Although the utility relocations
took place after the effective date of § 1653(f), they were
but a part of the right-of-way approvals given in 1962—
Site preparation, including utility relocations, is authorized
by the right-of-way approval.

Further, these statutes are inapplicable to I-66 because
Arlington County and the National Park Service have not
found that the areas under their respective jurisdictions are
of local or national significance for park purposes, as re-
quired by these statutes.

Bon Air Park was acquired by Arlington County in 1950
for the specific purpose of highway use—The portion to be
utilized for I-66 has been designated on the County’s General
Land Use Plan since 1961.

App. 41

Spout Run Parkway is now being used for park purposes
and has been since prior to 1-66 approval in 1959. The Na-
tional Park Service has agreed to the use of five acres of this
area for I-66 and 13.97 acres for 1-266 (the proposed con-
nection with the proposed Three Sisters Bridge) on condi-
tion that the land be replaced with other similar land. Al-
though there has been no specific finding by the appropriate
Arlington County and National Park Service officials that
these lands are of local or national significance for park
purposes, the only inferences that can be drawn from the
facts clearly indicate that these officials view these areas
more important for highway than for park purposes.

Finally, the plaintiffs invoke the provision of the National
Environmental Policy Act of 1969. This Act became ef-
fective on January 1, 1970. Section 102(2) (c) requires that
major federal action be accompanied by the filing of a state-
ment of environmental impact of this action with the Council
on Environmental Quality. :

A number of courts have held that this Act is not ap-
plicable particularly to cases involving interstate highways.
See Pennsylvania Environmental Council y. Bartlett, 315
F.Supp. 228 (MDPa. 1970) ; Brooks v. Volpe, 319 F.Supp.
90 (WDWash. 1970) ; and Elliot v. Volpe, supra.

The only activity on 1-66 since January 1, 1970 has been

the completion of work authorized or approved prior to that
date.
The instructional memorandum of the Federal Highway
Administration, issued November 30, 1970, stated that an
environmental impact statement under NEPA would be re-
quired on all projects which had not received design ap-
proval prior to February 1, 1971.

Design approval for I-66 was had January 21, 1971~—
Nevertheless the defendants in this case have stated in their

App. 42

answer that regardless of the technical question of the ap-
plicability of NEPA to future actions, they intend to re-
quire the filing of an impact statement prior to further con-
struction approval—Virginia is now preparing that state-
ment.

The federal defendants have further assured the Court
that they will give the impact statement, prior to approval
of construction, the objective evaluation urged by the court
in the Gillham Dam case, EDF v. Corps of Engineers, 2
ERC 1260.

Although it has not been made one of the issues here to
be determined, it is well known that Virginia has employed
a nationally known landscape architect to imvestigate the
environmental effects of 1-66 and that he is proposing noise
abatement requirements that would make Arlington County
quieter than it now is.

The Three Sisters Bridge is not a part of 1-66—neither
is the proposed connecting road, I-266. Some adjustments
in the I-66-I-266 interchange will be required if 1-266 is
not built. They have been considered and approved.

Therefore, there is no justification or legal requirement
for further delay in completing the construction of 1-66.

The plaintiffs’ suit will be dismissed as of this date.

The Clerk will send a copy of the dismissal order and of
this memorandum opinion to all counsel of record.

/s/ Oren R. Lewis
United States District Judge

a

App. 43

ORDER
Entered October 8, 1971

In accordance with the memorandum opinion of the
Court this day filed herein, the above styled matter is hereby
dismissed and stricken from the docket of this Court.

/s/ Oren R. Lewis
United States District Judge

APPENDIX D(1)
Federal-Aid Highway Act of 1958
§ 128. Public hearings

(a) Any State highway department which submits plans
for a Federal-aid highway project involving the bypassing
of, or going through, any City, town, or village, either in-
corporated or unincorporated, shall certify to the Secretary
that it has had public hearings, or has afforded the oppor-
tunity for such hearings, and has considered the economic
effects of such a location. Any State highway department
which submits plans for an Interstate System project shall
certify to the Secretary that it has had public hearings at a
convenient location, or has afforded the opportunity for such
hearings, for the purpose of enabling persons in rural areas
through or contiguous to whose property the highway will
pass to express any objections they may have to the proposed
location of such highway.

(b) When hearings have been held under subsection (a),
the State highway department shall submit a copy of the
transcript of said hearings to the Secretary, together with the

ee

App. 44

APPENDIX D(2)
Federal-Aid Highway Act of 1968
§ 128. Public hearings

(a) Any State highway department which submits plans
for a Federal-aid highway project involving the bypassing
of, or going through, any city, town, or village, either in-
corporated or unincorporated, shall certify to the Secretary
that it has had public hearings, or has afforded the oppor-
tunity for such hearings, and has considered the economic
and social effects of such a location, its impact on the en-
vironment, and its consistency with the goals and objectives
of such urban planning as has been promulgated by the com-
munity. Any State highway department which submits plans
for an Interstate System project shall certify to the Secre-
tary that it has had public hearings at a convenient location,
or has afforded the opportunity for such hearings, for the
purpose of enabling persons in rural areas through or con-
tiguous to whose property the highway will pass to express
any objections they may have to the proposed location of
such highway. Such certification shall be accompanied by
a report which indicates the consideration given to the eco-
nomic, social, environmental, and other effects of the plan
or highway location or design and various alternatives which
were raised during the hearing or which were otherwise con-
sidered.

APPENDIX D(3)
National Environmental Policy Act of 1969
§ 4332. Cooperation of agencies; reports; availability of
information; recommendations; international and national
coordination of efforts /.

The Congress authorizes and directs that, to the fullest ex-
tent possible: (1) the policies, regulations, and public laws

CTR ET NES Gye eT PPMENERY:

App. 45

of the United States shall be interpreted and administered
in accordance with the policies set forth in this chapter, and
(2) all agencies of the Federal Government shall—

(A) utilize a systematic, interdisciplinary approach which
will insure the integrated use of the natural and social
sciences and the environmental design arts in planning and
in decisionmaking which may have a impact on man’s en-
vironment ;

(B) identify and develop methods and procedures, in
consultation with the Council on Environmental Quality
established by subchapter II of this chapter, which will in-
sure that presently unquantified environmental amenities
and values may be given appropriate consideration in de-
cisionmaking along with economic and technical considera-
tions ;

(C) include in every recommendation or report on pro-
posals for legislation and other major Federal actions sig-
nificantly affecting the quality of the human environment,
a detailed statement by the responsible official on—

(i) the environmental impact of the proposed action,

(ii) any adverse environmental effects which cannot be
avoided should the proposal be implemented,

(ili) alternatives to the proposed action,

(iv) the relationship between local short-term uses of
man’s environment and the maintenance and enhancement
of long-term productivity, and

(v) any irreversible and irretrievable commitments of re-
sources which would be involved in the proposed action
should it be implemented.

App. 46

Prior to making any detailed statement, the responsible
Federal official shall consult with and obtain the comments
of any Federal agency which has jurisdiction by law or
special expertise with respect to any environmental impact
involved. Copies of such statement and the comments and
views of the appropriate Federal, State, and locai agencies,
which are authorized to develop and enforce environmental
standards, shall be made available to the President, the
Council on Environmental Quality and to the public as pro-
vided by section 552 of Title 5, and shall accompany the
proposal through the existing agency review processes;

(D) study, develop, and describe appropriate alternatives
to recommended courses of action in any proposal which
involves unresolved conflicts concerning alternative uses of
available resources;

(E) recognize the worldwide and long-range character
of environmental problems and, where consistent with the
foreign policy of the United States, lend appropriate support
to initiatives, resolutions, and programs designed to maxi-
mize international cooperation in anticipating and prevent-
ing a decline in the quality of mankind’s world environ-
ment;

(F) make available to States, counties, municipalities, in-
stitutions, and individuals, advice and information useful in
restoring, maintaining, and financing the quality of the
environment ;

(G) initiate and utilize ecological information in the plan-
ning and development of resource-oriented projects; and

(H) assist the Council on Environmental Quality estab-
lished by subchapter II of this chapter.

RARELY GEL AN LOR AMES MEP OAT AY EAE IRAE IETS * 231% SSH AR

App. 47

APPENDIX E
STIPULATION AS TO FACTS
Filed June 9, 1971

The parties hereto, by counsel, jointly agree that the state-
ments contained herein are assumed to be true and correct
for the purpose of the motions to dismiss and motion for
judgment filed herein.

1. (a) The highway in this action is known as Interstate
Route 66 and is a part of the Interstate System of Highways
authorized by 23 U.S.C. 103. It runs from Interstate 81 near
Strasburg, Virginia, through a portion of Fairfax County
and Arlington County, Virginia, to the Potomac River, a
distance of 75.4 miles, approximately 25 miles of which has
been completed.

(b) The Virginia Department of Highways began pre-
liminary studies for the location of I-66 through Fairfax
County and Arlington County prior to 1958 and completed
three studies regarding the location of the highway: to wit,
(1) preliminary study and feasibility estimate for Virginia
Route 66 dated April 1958 and a supplement to this study
dated October 1958 by Consulting Engineers Howard,
Needles, Tammen, and Bergendoff; (2) a report on I-66
by the Office of Planning of the Virginia Department of
Highways dated October 25, 1958; (3) the location study
of I-66 through Arlington County dated October 28, 1958,
by Wilbur Smith & Associates. Copies of these studies are
attached hereto as Exhibits A-1, A-2, and A-3 and asked to
be read as a part hereof.

(c) The Interstate System of highways is constructed by
the States under a Federal grant on a 90-10 ratio—90%
paid by the Federal Government and 10% by the States. The
Federal program is presently administered within the U.S.

Aye: al

WMerpeavttnraceres cof! TT irzeemgpronteermiony ty: othe: Heeedbereed! Hbtgtitcre: a:
crvmameesirnttiione, cecthancth, onsen cermenmpeeed! the EME UBtrenne SUH UB
ther pperonereagee: ects cordbredtodinveenmend! thy ce Mbeererets ch ME Peete
withers, bee Weeedberred! Wbbetboecee: Medbeotteimeecittion: Metter one
ttibee Uhsnelhreccees gporoneercaeer, onscees catdboediodateeneced! hee: MMenreenn i Hey
thie WReonnerth wectttbtte obbee UMeppanereeraeerey ad) (C connannnrrerees WOUTTE dp
measroness OH bee cagprereemions cecaveronrtiess Hamre oethaenegereeds bbe cereettyen:
nomen! sineanctnenees, ppanertodereddartibs tie dbee HHREUEEL Uaneers crernacennrer:
esmmermonenlits cibee catrone Wee Heeedbermed) Hbpebbewcar: Meddantindete stress
rmeaderenenior: core ofRRiere tins cerantth Hbeates crctlhed die bedeteny CE
vecthanet®: tte Uenendberd! bac or (bbbctinttenn HEtanetiarees Mee (Bbtttten Here
mmeerer’ oh omtmadbers bee anegereeerctintione aff ce WReereteonnatd Welbeantedeee ree
partion tee RE Ubyereweern cop Obbeeettennat URtneetineet dhe coo
aevcrerenl! Monsees. cated! isdbireretdbh: omenppnenmndbbbbetts cdbe: Hecedbersal | fBbes
ec Medbrettediteratton tin Wretbiionetemn: Me Bbeesten Htratree
Hho Witmetienio ts Abeer alll 0 ASdieer: cethe: cose canppentintett ns
rover’ the) Ppareneazeres FM) canned! coldes counntieeed thee dae EDP terd tern OME
se Wiitnriter: Utenetioneres of thee Shoredbeeetr Stbretitis frre: 4
Jieaemeneners: USES) tte Wika EES WEBS Batt rpnrettberreetery oT
vio) Wstenetiareres: cere Wes [Pb HaMMecate: thee cee TBE
Hior: Metepettoreeess Hireney ER ee Meretbbee OBE Mtr tteann Herren =
Wltees & bidberctt: ccommereetttine: thee dbeertbtopnnrnea ef TE
earthed!) ae Fottether 4

2% ppebbdbte Meceeertine; corms Heth ttt Sedhtaetar (Cone
WMevedtbne: 2M UNH tre cenppttddee cc oceoretiiies fh Mite Tha
Sritbinneteonn: (Ctonettte: renee cabbeeretattties crattte: cern conertterr
srond! baaeremmeeed!) cat thie creeerettinns Mes cnneeeettines cppeetteest ont
gperra: canmtel! ettbomeeed! cots '12 onndtbbbbitdbe: cothdh cnn: ceettinnaeteer I) pre
gone presen: cat othe: Henestines MEE MERC coats ere ert!
whee Wneneetttere Te MAerresnee A PME etooctdt hittin epernnee
genet! WReesettonnned! TEtegediorees: veers gprreeentt: Ebr ctllddien: oo ecoren
cece hed bd! opn SHinenetortdnes Hegeteerttbiee 2° SSE Ueber tte aren
teers oF vibes Mvitbaneteety: Clenetttes Weert ott rtttererns cute!

|

eseeoPRtEtNY gppeectnRtE: he reer: dies» troy

sareaaasarer bby Sdeereagpe tetscodteediiderere fd pede Mae

adberh tt We onerth og C ppeter termed: Wee canlereel lio
Yeditntes Conte Mecttl core di trette trek
arthétrerathteny cbt cdbieor NEIL oCppretter! oy
Veddineron (Conmere Meccth dined: retisratte rs myrrh ba
Wervertntbber: 2) MA rreeveneeettiee tis tec trae

tty TOME THES cropper is ttttetieghi Yo yade: 1

Heosrseblcts cccapet dee eif: 1 letters ot) Wrens 1°43;
Omtribies 22) NET HP vapae Wo oom M repiertivedd, «|
Wbdaneeery (Cone MMe fC camivsiony een: rypenatbes
He Vbitterenn Comme Heoerth dp wmensth re
Y creed OV wHiedi weer utthvernerthi iene:
fete UDetperetre en: SEAS | Colic ttt Pc ery T de RRS
Vid tie ppewertlt apmeeeth conrithes oon thee WY
ttter it Seventh (fh reeme irre rey)! y
‘titmpermatterd ce tp rerertde, TPeeeeettnery: of Ppa,
treevesenterathittter: mnthie lbecutteny “MN etersemte Meee ve
fetta: UW) Mie Pett receenen rochecl lias $8 ‘
were thdree cceetthes cneneepbies Thinthtes hei aR
Wis
MBbe Sitgepnnas. Sete Hbebiniy (C eeretastes YS dernegs
PRO rapablé cotter cae th there a, tt
lite |) rmetion cebberert oc thes itdha tpi. Mey
White 'Corrteber: VHS A thie reretecmeeweth) caer. ti
reeebisthens. cthtatiore thie cones ttagtred! Heres
Wi akhkerbirn 1 Preah {Eattiperent TY " ‘

Hdttonn cseesontbimttrett cc che Wetherall deren. 4 tynne ty,
‘terethion wwithi be tarmeeeaty liveecl theretr ee Whbeeh on
Ye Reet On Wheedi te cone the Teelerel tpi.
'hremtee: eett {Ubi mateetad le: Si. segue) the Wee
Theettrees nn heerrrensty Whetbdow! 6. MN ebeR yD,
Prrenyree thie {bebry- ‘hint he erele pees crude

=

_—

Mae ye Sebo

;
>
+

App. 50

State was the only route supported at the public hearing.
neer to the Regional Engineer by memorandum dated May
22, 1959. See Exhibit D-4. The Regional Engineer on May
25, 1959, submitted this information to the Assistant Com-
missioner, Office of Engineering, Bureau of Public Roads,
Washington, D.C., with the recommendation that line 2,
the presently approved route, be approved. See Exhibit D-5.
By memorandum of June 4, 1959, the Assistant Commis-
sioner informed the Regional Engineer as follows:

“In view of the statements made in the State's letter of
May 28, Line 2, the so-called Fairfax Drive-Bluemont
Drive corridor, as proposed by the State after considera-
tion of the material presen at the public hearing held
on October 29, 1958, and initially recommended by the
State on February 20, 1959, may be approved subject
to any required adjustments in the financing of im-
provements on the previously location which
involved Federal-aid Interstate The State may
also be authorized to proceed with the necessary surveys
to determine a detailed location for the ultimate im-
provement of Interstate Route 66.” (See Exhibit D-6).

On June 26, 1959, the Division Engineer informed the Vir-
ginia Department of Highways that the so-called Fairfax
Drive-Bluemont Drive Corridor, the presently proposed
route, was approved June 4, 1959. See Exhibit D-7. A lay-
out map showing the approved route from the Beltway to
the Potomac River is attached as Exhibit D-8.

4. On March 19, 1959, the Virginia Department of High-
ways certified to the Federal Division Engineer that a public
hearing had been held and consideration was given to the
economic effects of the location of 1-66.

[Text truncated at 120,000 characters. The full text is on the page linked above.]

---