# Petition for Writ of Certiorari — Miners Advocacy Council, Inc. v. Alaska Department of Environmental Conservation

> Briefs, arguments, decisions, and more.

URL: https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385020_0820%3A1

## Record

- **Collection:** Supreme Court brief
- **Document type:** Petition for Writ of Certiorari
- **Published:** January 1, 1990
- **Citation:** 493 U.S. 1077

## Text

\

(1)
$Y i 0 U 3 a | Supreme Guurt, U.S,

FILED
No. 89-__ EC 14 RS
JOSEPH F. SPANIOL, JR.
In The EK

Supreme Court of the United States
October Term, 1989

,%
4

MINERS ADVOCACY COUNCIL, INC.,

Petitioner,

THE STATE OF ALASKA, DEPARTMENT OF
ENVIRONMENTAL CONSERVATION; DENNIS D.
KELSO, COMMISSIONER OF THE
DEPARTMENT OF ENVIRONMENTAL
CONSERVATION; TRUSTEES FOR
ALASKA; and NORTHERN ALASKA
ENVIRONMENTAL CENTER,

Respondents.

-%
4

PETITION FOR WRIT OF CERTIORARI
TO THE SUPREME COURT OF ALASKA

,%
—

Rosert JOHN # .
WILLIAM R. SATTERBERG, JR. *
Law Orrices OF WILLIAM R.
SATTERBERG, JR.

709 Fourth Avenue
Fairbanks, Alaska 99701
(907) 452-4454

#Of Counsel
*Counsel of Record

COCKLE LAW BRIEF PRINTING CO,, (800) 225-6964
OR CALL COLLECT (402) 342-2831

QUESTIONS PRESENTED FOR REVIEW

(1) May the State of Alaska, through the National
Pollution Discharge Elimination System (NPDES) permit
certification process, simultaneously insert the same
water quality based effluent limitation in several hundred
permits, or must the State instead certify NPDES permits
and insert water quality based effluent limitations on an
individual, case-by-case basis?

(2) Did the State of Alaska waive its right to certify
by failing to certify within the 60-day period prescribed
by law?

(3) When the United States Environmental Protec-
tion Agency (EPA) proposes to modify particular terms of
an NPDES permit, may the State of Alaska via the certi-
fication process modify different NPDES permit terms
which the EPA-proposed permit modification did not
even purport to affect?

(4) Did the State of Alaska’s certification of the
same water quality based effluent limitation for several!
hundred permits, in disregard of whether such a strin-
gent limitation is necessary to meet State water quality
standards in individual cases, effect a taking of property
in violation of the Fifth and Fourteenth Amendments?

il

TABLE OF CONTENTS

Page
QUESTIONS PRESENTED FOR REVIEW...........
TABLE OF CONTIN... ii
TASLE OF AUTHGRTEe....os. as V
OPINION MRLAWW ios. tee 1
JURISDICTION OF THE COURT................... 1
CONSTITUTIONAL PROVISIONS, STATUTES, AND
REGULATIONS INVOLVED .................005. 1
STATEMENT OF THE CAGE? nse ees 2
REASONS FOR GRANTING THE WRIT ........... 13

I. THE STATE MUST CERTIFY WATER QUAL-
ITY BASED EFFLUENT LIMITATIONS ON
AN INDIVIDUAL, CASE-BY-CASE BASIS.. 14

II. BY FAILING TO CERTIFY WITHIN THE 60-
DAY PERIOD PRESCRIBED BY LAW, THE
STATE WAIVED ANY RIGHT TO CERTIFY
THE NPURES PRRMIIED «once ccecnaticsscss: 18

Ill. THE STATE ILLEGALLY INSERTED THE
0.2ML/L SETTLEABLE SOLIDS EFFLUENT
LIMITATION IN THE 446 NPDES PERMITS
WHICH EPA PROPOSED TO MODIFY
ONLY WITH RESPECT TO TURBIDITY
AND) ARINC 6 os00655sn5cuue eee ee 21

be on Re On eh ct MOE palidoes

ili

TABLE OF CONTENTS - Continued

Page

IV. THE STATE EFFECTED A TAKING OF PRI-
VATE PROPERTY IN VIOLATION OF THE
FIFTH AND FOURTEENTH AMENDMENTS
BY CERTIFYING THE SAME WATER QUAL-
ITY BASED EFFLUENT LIMITATION FOR
SEVERAL HUNDRED PERMITS WITHOUT
DEMONSTRATING THAT SUCH A STRIN-
GENT LIMITATION IS NECESSARY TO
MEET STATE WATER QUALITY STAN-

DARDS IN EACH INDIVIDUAL CASE .... 22
eas is ok wa xs Givens hs

catory Hearing (Excerpt).. App. 147

APPENDIX O - Constitutional Provisions,
Statutes, and Regulations
App. 148

RL a ke oo, cee

TABLE OF AUTHORITIES

Cases
Armstrong v. United States, 364 U.S. 40 (1960)........ 23

Best v. Humboldt Mining Co., 371 U.S. 334 (1963)..... 22

Costle v. Pacific Legal Foundation, 445 U.S. 198
(1980), rehearing denied, 446 U.S. 947 (1980)........ 21

Dobbins v. City of Los Angeles, 195 U.S. 223 (1904) .... 27

Environmental Defense Fund v. Alexander, 501
F.Supp. 742 (N.D. Miss. 1980), affirmed in part,
reversed in part on other grounds, 651 F.2d 983
(5th Cir. 1981), on remand, 554 F.Supp. 451 (N.D.
PE Sas FR es Woewanetes poke eeveda Nea Shc 19

E.P.A. v. California ex rel. State Water Resources
Control Board, 426 U.S. 200 (1976)................. 16

Hallstrom v. Tillamook County, ___ U.S. ___, 58 US.
a nat oe ae he ere ee Ca 20

Homestake Mining Co. v. United States Envtl. Protec-
tion Agency, 477 F.Supp. 1279 (D.S.D. 1979)........ 10

].E.D. Associates, Inc. v. Atkinson, 121 N.H. 581, 432
ee gnc lvicn ccc nek maka eaee er eees 26

Lake Erie Alliance v. U.S. Corps of Engineers, 526
F.Supp. 1063 (W.D.Pa. 1981), affirmed 707 F.2d
1392 (3rd Cir. 1983), cert. denied., 464 U.S. 915
SUING Wiad s Spckace Nn bo eee cn ee es ORE PET OLAS 12

Lawten ©. Stecke, 132 US. 133 (IGP)... os ess was. 28
Leo Sheep Co. v. United States, 440 U.S. 668 (1979) .... 18

Marathon Oil Co. v. E.P.A., 830 F.2d 1346 (5th Cir.
Ds nu vbe cx ha kes cee we ca ese ee 12, 14, 16, 20, 27

vi

TABLE OF AUTHORITIES - Continued

Natural Resources Defense Council v. E.P.A., 273
U.S.App. D.C. 240, 859 F.2d 156 (1988).........

Nollan v. California Coastal Commission, 483 US.
MN RE rere re roe 24,

Penn Central Transportation Co. v. City of New York,
COD UE re Re ons o's cadveasenauseseseets-

Pennell v. City of San Jose, __ U.S. __, 108 S.Ct.
SOD, FS RBA FT CGI aos a icles vaccssscnses

Pennsylvania Coal Co. v. Mahon, 260 U.S. 393 (1922) ..

Roosevelt Campobello International Park Commission
v. E.P.A., 684 F.2d 1041 (1st Cir. 1982)..........

Seacoast Anti-Pollution League v. Costle, 527 F.2d
872 (1st Cir. 1978), cert. denied, 439 U.S. 824

(IGF ED oc cc ccccctacasbUiieseks sesh eeeeeteeRnernis

Town of Sutton v. Water Supply and Pollution Control

Commission, 116 N.H. 154, 355 A.2d 867 (1976)...

Trustees for Alaska v. E.P.A., 749 F.2d 549 (9th Cir.
BOE). on vccibnce cnet biseees SesencuePeeeee ces

Union Oil Co. v. Smith, 249 U.S. 337 (1919).......
United States v. Coleman, 390 U.S. 599 (1968)......

‘United States v. Florida East Coast Railway Co., 410
UG. 208 CET «5 cvnnedhuesditasnisakeceses tees

United States v. Locke, 471 U.S. 84 (1985) .........

United States v. Riverside Bayview Homes, Inc., 474
SS. “SSE - CRO oan inc sewiscusdayeceieeassavent

26, 27

ee

cae

eS ee ae OR, -

Vii

TABLE OF AUTHORITIES - Continued

Page
CONSTITUTIONAL PROVISIONS

The United States Constitution, Amendment V....1, 22
The United States Constitution, Amendment XIV,

ERG shaw seek cheek ebNs- te. Ebina eee che oh ee keccl 1, 22

STATUTES AND REGULATIONS

United States Code
ee os 5 cance uéake snaped es kame pe as 1
sd. 4 6 o4.ece wwenes sanemm ae 26
ee ao Stace ewe vuaseudaceWeeeen 3
BF Wie MEEPS ow sv onc cn cccsccucnsnseeacns 1, 17
on 0 04 no040s sense keene ean 13
EA a i ain 5 5 50-4 wd aka 0 84s wed 6 aoe bee 1
er NN IE os coc cksnnscctecoeesescies 3, 4, 19
ee a nn cn andcccaseacaedesnedswoaw ae 4
ee IID 50s csc canseccvewusecccctccunee 3
EE ere a eer 2,3
RE Sn Ce rT ro 13
Code of Federal Regulations
pot ek | ree 2, 8, 14
Co renee ys
ee KE | errr a
Sp Gee, ee CUPEE 6 5 ov S vee secececaecees 3. 19

viii

TABLE OF AUTHORITIES - Continued

Page
SD CRE, Be Be hia ha ieee see es cee es 4, 19
40 C.F.R. §124.53(eX2) (1985)... 2.2.2... eee eee ee. 4
40 C.F.R. §124.53(e)(3) (1985)............ 4, 9, 14, 15, 26
CD Ce SD GUND ove dciccssscuccsnesieces re

RULES

Supreme Court Rule 17.1(b)-(c) .................-45. 13
RE GE GD EO 665 co ce dcnsinsestcewess 1

Lecistative History
House Report No. 92-911 (March 11, 1972)...18, 19, 20

FEDERAL REGISTER
Oe Fee I I wis hands ce ead w eee iwcuceecnanecen 19

OP Pe EN, IES oso nccacnuecwscessscbenetunen 15, 19

OPINION BELOW

The decision of the Alaska Supreme Court is offi-
cially reported beginning at 778 P.2d 1126. A copy of the
opinion is set forth in Appendix A. (App. 1-31)

|

JURISDICTION OF THE COURT

The Alaska Supreme Court rendered its decision in
this case on July 28, 1989. Petitioner Miners Advocacy
Council, Inc. (MAC) filed a timely petition for rehearing
(App. 72-88), which was denied in part on September 7,
1989, and in final on September 15, 1989. (App. 68-71)

Since Petitioner claimed and asserted rights under
the Constitution and statutes of the United States, this
Court has jurisdiction under 28 U.S.C. § 1257(a) to review
by writ of certiorari the decision of the Alaska Supreme
Court.

,
_

CONSTITUTIONAL PROVISIONS, STATUTES, AND
REGULATIONS INVOLVED

This case involves the following constitutional provi-
sions, statutes, and regulations. Since the provisions are
lengthy, pursuant to Supreme Court Rule 21.1(f), their
pertinent text is set forth in Appendix O (App. 148-65):

The United States Constitution, Amendment V;

The United States Constitution, Amendment
XIV, § 1;

33 U.S.C. § 1311(b)(1)(c);
33 U.S.C. § 1341;

33 U.S.C. § 1342(a)-(c);

40 C.F.R. § 121.2(a)(2)-(3) (1985);
40 C.RR. § 122.62 (1985);

40 C.ER. § 124.53 (1985);

40 C.RR. § 124.55(b) (1985).

sa
-

STATEMENT OF THE CASE

This case concerns the fate and livelihood of several
hundred gold miners in Alaska. While their gold mining
operations come in all shapes and sizes, the vast majority
of these miners are individuals or families, some of whom
trace their pursuit of this honest occupation back_to the
turn of the century. Since the imposition of the stringent
conditions at issue in this case, these souls have seen
their numbers decrease dramatically. 778 P.2d at 1130 n.7.
(App. 6-7)

Placer mining in essence involves the labor of gather-
ing from the earth small particles of that precious metal
known as gold. This is accomplished through placing
gold-bearing material, called “pay dirt,” in a channeled-
box known as a “sluice.” By then running water through
the sluice, the miner, through the force of gravity, gathers
the heavier particles, including gold, which collect in the
sluice on small underwater barriers known as “riffles.”

What goes in must come out, and after the pay dirt is
sluiced, it is discharged and captured by the miner, usu-
ally in a self-built settling pond. (App. 19) It is post-
capture discharge or “effluent” which subjects a miner to
the terms of the Clean Water Act.

wont

ne ee ae a

Oe ee

Both the land and the waters of Alaska are such that
they frequently contain naturally high levels of inert,
undissolved arsenic. Accordingly, when the earth is
washed through the miner’s sluice, it is natural for the
level in the receiving water to be increased somewhat by
the effluent. The same holds true for settleable solids,
which are heavier, quickly-settling sediments, and for
turbidity, which is not a pollutant but merely a measure-
ment of the cloudiness of the water. (App. 135-36)

Under Clean Water Act (CWA), 33 U.S.C.
§§ 1251-1387, any person wishing to discharge pollutants
into the waters of the United States must secure an
NPDES permit from either EPA or the source State,
depending on whether EPA has retained or delegated to
the State the permitting authority. 33 U.S.C. § 1342(a)-(c).
EPA has not delegated NPDES permitting authority to the
State of Alaska. Accordingly, while EPA is thus respons-
ible for issuing NPDES permits in Alaska, before EPA
may issue a permit, EPA must provide the State with an
opportunity to review the proposed permit to determine
whether the permit’s terms will meet the State’s water
quality standards. 33 U.S.C. § 1341(a)-(b). This process is
known as “certification.” Id.

Once a State has been presented with a certification
opportunity, the State has three options. The State may
deny certification of an NPDES permit, thus precluding
EPA from issuing the permit. 33 U.S.C. § 1341(a)(1). In
addition, the State may waive certification, either
expressly or by failing to render its certification decision
within the 60-day period prescribed by law. Id.; 40 C.F.R.

§ 124.53(c)(3), (d) (1985).! Third, the State may elect to
certify the NPDES permit. 33 U.S.C. § 1341(a)(1).

If the State does certify an NPDES permit, the State
may specify conditions more stringent than those in the
draft permit which are necessary to meet State water
quality standards, and must include for each such condi-
tion the CWA or State law reference upon which that
condition is based. 33 U.S.C. § 1341(a)(2); 40 C.F.R.
§ 124.53(e)(2). On the other hand, a certifying State is also
required to provide a “statement of the extent to which
each condition of the draft permit can be made less
stringent without violating the requirements of State law,
including water quality standards.” 40 C.F.R.
§ 124.53(e)(3). With the above background in mind, Peti-
tioner will turn to the facts of this case.

In 1984, EPA provided the State of Alaska Depart-
ment of Environmental Conservation (DEC) with the
opportunity to certify 446 NPDES permits to be issued to
placer gold miners in Alaska. At the time, DEC expressly
waived any right to certify the 446 permits. (App. 53, 55)
Accordingly, the 446 placer miners received their NPDES
permits which included, inter alia, a 0.7ml/1 monthly
average and 1.5ml/1 instantaneous maximum e.{luent
limitation for settleable solids. (App. 81, 91, 95)

Subsequent to the State’s waiver of certification and
the issuance of the 1984 permits, the United States Court
of Appeals rendered its decision in Trustees for Alaska v.
E.P.A., 749 F.2d 549 (9th Cir. 1984). This decision held that

' Unless specified otherwise, all future references to the
Code of Federal Regulations will refer to the 1985 C.F.R. as in
effect during the State’s 1985 certification. The relevant 1985
C.F.R. provisions have remained the same through their 1989
codification.

— ee

water quality standards, which are goals that must be met
for a given body of water, are not themselves proper
NPDES permit terms; rather, such water quality stan-
dards need to be translated into particular effluent limita-
tions applicable to an individual discharger. Id. at 556-57.
Thus, the Ninth Circuit held that EPA erred by not requir-
ing an effluent limitation for turbidity and not providing
a public hearing on the question of effluent limitations
for arsenic and mercury. Id. at 557, 561. The court then
remanded the case to the EPA to determine what, if any,
effluent limitations were necessary to meet the State
water quality standards for turbidity, arsenic, and mer-
cury. Id.

In response to the Ninth Circuit’s decision, EPA on
January 31, 1985, gave notice to the 446 permittees that
EPA was proposing to modify their 1984 NPDES permits
to include effluent limitations for turbidity and arsenic.
(App. 101-06) On the same date, EPA notified the State of
Alaska DEC of the proposed modifications. EPA also
provided DEC with copies of the draft permit with its
proposed modifications and informed DEC that the 60-
day period for State certification action was thereby com-
mencing and that the “State will be deemed to have
waived its right unless that right is exercised within 60
days of receipt of this letter.” (App. 89-94) The various
notices of the proposed modification nowhere indicated
that the settleable solids limitation was subject to mod-
ification, and consistent with EPA’s notice that it pro-
posed to modify the 446 permits with respect to turbidity
and arsenic, the proposed modifications which EPA sent
to DEC for certification did not alter the settleable solids
limitation, which remained at the 0.7/1.5 level. (App. 91)

With respect to State certification, the proposed modifica-
tion referred exclusively to limitations for turbidity and
arsenic. (App. 100)

Pursuant to the notice sent out by EPA, EPA and the
State DEC held joint hearings on the proposed modifica-
tion of the 446 existing NPDES permits and to issue 93
new permits for placer mining operations in the State, a
total of 539 individual NPDES permits. (App. 46) Based
on the notification that turbidity and arsenic were the
only conditions being modified, Petitioner MAC mem-
bers submitted comments only in regards to those and
not any other permit conditions. (App. 81) Only after EPA
and DEC held their two public hearings on the permits,
did DEC publicly announce that it intended to modify the
settleable solids limitation in the 446 permits and certify a
settleable solids limitation of 0.2m1/1. (App. 47)

The 60-day period in which the State was to have
certified came and went. Finally, on April 29, 1985, 88
days after EPA initiated the certification, DEC certified en
masse the 539 NPDES permits and inserted in each and
every one of the permits a settleable solids effluent lim-
itation of 0.2ml1/1. (App. 115-16) As authority for certify-
ing a settleable solids effluent of 0.2ml/I, the State
referred to a State water quality standard which did not
even provide for settleable solids until nearly two months
after the State certified the settleable solids effluent.
(App. 58-59, 73-74, 77-79, 82-83, 108) Moreover, the certi-
fication failed to indicate the degree to which the settle-
able solids limitation or any other limitations could be
made less stringent and still comply with State water
quality standards. (App. 115-16) In retrospect, this is not

surprising since, “DEC readily admits that it neither per-
formed site-specific evaluations nor considered informa-
tion contained within individual NPDES applications in
its certification process.” 778 P.2d at 1131 (footnote omit-
ted). (App. 8)

On May 6, 1985, Petitioner MAC, an association of
numerous placer miners who have been directly affected
by the actions of the State in certifying en masse the 539
NPDES permits, filed suit in the Alaska Superior Court,
seeking injunctive relief on several grounds. 778 P.2d at
1130. (App. 6, 37) Among these grounds were: that the
State had illegally conducted a mass certification instead
of certifying on an individual, case-by-case basis as
required by law; that the State had waived any right to
certify the permits by failing to certify within the 60-day
period prescribed by law; that the inclusion of the 0.2m1/1
settleable solids effluent in each of the 539 permits was
done without proper notice and hearing and violated the
procedural due process rights of the permittees; and that
the 0.2m1/1 solids effluent is overly stringent and arbi-
trary so as to effect a taking of property in violation of the
Fifth and Fourteenth Amendments.

Also subsequent to the State’s certification, a number
of parties, including Petitioner and several individual
miners, filed timely requests with DEC for an administra-
tive adjudication of the certification. These requests were
granted and the matters were consolidated. In addition,
Respondents Trustees for Alaska (TFA) and Northern
Alaska Environmental Center (NAEC) intervened in Peti-
tioner’s superior court suit. The superior court continued
its proceedings and retained jurisdiction pending a ruling
by the DEC Deciding Officer. 778 P.2d at 1130. (App. 6)

During the administrative hearing, Petitioner
renewed the arguments made in support of its complaint
for injunctive relief. (App. 117-19) At the adjudicatory
hearing itself, many miners were afraid to or prohibited
from testifying due to pending or threatened EPA
enforcement actions. (App. 147) After the hearing, the
Deciding Officer upheld DEC’s certification. In short, the
Deciding Officer ruled that DEC was not required to
certify on a site-specific, case-by-case basis and could
legally certify on a mass basis; that while the State did
indeed certify in an untimely manner, well outside the 60-
day limit, arguments as to the State’s waiver of any right
to certify should be made to EPA and not in the State
adjudicatory system; that DEC gave proper public notice
and held proper public hearings so as to allow DEC to
certify the 0.2m1/1 settleable solids effluent limitation in
each of the 539 NPDES permits; and that the 0.2m1/1
limitation was not overly stringent and arbitrary. (App.
52-62)

Petitioner appealed the administrative decision to the
superior court, raising again the issues presented in this
Petition. (App. 120-23) The superior court in essence
echoed the Deciding Officer’s conclusions and affirmed
the administrative decision. (App. 37-43) Petitioner then
appealed to the Alaska Supreme Court on August 28,
1987. (App. 124-25) After a lengthy period, the Alaska
Supreme Court rendered its decision.

With respect to Petitioner’s contention that the State
is required to certify NPDES permits on an individual,
site-specific basis rather than en masse, the Alaska
Supreme Court first examined the various regulations
governing State certification of federal licenses and per-
mits. The court took particular note of 40 C.F.R.

Puerco

§ 121.2(a)(2) which requires the certifying agency to pro-
vide a statement that the agency has either examined the
permittee’s application made to the federal permitting
agency and bases its certification upon water quality
related information contained in the application, or has
examined other information furnished by the permittee
so as to allow the certifying agency to state with reason-
able assurance that the permit’s terms will comply with
State water quality standards. 778 P.2d at 1132. (App.
10-11) In addition, the court took note of 40 C.FR.
§ 124.53(e)(3) which requires that the State’s certification
of an NPDES permit be in writing and include a “state-
ment of the extent to which each condition of the draft
permit can be made less stringent without violating the
requirements of State law, including water quality stan-
dards.” See 778 P.2d at 1132. (App. 11-12) Despite the
above C.F.R. provisions, the court concluded that the
Clean Water Act does not require States to certify NPDES
permits on an individual, case-by-case basis:

These provisions, particularly the require-
ments of 40 C.FR. § 121.2(a)(2), indicate that
site-specific matters may be important consider-
ations in the certification process. However, we
do not believe that the federal regulations
implementing the Clean Water Act can be read
to require states to certify draft NPDES permits
on a case-by-case basis.

Id. (App. 12) Beyond providing for reasonable assurance
that individual permittees will comply with State water
quality standards, the regulations were viewed by the
court as being “virtually silent as to what procedures
states should employ in certifying draft NPDES permits.”
Id. at 1132-33. (App. 12)

10

The Alaska Supreme Court also considered, but dis-
missed summarily, the observation of a federal district
court that water quality based effluent limitations must
be based upon site-specific examination of the pertinent
water body:

No reported cases have considered whether
states must certify NPDES permits on an indi-
vidual rather than a group basis, although a
federal district court has noted in dictum that
“effluent limitations are established by individ-
ual examination of the waterway.” Homestake
Mining Co. v. United States Envtl. Protection
Agency, 477 F.Supp. 1279, 1286 (D.S.D. 1979)
(court paraphrasing an EPA General Counsel’s
decision).

778 P.2d at 1133. (App. 13) The Homestake court’s observa-
tion was discussed no further. Yet, consistent with the
Homestake decision, the Alaska Supreme Court added that
“Alaska water quality standards apply to individual dis-
chargers, not to industries or groups considered as a
whole.” 778 P.2d at 1133 n.11 (emphasis added).
(App. 14)

In the end, the Alaska Supreme Court based its con-
clusion upon general statements contained in the legisla-
tive history of the Clean Water Act. The court reasoned
that since the legislative history of the Act suggests that
States are to play a large role in regulating potential
polluters and since (in the court’s view) “the Clean Water
Act and its implementing regulations[] lack . . . specific
requirements governing states’ NPDES certification pro-
cedures,” the Alaska DEC was not required to certify the
NPDES permits on an individual, case-by-case basis and
could instead certify the permits on a group basis. 778

11

P.2d at 1133-34. (App. 14-15) The court added that the
mass certification was thus reasonable since it might be
difficult for DEC to conduct the requisite site-specific
evaluations. 778 P.2d at 1134 n.11. (App. 15)

With respect to Petitioner’s argument that by failing
to certify within the 60-day period prescribed by law, the
State had waived any right it had to certify (App. 129-32),
the Alaska Supreme Court did little more than take note
of the fact that the State could waive its right to certify, in
which case “the NPDES permits are issued as originally
proposed by EPA.” 778 P.2d at 1129, 1135 (citing the 60-
day waiver requirement). (App. 3, 17-18) Petitioner’s
waiver argument was then disposed of by the court at the
end of its opinion. “We have reviewed all of the remain-
ing specifications of errors which have been advanced by
TFA, NAEC, and MAC and have concluded that they are
without merit.” 778 P.2d at 1140. (App. 31) Petitioner’s
argument that the State had modified the settleable solids
effluent in the 446 NPDES permits without the notice and
hearing required by law (App. 127-28, 132), suffered a
similar fate.

With respect to Petitioner’s argument that the
0.2m1/1 settleable solids effluent was overly stringent and
arbitrary so as to effect a taking of property (App.
133-36), the Alaska Supreme Court noted Petitioner’s
contention. 778 P.2d at 1135. (App. 19) The court, how-
ever, gave the argument short shrift and concluded that
in view of the facts and circumstances, the 0.2m1/1 limita-
tion was a reasonable exercise of the State’s regulatory
power. 778 P.2d at 1135-37. (App. 18-23)

12

As pointed out to the Alaska Supreme Court on
petition for rehearing, in the aftermath of the mass certi-
fication, Petitioner MAC members and other miners have
endured a host of problems, both administratively and in
the court system. (App. 74-75, 81-82, 84-88) Since EPA is
but an “interested observer” of the certification process,
Marathon Oil Co. v. E.P.A., 830 F.2d 1346, 1351 (Sth Cir.
1987), and since absent the required State statements, EPA
has no authority to determine whether the limitations
certified by the State are more stringent than required to
meet State water quality standards, Roosevelt Campobello
International Park Commission v. E.P.A., 684 F.2d 1041, 1056
(1st Cir. 1982); Lake Erie Alliance v. U.S. Corps of Engineers,
526 FSupp. 1063, 1074 (W.D.Pa. 1981), affirmed 707 F.2d
1392 (3rd Cir. 1983), cert. denied, 464 U.S. 915 (1983), when
miners have attempted to obtain EPA evidentiary hear-
ings on the extent to which their effluent limits could be
relaxed as to settleable solids, turbidity, and arsenic, the
miners have struck a brick wall. (App. 142-43) These
ongoing evidentiary hearings are presently pending
before EPA (App. 82, 85-88), and their result is directly
contingent upon the validity or invalidity of the State’s
certification. 40 C.F.R. § 124.55(b). Moreover, the State’s
mass certification practice shows no signs of stopping.
778 P.2d at 1130 n.7. (App. 6-7)

As noted, the State’s mass certification has also
resulted in numerous miners being brought before the
federal district court. (App. 81-82, 84-85) In one suit in
particular, EPA has charged one miner and her husband,
who have mined together for nearly 30 years, with
numerous violations of their 1985 NPDES permit, all but
one of which relates to the 0.2m1/1 settleable solids efflu-
ent limitation incorporated into their modified permit as
a result of State certification. (App. 81-82)

13

As such, the two (both MAC members), and other miners
as well, face the exaction of severe penalties, civil, crimi-
nal and administrative, as a result of the State’s illegal
certification. See 33 U.S.C. §§ 1319, 1365.

sé.
7

REASONS FOR GRANTING THE WRIT

Petitioner submits that the Alaska Supreme Court
has decided significant federal questions in a way which
is in direct conflict not only with the decisions of various
federal courts of appeal, but also with applicable deci-
sions of this Court. Even if these conflicts did not exist,
the Alaska Supreme Court has decided important ques-
tions of federal law concerning the scope and administra-
tion of a major environmental statute and the relation
between the statute and the property and liberty rights of
individuals. Given the broad applicability of the Clean
Water Act, with tens of thousands of NPDES permits
being issued nationwide, if Alaska remains unchecked in
its error, the practice of mass certification and the inclu-
sion of overly-stringent water quality based effluent lim-
itations in NPDES permits is bound to work its way
south, if it has not already. Moreover, in the wake of the
State’s certification, the number of miners in Alaska has
decreased dramatically. The potential for such economic
dislocations spreading elsewhere in the Nation militates
strongly in favor of this Court’s checking the State’s
practice in its incipient stage. Under Supreme Court Rule
17.1(b)-(c), these special and important reasons well war-
rant this Court’s granting review via writ of certiorari.
Petitioner will address these reasons concisely below.

14

I.

THE STATE MUST CERTIFY WATER QUAL-
ITY BASED EFFLUENT LIMITATIONS ON
AN INDIVIDUAL, CASE-BY-CASE BASIS.

Initially, Petitioner submits that the Alaska Supreme
Court is simply wrong in its conclusion that the Clean
Water Act and its implementing regulations do not
require individual, case-by-case consideration when the
State is certifying an NPDES permit. 40 C.F.R.
§ 121.2(a)(2) specifically requires individual, site-specific
consideration of an NPDES permittee’s application. Fur-
thermore, it is difficult to imagine how the State can
provide the statement required by 40 C.F.R. § 124.53(e)(3),
a “statement of the extent to which each condition of the
draft permit can be made less stringent without violating
the requirements of State law, including water quality
standards,” without giving individual consideration to a
permittee’s application.

In Marathon Oil, supra, the Fifth Circuit specifically
criticized the Alaska DEC’s misunderstanding of 40
C.F.R. § 124.53(e)(3), and pointed out DEC’s error. In that
case DEC, oddly enough, certified an NPDES permit indi-
vidually, on a very site-specific basis. See 830 F.2d at
1349-53. During the course of its opinion, the Court of
Appeals on several occasions noted that DEC labored
under the erroneous view that it could not specify condi-
tions less stringent than those contained in the draft
permit. Jd. at 1351 & n.26, 1352 & n.35, 1353. Yet, in a
schizophrenic burst DEC did include in its certification a
boiler plate § 124.53(e)(3) statement that the draft permit
“cannot be made less stringent without violating the require-
ments of Alaska state law and regulations including Alaska

15

water quality standards.” 830 F.2d at 1353 (quoting DEC’s
cover letter accompanying its Certificate of Reasonable
Assurance) (emphasis supplied by the court).

When EPA promulgated 40 C.FR. § 124.53(e)(3), the
Administrator explained the purpose of the provision
and that it does indeed mean what it says:

Some problems have resulted from the prac-
tice of certifying draft permits, which practice
has arisen from the practical difficulties of certi-
fying applications. In particular, certifications
have not always clearly stated exactly what con-
ditions are necessary to comply with State law
and whether less stringent conditions would
also satisfy State law. The final regulations rem-
edy these problems by requiring States to set
forth in all cases the minimum terms and condi-
tions which will be necessary to comply with
applicable law. For example, if a State certifies a
permit with an effluent limitation imposing a
daily maximum BOD of 25mg/I, it will be
required to identify also a ceiling representing
the minimum level of contrel, such as 30mg/1 or
40mg/1, which the State finds necessary to com-
ply with State law.

44 Fed. Reg. 32880 (emphasis added). EPA recognized the
burden this procedure places upon States, but found any
alternative to be unacceptable. /d.

The State of Alaska’s mass certification of NPDES
permits is directly contrary to the Clean Water Act’s
conception of the NPDES permitting process as one
involving individual, adjudicatory determinations. In Sea-
coast Anti-Pollution League v. Costle, 527 F.2d 872 (1st Cir.
1978), cert. denied, 439 U.S. 824 (1978), the Court of
Appeals explained that the NPDES permitting process is

16

by nature an adjudicatory one; its purpose is to determine
facts in particular cases, not to promulgate policy-type
rules or standards. 572 F.2d at 876. In Marathon Oil Co. v.
E.P.A., 564 F.2d 1253 (9th Cir. 1977), that Court of Appeals
made similar observations. In contrast to other proceed-
ings under the Clean Water Act, which provide for the
promulgating of technology based effluent limitations, the
NPDES permitting process itself focuses on the adjudica-
tory application of particular effluent limitations to indi-
vidual permittees; it is not designed for the promulgating
of policy-type rules or standards. 564 F.2d at 1262. In
opposition, the State has turned the permitting process
on its head by failing to certify on an individual basis,
and instead improperly promulgating a policy-type rule,
a 0.2ml1/1 settleable solids limitation which it inserted in
each and every one of the 539 NPDES permits.

The State’s failure to certify on an individual basis is
particularly noteworthy since it involves the imposition
of a water quality based effluent limitation, as opposed to
a technology based one. In E.P.A. v. California ex rel. State
Water Resources Control Board, 426 U.S. 200 (1976), Justice
White clearly explained that while technology based
effluent limitations may be imposed on an industry-wide
or group basis, water quality based effluent limitations
must be the result of individualized consideration of the
receiving waters and the situation of the permittee:

Congress contemplated that there may be
some States, which would elect not to develop
an NPDES program but would nonetheless
determine — as § 510 permits - to adopt water
quality standards or other limitations stricter
than those EPA itself has promulgated and
would otherwise apply. This being the case,

17

Congress must have contemplated that the EPA
was capable of issuing permits in that State
. . . and of enforcing those stricter standards.
Some of those standards - in fact all but those
pegged to the quality of the receiving waters — could
be translated into permit conditions for each
discharger without coordinating the conditions
in the other permits, because the effluent limita-
tions in the Amendments are technology based
and the timetable by which compliance is to be
achieved is not made to depend on the perfor-
mance of other dischargers. Other standards, pri-
marily those involving water quality standards,
would require coordination among the permit condi-
tions of numerous pollutors . . . and it is evident that
Congress contemplated that the EPA was capable of
carrying out this function as well.

426 U.S. at 219-20 (emphasis added).

The clear wording of the relevant provision of the
Act is that water quality based effluent limitations must
be “necessary to meet water quality standards.” 33 U.S.C.
§ 1311(b)(1)(c) (emphasis added). The use of the words
“necessary” and “meet” in this context requires an indi-
vidual, site-specific determination of the necessity for a
given water quality based effluent limitation. As such, the
Act does not provide broad license to regulate in the
name of water quality. The power to impose a water
quality based effluent limitation is circumscribed by the
necessity for the limitation being as stringent as it is. Cf.
Natural Resources Defense Council v. E.P.A., 273 U.S. App.
D.C. 240, 859 F.2d 156, 208 (1988).

In sum, the State’s mass certification practice contra-
venes the NPDES permitting process as envisioned in the
Clean Water Act and its implementing regulations. The
Alaska Supreme Court’s decision in this respect is in

18

direct conflict with the provisions of the Act as construed
by this Court and federal courts of appeal. Given the
thousands of NPDES permit certifications which have
occurred under the Clean Water Act, this case stands
alone as the sole reported decision involving a mass
certification. As the Chief Justice observed in another
context, the unprecedented nature of the State’s mass
certification attests not to its correctness but to its error.
Leo Sheep Co. v. United States, 440 U.S. 668, 686 (1979). “It
is some testament to common sense that the present case
is virtually unprecedented.” Id.

Il.

BY FAILING TO CERTIFY WITHIN THE 60-
DAY PERIOD PRESCRIBED BY LAW, THE
STATE WAIVED ANY RIGHT TO CERTIFY
THE NPDES PERMITS.

,

The purpose behind the time requirement in the cer-
tification process is to protect the permittee so that his
application is not frustrated by State delay. House Report
No. 92-911 at 122 (March 11, 1972) (1972 House Report).
When EPA promulgated 40 C.F.R. § 124.53, the Adminis-
trator accordingly explained:

Many commenters objected to the delays
caused by the State certification process in the
NPDES program. Specifically they thought that
the provision in the proposal for potentially
allowing a State one year to certify was uncon-
scionable. In response to those comments the
regulations have been modified so that the right
to certify will be deemed waived unless exer-
cised within a specified reasonable time which
shall not exceed 60 days unless the Regional

19

Administrator finds that unusual circumstances
require a longer time.

44 Fed. Reg. 32880 (emphasis in original).

Under 40 C.FR. § 124.53(c)(3), EPA may, of course,
advise the State that it will have less than 60 days in
which to certify. 42 Fed. Reg. 37115. For the State to
exceed the 60 days, however, the State must first notify
EPA in writing that more time is needed for evaluating the
permit. Id. EPA is not required to grant such a request. /d.

In this case there is no evidence whatsoever that the
State requested by any means, much less in writing, an
extension of the certification period or that EPA granted
this imaginary request. Where, as here, the State fails to
certify within the prescribed period, “then the certifica-
tion requirement is waived.” 1972 House Report at 122
(emphasis added). In the words of the Act, “[iJf the
State . . . refuses to act on a request for certification
within [the prescribed] period of time . . . after receipt of
such request, the certification requirements of this sub-
section shall be waived with respect to such federal appli-
cation.” 33 U.S.C. § 1341(a)(1) (emphasis added); see 40
C.F.R. § 124.53(d). If the State fails to certify within a
required time, waiver is automatic. Environmental Defense
Fund v. Alexander, 501 F.Supp. 742, 771 (N.D.Miss. 1980),
affirmed in part, reversed in part on other grounds, 651 F.2d
983 (5th Cir. 1981), on remand, 554 F.Supp. 451 (N.D.Miss.
1981).

During the case, the State’s arguments have boiled
down to asserting that since EPA accepted the State’s
untimely certification, any challenge to the timeliness of
the State’s certification must be brought before EPA.

2 ey

4 opinmeagy

RIT nde RON EE STII ATT HD

An Ae Qe OR WHS we

App. 131

over again.” 714 P.2d at 581. After analyzing these var-
ious arguments, the Foster court agreed that “the
[agency’s] failure to render and sign its decision under
the terms of the [relevant statute] makes its decision null
and void.” Id. As the court explained:

“The words of [the statute] are mandatory.
There is no room for constru[ction] . . . Where
rulings by the administrative agencies are not in
accord with the basic requirements of the stat-
utes relating to those agencies, the decisions of
the agencies are void. The ninety day period
required under [the statute] expired on August
1, 1984. The [agency’s] decision was not signed
until August 6, 1984, five days after the statu-
tory requirement ended. Because the [agency]
failed to take action within the required ninety day
period, its decision is void and must be reversed. To
rule otherwise would ignore the plain language
of [the statute]’” (sic) Id. (citation omitted)
(emphasis added)

Here, the DEC rendered its decision almost one
month after the expiration of the certification period. (AR
1475, 1477). This action is plainly contrary to the lan-
guage and intent of 40 C.F.R. 125.53(c)(3), that [“]the State
will be deemed to have waived its right to certify unless
that right is exercised within a reasonable time not to
exceed 60 days.” The requirement is not “may” but man-
datory, and the “agency’s failure to follow regulations is
fatal to the deviant action.” Union of Concerned Scientists v.

Atomic Energy Commission, 499 F.2d 1069, 1072 (D.C.Cir.
1974). ;

As a final note, the State may contend, as the Decid-
ing Officer did, that this issue is not one for resolution by
this Court, and that the “argument is really one which

App. 132

would more appropriately be made to the EPA than to the
State.” (AR 1486). Any such contention, however, is
firmly against a string of federal decisions consistently
agreeing that “the proper forum to review the appro-
priateness of a state’s certification is the state court.”
Roosevelt Campebello Intern. Park v. U.S.E.P.A., 684 F.2d
1041, 1056 (1st Cir. 1982); see also United States Steel Corp.
v. Train, 556 F.2d 822, 837-39 & n.22(7th Cir. 1977); Lake
Erie Alliance v. U.S. Army Corps of Engineers, 526 F.Supp.
1063, 1074 (W.D.Pa. 1981), affirmed, 707 F.2d 1392 (3rd Cir.
1983), cert. denied, 464 U.S. 915, 104 S.Ct. 277, 78 L.Ed.2d
257 (1983), Mobil Oil Corp. v. Kelley, 426 F.Supp. 230,
234-35 (S.D.Ala. 1976).

C. Permit Modifications Limited To Turbidity and
Arsenic

When the State and EPA issued their Public Notice of
Proposed Modifications to the 1984 NPDES permits, the
notices made clear that the modifications concerned
solely the effluent limits for turbidity and arsenic, noth-
ing more. (AR 1251-98, 2804E-2804CAA). As to this
action, the Code of Federal Regulations makes explicit
provision that only the terms subject to modification may
be changed. 40 C.FR. __ 122.62. “When a permit is
modified, only the conditions subject to modification are
reopened.” Id. Accordingly, the effluent limitations for
settleable solids were to have been left undisturbed. The
State’s prying open of the settleable solids limitation and
sudden insertion of a different limit is directly contrary to
this basic prohibition and, as such, fatal to the deviant
action. See Union of Concerned Scientists, 499 F.2d at 1072;
Foster, 714 P.2d at 581.

a
4
:

>
5
4
a
*

App. 133

D. Failure to Provide Statement of Degree To Which
Conditions Could Be Made Less Stringent

A pertinent provision of 40 C.FR. ___ 124.53(e)(3)
reads as follows:
State certification shall be in writing and shall
include [a] statement of the extent to which each
condition of the draft permit can be made less strin-
gent without violating the requirements of State law,
including water quality standards. Failure to pro-
vide this statement for any condition waives the
right to certify or object to any less stringent
condition which may be established during the
EPA permit issuance process. (emphasis added)

One will search in vain for any DEC statement in any
permit as to any condition at all which may be made less
stringent without violating State law. The DEC simply
failed on every count to provide the requisite statement,
and as § 124.53(e)(3) explains, must be held to have
waived its right to certify.

When one examines the record, the State’s failure is
all the more blatant since the uncontroverted facts indi-
cate that the impermissibly inserted .2 ml/1 settleable
solids effluent could have been greatly relaxed, depend-
ing on the specific mining site, and that the same holds
for the turbidity effluent, if indeed a turbidity effluent
can ever be justified at all.

1. Disregard of Dilution Ratios for Settleable Solids

In the proceeding before Deciding Officer Ashburn,
evidence was presented, and the Deciding Officer so
found, dilution ratios that ranged from 1:1 to 1:9, depend-
ing on the site-specific of the particular operation. (AR

App. 134

1479). Plugging this information into a mathematical for-
mula, the following equation represents the allowable
effluent on a site-specific basis:

A = .1ml/l x D

where A = Allowable effiuent
D. = dilution factor

.1 ml/l = no measuarable increase at measuring point
downstream?

Thus, where the dilution ration of effluent to receiving
water is 1:1, a .2 ml/1 effluent will satisfy the .1 ml/1 “no
measurable increase” downsiream. However, where the
dilution ratio is 1:9, the .2 ml/l requirement is unduly
harsh since a 1.0 ml/1 effluent will nonetheless satisfy the
.1 ml/l Water Quality Standard (WQS).

2. The Turbidity Un-Effluent

In rendering their decisions, both the DEC and the
Deciding Officer neglected to consider the effects of the 5
NTU turbidity effluent limit in the NPDES permits.
Instead, the .2 ml/1 standard was considered as an iso-
lated effluent limit. (R 1481).

The evidence presented by those well-versed in the
matter established that, though there was some difference
of opinion about the scientific and economic attainability
of the State’s “no measurable increase” standard, the 5

3 This is the applicable State Water Quality Standard
(WQS) for settleable solids. See 18 AAC 70.020(b) (table).

App. 135

NTU effluent limit for turbidity is absolutely unattainable
so as to be confiscatory and effect a taking on its face.
(AR 237-41; AR 246-56; AR 256-318; AR 350-53; AR
354-57) See Agins v. Tiburon, 447 U.S. 255, 100 S.Ct.2138, 65
L.Ed.2d 1061 (1980).

What is most remarkable about the State’s utilization
of the 5 NTU limit is that where the natural turbidity of
the water is more than 50 NTU, the applicable State Water
Quality Standard allows an increase in turbidity of 5 NTU
plus ten (10) percent of the amount that the natural turbidity
of the water exceeds 50 NTU, with a maximum increase of 25
NTU. 18 AAC 70.020(b)(table).

It should further be noted that the 5-25 NTU range
for turbidity set forth at 18 AAC 70.020(b) is a State Water
Quality Standard and not an effluent limit. The 5-25 NTU
range is like the “no measureable (sic) increase” WQS
applicable to settleable solids, see Part IV.D.01. & n.3.,
supra; they both address the WQS to be attained by the
dilution of the effluent prior to the measuring point.
Thus, the same overstringency arises as with the settle-
able solids effluent. Assuming similar dilution rations of
from 1:1 to 1:9, see Part IV.D.1., supra, the allowable turbi-
dity effluents should be from 10 NTU to 250 NTU, with 5
NTU nowhere to be found. To find otherwise would
require the magical assumption that turbidity somehow
propagates exponentially in the course of being diluted.

The real question, however, is what is a turbidity
effluent doing in the permits in the first place? Turbidity
is in essence a measurement of light passing through
water. See 18 AAC 70.020 Notes. It is a condition or
quality of the water, a water quality standard. See Id. at

App. 136

020(b). The Clean Water Act (CWA), however, is not
concerned with regulating the discharge of “conditions”
but with regulating the discharge of “pollutants,” a defi-
nition which “turbidity” simply fails to meet. See National
Wildlife Association v. Gorsuch, 693 F.2d 156, 171-72
(D.C.Cir. 1982). “Clear water is not within the definition
of a pollutant under the CWA.” Orleans Audubon Society v.
Lee, 742 F.2d 901, 910, rehearing en banc denied, 750 F.3d 69
(1984).

Interestingly, the State itself recognized in its certi-
fication decision the inherent contradiction. of utilizing a
State Water Quality Standard as an effluent limit. (AR 3)
The State, however, neglected to take the appropriate step
and strike the turbidity term from the permits.

3. On The Record Requirement Ignored

As MAC discussed in Parts II and III, supra, the
NPDES process is a highly individualized one that is fact
finding and not policy making in nature. See Seacoast
Anti-Pollution League, 572 F.2d at 876-77. Thus, when the
DEC made its permit decisions, it was to have based its
decision on that information contained in the particular
permit, plus the record generated at the public hearings
on the matter. 40 C.F.R. _ 121.2(a)(2); 18 AAC 15.160. As
such, the DEC was to have made its certification deci-
sions on the record in accordance with the information in
the permits and the evidence adduced at the hearings.
Seacoast Anti-Pollution League, 572 F.2d at 877-78. In prac-
tice, however, this requirement was ignored.

‘pp. 137

The person entrusted with formulating the DEC’s
decision, Randolph Bayliss, testified that most of the var-
ious applications for NPDES permits were not even
reviewed at all. (AR 3266). Apparently, the conglome-
rated hearings that were held served as the same mere
formality since the final decision was soleiy the result of
meetings with various concerned parties, discussions
among agency personnel, and information gathered from
Mr. Bayliss’ personal readings and experience. (AR
911-919, 3234-71). This “off the record” certification is the
exact opposite of that contemplated. The DEC was to
have certified “limited to the administrative record as a
basis for decision making.” Herbert, 743 P.2d at 397.
Instead, the agency consciously excluded the record and
made a self-informed policy choice.

The tragedy of the DEC’s method is twofold. Not
only should such decisions be based on the record to
insure reasoned decision making, equally as important,
they are to be based on the record so as to guarantee
meaningful judicial review. Southeast Alaska Conservation
Council v. State, 665 P.2d 544, 549 (Alaska 1983)(SEACC);
Seacoast Anti-Pollution League, 572 F.2d at 876. Practices
such as the DEC’s, then, not only dislocate the permitting
process, they also hamper this Court’s function of engag-
ing in the requisite probing review. See SEACC, 665 P.2d
at 549. They are practices that are never to be condoned.
Where those responsible for rendering a decision are
unfamiliar with the record on which they are to base their
decision, the decision must be set aside. Messer v.
Snohomish County Board of Adjustment, 19 Wash.App. 780,
578 P.2d 50, 59 (Wash.App. 1978).

App. 138

DATED this 16th day of December, 1987, at Fair-
banks, Alaska.

LAW OFFICES OF WILLIAM R.
SATTERBERG, JR.

By /s/ William R. Satterberg, Jr.
William R. Satterberg, Jr.

App. 139

IN THE SUPREME COURT FOR THE
STATE OF ALASKA

MINERS ADVOCACY )
COUNCIL, INC., )

Appellant,

V.

STATE OF ALASKA,
DEPARTMENT OF
ENVIRONMENTAL
CONSERVATION, et al,

Appellee.

TRUSTEES FOR ALASKA;
NORTHERN ALASKA
ENVIRONMENTAL CENTER,

Appellant,

V.

STATE OF ALASKA,
DEPARTMENT OF
ENVIRONMENTAL
CONSERVATION, and DENNIS
KELSO, Commissioner of the
Department of Environmental
Conservation, and MINERS
ADVOCACY COUNCIL, INC.,

Appellees.

en ee ee ee ee ee a a a_i

Supreme Court No. $2369 & $2370
(Superior Court No. 4FA-86-1556 Civil)
(Consolidated with 4FA-86-1690 Civil)

App. 140

REPLY BRIEF OF APPELLANT MINERS
ADVOCACY COUNCIL

LAW OFFICES OF

WILLIAM R. SATTERBERG, JR.
709 Fourth Avenue

Fairbanks, Alaska 99701
Attorney for Appellant, MAC

/s/ William R. Satterberg, Jr.
William R. Satterberg, Jr.

FILED in the Supreme Court
of the State of Alaska
this 29th day of March, 1988.

/s/ Peggy D. Lewis
Deputy Clerk

. * .

B. The DEC Failed To State To What Extent Permit
Conditions Could Be Made Less Stringent.

In the Brief of Appellee at 5-6 and 36-37, the State
continues to maintain that it is under no duty whatsoever
to indicate to what extent individual permit conditions
can be made less stringent and still meet the require-
ments of State law. To the contrary, 40 CFR 124.53(e)(3)
provides that the State must so indicate and a failure to
do so waives the right to certify.

The DEC’s confusion in this regard was recently
noted by the Court in Marathon Oil Co. v. E.P.A., supra, 830
F.2d 1346. In Marathon Oil, DEC, oddly enough, certified
an individual NPDES permit on a very site-specific basis.
See 830 F.2d at 1349-53. During the certification process,
DEC labored unter (sic) the mistaken impression that it
could not relax conditions in an NPDES permit but could
only make them more stringent. See id. at 1351 & n.26,

App. 141

1352 & n.35, 1353. Yet, despite this erroneous conception
of the certification requirements, DEC still rendered that
certification which it claims it may not render here, one
which modified the conditions of the permit so that the
conditions could not be made any less stringent without
violating the requirements of State law. See id. at 1352-53.

When EPA promulgated 40 CFR 124.53(e)(3), the
Administrator explained the purpose of the provision
and that it does indeed mean what it says:

Some problems have resulted from the practice
of certifying draft permits, which practice has
arisen from the practical difficulties of certifying
applications. In particular, certifications have
not always clearly stated exactly what condi-
tions are necessary to comply with State law,
and whether less stringent conditions would
also satisfy State law. The final regulations rem-
edy these problems by requiring states to set
forth in all cases the minimum terms and condi-
tions which will be necessary to comply with
applicable law. For example, if a State certifies a
permit with an effluent limitation imposing a
daily maximum BOD of 25ml/I, it will be
required to identify also a ceiling representing
the minimum level of control, such as 30mg/1 or
40mg/1, which the State finds necessary to com-
ply with State law.

44 Fed.Reg. 32880. EPA recognized the burden this pro-
cedure places upon states, but found any alternative to be
unacceptable. Id.

The result of the State’s failure to indicate the extent
to which the terms of individual’s permits could be
relaxed, yet still comply with State law, has been to
severely prejudice the rights of the individual permittees.

App. 142

Absent the required State statements, EPA has no author-
ity to determine whether limitations certified by the State
are more stringent than required to meet the require-
ments of State law. Roosevelt Campobello, 684 F.2d at 1056.
Thus, when individual miners have attempted to obtain
evidentiary hearings on the extent to which their effluent
limits could be relaxed as to settleable solids, turbidity,
and arsenic, the miners have struck a brick wall. See In the
Matter of: National Pollutant Discharge Elimination System
Permit for 415 Alaska Placer Miners, More or Less, Docket
No. 1087-08-03-402C, Regional Administrators Decision
on Request for Evidentiary Hearing, Attachment C at 1-2
(1987); In the Matter of: National Pollutant Discharge Elim-
ination System Permit for 539 Alaska Placer Miners, More or
Less, Docket No. 1085-06-06-14-402C, Regional Adminis-
trators Decision on Request for Evidentiary Hearing,
Attachment B at 3-4 (January 30, 1987). The Regional
Administrator explained:

Pursuant to Section 401 of the Clean Water Act,
33 U.S.C. § 1341, and 40 CFR § 124.53, the
Alaska Department of Environmental Conserva-
tion certified 0.2ml/1 as the effluent limit for
settleable solids, 5 NTU’s above background for
turbidity and 0.05mg/1 for total arsenic. 33
U.S.C. § 1341 and 40 CFR § 124.55 require that
EPA include as a permit condition any more
stringent effluent limit certified by the state as
necessary to meet the state’s water quality stan-
dards . . . Because EPA lacks jurisdiction to
review permit limitations and conditions attrib-
utable to state certification, the issue of whether
a less stringent limit is required is not a proper
issue for an evidentiary hearing and the request
is denied. See 40 CFR § 124.55(e); In The Matter of

App. 143

Homestake Mining Company, NPDES Appeal No.
84-5 (May 19, 1986).

415 Alaska Placer Miners, supra, Attachment C at 1-2.

* * *

CONCLUSION

DEC has been derelict in its duties. Certification is
intended to be based on full information. Senate Report
No. 91-351 at 28. (August 7, 1969) (hereinafter 1969 Senate
Report). The DEC, however, complains that it does not
have such information, though it has the authority to
obtain such information from the permittees, Id. at 28-29;
18 AAC 15.130(b), but not by imposing unreasonably
burdensome, foreign chores, such as requiring permittees
to perform highly scientific tests or gather complex, tech-
nical data. Marathon Oil v. E.P.A., 564 F.2d at 1253 & n.56
(9th Cir. 1977); 1969 Senate Report at 28; see American
Petroleum Institute, supra, 787 F.2d at 984. It is a question
of where lies the expertise.

Under the CWA, DEC, as the State’s resident expert
on environmental matters, has a duty not only to obtain
sufficient information so that its certifications are “fully
informed,” it has the further duty to engage in a continu-
ing process of planning and information gathering. See
CWA § 303(e), 33 U.S.C. § 1313(e). State law requires
much the same. See AS 46.03.040. This Court has corre-
spondingly recognized that in environmental matters,
“an agency has a continuing duty to gather and evaluate
new information” so that the agency is best able to take
the requisite “hard look” at those problems which do

App. 144

arise in the course of administering its area of law. Alaska
Survival, supra, 723 P.2d at 1287.

To perform its duties, DEC has been granted exten-
sive authority duties. The agency has been empowered to
undertake studies, inquiries, surveys, and analyses in
order to fulfill its legal obligations. AS 46.03.020(5). To
insure that these obligations are met, DEC has authority
to enlist the services of numerous public and private
agencies, including colleges, universities, institutes, foun-
dations, and other research organizations. Id. However, in
this case DEC would leave these resources “in the
ground,” perferring (sic) instead to wave the lazy flag of
“impossiblity” or administrative infeasibility, the so-
called “short cut” doctrine.

Contentions similar to DEC’s were raised by EPA in
Natural Resources Defense Council v. Costle, supra, 568 F.2d
1369 (NRDC). In NRDC, EPA filed a Memorandum on
“Impossiblity,” which raised the spectre of administrative
infeasibility if the CWA was not interpreted according to
EPA’s wishes. 568 F.2d at 1377-78. In the Court’s opinion,
Circuit Judge Leventhal looked with a skeptical eye on
such contentions, especially since EPA, like the State here,
made little if any effort to comply but merely proceeded
as was most convenient. Id. at 1380. Administration
under the CWA is not intended to be easy; it requires
agency effort and creative solutions to difficult problems.

But this ambitious statute is not hospitable to
the concept that the appropriate response to a
difficult problem is not to try atall. ... Imagina-
tion conjoined with determination will likely
give EPA a capability for practicable administra-
tion. If not, the remedy lies with Congress.

NRDC, 568 F.2d at 1380,1383.

App. 145

The solution to the DEC’s administrative problems in
this case lies first with the DEC. Working in cooperation
with EPA, DEC can certainly do better than its present
myopic insistence on the status quo. To make certifica-
tions more manageable, MAC would suggest the
following:

(1) Issue NPDES Permits for a Longer Period

Pursuant to CWA § 402(b)(1)(B), 33 U.S.C.
§ 1342(b)(1)(B), and 40 CFR 122.46(a), NPDES
permits may be issued for five years instead of
the two or three years in this case.

(2) Stagger the Issuance of the Permits

In the present case, the permits were issued so
that all expired at once. [IJf the permits were
issued for five years and staggered, the State
would never have to review more than 20 per-
cent of the permits in a given year, as opposed
to the “all at once” approach in this case.

(3) Incorporate By Reference

Once the State has properly certified a permit,
subsequent certifications of that permit could
incorporate previous findings by reference. New
information would be needed only to the extent
that there were changes or proposed changes in
the activity.

Administrative fears concerning inroads upon
agency habit are rarely borne out in reality. See Baker v.
City of Fairbanks, supra, 471 P.2d at 402. If the DEC puts its
administrative ingenuity, its imagination and determina-
tion to the task, a workable solution will undoubtedly be
found. Should a solution not be forthcoming, the agency’s
redress lies not with this Court but with Congress and/or
the State Legislature. See NRDC, 568 F.2d at 1383; Mara-
thon Oil, supra, 564 F.2d at 1273, and 830 F.2d; cf. Board of

App. 146

Governors, supra, ___ U.S. at ___ n.7, 106 S.Ct. at 689 n.7,
88 L.Ed.2d at 703 n.7.

WHEREFORE, MAC respectfully prays that the court
reverse the decisions of the Superior Court and the
Deciding Officer, hold that the State of Alaska waived its
right to certify 1985 NPDES placer mining permits, hold
that the .2ml1/1 settleable solids effluent is otherwise null
and void as being both an improperly promulgated “reg-
ulation” and an arbitrarily and otherwise illegally inser-
ted permit term, hold that the 5 NTU turbidity effluent is
null and void as an overly stringent and otherwise imper-
missible effluent limit, and further that the Court hold
that the original .7/1.5m1/! settieable solids effluent shall
remain the enforceable figure until such time as the DEC
obtains the requisite information and properly certifies
future NPDES permits on a permit-by-permit, site-spe-
cific basis.

DATED this 3rd day of March, 1988, at Fairbanks, |
Alaska.

LAW OFFICES OF WILLIAM R.
SATTERBERG, JR.

/s/ William R. Satterberg, Jr.
William R. Satterberg, Jr.

App. 147

APPENDIX N
PLACER MINING HEARING
Day One - 2/3/86

MARK ASHBURN
: Deciding Officer

APPEARANCES:
Trustees for Alaska Eric Smith
Miner’s Advocacy Council William Satterberg
Miner’s Representative Ann Rhian
State Department of
Environmental Conservation John McDonaugh

HEARING OFFICER: ... And so I guess what I’d ask you
to address is this notion that if you establish that predi-
cate, that it’s not necessary to meet water quality stan-
dards, do your clients still, are your clients still in
jeopardy such that you would -um- advise them not to
testify, I, 1, my inclination is to go forward at the hearing
because I don’t see what, I don’t see the problem as going
away for a number of years, and if we are going to have
the hearing, I think we should have it, if in April the
problem will, for practical purposes, probably be -um-,
probably not be there -um- it seems to me your client
still would face a difficult -uh- choice, that if they are,
were going to testify and offer evidence that would
essentially make the EPA’s case, that that would be some-
thing that would be as, as much a jeopardy then as now.

App. 148

APPENDIX O

CONSTITUTIONAL PROVISIONS, STATUTES,
AND REGULATIONS INVOLVED

The United States Constitution, Amendment V
provides:

No person shall be held to answer for a
capital, or otherwise infamous crime, unless on
a presentment or indictment of a grand jury,
except in cases arising in the land or naval
forces, or in the militia, when in actual service in
time of war or public danger; nor shall any
person be subject for the same offence to be
twice put in jeopardy of life or limb; nor shall be
compelled in any criminal case to be a witness
against himself; nor be deprived of life, liberty,
or property, without due process of law; nor
shall private property be taken for public use, with-
out just compensation.

The United States Constitution, Amendment XIV,
§ 1 provides:

All persons born or na‘uralized in the
United States, and subject to the jurisdiction
thereof, are citizens of the United States and of
the state wherein they reside. No state shall
make or enforce any law which shall abridge the
privileges or immunities of citizens of the
United States; nor shall any state deprive any per-
son of life, liberty, or property, without due process
of law; nor deny to any person within its juris-
diction the equal protection of the laws.~

App. 149

33 U.S.C. § 1311(b)(1)(C) provides:

Effluent limitations

* * *

(b) Timetable for achievement of objectives

In order to carry out the objective of this chapter
there shall be achieved —-

73° 7

(C) Not later than July 1, 1977, any more stringent
limitation, including those necessary to meet water qual-
ity standards, treatment standards, or schedules of com-
pliance, established pursuant to any State law or
regulations (under authority preserved by section 1370 of
this title) or any other Federal law or regulation, or
required to implement any applicable water quality stan-
dard established pursuant to this chapter.

33 U.S.C. § 1341 provides:
Certification

(a) Compliance with applicable requirements; applica-
tion; procedures; license suspension

(1) Any applicant for a Federal license or permit to
conduct any activity including, but not limited to, the
construction or operation of facilities, which may result
in any discharge into the navigable waters, shall provide
the licensing or permitting agency a certification from the
State in which the discharge originates or will originate,
or, if appropriate, from the interstate water pollution
control agency having jurisdiction over the navigable
waters at the point where the discharge originates or will
originate, that any such discharge will comply with the

App. 150

applicable provisions of sections 1311, 1312, 1313, 1316,
and 1317 of this title. In the case of any such activity for
which there is not an applicable effluent limitation or
other limitation under sections 1311(b) and 1312 of this
title, and there is not an applicable standard under sec-
tions 1316 and 1317 of this title, the State shall so certify,
except that any such certification shall not be deemed to
satisfy section 1371(c) of this title. Such State or interstate
agency shall establish procedures for public notice in the
case of all applications for certification by it and, to the
extent it deems appropriate, procedures for public hear-
ings in connection with specific applications. In any case
where a State or interstate agency has no authority to
give such a certification, such certification shall be from
the Administrator. If the State, interstate agency, or
Administrator, as the case may be, fails or refuses to act
on a request for certification, within a reasonable period
of time (which shall not exceed one year) after receipt of
such request, the certification requirements of this sub-
section shall be waived with respect to such Federal
application. No license or permit shall be granted until
the certification required by this section has been
obtained or has been waived as provided in the preced-
ing sentence. No license or permit shall be granted if
certification has been denied by the State, interstate
agency, or the Administrator, as the case may be.

(2) Upon receipt of such application and certifica-
tion the licensing or permitting agency shall immediately
notify the Administrator of such application and certifica-
tion. Whenever such a discharge may affect, as deter-
mined by the Administrator, the quality of the waters of
any other State, the Administrator within thirty days of

App. 151

the date of notice of application for such Federal license
or permit shall so notify such other State, the licensing or
permitting agency, and the applicant. If, within sixty days
after receipt of such notification, such other State deter-
mines that such discharge will affect the quality of its
waters so as to violate any water quality requirements in
such State, and within such sixty-day period notifies the
Administrator and the licensing or permitting agency in
writing of its objection to the issuance of such license or
permit and requests a public hearing on such objection,
the licensing or permitting agency shall hold such a hear-
ing. The Administrator shall at such hearing submit his
evaluation and recommendations with respect to ‘any
such objection to the licensing or permitting agency. Such
agency, based upon the recommendations of such State,
the Administrator, and upon any additional evidence, if
any, presented to the agency at the hearing, shall condi-
tion such license or permit in such manner as may be
necessary to insure compliance with applicable water
quality requirements. If the imposition of conditions can-
not insure such compliance such agency shall not issue
such license or permit.

(3) The certification obtained pursuant to paragraph
(1) of this subsection with respect to the construction of
any facility shall fulfill the requirements of this subsec-
tion with respect to certification in connection with any
other Federal license or permit required for the operation
of such facility unless, after notice to the certifying State,
agency, or Administrator, as the case may be, which shall
be given by the Federal agency to whom application is
made for such operating license or permit, the State, or if
appropriate, the interstate agency or the Administrator,

App. 152

notifies such agency within sixty days after receipt of
such notice that there is no longer reasonable assurance
that there will be compliance with the applicable provi-
sions of sections 1311, 1312, 1313, 1316, and 1317 of this
title because of changes since the construction license or
permit certification was issued in (A) the construction or
operation of the facility, (B) the characteristics of the
waters into which such discharge is made, (C) the water
quality criteria applicable to such waters or (D) applica-
ble effluent limitations or other requirements. This para-
graph shall be inapplicable in any case where the
applicant for such operating license or permit has failed
to provide the certifying State, or, if appropriate, the
interstate agency or the Administrator, with notice of any
proposed changes in the construction or operation of the
facility with respect to which a construction license or
permit has been granted, which changes may result in
violation of section 1311, 1312, 1313, 1316, or 1317 of this
title.

(4) Prior to the initial operation of any federally
licensed or permitted facility or activity which may result
in any discharge into the navigable waters and with
respect to which a certification has been obtained pur-
suant to paragraph (1) of this subsection, which facility or
activity is not subject to a Federal operating license or
permit, the licensee or permittee shall provide an oppor-
tunity for such certifying State, or, if appropriate, the
interstate agency or the Administrator to review the man-
ner in which the facility or activity shall be operated or
conducted for the purposes of assuring that applicable
effluent limitations or other limitations or other applica-
ble water quality requirements will not be violated. Upon

App. 153

notification by the certifying State, or if appropriate, the
interstate agency or the Administrator that the operation
of any such federally licensed or permitted facility or
activity will violate applicable effluent limitations or
other limitations or other water quality requirements
such Federal agency may, after public hearing, suspend
such license or permit. If such license or permit is sus-
pended, it shall remain suspended until notification is
received from the certifying State, agency, or Administra-
tor, as the case may be, that there is reasonable assurance
that such facility or activity will not violate the applicable
provisions of section 1311, 1312, 1313, 1316, or 1317 of
this title.

(5) Any Federal license or permit with respect to
which a certification has been obtained under paragraph
(1) of this subsection may be suspended or revoked by —
the Federal agency issuing such license or permit upon
the entering of a judgment under this chapter that such
facility or activity has been operated in violation of the
applicable provisions of section 1311, 1312, 1313, 1316, or
1317 of this title.

(6) Except with respect to a permit issued under
section 1342 of this title, in any case where actual con-
struction of a facility has been lawfully commenced prior
to April 3, 1970, no certification shall be required under
this subsection for a license or permit issued after April 8,
1970, to operate such facility, except that any such license
Or permit issued without certification shall terminate
April 3, 1973, unless prior to such termination date the

App. 154

person having such license or permit submits to the Fed-
eral agency which issued such license or permit a
certification and otherwise meets the requirements of this
section.

(b) Compliance with other provisions of law setting
applicable water quality requirements

Nothing in this section shall be construed to limit the
authority of any department or agency pursuant to any
other provision of law to require compliance with any
applicable water quality requirements. The Administrator
shall, upon the request of any Federa' department or
agency, or State or interstate agency, or applicant, pro-
vide, for the purpose of this section, any relevant infor-
mation on applicable effluent limitations, or other
limitations, standards, regulations, or requirements, or
water quality criteria, and shall, when requested by any
such department or agency or State or interstate agency,
or applicant, comment on any methods to comply with-
such limitations, standards, regulations, requirements, or
criteria.

(c) Authority of Secretary of the Army to permit use of
spoil disposal areas by Federal Licensees or
permittees

In order to implement the provisions of this section,
the Secretary of the Army, acting through the Chief of
Engineers, is authorized, if he deems it to be in the public
interest, to permit the use of spoil disposal areas under
his jurisdiction by Federal licensees or permittees, and to
make an appropriate charge for such use. Moneys

App. 155

received from such licensees or permittees shall be depos-
ited in the Treasury as miscellaneous receipts.

(d) Limitations and monitoring requirements of
certification

Any certification provided under this section shall
set forth any effluent limitations and other limitations,
and monitoring requirements necessary to assure that
any applicant for a Federal license or permit will comply
with any applicable effluent limitations and other limita-
tions, under section 1311 or 1312 of this title, standard of
performance under section 1316 of this title, or prohibi-
tion, effluent standard, or pretreatment standard under
section 1317 of this title, and with any other appropriate
requirement of State law set forth in such certification,
and shall become a condition on any Federal license or
permit subject to the provisions of this section.

33 U.S.C. § 1342(a)-(c) provides:

National pollutant discharge
elimination system

(a) Permits for discharge of pollutants

(1) Except as provided in sections 1328 and 1344 of
this title, the Administrator may, after opportunity for
public hearing, issue a permit for the discharge of any
pollutant, or combination of pollutants, notwithstanding
section 1311(a) of this title, upon condition that such
discharge will meet either (A) all applicable requirements
under sections 1311, 1312, 1316, 1317, 1318, and 1343 of
this title, or (B) prior to the taking of necessary imple-
menting actions relating to all such requirements, such

App. 156

conditions as the Administrator determines are necessary
to carry out the provisions of this chapter.

(2) The Administrator shall prescribe conditions for
such permits to assure compliance with the requirements
of paragraph (1) of this subsection, including conditions
on data and information collection, reporting, and such
other requirements as he deems appropriate.

(3) The permit program of the Administrator under
paragraph (1) of this subsection, and permits issued
thereunder, shall be subject to the same terms, conditions,
and requirements as apply to a State permit program and
permits issued thereunder under subsection (b) of this
section.

(4) All permits for discharges into the navigable
waters issued pursuant to section 407 of this title shall be
deemed to be permits issued under this subchapter, and
permiis issued under this subchapter shall be deemed to
be permits issued under section 407 of this title, and shall
continue in force and effect for their term unless revoked,

~——tnrodified, or suspended in accordance with the provi-
sions of this chapter.

(5) No permit for a discharge into the navigable
waters shall be issued under section 407 of this title after
October 18, 1972. Each application for a permit under
section 407 of this title, pending on October 18, 1972, shall
be deemed to be an application for a permit under this
section. The Administrator shall authorize a State, which
he determines has the capability of administering a per-
mit program which will carry out the objectives of this
chapter to issue permits for discharges into the navigable

App. 157

waters within the jurisdiction of such State. The Adminis-
trator may exercise the authority granted him by the
preceding sentence only during the period which begins
on October 18, 1972, and ends either on the ninetieth day
after the date of the first promulgation of guidelines
required by section 1314(i)(2) of this title, or the date of
approval by the Administrator of a permit program for
such State under subsection (b) of this section, whichever
date first occurs, and no such authorization to a State
shall extend beyond the last day of such period. Each
such permit shall be subject to such conditions as the
Administrator determines are necessary to carry out the
provisions of this chapter. No such permit shall issue if
the Administrator objects to such issuance.

(b) State permit programs

At any time after the promulgation of the guidelines
required by subsection (i)(2) of section 1314 of this title,
the Governor of each State desiring to administer its own
permit program for discharges into navigable waters
within its jurisdiction may submit to the Administrator a
full and complete description of the program it proposes
to establish and administer under State law or under an
interstate compact. In addition, such State shall submit a
statement from the attorney general (or the attorney for
those State water pollution control agencies which have
independent legal counsel), or from the chief legal officer
in the case of an interstate agency, that the laws of such
State, or the interstate compact, as the case may be,
provide adequate authority to carry out the described

App. 158

program. The Administrator shall approve each submit-
ted program unless he determines that adequate author-
ity does not exist:

(1) To issue permits which -

(A) apply, and insure compliance with, any applica-
ble requirements of sections 1311, 1312, 1316, 1317, and
1343 of this title;

(B) are for fixed terms not exceeding five years; and

(C) can be terminated or modified for cause includ-
ing, but not limited to, the following:

(i) violation of any condition of the permit;

(ii) obtaining a permit by misrepresenta-
tion, or failure to disclose fully all relevant facts;

(iii) change in any condition that requires
either a temporary or permanent reduction or
elimination of the permitted discharge;

(D) control the disposal of pollutants into wells;

(2)(A) To issue permits which apply, and insure
compliance with, all applicable requirements of section
1318 of this title; or

(B) To inspect, monitor, enter, and require reports to
at least the same extent as required in section 1318 of this
title;

(3) To insure that the public, and any other State the
waters of which may be affected, receive notice of each
application for a permit and to provide an opportunity
for public hearing before a ruling on each such
application;

App. 159

(4) To insure that the Administrator receives notice

of each application (including a copy thereof) for a
permit;

(5) To insure that any State (other than the permit-
ting State), whose waters may be affected by the issuance
of a permit may submit written recommendations to the
permitting State (and the Administrator) with respect to
any permit application and, if any part of such written
recommendations are not accepted by the permitting
State, that the permitting State will notify such affected
State (and the Administrator) in writing of its failure to
so accept such recommendations together with its reasons
for so doing;

(6) To insure that no permit will be issued if, in the
judgment of the Secretary of the Army acting through the
Chief of Engineers, after consultation with the Secretary
of the department in which the Coast Guard is operating,
anchorage and navigation of any of the navigable waters
would be substantially impaired thereby;

(7) To abate violations of the permit or the permit
program, including civil and criminal penalties and other
ways and means of enforcement;

(8) To insure that any permit for a discharge from a
publicly owned treatment works includes conditions to
require the identification in terms of character and vol-
ume of pollutants of any significant source introducing
pollutants subject to pretreatment standards under sec-
tion 1317(b) of this title into such works and a program to
assure compliance with such pretreatment standards by
each such source, in addition to adequate notice to the
permitting agency of (A) new introductions into such

App. 160

works of pollutants from any source which would be a
new source as defined in section 1316 of this title if such
source were discharging pollutants, (B) new introduc-
tions of pollutants into such works from a source which
would be subject to section 1311 of this title if it were
discharging such pollutants, or (C) a substantial change
in volume or character of pollutants being introduced
into such works by a source introducing pollutants into
such works at the time of issuance of the permit. Such
notice shall include information on the quality and quan-
tity of effluent to be introduced into such treatment
works and any anticipated impact of such change in the
quantity or quality of effluent to be discharged from such
publicly owned treatment works; and

(9) To insure that any industrial user of any publicly
owned treatment works will comply with sections
1284(b), 1317, and 1318 of this title.

(c) Suspension of Federal program upon submission of
State program; withdrawal of approval of State pro-
gram; return of State program to Administrator

(1) Not later than ninety days after the date on which
a State has submitted a program (or revision thereof)
pursuant to subsection (b) of this section, the Administra-
tor shall suspend the issuance of permits under subsec-
tion (a) of this section as to those discharges subject to
such program unless he determines that the State permit
program does not meet the requirements of subsection (b)
of this section or does not conform to the guidelines
issued under section 1314(i)(2) of this title. If the Admin-
istrator so determines, he shall notify the State of any

App. 161

revisions or modifications necessary to conform to such
requirements or guidelines.

(2) Any State permit program under this section
shall at all times be in accordance with this section and

guidelines promulgated pursuant to section 1314(i)(2) of
this title.

(3) Whenever the Administrator determines after
public hearing that a State is not administering a program
approved under this section in accordance with require-
ments of this section, he shall so notify the State and, if
appropriate corrective action is not taken within a reason-
able time, not to exceed ninety days, the Administrator
shall withdraw approval of such program. The Adminis-
trator shall not withdraw approval of any such program
unless he shall first have notified the State, and made
public, in writing, the reasons for such withdrawal.

(4) Limitations on partial permit program returns and
withdrawals. -

A State may return to the Administrator administra-
tion, and the Administrator may withdraw under para-
graph (3) of this subsection approval, of -

(A) a State partial permit program
approved under subsection (n)(3) of this section
only if the entire permit program being adminis-
tered by the State department or agency at the
time is returned or withdrawn; and

(B) a State partial permit program
approved under subsection (n)(4) of this section
only if an entire phased component of the per-
mit program being administered by the State at
the time is returned or withdrawn. |

App. 162

40 C.ER. § 121.2(a)(2)-(3) provides:

Contents of certification.

(a) A certification made by a certifying agency shall
include the following:

* * *

(2) A statement that the certifying agency has either
(i) examined the application made by the applicant to the
licensing or permitting agency (specifically identifying
the number or code affixed to such application) and bases
its certification upon an evaluation of the information
contained in such application which is relevant to water
quality considerations, or (ii) examined other information
furnished by the applicant sufficient to permit the certify-
ing agency to make the statement described in paragraph
(a)(3) of this section;

(3) A statement that there is a reasonable assurance
that the activity will be conducted in a manner which will
not violate applicable water quality standards.

40 C.F.R. § 122.62 provides in relevant part:

Modification or revocation and.
reissuance of permits

* * ~

When the Director receives any information (for
example, inspects the facility, receives information sub-
mitted by the permittee as required in the permit (see
§ 122.41), receives a request for modification or revoca-
tion and reissuance under § 124.5, or conducts a review of
the permit file) he or she may determine whether or not
one or more of the causes listed in paragraphs (a) and (b)

App. 163

of this section for modification or revocation and reis-
suance or both exist. If cause exists, the Director may
modify or revoke and reissue the permit accordingly,
subject to the limitations of paragraph (c) of this section,
and may request an updated application if necessary.
When a permit is modified, only the conditions subject to
modification are reopened. If a permit is revoked and reis-
sued, the entire permit is reopened and subject to revi-
sion and the permit is reissued for a new term. See
§ 124.5(c)(2). If cause does not exist under this section or
§ 122.63, the Director shall not modify or revoke and
reissue the permit. If a permit modification satisfies the
criteria in § 122.63 for “minor modifications” the permit
may be modified without a draft permit or public review.
Otherwise, a draft permit must be prepared and other
procedures in Part 124 (or procedures of an approved
State program) followed.

40 C.ER. § 124.53 provides:

State certification.

(a) Under CWA section 401(a)(1), EPA may not issue
a permit until a certification is granted or waived in
accordance with that section by the State in which the
discharge originated or will originate.

(b) Applications received without a State certifica-
tion shall be forwarded by the Regional Administrator to
the certifying State Agency with a request that certifica-
tion be granted or denied.

(c) If State certification has not been received by the
time the draft permit is prepared, the Regional Adminis-
trator shall send the certifying State agency;

App. 164

(1) A copy of a draft permit;

(2) A statement that EPA cannot issue or deny the
permit until the certifying State agency has granted or
denied certification under § 124.55, or waived its right to
certify; and

(3) A statement that the State will be deemed to
have waived its right to certify unless that right is exer-
cised within a specified reasonable time not to exceed 60
days from the date the draft permit is mailed to the
certifying State agency unless the Regional Administrator
finds that unusual circumstances require a longer time.

(d) State certification shall be granted or denied
within the reasonable time specified under paragraph
(c)(3) of this section. The State shall send a notice of its
action, including a copy of any certification, to the appli-
cant and the Regional Administrator.

(e) State certification shall be in writing and shall
include:

(1) Conditions which are necessary to assure com-
pliance with the applicable provisions of CWA sections
208(e), 301, 302, 303, 306, and 307 and with appropriate
requirements of State law:

(2) When the State certifies a draft permit instead of
a permit application, any conditions more stringent than
those in the draft permit which the State finds necessary
to meet the requirements listed in paragraph (e)(1) of this
section. For each more stringent condition, the certifying
State agency shall cite the CWA or State law references
upon which that condition is based. Failure to provide

App. 165

such a citation waives the right to certify with respect to
that condition; and

(3) A statement of the extent to which each condi-
tion of the draft permit can be made less stringent with-
out violating the requirements of State law, including
water quality standards. Failure to provide this statement
for any condition waives the right to certify or object to
any less stringent condition which may be established
during the EPA permit issuance process.

40 C.ER. § 124.55(b) provides:

Effect of State certification.

* * *

(b) If there is a change in the State law or regulation
upon which a certification is based, or if a court of
competent jurisdiction or appropriate State board or
agency stays, vacates, or remands a certification, a State
which has issued a certification under § 124.53 may issue
a modified certification or notice of waiver and forward it
to EPA. If the modified certification is received before
final agency action on the permit, the permit shall be
consistent with the more stringent conditions which are
based upon State law identified in such certification. If
the certification or notice of waiver is received after final
agency action on the permit, the Regional Administrator
may modify the permit on request of the permittee only
to the extent necessary to delete any conditions based on
a condition in a certification invalidated by a court of
competent jurisdiction or by an appropriate State board
or agency.

---

Source: Frix Law Library, https://www.frixlaw.com/law-library/documents/brief%3Amicro_IA40385020_0820%3A1. Public record. Not legal advice.