# Petition for Writ of Certiorari — Fiocchi v. Robert G. Regan Co.

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385601_1818%3A2

## Record

- **Collection:** Supreme Court brief
- **Document type:** Petition for Writ of Certiorari
- **Published:** January 1, 1964
- **Citation:** 379 U.S. 828

## Text

JOHN F. DAVIS, GLERK

Supreme Court of the United States.

9 aes € 2

ROBERT G. REGAN CO., a corporation,
; ° Respondent,

ws.

CAESAR A. FIOCCHI and CHARLES FIOCCHI, co-
partners, d/b/a Caesar Fiocchi Company, and SEA-
BOARD SURETY COMPANY, a corporation,

Petitioners.

4

\

PETITION FOR A WRIT OF CERTIORARK.TO
THE SUPREME COURT OF ILLINOIS

—

KeNNETH S Lewis,
Suite 1734
7 South Dearborn Street
Chicago, Illinois,
: Attorney for Petitioners.
Lowe. B. Komi,
WituiaM Levinson,
Suite 2110 : >
77 W. Washington Street
Chicago, Ilinvis
Of Counsel.

The Scheffer Press, Ine—-ANdover 38-6850

INDEX

PAGE
SIN TREE veassicensdesiconeeincainercs Sctdiachabicalciaaiepctinanananases 2
Jurisdiction ..c.ccccessccccssseseceeseeee thelial Re satacasiciedsninisin 2
Questions Presented... een iensineiapeneenncleniacsane 2
ee SII aos cncdaccsssccinesinces Accsanentosmremsectonactosacc 3.
IE aia in ectmcencensencrrncctacts ss cbtancatedmaanucmabaomion 3-7.
SIRES, SOREN cine sncagnnienccininanincns pS 8
Reasons For Granting Wit. ...........ccccccccsccscsesteeseseeece 9-11
NII caret cnsuginntine cateennaesleiapicisniacenpenciliaeviactionancsisastietalataies il
INDEX TO APPENDICES
Appendix A =
BRE GRRE Sara near —_ enacsnssnsssronrensenese la

Appendix B— ;
Opinion of Appellate Court of Illinois, 2nd Dis-

BEWNG © iicteciacaes se aceaierata deb bnaeuaaiak eer aiaiee cansesessenaneneee 2a
CITATIONS.
Wilson v. United States, 221 U.S.°361, 31S. Ct. 538,
Oe” rl a. | |) Sennen eeMrmen UF |

People v. Ryan, 410 TIL 486, 103 N.E, 2d 116, (1952)... 10

IN THE
SUPREME COURT OF THE UNITED STATES
Octoser TERM, A. D. 1964.

No,

ROBERT G. REGAN CO. a corporation,
oy cane ut,

Us.

_CAESAR A. FIOCCHI and CHARLES FIOCCHT, co-
partners, db a Caesar Fiocchi Company, and SEA
BOARD SU RETY COMPANY, a corporation,

2 Petitioners.

“

PETITION FOR A WRIT OF | RTIORARI TO -
THE SUPREME COURT LINOIS

To the Honorable, the Cleef Baslier, and the Associate
Justices of the Supreme Court of the United States:

Caesar A. Fioechi and Charles Fiocchi, ca-partners do-
ing business as Caesar Fioechi Company, and Seaboard
Surety Company, a corporation, pray: that a writ of cer-
‘tiocari issue to review a judgment of the Supreme Court
of Tilirois entered in the above entitled case on Maren 16,
1964, denying petitioners leave to appeal to the Supreme
Court of Hlinois from a judgment of tie Appellate C ourt
of Illinois, 2nd district, entered on December 6, 1963..

=~
CITATIONS TO OPINION BELOW

The opinion of the Appellate Court of Illinois, 2nd dis-

trict, is reported in 44 Ill. App. 2d 336, 194 N. E. 2d 665
(1963). There was no opinion in the Supreme Court of
Tilinois. ;

JURISDICTION

The /jodgment of the Appellate Court of Illinois, 2nd
district, was entered on December 6, 1963. The opinion —

is printed in Appendix B accompanying this Petition. The

bo

jurisdiction of this Court is invoked under Title 28 U.S.C.
1254 (1).

* QUESTIONS PRESENTED

1.. Whether. the Supreme Court ‘of Illinois erred in deny-

ing petitioners leave to appeal on March Toi 1964.

from a judgment of the Appellate Court «! Tllinois,.
2nd district, entéred on December 6, 1963, ‘ioc:

a directed verdict and judgment of the Circuit Court

of Lake County, I}inois, in favor of respondent and ,

against petitioners in the amount of $11,295.15 en-
tered on June 26, 1962.

[t is respectfully submitted that error was committed
by the trial judge in directing a verdict against peti-

- tioners and denying their motion for new trial filed

July 26, 1962 (Abstract of Record—Pages 14. 15 and
16). The basis alleged for error is that the trial judge
denied petitioners access to certain records of the Fed-
eral Housing Authority that they- had subpoenaed for
use at the trial by way of subpoena duces tecum.

=
THE STATUTES INVOLVED
‘The statutes involved are Amendi.-nt XIV, Sect. 1,
Constitution of the United States (due process); Ch. 110,

Ill. .Rev. Stat. See. 62 (subpoenas). Botn the foregoing are
printed in Appendix A, infra.

f . §TATEMENT OF THE CASE

Respondent, Robert G. Regan Co., a ge neral contractor
jin the construction industry, filed suit against Caesar A.
Fiocechi and Charles Fiocehi, co-partners, doing business as
Caesar Fiocchi Company in the Circuit Court of Lake
County at Waukegan, Illinois on December 22, 1960. The
Fioechi brothers conducted a mason contracting business
as co-partners in Highland Park, Illinois and were joined .
as partners in the suit eta eh their surety, Seaboard
’ Surety Company, who had written the performance bond
under the construction contract made the subject of the
action.

Robert “G. Regan Co. brought a two count complaint
‘against the Fiocchis and their surety, Seaboard Surety
Company, alleging failure to perform a masonry subcon-
tract for the brick work on certain residences. constructed
by Robert G. Regan Co. at the Glenview Navaf Air Station.

Glenview, Illinois. The specific failure of performance al-

leged was a material deviation in installing wall ties bind-
ing the veneer to the framing of the buildings as ealled
for by the specifications ( Abstract of Record, pages 1-5).

It was alleged that the secatie work was buckling on the

buildings.

The Fioechi brothers and Seaboard Surety Company in
their answer admitted the deviation in the placement of the
wall ties but alleged that the breach was trivial and not re-
lated to the damage that had arisen to the buildings ( Ab-

ae? oe

stract of Record, pages 6-8). It was alleged in the answer
that the falling away or buckling condition of the’ brick
work arose through the fault-of Robert G. Regan Co., it |
being ‘the theory of petitioners that the real cause, of
damage to the buildings arose through both improper de-
_ sign and the use of inferior lumber r setting up a shrinking
force that pulled away the veneer.

The case came to trial before a jury in ‘June of 1962.
After Respondent had put on his case, Petitioners’ counsel
opened his defense by calling the president of Respondent
Company as an adverse witness. After hearing testimony
from only this witness the trial judge directed Petitioners
to make an Offer of proof, which offer of proof was denied
and the juyy was directed to return a verdict and judgmert
in favor of Respondent. This directed verdict and judg-
ment was entered against Petitioners and. in. favot of Re-
spondent in the amount of $11,296.15 on June 26, 1962.
(Abstract of Record, pages 12-13). |

Prior to the commencemént of the trial, Petitioners and
Respondent also it is believed caused to be served upon the
Federal Housing Authority certain subpoenas. Petitioners’
subpoena is set both in form and substance below :

>

—i5—
No. 74417
CIRCUIT COURT LAKE COUNTY, ILLINOIS
Robert G. Regan Co., a corporation vs. Caesar A. Fiocchi, .
et al : ,
| Subpoena Duces Tecum |

a: Federal Housing Authority at 36 South Wabash —
Avenue, Chicago 3, Illinois -

State of Illinois, Lake County—ss.

The Peoplt of the-State of Illinois to the Sheriff of said

- County —Greeting: We Command You to Summon Federal
Housing Authority, by its duly authorized agent and keep-
-er of records if he shall be found, in your County, pers on-
ally to be and appear before the Circuit: Court of said
County, on the 25th day of June 1962, at the Court House
in Waukegan at the hour of 9:30 a.m., and to bring with him
and produce at the time and place aforesaid, to be used as
evidence, certain instruments of writing purporting to be
all records, correspondence, photographs, reports, writings,
and documents pertaining to construction of a Wherry
Housing Development under Title VIII of, the National
Housing Act as amended, known as -FHA Projec { No. O71-
80009 then and there to testify, and the truth to speak, con-
cerning all and singular those things of which he may have
knowledge, or the said instruments of writing doth import
of, and concerning a certain suit now pending and undeter-
mined in the said Circuit Court, wherein Robert G. Regan
Co., a corporation plaintiff and Caesar A. Fiocchi and
Charles Fiocchi, co-partners, d/b/a Caesar Fioechi Com-
pany, and Seaboard Surety Co., a corporation defendants.
to testify.on the part of the said Caesar A. Fioechi et al.
© And this he shall in no wise omit under penalt’ of what
the law directs; and have yvou'then and there this writ,

i

—_ § =.

with an indorsement thereon’ in what manner you shall
have executed the same.

Seal.

| Witness Stephanie Sulthin, Clerk of said Circuit Court,
and the seal thereof at Waukegan, Illinois this 21st day of
June A.D., 1962, Stephanie Sulthin, Clerk

I, Lowell B. Komie, having been first duly sworn upon
my oath state that on the 2Ist day of June, 1962, at the
hours of 3:00 P.M., I served the Federal Housing Authority
at 36 South Wabash Avenue, Chicago 3, Illinois, by hand-
ing a copy of this Subpoena Duces Tecum to Joseph Lyons,
agent.

/s/ Lowell B. Komie
Seal.

In putting on its case, Respondent called one Erith Olsen
as a witness. Olsen testified that he was the FHA inspector
on the job and had refused to give it final certification due
to the faulty condition of the veneer work. The coritract
between the owner and Robert G. Regan Co. required ae-
ceptanée by FHA before final payment to the general con-
tractor. The FHA inspector also testified that in his opinion
the condition causing the veneer “to come loose resulted
from the Petitioners’ failure to properly install wall ties as
provided by the specifications.

It is Petitioners’ belief that Inspector Olsen appeared on
behalf of Respondent in answer to a subpoena served upon
him or the Federal Housing Authority by Respondent. -
In any event, he was the only official of FHA who ap-.
peared at the trial and it was Petitioners’ belief that he
or. some other official of FHA would also: be present at.
the trial to produce the records requested by Petitioners’
Subpoena Duces Tecum at such time that Petitioners com-

a poe

menced their defense. The documents requested in the
Subpoena Duces Tecum were necessary to Petitioners de-
fense to determine whether the decision reached by In-
spector Olsen as testified to-by him in behalf of Respondent
was in any manner fraudulent, unreasonable or arbitrary.
Petitioners had no intention of calling Inspector Olsen as
a witnessgbut merely sought to inspect his file on the project
and to use such documents as might be relevant to im-

peach his conclusion through the testimony of Petitioners’
own expert witnesses.

In the short interval that passed subsequent to the
testimony of Inspector Olsen as a witness for Respondent
and prior to the commencement of Petitioners’ defense,
Petitioners contacted ‘the hag al office of FHA and re-
newed their request that t ocuments made the subject of
their Subpoena Duces Tecum be produced at once. Peti-
tioners were told that the documents would he produced but
that they were in a warehouse apd some difficulty was
being incurred in locating them. Whereupon, on June 26,
1962, Petitioners were required ta commence their defense
at bar without recourse to the documents subpoenaed and
were almost immediately after the commencement of their
defense ordered by the trial judge to make an offer of
proof, said offer thereupon being denied and the jury di-
rected to bring forth a verdict and judgment against Peti-
tioners. At no time during the trial were the documents
requested in Petitioners’ Subpoena Duces Tecum produced
by the Federal Housing Authority nor was cause shown
for their non-production or objection made to the subpoena
itself. . |

On July 26, 1962 Petitioners filed their Motion for N yew
Trial and raised therein as an allegation of error the failure
of FHA to produce the subpoenaed docunients (Abstract of

: —8—

Record, pages 14 and 15, para. 6). The trial court denied
the Motion for New. Trial (Abstract of Reeord, page 16).

Appeal was perfected by Petitioners to thie ‘Appellate
Court of Illinois, 2nd District and on December 6, 1963
the Appellate Court entered an order affirming the judg-
ment. of the Circuit Court of Lake County (Abstract of
Record, page 53). In its opinion, which is set forth in
Appendix B, infra, the Court commented on the fact that
Petitioners made no attempt to show that the FHA de-
cision was unreasonable, arbitrary or fraudulent and con:
sequently were bound by the decision and determination
of FHA. |

On December 30, 1963. the Appellate Court of [linois,
2nd District, denied Petition for Rehearing (Abstract of
Record, page 95).

On March 16, 1964, the Supreme Court of Illinois denied
Petition for Leave to Appeal.

FEDERAL QUESTIONS

‘It is alleged that the failure of the Federal Housing
Authority to ‘produce records and documents specified in
the Subpoena Duces Tecum served upon its agent in Chi-
eago, Hlinois on June 21, 1962 by Petitioners for produc-
tion and delivery to the. trial court has resulted in a
deprivation of Petitioners’ property without due process
of law (Constitution of the United States, Amendment
XIV, See. 1, Appendix A). It is also respectfully submitted
that in denying Petitioners access to these records and

~ documents the Circuit Court of Lake County, Hlinois. so
far departed from the accepted and usual course of judi-
cial proceedings as to call for an exercise of the Court's

ower of supervision (Rules of the Supreme Court of the
United States, Rule 19, 1(b)).

The stage of the proceeding at bar at which the alleged
Federal question was first raised by Petitioners was upon
the filing of their Motion for New Trial in the Trial Court
on July 26, 1962 (Abstract of Record, pages 14 and 15,
para. 6). The trial court denied the Motion for New Trial
(Abstract of Reeord, page 16). The Motion for New Trial
thereupon was abstracted and the error preserved in the
record before the Appellate Court, 2nd District and Su-
preme Court of Illinois (Abstract Of Record, pages 14 and
15, para. 6). The alleged constitutional deprivation and
resultant federal question were further specifically raised
. and argued in Petition for Rehearing before the Appellate
Court of Illinois, 2nd District (pages 3 and 4). Petition for
. Rehearing was denied by the Appellate Court of Illinois,
2nd District on December 30, 1963 (Abstract of Record,
page 93).

REASONS FOR GRANTING THE WRIT

It is clear that under Illinois law, Petitioners as a
matter of right had authority to cause a Subpoena Duces
Tecum to be issued from the Cireuit Court of Lake County,
Illinois for service upon the Federal Housing Authority in
Chicago for: production of those documents and records
Petitioners believed relevant to their presentation of an
orderly defense. Ch. 110 TIL Rev. Stat., Sec. 62. (Appen-
dix A). It is also evident from the language of this section
of the Illinois Civil Practice Act that Petitioners were not
required to obtain an order of court prior to issuance by
the clerk of the Subpoena Duces Tecum.

In Wilson v. United States, 221 U.S. 361, 31S. Ct. 538,
a5 L. Ed. 771, (1911) a president of a private corporation
refused to produce certain corporate records before a New
York City Grand Jury in response to its Subpoena Duces

—

Tecum. He was committed by the New York Cireuit Court
for contempt and on appeal to the Supreme Court of the
United States, the judgment of the Circuit Court was af-
firmed. Mr. Justice Hughes delivered the opinion of the

Court and had occasion to discuss therein the traditional

use of the writ of subpoena duces tecumn, saying at 221
US. 31,372: .* . .

“The power to compel the production of doeu-
ments is, of course, not limited to those cases where it
is sought merely to supplement or aid the testimony
of the pefson required to produce them. The produe-
tion may be enforced independently of his testimony,
and it was held long since that the writ of subpoena
duces tecum was adequate for this purpose ... The
right to resort .to means competent to compel the pro-
duction of written, as well as gral) testimony seems
essential to the very existence and constitution of a

Court of common law, which regeives and acts. upon -

both descriptions of evidence and could net possibly
proceed with due effect without them. ...”

The statement of Mr. Justice Hughes that ‘the right to
‘production of written testimony is essential to the exist-
ence of a Court of Jaw indicates that the Petitioners
tight to issuance and return of their subpoena duces
tecum is a basic procedural right and therefore would
he protected under the Fourteenth Amendnint of the
Constitution of the United States (Amendment XIV. See.
1, U.S. Constitution, Appendix A). Both Wilson v.
United States and People v. Ryan, 410 TIL 486, 103 NE.
* 2d 116 (1951), a case also involving the refusal of a
corporate officer to produce documents requested by a
subpoena duces tecum issued by a grand jury, illustrate
that the right to production of written testimony by sub-
poena duces tecum.is so basic to the orderly procedural
administration of our courts that failure to comply with
the writ will be punishable by contempt.

*
£

mt

prey | pres

Wilson v. United States, also* indicates that it is not
necessary under a subpoena duces tecum that the person
returhing the writ be sworn as a witness and his oral
testimony taken. The writ@of subpoena duces tecum is
regarded as an order for the production of documents and
these must be produced by. a respondent to the writ re-
gardless of whether his testimony is to be taken orally.
Therefore, Petitioners had a right to production of the
documents and records requested in their writ regardless
of whether they intended to call FHA inspector Olsen as
a witness, If, they intended to use the documents and _re-
ports to be introduced through the testimony of their own
expert witnesses to impeach Inspector Olsen, this was + their

right.

The Appellate Court of Ilinvis, 2nd District, in’ its
opinion at 44 Hl App. 2d 336, 194 NE. 2d 665 (1963)
emphasized that petitioner made no attempt to show In-
spector Olsen's detision to be unreasonable, arbitrary or
fraudulent and therefore held that they were bound by the
decision in absence of any showing to the contrary,

At 194 N. EF. 2d 665, 668, it is said, Appendix B mira:

: Defendante-inade ho attempt to show that the
PHA‘s decision or determination that the wall ties
should have been installed in accordance with the
speciications was unreasonable, arbitrary or fray-
dulent, nor even any attempt to explain why the wall
ties were not so installed ino the. first place, Con-
sequently -defendants avere bound by the decision and
determination of. FILA that the brick would have
to be taken down, the wall ties put in according to
specifications, and the brick relaid 2.0."

It is respectfully submitted that had the Federal Hous-
ing Authority complied with Petitioners’ subpoena duces
feceum, Petitioner would have had an opportunity to

‘—12-— °

explain why the decision of .Inspector Olsen blaming
them for the damage to the buildings was unreasonable.
arbitrary or fraudulent. Without recourse to FHA's ree-
ords relating to the project, petitioners would have little
hasix to lay the foundation for impeachment of. Inspector
Olsen's previous testimony.

CONCLUSION.

“For the foregoing reason the writ of certiorari should

be granted.
Respectfully submitted,

Kexxetu S Lewis |
Suite 1734
7 S.. Dearborn St.
Chicago, Hlinois
Attorney for Petitioner

Lowell B. Komie

William Levinson

Suite 210,

77 W: Washington St.

Ahicayo 2. Minois

Of Counsel.

te

—— jg —

APPENDIX A

—

Amendment XIV, Sect. 1, Constitution of the United
States: 3
- “All persons born or naturalized in the United

States, and subject to the jurisdiction thereof, are citi-
zens of the United States and of the State wherein

they reside. No state-shali make or enforce any Jaw (|

which shall abridge the privileges or immunities of citi-
zens of the United States; nor shall any State deprive
any person of life, liberty. or property, without due
process of law: nor deny te any person within its
jurisdiction the eqnal protection of the laws.”

Ch. 116, Tl. Rey. Stat. Sect, 62 (subpoenas) :

“The clerk of any courf ip which an action is pend-
ing shall. from,time to time, issue subpoenas for those
Witnesses and to those counties in the State as may be
required by cither party... Every clerk who shall re
fuse so to.do shall be -fined, at the diseretion of the
court, in any sum not to exceed $100, An order of
court is not reqiired to obtain the issuance by the
clerk of a subpoena duees tecum. For good cause
shown, the court on motion may quash or modify any °
subpoena or in the case of a subpoena.duess tecum,

‘condition the denial of the motion npon payment in
advance by the person in whese behalf the subpoena
ix issued of the reasonable expense of producing any

item therein specified.”

£9_ —
APPENDIX B

Opinion of the Appellate Court.
McNeat., J.—

The plaintiff. Robert G. Regan Co.. was the general
contractor for the construction of. certain buildings for
Glenview Naval Homes, Ine. Plaintiff: entered into’ a
subcontract with the defendants, Caesar A. Fioechi and
Charles Fiocehi, to do all masonry werk ino accordance
With the plans and specifications of the contraet. Plain-
tiff sued defendants for their failure and neglect to con-
form strictly with such plans and specifications, and also
sned the Seaboard Surety -Company as surety for the
faithful performance of the subcontract. At the close of
plaintiff's evidence, the Cireuit Court of Lake County
denied certain offers of proof by defendants. and then
directed the jury to return & verdiet against defendants
for $11,296.15. The court entered judgment on. the directed
verdict, and defendants appealed.

The general contraet was for construction of a number
of buildings at the Glenview Naval Air @tation. known as
the Johnson Court Wherry Housing Development. The
project was financed by. FHA insured financing under
Tithe VIED of the Netional Housing Act. as amended, and
known as FHA Project No. 07180009. On November 21,
155, the defendant. partners made ao subeontreet with
the plaintiff corporation te perforin all masonry work
under the prune contract per plans and specifications for -
113.000, ON portion of the prime contract relating to
masonry construction of exterior walls provided :

“Brick vencer facing on wood frames shall be at
east Ot. inches thick, laid on running bond exeept
Where stacked bond is shown. and securely attached
to the structure swith corrosion resistant ties spaced
not farther apart than 160 inches vertically and. 16
inches horizontally." 2

‘

E ann 0 ame

The subcontract referred to the plans and spe¢ifications
and recited that the ‘subeontractor hitd examined them
and knew the contents thereof. By the subcontract defend-
ants agreed to conform strictly with all the terms and
conditions of the plans and. specifications in the per-
formance of the subcontract, and agreed to replace, upon
demand of. contractor and at subcontractor’s-expense, with
proper materials, any materials determined by contractor
or owner to be unsatisfactoy within ong year from the
date of final completion ‘of the prime contract and the
final inspection and approval of FIA. Subcontractor also
agreed to indemnify and save the contractor harmless
from any and all claims, damages of liabilities of what-
ever nature which might result from performance of the:
subcontract, and agreed that in,the event of the subeon-
tractor’s default in the performance of the subcontract
in any respect as required by contractor, the contractor
might perform the work and furnish materials therefor,
or imight have other parties do the same, and the subcon-
. tractor agreed. to paw any excess in cost over the subeon-
tract agreed price for completion by the contractor. The
subeontractor also guaranteed to remove ard remedy any
defeets arising within one vear of the completion of the
project, and agreed that payvinent should not constitute
acceptance of any inproper work or performance.”

The subcontractor also agreed te comply with all regula:
tions and require:ents of the FHA. Among these require-
nents were provisions that the FELA shall have the right
to interpret the contract documents and to determine eom-
plianee therewith; that all items of constructions shall be
subject to final acceptance by the FEA: and that the con-
tractor shall acceptably correct any defeats duc to. faulty
materials or workmanship which appear Within a period
of one year following substantial completion.

The subcontractor was paid in fuil upow the first inspec
tion by FHA, but within the one-year period the inspector
determined that the wall ‘ties were not attached as re-
quired by the specifieations and the brick walls on many
of the buildings constructed’ by defendants commenced to >

Rey ae

bulge. The inspector notified the owner, Glenview Naval
Homes, to correct the condition by installing ties aceord-
ing, to specifications. Thereupon the owner called upon
plaintiff to correct the condition and in turn plaintiff di-
rected the defendant subcontractor to install. the ties.

It was admitted in defendants” answer and established
by the evidence that defendants did not comply with the
provision of the prime contract requiring brick veneer to
be securely attached to the structure with corrosion re-—
sistant ties spaced not farther apart ‘than.16 inches ver-
tically and 16 inches horizontally. According to the evi-
denee, on many building the wall ties were 4 foot. on
_ center instead of 16 inches, and there was no place on any
of the 16 buildings where wall ties were found to, be in
place 16 inches vertically and horizontally.

It was stipulated that the FHA inspector prepared a
report after his inspection of the work and sent the report
to Glenview Naval Homes, Ine., that in the report the ‘in-
spector stated that the brick would have to be taken down
and the ties would have to be put in according to specifi-
‘cations and the brick put back-up to satisfy the FHA on
the project, and that the report was forw arded by Glen-
view Naval -Homes, Ine. to the plaintiff and <ubsequently
by the plaintiff to the defendants. It was further stipu-
lated that a series of letters went from the plaintiff to the
defendants notifying them of the absence of wall ties,
demanding that. defendants do the work, stating that the
-owner and Glenview Naval Homes demanded that the ties
be installed, and notifving defendants that if they did not
do the work plaintiff would he forced te do the work itse If;
and in. that event plaintiff would charze defendants for
the expense entailed in so doing; that the demand made
was to take off the brick, install the ties and put the brick
back up; and that all this was done prior to the commence-
ment of any work by the plaintiff company.

Defendants refused to remove the bricks and remedy
the omission of wall ties. Thereafter plaintiff removed
the brick, installed the ties to the satisfaction of the FHA
and replaced the brick. According to uncontradicted evi-.

—
dence in the record it cost plaintiff $11,296.15 to remedy
defendants’ faulty work. Defendants refused to pay for
this additional expense and — commenced. this
action.

During the trial counsel for defendants made an_ offer
to prove by one of the defendants that he estimated the
cost of taking the buckled brick off, placing wall ties 16
inches on center, and rebricking where brick had. been
removed, at $6000. Defendants’ counsel also offered to
prove by an architectural envineer and a contractor that
in their opinions the walls would have bulged whether the
provisions of the contract as to-wall ties had been strictly
complied with or not. Objections to these offers of proof
on the grounds that the estimate and opinions were imma-
terial were sustained, and the offers denied. Defendant
offered no further evidence and the court directed a verdict
for the amount of the juagment entered against them.
_ Defendants’ motion for a new trial was denied, and this
appeal followed. nares .

Contractors have no right to depart from working plans
made a part of the contract. If they do sc, it is at their
peril, and they became guarantors-as to the strength: and
safety of the struetures. The parties were clearly entitled
to contract to have the buildings erected in accordance
with certain plans and specifications. An express coritract
admit: of no departure from-its terms, and the: subcon-
tractors could discharge themselves from liability only by

constructing the buildings in aecordance with the plans -

and specifications, unless a deviation was jnutually agreed

upon. Clark et al. v. Pope et al, 70 Mil. 128, 132. Where:

the parties to a building contract agree that an architect
shall pass upon the work and certify as to the payments

to be made, his decision is binding and can only be at-:

* tacked for fraud or evident mistake. Hennessy v. Metzger,
152 Hi. 505, 515. When a sub-contract provides. that the
commissioner of public works is to decide all questions ax
to’ the prope r pe ‘rformance of the work, the determination
of the commissioner is binding on the sub-contractor and
can only be avoided by showing that the commissioner

J

— -
acted unreasonably, arbitrarily or fraudulently, and the

onus of showing such facts is upon the sub-contractor.
Brownell Imp. Co. v. Critchfield, 197 Ill. 61, 71.

In the instant case defendants agreed to conform ‘strictly
with all terms and conditions of the plans and_ specifi-
cations in thé performance of the’ subcontract, and _ to.
comply with the FHA’s regulations and requirements, in-
cluding the FHA’s. interpretation of contract documents
and determination of compliance therewith, and including
a provision that all items of construction were subject to
final acceptance by FHA. Defendants made no attempt to
show that the FHA’s decision or determination that the
wall ties should” have been installed in accordance with
the specifications was unreasonable, arbitrary cr fraudu-
lent, nor even any attempt to explain why the wall ties
were not so installed in the -first place. Consequently de-_
fendants were bound by the decision and determination
of the FHA that the brick would have to be taken down,’
the wall ties put in according to specifications, and the
brick relaid.

Under the authorities cited above this contract admitted
of no departure from its terms, and defendants were able.
to discharge their: liability only by constructing the build-
ings strictly in accordance with the terms and conditions
of the plans. and specifications. Whether or not one of
the defendants estimated that the cost of removing the
brick, installing the wall ties in accordance with specifica-
tions, and replacing the brick as required by FHA, would
amount to $6000 instead of $11,296.15, was entirely im-
material. Likewise, opinions that the walls would have
bulged even though the .wall ties had been installed or
that the walls were stronger without the ties, were ‘also .
wholly immaterial. Here the contract required strict. con-
formance: with ‘a specification that the brick véneer be
securely vattached to the main, structure with corrosion
resistant ties installed 16 inches apart. When defendants -
departed from this specification they did so at their peril,
und all attempted excuses for non compliance became - im-

A

—ia—

material. The trial court properly sae defendants
offers of proof.

Defendants’ deviations from the specification were not
with plaintiff’s consent. On the contrary, the record is
replete with requests and demands’ for compliance with
the specification and replacement of the faulty work.
Although not abstracted, the record includes photographs
showing that the brick vencer in many places bulged about
two inches away from the main structrres. Innumerable
invoices, payrolls and other exhibits are included in the
record and show in detail the amounts expended by plain-
tiff to comply with FHA requirements relative .to the
wall Ries ‘speecified/’The trial judge limited such amount:
to necessary expenses and carefully eliminated items of
profit and overhead expense,

In our opinion the judgment of the Cireuit Court of Lake
County must be, and the same is hereby affirmed.

AFFIRMED.
Dove, J., Concurs

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385601_1818%3A2. Public record. Not legal advice.
