APPENDIX A.

Decree.

United States Court of Appeals, for the Ninth Cir-
cuit.

Pacific Power & Light Company, Petitioner, vs. Fed-
eral Power Commission, Respondent. No. 18853.

Department of Fish & Game of the State of Cali-
fornia, Petitioner, vs. Federal Power Commission, Re-
spondent. No. 18954.

Before: Pope, Merrill & Duniway, Circuit Judges

These causes came to be heard upon petition of Pa-
cific Power & Light Company filed August 22, 1963
and the petition of the Department of Fish & Game
of the State of California, filed October 16, 1963 to re-
view an order of the Federal Power Commission is-
sued by it on March 14, 1963 and as amended by a
further order issued on August 19, 1963. The Court
heard argument of respective counsel on March 9, 1964
and has considered the briefs and joint appendix filed
in this cause.

On consideration whereof, and pursuant to the opin-
ion rendered and filed, on June 8, 1964, It Is Ordered,
Adjudged and Decreed by this Court that said causes
be and hereby are remanded to the Federal Power Com-
mission for further proceedings, not inconsistent with
the opinion of this Court, relating to the cost of oper-
ating and maintaining the fish trapping and egg tak-
ing facilities, and for such clarification of Article 50 as
it may desire to make. In -!! other respects, the or-
ders of the said Federal Power Commission be, 2nd here-
by are.affirmed.

A True Copy

Attest: August 21, 1964

Frank H. Schmid, Clerk.

|
Opinion of the United States Court of Appeals for
the Ninth Circuit.

United States Court of Appeals for the Ninth Cir-
cuit.

Pacific Power & Light Company, Department of
Fish and Game of the State of California, Petitioners,

vs. Federal Power Commission, Respondent. Nos. 18- ©

853 and 18,954 [333 F. 2d 689].

[June 8, 1964]
On Petitions to Review an Order of the
Federal Power Commission

Before: Pope, Merrill and Duniway, Circuit Judges
Duniway, Circuit Judge:

These are petitions, consolidated for hearing and de-
termination, to review a decision of the Federal Power
Commission. The order in question relates to the Iron
Gate Dam on the Klamath River in Northern Cali-
fornia, a facility constructed by petitioner, Pacific Pow-
er & Light Company (Pacific) under a Commission li-
cense. Pacific attacks the portion of the order that
requires it to construct, at its expense, a fish hatchery,
and to reimburse the Department of Fish and Game of
the State of California (Department) for 80 percent
of the cost of operating the hatchery and of operating
fish egg taking facilities already constructed. The De-
partment also attacks the order, urging that Pacific
should be required to pay 100 percent of the cost of
the operation of these facilities, with one exception.’

'1The Department voluntarily consents to bear operation and
maintenance costs of Iron Gate Fishery facilities that may be
incurred for all king salmon egg taking at Iron Gate over
15,800,000 annually. and 19% of the quantity up to that figure.
It asserts that it has not agreed to bear any costs with respect

ame ee

The Klamath River, which rises in Southern Ore-
gon and flows into and across California to the Pacific
Ocean, has long been a famous fishing stream, sup-
porting large numbers of anadromous fish: king sal-
mon, silver salmon and steelhead trout. Pacific’s prede-
cessor, the California Oregon Power Company (Cop-
co), constructed five hydroelectric plants on the river

and its tributaries, between 1908 and 1925. None was
licensed by the Commission; three were constructed be-
tore the enactment of the Federal Water Power Act
on June 10, 1920.

Two of the plants, Copco No. 1, built in 1918, and
Copco No. 2, built in 1925, are located close together on
the river and about 100 miles from the sea. Their con-
struction cut off access to spawning areas above them,
and Copco and the State of California therefore agreed
that Copco should build a fish hatchery at Fall Creek,
just below Copco No. 2, and an egg taking station.
The hatchery was conveyed to the state, which operated
it at its own expense, until 1948, when it was aban-
doned. Thereafter, eggs taken at the station were trans-
ported by the state to its Mt. Shasta hatchery.

Cepco No. 1 and No. 2 have been operated as peak
load facilities. Water was released downstream only
when it was desired, because of demands on the Copco
system, to add their power output. This has resulted
in sudden and extreme fluctuations in the flow of the

to species other than king salmon, or 81% of the king salmon
eggs up to 15,800,000 annually.

The Department takes this distinction based upon its historical
assumption of operation and maintenance costs of the now
abandoned Fall Creek facilities and facilities substituted since its
abandonment. However, this distinction becomes irrelevant in
view of the conclusions we reach, infra.

_

river, which, in turn, has been detrimental to the fishery
and hazardous to human life. While Copco claimed
that its operation in this manner had continued so long
that it had a prescriptive right to continue it, the state
took a contrary position, and sought to prevent the
operation as a public nuisance. In 1950 it filed suit for
that purpose. (See California Oregon Power Co. v.
Superior Court, 1955, 45 Cai.2d 858, 291 P.2d 455).

In 1951, Copco applied to the Commission for a li-
cense to construct another facility, called Big Bend No.
2. The Commission then issued an order requiring it
to show cause why all of the existing facilities should
not be brought under license. (See California Oregon
Power Co., 10 F.P.C. 1561) In 1954, the Commission
held that all of the facilities were within its jurisdic-
tion. (13 F.P.C. 1; 15 F.P.C. 14; California Oregon
Power Co. v. F.P.C., D.C. Cir., 1956, 239 F.2d 426)
The 1954 order left open the question whether a license
should require the installation of re-regulating facilities
at Iron Gate.

In 1957, Copco asked for a license, Project No. 2082,
for the existing facilities, and also for an amendment
of the license to authorize the Iron Gate development,
for two stated purposes, production of power and regu-
lation of the flow of the river. Thereafter, in 1959,
Copco and the state entered into an agreement which
refers to the state’s pending lawsuit and Copco’s pend-
ing application for a license for Iron Gate. It recites
that Iron Gate will regulate the flow of the river in
the manner desired by the state, and that the desire
of the parties is to facilitate the issuance of the license.
Copco agrees to proceed with the development as soon
as licensed, and to release water from it in a manner

RO MC ne Pr om

a ee

specified. The agreement, paragraph 3, also provides:
“Copco shall construct permanent fish trapping and egg
collecting facilities at or near and downstream from the
Iron Gate development, . . . and title thereto, . . . shall,
upon completion of the facilities, be conveyed by Copco
to the State;”.

Copco received from the siate a dismissal, with preju-
dice, of its lawsuit, and a release. It agreed, pending
construction of Iron Gate, to “manually operate” Copco
No. 1 and No. 2 so as to limit downstream fluctua-
tions. The release is: “. . . from any and all claims,
demands, actions and causes of action, for any and all
legal and equitable relief arising at any time in the
past, and for such reasonable future time as may be
necessary for construction of the Iron Gate develop-
ment referred to in said agreement by reason of alleged
conduct of Copco of the kind described in the com-
plaint in an action in the Superior Court of the State
of California, in and for the County of Siskiyou, No.
13995.” The agreement states, in reference to the re-
lease and dismissal: ‘The parties hereto understand
and agree that the effect of said dismissal with preju-
dice and said release will be that no claim will ever be
made against Copco in the future for damages or any
other relief arising out of any act or omission of Copco,
up to the date of this agreement so long hereafter as
Copco shall perform its obligations under this agree-
ment, of the kind embraced within the complaint in
said state court suit; but that the prosecution of any
action hereafter brought, claiming relief by reason of
alleged wrongful conduct uf Copco occurring after the
date of this agreement, shall not be prejudiced there-
by.” It also provides: “The State, the Department and

~~

the [California Fish and Game] Commission shall forth-
with cause to be withdrawn and dismissed all protests
and interventions with respect to the pending applica-
tions of Copco before the Federal Power Commission
in Project No. 2082, and before the State Water Rights
Board in Application No. 17,527; provided, that the
right is reserved to all parties hereto to be heard in any
future proceedings in regard to fishery facilities, other
than the fish trapping, and egg collecting facilities re-
ferred to in paragraph 3 thereof.” It does not state
-t whose expense the fish trapping and egg collecting
facilities are to be operated. Pacific asserts that con-
veyance of title to the state means that the state is to
operate them at its own expense, particularly because
the reservation of the rights to be heard in future pro-
ceedings in regard to fishery facilities expressly ex-_
cepts the fish trapping and egg collecting facilities.

Pursuant to the agreement, the state, the Department
and the California Fish and Game Commission with-
drew their protests and interventions in the Commis-
sion’s Project No. 2082, and the Commission issued its
license for Iron Gate in January, 1960. (23 F.P.C.
59; 25 F.P.C. 579). The order amends the license for
Project No. 2082 to include the existing facilities, and
to authorize Iron Gate, all as part of a single project.
Article 30 contains the following reservations: “The
Commission reserves the right to determine at a later
date after notice and opportunity for hearing, the fol-
lowing matters . . . (b) Whether the Licensee for
Project No. 2082 shall construct, operate and maintain
a fish hatchery and appurtenant facilities.”

Article 42 requires construction of the agreed-upon
fish trapping and egg collecting facilities. It is silent

—

on the subject of their operation. Article 43, on the
other hand, requires Copco to construct, maintain and
operate fish ladders, fish traps, or other fish handling
facilities or fish protective devices.

An amendment of March 27, 1961 adds Articles 49
and 50:

“Article 49. The Licensee shall construct, main-
tain, and operate or shall arrange for the construc-
tion, maintenance, and operation of artificial prop-
agation facilities and such other permanent fish
facilities and protective devices including, but not
limited to, fish-hauling trucks, fish screens or lad-
ders, and comply with such reasonable modifica-
tions in project structures and operation in the ia-
terest of fish life as may be prescribed hereafter
by the Commission upon the recommendation of
the Secretary of the Interior and the California
Department of Fish and Game, after notice and
opportunity for hearing.

“Article 50. The Licensee shall construct, con-
currently with the construction of Iron Gate Dam,
and thereafter operate ard maintain permanent fish
trapping, collecting, holding, and spawn-taking fa-
cilities and appurtenances at or near and down-
stream from Iron Gate Dam as may be prescribed
hereafter by the Commission upon the recoramen-
dation of the Secretary of the Interior and the Cali-
fornia Department of Fish and Game, after notice
and opportunity for hearing.”

Articles 42 and 43 were eliminated. The license. as so
amended, was accepted by Copco.

In August, 1961, the Department petitioned, in Proj-
ect No. 2082, pursuant to Article 49, for an order re-

wells.

quiring Pacific to construct, operaic, and maintain a
hatchery adjacent to the egg collecting station. The pe-
tition does not ask that Pacific be required to pay the
cost of operating the egg collecting station. Pacific
denied that a hatchery was necessary or appropriate,
and the matter was heard on these pleadings. Pacific
and the Department stipulated as to the size and type
of hatchery that would be built, if the Commission
should so order, but reserving Pacific’s claims that a
hatchery was not required and that, if required, Pacific
should not pay for it or for its operation. The power
of the Commission to require the construction and oper-
ation of fishery facilities, including a fish hatchery, rests
on section 10(a) of the Federal Power Act, 16 U.S.C.
§803(a), which provides that all licenses issued by the
Commission shall contain conditio:us;:

“That the project * * * shall be such as in the
judgment of the Commission will be best adapted
to c comprehensive plan for improving or develop-
ing a waterway or waterwavs for the use or bene-
fit of interstate or foreign commerce, for the im-
provement and utilization of water-power develop-
ment, and for other beneficial uses, including rec-
reational purposes; * * *” (Emphasis added)

The petitioners are agreed that the Commission is
empowered by this subsection to require the construc-
tion and maintenance of a fish hatchery. The basic
questions, then, are whether this is an appropriate case
for the exercise of that power, and if so, whether the
power has been properly exercised. Pacific also con-
cedes that the question of whether a hatchery should be
built was reserved, both in its agreement with the state
and in the Commission’s prior orders, and was properly

A ee Ne AN, eae Se

a eee

before the Commission upon the Department’s August,
1961 petition. Its contention is that the evidence does
not sustain the determination that a hatchery was
needed. We do not agree.

The evidence shows that one of the reasons for con-
structing the Iron Gate Dam was to regulate the flow
of the stream, so as to eliminate the extreme fluctua-
tions caused by the method of operating Copco Nos. 1
and 2. It was Copco that chose to operate them that
way. It could have abated the fluctuations by operat-
ing them in a different manner. It preferred the Iron
Gate Dam because this would assure the continued oper-
ation of Copco Nos. 1 and 2 as peak load facilities,
would create another source of power at Iron Gate
Dam itself, and would eliminate the fluctuations as the
state was seeking to require, both in its lawsuit and
before the Commission. The fact that the state, which
had been seeking to abate what it claimed io be the
nuisance created by Pacific’s method of operating its
two facilities, decided to accept this method of abate-
ment, does not make the choice that of the state rather
than that of Pacific. At most it makes it the choice
of both. When parties settle a controversy, the settle-
ment is ordinarily not forced by one upon the other—
usually it is a result somewhere between the desires of
either.

The way in which these objectives were accomplished
was by the building of a dam at Iron Gate, some 8
miles below Copco No. 2. This created a reservoir
area some 8 miles long, into which flows the irregular
discharges from the two Copco facilities, and in which
they are held. The power plant and dam at Iron Gate
are then so operated as to maintain a reasonably conr-

—10A—

tinuous discharge of water below Iron Gate. ‘This
does eliininate the fluctuations below Iron Gate, and
does improve the fishery below Iron Gate.

There is, however, another result. The new reservoir,
above Iron Gate, submerges some 16 miles (about 8
on the Klamath; about 8 on its tributaries) of the bet-
ter fishing and spawning grounds on the river. It
covers them with comparatively still water, and 1¢nders
them unfit for spawning, and less desirable as habitat.
The evidence supports, though it may not require, a
finding that most fish headed upstream and reaching
the barrier of Iron Gate Dam will not turn back down-
stream to spawn, and that a substantial percentage (per-
haps over 50%) of the fish moving upstream will be so
affected. The fish could not testify. The commission
had to rely upon studies by, and the opinion tcstimony
of, expert biologists. In the nature of things, preci-
sion in prediction was quite impossible. But as we
read the record, we think that it fairly supports the
Commission’s conclusions that “without a hatchery there
can be no assurance that the fishery resource will be
preserved and maintained at a level approximately
equal to that which existed prior to construction of the
Iron Cate Development” and that “[s]ince Licensee has
created the situation which necessitates the fish hatch-
ery, it is no more than reasonable to require that it
pay the cost of construction thereof.”

We have no doubt that the Commission could re-
quire Pacific to construct the hatchery at its own ex-
pense. Pacific’s operations, as a unit, substantially
interfere with the ratural ecology of the river and dele-
teriously affect one of its most valuable recreational]
features. It is quite proper that, as a condjtion to its

—l1A—

having the privilege of so doing, Pacific should be re-
quired to pay for facilities that will, at least in part,
prevent the impairment of the principal recreational
feature of the stream.

The Commission’s orders do not directly require that
the hatchery be conveyed to the State, as the contract
between Pacific (Copco) and the state requires that the
egg taking facilities be conveyed. But this result is
certainly implicit in the order, else why the requirement
that Pacific reimburse the Department for 80 percent
of the cost of its operation and maintenance? At oral
argument, counsel for Pacific stated that it would prefer
to own and operate the hatchery itself. This, however,
seems to be an afterthought. We cannot find in the
record any indication that it seriously urged this con-
tention Lefore the Commission. There, its position has
been (a) that no hatchery is needed, (b) that if one
is needed, Pacific should not be required either to build
it or pay for it, and (c) that in any event it should
not be required to pay for maintenance and operation.
It does not now urge that the state is not able or wil-
ling to operate the hatchery properly.

Assuming that the contention is available to Pacific,
we cannot say that it is improper for the Commission
to require conveyance of the hatchery to the state. The
state and federal governments are not such separate
entities, either legally or in fact, that one cannot call
upon the other tc help to achieve, in the public interest,
a result that they both desire. The objective that the
Commission seeks here is one that Congress has author-
ized it to seek. The choice of means, so long as they
are reasonably adapted to achieve the authorized end,
is not for Pacific, but for the Commission. There is

—12A—

no doubt, upon this record, as to the competence of
the state to operate the hatchery, or its willingness to
do so. If there be evidence in the record that Pacific
is equally able and willing, it has not been called to
our attention.

There remain the questicns of the expense of main-
tenance and operation (1) of the hatchery and (2) of
the egg taking facilities. As to the hatchery, we think
that what we have already said disposes of the ques-
tion. If the Commission could have required Pacific
to build and itself to maintain and operate, and if, as
we have held, it could require conveyance of the hatch-
ery to the state, it can also require that the state be
reimbursed for the expense of maintenance and opera-
tion. Unless the hatchery is maintained and operated,
its construction means nothing, and the desired end,
preservation of the fishery, will not be achieved.

Pacific’s reply is, first that the Commission is med-
dling in matters that are beyond the scope of the Fed-
eral Power Act, and is acting in contravention of state
laws. It says that, if no funds were provided by it,
the Department would still be required by state law to
operate the hatchery at its expense, and that therefore
the Commission’s order improperly interferes with the
fiscal affairs of the staie, and unlawfully imposes upon
Pacific a burden that, under state law, Pacific is en-
titled to have the state bear. It says, second, that its
settlement agreement with the state gives it a contract
right to have the state maintain and operate the hatch-
ery. P

In support of its first argument, Pacific cites Sec-
tion 5938 of the California Fish and Game Code. That
section provides :

Se ee eee reo

—13A—

“Whenever in the opinion of the [California Fish
and Game] commission it is impracticable, be-
cause of the height of any dam, or other condi-
tions, to construct a fishway over or around the
dam, the [California Fish and Game] commission
may, in lieu of the fishway, order the owner of the
dam completely to equip, within a specified time,
on a site to be selected by the department, a hatch-
ery, together with dwellings for help, traps for the
taking of fish, and all other equipment. necessary
to operate a hatchery station, according to plans
and specifications furnished by the department.
After such hatchery has been constructed, the de-
partment shall operate it \‘ithout further expense
to the owner of the dam except as provided in sec-
tions 5940 and 5941.” (Emphasis and bracketed
words added.)

It was first enacted in 1917 (Cal. Stats. 1917, ch. 749,
§1), before the Federal Water Power Aci. and on its
face deals only with hatcheries ordered constructed by
the state. It does not purport to deal with federally li-
censed projects. Here, it is the Commission, not the
state, that ordered the hatchery constructed. The De-
partment’s request that the Commission do so does not
make the order the state’s order. Indeed, we think it
doubtful that the state could have ordered this federal
licensee to construct a hatchery at this federally licensed
facility. We think there is nothing in Pacific’s first
contention. Nor is there anything in Pacific’s argu-
ment that the Department has no authority to receive
or use the funds required to be paid to it. We doubt
if Pacific has any standing to raise the question. Sec-
tion 13,011 of the California Fish and Game Code does
not support Pacific’s arguments.

—14A—

The short answer to Pacific's second contention is
that there is nothing in the agreement with the De-
partment, or the release, that requires that the Depart-
ment, rather than Pacific, pay for the operation or main-
tenance of the hatchery. On the other hand, Article
49 of Pacific’s license does require Pacific to ‘‘con-

struct, maintain and operate, or . . . arrange for the
construction, maintenane and operation of artificial
propagation facilities . . . as may be prescribed here-

after by the Commission. .. .”

The egg taking facilities present a different ques-
tion. They were provided for in Pacific's agreement
with the Department, had been constructed and con-
veyed to the Department, and were being operated by
the Department, when the order under review was made.
We assume that Article *O reserves the question as to
who shall pay for operation and maintenance, as the
Department claims.” But we are of the opinion that
the contract, although it does not specifically refer to
maintenance and operation, contemplates maintenance
and operation by the Department, and that the reser-
vation in the contract relating to fishery facilities,
which specifically excepts these facilities from its terms,
does not reserve to the Department the right to de-
mand that maintenance and operation be paid for by
Pacific. The Department made a post hoc attempt to

2We are not, however, convinced that .t does. Article 50
refers to facilities of this kind that “may be prescribed here-
after . . . after notice and hearing.” Hereafter must mean
after March 27. 1961. when Article 50 was added to the li-
cense. The Commission had previously, in Articl 42, of Jan-
uary 13, 1960, ordered Pac ific to construct the agreed facili-
ties. They were completed and tendered to the state by Feb-
ruary of 1962. How, then. can Article 50 refer to them?
On its face, it appears to refer to possible on or addi-
tional facilities.

et es

—15A—

keep the question open by accepting the conveyance of
the facilities as agreed, but seeking to reserve the ques-
tion unilaterally. This, however, cannot change the ef-
fect of the agreement, although the Commission seems
to rely rather heavily upon it. We do not think that
Article 50 is a valid contrary determination by the
Commission. Nor does the original reservation in Ar-
ticle 30 of the license for Iron Gate reserve this ques-
tion. The Department’s petition did not ask for this
relief specifically.

It may well be that none of these facts, as a matter
of law, prevents the Commission from requiring Pacif-
ic to pay for the maintenance and operation of these
facilities.” But the existence of power in the Com-
mission does not dispose of the problem. The state ar-
rived at a settlement with Pacific, under which these
facilities were constructed and conveyed by Pacific to
it. The Commission, to that extent, saw to it that the
State got this benefit of its bargain. The state re-
served no right to make further demands in this con-
nection. We hold that it impliedly agreed to pay for
maintenance and operation. This, together with the
Commission’s orders relating to the hatchery, appears
to us, absent other facts, to assure the desired preser-
vation of the fishery. The Commission gives us no rea-
son in public policy why the Commission should now
transfer the burden to Pacific and relieve the -tate from
its bargain. We think that it would be justified in
so doing only if it found upon sufficient evidence that

®The Commission says that it is not bound by any agree-
ment between Pacific and the Department, citing F.P.C. v. Ore-
gon, 349 U.S. 435; First lowa Hydro-Electric Coop. v. F.P.C..
328 U.S. 152, and other cases. This, however, does not mean
that the Commission can arbitrarily disregard the contract.

—16A—

there are sound reasons to do so. It made no such find-
ing or determination. So far as its findings and opinion
reveal, it based its decision entirely upon what we hold
to be its erroneous legal conclusions, either (a) that
the state had not agreed to pay the cost of operation
and maintenance, or (b) that the state could unilateral-
ly relieve itself of its obligations, or (c) that Article
50 had the effect of relieving the state of its obligations.

The Commission now asserts in its brief that it is
not bound by the contract, assuming that it means
what Pacific says that it does and what we hold that
it does. We quite agree that this is not a private law-
suit between Pacific and the Department. We also
agree that the Commission is not “bound” by the
contract. We do not, however, think that this alone
is a reason for disregarding the contract.‘ As the
Supreme Court has said in Burlington Truck Lines,
Inc. v. United States, 1962, 371 U.S. 156, 167:

“There are no findings and no analysis here to
justify the choice made, no indication of the basis
on which the Commission exercised its expert dis-
cretion. We are not prepared to and the Adminis-
trative Procedure Act will not permit us to accept
such adjudicatory practice. See Siegel Co. v. Fed-
eral Trade Comm'n, 327 ~.s. 608, 613-614. Ex-
pert discretion is the lifeblood of the administra-
tive process, but ‘unless we make the requirements

‘The Federal Power Act. §$313(b) (16 U.S.C. §251/(b))
declares that this court, on review of an order of the Com-
mission, has jurisdiction “to affirm, modify or set aside such
order [of the Commission] in whole or in part.” The Adminis-
trative Procedure Act $10(e) (5 U.S.C. $19009(e)) directs that
this court shail “hold unlawful and set aside agency action,
findings, and conclusions found to be (1) arbitrary, capricious,
an abuse of discretion, or otherwise not in accordance with law.”

AL 8D ORS PTR A BAO I ALE A ACTED tts TN a
.

—17A—

for administrative action strict and demanding, ex-
pertise, the strength of modern government, can
become a monster, which rules with no practical
limits on its discretion.” New York v. United
States, 342 U.S. 882, 884 (dissenting opinion).
‘Congress did not purport to transfer its legislative
power to the unbounded discretion of the regula-
tory body.’ Federal Communications Comm’n v.
RCA Con:munications, Inc., 346 U.S. 86, 90.”

The Commission does not act in a vacuum, and we
thirk it just as much bound to take into account a
contract of this kind, which, if carried out, would as-
sist in accomplishing the result that the Commission de-
sires, as it is to take into account the topography of
the Klamath River Basin and the biological function-
ing of anadromous fish. Surely, it would be arbitrary
if the Commission had concluded, in the face of the
evidence, that the fish would spawn successfully in the
reservoir formed by the Iron Gate Dam, when al! of
the evidence is that they would not. ‘io here we think
it arbitrary for the Commission to disregard the con-
tract for no apparent reason. It has not found, and it
makes no attempt to point to any evidence that would
support a finding of reasons to disregard the contract
and thus relieve the state of its bargain.

There remains the Department’s contention that the
Commission could not require that it pay 20 percent
of the cost of maintenance and operation of the hatch-
ery. The Commission did not so order. It merely or-
dered that Pacific pay 80 percent. The Department
asserts that section 10(a) of the Act, quoted supra,
requires that the Commission impose the entire cost
upon Pacific. The section certainly does not do so ex-

—18A—

pressly. It merely requires conditions in the license
that, “in the judgment of the Commission,” will be best
adapted, inter alia, “for other beneficial uses, includ-
ing recreational purposes.” We think that this gives the
Commission wide latitude, and that its judgment should
not be disturbed unless exercised in an arbitrary manner.

Here the Commission determined that “[t}he evi-
dence in the record suggests that the regulation of the
flow of the Klamath River by the Iron Gate Dam com-
bined with the construction and operation of the hatch-
ery will result in a greater fish population than if
Iron Gate had not been built. This would stem from
the reduction or elimination of destruction of natural
fluctuation and river levels which will follow from the
construction of Iron Cte Dam and its operation in ac-
cordance with the year-round minimum releases required
by Article 52 of the license. To impose on the Licensee
the full costs of building and operating the hatchery
would not merely restore the status quo, but would
actually require Licensee to pay for enhancing the fish
production as compared with pre-Iron Gate conditions.
Apportioning 20 percent of the operating costs to the
Department will more nearly result in restoring the
status quo.” (Our emphasis)

The Department attacks this statement as inconsis-
tent with the formal finding thst the hatchery is needed
to compensate for the loss of spawning grounds above
Iron Gate, and is necessary to sustain the fishery at a
levei “approximately equal” to that which existed be-
fore the construction of Iron Gate. In this, the De-
partment is perhaps technically correct. We do not
think, however, that the matter should be treated with
such iron rigidity. As we have pointed out, the Com-

—19A—

mission was here dealing with predictions. The evidence
does indeed “suggest” what the Commission Says it
does. Even the finding on which the Department relies
deals only with conditions “approximately equal” to
pre-Iron Gate conditions. We do not think that the
Commission’s conclusion is unreasonable. We need not
consider the other bases for its order that are siated
in the Commission’s opinion. We neither approve nor
disapprove them.

We do think, however, that Article 50 of the license
is unclear in one respect. Rather than requiring Pa-
cific to pay the full cost of operating and maintaining
the hatchery at 80 percent of capacity, it requires that it
pay 80 percent of the annual cost of operation and
maintenance. Thus, if the Department chose to reject
the benefit of full capacity operation (a benefit that the
Commission does not claim that it can order the De-
pa: ment to accept) and operates at 80 percent, Pa-
cific would pay only 80 percent of 80 percent. This
appears to be inconsistent with the views expressed by
the Commission itself. We presume that the Commis-
sion intends that, so long as the Department operates
the hatchery at at least 80 percent of capacity, Pacific
should pay for the cost of operating at 80 percent of
capacity, but that in no event should Pacific be re-
quired to pay more than actual operating costs.

It may be that there is evidence now in the record,
o* that other evidence can be produced, that would jus-
tify the decision of the Commission as to the operation
and maintenance of the fish trapping and egg taking
facilities. That is a question for the Commission, not
for us. (Burlington Truck Lines v. United States,
supra; F.P.C. v. Idaho Power Co., 1952, 344 U.S. 17,
20-1)

= "ae

The matter is remanded to the Commission for fur-
ther proceedings, not inconsistent with this opinion, re-
lating to the cost uf operating and maintaining the fish
trapping and egg taking facilities, and for such clarifi-
cation of Article 50 as it may desire to make. In all
other respects, the orders of the Commission are af-
firmed.

Bt OD ele he OE ee eRe A ammewte S

—21A—
APPENDIX B.

[29 F.P.C. 478.]

OPINION NO. 381

PACIFIC POWER & LIGHT COMPANY,
PROJECT NO 2082

Opinion and Order on Petition to Require Licensee to
€onstruct, Operate, and Maintain a Fish Hatchery,
Amending License, and Directing Revised Filings

(Issued March 14, 1963)*

* * © * *

Commission Requires Licensee to Construct Fish Hatch-
ery at Its Iron Gate Dam to Compensate for
Spawning Areas Rendered Inaccessible by Dam’s
Construction. P. 482.

Before Commissioners: Joseph C. Swidler, Chair-
man; Howard Morgan, L. J. O’Connor, jr., Charles
R. Ross, and Harold C. Woodward.

Woodwara, Commissioner:

This proceeding arose before the Commission on mny.”
Whether the State Legislature intended that the statu-
tory provision would be applicable to federally licensed
projects or, as alleged by the Department, the section
refers only to hatcheries constructed pursuant to State
requirement, is wholly immaterial since the Federal gov-
ernment, in its enactment of the Federal Power Act,
has occupied the entire field of licensing power projects
on navigable and interstate water, to the exclusion of

—itih—~

concomitant state jurisdiction."* That no residual or
supplementary control with respect to the determina-
tion of necessary provisions for maintenance of the
fish resource has been left to the states was indicated
in the passage of the Fish and Wildlife Coordination
Act,’’ which contemplates that power companies op-
erating under a federal license would be required to
make adequaie provision for fish conservation as a con-
dition of the license.

We are not convinced, however, that Licensee should
be required to pay the full costs involved in operating
and maintaining the hatchery and related facilities.”
Some sharing in costs already is envisioned in Item
No. i(c) of the stipulation as agreed to by the parties.
Reregulation in the flow of the Klamath River by Iron
Gate Dam will not only restore the downstream reaches
to the condition which existed prior to 1918 but will
also serve to diminish or possibly even eliminate de-
structive natural fluctuations in the river level, particu-

State of Washington Dept. of Game v. F.P.C., 207 ©. 2d
391; F.P.C. v. Oregon, 349 U.S. 435.

1716 U.S.C. 661, et sea.

1’Both the Department's brief and that of the Licensee in-
clude the question of responsibility for the costs of operation
and maintenance of the fish trapping and egg collecting sta-
tion among the issues to be decided herein. Licensee's statement
tha: the Department undertcok to operate these facilities and in-
dictating that the matter is settled is contradicted in the exchange
of correspondence between Licensee and the Department where-
in the latter was permitted to operate the facilities temporarily
in full recognition by both parties that such action was not de-
terminative of the issue as to their continued operation and
maintenance. The presentations made by the parties do not dis-
tinguish between the facilities on this point nor do they in any
way indicate that the matter is now ripe for decision. Our
determination herein with respect to operation and maintenznce
of the hatchery facility, accordingly, is also dispositive of this
issue.

—35A—

larly in these reaches contiguous to the Development.
To this extent, the river and the enjoyment thereof
by the people of the State of California will be en-
hanced over its original condition. Availability of the
Iron Gate Reservoir to the public for lake fishing, boat-
ing, swimming, and other recreational activities like-
wise indicates that the advantages to be derived from
Licensee’s election to construct the Iron Gate Develop-
ment are not all one-sided. In our opinion, an equitable
division of costs will be achieved, commensurate with
the benefits attained, if Licensee is required to construct
the hatchery and, again assuming State operation, to
pay the State for 80 percent of the yearly costs of .
operation and maintenance of all fishery facilities at
the Developmen’. Although we are unable to order the
State of California to assume the remaining 20 percent
of the operation and maintenance expenses, we believe
that the apportionment of costs as herein sef out is
reasonable and will be so considered by the State agency.
Apportionment of the costs in this manner also will
provide the State with a financial incentive to assure
economy of operation of the fishery facilities. More-
over, while no major difficulties are anticipated under
the arrangement, we shall retain continuing jurisdic-
tion to settle possible disputes which may arise over
the determination of the proper annual amount to be
charged Licensee by the State.

The Commission further finds:

(1) Iron Gate Development is a unit of Project No.
2082, licensed to Pacific Power & Light Company, and
is situated on the Klamath River, a navigable water
of the United States as previously found by the Com-
mission.

—36A—

(2) Iron Gate Development has been constructed by
Pacific Power & Light Company and is now in opera-
tion.

(3) Iron Gate Development blocks and prevents the
seasonal migration of anadromous fish to approximately
16 miles of spawning gravels in the Klamath River
and its tributaries between the Iron Gate Development
and the Copco No. 1 and Copco No. 2 hydroelectric
plants.

(4) To compensate for the loss of the spawning
areas described in Finding (3) hereof, a fish hatchery
should be constructed, operated, and maintained at Iron
Gate Development of a size and capacity to annually
hatch and rear 200,000 yearling steelhead trout to a
total weight not to exceed 20,000 pounds, 75,000 year-
ling silver salmon to a total weight not to exceed 5,000
pounds, 6,000,000 fingerling king salmon to a total
weight not to exceed 20,000 pounds, and 5,500,000 king
salmon swim-up fry; provided, not more than 12,800,-
000 king salmon eggs should be required to be accom-
modated in any year at the Iron Gate hatchery facility.

(5) Licensee has constructed a fish trapping and egg
collecting station at the Iron Gate Development of suf-
ficient size and capacity to obtain the eggs for supply-
ing a hatchery of the aforesaid size and capacity.

(6) Iron Gate Development will be economically and
financially feasible if the aforesaid fish facilities are
constructed, operated, and maintained in the manner as
hereinafter provided.

(7) The construction, operation, and maintenance of
a fish hatchery. as hereinafter provided. of the afore-
said size and capacity is necessary in the public interest

—37A—

to sustain the anadromous fishery resource of the upper
‘Jamath River at a level approximately equal to that
which existed prior to the construction of the Iron
Gate Development.

The Commission orders:

(A) The license for Project No. 2082, as amended,
is further amended tu provide as follows:

Article 49. The Licensee shall construct or arrange
for the construction, at its expense, of a fish hatchery
at iron Gate Development, together with supplemental
structures and ancillary equipment as detailed in the
agreement filed with the Commission on August 17,
1962, by the State of Califorma Department of Fish
and Game and the Licensee, of 2 size and capacity to
annually hatch and rear 200,000 yearling steelhead trout
to a total weight not to exceed 20,000 pounds, 75.000
yearling silver salmon to a total weight not to exceed
5,000 pounds, 6,000,000 fingerling king salmon to a
total weight not to exceed 20,000 pounds, and 5,500,000
king salmon swim-up fry; provided not more than 12,-
800,000 king salmon eggs shall be required to be ac-
commodated in any year. Plans for the aforesaid fa-
cility shali be prepared by Licensee, in cooperation with
the State of California Department of Fish and Game
and the U.S. Fish and Wildlife Service, Department of
the Interior, and shall be submitted to the Commission
for approval within 60 days of the issuance of this
order. The. facility shall be constructed within one year
from the date of approval of the plans by the Com-

mission.

|) om

Article 50. Licensee shall reimburse the State of
California Department of Fish and Game for 80 percent
of the combined annual cost of operation and mainte-
nance of the facilities and appurtenances constructed
pursuant to Article 49 and of the permanent fish trap-
ping, collecting, holding, and spawn-taking facilities and
appurtenances constructed at Iron Gate Dam. Should
Licensee and the State of Caiifornia Department of
Fish and Game fail to agree on the amount to be paid
by the Licensee for this purpose, the Commission re-
serves the right to determine the amount of such annual
payment, after notice and opportunity for hearing.

(B) Pending completion of the aforesaid facility,
Licensee shall take all reasonable measures to provide
for maintenance of the Klamath River fishery resource.

(C) To the extent not inconsistent herewith, the de-
cision of the examiner is affirmed.

(D) All exceptions to the decision of the examiner
not herein granted are hereby denied.

(E) This order amending the license for Project No.
2082 shall become final 30 days from the date of its
issuance unless application for rehearing shall be filed
as provided in Section 313(a) of the Federal Power
Act, and failure to file such an application shali con-
stitute acceptance of this order. In acknowledgment
of the acceptance of this order. it shall be signed for
Licensee and returned to the Commission within 60

days from the date of its issuance.

—39A—

INITIAL DECISION
UPON PETITION BY THE STATE OF CALIFORNIA TO REQUIRE LICENSEE TO CONSTRUCT,
OPERATE, AND MAINTAIN A FIS6H HATCHERY

(Issued November 14, 1962)

eee SUES ‘a cee ote oe ome ete « game = 00 mero

CALIFORNIA =
N =
ous on f
a a auas 4 % wala:
; ih
aA ,
Toon Gots Proje ry °
f& Sas
v
LEGEND
LMIAP OF
L DAM :
LEPER ALAMATH RIVER

@ Power HOUSE

E FIisH CowrTis STAT?IOW

"a

Levy, Presiding Examiner: This proceeding is before
the Federal Power Commission by reason of a petition
filed by the California Department of Fish and Game
(Department) on August 21, 1961, requesting that Pa-
cific Power and Light Company (Licensee) be required
to construct, operate, and maintain a fish hatchery at
its recently completed Iron Gate Dam (Project No.
2082) pursuant to Article 49 of the license.’

The Licensee, in its Answer of September 13, 1961,
denied the necessity for any fishery facilities to main-
tain normal fish runs in the Klamath River, or that it
should be required to construct or maintain such fa-
cilities. On January 30, 1962, the Commission issued
an Order setting the matter down for hearing and pre-
scribing certain prehearing procedures, including the
filing and exchange of prepared testimony and exhibits.
After the close of the hearing, held June 4th and 5th
in San Francisco, Licensee and the Department stipu-
lated, at the request of the Presiding Examiner, to the
details of fish hatchery facilities which would be built
if required by the Commission. The stipulation filed
August 17, 1962 (Appendix A), is without prejudice
to the Licensee’s position that there is no need for a
fish hatchery and that, in any event, it is not liable
for construction, operation, or inaintenance.

1Article 49 reads as follows:

Article 49. The Licensee shall construct, maintain, and oper-
ate or shall arrange for the construction, maintenance, and opera-
tion of artificial propagation facilities and such other perma-
nent fish facilities and protective devices including, but not lim-
ited to, fish-hauling trucks, fish screens or ladders, and comply
with such reasonable modifications in project structures and oper-
ation in the interest of fish life as may be prescribed here-
after by the Commission upon the recommendation of the Secre-
tary of the Interior and the California Department of Fish and
Game, after notice and opportunity for hearing.

soll pane

Background of the Proceeding

The instant proceeding is the latest episode in an
extended fishery controversy between the Department
and the Licensee? that goes back to the construction
in 1918 and 1925, of two hydroelectric plants known
as Copco No. 1 and Copco No. 2 on the Klamath
River in California just below the Oregon border (see
Map.) In lieu of a fish ladder the Licensee constructed
a fish hatchery at Fall Creek, a short distance do-yn
river and, under an agreement with the Department,
conveycd the facility to the State of California in March
1919. In 1925, the Licensee constructed and conveyed
to the State an egg collecting station at Klamathon some
15 miles downstream.

The Fall Creek hatchery was operated and maintained
by the Department until 1948 when “operations were
discontinued due to the high cost of maintaining the
installation and high operational cost of raising fish”.
(23 FPC 66) The egg collecting station was continued
in operation by the Department until the construction
by the Licensee of new egg collecting facilities in
March 1962, pursuant to Article 50 of the Iron Gate
license.*

“Licensee” also includes. where applicable, Pacific Power and
Light Company’s predecessor, California Oregon Power Com-
pany (Copco).

3Article 50 (25 FPC 579, 581) reads as follows:

The Licensee shall construct, concurrently with the construc-
tion of Iron Gate Dam, and thereafter operate and maintain
permanent, fish trapping, coijiecting, holding, and spawn-taking
facilities and appurtenances at or near downstream from Iron
Gate Dam as may be prescribed hereafter by the Commis-
sion upon the recommendation of the Secretary of the Interior
and the California Department of Fish and Game, after notice
and opportunity for hearing.

9?

ar~——-—

The hydroelectric plants were operated to meet peak
load requirements by alternately storing and releasing
water with increasingly severe downstream fiuctuations.
The Department maintained, and the Presiding Exami-
ner in the license proceeding found, that the fluctuat-
ing water levels “. . . have a decidedly detrimental effect
on fish and aquatic life.” (23 FPC 66)

In 1950 the Devartment filed suit to compel the Li-
censee to construct a regulating dam at Iron Gate. After
protracted negotiations and the commencement of li-
cense* proceedings to authorize the construction and op-
eration of a regulating dam, the Department and the
Licensee entered into an agreement on July 27, 1959,
Exhibit 62 in the license procéeding, under which the
Department withdrew its objections to the Iron Gate
development as proposed by the Applicant. The agree-
ment provided that the Licensee would construct a dam
at Iron Gate for the principal purpose of regulating
the flow of water in the Klamath River, and would
build fish trapping and egg collecting facilities in ac-
cordance with plans and specifications to be furnished
by the Department. The necessity for the construction
of a fish hatchery at Iron Gate was expressly reserved
tor future determination.° Paragraph 6(b) of the

*The full history of the proceedings in Project No. 2082 is
stated in 23 FPC 59, 62 (199). The license was iurther
amended at 25 FPC 579 (1961) so as to authorize changes in
the design from a concrete arch dam to an earth-filled dam,
the erection initially to its ultimate height. and reduction in the
size of the generator from 25,000 to 18,000 kilowatts.

5The Presiding Examiner denied a request by the department
for the inclusior in the findings of language which could be con-
strued as implying a determination that fish hatchery facilities
ought to be constructed as a condition of the license. (23
FPC 68, 71)

ee ee ee

Li I ete i te RNR the ae

A a

~=ARA—o

Agreement provides as follows:

The State, the Department and the Commission
shall forthwith cause to be withdrawn and dis-
missed all protests and interventions with respect
to the pending applications of Copco before the
Federal Power Commission in Project No. 2082,
and before the State Water Rights Board in Ap-
plication No. 17527; provided, that the right is re-
served to all parties hereto to be heard in any
future proceedings in regard to fishery facilities,
other than the fish trapping and egg collecting
facili‘ies referred to in paragraph 3 thereof. [Em-
phasis supplied. ]

Construction of the Iron Gate facility, in a single
Stage rather than the two stage construction originally
contemplated, was completed in January 1962 at a cost
in excess of $8,000,000. Of this amount more than
$700,000 was represented by the cost of building the
fish trapping and egg collecting facilities. The Iron
Gate Development as completed consists of an earthfill
dam about 173 feet high with crest elevation of 2,338
feet, a concrete side channel spillway of the overflow
type in the right abutment, a reservoir with normal
water surface at elevation 2,328 feet and a capacity of
about 58,000 acre-feet, a tunnel through the right abut-
ment which will serve as a sluice and diversion during
construction, an intake structure, a power conduit
through the left abutment, a penstock, a powerhouse
with one 25,000-horsepower turbine connected to an
18,000-kilowatt generator, a substation adjacent to the
powerhouse, a 66 k. transmission line extending to
COPCO No. 2 Switchyard, a fish ladder and fish trap-
ping facilities complete with appurtenant facilities, and

a

other electrical and mechanical facilities. The existing
fish facilities are being operated by the Department
temporarily, with the consent of the Licensee, pending
determination of responsibility for operation and
maintenance (See Exh. B attached to California’s Reply
Brief).

The Issues

The stipulation of August 17, 1962, covering the de-
tails of fish hatchery facilities, if required, leaves the
following issues for determination:

1. Are additional fish rearing facilities required at
Iron Gate to preserve aiid maintain the fishery resource
at a level approximately equal to that which existed
before the construction of the Iron Gate Development?

2. If so, who is responsible for construction, opera-
tion and maintenance of the fishery facilities?

The Evidence

The Department’s experts, fishery biologists Skiriner,
Croker, Bailey, Hill, and Fraser testified in substance
that the Iron Gate Development prevents access by sal-
mon and steelhead to about 16 miles of spawning gravel
between Copco Dam and Iron Gate which historically
has been utilized by anadromous fish to spawn and re-
produce, and that a hatchery is needed to replace these
spawning areas which have been eliminated by the con-
struction of the Iron Gate Development. Croker testi-
fied that the general trend of salmon runs above
Klamathon is downward (Exh. 11-A) and that, based
on live fish counts, aerial surveys, carcass and redd
counts, 57.1 percent of the fish passing Klamathon
spawned above Iron Gate.

Robert Macklin, the Department’s Supervisor of Fish
Hatcheries, proposed the construction of a fish hatchery

—45A—

at Iron Gate, based on runs of 15,000 king salmon at
Klamathon, designed to incubate, hatch, and rear an-
nually 200,000 yearling steelhead trout, 75,000 yearling
silver salmon, and 6,000,000 fingerling king salmon, to
a total weight of 121,500 pounds, at an estimated con-
struction cost of $1,003,020, and an annual operating
and maintenance cost of approximately $95,256. (Exh.
Nos. 6, 7, 8, 9)

Jj. C. Boyle, Licensee’s Vice President, testified in
support of the Company’s position. Licensee’s fishery
biologist, Dr. Hamilton, conceded the loss of spawning
and rearing areas eliminated by the construction of
Iron Gate Dam. His proposed hatchery facilities were
smaller and less costly than those proposed by the De-
partment. (Exh. Nos. 15-18, inclusive) The facilities
detailed in the stipulation (Appendix A) are also less
costly than the Department’s original proposals. The
total weight of all fish produced is reduced from 121,-
500 pounds to 50,000 pounds. The holdover of one
million fingerlings for fall release is eliminated. Reduc-
tions in construction costs are effected by the substitu-
tion of rearing ponds for nursery ponds, reduction in
the area required to accommodate the hatchery troughs,
the number of incubation trays, and the elimination of
all of the 14 nursery ponds originally proposed. The
Staff estimates that annual operating and maintenance
costs will be reduced from $95,256 to $54,278. (Staff
br. p. 11)

Discussion

1. Licensee maintains that the Department has not
established the need for a fish hatchery at Iron Gate,
and questions the accuracy of its estimates as to the
number of fish spawning above the Iron Gate Develop-

a)

ment. It argues that normal runs will be sustained by
spawning grounds below Iron Gate Dam. The testimony
indicates, however, that Iron Gate Dam, completed in
1961, prevents access by salmon and steelhead trout to
about 16 miles of spawning gravel, thereby eliminating
one of the most popular stream fishing areas in the
upper Klamath River. (23 FPC, 66, 67) Licensee’s fish-
_ eries biologist, Dr. Hamilton, conceded that “. . . the
Iron Gate reservoir has eliminated whatever salmon and
steelhead spawning areas existing between Iron Gate
and COPCO Dam...” (Tr. 246) and chat “. . . about
970 steelhead were trapped at the site this spring after
the Iron Gate egg-taking station was put into operation
on February 27, 1962.” (Tr. 278, 286)

The historic decline of Klamath River king salmon is
documented in Exhibit 11-A, the most detailed data of
record. While the accuracy of the Department's esti-
mate that 57.1 percent of the fish runs at Klamathon
spawned above Iron Gate may be questioned, these esti-
mates are the best available and do support the necessity
for additional facilities to replace the lost spawning
areas above Iron Gate Dam. I conclude that facilities
for the artificial propagation and the perpetuation of
the anadromous fish are required at Iron Gate to pre-
serve and maintain the fishery resource at a level ap-
proximately equal to that which existed before the con-
struction of the Development. The question remains as
to whether a hatchery is required at Iron Gate.

Pursuant to the agreement of July 27, 1959, and Ar-
ticle 50 of the Iron Gate license, (Project No. 2082).
Licensee has constructed fish trapping and. egg collect-
ing facilities which went into operation on February 27.
1962. The Denartment argues that withoui the fur-

Pe eee

—47 A—
ther construction of a hatchery, the egg collecting sta-
tion is incomplete since “the eggs cannot be simply re-
leased back into the river. It is needed as a substitute
for [the] natural hatching and incubation process that
would normally occur above the Iron Gate Dam had the
dam not been constructed” (Tr. 18) The Licensee
suggests that any fish which wou!4 penetrate the river
as far as the Iron Gate Dam will turn back to find suit-
able spawning grounds down river, and, if this does
not maintain the runs, the fish can be transported
downstream to other suitable spawning grounds. There
is no assurance, however, or evidence that a sufficient
number of anadromous fish reaching Iron Gate Dam
will turn back and spawn downstream; or that they
can be made to do so even if they are trapped and physi-
cally transported to downstream areas. In short, I am
unable to conclude from the evidence of record that the
upper Kiamath fish runs can be maintained at an
equivalent level without the construction of additional
fish rearing facilities. A hatchery® is the established
method of insuring that the eggs taken from the fish
at the trapping facility are properly incubated, hatched,
and reared. Licensee’s predecessor had constructed a
fish hatchery at Fall Creek in 1919, which was op-
erated and maintained by the Department until 1948.
I concluded, therefore, that fish hatchery facilities are
required to replace natural spawning eliminated by the
dam and to complete the fish trapping and egg collect-
ing station heretofore constructed at Iron Gate. Fortu-
nately, the parties have stipulated to the nature of the

*The Departn:ent’s witness, Macklin, testified that 15 hatch-
eries are being operated by the California Department of Fish
and Game. (Tr. 145.)

—, |:

hatchery facilities to be built if required. These faciii-
ties are described in Appendix A, attached hereto and
made a part of this decision.

2. The construction costs of the hatchery, as detailed
in the stipulation, should be paid for by the Licensee.
This is consistent with the agreement between the Li-
censee and the Department of July 27, 1959 (Exh.
62) pursuant to which the Licensee built the fish trap-
ping and egg collecting facilities. The hatchery will
expand the egg collection station into a complete facility
for the maintenance of the fishery resource of the upper
Klamath River. The agreement provides (para. 3) for
the conveyance of the “permanent fish trapping and
egg collecting facilities’ to be built by the Licensee,
“ . . and title thereto, together with the land upon
which they are situate . . .” to the State. Similarly,
the complementary hatchery should be conveyed to the
State tu be owned, operated, and maintained by the
Department as an integrated fishery facility. The cost
of maintenance and operation, however, should be
borne by the Department and the State which will
now own, control, and operate the entire facility.

The Department argues chat the 1959 agreement is
not conclusive since it did not expressly agree therein
to opera'e and maintain the fish facilities. The agree-
ment did leave open the issue of hatchery construction
and overall cperz ion and maintenance costs. These
are the issues to be resolved in this proceeding. -

Operation and maintenance by the State is suggested,
however, by the following considerations. Historically,
the State operated and maintained the Fall Creek fish
hatchery constructed by COPCO and conveyed to the

. TREE

—iA—

State in 1919, and the fish trapping facilities at Klam-
athon built by COPCO and conveyed to the State in
1925. The Fall Creek hatchery was abandoned’ by
the Department in 1948 as too costly. The Iron Gate
hatchery, which Licensee is now required to build under
this order, will substantially replace the Fall Creek
hatchery previously operated and maintained by the
State.

The Fall Creek hatchery was operated and maintained
by the State, as are all 15 State hatcheries, under the
California Fish and Game Code. Section 5938 thereof
provides in pertinent part:

Whenever in the opinion of the commission it
is impracticable, because of the height of any dam,
or other conditions, to construct a fishway over
or around the dam, the commission may, (n lieu
of the fishway, order the owner of the dam com-
pletely to equip, within a specified time, on a site
to be selected by the department, a hatchery,
together with dwellings for help, traps for the
taking of fish, and all other equipment necessary
to operate a hatchery station, according to plans
and specifications furnished by the department.
After such hatchery has been constructed, the
depariment shall operate it without further expense
to the owner of the dam except as provided in
Sections 5940 and 5941. [Emphasis supplied. ]

The Department argues that the Fish and Game Code
of California is inapplicable to a federally licensed
power project. The Federal Power Cummission has the

7After its abandonment, eggs taken at Klamathon were reared
at the Department’s Mount Shasta hatchery.

—S0A—

vuthority under the Federal Power Act, which it has
exercised in appropriate circumstances, to require the
construction, operation, and maintenance of fish facili-
tits by the Licensee as a condition of the license.
State law, policy, and history are, however, relevant
considerations in the exercise of such power. The
policy of the State of California, as set forth in its
Fish and Game Code, is to share in the expense of
maintaining fish runs, disrupted by the construction
of hydroelectric projects, by operating and maintaining
fish hatcher:2s constructed by the owner of the project
at his cwn expense. This policy is not in conflict with
the Federal Power Act or Coinmission policy. I see
no good reason why it should not be followed in this
proceeding.

Here the Department by agreement has obligated the
Licensee to convey to the State the fish trapping and
egg collecting station which it built and the Department
is now opetating. The fish hatchery when completed
should also be conveyed to the State so that its operation
can be integrated with the related fishery facilities.

State ownership and control of the Iron Gate fish
facilities should carry with it responsibility for the cost
of operai:on and maintenance. This is consistent with
California law, with sound fiscal policy, and with the
prior pattern on the Upper K!amath.

The Department argues that it is unfair and inequit-
able to burden California taxpayers with part of the
costs of generating power which is distributed and sold
interstate. It is not unfair, however, to require tax-
payers to participate in the maintenance of a natural
resource from which all benefit. The California legis-

te

—51A—

lature long ago decided to share in the expense of pre-
serving fish by operating and maintaining hatcheries
constructed by the owners of California dams. More-
over, the taxpayers of California also benefit from the
construction of license. )ower projects. The rate-
payers of California and Oregon may well ask why
they should be saddled in perpetuity with the unknown
and escalating costs of hatcheries operated by the
Department, without cost limitations, for the benefit of
all citizens and taxpayers. The objective of the Federal
Power Act is the maximum development of the entire
water resource including power and recreation® as well
as fish. ] am therefore compelled to reject the position
of the Department that the Licensee should, in addition
to constructing the hatchery, defray all operations and
maintenance expense The history of this project
and the facts in this proceeding suggest otherwise.

The Staff brief is silent in respect of who is to
bear the cost of operating and maintaining the egg
collecting facility at Iron Gate. The Staff proposes,
however, that Licensee and the State share equally in
the costs of operating and maintaining the fish hatchery
to be constructed at Licensee’s expense. The State
would continue to pay for the annual operating and
maintenance expense attributable to an annual average
of 3,000,000 Klamath River king salmon eggs presently
hatched and reared at its Mount Shasta hatchery for
release into the upper Klamath River.

Licensee and the Department oppose the Staff sug-
gestion; Licensee on the ground that it has no obliga-

*The Iron Gate Development has improved the recreational
facilities of the upper Klamath by creating a 1,200 acre reser-
voir available to the public. (Tr. 181-183.)

—52A—

tion to pay for half the operation and that the Staff
proposal is a compromise® “unsupported by law or
reason”. The Department argues that hatchery con-
struction should not be conditioned on their acceptance
of the obligation to operate and maintain the facility.
I have concluded for all the reasons previously discussed
that the Department should pay for the entire cost
of mainta‘ning facilities it will own, control, and operate
in conjunction with numercus other hatcheries through-
out the State.

ADDITIONAL FINDINGS AND CONCLUSIONS

Upon consideration of the entire record in this pro-
ceeding, including the pleadings, the evidence adduced,
and the briefs filed, it is found and concluded in addi-
tion to the findings and conclusions heretofore stated
that:

(1) The erection of the Iron Gate development
eliminated approximately 16 miles of natural spawning
grounds previously used by king salmon, silver salmon,
and steelhead trout.

(2) A fish hatchery, the details of which are de-
scribed in a stipulation filed with the Commission on
August 17, 1962, (Appendix A), is required to sustain
the anadromous fishery resources of the upper Klamath
River at a level approximately equal to that which
existed before the construction of the Jron Gate +)s-
velopment.

(3) The public interest in the conservation and the
development of the fishery resourcés affected by the

®The Licensee points out (Reply br. p. 3) that sharing costs
will create serious allocation problems with respect to adminis-
trative overhead and other costs associated with running the
Department and its facilities throughout the State of California.

saints Cites mii _—_

Pe ee ee ee el

—53A—

Iron Gate Development requires the construction of the
fish hatchery by the Licensee, and its ownership, oper-
ation, and maintenance by the Department as herein-
after provided.

ORDER

WHEREFORE, IT IS ORDERED, pursuant to
Articles 49 and 50, Project No. 2082, as amended,
subject to review by the Commission that:

(A) T'e Licensee shall provide for a site and
arrange for, and pay for, the construction of a fish
hatchery as described in the stipulation filed herein on
August 17, 1962, (Appendix A).

(B) Plans for the aforesaid facilities shall be pre-
pared by the Licensee, in cooperation with the State
of California Department of Fish and Game, shall be
submitted to the Commission for approval within 60
days of the issuance of this Order, and shall be con-
structed within one year from the date of approval by
the Commission. Upon completion of the aforesaid
facilities, all the fish facilities shall be conveyed by
Licensee to the State; provided that the Licensee shall
not be required to reimburse the State of California
for the cost of operation and maintenance.

William C. Levy,
Presiding Examiner.

[Appendix “A” to the Presiding Examiner’s decision
(Stipulation re size of hatchery) omitted. ]

re

=)
APPENDIX C.

[30 F.P.C. 499.]

OPINION NO. 381-A

PACIFIC POWER & LIGHT COMPANY,
PROJECT NO. 2082

Opinion and Order on Rehearing and Denial of
Motion for Stay
(Issued August 19, 1963)

* * * * *

Before Commissioners: Joseph C. Swidler, Chair-
man; Howard Morgan, L. J. O’Connor, Jr., Charles
R. Ross, and Harold C. Woodward.

On April 10, 1963, Pacific Power & Light Com-
pany, licensee for Project No. 2082, applied for rehear-
ing of the Commission’s Opinion No. 381 and Order is-
sued on March 14, 1963, 29 FPC 478, in the above-en-
titled proceeding. A second application for rehearing
was filed April 12, 1963, by the Department of Fish
and Game of the State of California. By order issued
May 3, 1963, rehearing was granted for the limited pur-
pose of affording opportunity for additional considera-
tion. On examination of the rehearing applications
we find that while the majority of points raised by Li-
censee and the Department are merely restatements of
arguments raised in their exceptions which have been
covered in our Opinion and Order and do not warrant
further discussion here, certain aspects of our opinion
require clarification.

Licensee urges that amended Article 49 of the li-
cense for Project No. 2082, as provided in ordering
paragraph (A) of the order accompanying Opinion No.

—55A—

381, is not in complete conformity with the July 20,
1962 stipulation and distorts the agreed upon provi-
sion limiting the number of king salmon eggs required
to be accommodated at the Iron Gate hatchery in any
one year. Item No. 1 of the stipulation provides in per-
tinent part:

1. If the Commission determines that fish
hatchery facilities are required at Iron Gate, said
facilities shali be sufficient to accommodate the in-
cubation, hatching, and rearing of the following
kinds and numbers of fish each year:

(a)* * * #

(b)* * * *#

(c) King salmon (Oncorhynchus tshawytscha)
Rear up to 6,000,000 fingerlings to a total weight
not to exceed 20,000 Ibs., and release an additional
5,500,000 swim-up fry. Not more than 12,800,-
000 king salmon eggs are required to be accom-
modated in any one year by the Iron Gate hatchery
facility; provided, nowever, if the total number of
king salmon eggs taken at the Iron Gate egg collec-
tion facility in any one year is equal to or less than
15,800,000, the fish hatchery facilities described
herein shall not be required to accommodate more
than 81% of the total king salmon eggs taken dur-
ing the year.

The clause omiticd from Article 49 is the portion of
Item No. 1(c) which provides that “if the total num-
ber of king salmon eggs taken at the Iron Gate egg col-
lection facility in any one year is equal to or iess
than 15,800,000 the fish hatchery facilities described
herein shall not be required to accommodate more than

a)

81% of the total king salmon eggs taken during the
year.” The Department, in its application for rehear-
ing, specifically acknowledged its responsibility for the
hatching and rearing of 19 percent of the king salmon
eggs taken at the egg collection station up to 15,800,-
000 per year’ as representing the number of eggs for-
merly reared by the Department in connection with
the abandened Fall Creek hatchery. It was not our
intention, in determining the capacity of the hatchery
to be constructed at Iron Gate and the number of king
salmon eggs to be accommodate therein, to change or
modify any of the provisions of the stipulation or to
release the Department from a recognized responsibility.
No finding was made that deletion of the proviso is
required to effectuate the purposes of the Federal
Power Act and no such finding could have been made
on the record presented in this case. Accordingly, we
chall amend our findings and Article 49 of the license
to include all provisions contained in Item No. 1(c)
of the stipulation.

The Depariment’s exceptions raise objections to cer-
tain language in the Commission’s opinion which we
take this occasion to clarify. In our discussion of the
reasons for assigning 20 percent of the operating and
maintenance costs of the hatchery to the State, we com-
mented as follows as to the impact of the construction
of the Iron Gate Dam:

* * * To this extent, the river and the en-
joyment thereof by the people of the State of Cali-
fornia will be enhanced over its origina! conci-

1The Department states that it will defray 100 percent of
the cost of rearing any king salmon eggs-in excess of 15,000,-
000 taken in any year.

Allis ithe etna Nts di

—57A—

tion. Availability of the Iron Gate Reservoir to
the public for lake fishing, boating, swimming, and
other recreational activities likewise indicates that
the advantages to be derived from Licensee’s elec-
tion to construct the Iron Gate Development are not
all one-sided. [P. 485.]

The Department’s exceptions suggest that the lan-
guage carries implications which are far reaching and
which go beyond our intentions. We therefore wish
to restate the Commission’s position un the questions
raised in the above-quoted sentences to avoid any such
misinterpretation.

We do not believe that recreational advantages such
as lake fishing, boating and swimming, which are by-
products of Licensee’s hydroelectric project of general
public benefit, should constitute an off-set to the Li-
censee’s responsibility to provide reasonable facilities to
maintain the fishery resource of the river, in the ab-
sence of prior agreement to that effect by all interested
parties or special circumstances not present here. There
is much to be said for cooperation by local, state and
Federal agencies to provide non-power benefits from
multi-purpose projects beyond those which could feasi-
bly be imposed upon an applicant for a license, but this
does not apply to the provision of facilities intended to
correct for damage to existing resources created by the
construction of a project.

As a general rule, a licensee is required to make full
recompense for the diminution of a natural resource
resulting from a power development on a navigable
stream. The evidence presented by the parties estab-
lished that the construction of Iron Gate Dam will re-

—58A—

sult in a lessening of the anadromous fish resource in
the upper Klamath River and that a hatchery is neces-
sary to counter this eftect. A licensee in such circum-
stances would normally be required to pay all costs in-
volved in restoration of the fish resource, both as in-
curred in construction of the hatchery and in the yearly
costs of operation and maintenance. In this case we
shall require the licensee to construct the hatchery en-
tirely at its cost, but there are special circumstances
which persuade us that the State should assume 20 per-
cent of the yearly cost of operation and maintenance of
all fishery facilities at the development:

(1) The history of this controversy cannot be ig-
nored. The proper apportionment of the cost of oper-
ating and maintaining the hatchery should be considered
in light of the prior relationship between the State
and the licensee with respect to the operation of the
Fall Creek Hatchery, in which the State assumed all the
expenses of operation. In 1919 after construction was
begun on COPCO 1 and COPCO 2, the Fal! Creek
Hatchery was conveyed to the State, and in 1925 the
licensee added fish trapping and egg collecting facilities
to the Fall Creek Station. The State operated the
Hatchery at State expense until 1948 and the egg col-
lection facility until 1961. Thus, to eliminate any
State participation in the operating cost of the Iron
Gate Hatchery would be inconsistent with this pre-
existing pattern.

(2) To impose the full cost of building and operating
the hatchery on the Licensee would be to assess costs
that wouid overcompensate for the damage by Licensee’s
project to the fish population. The evidence in the
record suggests that the reregulation of the flow of

—59A—

Klamath River by the Iron Gate Dam combined with
the construction and operation of the hatchery will re-
sult in a greater fish population than if Iron Gate
had not been built. This would stem from the reduction
or elimination of destruction of natural fluctuations
and river levels which will follow from the construction
of Iron Gate Dam and its operation ir. accordance
with the year-round minimum releases required by
Article 52 of the license. To impose on the Licensee
the full costs of building and operating the hatchery
would not merely restore the status quo but would
actually require Licensee to pay for enhancing the fish
production as compared with pre-Iron Gate conditions.
Apportioning 20 percent of the operating costs to the
State will more nearly result in restoring the status
quo.

(3) Apportioning this small share of operating costs
tu the State will provide it with a financial incentive
to irsure economy of operation of the fish facilities.

The remaining assignments of error contained in the
applications now before us do not convince us that
we are incorrect in our determinations or, except for
amending finding No. 4 and Article 49 to conform
to the stipulation, that any further action is necessary
on the rehearing other than to affirm sur original de-
cision and order.

Licensee had requested separately that it not be re-
quired to comply with the provision in the second sen-
tence of Article 49 >f the license for Project No. 2082
pending possible judicial review of the Commission’s
opinion and order. The sentence now provides: “Plans
for the aforesaid facility shall be prepared by Licensee,
in cooperation with the State of California Department

—(QA—

of Fish and Game and the U.S. Fish ana Wildlife
Service, Department of the Interior, and shall be sub-
mitted to the Commission for approval within 60 days
of the issuance of this order.” in the alternative,
Licensee requested that the time be extended for a
short period, designating June 30, 1963. The 60-day
period would have expired May 13, 1963, had the
running thereof not been tolled by our decision to grant
rehearing sojiely in order to afford additional time to
consider the matters set forth in the applications. It
does not appear that a brief stay will materially affect
the time required for construction of the hatchery.
Accordingly, we shall extend the time for Licensee’s
compliance with the requirements of the quoted pro-
vision to October 15, 1963, in line with the request
made in the second part of the motion filed April 10,
1963. In all other respects, the motion will be denied.

The Commission further finds:

(1) The assignments of error set forth in the appli-
cations for rehearing present no new facts or principles
of law which were not fully considered by the Com-
mission when it issued its Opinion No. 381 and Order,
or which having now been considered, warrant any
change in, modification, or rehearing of such Opinion
and Order, except as stated above and specified below.

(2) There is no justification for, and the public
interest would not be served by, granting a stay of
the order accompanying Opinion No. 381, as herein
amended, pending judicial review.

(3) Good cause exists for extending the time for
compliance with the second sentence of Article 49, as
amended, of the license for Project No. 2082 to October
15, 1963.

ee ae ne ae os ie

—61A—

The Commission orders:

(A) The assignments of error Set forth in the appli-
cations for rehearing in the above-entitied proceeding
are hereby denied, except to the extent specified below.

(4) To comperisate for the loss of the spawning areas
described in Find'ng (3) hereof, a fish hatchery should
be constructed, operated, and maintained at Iron Gate
Development of a size and capacity to annually hatch
and rear 200,000 yearling steelhead trout to a total
weight not to exceed 20,000 pounds, 75,000 yearling
silver salmon to a total weight not to exceed 5,000
pounds, 6,000,000 fingerling king salmon to a. total
weight not to exceed 20,000 pounds, and 5,500,000 king
salmon swim-up fry; provided, not more than 12,800,-
000 king salmon eggs should be required to be accom-
modated in any one year at the Iron Gate hatchery
facility; and provided further that if tke total number
of king salmon eggs taken at the Irun Gate egg col-
lection facility in any one year is equal to or less than
15,800,000, the fish hatchery facilities described herein
shall not be required to accommodate more than 8]
percent of the total king salmon eggs taken during
the year.

(C) Article 49 of the license for Project No. 2082,
as amended by our opinion and order issued March
14, 1963, is further amended to provide as follows:

Article 49. The Licensee shall construct or arrange
for the construction, at its expense, of @- fish hatchery
at Iron Gate Development, together with supplemental
Structures and ancillary equipment as detailed in the
agreement filed with the Commission on August 17,
1962. by the State of California Department of Fish
and Game and the Licensee, of a size and capacity

oy oe

to annually hatch and rear 200,000 yearling steelhead
trout to a total weight not to exceed 20,000 pounds,
75,000 yearling silver salmon to a total weight not to
exceed 5,000 pounds, 6,000,000 fingerling king saimon
to a total weight not to exceed 20,000 pounds, and
5,500,000 king salmon swim-up fry; provided not more
than 12,800,000 king salmon eggs shall be required to
be accommodated in any one year at the Iron Gate
hatchery facility; and provided further that if the total
number of king salmon eggs taken at the Iron Gate
egg collection facility in any one year is equal to or
less than 15,800,000, the fish hatchery facilities de-
scribed herein shall not be required to accommodate
more than 81 percent of the totai king salmon eggs
taken during the year. Plans for the aforesaid facility
shall be prepared by Licensee, in cooperation with the
State of California Department of Fish and Game and
the U.S. Fish and Wildlife Service, Department of the
Interior, and shall be submitted to the Commission for
approval no later than October 15, 1963. The facility
shall be constructed within one year from the date
of approval of the plans by the Commission.

(D) The motion--filed by Pacific Power & Light
Company on April 10, 1963, is denied to the extent
that stay is requested pending judicial review.

(E) In all other respects, the original cpinion and
order issued in these preceedings is affirmed.

Commissioner O’Connor concurring in resuit.

Commissioner Ross concurring i part and dissenting

in part, filed a separate statement appended hereto.

Commissioner Morgan dissenting in part filed a sep-
arate statement appended hereto.

PPP ARE Basi Ge me

iiSionn

Ross, Commissioner, concurring in part and dissenting
in part:

I concur generally with the statement of Commis-
sioner Morgan, and contend that California should
defray only those costs to which it has agreed in the
stipulation in this case. In view of the fundamental
shift in the majority’s approach to a licensee’s obli-
gation regarding comprehensive development, a _ ad-
ditional comments are required.

The majority is holding that construction and oper-
ation of the fish hatchery, which it alleges overcom-
pensates for the damage inflicted by Licensee’s project
to the fish population, constitutes a basis for this
Commission’s imposition of user charges. This holding
assumes that the Commission has the authority to al-
locate, and should allocate, a portion of the costs of
these supposed benefits to the people of the State of
California.

Such a position opens a Pandora’s Box. It means
that licensees hereafter have a legal basis for contend-
ing that the citizens of any state wherein a hydro-
electric power project is constructed which produces
nonpower benefits (e.g., flood control, recreation, irri-
gation, fish and wildlife) should bear some part of the
costs of the project which are attributable to the asso-
ciated nonpower benefits regardless of whether the
Citizens of a state desire or request such benefits.
With the instant opinion as precedent, it is difficult
to see how this contention could be rejected.

Adoption of this concept might well be required in
the years ahead when relatively less economical hydro
sites, from a power aspect, may be developed. However,

aT

in my opinion, this is an extremely important step and
Congress must first act and provide a legislative basis
for our imposing of part of the costs of such devel-
opment upon anyone other than the licensee. Once
Congress determines that comprehensive development of
our water resources requires contributions from the
users of nonpower benefits, then the Commission should
make the required allocation.’

But in the absence of such legislation, we should
continue io implement the policy, established by Con-
gress, of requiring licensees to bear all the costs as-
sociated with the development of a navigable waterway.
The Federal Power Act reflects the philosophy that
any development must be consistent with a compre-
hensive plan of development, i.e., that which provides
the greatest benefits—power and nonpower alike. The
framers of the Act wisely insisted on comprehensive
development as the quid pro quo of granting the right
to private parties to use our nation’s water resources
for commercial purposes. This Commission should not
waive this hard fought concession to the public interest.

For these additional reasons, I respectfully dissent
to the majority's decision to the extent that it allocates
20 percent of the operating costs of the Iron Gate
fish facilities to the State of California.

Morgan, Commissioner, dissenting in part:

I dissent from my colleagues’ denial of the remedial
relief requested by the petition of the Department of
Fish and Game of the State of California for rehearing

1In this connection, I believe that any user charges should
be imposed upon a statewide or national basis, depending upon
whether the benefits are limited to the residents of a particular
state or are available to all citizens.

online

and, upon reconsideration, I must dissent from that
portion of Opinion No. 381 which requires the Depart-
ment to pay 20% of the total cost of Operating and
maintaining the Iron Gate fish facilities.

By its petition for rehearing the Department has
made it clear that it only offered, in its stipulation
with the Licensee, to bear the cost of rearing 19%
of the king salmon eggs taken at the Iron Gate fish
facilities; and not an additional 199 or 20% of the
entire cost of operating and maintaining hatchery fa-
cilities for the rearing of the remaining 81% of the
king salmon eggs plus the eggs of additional species.
Yet this is what the majority has attempted to force
the State of California to do.

I cannot say whether my colleagues’ decision to order
the Department to assume 19% (in round numbers,
20%) of the full cost of operating those facilities
was based on the mistaken belief that the Department
had volunteered to do so. But I must say that mine
was. Nor can I say whether my failure to recognize
the Department’s specific limitation on that 19% was
due to the truncated record in this case, or to failure
by the Department to make its limitation clear, or to
inadequate analysis of the Department’s proposal and
the record herein.!

—_ ——

"However self-evident the facts and the law on this point
may have been to the Department, it is now clear that to ob-
viate confusion in minds more hurried and less familiar with
the background facts than their own, the Department should
have continued the methed of making the governing distinction
that it used in its Reply Brief before the examiner. It there
treated the matter as follows (at p. 23):

Whenever maintenance and operation costs and hatchery
costs have been mentioned in this brief. such expense ex-
cludes 19% of the king salmon eggs taken at Iron Gate.
This was done for the sake of brevity, so that continual
reference would not have to be made throughout this brief
to the exception of 19%.

—66A—

I have never knowingly departed, as some of my
colleagues here depart, from that principle of resource
development (explicitly set forth as Section 18 of the
Federal Power Act) which requires licensees to conserve
or to compensate for all resource values impaired, dam-
aged or diminished by their use of the Nation’s streams
for generating electric power. My apparent willingness
to do so in Opinion No. 381 was based solely upon
the belief that the State of California—by way of
settlement and for reasons best known to itself and not
shown upon the record—had agreed to pay 19% of
the cost of offsetting the damage that Licensee’s Iron
Gate Dam caused to the fis resources of the Klamath
River.

I considered and believed that the 20% figure se-
lected by my colleagues and here reiterated by the ma-
jority was a departure of only a single percentile from
an agreement entered into by the State of California

with ihe Licensee and that the difference, while sup-
ported by no rational explanation whatsoever, was
de minimis. Accordingly, and solely in order to reach
a decision I believed to represent no significant depar-
ture from principle, I concurred in their arbitrary se-
lection of that figure.

But, as the supplementary pleading filed by Cali-
fornia now makes abundantly clear, my belief was mis-
taken. That pleading now leaves us with no alternative

During its oral presentation before the full Commission, the
Department did not similarly limit or qualify its response when
asked if it maintained that Licensee should be required “. . . to
pay the whole cost of this hatchery?” Although the limitation
or qualification is implicit in the remainder ‘of the Department's
response, its reply nevertheless was specific: “We are only ask-
ing them to pry for 81 percent of it.” (Tr., page 339.)
It is now clear that this was mere ellipsis.

—~67A—

but to remedy our error by requiring the Licensee
to compensate the public in full for the damage in-
flicted; and the majority’s obdurate refusal to do so
here requires my most respectful but total dissent.
Although the amount of money involved is negligible,
the majority’s refusal to vindicate the principle involved
is a policy aberration of alarming precedential signif-
icance.

By themselves, the incidental flood control and recrea-
tion “benefits” that allegedly result from the existence
of the Iron Gate Dam, although sharply disputed by
the Department, essentially are nothing more than the
inevitable results of the performance of licensee’s duty
to re-regulate stream flow fluctuations caused by its
COPCO omlant. As long as it was mistakenly assumed
that the State had undertaken to defray a portion of
the particular costs in question, the recital of those
“benefits” in Opinion No. 38] (although objectionable
to me) was in the nature of dicta and did not call for
my dissent. However, those alleged, unsolicited “bene-
fits’ —“‘benefits” unwanted and unneeded prior to the
building of Licensee’s projects—are plainly no substi-
tute for Licensee’s duty to compensate for its impair-
ment of Klamath fish resources; and I here dissent
from any attempt to make them serve as such in jaw.?

—68A—

The operative facts of this specific matter, the emer-
gent issue, and the applicable law now are unmistak-
ably clear. Since 1919 the existence of the barriers
caused by Licensee’s COPCO projects, together with
Licensee’s failure to shoulder its proper respunsibility
under Federal law, required the Department to main-
tain and pay the operating costs of an artificial hatch-
ery facility to accommodate some 3 million king salmon
eggs produced by Klamath River fish whose upstream
passage had been blocked by those dams for more than
40 years. From 1919 until it was abandoned as uneco-
nomical in 1948, the Department conducted this service
at the Fall Creek hatchery. Since then, and by eimploy-
ing tank truck transport, the Department has utilized
its hatchery at Mount Shasta to accommodate the eggs
formerly propagated at Fall Creek, and it has volun-
tarily agreed to go on doing so. These eggs comprise
an annual average of 19% of the king salmon eggs
which will be taken below Iron Gate. However, the
existence of the Iron Gate Dam (completed in 1962)
now constitutes a barrier to the migration not only of
the 3,00¢ king salmon which produce those eggs but, in
addition, some 12,800 additional king salmon as well
as several other species!

A new hatchery is needed to accommodate the eggs
produced by these additional fish if the annual runs are
to be, preserved, and the State of California has no
obligation whatever to pay any of the costs thereof.

I think they can be explained, but it would be difficult to do
so in a manner which lends stature to the majority’s candor or
objectivity. #

The majority feels entirely free to abandon its original ar-
guments. It does not feel at all free to abandon its original
conclusion, even in the face of obvious difficulty in making
that old couclusion square with the new or remaining arguments.
We may be pardoned, I think, for asking what is going on here.

—69A—

The obligation to defray these costs rests exclusively
on the Licensee. ;

The record shows all this'clearly, and because it does,
we found and ordered that the Licensee must construct
a hatchery to accommodate all fish runs impaired or
blocked by Iron Gate, except those 3 million Fall Creek
king salmon eggs that the Department historically has
provided for and has voluntarily agreed to continue
providing for. Responsibility for operation of this new
Iron Gate fish hatchery follows a fertiori from the
same reason and rule that compels us to require Li-
censee to construct that hatchery.

However, and intentionally or unintentionally, by dis-
torting the Department's willingness to continue to pro-
vide for the 3 million Fall Creek king salmon eggs it
has provided for historically—which comprise 19% of
the total king salmon run impaired by Iron Gate—the
majority rules that the State of California must pay
20% of the entire cost of operating the hatchery we
have decided Licensee must build to accommodate the
fish runs blocked by erection of Iron Gate. This, it is
now clear, is over and above the outlay the State has
voluntarily agreed to continue making in order to pro-
vide for the 3 million king salmon eggs discussed above.

No valid reason is given for this decision. The record
before us cannot provide a reason for this decision—
with the exception of the reason clearly illuminated by
the briefs, arguments and petition of the State of Cali-
fornia: that the terms, effect and purpose of th. agree-
ment entered into by the State of California and the
Licensee were misunderstood.

To misunderstand may be embarrassing, though it
need not be so in this case: counsel for the State of

Z 7 = Stews ie
> 92-0.) Site. 3 da A ee

aad
ee ae

—70A—

California must bear some responsibility for the mis-
understanding here. But to attempt to rationalize, de-
fend and perpetuate a misunderstanding is inexcusable.
And to do so in circumstances which produce a danger-
ous precedent adverse to a valuable principle is out-
rageous.
The majority now rests the conclusions it previously
set forth in Opinion No. 381 on the followings bases:
1. The history of this controversy cannot be
ignored. The proper apportionment of the cost of
operating and maintaining the hatchery should be
considered in ‘ight of the prior relationship be-
tween the State and the licensee with respect to
the operation of the Fall Creek Hatchery, in which
the State assumed all the expenses of operation.
In 1919 after construction was begun on COPCO
1 and COPCO 2, the Fall Creek Hatchery was
conveyed to the State, and in 1925 the licensee
added fish trapping and egg collecting facilities to
the Fall Creek Station. The State operated the
Hatchery at State expense until 1948 and the egg
collection facility until 1961. Thus, to eliminate any
State participation in the operating cost of the
Iron Gate Hatchery would be inconsistent with: this
pre-existing pattern. [P. 502.]

Indecd we should not lose sight of the history of
this controversy! But the use the majority opinion
makes of that history in an attempt to justify its mis-
taken conclusions is little short of incredible.

“This controversy,” Opinion Na. 381 explains at
page 479, involves the question of whether Licensee
should be required “to erect and maintain a fish

—71A—

hatchery . . . to continue the runs of salmon and steel-
head trout which have been displaced by Licensee’s con-
struction of its Iron Gate Development on the Klamath
River” seven miles below COPCO No. 2 {emphasis
added].

Iron Gate was licensed in 1957 ; its construction was
completed in January 1962; and in Opinion No. 381
we found that it constitutes an impassable barrier to
all fish that: formerly spawned in the eight miles be-
tween Iron Gate and COPCO No. 2. There is no con-
troversy here. Opinion No. 381 settled the matter.

Nor is there any controversy here over who will pay
to hatch the eggs of the fish whose upstream passage
was blocked by COPCO No. 2 in the past and which
is now blocked eight miles downstream (along with the
upstream passage of many other fish) by the new Iron
Gate barrier. The State always paid to hatch the eggs
of the fish formerly blocked by COPCO No. 2 and the
State proposes to continue to do so. The eggs of the fish
formerly blocked by COPCO No. 2 and now blocked by
Iron Gate comprise 19% of the 15.8 million eggs of
king salmon blocked by Iron Gate: so the State has
volunteered to bear the expense of hatching 19% (or
3 million) of the 15.8 million eggs of king salmon
blocked by Iron Gate. Plainly, the Federal Power Act
never requested the State to defray the cost of hatch-
ing those 3 million eggs in the past: and plainly that
Act does not require the State to do so now that the
COPCO plants have been put under license and made
subject to the comprehensive development requirements
of Section 10(a) and Section 18 of the Act. Neverthe-
less, ithe State has volunteered to pay the cost of hatch-
ing those 3 million eggs, and there is no question or
controversy over that matter here.

—72A—

This controversy only relates to who should bear the
cost of operating and maintaining a hatchery big
enough to hatch the eggs of only those fish that for-
merly spawned in the eight-mile stretch between Iron
Gate and COPCO No. 2. There is not even any dispute
as to the number and weight of fish that the hatchery
must hatch: the parties have stipulated the size of a
hatchery sufficient to hold the eggs of only those fish
that previously spawned in “the lost spawning areas
above Iron Gate” and below the COPCO No. 2 facilities
(Examiner at pp. 490-491, Opinion No. 381 at pp.
482-483). We found that “since Licensee has created
the situation which necessitates [a] fish hatchery” ade-
quate to hold the eggs of (only) the stipulated number
of fish that previously spawned in the gravels above
Iron Gate, “it is no more than reasonable to require
it to pay the cost of consiruction thereof.” Thus there

is no controversy with respect to construction of the
hatchery.

Licensee argued that we should not require it to pay
the cost of operating and maintaining the (stipulated)
hatchery. because state law says the state will do so
and because the state paid the cost of operating the old
(3 million egg) COPCO hatchery at another reach of
the River. In Opinion No. 381 we said those historic
matters are “wholly immaterial,” because (a) “the Fed-
eral government, in its enactment of the Federal Power
Act has occupied the entire field”; and (b) because “the
Fish and Wildlife Coordination Act . . . contemplates
that power companies operating under a federal license
would be required to make adequate’ provision for fish
conservation as a condition of the license.” We did not
feel ‘t was necessary to explain that the comprehensive

—73A—

development standard of Section 10(a) of the Act
means that if Licensee’s use of the waters to develop
electricity results in damage to fish or other resources,
Licensee must pay for facilities to preserve them; and
we did not feel it was necessary to point out that Sec-
tion 18 of the Act says that “the Commission shall
require the construction, maintenance and operation by
a licensee at its own expense of . . . such fishways as
may be prescribed . . .”

Now the majority contradicts itself. Contrary to its
own exposition of the requirements of the Act, the
majority now says that the State must help pay to pre-
serve a resource damaged by a re-regulating hydroelec-
tric plant licensed by us in 1957, because in the past
and under a discredited, inapplicable state law, the State
had to pay to preserve a different and separate. fish
resource impaired by an unlicensed plant, built before
enactment of the Federal Power Act, in a different reach
of the River.

I heartily dissent from this contradiction; and totally
disassociate myself from the majority’s attempt to ob-
fuscate and conceal the operative facts of this contro-
versy. The majority need iiot stoop to conquer.

The majority then proceeds to its next major point:

2. To impose the full cost of building and op-
erating the hatchery on the Licensee would be to
assess costs that would overcompensate for the
damage of Licensee’s project to the fish population.
The evidence in the record suggests that the re-
regulation of the flow of Klamath River by the
Iron Gate Dam combined with the construction
and operation of the hatchery will result in a
greater tish population than if Iron Gate had not

Man

been built. This would stem from the reduction or
elimination of destruction of natural fluctuations
and river levels which will follow from the con-
struction of Iron Gate Dam and its operation in
accordance with the year-round minimum releases
required by Article 52 of the license. To impose on
the Licensee the full costs of building and operat-
ing the hatchery would not merely restore the
status quo but would actually require Licensee to
pay for enhancing the fish production as compared
with pre-Iron Gate conditions. Apportioning 20
percent of the operating costs to the State will
more nearly result in restoring the status quo. [P.

502. |

The stipulation entered into by the parties to this
proceeding provides that: ‘‘(1) if tie Commission de-
termines that fish hatchery facilities are required at
Iron Gate, said facilities shall be sufficient to accom-
modate . . .” the stated number of fish whose
spawning grounds were blocked by Iron Gate.

The Commission, in Opinion No. 381, found that
a fish hatchery was required at Iron Gate; and that a
hatchery oi the stipulated size will “preserve and
maintain [the fish resources] at a level approximately
equal to that which existed prior to the coustruction
of the Iron Gate Development” [emphasis added}.

The Commission failed to find that re-regulation of
the River will improve the fish resource over its condi-
tion prior to Iron Gate, because the record contained
no evidence whatsoever to support such a finding. It
does not contain any now. Further, contrary to the
majority's empty assertion here, the record does not
even “suggest” that re-regulation and the hatchery com-

a

—75A-—

bined “will result in a greater fish population than if
Iron Gate had not been built.”

Obviously, if the majority’s present “reasoning” is
to hold water, it must rest on findings of fact, and
those findings in turn must be based on a preponderance
of solid evidence in the record before us. Neither the
findings nor the evidence upon which to base them can
be pointed out.

Here again, therefore, the majority fails in its
attempt to manufacture now a reason why—contrary
to the record evidence, its own findings, and the re-
quirements of the Federal Power Act—it ordered Cal-
ifornia to pay 20% of the cost of operating and main-
taining the project facilities that the comprehensive
development standards of the Federal Power Act re-
quire Licensee to maintain.

Finally the majority rests its order on the following:

3. Apportioning this small share of operating
costs to the State will provide it with a financial
incentive to insure economy of operation of the

fish facilities. [P. 502.]

Here the majority discloses what it now insists was _
a central purpose underlying its impcsition of 19%
(rounded to 20%) of the O & M costs of the fish
hatchery on the State of California. That purpose was
to protect the Licensee from assumed extravagance on
the part of the State. The question of the ethics of
the State of California was not made an issue in the
proceeding but apart from this the requirement that
the State must pay 20% would very likely achieve the
desired result. We may likewise assume that if the
Commission were to require the State to pay 100%

—76A—

of the O & M costs it would almost certainly achieve
the desired result. Better still, if the Commission were
to require the State to pay the Licensee 200% of the
O & M costs it would certainly achieve the desired
result.

But this exhilarating vista of expanding Commission
jurisdiction over the sovereign states (in order to protect
Licensees from conjectural expense) evaporates when
a simple question is asked: What is ‘the statutory au-
thority for the Commission to impose such a charge on
the State? The answer is: No such authority exists
in law.

I agree that the Licensee is entitled to protection
against State extravagance, whether real or fancied.
Such protection is afforded by the arrangement, which
has been operating successfully for years, between the
Department of the Interior and California as well as
a number of other States. Under this arrangement
the Department builds hatcheries to correct damage to
State fishery resources caused by its dams, turns those
hatcheries over to the State and reimburses the State
for operation and maintenance. Prior to the beginning
of each fiscal year a budget conference between the
State and the Department is held for the purpose of
reaching agreement on operation of each hatchery
during the coming year, and the hatchery is operated
in accordance with that annual budgetary agreement.

Such an arrangement could properly be required
as a license condition here, and the Commission could
reserve the right to settle any dispute which prevents
agreement in the unlikely event such a dispute were
to occur. This is the pattern suggested by California
during oral argument. It is the pattern we should

—77A—

have adopted here. It is equitable; it provides ali the

protection needed by the Licensee; and it does not

require the Commission to exceed its statutory powers.
i, 2a oe oe

In sum, the majority defends its ruling that Cali-
fornia should bear 19% (rounded to 20%) of the
hatchery O & M costs by citing: (1) a history of the
controversy which the majority clearly misunderstood
and misapplied, (2) an hallucinatory claim that such
costs would exactly balance an unproved “over-compen-
sation” of the State by the Licensee, and-(3) a claim
that imposition of such costs is necessary to preserve
California’s virtue.

Let us examine item (2) at greater length, though
the temptation is great to discourse further on all
three.

If my reading of the majority’s reason No. 2 is
correct, it is as follows: The parties in this controversy
have agreed upon the size of the hatchery to be built,
but their agreement was in error. Further, the majority
knows the nature and direction of the error: the hatch-
ery agreed upon is not too small; it is too large. It
is too large because that hatchery, in combination with
future improved conditions in the spawning beds below
Iron Gate will, in the course of time, result in the
propagation of more fish in the future than before
Iron Gate was built. Further, the majority knows
exactly how many more fish will be propagated in the
future than before Iron Gate was built, as well as the
value of those additional fish. Therefore the majority
feels able to correct, with precision, the error made
by the parties to the agreement. It finds, on the basis
of no evidence beyond the foregoing assertions, that

—78A—

experience in future years will demonstrate that Iron
Gate re-regulation, plus a too-large fish hatchery, will
overcompensate California by exactly the amount equal
19% (rounded to 20%) of the cost of operating and
maintaining the stipulated fish hatchery!

I freely confess that I lack both the evidence and
the expertise necessary to make such daring yet metic-
ulous calculations involving the life and behavior of
generations of fish yet unborn, and the operation of
facilities yet unbuilt. If I possessed such expertise
and evidence I might have been tempted to correct the
(assumed) error of the parties by the simpler method
of adjusting the size of the hatchery those parties had
already agreed to.

¢ Jf the majority really possessed this dazzlingly in-
tuitive expertise I am confident they too would have
made such a correction. But they did not. It matters
little whether we conclude they failed to do so because
they had neither the expertise nor the evidence on which
to act, or because they are here merely attempting to
rationalize a misunderstanding.

What js important is that they lacked the authority
to do what they decided to do.
A. Rs ee

A clear understanding of and correct ruling on this
matter can be achieved by the reading of a simple and
undisputed statement of fact, plus the answers to two
simple questions. The simple statement of fact is as
follows: The fishery facility we have prescribed and
have ordered Licensee to build is required in order to
correct and repair damage inflicted on the fishery re-
source of the Klamath River in California by the Jron
Gate Dam constructed by Licensee.

—79A—

Question number one: How much of this damage
resulted from activities of the people of the State of
California? Answer: None.

Question number two: What proportion of the cost
OI repairing this damage should be borne by the people
of the State of California? Answer: None.

The majority, by an indirect, oblique approach,
attempts to lend the authority of this Commission to
a new and alarming theory—that a Licensee, without
the agreement or consent of a sovereign State, may
impose charges on the State for asserted but disputed
and unwanted “benefits” arising indirectly from Licen-
see’s use of the Nation’s rivers for the generation of
electric power; and that this Commission, under the
Federal Power Act, has the authority to force the State
to bear those charges against its will.

If the majority seriously believes it lawfully has this
power—which I maintain it does not—it should
(attempt to) assert that power openly, citing statutory
authority, rather than attempt to establish such power
obliquely, as it does here, by entangling its new theory
with a legitimate dispute over the Proper responsibility
5f a Licensee to repair and correct damages it has
inflicted upon a natural resource of the State of
California.

I believe the majority’s attempt to establish such a
theory will fail, regardless of whether it is made openly
or as in this proceeding, and I concur in the dissenting
remarks of Commissioner Ross on this subject.

The one question Properly before us is the respon-
sibility of Licensee to protect and conserve the fishery
resource of the Klamath River in California.

a

This Commission has committed a serious error, and
in doing so has set a precedent dangerous to the rights
of the several States and their citizens, by attempting
to force the people of California to pay cosis not rightly
theirs, for damages not inflicted by them, upon a re-
source they have every right to enjoy unimpaired.
There is an obligation to pay for correcting the damage
inflicted on that resource by Licensee’s project. But
that obligation rests squarely on the Licensee. Not one
iota of that responsibility rests upon the public.

If Licensee and the State of California had entered
into an agreement to share the costs of meeting that
responsibility in the manner mistakenly understood to
be the case on first presentation of this matter before
us, this Commission would have had adequate statutory
authority to examine such an agreement and decide
whether its impact on Licensee’s customers did or did
not serve the public interest. But, as is now clear,
there was "o such agreement, and we have not the
slightest shred of statutory authority to concoct a sub-
stitute therefor and then proceed to force the State
of California, against its determination of the public
interest and against its will, to accept it and require
its taxpayers to pay for tt.

The majority’s attempt to force the people of Cali-
fornia to do more than they voluntarily agreed to do is
wrong and cannot be supported by facts, by logic or
by law. I am confident that on review their attempt
will be struck down by the courts, as it should be.

---