iiRary 3 | “RSS

COURT Uf

MAY 7 1965
“JOHN F. DAVIS, CLERK

’ IN. THE

| Supreme Court of the inited States |
Ocroser TERM, i:

No. rae 1)

CarRLO BIANCHI AND Company, Inc., Petitioner
Ke |

‘Unitep Srates, Respondent

= .

PETITION FOR A WRIT OF CERTIORARI TO THE
UNITED STATES COURT OF CLAIMS —

Ce

Rosert F', BRADFORD

53 State Street
_ Boston, Massachusetts 02109
. Attorney for Petitioner

WiLuiAM H. MATTHEWS
821-15th St.,N. W. .
Washington, D. C. 20005
Of Counsel’

May 7, 1965."

Press or Byron S. ApaMs, WASHINGTON, D. C.:

>>

nor a eaer anneal

Opinion below .........6..sesee. nA. S eligucionae oe
Jurisdiction ° sihdncaxateneie © eeacddedacuesadeueda 1
Questions presented snaee pinnecesinntctuntaccneuats 2
Statutory and contract provisions involved cakueeuees 2
Statement ....... Kakkedbeiuaudes oun sednesaas ae
Reasons for granting the writ .......+... me Gavan: 9
CIE sca Nconvbwkendobewenbcensaess anne er ie
Appendix ........ Wkemeuneeaaner clseecbasbcacsids- 2k
. CITATIONS
CasEs:
a Traders, Ine, v. United States, 144 Ct. Cl.
ES Ee rte MO aN PE PO ey Conn oie 15.
Bell Aircraft Corp. v. United: States, 120 Ct. C1. 398,
BE ee ob nea on'ennt 0s dccnnececkinsasces 14
ae a, a geome Co. v. United States, 122 Ct.
i Kk PPT Pree res Cnr) pet rey om 14
Securities & Exchange Commission v. Chenery Corp., . _
318 U.S. 80; 382 U.S. 194 ... 0... cece cece cece 14:
United States v: Bianchi, 373 U.S. 509 ............ 3
Wunderlich et al v. United States, 117 Ct. Cl. 92, 342
US. 98 ........ hahha shear iwd oe kdaeheekeekens “14
Srarures: .
‘Act of May 11, 1954, 68 Stat. 81 cae Act)
(41 U.S.C. 521-822) soccer eect eee eceseneeeeess va

°

| Supreme Court of the United States

_Octoser TERM, 1964

No.

_ ° Canto Brancut anp Company, INc., Petitioner
a | v. :
| Untrep States, Respondent

PETITION FOR A WRIT OF CERTIORARI TO THE
: UNITED STATES COURT OF CLAIMS i

‘Petitioner; Carlo Bianchi and Company, Inc, prays

that a Writ of:Certiorari issue to review the judgment
- ° of the Court of Claims entered in this case on 1 J fuly 17,

=
OPINION BELOW |

The opinion of the Court of Claims of July 17, 1964
(App., infra, p. da) is not yet reported.

" JURISDICTION ae

- The judgment of the Court of Claims was entered .
on July 17, 1964.
that extensive rockfalls occurred throughout the length
of the tunnel, which necesssitated the installation of
_ the permanent tunnel protection before concreting be-
cause of the threat of rock — into wet or uncured
concrete.

9
_ REASONS FOR GRANTING THE WRIT

(1) The decision below is based upon the Court of
Claims determination of a factual issue not presented
_to and not.considered by the Claims and Appeals
Board. The Court properly states that. the eritical
_ issue is whether it was necessary for petitioner to in-
- stall steel supports throughout the length of the tunnel.
However, in resolving that issue, the Court states in
substance that no recovery is proper unless the steel
supports were required for the permanent support and
' maintenance of the tunnel. (App., p. lla, 3rd par.).
- This issue was never before the Board. There the .
issue was whether or not it was necessary to install the
permanent steel ‘supports before the concrete lining of.
the tunnel could be accomplished, as indicated by peti-
tioner’s counsel in his opening: statement before the —
Board:

. Mr. Fox (the Government attorney) has clearly
stated the position of the appellant to this extent
that the appellant has lined this entire tunnel with
steel liner plates and appears before this Board
asking in-equity and good conscience that it be
reimbursed by the Government for the installation
of these are liner plates which the contractor
felt were absolutely necessary in order to line this
tunnel and complete the tunnel job because of the
character of the rock that was encountered... We
ask, that we be paid for the work which we say was
absolutely necessary and without: which this tun-’
nel could not have been«lined with concrete as
required. (R., pp. 79, 83).

According to the siecle own ind witness,
_ if. steel supports were not installed before concreting
in the area of major rockfalls, the tunnel could not have —
been successfully lined with concrete ‘‘without danger

ae
to personnel or structure’? (emphasis supplied) (R.,
p. 142). The testimony of this witness establishes that
the steel supports he deemed necessary for a limited
area were for the purpose of preventing rock move-

‘ment that would damage the concrete before it had a
chance to harden (R., p. 148). Testimony of the gov-

- .ernment’s design engineer clearly indicates that once

the concrete was installed and hardened, that alone |
would adequately support any load that eould possibly
come on it from the roof of the tunnel (R., p. 134).

No witness before the Board indicated that the steel
supports were necessary for the permanent support
of.thé tunnel. Nor did the Board decision. As a mat-
ter of fact, the Government design engineer testified in
a positive manner that at the end sections of the tunnel,
- where the plans ealled for the installation of permanent
tunnel protection, the 1. foot-3 inch thickness of rein-
forced concrete tunnel lining was sufficiently strong to

' take care of any load which would occur on these ends
’ without using in any way the protection work in the
’ form of steel ribs and plates. The Government design
engineer further testified that, within the mid-section
_ of the tunnel, the concrete tunnel lining was designed
for sufficient strength to make the rock above the tun-
nel completely stable, and that the roof would be sup-
ported by the concrete without the necessity for any
type of tunnel protection. (R., p. 129.) |

The Court below seems’to rely in part on the testi-
mony of Mr. Mather, the Resident Engineer, in sup-
port of its assertion that, in order to recover, petitioner
must establish that the steel supports were required
' for the permanent support of the tunnel. The Court
decision states, referring to ‘his testimony: ‘He testi-
fied that the contract required steel lining only where

4

11 | “ é

necessary for the support of the tunnel on a permanent
basis.”” “{App., p. 9a). This was not Mr. Mather’s

testimony. Had he expressed that opinion it would _

have been. entitled to no credence, because no ‘such pro-
vision is contained in the contract, and also because of
his very limited experience in tunnel roof construction,
and the fact-that he did not profess to be a design

engineer. (R., pp. 150, 151). This witness stated that:

he refused to authorize permanent tunnel protection
because his interpretation of the specifications was that

the protection required was ‘‘temporary protection’’, .

and that it was the responsibility of the contractor to
place it for the protection of his workmen. Another
statement attributed to Mr. Mather was one which he
made to the sub-contractor’s engineer in direct charge
of the tunnel excavation work that the only time tun-
- nel protection would be used would be to prevent the
failure of the tunnel itself. (R., p. 113). This ob-

viously refers to the failure of the “tanned during the °

course of construction, and not to the maintenance or
permanent support of ‘the tunnel, .

“The Court of Claims bases its declaration that the
central issue was whether the steel supports were neces-
sary for the maintenance or permanent support of the
tunnel, and its disposition of this issue in favor of the
respondent, primarily on its reference to the ‘‘perma-
nent tunnel protection” and “temporary protection’?
provisions (TP403, TP4-02) of the specifications.
(App., p. 1la). . The Court concludes:

. Had the contract contemplated payment for

sup rts designed only to protect. the workmen

e the job was being completed, it seems reason-

xble $6 suppose that T’P4-08, or some comparable
paragraph, would have made this —_— Cop.
pp. said 7 2 | ‘

12
_ The above statement indicates that the Court mis-
takenly believed that the steel supports were installed
by petitioner in-the mid-section of the tunnel only to
protect the workmen while the job was in progress.
This is not so: As indicated by the testimony of re-
spondent’s expert witness, Mr. McGavock, supra p.

6, the purpose of the steel supports was to make it
possible to install the concrete lining without danger

to the structure, in order to protect it from rupture by —
falling rock during its installation and during the sub- |

sequent period of hardening, as well as without danger

to the workmen. ' Nor is there any concéivable conflict .

on this basic issue between the testimony of Mr. Me-
- Gavock. and that\of petitioner’s expert witness, Mr.

- Following the Contracting Officer’s interpretation of
_ the specifications that the ‘temporary protection’’ pro-

vision of the contract, imposed on petitioner the obli- ©

gation to provide ‘protection against damage to the

tunnel structure as well-as for the safety of the work- ©

_ men, respondent’s expert witness took the position that
the steel supports he recommended were temporary

protection even though the steel supports, with back- '

packing above, had to forever remain embedded in the

concrete, supra, pp. 5, 6. Completely ignored was the ©

fact that under paragraph TP4-02 temporary protet-
tion was, required by the contract solely for thé protec-
_ tion of the workmen, and ony. during the process of
tunnel excavation.

_ The contract specifications provided that the perma-
nent tunnel protection be installed beyond the 50 feet
from the portals where ‘‘required’’ or ‘‘directed’’ by
the Contracting Officer, supra, p. 4. It was conceded

by respondent’s design engineer that the words ‘‘re-
quired’’ or-‘‘directed’’ were inserted in the specifica-

mG

13 .
tions to cover the possibility that conditions would be
encountered at the tunnel site differing from those rea-
sonably to be expected, and which would require the
installation of the steel supports beyond the 50 feet
from the tunnel portals (R., p. 133). This testimony.
confirms the reasonableness of the basis on which the

contract was bid, that additional tunnel protection

- would be directed before concreting if needed, supra,
~p. 4.

=

were required for the permanent support of the tunnel

is in direct violation of the engineéring design of this -

tunnel, and it imposes on petitioner a burden of proof
- for which there is no warrant an the.record, or in the

' decision of the Board. The Court states:

We find it impossible to say that the Board could —

-not properly conclude that the steel ribbing and,
; plates were not required for the continued support
of the tunnel (emphasis supplied) (App., p. 12a,

line 5)

Nowhere does the Board decision indicate any con-

clusion on its part that the tunnel supports which peti-

tioner installed lost their essentially permanent -char-

- acter merely because they did not fulfill the function. .

of providing continuing support of the tunnel struc-
ture, which means support after the completion of the

work:. Nor was this function contemplated or required |

under the contract..: - Sa
Petitioner submits that the decision of the Court
below is fundamentally erroneous because it is based

upon a determination of ‘the issue whether the steel:

supports were necessary for the permanent support of

the tunnel, an issue not presented to and not considered ~

_ The holding of. the Court of Claims that no recovery
is proper unless it can be said that the steel supports

o>:

#4

i the Board. J udicial review is limited to the i issues
presented to the administrative agency. In Securities ©
& Exchange Commission v. Chenery Corp., 318 U.S. 80, |
87 (1943), the first Chenery case, this Court states. _
\. The .grounds upon which:an administrative order
must be judged are those upon which the record dis-
closes that its action was based’’. In the second Chenery '
- ease, 332 U.S. 194, 196 ca08t), ' this Court amplified its —
previous statement:

When the case: was first ue we ; letead a
simple but’ fundamental rule of administrative law.
* » hat rule is to the effect that a reviewing court,
-- in dealing with a determination or judgment which
- an administrative agency alone is,authorized to
‘make, must judge the propriety of such - action
. gsolely:by the grounds invoked by the agency. If
‘”.. those grounds are inadequate or improper, the
Court is powerless to affirm. the administrative
action by substituting what it considers to be a
more adequate or proper basis. |

es (2) The decision below applied the substantial ‘evi-

| dente rule, and thereby attached finality, tothe con-
tracting agency’s interpretation of the. specifications
as applied to admitted facts, a question of law.

"The Wunderlich Act permits finality for adminis-
trative decisions only on questions of fact, -as distin-

- .guished.from questions of law, supra, pp. 2,3. Gen--

- erally, questions of igterpretation of. contracts are not —
‘questions of fact’’ within the meaning of that expres-
sion as it is written into disputes articles of govern-.
- ment contracts, but are questions of law to be decided

- by the Court. Wunderlich et al v. Umted States, 117
Ot: Cl.,92, 212-214, reversed on other grounds 342 U.S..
98, and cases there cited; Bell Aircraft Corp. v. United
States, 120 Ct. CL. 398, affirmed 344 U.S. 860; ——

15

: Shipbuilding Co. v. United States, 122 Ct. Cl. 72, 97;
Associated Traders, Inc. v. United States, 144 Ct. Cl.”
744, 750-751. |

The Claims and Appeals Board interpreted the
“Temporary Tunnel Protection’ provision (Par.
T'P4-02) of the specifications as\ embracing any steel
supports with backpacking above, which are needed to
' protect the structure of the tunnel in the course of the
‘ Installation of thé concrete lining, even though both

the’ steel supports and backpacking had to remain em- ___

bedded in the concrete forever. This interpretation is
Implicit in the Board’s finding that: © .

. . . Vertical joints encountered at three central
locations representing less than 100 feet of tunnel ©

length could have been supported with relatively |
little temporary protection. (R., p. 176),

when considered with the admission of respondent’s
- expert witness that the steel supports he deemed neces-

‘ sary, similar: to what ‘were installed by petitioner,?: .
_ were for this purpose and met these tests. 3

* The Contracting Officer by letter of 13 June 1947 (Exhibit N -
before the Board, R., p. 248) recommended that adequate protection
_ would be obtained by using throughout the length of the tunnel
- Steel T beam ribs of about 3 inches and 6 lb. weight; spaced 4 to 8
* feet apart, with two-inch timber lagging. This was in lieu of the
contractor’s recommendation that the same size steel ribs and liner
plates as were prescribed and used at the portals be used throughout
the central portion of the tunnel. The Contracting Officer took the
position that this type of installation was considered an overdesign
for the purpose required, and therefore would be more costly than

» he considered necessary. He recognized and admitted the necessity .

for support throughout the entire length of the tunnel. The type
of tunnel protection recommended by the Contracting Officer is in
its very make-up identical with that contemplated under paragraph
TP4-03 ‘‘Tunnel Protection’’ in the contract specifications’ Never-
theless, he interpreted the specifications by characterizing it as
**temporary’’. | ’

soe

16

.The Board preceded the above finding by quoting the
contract provisions for Temporary Tunnel Protec-
tion dnd for Permanent Tunnel Protection, com-
menting on these provisions. (R., pp. 169-173). The
Board’s conclusion that only ‘‘temporary tunnel pro-
tection’’ was required necessarily involved an inter-
pretation of these provisions of the specifications, ‘as
applied to admitted facts. Petitioner submits that this
was a question of law.

The Court of Claims applied the substantial evidence
rule to the Board’s interpretation of the specifications
im the following language:

. the critical issue remains the necessity for
steel supports throughout the length. On that
question the Board’s conclusion that ‘vertical
joints encoun at three central locations repre-:
mesg Bye 100 feet of tunnel length could
have beén supported with relatively little tempo-
rary protection’’, seems buttressed by substantial

evidence. _(App., p. 12a, 1st full par., line 8)

_ The decision below upholds the Board on the ground
. that there was a conflict in the testimony of petitioner’s
and respondent’s expert witnésses which the Board had
a right to resolve in favor of respondent. (App., p..
lla). The decision properly states that the critical
issue is the necessity for steel supports throughout the
length of the tunnel. However, confining this critical .
factual issue to the 100 feet of tunnel protection, apart
from the question of interpreting the specifications,
there is no conflict whatsoever between the testimony of
‘any of petitioner’s and respondent’s witnesses. In
limiting the tunnel. protection installed to Mr. Me-
Gavock’s 100 feet no question of fact is involved, but

17

only a question of law which can be resolved within the |
four corners of the specifications.

If petitioner’ s contention thatthe steel supports
which. respondent’s expert deemed necessary consti-
tuted permanent tunnel protection rather than tempo-
rary protection, under the specifications, be sustained,
the only remaining real issue is how much additional
tunnel protection, other than the respondent’s expert’s |
100 feet, was required before the concrete lining of the —

tunnel could be accomplished. Although the words:
* “permanent tunnel protection’? do not appear in the
contract or the specifications, the issue before the Con-
tracting Officer and before the Board was ‘whether

“‘permanent tunnel protection’’ under paragraph TP4- |
03, or ‘‘temporary tunnel protection’’ under paragraph
TP4-02 of the contract specifications, was required
throughout the length of the tunnel b re it would
be possible to line it with concrete. That this was the ©
issue. is apparent from the opening statements of .
counsel for both parties, from the testimony and ex-
hibits of.record, and from the decision of the Board.
(R., pp. 77-81, 153-161, 171-176).

The Court of Claims disposes of the issue: of jie :
‘much additional tunnel protection was needed, over and
above Mr. McGavock’s 100 feet, by. eoneluding that
_ rockfall in the downstream half, uninspected by Mr.
McGavock, could have been averted by scaling. (App.,
p. 12a) This conclusion is based on the Court’s com-

‘parison of total rockfall in five 30-foot Monoliths with

three such Monoliths in the upstream half of the tun-
nel, which is in.effect the expression of an expert opin-
ion for which there is no warrant in the record. Had re-
spondent’s expert witness expressed this opinion, and
had petitioner ‘been deprived of the right of cross
‘examination or siesta this would — been a serious
error.

18
CONCLUSION
For the foregoing reasons, it is respectfully sub-

mitted that the petition for a Writ of Certiorari be
granted.

ROBERT F. BRADFORD
53 State Street -
Boston, Massachusetts 02109 .
aa Attorney for Petitioner

Wuuiam H. MarrHews |
821-15th St, N. W..
Washington, D. C. 20005
| Of Counsel

May 7,196. ©

Si Sie 3
oe ‘

Fae 8

la
APPENDIX
IN THE UNITED STATES COURT OF CLAIMS
a ie
(Decided July 17, 1964)

Carto BiancHi ann. Company, Inc. v. THE Unrrep States
William H. Matthews for plaintiff. Robert F, Bradford
on the briefs. —

_ Gerson B. Kramer, with whom was Assistant Alterna
General John W. Douglas, for defendant.

Before Jones, Senior Judge, Rezp, Justice (Ret.), sit-
ing by designation, LarAMOrE- and DuRFEE, ani
“Opinion | eo
Reep, Justice (Ret.), sitting by designation, delivered the
- opinion of the court:

_ In 1946 the plaintiff contracted with the ieotencanbsiah to
. construct a flood control dam in upstaté New York: Inci- |

dent to the project was the construction of a tunnel 710 |
_ feet long with a diameter of 13 feet after concreting. The

contract called for steel ribs and liner plates to be installed
as tunnel support in the 50 feet at each end of the tunnel.

_ .No other protection than the concreting was provided for
the central 610 feet. Plaintiff deemed it necessary to pro-
vide steel support for the entire length. This suit is for the
large additional expense allegedly involved. in installing
ribs and liner plates beyond the 50 feet at each mouth.

The plaintiff’s request for authority to use permanent
_ steel supports throughout was first presented by-letter to

2a |

the contracting officer in April 1947, before the supports had |
been installed. The officer refused to authorize the addi-
tional expense on the grounds that the contractor had Been ..
furnished full information as to rock conditions at the
tunnel site, that the contract limited steel support to one
hundred feet, and that the contract placed the cost of pro-
_ tection of the safety of workmen during construction on the
contractor. An appeal was taken to the Board of Claims
and Appeals of the Corps of Engineers, While that appeal
was pending ‘the plaintiff installed the supports for which
compensation was claimed.

In June .1948 the Board held a — and in December
of that year it rendéred its decision denying plaintiff’s
claim.’ In 1954 plaintiff timely instituted this action in
this court. In this suit, varying the claim presented to
the Board for estimated costs of installing the support,
plaintiff requested a. total of $233,425.25 costs allegedly in-
curred as a consequence of the government’s refusal to au-
thorize support throughout the tunnel. The primary issue
here, too, is the necessity for the additional support. Plain- ~
- tiff does not contend that this issue is not one of ‘‘fact’’
under the standard ‘*Disputes Clause” in plaintiff ’s con-
tract:

“Except as dhiiotin rere provided in this con-
tract, all disputes concerning questions of fact arising.
under this contract shall be decided by the contracting
officer subject to written appeal by the contractor within .
30 days to the head of the department concerned or

’ his duly authorized representative, whose decision shall
be final and conclusive upon the parties thereto. In
the meantime the contractor shall agus proceed
with the work as directed.”?

1The Board’ s decisions are not officially aieiiiil The opinion ©
is to be found in the printed record, in the Supreme Court, Carlo
“Bianchi v. United States, 373 U.S. 709, Record p. 166.

P of
.

. 3a

As the claim was presented under this clause, the suit is gov- .
erned by the ‘‘Wunderlich Act,’’? 41 U.S.C. §§ 321-322
(1958), which provides that the Board’s decision on mat-
ters covered by the Disputes Clauses ‘‘shall be final and
' conclusive unless the same is fraudulent or capricious or
arbitrary or so grossly erroneous as necessarily to imply
bad faith, or is not supported by substantial evidence.’
The ‘case was sent to a Commissioner who conducted a
-second hearing admitting. evidence not presented to ‘the
Board. The Commissioner recommended that plaintiff re-
‘cover. This court accepted the Commissioner’s findings
and conclusions, 144 Ct. Cls. 500, and, after receiving addi-
tional evidence on the question of damages, entered judg-

ment for plaintiff. 157 Ct. Cls. 432 (May 9, ee oN

The Supreme Court reversed, 373 U.S. 709 (1963), hold-
ing that the Wunderlich Act prevents de novo consideration
by a court where an administrative determination has been
made. Rather the Supreme Court held the reviewing court

-is limited to a determination whether there is substantial
evidence, based on the record’ develéped before the. Board,
to support the administrative conclusions.

The case was again sent to the Commissioner after re-
-mand from the Supreme Court decision. The Commis-
sioner, after examining the record of the Board hearing,
concluded that the Board’s finding for the government was
not based on substantial evidence.? The parties are agreed
that under the Wunderlich Act our scope of Peview i is the
same as that exercised by the federal cour® of appeals
under the Standards of Universal Camera Corp. v. Labor
Board, 340 US: 474, and its progeny.” .

2 Commissioner’s Determination Pursuant to Court’ s Order of
July 12, 1963, upon Remand from the Supreme Court of the United
States, filed November 4, 1963. “*. :

.**P1. Br. 40-45; Def. Br. 7-10. .

| 4a . |
The task -before this court under the Supreme Court
decision is to review the determination of the Board of

Claims and Appeals of the Corps of Engineers and decide
whether there was substantial evidence in the regord as a

whole before that Board to justify its conclusion. . In reach- .
ing our conclusion, we cannot disregard plaintiff’s evidence.
_ However, even though we might have decided as an original -

meter with plaintiff on balfnce, the decision of the Su-
preme Court requires us to go further and uphold the
Board’s decision if there was substantial evidence to sup-
port the Board’s decision on the record as a whole.

Plaintiff and defendant are agreed that the original con-

tract called for steel ribbing only in the 50 feet of the'tunnel -

nearest to each end. Plaintiff contends, however, that the
‘ condition of the rock was such that steel ribs and liner plates

were required throughout the tunnel. Accordingly, plaintiff -

contends that recovery should be granted under paragraph
TP4-08 of the specifications, which provides that ‘‘ Payment
for all costs of furnishing and placing liner plates, and tun-
~ nel supports, * * * specified herein or directed by the Con-
tracting Officer, will be made at the applicable unit price
**¢ > Plaintiff contends that the evidence establishes

| that ‘the officer should have directed the installation of .

the liner plates and ribs involved, and- therefore that the
. government should pay for the support.— Plaintiff also
pra to TP4-03, which. provides:

- TP4.03. Tunnel Protection.—a. Bikee= _The tunnel
' protection shall be furnished and placed as required for

. distances of approximately the first 50 feet at each end.

of the tunnel which includes the underground portion

of the outlet transition. Such tunnel protection con- -

forming to‘the cross-sectional shape of the tunnel and
transition, shall consist of steel arch ribs and corru-

.

gated steel liner plates a® indicated on the drawings -

or required, including tie rods and spreaders. eer

. [Italics © supplied]

5a

_ As an alternative theory, plaintiff ‘argues that the condi-
tion of the rock was sufficiently different from that revealed
by test borings to show the supports became necessary by
virtue of changed conditions within the meaning of Article 4
of the contract:- ‘ Ny:

“Article 4. Changed Conditions—Should the ¢on-
tractor encounter, or the Government discover, during.
the progress of the work subsurface and/or latent con- ~°

ditions at the site materially differing-from those
shown on the drawings or indicated in the specifications,
or unknown conditions of an unusual nature differing ©
materially ‘from those ordinarily encountered. and ae
generally recognized as inhering in work of the .char- *
acter provided for in the plans and specifications, the
attention of. the contracting officer shall be éalled im-
mediately to such conditions before they are disturbed.
The Contracting Officer shall thereupon promptly in-
vestigate the conditions, and if he finds that they do so
materially differ the contract shall with the written
approval of the Secretary of War or his duly author-
ized representative, be modified to provide for any in-
_ erease or decrease of cost and/or difference in time
resulting from such conditions.” ars His

The Board rejected plaintiff’s d@ntention that it had en-
countered changed conditions. The Board held that the
testimony indicated that the job could have been completed
with the aid of temporary supports at vertical joints in the
rock. Under the contract ‘‘temporary”’ supports are not to ;
be computed as -pay items. It was further thought that
plaintiff’s delay from the holing out in March until De-
cember 1947 when the concreting was started: had contrib- —
uted to the rockfall that had dpcurred in the turinel, and
that. the rockfall after the ho ing out was not excessive.
The. Board also found that the failure to undertake con-’
ereting promptly and air slaking due to the failure to séal
. up the tunnel were the cause of what it, termed ‘‘gradual

deterioration’’ of the rock. a:

6a °

The Commissioner found these conclusions unwarranted.
First, the conclusion that ‘‘temporary’’ supports would be:
~~ adequate for the protection of the workmen was rejected.
~™Phe ommissioner apparently took the position that. be-
‘ eause backpacking would be used even with wooden lagging,
‘ o + ‘and the backpacking would ultimately be encased in con-
crete when the tunnel was grouted, such support. could —
not be deemed ‘‘temporary’’ under the specifications. Fur- ~
ther, the photographs introduced by plaintiff showed sub- —
' stantial amounts of rockfall in the period shortly after the
tunnel holed ut. * The Commissioner.agreed_, with the) —
plainti that this demonstrated the threat of tockfall into |
% -. .wet or uncured conerete.if the gh had been under-
taken’ immediately. And last, the Co oner disagreed
that the plaintiff had contributed to tiecttan by failing
properly to seal up the tunnel while awaiting the grouting
process. The Commissioner held that the provision of the
contract that the tunnel shall be ‘‘adequately lighted and
wentilated’”’ prevented any sealing to prevent temperature |
- and humidity changes from causing rockfall. Farther, he _

thought the all was to a large extent in pieces |
- too large to have: n caused by air slaking. if
-.- We are unable with the Commissioner that the

' Board’s conclusions..were unsupported by substantial evi-
dence. The plaintiff, in order to recover, must establish
either that changed conditions were encountered within the
meaning of Article 4 quoted above, or that the permanent ~
steel ribs and liner plates were necessary to the completion |

' of the tunnel and therefore should have been directed by the
cont, ‘officer under paragraph TP4-08. We do not
consider the view ‘of the Commissioner that the failure to

: ‘ seal! up the tunnel is an inadequate basis for denying
recovery on the evidence adduced before the Board. We -
hold that the Board was warranted in finding that no chang-
ed conditions were encountered necessitating the support
and that the contracting officer was not required under the’
circumstances to direct the installation of steel ribs and liner
_— throughout the tunnel.

.
EA Oh AO eh Ne APRIL Des hg tM ae TL hima te ate i tie

i Ta can . |

The testimony before the Board consisted of the views
of four witnesses for ” plaintiff and three soi the
: government. ’

' ‘Thomas A. hiv, the plaintift *s onan superintendent,
testified that the nature-of the rock did not change as the
tunnel was dug deeper. Vertical joints in the rock appeared
every 3 to 5 feet. Earlier test borings had not revealed .
_- these joints because no borings had been made at an- angle.

| Because of winter weather, the grouting was not started has
- as soon as the tunnel was holed out. By April the roof of
the tunnel had started to fall,and ‘by August the volume of
fallen’ rock had reached 203 cubic yards. | Temporary sup-

ports’ would riot have been feasible because: it would not.

have been practicable to remove the backpacking that would
have been necessary. The contractor ..would have beén.
required to encase the backpacking in-concrete during the

grouting process. Mr. Coyne had had no prior experience _

- in tunnels of this length.

_ Elford H. Richardson, plaintiff 5 chief engineer, testified
‘that there was no data as to the dates on which the rock
fell, but that over the entire March to August period some

203 cubic‘yards fell, including some that had to be servary 2

for the installation of liner plates.

Everett Diehl, the chief engineer of the subcontractor that ;
excavated the tunnel, testified that weakness in the roof had —
been noted from the outiet. Steps were taken in blasting
to avoid éausing rockfall, and the tunnel was holed out -
without incident. The rockfall between March 12 and the
end of the clean-up on March 25 was approximately 60 cubic
yards in Mr. Diehl’s estimation. The total -volume of the
- excavation was 6,000 cubic yards. Mr. Diehl could not esti-
mate whether 3% (203/6000) was. an excessive fall because
he had had no prior experience in unsupperted tunnels of
this length. Mr. Diehl also testified that. the resident engi-
'.neer told him at the time of the excavation that the only
circumstance under which permanent support would be
authorized would be if it became necessary to. prevent the

4%

| ie
collapse of pet tunnel ii i.e., to prevent the failure of the -

tunnel itself. _
Irving | . Crosby, plaintiff *g siiittiais quent’ testified
¢

‘that he Visited the dam in April 1948, At that'time the
tunnel was largely lined with concrete, but some 140 feet -
were unlined. The steel ribs and liner plates were installed —

- throughout. The liner plates were so installed that. Mr.
Crosby could see “‘almost to the crown of the roof.’’ Mr.
“Crosby expressed the view that the rockfall was chiefly due
to the fracturing of the rock: The rock contained parallel

systems of fractures intersecting at.more or less right.

angles. .These fractures were not indicated on the contract

drawings and there was no way of knowing that the roof .

conditions would be so bad. If no support was provided, it

would have been likely that rock would have fallen through _

the wet concrete.

‘The first PORE 2 witness was David 0. Congteton,
chief of the Dam Design Section of Baltimore District.
He had had some 15 years experience in tunnel construction.
He testified that no likelihood of rockslide was seen except

_ at the ends of the tunnel where the 50 feet of ‘permanent

steel supports were provided. It was assumed that the roof
would stand without further scat once ths: concrete lin-
. ing was installed.

-C. B. McGavock, J r., & wetligiet with the Baltimore Dis-

© trist, testified that he examined the tunnel in June 1947,

before the support was installed. He estimated at the time
that he examined ‘‘the upstream half’’ of the tunnel, but
- did not see the remainder of the tunnel because of water.
He later testified before the Board that he examined all
but about 200 feet. He stated that the rockfall was largely
in three.areas comprising about 100 feet in total. These
areas were where intersecting joints occurred at particu-

| ~~ larly acute angles. Soms form of “temporary”? “support. —

would be necessary in these places, but as to the remainder

of the tunnel there was ‘no reason why it could not safely be |

grouted without support. Scaling with the jumbo would
| \

a weisits

be necessary.” Mr. McGavock also expressed the view that :
if the tunnel had been sealed up to prevent outside air from °
_ entering during the period after the cleaning up, much of

' cfhhe expansion causing the rockfall that did occur would not

‘have taken place.

- The last witness was Donald. Mather, the government's
resident engineer on the project. He testified that the con-.
tract required steel lining only where necessary for the —
support of the tunnel on a permanent basis. Support: neces-
‘sary for/the workmen’ while concreting was the regponsi- —
! bility of the plaintiff under TP4-02.* - also expressed

unable to be anticipated, remains whether the changed con-‘

” dition required the installation of the steel supports. On.

that issue, as we have stated, we find the Board’s oo.

clusions adequately supported.

- The purpose of the adoption of the rule of the Wunderlich
fre. submitting determinations of technical disagreements

~ betwéen parties to government contracts to boards familiar -

with the subjects of such:contracts, was to have determina-
tions by experts. No charge of fraud arisés in this case.
The conclusion of the Board has substantial support in

the record as a whole and must be upheld. * Judgment is”! :

entered for the ‘defendant and ac ogat pear es is dis-”
4 \ CONCLUSION OF LAW

Upon the foregoing opinion which incindée therein the
findings of fact made-by the court as a part of its judgment

| _ herein, the court concludes as a matter of law. that plaintiff -
is not entitled to recover, and its’ petition is therefore

dismissed.

Davis, Judge, took’ no part in the consideration and -

decision of this ¢ case.

a]

---